HomeMy WebLinkAbout303310-002 2023-02-17 City of SLO Parking Structure 1A-CMP-MMEarth Systems Pacific DAILY FIELD REPORT
Date:
Map/Sketch:
NOTE: No guarantee or warranty of the contractor's work is made, expressed or implied.Field Rep: Mark Meeks
Test Location Depth/
Elevation (ft)Moisture (%)Dry Density
(pcf)
Max Dry
Density (pcf)
Relative
Comp. (%)
Rel. Comp.
Spec
Failing Test *
Passing
Retest **
EQUIPMENT ONSITE:
Summary: Onsite am. I retested the failed compaction tests taken on 2/16/23 on the Comm line
trench and vault # 5 at different elevations. 95% compaction is required 6" above top of pipe per
City of Slo Trench detail. I also tested the fill being placed within trench along Broad street. All
retests and comp tests taken today met passing requirements
Test Only Retaining Wall Other
Density
STD:25073 Moisture
STD:9728Observation & Testing
Nuc. Gauge Make: CPN
Nuc. Gauge Model No. 5995Building Pad Parking/Roadway
Observation Embankment Trench Backfill
TYPE OF WORK
Project Name:
Project Location:
Project Manager:
Copies To:
SEC of Palm and Nipomo Streets
R. Down
ESP
City of San Luis Obispo - Cultural Arts Parking Structure 1A
2/17/2023
JMCContractor:
Bill F.Met With:
Project No.:
OSHPD No.:
DSA File:
DSA App.:
303310-002
0
N/A
N/A
San Luis Obispo Santa Maria
(805) 544-3276 (805) 928-2991
(805) 544-1786 fax (805) 928-9253 fax
Hollister Fremont
(831) 637-2133 (510) 353-3883
(831) 637-0510 fax (888) 567-4293 fax