Loading...
HomeMy WebLinkAbout303310-002 2023-02-17 City of SLO Parking Structure 1A-CMP-MMEarth Systems Pacific DAILY FIELD REPORT Date: Map/Sketch: NOTE: No guarantee or warranty of the contractor's work is made, expressed or implied.Field Rep: Mark Meeks Test Location Depth/ Elevation (ft)Moisture (%)Dry Density (pcf) Max Dry Density (pcf) Relative Comp. (%) Rel. Comp. Spec Failing Test * Passing Retest ** EQUIPMENT ONSITE: Summary: Onsite am. I retested the failed compaction tests taken on 2/16/23 on the Comm line trench and vault # 5 at different elevations. 95% compaction is required 6" above top of pipe per City of Slo Trench detail. I also tested the fill being placed within trench along Broad street. All retests and comp tests taken today met passing requirements Test Only Retaining Wall Other Density STD:25073 Moisture STD:9728Observation & Testing Nuc. Gauge Make: CPN Nuc. Gauge Model No. 5995Building Pad Parking/Roadway Observation Embankment Trench Backfill TYPE OF WORK Project Name: Project Location: Project Manager: Copies To: SEC of Palm and Nipomo Streets R. Down ESP City of San Luis Obispo - Cultural Arts Parking Structure 1A 2/17/2023 JMCContractor: Bill F.Met With: Project No.: OSHPD No.: DSA File: DSA App.: 303310-002 0 N/A N/A San Luis Obispo Santa Maria (805) 544-3276 (805) 928-2991 (805) 544-1786 fax (805) 928-9253 fax Hollister Fremont (831) 637-2133 (510) 353-3883 (831) 637-0510 fax (888) 567-4293 fax 1 2 3 467 Montery Street 1 2 3 4 5 6 Palm Street Broad st