HomeMy WebLinkAbout06-26-2024 PC Agenda Packet
Planning Commission
AGENDA
Wednesday, June 26, 2024, 6:00 p.m.
Council Chambers, 990 Palm Street, San Luis Obispo
The Planning Commission holds in-person meetings. Zoom participation will not be supported at this
time. Planning Commission meetings can be viewed remotely on Channel 20 and the City’s YouTube
Channel: http://youtube.slo.city
INSTRUCTIONS FOR PUBLIC COMMENT:
Public Comment prior to the meeting (must be received 3 hours in advance of the meeting):
Mail - Delivered by the U.S. Postal Service. Address letters to the City Clerk's Office at 990
Palm Street, San Luis Obispo, California, 93401.
Email - Submit Public Comments via email to advisorybodies@slocity.org. In the body of your
email, please include the date of the meeting and the item number (if applicable). Emails will not
be read aloud during the meeting.
Voicemail - Call (805) 781-7164 and leave a voicemail. Please state and spell your name, the
agenda item number you are calling about, and leave your comment. Verbal comments must be
limited to 3 minutes. Voicemails will not be played during the meeting.
*All correspondence will be archived and distributed to members, however, submissions received
after the deadline may not be processed until the following day.
Public Comment during the meeting:
Meetings are held in-person. To provide public comment during the meeting, you must be
present at the meeting location.
Electronic Visual Aid Presentation. To conform with the City's Network Access and Use Policy,
Chapter 1.3.8 of the Council Policies & Procedures Manual, members of the public who desire
to utilize electronic visual aids to supplement their oral presentation must provide display-ready
material to the City Clerk by 12:00 p.m. on the day of the meeting. Contact the City Clerk's
Office at cityclerk@slocity.org or (805) 781-7114.
Pages
1.CALL TO ORDER
Chair Cooley will call the Regular Meeting of the Planning Commission to order.
2.PUBLIC COMMENT FOR ITEMS NOT ON THE AGENDA
At this time, people may address the Commission about items not on the
agenda. Comments are limited to three minutes per person. Items raised at this
time are generally referred to staff and, if action by the Commission is
necessary, may be scheduled for a future meeting.
3.CONSENT
Matters appearing on the Consent Calendar are expected to be non-
controversial and will be acted upon at one time. A member of the public may
request the Planning Commission to pull an item for discussion. The public may
comment on any and all items on the Consent Agenda within the three-minute
time limit.
3.a CONSIDERATION OF MINUTES - JUNE 12, 2024 PLANNING
COMMISSION MINUTES
5
Recommendation:
To approve the Planning Commission Minutes of June 12, 2024.
4.PUBLIC HEARINGS
Note: Any court challenge to the action taken on public hearing items on this
agenda may be limited to considering only those issues raised at the public
hearing or in written correspondence delivered to the City of San Luis Obispo at,
or prior to, the public hearing. If you wish to speak, please give your name and
address for the record. Please limit your comments to three minutes; consultant
and project presentations limited to six minutes.
4.a 1925 SANTA BARBARA AVENUE (APPL-0232-2024) APPEAL OF THE
COMMUNITY DEVELOPMENT DIRECTOR'S DECISION TO
APPROVE ARCHITECTURAL REVIEW APPLICATION ARCH-0448-
2022
11
Recommendation:
Adopt the Draft Resolution denying the appeal and upholding the
decision of the Community Development Director approving the Minor
Development Review application ARCH-0448-2022.
4.b 10 HIGUERA STREET (ARCH-0358-2023) REVIEW OF A NEW
MIXED-USE PROJECT THAT CONTAINS APPROXIMATELY 23,164
SQUARE FEET OF COMMERCIAL SPACE AND A ONE
BEDROOM RESIDENTIAL UNIT, WITH ASSOCIATED SITE
IMPROVEMENTS
59
Recommendation:
Adopt the Draft Resolution approving the proposed new mixed-use
project, associated site design and improvements, sign program, and
the removal of two trees based on findings and subject to conditions of
approval. This project is categorically exempt from environmental review
under CEQA Guidelines section 15332 (Class 32, Infill Development
Projects).
5.COMMENT AND DISCUSSION
5.a STAFF UPDATES AND AGENDA FORECAST
Receive a brief update from Senior Planner Rachel Cohen.
6.ADJOURNMENT
The next Regular Meeting of the Planning Commission is scheduled for July 10,
2024 at 6:00 p.m. in the Council Chambers at City Hall, 990 Palm Street, San
Luis Obispo.
LISTENING ASSISTIVE DEVICES for the hearing impaired--see the Clerk
The City of San Luis Obispo wishes to make all of its public meetings accessible
to the public. Upon request, this agenda will be made available in appropriate
alternative formats to persons with disabilities. Any person with a disability who
requires a modification or accommodation in order to participate in a meeting
should direct such request to the City Clerk’s Office at (805) 781-7114 at least
48 hours before the meeting, if possible. Telecommunications Device for the
Deaf (805) 781-7410.
Planning Commission meetings are televised live on Charter Channel 20 and on
the City's YouTube Channel: www.youtube.com/CityofSanLuisObispo. Agenda
related writings or documents provided to the Planning Commission are
available for public inspection on the City’s website:
https://www.slocity.org/government/mayor-and-city-council/agendas-and-
minutes.
1
Planning Commission Minutes
June 12, 2024, 6:00 p.m.
Council Chambers, 990 Palm Street, San Luis Obispo
Planning
Commissioners
Present:
Commissioner Sheryl Flores, Commissioner Bob Jorgensen,
Commissioner Steve Kahn, Commissioner Eric Tolle, Vice Chair
Dave Houghton
PC Absent: Commissioner Juan Munoz-Morris, Chair Justin Cooley
City Staff Present: Deputy Community Development Director Tyler Corey, Assistant
City Attorney Markie Kersten, Megan Wilbanks, Deputy City
Clerk
_____________________________________________________________________
1. CALL TO ORDER
A Regular Meeting of the San Luis Obispo Planning Commission was called to
order on June 12, 2024 at 6:00 p.m. in the Council Chambers at City Hall, 990
Palm Street, San Luis Obispo, by Vice Chair Houghton.
2. PUBLIC COMMENT FOR ITEMS NOT ON THE AGENDA
Public Comment:
None
--End of Public Comment--
3. CONSENT
3.a CONSIDERATION OF MINUTES - MAY 8, 2024 PLANNING
COMMISSION MINUTES
Motion By Commissioner Tolle
Second By Commissioner Kahn
To approve the Planning Commission Minutes of May 8, 2024.
Ayes (5): Commissioner Flores, Commissioner Jorgensen, Commissioner
Kahn, Commissioner Tolle, and Vice Chair Houghton
Absent (2): Commissioner Munoz-Morris, and Chair Cooley
CARRIED (5 to 0)
Page 5 of 98
2
4. PUBLIC HEARINGS
4.a REVIEW CONDITIONAL USE PERMIT (USE-0331-2023) TO ESTABLISH
A FRATERNITY FOR UP TO 24 RESIDENTS, INCLUDING A REQUEST
TO PROVIDE TWO (2) PARKING SPACES IN TANDEM ON AN
EXISTING DRIVEWAY; THE PROJECT IS EXEMPT FROM
ENVIRONMENTAL REVIEW
Commissioner Kahn provided ex-parte disclosure and announced that he
visited site on Monday, June 10th and spoke with residents.
Vice Chair Houghton provided ex-parte disclosure and announced that he
visited the site on Wednesday, June 12th and discussed the proposal with
the Applicant, Thomas Symer.
Associate Planner Hannah Hanh presented the staff report and responded
to Commission inquiries.
The Applicant, Thomas Symer, provided a brief overview of the project and
responded to questions raised.
Vice Chair Houghton opened the Public Hearing
Public Comment:
Kathie Walker
Sandra Rowley
Steven Walker
--End of Public Comment--
Vice Chair Houghton closed Public Comment
Motion By Commissioner Kahn
Second By Commissioner Jorgensen
Adopt the Draft Resolution approving the project, which is categorically
exempt from environmental review under Section 15301 (Existing
Facilities) of the California Environmental Quality Act (CEQA) Guidelines,
with the added conditions listed below.
"A RESOLUTION OF THE CITY OF SAN LUIS OBISPO PLANNING
COMMISSION APPROVING A CONDITIONAL USE PERMIT TO
ESTABLISH A FRATERNITY AT 1264 AND 1264 ½ EAST FOOTHILL
BOULEVARD AND 1241, 1243, 1249, AND 1251 MONTE VISTA PLACE.
THE PROJECT INCLUDES A REQUEST TO PROVIDE TWO (2)
PARKING SPACES IN TANDEM ON AN EXISTING DRIVEWAY ALONG
Page 6 of 98
3
EAST FOOTHILL BOULEVARD. THE PROJECT IS EXEMPT FROM
ENVIRONMENTAL REVIEW UNDER SECTION 15301 (EXISTING
FACILITIES) OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
(CEQA) GUIDELINES AS REPRESENTED IN THE STAFF REPORT AND
ATTACHMENTS DATED JUNE 12, 2024 (USE-0331-2023)"
Condition #14: The fraternity use shall comply with Table 1 (Exterior
Noise Limits) of Section 9.12.060 (Exterior Noise Limits) between the
extended hours of 10:00 pm and 9:00 am, except as approved in
writing as a special event by the Community Development Director.
Condition #15: Prior to a special event approved by the Community
Development Director pursuant to Condition No. 5, the fraternity shall
provide written notification of the event to occupants within 300 feet of
the site. The written notification shall include the date, hours, and
contact information for the responsible party for the special event.
Condition #16: Live entertainment, bands, and/or amplified sounds are
prohibited, unless otherwise approved through a special event by the
Community Development Department.
Ayes (5): Commissioner Flores, Commissioner Jorgensen, Commissioner
Kahn, Commissioner Tolle, and Vice Chair Houghton
Absent (2): Commissioner Munoz-Morris, and Chair Cooley
CARRIED (5 to 0)
4.b REVIEW TEXT AMENDMENT TO ZONING REGULATIONS (CODE-0224-
2024) TO ADD SINGLE-FAMILY AND MULTI-FAMILY USES AS
CONDITIONALLY ALLOWED WITH APPROVAL OF MINOR USE
PERMIT IN THE NEIGHBORHOOD COMMERCIAL (C-N) ZONE; THE
PROJECT IS EXEMPT FROM ENVIRONMENTAL REVIEW
Associate Planner Hannah Hanh presented the staff report and responded
to Commission inquiries.
Vice Chair Houghton opened the Public Hearing
Public Comment:
Sandra Rowley
Toni Detz
--End of Public Comment--
Vice Chair Houghton closed Public Comment
Page 7 of 98
4
Motion By Commissioner Tolle
Second By Commissioner Flores
Adopt the Draft Resolution, which recommends the City Council introduce
and adopt an Ordinance revising Table 2-1 (Uses Allowed by Zone) in Title
17 (Zoning Regulations) to add single-family and multi-family uses as
conditionally allowed with approval of a Minor Use Permit in the
Neighborhood Commercial (C-N) Zone. The project is exempt from
environmental review under Section 15301(b)(3) (General Rule Exemption)
of the California Environmental Quality Act (CEQA) Guidelines.
"A RESOLUTION OF THE CITY OF SAN LUIS OBISPO PLANNING
COMMISSION RECOMMENDING THE CITY COUNCIL INTRODUCE AND
ADOPT AN ORDINANCE AMENDING TABLE 2-1 (USES ALLOWED BY
ZONE) IN TITLE 17 (ZONING REGULATIONS) OF THE MUNICIPAL CODE
TO ADD SINGLE-FAMILY AND MULTI-FAMILY USES AS CONDITIONALLY
ALLOWED WITH APPROVAL OF A MINOR USE PERMIT IN THE
NEIGHBORHOOD COMMERCIAL (C-N) ZONE. THE PROJECT IS
EXEMPT FROM ENVIRONMENTAL REVIEW (CEQA) AS REPRESENTED
IN THE PLANNING COMMISSION AGENDA REPORT AND
ATTACHMENTS DATED JUNE 12, 2024 (CITYWIDE; CODE-0224-2024) "
Ayes (5): Commissioner Flores, Commissioner Jorgensen, Commissioner
Kahn, Commissioner Tolle, and Vice Chair Houghton
Absent (2): Commissioner Munoz-Morris, and Chair Cooley
CARRIED (5 to 0)
5. COMMENT AND DISCUSSION
5.a STAFF UPDATES AND AGENDA FORECAST
Deputy Community Development Director Tyler Corey provided the
following update of upcoming projects:
On June 26, 2024, the Planning Commission will review an Appeal
of the Community Development Director's decision regarding a new
mixed-use development at 1925 Santa Barbara Avenue (APPL -
0232-2024) and review of a new mixed-use project at 10 Higuera
Road (ARCH-0358-2023).
Page 8 of 98
5
On July 10, 2024, the Planning Commission will review an Appeal
of the Community Development Director's decision to deny a
Homestay Permit at 1137 Peach Street (APPL 0210-2024).
6. ADJOURNMENT
The meeting was adjourned at 8:19 p.m. The next Regular Meeting of the
Planning Commission is scheduled for June 26, 2024 at 6:00 p.m. in the Council
Chambers at City Hall, 990 Palm Street, San Luis Obispo.
_________________________
APPROVED BY PLANNING COMMISSION: XX/XX/2024
Page 9 of 98
Page 10 of 98
PLANNING COMMISSION AGENDA REPORT
SUBJECT: 1925 SANTA BARBARA AVENUE (APPL-0232-2024) – APPEAL OF
DECISION APPROVING ARCHITECTURAL REVIEW APPLICATION ARCH-0448-2022
BY: Walter Oetzell, Assistant Planner FROM: Rachel Cohen, Senior Planner
Phone Number: (805) 781-7593 Phone Number: (805) 781-7574
Email: woetzell@slocity.org Email: rcohen@slocity.org
APPELLANT: Wayne Terry
RECOMMENDATION
Adopt the Draft Resolution denying the appeal and upholding the decision of the
Community Development Director approving the Minor Development Review application
ARCH-0448-2022.
1.0 COMMISSION'S PURVIEW
As provided by Zoning Regulations Section 17.126.040 (A), the Commission will consider
an appeal of the decision of the Community Development Director.
2.0 SUMMARY
Obispo Investments Inc. proposes to develop the property at 1925 Santa Barbara Avenue
with a mixed-use project comprised of four residential dwelling units and a small street -
fronting nonresidential space (see Attachments B and C, and Figure 2, below). The
project is subject to Minor Development Review1 and review by the City’s Cultural
Heritage Committee, as the project site is located within the Railroad Historic District.2
Accordingly, Minor Development Review application ARCH-0448-2022 was filed on
August 17, 2022. On April 22, 2024, the application was approved by the Community
Development Director, based in part on the recommendation of the Cultural Heritage
Committee, as to the consistency of the proposal with historical preservation policies,
standards, and guidelines (see Decision Letter, Attachment D).
Wayne Terry, owner and resident of the property at 1902 Chorro Street, situated
immediately southwest of the subject site, appealed the decision of the Director, providing
a narrative discussion of the reasons for the appeal (see Appeal Statement,
Attachment E).
1 Minor development review is a staff -level review process with public notice provided, with no public hearing
required (Zoning Regs. § 17.106.030 (B))
2 For each level of development review, an advisory body may provide a recommendation to the review
authority as applicable or required (Zoning Regs. § 17.106.040 (A)); The Cultural Heritage Committee shall
review and make recommendations to the Director on applications and development review projects which
include new construction located in historic districts.
Meeting Date: 6/26/2024
Item Number: 4a
Time Estimate: 45 Minutes
Page 11 of 98
Item 4a
APPL-0232-2024 (1925 Santa Barbara)
Planning Commission Report – June 26, 2024
In the discussion, the appellant raises concerns with the conduct of the Cultural Heritage
Committee’s deliberations and questions the project’s consistency with the development
pattern in the Railroad Historic District and with the City’s Historic Preservation Ordinance
and Historic Preservation Program Guidelines. This appeal is now before the Planning
Commission.
3.0 BACKGROUND
Site and Setting
The subject property is a rectangular parcel
measuring about 7,250 square feet in area,
on the west side of Santa Barbara Avenue,
225 feet south of Upham Street, in a Service
Commercial (C-S) Zone, and Historical
Preservation Overlay (H) Zone denoting its
location in the Railroad Historic District (see
Figure 1). It is developed with a small
commercial building installed in 1985 to serve
as an office for an auto sales lot, and most
recently used for personal services (The
Brow Shoppe).
Adjacent to the site, directly north and south,
are single-family dwellings (neither of which
are included in the City’s Inventory of Historic Resources). Also in the vicinity are the San
Luis Obispo Railroad Museum (a Master List Resource, the Southern Pacific
Warehouse), the Del Monte Café (a Contributing List Resource), a development
comprised of industrial sheds (formerly Flanders Bicycle Shop; 1951 Santa Barbara), and
a newer development of three mixed -use buildings, designed in an historical vernacular
style with false fronts (1957-1977 Santa Barbara). Behind the subject site are the Chapek
House (at 843 Upham) and the Bittick Residence (1902 Chorro), both Master List Historic
Resources within the adjacent Old Town Historic District.
Railroad District Plan
In 1998, the City Council adopted the Railroad District Plan (RDP),3 an “Area Plan”,
intended to implement General Plan policies within the Railroad Historic District. The plan
aims to retain and preserve the historic and architectural character of the District with
architectural standards to guide new development. The Architectural Guidelines provided
in the Plan (see Attachment F) help to ensure that new development is architecturally
compatible with adjacent buildings, and these guidelines are applied in reviewing new
development in the Railroad Historic District.
3 The Railroad District Plan may be accessed through the City’s website, at :
www.slocity.org/home/showpublisheddocument/27524/637305754075300000
Figure 1: 1925 Santa Barbara
Page 12 of 98
Item 4a
APPL-0232-2024 (1925 Santa Barbara)
Planning Commission Report – June 26, 2024
Project Description
The proposed project is comprised of three new buildings accommodating four dwellings
and a nonresidential suite (see Project Description and Project Plans, Attachments B
and C, and Figure 2, below). The nonresidential space is provided at the Santa Barbara
Avenue street frontage and is intended for the range of uses and activities permitted in a
Service-Commercial Zone.4 The buildings are designed in a contemporary style, based
on rectangular forms, and having medium-sloped pitched roofs with eave overhangs.
Plaster and horizontally oriented cement fiber board siding are the predominant exterior
materials. Double-hung or divided lite windows are recessed into the building walls and
provided with wood trim and sill features.
Non-Residential Space 485 sq. ft. 1-story
Accessible Living Unit 825 sq. ft. 2-story
Tri-Plex (825 sq. ft. /ea.) 2,475 sq. ft. 2-story over under-building parking
area
4.0 PREVIOUS REVIEW
Cultural Heritage Committee
The application was reviewed by the Cultural Heritage Committee, over the course of two
public hearings, for their recommendation to the Community Development Director on the
application of architectural and historic preservation standards and guidelines to the
proposed project. Video record of each hearing, along with hearing agendas and staff
reports, is accessible from the Past Meetings section of the Public Meeting Agendas page
on the City’s website5, and Agenda Correspondence and Minutes for each hearing are
available in the City Clerk’s document archive.6
4 Uses permitted in various Zones are summarized in Zoning Regs. § 17.10.020 (A)
5 Public Meeting Agendas may be accessed through the City’s website at
www.slocity.org/government/mayor-and-city-council/agendas-and-minutes
6 The City Clerk’s Documents Archive may be accessed at
opengov.slocity.org/WebLink/Browse.aspx?id=26291
Figure 2: Project Rendering, from Santa Barbara Avenue
Page 13 of 98
Item 4a
APPL-0232-2024 (1925 Santa Barbara)
Planning Commission Report – June 26, 2024
On January 22, 2024, the application was brought before the Cultural Heritage
Committee.7 After deliberation, the Committee continued review of the application to “a
date uncertain,” providing direction to staff and the applicant regarding building massing,
height, and placement, roof forms, and building details such as materials, finishes,
decorative elements, and window patterns.
Project plans were revised by the applicant and project architect in response to the
Committee’s direction, and the application was brought back to the Committee on
March 25th, 2024.8 Revisions included lowering the building height and modifying the roof
form, bringing its upper portion further away from the rear of the site. Fiber cement board
with the appearance of wood was employed for the exterior material of the larger triplex
building, and trim, decorative elements, and door and window recesses were refined to
enhance visual interest, as encouraged by the Architectural Guidelines of the Railroad
District Plan. The Committee considered the design revisions to be responsive to the
direction they provided and recommended that the Community Development Director find
the project to be consistent with the City’s Historic Preservation Ordinance, including
architectural standards for construction in the Railroad Historic District.
Director Decision (Minor Development Review)
On April 22, 2024, the Community Development Director approved the project by
administrative action, based on findings of consistency with the General Plan, Zoning
Regulations, and, following the recommendation of the CHC, historical preservation
policies, standards, and Historic Preservation Program Guidelines, including consistency
with the Architectural Guidelines of the Railroad District Plan (Decision Letter,
Attachment D).
5.0 APPEAL EVALUATION
Public Comment at Hearings
In his appeal statement (Attachment E), the appellant states that his right to public
comment was hindered at the March 25th Cultural Heritage Committee hearing, by refusal
of a visual presentation to supplement his public comment, and as such, he could not
adequately provide important information to the Committee.
Immediately prior to the March 25th CHC hearing, Mr. Terry requested that the Deputy
City Clerk make a presentation available on the City’s computer netwo rk, from a personal
“flash drive” that he had brought to the hearing. The presentation is said to have included
images of buildings on Santa Barbara Avenue and excerpts of text from the Railroad
District Plan, germane to his comments regarding the scale, m assing, and pattern of
buildings on this street.
7 The Meeting Agenda, Video, and Staff Reports for the January 22 nd meeting may be accessed online at
pub-slocity.escribemeetings.com/Meeting.aspx?Id=092f5d9e-222d-4d65-8388-30e946288483
8 The Meeting Agenda, Video, and Staff Reports for the March 25th meeting may be accessed online at
pub-slocity.escribemeetings.com/Meeting.aspx?Id=0fb2d569-cf24-478d-8a8d-d2e4a0dd4582
Page 14 of 98
Item 4a
APPL-0232-2024 (1925 Santa Barbara)
Planning Commission Report – June 26, 2024
The City’s Electronic Visual Aid Presentation policy9 encourages members of the public
who wish to utilize electronic visual aids as a supplement to their oral presentation to
provide those materials to the City Clerk by noon on the day of the hearing. The Clerk
follows this policy to ensure safe transfer of files to the City’s computer network (digital
files are subjected to a “virus scan”) and to allow for the timely commencement of public
hearings. In this case, the Deputy Clerk was not able to accommodate Mr. Terry’s request
immediately prior to the hearing, well past the noon deadline.
Nevertheless, many images of buildings along the west side of Santa Barbara Avenue
were provided to the Committee in the applicant’s project plans (see Sheet 7 of Project
Plans, Attachment C), including a study of the development pattern on this block), in staff
reports to the Commission, and with photographs displayed in the staff presentation.
These photographs were also displayed by staff during Mr. Terry’s public comment.
Staff reports also included evaluation of the consistency of the proposed project with
historical preservation policies, standards, and guidelines, including the consistency of
new buildings with the scale, massing, rhythm, and siting of historic structure s in the
district, along with specific architectural guidelines from the Railroad District Plan.
Furthermore, the matter of scale, pattern, and spacing of existing buildings on the west
side of the street were, before each Committee hearing, explicitly raised and discussed
directly in Mr. Terry’s correspondence and his public comment to the Committee, prior to,
and during, both hearings.
The record of agenda correspondence and public comment reflects that Mr. Terry was
not hindered in his ability to provide information and public comment to the Committee
regarding this item
Advisory Body Review Process
The appellant raises concern with the process by which the Cultural Heritage Committee
formed their recommendation; that the Committee failed to consider key elements of the
Railroad District Plan and inadequately deliberated about the pattern of development in
the vicinity of the project site. He notes that the project architect was not present at the
second (March 25th) Committee hearing, that the Committee Chair had professional
familiarity with the project architect, and that the Chair disclosed that he had met the
architect and discussed the project design.
It is not uncommon for architectural professionals active in the local community to be
familiar with each other and with their work, and ex parte communication between a
project proponent and individual Committee Members is permissible, where properly
disclosed. Under the Brown Act, if a majority of Committee members are present during
communication with a project proponent, generally such discussion could only take place
at a noticed public hearing unless an exception applied. Here, however, communication
with the applicant’s architect was limited to discussion with an individual Committee
Member, to share some conceptual ideas regarding potential design revisions, and this
9 This policy is described on the City’s website and on Public Meeting Agendas, see:
www.slocity.org/government/mayor-and-city-council/agendas-and-minutes
Page 15 of 98
Item 4a
APPL-0232-2024 (1925 Santa Barbara)
Planning Commission Report – June 26, 2024
ex-parte communication was properly disclosed by the Committee Chair during the
hearing, immediately following staff’s presentation.
Staff notes, again, that all relevant elements of the City’s Historic Preservation Program
Guidelines and the Railroad District Plan were fully evaluated in staff’s report and
presentation to the Committee, including the consistency of the proposed project with the
character of the Railroad District in terms of scale, massing, siting, and spacing of
buildings, and these matters were given full deliberation by the Committee. In addition,
these elements were directly raised and discussed in the appellant’s correspondence and
public comment to the Committee prior to, and during, both hearings.
The project architect was absent from the March 25th Committee hearing, due to an
unintentional scheduling error (mistaking the hearing start time). Although it is customary
for an applicant or their representative to be present at public hearings, there is no formal
applicant attendance requirement that would constrain the Committee from deliberating
and acting on an item under consideration. In this case, the hearing was the second
hearing on the item, to consider revisions made in response to Committee direction. Staff
advised the Committee that they could proceed with the hearing or, if necessary, further
continue consideration of the item to a futu re date. The Committee elected to proceed
with deliberations, having sufficient information available in the project plans and
materials, staff reports and presentations, and public correspondence and comments, on
which to base their recommendation to the Director.
Pattern of Development
The pattern of development in the vicinity of the project site and along the west side of
Santa Barbara Avenue are further discussed in the appellant’s statement. The appellant
notes that the Railroad District Plan makes n o explicit distinction between portions of
Santa Barbara Avenue that are north and south of Upham Street, though they lie within
different Zones and are subject to different development standards. The predominant
building type and pattern of massing and spacing south of Upham is described in the
appellant statement, and it is suggested that projects adjacent to historic resources
should provide deep rear setbacks and concentrate building height at their west (Santa
Barbara Avenue) side, as more appropriate and consistent with the area.
The Railroad District Plan explicitly refers to the City’s Zoning Regulations for descriptions
of applicable property development standards (see Plan, pg. 33) and provides no specific
standards for building setbacks or height for new development. Guidance on building
setbacks is limited to encouraging new residential buildings to generally maintain the
prevailing setbacks of older houses and apartments along Osos, Santa Barbara, and
Church streets (Plan, pg. 82), an area that lies north of Upham Street, in a Medium-High
Residential (R-3) Zone.
Page 16 of 98
Item 4a
APPL-0232-2024 (1925 Santa Barbara)
Planning Commission Report – June 26, 2024
The project was found by the Community Development Director to conform to the
development standards applicable to the Service Commercial (C-S) Zone in which it is
located, including standards for building height and setbacks, lot coverage, and parking
requirements. Zoning Regulations set no rear setback standard within the C-S Zone, but
require that, where a site is adjacent to a zone with minimum setback requirements, a
setback be provided as in the zone of the adjacent property.10 In this case, the site is
adjacent to a Medium-Density (R-2) Zone, and therefore a minimum setback ranging from
five feet (at the ground floor) to ten feet (at the upper levels of the building) must be
provided.11 Furthermore, the project is subject to “Edge Condition” provisions in the
Zoning Regulations,12 to provide a buffer between commercial zones and adjacent lower
intensity residential zones. An enhanced building setback ranging from ten feet (at the
ground level) to twelve feet (at the upper levels of the building) is required at the rear of
the site, adjacent to the residential uses behind it. This project exceeds this requirement,
providing a twelve-foot rear setback for the whole building, from the ground to its upper
levels.
At just over 25 feet above existing grade to the peak of a single roof gable feature, t he
height of the tallest building in the project is considered to be consistent with the height
of existing residential structures in the adjacent Medium Density Residential (R -2) Zone,
including listed historic resources, and well below the maximum 35 -foot building height
allowed in both the C-S Zone and the adjacent R-2 Zone.
Given these facts, neither the project’s building height nor setback from the adjacent
residential zone would provide a basis under the City’s applicable development standards
or historical preservation standards to require modification of the project design or to deny
the Architectural Review application.
10 See Zoning Regulations § 17.36.020 (B): sanluisobispo.municipal.codes/Code/17.36.020
11 See Zoning Regulations § 17.18.020 (B): sanluisobispo.municipal.codes/Code/17.18.020
12 See Zoning Regulations § 17.70.050: sanluisobispo.municipal.codes/Code/17.70.095
Figure 3: Pattern Study (from Project Plans), West Side of Santa Barbara Avenue
Page 17 of 98
Item 4a
APPL-0232-2024 (1925 Santa Barbara)
Planning Commission Report – June 26, 2024
Negative Impacts
The appellant’s statement concludes that the project, due to building height and se tbacks,
will negatively impact Master List Historical resources near the project site.
The Guidelines for the Implementation of
the California Environmental Quality Act
(CEQA Guidelines) provide guidance
about determining the significance of
impacts to historical resources: “A project
with an effect that may cause a substantial
adverse change in the significance of an
historical resource is a project that may
have a significant effect on the
environment.” (CEQA Guidelines
§15064.5(b)). Substantial adverse change
in the significance of an historical resource
means physical demolition, destruction,
relocation, or alteration of the resource or
its immediate surroundings such that the
significance of an historical resource
would be materially impaired.” As to “materially impaired,” CEQA Guidelines describe this
as involving demolition or material alteration of physical characteristics of a historic
resource that convey its significance. 13
In the case of the Master List “Bittick Residence” at 1902 Chorro (Figure 4, above), the
property was found to be eligible for listing as a historic resource due to its Colonial Dutch
Barn Style, rarity of its single-story Gambrel Roof style, architectural integrity,
attractiveness of design, and association with John Chapek, an early local builder and
Town Council member (see Council Resolution No. 9310, Attachment G). Construction
of the proposed project on an adjacent site, in conformance to the height limits and
enhanced setbacks required under the City’s development standards, involves no
demolition, destruction, relocation, or alteration of the features identified as important to
the significance of the Bittick Residence , nor would the project development to the rear
of the Bittick Residence compromise its ability to convey its significance.
Summary
In summary response to the appellant’s discussion, staff maintains that the Director took
into consideration all relevant matters, including the development pattern of the Railroad
Historic District, the City’s historical preservation policies, standards, and guidelines, and
any potential for negative impacts to historic resources, in deciding to approve the Minor
Development Review application for the proposed mixed -use project. The Director’s
decision was informed by correspondence received from interested parties, and by the
recommendation of the Cultural Heritage Committee (CHC), whose duties include
13 See CEQA Guidelines § 15064.5 (b), available online (Thomson Reuters Westlaw):
govt.westlaw.com/calregs/Document/I87D9F3AA5B4D11EC976B000D3A7C4BC3
Figure 4: Bittick Residence, 1902 Chorro
Page 18 of 98
Item 4a
APPL-0232-2024 (1925 Santa Barbara)
Planning Commission Report – June 26, 2024
application of historical preservation standards and guidelines, as set out in the City’s
Historic Preservation Ordinance (SLOMC § 14.01.030 (B)). The CHC deliberated and
formulated their recommendation over the course of two duly noticed and conducted
public hearings, following review of all relevant information in staff reports and
presentations, along with public correspondence and in-person comment provided at the
hearings.
As there is no basis presented with this appeal on which to deny the Minor Development
Review application ARCH-0448-2022, for development of the subject property with a
mixed-use development, staff recommends that the Commission deny the appeal and
uphold the decision of the Community Development Director approving the application.
6.0 ENVIRONMENTAL REVIEW
The project is categorically exempt from the provisions of the California Environmental
Quality Act (CEQA). It consists of Infill Development consistent with the Services and
Manufacturing land use designation and applicable policies described in the Cit y’s
General Plan, consistent with standards and limitations described in Zoning Regulations
for the Service Commercial (C-S) Zone, occurs on a project site of less than five acres
substantially surrounded by urban uses with no value as habitat for endanger ed, rare or
threatened species, would not result in any significant effects relating to traffic, noise, air
quality, or water quality, and can be adequately served by all required utilities and public
services, as described in CEQA Guidelines § 15332. Furthermore, development of the
proposed project will not cause a substantial adverse change in the significance of any
historical resources (CEQA Guidelines § 15300.2 (f)) since the project has been found
consistent with the Historic Preservation Ordinance provisions for compatible
development in historic districts; is not located on a listed historic property; and would not
have the potential to result in adverse impacts to adjacent and nearby historic resources.
7.0 ALTERNATIVES
1. Uphold the appeal and direct staff to prepare a resolution denying the Minor
Development Review application ARCH-0448-2022, regarding development of a
proposed mixed-use project at 1925 Santa Barbara Avenue.
This action is not recommended since the appeal provides no justification for
denying the Minor Development Review application or for finding that the proposed
project is inconsistent with the City’s Historic Preservation Ordinance and Historic
Preservation Program Guidelines, including those regarding architectural
compatibility for new construction in historic districts. Furthermore, this project is a
“housing development project” pursuant to the Housing Accountability Act and
therefore can only be denied or conditioned in a manner that reduces density if a
“specific adverse impact” (a significant, quantifiable, direct, and unavoidable
impact, based on objective, identified written public health or safety standards,
policies, or conditions) is identified. Facts and evidence based on the City’s
historical preservation policies, standards, and guidelines, as set out in the
Historical Preservation Ordinance (SLOMC Ch. 14.01), along with specific adverse
Page 19 of 98
Item 4a
APPL-0232-2024 (1925 Santa Barbara)
Planning Commission Report – June 26, 2024
impacts to public health or safety, as described by the Housing Accountability Act,
would have to be provided with any consideration to uphold the appeal as the basis
for this alternative.
2. Continue consideration of the item to a future date, with relevant guidance to staff
and applicant.
This alternative is not recommended, as continued consideration beyond the three
public hearings that will have already been held on the item is unlikely to uncover
additional considerations relevant to the action taken on this application.
Furthermore, the Housing Crisis Act limits an agency to conduct of no more than
five hearings on a proposed housing development that complies with objective
standards (Govt. Code § 65905.5 (a)).
8.0 ATTACHMENTS
A - Draft Planning Commission Resolution (APPL-0232-2024)
B - Project Description: Santa Barbara Lofts
C - Approved Project Plans Santa Barbara Lofts
D - Decision Letter (ARCH-0448-2022)
E - Appeal Statement (Wayne Terry)
F - Architectural Guidelines (Railroad District Plan)
G - Council Resolution No. 9310 (2002)
Page 20 of 98
R ______
RESOLUTION NO. PC-XXXX-24
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
SAN LUIS OBISPO, CALIFORNIA, DENYING AN APPEAL AND
UPHOLDING THE COMMUNITY DEVELOPMENT DIRECTOR’S
DECISION APPROVING MINOR DEVELOPMENT REVIEW
APPLICATION ARCH-0448-2022 REGARDING DEVELOPMENT OF A
MIXED-USE PROJECT AT 1925 SANTA BARBARA AVENUE
(APPL-0232-2024)
WHEREAS, the Cultural Heritage Committee of the City of San Luis Obispo conducted
a public hearing in the Council Chamber of City Hall, 990 Palm Street, San Luis Obispo,
California, on January 22, 2024, for the purpose of reviewing a proposed mixed-use development
comprised of four residential dwellings and a nonresidential suite located at 1925 Santa Barbara
Avenue, under Minor Development Review application ARCH 0448 2024; Obispo Investments
Inc., applicant, and continued consideration of the application to a date uncertain with direction to
staff and the applicant; and
WHEREAS, the Cultural Heritage Committee of the City of San Luis Obispo conducted
a public hearing in the Council Chamber of City Hall, 990 Palm Street, San Luis Obispo,
California, on March 25, 2024, for the purpose of reviewing revised plans for the proposed mixed-
use development, and recommended that the Community Development Director find the project
to be consistent with the City’s Historic Preservation Ordinance, including architectural standards
for new construction in the Railroad Historic District; and
WHEREAS, on April 22, 2024 the Community Development Director approved the
proposed mixed-use project, under Minor Development Review application ARCH-0448-2024;
and
WHEREAS, On May 2, 2024, Wayne Terry filed an appeal of the Community
Development Director’s decision to approve the Minor Development Review application; and
WHEREAS, the Planning Commission of the City of San Luis Obispo conducted a public
hearing in the Council Chamber of City Hall, 990 Palm Street, on June 26, 2024, to consider the
appeal of the Community Development Director’s decision; and
WHEREAS, notices of said public hearing were made at the time and in the manner
required by law; and
WHEREAS, the Planning Commission has duly considered all evidence, including the
testimony of the applicant, interested parties, and evaluation and recommendations by staff
presented at said hearing.
NOW, THEREFORE, BE IT RESOLVED by the Planning Commission of the City of
San Luis Obispo as follows:
Page 21 of 98
Resolution No. _____ (2024 Series) Page 2
SECTION 1. Findings. Based upon all the evidence, the Commission makes the
following findings:
1. As conditioned, the proposed project is consistent with the goals and policies of the Land
Use Element (LUE) of the City’s General Plan applicable to development in a Services and
Manufacturing area, and with goals and policies of the General Plan’s Conservation and
Open Space Policies (COSE) for Cultural Heritage (COSE § 3). Mixed uses are encouraged
in commercial districts (LUE §3.8.5). The project’s residential component is situated at the
west side of the site, at the boundary with an adjacent residential neighborhood to the west
and provides enhanced building setbacks such that the residential atmosphere of the
adjacent neighborhood is protected (LUE §2.3.3). New construction reflects the form,
spacing, and materials of nearby historic structures and does not affect the street
appearance of buildings which contribute to the neighborhood’s architectural character,
consistent with Conservation and Open Space Element Policy 3.3.4. Fiber cement board
and plaster are employed as the predominant exterior materials, which are visually
compatible with the exterior materials of buildings in the vicinity.
2. As conditioned, the project design is consistent with standards and limitations set out in
the City’s Zoning Regulations. The site is within a Service Commercial (C-S) Zone, and
Mixed-Use Development is a permitted use in the Zone (§ 17.10.020). The project and
proposed new structures conform to applicable development standards for the zone
(Ch. 17.70), including enhanced Edge Condition setbacks at the boundary of the adjacent
residential neighborhood to the west (§17.70.050) and with standards for Mixed-Use
Development (§17.70.130).
3. According to the recommendation of the Cultural Heritage Committee made on
March 25, 2024, the project is consistent with the City’s Historic Preservation Ordinance
(SLOMC Ch. 14.01) and the supporting Historic Preservation Program Guidelines
(HPPG), in particular with guidelines related to architectural compatibility (HPPG §§ 3.2.1
& 3.3.2). The proposed new buildings are based on simple rectangular forms and exhibit
horizontal massing, sloping roof forms, grouped horizontal window patterns, fiber cement
board (simulating wood appearance) and plaster exterior materials, and trim and roof
detailing, consistent with Architectural Guidelines provided in the Railroad District Plan,
complementing the District’s historic character.
4. According to the recommendation of the Cultural Heritage Committee made on
March 25, 2024, the project is consistent with the Secretary of the Interior’s Standards for
the Treatment of Historic Properties. The proposed new construction has been designed to
be compatible in form, massing, color, and materials with the historic character of the
Railroad Historic District.
5. The project is consistent with the City’s Community Design Guidelines. It is designed in
an attractive and environmentally sensitive manner that responds to the character and
constraints of the site, fits in with site design and architecture in the vicinity, and logically
locates site elements for efficient operation (§ 2.1). The new building exhibits proper
proportion, harmony, simplicity, rhythm, balance, and is designed to coordinate with
existing structures on the site (§ 2.2) and is compatible with adjacent buildings and those
in the immediate neighborhood (§ 5.3).
Page 22 of 98
Resolution No. _____ (2024 Series) Page 3
SECTION 2. Environmental Review. The project is categorically exempt from the
provisions of the California Environmental Quality Act (CEQA). It consists of Infill Development
consistent with the Services and Manufacturing land use designation and applicable policies
described in the City’s General Plan, consistent with standards and limitations described in Zoning
Regulations for the Service Commercial (C-S) Zone, occurs on a project site of less than five acres
substantially surrounded by urban uses with no value as habitat for endangered, rare or threatened
species, would not result in any significant effects relating to traffic, noise, air quality, or water
quality, and can be adequately served by all required utilities and public services, as described in
CEQA Guidelines § 15332. Furthermore, development of the proposed project will not cause a
substantial adverse change in the significance of any historical resources (CEQA Guidelines
§ 15300.2 (f)) since the project has been found consistent with the Historic Preservation Ordinance
provisions for compatible development in historic districts; the property is not located on a historic
property; and the project would not have the potential to result in adverse impacts to adjacent and
nearby historic resources.
SECTION 3. Action. The Planning Commission does hereby deny the subject appeal
filed by Wayne Terry, and upholds the Community Development Director’s decision to approve
development of 1925 Santa Barbara Avenue with a mixed-use development project, under Minor
Development Review application ARCH-0448-2022, based on the above findings, and subject to
the following conditions:
1. Conformance to approved plans and conditions. Final project design and construction
drawings submitted for building permits shall be in substantial compliance with approved
plans, as revised according to the direction provided by the Cultural Heritage Committee,
and with the conditions of approval herein. A separate full-size sheet shall be included in
plans submitted for permits, listing all conditions of project approval. Reference shall be
made in the margin of the listed conditions as to where in plans requirements are addressed.
Any change to approved design, colors, materials, landscaping or other conditions of
approval must be reviewed and approved by the Community Development Director.
2. Colors and materials. Plan submitted for permits to complete this project shall clearly
depict and describe all materials and colors, including siding, roofing, windows, and
decorative trim, and the dimensions of windows, including window frames and mullions,
lintels, sills, surrounds, recesses, trim, and other related window features, shall be clearly
indicated, to the satisfaction of the Community Development Director.
Page 23 of 98
Resolution No. _____ (2024 Series) Page 4
3. Night Sky Preservation. Plans submitted for construction permits to complete this project
shall include information about exterior lighting, including building-mounted lighting,
sufficient to verify conformance to Night Sky Preservation regulations (Zoning
Regulations Ch. 17.23).
Upon motion of _______________, seconded by ________________, and on the
following roll call vote:
AYES:
NOES:
RECUSED:
ABSENT:
The foregoing resolution was adopted this 26th day of June 2024.
____________________________________
Rachel Cohen, Secretary
Planning Commission
Page 24 of 98
1925 Santa Barbara Avenue Project Description
Note: All section numbers called out as reference are from the City of San Luis Obispo, Title 17 Zoning
Regulations, unless noted differently. Words in italics have been taken directly from the zoning
ordinance for clarification and support of the proposal.
Project Use Concept –The premise of this project is to create a mixed-use development that will provide
a commercial space on the street frontage and living spaces behind, similar to current developments on
Santa Barbara Ave.
Zone – C-S-H
Lot size – 7257 SF (.166 AC)
Max. Dwelling units = 24/AC = .166 x 43560 = 3.998
Proposed dwelling units = 4 - 1-bedroom units = 2.64< 3.98
Additional Use 1 commercial space 485 SF
Lot coverage – Max = 75%
Units including South balconies = 2630 SF
Elevated walkways and stairs = 429 SF
Commercial space = 485 SF
Total = 3544 SF
Coverage = 4740 / 7257 = 48.8%
FAR – C-S zone 1.5
Allowable 1.5 site area = 1.5 x 7257 = 10885 SF
3 housing unit = 3 x 895 = 2685 SF
Accessible unit = 1 x 768 = 768 SF
Commercial = 485 SF
Total = 3938 SF
Parking requirements
1 space for 1 bedroom = 4
1 space per 300 SF = 2
Total required =6
Proposed parking
Standard parking space =6
Van accessible =1
Total provided =7
Page 25 of 98
Bicycle parking
8 Long-term bicycle parking spaces have been provided in lockers in the sub-terranean parking
area.
Motorcycle parking
Not required
Existing structures – The current development on the site was built in 1985, on what was at that time a
vacant lot. The site was developed as a used car lot with a small office with restroom (257 SF +/-) and a
carport (220 SF+/-) for auto detailing. The site was paved, curbs were added, parking lot lights, and
signage were added. A drainage easement was secure through the rear property. All that work is to be
removed to the sub-grade.
Structures to be removed - All structures, pavement, etc., as existing above are to be removed to the
sub-grade.
Adjacent uses – Single family dwellings exist to the North and South of the site. In the C-S zone this is a
use that is no longer on the approved list. To the West are residences that are in the R-2 zone. As per
SLO Municipal Code 17.36.20 Table 2-20 C-S Zone Development Standards “No setback unless adjacent
to zone with minimum setback requirement, in which case the adjoining setback shall be as provided in
zone of adjacent lot.” These set back lines are shown on Sheet 8 - Sections
New land use proposal – Mixed Use – as allowed by 17.10.020 Table 2-1 Uses allowed in C-S zone
Allowed Uses. A mixed-use project requires a combination of residential units with any other use or
multiple uses allowed in the applicable zone by Section 17.10.020
Proposed Uses - A Mixed use, residential with a small commercial space. The project consists of three
1-bedroom residential units over a sub-terranean garage, an accessible 1 bedroom unit and a small
commercial space.
From 17.70.130 - Mixed Use Development
Mixed-use projects provide an opportunity to locate housing, jobs, recreation, and other daily needs in
close proximity to one another, thereby enhancing vitality and street life in San Luis Obispo and
forwarding the city’s sustainability goals.
A. Purpose – See above.
B. Allowable uses – See above.
C. Maximum density - See above.
D. Site layout and project design standards
1. Location of Units –
a. Ground Floor Limitations - In all other zones, residential units shall not occupy more than fifty
percent of the ground floor space within the first fifty feet of floor area measured from each
Page 26 of 98
building face adjacent to a street toward the rear of the building, with no more than thirty
percent of the building frontage to be occupied by residential uses.
Proposed location – The residential units are 45’-4” from the street property line and occupy
approximately 9% of the front of the site as required above. The street frontage is primarily
occupied by the small commercial use.
3. Trash and Recycling Areas.
Areas for the collection and storage of trash and recyclable materials shall be located on the site
in locations that are convenient for both the residential and nonresidential uses. The location
and design of trash enclosures shall reduce nuisances from odors and noise when
residential uses might be impacted.
Proposed location – The location is conveniently located outside the front yard setback at the
side of the commercial space. The garbage and recycling bins are in a lockable enclosure that is
screened from the street and neighboring property. We have worked with San Luis Garbage
Company, and they have provided a will-serve letter for this location.
E. Design standards - The following is written to address the various parts of this section.
The design concept is to continue the commercial street frontage while adding more permanent
residences. The commercial space continues the pattern of small commercial spaces along this side of
the avenue in this block. The residential units have been designed in a residential character with the
living area on the ground floor and the bedrooms above, in a loft type configuration.
The proposal has a potential impact on the single-family residences to the north and south. These uses,
if proposed today, would not be allowed. Like much of the rest of the area to the south the old
residences were removed and new mixed-use developments have replaced them. The overall area is a
mix of commercial and multi-family residential. The individual uses in the residences are located such
that the major living spaces are on the south allowing for a natural controlled light. Each living unit has a
personal outdoor space.
F. Performance Standards
1. Lighting – The commercial space is located on the street frontage. Landscape lighting will be
used along the walks. A downlight for signage will be used. There are no other lights purposed
that will have an effect on the residential uses on site or off.
2. Noise – With the small commercial space being located at ground level and on the streetside
of the property there should not be any adverse impact on the residential units on site or off.
3. Air quality and odors – all heating / cooling units will be individual residential electric heat
pumps.
4. Hours of operation – the commercial component of the project will adhere to city standards
5. Residential noise notice – all residences of the project will be provided in writing that they will
be living in an urban-like environment and that the noise levels may be higher tha a strictly
residential area.
Page 27 of 98
G. Pedestrian access - the project meets is designed to meet all code requirements for pedestrian access
and circulation.
H. Objective design criteria – the project has taken these points as well as those of the Railroad District
Plan into consideration in the design.
Railroad District Plan (RDP)
Under Land Use Developing trends the Mixed use Live / work development is identified as a developing
trend.
The RDP identifies a wide range of structures in size, architectural style and materials that are present in
the District. In addition, the most recent developments go along this direction. In particular the 3
buildings at 1957, 1965, & 1957 Santa Barbara Ave. erected approximately 15 years ago take on a
pseudo-historic character with the false front, gabled roof behind, and wood cladding. The more recent
development at 2120 Santa Barbara Ave. while much larger, is more cubic in appearance with the bulk
of the building having a flat roof. A saw tooth roof at the street facade works more with the RDP
objectives. The building facades are composed of multiple building materials: stucco, metal siding,
composite siding, and wood.
Our proposal is a similar approach to the 2120 Santa Barbara Ave. See Sheet 7 – Photo Essay
The project at 2120 Santa Barbara is the latest development on this stretch of Santa Barbara Ave. It too
is a mixed-use project with residential and commercial. Although 2021 is a much larger project, in part
due to parcel size, and taller project this proposal uses similar materials and to some extent building
profile.
Page 28 of 98
6$1/8,62%,632&$
(//$675((7
$UFKLWHFW'HYHORSHU
%$55</ :,//,$06
5(1(:$/
1R&
%$55</:,//,$06
$5&+,7(&
7
$,152),/$&)2
(7$
7
6
/,&(1 6 ('
EOZD#FKDUWHUQHW
EOZ
6
$
1
7
$
%
$
5
%
$
5
$
$
9
(
6
/
2
&
$
6%
0
,
;
(
'
8
6
(
2%,632
,19(670(176,1&
&$/,)251,$%/9'67(&
6$1/8,62%6,32&$
35
2
3
2
6
(
'
3
(
5
6
3
(
&
7
,
9
(
(
;
,
6
7
,
1
*
3
+
2
7
2
6
7
$
7
,
6
7
,
&
6
(;,67,1*9,(:)5206$17$%$5%$5$$9(
6+((7,1'(;6,7('(9(/230(176800$5<
=21(&6+
/276,=(
;
6)25$&
0$;':(//,1* $& ':(//,1*81,76
352326('%('522081,76 ; 81,76
$'',7,21$/86$*(&200(5&,$/63$&( 6)
3$5.,1*5(48,5(0(17 3(5%('522081,7
3(56)2)&200(5&,$/
727$/5(4
'
3$5.,1*63$&(6352326('
$&&(667$1'$5'
/27&29(5$*( 0$;
352326('/27&29(5$*( 81,76:%$/&21,(6 6)
(/(9$7(':$/.:$<6$1'67$,56 6)
&200(5&,$/ 75$6+ 6)
727$/ 6)
)$5$//2:(' ; 6)
%('522081,76#6)81,7 6)
%('522081,7#6)
&200(5&,$/#6) 6)
727$/ 6)
*(1(5$/,1)250$7,21
2:1(5
2%,632,19(670(176//&
&$/,)251,$%/9'67(&
6$1/8,62%,632
$31
&855(1786$*(
6,7($5($
6) $&
=21,1*
6$17$%$5%$5$$9(18(
6%/,9(:25.81,76
6$1/8,62%,632&$
352326('86$*(
&200(5&,$/
352-(&7'(6&5,37,21
/,9(:25.63$&(6$1'60$//&200(5&,$/
&6+
7+,60,;('86(352-(&7352326(6%('522081,76:,7+$60$//&200(5&,$/
63$&($77+(675((7)5217$*(21($&&(66,%/(81,7$63(5&%&6(&7,21$
,63529,'('$7*5281'/(9(/1(;772$1$&&(66,%/(3$5.,1*63$&($///,9,1*
81,76$5('(6,*1('$6/2)767</(81,760$7(5,$/6+$9(%((16(/(&7('72
+$5021,=(:,7+7+26(2)7+(,00(',$7($5($$1'$668**(67(',17+(*8,'(/,1(6
)257+(+,6725,&$/5$,/52$'',675,&7'(7$,/6:+(135$&7,&$/$1'$335235,$7(
$/625(63(&77+(*8,'(/,1(6)257+(',675,&7
3(63(&7,9()5206$17$%$5%$5$$9(18(
9,&,1,7<0$3
6$17$
%$5%$5$$9(
83+$0
&$/,)251,$%8,/',1*&2'(
6$1/8,62%,632081,&,3$/&2'(
&$/,)251,$(1(5*<&2'(
&$/,)251,$*5((1%8,/',1*&2'(
&0&
&3&
&(&
&$/,)251,$),5(&2'(
&/,0$7(=21(&=
6(,60,&&$7(*25<(
&2'($1$/<6,6
6%/,9(:25.0,;('86(
635,1./('\HV1)3$
$OORZDEOH$UHDDQG+HLJKW&DOFXODWLRQV
2FFXSDQF\
*URXS
'HVFULSWLRQ
&KDSWHU
5
%
6
1RWHVDOODUHDVDQGKHLJKWVDUHZLWKRXWLQFUHDVHV
$UHD6WRU\DQG+HLJKW0RGLILFDWLRQV1RWH6HHVHFWLRQ
1RQUHTXLUHG
0L[HG8VHDQG2FFXSDQF\&DOFXODWLRQ6HFWLRQ
2FFXSDQF\
*URXS
$FWXDO$UHD3HU6WRU\
5
%
6
6XPRIUDWLR¶V
2FFXSDQF\6HSDUDWLRQ1RWH6HH7DEOHIRURFFXSDQF\VHSDUDWLRQ
2FFXSDQF\*URXS
5
2FFXSDQF\*URXS
6
6
5
%
%
5HTXLUHG6HSDUDWLRQRI2FFXSDQFLHV
+5
+5
+5
1RWHV
6((
7RWDO$OORZDEOH$UHD3HU6WRU\
5DWLR$FWXDO$UHD7RWDO$OORZDEOH$UHD
5(6,'(17,$/
%86,1(66
/2:+$=$5'
&RQVW7\SH
6HFWLRQ
9%
9%
,,%
$OORZDEOHDUHD
7DEOH
VP
VP
$FWXDODUHD
%/:$
-$1
$OORZDEOH+HLJKW
7DEOH
$OORZDEOH6WRULHV
7DEOH
)LUH5HVLVWDQFH5DWLQJIRU%XLOGLQJ(OHPHQWV1RWH6HH7DEOHIRUUDWLQJUHTXLUHPHQWVDQG7DEOHIRUUDWHGFRQVWUXFWLRQ
%XLOGLQJ(OHPHQW
([WHULRUZDOOVEHDULQJ
,QWHULRUZDOOVEHDULQJ
([WZDOOVQRQEHDULQJ7DEOH
6WUXFWXUDOIUDPH
3DUWLWLRQVSHUPDQHQW
6KDIWHQFORVXUHV6HFWLRQ
)ORRU IORRUFHLOLQJ
5RRI URRIFHLOLQJ
1RWHV
)LUH5HVLVWDQFH5DWLQJ)RU([WHULRU:DOOV%DVHGRQ)LUH6HSDUDWLRQ'LVWDQFH7DEOH
2FFXSDQF\
*URXS
&RQVW7\SH
6HFWLRQ
5
%
6
1RWHV&23(13$5.,1**$5$*(6&203/<,1*:,7+6+$//127%(5(4
'72+$9($),5(5(6,67,9(5$7,1*
0D[LPXP$UHDRI([WHULRU:DOO2SHQLQJV6HFWLRQ
:DOO )LUH6HSDUDWLRQ
'LVWDQFH
1RUWK
6RXWK
(DVW
:HVW
!
$UHDRIZDOO
$OORZDEOH
3URWHFWHG
1$
1$
1RWH,IVSULQNOHGXVHDOORZDEOHSURWHFWHGRSHQLQJVIRUXQSURWHFWHGRSHQLQJV
1RWHV
XSSHUIORRU
(JUHVV 2FFXSDQF\5HIHUWR&KDSWHUIRURWKHUH[LWUHTXLUHPHQWV±FRUULGRUVKRUL]RQWDODQGYHUWLFDOH[LWVWUDYHOGLVWDQFHHWF
)XQFWLRQRI6SDFH
7DEOH
'HVFULSWLRQ
5HVLGHQWLDO
5HVLGHQWLDO
%XVLQHVV
*DUDJH
,QGLYLGXDOXQLW
7ULSOH[3HU8QLW
&RPPHUFLDO
)ORRU$UHDSHU2FF
7DEOH$R
$FWXDO6)$V
2FFXSDQW
/RDG
$V$R
([LW:LGWKLQ
7DEOH
([LWVUHT¶G
7DEOH
$OORZDEOH
8Q3URWHFWHG
$FWXDO
3URWHFWHG
6)
1$
1$
$FWXDO
8Q3URWHFWHG
6)
5DWLR(TXDWLRQ
9%
9%
9%
;¶
·;·
·;· ;·
5HTXLUHG
)LUH5DWLQJ
5DWHG$VVHPEO\
1XPEHU'HVFULSWLRQ
1$
1$
1$
1$
1$
1$
1$
1$
$33/,&$%/(&2'(6
&%&&2'($1$/<6,6
5(48,5('6(7%$&.6
)5217
)253$5.,1*$1'6,*16
)25%8,/',1*6/(667+$125(48$/72
,1+(,*+7
)25%8,/',1*6*5($7(57+$1
6,'( 5($5<$5'6126(7%$&.5(48,5('81/(66$'-$&(1772=21(:,7+0,1,0806(7%$&.5(48,5(0(17,1:+,&+&$6(7+(
$'-2,1,1*6(7%$&.6+$//%(3529,'(',1=21(2)$'-$&(17/27
3523(57,(6727+(1257+$1'6287+$5(,17+(&6+=21(3523(57<727+(:(67,6,17+(5=21(
$'',7,21$/6(7%$&.6$63(57,7/(6/2=21,1*5(*8/$7,216&6=21(7$%/(
+$9(%((1$'+(5('72
6((6+((76
0$;+(,*+7
63(&,),&6
1223(1,1*6
52&&/2$'7+(5()25((;,75(48,5('(;,7',67$1&(
6((&%&$1'7$%/(
6+((7'(6&5,37,21
3(563(&7,9(3+272$1'67$7,67,&6
6,7(6859(<'(02/,7,21 *5$',1*3/$16
6,7(,03529(0(17 *5281'/(9(/3/$16
1' 522)/(9(/3/$16
62/,':$67(3/$1 '(7$,/6
$5&+,7(&785$/(;7(5,25(/(9$7,216
$5&+,7(&785$/(;7(5,25(/(9$7,216
3+2726859(<2)6$17$%$5%$5$$9(
$5&+,7(&785$/6(&7,216
67250:$7(5&21752/3/$1
/$1'6&$3(3/$1
Page 29 of 98
6$1/8,62%,632&$
(//$675((7
$UFKLWHFW'HYHORSHU
%$55</:,//,$06
5(1(:$/
1R&
%$55</:,//,$06
$5&+,7(&
7
$,152),/$&)2
(7$
7
6
/,&(1 6 ('
EOZD#FKDUWHUQHW
EOZ
6
$
1
7
$
%
$
5
%
$
5
$
$
9
(
6
/
2
&
$
6%
0
,
;
(
'
8
6
(
2%,632
,19(670(176,1&
&$/,)251,$%/9'67(&
6$1/8,62%6,32&$
&3;7&
%&(*
(3$&
(*
7&)%2&(3$&%2&(3$&7&)
%2&$&
7&)
(*7&)
%2&$&
%2&$&7&)(*
(*
%2&$&
%2&$&
7&)
(*(*7&)%8&$&
$&
%2&$&
7&)
)(:&25(*
%2//$5'
(*
7&)
6:%
6:%
7&)(1'
%2&$&
%2&$&
7&)
(*
(*
7&)
%2&$&
%2&$&
7&)&25(*
(*$76,*1(*$76,*1
%2//$5'
7&)':
7&)
)/
/,3
36:
1
:
1
:
1
(
1
(
6$
1
7
$
%
$
5
%
$
5
$
$
9
(
6:%
(*(*
(*
1
0
0
:
$
7
(
5
/
,
1
(
00&8
(
6
(
:
(
5
33
29(5+($'
(/(&7
29(5+($'(/(&7 32/(7%5
6,7(*5$',1*6&$/(
(;,67,1*6,7(7232*5$3+,&32,176 '(02/,7,21127(6 6&$/(
$&3$9,1*72%(5(029('
'5,9(:$<$3521
72%(5(3/$&('
72&855(173:
67$1'$5'6
(;,67,1*%8,/',1*$1'
&$5325772%(5(029('
6DQ/XLV2ELVSR&$
&,9,/'(6,*1
62/87,216
7RSR
$SULO
6DQWD%DUEDUD$YH
5(029(6,*1
5(029($//)(1&,1*
5(029($//)(1&,1*
5($5)(1&(725(0$,1'85,1*
&21678&7,21
5(029($//216,7(&21&&85%,1*
5(029(3$5.,1*/27/,*+76
5(029(67(36:22'
'(&.$1'68332576$1'
5$,/6
*(1(5$/127(
(17,5(6,7(,672%(675,33('2)$//0$7(5,$/6'2:1
721$785$/62,/)5203523(57</,1(723523(57</,1(
6,
7
(
6
8
5
9
(
<
'
(
0
2
/
,
7
,
2
1
*
5
$
'
,
1
*
3
/
$
1
6
),5(+<'5$17/2&$7,216
6$17$%$5%$5$$9(
),5(+<'5$1721:(67
6,'(2)675((7
),5(+<'5$1721($67
6,'(2)675((7
127(%8,/',1*,621
3,(56123(5,0(7(5
)281'$7,21&216,'(5('
3(50($%/(
$&3$9,1*72%(5(029('
:$7(50(7(5(
72%(5(029('
39&:$7(5/,1((
7%5:22')(1&((7%5
:22')(1&((7%5
(;,6,7,1*+286((;,67,1*6+('
(;,67,1**$5$*(
1257+
1257+
$1<6,'(:$/.5(3/$&(0(17,672%(&216758&7('$63(5(1*67'
,17(*5$/6,'(:$/.
6((6+((7)256,7(,03529(0(17'(6&5,37,216
6((6+((7)2567250:$7(5&21752/0($685(6
6/((9(,1&21&)25'52352'
7<3&/26('326,7,21
3$,5'28%/(
*$7(6(48$/
6758&785$/:$//2)&200(5&,$/
63$&(
75$6+(1&/2685(6&$/(
127(*$7(623(1G
)81&7,21$/3/$1
6758&785$/3/$1
6,1*/(
*$7(
;;67/
&2/
*$/ *$/ *$/ *$/ *$/
6/
2
3
(
;;&21&%/2&.:,1*
:$//6:
3/$67(5),1,6+
2
6((3/$1)2523(1,1*
0$6215<:3257&(03/$67(50
),1)/5
%
$
$
127(
$//67((/72%(3$,17('
75$6+(1&/2685(6&$/(
/$7&+
(/(9$7,21
a+2/()253$'/2&.
6(&7,21
_[[B67/$1*/(
;67/78%(6
_[[B[/21*
[[B3/
)5$0(0,7(5 :(/'
%
*$7(67233(5
(/(9$7,21
$
%
6(&7,21
:$6+(5:(/'7252'723
a[67'3,3(,172
3$9(0(17,167$//3,3(6$7
&/26('$1'23(1326,7,21
2)*$7(
2)3$9(0(17
)5$0(0,7(5 :(/'
a52'%27+6,'(6
3/$7(
%
58%%(5:+((/21635,1*
3,67217<3($*$7(/($)
-$0%&211(&7,21
$
&217+,1*(:(/'('72-$0%
7278%()5$0(%<0,6&,521
67/68%&2175+,1*(6+$//
&216,672)7+.67/3/$7(
%
:a[$1&+256
[[67/78%()5$0(
0$6215<:3257&(03/$67(5
_[[B67/
$1*/()5$0(
#)520723
2&
&/5
127(&855(172))6,7(
'5$,1$*(($6(0(1772%(
$%$1'21
5(7$,1,1*:$//6&$/(
3/
#
6
2
8
7
+
6
,
'
(
3$9(5625$&3$9,1*
21&203$&7('%$6($6
3(562,/6(1*
&08%/2&.:$//
72%((1*,1((5('
,03(59,286$5($ 6)
/$1'6&$3( ',57$5($ 6)
:,//6(59(/(77(5
KĐƚŽďĞƌϮϯ͕ϮϬϮϯ
ĂƌƌLJtŝůůŝĂŵƐ͕ƌĐŚŝƚĞĐƚ
>tƌĐŚŝƚĞĐƚƐ
ϭϭϬϯůůĂ^ƚ
^ĂŶ>ƵŝƐKďŝƐƉŽ͕ϵϯϰϬϭ
ϴϬϱͲϰϱϵͲϳϯϱϯ
ZĞ͗ϭϵϮϱ^ĂŶƚĂĂƌďĂƌĂǀĞʹŶĐůŽƐƵƌĞWůĂŶƐĨŽƌD&hʹZĞǀŝƐĞĚtŝůůͲ^ĞƌǀĞ>ĞƚƚĞƌ
dŚŝƐůĞƚƚĞƌŝƐƚŽĂĐƚĂƐĂtŝůůͲ^ĞƌǀĞůĞƚƚĞƌĨŽƌƚŚĞĐŽůůĞĐƚŝŽŶŽĨƐŽůŝĚǁĂƐƚĞ͕ƌĞĐLJĐůŝŶŐ͕ĂŶĚŽƌŐĂŶŝĐǁĂƐƚĞĂƚ͗
ϭϵϮϱ^ĂŶƚĂĂƌďĂƌĂǀĞ͕^ĂŶ>ƵŝƐKďŝƐƉŽ͕͕ϵϯϰϬϭ
WĞƌƉĂŐĞƐϮĂŶĚϯŽĨƚŚĞƌĐŚŝƚĞĐƚƵƌĂů^ŝƚĞWůĂŶƌĞĐĞŝǀĞĚŽŶϭϬͬϮϮͬϮϬϮϯ
/ŶĂĐĐŽƌĚĂŶĐĞǁŝƚŚƚŚĞĨƌĂŶĐŚŝƐĞĂŐƌĞĞŵĞŶƚǁŝƚŚƚŚĞŝƚLJŽĨ^ĂŶ>ƵŝƐKďŝƐƉŽ͕^ĂŶ>ƵŝƐ'ĂƌďĂŐĞŽŵƉĂŶLJǁŝůů
ƉƌŽǀŝĚĞĐŽŵŵĞƌĐŝĂůŝŶͲLJĂƌĚĐŽůůĞĐƚŝŽŶŽĨƚŚĞƚŚƌĞĞǁĂƐƚĞƐƚƌĞĂŵƐĂƚƚŚŝƐůŽĐĂƚŝŽŶƉĞƌƚŚĞĨŽůůŽǁŝŶŐƐĐŚĞĚƵůĞ͗
^ŽůŝĚtĂƐƚĞ͗ϮϵϱͲŐĂůůŽŶƚƌĂƐŚĐĂŶƐ͕ϭdžǁĞĞŬůLJ
ZĞĐLJĐůŝŶŐ͗
KƌŐĂŶŝĐtĂƐƚĞ͗ϭϲϱ'ĐĂŶ͕ϭdžǁĞĞŬůLJ
EŽƚĞ͗^ĞƌǀŝĐĞůĞǀĞůƐŵĂLJĐŚĂŶŐĞĚĞƉĞŶĚŝŶŐŽŶǀŽůƵŵĞƐ͘
/ƚǁŝůůďĞƚŚĞƉƌŽƉĞƌƚLJŽǁŶĞƌ͛ƐƌĞƐƉŽŶƐŝďŝůŝƚLJƚŽŵĂŬĞƐƵƌĞƚŚĂƚĂůůĐŽŶƚĂŝŶĞƌƐĂƌĞĂĐĐĞƐƐŝďůĞďLJϲ͗ϬϬDŽŶƚŚĞ
ĚĂLJ;ƐͿŽĨĐŽůůĞĐƚŝŽŶ͘
ĂƐĞĚŽŶŵLJƌĞǀŝĞǁŽĨƚŚĞƉƌŽƉĞƌƚLJĂŶĚƉůĂŶƐĞƚ͕ƚŚĞƐƉĂĐĞĂůůŽƚƚĞĚĨŽƌǁĂƐƚĞƐƚŽƌĂŐĞĂŶĚƐĞƌǀŝĐĞŝƐ
ƐƵĨĨŝĐŝĞŶƚ͘
ĂƐĞĚŽŶŵLJƌĞǀŝĞǁŽĨƚŚĞƉƌŽƉĞƌƚLJĂŶĚƉůĂŶƐĞƚ͕ƚŚĞǀŽůƵŵĞŽĨĐĂŶƐĂŶƚŝĐŝƉĂƚĞĚĨŽƌƵƐĞĂƚƚŚŝƐƉƌŽƉĞƌƚLJ
ŝƐƐƵĨĨŝĐŝĞŶƚ͘
/ƚŝƐƚŚĞƉƌŽƉĞƌƚLJŽǁŶĞƌ͛ƐƌĞƐƉŽŶƐŝďŝůŝƚLJƚŽŝŶĐƌĞĂƐĞĨƌĞƋƵĞŶĐLJŽƌǀŽůƵŵĞŽĨƐĞƌǀŝĐĞŝĨŶĞĐĞƐƐĂƌLJƉƵƌƐƵĂŶƚƚŽ
DƵŶŝĐŝƉĂůŽĚĞ^ĞĐƚŝŽŶϴ͘Ϭϰ͘ϬϳϬ;Ϳ͘
EŽƚĞƐZĞŐĂƌĚŝŶŐ^ĞƌǀŝĐĞ͗
dŚŝƐD&hĐŽŵŵĞƌĐŝĂůĂĐĐŽƵŶƚǁŝůůƐŚĂƌĞĨŝǀĞƌĞƐŝĚĞŶƚŝĂůƐƚLJůĞĐĂŶƐ͘/ŶͲLJĂƌĚƐĞƌǀŝĐĞƚŽďĞŝŶĐůƵĚĞĚǁŝƚŚƚŚĞ
ĐŽŵŵĞƌĐŝĂůĂĐĐŽƵŶƚ͘,ŽǁĞǀĞƌ͕ĐĂŶƐŵĂLJĂůƐŽďĞƌŽůůĞĚŽŶƚŽƚŚĞƐƚƌĞĞƚďLJƌĞƐŝĚĞŶƚƐƚŽďĞƐĞƌǀŝĐĞĚĐƵƌďƐŝĚĞ͘
/ĨLJŽƵŚĂǀĞĂŶLJƋƵĞƐƚŝŽŶƐŽƌŶĞĞĚĂŶLJĂĚĚŝƚŝŽŶĂůŝŶĨŽƌŵĂƚŝŽŶ͕ƉůĞĂƐĞĚŽŶŽƚŚĞƐŝƚĂƚĞƚŽĐŽŶƚĂĐƚŵĞ͘
<ƌŝƐDĂnjƵƌĞŬ
KƉĞƌĂƚŝŽŶƐ^ƵƉĞƌǀŝƐŽƌ
ϯϲϬͲϳϴϵͲϬϵϵϭĞůů
ϰϯϴϴKůĚ^ĂŶƚĂ&ĞZĚ^ĂŶ>ƵŝƐKďŝƐƉŽ͕ϵϯϰϬϭϴϬϱͲϱϰϯͲϬϴϳϱ
ϮϵϱͲŐĂůůŽŶƌĞĐLJĐůĞĐĂŶƐ͕ϭdžǁĞĞŬůLJ
(*(*
(*
(*
(*(*
)(:&25(*
(*
7&)
6:%
6:%
(*
(*
(*
6:%
(*
(*
))
6:%
6/23(
6/
2
3
(
0
$
;
)) 2
9(57,&$/&859($6
3(53:67'
0$;$&&(66,%/(6/23(:25$03
),1)/51(('672%(
0,1$%29(),1
*5$'(
6/23(
0$;$&&(66,%/(6/23(:25$03
$&&(66,%/(3$7+
2)75$9(/
+$7&+('
Page 30 of 98
6$1/8,62%,632&$
(//$675((7
$UFKLWHFW'HYHORSHU
%$55</:,//,$06
5(1(:$/
1R&
%$55</:,//,$06
$5&+,7(&
7
$,152),/$&)2
(7$
7
6
/,&(1 6 ('
EOZD#FKDUWHUQHW
EOZ
6
$
1
7
$
%
$
5
%
$
5
$
$
9
(
6
/
2
&
$
6%
0
,
;
(
'
8
6
(
2%,632
,19(670(176,1&
&$/,)251,$%/9'67(&
6$1/8,62%6,32&$
*5281'/(9(/3/$1
6&$/(
6&/$(
6,
7
(
,
0
3
5
2
9
(
0
(
1
7
*
5
2
8
1
'
/
(
9
(
/
3
/
$
1
6
9$1
$&&(66,%/(
3$5.,1*
&&
1257+
&6=21(
5=21(
9$13$5.,1*5HIHUHQFH
$'$6WDQGDUGVIRU$FFHVVLEOH
'HVLJQ&)53DUW
$OWHUDWLRQV
$FFHVVLEOH6LWHVDQG([WHULRU)DFLOLWLHV1HZ&RQVWUXFWLRQ
DQG
3DUNLQJDQG3DVVHQJHU
/RDGLQJ=RQHV
$
$
%
%
),5(%$&.)/2:35(9(17,21'(9,&($1')'&
6((6+((7)25),5(+<'5$17/2&$7,216
6,7(,03529(0(173/$1
1(:'5,9(:$<$3352$&+
6/2(1*67'
:$7(50(7(56
75$6+
(1&/2685(
3(59,2863$9(56
,03(59,286$5($ 6)
/$1'6&$3($5($ 6)
3(59,286$5($ 6)
1(,*+%255(6,'(1&(*$5$*(
*$5$*(
1(,*+%255(6,'(1&(
&6=21(
&6=21(
5=21(
:+((/6723
68%7(55$1($13$5.,1*
9,75(286&+,1$%$7+52206,1.9((5.
9,75(286&+,1$%$7+52206,1.9((5.9,75(286&+,1$%$7+52206,1.9((5.9,75(286&+,1$%$7+52206,1.9((5.
1257+
3(59,2863$9(56
%(1&+
%(1&+
/$1'&$3(
/$1'&$3(
+,*+
&08:$//
3/$67(5('
(;7(5,25(/(9$7,21
/(*(1'
6(7%$&.
3(59,2863$9(56
/$1'&$3(
$
$
'%&$
(
120,1$/6,=( 0$7(5,$/ +($'
:,1'2:'(6&5,37,21 )5$0( '(7$,/6 127(6
:,1'2:$1'*/$=,1*6&+('8/(
7<3( */$66 ),1,6+ 6,//-$0%
$
%
&
/(*(1'
7<3(
)*),;('*/$66
6/6/,'(5
6+6,1*/(+81*
$:1$:1,1*
&607&$6(0(17
*/$66
'*'8$/*/$=('
'*7'8$/*/$=('7(03(5('
6*6,1*/(*/$=('
6*76,1*/(*/$=('7(03(5('
6*/6,1*/(*/$=('/$0,1$7('
0$7(5,$/
$/$/80,180
919,1</
:':22'
)*),%(5*/$66
67/67((/
)5$0(),1,6+
$12$12',=('
3&32:'(5&2$7('
373$,17('
6767$,1('
),5(
'
:$'9$1&('/2:(*/$660,18)$&7256+*&
;
35'+'*
;
6/'*7
)*'*7
;
1$
1$
1$
6./7 6.</,*+7
(
)
;
;
)*'*1$
$:1 '*1$
0,/*$5'6(5,(675,16,&6(5,(69%/$&.&$3672&.
;
35'+$/3&'*1$
*
+
,
;
;
6+'*1$
'*1$
;
)*'*1$
6/
-
;
'+'*1(('6720((7(*5(665(48,5(0(17
:,1'2:6&+('8/(
0$,/%2;(6(/(&75,&
0(7(56
(/(&75,&
0(7(56
5(&(66(':':$73/$67(5 6&$/(
:,1'2:5(&(66('
6,//(;7(1'6%(<21'),1,6+:$//6(('7/
$//685)$&(660227+3/$67(5:(/$6720(5,&3$,17
:':75,0$7+25,=6,',1*6&$/(
[:22'75,0$5281':,1'2:6,'(6
6+$3(';:22'6,//
0$,/%2;(6
),5(5,6(5
5220
6(7%$&.
83
%,.(
/2&.(5
%('522081,76
29(53$5.,1*
&200(5&,$/$&&(66,%/(5(6,'(1&(/,)7
(;,75287(
Page 31 of 98
6$1/8,62%,632&$
(//$675((7
$UFKLWHFW'HYHORSHU
%$55</:,//,$06
5(1(:$/
1R&
%$55</:,//,$06
$5&+,7(&
7
$,152),/$&)2
(7$
7
6
/,&(1 6 ('
EOZD#FKDUWHUQHW
EOZ
6
$
1
7
$
%
$
5
%
$
5
$
$
9
(
6
/
2
&
$
6%
0
,
;
(
'
8
6
(
2%,632
,19(670(176,1&
&$/,)251,$%/9'67(&
6$1/8,62%6,32&$
1'/(9(/3/$1 6&/$(
9,75(286&+,1$% $ 7+5 2206 ,1.9((5.9,75(286&+,1$% $ 7+5 2206 ,1.9((5.9,75(286&+,1$% $ 7+5 2206 ,1.9((5.9,75(286&+,1$%$7+52206,1.9((5.
6&/$(
1
'
5
2
2
)
/
(
9
(
/
3
/
$
1
6
1257+
522)3/$1 6&/$(
35,9$7('(&.
67$1',1*6($00(7$/522)621
6/23(:3+27292/7$,&
3$1(/6$77$&+('7<32)
81,7
81,7
81,7
23(172%(/2:
121'/(9(/$7
&200(5&,$/
23(172%(/2: 23(172%(/2:
35,9$7('(&. 35,9$7('(&.
&
&
$
$
%
%
&
&
$
$
%
%
1257+
67$1',1*6($00(7$/522)621
6/23(
81,7
/2::$//
&/
&/&/&/
23(172%(/2:
23(15$,/%(/2:
:,1'2:6
()
**
%++,,
%++,
(;73/$67(56,//
%/$&.$/80,180:,1'2:6
60227+(;7(5,253/$67(5:(/$6720(5,&
&2$7,1*
&$8/.%7:,1'2:$1'6,//
;'%/3/
;'%/3/
;6758&7:$//
3257,&2(175<$775,3/(;81,76
(;326('5$)7(57$,/63$,17('&8772;',0(16,21:
3$,17(')$6&,$
+$5',(%2$5'&(0(176,',1*(;32685(
;%(//<%$1'
67((/3,3(5$,/,1*
&2558*$7('0(7$/6,',1*:,7+&$3
3$5.,1*%(/2:
(175<3257,&2:,7+5$,/,1*386+('287)25%(1&+
&21&(37723527(&7(175<$1'72352027(',1)250$/
&219(56$7,21$5($6
'28%/(+81*:,1'2:6::22'75,06855281'
+$5',(%2$5'&(0(176,',1*(;32685($/7(51$7(3/$67(5/2:(5)/225
Page 32 of 98
6$1/8,62%,632&$
(//$675((7
$UFKLWHFW'HYHORSHU
%$55</:,//,$06
5(1(:$/
1R&
%$55</:,//,$06
$5&+,7(&
7
$,152),/$&)2
(7$
7
6
/,&(1 6 ('
EOZD#FKDUWHUQHW
EOZ
6
$
1
7
$
%
$
5
%
$
5
$
$
9
(
6
/
2
&
$
6%
0
,
;
(
'
8
6
(
2%,632
,19(670(176,1&
&$/,)251,$%/9'67(&
6$1/8,62%6,32&$
(;
7
(
5
,
2
5
(
/
(
9
$
7
,
2
1
6
6287+(/(9$7,21
6&$/(
6&$/(
*5((16&5((1:)2/,$*(720$6.
68%7(55$1($13$5.,1*
3523(57</,1(
$12',=(':,1'2:6%/$&.),1,6+7<3
3,3(5$,/7235$,/,1*32:'(5&2$7('
*$&2558*$7('0(7$/6,',1*
3523(57</,1(
$12',=(':,1'2:6%/$&.),1,6+
3,3(5$,/7235$,/,1*32:'(5
&2$7('$775,3/(;%(<21'
*$&2558*$7('0(7$/6,',1*
($67(/(9$7,216$17$%$5%$5$675((7)5217$*(
/(9(/2)68%7(55$,1,$13$5.,1*%(/2:
*5281'/(9(/$7675((7
3523(57</,1(
127(6
6((6+((7)256(7%$&.6$753523(57<727+(:(67
$///,*+7,1*,672%('2:1/,*+7,1*/2&$7(',162))(725&(,/,1*625:$///,*+76
:,7+$'2:1:$5'',5(&7,21
67$,5672*$5$*(
),1,6+*5$'($73523(57</,1(&21&6233257&2/6
7<32)
+25,=217$/&(0(17%2$5'6,',1*
3$,17('%(<21'$&&(66,%/(81,7
+25,=217$/&(0(17%2$5'6,',1*
3$,17('
3+27292/7$,&3$1(/6267$1',1*6($00(7$/
522),1*7<32)
6,*1$*(
60227+(;7(5,253/$67(5:
(/$6720(5,&),1,6+
6&$/(
($67(/(9$7,212)5(6,'(1&(6%(+,1'&200(5&,$/
*$&2558*$7('0(7$/6,',1*
3+27292/7$,&3$1(/6267$1',1*6($00(7$/
522),1*
5(':22')(1&($73523(57</,1(
5(':22')(1&($73523(57</,1(
/2::$//3/$67(5('2&08:$''5(66
)'&
%(1&+(6
3+27292/7$,&3$1(/6267$1',1*
6($00(7$/522),1*
3523(57</,1(
3523(57</,1(
*$&2558*$7('0(7$/6,',1*
3,3(5$,/7235$,/,1*32:'(5&2$7('
60227+(;7(5,253/$67(5:(/$6720(5,&),1,6+
/(9(/2)68%7(55$,1,$13$5.,1*%(/2:
*$&2558*$7('0(7$/6,',1*
3,3(5$,/7235$,/,1*32:'(5&2$7('
3$,17(')$6&,$6:0(7$/)/$6+,1*720$7&+
522)7<33$,17(')$6&,$6:0(7$/)/$6+,1*72
0$7&+522)7<3
+25,=217$/&(0(17%2$5'6,',1*
3$,17('
3$,17(')$6&,$6:0(7$/)/$6+,1*72
0$7&+522)7<3
5(':22')(1&($73523(57</,1(
5(029(')259,(:2)81,7
29(5+$1*
1257+
6287+
:(67
1257+
6287+
5(&(66('(175<
1$785$/:22''22567$,1('
:,7+75$16/8&(17/,7(6
2175,3/(;%(<21'
$&&(66,%/(%('522081,7 &200(5&,$/81,7
7<3
;(;7(5,25&251(567<3
;%(//<%$1'
&29(5('(175,(6
60227+(;7(5,253/$67(5:(/$6720(5,&),1,6+
67$1',1*6($00(7$/522)
1$552:5,%215(6,'(17,$/
7<3
67$1',1*6($00(7$/522)
:,'(5,%21&200(5&,$/
;*$%/((1'63$,17('
+25,=217$/&(0(17%2$5'6,',1*
3$,17('
;*$%/((1'63$,17('
60227+(;7(5,253/$67(5:(/$6720(5,&),1,6+
Page 33 of 98
6$1/8,62%,632&$
(//$675((7
$UFKLWHFW'HYHORSHU
%$55</:,//,$06
5(1(:$/
1R&
%$55</:,//,$06
$5&+,7(&
7
$,152),/$&)2
(7$
7
6
/,&(1 6 ('
EOZD#FKDUWHUQHW
EOZ
6
$
1
7
$
%
$
5
%
$
5
$
$
9
(
6
/
2
&
$
6%
0
,
;
(
'
8
6
(
2%,632
,19(670(176,1&
&$/,)251,$%/9'67(&
6$1/8,62%6,32&$
:(67(/(9$7,212)&200(5&,$/
6&/$(
6&/$(
(;
7
(
5
,
2
5
(
/
(
9
$
7
,
2
1
6
3523(57</,1(
$12',=(':,1'2:6%/$&.),1,6+7<3
3,3(5$,/7235$,/,1*32:'(5
&2$7('
*$&2558*$7('0(7$/6,',1*
1257+(/(9$7,21
/(9(/2)68%7(55$,1,$13$5.,1*%(/2:
*5((16&5((1$/21*3523(57<
/,1(720$6.3$5.,1*
3+27292/7$,&
3$1(/62
67$1',1*6($0
0(7$/522),1*
/$1'6&$3(675,3
0$7(5,$/61(:352326$/
6$/6%85<860$,/
*5((16&5((1%(<21'$/21*:(67
3523(57</,1(720$6.3$5.,1*
&086833257
:$//
3,3(5$,/7235$,/,1*32:'(5
&2$7('
*$&2558*$7('0(7$/6,',1*
*$&2558*$7('0(7$/6,',1*
),5(
5,6(5
'5,9(:$<
0$,/%2;(6
67$1',1*6($00(7$/522)
7<3
67$1',1*6($00(7$/
522)7<3
67$1',1*6($00(7$/522)
1$552:5,%215(6,'(17,$/
7<3
*$&2558*$7('0(7$/6,',1*
75$6+(1&/2685($&&(66,%/(3$5.,1*3$66(1*(5/2$',1*
$&&(66,%/(/,9,1*81,7
:(67(/(9$7,21
&21&6233257&2/6
7<32)
5(':22')(1&($7:(67
3523(57</,1(
5(':22')(1&($7
3523(57</,1(
(;&(37$76287+(1'
:,7+*5((16&5((1
1$785$/*5$'($73523(57</,1(
6$
1
7
$
%
$
5
%
$
5
$
6
7
5
(
(
7
5
2
:
+25,=217$/&(0(17%2$5'6,',1*
3$,17('
:;75,0
;&251(575,07<3
&29(5('(175,(67<3
833(5)/2253233('28721(1'6
.1((%5$&(6
0$,/%2;(6
67$1',1*6($00(7$/522)
1$552:5,%215(6,'(17,$/
7<3
67$1',1*6($00(7$/522)
:,'(5,%21&200(5&,$/
60227+(;7(5,253/$67(5:(/$6720(5,&),1,6+
$12',=(':,1'2:6%/$&.),1,6+
5(&(66(',1:$//:,7+352758',1*6,//
7<3
;:22'%$1'
;%$1'
+25,=217$/&(0(17%2$5'6,',1*
3$,17('
;:22'%$1'
60227+(;7(5,253/$67(5:(/$6720(5,&),1,6+
Page 34 of 98
7+(6(7+5((352-(&76:(5($//%8,/7$5281'7+(<$5(&200(5&,$/5(6,'(17,$/7+(
$5&+,7(&785(7$.(6)5207+()$/6()52172)7+('(/0217(:,7+620(025(
&217(0325$5<728&+(6
7+,62/'&63523(57<+$66(59(',10$1<&$3$&,7,(6$6$
&200(5&,$/6(59,&(3523(57<,7$/21*:,7+7+(3523(57,(6
727+(1257+$5(%281'72%(5('(9(/23('
7+,6,621(2)7+(/$67
5(0$,1,1*6,1*/()$0,/<
5(6,'(1&(6216$17$
%$5%$5$$9(
7+,66,7(:$6$9$&$17/27
817,/:+(17+(
25,*,1$/0F&$57+<
686('
&$5/27:$63/$&('21,7
6,1&(,7+$6+$'$&283/(2)
27+(5&200(5&,$/86(6
7+,66,1*/()$0,/<
5(6,'(1&(6:,7+$&283/(2)
287%8,/',1*6+286,1*
5(6,'(1&(6+$6+$'$
&283/(2)5('(9(/230(17
352326$/6
7+('(/0217(&$)(+$6%((1$/$1'0$5.6,1&(7+(
6:+(17+(2/'9$&$170$5.(7:$67851(',172
$5(67$85$17
7+,6(&/(&7,&%8,/',1*+$66(59('$6$+$5':$5(6725($1'12:$0(17$/+($/7+
)$&,/,7<
,521+256(2)),&(%8,/',1*%8,/7,1'2(6$*22'-2%$786,1*,1'8675,$/0$7(5,$/6
7+$721(0,*+7),1'$/21*$5$,/52$'52:
352326('675((7(/(9$7,21
352326('
)22735,17
3$5.,1*
6$17$%$5%$5$675((7
6$17$%$5%$5$$9(5$,/52$'648$5(
7+(25,*,1$/5$,/52$'648$5(%8,/',1*.12:1$67+(&+$11(/%8,/',1*:$6%$'/<'$0$*(',1$),5(,1
$/7+28*+
6:22'$'',7,216:(5('(6752<('7+(25,*,1$/%5,&.%8,/',1*:$6$%/(72%(
6$/9$*('&217(0325$5<$'',72160267/<,167((/&/$'',1*(5($''('72($&+(1'%22.(1',1*7+(
25,*,1$/6758&785($1'$//2:,1*,77267$1'2877+,6,6$*5($7(;$03/(2)$&217(0325$5<
$5&+,7(&785$/,17(59(17,21+$5021,=,1*12775<,1*725(3/,&$7(25&203(7(:,7+$:21'(5)8/
+,6725,&$/6758&785(
&,5&8067$1&(681,48(727+,6352-(&77$.(1)5202$6,6:(%3$*(
5(+$%,/,7$7,21$1'$'$37,9(5(86(2)$1+,6725,&$/6758&785(
68%67$17,$/38%/,&2875($&+$1'&20081,7<,192/9(0(17
),5('$0$*(5(6725$7,21
815(,1)25&('0$6215<6(,60,&5(752),7
7+(02675(&(17352-(&7&203/(7('216$17$%$5%$5$$9(,6$0,;2)&200(5&,$/$1'
5(6,'(17,$/7+(675((7)5217$*(,686,1*6+('522)6,1$6$:7227+25,(17$7,217+(
0$7(5,$/6$5($&20%,1$7,212)&(0(17%2$5'6,',1*(;7(5,253/$67(5$1'9$5,286
352),/(62)0(7$/3$1(/6
6$17$%$5%$5$$9(18(52:
6$1/8,62%,632&$
(//$675((7
$UFKLWHFW'HYHORSHU
%$55</:,//,$06
5(1(:$/
1R&%$55</:,//,$06
$5&+,7(
&
7
$,152),/$&)2
(7$
7
6
/,&(1 6 ('
EOZD#FKDUWHUQHW
EOZ
6
$
1
7
$
%
$
5
%
$
5
$
$
9
(
6
/
2
&
$
6%
0
,
;
(
'
8
6
(
2%,632
,19(670(176,1&
&$/,)251,$%/9'67(&
6$1/8,62%6,32&$
Page 35 of 98
6$1/8,62%,632&$
(//$675((7
$UFKLWHFW'HYHORSHU
%$55</:,//,$06
5(1(:$/
1R&
%$55</:,//,$06
$5&+,7(&
7
$,152),/$&)2
(7$
7
6
/,&(1 6 ('
EOZD#FKDUWHUQHW
EOZ
6
$
1
7
$
%
$
5
%
$
5
$
$
9
(
6
/
2
&
$
6%
0
,
;
(
'
8
6
(
2%,632
,19(670(176,1&
&$/,)251,$%/9'67(&
6$1/8,62%6,32&$
6(&7,21&&
6&$/(
6&$/(
6(&7,21$$%8
,
/
'
,
1
*
6
(
&
7
,
2
1
6
&200(5&,$/63$&(
81,7
6(&7,21%%
1$785$/*5$'((
0$;$//2:$%/(3523(57<'(9(/230(17287/,1(
127(3523(57<727+(:(67,6=21('5
$63(5=21,1*5(*8/$7,216
81,7
81,7
81,7
0$;$//2:$%/(3523(57<'(9(/230(17287/,1(0$;$//2:$%/(3523(57<'(9(/230(17287/,1(
(175<:$/.:$<81,7
81,7
75,3/(;%(<21'
68%7(55$1($13$5.,1*/(9(/
%(<21'
+5),5(5$7,1*5(4
'
6((6+((7&%&&2'($1$/<6,6
+5),5(5$7,1*5(4
'
6((6+((7&%&&2'($1$/<6,6
35,9$7('(&.
($81,7
3$7,2
0$
;
+
7
$
/
/
2
:
(
'
5
3$5.,1*
+5),5(5$7,1*5(4
'
6((6+((7&%&&2'($1$/<6,6
+5),5(5$7,1*5(4
'
6((6+((7&%&&2'($1$/<6,6
('*(&21',7216$33/<6((6/2=21,1*25',1$1&(6(&7,21
$$*
$(*
$(*
$(*
$$*
HJ
$&78$/%8,/',1*6(7%$&.
9(57,&$/&859($63(53:67'
,17(532/$7('$6
581
'5,9($668%0,77('
'5,9($60$;,080'(&(17
&(
1
7
(
5
2
)
3
5
2
3
(
5
7
<
Page 36 of 98
1
:
1
:
1
(
1
(
6$
1
7
$
%
$
5
%
$
5
$
$
9
(
,03(59,286$5($6)(;,67,1*6,7(
,03(59,286$5($6)
352326('6,7(/$1'6&$3($5($6)
3(59,2863$9(56 1$785$/$5($6)
/$1'6&$3($1'1$785$/$5($6)
6$
1
7
$
%
$
5
%
$
5
$
$
9
(
727$/$5($
127((;,67,1*6758&785(,621
&$,66216$1'5$,6('2))2'
7+(*5281'
6$1/8,62%,632&$
(//$675((7
$UFKLWHFW'HYHORSHU
%$55</:,//,$06
5(1(:$/
1R&
%$55</:,//,$06
$5&+,7(&
7
$,152),/$&)2(7$7
6
/,&(1 6 ('
EOZD#FKDUWHUQHW
EOZ
6
$
1
7
$
%
$
5
%
$
5
$
$
9
(
6
/
2
&
$
6%
0
,
;
(
'
8
6
(
2%,632,19(670(176,1&
&$/,)251,$%/9'67(&
6$1/8,62%6,32&$
Page 37 of 98
48$17
PLANT SYMBOL LEGEND
6<0%2/6,=(:$7(586(
3/$17:$7(586(3(5:8&2/6=21(
GROUND COVERS LEGEND
3/$171$0(
LS. AREA CALCULATION & HYDROZONES
BUILDING
PROPOSED
LP
LP
LP
LP
(1st fl GARAGE)
BUILDING
PROPOSED
³
LANDSCAPE DOCUMENT REQUIREMENTS
GREEN CODE REQUIRMENTS :
LANDSCAPE DEVELOPMENT PLAN
BUILDING
PROPOSED
CASEY J PATTERSONLANDSCAPE ARCHITECT 1 10 /11 /23
LANDSCAPE DEVELOPMENTPLAN
3/16" = 1'-0"
SB-LIVE-WORK STUDIOS1925 SANTA BARBARA STREET,SAN LUIS OBISPO, CA
:$7(5%8'*(7&$/&8/$7,21
WZK:d͗ ^ƚĂŶƚĂĂƌďĂƌĂ^ƚDŝdžĞĚhƐĞĚWƌŽũĞĐƚ
Dtс;dŽͿdž;Ϭ͘ϲϮͿdž;Ϭ͘ϱϱdž>Ϳн;Ϭ͘ϯdž^>Ϳ
^>с Ϭ
Dtс ϭϬ͕Ϭϲϲ͘ϳ
dthс;ƚŽͿdž;Ϭ͘ϲϮͿdž;W&dž,ͬ/Ϳн^>
^ŝƚĞ>ŽĐĂƚŝŽŶ͗ ^ĂŶ>ƵŝƐKďŝƐƉŽ
^ŝƚĞΖƐdŽ͗ ϰϯ͘ϴ
/ƌƌŝŐĂƚŝŽŶĨĨŝĐŝĞŶĐLJ͗ Ϭ͘ϴϭ K͘,с͘ϳϱŵĂdž
ƌŝƉс͘ϴϭ
WůĂŶƚ&ĂĐƚŽƌƐ
>Žǁ ϬͲϬ͘ϯ
DĞĚŝƵŵ Ϭ͘ϰͲϬ͘ϲ
,ŝŐŚ Ϭ͘ϳͲϭ͘Ϭ
d&с Ϭ͘ϱϱ Z^͘сϬ͘ϰϱ
KD͘сϬ͘ϱϱ
WůĂŶƚŝŶŐ WůĂŶƚ ,LJĚƌŽnjŽŶĞ
,LJĚƌŽnjŽŶĞ dLJƉĞ &ĂĐƚŽƌ ƌĞĂ W&dž,;&d^YͿ dth >Kd/KE
ϭ >Žǁ Ϭ͘Ϯ ϲϳϰ ϭϯϱ ϰ͕ϱϭϵ ŶƚŝƌĞƉƌŽƉĞƌƚLJ
^Ƶŵ͗ ϲϳϰ ϭϯϱ ϰ͕ϱϭϵ dKd>
>ŽǁǁĂƚĞƌƵƐĞĂƌĞĂƐ͗ ϲϳϰ
DĞĚŝƵŵǁĂƚĞƌƵƐĞĂƌĞĂ͗ Ϭ
;h'dͿ ;^d/DdͿ
Dtс ϭϬ͕Ϭϲϳ dthс ϰ͕ϱϭϵ
;DĂdž͘ůůŽǁĞĚtĂƚĞƌůůŽƚŵĞŶƚͿ WƌŽũĞĐƚĐŽŵƉůŝĞƐǁŝƚŚDt>K
;ĞƐƚŝŵĂƚĞĚŝƐůŽǁĞƌƚŚĂƚďƵĚŐĞƚͿ
PLANT IMAGES
Page 38 of 98
City of San Luis Obispo, Community Development, 919 Palm Street, San Luis Obispo, CA, 93401-3218, 805.781.7170, slocity.org
April 22, 2024
Obispo Investments Inc
c/o Barry Williams
1103 Ella St.
San Luis Obispo, CA 93401
SUBJECT: Application ARCH-0448-2022 (1925 Santa Barbara)
Architectural review of a new mixed-use development of three buildings, with
four residential units and street-fronting nonresidential, in the Railroad Historic
District
Dear Mr. Williams:
On April 22, 2024, I reviewed your client’s Architectural Review application regarding a new
mixed-use project within the Railroad Historic District. After reviewing the plans, I determined
that the project is minor and will not require review by the Architectural Review Commission
(ARC). Your plans are approved, based on findings and subject to the following conditions:
Findings:
1. As conditioned, the proposed project is consistent with the goals and policies of the Land
Use Element (LUE) of the City’s General Plan applicable to development in a Services
and Manufacturing area, and with goals and policies of the General Plan’s Conservation
and Open Space Policies (COSE) for Cultural Heritage (COSE § 3). Mixed uses are
encouraged in commercial districts (LUE §3.8.5). The project’s residential component is
situated at the west side of the site, at the boundary with an adjacent residential
neighborhood to the west and provides enhanced building setbacks such that the
residential atmosphere of the adjacent neighborhood is protected (LUE §2.3.3). New
construction reflects the form, spacing, and materials of nearby historic structures and
does not affect the street appearance of buildings which contribute to the neighborhood’s
architectural character, consistent with Conservation and Open Space Element Policy
3.3.4. Fiber cement board and plaster are employed as the predominant exterior materials,
which are visually compatible with the exterior materials of buildings in the vicinity.
2. As conditioned, the project design is consistent with standards and limitations set out in
the City’s Zoning Regulations. The site is within a Service Commercial (C-S) Zone, and
Mixed-Use Development is a permitted use in the Zone (§ 17.10.020). The project and
proposed new structures conform to applicable development standards for the zone
(Ch. 17.70), including enhanced Edge Condition setbacks at the boundary of the adjacent
residential neighborhood to the west (§17.70.050) and with standards for Mixed-Use
Development (§17.70.130).
3. According to the recommendation of the Cultural Heritage Committee made on
Page 39 of 98
ARCH-0448-2022 (1925 Santa Barbara)
Page 2
March 25, 2024, the project is consistent with the City’s Historic Preservation Ordinance
(SLOMC Ch. 14.01) and the supporting Historic Preservation Program Guidelines
(HPPG), in particular with guidelines related to architectural compatibility (HPPG
§§ 3.2.1 & 3.3.2). The proposed new buildings are based on simple rectangular forms
and exhibit horizontal massing, sloping roof forms, grouped horizontal window patterns,
fiber cement board (simulating wood appearance) and plaster exterior materials, and trim
and roof detailing, consistent with Architectural Guidelines provided in the Railroad
District Plan, complementing the District’s historic character.
4. According to the recommendation of the Cultural Heritage Committee made on
March 25, 2024, the project is consistent with the Secretary of the Interior’s Standards
for the Treatment of Historic Properties. The proposed new construction has been
designed to be compatible in form, massing, color, and materials with the historic
character of the Railroad Historic District.
5. The project is consistent with the City’s Community Design Guidelines. It is designed in
an attractive and environmentally sensitive manner that responds to the character and
constraints of the site, fits in with site design and architecture in the vicinity, and logically
locates site elements for efficient operation (§ 2.1). The new building exhibits proper
proportion, harmony, simplicity, rhythm, balance, and is designed to coordinate with
existing structures on the site (§ 2.2) and is compatible with adjacent buildings and those
in the immediate neighborhood (§ 5.3).
6. The project is categorically exempt from CEQA environmental review, as Infill
Development (CEQA Guidelines §15332). The proposed development is consistent with
the Services and Manufacturing designation of the property, applicable General Plan
policies, and with the standards and land use limitations set out in Zoning Regulations
for the Service Commercial (C-S) Zone with Historic Overlay. The site measures less
than five acres in area, is located within City limits, substantially surrounded by urban
uses, and has no value as habitat for endangered, rare or threatened species. Approval of
the project would not result in any significant effects relating to traffic, noise, air quality,
or water quality, and the site can be adequately served by all required utilities and public
services. The project does not involve physical demolition, destruction, relocation, or
alteration of any historical resource or its immediate surroundings, and therefore does
not cause a substantial adverse change in the significance of any such resource (CEQA
Guidelines §15064.5(b)). The historical resources nearest to the property are located on
separate parcels apart from the subject site, physically removed from, and not impacted
by, the proposed project. As described in Findings 3 and 4, the project has been found to
be architecturally compatible with adjacent and nearby historic resources and with the
character of the Railroad Historic District.
Conditions:
Please note the project conditions of approval do not include mandatory code requirements.
Code compliance will be verified during the plan check process, which may include additional
requirements applicable to your project.
Page 40 of 98
ARCH-0448-2022 (1925 Santa Barbara)
Page 3
Planning
1. Conformance to approved plans and conditions. Final project design and construction
drawings submitted for building permits shall be in substantial compliance with approved
plans, as revised according to the direction provided by the Cultural Heritage Committee,
and with the conditions of approval herein. A separate full-size sheet shall be included in
plans submitted for permits, listing all conditions of project approval. Reference shall be
made in the margin of the listed conditions as to where in plans requirements are addressed.
Any change to approved design, colors, materials, landscaping or other conditions of
approval must be reviewed and approved by the Community Development Director.
2. Colors and materials. Plan submitted for permits to complete this project shall clearly
depict and describe all materials and colors, including siding, roofing, windows, and
decorative trim, and the dimensions of windows, including window frames and mullions,
lintels, sills, surrounds, recesses, trim, and other related window features, shall be clearly
indicated, to the satisfaction of the Community Development Director.
3. Night Sky Preservation. Plans submitted for construction permits to complete this project
shall include information about exterior lighting, including building-mounted lighting,
sufficient to verify conformance to Night Sky Preservation regulations (Zoning
Regulations Ch. 17.23).
Code Compliance Notes:
Engineering
1. The building plan submittal shall show and label all existing and proposed public or private
easements for reference. Any required on-site or off-site easements shall be recorded prior
to building permit issuance.
2. Complete frontage improvements will be required as a condition of the building permit
including new curb, gutter, sidewalk and street paveout. The improvements shall be
constructed in accordance with the Engineering Standards in effect at the time of
encroachment permit issuance.
3. The building plan submittal shall note or dimension the street right-of-way width on the
site plan. The plan shall show the dimensions of the centerline to property line, centerline
to face of curb, and face of curb to property line for reference.
4. The building plan submittal shall show all required short-term and long-term bicycle
parking to the satisfaction of the Community Development Department. Include details
and detail references on the plans for the proposed bicycle parking facilities. The building
plans shall provide a detailed site plan of any racks. Show all dimensions and clearances
to obstructions per city standard. The Title Sheet of plans shall include a parking
calculation describing the required and proposed bicycle parking for the project.
5. Final plans submitted for construction permits to complete this project shall be
accompanied by written confirmation of solid waste service by the City’s Franchise Waste
Hauler (San Luis Garbage).
6. Final plans submitted for construction permits to complete this project shall depict the
location of the proposed mail receptacles or mailbox unit (MBU) serving the project, to the
satisfaction of the Postmaster and the City Engineer. MBU’s shall not be located within
Page 41 of 98
ARCH-0448-2022 (1925 Santa Barbara)
Page 4
the public right-of-way or public sidewalk area, unless specifically approved by the City
Engineer.
Fire
7. Final plans submitted for construction permits to complete this project shall depict fire
sprinkler riser rooms with direct exterior access for each building with direct exterior
access, to the satisfaction of the Fire Marshal.
8. Proposed structures of Construction type “VB” and Occupancy Type “R-2,” as depicted in
final plans submitted for permits to complete this project, shall be provided with a full
NFPA 13-standard fire sprinkler system.
9. Plans submitted for construction permits to complete this project shall demonstrate
compliance with minimum fire separation distance standards (i.e., 10 feet from the exterior
edge of stairways and landings to adjacent lot lines and to other buildings on the same lot)
set out in applicable building and fire safety codes, to the satisfaction of the Fire Marshal.
10. Plans submitted for construction permits to complete this project shall depict fire
department ladder access from driveways to bedroom windows and roofs, compliant with
applicable building and fire safety codes. Distances from accessible ground up shall be
indicated, and any obstruction by support beams clearly noted.
11. Plans submitted for construction permits to complete this project shall show exit travel
distances from units to the public way from exterior exit stairs for the residential buildings.
Utilities
12. Final plans submitted for construction permits to complete this project shall include a site
utility plan showing the size of existing and proposed sewer and water services. The
construction plans for sewer and water services shall be in accordance with the engineering
design standards in effect at the time the building permit is approved. The project’s
commercial and residential uses shall be metered separately. All residential units are to be
individually metered. The sewer lateral serving the property shall be made with HDPE
material and shall be installed per the City’s engineering design standards.
13. Final plans submitted for construction permits to complete this project shall demonstrate
compliance with fire flow and fire sprinkler requirements for all floors of the proposed
project, to the satisfaction of the Utilities Director and Chief Building Official. Design
plans shall be supported by engineering calculations, to be submitted with the building
permit.
14. The project is located within a capacity constrained area and shall satisfy the wastewater
flow offset requirements described in Municipal Code Section 13.08.396, prior to issuance
of construction permits to complete the project.
15. The building permit submittal shall include a final landscape design plan and irrigation
plan that includes all the criteria required in the City Engineering Standards Uniform
Design Criteria for Landscaping and Irrigation.
16. The project’s estimated total water use (ETWU) to support new ornamental landscaping
shall not exceed the project’s maximum applied water allowance (MAWA). Final plans
submitted for construction permits to complete this project shall include calculation and
information for review and approval by the Utilities Department prior to issuance of a
Page 42 of 98
ARCH-0448-2022 (1925 Santa Barbara)
Page 5
building permit to support required water demand of the project’s proposed landscaping.
17. Where commercial uses in the project may include food preparation, final plans submitted
for construction permits to complete this project shall depict provisions for grease
interceptors and FOG (fats, oils, and grease) storage within solid waste enclosure(s). Such
commercial facilities shall be subject to issuance of an Industrial Wastewater Discharge
Survey and Permit Application prior to issuance of occupancy permit, and an area must be
provided to wash floor mats, equipment, and trash cans that is located inside, and drained
to the sanitary sewer.
18. Potable city water shall not be used for major construction activities, such as grading and
dust control. Recycled water is available through the City’s Construction Water Permit
program.
Building
19. The design of the under-building parking garage depicted in final plans submitted for
construction permits to complete this project must demonstrate compliance with building
and fire codes applicable to parking garages, including, but not limited to California
Building Code Sections 406 (Motor-Vehicle-Related Occupancies) and 705 (Fire and
Smoke Protection Features), and where electric vehicle charging facilities are provided,
California Fire Code Section 1207.
Housing
20. The project is subject to Inclusionary Housing Requirements described in Municipal Code
Chapter 17.138. Final plans for construction permits must be accompanied by a statement
describing the project’s inclusionary housing plan, as described in Zoning Regulations
Section 17.138.070(A).
21. The project is subject to the Commercial Linkage Fee described by Municipal Code
Chapter 4.60. The fee must be paid in full prior to the issuance of the first building permit
for the commercial development project.
Indemnification
The applicant shall defend, indemnify, and hold harmless the City and/or its agents, officers
and employees from any claim, action or proceeding against the City and/or its agents, officers
or employees to attack, set aside, void or annul, the approval by the City of this project, and
all actions relating thereto, including but not limited to environmental review (“Indemnified
Claims”). The City shall promptly notify the applicant of any Indemnified Claim upon being
presented with the Indemnified Claim and City shall fully cooperate in the defense against an
Indemnified Claim.
My action is final unless appealed within 10 calendar days of the date of the decision. Anyone
may appeal the action by submitting a letter to the Community Development Department
within the time specified. The appropriate appeal fee must accompany the appeal
documentation. Appeals will be scheduled for the first available Planning Commission meeting
date. If an appeal is filed, you will be notified by mail of the date and time of the hearing.
The Community Development Director’s approval of this project will automatically expire in
one year, unless plans for a building permit have been submitted, or unless a different
Page 43 of 98
ARCH-0448-2022 (1925 Santa Barbara)
Page 6
expiration date or unlimited expiration is stipulated at the time of approval, per Municipal Code
section 2.48.070. On request, the Community Development Director may grant a single, one-
year extension, provided, that approval not exceed a maximum of two years from the date of
original approval.
Included with this letter is an invoice for the Completion Fee associated with this planning
application, which is now due. Completion Fees are to be paid within six months of the final
action taken on planning services provided or prior to the acceptance of a building permit to
construct the project. Please note that building permit applications will not be accepted prior
to payment of the Completion Fee. Payment of this fee may be made in person, online, by mail
or by phone.
In Person Payment: Please visit the Community Development Department at 919 Palm Street,
Monday and Wednesday between 1:00 p.m. and 4:00 p.m., and Tuesday and Thursday between
9:00 a.m. and 12:00 p.m. In person payments can be made in cash, check, or credit/debit card.
Payment Online: The online payment portal has launched. Please visit the link:
https://infoslo.slocity.org/EnerGov_Prod/selfservice#/home to pay the invoice online.
Payment by Mail: Mailed payments must be check, payable to City of San Luis Obispo, with
the application number from the subject line of this letter included, and sent to:
CDD Planning Fees
City of San Luis Obispo
919 Palm Street
San Luis Obispo, CA 93401
Payment by Phone: Call our main line 805-781-7170, please press option #6 to speak with a
staff member to process credit card payment.
If you have any questions, or if you need additional information, please contact Walter Oetzell,
Assistant Planner at (805) 781-7593, or by email at: woetzell@slocity.org
Sincerely,
Tyler Corey
Deputy Director
Community Development
Page 44 of 98
Page 45 of 98
Page 46 of 98
railroad district plan
page
architectural guidelines
Architectural Guidelines for the Railroad District
San Luis Obispo has adopted citywide architectural guidelines which apply to new buildings, significant remodels, site improvements, and public area im-
provements. The Railroad District Architectural Guidelines are to supplement the citywide architectural guidelines and are to be applied in a similar manner,
except that they apply only to the Railroad District as shown in Figure 4. Within this area, new development, remodels and additions, site improvements,
and publicly-funded projects should follow these guidelines. Property owners, developers, designers, City staff and advisory bodies, such as the Cultural
Heritage Committee, Architectural Review Commission and the Planning Commission will use these guidelines to review development projects, consistent
with Municipal Code Chapter 2.48.
Many of the older buildings in the Railroad District are generally described as “Railroad Vernacular” buildings. A variety of architectural styles fall under this
category. Some of the more common architectural elements exemplifying this architectural style are illustrated in this document. These examples provide a
“menu” of architectural elements which can be incorporated into new development projects in the Railroad District. New buildings need not include all of these
elements, nor be designed to be a replica of a historic building. The Cultural Heritage Committee and Architectural Review Commission interpret the guidelines
and will consider contemporary architectural styles which are consistent with these guidelines and which complement the District’s historic character.
Examples of different architectural styles that may generally be referred to as Railroad Vernacular.
Page 47 of 98
railroad district plan
page
architectural guidelines
1. Simple, rectilinear building forms should
predominate.
2. Lower building level (ground floor) massing
should be horizontal with equal or lesser volume
on upper levels.
3. Use medium-sloping roofs, generally 4:12 - 8:12
pitch.
4. False-front buildings with shed roofs and parapets
may be used.
5. Gable, hip, and shed roof forms are typical, with
some combinations and minor variations.
6. Deep roof overhangs are common, particularly
for commercial buildings, at ground floor level.
7. Roof overhangs are typically supported with
exposed, diagonal support braces or decorative
brackets.
8. Simple gable, hipped, or Dutch hipped dormers
can be used for light or ventilation.
Building Form, Massing, and
Roof Lines
Shed roofed buildings help increase light and ventilation in
industrial buildings and contribute to the character of the
District.
Roof lines and details.Simple, rectilinear building forms.
Page 48 of 98
railroad district plan
page
Doors and Windows
1. Doors and windows should emphasize
symmetry and be vertically oriented.
2. Doors should typically be single or multi-
panel, occasionally with glazing and transom
windows above doors.
3. Windows are typically fixed, or double hung,
often with divided lites.
4. Windows are often grouped in multiples of
two or three, side by side.
5. Horizontal windows may be used with
divided lites and may be grouped.
6. Doors and windows should generally have
wood or plaster trim.
7. Windows in plaster buildings may be arched
and recessed, sometimes with wood trim.
architectural guidelines
Single and multi-panel doors emphasizing
symmetry.
Various windows, single and grouped, with
divided lites.
This rendering shows many of the elements which
contribute to the Railroad Vernacular style, including eaves
with exposed rafters, a single panel door, and recessed
windows with divided lites.
Page 49 of 98
railroad district plan
page
architectural guidelines
Surface Treatment and Colors
Wood Buildings
1. Horizontal and vertical shiplap, “V-rustic” siding, or board and batten siding are common.
2. Shingles are often used as infill siding for gable ends or above doors and windows, away
from people contact areas.
3. Wood trim is commonly used to create decorative patterns.
4. Siding may change direction in the same plane to provide variety in surface pattern and
texture.
5. Horizontal trim may be used to separate board patterns or to create a wainscot effect.
6. Emphasize lighter earthtones such as tan and ochre, with contrasting trim and roof colors.
Accent colors are generally low chroma and relatively neutral colors.
7. Common roof materials include composition shingle, rolled asphalt roofing, built-up roofing,
low profile corrugated metal, and barrel tile. Barrel tile is occasionally used to accent ridges
on composition shingle roofs.
8. If chimneys are used, they are generally of brick with simple ornamentation at the cap.
9. Foundations are commonly emphasized with brick, stone, or plaster wainscot.
Plaster/Masonry Buildings
1. Brick is commonly used as an exterior building material.
2. Plaster should have a smooth, hand-finished appearance. Stucco or heavily-troweled finishes
should be avoided.
3. Plaster buildings are usually white or off-white with accent plaster colors at wainscot or in
accent areas. Accent colors should be pastel or low chroma.
4. Plaster building wainscots at lower walls may be flush and painted simply, or dimensional.
5. Roof material is generally barrel tile, or sometimes “diamond pattern” or similar decorative
composition shingle roofing with accent tiles. Built-up roofing is also common.
Auxiliary Buildings
1. Auxiliary buildings may be sided with the same material as adjacent principle buildings on
the same lot; or if solitary, wood or unpainted corrugated metal panel siding is common.
2. Roofs should generally consist of composition shingles or corrugated metal panels.
Wood or corrugated metal panel siding, or plaster are
common surfaces. Stucco should be avoided.
Page 50 of 98
railroad district plan
page
Architectural Details
1. Commercial buildings generally have simple detailing with little decoration or ornamentation.
2. Some carved shapes are used for rafter tiles, brackets, roof eave bracing, and roof gutters.
3. More elaborate ornamentation is common on masonry buildings, including parapet details, towers or decorative cornices or quoins.
4. Finials and decorative wood work is sometimes used at roof ridges.
5. Plaster corners are typically rounded.
6. Connection details, particularly for large structures, are visually emphasized, sometimes with timber connectors, bolts, brackets or other similar
hardware.
7. Linear raised decks or platforms common with structures with raised floors.
8. Exterior-mounted mechanical equipment, including HVAC units, fire suppression equipment, and antennas should be architecturally
screened.
Signs and Awnings
1. Signage should generally be non-illuminated. Spot lighting should be used where lighting is needed.
2. Signs should either be monument type, or painted or applied individual letters directly on building walls.
3. The City will consider exceptions to Sign Regulations to encourage historic sign designs and placement.
4. Signs within the Railroad right-of-way should be simple, clearly legible, and reflect historical railroad graphic standards and colors.
architectural guidelines
Elaborate ornamentation is common on masonry buildings. The City will consider exceptions to the Sign Regulations to encourage historic sign designs.
Page 51 of 98
railroad district plan
page 0
architectural guidelines
Site and Public Area Improvements
1. Site improvements, such as seating areas, bollards, stairs, ramps and
walkways should be designed to complement the railroad architectural
character. Public improvements such as, but not limited to, traffic controls,
street lights, signs, benches and trash containers should be designed
in a historic character similar to styles prevalent in the Railroad District
before 1950, and they shall be approved by the Architectural Review
Commission before the final design is completed.
2. Lighting in the depot area should closely resemble the design of the
railroad era downlights used in the passenger platform area. All lighting
should be shielded to prevent glare onto adjacent properties.
3. Pole lights, bollards, information signs, trees and other vertical landscape
features should be used to create repetitive, linear, rhythmic elements along
the railroad corridor to complement the District’s historic character.
4. In the passenger depot and other high traffic areas, an open-style,
decorative fencing and/or rails should be used. In non-traffic areas
abutting the railroad right-of-way, storage areas, construction yards and
similar uses should be visually screened from the railroad right-of-way.
Appropriate fencing materials include vinyl-clad chainlink, steel picket,
wrought iron and other similar, low-maintenance open fences which
discourage graffiti. Combination wood and metal rails may also be
appropriate. Solid, plain masonry and concrete, walls; and residential-style
wood fencing should generally be avoided or accompanied by climbing
vines to discourage graffiti.
5. Security fencing, such as barbed or concertina wire, should be minimized
where visible from the railroad yard or a public way. The Architectural
Review Commission may approve the use of security fencing when
such materials are visually compatible with their surroundings and used
sparingly.
6. Public sidewalks along portions of Osos, Santa Barbara, Church, Emily,
High, and Roundhouse streets within the Railroad District should be a
City-approved wood boardwalk design.
7. Decorative paving using patterns or integral color is encouraged in specific
areas to define or clarify circulation or activity areas.
8. Pedestrian bridges, underpasses and other transportation- or rail-related
structures should use historic materials and design elements. Possible
elements include: metal and heavy timber structural supports with
exposed connectors; local stone or brick foundations or bases; and use
of spur track, railroad ties or other railroad equipment and materials.
Figure 26: Railroad District
pedestrian lighting, typical
Page 52 of 98
railroad district plan
page 1
Landscape Design
1. Planting areas should be provided: 1)
in or adjacent to outdoor public use
areas; 2) along the railroad right-of-way
to screen storage yards, solid walls or
fences, or unsightly views; and along
public street parkways.
2. Planting should be used sparingly to
define pedestrian use areas, waiting
areas, and other high visibility/high traffic
areas that can be regularly maintained.
3. Planting within the railroad right-of-way
should be low-profile, generally not over
12-15 feet tall, to provide screening and
color.
4. Tree planting within or immediately
adjacent to the railroad right-of-way
should emphasize open, medium-
height canopy trees; and trees should
be selected and placed to preserve and
frame scenic vistas of the Morros and
surrounding hillsides. Within the historic
Railroad Yard, Canary Island Date Palms
or equal should be used to extend the
Southern Pacific theme as an entry
statement for the Railroad District.
architectural guidelines
Railroad District boardwalk.
Page 53 of 98
railroad district plan
page 2
Residential Buildings
1. New residential buildings should generally maintain the prevailing
spacing, scale, setbacks and character of older houses and
apartments along Osos, Santa Barbara, and Church streets.
2. New houses and apartments should generally reflect the District’s
predominant architectural styles, which include, but are not limited
to California Bungalow, Spanish Revival, Italianate, and Victorian.
New development should include architectural features common to
the particular architectural style.
3. Raised foundations, covered front porches, and recessed front entries
are common residential architectural features.
4. Architectural detailing at roof gable ends, roof eaves, windows, doors,
railings, foundations, and chimneys should be emphasized, and be
used consistently on all building elevations.
5. Site features such as exterior lighting, paving, walls, fences, railings
and landscaping should be selected for ease of maintenance and for
compatibility with traditional designs and materials.
6. Utility areas, trash enclosures, and uncovered parking spaces (except
in driveways) should generally be screened with landscaping and/or
low walls or fencing.
Remodels and Additions
1. Remodels and additions should be sensitive to the building’s original
character and to the character of adjacent buildings. Roof pitch,
building form and materials, windows and doors, and architectural
detailing should, where possible, match existing building features
and be compatible with the scale, spacing, setbacks and massing
of adjacent buildings within the Railroad Historic District.
2. Building colors and materials should complement the building’s
historic character. When remodeling designated historic structures,
materials and details should be used honestly such as wood sash
windows to replace existing wood windows. Simulated or veneer
products should generally be avoided.
3. When remodeling or adding on to designated historic structures,
property owners and designers are encouraged to follow the U.S.
Secretary of the Interior’s Guidelines for Preserving, Rehabilitating,
Restoring, and Reconstructing Historic Buildings.
architectural guidelines
Figure 27: Residential Remodel and Addition
Above: This rendering shows the potential for remodelling and expanding residential structures while
maintaining the architectural character of the Railroad District. Below: A photograph of the structure.
Page 54 of 98
RECORDING REQUESTED
AND WHEN RECORDED MAIL TO:
City Clerk's Office
CITY OF SAN LUIS OBISPO
990 Palm Street
San Luis Obispo, CA 93401
JULIE RODE ii
San Luis Obispo County— ClerklRecorder
Recorded at the request of
Public
uoc #: 2002039415
RESOLUTION NO. 9310 (2002 SERIES)
SR
5/10/2002
11:42 AM
Titles: 1 Pages: 4
A RESOLUTION OF THE COUNCIL OF THE CITY OF SAN LUIS OBISPO
AMENDING THE MASTER LIST OF HISTORIC RESOURCES TO INCLUDE
PROPERTY LOCATED AT 1902 CHORRC STREET
WHEREAS, in 1983 the City Council adopted Resolution No. 5197 establishing the
Master List of Historic Resources," along with procedures for adding properties to the listing; and
WHEREAS, on March 21, 2002 the Cultural Heritage Committee held an advertised public
hearing to consider recommending to the City Council the addition of 1902 Chorro Street to the
Master List of Historic Resources due to its historical and/or architectural significance to the
community; and
WHEREAS, at said meeting, the Cultural Heritage Committee reviewed the historical
documentation on the property and recommended that the City Council add the property to the
Master List of Historic Resources; and;.
WHEREAS, this City Council considered this recommendation during a public hearing on
May 7, 2002 pursuant to historic preservation guidelines established by Council Resolution No.
6157 (1987 Series);
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of San Luis Obispo
that based on the Cultural Heritage Committee's recommendation, documentation as described in
the Historical Resource Inventory for the property, on file in the Community Development
Department, public testimony, the staff report, and on the City's Historical Preservation Program
Guidelines the following:
SECTION 1. Findings.
A. The building located at 1902 Chorro Street meets the Historic Resource Criteria For
Building Evaluation and Recommendations as listed in the Historic Preservation Program
Guidelines, under the following categories:
R9310
Fees 0.00
Taxes 0.00
Others 0.00
PAID 0.00
A RESOLUTION OF THE COUNCIL OF THE CITY OF SAN LUIS OBISPO
AMENDING THE MASTER LIST OF HISTORIC RESOURCES TO INCLUDE
PROPERTY LOCATED AT 1902 CHORRC STREET
WHEREAS, in 1983 the City Council adopted Resolution No. 5197 establishing the
Master List of Historic Resources," along with procedures for adding properties to the listing; and
WHEREAS, on March 21, 2002 the Cultural Heritage Committee held an advertised public
hearing to consider recommending to the City Council the addition of 1902 Chorro Street to the
Master List of Historic Resources due to its historical and/or architectural significance to the
community; and
WHEREAS, at said meeting, the Cultural Heritage Committee reviewed the historical
documentation on the property and recommended that the City Council add the property to the
Master List of Historic Resources; and;.
WHEREAS, this City Council considered this recommendation during a public hearing on
May 7, 2002 pursuant to historic preservation guidelines established by Council Resolution No.
6157 (1987 Series);
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of San Luis Obispo
that based on the Cultural Heritage Committee's recommendation, documentation as described in
the Historical Resource Inventory for the property, on file in the Community Development
Department, public testimony, the staff report, and on the City's Historical Preservation Program
Guidelines the following:
SECTION 1. Findings.
A. The building located at 1902 Chorro Street meets the Historic Resource Criteria For
Building Evaluation and Recommendations as listed in the Historic Preservation Program
Guidelines, under the following categories:
R9310
Page 55 of 98
o
Resolution No. 9310 (2002 Series)
Page 2
I. Architectural Criteria
1. Relative purity of a traditional style: Colonial Dutch Barn Style.
2. Rarity of existence of the single -story, Gambrel Roof style structure.
4. Degree to which the structure has maintained its architectural integrity.
Ii. Design
2. Overall attractiveness because of craftsmanship and aesthetic value, though not
necessarily unique. -
IV. Architect/Builder
1. The house was designed and built by John Chapek, a designer/builder who, in
terms of craftsmanship, made significant contributions to San Luis Obispo.
VI. History- Person
3. The house is associated with John Chapek, an early San Luis Obispo builder and
Town Council member who made early, unique or outstanding contributions to
important local affairs or institutions.
B. Historic designation does not constitute a "project" as defined under Section 15378 of Title
14, Ch. 3 Califomia Code of Regulations and therefore is not subject to review under the
California Environmental Quality Act (CEQA).
SECTION 2. Addition to Master List of Historic Resources. The building located at
1902 Chorro Street (Exhibit A) is hereby added to the Master List of Historic Resources as the
historic `Bittick Residence" with the numeric historic ranking as a Type #5 historic property
historically significant at a local level but not eligible for the National Register of Historic Places),
as further described in the Documentation of Historical Significance and Historic Resources
Inventory for the property, on file in the Community Development Department.
SECTION 3. Publish Revised Master List. The Community Development Director is
hereby directed to amend the Master List of Historic Resources to include the property listed above,
and to publish a revised Master List for public distribution.
SECTION 4. Recording of Historic Properties. The City Clerk is hereby directed to
record the properties' historic designation with the County Recorder, pursuant to State Law.
On motion of Vice Mayor Marx, seconded by Council Member Mulholland and on the
following roll call vote:
AYES: Council Members Ewan, Mulholland, Schwartz, Vice Mayor Marx and
Mayor Settle
NOES: None
ABSENT: None
Page 56 of 98
Resolution No. 9310 (2002 Series)
Page 3
The foregoing Resolution was passed and adopted this 7th day of May 2002.
Mayor Allen K. Seth
A'
ee Price, City Clf
APPROVED AS TO FORM:
51 3
I ff nor ense , City tort}
Page 57 of 98
V
Resolution No. 9310 (2002 Series)
Page 4
EXHIBIT A
LEGAL DESCRIPTION OF LISTED HISTORIC PROPERTY
Following is the legal description of the property added to the City of San Luis Obispo's Master List
of Historic Resources, by City Council Resolution No. 9310 (2002 Series):
1902 Chorro Street. (Historic Name: `Bittick Residence ")
City of San Luis Obispo, Ingleside Homestead Tract, Block 186, Lot 3 (Assessor's Parcel
Number (APN #) 003 -647 -002). Owners: Wayne and Leslie Terry.
END OF DOCUMENTPage 58 of 98
PLANNING COMMISSION AGENDA REPORT
SUBJECT: REVIEW OF A NEW MIXED-USE PROJECT THAT CONTAINS
APPROXIMATELY 23,164 SQUARE FEET OF COMMERCIAL SPACE AND A
ONE BEDROOM RESIDENTIAL UNIT, WITH ASSOCIATED SITE IMPROVEMENTS, A
SIGN PROGRAM, AND A REQUEST TO REMOVE TW O TREES AND REPLANT 25
TREES
PROJECT ADDRESS: 10 Higuera Street FILE NUMBER: ARCH-0358-2023
BY: Rachel Cohen, Senior Planner
Phone Number: (805) 781-7574
Email: rcohen@slocity.org
RECOMMENDATION
Adopt the Draft Resolution (Attachment A) approving the proposed new mixed-use
project, associated site design and improvements, sign program, and the removal of two
trees based on findings and subject to conditions of approval. This project is categorically
exempt from environmental review under CEQA Guidelines section 15332 (Class 32, Infill
Development Projects).
SITE DATA
Applicant Keith Sweeny
Zone
Service Commercial with a
special consideration overlay
(C-S-S) & Tourist Commercial
with a mixed-use overlay (C-T-
MU) zone
General Plan
Land Use
General Retail and Services &
Manufacturing
Site Area 2.96-acre parcel (128,938
square feet)
Environmental
Determination
Categorically exempt from
environmental review under
CEQA Guidelines section
15332 (Class 32, Infill
Development Projects)
1.0 SUMMARY
Keith Sweeny (Applicant) has applied for a Major Development Review (ARCH -0358-
2023) to allow for the construction of a new mixed-use project that contains approximately
23,164 square feet of commercial space [proposed to be occupied by a distillery,
restaurant, tasting room, and associated spaces] and a one -bedroom residential unit with
associated site improvements, a sign program, and a request to remove two trees on a
2.96 acre parcel zoned Service Commercial with a special consideration overlay (C-S-S)
and Tourist Commercial with a mixed-use overlay (C-T-MU).
Meeting Date: 6/26/2024
Item Number: 4b
Time Estimate: 45 minutes
Figure 1: Subject Property Location
Page 59 of 98
Item 4b
ARCH-0358-2023
Planning Commission Report – June 26, 2024
2.0 COMMISSION'S PURVIEW
The Planning Commission’s role is to review the project for consistency with the General
Plan, Zoning Regulations, Community Design Guidelines (CDG), Sign Regulations and
applicable City Standards. Per Zoning Regulations section 17.106.030(D)(3) a
nonresidential / mixed-use development with more than ten thousand gross square feet
of new construction requires discretionary Planning Commission review.
3.0 PROJECT INFORMATION
3.1 Project Description
The applicant has applied for a new mixed-use project that contains approximately 23,164
square feet of commercial space [proposed future uses to be a distillery, restaurant,
tasting room, and associated spaces] and a one-bedroom residential unit with associated
site improvements, a sign program, and a request to remove two trees. The project is
proposed on property located at 10 Higuera Street (Assessor Parcel Numbers [APN] 004-
511-015 and 004-511-022) that is 2.96-acre parcel acres in size located in the Service
Commercial with a special consideration overlay (C-S-S) and Tourist Commercial with a
mixed-use overlay (C-T-MU) zones. The project would include on-site amenities including
a trash enclosure, a parking lot, bicycle parking, and landscaping (including the planting
of 25 trees) (see Attachment B, Project Plans).
3.2 Site Information
Present Development
and Uses
Partially developed site with a small distillery, some site
improvements including access, some parking, and landscaping.
Topography Relatively flat. San Luis Creek is located along the west property
line and Exposition Creek is located along the south property line.
Access Higuera Street
Surrounding Zoning
Designations and Uses
East: Higuera Street, (C-S-MU) Retail Businesses
West: San Luis Creek and Highway 101
North: (C-T-MU) Caltrans District 5 Offices
South: (C-S-MU) Cemetery
3.3 Project Design
Architecture: Contemporary
Design details: The building utilizes symmetrical and asymmetrical lines, large windows,
and a mix of materials and colors to provide contemporary design.
Materials: Vertical box rib metal siding, vertical wood siding, concrete bulkheads, dark
bronze aluminum storefront windows, and a standing seam metal room.
Colors: Black, Gray, natural wood, and dark bronze colors are proposed.
Page 60 of 98
Item 4b
ARCH-0358-2023
Planning Commission Report – June 26, 2024
Figure 3: Rendering of the proposed project looking west toward the public entrance to the
building.
Figure 3: Rendering of the proposed project as viewed from the loading area towards the
front entrance.
Page 61 of 98
Item 4b
ARCH-0358-2023
Planning Commission Report – June 26, 2024
3.4 Sign Program
Municipal Code Chapter 15.40 outlines the City’s Sign Regulations. Subsection 15.40.485
describes that sign programs are required for new mixed-use projects in order to establish
ongoing sign requirements and to ensure the signage is complementary and compatible
with the development and the surrounding neighborhood and commercial district. The
applicant has proposed a sign program and staff has highlighted components of the sign
program in Table 1. Details of the sign program and example signage are provided on
Sheet A3.1 of the Project Plans (Attachment B).
Table 1. Proposed Sign Program Design Guidelines
Proposed
Signs
Maximum
Size
Max
Number
Design Material Illumination
Sign Zone 1
(wall sign) 150 square feet 1
Three-dimensional
lettering and / or logo
balanced and in
proportion with the
building.
High Quality
Materials and
colors that
complement
and / or similar
to the building
materials.
Exterior or
internal
illumination
permitted
(consistent
with SLOMC
15.40.430)
Sign Zone 2
(hanging,
suspended,
or awning if
applicable)
Hanging or
Suspended
signs: max area
of 8 square feet
(consistent with
SLOMC
15.40.470(E)(2)).
1
All signage shall be
three-dimensional
lettering and or logo
balanced in proportion
with the building.
High Quality
Materials and
colors that
complement
and / or similar
to the building
materials.
Exterior or
internal
illumination
permitted
(consistent
with SLOMC
15.40.430)
Sign Zone 3
(window
signs)
Signs shall be
limited to a
maximum of 24
square feet or 15
percent of the
window area,
whichever is less
(SLOMC
15.40.470(B)(2))
1 per
window
Signs shall be limited to
small graphics and text
that serve to frame a
window or provide
information. Signs are
two-dimensional
adhered to glass of
windows.
High Quality
Materials and
colors that
complement
and / or similar
to the building
materials.
Sign Zone 4
(wall sign) 150 square feet 1
Three-dimensional
lettering and / or logo
balanced and in
proportion with the
building.
High Quality
Materials and
colors that
complement
and / or similar
to the building
materials.
Exterior or
internal
illumination
permitted
(consistent
with SLOMC
15.40.430)
Sign Zone 5
(wall sign
that faces
the rear of
the property)
300 square feet 1
Three-dimensional
lettering and / or logo
balanced and in
proportion with the
building.
High Quality
Materials and
colors that
complement
and / or similar
to the building
materials.
Exterior or
internal
illumination
permitted
(consistent
with SLOMC
15.40.430)
Page 62 of 98
Item 4b
ARCH-0358-2023
Planning Commission Report – June 26, 2024
3.5 Tree Removal Request
The applicant is requesting to remove two Schinus molle (Peruvian pepper) trees and
replant 25 trees that include 12 strawberry trees, eight buckeye trees and five red oak
trees.
3.6 Project Statistics
Staff has reviewed the project for consistency with relevant development standards of the
Zoning Regulations and have summarized its compliance in Table 2 below. The project
is not seeking any exceptions from development standards.
Table 2. Project Compliance with the Zoning Regulations Development Standards
Site Details Proposed Allowed/Required*
C-S-S Zone C-T-MU Zone
Minimum Setbacks
Front
Interior Side
Rear
> 15 feet
None
20 feet (Creek setback)
15 feet
None
20 feet (Creek
setback)
10 feet
None
None
Maximum Building Height 33 feet 5 inches to 40 feet 35 feet 45 Feet
Maximum Lot Coverage 13% 75% 75%
Floor Area Ratio (FAR) 0.14 to 0.29 1.5 2.5
Affordable Housing Pay in-lieu fee and
commercial linkage fee
Provide units or pay in-lieu fee and
commercial linkage fee
Parking and Loading Standards
Parking Spaces (Total)
Commercial Space
Residential
EV Ready
EV Capable
78
74
1
8
20
75
74
1
8
20
Bicycle Spaces (Total)
Short-term
Long-term
35
20
15
35
20
15
Motorcycle Parking 4 4
Tree Removal
Replacement Plantings
2 trees removed;
25 trees to be replanted on-
site
1:1 replacement planting ratio
*2022 Zoning Regulations
Page 63 of 98
Item 4b
ARCH-0358-2023
Planning Commission Report – June 26, 2024
4.0 PREVIOUS REVIEW
Both the Architectural Review Commission (ARC) and the Tree Committee have reviewed
the proposed project. Details regarding their purview and review can be found in the
associated staff reports linked below.
May 6, 2024: The (ARC) reviewed the proposed mixed-use project and found the
proposed project design consistent with the Community Design Guidelines, Sign
Regulations, and applicable City Standards with specific direction regarding design
changes and recommended the Planning Commission approve the design .
May 20, 2024: The Tree Committee (TC) reviewed the removal of two Peruvian pepper
(Schinus molle) trees and the replanting of 25 new trees as a part of the proposed new
mixed-use project. The Tree Committee recommended the Planning Commission
approve the Tree Removal Application with specific direction regarding trees species
selection.
4.0 PROJECT ANALYSIS
4.1 Consistency with the General Plan
The General Plan does not provide specific design guidelines for new structures located
within General Retail and Services & Manufacturing land use areas other than to discuss
that new commercial buildings shall be accessed from arterial and collector streets and
be designed and located to avoid increasing traffic on residential streets (Land Use
Element Policy 3.1.2). As proposed, the projec t is accessed from Higuera Street, an
arterial street (see Circulation Element Figure 1) and will not increase traffic on residential
streets since the site is not located near residential areas.
The new mixed-use project would also support the City’s land use designation’s purpose
and application for General Retail and Services and Manufacturing land uses (Land Use
Element Table 1). The project would include restaurant and retail uses, as well as l ight
manufacturing and residential uses located near the intersection of Madonna Road and
Highway 101.
4.2 Consistency with the Zoning Regulations
As noted in Section 3.4 above, the proposed mixed-use project complies with the
development standards for new structures located within the Service Commercial and
Tourist Commercial zones.
4.3 Consistency with Design Guidelines
The proposed project is a mixed-use project and with the proposed uses, zoning, and
location it supports a more industrial / commercial design rather than residential. As such,
staff evaluated the project for consistency with relevant standards and guidelines of the
Community Design Guidelines (CDG), including Chapter 3, Section 3.3 (Industrial Project
Design Guidelines) and Chapter 6 (Site Planning and Other Design Details) as well as
the City’s Active Transportation Plan (ATC), Appendix C for bicycle parking design
standards and Sign Regulations.
Page 64 of 98
Item 4b
ARCH-0358-2023
Planning Commission Report – June 26, 2024
As proposed, the project would utilize a contemporary design that includes symmetrical
and asymmetrical elements, large windows, and a mix of materials and colors. The
exterior materials include vertical box rib metal siding, vertical wood siding, concrete
bulkheads, dark bronze aluminum storefront windows, and a standing seam metal room.
Blacks, Grays, natural wood, and dark bronze colors are proposed. The overall site plan
has robust landscaping, and designated areas for vehicle and bicycle parking.
On May 6, 2024, the ARC reviewed the proposed project and found it to be consistent
with the CDG, ATC, and the sign regulations with two directional items and recommended
the Planning Commission approve the project design. Provided below is a discussion on
the two directional items:
1. Provide a change in color, materials, and/or window fenestration to the north
elevation to provide architectural interest.
Per direction from the ARC, the applicant has revised the north elevation to include
more architectural interest by adding window fenestration and wrapping the wood
accent feature from the west elevation around to the north elevation. Attachment
B, Project Plans, includes the revised north elevation as part of the plans. The
Planning Commission should discuss if the proposed revisions provide sufficient
articulation and architectural features to break up the large wall expanse on the
north elevation.
2. Provide screening around the bicycle lockers and/or paint them so that they better
integrate into the site plan and overall architectural design.
The applicant has indicated that they are willing to better integrate the long -term
bicycle lockers into the site plan and design. As such, staff is recommending
condition of approval #11 that states “Building plans submitted for the project shall
show that the bicycle lockers are screened and/or painted so that they become
integrated into the site and overall architectural design to the satisfaction of the
Community Development Director.”
Figure 5: Revised north elevation with additional window fenestration and wood detailing.
Figure 5: Original north elevation design.
Page 65 of 98
Item 4b
ARCH-0358-2023
Planning Commission Report – June 26, 2024
4.4 Consistency with Tree Regulations
The City’s Tree Ordinance (Municipal Code Chapter 12.24) was adopted in 2010 and
recently updated in 2019 with the purpose of establishing a comprehensive program for
installing, maintaining, and preserving trees within the City. This ordinance establishes
policies, regulations, and specifications necessary to govern installation, maintenance,
removal, and preservation of trees to beautify the city; to purify the air; to provide shade
and wind protection; to add environmental and economic value; and to preserve trees
with historic or unusual value.
On May 20, 2024, the Tree Committee reviewed the proposed project and found it to be
consistent with tree regulations with one directional item and recommended the Planning
Commission approve the tree removal request. Provided below is a discussion on the
directional item.
1. The applicant should consider replacing the proposed twelve (12) Marina
Strawberry trees (Arbutus) with an alternate species from the City's Master Tree
List, with the goal of maximizing canopy potential.
The Committee noted that Strawberry trees are not well suited for high traffic areas, as
their leaf and fruit litter are messy and require constant cleanup / maintenance and, even
at maturity, this species will not provide sufficient canopy coverage. Staff is
recommending condition of approval #14(a) that states that “Arbutus x ‘marina’ shall not
be planted as part of the landscape plan. The project shall select another species from
the City’s Master Tree List to be planted instead, to the satisfaction of the City Arborist.”
5.0 ENVIRONMENTAL REVIEW
The project is categorically exempt from provisions of CEQA described in Section 15332
(Infill) of the CEQA Guidelines because it consists of infill development consistent with
the applicable General Plan designation and all applicable General Plan policies as well
as with the applicable zoning designation and regulations, it is located within city limits on
a project site of no more than 5 acres in size (only 2.96 acres) surrounded by urban uses
(existing light manufacturing, distribution, storage, and office uses), the site has no value
as habitat for endangered, rare, or threatened species, approval of the project would not
result in any significant effects relating to traffic, noise, air quality, or water quality, and
the site can be adequately served by all required utilities and public services.
6.0 OTHER DEPARTMENT COMMENTS
The project has been reviewed by the Engineering Division, Transportation Division,
Building Division, Utilities Department, and Fire Department. Any conditions of approval
or informational notes from these departments and divisions have been incorporated into
the Draft Resolution (Attachment A) for project approval.
Page 66 of 98
Item 4b
ARCH-0358-2023
Planning Commission Report – June 26, 2024
7.0 ALTERNATIVES
1. Continue project. An action to continue the item should include a detailed list of
additional information or analysis required to make a decision.
2. Deny the project. An action denying the project should include findings that cite the
basis for denial and should reference inconsistency with the General Plan, Zoning
Regulations, or other policy documents.
8.0 ATTACHMENTS
A - Draft Resolution for 10 Higuera (ARCH-0358-2023) approving a new, mixed-use
project that contains approximately 23,164 square feet of commercial space and a
one-bedroom residential unit with associated site improvements, a sign program, and
a request to remove two trees.
B - Project Plans for 10 Higuera (ARCH-0358-2023)
Page 67 of 98
Page 68 of 98
RESOLUTION NO. PC-XXXX-24
A RESOLUTION OF THE CITY OF SAN LUIS OBISPO PLANNING
COMMISSION APPROVING A NEW MIXED-USE PROJECT THAT
CONTAINS APPROXIMATELY 23,164 SQUARE FEET OF
COMMERCIAL SPACE AND A ONE BEDROOM RESIDENTIAL UNIT,
WITH ASSOCIATED SITE IMPROVEMENTS, A SIGN PROGRAM, AND
A REQUEST TO REMOVE TWO TREES AND REPLANT 25 TREES. THE
PROJECT IS EXEMPT FROM ENVIRONMENTAL REVIEW UNDER
SECTION 15332 (CLASS 32, INFILL DEVELOPMENT) OF THE
CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) GUIDELINES
AS REPRESENTED IN THE STAFF REPORT AND ATTACHMENTS
DATED JUNE 26, 2024 (10 HIGUERA STREET, ARCH-0358-2023)
WHEREAS, the Architectural Review Commission of the City of San Luis Obispo
conducted a public hearing in the Council Chamber of City Hall, 990 Palm Street, on May
6, 2024, reviewed the new mixed-use project at 10 Higuera Street and recommended the
Planning Commission find the project consistent with the Community Design Guidelines,
Sign Regulations, and applicable City Standards with two design modifications, pursuant
to a proceeding instituted under ARCH-0358-2023, Keith Sweeny, applicant; and
WHEREAS, the Tree Committee of the City of San Luis Obispo conducted a public
hearing in the Council Hearing Room of City Hall, 990 Palm Street, San Luis Obispo,
California, on May 20, 2024, and recommended that the Planning Commission find the
project consistent with the Tree Regulations with one modification, pursuant to a
proceeding instituted under ARCH-0358-2023, Keith Sweeny, applicant; and
WHEREAS, the Planning Commission of the City of San Luis Obispo conducted a
public hearing in the Council Chamber of City Hall, 990 Palm Street, on June 26, 2024,
to review a Major Development Project for new mixed-use project at 10 Higuera Street,
pursuant to a proceeding instituted under ARCH-0358-2023, Keith Sweeny, applicant;
and
WHEREAS, the Planning Commission of the City of San Luis Obispo has duly
considered all evidence, including recommendations by staff, presented at said hearing;
and
WHEREAS, notices of said public hearings were made at the time and in the
manner required by law; and
NOW, THEREFORE, BE IT RESOLVED by the Planning Commission of the City
of San Luis Obispo as follows:
SECTION 1. Findings. The Planning Commission hereby grants final approval for
the project (ARCH-0358-2023), based on the following findings:
Development Review
Page 69 of 98
Resolution No. PC-XXXX-24
ARCH-0358-2023
10 Higuera Street
Page 2
1. The project is consistent with the Land Use Element of the General Plan,
particularly Land Use Element Table 1 and Policy 3.1.2 because it supports the
City’s land use designation’s purpose and application for General Retail and
Services and Manufacturing land uses by providing restaurant and retail uses, as
well as light manufacturing and residential uses located near the intersection of
Madonna Road and Highway 101 and the new mixed-use building will be accessed
from Higuera Street, an arterial street and will not increase traffic on residential
streets since the site is not located near residential areas .
2. As conditioned, the project conforms to applicable property development
standards, set forth in the Zoning Regulations, for the Service Commercial with a
special consideration overlay (C-S-S) zone and Tourist Commercial with a mixed-
use overlay (C-T-MU) zone. The project is an allowed use in the C-S-S and C-T-
MU zones and would be compatible with established commercial uses on Higuera
Street.
3. On May 6, 2024, the ARC reviewed the project and recommended the Planning
Commission find it consistent with the CDG, ATC, and Sign Regulations subject to
considerations of (1) providing a change in color, materials, and/or window
fenestration to the north elevation to provide architectural interest and (2) providing
screening around the bicycle lockers and/or painting them so that they better
integrate into the site plan and overall architectural design. As conditioned, the
project building, site, and sign designs would be complementary improvements to
the existing neighborhood and incorporate a contemporary design that exhibit
proper proportion, articulation, rhythm, and balance.
4. As conditioned, the project will not be detrimental to the health, safety, and welfare
of persons living or working at the site or in the vicinity because conditions have
been included that place limits on the number of persons allowed on site, restrict
activities, provide adequate parking, and limit potential disturbances to neighboring
properties. The project will be compatible with the existing site constraints and the
character of the neighborhood.
Sign Program
5. The sign program is consistent with the intent and purpose of Chapter 15.40 (Sign
Regulations) and includes signs that comply with Section 15.40.480 (Design
Principles) to provide sufficient visibility and identification without resulting in clutter
or utilizing excessively sized signage. In addition, the ARC reviewed the sign
program and found it to be consistent with the intent of the Sign Regulations and
CDG.
Page 70 of 98
Resolution No. PC-XXXX-24
ARCH-0358-2023
10 Higuera Street
Page 3
Tree Removal
6. The proposed tree removal request is consistent with Municipal Code Section
12.24.090(G) because the two trees are located interior to the almost 3 -acre
project site and are non-native and therefore have a lower preservation priority. In
addition, the Tree Committee reviewed the tree removal application and found the
request to be consistent with the Tree Regulations.
7. As conditioned, the proposed tree removal request is consistent with Municipal
Code Section 12.24.090(J) because the two tree removals will be compensated by
planting 25 new trees on the same property.
SECTION 2. Environmental Review. The project is categorically exempt from
provisions of CEQA described in Section 15332 (Infill) of the CEQA Guidelines because
it consists of infill development consistent with the applicable General Plan designation
and all applicable General Plan policies as well as with the applicable zoning designation
and regulations, it is located within city limits on a project site of no more than 5 acres in
size (only 2.96 acres) surrounded by urban uses (existing light manufacturing,
distribution, storage, and office uses), the site has no value as habitat for endangered,
rare, or threatened species, approval of the project would not result in any significant
effects relating to traffic, noise, air quality, or water quality, and the site can be adequately
served by all required utilities and public services.
SECTION 3. Action. The Planning Commission hereby grants final approval to the
project with incorporation of the following conditions:
Planning Division – Community Development Department
1. Final project design and construction drawings submitted for a building permit
shall be in substantial compliance with the project description and plans
represented in the Staff Report dated June 26, 2024. A separate, full-sized sheet
shall be included in the working drawings submitted for a building permit that lists
all conditions of approval and applicable code requirements as Sheet No. 2.
Reference shall be made in the margin of listed items as to where these
requirements are addressed in the plans. Any change to the approved design,
colors, materials, landscaping, or other conditions of approval must be approved
by the Community Development Director and may be subject to review by the
Architectural Review Commission, as deemed appropriate.
2. Plans submitted for a building permit shall call out the colors and materials of all
proposed building surfaces and other improvements. Colors and materials shall
be consistent with the colors and materials board submitted with the Development
Review application.
Page 71 of 98
Resolution No. PC-XXXX-24
ARCH-0358-2023
10 Higuera Street
Page 4
3. Plans shall indicate the type of materials for the window frames and mullions, their
dimensions, and colors. Plans shall include the materials and dimensions of all
lintels, sills, surrounds recesses and other related window features.
4. Plans submitted for a building permit shall include the locations of all lighting such
as bollard style landscaping or path lighting. All wall-mounted lighting fixtures shall
be clearly labeled on building elevations and complement the building
architecture. The lighting schedule for the building shall include a graphic
representation of the proposed lighting fixtures and cut sheets in the submitted
plans. The selected fixture(s) shall be shielded to ensure that light is directed
downward consistent with standards outlined in Section 17.70.100 (Lighting and
Night Sky Preservation).
5. Mechanical and electrical equipment shall be located internally to the building to
the greatest extent possible. Plans submitted for a building permit shall include
sectional views of the building, which clearly show the sizes of any proposed
condensers and other mechanical equipment. If any condenser, or other
mechanical equipment, is to be placed on the roof, plans submitted for a building
permit shall confirm that parapets and other roof features will adequately screen
them. A line-of-sight diagram may be required to confirm the proposed screening
will be adequate. Please note this requirement applies to the initial construction of
the building and any subsequent improvements.
6. Plans submitted for a building permit shall include landscape and irrigation plans.
The legend for the landscaping plan shall include the sizes and species of all
groundcovers, shrubs, and trees with corresponding symbols for each plant
material showing their specific locations on plans. Details on the proposed
surfaces and finishes of hardscapes shall also be included in the landscaping
plan.
7. Plans submitted for a building permit shall include elevations and detail drawings
of all proposed fences and/or walls. Any proposed fences, walls, and hedges shall
comply with standards outlined in Section 17.70.070 (Fences, Walls, and
Hedges).
8. The location of any required backflow preventer and double-check assembly shall
be shown on all site plans submitted for a building permit, including the
landscaping plan. Construction plans shall also include a scaled diagram of the
equipment proposed. Where possible, as determined by the Utilities Director,
equipment shall be located inside the building within 20 feet of the front property
line. Where this is not possible, as determined by the Utilities Director, the back -
flow preventer and double-check assembly shall be located in the street yard and
screened using a combination of paint color, landscaping and, if deemed
appropriate by the Community Development Director, a low wall. The size and
configuration of such equipment shall be subject to review and approval by the
Utilities and Community Development Directors.
Page 72 of 98
Resolution No. PC-XXXX-24
ARCH-0358-2023
10 Higuera Street
Page 5
9. Plans submitted for a sign permit shall be in substantial conformance with the
approved Sign Program. Modifications to the Sign Program or a request for
additional signage may require review by the Architectural Review Commission or
Community Development Director, as deemed appropriate.
10. Plans submitted for a building permit shall clearly depict the location of all required
short and long-term bicycle parking for all intended uses. Plans shall show all
areas designated for long-term bicycle parking such as bicycle lockers, interior
spaces, or storage rooms. Short-term bicycle racks shall be consistent with the
City Active Transportation Plan Design Guidelines and feature “hi-low style”
campus racks (such as “Peak Racks”) or an inverted “U” rack design and shall be
installed in close proximity to, and visible from, the main entries into the building.
Sufficient detail shall be provided about the placement and design of bike racks,
lockers, and interior spaces to demonstrate compliance with relevant Engineering
Standards and Community Design Guidelines, to the satisf action of the Public
Works and Community Development Directors.
11. Building plans submitted for the project shall show that the bicycle lockers are
screened and/or painted so that they become integrated into the site and overall
architectural design to the satisfaction of the Community Development Director.”
Housing – Community Development Department
12. The applicant shall pay an inclusionary housing in-lieu fee and commercial linkage
fee consistent with Municipal Code Chapters 17.138 and 4.60 prior to building
permit approval.
City Arborist – Community Development Department
13. The tree removals for the site shall include the two (2) Schinus molle (Peruvian
Pepper) tree removals requested by the applicant in the project proposal.
14. The project shall replant, at a minimum, twenty-five (25) trees. All trees replanted
shall be 15-gallon or 24-inch box trees. Trees shall be planted according to the
landscaping plan with the following exception:
a. Arbutus x ‘marina’ shall not be planted as part of the landscape plan. The
project shall select another species from the City’s Master Tree List to be
planted instead, to the satisfaction of the City Arborist.
15. All trees shall be planted per the City’s Engineering Standards for tree planting
prior to final building inspection. All trees planted as part of a compensatory plan
shall survive and any trees that do not survive shall be replanted.
Page 73 of 98
Resolution No. PC-XXXX-24
ARCH-0358-2023
10 Higuera Street
Page 6
16. The building plan submittal shall show all existing trees to be removed and trees
to be retained. The plan shall show any neighboring trees with canopies/root
zones within the area of construction disturbance. Tree preservation measures
shall be shown and noted on the building plans to the satisfaction of the City
Arborist.
17. California Fish and Game Code Section 3503.5 and the Migratory Bird Treaty Act
of 1972 prevents the removal of trees with active nests. To account for most
nesting birds, removal of trees should be scheduled to occur in the fall and winter
(between September 1st and January 31st) and after the young have fledged. If
removing trees during the nesting season (February 1st to August 31st), a
qualified biologist shall inspect any trees marked for removal that contain nests to
determine if the nests are active. If there are active nests, trees shall not be
removed and may only be removed once a qualified biologist provides a
confirmation memo that breeding / nesting is completed, and young have fledged
the nest prior to removal of the tree to the satisfaction of the Community
Development Director or City Biologist.
Engineering Division – Community Development / Public Works Departments
18. Improvement plan submittal shall show the existing Biological Open Space Creek
Easement limits, and the 20-foot-wide creek setback and future bike path
easement.
19. The project shall show and document compliance with the Post Construction
Stormwater Regulations as promulgated by the Regional Water Quality Control
Board. The building permit application shall include the required PCR checklist to
show compliance with any pertinent standards.
Page 74 of 98
Resolution No. PC-XXXX-24
ARCH-0358-2023
10 Higuera Street
Page 7
20. A Private Stormwater Conveyance System Management and Maintenance
Agreement (Operations and Maintenance Agreement) shall be provided, City will
provide template. The agreement shall be recorded and shall reference a separate
maintenance program for the stormwater items and the approved building plans.
21. Parking lots with parking spaces and drive aisles, including bay widths and
turnaround areas will be subject to the latest City Engineering Standards.
22. Plan shall denote the finish floor elevations, elevations of finish grades adjacent
to building, established parking lot grades, drainage patterns and locations and
gradients of cut or fill slopes.
23. Drainage report shall provide a summary of the pre vs. post drainage analysis for
the 2 through 100-year storm. Improved or diverted drainage shall not be directed
across the side or rear property lines unless conveyed in an existing waterway, or
a drainage easement.
24. New roof downspouts outlets shall show non-erosive discharge (such as splash
blocks) to landscaped areas or approved outlet, or to required stormwater storage
chambers per engineered plans.
25. As an option, the improved drainage may be retained/detained on site with a
controlled outlet to mimic the pre-construction historic run-off (no increase of run-
off volume, recreate sheet flow, and/or direct runoff to an existing concentrated
outlet location).
26. The water service piping and water meter shall be sized in accordance with the
approved fire sprinkler plans.
27. Provide walking surfaces that are part of an accessible route of travel between
public way and accessible entrance.
28. Cleanouts for new sewer lateral on site shall be located at 100 feet minimum
intervals.
29. Water meter and water service lateral to city main water line must be sized in
accordance with approved fire sprinkler plans. If upsized meter required, the water
service lateral, shall also be upsized.
30. The location of any required backflow prevention devices shall be shown on all
site plans, including the landscaping plan.
31. Work adjacent to or within a channel or creek may require the approvals of Fish
and Game, Army Corp of Engineers, and/or the Regional Water Quality Control
Board. Provide copies of any required permits or a written waiver or exemption for
the same.
Page 75 of 98
Resolution No. PC-XXXX-24
ARCH-0358-2023
10 Higuera Street
Page 8
32. Provide documentation that the adjoining property owner has been notified of the
impending excavation and other future construction activity.
33. A CAL-OSHA permit is required for excavations or trenching greater than 5 feet
in depth. A copy of the annual, provisional, or temporary permit shall be provided
to the Building Division prior to building, utility, and/or grading permit issuance if
applicable. CA Health and Safety Code Section 17922.5
34. All parking spaces shall be able to be entered in one movement. All spaces, drive
aisles, etc. shall be designed so that all vehicles can exit to the adjoining street in
a forward motion in not more than two maneuvers. For purposes of
maneuverability, all required and proposed covered and uncovered spaces shall
be assumed to be occupied by a standard size vehicle.
35. Include complete parking statistics on the cover sheet of the plans in accordance
with the zoning regulations. Include the number of required and proposed vehicle
spaces, motorcycle spaces, and bicycle parking spaces. The project summary
shall include all required and proposed short-term and long-term bicycle parking
spaces. Commercial centers shall include the number and location of the required
12’ x 25’ commercial loading zones.
36. Clearly show the location and extent of the A and B flood zones on the site plan.
37. Unless on-site fire hydrants are required or proposed the fire service backflow
preventer shall be a double-check assembly. An interior double-check may be
approved when the fire riser assembly is located not more than 25’ from the
property line.
38. Double check assemblies shall comply with city Engineering Standard #6420.
39. Show the location of any existing private water well and private waste disposal
system for reference if applicable. Show or note the disposition of any well, septic
tank, or leach field. Abandonment of a water well or private waste disposal system
shall be in accordance with local ordinance, plumbing code requirements, and
state requirements.
40. Provide a Water Pollution Control Plan (W PCP) in the format provided by the
Building Division for minor projects less than 1 acre of disturbance.
41. Erosion control measures are required in accordance with the grading ordinance
and Waterway Management Plan Drainage Design Manual. Provide an erosion
control plan and/or erosion control notes on the plans to the satisfaction of the
Building Official and Public Works Director. Erosion control measures shall be
implemented and maintained during all construction and ground disturbing
activities. A detailed erosion control plan is required in accordance with Waterway
Management Plan Section 3.7 and Section 10.0.
Page 76 of 98
Resolution No. PC-XXXX-24
ARCH-0358-2023
10 Higuera Street
Page 9
42. Notes shall be added to the plans whether floodproofing or partial floodproofing
will be completed with this permit or not.
43. Regardless of the valuation of building improvements, all new building service
equipment shall be elevated to 1’ above the BFE or otherwise protected in
accordance with the CBC as amended locally for buildings located in the flood
zone.
44. This project shall comply with the Floodplain Management Regulations. Analysis
shall be provided to show that this development project is reasonably safe from
flooding and that that the project will not adversely affect adjoining properties.
45. All utilities, including but not limited to gas, electrical panels, telephone panels,
sewer laterals, water service, fire service, and utility conduits entering the
structure must be sealed to preclude infiltration of floodwater.
46. Only one sewer connection is allowed per property. If connecting to the existing
sewer lateral, provide the required video inspection. Include the invert elevations
for the new sewer lateral.
Transportation Division - Public Works Department
47. Applicable Citywide Transportation Impact Fees must be paid prior to building
permit issuance.
48. Unless otherwise approved by the Public Works Director, removal/relocation of
any trees, landscaping, fencing, irrigation, or other elements that are constructed
by the Project within the existing 20-foot Bike Path Easement (recorded July 2 1,
2020) shall be completed by the property owner at no expense to the City within
90 days of the City providing notice to the property owner of intent to begin
construction of Bike Path.
Utilities Department
49. The construction plans for sewer and water services shall be in accordance with
the engineering design standards in effect at the time the building permit is
approved. Building permit submittal shall identify the size of existing and proposed
water services, water meters, sewer lateral, and sewer services for the project,
and shall include a licensed engineer’s design narrative and supportive
engineering calculations. The project’s commercial and residential uses shall be
metered separately. The project shall provide a separate city-owned water meter
and service line, due to the landscaped area exceeding 1,000 square feet.
50. Plans submitted for a building permit shall show a private water sub -meter for the
proposed new building, to the satisfaction of the Utilities Director.
Page 77 of 98
Resolution No. PC-XXXX-24
ARCH-0358-2023
10 Higuera Street
Page 10
51. Commercial uses in the project include food preparation; therefore, provisions for
grease interceptors and FOG (fats, oils, and grease) storage within solid waste
enclosure(s) shall be provided with the plans submitted for a building permit.
These commercial facilities shall also provide an area to wash floor mats,
equipment, and trash cans. The wash area shall be inside, drained to the sanitary
sewer, and an Industrial Wastewater Discharge Survey and Permit Application
shall be submitted, and permit obtained prior to issuance of occupancy permit.
52. The building permit submittal shall include a final landscape design plan and
irrigation plan that includes all the criteria required in the City Engineering
Standards Uniform Design Criteria for Landscaping and Irrigation. The building
permit submittal shall include a completed Maximum Applied Water Allowance
(MAWA) form based on the final landscape design plan and a hydrozone table
with a summary of Estimated Total Water Use (ETWU) and the corresponding
irrigation window.
53. The proposed project shall comply with the City’s Development Standards for
Solid Waste Services. Show the location and size of the bin enclosure(s) that can
store the required containers for waste, recycling, and organics. Building permit
submittal shall include a letter of service from San Luis Garbage Company pasted
on the plans.
Code Requirements
Building Division – Community Development Department
54. Please be aware of H-2 requirements for the “Still Tower” regarding fire protection
requirements If over the maximum amount allowed by table (307.1 CBC). Please
be especially aware of section 415.6 CBC/CFC due to 25% of the H occupancy
will have to be located on the exterior wall. Please be aware of maximum
quantities of anticipated amounts for the H-2 / H-3 occupancy as building setback
would have to be changed as only 10’ is shown. (415.6.3 CBC)
55. Parapets may be required, but this will be determined during building review.
(705.11 CBC)
Utilities Department
56. Plans submitted for a building permit shall show a backflow preventor, consistent
with City Engineering Standards Uniform Design Criteria 6.1.3 Cross Connections
(required for restaurants and private fire-protection lines, including fire sprinkler
systems), to the satisfaction of the Utilities Director and Fire Department.
57. Plans submitted for a building permit shall show clearance between the private
water service line and private sewer lateral in compliance with the Plumbing Code,
to be demonstrated upon building permit issuance.
Page 78 of 98
Resolution No. PC-XXXX-24
ARCH-0358-2023
10 Higuera Street
Page 11
58. The proposed sewer lateral serving the property shall be made with HDPE
material and shall be installed per the City’s engineering design standards.
Existing lateral(s) that are not proposed to be reused shall be abandoned at the
City main consistent with City standards.
59. Potable city water shall not be used for major construction activities, such as
grading and dust control. Recycled water is available through the City’s
Construction Water Permit program.
Indemnification
60. The applicant shall defend, indemnify, and hold harmless the City and/or its
agents, officers and employees from any claim, action or proceeding against the
City and/or its agents, officers, or employees to attack, set aside, void or annul,
the approval by the City of this project, and all actions relating thereto, including
but not limited to environmental review (“Indemnified Claims”). The City shall
promptly notify the applicant of any Indemnified Claim upon being presented with
the Indemnified Claim and the City shall fully cooperate in the defense against an
Indemnified Claim.
On motion by __________, seconded by __________, and on the following roll call
vote:
AYES:
NOES:
RECUSED:
ABSENT:
The foregoing resolution was passed and adopted this 26th day of June 2024.
___________________
Rachel Cohen, Secretary
Planning Commission
Page 79 of 98
Page 80 of 98
THIS PROJECT SHALL COMPLY WITH CURRENT APPLICABLE CODES & ORDINANCES
2022 CALIFORNIA BUILDING STANDARDS ADMINISTRATIVE CODE
2022 CALIFORNIA BUILDING CODE
2022 CALIFORNIA ELECTRICAL CODE
2022 CALIFORNIA MECHANICAL CODE
2022 CALIFORNIA PLUMBING CODE
2022 CALIFORNIA ENERGY CODE
2022 CALIFORNIA HISTORICAL BUILDING CODE
2022 CALIFORNIA FIRE CODE
2022 CALIFORNIA EXISTING BUILDING STANDARDS CODE
2022 CALIFORNIA REFERENCE STANDARDS CODE
CITY OF SAN LUIS OBISPO MUNICIPAL CODE: TITLE 15 BUILDINGS AND CONSTRUCTION
CITY OF SAN LUIS OBISPO TITLE 17 ZONING REGULATIONS
CALIFORNIA CODE REFERENCES
DRAWING SYMBOLS
Name
Elevation HEIGHT/ ELEVATION MARKER
NORTH ARROW
Room name
101
150 SF
ROOM NAME
ROOM NUMBER
ROOM AREA
ROOF / GROUND SLOPE:
INDICATES SLOPE AND
DIRECTION OF SLOPE
OVERHEAD LINES
KEYNOTE DIVISION
NUMBER AND
SPECIFICATION
?XX.XXX
DIMENSION LINES
CENTERLINE OF
COLUMN OR STUD
CENTERLINE OF
OPENING
FACE OF STUD
CITY OF SAN LUIS OBISPO - COMMUNITY DEVELOPMENT DEPARTMENT
919 PALM STREET
SAN LUIS OBISPO, CA 93401 PH: 805.781.7180
CITY OF SAN LUIS OBISPO - BUILDING DEPARTMENT
919 PALM STREET
SAN LUIS OBISPO, CA 93401 PH: 805.781.7180
CITY OF SAN LUIS OBISPO - PLANNING DEPARTMENT
919 PALM STREET
SAN LUIS OBISPO, CA 93401 PH: 805.781.7170
CITY OF SAN LUIS OBISPO - PUBLIC WORKS DEPARTMENT
919 PALM STREET
SAN LUIS OBISPO, CA 93401 PH: 805.781.7220
CITY OF SAN LUIS OBISPO - FIRE DEPARTMENT
2160 SANTA BARBARA AVENUE
SAN LUIS OBISPO, CA 93401 PH: 805.781.7380
PG & E
406 HIGUERA STREET
SAN LUIS OBISPO, CA 93401 PH: 800.743.5000
SOUTHERN CALIFORNIA GAS COMPANY
1314 BROAD STREET
SAN LUIS OBISPO, CA 93401 PH: 1.800.427.2200
AGENCIES & UTILITIES
OWNER
KEITH SWEENEY CONTACT: KEITH SWEENEY
225 RANCHITO LANE PHONE: 415.740.4984
SLO, CA 93401 EMAIL: keith@sweeneyplumbing.com
ARCHITECT
TEN OVER STUDIO CONTACT: JOEL SNYDER
539 MARSH ST. PHONE: 805.541.1010
SLO, CA 93401 EMAIL: joels@tenoverstudio.com
CIVIL ENGINEER
BKF ENGINEERS CONTACT: JEREMY MARELLO
200 4TH STREET, SUITE 300 PHONE: 408.461.1640
SANTA ROSA, CA 95401 EMAIL: jmarello@bkf.com
LANDSCAPE ARCHITECT
TEN OVER STUDIO CONTACT: JULIA OBERHOFF
539 MARSH ST. PHONE: 805.541.1010
SLO, CA 93401 EMAIL: juliao@tenoverstudio.com
PROJECT DIRECTORY
N
101 FREEWAY
PROJECT LOCATION
10 HIGUERA STREET
HI
G
U
E
R
A
S
T
S
H
I
G
U
E
R
A
S
T
M A D O N N A R D
BRIDGE ST
ELKS LN
THESE DRAWINGS ARE INSTRUMENTS OF SERVICE
AND ARE THE PROPERTY OF TEN OVER STUDIO, INC.
THE DESIGN AND INFORMATION REPRESENTED ON
THESE DRAWINGS ARE EXCLUSIVELY FOR THE PROJECT
INDICATED AND SHALL NOT BE TRANSFERRED OR
OTHERWISE REPRODUCED WITHOUT EXPRESS WRITTEN
PERMISSION FROM TEN OVER STUDIO, INC.
COPYRIGHT 2022
539 Marsh Street
San Luis Obispo, CA
805.541.1010
info@tenoverstudio.com
www.tenoverstudio.com
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
DRWN BY:
CHK'D BY:
PROJ #:
NOT FOR
CONSTRUCTION
JOEL R. SNYDER
C-39262
2.28.2023
RENEWAL
L
I
C E N S E D A RCH
I
T
E
C
T
S
T
A
T
E
O F A L I F O R NI
A
C
MF
NM
TITLE SHEET
10
H
I
G
U
E
R
A
10
H
I
G
U
E
R
A
S
T
.
SA
N
L
U
I
S
O
B
I
S
P
O
,
C
A
2023-020
VICINITY MAP
SHEET INDEX (ARC)
GENERAL
T1.0 TITLE SHEET
CIVIL
C1.0 EXISTING CONDITIONS
C2.0 SITE DEMOLITION PLAN
C3.0 SITE PLAN
C4.1 GRADING AND DRAINAGE PLAN
C4.2 SITE SECTIONS
C5.1 UTILITY PLAN
C6.1 STORMWATER CONTROL PLAN
C7.1 CONSTRUCTION DETAILS
LANDSCAPE
L1.0 LANDSCAPE PLAN
L2.0 LIGHTING PLAN
L3.0 LANDSCAPE CUT SHEET
ARCHITECTURE
A1.0 SITE PLAN
A2.0 FIRST FLOOR PLAN
A2.1 SECOND FLOOR PLAN
A3.0 EXTERIOR ELEVATIONS
A3.1 SIGNAGE PROGRAM
A4.0 PERSPECTIVE IMAGES
T1.0
10 HIGUERA
10 HIGUERA ST., SAN LUIS OBISPO, CA 93401
NO. DATE SUBMITTAL
1 23.07.14 ARC INITIAL SUBMITTAL
2 24.02.06 ARC RESUBMITTAL 1
3 24.03.19 ARC RESUBMITTAL 2
Page 81 of 98
BKF
ENGINEERS
200
4th
STREET
SUITE
300
SANTA
ROSA,
CA
95401
(707)
583-8500
www.bkf.com
Page 82 of 98
BKF
ENGINEERS
200
4th
STREET
SUITE
300
SANTA
ROSA,
CA
95401
(707)
583-8500
www.bkf.com
Page 83 of 98
BKF
ENGINEERS
200
4th
STREET
SUITE
300
SANTA
ROSA,
CA
95401
(707)
583-8500
www.bkf.com
Page 84 of 98
BKF
ENGINEERS
200
4th
STREET
SUITE
300
SANTA
ROSA,
CA
95401
(707)
583-8500
www.bkf.com
Page 85 of 98
BKF
ENGINEERS
200
4th
STREET
SUITE
300
SANTA
ROSA,
CA
95401
(707)
583-8500
www.bkf.com
Page 86 of 98
BKF
ENGINEERS
200
4th
STREET
SUITE
300
SANTA
ROSA,
CA
95401
(707)
583-8500
www.bkf.com
Page 87 of 98
BKF
ENGINEERS
200
4th
STREET
SUITE
300
SANTA
ROSA,
CA
95401
(707)
583-8500
www.bkf.com
··
·
·
·
·
·
·
·
·
·
·
·
·
Page 88 of 98
BKF
ENGINEERS
200
4th
STREET
SUITE
300
SANTA
ROSA,
CA
95401
(707)
583-8500
www.bkf.com
Page 89 of 98
NO
PARKING
NO
PARKING
NO
PARKING
NO
PARKING
(E) DISTILLERY
KROBAR
S
H
I
G
U
E
R
A
S
T
R
E
E
T
EXPOSITION CREEK
SA
N
L
U
I
S
O
B
I
S
P
O
C
R
E
E
K
(E) BREWERY
CENTRAL COAST BREWING
LOADING
DOCK
(N) DISTILLERY &
WAREHOUSE STORAGE
6
4
5
1
1
1
TYP.
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
PROPERTY LINEPROPERTY LINE
PR
O
P
E
R
T
Y
L
I
N
E
TYP.
3
7
8
7
8
7
8
9
9
10
11
12
11
12
11
11
12
13
2
5
11
SYMBOL QTY BOTANICAL / COMMON NAME SIZE
TREES
Aesculus californica / California Buckeye 15 gal
1 Arbutus x `Marina` / Marina Strawberry Tree 24"box
Quercus rubra / Red Oak 24"box
BIORETENTION SHRUBS
Carex praegracilis / California Field Sedge
Chondropetalum tectorum 'El Campo' / El Campo Cape Rush
Juncus effusus 'Carman's Japanese' / Carman's Japanese Soft Rush
Juncus patens / California Gray Rush
ORNAMENTAL GRASSES
Lomandra longifolia 'Roma 13' / Platinum Beauty® Variegated Mat Rush
Pennisetum spathiolatum / Slender Veldt Grass
Sesleria autumnalis 'Campo Verde' / Campo Verde Autumn Moor Grass
GROUNDCOVER PLANTING
Ceanothus griseus horizontalis 'Diamond Heights' / Diamond Heights Variegated Carmel Creeper
Verbena lilacina 'De la Mina' / De la Mina Lilac Verbena
NATIVE SHRUBS
Eriogonum giganteum / St. Catherine's Lace
Frangula californica / California Coffeeberry
Rhus integrifolia / Lemonade Berry
FLOWERING SHRUBS
Epilobium canum 'Catalina' / Catalina California Fuchsia
Kniphofia x 'Gladness' / Gladness Red Hot Poker
FOUNDATION SHRUBS
Pennisetum spathiolatum / Slender Veldt Grass
NATIVE GRASSES
Calamagrostis foliosa / Reed Grass
Festuca idahoensis / Idaho Fescue
Muhlenbergia rigens / Deer Grass
SHRUB AREAS
See above.
STORMWATER TREATMENT PLANTERS
Carex divulsa / European Grey Sedge
Chondropetalum tectorum 'El Campo' / El Campo Cape Rush
Juncus effusus 'Carman's Japanese' / Carman's Japanese Soft Rush
Juncus patens / California Gray Rush
LANDSCAPE NOTES
1.THIS PLAN IS SCHEMATIC IN NATURE AND INTENDED TO SHOW COMPLIANCE WITH LOCAL
ZONING AND DEVELOPMENT CODES.
2.ALL LANDSCAPE AREAS SHALL BE IRRIGATED WITH A PERMANENT UNDERGROUND
IRRIGATION SYSTEM. IRRIGATION SYSTEM SHALL BE DESIGNED TO ADEQUATELY AND
EFFICIENTLY WATER ALL SHRUB AREAS AND TREES.
3.IRRIGATION CONROLLER SHALL BE PROGRAMMABLE AND HAVE WEATHER-BASED
CAPABILITIES.
4.SOIL SHALL BE AMENDED PRIOR TO PLANTING FOR OPTIMAL HEALTH OF ALL PLANT
MATERIAL. SOIL AMENDMENT SPECIFICATIONS SHALL BE DETERMINED BASED ON A SOIL
TEST ANALYSIS.
N
SCALE:
0 2010 40
1" = 20'-0"1 LANDSCAPE PLAN
LANDSCAPE PLAN LEGEND
KEYNOTES
REFER TO CIVIL PLANS FOR MORE INFORMATION REGARDING STORMWATER TREATMENT &
DRAINAGE
ENTRY PLAZA
BENCH, REFER TO 6 / L3.0
MECHANICAL / CHILLER PAD
(E) LOADING / DELIVERY BAY FOR CENTRAL COAST BREWING
(E) PUMP HOUSE (NOT A PART)
TOP OF BANK
20' SETBACK FROM TOP OF CREEK BANK
DG PATH
TRASH ENCLOSURE
ACCESSIBLE PEDESTRIAN RAMP
CROSSWALK
BIKE RACK - PEAK RACKS, SINGLE SIDED RACK - REFER TO 5 / L3.0
1
2
3
4
5
6
7
8
9
10
11
12
13
L1.0
LANDSCAPE PLAN
10
H
I
G
U
E
R
A
JOEL R. SNYDER
C-39262
2.28.2025
RENEWAL
L
I
C E N S E D A R CHI
T
E
C
T
S
T
A
T
E
OF A L I F O R NI
A
C
NOT FOR
CONSTRUCTION
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
PROJ #:2023-020
DRWN BY:JD
CHK'D BY:NM
10
H
I
G
U
E
R
A
S
T
.
SA
N
L
U
I
S
O
B
I
S
P
O
,
C
A
10
H
I
G
U
E
R
A
info@tenoverstudio.com
805.541.1010
www.tenoverstudio.com
San Luis Obispo, CA
539 Marsh Street
THESE DRAWINGS ARE INSTRUMENTS OF SERVICE
AND ARE THE PROPERTY OF TEN OVER STUDIO, INC.
THE DESIGN AND INFORMATION REPRESENTED ON
THESE DRAWINGS ARE EXCLUSIVELY FOR THE PROJECT
INDICATED AND SHALL NOT BE TRANSFERRED OR
OTHERWISE REPRODUCED WITHOUT EXPRESS WRITTEN
PERMISSION FROM TEN OVER STUDIO, INC.
COPYRIGHT 2022
PLANT SCHEDULE PLANT SCHEDULE
ASPHALT PAVING
CONCRETE PAVING
DG OR GRAVEL
ACCENT CONCRETE PAVING
PROPOSED 6' TALL, HORIZONTAL WOOD FENCE
MWELO IRRIGATION CALCULATION
NO.DATE SUBMITTAL
1 23.07.14 ARC INITIAL SUBMITTAL
2 24.02.06 ARC RESUBMITTAL 1
3 24.03.19 ARC RESUBMITTAL 2
4 24.61.18 PLANNING HEARING
15
2
18
Page 90 of 98
NO
PARKING
NO
PARKING
NO
PARKING
NO
PARKING
(E) DISTILLERY
KROBAR
S
H
I
G
U
E
R
A
S
T
R
E
E
T
EXPOSITION CREEK
SA
N
L
U
I
S
O
B
I
S
P
O
C
R
E
E
K
(E) BREWERY
CENTRAL COAST BREWING
LOADING DOCK
S1
S1
S1
S2
S2
S1 S1
S1 S1 S1
S1
S1
S1S1S1
S4 S4
S4
S1
S2
S3
S3
S3
S3
S3
S3
S5
S5
S5
S5 S5
S5
S5 S5
S5 S5
S5 S5
S5
S4
(N) DISTILLERY &
WAREHOUSE STORAGE
D-SERIES SIZE 0 AREA LUMINAIRE P3 PERFORMANCE PACKAGE
TYPE 3 EXTREME BACKLIGHT CONTROL
SYBMOL QTY.DESCRIPTION
14
6
4
MODEL
LITHONIA LIGHTING
3 LITHONIA LIGHTING
LITHONIA LIGHTING
BEGA
D-SERIES SIZE 0 AREA LUMINAIRE P3 PERFORMANCE PACKAGE
4000K CCT 80 CRI TYPE 3 MEDIUM
WDGE2 LED WITH P2SW - PERFORMANCE PACKAGE, 4000K,
80CRI, VISUAL COMFORT FORWARD OPTIC
S1
S2
S3
S4
13 LOW LEVEL BOLLARDS5
SURFACE MOUNTED CYLINDER
BEGA
N
SCALE:
0 2010 40
1" = 20'-0"1 LIGHTING PLAN
L2.0
LIGHTING PLAN
LIGHTING PLAN GENERAL NOTES
1.REFER TO SHEET L3.0 FOR LIGHTING PRODUCT CUT SHEETS.
2.REFER TO PHOTOMETRIC LIGHTING PLAN PROVIDED BY MVS FOR MORE INFORMATION REGARDING PHOTOMETRIC VALUES
AND PRODUCT INFORMATION.
10
H
I
G
U
E
R
A
JOEL R. SNYDER
C-39262
2.28.2025
RENEWAL
L
I
C E N S E D A R CHI
T
E
C
T
S
T
A
T
E
OF A L I F O R NI
A
C
NOT FOR
CONSTRUCTION
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
PROJ #:2023-020
DRWN BY:JD
CHK'D BY:NM
10
H
I
G
U
E
R
A
S
T
.
SA
N
L
U
I
S
O
B
I
S
P
O
,
C
A
10
H
I
G
U
E
R
A
info@tenoverstudio.com
805.541.1010
www.tenoverstudio.com
San Luis Obispo, CA
539 Marsh Street
THESE DRAWINGS ARE INSTRUMENTS OF SERVICE
AND ARE THE PROPERTY OF TEN OVER STUDIO, INC.
THE DESIGN AND INFORMATION REPRESENTED ON
THESE DRAWINGS ARE EXCLUSIVELY FOR THE PROJECT
INDICATED AND SHALL NOT BE TRANSFERRED OR
OTHERWISE REPRODUCED WITHOUT EXPRESS WRITTEN
PERMISSION FROM TEN OVER STUDIO, INC.
COPYRIGHT 2022
LIGHTING SCHEDULE
NO.DATE SUBMITTAL
1 23.0.14ARC INITIAL SUBMITTAL
2 24.02.06 ARC RESUBMITTAL 1
3 24.03.19 ARC RESUBMITTAL 2
4 24.61.18 PLANNING HEARING
Page 91 of 98
1 S1 & S2 LIGHT FIXTURE
REFER TO SHEET L2.0 FOR LIGHTING SCHEDULE & PLAN
L3.0
LANDSCAPE CUT
SHEETS
10
H
I
G
U
E
R
A
JOEL R. SNYDER
C-39262
2.28.2025
RENEWAL
L
I
C E N S E D A R CHI
T
E
C
T
S
T
A
T
E
OF A L I F O R NI
A
C
NOT FOR
CONSTRUCTION
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
PROJ #:2023-020
DRWN BY:JD
CHK'D BY:NM
10
H
I
G
U
E
R
A
S
T
.
SA
N
L
U
I
S
O
B
I
S
P
O
,
C
A
10
H
I
G
U
E
R
A
info@tenoverstudio.com
805.541.1010
www.tenoverstudio.com
San Luis Obispo, CA
539 Marsh Street
THESE DRAWINGS ARE INSTRUMENTS OF SERVICE
AND ARE THE PROPERTY OF TEN OVER STUDIO, INC.
THE DESIGN AND INFORMATION REPRESENTED ON
THESE DRAWINGS ARE EXCLUSIVELY FOR THE PROJECT
INDICATED AND SHALL NOT BE TRANSFERRED OR
OTHERWISE REPRODUCED WITHOUT EXPRESS WRITTEN
PERMISSION FROM TEN OVER STUDIO, INC.
COPYRIGHT 2022
2 S3 LIGHT FIXTURE
REFER TO SHEET L2.0 FOR LIGHTING SCHEDULE & PLAN
6 BENCH
3 S4 LIGHT FIXTURE
REFER TO SHEET L2.0 FOR LIGHTING SCHEDULE & PLAN4S5 BOLLARD
REFER TO SHEET L2.0 FOR LIGHTING SCHEDULE & PLAN
5
NOT USED
NO.DATE SUB0ITTAL
1 23.0.14ARC INITIAL SUB0ITTAL
2 24.02.06 ARC RESUB0ITTAL 1
3 24.03.1ARC RESUB0ITTAL 2
4 24.61.13LANNING HEARING
Page 92 of 98
NO
PARKING
VA-EVR
EV CAPABLEEV CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE
EV CH
A
R
G
I
N
G
ONLY
EV CH
A
R
G
I
N
G
ONLY
EV CH
A
R
G
I
N
G
ONLY
EV CH
A
R
G
I
N
G
ONLY
EV CH
A
R
G
I
N
G
ONLY
S-EVR
S-EVR
S-EVR
S-EVR
S-EVR
S-EVRS-EVR
EV CHARGING
ONLY
EV CHARGING
ONLYEV CAPABLEEV CAPABLEEV CAPABLEEV CAPABLEEV CAPABLEEV CAPABLEEV CAPABLEEV CAPABLEEV CAPABLEEV CAPABLEEV CAPABLEEV CAPABLEEV CAPABLE
S-EVCS-EVCS-EVCS-EVCS-EVCS-EVCS-EVCS-EVCS-EVCS-EVCS-EVCC-EVCC-EVCC-EVCC-EVCC-EVCC-EVCC-EVC
NO
PARKING
EV CHARGING
ONLY
S-EVC
EV CAPABLE
(E) DISTILLERY
KROBAR
S
H
I
G
U
E
R
A
S
T
R
E
E
T
EXPOSITION CREEK
SA
N
L
U
I
S
O
B
I
S
P
O
C
R
E
E
K
(E) BREWERY
CENTRAL COAST BREWING
LOADING DOCK
1
2
3
3
5
6
TYP.
7
8
9
1
2
126'-1"38'-4"
1
A8.2
(N) DISTILLERY & WAREHOUSE
RESTAURANT & BAR
APPROX. 21,140 SF
10
(E) PARKING
30 SPACES
PROPOSED PARKING
78 TOTAL SPACES
11
C-S ZONE DESIGNATION C-T ZONE DESIGNATION
12
13
14
15
10
'
-
0
"
16
18
17
2ND FLOOR
RES. UNIT
APPROX. 660 SF
2ND FLOOR
TASTING & OFFICES
APPROX. 4995 SF
19
4
4
16
2020
21
21
22
23
24
24
24
24
24
N
SCALE:
0 2010 40
1" = 20'-0"1 SITE PLAN
ARCHITECTURAL SITE PLAN LEGEND
LANDSCAPE AREA
(E) PROPERTY LINE, REFER TO ATTACHED LOT LINE
ADJUSTMENT DOCUMENT
KEYNOTES
TOP OF CREEK BANK LINE
20' SETBACK LINE FROM TOP OF CREEK BANK
(E) DRIVEWAY, NOT A PART OF THIS PROJECT
LONG TERM BIKE PARKING (8 TOTAL), 2 EA
TRASH ENCLOSURE TO COMPLY WITH CITY OF SAN LUIS OBISPO CITY ENGINEERING
STANDARDS BY PROVIDING ADEQUATE SIZING TO STORE REQUIRED CONTAINERS FOR WASTE,
RECYCLING, ORGANICS, AND FOG, PER CITY BIN ENCLOSURE DRAWINGS AND SLO MUNICIPAL
CODE 17.70.200 TRASH ENCLOSURE STANDARDS.
SHORT TERM BIKE PARKING, PEAK RACK OR SIMILAR "U" STYLE RACK, (20), 5 EA
BACK-IN RAMP TO LOADING DOCK
MECHANICAL PAD, UNDER FUTURE TENANT IMPROVEMENT PERMIT
(E) PUMP HOUSE TO REMAIN, NOT IN SCOPE
FLAG POLE
FIRE RISER PRELIMINARY LOCATION; FINAL ROOM LOCATION AND RISER SHALL BE LOCATED
FOR BUILDING PERMIT APPLICATION SUBMITTAL
(E) ZONE BOUNDARY, REFER TO ATTACHED LOT LINE ADJUSTMENT DOCUMENT
EXTENT OF FUTURE BOB JONES TRAIL EASEMENT THROUGH SITE
(N) TRANSFORMER
PG&E EASEMENT
UTILITY POLE TO REMAIN, PROTECT IN PLACE
DECOMPOSED GRANITE
6' FOOT TALL DECORATIVE LANDSCAPE FENCING AT OUT DOOR AREA
SWITCHGEAR LOCATION
BOLLARD AND CHAIN LOCATION AT OVERFLOW PARKING. OVERFLOW PARKING SHALL REMAIN
CLOSED WITH CHAIN DEPLOYED DURING STORM EVENTS
(E) PERUVIAN PEPPER TREE TO BE REMOVED, PLEASE SEE ARBORIST REPORT FOR TREE
REMOVAL AND TREE PROTECTION INFORMATION
CONCRETE STAIRS WITH HANDRAIL
ACCESS TO PG&E EASEMENT ON NORTHERN PROPERTY LINE
(N) LOCATION OF FUTURE ELECTRICAL VEHICLE CHARGING STATION (EVCS)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
A1.0
SITE PLAN
ARCHITECTURAL SITE PLAN GENERAL NOTES
1.REFER TO SHEET T1.0 FOR PARKING REQUIREMENTS AND CALCULATIONS.
2.REFER TO CIVIL ENGINEERING PLANS FOR EXISTING CONDITIONS AND DEMOLITION PLANS.
3.REFER TO LANDSCAPE PLANS FOR MORE INFORMATION REGARDING PLANTING, SITE LIGHTING, AND HARDSCAPE
10
H
I
G
U
E
R
A
JOEL R. SNYDER
C-39262
2.28.2025
RENEWAL
L
I
C E N S E D A R CHI
T
E
C
T
S
T
A
T
E
OF A L I F O R NI
A
C
NOT FOR
CONSTRUCTION
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
PROJ #:2023-020
DRWN BY:JD
CHK'D BY:NM
10
H
I
G
U
E
R
A
S
T
.
SA
N
L
U
I
S
O
B
I
S
P
O
,
C
A
10
H
I
G
U
E
R
A
NO.DATE SUBMITTAL
info@tenoverstudio.com
805.541.1010
www.tenoverstudio.com
San Luis Obispo, CA
539 Marsh Street
THESE DRAWINGS ARE INSTRUMENTS OF SERVICE
AND ARE THE PROPERTY OF TEN OVER STUDIO, INC.
THE DESIGN AND INFORMATION REPRESENTED ON
THESE DRAWINGS ARE EXCLUSIVELY FOR THE PROJECT
INDICATED AND SHALL NOT BE TRANSFERRED OR
OTHERWISE REPRODUCED WITHOUT EXPRESS WRITTEN
PERMISSION FROM TEN OVER STUDIO, INC.
COPYRIGHT 2022
1 23.07.14 ARC INITIAL SUBMITTAL
2 24.02.06 ARC RESUBMITTAL 1
3 24.03.19 ARC RESUBMITTAL 2
STORMWATER TREATMENT
LANDSCAPE AREA
(E) CREEK / BUILDING SETBACK LINE
(N) FENCE - 6' TALL, COATED CHAIN
LINK, COLOR: BLACK
FLOOD SHADOW
SITE ARRIVAL POINT PATH OF TRAVEL FROM SIDEWALK
AND EXIT DISCHARGE ROUTE PATH OF TRAVEL
(E) ZONE BOUNDARY, REFER TO ATTACHED LOT LINE
ADJUSTMENT DOCUMENT
CONCRETE AT ENTRY PLAZA
4 24.61.18 PLANNING HEARING
Page 93 of 98
UP
UP
UP
48
'
-
4
1
/
2
"
1
1
'
-
5
1
/
2
"
11
'
-
8
"
8'-10"
14'-5"
9'-3"9'-3"
30'-6"
10'-6"
12'-0"
15
'
-
0
"
19
'
-
0
"
18'-5"
22.001
22.002
08.003
08.003
01.001
245'-0"
10.001
7'
-
0
"
22.001
22.003
21
'
-
0
"
01.006
01.010
20'-0"
23.002
01.007
265'-0"
19
'
-
6
"
2
4
'
-
6
"
01.003
08.003
79'-10 1/2"30'-5"
TYP.
01.005
22.004
8'-7"
7308 SF
WAREHOUSE
STORAGE
101
7369 SF
DISTILLERY
105
479 SF
STILL
TOWER
111
124 SF
M RR
116
124 SF
W RR
117
77 SF
SHOWER
112
74 SF
RR
114
180 SF
LOCKER
ROOM
102
252 SF
OFFICE
103
67 SF
WALK-IN
119A
1007 SF
BOTTLING
ROOM
106
69 SF
RR
104
COVERED
EXTERIOR
LOADING
EGRESS
STAIR 2
EGRESS
STAIR 1
ELEVATOR
47 SF
ELEVATOR
MACHINE
ROOM
115
43 SF
FREEZER
90
'
-
6
"
8'
-
2
"
13
'
-
1
"
W1
14.001
W1
W1
W1
W1
W1
W1W1
W1 W1
W1
8'
-
0
"
9'
-
8
3
/
8
"
720 SF
KITCHEN
119
21
'
-
2
"
8'
-
6
"
684 SF
LOUNGE
120
270 SF
BAR
121
614 SF
DINING
118
256 SF
HOST
122
4'
-
0
"
8'-0"
22.006
26.002
46'-0"39'-3 3/8"
12.001
08.004
12.001
22
'
-
0
"
08.003
TYP.
01.004
61 SF
STORAGE
123
22.003
FLOOR PLAN GENERAL NOTES
B. THERE SHALL BE A LANDING OR FLOOR ON EACH SIDE OF EACH EXTERIOR DOOR. THE WIDTH
OF EACH LANDING SHALL NOT BE LESS THAN THE DOOR SERVED. EVERY LANDING SHALL
HAVE A MINIMUM DIMENSION OF 36" MEASURED IN THE DIRECTION OF TRAVEL. EXTERIOR
LANDINGS SHALL BE PERMITTED TO HAVE A SLOPE NOT TO EXCEED 2%. EXTERIOR
BALCONIES LESS THAN 60 S.F. AND ONLY ACCESSIBLE FROM A DOOR ARE PERMITTED TO
HAVE A LANDING LESS THAN 36" DEEP. REFER TO CRC R311.3.
C. LANDINGS OR FLOORS AT THE REQUIRED EGRESS DOOR SHALL NOT BE MORE THAN 1-1/2"
LOWER THAN THE TOP OF THE THRESHOLD. THE EXTERIOR LANDING OR FLOOR SHALL NOT
BE MORE THAN 7-3/4" BELOW THE TOP OF THE THRESHOLD PROVIDED THE DOOR DOES NOT
SWING OVER THE LANDING OR FLOOR. WHEN EXTERIOR LANDINGS OR FLOORS SERVING THE
REQUIRED EGRESS DOOR ARE NOT AT GRADE, THEY SHALL BE PROVIDED WITH ACCESS TO
GRADE BY MEANS OF A RAMP IN ACCORDANCE WITH SECTION R311.8 OR A STAIRWAY IN
ACCORDANCE WITH SECTION R311.7.
D. DOORS OTHER THEN THE REQUIRED EGRESS DOOR SHALL BE PROVIDED WITH LANDINGS OR
FLOORS NOT MORE THAN 7-3/4" BELOW THE TOP OF THE THRESHOLD. A LANDING IS NOT
REQUIRED WHERE A STAIRWAY OF TWO OR FEWER RISERS IS LOCATED ON THE EXTERIOR
SIDE OF THE DOOR, PROVIDED THE DOOR DOES NOT SWING OVER THE STAIRWAY.
E. STORM AND SCREEN DOORS SHALL BE PERMITTED TO SWING OVER ALL EXTERIOR STAIRS
AND LANDINGS.
12. DO NOT SCALE DRAWINGS. ALL DIMENSIONS ARE ROUGH AND TO FACE OF STUD (F.O.S.).
13. ALL DIMENSIONS SHALL BE FIELD VERIFIED PRIOR TO COMMENCEMENT OF WORK. IF ANY
VARIATION, DISCREPANCY OR OMISSION IS FOUND, THE CONTRACTOR OR SUB-CONTRACTOR
SHALL NOTIFY THE ARCHITECT / DESIGNER IN WRITING AND OBTAIN WRITTEN RESOLUTION FROM
ARCHITECT / DESIGNER PRIOR TO PROCEEDING WITH ANY WORK.
1. TOILET ROOMS SHALL HAVE EXHAUST RATE OF 50 CFM MINIMUM.
2. ELECTRICAL OUTLETS TO BE PLACED AT 18" TO CENTERLINE ABOVE FINISH FLOOR U.N.O.
3. ELECTRICAL SWITCHES TO BE PLACED AT 48" TO CENTERLINE FROM FINISH FLOOR U.N.O.
4. DOORS HANDLES, LOCK AND OTHER OPERATING DEVICES SHALL BE INSTALLED AT A MINIMUM 34" AND
A MAXIMUM 48" A.F.F.
5. ALL EXTERIOR WALL SHALL BE 2X FRAMING WITH R-13 MINIMUM INSULATION OR PER TITLE 24, U.N.O.
REFER TO WALL LEGEND.
6. ALL INTERIOR WALLS SHALL BE 2X4 FRAMING, TYPICAL U.N.O. REFER TO WALL LEGEND.
7. ALL PLUMBING WALLS SHALL BE 2X6 MINIMUM FRAMING. REFER TO WALL LEGEND.
8. PROVIDE R-13 MINIMUM INSULATION AT PLUMBING WALLS AND WALLS OF LAUNDRY ROOM.
9. PROVIDE 1" MINIMUM AIR SPACE BETWEEN WOOD STRUCTURES AND RETAINING WALLS.
10. PROVIDE 1 MIRROR, 1 TOILET PAPER HOLDER, 1 HAND TOWEL BAR, AND 2 BATH TOWEL BARS PER
BATHROOM.
11. THRESHOLD AND LANDINGS
A. THRESHOLDS AT DOORWAYS SHALL NOT EXCEED 3/4" IN HEIGHT FOR SLIDING DOORS
SERVING DWELLING UNITS OR 1/2" FOR OTHER DOORS. RAISED THRESHOLDS AND FLOOR
LEVEL CHANGES GREATER THAN 1/4" AT DOORWAYS SHALL BE BEVELED WITH A SLOPE NOT
GREATER THAN ONE UNIT VERTICAL IN TWO UNITS HORIZONTAL (50% SLOPE). THE
THRESHOLD HEIGHT SHALL BE LIMITED TO 7- 3/4" AND THE DOOR IS AN EXTERIOR DOOR
THAT IS NOT A COMPONENT OF THE REQUIRED MEANS OF EGRESS; THE DOOR DOES NOT
SWING OVER THE LANDING OR STEP; AND THE DOORWAY IS NOT ON AN ACCESSIBLE ROUTE
AND IS NOT PART OF AN ADAPTABLE OR ACCESSIBLE DWELLING UNIT. REFER TO CBC
1008.1.7.
EXTERIOR WALL ASSEMBLY SCHEDULE
TYPE DESCRIPTION
W1 FIRE RATED WALL
EXTERIOR SIDEWALK; DRAIN AWAY
FROM BUILDING WHERE OCCURS
FOUNDATION PER STRUCTURAL
EXPANSION JOINT FILLER
WALL ASSEMBLY PER PLAN
4" LIGHT-GAUGE STEEL FRAMING
CONTINUOUS SILICONE SEALANT
BUILDING SLAB PER STRUCTURAL
BACKER ROD & SEALANT
FLOODPROOFING WALL ASSEMBLY
CORRUGATED VERTICAL METAL SIDING
RUBBER COAT BRUSH APPLIED
WATERPROOFING1/2" PLYWOOD
SHEATHING, TAPE ALL JOINTS
STEEL ANGLE CLIP PER STRUCTURAL
VERTICAL CORRUGATED METAL TO MATCH
THESE DRAWINGS ARE INSTRUMENTS OF SERVICE
AND ARE THE PROPERTY OF TEN OVER STUDIO, INC.
THE DESIGN AND INFORMATION REPRESENTED ON
THESE DRAWINGS ARE EXCLUSIVELY FOR THE PROJECT
INDICATED AND SHALL NOT BE TRANSFERRED OR
OTHERWISE REPRODUCED WITHOUT EXPRESS WRITTEN
PERMISSION FROM TEN OVER STUDIO, INC.
COPYRIGHT 2022
539 Marsh Street
San Luis Obispo, CA
805.541.1010
info@tenoverstudio.com
www.tenoverstudio.com
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
DRWN BY:
CHK'D BY:
PROJ #:
NOT FOR
CONSTRUCTION
JOEL R. SNYDER
C-39262
2.28.2023
RENEWAL
L
I
C E N S E D A RCH
I
T
E
C
T
S
T
A
T
E
O F A L I F O R NI
A
C
MF
NM
FIRST FLOOR PLAN
10
H
I
G
U
E
R
A
10
H
I
G
U
E
R
A
S
T
.
SA
N
L
U
I
S
O
B
I
S
P
O
,
C
A
2023-020
1/8" = 1'-0"1 FLOOR PLAN
KEYNOTES
01.001 DASHED OVERHEAD LINE INDICATES EXTENT OF SECOND FLOOR
01.003 DASHED LINE INDICATES CATWALK OVERLOOKING THE STILL TOWER
01.004 DASHED LINE INDICATES PALLET STORAGE, SPIRIT HOLDING TANKS AND FERMENTING
TANKS
01.005 DASHED LINE INDICATES PALLET STORAGE
01.006 BAR AND BAR SEATING
01.007 ADA BAR, MAXIMUM HEIGHT OF 34"
01.010 LIQUOR STILL
08.003 OVERHEAD ROLL-UP DOOR
08.004 DOUBLE SWINGING KITCHEN DOOR
10.001 METAL LOCKERS, TYPE AND MANUFACTURER TBD
12.001 BUILT-IN BOOTH SEATING
14.001 ELEVATOR, TYPE AND MANUFACTURER TBD
22.001 ACCESSIBLE FLOOR-MOUNTED TOILET WITH GRAB BARS
22.002 WALL-MOUNTED URINAL
22.003 COUNTER-MOUNTED LAVATORY WITH REQUIRED KNEE AND TOE CLEARANCES PROVIDED
22.004 ACCESSIBLE ROLL-IN SHOWER WITH FOLDING SEAT AND TRANSFER AND CLEAR SPACE
PROVIDED
22.006 FIRE RISER PRELIMINARY LOCATION; FINAL ROOM LOCATION AND RISER SHALL BE
LOCATED FOR BUILDING PERMIT APPLICATION SUBMITTAL
23.002 TYPE 1 HOOD OVERHEAD
26.002 ELECTRICAL SWITCHGEAR; SEE ELECTRICAL DRAWINGS
A2.01 1/2" = 1'-0"2 FLOODPROOFING @ EXTERIOR WALL
NO. DATE SUBMITTAL
1 23.07.14 ARC INITIAL SUBMITTAL
24.02.06 ARC RESUBMITTAL 12
3 24.03.19 ARC RESUBMITTAL 2
4 24.61.18 PLANNING HEARING
Page 94 of 98
DN DN
DN
15'-10"
11
'
-
6
1
/
2
"
10'-0 3/4"10'-0 1/8"8'-7 1/2"
7'-
6
"
11
'
-
8
3
/
4
"
12
'
-
4
"
11
'
-
8
"
5'-6"
TYP.
08.001
TYP.
22.003
TYP.
22.001
23.001
01.006
01.002
15'-10"
01.007
01.010
221 SF
BRAND
EDUCATION
204
78 SF
W RR
209
208 SF
ELEVATOR
LOBBY
201
221 SF
BRAND
EDUCATION
205
219 SF
BRAND
EDUCATION
206
115 SF
STILL
TOWER
ELEVATOR
90
'
-
6
"
19
'
-
0
"
TYP.
14.001
7'-
1
0
"
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
298 SF
LIVING &
KITCHEN
211
167 SF
BEDROOM
212
43 SF
CLOSET
213
46 SF
BATHROOM
214
37 SF
POWDER
215
78 SF
M RR
210
192 SF
BRAND
EDUCATION
202
195 SF
BRAND
EDUCATION
203
305 SF
CONFERENCE
ROOM
220
134 SF
OFFICE
216
134 SF
OFFICE
217
183 SF
OFFICE
218
76 SF
STORAGE
219
5'
-
6
"
9'-
1
0
"
6'-0"
29'-11 1/2" 3'-6"
18
'
-
4
"
1187 SF
TASTING
ROOM
207
FLOOR PLAN GENERAL NOTES
B. THERE SHALL BE A LANDING OR FLOOR ON EACH SIDE OF EACH EXTERIOR DOOR. THE WIDTH
OF EACH LANDING SHALL NOT BE LESS THAN THE DOOR SERVED. EVERY LANDING SHALL
HAVE A MINIMUM DIMENSION OF 36" MEASURED IN THE DIRECTION OF TRAVEL. EXTERIOR
LANDINGS SHALL BE PERMITTED TO HAVE A SLOPE NOT TO EXCEED 2%. EXTERIOR
BALCONIES LESS THAN 60 S.F. AND ONLY ACCESSIBLE FROM A DOOR ARE PERMITTED TO
HAVE A LANDING LESS THAN 36" DEEP. REFER TO CRC R311.3.
C. LANDINGS OR FLOORS AT THE REQUIRED EGRESS DOOR SHALL NOT BE MORE THAN 1-1/2"
LOWER THAN THE TOP OF THE THRESHOLD. THE EXTERIOR LANDING OR FLOOR SHALL NOT
BE MORE THAN 7-3/4" BELOW THE TOP OF THE THRESHOLD PROVIDED THE DOOR DOES NOT
SWING OVER THE LANDING OR FLOOR. WHEN EXTERIOR LANDINGS OR FLOORS SERVING THE
REQUIRED EGRESS DOOR ARE NOT AT GRADE, THEY SHALL BE PROVIDED WITH ACCESS TO
GRADE BY MEANS OF A RAMP IN ACCORDANCE WITH SECTION R311.8 OR A STAIRWAY IN
ACCORDANCE WITH SECTION R311.7.
D. DOORS OTHER THEN THE REQUIRED EGRESS DOOR SHALL BE PROVIDED WITH LANDINGS OR
FLOORS NOT MORE THAN 7-3/4" BELOW THE TOP OF THE THRESHOLD. A LANDING IS NOT
REQUIRED WHERE A STAIRWAY OF TWO OR FEWER RISERS IS LOCATED ON THE EXTERIOR
SIDE OF THE DOOR, PROVIDED THE DOOR DOES NOT SWING OVER THE STAIRWAY.
E. STORM AND SCREEN DOORS SHALL BE PERMITTED TO SWING OVER ALL EXTERIOR STAIRS
AND LANDINGS.
12. DO NOT SCALE DRAWINGS. ALL DIMENSIONS ARE ROUGH AND TO FACE OF STUD (F.O.S.).
13. ALL DIMENSIONS SHALL BE FIELD VERIFIED PRIOR TO COMMENCEMENT OF WORK. IF ANY
VARIATION, DISCREPANCY OR OMISSION IS FOUND, THE CONTRACTOR OR SUB-CONTRACTOR
SHALL NOTIFY THE ARCHITECT / DESIGNER IN WRITING AND OBTAIN WRITTEN RESOLUTION FROM
ARCHITECT / DESIGNER PRIOR TO PROCEEDING WITH ANY WORK.
1. TOILET ROOMS SHALL HAVE EXHAUST RATE OF 50 CFM MINIMUM.
2. ELECTRICAL OUTLETS TO BE PLACED AT 18" TO CENTERLINE ABOVE FINISH FLOOR U.N.O.
3. ELECTRICAL SWITCHES TO BE PLACED AT 48" TO CENTERLINE FROM FINISH FLOOR U.N.O.
4. DOORS HANDLES, LOCK AND OTHER OPERATING DEVICES SHALL BE INSTALLED AT A MINIMUM 34" AND
A MAXIMUM 48" A.F.F.
5. ALL EXTERIOR WALL SHALL BE 2X FRAMING WITH R-13 MINIMUM INSULATION OR PER TITLE 24, U.N.O.
REFER TO WALL LEGEND.
6. ALL INTERIOR WALLS SHALL BE 2X4 FRAMING, TYPICAL U.N.O. REFER TO WALL LEGEND.
7. ALL PLUMBING WALLS SHALL BE 2X6 MINIMUM FRAMING. REFER TO WALL LEGEND.
8. PROVIDE R-13 MINIMUM INSULATION AT PLUMBING WALLS AND WALLS OF LAUNDRY ROOM.
9. PROVIDE 1" MINIMUM AIR SPACE BETWEEN WOOD STRUCTURES AND RETAINING WALLS.
10. PROVIDE 1 MIRROR, 1 TOILET PAPER HOLDER, 1 HAND TOWEL BAR, AND 2 BATH TOWEL BARS PER
BATHROOM.
11. THRESHOLD AND LANDINGS
A. THRESHOLDS AT DOORWAYS SHALL NOT EXCEED 3/4" IN HEIGHT FOR SLIDING DOORS
SERVING DWELLING UNITS OR 1/2" FOR OTHER DOORS. RAISED THRESHOLDS AND FLOOR
LEVEL CHANGES GREATER THAN 1/4" AT DOORWAYS SHALL BE BEVELED WITH A SLOPE NOT
GREATER THAN ONE UNIT VERTICAL IN TWO UNITS HORIZONTAL (50% SLOPE). THE
THRESHOLD HEIGHT SHALL BE LIMITED TO 7- 3/4" AND THE DOOR IS AN EXTERIOR DOOR
THAT IS NOT A COMPONENT OF THE REQUIRED MEANS OF EGRESS; THE DOOR DOES NOT
SWING OVER THE LANDING OR STEP; AND THE DOORWAY IS NOT ON AN ACCESSIBLE ROUTE
AND IS NOT PART OF AN ADAPTABLE OR ACCESSIBLE DWELLING UNIT. REFER TO CBC
1008.1.7.
EXTERIOR WALL ASSEMBLY SCHEDULE
TYPE DESCRIPTION
W1 FIRE RATED WALL
THESE DRAWINGS ARE INSTRUMENTS OF SERVICE
AND ARE THE PROPERTY OF TEN OVER STUDIO, INC.
THE DESIGN AND INFORMATION REPRESENTED ON
THESE DRAWINGS ARE EXCLUSIVELY FOR THE PROJECT
INDICATED AND SHALL NOT BE TRANSFERRED OR
OTHERWISE REPRODUCED WITHOUT EXPRESS WRITTEN
PERMISSION FROM TEN OVER STUDIO, INC.
COPYRIGHT 2022
539 Marsh Street
San Luis Obispo, CA
805.541.1010
info@tenoverstudio.com
www.tenoverstudio.com
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
DRWN BY:
CHK'D BY:
PROJ #:
NOT FOR
CONSTRUCTION
JOEL R. SNYDER
C-39262
2.28.2023
RENEWAL
L
I
C E N S E D A RCH
I
T
E
C
T
S
T
A
T
E
O F A L I F O R NI
A
C
MF
NM
SECOND FLOOR
PLAN
10
H
I
G
U
E
R
A
10
H
I
G
U
E
R
A
S
T
.
SA
N
L
U
I
S
O
B
I
S
P
O
,
C
A
2023-020
1/8" = 1'-0"1 SECOND FLOOR PLAN
KEYNOTES
01.002 DASHED OVERHEAD LINE INDICATES ROOF LINE ABOVE
01.006 BAR AND BAR SEATING
01.007 ADA BAR, MAXIMUM HEIGHT OF 34"
01.010 LIQUOR STILL
08.001 ALUMINUM STOREFRONT SYSTEM
14.001 ELEVATOR, TYPE AND MANUFACTURER TBD
22.001 ACCESSIBLE FLOOR-MOUNTED TOILET WITH GRAB BARS
22.003 COUNTER-MOUNTED LAVATORY WITH REQUIRED KNEE AND TOE CLEARANCES PROVIDED
23.001 CHASE PROVIDED FOR VENTING AND HVAC
A2.1
NO. DATE SUBMITTAL
1 23.07.14 ARC INITIAL SUBMITTAL
24.02.06 ARC RESUBMITTAL 12
3 24.03.19 ARC RESUBMITTAL 2
4 24.61.18 PLANNING HEARING
Page 95 of 98
GROUND FLOOR0"
SECOND FLOOR (MEZZANINE)
14'-6"
TOP OF TOWER ROOF40'-0"
TOP OF UPPER ROOF33'-5"
TYP.
08.002
TYP.
05.003
SECOND FLOOR (RES. UNIT)10'-6"
GROUND FLOOR0"
SECOND FLOOR (MEZZANINE)
14'-6"
TOP OF TOWER ROOF40'-0"
TOP OF UPPER ROOF
33'-5"
TOP OF LOWER ROOF25'-5"
TYP.
05.005
TYP.
05.00308.002
SECOND FLOOR (RES. UNIT)10'-6"
08.003
GROUND FLOOR0"
TOP OF TOWER ROOF40'-0"
TOP OF UPPER ROOF33'-5"
TOP OF LOWER ROOF
25'-5"
TYP.
05.001
SECOND FLOOR (RES. UNIT)10'-6"
EXTERIOR ELEVATION GENERAL NOTES
1.EXTERIOR FINISHES AND COLORS SHALL BE VERIFIED WITH THE OWNER PRIOR TO APPLICATION,
WHETHER SPECIFIED ON THE PLANS OR NOT.
2.PROVIDE FLASHING AND COUNTERFLASHING PER CBC 1707 AT CHIMNEYS, PARAPETS,
BALCONIES, LANDINGS, EXTERIOR STAIRWAYS, ROOF TO WALL INTERSECTIONS, AND ANY OTHER
VERTICAL TO HORIZONTAL INTERSECTIONS TO MAINTAIN A WEATHER AND WATER TIGHT
ENVELOPE. FLASHING AND COUNTERFLASHING SHALL BE MIN. 26 GA. GALV. METAL. PAINT ALL
GALV. METAL MATERIAL TO MATCH ADJACENT MATERIAL
3.GUTTER AND DOWNSPOUTS SHALL BE INSTALLED ON ALL ROOF AREAS UNO. ALL GUTTERS SHALL
BE GALVANIZED METAL OR ALUMINUM, PAINTED TO MATCH FASCIA. DOWNSPOUTS SHALL BE
PAINTED TO MATCH ADJACENT WALL FINISH UNO AND TIED INTO UNDERGROUND DRAINAGE.
REFER TO GRADING/DRAINAGE PLAN (IF PROVIDED) FOR ADDITIONAL INFORMATION
4.GUTTERS SHALL INCLUDE AN INTEGRAL MEANS OF PREVENTING ACCUMULATION OF LEAVES AND
DEBRIS.
VERTICAL BOX RIB METAL SIDING; AEP SPAN, COOL
DURA TECH 5000 MATTE BLACK
EXTERIOR ELEVATION LEGEND
STANDING SEAM METAL ROOFING; AEP SPANSEAM,
COOL DURA TECH 5000 SLATE GRAY
VERTICAL WOOD SIDING; NATURAL STAIN ALUMINUM STOREFRONT WINDOW FRAMES, MULLIONS
AND DOOR FRAMES; ANODIZED DARK BRONZE
EXTERIOR DOWNLIT WALL SCONCE IN COMPLIANCE
WITH DARK SKY REQUIREMENTS; DARK BRONZE
CONCRETE BASE, BOARD FINISHED
GROUND FLOOR
0"
SECOND FLOOR (MEZZANINE)14'-6"
TOP OF TOWER ROOF40'-0"
TOP OF UPPER ROOF
33'-5"
TOP OF LOWER ROOF25'-5"
SECOND FLOOR (RES. UNIT)
10'-6"
08.003
THESE DRAWINGS ARE INSTRUMENTS OF SERVICEAND ARE THE PROPERTY OF TEN OVER STUDIO, INC.
THE DESIGN AND INFORMATION REPRESENTED ON
THESE DRAWINGS ARE EXCLUSIVELY FOR THE PROJECT
INDICATED AND SHALL NOT BE TRANSFERRED OR
OTHERWISE REPRODUCED WITHOUT EXPRESS WRITTEN
PERMISSION FROM TEN OVER STUDIO, INC.
COPYRIGHT 2022
539 Marsh Street
San Luis Obispo, CA
805.541.1010
info@tenoverstudio.com
www.tenoverstudio.com
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
DRWN BY:
CHK'D BY:
PROJ #:
NOT FOR
CONSTRUCTION
JOEL R. SNYDER
C-39262
2.28.2023
RENEWAL
L
I
CE N S E D A R CHI
T
E
C
T
S
T
A
T
E
OF A L I F O RNI
A
C
MF
NM
EXTERIOR
ELEVATIONS
10
H
I
G
U
E
R
A
10
H
I
G
U
E
R
A
S
T
.
SA
N
L
U
I
S
O
B
I
S
P
O
,
C
A
2023-020
1/8" = 1'-0"2 EAST ELEVATION
1/8" = 1'-0"1 SOUTH ELEVATION
1/8" = 1'-0"3 WEST ELEVATION
KEYNOTES
05.001 EXTERIOR STEEL COLUMN, PAINTED BLACK
05.003 EXTERIOR STEEL AWNING
05.005 EXTERIOR STEEL SCREENING
08.002 ALUMINUM STOREFRONT ENTRANCE DOORS
08.003 OVERHEAD ROLL-UP DOOR
A3.0
NO.DATE SUBMITTAL
1 23.07.14 ARC INITIAL SUBMITTAL
2 24.02.06 ARC RESUBMITTAL 1
1/8" = 1'-0"4 NORTH ELEVATION
3 24.03.19 ARC RESUBMITTAL 2
4 24.61.18 PLANNING HEARING
Page 96 of 98
SIGNAGE PROGRAM GENERAL NOTES
1.SIGNAGE IS ONLY PERMITTED IN ZONES INDICATED IN ELEVATION DRAWINGS ABOVE.
2.ALL SIGNAGE SHALL FOLLOW GUIDELINES LISTED IN EACH RESPECTIVE ZONE'S NOTES ON THOSE
ELEVATIONS INCLUDING SIGNAGE TYPES, NUMBER, DESIGN, SIZE, MATERIALS, COLOR,
ILLUMINATION, AND INSTALLATION .
3.ALL SIGNAGE TYPES, DIMENSIONS, AND SPECIFICATIONS ARE BASED ON CHAPTER 15.40 "SIGN
REGULATIONS" AND SECTION 15.40.460 ("SIGN STANDARDS BY DISTRICT") TABLE UNDER C-T AND
C-S ZONING DESIGNATION AND SECTION 15.40.460 ("SIGN STANDARDS BY SIGN TYPE") WITH
ADJUSTMENTS PER PROJECT PROGRAM AND DESIGN.
4. ALL SIGNS WILL COMPLY WITH ILLUMINATION REGULATIONS IN SAN LUIS OBISPO MUNICIPAL
CODE SECTION 15.40.430.
5 . ALL SIGNS WILL COMPLY WITH DESIGN PRINCIPLES IN SAN LUIS OBISPO MUNICIPAL CODE
SECTION 15.40.480.
GROUND FLOOR0"
SECOND FLOOR (MEZZANINE)
14'-6"
TOP OF TOWER ROOF40'-0"
TOP OF UPPER ROOF
33'-5"
SIGN ZONE 1
TYPES PERMITTED: WALL-MOUNTED SIGNS
NUMBER: 1 SIGN MAXIMUM
MAXIMUM SIZE: 150 SF TOTAL
DESIGN: THREE-DIMENSIONAL LETTERING AND/OR LOGO BALANCED AND IN PROPORTION TO SCALE WITH
BUILDING ELEVATION WITH COMPOSITION THAT DOES NOT OVERWHELM OR OBSCURE DESIGN.
MATERIAL: HIGH QUALITY AND DURABLE MATERIALS THAT ARE COMPLEMENTARY AND/OR SIMILAR TO
BUILDING MATERIALS AND DO NOT DISTRACT FROM OF OVERWHELM DESIGN OR OVERALL BUILDING
FORM. SIGN MATERIALS SHALL CONVEY A SENSE OF PERMANENCE AND DURABILITY, AND NOT CONSIST
OF FOAM, POSTER BOARD, FLAT PLASTIC, OR ANY OTHER MATERIAL INDICATING TEMPORARY SIGNAGE.
COLOR: ALL COLORS SHOULD BE COMPLEMENTARY TO BUILDING MATERIALS AND COLOR.
ILLUMINATION: EXTERNAL OR INTERNAL PERMITTED CONSISTENT W/SLO MUNI CODE SECTION 15.40.430
INSTALLATION: HIGH QUALITY INSTALLATION USING A DIRECT OR FLUSH MOUNT WITHOUT EXPOSED
WIRING, RACEWAYS, OR OTHER STABLIZING DEVICES INCLUDING BACKER MOUNTS. ATTACHMENTS SHALL
BE HIDDEN FROM VIEW IN LEAST DESTRUCTIVE MANNER POSSIBLE.
MIN.
1'-6"
SIGN ZONE 2
TYPES PERMITTED: HANGING & SUSPENDED, OR AWNING IF APPLICABLE
NUMBER: 1 SIGN MAXIMUM
MAXIMUM SIZE: SIZE OF SIGNS SHALL BE PEDESTRIAN SCALE, IN PROPORTION WITH BUILDING, AND NOT NEGATIVELY
OBSCURE TRANSPARENCY INTO BUILDING AT GLASS FACADE ELEMENTS. REFER TO SLO MUNI CODE SECTION 15.40.470
FOR GENERAL SIZE PARAMETERS.
DESIGN: HANGING & SUSPENDED DESIGNED IN A CONSISTENT MANNER. ALL SIGNAGE SHALL BE THREE DIMENSIONAL
(NOT ENTIRELY FLAT OR SIMPLY PAINTED) IN PROPORTION TO SCALE WITH BUILDING ELEVATION WITH COMPOSITION
THAT DOES NOT OVERWHELM OR OBSCURE DESIGN. ANY ADDITIONAL ELEMENTS ADDED FOR SIGNAGE (AWNINGS,
STRUCTURE, ETC...) MUST BE COHESIVELY INCORPORATED INTO BUILDING DESIGN IN TERMS OF FORM, SIZE, AND
MATERIAL.
MATERIAL: HIGH QUALITY AND DURABLE MATERIALS THAT ARE COMPLEMENTARY AND/OR SIMILAR TO BUILDING
MATERIALS AND DO NOT DISTRACT FROM OF OVERWHELM DESIGN OR OVERALL BUILDING FORM. SIGN MATERIALS
SHALL CONVEY A SENSE OF PERMANENCE AND DURABILITY, AND NOT CONSIST OF FOAM, POSTER BOARD, FLAT
PLASTIC, OR ANY OTHER MATERIAL INDICATING TEMPORARY SIGNAGE.
COLOR: ALL COLORS SHOULD BE COMPLEMENTARY TO BUILDING MATERIALS AND COLOR.
ILLUMINATION: EXTERNAL OR INTERNAL PERMITTED CONSISTENT W/SLO MUNI CODE SECTION 15.40.430
INSTALLATION: HIGH QUALITY INSTALLATION WITHOUT EXPOSED WIRING, RACEWAYS, OR OTHER STABLIZING DEVICES
INCLUDING BACKER MOUNTS. ATTACHMENTS SHALL BE HIDDEN FROM VIEW IN LEAST DESTRUCTIVE MANNER POSSIBLE.
ADDITIONAL REQUIREMENTS: ALL SIGNS MUST MAINTAIN MINIMUM VERTICAL AND HORIZONTAL CLEARANCE
REQUIREMENTS OF SLO MUNI CODE SECTION 15.40.440.
8'-
4
"
M
I
N
.
TYPES PERMITTED: WINDOW SIGNS
NUMBER: 1 SIGN PER WINDOW
MAXIMUM SIZE: SIZE OF SIGNS SHALL BE PEDESTRIAN SCALE, IN PROPORTION WITH BUILDING, AND NOT NEGATIVELY OBSCURE VIEW TO INTERIOR AT GLASS. REFER TO SLO MUNI CODE SECTION 15.40.470
FOR GENERAL SIZE PARAMETERS.
DESIGN: SIGNS SHALL BE LIMITED TO SMALL GRAPHICS AND TEXT THAT SERVE TO FRAME A WINDOW OR PROVIDE INFORMATION. WINDOW SIGNS ARE LOCATED WITHIN 36 INCHES OF A WINDOW. SIGNS
SHOULD CLEARLY RELATE TO THEIR TENANT SPACE. TYPICALLY WINDOW SIGNS ARE TWO-DIMENSIONAL SIGNS ADHERED TO GLASS OF WINDOWS OR DOORS.
MATERIAL: HIGH QUALITY AND DURABLE MATERIALS THAT ARE COMPLEMENTARY AND/OR SIMILAR TO BUILDING MATERIALS AND DO NOT DISTRACT FROM OF OVERWHELM DESIGN OR OVERALL BUILDING
FORM. SIGN MATERIALS SHALL CONVEY A SENSE OF PERMANENCE AND DURABILITY, AND NOT CONSIST OF FOAM, POSTER BOARD, FLAT PLASTIC, OR ANY OTHER MATERIAL INDICATING TEMPORARY SIGNAGE.
COLOR: ALL COLORS SHOULD BE COMPLEMENTARY TO BUILDING MATERIALS AND COLOR.
INSTALLATION: HIGH QUALITY INSTALLATION WITHOUT EXPOSED WIRING, RACEWAYS, OR OTHER STABLIZING DEVICES INCLUDING BACKER MOUNTS. ATTACHMENTS SHALL BE HIDDEN FROM VIEW IN LEAST
DESTRUCTIVE MANNER POSSIBLE.
ADDITIONAL REQUIREMENTS: SIGNS IN THIS ZONE MAY BE ATTACHED TO WINDOWS AND/OR DOORS.
SIGN ZONE 3
MIN.
1'-6"
MI
N
.
1'-
6
"
SECOND FLOOR (RES. UNIT)
10'-6"
GROUND FLOOR
0"
SECOND FLOOR (MEZZANINE)14'-6"
TOP OF TOWER ROOF
40'-0"
TOP OF UPPER ROOF33'-5"
TOP OF LOWER ROOF25'-5"
SIGN ZONE 4
TYPES PERMITTED: WALL-MOUNTED SIGNS
NUMBER: 1 SIGN MAXIMUM
MAXIMUM SIZE: 150 SF TOTAL
DESIGN: THREE-DIMENSIONAL LETTERING AND/OR LOGO BALANCED AND IN PROPORTION TO SCALE WITH BUILDING ELEVATION WITH
COMPOSITION THAT DOES NOT OVERWHELM OR OBSCURE DESIGN.
MATERIAL: HIGH QUALITY AND DURABLE MATERIALS THAT ARE COMPLEMENTARY AND/OR SIMILAR TO BUILDING MATERIALS AND DO NOT
DISTRACT FROM OF OVERWHELM DESIGN OR OVERALL BUILDING FORM. SIGN MATERIALS SHALL CONVEY A SENSE OF PERMANENCE AND
DURABILITY, AND NOT CONSIST OF FOAM, POSTER BOARD, FLAT PLASTIC, OR ANY OTHER MATERIAL INDICATING TEMPORARY SIGNAGE.
COLOR: ALL COLORS SHOULD BE COMPLEMENTARY TO BUILDING MATERIALS AND COLOR.
ILLUMINATION: EXTERNAL OR INTERNAL PERMITTED CONSISTENT W/SLO MUNI CODE SECTION 15.40.430
INSTALLATION: HIGH QUALITY INSTALLATION USING A DIRECT OR FLUSH MOUNT WITHOUT EXPOSED WIRING, RACEWAYS, OR OTHER
STABLIZING DEVICES INCLUDING BACKER MOUNTS. ATTACHMENTS SHALL BE HIDDEN FROM VIEW IN LEAST DESTRUCTIVE MANNER POSSIBLE.
MIN.
1'-6"
MIN.
1'-6"
BO
T
T
O
M
O
F
S
I
G
N
S
H
A
L
L
B
E
A
B
O
V
E
L
A
N
D
S
C
A
P
E
F
E
A
T
U
R
E
S
MI
N
.
2'-
0
"
SECOND FLOOR (RES. UNIT)10'-6"
GROUND FLOOR0"
TOP OF TOWER ROOF40'-0"
TOP OF UPPER ROOF
33'-5"
TOP OF LOWER ROOF25'-5"
WALL SIGN ZONE 5
TYPES PERMITTED: WALL-MOUNTED SIGNS
NUMBER: 1 SIGN MAXIMUM
MAXIMUM SIZE: 300 SF TOTAL
DESIGN: THREE-DIMENSIONAL LETTERING AND/OR LOGO BALANCED AND IN PROPORTION TO SCALE WITH
BUILDING ELEVATION WITH COMPOSITION THAT DOES NOT OVERWHELM OR OBSCURE DESIGN.
MATERIAL: HIGH QUALITY AND DURABLE MATERIALS THAT ARE COMPLEMENTARY AND/OR SIMILAR TO
BUILDING MATERIALS AND DO NOT DISTRACT FROM OF OVERWHELM DESIGN OR OVERALL BUILDING FORM.
SIGN MATERIALS SHALL CONVEY A SENSE OF PERMANENCE AND DURABILITY, AND NOT CONSIST OF FOAM,
POSTER BOARD, FLAT PLASTIC, OR ANY OTHER MATERIAL INDICATING TEMPORARY SIGNAGE.
COLOR: ALL COLORS SHOULD BE COMPLEMENTARY TO BUILDING MATERIALS AND COLOR.
ILLUMINATION: EXTERNAL OR INTERNAL PERMITTED CONSISTENT W/SLO MUNI CODE SECTION 15.40.430
INSTALLATION: HIGH QUALITY INSTALLATION USING A DIRECT OR FLUSH MOUNT WITHOUT EXPOSED
WIRING, RACEWAYS, OR OTHER STABLIZING DEVICES INCLUDING BACKER MOUNTS. ATTACHMENTS SHALL
BE HIDDEN FROM VIEW IN LEAST DESTRUCTIVE MANNER POSSIBLE.
MIN.
2'-10 1/4"
SECOND FLOOR (RES. UNIT)
10'-6"
WALL MOUNTED SIGN
NOTE: THE SIGNS ABOVE ARE EXAMPLES OF SIGNAGE THAT GENERALLY COMPLY WITH THE DESIGN STANDARDS OF THIS SIGNAGE PROGRAM. SEE EACH ZONE FOR SPECIFIC REQUIREMENTS.
WINDOW SIGNAWNING SIGN PROJECTING SIGN HANGING & SUSPENDED SIGN
THESE DRAWINGS ARE INSTRUMENTS OF SERVICE
AND ARE THE PROPERTY OF TEN OVER STUDIO, INC.
THE DESIGN AND INFORMATION REPRESENTED ON
THESE DRAWINGS ARE EXCLUSIVELY FOR THE PROJECT
INDICATED AND SHALL NOT BE TRANSFERRED OR
OTHERWISE REPRODUCED WITHOUT EXPRESS WRITTEN
PERMISSION FROM TEN OVER STUDIO, INC.
COPYRIGHT 2022
539 Marsh Street
San Luis Obispo, CA
805.541.1010
info@tenoverstudio.com
www.tenoverstudio.com
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
DRWN BY:
CHK'D BY:
PROJ #:
NOT FOR
CONSTRUCTION
JOEL R. SNYDER
C-39262
2.28.2023RENEWAL
L
I
CE N S E D A R CHI
T
E
C
T
S
T
A
T
E
OF A L I F O RNI
A
C
MF
NM
SIGNAGE PROGRAM
10
H
I
G
U
E
R
A
10
H
I
G
U
E
R
A
S
T
.
SA
N
L
U
I
S
O
B
I
S
P
O
,
C
A
2023-020
A3.1
1/8" = 1'-0"2 EAST ELEVATION
1/8" = 1'-0"1 SOUTH ELEVATION
1/8" = 1'-0"3 WEST ELEVATION
3" = 1'-0"4 SIGNAGE TYPE EXAMPLES
NO.DATE SUBMITTAL
1 23.07.14 ARC INITIAL SUBMITTAL
2 24.02.06 ARC RESUBMITTAL 1
3 24.03.19 ARC RESUBMITTAL 2
4 24.61.18 PLANNING HEARING
Page 97 of 98
THESE DRAWINGS ARE INSTRUMENTS OF SERVICE
AND ARE THE PROPERTY OF TEN OVER STUDIO, INC.
THE DESIGN AND INFORMATION REPRESENTED ON
THESE DRAWINGS ARE EXCLUSIVELY FOR THE PROJECT
INDICATED AND SHALL NOT BE TRANSFERRED OR
OTHERWISE REPRODUCED WITHOUT EXPRESS WRITTEN
PERMISSION FROM TEN OVER STUDIO, INC.
COPYRIGHT 2022
539 Marsh Street
San Luis Obispo, CA
805.541.1010
info@tenoverstudio.com
www.tenoverstudio.com
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
DRWN BY:
CHK'D BY:
PROJ #:
NOT FOR
CONSTRUCTION
JOEL R. SNYDER
C-39262
2.28.2023
RENEWAL
L
I
C E N S E D A RCH
I
T
E
C
T
S
T
A
T
E
O F A L I F O R NI
A
C
EH
NM
PERSPECTIVE
IMAGES
10
H
I
G
U
E
R
A
10
H
I
G
U
E
R
A
S
T
.
SA
N
L
U
I
S
O
B
I
S
P
O
,
C
A
2023-020
01 -VIEW FROM ENTRY 02 -VIEW FROM PLAZA
03 -VIEW FROM PARKING AREA 04 -VIEW FROM LOADING AREA A4.0
NO. DATE SUBMITTAL
1 23.07.14 ARC INITIAL SUBMITTAL
24.02.06 ARC RESUBMITTAL 12
3 24.03.19 ARC RESUBMITTAL 2
4 24.61.18 PLANNING HEARING
Page 98 of 98