HomeMy WebLinkAbout7/2/2024 Item 7a, Jackson - Staff Agenda CorrespondenceCity of San Luis Obispo, Council Memorandum
City of San Luis Obispo
Council Agenda Correspondence
DATE: July 2, 2024
TO: Mayor and Council
FROM: Whitney McDonald, Interim City Manager
Emily Jackson, Finance Director
Debbie Malicoat, Deputy Finance Director
SUBJECT: ITEM 7A – REVIEW AND ADOPT REVISED CITYWIDE USER AND
REGULATORY FEES
Staff received the following questions and comments regarding the recommended
updates to the City’s user and regulatory fees. The questions and comments are below
with staff’s response shown in italics:
1) Are there other options for phasing fees other than the option presented in
the staff report?
If the Council would like to consider a phased approach to fee increases, there are
numerous different ways that phasing could occur. As noted in the ‘Alternatives’
section of the Council Agenda Report, staff suggested that fees increasing by more
than 50% and $10 could be phased in over two years, with half of the increase
effective on October 1, 2024 and the second half of the increase effective on July
1, 2025. Attachments A and B to this correspondence provide additional phasing
options for the Council to consider:
Attachment A to this correspondence provides a list of fees that would be impacted
if phasing is based on all fees that exceed 100% and $10 increase.
Attachment B to this correspondence provides a list of fees that would be impacted
if phasing is based on all fees that exceed 150% and $10 increase.
2) What do other jurisdictions charge for appeal fees? Are there
constitutionality issues related to charging appeal fees?
City staff researched appeal fees for the cities that were considered as comparable
jurisdictions in the MGT report (City of Santa Barbara, San Luis Obispo County,
City of Ventura and City of Monterey) as well as other nearby jurisdictions. The
appeal fees for planning cases are as follows:
Item 7a. Review and Adopt Revised Citywide User and Regulatory Fees Page 2
• City of Santa Barbara
Most planning appeal fees are $1,095
Appeal from Sign Committee is $434
• San Luis Obispo County
Planning appeal fee is $850
Cannabis related appeal is $2,000
• City of Ventura
Planning appeal fee is $1,050
Cannabis related appeal is $3,465
• City of Monterey
Appeal to the Planning Commission is $938.63
Appeal of decision of Planning Commission to the City Council is
$1,835.50
• City of Arroyo Grande
Appeal of Director decision is $800
Appeal of Planning Commission decision is $1,224
• City of Atascadero
Appeal fee to Planning Commission is $1,615 (70% cost recovery)
Appeal fee to City Council is $1,816 (70% cost recovery)
• City of Grover Beach
Planning appeal fee to Planning Commission or City Council is
$1,000
• City of Morro Bay
Refundable appeal fee is $336 (set at 9.1% cost recovery)
• City of Paso Robles
Planning appeal fee is $248
Fire Code appeal fee is $747
• City of Pismo Beach
Appeals to Planning Commission and City Council are $1,035
Item 7a. Review and Adopt Revised Citywide User and Regulatory Fees Page 3
There are not constitutionality issues related to charging appeal fees. The
California Constitution as well as the California Government Code authorize the
City to charge user fees for the estimated reasonable cost of providing various
governmental services. Through comprehensive analysis of the time spent by City
staff in providing these governmental services, the City’s consultant calculated
each fee to recover no more than the reasonable cost of each service.
A number of public comments have been received about the proposed appeal fees
presented in the Council Agenda Report. In the report, staff provided the estimated
full cost to process appeals at different tiers, and also provided proposed appeal
fees at the cost recovery amounts that were previously established by the City
Council in 2017. In 2017, the City Council attempted to balance the desire to
recover the cost of processing appeals, while also not overly encouraging or
discouraging appeals through the pricing of the fee. Staff also provided a table
showing what the appeal fees would be for each tier if they were set at various
percentages of the full cost. This table can help guide City Council discussion on
the setting of appeal fees if the Council would like to consider different percentages
of full cost recovery.
The City Council may wish to consider setting a flat fee for appeals, as it appears
this is the most common way appeal fees are assessed amongst peer and
neighboring jurisdictions. The Council could set an appeal fee that is lower for
appeals from a staff level decision, and higher for appeals from an advisory body,
as those types of projects tend to be more complicated and take more time to
process (this would be similar to the structure in the City of Arroyo Grande noted
above) or keep the tiered system that exists today and implement a flat fee within
each tier.
The following tables illustrate how different appeal fee approaches could look. The
numbers provided are an attempt to bring the appeal fees in line with peer and
neighboring jurisdictions, but could be adjusted up or down per direction from the
Council, as long as the fees do not exceed the full cost recovery amounts provided
by MGT.
The tiers are defined in the staff report and are provided here for reference:
Item 7a. Review and Adopt Revised Citywide User and Regulatory Fees Page 4
Alternative Approach 1 – set the appeal fees based on a percentage of cost
recovery but lower the cost recovery percentage. If cost recovery percentages
were lowered to 10% for both applicants and non-applicants the appeals would be
as follows (note, Tier 3 and Tier 4 do not currently differentiate between applicant
and non-applicant):
Fee
Tier 1 Applicant $1,671
Tier 1 Non-applicant $1,704
Tier 2 Applicant $1,052
Tier 2 Non-applicant $1,035
Tier 3 $515
Tier 4 $270
Alternatively, the Council could utilize Alternative Approach #1 but charge the
same fee for applicants and non-applicants.
Alternative Approach 2a – set fixed appeal fees and retain existing tiers. The
suggested amounts below would be in-line with nearby and peer jurisdictions.
Fee
Tier 1 $1,000
Tier 2 $800
Tier 3 $600
Tier 4 $400
Approach 2b – set fixed appeal fees and retain both the existing tiers and the
applicant/non-applicant fees. The suggested amounts below would incorporate
the information related to nearby and peer jurisdictions while retaining a distinction
between applicants and non-applicants, with the applicant fee proposed to be 20%
more than non-applicant. Currently, with the established fee structure, applicants
pay more than double what non-applicants do for Tier 1 and Tier 2 appeals, and
applicants and non-applicants pay the same amount as one another for Tier 3 and
Tier 4 appeals.
Fee
Tier 1 Applicant $1,200
Tier 1 Non-applicant $1,000
Tier 2 Applicant $960
Tier 2 Non-applicant $800
Tier 3 $600
Tier 4 $400
Item 7a. Review and Adopt Revised Citywide User and Regulatory Fees Page 5
Approach 3 – set fixed appeal fees based on the body to which a permit is
being appealed. The suggested amounts below would be in-line with nearby and
peer jurisdictions.
Fee
Appeal of advisory body
decision
$1,000
Appeal of director decision $500
Refund Option - In addition, the City Council could consider implementing a policy
related to appeals that allows for the refunding of some or all appeal fees should
an appellant be successful in their appeal. This would mean that an appeal fee
would be charged in order to file the appeal, but refunded to the appellant if the
appeal were successful and a decision was made in their favor.
3) What fees are generally associated with projects or home improvements that
help advance sustainability goals of the City? What would the fees for these
permits be if the City established a 50% cost recovery goal for these types
of permits? What would be the estimated economic impact of NOT
implementing the increases as recommended?
The following Building permits are generally associated with sustainability goals of
the City:
• Electric Car Charging System
• Graywater System
• Graywater/Rainwater Harvesting System
• Heat Pump
• Insulation/Energy Update
• Photovoltaic Systems
• Photovoltaic Unit Installation – Residential
• Residential Photovoltaic System
• Solar/PV System – Commercial BLDG
• Solar/PV System – Multifamily BLDG
• Solar Water System Fixtures – BLDG
• Doors/Windows
• Electric Service Upgrades
• New/Altered Circuits
• Window Retrofit
Based on estimated annual volumes of these permit types, the currently proposed
fees are expected to generate about $134,400. If Council adopted a 50% cost
recovery, it would result in $67,200 of revenue generated. The fee amounts are
as shown below:
Item 7a. Review and Adopt Revised Citywide User and Regulatory Fees Page 6
4) What do other agencies charge for Conceal Carry Weapon Permit fees?
The following chart reflects what other agency fees are as of July 1, 2024. It is
important to note that the City’s current fee of $100 for new permits lagged behind
other agencies in the County, but as language changed in the Penal Code in
January 2024 while the City-wide Fee Study was underway, MGT was able to
provide an accurate determination of the City’s true time and cost above the prior
legislative cap. Additionally, feedback from other departments in the County
indicated they would most likely be re-assessing their fees in the near future, given
that the new statutory requirements include tasks which involve increased staff
time. The department also intends to reassess these fees as part of the City’s next
Fee Study and examine how costs compare to other County agencies and adjust
if needed.
Current Proposed
50% cost
recovery
Electric Car Charging System 149.70$ 173$ 86.50$
Graywater System 184.15$ 604$ 302.00$
Graywater/Rainwater Harvesting System 91.41$ 173$ 86.50$
Heat Pump 68.89$ 173$ 86.50$
Insulation/Energy Update 144.39$ 475$ 237.50$
Photovoltaic Systems 195.86$ 604$ 302.00$
Photovoltaic Unit Installation – Residential 84.62$ 259$ 129.50$
Residential Photovoltaic System 206.67$ 604$ 302.00$
Solar/PV System – Commercial BLDG 993.60$ 1,426$ 713.00$
Solar/PV System – Multifamily BLDG 967.08$ 1,426$ 713.00$
Solar Water System Fixtures – BLDG 91.41$ 115$ 57.50$
Doors/Windows 702.91$ 604$ 302.00$
Electric Service Upgrades 149.70$ 324$ 162.00$
New/Altered Circuits (new fee)-303$ 151.50$
Window Retrofit 241.11$ 389$ 194.50$
Item 7a. Review and Adopt Revised Citywide User and Regulatory Fees Page 7
5) Is more information available about the projects that did not pay both
installments of their required planning fees that are presented in the Agenda
Report?
Staff provided a table in the Agenda Report to highlight the uncollected amount of
fees in Planning due to the two installment payment system. For clarification, the
projects in this table represent projects that have been submitted between 2020
and 2024. The total number of projects that have not paid their second payment
installment is 42. The table below shows the number of each type of permit that
represents the unpaid fee amount. The largest number of projects with uncollected
fees are Major Development Projects, followed by Minor Development Projects,
Moderate Development Projects and Minor Use permits.
6) The staff report recommends that the City conduct fee studies every three
years moving forward. What does that mean in terms of when the next study
would be conducted and new fees implemented?
Staff is recommending that comprehensive fee studies be conducted every three
years moving forward to make sure that the City is able to incrementally adjust its
fees, rather than considering significant changes every five years. If this
recommendation is adopted by Council, staff would work with a consultant to
conduct a fee study in 2026 and target making a recommendation to Council in the
spring of 2027 so that the new fees could go into effect in July 2027, when the
2027-29 Financial Plan period begins. Consistent with Council-adopted Budget
Policies, fees adopted on July 2, 2024, would be adjusted by the consumer price
index (CPI) on July 1, 2025, and July 1, 2026, leading up to the next
comprehensive fee study.
2023-24
Application Fee
IT
Surcharge
First
Payment
Completion
Payment
# of Permits
Uncollected
$ Currently
Uncollected
Minor Use Permit 1,291.89$ 115.98$ 1,407.87$ 2,510.57$ 8 18,667.94$
Conditional Use Permit 2,976.25$ 241.38$ 3,217.63$ 4,937.84$ 2 9,875.68$
Variance 1,365.54$ 110.68$ 1,476.21$ 2,263.19$
Affordable Housing Incentive Request 559.70$ 45.96$ 605.66$ 947.34$ 2 1,758.50$
Reviews Requiring ALUC Hearing 2,268.58$ 103.90$ 2,372.48$ 1,181.36$
Architectural Review
Signs 2,607.75$ 185.94$ 2,793.68$ 3,488.61$
Conceptual Review 2,732.96$ 221.63$ 2,954.59$ 4,533.62$ 1 4,367.65$
Development Projects - Moderate 5,572.34$ 455.71$ 6,028.05$ 9,369.04$ 8 71,915.67$
Development Projects - Major 7,559.87$ 609.02$ 8,168.89$ 12,407.96$ 11 125,993.29$
Development Projects - Minor 2,016.42$ 156.95$ 2,173.37$ 3,129.42$ 8 24,135.64$
Plan Revision 2,367.13$ 178.01$ 2,545.14$ 3,469.17$
Cannabis Operator 27,713.42$ 285.45$ 5,903.19$ 21,810.23$ 2 39,808.48$
42 296,522.85$
Fees currently collected in two installments
Item 7a. Review and Adopt Revised Citywide User and Regulatory Fees Page 8
7) Can you explain the difference between the fee for “Window Retrofits (non-
structural) - BLDG – Base Fee” and “Window Retrofits (non-structural) -
BLDG – Each addtl” and why we are proposing a new fee here?
Previously, there was a flat fee assigned for all window retrofit projects that did not
provide for full cost recovery. Staff determined that the cost and time was most
accurately calculated based on the number of windows being replaced for a given
project. The “Base Fee” is the cost of the permit to replace up to 10 windows, and
the “Each addtl” fee is charged for up to each additional 10 windows on a project.
For example, 11-20 windows would be charged the “Base Fee” plus the “Each
addtl” fee for total of $666.73. Whereas a project consisting of 21-30 windows
would be charged the “Base Fee” plus 2 times the “Each addtl” fee, for a total cost
of $932.60. The new fee category captures the additional staff time for larger
projects.
8) It says in the report that an extensive amount of public and stakeholder
group feedback was sought as part of this study. Did you consult with the
non-profit developer community as part of the outreach? Also, were there
any other groups or individuals consulted consisting of low-income or other
historically marginalized or under-represented groups?
Key stakeholders from the non-profit developer community, as well as developers
that build affordable housing as part of larger projects, have been notified about
the fee study and are part of Developer’s Roundtable email lists. Several have
been present at the in-person meetings where the fee study has been presented
including as part of the Chamber of Commerce’s Economic Development
Committee. Due to the potential impact of Parks and Recreation fees on all
members of the community, the Parks and Recreation fees were taken to the
Commission so that they could be shared in a public forum. Additionally, e-
Notifications were sent to the local media and to more than 3,000 subscribers, and
stories were posted on Facebook and Instagram twice regarding the fee study.
Fee study information was also included in the SLO Business Update sent out by
the City’s Economic Development staff, which was distributed to 7,004
subscribers.
9) Why isn’t there a non-resident fee charged for golf? How was it determined
which Parks and Recreation services should have a resident and non-
resident fee?
Resident and non-resident fees are recommended for Parks and Recreation
services that require advance registration (ex. youth sports camps, instructional
classes, and Jack House rentals) primarily due to the complexity of administering
a non-resident rate for services that do not require registration and are instead paid
for at the counter. Staff’s recommendation is to add a non-resident fee for
programs that require registration/enrollment (i.e. classes) and already have a
Item 7a. Review and Adopt Revised Citywide User and Regulatory Fees Page 9
process is place for gathering information about residency. The recommendations
for use of non-resident fees also target those programs with impacted enrollment
(i.e. where we run out of space).
10) Is the Affordable Housing Agreement/MOU fee charged to non-profit
affordable housing developers?
This fee is not charged to non-profit affordable housing developers for affordable
housing projects.
11) What Planning permits/fees are generally associated with larger projects vs.
Individuals?
The Planning permits are utilized by a variety of users and each permit/fee could
be associated with an individual homeowner or with a larger development project.
In general, the following Planning permits are typically associated with larger
projects than smaller ones:
• Development projects – moderate
• Development projects – major
• Initial study/environmental impact report
• Tentative tract map
• Tentative parcel map
• Condominium conversion
• Rezoning
• Map amendment
• Text amendment
• General plan amendment
• Annexation
• Agreements (all)
• Street abandonment
12) In relation to the issue of Planning Fee installment payments, does staff
currently provide refunds for planning projects that do not proceed through
the entire planning process?
Yes. Currently staff will provide a full refund if an applicant withdraws a planning
project early in the review period, or if planning staff and the applicant determine
early that the project is not viable upon initial review. Staff also works with
applicants to provide reasonable refunds if the applicant withdraws an application
later in the process with consideration given to the amount of work that has already
been completed for the project.
Item 7a. Review and Adopt Revised Citywide User and Regulatory Fees Page 10
Staff Corrections
Staff discovered an error in the annual volumes used to calculate the Engineering fee
revenue related to blanket encroachment permits for utility companies. The correction
results in $176,070 less in estimated Engineering Fee revenues. In addition, the Planning
revenue calculation assumed that all revenue from SB9 urban lot splits is new revenue.
However, there is a current fee for this service, staff is simply recommending discretely
separating out the SB9 process. This results in $30,600 less Planning Fee related
revenues than originally calculated. The overall resulting estimated revenue is presented
below.
Finally, staff is correcting Exhibit 1 to the Draft Resolution (Attachment C to this
correspondence) to: 1. reflect staff’s recommendation as noted in the Council Agenda
Report that the Tree Removal Permit be $330.50 instead of $661; and 2. reflect corrected
fee amounts for Recycled Water Construction Permits and a simplified fee structure for
this service, as noted in the Agenda Correspondence sent out on June 28, 2024. Exhibit
1 is being updated as it is referenced in the resolution adopting the fee schedule. Note
that other attachments to the report include the fee amounts for Tree Removal Permits
and Recycled Water Construction Permits initially included in those attachments.
ATTACHMENTS
A - List of fees that would be impacted if phasing is based on 100% increase
B - List of fees that would be impacted if phasing is based on 150% increase
C - Corrected Exhibit 1 to Attachment A - Draft Resolution amending the City’s
Comprehensive Fee Schedule
MGT Report
Staff
Recommendation
User Fee Category
Building 145,474$ 145,474$
Engineering 742,209$ 566,139$
Fire 12,994$ 12,994$
General Government (85,201)$ (85,201)$
Parks and Recreation 1,516,875$ 115,839$
Planning 951,869$ 921,269$
Police (84,680)$ (84,680)$
Public Works 2,184$ 2,184$
Utilities 315,652$ 315,652$
Total 3,517,376$ 1,909,670$
General Fund 3,201,724$ 1,594,018$
Increased/(Decreased) Revenue
Fees based on phasing if % change >100%
Fee #Service Name Current rate
Recommended
Rate Eff 10/1/24 $ change % change Rate Eff 10/1/24 Rate Eff 7/1/25
Planning Fees
1 Affordable Housing/MOUs 1,090.24$ 3,343.97$ 2,253.73$ 206.7%2,217.11$ 3,343.97$
3 Development Agreement 19,220.86$ 59,620.61$ 40,399.75$ 210.2%39,420.73$ 59,620.61$
4 Reimbursement Agreement 19,220.86$ 40,793.37$ 21,572.51$ 112.2%30,007.12$ 40,793.37$
6 Annexation, Deposit 28,229.18$ 56,934.09$ 28,704.91$ 101.7%42,581.64$ 56,934.09$
9 Tier 1: e.g. Appeals to the City Council - Applicant 1,992.53$ 8,610.86$ 6,618.33$ 332.2%5,301.69$ 8,610.86$
10 Tier 1 Appeal - Non Applicant 797.27$ 3,511.94$ 2,714.67$ 340.5%2,154.61$ 3,511.94$
11
Tier 2: e.g. Minor/Incidental Arch Review, Administrative Use
Permit, Variance, Subdivisions <5 lots - Applicant 1,106.96$ 5,419.40$ 4,312.44$ 389.6%3,263.18$ 5,419.40$
12 Tier 2 Appeal - Non Applicant 442.79$ 2,133.14$ 1,690.35$ 381.7%1,287.96$ 2,133.14$
13
Tier 3: e.g. Fence Height Exception, Administrative Approval
Application - Applicant 387.76$ 1,325.22$ 937.46$ 241.8%856.49$ 1,325.22$
14 Tier 3 Appeal - Non Applicant 387.76$ 1,325.22$ 937.46$ 241.8%856.49$ 1,325.22$
15
Tier 4: e.g. Home Occupation permit, Non-Profit Special
Event - Applicant 166.37$ 694.56$ 528.19$ 317.5%430.46$ 694.56$
16 Tier 4 Appeal - Non Applicant 166.37$ 694.56$ 528.19$ 317.5%430.46$ 694.56$
23 Business License Zoning Clearance 129.79$ 276.17$ 146.38$ 112.8%202.98$ 276.17$
24 Business License Change of Location Only 129.79$ 276.17$ 146.38$ 112.8%202.98$ 276.17$
34 Development Projects - Major 20,576.85$ 41,894.98$ 21,318.13$ 103.6%31,235.91$ 41,894.98$
37 Director's Action - General 1,075.81$ 2,961.66$ 1,885.85$ 175.3%2,018.73$ 2,961.66$
38 Sidewalk Café User and Parklet Application Fee 971.43$ 3,729.38$ 2,757.95$ 283.9%2,350.40$ 3,729.38$
49 Text Amendment 10,743.60$ 22,631.84$ 11,888.24$ 110.7%16,687.72$ 22,631.84$
59 Tree Committee Recommendation 136.00$ 330.50$ 194.50$ 143.0%233.25$ 330.50$
Building and Safety Fees
6 Air Handler - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$
20 Cell Tower/Antenna - BLDG - add on - Each Addtl (Up to 20)119.98$ 265.87$ 145.89$ 121.6%192.93$ 265.87$
33 Drain Vent Repair/Replace - BLDG 70.95$ 178.28$ 107.33$ 151.3%124.61$ 178.28$
35 Duct Work Only - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$
38 Electric Car Charging System -BLDG 149.70$ 489.49$ 339.79$ 227.0%319.59$ 489.49$
39 Electric Service Upgrade (up to 200 amp) -BLDG 149.70$ 333.88$ 184.18$ 123.0%241.79$ 333.88$
40 Evaporative Cooler - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$
41 Exhaust Hood - Type I - BLDG 139.11$ 689.40$ 550.30$ 395.6%414.26$ 689.40$
43 Exhaust Hood & Duct - Residential - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$
50 Fixtures, Plumbing - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$
55 Furnace/Heater Replacement Only -BLDG 149.70$ 489.49$ 339.79$ 227.0%319.59$ 489.49$
57 Gas System Repair/Replace/Extend - BLDG 65.64$ 178.28$ 112.63$ 171.6%121.96$ 178.28$
58 Generator Installation - BLDG 105.99$ 622.42$ 516.44$ 487.3%364.20$ 622.42$
59 Graywater Systems - BLDG 184.15$ 622.42$ 438.27$ 238.0%403.29$ 622.42$
61 Grease Trap - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$
62 Heat Pump - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$
63 Heater - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$
66 Insulation/Energy Upgrade -BLDG 140.12$ 489.49$ 349.37$ 249.3%314.80$ 489.49$
67 Make-Up Air System - BLDG 66.85$ 178.28$ 111.43$ 166.7%122.56$ 178.28$
84 Photovoltaic Systems (residential roof mount)195.86$ 622.42$ 426.57$ 217.8%409.14$ 622.42$
85 Photovoltaic Unit Installation - Residential 84.62$ 266.90$ 182.27$ 215.4%175.76$ 266.90$
88 Refrigeration Compressor/Condenser - BLDG 115.27$ 400.86$ 285.59$ 247.8%258.07$ 400.86$
90 Re-roof with Added Ventilation -BLDG 144.39$ 400.86$ 256.47$ 177.6%272.63$ 400.86$
91 Residential Photovoltaic System 206.67$ 622.42$ 415.76$ 201.2%414.54$ 622.42$
96 Seismic Strengthening of URM Bldg 56.85$ 312.24$ 255.39$ 449.2%184.55$ 312.24$
120 Temporary Service - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$
124 Vent Fan (Single Duct) - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$
126 Water Heater Replacement Only -BLDG 147.36$ 312.24$ 164.88$ 111.9%229.80$ 312.24$
127 Water Pipe Repair/Replace - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$
Engineering Fees
29 Non-Single Family Residential 5000-14999 180.50$ 430.75$ 250.25$ 138.6%305.62$ 430.75$
45 Moderate Traffic Control Plan Review (multiple locations, one 371.55$ 885.20$ 513.65$ 138.2%628.37$ 885.20$
46 Major Traffic Control Plan Review (one or more locations and 655.98$ 2,397.97$ 1,741.99$ 265.6%1,526.98$ 2,397.97$
47 Minor - first day (one location, one phase) 88.15$ 377.16$ 289.01$ 327.9%232.66$ 377.16$
48 Minor each additional day 88.15$ 229.80$ 141.65$ 160.7%158.98$ 229.80$
49 Moderate - first day (multiple locations, one phase) 176.28$ 525.56$ 349.28$ 198.1%350.92$ 525.56$
50 Moderate each additional day 88.15$ 306.06$ 217.91$ 247.2%197.10$ 306.06$
51 Major - first day (one or more locations and multiple phases) 352.59$ 1,314.92$ 962.33$ 272.9%833.75$ 1,314.92$
52 Major each additional day 88.15$ 382.32$ 294.17$ 333.7%235.23$ 382.32$
53 Public Improvement Plans 1,853.34$ 4,037.50$ 2,184.16$ 117.8%2,945.42$ 4,037.50$
54 Building Plans 441.43$ 1,319.04$ 877.61$ 198.8%880.24$ 1,319.04$
55 Maps / Additional Documents 507.21$ 2,407.25$ 1,900.04$ 374.6%1,457.23$ 2,407.25$
56 Design Exception/Revision 353.86$ 914.05$ 560.19$ 158.3%633.96$ 914.05$
57 Site Improvement 0-2499 361.02$ 1,033.59$ 672.57$ 186.3%697.31$ 1,033.59$
58 Site Improvement 2500-4999 541.52$ 1,378.81$ 837.29$ 154.6%960.16$ 1,378.81$
74 Minor (under an acre) 361.01$ 1,723.00$ 1,361.99$ 377.3%1,042.00$ 1,723.00$
75 Major (over an acre) 902.54$ 3,445.99$ 2,543.45$ 281.8%2,174.27$ 3,445.99$
Fire Fees
123 Site Remediation Oversight 251.45$ 708.00$ 456.55$ 181.6%479.73$ 708.00$
124 Soil Remediation 251.45$ 708.00$ 456.55$ 181.6%479.73$ 708.00$
139 Each Additional Owner 12.43$ 44.00$ 31.57$ 254.0%28.22$ 44.00$
1 New Accessory Building 0.32$ 0.66$ 0.42$ 175.0%0.45$ 0.66$
10 New Single Family 0.42$ 0.72$ 0.60$ 500.0%0.42$ 0.72$
Phased-In Approach
*The size of this document has been reduced for enhanced web-viewing. To view the full-sized
document, which presents larger font sizes, please visit the City's Laserfiche repository at:
https://opengov.slocity.org/WebLink/Browse.aspx?id=195281 Attachment A
Fees based on phasing if % change >100%
Fee #Service Name Current rate
Recommended
Rate Eff 10/1/24 $ change % change Rate Eff 10/1/24 Rate Eff 7/1/25
Phased-In Approach
Parks and Recreation Fees
Multi-Use Courts
Damon-Garcia (full use = 4 lower fields, 1 upper field)
94 Lower Fields Facility Use (Day)800.00$ 436.50$ 120.1%581.75$ 800.00$
96 Lower Fields Light Fee 56.00$ 29.25$ 109.3%41.38$ 56.00$
Police Fees
6 New Permit: Investigative costs and permit processing 100.00$ 269.00$ 169.00$ 169.0%184.50$ 269.00$
9 Renewal - Concealed Weapons Permit: No new firearms 25.00$ 131.00$ 106.00$ 424.0%78.00$ 131.00$
10
Renewal - Concealed Weapons Permit: Adding new or
replacing firearms 25.00$ 187.00$ 162.00$ 648.0%106.00$ 187.00$
11
Amendment - Concealed Weapons Permit: Adding new
firearm 10.00$ 162.00$ 152.00$ 1520.0%86.00$ 162.00$
12
Amendment - Concealed Weapons Permit: Change in
Address 10.00$ 72.00$ 62.00$ 620.0%41.00$ 72.00$
33 Pedicab Renewal Fee 68.08$ 195.00$ 126.92$ 186.4%131.54$ 195.00$
Utilities Fees
13 Adapter Cost (1" Service/.58"x.75" Meter) 32.09$ 74.20$42.11$ 131.2%53.14$ 74.20$
14 Adapter Cost (1" Service/.75" Meter) 19.04$ 74.20$55.16$ 289.7%46.62$ 74.20$
16 Adapter Cost (2" Service/1" Meter) 143.33$ 338.00$ 194.67$ 135.8%240.67$ 338.00$
34 Industrial User Re-Inspection 95.81$ 253.00$ 157.19$ 164.1%174.41$ 253.00$
Fees based on phasing if % change >150%
Fee #Service Name Current rate
Recommended
Rate Eff 10/1/24 $ change % change Rate Eff 10/1/24 Rate Eff 7/1/25
Planning Fees
1 Affordable Housing/MOUs 1,090.24$ 3,343.97$ 2,253.73$ 206.7%2,217.11$ 3,343.97$
3 Development Agreement 19,220.86$ 59,620.61$ 40,399.75$ 210.2%39,420.73$ 59,620.61$
9 Tier 1: e.g. Appeals to the City Council - Applicant 1,992.53$ 8,610.86$ 6,618.33$ 332.2%5,301.69$ 8,610.86$
10 Tier 1 Appeal - Non Applicant 797.27$ 3,511.94$ 2,714.67$ 340.5%2,154.61$ 3,511.94$
11
Tier 2: e.g. Minor/Incidental Arch Review, Administrative Use
Permit, Variance, Subdivisions <5 lots - Applicant 1,106.96$ 5,419.40$ 4,312.44$ 389.6%3,263.18$ 5,419.40$
12 Tier 2 Appeal - Non Applicant 442.79$ 2,133.14$ 1,690.35$ 381.7%1,287.96$ 2,133.14$
13
Tier 3: e.g. Fence Height Exception, Administrative Approval
Application - Applicant 387.76$ 1,325.22$ 937.46$ 241.8%856.49$ 1,325.22$
14 Tier 3 Appeal - Non Applicant 387.76$ 1,325.22$ 937.46$ 241.8%856.49$ 1,325.22$
15
Tier 4: e.g. Home Occupation permit, Non-Profit Special
Event - Applicant 166.37$ 694.56$ 528.19$ 317.5%430.46$ 694.56$
16 Tier 4 Appeal - Non Applicant 166.37$ 694.56$ 528.19$ 317.5%430.46$ 694.56$
37 Director's Action - General 1,075.81$ 2,961.66$ 1,885.85$ 175.3%2,018.73$ 2,961.66$
38 Sidewalk Café User and Parklet Application Fee 971.43$ 3,729.38$ 2,757.95$ 283.9%2,350.40$ 3,729.38$
Building and Safety Fees
6 Air Handler - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$
33 Drain Vent Repair/Replace - BLDG 70.95$ 178.28$ 107.33$ 151.3%124.61$ 178.28$
35 Duct Work Only - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$
38 Electric Car Charging System -BLDG 149.70$ 489.49$ 339.79$ 227.0%319.59$ 489.49$
40 Evaporative Cooler - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$
41 Exhaust Hood - Type I - BLDG 139.11$ 689.40$ 550.30$ 395.6%414.26$ 689.40$
43 Exhaust Hood & Duct - Residential - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$
50 Fixtures, Plumbing - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$
55 Furnace/Heater Replacement Only -BLDG 149.70$ 489.49$ 339.79$ 227.0%319.59$ 489.49$
57 Gas System Repair/Replace/Extend - BLDG 65.64$ 178.28$ 112.63$ 171.6%121.96$ 178.28$
58 Generator Installation - BLDG 105.99$ 622.42$ 516.44$ 487.3%364.20$ 622.42$
59 Graywater Systems - BLDG 184.15$ 622.42$ 438.27$ 238.0%403.29$ 622.42$
61 Grease Trap - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$
62 Heat Pump - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$
63 Heater - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$
66 Insulation/Energy Upgrade -BLDG 140.12$ 489.49$ 349.37$ 249.3%314.80$ 489.49$
67 Make-Up Air System - BLDG 66.85$ 178.28$ 111.43$ 166.7%122.56$ 178.28$
84 Photovoltaic Systems (residential roof mount)195.86$ 622.42$ 426.57$ 217.8%409.14$ 622.42$
85 Photovoltaic Unit Installation - Residential 84.62$ 266.90$ 182.27$ 215.4%175.76$ 266.90$
88 Refrigeration Compressor/Condenser - BLDG 115.27$ 400.86$ 285.59$ 247.8%258.07$ 400.86$
90 Re-roof with Added Ventilation -BLDG 144.39$ 400.86$ 256.47$ 177.6%272.63$ 400.86$
91 Residential Photovoltaic System 206.67$ 622.42$ 415.76$ 201.2%414.54$ 622.42$
96 Seismic Strengthening of URM Bldg 56.85$ 312.24$ 255.39$ 449.2%184.55$ 312.24$
120 Temporary Service - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$
124 Vent Fan (Single Duct) - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$
127 Water Pipe Repair/Replace - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$
Engineering Fees
46 Major Traffic Control Plan Review (one or more locations and 655.98$ 2,397.97$ 1,741.99$ 265.6%1,526.98$ 2,397.97$
47 Minor - first day (one location, one phase) 88.15$ 377.16$ 289.01$ 327.9%232.66$ 377.16$
48 Minor each additional day 88.15$ 229.80$ 141.65$ 160.7%158.98$ 229.80$
49 Moderate - first day (multiple locations, one phase) 176.28$ 525.56$ 349.28$ 198.1%350.92$ 525.56$
50 Moderate each additional day 88.15$ 306.06$ 217.91$ 247.2%197.10$ 306.06$
51 Major - first day (one or more locations and multiple phases) 352.59$ 1,314.92$ 962.33$ 272.9%833.75$ 1,314.92$
52 Major each additional day 88.15$ 382.32$ 294.17$ 333.7%235.23$ 382.32$
54 Building Plans 441.43$ 1,319.04$ 877.61$ 198.8%880.24$ 1,319.04$
55 Maps / Additional Documents 507.21$ 2,407.25$ 1,900.04$ 374.6%1,457.23$ 2,407.25$
56 Design Exception/Revision 353.86$ 914.05$ 560.19$ 158.3%633.96$ 914.05$
57 Site Improvement 0-2499 361.02$ 1,033.59$ 672.57$ 186.3%697.31$ 1,033.59$
58 Site Improvement 2500-4999 541.52$ 1,378.81$ 837.29$ 154.6%960.16$ 1,378.81$
74 Minor (under an acre) 361.01$ 1,723.00$ 1,361.99$ 377.3%1,042.00$ 1,723.00$
75 Major (over an acre) 902.54$ 3,445.99$ 2,543.45$ 281.8%2,174.27$ 3,445.99$
Fire Fees
123 Site Remediation Oversight 251.45$ 708.00$ 456.55$ 181.6%479.73$ 708.00$
124 Soil Remediation 251.45$ 708.00$ 456.55$ 181.6%479.73$ 708.00$
139 Each Additional Owner 12.43$ 44.00$ 31.57$ 254.0%28.22$ 44.00$
1 New Accessory Building 0.32$ 0.66$ 0.42$ 175.0%0.45$ 0.66$
10 New Single Family 0.42$ 0.72$ 0.60$ 500.0%0.42$ 0.72$
Police Fees
6 New Permit: Investigative costs and permit processing 100.00$ 269.00$ 169.00$ 169.0%184.50$ 269.00$
9 Renewal - Concealed Weapons Permit: No new firearms 25.00$ 131.00$ 106.00$ 424.0%78.00$ 131.00$
10
Renewal - Concealed Weapons Permit: Adding new or
replacing firearms 25.00$ 187.00$ 162.00$ 648.0%106.00$ 187.00$
11
Amendment - Concealed Weapons Permit: Adding new
firearm 10.00$ 162.00$ 152.00$ 1520.0%86.00$ 162.00$
12
Amendment - Concealed Weapons Permit: Change in
Address 10.00$ 72.00$ 62.00$ 620.0%41.00$ 72.00$
33 Pedicab Renewal Fee 68.08$ 195.00$ 126.92$ 186.4%131.54$ 195.00$
Phased-In Approach
*The size of this document has been reduced for enhanced web-viewing. To view the full-sized
document, which presents larger font sizes, please visit the City's Laserfiche repository at:
https://opengov.slocity.org/WebLink/Browse.aspx?id=195281 Attachment B
Fees based on phasing if % change >150%
Fee #Service Name Current rate
Recommended
Rate Eff 10/1/24 $ change % change Rate Eff 10/1/24 Rate Eff 7/1/25
Phased-In Approach
Utilities Fees
14 Adapter Cost (1" Service/.75" Meter) 19.04$ 74.20$55.16$ 289.7%46.62$ 74.20$
34 Industrial User Re-Inspection 95.81$ 253.00$157.19$ 164.1%174.41$ 253.00$
Fee
number Service Name Fee Description
Rate Effective
10/1/24
IT Surcharge
(if applicable) Total Notes
Agreements
1 Affordable Housing/MOUs Fixed Fee 3,245.00$ 98.97$ 3,343.97$
2 Agreements/Bonds/Guarantees Fixed Fee 1,785.00$ 54.44$ 1,839.44$
3 Development Agreement Fixed Fee 57,856.00$ 1,764.61$ 59,620.61$
4 Reimbursement Agreement Fixed Fee 39,586.00$ 1,207.37$ 40,793.37$
Airport Land Use Commission (ALUC)
5 Reviews Requiring ALUC Hearing Fixed Fee 2,697.00$ 82.26$ 2,779.26$
Amendments / Annexation
6 Annexation, Deposit Deposit 55,249.00$ 1,685.09$ 56,934.09$ 1
7 General Plan Amendment - Map (includes rezoning), Deposit Deposit 39,362.00$ 1,200.54$ 40,562.54$ 1
8 General Plan Amendment - Text Fixed Fee 34,699.00$ 1,058.32$ 35,757.32$
Appeals
9 Tier 1: e.g. Appeals to the City Council - Applicant Fixed Fee 8,356.00$ 254.86$ 8,610.86$
10 Tier 1 Appeal - Non Applicant Fixed Fee 3,408.00$ 103.94$ 3,511.94$
11
Tier 2: e.g. Minor/Incidental Arch Review, Administrative Use
Permit, Variance, Subdivisions <5 lots - Applicant Fixed Fee 5,259.00$ 160.40$ 5,419.40$
12 Tier 2 Appeal - Non Applicant Fixed Fee 2,070.00$ 63.14$ 2,133.14$
13
Tier 3: e.g. Fence Height Exception, Administrative Approval
Application - Applicant Fixed Fee 1,286.00$ 39.22$ 1,325.22$
14 Tier 3 Appeal - Non Applicant Fixed Fee 1,286.00$ 39.22$ 1,325.22$
15
Tier 4: e.g. Home Occupation permit, Non-Profit Special Event -
Applicant Fixed Fee 674.00$ 20.56$ 694.56$
16 Tier 4 Appeal - Non Applicant Fixed Fee 674.00$ 20.56$ 694.56$
Building Permit Review - Planning
Residential Fixed Fee
17 Minor Fixed Fee 220.21$ 6.72$ 226.93$
18 Moderate Fixed Fee 440.42$ 13.43$ 453.85$
19 Major Deposit 1,101.05$ 33.58$ 1,134.63$
Commercial
20 Minor Fixed Fee 330.32$ 10.07$ 340.39$
21 Moderate Fixed Fee 550.53$ 16.79$ 567.32$
22 Major Deposit 1,101.05$ 33.58$ 1,134.63$
Business Related Fees
23 Business License Zoning Clearance Fixed Fee 268.00$ 8.17$ 276.17$
24 Business License Change of Location Only Fixed Fee 268.00$ 8.17$ 276.17$
25 Home Occupation Permit Fixed Fee 293.00$ 8.94$ 301.94$
Cannabis Related Fees
26 Application Fee Fixed Fee 25,002.00$ 762.56$ 25,764.56$
Annual License Fee Fixed Fee
27
Commercial, Retail Storefront, Delivery, Manufacturing,
Cultivation Fixed Fee 49,191.00$ 1,500.33$ 50,691.33$ 2
Cannabis Transfer of Ownership Fixed Fee
28 Transfer Fee - All Types Fixed Fee 13,978.00$ 426.33$ 14,404.33$ New
Development Review
29 Pre-Application Fixed Fee 1,333.00$ 40.66$ 1,373.66$
30 With site visit Fixed Fee 1,635.00$ 49.87$ 1,684.87$
31 With site visit + ARC Review Fixed Fee 3,615.00$ 110.26$ 3,725.26$ New
32 Development Projects - Minor Fixed Fee 8,390.00$ 255.90$ 8,645.90$
33 Development Projects - Moderate Fixed Fee 24,200.00$ 738.10$ 24,938.10$
34 Development Projects - Major Fixed Fee 40,655.00$ 1,239.98$ 41,894.98$
CCity of San Luis Obispo
Planning Fees
*The size of this document has been reduced for enhanced web-viewing. To view the full-sized
document, which presents larger font sizes, please visit the City's Laserfiche repository at:
https://opengov.slocity.org/WebLink/Browse.aspx?id=195281
Attachment C
Fee
number Service Name Fee Description
Rate Effective
10/1/24
IT Surcharge
(if applicable) Total Notes
CCity of San Luis Obispo
Planning Fees
Director's Action
35 Christmas Tree/Pumpkin Lot Permit Fixed Fee 441.00$ 13.45$ 454.45$
36 Creek Setback Exception (Director's Hearing)Fixed Fee 3,471.00$ 105.87$ 3,576.87$
37 Director's Action - General Fixed Fee 2,874.00$ 87.66$ 2,961.66$
38 Sidewalk Café User and Parklet Application Fee Fixed Fee 3,619.00$ 110.38$ 3,729.38$
39 Parklet Use Fee per sq foot per month Per month 3.52$ N/A 3.52$
40 Sidewalk Café Use Fee per sq foot per month Per month 1.00$ N/A 1.00$
41 Tables & Chairs Use Fee per sq foot per month Per month 1.00$ N/A 1.00$
Environmental Services Review
42 Initial Study/Environmental Impact Report 30% plus contract costs 3
Historic Resources
43 CHC Development Review Fixed Fee 3,860.00$ 117.73$ 3,977.73$ New
44 CHC Staff Referral Review Fixed Fee 881.00$ 26.87$ 907.87$ New
45 Historic Property Listing/Delisting Fixed Fee 3,647.00$ 111.23$ 3,758.23$ New
46 Mills Act Participation Application Fixed Fee 1,885.00$ 57.49$ 1,942.49$
Planned Development
47 Rezoning Deposit 36,000.00$ 1,098.00$ 37,098.00$ 1
Rezoning Amendment
48 Map Amendment Deposit 28,839.00$ 879.59$ 29,718.59$ 1
49 Text Amendment Deposit 21,962.00$ 669.84$ 22,631.84$ 1
Specific Plan
50 New Specific Plan Deposit 53,127.00$ 1,620.37$ 54,747.37$ New
51 Specific Plan Amendment Deposit 32,498.00$ 991.19$ 33,489.19$
Subdivision Services
52 Certificate of Compliance Fixed Fee 3,329.00$ 101.53$ 3,430.53$
53 Condominium Conversion Fixed Fee 28,333.00$ 864.16$ 29,197.16$
54 Lot Line Adjustment Fixed Fee 4,052.00$ 123.59$ 4,175.59$
55 S.B. 9 Urban Lot Split Fixed Fee 8,704.00$ 265.47$ 8,969.47$ New
56 Tentative parcel map Fixed Fee 11,257.00$ 343.34$ 11,600.34$
57 Tentative Tract map Fixed Fee 32,534.00$ 992.29$ 33,526.29$
58 Voluntary Merger Fixed Fee 995.00$ 30.35$ 1,025.35$
Trees
59 Tree Committee Recommendation Fixed Fee 330.50$ N/A 330.50$
60 Tree Removal Permit Fixed Fee 330.50$ N/A 330.50$
Miscellaneous Fees
61 Affordable Housing Incentive Request Fixed Fee 2,503.00$ 76.34$ 2,579.34$
62 Conditional Use Permit (Planning Commission)Fixed Fee 10,609.00$ 323.57$ 10,932.57$
63 Final Inspection Approval Fixed Fee 330.00$ 10.07$ 340.07$
64 Land Use Documentation Request Fixed Fee 661.00$ 20.16$ 681.16$
65 Minor Use Permit (Admin)Fixed Fee 3,506.00$ 106.93$ 3,612.93$
66 Modification 25% of filing fee -$ -$
67 Non-profit Special Event Fee Fixed Fee 200.00$ 6.10$ 206.10$
68 Planning Consultation Per hour 220.00$ 6.71$ 226.71$
69 Street Abandonment (Right of Way Abandonment) Fixed Fee 14,367.00$ 438.19$ 14,805.19$
70 Time Extension 25% of filing fee -$ -$
71 Variance Fixed Fee 3,894.00$ 118.77$ 4,012.77$
1. Fee will be set on a deposit basis and debited by the amount of staff time and other materials required to provide service or Consultant Fee plus 30% administration
2. Prorated on Fiscal Year
3. Separate Fish and Game fees may apply, as set by the State of California
Fee
number Service Name
Rate Effective
10/1/24
IT Surcharge
(if applicable) Total Notes
1 Access Board of Appeals - BLDG - Minor 618.00$ 18.85$ 636.85$ New
2 Access Board of Appeals - BLDG Moderate 1,106.00$ 33.73$ 1,139.73$ New
3 Access Board of Appeals - BLDG -Major 1,953.00$ 59.57$ 2,012.57$
4 A/C Residential - BLDG 173.00$ 5.28$ 178.28$
5 After Hours Call Out (Building) (2 hour min plus per addtl hour) - BLDG 778.00$ 23.73$ 801.73$
6 Air Handler - BLDG 173.00$ 5.28$ 178.28$
7 Alternative Means and Methods Request (AMMR)519.00$ 15.83$ 534.83$ New
8 Annual Stormwater Review 324.00$ 9.88$ 333.88$ New
9 Antenna/Tower w/ Equipment Shelter - BLDG 1,124.00$ 34.28$ 1,158.28$
10 Appeal of Building Official Decision - BLDG Minor 618.00$ 18.85$ 636.85$ New
11 Appeal of Building Official Decision - BLDG Moderate 1,106.00$ 33.73$ 1,139.73$ New
12 Appeal of Building Official Decision - BLDG Major 1,953.00$ 59.57$ 2,012.57$
13 Awning/Canopy - BLDG - Base Fee for 1 539.00$ 16.44$ 555.44$
14 Awning/Canopy - BLDG - Each Addtl (Up to 10 max)258.00$ 7.87$ 265.87$ New
15 Boiler - BLDG 303.00$ 9.24$ 312.24$
16 Building Sewer - BLDG 173.00$ 5.28$ 178.28$
17 Balcony/Porch/Deck - BLDG (up to 500 sq ft)993.00$ 30.29$ 1,023.29$
18 Balcony/Porch/Deck - BLDG Each Addtl 500 sq ft or portion thereof 259.00$ 7.90$ 266.90$ New
19 Cell Tower/Antenna Only - BLDG - Base Fee 864.00$ 26.35$ 890.35$
20 Cell Tower/Antenna - BLDG - add on - Each Addtl (Up to 20)258.00$ 7.87$ 265.87$
21 Chiller - BLDG 173.00$ 5.28$ 178.28$
22 Code Enforcement Fee 519.00$ 15.83$ 534.83$
23 Commercial Access Upgrade - Site work - BLDG 1,253.00$ 38.22$ 1,291.22$
24 Commercial Access Upgrade - Upgrades - BLDG 1,382.00$ 42.15$ 1,424.15$
25 Commercial Coach Installation - BLDG 2,594.00$ 79.12$ 2,673.12$
26 Construction Tax - BLDG 177.00$ 5.40$ 182.40$
27 Demolition - Interior or Garage/Utility Build - BLDG 734.00$ 22.39$ 756.39$
28 Demolition - Entire Building - BLDG 993.00$ 30.29$ 1,023.29$
29 Doors/Windows- Box Structural - Base Fee (up to 10)604.00$ 18.42$ 622.42$
30 Doors/Windows- Box Structural - Each Addtl group of 10 87.00$ 2.65$ 89.65$ New
31 Doors/Windows- Box Non-Structural - Base Fee (up to 10)604.00$ 18.42$ 622.42$
32 Doors/Windows- Box Non-Structural - Each Addtl group of 10 87.00$ 2.65$ 89.65$ New
33 Drain Vent Repair/Replace - BLDG 173.00$ 5.28$ 178.28$
34 Dry Rot / Termite Repair - BLDG 475.00$ 14.49$ 489.49$
35 Duct Work Only - BLDG 173.00$ 5.28$ 178.28$
36 Duplicate Single Family Plan (35% of plan review)New
37 Duplicate Multi Family Plan (35% of plan review)New
38 Electric Car Charging System -BLDG 475.00$ 14.49$ 489.49$
39 Electric Service Upgrade (up to 200 amp) -BLDG 324.00$ 9.88$ 333.88$
40 Evaporative Cooler - BLDG 173.00$ 5.28$ 178.28$
41 Exhaust Hood - Type I - BLDG 669.00$ 20.40$ 689.40$
42 Exhaust Hood - Type II - BLDG 173.00$ 5.28$ 178.28$
43 Exhaust Hood & Duct - Residential - BLDG 173.00$ 5.28$ 178.28$
44 Expired permit/application extension fee 130.00$ 3.97$ 133.97$ New
45 Fence or Non-Engineered Wall - BLDG 604.00$ 18.42$ 622.42$
46 Fire Permit Handling Fee - BLDG 195.00$ 5.95$ 200.95$
47 Fireplace Insert Upgrade -BLDG 604.00$ 18.42$ 622.42$
48 Fireplace Retrofit / Chimney Repair - BLDG 993.00$ 30.29$ 1,023.29$
49 Fireplace: Masonry 993.00$ 30.29$ 1,023.29$
50 Fixtures, Plumbing - BLDG 173.00$ 5.28$ 178.28$
51 Flag, Light, or Sign Pole - BLDG 864.00$ 26.35$ 890.35$
52 Foundation New/Replace - BLDG - Base (3000 sqft)1,512.00$ 46.12$ 1,558.12$
53 Foundation New/Replace - BLDG - Each addtl 500 sq ft or portion thereof 195.00$ 5.95$ 200.95$ New
54 Foundation Repair Only - BLDG 864.00$ 26.35$ 890.35$
55 Furnace/Heater Replacement Only -BLDG 475.00$ 14.49$ 489.49$
56 Furnaces - BLDG 173.00$ 5.28$ 178.28$
57 Gas System Repair/Replace/Extend - BLDG 173.00$ 5.28$ 178.28$
58 Generator Installation - BLDG 604.00$ 18.42$ 622.42$
59 Graywater Systems - BLDG 604.00$ 18.42$ 622.42$
60 Graywater/Rainwater Harvesting System -BLDG 173.00$ 5.28$ 178.28$
CCity of San Luis Obispo
Building Fixed Fees
Fee
number Service Name
Rate Effective
10/1/24
IT Surcharge
(if applicable) Total Notes
CCity of San Luis Obispo
Building Fixed Fees
61 Grease Trap - BLDG 173.00$ 5.28$ 178.28$
62 Heat Pump - BLDG 173.00$ 5.28$ 178.28$
63 Heater - BLDG 173.00$ 5.28$ 178.28$
64 Heater - Wall - BLDG 173.00$ 5.28$ 178.28$
65 Inert Gas Systems 1,815.00$ 55.36$ 1,870.36$
66 Insulation/Energy Upgrade -BLDG 475.00$ 14.49$ 489.49$
67 Make-Up Air System - BLDG 173.00$ 5.28$ 178.28$
68 Minor Code Corrections - BLDG 475.00$ 14.49$ 489.49$
69 Minor Repairs - up to 2 inspections - BLDG 604.00$ 18.42$ 622.42$
70 New/Altered Circuits - Per Circuit - BLDG 303.00$ 9.24$ 312.24$ New
71 New/Altered Circuits - Per Duplex Circuit - BLDG 346.00$ 10.55$ 356.55$ New
72 Paint Booth - BLDG 1,512.00$ 46.12$ 1,558.12$
73 Paper Plan Disposal Fee + Disposal Actual Cost 41.00$ 1.25$ 42.25$ New
74 Partition- BLDG (Per Project)864.00$ 26.35$ 890.35$
75 Patio - Enclosed - BLDG - Base Fee (500 sq ft)1,512.00$ 46.12$ 1,558.12$
76 Patio - Enclosed - BLDG - Each Addtl 500 sq ft or portion thereof 259.00$ 7.90$ 266.90$ New
77 Patio Cover - Open - BLDG - Base Fee (500 sq ft)993.00$ 30.29$ 1,023.29$
78 Patio Cover - Open - BLDG - Each Addtl 500 sq ft or portion thereof 259.00$ 7.90$ 266.90$ New
79 Permit Issuance - BLDG (Minimum permit fee)433.00$ 13.21$ 446.21$
80 Permit Reissuance - Hourly 171.00$ 5.22$ 176.22$ New
81 Perspective Design Wall - Base Fee - BLDG - 1-100 ln ft 734.00$ 22.39$ 756.39$
82 Perspective Design Wall - Each addtl ln ft - BLDG 1.00$ 0.03$ 1.03$ New
83 Phased approval - Hourly 195.00$ 5.95$ 200.95$ New
84 Photovoltaic Systems (residential roof mount)604.00$ 18.42$ 622.42$
85 Photovoltaic Unit Installation - Residential 259.00$ 7.90$ 266.90$
86 Pool/Spa Commercial - BLDG 1,512.00$ 46.12$ 1,558.12$
87 Preliminary Project Consult/Code Analysis - BLDG (per hour)519.00$ 15.83$ 534.83$
88 Refrigeration Compressor/Condenser - BLDG 389.00$ 11.86$ 400.86$
89 Re-Roof Residential - BLDG 453.00$ 13.82$ 466.82$
90 Re-roof with Added Ventilation -BLDG 389.00$ 11.86$ 400.86$
91 Residential Photovoltaic System 604.00$ 18.42$ 622.42$
92 Residential Pool/Spa - Site Built - BLDG 1,382.00$ 42.15$ 1,424.15$
93 Retaining Wall Engineered 1-100 Linear Feet 1,253.00$ 38.22$ 1,291.22$
93 Retaining Wall Engineered each additional linear foot 1.56$ 0.05$ 1.61$
94 Roof Structure Replacement - BLDG - Base Fee (500 sq ft)993.00$ 30.29$ 1,023.29$
95 Roof Structure Replacement - BLDG - Each addtl 250 sq ft or portion thereof 259.00$ 7.90$ 266.90$ New
96 Seismic Strengthening of URM Bldg 303.00$ 9.24$ 312.24$
97 Shear Wall / Steel Support Column - BLDG 1,253.00$ 38.22$ 1,291.22$
98 Site Work- Grading 1-1,000 Cubic Yards 1,123.00$ 34.25$ 1,157.25$
99 Each Additional 1,000 Cubic Yards or portion thereof 475.00$ 14.49$ 489.49$
100 Sign - Monument or free standing - BLDG 864.00$ 26.35$ 890.35$
101 Sign - Wall - BLDG 604.00$ 18.42$ 622.42$
102 Skylight - Base Fee (for 1 window)475.00$ 14.49$ 489.49$
103 Skylight - Each Addtl unit 64.00$ 1.95$ 65.95$ New
104 SMIP (Commercial)31.00$ 0.95$ 31.95$
105 SMIP (Residential)15.00$ 0.46$ 15.46$
106 Solar/PV System - Commercial -BLDG 1,426.00$ 43.49$ 1,469.49$
107 Solar/ PV System - Multifamily - BLDG 1,426.00$ 43.49$ 1,469.49$
108 Solar Water System Fixtures - BLDG 115.00$ 3.51$ 118.51$
109 Stairs - Repair/Replace - BLDG (1 story)993.00$ 30.29$ 1,023.29$
110 Stairs - Repair/Replace - BLDG (each additional story)259.00$ 7.90$ 266.90$ New
111 Store Front / Facade Alterations: Minor - BLDG 1,512.00$ 46.12$ 1,558.12$
112 Stormwater - Minor Project - BLDG 519.00$ 15.83$ 534.83$
113 Stormwater - Moderate Project - BLDG 3,242.00$ 98.88$ 3,340.88$
114 Stormwater - Major Project - BLDG 6,743.00$ 205.66$ 6,948.66$
115 Stucco/Siding - BLDG (per building)734.00$ 22.39$ 756.39$
116 Supplemental Inspection (Building) - BLDG 259.00$ 7.90$ 266.90$
117 Supplemental Plan Check (Building) - BLDG 259.00$ 7.90$ 266.90$
118 T-Bar Ceiling - BLDG - Per Project 1,253.00$ 38.22$ 1,291.22$
119 Temporary Certificate of Occupancy 1,214.00$ 37.03$ 1,251.03$
120 Temporary Service - BLDG 173.00$ 5.28$ 178.28$
Fee
number Service Name
Rate Effective
10/1/24
IT Surcharge
(if applicable) Total Notes
CCity of San Luis Obispo
Building Fixed Fees
121 Trash Enclosure - BLDG 1,253.00$ 38.22$ 1,291.22$
123 Vapor Recovery - BLDG 993.00$ 30.29$ 1,023.29$
124 Vent Fan (Single Duct) - BLDG 173.00$ 5.28$ 178.28$
125 Walk-in Box/Refrigerator Coil - BLDG 173.00$ 5.28$ 178.28$
126 Water Heater Replacement Only -BLDG 303.00$ 9.24$ 312.24$
127 Water Pipe Repair/Replace - BLDG 173.00$ 5.28$ 178.28$
128 Window Retrofits (non-structural) -BLDG - Base Fee (up to 10)389.00$ 11.86$ 400.86$
129 Window Retrofits (non-structural) -BLDG - Each addtl group of 10 258.00$ 7.87$ 265.87$ New
Fee
number Construction Type
Plan Review
fee per
square foot
Inspection
fee per
square foot Total
IT Surcharge
(if applicable) Notes
1
Alt/Addition - ADU
per square foot (400 sq ft minimum)5.40$ 5.40$ 10.80$ 0.33$
2
Alt/Addition - Commercial
per square foot (1500 sq ft minimum)1.11$ 1.16$ 2.27$ 0.07$
3
Alt/Addition - Mixed Use or Multi Family
per square foot (2500 sq ft minimum)1.29$ 1.43$ 2.72$ 0.08$
4
Alt/Addition Single Family
per square foot (400 sq ft minimum)3.80$ 3.52$ 7.32$ 0.22$
5
New Accessory Building
per square foot (400 sq ft minimum)2.16$ 3.24$ 5.40$ 0.16$
6
New ADU
per square foot (500 sq ft minimum)3.89$ 4.32$ 8.21$ 0.25$
7
New Commercial Building
per square foot (5,000 sq ft minimum/50,000 sq ft
maximum)0.64$ 0.72$ 1.36$ 0.04$
8
New Commercial Shell
per square foot (5,000 sq ft minimum/25,000 sq ft
maximum)0.56$ 0.48$ 1.04$ 0.03$
9
New Mixed-Use
per square foot (5,000 sq ft minimum/25,000 sq ft
maximum)1.30$ 1.25$ 2.55$ 0.08$
10
New Multi Family (R2)
per square foot (7,500 sq ft minimum/25,000 sq ft
maximum)1.21$ 1.08$ 2.29$ 0.07$
11
New Multi Family (R3)
per square foot (5,000 sq ft minimum/25,000 sq ft
maximum)1.14$ 0.96$ 2.10$ 0.06$
12
New Single Family
per square foot (1,000 sq ft minimum/3,000 sq ft
maximum)2.59$ 3.05$ 5.64$ 0.17$
CCity of San Luis Obispo
Building Fees
Rate Effective 10/1/24
Fee
number Service Name
Fee
Description
Rate Effective
10/1/24
IT Surcharge
(if applicable) Total Notes
Improvement Plan Check
1 15% of Estimated Construction Costs for the first $100,000 plus 1.0% thereafter % of construction cost estimate 3.05%
Construction Inspection
2 8.4% of Estimated Construction Costs for the first $500,000 plus 3.3% thereafter % of construction cost estimate 3.05%
Certificates of Compliance and Lot Line Adjustments
3 Lot Line Adjustment Map or Agreement Fixed Fee 5,518.00$ 168.30$ 5,686.30$
4 Certificates of Compliance Fixed Fee 1,338.00$ 40.81$ 1,378.81$
5 Additional Document Review/Certificates of Correction Fixed Fee 502.00$ 15.31$ 517.31$
Encroachment Permits- Concrete Flatwork
6 Curb and Gutter base fee Base Fee 1,096.00$ 33.43$ 1,129.43$
7 Curb and Gutter per linear foot Per linear foot 12.26$ 0.37$ 12.63$
8 Sidewalk base fee Base Fee 1,096.00$ 33.43$ 1,129.43$
9 Sidewalk plus per linear foot Per linear foot 7.80$ 0.24$ 8.04$
10 Driveway Approach/Curb Ramp base fee Base Fee 1,476.00$ 45.02$ 1,521.02$
11 Driveway Approach/Curb Ramp plus per linear foot Per linear foot 12.26$ 0.37$ 12.63$
Encroachment Permits- Excavation Trenched or Bored
12 Water Service/Recycled Service base fee Base Fee 864.00$ 26.35$ 890.35$
13 Water Service/Recycled Service plus per linear foot Per linear foot 22.28$ 0.68$ 22.96$
14 Sewer Service base fee Base Fee 780.00$ 23.79$ 803.79$
15 Sewer Service plus per linear foot Per linear foot 8.91$ 0.27$ 9.18$
16 Fire Lateral/Hydrant/Water and Recycled Main Extension base fee Base Fee 1,458.00$ 44.47$ 1,502.47$
17 Fire Lateral/Hydrant/Water and Recycled Main Extension plus per linear foot Per linear foot 29.71$ 0.91$ 30.62$
18 Other/Dry Utilities base fee Base Fee 1,077.00$ 32.85$ 1,109.85$
19 Other/Dry Utilities plus per linear foot (Bore) Per linear foot 7.43$ 0.23$ 7.66$
20 Other/Dry Utilities plus per linear foot (Trench) Per linear foot 11.88$ 0.36$ 12.24$
21 Monitoring Well Fixed Fee 334.00$ 10.19$ 344.19$
22
Other Minor Encroachment Permits not Listed (such as a rolloff dumpster or storage
container)Fixed Fee 167.00$ 5.09$ 172.09$ New
23
Other Moderate Encroachment Permits not Listed (such as staging for work in the right-
of-way multiple days)Fixed Fee 334.00$ 10.19$ 344.19$
24 Time Extension for Encroachment Permit Fixed Fee 167.00$ 5.09$ 172.09$
25 Plan Review for Special Cases Fixed Fee 334.00$ 10.19$ 344.19$
26 Annual Encroachment Permit for Utility Companies Fixed Fee 20,902.00$ 637.51$ 21,539.51$
Final Inspections
Square Footage of Site Disturbance:
Non-Single Family Residential
27 Non-Single Family Residential 0-2499 Fixed Fee 251.00$ 7.66$ 258.66$
28 Non-Single Family Residential 2500-4999 Fixed Fee 334.00$ 10.19$ 344.19$
29 Non-Single Family Residential 5000-14999 Fixed Fee 418.00$ 12.75$ 430.75$
30 Non-Single Family Residential 15000-21999 Fixed Fee 502.00$ 15.31$ 517.31$
31 Non-Single Family Residential 22000-43559 (PW 3 Hours) Fixed Fee 585.00$ 17.84$ 602.84$
32 Non-Single Family Residential 43560+ Fixed Fee 669.00$ 20.40$ 689.40$
Single Family Residential
33 Single Family Residential 0-2499 Fixed Fee 251.00$ 7.66$ 258.66$
34 Single Family Residential 2500+ Fixed Fee 334.00$ 10.19$ 344.19$
Flood Zone Analysis
35 Minor - Verification only Fixed Fee 334.00$ 10.19$ 344.19$
36 Major - New/Substantial Remodel Analysis/Documentation Fixed Fee 1,338.00$ 40.81$ 1,378.81$
Subdivision Maps
37 Parcel Map - (up to 4 parcels) Fixed Fee 10,416.00$ 317.69$ 10,733.69$
38 Parcel Map - Commercial or Condominium Base Fee 14,095.00$ 429.90$ 14,524.90$
39 Plus per parcel or condominium unit per parcel/unit 84.00$ 2.56$ 86.56$
40 Tract Map Base Fee 22,593.00$ 689.09$ 23,282.09$
41 Plus per lot or condominium unit per lot/unit 251.00$ 7.66$ 258.66$
Transportation Permit
42 Single Trip Permit Fixed Fee 16.00$ N/A 16.00$ 1
43 Annual Permit Fixed Fee 90.00$ N/A 90.00$ 1
(only the highest base fee is applied if there are multiple concrete flatwork scopes of
work on a single encroachment permit)
(only the highest base fee is applied if there are multiple trenched or bored scopes of
work on a single encroachment permit)
CCity of San Luis Obispo
Engineering Fees
Fee
number Service Name
Fee
Description
Rate Effective
10/1/24
IT Surcharge
(if applicable) Total Notes
CCity of San Luis Obispo
Engineering Fees
Traffic Control Plan Review
44 Minor Traffic Control Plan Review (one location, one phase) Fixed Fee 306.00$ 9.33$ 315.33$
45 Moderate Traffic Control Plan Review (multiple locations, one phase) Fixed Fee 859.00$ 26.20$ 885.20$
46 Major Traffic Control Plan Review (one or more locations and multiple phases) Fixed Fee 2,327.00$ 70.97$ 2,397.97$
Traffic Control Plan Inspection
47 Minor - first day (one location, one phase) Fixed Fee 366.00$ 11.16$ 377.16$
48 Minor each additional day Fixed Fee 223.00$ 6.80$ 229.80$
49 Moderate - first day (multiple locations, one phase) Fixed Fee 510.00$ 15.56$ 525.56$
50 Moderate each additional day Fixed Fee 297.00$ 9.06$ 306.06$
51 Major - first day (one or more locations and multiple phases) Fixed Fee 1,276.00$ 38.92$ 1,314.92$
52 Major each additional day Fixed Fee 371.00$ 11.32$ 382.32$
4th and subsequent plan review (per submittal)
53 Public Improvement Plans Fixed Fee 3,918.00$ 119.50$ 4,037.50$
54 Building Plans Fixed Fee 1,280.00$ 39.04$ 1,319.04$
55 Maps / Additional Documents Fixed Fee 2,336.00$ 71.25$ 2,407.25$
56 Design Exception/Revision Fixed Fee 887.00$ 27.05$ 914.05$
Site Improvements plan review (square feet)2
57 Site Improvement 0-2499 Fixed Fee 1,003.00$ 30.59$ 1,033.59$
58 Site Improvement 2500-4999 Fixed Fee 1,338.00$ 40.81$ 1,378.81$
59 Site Improvement 5000-14999 Fixed Fee 1,672.00$ 51.00$ 1,723.00$
60 Site Improvement 15000-21999 Fixed Fee 2,007.00$ 61.21$ 2,068.21$
61 Site Improvement 22000-43559 Fixed Fee 2,341.00$ 71.40$ 2,412.40$
62 Site Improvement 43560+ Fixed Fee 2,675.00$ 81.59$ 2,756.59$
Single Family Residential plan review (square feet)
63 Single Family Residential 0-2499 Fixed Fee 669.00$ 20.40$ 689.40$
64 Single Family Residential 2500+ Fixed Fee 1,338.00$ 40.81$ 1,378.81$
Stormwater Post Construction Requirements
Non-Single Family Residential (Net Impervious Area per SCP)
65 Non-Single Family Residential (Net Impervious Area per SCP) 0-2499 square feet Fixed Fee 334.00$ 10.19$ 344.19$
66 Non-Single Family Residential (Net Impervious Area per SCP) 2500-4999 Fixed Fee 502.00$ 15.31$ 517.31$
67 Non-Single Family Residential (Net Impervious Area per SCP) 5000-14999 Fixed Fee 669.00$ 20.40$ 689.40$
68 Non-Single Family Residential (Net Impervious Area per SCP) 15000-24999 Fixed Fee 836.00$ 25.50$ 861.50$
69 Non-Single Family Residential (Net Impervious Area per SCP) 25000+ Fixed Fee 1,003.00$ 30.59$ 1,033.59$
70 Stormwater Control Plan Fixed Fee 334.00$ 10.19$ 344.19$ New
71 Private Stormwater Conveyance System Agreement Fixed Fee 334.00$ 10.19$ 344.19$ New
Single Family Residential (Net Impervious Area per SCP)
72 Single Family Residential (Net Impervious Area per SCP) 0-2499 square feet Fixed Fee 334.00$ 10.19$ 344.19$
73 Single Family Residential (Net Impervious Area per SCP) 2500+ Fixed Fee 669.00$ 20.40$ 689.40$
Drainage Report/Flood Study Review
74 Minor (under an acre) Fixed Fee 1,672.00$ 51.00$ 1,723.00$
75 Major (over an acre) Fixed Fee 3,344.00$ 101.99$ 3,445.99$
1. Set by the State of California Department of Transportation and is not subject to CPI increases.
2. This includes substantial development of private parking lots which are processed separate of the structure and include any combination of the following:
underground utilities, parking lot lighting, accessible path of travel analysis, grading, drainage and compliance with the City's parking and driveway standards.
Fee
number Service Name Fee Description
Rate Effective
10/1/24
IT Surcharge
(if applicable) Total Notes
FIRE DEVELOPMENT FIXED FEES
Fire Sprinkler and Suppression Systems -(Issued by Building and Safety)
Fire Sprinkler Systems (New Installation) - Plan Review
Residential Fire Sprinkler Plan Review
Private Underground Fire Line Installation
1 1-25 Heads Fixed fee 752.00$ 22.94$ 774.94$
2 26-50 Heads Fixed fee 929.00$ 28.33$ 957.33$
3 51-100 Heads Fixed fee 1,195.00$ 36.45$ 1,231.45$
4 101-200 Heads Fixed fee 1,460.00$ 44.53$ 1,504.53$
5 Every 200 Heads above 200 Fixed fee 443.00$ 13.51$ 456.51$
Fire Sprinkler Systems (New Installation) - Inspection
Residential Fire Sprinkler Plan Review
Private Underground Fire Line Installation
6 1-25 Heads Fixed fee 531.00$ 16.20$ 547.20$
7 26-50 Heads Fixed fee 708.00$ 21.59$ 729.59$
8 51-100 Heads Fixed fee 708.00$ 21.59$ 729.59$
9 101-200 Heads Fixed fee 885.00$ 26.99$ 911.99$
10 Every 200 Heads above 200 Fixed fee 354.00$ 10.80$ 364.80$
Fire Alarm System (New Installation) - Plan Review
11 1-50 Devices Fixed fee 841.00$ 25.65$ 866.65$
12 51-100 Devices Fixed fee 1,239.00$ 37.79$ 1,276.79$
13 Every 50 Devices above 100 Fixed fee 398.00$ 12.14$ 410.14$
14 Sprinkler Monitoring System Fixed fee 266.00$ 8.11$ 274.11$
Fire Alarm System (New Installation) - Inspection
15 1-50 Devices Fixed fee 354.00$ 10.80$ 364.80$
16 51-100 Devices Fixed fee 708.00$ 21.59$ 729.59$
17 Every 50 Devices above 100 Fixed fee 354.00$ 10.80$ 364.80$
18 Sprinkler Monitoring System Fixed fee 177.00$ 5.40$ 182.40$
Fire Sprinkler Systems (Tenant Improvement) - Plan Review
19 1-25 Heads Fixed fee 310.00$ 9.46$ 319.46$
20 26-50 Heads Fixed fee 487.00$ 14.85$ 501.85$
21 51-100 Heads Fixed fee 708.00$ 21.59$ 729.59$
22 101-200 Heads Fixed fee 929.00$ 28.33$ 957.33$
23 Every 200 Heads above 200 Fixed fee 443.00$ 13.51$ 456.51$
Fire Sprinkler Systems (Tenant Improvement) - Inspection
24 1-25 Heads Fixed fee 266.00$ 8.11$ 274.11$
25 26-50 Heads Fixed fee 354.00$ 10.80$ 364.80$
26 51-100 Heads Fixed fee 443.00$ 13.51$ 456.51$
27 101-200 Heads Fixed fee 531.00$ 16.20$ 547.20$
28 Every 200 Heads above 200 Fixed fee 354.00$ 10.80$ 364.80$
Fire Alarm System (Tenant Improvement) - Plan Review
29 Minor modification (Panel replacement etc)266.00$ 8.11$ 274.11$ New
30 1-50 Devices Fixed fee 841.00$ 25.65$ 866.65$
31 51-100 Devices Fixed fee 1,239.00$ 37.79$ 1,276.79$
32 Every 50 Devices above 100 Fixed fee 398.00$ 12.14$ 410.14$
33 Sprinkler Monitoring System Fixed fee 266.00$ 8.11$ 274.11$
Fire Alarm System (Tenant Improvement) - Inspection
34 Minor modification 89.00$ 2.71$ 91.71$ New
35 1-50 Devices Fixed fee 354.00$ 10.80$ 364.80$
36 51-100 Devices Fixed fee 708.00$ 21.59$ 729.59$
37 Every 50 Devices above 100 Fixed fee 354.00$ 10.80$ 364.80$
38 Sprinkler Monitoring System Fixed fee 177.00$ 5.40$ 182.40$
Other Suppression Systems
39 Insert Gas Systems Fixed fee 1,283.00$ 39.13$ 1,322.13$
40 Dry Chemical Systems Fixed fee 708.00$ 21.59$ 729.59$
41 Wet Chemical/Kitchen Hood Fixed fee 531.00$ 16.20$ 547.20$
42 Foam Systems Fixed fee 2,257.00$ 68.84$ 2,325.84$
43 Paint Spray Booth Fixed fee 797.00$ 24.31$ 821.31$
OTHER MISCELLANEOUS FEES
44 Supplemental Fire Plan Review Fixed fee 310.00$ 9.46$ 319.46$ New
45 Supplemental Fire Inspection Fixed fee 266.00$ 8.11$ 274.11$ New
46 Alternative Method and Material Review Fixed fee 708.00$ 21.59$ 729.59$
47 Expedited Plan Review Fee Fixed fee 398.00$ 12.14$ 410.14$ New
48 Commercial Solar/Energy Storage System (new category) Fixed fee 443.00$ 13.51$ 456.51$ New
CCity of San Luis Obispo
Fire Fixed Fees
Fee
number Service Name Fee Description
Rate Effective
10/1/24
IT Surcharge
(if applicable) Total Notes
CCity of San Luis Obispo
Fire Fixed Fees
FIRE NON-DEVELOPMENT FIXED FEES
Hazardous Occupancy Permits
49 Additive Manufacturing Fixed fee 221.00$ N/A 221.00$ New
50 Aircraft Refueling Vehicles Fixed fee 310.00$ N/A 310.00$
51 Aircraft Repair Hangar Fixed fee 487.00$ N/A 487.00$
52 Automobile Wrecking Yard Fixed fee 575.00$ N/A 575.00$
53 Bonfire or Rubbish Fires Fixed fee 221.00$ N/A 221.00$
54 Burning in Public Place Fixed fee 221.00$ N/A 221.00$
55 Candles or Open-Flames in Assembly Areas Fixed fee 221.00$ N/A 221.00$
56 Combustible Fiber Storage (handle/store over 100 cu ft) Fixed fee 487.00$ N/A 487.00$
57 Compressed Gases (Unless in the CUPA Program) Fixed fee 310.00$ N/A 310.00$
58 Cryogens (Unless in the CUPA Program) Fixed fee 310.00$ N/A 310.00$
59 Dry Cleaning Plant Fixed fee 310.00$ N/A 310.00$
60 Dust Producing Operation Fixed fee 398.00$ N/A 398.00$
61 Energy Storage Systems Fixed fee 310.00$ N/A 310.00$ New
62 Explosives or Blasting Agents Fixed fee 575.00$ N/A 575.00$
63 Fireworks Fixed fee 929.00$ N/A 929.00$
64 Flammable or Combustible Liquids (Unless in the CUPA Program) Fixed fee 310.00$ N/A 310.00$
65 Fruit Ripening - Ethylene Gas Fogging Fixed fee 310.00$ N/A 310.00$
66 Garages - Repair Fixed fee 487.00$ N/A 487.00$
67 Hazardous Chemicals (Unless in the CUPA Program): Fixed fee 487.00$ N/A 487.00$
68 Junk Yards Fixed fee 575.00$ N/A 575.00$
69 Liquefied Petroleum Gas Fixed fee 310.00$ N/A 310.00$
70 Lithium Battery Storage > 15 Cubic Feet - New Category Fixed fee 398.00$ N/A 398.00$ New
71 Lumberyard - Storage in excess of 100,000 board feet Fixed fee 487.00$ N/A 487.00$
72 Magnesium Working - Process more than 10 lbs daily Fixed fee 310.00$ N/A 310.00$
73 Mall (covered) Fixed fee 487.00$ N/A 487.00$
74 Motor Fuel Dispensing Fixed fee 310.00$ N/A 310.00$ New
75 On-Demand Fueling Operations Fixed fee 266.00$ N/A 266.00$ New
76 Organic Coatings - manufacture over 1 gallon a day Fixed fee 310.00$ N/A 310.00$
77 Ovens - Industrial, Baking and Drying Fixed fee 310.00$ N/A 310.00$
78 Places of Assembly Fixed fee 398.00$ N/A 398.00$
79 Plan Extraction Fixed fee 310.00$ N/A 310.00$ New
80
Refrigeration Equipment - Mechanical refrigeration (see UFC for most
common refrigerants)Fixed fee 487.00$ N/A 487.00$
81 Outdoor Assembly Event > 1000 participants Fixed fee 929.00$ N/A 929.00$ New
82 Spraying or Dipping Fixed fee 398.00$ N/A 398.00$
83 Tents and Air-supported Structures - excess of 200 sq ft Fixed fee 398.00$ N/A 398.00$
84 Tire Re-capping Fixed fee 310.00$ N/A 310.00$
85 Waste Material Plant Fixed fee 575.00$ N/A 575.00$
86 Welding and Cutting Operations - Any Occupancy Fixed fee 221.00$ N/A 221.00$
87 Additional Permitted Use (per permit) Fixed fee 133.00$ N/A 133.00$
MANDATED / REQUIRED INSPECTIONS -$
88 Public/Private Schools (K-8) Waived by policy -$
89 Public/Private Schools (High Schools) Waived by policy -$
90 Commercial Day Care (Group E and I4) Waived by policy -$
91 Assisted Living (Group R2.1, R4, I3) <26 Residents -$
92 Assisted Living (Group R2.1, R4, I3) 26 residents or more -$
NON-MANDATED / REQUIRED INSPECTIONS -$
Commercial Business Inspections (Up to 3 stories)-$
93 0 – 5,000 sq. ft. Fixed fee 133.00$ 133.00$
94 5,001 – 40,000 sq. ft. Fixed fee 221.00$ 221.00$
95 40,001 – 120,000 sq. ft. Fixed fee 398.00$ 398.00$
96 120,001 – 150,000 sq. ft. Fixed fee 575.00$ 575.00$
97 150,001 – or more sq. ft. Fixed fee 752.00$ 752.00$
98 Mid Rise Inspections (4 -6 stories) Fixed fee 443.00$ 443.00$
99 Self-Inspection Non-Compliance Fixed fee 177.00$ 177.00$
100 New Business Inspection (Baseline) Fixed fee 177.00$ 177.00$
FIRE FALSE ALARM FEES
Initial Permit and Renewal Registrations - see Police
101 Excessive false alarm fee Per occurrence 656.00$ N/A 656.00$ 1
CERTIFIED UNIFIED PARTICIPATING AGENCY FEES
Hazardous Materials Handlers
102 Remote utility (1-time fee) Fixed fee 620.00$ N/A 620.00$
103 1 - 4 Materials handled Fixed fee 354.00$ N/A 354.00$
104 5 - 10 Materials handled Fixed fee 398.00$ N/A 398.00$
105 11+ Materials handled Fixed fee 575.00$ N/A 575.00$
Fee
number Service Name Fee Description
Rate Effective
10/1/24
IT Surcharge
(if applicable) Total Notes
CCity of San Luis Obispo
Fire Fixed Fees
Waste Generators
106 1 Waste stream (professional or medical) Fixed fee 221.00$ N/A 221.00$
107 1 - 5 Waste streams (all others) Fixed fee 354.00$ N/A 354.00$
108 6+ Waste streams Fixed fee 575.00$ N/A 575.00$
109 Waste Stream (DeMinimus) Fixed fee 221.00$ N/A 221.00$
Tiered Permitting
110 Conditionally Exempt (CE) Fixed fee 531.00$ N/A 531.00$
111 Conditionally Authorized (CA) Fixed fee 1,062.00$ N/A 1,062.00$
112 Permit by Rule (PBR)Fixed fee2,301.00$ N/A 2,301.00$
Underground Storage Tanks (general model)
113 First tank Fixed fee 1,947.00$ N/A 1,947.00$
114 Tank installation Fixed fee 6,018.00$ N/A 6,018.00$
115 Tank removal Fixed fee 4,779.00$ N/A 4,779.00$
116 Minor Modification Fixed fee 1,947.00$ N/A 1,947.00$
117 Major Modification Fixed fee 4,956.00$ N/A 4,956.00$
Above Ground Storage Tanks
118 One Tank Fixed fee 443.00$ N/A 443.00$
119 Two Tanks Fixed fee 620.00$ N/A 620.00$
120 Three Tanks Fixed fee 797.00$ N/A 797.00$
California Accidental Release Prevention Program (CalARP)
121 New Stationary Source Facility Fixed fee 2,832.00$ N/A 2,832.00$
122 Existing Annual Facility Inspection Fixed fee 708.00$ N/A 708.00$
123 Site Remediation Oversight Fixed fee 708.00$ N/A 708.00$
124 Soil Remediation Fixed fee 708.00$ N/A 708.00$
125 Temporary Closure Permit Fixed fee 1,770.00$ N/A 1,770.00$
Closures
126 Temporary Closure Fixed fee 1,770.00$ N/A 1,770.00$
127 Closure in Place Fixed fee 2,124.00$ N/A 2,124.00$
Late Fee
128 Annual permit fees received 31-60 days after original invoice day 25% of permit amount N/A -$
129 Annual permit fees received 61 + days after original invoice day Addl 25% of permit amount N/A -$
FIRE EQUIPMENT AND PERSONNEL STAND-BY FEES
130 Fire Ladder Truck Standby (4 person) Per hour one (1) hour minimum 885.04$ N/A 885.04$
131 Fire Engine/Truck Standby (3 person) Per hour one (1) hour minimum 663.78$ N/A 663.78$
132 Squad or Light Rescue Equipment Standby (2 person) Per hour one (1) hour minimum 442.52$ N/A 442.52$
133 Fire Investigation/Fire Prevention Standby Per hour one (1) hour minimum 177.00$ N/A 177.00$ New
134 Fire Suppression Standby Per hour one (1) hour minimum 221.26$ N/A 221.26$ New
135 Administrative/Clerical Standby Per hour one (1) hour minimum 167.39$ N/A 167.39$ New
136 Additional Site Inspection Fee (one hour min.) Per hour one (1) hour minimum 177.00$ N/A 177.00$
137 Third & Subsequent Fire Inspection Fee Per inspection 227.00$ N/A 227.00$
Multi-Dwelling Fire and Life Safety Inspection Fee Schedule 2, 3
Administrative Fee Fixed fee 4
138 Processing per facility Fixed fee 89.00$ N/A 89.00$
139 Each Additional Owner Fixed fee 44.00$ N/A 44.00$
140 Re-inspection Fee Fixed fee 221.00$ N/A 221.00$ New
141 Re-inspection Fee, 2nd reinspection and all subsequent reinspections Base fee + increment 271.00$ N/A New
Apartment Houses
Fees are waived for units that are built, owned and managed by the San Luis Obispo Housing Authority, other government agencies or not-for-profit housing organizations
142 Up to 10 units Fixed fee 354.00$ N/A 354.00$
143 11 - 20 Units Fixed fee 531.00$ N/A 531.00$
144 21 - 50 Units Fixed fee 708.00$ N/A 708.00$
145 51 - 100 Units Fixed fee 885.00$ N/A 885.00$
146 101 - 200 Units Fixed fee 1,593.00$ N/A 1,593.00$
147 Every additional 100 Units over 200 Fixed fee 531.00$ N/A 531.00$
Hotels, Motels, Lodging Houses, Bed & Breakfast Facilities, Youth Hostel Facilities, Senior Facilities, Sororities, Fraternities and Other Congregate Residences
Hotel, Motel, Bed & Breakfast
148 1 - 20 Units Fixed fee 354.00$ N/A 354.00$
149 21 - 50 Units Fixed fee 531.00$ N/A 531.00$
150 51 - 100 Units Fixed fee 885.00$ N/A 885.00$
151 101 - 200 Units Fixed fee 1,328.00$ N/A 1,328.00$
152 Sorority and Fraternity Fixed fee 708.00$ N/A 708.00$
Condominiums
153 Up to 10 Units Fixed fee 354.00$ N/A 354.00$
154 11 - 20 Units Fixed fee 531.00$ N/A 531.00$
155 21 - 50 Units Fixed fee 708.00$ N/A 708.00$
156 51 - 500 Units Fixed fee 1,062.00$ N/A 1,062.00$
Fee
number Service Name Fee Description
Rate Effective
10/1/24
IT Surcharge
(if applicable) Total Notes
CCity of San Luis Obispo
Fire Fixed Fees
OTHER FIRE FEES
157 Hydrant Flow Test (First Hydrant) Fixed fee 177.00$ N/A 177.00$
158 Hydrant Flow Test (Each Additional Hydrant) Fixed fee 89.00$ N/A 89.00$
159 Reinspection Fee (construction) Fixed fee 221.00$ N/A 221.00$
160 Board of Appeals Fixed fee 365.00$ N/A 365.00$
161 Emergency Call-Out (Non-Scheduled) Per hour four hour (4) minimum 884.00$ N/A 884.00$
162 After Hours Call-Out (Scheduled) Per hour one (1) hour minimum 221.00$ N/A 221.00$
1. Excessive false alarms are defined as: two or more false alarms in any thirty-day period or three false alarms in any three-hundred-sixty day period
2. Fees are waived for units that are built, owned and managed by the San Luis Obispo Housing Authority, other government agencies or not-for-profit housing organizations
3. These fees are applicable to all multi-dwelling units in the City based on the definitions set forth in the 2007 California Building Code
4. Administrative fee applies to both Apartment Houses and Hotels, Motels, etc. Total processing fee calculated will be divided equally amongst all owners
Fee number Construction Type
Plan Review
fee per square
foot
Inspection
fee per square
foot
IT Surcharge
(if applicable) Total Notes
1 New Accessory Building 0.32$ 0.32$ 0.02$ 0.66$
2 New Commercial 0.11$ 0.17$ 0.01$ 0.29$
3 Alt/Addition-Commercial 0.14$ 0.18$ 0.01$ 0.33$
4 Alt/Addition-Mixed Use 0.19$ 0.25$ 0.01$ 0.45$
5 New Mixed Use 0.16$ 0.26$ 0.01$ 0.43$
6 Alt/Addition ADU 0.92$ 0.92$ 0.06$ 1.90$
7 Alt/Addition- Single Family 0.51$ 0.51$ 0.03$ 1.05$
8 Alt/Addition-Multi Family 0.19$ 0.25$ 0.01$ 0.45$
9 New Multi Family 0.12$ 0.08$ 0.01$ 0.21$
10 New Single Family 0.42$ 0.28$ 0.02$ 0.72$
Rate Effective 10/1/24
CCity of San Luis Obispo
Fire Fees - Construction Plan Review and Inspection
Fee number Service Name
Fee
Description
Rate Effective
10/1/24 (Resident)
Rate Effective
10/1/24 (Non-
Resident) Notes
Youth Services
Sun-N-Fun
1 Registration Fee Fixed fee 90.00$ 90.00$
2 School Year - hourly option Per hour 6.00$ 6.00$
Teacher Work Day
3 Teacher Work Day Per day 68.00$ 78.00$
Spring Break Camp
4 Weekly Option Per week 200.00$ 230.00$
Summer Camp
5 Registration Fee Fixed fee 6.25$ 7.20$
6 Full week Care Option Per week 200.00$ 230.00$
7 Summer School Package Varies 1
8 Field Trip Sign Ups Varies 2
9 Late Registration Fee 11.00$ 12.75$
Youth Sports
10 Sport Camp Weekly 157.00$ 181.00$
11 Sport Clinic Per clinic 80.00$ 92.00$
Aquatics 3
Lap Swim
12 Adult per use Fixed fee 4.75$ 4.75$
13 Adult Monthly Fixed fee 71.25$ 71.25$
14 Youth/Senior per use Fixed fee 4.25$ 4.25$
15 Youth/Senior monthly Fixed fee 63.75$ 63.75$
Recreational Swim
16 Adult per use Fixed fee 5.25$ 5.25$
17 Youth/Senior per use Fixed fee 4.75$ 4.75$
Swim Script
18 Adult per use Fixed fee 42.75$ 42.75$
19 Youth/Senior per use Fixed fee 38.25$ 38.25$
Recreational Swim Script
20 Adult per use Fixed fee 47.25$ 47.25$
21 Youth/Senior per use Fixed fee 42.75$ 42.75$
Lessons
22 Lessons Fixed fee 120.00$ 138.00$
23 Private Lessons Fixed fee 210.00$ 241.50$
Special Classes
24 Lifeguard Fixed fee 260.00$ 299.00$
25 Warm Water Exercise Fixed fee 60.00$ 60.00$
26 Facility Use Fixed fee $75/day + $24/Lifeguard $87/day + $28/Lifeguard
27 Junior Lifeguard Program Fixed fee 250.00$ 290.00$
Recreational Sports
Adult Softball
28 Teams (15 per team) Fixed fee 710.00$ 710.00$
Instructional Classes 4
29 Adult/Senior Varies by class $8.30 - $166.00 + 15%
30 Youth Varies by class $4.15 - $440.00 + 15%
Special Events
Parks & Recreation Events
31 Parks and Recreation Sponsored Events Varies by event $0 - $75.00 $0 - $75.00
Special Application Fees
32 Special Event Application - Park Use Fixed fee 140.00$ 140.00$
33 Special Event Application - Encroachment Fixed fee 225.00$ 225.00$
34 Banner Permit Application/Installation Fixed fee 325.00$ 325.00$
CCity of San Luis Obispo
Parks & Recreation
Fee number Service Name
Fee
Description
Rate Effective
10/1/24 (Resident)
Rate Effective
10/1/24 (Non-
Resident) Notes
CCity of San Luis Obispo
Parks & Recreation
Film Application Fee
35 Still Photography Fixed fee 140.00$ 140.00$
36 Commercial Fixed fee 180.00$ 180.00$
37 Non-Profit Fixed fee 60.00$ 60.00$
38 Destination Marketing Waived by policy -$ -$
Permit Fee
39 Permit Processing Fee Fixed fee 25.00$ 25.00$
40 Tournament/Long-Term Rental Allocation Fee Fixed fee 125.00$ 125.00$
41 Full Park Use Fixed fee 800.00$ 800.00$
42 Half Park Use Fixed fee 400.00$ 400.00$
Mission Plaza
43 Full Plaza Fixed fee 800.00$ 800.00$
44 Full Plaza (Non-Profit/Community Event) Fixed fee 640.00$ 640.00$
45 Security Deposit Fixed fee 1,000.00$ 1,000.00$
Indoor Facilities
Ludwick Community Center
46 Assembly Room (Non-Profit) Per day 45.00$ 45.00$
47 Assembly Room (For-Profit) Per day 85.00$ 85.00$
48 Assembly Room (Municipality) Per day 35.00$ 35.00$ New
49 Gymnasium (Non-Profit) Per day 60.00$ 60.00$
50 Gymnasium (For-Profit) Per day 95.00$ 95.00$
51 Kitchen (Non-Profit) Per day 18.00$ 18.00$
52 Kitchen (For-Profit) Per day 22.00$ 22.00$
53 Floor Covers Per day 110.00$ 110.00$
54 Full Facility Use (14 Hours) Per day 1,900.00$ 1,900.00$
Senior Center
55 Main Room (Non-Profit) Per day 45.00$ 45.00$
56 Main Room (For-Profit) Per day 85.00$ 85.00$
57 Conference Room (Non-Profit) Per day 20.00$ 20.00$
58 Conference Room (For-Profit) Per day 35.00$ 35.00$
Meadow Park Building
59 Non-Profit Per day 20.00$ 20.00$
60 For-Profit Per day 35.00$ 35.00$
61 Community Room (Non-Profit) Per day 45.00$ 45.00$
62 Community Room (For-Profit) Per day 85.00$ 85.00$
63 Community Room (Municipality) Per day 35.00$ 35.00$ New
64 Conference Room (Non-Profit) Per day 20.00$ 20.00$
65 Conference Room (For-Profit) Per day 35.00$ 35.00$
66 Conference Room (Municipality) Per day 15.00$ 15.00$ New
Outdoor Facilities
67 Outdoor Seating Areas Fixed fee 95.00$ 95.00$
Jack House Gardens
Wedding and Reception
68 Full Day WEEKEND (Resident) Per day 4,000.00$
69 Full Day WEEKEND (non-resident) Per day 4,600.00$
70 Full Day WEEKDAY (Resident) Per day 3,800.00$
71 Full Day WEEKDAY (non-resident) Per day 4,375.00$
Party by Attendance (4 hour)
72 Under 50 Attendees Per hour 150.00$ 150.00$
73 Under 50 Attendees (Non-Profit) Per hour 75.00$ 75.00$
74 50-100 Attendees Per hour 250.00$ 250.00$
75 50-100 Attendees (Non-Profit) Per hour 125.00$ 125.00$
76 100+ Attendees Per hour 380.00$ 380.00$
77 100+ Attendees (Non-Profit) Per hour 190.00$ 190.00$
78 Security Deposit Fixed fee 1,000.00$ 1,000.00$
Softball Fields (3 total of these)
79 Hourly Field Use Per hour 30.00$ 30.00$
80 Youth Recreational Fee (Non-Profit) Per hour 12.00$ 12.00$ New
81 Local School District Field Use Per hour 15.00$ 15.00$
82 Light Fee Per hour 28.00$ 28.00$
Fee number Service Name
Fee
Description
Rate Effective
10/1/24 (Resident)
Rate Effective
10/1/24 (Non-
Resident) Notes
CCity of San Luis Obispo
Parks & Recreation
Multi-Use Courts
83 Hourly Use Per hour 12.00$ 12.00$
84 Light Fee Per hour 15.00$ 15.00$
Pickleball (Single) Court
85 Hourly Use Per hour 4.50$ 4.50$
86 Light Fee Per hour 15.00$ 15.00$
Tennis & Volleyball Courts
87 Full Use Facility (Hour) Per hour 12.00$ 12.00$
88 Local School District Field Use Per hour 7.00$ 7.00$
Damon-Garcia (full use = 4 lower fields, 1 upper field)
89 Full Use Facility (Day) Per day 1,000.00$ 1,000.00$
90 Full Use Facility (Hour) Per hour 120.00$ 120.00$
91 Full Use Light Fee (Hour) Per hour 84.00$ 84.00$
92 Field Preparation Fee Fixed fee 30.00$ 30.00$
93 Concession Stand Rental Fixed fee 175.00$ 175.00$
94 Lower Fields Facility Use (Day) Per day 800.00$ 800.00$
95 Lower Fields Facility Use (Hour) Per hour 110.00$ 110.00$
96 Lower Fields Light Fee Per hour 56.00$ 56.00$
97 Single Field Facility Use (Day) Per day 220.00$ 220.00$
98 Single Field Facility Use (Hour) Per hour 30.00$ 30.00$
99 Single Field Light Fee Per hour 28.00$ 28.00$
100 Youth Recreational Fee (Non-Profit) Per hour 12.00$ 12.00$ New
101 Local School District Field Use Per hour 15.00$ 15.00$
102 Overflow Parking Fee - weekday Per day 150.00$ 150.00$ New
103 Overflow Parking Fee - weekend Per day 300.00$ 300.00$ New
Baseball Stadium
104 Hourly Field Use Per hour 30.00$ 30.00$
105 Local School District Field Use Per hour 15.00$ 15.00$
106 Lights Per hour 28.00$ 28.00$
107 Press box Rental Fixed fee 25.00$ 25.00$
108 Field Preparation Fee Fixed fee 60.00$ 60.00$
109 Concession Stand Rental (daily) Per day 155.00$ 155.00$
110 Concession Stand Rental (hourly) Per hour 30.00$ 30.00$
Other
111 Bounce House Fixed fee 50.00$ 50.00$
112 Portable BBQ Fixed fee 41.00$ 41.00$
Community Gardens
113 Community Gardens (base) Per year 36.00$ 36.00$
114 Community Gardens (per square foot) Per sq ft 0.03$ 0.03$
Ranger Service
Junior Ranger Camp
115 Junior Ranger Camp Fixed fee 190.00$ 220.00$
Fee number Service Name
Fee
Description
Rate Effective
10/1/24 (Resident)
Rate Effective
10/1/24 (Non-
Resident) Notes
CCity of San Luis Obispo
Parks & Recreation
Laguna Lake Golf Course 5
116 Cart Rental Per person 12.00$ 12.00$
117 Pull Carts Per cart 5.25$ 5.25$
118 Club Rentals (Regular) Fixed fee 10.00$ 10.00$
119 Club Rentals (Snr/Yth/Stu/Mil) Fixed fee 5.00$ 5.00$
120 Alternative Programming Uses Fixed fee 12.00$ 12.00$
121 Spectator Fee Fixed fee 6.00$ 6.00$
Tournament Use
122 Shotgun Fee Fixed fee 300.00$ 300.00$
123 Daily Use for 39 or Under Fixed fee 15.00$ 15.00$
124 Daily Use for 40 or Over Fixed fee 12.00$ 12.00$
Rounds
125 Monday-Thursday (Regular) Fixed fee 16.00$ 16.00$
126 Monday-Thursday (Snr/Yth/Stu/Mil) Fixed fee 12.00$ 12.00$
127 Friday-Sunday (Regular) Fixed fee 17.00$ 17.00$
128 Friday-Sunday (Snr/Yth/Stu/Mil) Fixed fee 13.00$ 13.00$
129 Replay Fixed fee 9.00$ 9.00$
130 Off Peak (M-Th 12-3 PM) (Regular) Fixed fee 13.00$ 13.00$
131 Off Peak (M-Th 12-3 PM) (Snr/Yth/Stu/Mil) Fixed fee 12.00$ 12.00$
132 Twilight (after 3 PM) Fixed fee 12.00$ 12.00$
133 Family Rate (4 people) Fixed fee 34.00$ 34.00$
134 Super Twilight Fixed fee 9.00$ 9.00$
135 10-Play Cards (Regular) Fixed fee 140.00$ 140.00$
136 10-Play Cards (Snr/Yth/Stu/Mil) Fixed fee 105.00$ 105.00$
Footnotes:
1. Fluctutes per school district schedule.
2. Fee varies by field trip.
3. Aquatics fees to increase following summer session, effective 9/30/2024. Rate remains the same as previous Fiscal Year prior to this date.
4. Fees vary depending on class and frequency.
5. Golf course fees to increse following summer session, effective 9/30/2024. Rate remains the same as prevous Fiscal Year prior to this date.
Fee
number Service Name
Fee
Description Rate Effective 10/1/24 Notes
1 Administrative Investigations Determined by Finance Director
2 Clearance Letters 25.00$ 2
3 Civil SDT 15.00$ 3
4 Criminal SDT -$ 4
5 Civil Subpoena 275.00$ 5
Concealed Weapons Permit 6, 7
6 New Permit: Investigative costs and permit processing Fixed fee 269.00$
7 New Permit: Livescan Fee each 93.00$
8 New Permit: Social Media Check each 33.00$
9 Renewal - Concealed Weapons Permit: No new firearms Fixed fee 131.00$
10
Renewal - Concealed Weapons Permit: Adding new or replacing
firearms Fixed fee 187.00$
11 Amendment - Concealed Weapons Permit: Adding new firearm Fixed fee 162.00$
12 Amendment - Concealed Weapons Permit: Change in Address Fixed fee 72.00$
13 DUI Cost recovery Determined by Finance Director
False Alarms and Alarm Permits
14 Permit Fixed fee 32.00$
15 Renewal Fixed fee 32.00$
1st and 2nd False Alarm Response
16 3rd False Alarm Response (cost recovery flat fee) each 175.00$
17 4th False Alarm Response (flat fee + penalty $50) each 225.00$
18 5th False Alarm Response (flat fee + penalty $175) each 350.00$
19 6th or more (flat fee + penalty $325) each 500.00$
20 Impound Vehicle Release (30-day impound)Fixed fee 198.00$
21 Local Record Information 25.00$ 8
22 Massage Facility Permit Fixed fee 365.00$
23 Massage Technician Initial Permit Fixed fee 195.00$
24 Massage Technician Permit Renewal Fixed fee 195.00$
25 Nuisance abatement Determined by Finance Director
Planning Support
26 Administrative Use Permit (bars/nightclubs) 340.00$
Property Damage-Only Collisions Investigations
27 Per party per non-injury traffic collision investigation report Fixed fee 113.00$
28 Record sealing Determined by Finance Director
CCity of San Luis Obispo
Police Department
Fee
number Service Name
Fee
Description Rate Effective 10/1/24 Notes
CCity of San Luis Obispo
Police Department
29 Second Response Cost Recovery Determined by Finance Director
Taxi Permit
30 Permit fee Fixed fee 195.00$
31 Permit Renewal fee Fixed fee 195.00$
32 Pedicab Fee Fixed fee 195.00$
33 Pedicab Renewal Fee Fixed fee 195.00$
34 Vehicle Tow Release Fee Fixed fee 122.00$
Miscellaneous Permits
35 Electronic Game Center Permit Fixed fee 404.00$
36 Public Dance Permit Fixed fee 124.00$
37 Tobacco License Fee - per location Fixed fee 862.00$
38 Mobile Food Vendor License Fixed fee 188.00$
1. Fee set by Municipal Code
2. Fee set by Penal Code 13322
3. Fee set by California Evidence Code 1563
4. Access through discovery
5. Fee set by statute GC 68097.2
6. Set by Penal Code 26190
7. Concealed Weapons Permit Fees reflect recommended cost recovery level of 50%
8. Fee limited by Penal Code 13322
Fee
number Service Name
Fee
Description
Rate Effective
10/1/24
IT Surcharge
(if applicable) Total Notes
Final Inspection Approval / Department Final Signoff
Square Footage of Site Disturbance:
Non-Single Family Residential
1 Non-Single Family Residential: 0-2499 Fixed fee 297.00$ 9.06$ 306.06$
2 Non-Single Family Residential: 2500-4999 Fixed fee 297.00$ 9.06$ 306.06$
3 Non-Single Family Residential: 5000-14999 Fixed fee 297.00$ 9.06$ 306.06$
4 Non-Single Family Residential: 15000-21999 Fixed fee 446.00$ 13.60$ 459.60$
5 Non-Single Family Residential: 22000-43559 Fixed fee 446.00$ 13.60$ 459.60$
6 Non-Single Family Residential: 43560+ Fixed fee 446.00$ 13.60$ 459.60$
Single Family Residential
7 Single Family Residential: 0-2500 Fixed fee 297.00$ 9.06$ 306.06$
8 Single Family Residential: 2501+ Fixed fee 297.00$ 9.06$ 306.06$
9 Review of Mitigation Measures and Conditions of Approval Fixed fee 346.00$ 10.55$ 356.55$
Abandoned Shopping Carts
10 Failure to Submit Abandoned Shopping Cart Prevention & Retrieval Plan Per Month 100.00$ N/A 100.00$
Failure to Reclaim Abandoned Shopping Carts
11 After 3rd occurrence in a 6-month period Per occurrence 50.00$ N/A 50.00$ 1
12 Retrieval/impoundment costs Actual cost Actual cost N/A Actual cost
Parking in-Lieu Fees 2
New Construction:
13 Standard (Fee Per Space) Per space 30,794.37$ N/A 30,794.37$
14 Community Partners (50% Reduction) Per space 15,394.96$ N/A 15,394.96$
Additions to Existing Buildings:
15 Standard (Fee Per Space) Per space 30,794.37$ N/A 30,794.37$
16 Community Partners (50% Reduction) Per space 15,394.96$ N/A 15,394.96$
Change in Occupancy Requiring Additional Parking: 2
17 Standard (Fee Per Space) Per space 7,698.22$ N/A 7,698.22$
18 Community Partners (50% Reduction) Per space 3,850.60$ N/A 3,850.60$
Tree Related Fees
19 Tree/Shrub Hazardous Abatement Actual cost N/A Actual cost
20 Commemorative Tree Planting Fixed Fee 661.00$ N/A 661.00$
CCity of San Luis Obispo
Public Works
1. Pursuant to Business and Professions Code Section 22435.7(f), any owner that fails to retrieve the owner’s shopping cart or shopping carts within three business days
from the date of being given notice of the cart’s or carts’ discovery and location, or impoundment, by the city, is guilty of a violation of this chapter and may be punished
with an administrative fine of fifty dollars for each occurrence in excess of three during the six-month period starting January 1st and ending on June 30th or the six-month
period starting July 1st and ending December 31st of each calendar year.
2. Per vehicle space required by zoning regulations and not otherwise provided. The number of spaces required by the change shall be the difference between the number
required by the new use and the number required by the previous occupancy.
Fee
number Service Name Fee Description
Rate Effective
10/1/24 Notes
Appeals to Advisory Bodies Following Administrative (non-Planning) Decisions
1 Administrative Review Board Fixed Fee 652.00$
2 Hearing Officer Review or 25% of fine, whichever is less 106.00$ New
3 All Other Appeals Fixed Fee 532.00$
Business Related Fees
4 Business License Application Fixed Fee 95.00$
5 Business License Zoning Fee Fixed Fee 128.00$ 1
6 Annual Business License Renewal Processing Fee Fixed Fee 42.00$ 1
7 Annual Business Minimum Tax or 0.5%, whichever is greater 25.00$
8 Annual Downtown Assessment -for locations within Downtown or 0.5%, whichever is greater 150.00$
9 SB1186 State Fee - Disability Access Set by the State 4.00$ 2
Creek & Flood Protection
Stormwater Connection Fee Fixed Fee
10 Single Property Fixed Fee 26.00$
11 Larger Developments Fixed Fee 68.00$
Late Fees
12 Minimum or 1.5%, whichever is greater 15.00$
Reproduction/Photo Copies
13 Standard or legal Per page 0.47$ 3
14 11" x 17" Per page 0.82$
15 Photographs Each 6.73$
16 All other reproduction services will be charged at actual cost incurred Actual cost Actual cost
Returned Check Fees
17 Initial returned check Fixed Fee 25.00$
18 Each subsequent returned check Fixed Fee 35.00$
1. Businesses located within the City of San Luis Obispo
2. Added to new licenses and renewals. Fee is fixed and set by the State of California
3. Two sided copies should be charged as two pages.
CCity of San Luis Obispo
General Government
Fee
number Service Name
Rate Effective
10/1/24
IT Surcharge
(if applicable) Total Notes
Meter Services
1 Water Meter Cost (.75") 199.00$ 6.07$ 205.07$
2 Water Meter Cost (1") 234.00$ 7.14$ 241.14$
3 Water Meter Cost (1.5") 550.00$ 16.78$ 566.78$
4 Water Meter Cost (2") 739.00$ 22.54$ 761.54$
5 Water Meter: Cellular Data transmitter cost (All Sizes) 128.00$ 3.90$ 131.90$ New
6 Water Meter: Cellular Data transmitter installation(All Sizes) 84.00$ 2.56$ 86.56$ New
7 Install Water Meter (3/4" - 1") 169.00$ 5.15$ 174.15$
8 Install Water Meter (1.5" - 2") 338.00$ 10.31$ 348.31$
9 Install Water Meter (larger than 2") Time & Materials
10 Remove Water Meter (5/8" - 1") 169.00$ 5.15$ 174.15$
11 Remove Water Meter (1.5" - 2") 338.00$ 10.31$ 348.31$
12 Remove Water Meter (larger than 2") Time & Materials
13 Adapter Cost (1" Service/.58"x.75" Meter) 72.00$ 2.20$ 74.20$
14 Adapter Cost (1" Service/.75" Meter) 72.00$ 2.20$ 74.20$
15 Adapter Cost (1.5" Service/1" Meter) 315.00$ 9.61$ 324.61$
16 Adapter Cost (2" Service/1" Meter) 328.00$ 10.00$ 338.00$
17 Adapter Cost (2" Service/1.5" Meter) 427.00$ 13.02$ 440.02$
18 Adapter Cost (2" /1" + 1"/.75" Combo Meter) 400.00$ 12.20$ 412.20$
19 Retirement of Service (2" or smaller) Time & Materials
20 Retirement of Service (larger than 2") Time & Materials
21 Account Set-up 42.00$ N/A 42.00$
22 Account Set-up After Hours/Weekends 507.00$ N/A 507.00$
23 Disconnect Service for Non-Payment (SB-998) 57.00$ N/A 57.00$ 1
24 Sewer Lateral Installation 675.00$ 20.59$ 695.59$
25 Sewer Lateral Abandonment 675.00$ 20.59$ 695.59$
Per Plan Review Submittal -$
26 Plan check review water service 675.00$ 20.59$ 695.59$
27 Plan check review irrigation water 675.00$ 20.59$ 695.59$
28 Plan check review sewer service 675.00$ 20.59$ 695.59$
29 Recycled water cross connection test 844.00$ 25.74$ 869.74$
30 Construction & Demolition Recycling 84.00$ 2.56$ 86.56$
Industrial Users
31 Class I Industrial User Annual Permit Fee (ex: Automotive Repair)405.00$ N/A 405.00$
32 Class II Industrial User Annual Permit Fee (Ex: Restaurant, Bakery)304.00$ N/A 304.00$
33 Significant Industrial User (ex: Chemical Manufacturing, Electro-plating) 2,026.00$ N/A 2,026.00$
34 Industrial User Re-Inspection 253.00$ N/A 253.00$
Recycled Water - Construction Water Permit
Permit Fee - includes one vehicle
35 Full Year 1,954.00$ 59.60$ 2,013.60$ New
36 Half Year 1,124.00$ 34.28$ 1,158.28$ New
37 Quarterly 691.00$ 21.08$ 712.08$ New
Each Additional Vehicle
38 Full Year 1,446.00$ 44.10$ 1,490.10$ New
39 Half Year 723.00$ 22.05$ 745.05$ New
40 Quarterly 361.00$ 11.01$ 372.01$ New
Miscellaneous Utilities Fees
41 Non-compliance Water Restoration Fee 169.00$ 5.15$ 174.15$ New
42 Temporary Wastewater Discharge Application 253.00$ 7.72$ 260.72$ New
43 Sewer Lateral CCTV Review 84.00$ 2.56$ 86.56$ New
44 Sewer WYE Installation 530.00$ 16.17$ 546.17$ New
1. Fixed Fee set by SB-998 not subject to CPI increase
CCity of San Luis Obispo