Loading...
HomeMy WebLinkAbout7/2/2024 Item 7a, Jackson - Staff Agenda CorrespondenceCity of San Luis Obispo, Council Memorandum City of San Luis Obispo Council Agenda Correspondence DATE: July 2, 2024 TO: Mayor and Council FROM: Whitney McDonald, Interim City Manager Emily Jackson, Finance Director Debbie Malicoat, Deputy Finance Director SUBJECT: ITEM 7A – REVIEW AND ADOPT REVISED CITYWIDE USER AND REGULATORY FEES Staff received the following questions and comments regarding the recommended updates to the City’s user and regulatory fees. The questions and comments are below with staff’s response shown in italics: 1) Are there other options for phasing fees other than the option presented in the staff report? If the Council would like to consider a phased approach to fee increases, there are numerous different ways that phasing could occur. As noted in the ‘Alternatives’ section of the Council Agenda Report, staff suggested that fees increasing by more than 50% and $10 could be phased in over two years, with half of the increase effective on October 1, 2024 and the second half of the increase effective on July 1, 2025. Attachments A and B to this correspondence provide additional phasing options for the Council to consider: Attachment A to this correspondence provides a list of fees that would be impacted if phasing is based on all fees that exceed 100% and $10 increase. Attachment B to this correspondence provides a list of fees that would be impacted if phasing is based on all fees that exceed 150% and $10 increase. 2) What do other jurisdictions charge for appeal fees? Are there constitutionality issues related to charging appeal fees? City staff researched appeal fees for the cities that were considered as comparable jurisdictions in the MGT report (City of Santa Barbara, San Luis Obispo County, City of Ventura and City of Monterey) as well as other nearby jurisdictions. The appeal fees for planning cases are as follows: Item 7a. Review and Adopt Revised Citywide User and Regulatory Fees Page 2 • City of Santa Barbara  Most planning appeal fees are $1,095  Appeal from Sign Committee is $434 • San Luis Obispo County  Planning appeal fee is $850  Cannabis related appeal is $2,000 • City of Ventura  Planning appeal fee is $1,050  Cannabis related appeal is $3,465 • City of Monterey  Appeal to the Planning Commission is $938.63  Appeal of decision of Planning Commission to the City Council is $1,835.50 • City of Arroyo Grande  Appeal of Director decision is $800  Appeal of Planning Commission decision is $1,224 • City of Atascadero  Appeal fee to Planning Commission is $1,615 (70% cost recovery)  Appeal fee to City Council is $1,816 (70% cost recovery) • City of Grover Beach  Planning appeal fee to Planning Commission or City Council is $1,000 • City of Morro Bay  Refundable appeal fee is $336 (set at 9.1% cost recovery) • City of Paso Robles  Planning appeal fee is $248  Fire Code appeal fee is $747 • City of Pismo Beach  Appeals to Planning Commission and City Council are $1,035 Item 7a. Review and Adopt Revised Citywide User and Regulatory Fees Page 3 There are not constitutionality issues related to charging appeal fees. The California Constitution as well as the California Government Code authorize the City to charge user fees for the estimated reasonable cost of providing various governmental services. Through comprehensive analysis of the time spent by City staff in providing these governmental services, the City’s consultant calculated each fee to recover no more than the reasonable cost of each service. A number of public comments have been received about the proposed appeal fees presented in the Council Agenda Report. In the report, staff provided the estimated full cost to process appeals at different tiers, and also provided proposed appeal fees at the cost recovery amounts that were previously established by the City Council in 2017. In 2017, the City Council attempted to balance the desire to recover the cost of processing appeals, while also not overly encouraging or discouraging appeals through the pricing of the fee. Staff also provided a table showing what the appeal fees would be for each tier if they were set at various percentages of the full cost. This table can help guide City Council discussion on the setting of appeal fees if the Council would like to consider different percentages of full cost recovery. The City Council may wish to consider setting a flat fee for appeals, as it appears this is the most common way appeal fees are assessed amongst peer and neighboring jurisdictions. The Council could set an appeal fee that is lower for appeals from a staff level decision, and higher for appeals from an advisory body, as those types of projects tend to be more complicated and take more time to process (this would be similar to the structure in the City of Arroyo Grande noted above) or keep the tiered system that exists today and implement a flat fee within each tier. The following tables illustrate how different appeal fee approaches could look. The numbers provided are an attempt to bring the appeal fees in line with peer and neighboring jurisdictions, but could be adjusted up or down per direction from the Council, as long as the fees do not exceed the full cost recovery amounts provided by MGT. The tiers are defined in the staff report and are provided here for reference: Item 7a. Review and Adopt Revised Citywide User and Regulatory Fees Page 4 Alternative Approach 1 – set the appeal fees based on a percentage of cost recovery but lower the cost recovery percentage. If cost recovery percentages were lowered to 10% for both applicants and non-applicants the appeals would be as follows (note, Tier 3 and Tier 4 do not currently differentiate between applicant and non-applicant): Fee Tier 1 Applicant $1,671 Tier 1 Non-applicant $1,704 Tier 2 Applicant $1,052 Tier 2 Non-applicant $1,035 Tier 3 $515 Tier 4 $270 Alternatively, the Council could utilize Alternative Approach #1 but charge the same fee for applicants and non-applicants. Alternative Approach 2a – set fixed appeal fees and retain existing tiers. The suggested amounts below would be in-line with nearby and peer jurisdictions. Fee Tier 1 $1,000 Tier 2 $800 Tier 3 $600 Tier 4 $400 Approach 2b – set fixed appeal fees and retain both the existing tiers and the applicant/non-applicant fees. The suggested amounts below would incorporate the information related to nearby and peer jurisdictions while retaining a distinction between applicants and non-applicants, with the applicant fee proposed to be 20% more than non-applicant. Currently, with the established fee structure, applicants pay more than double what non-applicants do for Tier 1 and Tier 2 appeals, and applicants and non-applicants pay the same amount as one another for Tier 3 and Tier 4 appeals. Fee Tier 1 Applicant $1,200 Tier 1 Non-applicant $1,000 Tier 2 Applicant $960 Tier 2 Non-applicant $800 Tier 3 $600 Tier 4 $400 Item 7a. Review and Adopt Revised Citywide User and Regulatory Fees Page 5 Approach 3 – set fixed appeal fees based on the body to which a permit is being appealed. The suggested amounts below would be in-line with nearby and peer jurisdictions. Fee Appeal of advisory body decision $1,000 Appeal of director decision $500 Refund Option - In addition, the City Council could consider implementing a policy related to appeals that allows for the refunding of some or all appeal fees should an appellant be successful in their appeal. This would mean that an appeal fee would be charged in order to file the appeal, but refunded to the appellant if the appeal were successful and a decision was made in their favor. 3) What fees are generally associated with projects or home improvements that help advance sustainability goals of the City? What would the fees for these permits be if the City established a 50% cost recovery goal for these types of permits? What would be the estimated economic impact of NOT implementing the increases as recommended? The following Building permits are generally associated with sustainability goals of the City: • Electric Car Charging System • Graywater System • Graywater/Rainwater Harvesting System • Heat Pump • Insulation/Energy Update • Photovoltaic Systems • Photovoltaic Unit Installation – Residential • Residential Photovoltaic System • Solar/PV System – Commercial BLDG • Solar/PV System – Multifamily BLDG • Solar Water System Fixtures – BLDG • Doors/Windows • Electric Service Upgrades • New/Altered Circuits • Window Retrofit Based on estimated annual volumes of these permit types, the currently proposed fees are expected to generate about $134,400. If Council adopted a 50% cost recovery, it would result in $67,200 of revenue generated. The fee amounts are as shown below: Item 7a. Review and Adopt Revised Citywide User and Regulatory Fees Page 6 4) What do other agencies charge for Conceal Carry Weapon Permit fees? The following chart reflects what other agency fees are as of July 1, 2024. It is important to note that the City’s current fee of $100 for new permits lagged behind other agencies in the County, but as language changed in the Penal Code in January 2024 while the City-wide Fee Study was underway, MGT was able to provide an accurate determination of the City’s true time and cost above the prior legislative cap. Additionally, feedback from other departments in the County indicated they would most likely be re-assessing their fees in the near future, given that the new statutory requirements include tasks which involve increased staff time. The department also intends to reassess these fees as part of the City’s next Fee Study and examine how costs compare to other County agencies and adjust if needed. Current Proposed 50% cost recovery Electric Car Charging System 149.70$ 173$ 86.50$ Graywater System 184.15$ 604$ 302.00$ Graywater/Rainwater Harvesting System 91.41$ 173$ 86.50$ Heat Pump 68.89$ 173$ 86.50$ Insulation/Energy Update 144.39$ 475$ 237.50$ Photovoltaic Systems 195.86$ 604$ 302.00$ Photovoltaic Unit Installation – Residential 84.62$ 259$ 129.50$ Residential Photovoltaic System 206.67$ 604$ 302.00$ Solar/PV System – Commercial BLDG 993.60$ 1,426$ 713.00$ Solar/PV System – Multifamily BLDG 967.08$ 1,426$ 713.00$ Solar Water System Fixtures – BLDG 91.41$ 115$ 57.50$ Doors/Windows 702.91$ 604$ 302.00$ Electric Service Upgrades 149.70$ 324$ 162.00$ New/Altered Circuits (new fee)-303$ 151.50$ Window Retrofit 241.11$ 389$ 194.50$ Item 7a. Review and Adopt Revised Citywide User and Regulatory Fees Page 7 5) Is more information available about the projects that did not pay both installments of their required planning fees that are presented in the Agenda Report? Staff provided a table in the Agenda Report to highlight the uncollected amount of fees in Planning due to the two installment payment system. For clarification, the projects in this table represent projects that have been submitted between 2020 and 2024. The total number of projects that have not paid their second payment installment is 42. The table below shows the number of each type of permit that represents the unpaid fee amount. The largest number of projects with uncollected fees are Major Development Projects, followed by Minor Development Projects, Moderate Development Projects and Minor Use permits. 6) The staff report recommends that the City conduct fee studies every three years moving forward. What does that mean in terms of when the next study would be conducted and new fees implemented? Staff is recommending that comprehensive fee studies be conducted every three years moving forward to make sure that the City is able to incrementally adjust its fees, rather than considering significant changes every five years. If this recommendation is adopted by Council, staff would work with a consultant to conduct a fee study in 2026 and target making a recommendation to Council in the spring of 2027 so that the new fees could go into effect in July 2027, when the 2027-29 Financial Plan period begins. Consistent with Council-adopted Budget Policies, fees adopted on July 2, 2024, would be adjusted by the consumer price index (CPI) on July 1, 2025, and July 1, 2026, leading up to the next comprehensive fee study. 2023-24 Application Fee IT Surcharge First Payment Completion Payment # of Permits Uncollected $ Currently Uncollected Minor Use Permit 1,291.89$ 115.98$ 1,407.87$ 2,510.57$ 8 18,667.94$ Conditional Use Permit 2,976.25$ 241.38$ 3,217.63$ 4,937.84$ 2 9,875.68$ Variance 1,365.54$ 110.68$ 1,476.21$ 2,263.19$ Affordable Housing Incentive Request 559.70$ 45.96$ 605.66$ 947.34$ 2 1,758.50$ Reviews Requiring ALUC Hearing 2,268.58$ 103.90$ 2,372.48$ 1,181.36$ Architectural Review Signs 2,607.75$ 185.94$ 2,793.68$ 3,488.61$ Conceptual Review 2,732.96$ 221.63$ 2,954.59$ 4,533.62$ 1 4,367.65$ Development Projects - Moderate 5,572.34$ 455.71$ 6,028.05$ 9,369.04$ 8 71,915.67$ Development Projects - Major 7,559.87$ 609.02$ 8,168.89$ 12,407.96$ 11 125,993.29$ Development Projects - Minor 2,016.42$ 156.95$ 2,173.37$ 3,129.42$ 8 24,135.64$ Plan Revision 2,367.13$ 178.01$ 2,545.14$ 3,469.17$ Cannabis Operator 27,713.42$ 285.45$ 5,903.19$ 21,810.23$ 2 39,808.48$ 42 296,522.85$ Fees currently collected in two installments Item 7a. Review and Adopt Revised Citywide User and Regulatory Fees Page 8 7) Can you explain the difference between the fee for “Window Retrofits (non- structural) - BLDG – Base Fee” and “Window Retrofits (non-structural) - BLDG – Each addtl” and why we are proposing a new fee here? Previously, there was a flat fee assigned for all window retrofit projects that did not provide for full cost recovery. Staff determined that the cost and time was most accurately calculated based on the number of windows being replaced for a given project. The “Base Fee” is the cost of the permit to replace up to 10 windows, and the “Each addtl” fee is charged for up to each additional 10 windows on a project. For example, 11-20 windows would be charged the “Base Fee” plus the “Each addtl” fee for total of $666.73. Whereas a project consisting of 21-30 windows would be charged the “Base Fee” plus 2 times the “Each addtl” fee, for a total cost of $932.60. The new fee category captures the additional staff time for larger projects. 8) It says in the report that an extensive amount of public and stakeholder group feedback was sought as part of this study. Did you consult with the non-profit developer community as part of the outreach? Also, were there any other groups or individuals consulted consisting of low-income or other historically marginalized or under-represented groups? Key stakeholders from the non-profit developer community, as well as developers that build affordable housing as part of larger projects, have been notified about the fee study and are part of Developer’s Roundtable email lists. Several have been present at the in-person meetings where the fee study has been presented including as part of the Chamber of Commerce’s Economic Development Committee. Due to the potential impact of Parks and Recreation fees on all members of the community, the Parks and Recreation fees were taken to the Commission so that they could be shared in a public forum. Additionally, e- Notifications were sent to the local media and to more than 3,000 subscribers, and stories were posted on Facebook and Instagram twice regarding the fee study. Fee study information was also included in the SLO Business Update sent out by the City’s Economic Development staff, which was distributed to 7,004 subscribers. 9) Why isn’t there a non-resident fee charged for golf? How was it determined which Parks and Recreation services should have a resident and non- resident fee? Resident and non-resident fees are recommended for Parks and Recreation services that require advance registration (ex. youth sports camps, instructional classes, and Jack House rentals) primarily due to the complexity of administering a non-resident rate for services that do not require registration and are instead paid for at the counter. Staff’s recommendation is to add a non-resident fee for programs that require registration/enrollment (i.e. classes) and already have a Item 7a. Review and Adopt Revised Citywide User and Regulatory Fees Page 9 process is place for gathering information about residency. The recommendations for use of non-resident fees also target those programs with impacted enrollment (i.e. where we run out of space). 10) Is the Affordable Housing Agreement/MOU fee charged to non-profit affordable housing developers? This fee is not charged to non-profit affordable housing developers for affordable housing projects. 11) What Planning permits/fees are generally associated with larger projects vs. Individuals? The Planning permits are utilized by a variety of users and each permit/fee could be associated with an individual homeowner or with a larger development project. In general, the following Planning permits are typically associated with larger projects than smaller ones: • Development projects – moderate • Development projects – major • Initial study/environmental impact report • Tentative tract map • Tentative parcel map • Condominium conversion • Rezoning • Map amendment • Text amendment • General plan amendment • Annexation • Agreements (all) • Street abandonment 12) In relation to the issue of Planning Fee installment payments, does staff currently provide refunds for planning projects that do not proceed through the entire planning process? Yes. Currently staff will provide a full refund if an applicant withdraws a planning project early in the review period, or if planning staff and the applicant determine early that the project is not viable upon initial review. Staff also works with applicants to provide reasonable refunds if the applicant withdraws an application later in the process with consideration given to the amount of work that has already been completed for the project. Item 7a. Review and Adopt Revised Citywide User and Regulatory Fees Page 10 Staff Corrections Staff discovered an error in the annual volumes used to calculate the Engineering fee revenue related to blanket encroachment permits for utility companies. The correction results in $176,070 less in estimated Engineering Fee revenues. In addition, the Planning revenue calculation assumed that all revenue from SB9 urban lot splits is new revenue. However, there is a current fee for this service, staff is simply recommending discretely separating out the SB9 process. This results in $30,600 less Planning Fee related revenues than originally calculated. The overall resulting estimated revenue is presented below. Finally, staff is correcting Exhibit 1 to the Draft Resolution (Attachment C to this correspondence) to: 1. reflect staff’s recommendation as noted in the Council Agenda Report that the Tree Removal Permit be $330.50 instead of $661; and 2. reflect corrected fee amounts for Recycled Water Construction Permits and a simplified fee structure for this service, as noted in the Agenda Correspondence sent out on June 28, 2024. Exhibit 1 is being updated as it is referenced in the resolution adopting the fee schedule. Note that other attachments to the report include the fee amounts for Tree Removal Permits and Recycled Water Construction Permits initially included in those attachments. ATTACHMENTS A - List of fees that would be impacted if phasing is based on 100% increase B - List of fees that would be impacted if phasing is based on 150% increase C - Corrected Exhibit 1 to Attachment A - Draft Resolution amending the City’s Comprehensive Fee Schedule MGT Report Staff Recommendation User Fee Category Building 145,474$ 145,474$ Engineering 742,209$ 566,139$ Fire 12,994$ 12,994$ General Government (85,201)$ (85,201)$ Parks and Recreation 1,516,875$ 115,839$ Planning 951,869$ 921,269$ Police (84,680)$ (84,680)$ Public Works 2,184$ 2,184$ Utilities 315,652$ 315,652$ Total 3,517,376$ 1,909,670$ General Fund 3,201,724$ 1,594,018$ Increased/(Decreased) Revenue Fees based on phasing if % change >100% Fee #Service Name Current rate Recommended Rate Eff 10/1/24 $ change % change Rate Eff 10/1/24 Rate Eff 7/1/25 Planning Fees 1 Affordable Housing/MOUs 1,090.24$ 3,343.97$ 2,253.73$ 206.7%2,217.11$ 3,343.97$ 3 Development Agreement 19,220.86$ 59,620.61$ 40,399.75$ 210.2%39,420.73$ 59,620.61$ 4 Reimbursement Agreement 19,220.86$ 40,793.37$ 21,572.51$ 112.2%30,007.12$ 40,793.37$ 6 Annexation, Deposit 28,229.18$ 56,934.09$ 28,704.91$ 101.7%42,581.64$ 56,934.09$ 9 Tier 1: e.g. Appeals to the City Council - Applicant 1,992.53$ 8,610.86$ 6,618.33$ 332.2%5,301.69$ 8,610.86$ 10 Tier 1 Appeal - Non Applicant 797.27$ 3,511.94$ 2,714.67$ 340.5%2,154.61$ 3,511.94$ 11 Tier 2: e.g. Minor/Incidental Arch Review, Administrative Use Permit, Variance, Subdivisions <5 lots - Applicant 1,106.96$ 5,419.40$ 4,312.44$ 389.6%3,263.18$ 5,419.40$ 12 Tier 2 Appeal - Non Applicant 442.79$ 2,133.14$ 1,690.35$ 381.7%1,287.96$ 2,133.14$ 13 Tier 3: e.g. Fence Height Exception, Administrative Approval Application - Applicant 387.76$ 1,325.22$ 937.46$ 241.8%856.49$ 1,325.22$ 14 Tier 3 Appeal - Non Applicant 387.76$ 1,325.22$ 937.46$ 241.8%856.49$ 1,325.22$ 15 Tier 4: e.g. Home Occupation permit, Non-Profit Special Event - Applicant 166.37$ 694.56$ 528.19$ 317.5%430.46$ 694.56$ 16 Tier 4 Appeal - Non Applicant 166.37$ 694.56$ 528.19$ 317.5%430.46$ 694.56$ 23 Business License Zoning Clearance 129.79$ 276.17$ 146.38$ 112.8%202.98$ 276.17$ 24 Business License Change of Location Only 129.79$ 276.17$ 146.38$ 112.8%202.98$ 276.17$ 34 Development Projects - Major 20,576.85$ 41,894.98$ 21,318.13$ 103.6%31,235.91$ 41,894.98$ 37 Director's Action - General 1,075.81$ 2,961.66$ 1,885.85$ 175.3%2,018.73$ 2,961.66$ 38 Sidewalk Café User and Parklet Application Fee 971.43$ 3,729.38$ 2,757.95$ 283.9%2,350.40$ 3,729.38$ 49 Text Amendment 10,743.60$ 22,631.84$ 11,888.24$ 110.7%16,687.72$ 22,631.84$ 59 Tree Committee Recommendation 136.00$ 330.50$ 194.50$ 143.0%233.25$ 330.50$ Building and Safety Fees 6 Air Handler - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$ 20 Cell Tower/Antenna - BLDG - add on - Each Addtl (Up to 20)119.98$ 265.87$ 145.89$ 121.6%192.93$ 265.87$ 33 Drain Vent Repair/Replace - BLDG 70.95$ 178.28$ 107.33$ 151.3%124.61$ 178.28$ 35 Duct Work Only - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$ 38 Electric Car Charging System -BLDG 149.70$ 489.49$ 339.79$ 227.0%319.59$ 489.49$ 39 Electric Service Upgrade (up to 200 amp) -BLDG 149.70$ 333.88$ 184.18$ 123.0%241.79$ 333.88$ 40 Evaporative Cooler - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$ 41 Exhaust Hood - Type I - BLDG 139.11$ 689.40$ 550.30$ 395.6%414.26$ 689.40$ 43 Exhaust Hood & Duct - Residential - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$ 50 Fixtures, Plumbing - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$ 55 Furnace/Heater Replacement Only -BLDG 149.70$ 489.49$ 339.79$ 227.0%319.59$ 489.49$ 57 Gas System Repair/Replace/Extend - BLDG 65.64$ 178.28$ 112.63$ 171.6%121.96$ 178.28$ 58 Generator Installation - BLDG 105.99$ 622.42$ 516.44$ 487.3%364.20$ 622.42$ 59 Graywater Systems - BLDG 184.15$ 622.42$ 438.27$ 238.0%403.29$ 622.42$ 61 Grease Trap - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$ 62 Heat Pump - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$ 63 Heater - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$ 66 Insulation/Energy Upgrade -BLDG 140.12$ 489.49$ 349.37$ 249.3%314.80$ 489.49$ 67 Make-Up Air System - BLDG 66.85$ 178.28$ 111.43$ 166.7%122.56$ 178.28$ 84 Photovoltaic Systems (residential roof mount)195.86$ 622.42$ 426.57$ 217.8%409.14$ 622.42$ 85 Photovoltaic Unit Installation - Residential 84.62$ 266.90$ 182.27$ 215.4%175.76$ 266.90$ 88 Refrigeration Compressor/Condenser - BLDG 115.27$ 400.86$ 285.59$ 247.8%258.07$ 400.86$ 90 Re-roof with Added Ventilation -BLDG 144.39$ 400.86$ 256.47$ 177.6%272.63$ 400.86$ 91 Residential Photovoltaic System 206.67$ 622.42$ 415.76$ 201.2%414.54$ 622.42$ 96 Seismic Strengthening of URM Bldg 56.85$ 312.24$ 255.39$ 449.2%184.55$ 312.24$ 120 Temporary Service - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$ 124 Vent Fan (Single Duct) - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$ 126 Water Heater Replacement Only -BLDG 147.36$ 312.24$ 164.88$ 111.9%229.80$ 312.24$ 127 Water Pipe Repair/Replace - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$ Engineering Fees 29 Non-Single Family Residential 5000-14999 180.50$ 430.75$ 250.25$ 138.6%305.62$ 430.75$ 45 Moderate Traffic Control Plan Review (multiple locations, one 371.55$ 885.20$ 513.65$ 138.2%628.37$ 885.20$ 46 Major Traffic Control Plan Review (one or more locations and 655.98$ 2,397.97$ 1,741.99$ 265.6%1,526.98$ 2,397.97$ 47 Minor - first day (one location, one phase) 88.15$ 377.16$ 289.01$ 327.9%232.66$ 377.16$ 48 Minor each additional day 88.15$ 229.80$ 141.65$ 160.7%158.98$ 229.80$ 49 Moderate - first day (multiple locations, one phase) 176.28$ 525.56$ 349.28$ 198.1%350.92$ 525.56$ 50 Moderate each additional day 88.15$ 306.06$ 217.91$ 247.2%197.10$ 306.06$ 51 Major - first day (one or more locations and multiple phases) 352.59$ 1,314.92$ 962.33$ 272.9%833.75$ 1,314.92$ 52 Major each additional day 88.15$ 382.32$ 294.17$ 333.7%235.23$ 382.32$ 53 Public Improvement Plans 1,853.34$ 4,037.50$ 2,184.16$ 117.8%2,945.42$ 4,037.50$ 54 Building Plans 441.43$ 1,319.04$ 877.61$ 198.8%880.24$ 1,319.04$ 55 Maps / Additional Documents 507.21$ 2,407.25$ 1,900.04$ 374.6%1,457.23$ 2,407.25$ 56 Design Exception/Revision 353.86$ 914.05$ 560.19$ 158.3%633.96$ 914.05$ 57 Site Improvement 0-2499 361.02$ 1,033.59$ 672.57$ 186.3%697.31$ 1,033.59$ 58 Site Improvement 2500-4999 541.52$ 1,378.81$ 837.29$ 154.6%960.16$ 1,378.81$ 74 Minor (under an acre) 361.01$ 1,723.00$ 1,361.99$ 377.3%1,042.00$ 1,723.00$ 75 Major (over an acre) 902.54$ 3,445.99$ 2,543.45$ 281.8%2,174.27$ 3,445.99$ Fire Fees 123 Site Remediation Oversight 251.45$ 708.00$ 456.55$ 181.6%479.73$ 708.00$ 124 Soil Remediation 251.45$ 708.00$ 456.55$ 181.6%479.73$ 708.00$ 139 Each Additional Owner 12.43$ 44.00$ 31.57$ 254.0%28.22$ 44.00$ 1 New Accessory Building 0.32$ 0.66$ 0.42$ 175.0%0.45$ 0.66$ 10 New Single Family 0.42$ 0.72$ 0.60$ 500.0%0.42$ 0.72$ Phased-In Approach *The size of this document has been reduced for enhanced web-viewing. To view the full-sized document, which presents larger font sizes, please visit the City's Laserfiche repository at: https://opengov.slocity.org/WebLink/Browse.aspx?id=195281 Attachment A Fees based on phasing if % change >100% Fee #Service Name Current rate Recommended Rate Eff 10/1/24 $ change % change Rate Eff 10/1/24 Rate Eff 7/1/25 Phased-In Approach Parks and Recreation Fees Multi-Use Courts Damon-Garcia (full use = 4 lower fields, 1 upper field) 94 Lower Fields Facility Use (Day)800.00$ 436.50$ 120.1%581.75$ 800.00$ 96 Lower Fields Light Fee 56.00$ 29.25$ 109.3%41.38$ 56.00$ Police Fees 6 New Permit: Investigative costs and permit processing 100.00$ 269.00$ 169.00$ 169.0%184.50$ 269.00$ 9 Renewal - Concealed Weapons Permit: No new firearms 25.00$ 131.00$ 106.00$ 424.0%78.00$ 131.00$ 10 Renewal - Concealed Weapons Permit: Adding new or replacing firearms 25.00$ 187.00$ 162.00$ 648.0%106.00$ 187.00$ 11 Amendment - Concealed Weapons Permit: Adding new firearm 10.00$ 162.00$ 152.00$ 1520.0%86.00$ 162.00$ 12 Amendment - Concealed Weapons Permit: Change in Address 10.00$ 72.00$ 62.00$ 620.0%41.00$ 72.00$ 33 Pedicab Renewal Fee 68.08$ 195.00$ 126.92$ 186.4%131.54$ 195.00$ Utilities Fees 13 Adapter Cost (1" Service/.58"x.75" Meter) 32.09$ 74.20$42.11$ 131.2%53.14$ 74.20$ 14 Adapter Cost (1" Service/.75" Meter) 19.04$ 74.20$55.16$ 289.7%46.62$ 74.20$ 16 Adapter Cost (2" Service/1" Meter) 143.33$ 338.00$ 194.67$ 135.8%240.67$ 338.00$ 34 Industrial User Re-Inspection 95.81$ 253.00$ 157.19$ 164.1%174.41$ 253.00$ Fees based on phasing if % change >150% Fee #Service Name Current rate Recommended Rate Eff 10/1/24 $ change % change Rate Eff 10/1/24 Rate Eff 7/1/25 Planning Fees 1 Affordable Housing/MOUs 1,090.24$ 3,343.97$ 2,253.73$ 206.7%2,217.11$ 3,343.97$ 3 Development Agreement 19,220.86$ 59,620.61$ 40,399.75$ 210.2%39,420.73$ 59,620.61$ 9 Tier 1: e.g. Appeals to the City Council - Applicant 1,992.53$ 8,610.86$ 6,618.33$ 332.2%5,301.69$ 8,610.86$ 10 Tier 1 Appeal - Non Applicant 797.27$ 3,511.94$ 2,714.67$ 340.5%2,154.61$ 3,511.94$ 11 Tier 2: e.g. Minor/Incidental Arch Review, Administrative Use Permit, Variance, Subdivisions <5 lots - Applicant 1,106.96$ 5,419.40$ 4,312.44$ 389.6%3,263.18$ 5,419.40$ 12 Tier 2 Appeal - Non Applicant 442.79$ 2,133.14$ 1,690.35$ 381.7%1,287.96$ 2,133.14$ 13 Tier 3: e.g. Fence Height Exception, Administrative Approval Application - Applicant 387.76$ 1,325.22$ 937.46$ 241.8%856.49$ 1,325.22$ 14 Tier 3 Appeal - Non Applicant 387.76$ 1,325.22$ 937.46$ 241.8%856.49$ 1,325.22$ 15 Tier 4: e.g. Home Occupation permit, Non-Profit Special Event - Applicant 166.37$ 694.56$ 528.19$ 317.5%430.46$ 694.56$ 16 Tier 4 Appeal - Non Applicant 166.37$ 694.56$ 528.19$ 317.5%430.46$ 694.56$ 37 Director's Action - General 1,075.81$ 2,961.66$ 1,885.85$ 175.3%2,018.73$ 2,961.66$ 38 Sidewalk Café User and Parklet Application Fee 971.43$ 3,729.38$ 2,757.95$ 283.9%2,350.40$ 3,729.38$ Building and Safety Fees 6 Air Handler - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$ 33 Drain Vent Repair/Replace - BLDG 70.95$ 178.28$ 107.33$ 151.3%124.61$ 178.28$ 35 Duct Work Only - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$ 38 Electric Car Charging System -BLDG 149.70$ 489.49$ 339.79$ 227.0%319.59$ 489.49$ 40 Evaporative Cooler - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$ 41 Exhaust Hood - Type I - BLDG 139.11$ 689.40$ 550.30$ 395.6%414.26$ 689.40$ 43 Exhaust Hood & Duct - Residential - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$ 50 Fixtures, Plumbing - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$ 55 Furnace/Heater Replacement Only -BLDG 149.70$ 489.49$ 339.79$ 227.0%319.59$ 489.49$ 57 Gas System Repair/Replace/Extend - BLDG 65.64$ 178.28$ 112.63$ 171.6%121.96$ 178.28$ 58 Generator Installation - BLDG 105.99$ 622.42$ 516.44$ 487.3%364.20$ 622.42$ 59 Graywater Systems - BLDG 184.15$ 622.42$ 438.27$ 238.0%403.29$ 622.42$ 61 Grease Trap - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$ 62 Heat Pump - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$ 63 Heater - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$ 66 Insulation/Energy Upgrade -BLDG 140.12$ 489.49$ 349.37$ 249.3%314.80$ 489.49$ 67 Make-Up Air System - BLDG 66.85$ 178.28$ 111.43$ 166.7%122.56$ 178.28$ 84 Photovoltaic Systems (residential roof mount)195.86$ 622.42$ 426.57$ 217.8%409.14$ 622.42$ 85 Photovoltaic Unit Installation - Residential 84.62$ 266.90$ 182.27$ 215.4%175.76$ 266.90$ 88 Refrigeration Compressor/Condenser - BLDG 115.27$ 400.86$ 285.59$ 247.8%258.07$ 400.86$ 90 Re-roof with Added Ventilation -BLDG 144.39$ 400.86$ 256.47$ 177.6%272.63$ 400.86$ 91 Residential Photovoltaic System 206.67$ 622.42$ 415.76$ 201.2%414.54$ 622.42$ 96 Seismic Strengthening of URM Bldg 56.85$ 312.24$ 255.39$ 449.2%184.55$ 312.24$ 120 Temporary Service - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$ 124 Vent Fan (Single Duct) - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$ 127 Water Pipe Repair/Replace - BLDG 68.89$ 178.28$ 109.39$ 158.8%123.58$ 178.28$ Engineering Fees 46 Major Traffic Control Plan Review (one or more locations and 655.98$ 2,397.97$ 1,741.99$ 265.6%1,526.98$ 2,397.97$ 47 Minor - first day (one location, one phase) 88.15$ 377.16$ 289.01$ 327.9%232.66$ 377.16$ 48 Minor each additional day 88.15$ 229.80$ 141.65$ 160.7%158.98$ 229.80$ 49 Moderate - first day (multiple locations, one phase) 176.28$ 525.56$ 349.28$ 198.1%350.92$ 525.56$ 50 Moderate each additional day 88.15$ 306.06$ 217.91$ 247.2%197.10$ 306.06$ 51 Major - first day (one or more locations and multiple phases) 352.59$ 1,314.92$ 962.33$ 272.9%833.75$ 1,314.92$ 52 Major each additional day 88.15$ 382.32$ 294.17$ 333.7%235.23$ 382.32$ 54 Building Plans 441.43$ 1,319.04$ 877.61$ 198.8%880.24$ 1,319.04$ 55 Maps / Additional Documents 507.21$ 2,407.25$ 1,900.04$ 374.6%1,457.23$ 2,407.25$ 56 Design Exception/Revision 353.86$ 914.05$ 560.19$ 158.3%633.96$ 914.05$ 57 Site Improvement 0-2499 361.02$ 1,033.59$ 672.57$ 186.3%697.31$ 1,033.59$ 58 Site Improvement 2500-4999 541.52$ 1,378.81$ 837.29$ 154.6%960.16$ 1,378.81$ 74 Minor (under an acre) 361.01$ 1,723.00$ 1,361.99$ 377.3%1,042.00$ 1,723.00$ 75 Major (over an acre) 902.54$ 3,445.99$ 2,543.45$ 281.8%2,174.27$ 3,445.99$ Fire Fees 123 Site Remediation Oversight 251.45$ 708.00$ 456.55$ 181.6%479.73$ 708.00$ 124 Soil Remediation 251.45$ 708.00$ 456.55$ 181.6%479.73$ 708.00$ 139 Each Additional Owner 12.43$ 44.00$ 31.57$ 254.0%28.22$ 44.00$ 1 New Accessory Building 0.32$ 0.66$ 0.42$ 175.0%0.45$ 0.66$ 10 New Single Family 0.42$ 0.72$ 0.60$ 500.0%0.42$ 0.72$ Police Fees 6 New Permit: Investigative costs and permit processing 100.00$ 269.00$ 169.00$ 169.0%184.50$ 269.00$ 9 Renewal - Concealed Weapons Permit: No new firearms 25.00$ 131.00$ 106.00$ 424.0%78.00$ 131.00$ 10 Renewal - Concealed Weapons Permit: Adding new or replacing firearms 25.00$ 187.00$ 162.00$ 648.0%106.00$ 187.00$ 11 Amendment - Concealed Weapons Permit: Adding new firearm 10.00$ 162.00$ 152.00$ 1520.0%86.00$ 162.00$ 12 Amendment - Concealed Weapons Permit: Change in Address 10.00$ 72.00$ 62.00$ 620.0%41.00$ 72.00$ 33 Pedicab Renewal Fee 68.08$ 195.00$ 126.92$ 186.4%131.54$ 195.00$ Phased-In Approach *The size of this document has been reduced for enhanced web-viewing. To view the full-sized document, which presents larger font sizes, please visit the City's Laserfiche repository at: https://opengov.slocity.org/WebLink/Browse.aspx?id=195281 Attachment B Fees based on phasing if % change >150% Fee #Service Name Current rate Recommended Rate Eff 10/1/24 $ change % change Rate Eff 10/1/24 Rate Eff 7/1/25 Phased-In Approach Utilities Fees 14 Adapter Cost (1" Service/.75" Meter) 19.04$ 74.20$55.16$ 289.7%46.62$ 74.20$ 34 Industrial User Re-Inspection 95.81$ 253.00$157.19$ 164.1%174.41$ 253.00$ Fee number Service Name Fee Description Rate Effective 10/1/24 IT Surcharge (if applicable) Total Notes Agreements 1 Affordable Housing/MOUs Fixed Fee 3,245.00$ 98.97$ 3,343.97$ 2 Agreements/Bonds/Guarantees Fixed Fee 1,785.00$ 54.44$ 1,839.44$ 3 Development Agreement Fixed Fee 57,856.00$ 1,764.61$ 59,620.61$ 4 Reimbursement Agreement Fixed Fee 39,586.00$ 1,207.37$ 40,793.37$ Airport Land Use Commission (ALUC) 5 Reviews Requiring ALUC Hearing Fixed Fee 2,697.00$ 82.26$ 2,779.26$ Amendments / Annexation 6 Annexation, Deposit Deposit 55,249.00$ 1,685.09$ 56,934.09$ 1 7 General Plan Amendment - Map (includes rezoning), Deposit Deposit 39,362.00$ 1,200.54$ 40,562.54$ 1 8 General Plan Amendment - Text Fixed Fee 34,699.00$ 1,058.32$ 35,757.32$ Appeals 9 Tier 1: e.g. Appeals to the City Council - Applicant Fixed Fee 8,356.00$ 254.86$ 8,610.86$ 10 Tier 1 Appeal - Non Applicant Fixed Fee 3,408.00$ 103.94$ 3,511.94$ 11 Tier 2: e.g. Minor/Incidental Arch Review, Administrative Use Permit, Variance, Subdivisions <5 lots - Applicant Fixed Fee 5,259.00$ 160.40$ 5,419.40$ 12 Tier 2 Appeal - Non Applicant Fixed Fee 2,070.00$ 63.14$ 2,133.14$ 13 Tier 3: e.g. Fence Height Exception, Administrative Approval Application - Applicant Fixed Fee 1,286.00$ 39.22$ 1,325.22$ 14 Tier 3 Appeal - Non Applicant Fixed Fee 1,286.00$ 39.22$ 1,325.22$ 15 Tier 4: e.g. Home Occupation permit, Non-Profit Special Event - Applicant Fixed Fee 674.00$ 20.56$ 694.56$ 16 Tier 4 Appeal - Non Applicant Fixed Fee 674.00$ 20.56$ 694.56$ Building Permit Review - Planning Residential Fixed Fee 17 Minor Fixed Fee 220.21$ 6.72$ 226.93$ 18 Moderate Fixed Fee 440.42$ 13.43$ 453.85$ 19 Major Deposit 1,101.05$ 33.58$ 1,134.63$ Commercial 20 Minor Fixed Fee 330.32$ 10.07$ 340.39$ 21 Moderate Fixed Fee 550.53$ 16.79$ 567.32$ 22 Major Deposit 1,101.05$ 33.58$ 1,134.63$ Business Related Fees 23 Business License Zoning Clearance Fixed Fee 268.00$ 8.17$ 276.17$ 24 Business License Change of Location Only Fixed Fee 268.00$ 8.17$ 276.17$ 25 Home Occupation Permit Fixed Fee 293.00$ 8.94$ 301.94$ Cannabis Related Fees 26 Application Fee Fixed Fee 25,002.00$ 762.56$ 25,764.56$ Annual License Fee Fixed Fee 27 Commercial, Retail Storefront, Delivery, Manufacturing, Cultivation Fixed Fee 49,191.00$ 1,500.33$ 50,691.33$ 2 Cannabis Transfer of Ownership Fixed Fee 28 Transfer Fee - All Types Fixed Fee 13,978.00$ 426.33$ 14,404.33$ New Development Review 29 Pre-Application Fixed Fee 1,333.00$ 40.66$ 1,373.66$ 30 With site visit Fixed Fee 1,635.00$ 49.87$ 1,684.87$ 31 With site visit + ARC Review Fixed Fee 3,615.00$ 110.26$ 3,725.26$ New 32 Development Projects - Minor Fixed Fee 8,390.00$ 255.90$ 8,645.90$ 33 Development Projects - Moderate Fixed Fee 24,200.00$ 738.10$ 24,938.10$ 34 Development Projects - Major Fixed Fee 40,655.00$ 1,239.98$ 41,894.98$ CCity of San Luis Obispo Planning Fees *The size of this document has been reduced for enhanced web-viewing. To view the full-sized document, which presents larger font sizes, please visit the City's Laserfiche repository at: https://opengov.slocity.org/WebLink/Browse.aspx?id=195281 Attachment C Fee number Service Name Fee Description Rate Effective 10/1/24 IT Surcharge (if applicable) Total Notes CCity of San Luis Obispo Planning Fees Director's Action 35 Christmas Tree/Pumpkin Lot Permit Fixed Fee 441.00$ 13.45$ 454.45$ 36 Creek Setback Exception (Director's Hearing)Fixed Fee 3,471.00$ 105.87$ 3,576.87$ 37 Director's Action - General Fixed Fee 2,874.00$ 87.66$ 2,961.66$ 38 Sidewalk Café User and Parklet Application Fee Fixed Fee 3,619.00$ 110.38$ 3,729.38$ 39 Parklet Use Fee per sq foot per month Per month 3.52$ N/A 3.52$ 40 Sidewalk Café Use Fee per sq foot per month Per month 1.00$ N/A 1.00$ 41 Tables & Chairs Use Fee per sq foot per month Per month 1.00$ N/A 1.00$ Environmental Services Review 42 Initial Study/Environmental Impact Report 30% plus contract costs 3 Historic Resources 43 CHC Development Review Fixed Fee 3,860.00$ 117.73$ 3,977.73$ New 44 CHC Staff Referral Review Fixed Fee 881.00$ 26.87$ 907.87$ New 45 Historic Property Listing/Delisting Fixed Fee 3,647.00$ 111.23$ 3,758.23$ New 46 Mills Act Participation Application Fixed Fee 1,885.00$ 57.49$ 1,942.49$ Planned Development 47 Rezoning Deposit 36,000.00$ 1,098.00$ 37,098.00$ 1 Rezoning Amendment 48 Map Amendment Deposit 28,839.00$ 879.59$ 29,718.59$ 1 49 Text Amendment Deposit 21,962.00$ 669.84$ 22,631.84$ 1 Specific Plan 50 New Specific Plan Deposit 53,127.00$ 1,620.37$ 54,747.37$ New 51 Specific Plan Amendment Deposit 32,498.00$ 991.19$ 33,489.19$ Subdivision Services 52 Certificate of Compliance Fixed Fee 3,329.00$ 101.53$ 3,430.53$ 53 Condominium Conversion Fixed Fee 28,333.00$ 864.16$ 29,197.16$ 54 Lot Line Adjustment Fixed Fee 4,052.00$ 123.59$ 4,175.59$ 55 S.B. 9 Urban Lot Split Fixed Fee 8,704.00$ 265.47$ 8,969.47$ New 56 Tentative parcel map Fixed Fee 11,257.00$ 343.34$ 11,600.34$ 57 Tentative Tract map Fixed Fee 32,534.00$ 992.29$ 33,526.29$ 58 Voluntary Merger Fixed Fee 995.00$ 30.35$ 1,025.35$ Trees 59 Tree Committee Recommendation Fixed Fee 330.50$ N/A 330.50$ 60 Tree Removal Permit Fixed Fee 330.50$ N/A 330.50$ Miscellaneous Fees 61 Affordable Housing Incentive Request Fixed Fee 2,503.00$ 76.34$ 2,579.34$ 62 Conditional Use Permit (Planning Commission)Fixed Fee 10,609.00$ 323.57$ 10,932.57$ 63 Final Inspection Approval Fixed Fee 330.00$ 10.07$ 340.07$ 64 Land Use Documentation Request Fixed Fee 661.00$ 20.16$ 681.16$ 65 Minor Use Permit (Admin)Fixed Fee 3,506.00$ 106.93$ 3,612.93$ 66 Modification 25% of filing fee -$ -$ 67 Non-profit Special Event Fee Fixed Fee 200.00$ 6.10$ 206.10$ 68 Planning Consultation Per hour 220.00$ 6.71$ 226.71$ 69 Street Abandonment (Right of Way Abandonment) Fixed Fee 14,367.00$ 438.19$ 14,805.19$ 70 Time Extension 25% of filing fee -$ -$ 71 Variance Fixed Fee 3,894.00$ 118.77$ 4,012.77$ 1. Fee will be set on a deposit basis and debited by the amount of staff time and other materials required to provide service or Consultant Fee plus 30% administration 2. Prorated on Fiscal Year 3. Separate Fish and Game fees may apply, as set by the State of California Fee number Service Name Rate Effective 10/1/24 IT Surcharge (if applicable) Total Notes 1 Access Board of Appeals - BLDG - Minor 618.00$ 18.85$ 636.85$ New 2 Access Board of Appeals - BLDG Moderate 1,106.00$ 33.73$ 1,139.73$ New 3 Access Board of Appeals - BLDG -Major 1,953.00$ 59.57$ 2,012.57$ 4 A/C Residential - BLDG 173.00$ 5.28$ 178.28$ 5 After Hours Call Out (Building) (2 hour min plus per addtl hour) - BLDG 778.00$ 23.73$ 801.73$ 6 Air Handler - BLDG 173.00$ 5.28$ 178.28$ 7 Alternative Means and Methods Request (AMMR)519.00$ 15.83$ 534.83$ New 8 Annual Stormwater Review 324.00$ 9.88$ 333.88$ New 9 Antenna/Tower w/ Equipment Shelter - BLDG 1,124.00$ 34.28$ 1,158.28$ 10 Appeal of Building Official Decision - BLDG Minor 618.00$ 18.85$ 636.85$ New 11 Appeal of Building Official Decision - BLDG Moderate 1,106.00$ 33.73$ 1,139.73$ New 12 Appeal of Building Official Decision - BLDG Major 1,953.00$ 59.57$ 2,012.57$ 13 Awning/Canopy - BLDG - Base Fee for 1 539.00$ 16.44$ 555.44$ 14 Awning/Canopy - BLDG - Each Addtl (Up to 10 max)258.00$ 7.87$ 265.87$ New 15 Boiler - BLDG 303.00$ 9.24$ 312.24$ 16 Building Sewer - BLDG 173.00$ 5.28$ 178.28$ 17 Balcony/Porch/Deck - BLDG (up to 500 sq ft)993.00$ 30.29$ 1,023.29$ 18 Balcony/Porch/Deck - BLDG Each Addtl 500 sq ft or portion thereof 259.00$ 7.90$ 266.90$ New 19 Cell Tower/Antenna Only - BLDG - Base Fee 864.00$ 26.35$ 890.35$ 20 Cell Tower/Antenna - BLDG - add on - Each Addtl (Up to 20)258.00$ 7.87$ 265.87$ 21 Chiller - BLDG 173.00$ 5.28$ 178.28$ 22 Code Enforcement Fee 519.00$ 15.83$ 534.83$ 23 Commercial Access Upgrade - Site work - BLDG 1,253.00$ 38.22$ 1,291.22$ 24 Commercial Access Upgrade - Upgrades - BLDG 1,382.00$ 42.15$ 1,424.15$ 25 Commercial Coach Installation - BLDG 2,594.00$ 79.12$ 2,673.12$ 26 Construction Tax - BLDG 177.00$ 5.40$ 182.40$ 27 Demolition - Interior or Garage/Utility Build - BLDG 734.00$ 22.39$ 756.39$ 28 Demolition - Entire Building - BLDG 993.00$ 30.29$ 1,023.29$ 29 Doors/Windows- Box Structural - Base Fee (up to 10)604.00$ 18.42$ 622.42$ 30 Doors/Windows- Box Structural - Each Addtl group of 10 87.00$ 2.65$ 89.65$ New 31 Doors/Windows- Box Non-Structural - Base Fee (up to 10)604.00$ 18.42$ 622.42$ 32 Doors/Windows- Box Non-Structural - Each Addtl group of 10 87.00$ 2.65$ 89.65$ New 33 Drain Vent Repair/Replace - BLDG 173.00$ 5.28$ 178.28$ 34 Dry Rot / Termite Repair - BLDG 475.00$ 14.49$ 489.49$ 35 Duct Work Only - BLDG 173.00$ 5.28$ 178.28$ 36 Duplicate Single Family Plan (35% of plan review)New 37 Duplicate Multi Family Plan (35% of plan review)New 38 Electric Car Charging System -BLDG 475.00$ 14.49$ 489.49$ 39 Electric Service Upgrade (up to 200 amp) -BLDG 324.00$ 9.88$ 333.88$ 40 Evaporative Cooler - BLDG 173.00$ 5.28$ 178.28$ 41 Exhaust Hood - Type I - BLDG 669.00$ 20.40$ 689.40$ 42 Exhaust Hood - Type II - BLDG 173.00$ 5.28$ 178.28$ 43 Exhaust Hood & Duct - Residential - BLDG 173.00$ 5.28$ 178.28$ 44 Expired permit/application extension fee 130.00$ 3.97$ 133.97$ New 45 Fence or Non-Engineered Wall - BLDG 604.00$ 18.42$ 622.42$ 46 Fire Permit Handling Fee - BLDG 195.00$ 5.95$ 200.95$ 47 Fireplace Insert Upgrade -BLDG 604.00$ 18.42$ 622.42$ 48 Fireplace Retrofit / Chimney Repair - BLDG 993.00$ 30.29$ 1,023.29$ 49 Fireplace: Masonry 993.00$ 30.29$ 1,023.29$ 50 Fixtures, Plumbing - BLDG 173.00$ 5.28$ 178.28$ 51 Flag, Light, or Sign Pole - BLDG 864.00$ 26.35$ 890.35$ 52 Foundation New/Replace - BLDG - Base (3000 sqft)1,512.00$ 46.12$ 1,558.12$ 53 Foundation New/Replace - BLDG - Each addtl 500 sq ft or portion thereof 195.00$ 5.95$ 200.95$ New 54 Foundation Repair Only - BLDG 864.00$ 26.35$ 890.35$ 55 Furnace/Heater Replacement Only -BLDG 475.00$ 14.49$ 489.49$ 56 Furnaces - BLDG 173.00$ 5.28$ 178.28$ 57 Gas System Repair/Replace/Extend - BLDG 173.00$ 5.28$ 178.28$ 58 Generator Installation - BLDG 604.00$ 18.42$ 622.42$ 59 Graywater Systems - BLDG 604.00$ 18.42$ 622.42$ 60 Graywater/Rainwater Harvesting System -BLDG 173.00$ 5.28$ 178.28$ CCity of San Luis Obispo Building Fixed Fees Fee number Service Name Rate Effective 10/1/24 IT Surcharge (if applicable) Total Notes CCity of San Luis Obispo Building Fixed Fees 61 Grease Trap - BLDG 173.00$ 5.28$ 178.28$ 62 Heat Pump - BLDG 173.00$ 5.28$ 178.28$ 63 Heater - BLDG 173.00$ 5.28$ 178.28$ 64 Heater - Wall - BLDG 173.00$ 5.28$ 178.28$ 65 Inert Gas Systems 1,815.00$ 55.36$ 1,870.36$ 66 Insulation/Energy Upgrade -BLDG 475.00$ 14.49$ 489.49$ 67 Make-Up Air System - BLDG 173.00$ 5.28$ 178.28$ 68 Minor Code Corrections - BLDG 475.00$ 14.49$ 489.49$ 69 Minor Repairs - up to 2 inspections - BLDG 604.00$ 18.42$ 622.42$ 70 New/Altered Circuits - Per Circuit - BLDG 303.00$ 9.24$ 312.24$ New 71 New/Altered Circuits - Per Duplex Circuit - BLDG 346.00$ 10.55$ 356.55$ New 72 Paint Booth - BLDG 1,512.00$ 46.12$ 1,558.12$ 73 Paper Plan Disposal Fee + Disposal Actual Cost 41.00$ 1.25$ 42.25$ New 74 Partition- BLDG (Per Project)864.00$ 26.35$ 890.35$ 75 Patio - Enclosed - BLDG - Base Fee (500 sq ft)1,512.00$ 46.12$ 1,558.12$ 76 Patio - Enclosed - BLDG - Each Addtl 500 sq ft or portion thereof 259.00$ 7.90$ 266.90$ New 77 Patio Cover - Open - BLDG - Base Fee (500 sq ft)993.00$ 30.29$ 1,023.29$ 78 Patio Cover - Open - BLDG - Each Addtl 500 sq ft or portion thereof 259.00$ 7.90$ 266.90$ New 79 Permit Issuance - BLDG (Minimum permit fee)433.00$ 13.21$ 446.21$ 80 Permit Reissuance - Hourly 171.00$ 5.22$ 176.22$ New 81 Perspective Design Wall - Base Fee - BLDG - 1-100 ln ft 734.00$ 22.39$ 756.39$ 82 Perspective Design Wall - Each addtl ln ft - BLDG 1.00$ 0.03$ 1.03$ New 83 Phased approval - Hourly 195.00$ 5.95$ 200.95$ New 84 Photovoltaic Systems (residential roof mount)604.00$ 18.42$ 622.42$ 85 Photovoltaic Unit Installation - Residential 259.00$ 7.90$ 266.90$ 86 Pool/Spa Commercial - BLDG 1,512.00$ 46.12$ 1,558.12$ 87 Preliminary Project Consult/Code Analysis - BLDG (per hour)519.00$ 15.83$ 534.83$ 88 Refrigeration Compressor/Condenser - BLDG 389.00$ 11.86$ 400.86$ 89 Re-Roof Residential - BLDG 453.00$ 13.82$ 466.82$ 90 Re-roof with Added Ventilation -BLDG 389.00$ 11.86$ 400.86$ 91 Residential Photovoltaic System 604.00$ 18.42$ 622.42$ 92 Residential Pool/Spa - Site Built - BLDG 1,382.00$ 42.15$ 1,424.15$ 93 Retaining Wall Engineered 1-100 Linear Feet 1,253.00$ 38.22$ 1,291.22$ 93 Retaining Wall Engineered each additional linear foot 1.56$ 0.05$ 1.61$ 94 Roof Structure Replacement - BLDG - Base Fee (500 sq ft)993.00$ 30.29$ 1,023.29$ 95 Roof Structure Replacement - BLDG - Each addtl 250 sq ft or portion thereof 259.00$ 7.90$ 266.90$ New 96 Seismic Strengthening of URM Bldg 303.00$ 9.24$ 312.24$ 97 Shear Wall / Steel Support Column - BLDG 1,253.00$ 38.22$ 1,291.22$ 98 Site Work- Grading 1-1,000 Cubic Yards 1,123.00$ 34.25$ 1,157.25$ 99 Each Additional 1,000 Cubic Yards or portion thereof 475.00$ 14.49$ 489.49$ 100 Sign - Monument or free standing - BLDG 864.00$ 26.35$ 890.35$ 101 Sign - Wall - BLDG 604.00$ 18.42$ 622.42$ 102 Skylight - Base Fee (for 1 window)475.00$ 14.49$ 489.49$ 103 Skylight - Each Addtl unit 64.00$ 1.95$ 65.95$ New 104 SMIP (Commercial)31.00$ 0.95$ 31.95$ 105 SMIP (Residential)15.00$ 0.46$ 15.46$ 106 Solar/PV System - Commercial -BLDG 1,426.00$ 43.49$ 1,469.49$ 107 Solar/ PV System - Multifamily - BLDG 1,426.00$ 43.49$ 1,469.49$ 108 Solar Water System Fixtures - BLDG 115.00$ 3.51$ 118.51$ 109 Stairs - Repair/Replace - BLDG (1 story)993.00$ 30.29$ 1,023.29$ 110 Stairs - Repair/Replace - BLDG (each additional story)259.00$ 7.90$ 266.90$ New 111 Store Front / Facade Alterations: Minor - BLDG 1,512.00$ 46.12$ 1,558.12$ 112 Stormwater - Minor Project - BLDG 519.00$ 15.83$ 534.83$ 113 Stormwater - Moderate Project - BLDG 3,242.00$ 98.88$ 3,340.88$ 114 Stormwater - Major Project - BLDG 6,743.00$ 205.66$ 6,948.66$ 115 Stucco/Siding - BLDG (per building)734.00$ 22.39$ 756.39$ 116 Supplemental Inspection (Building) - BLDG 259.00$ 7.90$ 266.90$ 117 Supplemental Plan Check (Building) - BLDG 259.00$ 7.90$ 266.90$ 118 T-Bar Ceiling - BLDG - Per Project 1,253.00$ 38.22$ 1,291.22$ 119 Temporary Certificate of Occupancy 1,214.00$ 37.03$ 1,251.03$ 120 Temporary Service - BLDG 173.00$ 5.28$ 178.28$ Fee number Service Name Rate Effective 10/1/24 IT Surcharge (if applicable) Total Notes CCity of San Luis Obispo Building Fixed Fees 121 Trash Enclosure - BLDG 1,253.00$ 38.22$ 1,291.22$ 123 Vapor Recovery - BLDG 993.00$ 30.29$ 1,023.29$ 124 Vent Fan (Single Duct) - BLDG 173.00$ 5.28$ 178.28$ 125 Walk-in Box/Refrigerator Coil - BLDG 173.00$ 5.28$ 178.28$ 126 Water Heater Replacement Only -BLDG 303.00$ 9.24$ 312.24$ 127 Water Pipe Repair/Replace - BLDG 173.00$ 5.28$ 178.28$ 128 Window Retrofits (non-structural) -BLDG - Base Fee (up to 10)389.00$ 11.86$ 400.86$ 129 Window Retrofits (non-structural) -BLDG - Each addtl group of 10 258.00$ 7.87$ 265.87$ New Fee number Construction Type Plan Review fee per square foot Inspection fee per square foot Total IT Surcharge (if applicable) Notes 1 Alt/Addition - ADU per square foot (400 sq ft minimum)5.40$ 5.40$ 10.80$ 0.33$ 2 Alt/Addition - Commercial per square foot (1500 sq ft minimum)1.11$ 1.16$ 2.27$ 0.07$ 3 Alt/Addition - Mixed Use or Multi Family per square foot (2500 sq ft minimum)1.29$ 1.43$ 2.72$ 0.08$ 4 Alt/Addition Single Family per square foot (400 sq ft minimum)3.80$ 3.52$ 7.32$ 0.22$ 5 New Accessory Building per square foot (400 sq ft minimum)2.16$ 3.24$ 5.40$ 0.16$ 6 New ADU per square foot (500 sq ft minimum)3.89$ 4.32$ 8.21$ 0.25$ 7 New Commercial Building per square foot (5,000 sq ft minimum/50,000 sq ft maximum)0.64$ 0.72$ 1.36$ 0.04$ 8 New Commercial Shell per square foot (5,000 sq ft minimum/25,000 sq ft maximum)0.56$ 0.48$ 1.04$ 0.03$ 9 New Mixed-Use per square foot (5,000 sq ft minimum/25,000 sq ft maximum)1.30$ 1.25$ 2.55$ 0.08$ 10 New Multi Family (R2) per square foot (7,500 sq ft minimum/25,000 sq ft maximum)1.21$ 1.08$ 2.29$ 0.07$ 11 New Multi Family (R3) per square foot (5,000 sq ft minimum/25,000 sq ft maximum)1.14$ 0.96$ 2.10$ 0.06$ 12 New Single Family per square foot (1,000 sq ft minimum/3,000 sq ft maximum)2.59$ 3.05$ 5.64$ 0.17$ CCity of San Luis Obispo Building Fees Rate Effective 10/1/24 Fee number Service Name Fee Description Rate Effective 10/1/24 IT Surcharge (if applicable) Total Notes Improvement Plan Check 1 15% of Estimated Construction Costs for the first $100,000 plus 1.0% thereafter % of construction cost estimate 3.05% Construction Inspection 2 8.4% of Estimated Construction Costs for the first $500,000 plus 3.3% thereafter % of construction cost estimate 3.05% Certificates of Compliance and Lot Line Adjustments 3 Lot Line Adjustment Map or Agreement Fixed Fee 5,518.00$ 168.30$ 5,686.30$ 4 Certificates of Compliance Fixed Fee 1,338.00$ 40.81$ 1,378.81$ 5 Additional Document Review/Certificates of Correction Fixed Fee 502.00$ 15.31$ 517.31$ Encroachment Permits- Concrete Flatwork 6 Curb and Gutter base fee Base Fee 1,096.00$ 33.43$ 1,129.43$ 7 Curb and Gutter per linear foot Per linear foot 12.26$ 0.37$ 12.63$ 8 Sidewalk base fee Base Fee 1,096.00$ 33.43$ 1,129.43$ 9 Sidewalk plus per linear foot Per linear foot 7.80$ 0.24$ 8.04$ 10 Driveway Approach/Curb Ramp base fee Base Fee 1,476.00$ 45.02$ 1,521.02$ 11 Driveway Approach/Curb Ramp plus per linear foot Per linear foot 12.26$ 0.37$ 12.63$ Encroachment Permits- Excavation Trenched or Bored 12 Water Service/Recycled Service base fee Base Fee 864.00$ 26.35$ 890.35$ 13 Water Service/Recycled Service plus per linear foot Per linear foot 22.28$ 0.68$ 22.96$ 14 Sewer Service base fee Base Fee 780.00$ 23.79$ 803.79$ 15 Sewer Service plus per linear foot Per linear foot 8.91$ 0.27$ 9.18$ 16 Fire Lateral/Hydrant/Water and Recycled Main Extension base fee Base Fee 1,458.00$ 44.47$ 1,502.47$ 17 Fire Lateral/Hydrant/Water and Recycled Main Extension plus per linear foot Per linear foot 29.71$ 0.91$ 30.62$ 18 Other/Dry Utilities base fee Base Fee 1,077.00$ 32.85$ 1,109.85$ 19 Other/Dry Utilities plus per linear foot (Bore) Per linear foot 7.43$ 0.23$ 7.66$ 20 Other/Dry Utilities plus per linear foot (Trench) Per linear foot 11.88$ 0.36$ 12.24$ 21 Monitoring Well Fixed Fee 334.00$ 10.19$ 344.19$ 22 Other Minor Encroachment Permits not Listed (such as a rolloff dumpster or storage container)Fixed Fee 167.00$ 5.09$ 172.09$ New 23 Other Moderate Encroachment Permits not Listed (such as staging for work in the right- of-way multiple days)Fixed Fee 334.00$ 10.19$ 344.19$ 24 Time Extension for Encroachment Permit Fixed Fee 167.00$ 5.09$ 172.09$ 25 Plan Review for Special Cases Fixed Fee 334.00$ 10.19$ 344.19$ 26 Annual Encroachment Permit for Utility Companies Fixed Fee 20,902.00$ 637.51$ 21,539.51$ Final Inspections Square Footage of Site Disturbance: Non-Single Family Residential 27 Non-Single Family Residential 0-2499 Fixed Fee 251.00$ 7.66$ 258.66$ 28 Non-Single Family Residential 2500-4999 Fixed Fee 334.00$ 10.19$ 344.19$ 29 Non-Single Family Residential 5000-14999 Fixed Fee 418.00$ 12.75$ 430.75$ 30 Non-Single Family Residential 15000-21999 Fixed Fee 502.00$ 15.31$ 517.31$ 31 Non-Single Family Residential 22000-43559 (PW 3 Hours) Fixed Fee 585.00$ 17.84$ 602.84$ 32 Non-Single Family Residential 43560+ Fixed Fee 669.00$ 20.40$ 689.40$ Single Family Residential 33 Single Family Residential 0-2499 Fixed Fee 251.00$ 7.66$ 258.66$ 34 Single Family Residential 2500+ Fixed Fee 334.00$ 10.19$ 344.19$ Flood Zone Analysis 35 Minor - Verification only Fixed Fee 334.00$ 10.19$ 344.19$ 36 Major - New/Substantial Remodel Analysis/Documentation Fixed Fee 1,338.00$ 40.81$ 1,378.81$ Subdivision Maps 37 Parcel Map - (up to 4 parcels) Fixed Fee 10,416.00$ 317.69$ 10,733.69$ 38 Parcel Map - Commercial or Condominium Base Fee 14,095.00$ 429.90$ 14,524.90$ 39 Plus per parcel or condominium unit per parcel/unit 84.00$ 2.56$ 86.56$ 40 Tract Map Base Fee 22,593.00$ 689.09$ 23,282.09$ 41 Plus per lot or condominium unit per lot/unit 251.00$ 7.66$ 258.66$ Transportation Permit 42 Single Trip Permit Fixed Fee 16.00$ N/A 16.00$ 1 43 Annual Permit Fixed Fee 90.00$ N/A 90.00$ 1 (only the highest base fee is applied if there are multiple concrete flatwork scopes of work on a single encroachment permit) (only the highest base fee is applied if there are multiple trenched or bored scopes of work on a single encroachment permit) CCity of San Luis Obispo Engineering Fees Fee number Service Name Fee Description Rate Effective 10/1/24 IT Surcharge (if applicable) Total Notes CCity of San Luis Obispo Engineering Fees Traffic Control Plan Review 44 Minor Traffic Control Plan Review (one location, one phase) Fixed Fee 306.00$ 9.33$ 315.33$ 45 Moderate Traffic Control Plan Review (multiple locations, one phase) Fixed Fee 859.00$ 26.20$ 885.20$ 46 Major Traffic Control Plan Review (one or more locations and multiple phases) Fixed Fee 2,327.00$ 70.97$ 2,397.97$ Traffic Control Plan Inspection 47 Minor - first day (one location, one phase) Fixed Fee 366.00$ 11.16$ 377.16$ 48 Minor each additional day Fixed Fee 223.00$ 6.80$ 229.80$ 49 Moderate - first day (multiple locations, one phase) Fixed Fee 510.00$ 15.56$ 525.56$ 50 Moderate each additional day Fixed Fee 297.00$ 9.06$ 306.06$ 51 Major - first day (one or more locations and multiple phases) Fixed Fee 1,276.00$ 38.92$ 1,314.92$ 52 Major each additional day Fixed Fee 371.00$ 11.32$ 382.32$ 4th and subsequent plan review (per submittal) 53 Public Improvement Plans Fixed Fee 3,918.00$ 119.50$ 4,037.50$ 54 Building Plans Fixed Fee 1,280.00$ 39.04$ 1,319.04$ 55 Maps / Additional Documents Fixed Fee 2,336.00$ 71.25$ 2,407.25$ 56 Design Exception/Revision Fixed Fee 887.00$ 27.05$ 914.05$ Site Improvements plan review (square feet)2 57 Site Improvement 0-2499 Fixed Fee 1,003.00$ 30.59$ 1,033.59$ 58 Site Improvement 2500-4999 Fixed Fee 1,338.00$ 40.81$ 1,378.81$ 59 Site Improvement 5000-14999 Fixed Fee 1,672.00$ 51.00$ 1,723.00$ 60 Site Improvement 15000-21999 Fixed Fee 2,007.00$ 61.21$ 2,068.21$ 61 Site Improvement 22000-43559 Fixed Fee 2,341.00$ 71.40$ 2,412.40$ 62 Site Improvement 43560+ Fixed Fee 2,675.00$ 81.59$ 2,756.59$ Single Family Residential plan review (square feet) 63 Single Family Residential 0-2499 Fixed Fee 669.00$ 20.40$ 689.40$ 64 Single Family Residential 2500+ Fixed Fee 1,338.00$ 40.81$ 1,378.81$ Stormwater Post Construction Requirements Non-Single Family Residential (Net Impervious Area per SCP) 65 Non-Single Family Residential (Net Impervious Area per SCP) 0-2499 square feet Fixed Fee 334.00$ 10.19$ 344.19$ 66 Non-Single Family Residential (Net Impervious Area per SCP) 2500-4999 Fixed Fee 502.00$ 15.31$ 517.31$ 67 Non-Single Family Residential (Net Impervious Area per SCP) 5000-14999 Fixed Fee 669.00$ 20.40$ 689.40$ 68 Non-Single Family Residential (Net Impervious Area per SCP) 15000-24999 Fixed Fee 836.00$ 25.50$ 861.50$ 69 Non-Single Family Residential (Net Impervious Area per SCP) 25000+ Fixed Fee 1,003.00$ 30.59$ 1,033.59$ 70 Stormwater Control Plan Fixed Fee 334.00$ 10.19$ 344.19$ New 71 Private Stormwater Conveyance System Agreement Fixed Fee 334.00$ 10.19$ 344.19$ New Single Family Residential (Net Impervious Area per SCP) 72 Single Family Residential (Net Impervious Area per SCP) 0-2499 square feet Fixed Fee 334.00$ 10.19$ 344.19$ 73 Single Family Residential (Net Impervious Area per SCP) 2500+ Fixed Fee 669.00$ 20.40$ 689.40$ Drainage Report/Flood Study Review 74 Minor (under an acre) Fixed Fee 1,672.00$ 51.00$ 1,723.00$ 75 Major (over an acre) Fixed Fee 3,344.00$ 101.99$ 3,445.99$ 1. Set by the State of California Department of Transportation and is not subject to CPI increases. 2. This includes substantial development of private parking lots which are processed separate of the structure and include any combination of the following: underground utilities, parking lot lighting, accessible path of travel analysis, grading, drainage and compliance with the City's parking and driveway standards. Fee number Service Name Fee Description Rate Effective 10/1/24 IT Surcharge (if applicable) Total Notes FIRE DEVELOPMENT FIXED FEES Fire Sprinkler and Suppression Systems -(Issued by Building and Safety) Fire Sprinkler Systems (New Installation) - Plan Review Residential Fire Sprinkler Plan Review Private Underground Fire Line Installation 1 1-25 Heads Fixed fee 752.00$ 22.94$ 774.94$ 2 26-50 Heads Fixed fee 929.00$ 28.33$ 957.33$ 3 51-100 Heads Fixed fee 1,195.00$ 36.45$ 1,231.45$ 4 101-200 Heads Fixed fee 1,460.00$ 44.53$ 1,504.53$ 5 Every 200 Heads above 200 Fixed fee 443.00$ 13.51$ 456.51$ Fire Sprinkler Systems (New Installation) - Inspection Residential Fire Sprinkler Plan Review Private Underground Fire Line Installation 6 1-25 Heads Fixed fee 531.00$ 16.20$ 547.20$ 7 26-50 Heads Fixed fee 708.00$ 21.59$ 729.59$ 8 51-100 Heads Fixed fee 708.00$ 21.59$ 729.59$ 9 101-200 Heads Fixed fee 885.00$ 26.99$ 911.99$ 10 Every 200 Heads above 200 Fixed fee 354.00$ 10.80$ 364.80$ Fire Alarm System (New Installation) - Plan Review 11 1-50 Devices Fixed fee 841.00$ 25.65$ 866.65$ 12 51-100 Devices Fixed fee 1,239.00$ 37.79$ 1,276.79$ 13 Every 50 Devices above 100 Fixed fee 398.00$ 12.14$ 410.14$ 14 Sprinkler Monitoring System Fixed fee 266.00$ 8.11$ 274.11$ Fire Alarm System (New Installation) - Inspection 15 1-50 Devices Fixed fee 354.00$ 10.80$ 364.80$ 16 51-100 Devices Fixed fee 708.00$ 21.59$ 729.59$ 17 Every 50 Devices above 100 Fixed fee 354.00$ 10.80$ 364.80$ 18 Sprinkler Monitoring System Fixed fee 177.00$ 5.40$ 182.40$ Fire Sprinkler Systems (Tenant Improvement) - Plan Review 19 1-25 Heads Fixed fee 310.00$ 9.46$ 319.46$ 20 26-50 Heads Fixed fee 487.00$ 14.85$ 501.85$ 21 51-100 Heads Fixed fee 708.00$ 21.59$ 729.59$ 22 101-200 Heads Fixed fee 929.00$ 28.33$ 957.33$ 23 Every 200 Heads above 200 Fixed fee 443.00$ 13.51$ 456.51$ Fire Sprinkler Systems (Tenant Improvement) - Inspection 24 1-25 Heads Fixed fee 266.00$ 8.11$ 274.11$ 25 26-50 Heads Fixed fee 354.00$ 10.80$ 364.80$ 26 51-100 Heads Fixed fee 443.00$ 13.51$ 456.51$ 27 101-200 Heads Fixed fee 531.00$ 16.20$ 547.20$ 28 Every 200 Heads above 200 Fixed fee 354.00$ 10.80$ 364.80$ Fire Alarm System (Tenant Improvement) - Plan Review 29 Minor modification (Panel replacement etc)266.00$ 8.11$ 274.11$ New 30 1-50 Devices Fixed fee 841.00$ 25.65$ 866.65$ 31 51-100 Devices Fixed fee 1,239.00$ 37.79$ 1,276.79$ 32 Every 50 Devices above 100 Fixed fee 398.00$ 12.14$ 410.14$ 33 Sprinkler Monitoring System Fixed fee 266.00$ 8.11$ 274.11$ Fire Alarm System (Tenant Improvement) - Inspection 34 Minor modification 89.00$ 2.71$ 91.71$ New 35 1-50 Devices Fixed fee 354.00$ 10.80$ 364.80$ 36 51-100 Devices Fixed fee 708.00$ 21.59$ 729.59$ 37 Every 50 Devices above 100 Fixed fee 354.00$ 10.80$ 364.80$ 38 Sprinkler Monitoring System Fixed fee 177.00$ 5.40$ 182.40$ Other Suppression Systems 39 Insert Gas Systems Fixed fee 1,283.00$ 39.13$ 1,322.13$ 40 Dry Chemical Systems Fixed fee 708.00$ 21.59$ 729.59$ 41 Wet Chemical/Kitchen Hood Fixed fee 531.00$ 16.20$ 547.20$ 42 Foam Systems Fixed fee 2,257.00$ 68.84$ 2,325.84$ 43 Paint Spray Booth Fixed fee 797.00$ 24.31$ 821.31$ OTHER MISCELLANEOUS FEES 44 Supplemental Fire Plan Review Fixed fee 310.00$ 9.46$ 319.46$ New 45 Supplemental Fire Inspection Fixed fee 266.00$ 8.11$ 274.11$ New 46 Alternative Method and Material Review Fixed fee 708.00$ 21.59$ 729.59$ 47 Expedited Plan Review Fee Fixed fee 398.00$ 12.14$ 410.14$ New 48 Commercial Solar/Energy Storage System (new category) Fixed fee 443.00$ 13.51$ 456.51$ New CCity of San Luis Obispo Fire Fixed Fees Fee number Service Name Fee Description Rate Effective 10/1/24 IT Surcharge (if applicable) Total Notes CCity of San Luis Obispo Fire Fixed Fees FIRE NON-DEVELOPMENT FIXED FEES Hazardous Occupancy Permits 49 Additive Manufacturing Fixed fee 221.00$ N/A 221.00$ New 50 Aircraft Refueling Vehicles Fixed fee 310.00$ N/A 310.00$ 51 Aircraft Repair Hangar Fixed fee 487.00$ N/A 487.00$ 52 Automobile Wrecking Yard Fixed fee 575.00$ N/A 575.00$ 53 Bonfire or Rubbish Fires Fixed fee 221.00$ N/A 221.00$ 54 Burning in Public Place Fixed fee 221.00$ N/A 221.00$ 55 Candles or Open-Flames in Assembly Areas Fixed fee 221.00$ N/A 221.00$ 56 Combustible Fiber Storage (handle/store over 100 cu ft) Fixed fee 487.00$ N/A 487.00$ 57 Compressed Gases (Unless in the CUPA Program) Fixed fee 310.00$ N/A 310.00$ 58 Cryogens (Unless in the CUPA Program) Fixed fee 310.00$ N/A 310.00$ 59 Dry Cleaning Plant Fixed fee 310.00$ N/A 310.00$ 60 Dust Producing Operation Fixed fee 398.00$ N/A 398.00$ 61 Energy Storage Systems Fixed fee 310.00$ N/A 310.00$ New 62 Explosives or Blasting Agents Fixed fee 575.00$ N/A 575.00$ 63 Fireworks Fixed fee 929.00$ N/A 929.00$ 64 Flammable or Combustible Liquids (Unless in the CUPA Program) Fixed fee 310.00$ N/A 310.00$ 65 Fruit Ripening - Ethylene Gas Fogging Fixed fee 310.00$ N/A 310.00$ 66 Garages - Repair Fixed fee 487.00$ N/A 487.00$ 67 Hazardous Chemicals (Unless in the CUPA Program): Fixed fee 487.00$ N/A 487.00$ 68 Junk Yards Fixed fee 575.00$ N/A 575.00$ 69 Liquefied Petroleum Gas Fixed fee 310.00$ N/A 310.00$ 70 Lithium Battery Storage > 15 Cubic Feet - New Category Fixed fee 398.00$ N/A 398.00$ New 71 Lumberyard - Storage in excess of 100,000 board feet Fixed fee 487.00$ N/A 487.00$ 72 Magnesium Working - Process more than 10 lbs daily Fixed fee 310.00$ N/A 310.00$ 73 Mall (covered) Fixed fee 487.00$ N/A 487.00$ 74 Motor Fuel Dispensing Fixed fee 310.00$ N/A 310.00$ New 75 On-Demand Fueling Operations Fixed fee 266.00$ N/A 266.00$ New 76 Organic Coatings - manufacture over 1 gallon a day Fixed fee 310.00$ N/A 310.00$ 77 Ovens - Industrial, Baking and Drying Fixed fee 310.00$ N/A 310.00$ 78 Places of Assembly Fixed fee 398.00$ N/A 398.00$ 79 Plan Extraction Fixed fee 310.00$ N/A 310.00$ New 80 Refrigeration Equipment - Mechanical refrigeration (see UFC for most common refrigerants)Fixed fee 487.00$ N/A 487.00$ 81 Outdoor Assembly Event > 1000 participants Fixed fee 929.00$ N/A 929.00$ New 82 Spraying or Dipping Fixed fee 398.00$ N/A 398.00$ 83 Tents and Air-supported Structures - excess of 200 sq ft Fixed fee 398.00$ N/A 398.00$ 84 Tire Re-capping Fixed fee 310.00$ N/A 310.00$ 85 Waste Material Plant Fixed fee 575.00$ N/A 575.00$ 86 Welding and Cutting Operations - Any Occupancy Fixed fee 221.00$ N/A 221.00$ 87 Additional Permitted Use (per permit) Fixed fee 133.00$ N/A 133.00$ MANDATED / REQUIRED INSPECTIONS -$ 88 Public/Private Schools (K-8) Waived by policy -$ 89 Public/Private Schools (High Schools) Waived by policy -$ 90 Commercial Day Care (Group E and I4) Waived by policy -$ 91 Assisted Living (Group R2.1, R4, I3) <26 Residents -$ 92 Assisted Living (Group R2.1, R4, I3) 26 residents or more -$ NON-MANDATED / REQUIRED INSPECTIONS -$ Commercial Business Inspections (Up to 3 stories)-$ 93 0 – 5,000 sq. ft. Fixed fee 133.00$ 133.00$ 94 5,001 – 40,000 sq. ft. Fixed fee 221.00$ 221.00$ 95 40,001 – 120,000 sq. ft. Fixed fee 398.00$ 398.00$ 96 120,001 – 150,000 sq. ft. Fixed fee 575.00$ 575.00$ 97 150,001 – or more sq. ft. Fixed fee 752.00$ 752.00$ 98 Mid Rise Inspections (4 -6 stories) Fixed fee 443.00$ 443.00$ 99 Self-Inspection Non-Compliance Fixed fee 177.00$ 177.00$ 100 New Business Inspection (Baseline) Fixed fee 177.00$ 177.00$ FIRE FALSE ALARM FEES Initial Permit and Renewal Registrations - see Police 101 Excessive false alarm fee Per occurrence 656.00$ N/A 656.00$ 1 CERTIFIED UNIFIED PARTICIPATING AGENCY FEES Hazardous Materials Handlers 102 Remote utility (1-time fee) Fixed fee 620.00$ N/A 620.00$ 103 1 - 4 Materials handled Fixed fee 354.00$ N/A 354.00$ 104 5 - 10 Materials handled Fixed fee 398.00$ N/A 398.00$ 105 11+ Materials handled Fixed fee 575.00$ N/A 575.00$ Fee number Service Name Fee Description Rate Effective 10/1/24 IT Surcharge (if applicable) Total Notes CCity of San Luis Obispo Fire Fixed Fees Waste Generators 106 1 Waste stream (professional or medical) Fixed fee 221.00$ N/A 221.00$ 107 1 - 5 Waste streams (all others) Fixed fee 354.00$ N/A 354.00$ 108 6+ Waste streams Fixed fee 575.00$ N/A 575.00$ 109 Waste Stream (DeMinimus) Fixed fee 221.00$ N/A 221.00$ Tiered Permitting 110 Conditionally Exempt (CE) Fixed fee 531.00$ N/A 531.00$ 111 Conditionally Authorized (CA) Fixed fee 1,062.00$ N/A 1,062.00$ 112 Permit by Rule (PBR)Fixed fee2,301.00$ N/A 2,301.00$ Underground Storage Tanks (general model) 113 First tank Fixed fee 1,947.00$ N/A 1,947.00$ 114 Tank installation Fixed fee 6,018.00$ N/A 6,018.00$ 115 Tank removal Fixed fee 4,779.00$ N/A 4,779.00$ 116 Minor Modification Fixed fee 1,947.00$ N/A 1,947.00$ 117 Major Modification Fixed fee 4,956.00$ N/A 4,956.00$ Above Ground Storage Tanks 118 One Tank Fixed fee 443.00$ N/A 443.00$ 119 Two Tanks Fixed fee 620.00$ N/A 620.00$ 120 Three Tanks Fixed fee 797.00$ N/A 797.00$ California Accidental Release Prevention Program (CalARP) 121 New Stationary Source Facility Fixed fee 2,832.00$ N/A 2,832.00$ 122 Existing Annual Facility Inspection Fixed fee 708.00$ N/A 708.00$ 123 Site Remediation Oversight Fixed fee 708.00$ N/A 708.00$ 124 Soil Remediation Fixed fee 708.00$ N/A 708.00$ 125 Temporary Closure Permit Fixed fee 1,770.00$ N/A 1,770.00$ Closures 126 Temporary Closure Fixed fee 1,770.00$ N/A 1,770.00$ 127 Closure in Place Fixed fee 2,124.00$ N/A 2,124.00$ Late Fee 128 Annual permit fees received 31-60 days after original invoice day 25% of permit amount N/A -$ 129 Annual permit fees received 61 + days after original invoice day Addl 25% of permit amount N/A -$ FIRE EQUIPMENT AND PERSONNEL STAND-BY FEES 130 Fire Ladder Truck Standby (4 person) Per hour one (1) hour minimum 885.04$ N/A 885.04$ 131 Fire Engine/Truck Standby (3 person) Per hour one (1) hour minimum 663.78$ N/A 663.78$ 132 Squad or Light Rescue Equipment Standby (2 person) Per hour one (1) hour minimum 442.52$ N/A 442.52$ 133 Fire Investigation/Fire Prevention Standby Per hour one (1) hour minimum 177.00$ N/A 177.00$ New 134 Fire Suppression Standby Per hour one (1) hour minimum 221.26$ N/A 221.26$ New 135 Administrative/Clerical Standby Per hour one (1) hour minimum 167.39$ N/A 167.39$ New 136 Additional Site Inspection Fee (one hour min.) Per hour one (1) hour minimum 177.00$ N/A 177.00$ 137 Third & Subsequent Fire Inspection Fee Per inspection 227.00$ N/A 227.00$ Multi-Dwelling Fire and Life Safety Inspection Fee Schedule 2, 3 Administrative Fee Fixed fee 4 138 Processing per facility Fixed fee 89.00$ N/A 89.00$ 139 Each Additional Owner Fixed fee 44.00$ N/A 44.00$ 140 Re-inspection Fee Fixed fee 221.00$ N/A 221.00$ New 141 Re-inspection Fee, 2nd reinspection and all subsequent reinspections Base fee + increment 271.00$ N/A New Apartment Houses Fees are waived for units that are built, owned and managed by the San Luis Obispo Housing Authority, other government agencies or not-for-profit housing organizations 142 Up to 10 units Fixed fee 354.00$ N/A 354.00$ 143 11 - 20 Units Fixed fee 531.00$ N/A 531.00$ 144 21 - 50 Units Fixed fee 708.00$ N/A 708.00$ 145 51 - 100 Units Fixed fee 885.00$ N/A 885.00$ 146 101 - 200 Units Fixed fee 1,593.00$ N/A 1,593.00$ 147 Every additional 100 Units over 200 Fixed fee 531.00$ N/A 531.00$ Hotels, Motels, Lodging Houses, Bed & Breakfast Facilities, Youth Hostel Facilities, Senior Facilities, Sororities, Fraternities and Other Congregate Residences Hotel, Motel, Bed & Breakfast 148 1 - 20 Units Fixed fee 354.00$ N/A 354.00$ 149 21 - 50 Units Fixed fee 531.00$ N/A 531.00$ 150 51 - 100 Units Fixed fee 885.00$ N/A 885.00$ 151 101 - 200 Units Fixed fee 1,328.00$ N/A 1,328.00$ 152 Sorority and Fraternity Fixed fee 708.00$ N/A 708.00$ Condominiums 153 Up to 10 Units Fixed fee 354.00$ N/A 354.00$ 154 11 - 20 Units Fixed fee 531.00$ N/A 531.00$ 155 21 - 50 Units Fixed fee 708.00$ N/A 708.00$ 156 51 - 500 Units Fixed fee 1,062.00$ N/A 1,062.00$ Fee number Service Name Fee Description Rate Effective 10/1/24 IT Surcharge (if applicable) Total Notes CCity of San Luis Obispo Fire Fixed Fees OTHER FIRE FEES 157 Hydrant Flow Test (First Hydrant) Fixed fee 177.00$ N/A 177.00$ 158 Hydrant Flow Test (Each Additional Hydrant) Fixed fee 89.00$ N/A 89.00$ 159 Reinspection Fee (construction) Fixed fee 221.00$ N/A 221.00$ 160 Board of Appeals Fixed fee 365.00$ N/A 365.00$ 161 Emergency Call-Out (Non-Scheduled) Per hour four hour (4) minimum 884.00$ N/A 884.00$ 162 After Hours Call-Out (Scheduled) Per hour one (1) hour minimum 221.00$ N/A 221.00$ 1. Excessive false alarms are defined as: two or more false alarms in any thirty-day period or three false alarms in any three-hundred-sixty day period 2. Fees are waived for units that are built, owned and managed by the San Luis Obispo Housing Authority, other government agencies or not-for-profit housing organizations 3. These fees are applicable to all multi-dwelling units in the City based on the definitions set forth in the 2007 California Building Code 4. Administrative fee applies to both Apartment Houses and Hotels, Motels, etc. Total processing fee calculated will be divided equally amongst all owners Fee number Construction Type Plan Review fee per square foot Inspection fee per square foot IT Surcharge (if applicable) Total Notes 1 New Accessory Building 0.32$ 0.32$ 0.02$ 0.66$ 2 New Commercial 0.11$ 0.17$ 0.01$ 0.29$ 3 Alt/Addition-Commercial 0.14$ 0.18$ 0.01$ 0.33$ 4 Alt/Addition-Mixed Use 0.19$ 0.25$ 0.01$ 0.45$ 5 New Mixed Use 0.16$ 0.26$ 0.01$ 0.43$ 6 Alt/Addition ADU 0.92$ 0.92$ 0.06$ 1.90$ 7 Alt/Addition- Single Family 0.51$ 0.51$ 0.03$ 1.05$ 8 Alt/Addition-Multi Family 0.19$ 0.25$ 0.01$ 0.45$ 9 New Multi Family 0.12$ 0.08$ 0.01$ 0.21$ 10 New Single Family 0.42$ 0.28$ 0.02$ 0.72$ Rate Effective 10/1/24 CCity of San Luis Obispo Fire Fees - Construction Plan Review and Inspection Fee number Service Name Fee Description Rate Effective 10/1/24 (Resident) Rate Effective 10/1/24 (Non- Resident) Notes Youth Services Sun-N-Fun 1 Registration Fee Fixed fee 90.00$ 90.00$ 2 School Year - hourly option Per hour 6.00$ 6.00$ Teacher Work Day 3 Teacher Work Day Per day 68.00$ 78.00$ Spring Break Camp 4 Weekly Option Per week 200.00$ 230.00$ Summer Camp 5 Registration Fee Fixed fee 6.25$ 7.20$ 6 Full week Care Option Per week 200.00$ 230.00$ 7 Summer School Package Varies 1 8 Field Trip Sign Ups Varies 2 9 Late Registration Fee 11.00$ 12.75$ Youth Sports 10 Sport Camp Weekly 157.00$ 181.00$ 11 Sport Clinic Per clinic 80.00$ 92.00$ Aquatics 3 Lap Swim 12 Adult per use Fixed fee 4.75$ 4.75$ 13 Adult Monthly Fixed fee 71.25$ 71.25$ 14 Youth/Senior per use Fixed fee 4.25$ 4.25$ 15 Youth/Senior monthly Fixed fee 63.75$ 63.75$ Recreational Swim 16 Adult per use Fixed fee 5.25$ 5.25$ 17 Youth/Senior per use Fixed fee 4.75$ 4.75$ Swim Script 18 Adult per use Fixed fee 42.75$ 42.75$ 19 Youth/Senior per use Fixed fee 38.25$ 38.25$ Recreational Swim Script 20 Adult per use Fixed fee 47.25$ 47.25$ 21 Youth/Senior per use Fixed fee 42.75$ 42.75$ Lessons 22 Lessons Fixed fee 120.00$ 138.00$ 23 Private Lessons Fixed fee 210.00$ 241.50$ Special Classes 24 Lifeguard Fixed fee 260.00$ 299.00$ 25 Warm Water Exercise Fixed fee 60.00$ 60.00$ 26 Facility Use Fixed fee $75/day + $24/Lifeguard $87/day + $28/Lifeguard 27 Junior Lifeguard Program Fixed fee 250.00$ 290.00$ Recreational Sports Adult Softball 28 Teams (15 per team) Fixed fee 710.00$ 710.00$ Instructional Classes 4 29 Adult/Senior Varies by class $8.30 - $166.00 + 15% 30 Youth Varies by class $4.15 - $440.00 + 15% Special Events Parks & Recreation Events 31 Parks and Recreation Sponsored Events Varies by event $0 - $75.00 $0 - $75.00 Special Application Fees 32 Special Event Application - Park Use Fixed fee 140.00$ 140.00$ 33 Special Event Application - Encroachment Fixed fee 225.00$ 225.00$ 34 Banner Permit Application/Installation Fixed fee 325.00$ 325.00$ CCity of San Luis Obispo Parks & Recreation Fee number Service Name Fee Description Rate Effective 10/1/24 (Resident) Rate Effective 10/1/24 (Non- Resident) Notes CCity of San Luis Obispo Parks & Recreation Film Application Fee 35 Still Photography Fixed fee 140.00$ 140.00$ 36 Commercial Fixed fee 180.00$ 180.00$ 37 Non-Profit Fixed fee 60.00$ 60.00$ 38 Destination Marketing Waived by policy -$ -$ Permit Fee 39 Permit Processing Fee Fixed fee 25.00$ 25.00$ 40 Tournament/Long-Term Rental Allocation Fee Fixed fee 125.00$ 125.00$ 41 Full Park Use Fixed fee 800.00$ 800.00$ 42 Half Park Use Fixed fee 400.00$ 400.00$ Mission Plaza 43 Full Plaza Fixed fee 800.00$ 800.00$ 44 Full Plaza (Non-Profit/Community Event) Fixed fee 640.00$ 640.00$ 45 Security Deposit Fixed fee 1,000.00$ 1,000.00$ Indoor Facilities Ludwick Community Center 46 Assembly Room (Non-Profit) Per day 45.00$ 45.00$ 47 Assembly Room (For-Profit) Per day 85.00$ 85.00$ 48 Assembly Room (Municipality) Per day 35.00$ 35.00$ New 49 Gymnasium (Non-Profit) Per day 60.00$ 60.00$ 50 Gymnasium (For-Profit) Per day 95.00$ 95.00$ 51 Kitchen (Non-Profit) Per day 18.00$ 18.00$ 52 Kitchen (For-Profit) Per day 22.00$ 22.00$ 53 Floor Covers Per day 110.00$ 110.00$ 54 Full Facility Use (14 Hours) Per day 1,900.00$ 1,900.00$ Senior Center 55 Main Room (Non-Profit) Per day 45.00$ 45.00$ 56 Main Room (For-Profit) Per day 85.00$ 85.00$ 57 Conference Room (Non-Profit) Per day 20.00$ 20.00$ 58 Conference Room (For-Profit) Per day 35.00$ 35.00$ Meadow Park Building 59 Non-Profit Per day 20.00$ 20.00$ 60 For-Profit Per day 35.00$ 35.00$ 61 Community Room (Non-Profit) Per day 45.00$ 45.00$ 62 Community Room (For-Profit) Per day 85.00$ 85.00$ 63 Community Room (Municipality) Per day 35.00$ 35.00$ New 64 Conference Room (Non-Profit) Per day 20.00$ 20.00$ 65 Conference Room (For-Profit) Per day 35.00$ 35.00$ 66 Conference Room (Municipality) Per day 15.00$ 15.00$ New Outdoor Facilities 67 Outdoor Seating Areas Fixed fee 95.00$ 95.00$ Jack House Gardens Wedding and Reception 68 Full Day WEEKEND (Resident) Per day 4,000.00$ 69 Full Day WEEKEND (non-resident) Per day 4,600.00$ 70 Full Day WEEKDAY (Resident) Per day 3,800.00$ 71 Full Day WEEKDAY (non-resident) Per day 4,375.00$ Party by Attendance (4 hour) 72 Under 50 Attendees Per hour 150.00$ 150.00$ 73 Under 50 Attendees (Non-Profit) Per hour 75.00$ 75.00$ 74 50-100 Attendees Per hour 250.00$ 250.00$ 75 50-100 Attendees (Non-Profit) Per hour 125.00$ 125.00$ 76 100+ Attendees Per hour 380.00$ 380.00$ 77 100+ Attendees (Non-Profit) Per hour 190.00$ 190.00$ 78 Security Deposit Fixed fee 1,000.00$ 1,000.00$ Softball Fields (3 total of these) 79 Hourly Field Use Per hour 30.00$ 30.00$ 80 Youth Recreational Fee (Non-Profit) Per hour 12.00$ 12.00$ New 81 Local School District Field Use Per hour 15.00$ 15.00$ 82 Light Fee Per hour 28.00$ 28.00$ Fee number Service Name Fee Description Rate Effective 10/1/24 (Resident) Rate Effective 10/1/24 (Non- Resident) Notes CCity of San Luis Obispo Parks & Recreation Multi-Use Courts 83 Hourly Use Per hour 12.00$ 12.00$ 84 Light Fee Per hour 15.00$ 15.00$ Pickleball (Single) Court 85 Hourly Use Per hour 4.50$ 4.50$ 86 Light Fee Per hour 15.00$ 15.00$ Tennis & Volleyball Courts 87 Full Use Facility (Hour) Per hour 12.00$ 12.00$ 88 Local School District Field Use Per hour 7.00$ 7.00$ Damon-Garcia (full use = 4 lower fields, 1 upper field) 89 Full Use Facility (Day) Per day 1,000.00$ 1,000.00$ 90 Full Use Facility (Hour) Per hour 120.00$ 120.00$ 91 Full Use Light Fee (Hour) Per hour 84.00$ 84.00$ 92 Field Preparation Fee Fixed fee 30.00$ 30.00$ 93 Concession Stand Rental Fixed fee 175.00$ 175.00$ 94 Lower Fields Facility Use (Day) Per day 800.00$ 800.00$ 95 Lower Fields Facility Use (Hour) Per hour 110.00$ 110.00$ 96 Lower Fields Light Fee Per hour 56.00$ 56.00$ 97 Single Field Facility Use (Day) Per day 220.00$ 220.00$ 98 Single Field Facility Use (Hour) Per hour 30.00$ 30.00$ 99 Single Field Light Fee Per hour 28.00$ 28.00$ 100 Youth Recreational Fee (Non-Profit) Per hour 12.00$ 12.00$ New 101 Local School District Field Use Per hour 15.00$ 15.00$ 102 Overflow Parking Fee - weekday Per day 150.00$ 150.00$ New 103 Overflow Parking Fee - weekend Per day 300.00$ 300.00$ New Baseball Stadium 104 Hourly Field Use Per hour 30.00$ 30.00$ 105 Local School District Field Use Per hour 15.00$ 15.00$ 106 Lights Per hour 28.00$ 28.00$ 107 Press box Rental Fixed fee 25.00$ 25.00$ 108 Field Preparation Fee Fixed fee 60.00$ 60.00$ 109 Concession Stand Rental (daily) Per day 155.00$ 155.00$ 110 Concession Stand Rental (hourly) Per hour 30.00$ 30.00$ Other 111 Bounce House Fixed fee 50.00$ 50.00$ 112 Portable BBQ Fixed fee 41.00$ 41.00$ Community Gardens 113 Community Gardens (base) Per year 36.00$ 36.00$ 114 Community Gardens (per square foot) Per sq ft 0.03$ 0.03$ Ranger Service Junior Ranger Camp 115 Junior Ranger Camp Fixed fee 190.00$ 220.00$ Fee number Service Name Fee Description Rate Effective 10/1/24 (Resident) Rate Effective 10/1/24 (Non- Resident) Notes CCity of San Luis Obispo Parks & Recreation Laguna Lake Golf Course 5 116 Cart Rental Per person 12.00$ 12.00$ 117 Pull Carts Per cart 5.25$ 5.25$ 118 Club Rentals (Regular) Fixed fee 10.00$ 10.00$ 119 Club Rentals (Snr/Yth/Stu/Mil) Fixed fee 5.00$ 5.00$ 120 Alternative Programming Uses Fixed fee 12.00$ 12.00$ 121 Spectator Fee Fixed fee 6.00$ 6.00$ Tournament Use 122 Shotgun Fee Fixed fee 300.00$ 300.00$ 123 Daily Use for 39 or Under Fixed fee 15.00$ 15.00$ 124 Daily Use for 40 or Over Fixed fee 12.00$ 12.00$ Rounds 125 Monday-Thursday (Regular) Fixed fee 16.00$ 16.00$ 126 Monday-Thursday (Snr/Yth/Stu/Mil) Fixed fee 12.00$ 12.00$ 127 Friday-Sunday (Regular) Fixed fee 17.00$ 17.00$ 128 Friday-Sunday (Snr/Yth/Stu/Mil) Fixed fee 13.00$ 13.00$ 129 Replay Fixed fee 9.00$ 9.00$ 130 Off Peak (M-Th 12-3 PM) (Regular) Fixed fee 13.00$ 13.00$ 131 Off Peak (M-Th 12-3 PM) (Snr/Yth/Stu/Mil) Fixed fee 12.00$ 12.00$ 132 Twilight (after 3 PM) Fixed fee 12.00$ 12.00$ 133 Family Rate (4 people) Fixed fee 34.00$ 34.00$ 134 Super Twilight Fixed fee 9.00$ 9.00$ 135 10-Play Cards (Regular) Fixed fee 140.00$ 140.00$ 136 10-Play Cards (Snr/Yth/Stu/Mil) Fixed fee 105.00$ 105.00$ Footnotes: 1. Fluctutes per school district schedule. 2. Fee varies by field trip. 3. Aquatics fees to increase following summer session, effective 9/30/2024. Rate remains the same as previous Fiscal Year prior to this date. 4. Fees vary depending on class and frequency. 5. Golf course fees to increse following summer session, effective 9/30/2024. Rate remains the same as prevous Fiscal Year prior to this date. Fee number Service Name Fee Description Rate Effective 10/1/24 Notes 1 Administrative Investigations Determined by Finance Director 2 Clearance Letters 25.00$ 2 3 Civil SDT 15.00$ 3 4 Criminal SDT -$ 4 5 Civil Subpoena 275.00$ 5 Concealed Weapons Permit 6, 7 6 New Permit: Investigative costs and permit processing Fixed fee 269.00$ 7 New Permit: Livescan Fee each 93.00$ 8 New Permit: Social Media Check each 33.00$ 9 Renewal - Concealed Weapons Permit: No new firearms Fixed fee 131.00$ 10 Renewal - Concealed Weapons Permit: Adding new or replacing firearms Fixed fee 187.00$ 11 Amendment - Concealed Weapons Permit: Adding new firearm Fixed fee 162.00$ 12 Amendment - Concealed Weapons Permit: Change in Address Fixed fee 72.00$ 13 DUI Cost recovery Determined by Finance Director False Alarms and Alarm Permits 14 Permit Fixed fee 32.00$ 15 Renewal Fixed fee 32.00$ 1st and 2nd False Alarm Response 16 3rd False Alarm Response (cost recovery flat fee) each 175.00$ 17 4th False Alarm Response (flat fee + penalty $50) each 225.00$ 18 5th False Alarm Response (flat fee + penalty $175) each 350.00$ 19 6th or more (flat fee + penalty $325) each 500.00$ 20 Impound Vehicle Release (30-day impound)Fixed fee 198.00$ 21 Local Record Information 25.00$ 8 22 Massage Facility Permit Fixed fee 365.00$ 23 Massage Technician Initial Permit Fixed fee 195.00$ 24 Massage Technician Permit Renewal Fixed fee 195.00$ 25 Nuisance abatement Determined by Finance Director Planning Support 26 Administrative Use Permit (bars/nightclubs) 340.00$ Property Damage-Only Collisions Investigations 27 Per party per non-injury traffic collision investigation report Fixed fee 113.00$ 28 Record sealing Determined by Finance Director CCity of San Luis Obispo Police Department Fee number Service Name Fee Description Rate Effective 10/1/24 Notes CCity of San Luis Obispo Police Department 29 Second Response Cost Recovery Determined by Finance Director Taxi Permit 30 Permit fee Fixed fee 195.00$ 31 Permit Renewal fee Fixed fee 195.00$ 32 Pedicab Fee Fixed fee 195.00$ 33 Pedicab Renewal Fee Fixed fee 195.00$ 34 Vehicle Tow Release Fee Fixed fee 122.00$ Miscellaneous Permits 35 Electronic Game Center Permit Fixed fee 404.00$ 36 Public Dance Permit Fixed fee 124.00$ 37 Tobacco License Fee - per location Fixed fee 862.00$ 38 Mobile Food Vendor License Fixed fee 188.00$ 1. Fee set by Municipal Code 2. Fee set by Penal Code 13322 3. Fee set by California Evidence Code 1563 4. Access through discovery 5. Fee set by statute GC 68097.2 6. Set by Penal Code 26190 7. Concealed Weapons Permit Fees reflect recommended cost recovery level of 50% 8. Fee limited by Penal Code 13322 Fee number Service Name Fee Description Rate Effective 10/1/24 IT Surcharge (if applicable) Total Notes Final Inspection Approval / Department Final Signoff Square Footage of Site Disturbance: Non-Single Family Residential 1 Non-Single Family Residential: 0-2499 Fixed fee 297.00$ 9.06$ 306.06$ 2 Non-Single Family Residential: 2500-4999 Fixed fee 297.00$ 9.06$ 306.06$ 3 Non-Single Family Residential: 5000-14999 Fixed fee 297.00$ 9.06$ 306.06$ 4 Non-Single Family Residential: 15000-21999 Fixed fee 446.00$ 13.60$ 459.60$ 5 Non-Single Family Residential: 22000-43559 Fixed fee 446.00$ 13.60$ 459.60$ 6 Non-Single Family Residential: 43560+ Fixed fee 446.00$ 13.60$ 459.60$ Single Family Residential 7 Single Family Residential: 0-2500 Fixed fee 297.00$ 9.06$ 306.06$ 8 Single Family Residential: 2501+ Fixed fee 297.00$ 9.06$ 306.06$ 9 Review of Mitigation Measures and Conditions of Approval Fixed fee 346.00$ 10.55$ 356.55$ Abandoned Shopping Carts 10 Failure to Submit Abandoned Shopping Cart Prevention & Retrieval Plan Per Month 100.00$ N/A 100.00$ Failure to Reclaim Abandoned Shopping Carts 11 After 3rd occurrence in a 6-month period Per occurrence 50.00$ N/A 50.00$ 1 12 Retrieval/impoundment costs Actual cost Actual cost N/A Actual cost Parking in-Lieu Fees 2 New Construction: 13 Standard (Fee Per Space) Per space 30,794.37$ N/A 30,794.37$ 14 Community Partners (50% Reduction) Per space 15,394.96$ N/A 15,394.96$ Additions to Existing Buildings: 15 Standard (Fee Per Space) Per space 30,794.37$ N/A 30,794.37$ 16 Community Partners (50% Reduction) Per space 15,394.96$ N/A 15,394.96$ Change in Occupancy Requiring Additional Parking: 2 17 Standard (Fee Per Space) Per space 7,698.22$ N/A 7,698.22$ 18 Community Partners (50% Reduction) Per space 3,850.60$ N/A 3,850.60$ Tree Related Fees 19 Tree/Shrub Hazardous Abatement Actual cost N/A Actual cost 20 Commemorative Tree Planting Fixed Fee 661.00$ N/A 661.00$ CCity of San Luis Obispo Public Works 1. Pursuant to Business and Professions Code Section 22435.7(f), any owner that fails to retrieve the owner’s shopping cart or shopping carts within three business days from the date of being given notice of the cart’s or carts’ discovery and location, or impoundment, by the city, is guilty of a violation of this chapter and may be punished with an administrative fine of fifty dollars for each occurrence in excess of three during the six-month period starting January 1st and ending on June 30th or the six-month period starting July 1st and ending December 31st of each calendar year. 2. Per vehicle space required by zoning regulations and not otherwise provided. The number of spaces required by the change shall be the difference between the number required by the new use and the number required by the previous occupancy. Fee number Service Name Fee Description Rate Effective 10/1/24 Notes Appeals to Advisory Bodies Following Administrative (non-Planning) Decisions 1 Administrative Review Board Fixed Fee 652.00$ 2 Hearing Officer Review or 25% of fine, whichever is less 106.00$ New 3 All Other Appeals Fixed Fee 532.00$ Business Related Fees 4 Business License Application Fixed Fee 95.00$ 5 Business License Zoning Fee Fixed Fee 128.00$ 1 6 Annual Business License Renewal Processing Fee Fixed Fee 42.00$ 1 7 Annual Business Minimum Tax or 0.5%, whichever is greater 25.00$ 8 Annual Downtown Assessment -for locations within Downtown or 0.5%, whichever is greater 150.00$ 9 SB1186 State Fee - Disability Access Set by the State 4.00$ 2 Creek & Flood Protection Stormwater Connection Fee Fixed Fee 10 Single Property Fixed Fee 26.00$ 11 Larger Developments Fixed Fee 68.00$ Late Fees 12 Minimum or 1.5%, whichever is greater 15.00$ Reproduction/Photo Copies 13 Standard or legal Per page 0.47$ 3 14 11" x 17" Per page 0.82$ 15 Photographs Each 6.73$ 16 All other reproduction services will be charged at actual cost incurred Actual cost Actual cost Returned Check Fees 17 Initial returned check Fixed Fee 25.00$ 18 Each subsequent returned check Fixed Fee 35.00$ 1. Businesses located within the City of San Luis Obispo 2. Added to new licenses and renewals. Fee is fixed and set by the State of California 3. Two sided copies should be charged as two pages. CCity of San Luis Obispo General Government Fee number Service Name Rate Effective 10/1/24 IT Surcharge (if applicable) Total Notes Meter Services 1 Water Meter Cost (.75") 199.00$ 6.07$ 205.07$ 2 Water Meter Cost (1") 234.00$ 7.14$ 241.14$ 3 Water Meter Cost (1.5") 550.00$ 16.78$ 566.78$ 4 Water Meter Cost (2") 739.00$ 22.54$ 761.54$ 5 Water Meter: Cellular Data transmitter cost (All Sizes) 128.00$ 3.90$ 131.90$ New 6 Water Meter: Cellular Data transmitter installation(All Sizes) 84.00$ 2.56$ 86.56$ New 7 Install Water Meter (3/4" - 1") 169.00$ 5.15$ 174.15$ 8 Install Water Meter (1.5" - 2") 338.00$ 10.31$ 348.31$ 9 Install Water Meter (larger than 2") Time & Materials 10 Remove Water Meter (5/8" - 1") 169.00$ 5.15$ 174.15$ 11 Remove Water Meter (1.5" - 2") 338.00$ 10.31$ 348.31$ 12 Remove Water Meter (larger than 2") Time & Materials 13 Adapter Cost (1" Service/.58"x.75" Meter) 72.00$ 2.20$ 74.20$ 14 Adapter Cost (1" Service/.75" Meter) 72.00$ 2.20$ 74.20$ 15 Adapter Cost (1.5" Service/1" Meter) 315.00$ 9.61$ 324.61$ 16 Adapter Cost (2" Service/1" Meter) 328.00$ 10.00$ 338.00$ 17 Adapter Cost (2" Service/1.5" Meter) 427.00$ 13.02$ 440.02$ 18 Adapter Cost (2" /1" + 1"/.75" Combo Meter) 400.00$ 12.20$ 412.20$ 19 Retirement of Service (2" or smaller) Time & Materials 20 Retirement of Service (larger than 2") Time & Materials 21 Account Set-up 42.00$ N/A 42.00$ 22 Account Set-up After Hours/Weekends 507.00$ N/A 507.00$ 23 Disconnect Service for Non-Payment (SB-998) 57.00$ N/A 57.00$ 1 24 Sewer Lateral Installation 675.00$ 20.59$ 695.59$ 25 Sewer Lateral Abandonment 675.00$ 20.59$ 695.59$ Per Plan Review Submittal -$ 26 Plan check review water service 675.00$ 20.59$ 695.59$ 27 Plan check review irrigation water 675.00$ 20.59$ 695.59$ 28 Plan check review sewer service 675.00$ 20.59$ 695.59$ 29 Recycled water cross connection test 844.00$ 25.74$ 869.74$ 30 Construction & Demolition Recycling 84.00$ 2.56$ 86.56$ Industrial Users 31 Class I Industrial User Annual Permit Fee (ex: Automotive Repair)405.00$ N/A 405.00$ 32 Class II Industrial User Annual Permit Fee (Ex: Restaurant, Bakery)304.00$ N/A 304.00$ 33 Significant Industrial User (ex: Chemical Manufacturing, Electro-plating) 2,026.00$ N/A 2,026.00$ 34 Industrial User Re-Inspection 253.00$ N/A 253.00$ Recycled Water - Construction Water Permit Permit Fee - includes one vehicle 35 Full Year 1,954.00$ 59.60$ 2,013.60$ New 36 Half Year 1,124.00$ 34.28$ 1,158.28$ New 37 Quarterly 691.00$ 21.08$ 712.08$ New Each Additional Vehicle 38 Full Year 1,446.00$ 44.10$ 1,490.10$ New 39 Half Year 723.00$ 22.05$ 745.05$ New 40 Quarterly 361.00$ 11.01$ 372.01$ New Miscellaneous Utilities Fees 41 Non-compliance Water Restoration Fee 169.00$ 5.15$ 174.15$ New 42 Temporary Wastewater Discharge Application 253.00$ 7.72$ 260.72$ New 43 Sewer Lateral CCTV Review 84.00$ 2.56$ 86.56$ New 44 Sewer WYE Installation 530.00$ 16.17$ 546.17$ New 1. Fixed Fee set by SB-998 not subject to CPI increase CCity of San Luis Obispo Utilities