Loading...
HomeMy WebLinkAboutItem 5a. Fee Study Update Item 5a Construction Board of Appeals Agenda Report For Agenda of: 7/25/2024 Item Number: 5a FROM: Michael Loew, Deputy Director/Chief Building Official Prepared By: Michael Loew, Deputy Director/Chief Building Official SUBJECT: FEE STUDY UPDATE RECOMMENDATION This is an informational presentation and discussion topic only. There is no action within the CBOA’s purview to take regarding this matter. DISCUSSION Key Changes for Building and Safety Current: Building and Safety fees include fixed fees as well as construction permit fees that are charged on a base plus increment schedule as reflected on 30 separate matrices: 15 are for plan check services, and 15 are for building inspection services. Each matrix represents a building use, and calculates fees based on square footage and type of construction. Fixed fees in Building and Safety include things such as: water heater or furnace replacements, balcony/porch/deck construction, electric car charging system installation, and residential re-roofing. Recommendation that was approved by City Council: Construction permit fees will be simplified into 12 categories with a separate price per square foot for plan review and for inspections; the categories are aligned with the types of permits that are issued. The 12 categories include:  Alteration/Addition – Accessory Dwelling Unit  Alteration/Addition – Commercial  Alteration/Addition – Mixed Use or Multi Family  Alteration/Addition – Single Family  New Accessory Building  New Accessory Dwelling Unit  New Commercial Building  New Commercial Shell  New Mixed-Use  New Multi Family (R2)  New Multi Family (R3)  New Single Family These new categories will replace the 30 matrices that consists of hundreds of different options, which will simplify estimating fees for future projects and improve staff efficiency Page 13 of 21 Item 5a for calculating fees. As in the current fee schedule, the proposed restructured fee schedule is still based on square footage, which ensures that the cost of services are proportionate to the size and cost of the project. Each of the 12 categories also includes a minimum and/or maximum square footage for calculating the fee. This helps ensure that the fees for very small and very large buildings reflect the actual work effort required for plan review and inspection. The minimum permit fee for each category is necessary to ensure that the City captures all costs associated with processing applications. Regardless of the size of the project, the fee needs to capture the cost of staff time to process the permit and conduct inspections. The maximum permit fee is being recommended after staff analyzed the types of projects that exceed the square footage thresholds that are being recommended. Larger projects in the City tend to be similarly complex when it comes to reviews and inspections with more volume in the building. For example, a single-family home that is 4,000 square feet will have one kitchen, 3-4 bathrooms, and 4-6 bedrooms. Whereas a 2,000 square foot home will have one kitchen, 2-4 bathrooms, and 3-4 bedrooms. The major difference between the two homes is that the individual bedrooms, closets, and general living spaces are larger. Where the 2,000 square foot home may have a primary bedroom that is 350 square feet, the 4,000 square foot home will likely have a primary bedroom closer to 600 square feet. The cost per square footage is unique to each permit category and is based on how much time a typical project for each category will take to review and inspect. Staff analyzed projects within each category by calculating the time it took to process the permit based on how many review comments were provided and the number of inspections performed, as well as the nature of the comments and types of inspections for typical projects within each category. The recommendation represents the conversion of staff’s actual time into a cost per square foot. This means that the cost per square foot is not comparable across categories. For example, a new detached Accessory Dwelling Unit (ADU) is similar in nature to a new single-family home. The price per square foot is different in that it is much higher for the ADU; however, the actual permit and inspection costs are lower for the ADU because they are smaller projects. The following tables provide a few examples of the current and proposed fee amount changes for Building and Safety. In order to provide a sense of the impact of the new fee structure and amounts on projects, Table 4 below, illustrates the plan review and inspection fee that would be associated with several example projects of various sizes. Table 5 provides additional examples of current and proposed fees. Table 5 provides a sample of fixed-fee permits that are provided by the Building and Safety Division to illustrate the proposed changes in Building and Safety. Page 14 of 21 Item 5a New and Deleted Fees: As identified in MGT’s report, there are 23 new fees proposed and 26 fees that are recommended for deletion or consolidation in the building and safety fee schedule. Additionally, there are 25 fees that staff recommends alterations to the fee title to add clarity and ease of use of the fee schedule. Revenue Increase: Overall, the change to the fee structure and anticipated volume of permits is projected to generate approximately $145,000 in additional revenue . ATTACHMENTS A – New Master Fee Schedule Page 15 of 21 Page 16 of 21