Loading...
HomeMy WebLinkAboutItem 6d. Attachment D - 1166 Walnut Fencing Plans (Spec. 2000577-02)_High Resolution PlansIV IV IV EB WV IV IV IV WM EV EV HO S E B I B 115 246 . 5 4 FD 5 / 8 R B R W C A P WA L N U T S T . N 3 1 ° 0 2 ' 4 3 " E 5 7 . 0 1 ' N5 2 ° 5 3 ' 4 4 " E 1 5 4 . 5 4 ' S27°13'03"E 84. 1 5 ' S5 5 ° 4 6 ' 2 5 " W 9 6 . 1 6 ' S34°10'30"E 150.05' S5 5 ° 5 0 ' 1 8 " W 9 9 . 7 5 ' XXX ELEC EX-02 EX-02 EX-02 EX-02 EX-01 EX-05 EX-02 DE-01 DE-02 DE-04 EX-05 EX-01 EX-05 EX-05 EX-05 EX-03 EX-03 EX-01 EX-05 DE-05 DE-03 DE-02 DE-02 25 ' - 1 1 " DE-09 EX-02 DE-09 APPROX. 52' EXISTING FENCE DE-05 DE-05 DE-11 DE-07 DE-01 EX-06 EX-07 DE-12 DE-12 DE-12 APPR O X . 7 8 ' DE - 1 2 A P P R O X . 3 6 ' EX-04 EX-08 1' DE-13 1' EX-09 EX-09 EX-09 EX-09 EX-09 DE-01 DE-01 DE-14 DE-02 SEE TREE PROTECTION NOTES FOR ALL WORK UNDER EXISTING TREES DEMOLITION CODE DESCRIPTION CLEAR AND GRUB EXISTING VEGETATION. PROTECT OR RELOCATE IRRIGATION EQUIPMENT FOR IMPROVEMENTS. IRRIGATION SHALL REMAIN IN WORKING ORDER UPON COMPLETION OF PROJECT. PROTECT EXISTING ELECTRICAL CONDUIT, REFER TO ELECTRICAL PLANS PRIOR TO CONSTRUCTION ACTIVITY. REMOVE EXISTING CONCRETE CURB/ GUTTER WHERE OCCURS REMOVE EXISTING ASPHALT REMOVE EXISTING BIKE RACK REMOVE EXISTING GUARDRAIL REMOVE EXISTING PAVER TURF EDGING REMOVE EXISTING TREE STUMP RELOCATE EXISTING IRRIGATION MAINLAINE, VALVES, AND WIRES. ADDITIONAL IRRIGATION EQUIPMENT DAMAGED BY CONSTRUCTION ACTIVITIES SHALL BE REPLACED IN KIND BY THE CONTRACTOR. REMOVE EXISTING WOOD FENCE REMOVE EXISTING PAVERS/CONCRETE FOR NEW FENCE AND GATE POSTS, SEE LC SHEETS. REMOVE EXISTING CURB TRIM AND REMOVE EXISTING VINE OFF OF WALL AND FENCE TO FULL HEIGHT REMOVE EXISTING WHEEL STOP REMOVE EXISTING STORM DRAINS BETWEEN BUILDING AND SIDEWALK. PREP TIE IN AT BUILDING FOR NEW STORMDRAIN CONNECTION. DE-01 DE-02 DE-03 DE-04 DE-05 DE-06 DE-07 DE-08 DE-09 DE-10 DE-11 DE-12 DE-13 DE-14 DEMOLITION EXISTING TO REMAIN CODE DESCRIPTION EXISTING WOOD FENCE, PROTECT IN PLACE EXISTING LIGHT, PROTECT IN PLACE EXISTING TREE, PROTECT IN PLACE EXISTING UTILITIES, PROTECT IN PLACE EXISTING WALL, PROTECT IN PLACE EXISTING LANDSCAPE AND IRRIGATION, PROTECT IN PLACE EXISTING SIGN, PROTECT IN PLACE EXISTING CONCRETE, PAVERS AND WALKWAY, PROTECT IN PLACE EXISTING CURB, PROTECT IN PLACE EX-01 EX-02 EX-03 EX-04 EX-05 EX-06 EX-07 EX-08 EX-09 EXISTING TO REMAIN CITY SPECIFICATION NO. DATE: PR O J E C T T I T L E : SH E E T T I T L E : SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION AS NOTED SEPTEMBER, 2024 2504-05-PS23 2000577-02 90 % C O N S T R U C T I O N D O C U M E N T S 11 0 6 W A L N U T F E N C I N G I M P R O V E M E N T S N: \ 2 4 0 0 \ 2 5 0 4 - 0 5 - P S 2 3 - S L O - P D - N - B u i l d i n g - F e n c i n g \ L a n d s c a p e - A r c h i t e c t u r e \ T a s k - L 2 - C o n D o c s \ S h e e t - F i l e s \ D E M O - 2 5 0 4 - 0 5 . d w g , C D 1 0 1 , S e p 0 4 , 2 0 2 4 7 : 1 0 p m , L D W i e r s c h e m 9.9.24 0 10 20 30 feet 1"=10' 5 DEMOLITION SCHEDULE MATCHLINE - CD102 1.THIS DEMOLITION PLAN WAS PREPARED FOR THE CONVENIENCE OF THE CONTRACTOR. THE ARCHITECT AND THE ENGINEER DO NOT REPRESENT THAT ALL ITEMS WHICH MAY REQUIRE DEMOLITION AND REMOVAL HAVE BEEN SHOWN. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO CAREFULLY EXAMINE THE SITE AND DETERMINE AND EXECUTE ALL DEMOLITIONS AND REMOVALS NECESSARY FOR THE CONSTRUCTION OF THE NEW WORK TO THE SPECIFIED LINES, GRADES, AND CONFIGURATIONS. 2.DEMOLITION WORK AND ABANDONMENT SHALL CONFORM TO THE UNIFORM BUILDING CODE, TITLE 24, AND THE CITY OF SAN LUIS OBISPO REQUIREMENTS. ALL WORK SHALL BE SUBJECT TO THE APPROVAL OF THE ENGINEER OF RECORD AND THE CITY OF SAN LUIS OBISPO ENGINEER. 3.ALL DEMOLITION WORK SHALL CONFORM TO THE SPECIFICATIONS FOR THIS PROJECT. 4.NO DEMOLITION SHALL BE STARTED WITHOUT APPROVED PLANS. THE THE CITY OF SAN LUIS OBISPO SHALL BE NOTIFIED AT LEAST 48 HOURS PRIOR TO STARTING DEMOLITION. 5.THE PLANS DO NOT AUTHORIZE SITE DISTURBANCE BEYOND THE LIMITS OF THE DEMOLITION LIMIT LINES AS REPRESENTED ON THE PLANS UNLESS OTHERWISE NOTED. 6.ALL ITEMS DAMAGED DURING DEMOLITION AND CONSTRUCTION SHALL BE REPAIRED OR REPLACED TO ORIGINAL CONDITION OR TO THE SATISFACTION OF THE CITY. 7.ALL DEBRIS FROM THE DEMOLITION PROCESS SHALL BE REMOVED FROM THE SITE AND DISPOSED OF AT THE CONTRACTOR'S EXPENSE UNLESS OTHERWISE NOTED. 8.ALL STREETS, ALLEYS, VEHICULAR WAYS, SIDEWALKS, AND HAUL ROUTES SHALL BE KEPT CLEAN AND CLEAR OF DEBRIS, DIRT AND DUST IN A MANNER ACCEPTABLE TO THE CITY. AT A MINIMUM, THESE AREAS SHALL BE CLEANED AT THE END OF EACH WORK DAY. FAILURE TO DO SO WILL RESULT IN A "STOP WORK" NOTICE. SAID NOTICE WILL NOT BE RELEASED UNTIL THE AREA HAS BEEN CLEANED TO THE SATISFACTION OF THE CITY. THE FLUSHING OF DIRT OR DEBRIS INTO STORM DRAIN OR SANITARY SEWER FACILITIES SHALL NOT BE PERMITTED. 9.ALL ABANDONED UTILITIES SHALL BE MARKED IN THE FIELD AND LOCATED ON THE DRAWINGS OF RECORD BY THE CONTRACTOR. 10.IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATIONS OF ALL EXISTING UTILITIES PRIOR TO START OF CONSTRUCTION. EXISTING UTILITIES AND IMPROVEMENTS SHOWN ON THESE PLANS ARE FROM RECORD SOURCES AND SPOT CHECKS. UTILITIES ARE SHOWN FOR DESIGN PURPOSES ONLY. 11.CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFICATION OF ALL UTILITY COMPANIES 48 HOURS PRIOR TO THE BEGINNING OF WORK. BRING ANY CONFLICTS WITH NEW IMPROVEMENTS IMMEDIATELY TO THE ATTENTION OF THE CITY. 12.NOTIFY UNDERGROUND SERVICE ALERT (USA) TOLL FREE AT 811 A MINIMUM OF 48 WORKING HOURS PRIOR TO THE START OF CONSTRUCTION. 13.CONTRACTOR SHALL NOT INTERRUPT ANY SERVICES OR DISRUPT THE OPERATION OF ADJACENT BUSINESSES, RESIDENTIAL AREAS OR ONSITE FACILITIES OUTSIDE THE LIMITS OF DEMOLITION. DEMOLITION NOTES CD101 DE M O L I T I O N P L A N 1.EXISTING TREES IDENTIFIED TO REMAIN SHALL BE PRESERVED, PROTECTED, AND MAINTAINED. 2.DEMOLITION AND GRADING WITHIN THE TREE PROTECTION ZONES OF EXISTING TREES TO REMAIN SHALL BE MINIMIZED AND SHALL ONLY BE DONE UNDER THE DIRECT SUPERVISION OF THE PROJECT ARBORIST. THIS TYPE OF WORK SHALL BE PERFORMED USING HAND TOOLS OR, WHEN NECESSARY, WITH LIGHT (ONE TON OR LESS) RUBBER-TRACKED EQUIPMENT. 3.PRUNING OF EXISTING TREES IDENTIFIED TO REMAIN SHALL BE KEPT TO A MINIMUM AND SHALL COMPLY WITH ANSI A300 STANDARDS. 4.ROOT OR CROWN PRUNING SHALL BE PERFORMED UNDER THE DIRECT SUPERVISION OF THE PROJECT ARBORIST. NOTIFY THE PROJECT ARBORIST AT LEAST 48 HOURS IN ADVANCE OF ANY ROOT OR CROWN PRUNING ACTIVITY TO COORDINATE A SITE VISIT. CONTACT WALTER GAULT, SAN LUIS OBISPO CITY ARBORIST, AT (805) 781-7578 OR WGAULT@SLOCITY.ORG. 5.ANY TREE ROOTS ENCOUNTERED WITHIN THE TREE PROTECTION ZONE OVER 1" IN DIAMETER SHALL BE CLEANLY SEVERED WITH A HAND, CHAIN, OR RECIPROCATING SAW PERPENDICULAR TO THE DIRECTION OF GROWTH TO MINIMIZE THE SURFACE AREA OF THE WOUND. SEVERED ROOTS SHALL BE COVERED WITH SOIL IN THE FINAL GRADING CONDITION AND NO SEVERED ROOTS SHALL BE EXPOSED TO AIR OR SUNLIGHT FOR MORE THAN 48 HOURS. 6.IF ROOT PRUNING OCCURS, SUPPLEMENTAL WATER MAY BE REQUIRED WITHIN THE TREE PROTECTION ZONE. LOCATIONS AND FREQUENCY SHALL BE DIRECTED BY THE PROJECT ARBORIST. TREE PROTECTION NOTES D IV EB D CO WM PP EV 1008 241.56 FD RBR 1007 242.70 FD 5/8 RBR NO CAP 100 9 238 . 8 0 FD 5 / 8 R B R N O C A P WA L N U T S T . SANTA ROSA ST. N34°10'30"W 167.85' N5 5 ° 4 9 ' 3 0 " E 4 0 . 0 0 ' N 3 1 ° 0 2 ' 4 3 " E 5 7 . 0 1 ' N34°10'30"W 8.00' S55°49'30"W 26.64' Δ=54°20'29" R=32.00' L=30.35' DE-01 EX-02 DE-06 EX-04 EX-05 EX-05 EX-02 DE-01 15 ' - 1 0 " 6' 2'-5" DE-08 DE-06 APROX. 75' EX-02 DE-10 DE-08 EX-03 EX-06 EX-08 EX-08 EX-09EX-09 DE-01 DEMOLITION CODE DESCRIPTION CLEAR AND GRUB EXISTING VEGETATION. PROTECT OR RELOCATE IRRIGATION EQUIPMENT FOR IMPROVEMENTS. IRRIGATION SHALL REMAIN IN WORKING ORDER UPON COMPLETION OF PROJECT. PROTECT EXISTING ELECTRICAL CONDUIT, REFER TO ELECTRICAL PLANS PRIOR TO CONSTRUCTION ACTIVITY. REMOVE EXISTING CONCRETE CURB/ GUTTER WHERE OCCURS REMOVE EXISTING ASPHALT REMOVE EXISTING BIKE RACK REMOVE EXISTING GUARDRAIL REMOVE EXISTING PAVER TURF EDGING REMOVE EXISTING TREE STUMP RELOCATE EXISTING IRRIGATION MAINLAINE, VALVES, AND WIRES. ADDITIONAL IRRIGATION EQUIPMENT DAMAGED BY CONSTRUCTION ACTIVITIES SHALL BE REPLACED IN KIND BY THE CONTRACTOR. REMOVE EXISTING WOOD FENCE REMOVE EXISTING PAVERS/CONCRETE FOR NEW FENCE AND GATE POSTS, SEE LC SHEETS. REMOVE EXISTING CURB TRIM AND REMOVE EXISTING VINE OFF OF WALL AND FENCE TO FULL HEIGHT REMOVE EXISTING WHEEL STOP REMOVE EXISTING STORM DRAINS BETWEEN BUILDING AND SIDEWALK. PREP TIE IN AT BUILDING FOR NEW STORMDRAIN CONNECTION. DE-01 DE-02 DE-03 DE-04 DE-05 DE-06 DE-07 DE-08 DE-09 DE-10 DE-11 DE-12 DE-13 DE-14 DEMOLITION EXISTING TO REMAIN CODE DESCRIPTION EXISTING WOOD FENCE, PROTECT IN PLACE EXISTING LIGHT, PROTECT IN PLACE EXISTING TREE, PROTECT IN PLACE EXISTING UTILITIES, PROTECT IN PLACE EXISTING WALL, PROTECT IN PLACE EXISTING LANDSCAPE AND IRRIGATION, PROTECT IN PLACE EXISTING SIGN, PROTECT IN PLACE EXISTING CONCRETE, PAVERS AND WALKWAY, PROTECT IN PLACE EXISTING CURB, PROTECT IN PLACE EX-01 EX-02 EX-03 EX-04 EX-05 EX-06 EX-07 EX-08 EX-09 EXISTING TO REMAIN 0 10 20 30 feet 1"=10' 5 DEMOLITION SCHEDULE MATCHLINE - CD101 CITY SPECIFICATION NO. DATE: PR O J E C T T I T L E : SH E E T T I T L E : SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION AS NOTED SEPTEMBER, 2024 2504-05-PS23 2000577-02 90 % C O N S T R U C T I O N D O C U M E N T S 11 0 6 W A L N U T F E N C I N G I M P R O V E M E N T S N: \ 2 4 0 0 \ 2 5 0 4 - 0 5 - P S 2 3 - S L O - P D - N - B u i l d i n g - F e n c i n g \ L a n d s c a p e - A r c h i t e c t u r e \ T a s k - L 2 - C o n D o c s \ S h e e t - F i l e s \ D E M O - 2 5 0 4 - 0 5 . d w g , C D 1 0 2 , S e p 0 4 , 2 0 2 4 7 : 1 1 p m , L D W i e r s c h e m 9.9.24 CD102 DE M O L I T I O N P L A N 1.SEE CD101 FOR DEMOLITION AND TREE PROTECTION NOTES. NOTES IV IV IV IV D EB EB WV IV IV IV D CO WM PP WM EV EV EV HO S E B I B CITY SPECIFICATION NO. DATE: PR O J E C T T I T L E : SH E E T T I T L E : SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION AS NOTED SEPTEMBER, 2024 2504-05-PS23 2000577-02 90 % C O N S T R U C T I O N D O C U M E N T S 11 0 6 W A L N U T F E N C I N G I M P R O V E M E N T S N: \ 2 4 0 0 \ 2 5 0 4 - 0 5 - P S 2 3 - S L O - P D - N - B u i l d i n g - F e n c i n g \ L a n d s c a p e - A r c h i t e c t u r e \ T a s k - L 2 - C o n D o c s \ S h e e t - F i l e s \ L C - 2 5 0 4 - 0 5 . d w g , L C 0 0 1 , S e p 1 2 , 2 0 2 4 9 : 5 0 a m , L D W i e r s c h e m 9.9.24 LC001 SI T E R E F E R E N C E P L A N 0 20 40 60 feet 1"=20' 10 SEE SHEET - LC101 SEE SHEET - LC102 ENLARGEMENT, SEE LC401 201.83' 13 9 . 7 5 ' 40 . 0 0 ' 13 . 0 7 ' PROJECT INFORMATION SITE INFORMATION STREET ADDRESS: 1106 WALNUT ST., SAN LUIS OBISPO, CA APN: 001-207-039 ZONING: O (OFFICE) LOT SIZE: .87 AC LAND USE: EXISTING USE:OFFICE PROPOSED USE: OFFICE 15.04' 14.85' 30 . 5 2 ' 30 . 2 8 ' 30.02' 97.32' IV IV IV EB WV IV IV IV WM EV EV HO S E B I B 130 6 5 242 . 8 1 bld c o r 115 246 . 5 4 FD 5 / 8 R B R W C A P HW Y 1 0 1 EXISTING WOOD FENCE TO REMAIN FR-02 FR-02 FR-02 4' H FENCE PANEL, WALL MOUNT FR-02 2' H FENCE PANEL, FENCE MOUNT (BEGIN) (END) FR-02 2' H FENCE PANEL, FENCE WALL MOUNT 4' H FENCE PANEL, WALL MOUNT 3' H FENCE PANEL, WALL MOUNT FR-02 4' H FENCE PANEL, FENCE WALL MOUNT FR-06 FR-06 4" MAX. GAP BETWEEN DIFFERENT FENCE TYPES, TYP. 4" MAX. GAP BETWEEN DIFFERENT FENCE TYPES, TYP. CLEAN AND FILL ALL CRACKS IN WALL WITH EPOXY. ASSUME 20' OF CRACKS. FILL IN HOLES WHERE GUARDRAIL POSTS WERE REMOVED. ASSUME 16 POSTS. 236.72 TW 236.72 EG230.82 EG 237.31 TW 237.31 EG 231.22 EG 230.64 EG 232.69 TW 235.64 TW 236.0 EG 232.37 TW 229.0 EG 224.65 EG 232.41 TF 226.71 EG 225.44 EG 231.54 TF 225.69 EG 232.83 TF 232.38 TF 226.73 EG 226.48 EG 227.20 EG233.28 TF 227.26 EG 227.16 EG 227.80 EG 228.28 EG 228.89 EG 229.07 EG 229.14 EG 233.86 TF 233.40 TF 227.26 EG 233.84 TF 231.12 TW 223.78 EG 233.09 TW 231.12 TW 223.78 EG 234.49 TW 233.12 TW 224.17 EG 234.52 TW 224.16 EG 234.91 TW 234.14 TW 224.36 EG 232.04 EG 237.22 TW 238.16 TW 232.51 EG 233.23 EG 238.16 TW 239.24 TW 232.51 EG 236.29 EG 239.21 TW 240.52 TW 232.55 EG 234.67 EG 236.86 EG 238.71 EG 240.53 TW 240.87 TW 240.0 EG 240.87 TW 241.86 TW SYMBOL DESCRIPTION DETAIL BIKE RACK PEAKS RACK 5-BIKE SINGLE-SIDED RACK HOT DIPPED GALVANIZED - GRAY SURFACE MOUNT SF-01 SITE FURNISHINGS (SF) SEE SPECS SEE SPECS CODE DESCRIPTION DETAIL METAL PICKET FENCE - 8FT HEIGHT 1/LC501 METAL PICKET FENCE ON WALL HEIGHT VARIES, PER PLAN 1/LC501 CMU PILASTER 8/LC502 VEHICULAR ROLLING GATE 26FT WIDE, METAL PICKET 2/LC501 METAL PICKET GATE 1/LC503 BARBED WIRE ON EXISTING WALL/FENCE 9/LC502 METAL PICKET FENCE ON CMU WALL 2/LC503 FR-01 FR-02 FR-03 FR-04 FR-05 FR-06 FR-07 FENCES, RAILINGS, AND GATES (FR) CODE DESCRIPTION DETAIL REMOVABLE BOLLARD PER CITY STD DETAIL #7335 ROLLING GATE PEDESTAL FURNISHED AND INSTALLED BY OWNER 6/LC502 AUTOMATIC SENSOR LOOP SAW CUT INSTALLATION AS REQUIRED LIFT MASTER GATE OPERATOR FIXED POST WITH GATE SENSOR 5/LC502 WHEEL STOP PER CITY STD DETAIL #2260 ROLLING GATE V-TRACK 4/LC502 MI-01 MI-02 MI-03 MI-04 MI-05 MI-06 MI-07 MISCELLANEOUS (MI) SYMBOL DESCRIPTION DETAIL CONCRETE PAVING ASPHALT PAVING PER CITY STND DETAIL #7110 ROCK MULCH IN PLANTING AREA 2/LP501 PAVING AND SURFACING (PA) CODE DESCRIPTION DETAIL NATURAL TURF TO BE REPLACED IN KIND WITH SOD, POST CONSTRUCTION ACTIVITIES. IRRIGATION EQUIPMENT TO BE REPLACED IN KIND, POST CONSTRUCTION ACTIVITIES. PL-01 PL-02 PLANTING AND IRRIGATION (PL) CODE DESCRIPTION DETAIL CURB - 6" PER CITY STD DETAIL #4020 CURB AND GUTTER PER CITY STD DETAIL #4030 MOW CURB 2/LC502 CURB AT ROLLING GATE 3/LC503 CMU WALL W/ FENCE 2/LC503 WC-01 WC-02 WC-03 WC-04 WC-05 WALLS AND CURBS (WC) CODE DESCRIPTION DETAIL NEW ROOF DRAIN, SLOPE AND INSTALL 2 - 3" CIP TO OUTLET IN FACE OF CURB PER CITY STND #3415. UT-101 UNDERGROUND UTILITIES (UT) CITY SPECIFICATION NO. DATE: PR O J E C T T I T L E : SH E E T T I T L E : SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION AS NOTED SEPTEMBER, 2024 2504-05-PS23 2000577-02 90 % C O N S T R U C T I O N D O C U M E N T S 11 0 6 W A L N U T F E N C I N G I M P R O V E M E N T S N: \ 2 4 0 0 \ 2 5 0 4 - 0 5 - P S 2 3 - S L O - P D - N - B u i l d i n g - F e n c i n g \ L a n d s c a p e - A r c h i t e c t u r e \ T a s k - L 2 - C o n D o c s \ S h e e t - F i l e s \ L C - 2 5 0 4 - 0 5 . d w g , L C 1 0 1 , S e p 1 2 , 2 0 2 4 1 0 : 1 9 a m , L D W i e r s c h e m 9.9.24 0 10 20 30 feet 1"=10' 5 CONSTRUCTION SCHEDULE MATCHLINE - LC102 ENLARGEMENT, SEE LC401 LC101 CO N S T R U C T I O N P L A N IVD EB 130 6 4 242 . 7 9 bld c o r SANTA ROSA ST FR-03 TYP. FR-01 FR-01 FR-05 SF-01 FR-07 FR-01 23'-0" O.C., TYP. 2'-014"4'-0" FR-02 3' H FENCE PANEL, WALL MOUNT PL-01 IRR PL-02 238.00 FG 240.00 TW 237.00 FG 239.00 TW 237.50 FG 239.50 TW 239.00 FG 241.00 TW 239.50 FG 241.50 TW 240.00 FG 242.00 TW235.50 FG 237.50 TW 236.00 FG 238.00 TW WC-03 TYP. WC-05 WC-03 PL-02 IV 4" MAX. GAP BETWEEN DIFFERENT FENCE TYPES, TYP. 230.95 EG 231.50 EG 236.26 TW 226.31 EG 236.30 TW 234.95 TW 226.0 EG REPLACE AND INSTALL CONCRETE/ PAVERS TO MATCH EXISTING 0.8% 1.0% 1.4% 4. 7 % SYMBOL DESCRIPTION DETAIL BIKE RACK PEAKS RACK 5-BIKE SINGLE-SIDED RACK HOT DIPPED GALVANIZED - GRAY SURFACE MOUNT SF-01 SITE FURNISHINGS (SF) SEE SPECS SEE SPECS CODE DESCRIPTION DETAIL METAL PICKET FENCE - 8FT HEIGHT 1/LC501 METAL PICKET FENCE ON WALL HEIGHT VARIES, PER PLAN 1/LC501 CMU PILASTER 8/LC502 VEHICULAR ROLLING GATE 26FT WIDE, METAL PICKET 2/LC501 METAL PICKET GATE 1/LC503 BARBED WIRE ON EXISTING WALL/FENCE 9/LC502 METAL PICKET FENCE ON CMU WALL 2/LC503 FR-01 FR-02 FR-03 FR-04 FR-05 FR-06 FR-07 FENCES, RAILINGS, AND GATES (FR) CODE DESCRIPTION DETAIL NATURAL TURF TO BE REPLACED IN KIND WITH SOD, POST CONSTRUCTION ACTIVITIES. IRRIGATION EQUIPMENT TO BE REPLACED IN KIND, POST CONSTRUCTION ACTIVITIES. PL-01 PL-02 PLANTING AND IRRIGATION (PL) CODE DESCRIPTION DETAIL CURB - 6" PER CITY STD DETAIL #4020 CURB AND GUTTER PER CITY STD DETAIL #4030 MOW CURB 2/LC502 CURB AT ROLLING GATE 3/LC503 CMU WALL W/ FENCE 2/LC503 WC-01 WC-02 WC-03 WC-04 WC-05 WALLS AND CURBS (WC) CODE DESCRIPTION DETAIL NEW ROOF DRAIN, SLOPE AND INSTALL 2 - 3" CIP TO OUTLET IN FACE OF CURB PER CITY STND #3415. UT-101 UNDERGROUND UTILITIES (UT) CODE DESCRIPTION DETAIL REMOVABLE BOLLARD PER CITY STD DETAIL #7335 ROLLING GATE PEDESTAL FURNISHED AND INSTALLED BY OWNER 6/LC502 AUTOMATIC SENSOR LOOP SAW CUT INSTALLATION AS REQUIRED LIFT MASTER GATE OPERATOR FIXED POST WITH GATE SENSOR 5/LC502 WHEEL STOP PER CITY STD DETAIL #2260 ROLLING GATE V-TRACK 4/LC502 MI-01 MI-02 MI-03 MI-04 MI-05 MI-06 MI-07 MISCELLANEOUS (MI) SYMBOL DESCRIPTION DETAIL CONCRETE PAVING ASPHALT PAVING PER CITY STND DETAIL #7110 ROCK MULCH IN PLANTING AREA 2/LP501 PAVING AND SURFACING (PA) CITY SPECIFICATION NO. DATE: PR O J E C T T I T L E : SH E E T T I T L E : SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION AS NOTED SEPTEMBER, 2024 2504-05-PS23 2000577-02 90 % C O N S T R U C T I O N D O C U M E N T S 11 0 6 W A L N U T F E N C I N G I M P R O V E M E N T S N: \ 2 4 0 0 \ 2 5 0 4 - 0 5 - P S 2 3 - S L O - P D - N - B u i l d i n g - F e n c i n g \ L a n d s c a p e - A r c h i t e c t u r e \ T a s k - L 2 - C o n D o c s \ S h e e t - F i l e s \ L C - 2 5 0 4 - 0 5 . d w g , L C 1 0 2 , S e p 1 2 , 2 0 2 4 1 0 : 2 0 a m , L D W i e r s c h e m 9.9.24 0 10 20 30 feet 1"=10' 5 CONSTRUCTION SCHEDULE MATCHLINE - LC101 LC102 CO N S T R U C T I O N P L A N SD SD SDSD SD SD FR-04 FR-01 FR-01 WC-04 MI-03 MI-02 MI-04 WC-04 MI-03 25 ' - 0 " MI-01 FR-03 FR-03 13'-0" NEW PERIMETER PICKET FENCING ALONG GATE FRONTAGE TO MATCH TOTAL HEIGHT OF ROLLING GATE AT 7'-0" NEW PERIMETER PICKET FENCING ALONG THIS SIDE TO MATCH TOTAL HEIGHT OF ROLLING GATE AT 7'-0" 1'-0", TYP. 241.60 TC 28 ' - 0 " WC-03 WC-01 WC-01 242.50 TC 240.50 TC 240.00 FG 240.28 FS 242.50 TC 240.50 FS 240.50 TC MI-05 MI-05 MI-06 3 LC503 POST B 242.0 FG 242.0 FG 3 LC503 VERIFY BUILDING FOOTING PRIOR TO IMPROVEMENTS. CURB AND FOOTINGS SHALL REMAIN 3" MIN. FROM EDGE OF FOOTING. WC-01 UT-101 UT-101 WC-01 INSTALL CURB FLUSH AND AT GRADE WITH WALKWAY INSTALL CURB LEVEL WITH EXISTING CURB 240.50 TC MI-05ROLLER GUIDE POST SENSOR POST 234.67 EG 236.86 EG 240.0 EG 240.87 TW 241.86 TW MI-07 CONCRETE PAD FOR EV CHARGER, REFER TO SHEET E101. INSTALL PAVERS TO MATCH EXISTING WC-02 SYMBOL DESCRIPTION DETAIL BIKE RACK PEAKS RACK 5-BIKE SINGLE-SIDED RACK HOT DIPPED GALVANIZED - GRAY SURFACE MOUNT SF-01 SITE FURNISHINGS (SF) SEE SPECS SEE SPECS CODE DESCRIPTION DETAIL METAL PICKET FENCE - 8FT HEIGHT 1/LC501 METAL PICKET FENCE ON WALL HEIGHT VARIES, PER PLAN 1/LC501 CMU PILASTER 8/LC502 VEHICULAR ROLLING GATE 26FT WIDE, METAL PICKET 2/LC501 METAL PICKET GATE 1/LC503 BARBED WIRE ON EXISTING WALL/FENCE 9/LC502 METAL PICKET FENCE ON CMU WALL 2/LC503 FR-01 FR-02 FR-03 FR-04 FR-05 FR-06 FR-07 FENCES, RAILINGS, AND GATES (FR) CODE DESCRIPTION DETAIL NATURAL TURF TO BE REPLACED IN KIND WITH SOD, POST CONSTRUCTION ACTIVITIES. IRRIGATION EQUIPMENT TO BE REPLACED IN KIND, POST CONSTRUCTION ACTIVITIES. PL-01 PL-02 PLANTING AND IRRIGATION (PL) CODE DESCRIPTION DETAIL CURB - 6" PER CITY STD DETAIL #4020 CURB AND GUTTER PER CITY STD DETAIL #4030 MOW CURB 2/LC502 CURB AT ROLLING GATE 3/LC503 CMU WALL W/ FENCE 2/LC503 WC-01 WC-02 WC-03 WC-04 WC-05 WALLS AND CURBS (WC) CODE DESCRIPTION DETAIL NEW ROOF DRAIN, SLOPE AND INSTALL 2 - 3" CIP TO OUTLET IN FACE OF CURB PER CITY STND #3415. UT-101 UNDERGROUND UTILITIES (UT) CODE DESCRIPTION DETAIL REMOVABLE BOLLARD PER CITY STD DETAIL #7335 ROLLING GATE PEDESTAL FURNISHED AND INSTALLED BY OWNER 6/LC502 AUTOMATIC SENSOR LOOP SAW CUT INSTALLATION AS REQUIRED LIFT MASTER GATE OPERATOR FIXED POST WITH GATE SENSOR 5/LC502 WHEEL STOP PER CITY STD DETAIL #2260 ROLLING GATE V-TRACK 4/LC502 MI-01 MI-02 MI-03 MI-04 MI-05 MI-06 MI-07 MISCELLANEOUS (MI) SYMBOL DESCRIPTION DETAIL CONCRETE PAVING ASPHALT PAVING PER CITY STND DETAIL #7110 ROCK MULCH IN PLANTING AREA 2/LP501 PAVING AND SURFACING (PA) CITY SPECIFICATION NO. DATE: PR O J E C T T I T L E : SH E E T T I T L E : SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION AS NOTED SEPTEMBER, 2024 2504-05-PS23 2000577-02 90 % C O N S T R U C T I O N D O C U M E N T S 11 0 6 W A L N U T F E N C I N G I M P R O V E M E N T S N: \ 2 4 0 0 \ 2 5 0 4 - 0 5 - P S 2 3 - S L O - P D - N - B u i l d i n g - F e n c i n g \ L a n d s c a p e - A r c h i t e c t u r e \ T a s k - L 2 - C o n D o c s \ S h e e t - F i l e s \ L C - 2 5 0 4 - 0 5 . d w g , L C 4 0 1 , S e p 1 2 , 2 0 2 4 1 0 : 2 3 a m , L D W i e r s c h e m 9.9.24 0 4 8 12 feet 1"=4' 2 CONSTRUCTION SCHEDULE LC401 RO L L I N G G A T E E N L A R G E M E N T DETAIL A - GATE RECIEVER, ISO VIEW (ADD IN PILASTER CONNECTION?) DETAIL B - ROLLER HARDWARE, ISO VIEW DETAIL C - UPPER TRACK, SIDE VIEW TOP VIEW ELEVATION SECTION PLAN LATCH TO PILASTER CONNECTION LATCH V-TRACK ROLLER GUIDE POST FENCE LINE FENCE LINE DETAIL A DETAIL C 1'-03 4" DETAIL D - CROSS BRACE, ISO VIEW 3/8" THICK PLATE 3/8" BOLT 2"x2" TUBE OUTSIDE OF PROPERTY INSIDE OF PROPERTY 1'-1" 2'-8" OUTSIDE OF PROPERTY INSIDE OF PROPERTY PILASTER (BEYOND) 7' - 0 " 4' - 3 " DETAIL B: ROLLER HARDWARE: V-GROOVE ROLLER, PER MANUFACTURER GATE OPENING 25'-0", PER PLAN PILASTER, PER PLANS MOUNT ROLLER TO PILASTER WITH 'SET-3G' W/ 3 8" DIA F1554 GR. 36 W 3" EMBED, MIN. SEE DETAIL 23/S-321. PILASTER PER PLAN 6' - 0 " MOUNT L BRACKET TO PILASTER ORNAMENTAL PICKETS, 1" SQ TOP RAILS, UPRIGHTS, & DIAGONAL BRACES, 2" SQ BOTTOM RAIL. 2" X 4" (NOTCHED AND PLATED FOR V-GROOVE ROLLER) VEHICULAR ROLLING GATE 1/2" = 1'-0" GATE WIDTH 28'-0"-0" PILASTERS BEYOND CURB ROLLER GUIDE POST CURB CURB 3" C L R . 1' 1' 6' - 0 " MOUNT ROLLER TO PILASTER WITH 'SET-3G' W/ 3 8" DIA F1554 GR. 36 W 3" EMBED, MIN. SEE DETAIL 23/S-321. RRM-2500-2504.05-19 2 CITY SPECIFICATION NO. DATE: PR O J E C T T I T L E : SH E E T T I T L E : SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION AS NOTED SEPTEMBER, 2024 2504-05-PS23 2000577-02 90 % C O N S T R U C T I O N D O C U M E N T S 11 0 6 W A L N U T F E N C I N G I M P R O V E M E N T S N: \ 2 4 0 0 \ 2 5 0 4 - 0 5 - P S 2 3 - S L O - P D - N - B u i l d i n g - F e n c i n g \ L a n d s c a p e - A r c h i t e c t u r e \ T a s k - L 2 - C o n D o c s \ S h e e t - F i l e s \ L C - 2 5 0 4 - 0 5 . d w g , L C 5 0 1 , S e p 1 2 , 2 0 2 4 1 0 : 2 4 a m , L D W i e r s c h e m 9.9.24 8' - 0 " 2" NO M HE I G H T P E R P L A N , 2 ' M I N . 2" 10" ANCHOR POSTS TO EXTERIOR SIDE OF EXISTING WALL (ANCHORING PER STRUCTURAL) FENCE ON MOW CURB AN C H O R I N G P O S T S , LE N G T H P E R ST R U C T U R A L 19 - 3 / 8 " METAL PICKET FENCE ON EXISTING WALL OR FENCE 5' - 6 " 2 LC502 MOW CURB EXISTING WALL 8'-0" O.C.NOM 33 4" 1" x 14ga. Picket BRACKET OPTIONS HE I G H T O F E X I S T I N G W A L L PE R P L A N S TOP OF EXISTING WALL OR FENCE PER PLANS SECTION AT EXISTING WALL 8" 8" 8'-0" O.C. NOM MOUNT PER STRUCTURAL 13 4" FORERUNNER TM RAIL POST SIZE VARIES WITH HEIGHT. SEE AEGIS II TM POST-SIZING CHART 1" X 14GA PICKET POST SIZE VARIES WITH HEIGHT. SEE AEGIS II TM POST-SIZING CHART 13 4" FORERUNNER TM RAIL VA R I E S W I T H H E I G H T Uniform Zinc Coating (Hot Dip Galvanized) Base Material Uniform Zinc Coating (Hot Dip Galvanized) Zinc Phosphate & Conversion Coating Epoxy base coat 13 4" [44.5mm] 13 4" [44.5mm] OPTIONAL 45° SWIVEL BRACKET PANEL BRACKET Specially designed two -point connection ensures fixity of rail ends for increased strength. INTERNAL RETAINING ROD Variable pitch connection system for ease of installation, high angle bias ability and elimination of unsightly external fasteners. FORERUNNER RAIL Double-walled "U"-Channel Specially formed high strength architectural shape. TM FORERUNNER RAILTM "No-Mar" Polyester Powder finish coat Values shown are nominal and not to be used for installation purposes. See product specification for installation requirements. METAL PICKET FENCE 1/2" = 1'-0" PLAN VIEW CROSSING WALL NOTES: 1.POST SIZE DEPENDS ON FENCE HEIGHT AND WIND LOADS. SEE AEGIS II TM POST SIZING CHART. 2.ADDITIONAL HEIGHTS AVAILABLE ON REQUEST. 3.THIRD RAIL OPTIONAL. 4.PANELS ALSO AVAILABLE FOR 6' ON CENTER POST SPACING EXISTING WALL METAL PICKET FENCE SECTION CROSSING WALL EXISTING WALL MOUNT PER STRUCTUAL SE C T I O N AB O V E METAL PICKET FENCE FG/FS VARIES 3" MIN. CLR, TYP. WESTERN (W) BUILDING EDGE, WHERE OCCURS ON PLAN 3" MIN. CLR FROM BUILDING EDGE, TYP. 1'-1" NORTHERN (N) BUILDING EDGE, WHERE OCCURS ON PLAN. 1'-0" 3" M I N . C L R , T Y P . HE I G H T P E R PL A N 1 LC501 CO N S T R U C T I O N D E T A I L S CITY SPECIFICATION NO. DATE: PR O J E C T T I T L E : SH E E T T I T L E : SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION AS NOTED SEPTEMBER, 2024 2504-05-PS23 2000577-02 90 % C O N S T R U C T I O N D O C U M E N T S 11 0 6 W A L N U T F E N C I N G I M P R O V E M E N T S N: \ 2 4 0 0 \ 2 5 0 4 - 0 5 - P S 2 3 - S L O - P D - N - B u i l d i n g - F e n c i n g \ L a n d s c a p e - A r c h i t e c t u r e \ T a s k - L 2 - C o n D o c s \ S h e e t - F i l e s \ L C - 2 5 0 4 - 0 5 . d w g , L C 5 0 2 , S e p 1 2 , 2 0 2 4 1 0 : 2 4 a m , L D W i e r s c h e m 9.9.24 6" P.C. CONCRETE, MEDIUM BROOM FINISH, PERP. TO DIRECTION OF CURB 12" 4" CLASS 2 AGGREGATE BASE @ 90% COMPACTION NOTES: A.PROVIDE CONTRACTION JOINT EVERY 10' MAX. B.PROVIDE EXPANSION JOINT EVERY 20' MAX. C.SPACE JOINTS EVENLY BETWEEN BEGINNING AND END POINTS. 1 2" RADIUS EDGES, TYP. MOW CURB 1 1/2" = 1'-0" 1" A T T U R F A R E A S 2" A T P L A N T E R A R E A S FL U S H A T P A V I N G UN L E S S N O T E D 1 LC501 METAL PICKET FENCE FG 2 RRM-2500-2504.05-09 REMOVABLE BOLLARD 3/4" = 1'-0" NOTES A.PROVIDE KNOX-BOX PADLOCKS PER CITY FIRE DEPT. B.PROVIDE 5'-0" CLEAR SPACING BETWEEN BOLLARDS (5'-3" O.C.) FOR BICYCLING FACILITIES. FOR ALL OTHER INSTALLATIONS PROVIDE 4'-0" CLEAR SPACING BETWEEN BOLLARDS (4'-3" O.C.). C.RELIANCE FOUNDRY R-8902 OR APPROVED EQUAL. D.ENGINEERS AND ARCHITECTS ARE ENCOURAGED TO SUBMIT ALTERNATE DESIGNS THAT ARE CONSISTENT WITH THESE DESIGN FEATURES, AND THE PROJECTS WHERE THE BOLLARDS ARE TO BE USED. E.YELLOW REFLECTIVE TAPE SHALL BE PLACED ON EACH FACE OF BOLLARD AS DIRECTED BY ENGINEER. F.FOR BICYCLING FACILITIES, PROVIDE PATHWAY STRIPING THAT CONFORMS TO CA MUTCD. 1 RRM-2500-2504.05-97 ROLLING GATE V-TRACK 1" = 1'-0" GUIDE POSTS WHERE OCCURS 6" V-GROOVE WHEEL- SOLID STEEL W/ SEALED BEARINGS 1'-0" 1' - 0 " 3" X 1/4" PLATE, WITH 1.25" X 1.25" X 3/8" ANGLE IRON TRACK. CONTINUOUS FILLET WELD. HOT DIP GALVANIZE AFTER WELDING. CONTINUOUS CONCRETE BOND BEAM GALV. #4 REBAR HOOK 24" O.C. WELDED TO PLATE PRIOR TO GALVANIZATION 2" x 8" x 3/16" STEEL TUBE BOTTOM RAIL DECORATIVE STEEL GATE 3MIN. 3" M I N 3 LC503 PAVING PER PLANS 4 RRM-2500-2504.05-98 GATE SENSOR IN SURFACE MOUNTED WATERPROOF JUNCTION BOX REFLECTOR FOR UPPER SENSOR 5" SQ. STEEL BOLLARD-POWDER COATED ADJACENT FINISH SURFACE- REFER TO SITE PLANS 2' - 2 " 2' - 0 " M I N 1'-4" 4' - 0 " M I N 3/4" DIA. CONDUIT 3/4" DIA. CONDUIT GATE MOTION SENSOR TO MATCH SENSORS BELOW-TO ANGLE DOWN TO LOWER BOLLARD PROVIDE 1/2" CONDUIT W/ BOX AT TOP AND BOTTOM. EXTEND ANTENNA FROM GATE OPERATOR TO TOP OF POLE (LOCATE ADJACENT TO GATE OPERATOR ONLY) 1'-4" FIXED POST W/ GATE SENSOR 1/2" = 1'-0" CONCRETE FOOTING 16" SQ-FLUSH W/ ADJACENT FINISH SURFACE ROLLER GUIDE POST AND SENSOR POST (INSTALL WIRELESS SENSORS ONLY) POST B ROLLER GUIDE POST PER DETAIL 2/LC501 NOTE: CONTRACTOR IS RESPONSIBLE TO INSTALL ALL SENSING DEVICES AND SAFETY MECHANISMS COMPLYING WITH UL 325. SEE SPECIFICATION 32 3119. 5 RRM-2500-2504.05-99 ELEVATION 3. FOR MORE INFORMATION, SEE PEDESTALPRO.COM 4. PROVIDE KNOX KEY GATE ACCESS FOR EMERGENCY FIRE RESPONSE. 1' - 6 " 1' - 6 " 0'-8" MIN. ALIGN BOLLARDS AS SHOWN CONCRETE CURB 1'-9" TYP 1 LC502 REMOVABLE BOLLARD TYP. PLAN SECTION A - PEDESTAL FOUNDATION 1'-0" 1' - 0 " A - ROLLING GATE PEDESTAL 3/4" = 1'-0" B ANCHORAGE SHALL BE PROVIDED BY CONTRACTOR PEDESTAL BODY, FURNISHED AND INSTALLED BY OWNER SLOPE TOP AWAY & CHAMFER EDGE 3/4" 3" M I N . CONCRETE FOUNDATION, SHALL BE PROVIDED BY CONTRACTOR ELECTRICAL CONDUIT, SEE ELECTRICAL PLANS PEDESTAL ANCHORING PLATE 6 RRM-2500-2504.05-101 CMU PILASTER 1/2" = 1'-0" ATTACH FENCING W/ MASONRY ANCHORS PER MANUFACTURER RECOMMENDATIONS 1 LC501 METAL PICKET FENCE 6' H A T R O L L I N G G A T E / 8 ' H T Y P . 1'-4" 1'-8" CMU PILASTER, LOCATE PER PLAN, SEE DETAIL 42/S-321 3 3 / 4 " M I N . PRE-CAST CONCRETE WALL CAP, CDI PC 10 SERIES OR EQUIVALENT. CAP TO OVERHANG BLOCK 2" MAX. ALL SIDES. 8 RRM-2500-2504.05-103 LC502 CO N S T R U C T I O N D E T A I L S BARBED WIRE ON EXISTING WALL/FENCE 1" = 1'-0" 2-1 2" DIAMETER STAINLESS STEEL HILTI KWIK BOLT TZ2 ANCHORS TO EXISTING WALL EXISTING WALL CONDITION AT FENCE CONDITION AT WALL 7' M I N . LAG SCREWS EXISTING FENCE EXISTING WALL 12" CONCERTINA WIRE FG FG SIDE MOUNT BARB ARM (#013812), BY HEARNE STEEL CO. 6'-0" O.C. SPACING, KEEP LEVEL 24" TYP. 12" CONCERTINA WIRE SIDE MOUNT BARB ARM (#013812), BY HEARNE STEEL CO. 6'-0" O.C. SPACING, KEEP LEVEL 6" MI N . 24", TYP. HE I G H T V A R I E S EX. WALL CAP 9 RRM-2500-2504.05-111 CITY SPECIFICATION NO. DATE: PR O J E C T T I T L E : SH E E T T I T L E : SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION AS NOTED SEPTEMBER, 2024 2504-05-PS23 2000577-02 90 % C O N S T R U C T I O N D O C U M E N T S 11 0 6 W A L N U T F E N C I N G I M P R O V E M E N T S N: \ 2 4 0 0 \ 2 5 0 4 - 0 5 - P S 2 3 - S L O - P D - N - B u i l d i n g - F e n c i n g \ L a n d s c a p e - A r c h i t e c t u r e \ T a s k - L 2 - C o n D o c s \ S h e e t - F i l e s \ L C - 2 5 0 4 - 0 5 . d w g , L C 5 0 3 , S e p 1 2 , 2 0 2 4 1 0 : 2 5 a m , L D W i e r s c h e m 9.9.24 LC503 CO N S T R U C T I O N D E T A I L S SI T E WA L L PI L S T E R 42 / S - 3 2 1 6' - 0 " ± 2 4 " A B O V E F G FG FG 8 LC502 CMU PILASTER 1 LC501 METAL PICKET FENCE ± 7' VERIFY IN FIELD ± 7' VERIFY IN FIELD ± 7' VERIFY IN FIELD SITE WALL PILASTER 42/S-321 METAL PICKET FENCE ON CMU WALL 1/2" = 1'-0" FG 2'-0" 1' - 4 " CMU SITE WALL PER DETAIL 32/S-321 PRE-CAST CONCRETE WALL CAP, CDI M600 SERIES OF QUIVALENT. CAP TO OVERHANG BLOCK 2" MAX. ALL SIDES MOW CURB AT TURF CMU SITE WALL DETAIL 32/S-321 ELEVATION SECTION A 1 LC501 A - 2' - 0 " M A X 6" 1" A T T U R F A R E A S CLASS 2 AGGREGATE BASE @ 90% COMPACTION STEPPED FOOTING DETAIL 41/S-301 4" MI N . 2 RRM-2500-2504.05-106 CURB AT ROLLING GATE 1" = 1'-0" 1 LC501 FS 2 LC501 2 LP5016" M I N . / 2 ' M A X . 1' - 0 " CLASS 2R AGGREGATE BASE, COMPACTED TO 95%, 6" MINIMUM DEPTH UNLESS OTHERWISE NOTED 3"6"6" 3" C L R . 3-#4 CONT. HORIZ. BARS LIFT MASTER GATE OPERATOR, SEE SPECS 1' - 0 " #4 @16" O.C. BOTH WAYS PER MANUFACTURER CURB DEEPENS AS IT CUTS INTO SLOPE, SEE DETAIL 4/LC503 FS 2 LC501 2 LP501 BUILDING EDGE / VERIFY FOOTING LOCATION PRIOR TO DIGGING, ADJUST FENCE AND CURB TO PROTECT BUILDING FOOTING IN PLACE. AP P R O X . 2 ' S E E L C 4 0 1 1' - 0 " 2" M I N . / 6 " M A X . 3" MIN. TO BLDG. FOOTING VERIFY IN FIELD CLASS 2R AGGREGATE BASE, COMPACTED TO 95%, 6" MINIMUM DEPTH UNLESS OTHERWISE NOTED 1'-2" BUILDING FOOTING VERIFY WITH AS-BUILT PLANS 3"3" 3" CIP6"6" #4 @16" O.C. BOTH WAYS 3" C L R . 3- #4 CONT. HORIZ. BARS EQ.EQ. CONDITION WHERE RETAINING CONDITION AT DRIVEWAY 3 RRM-2500-2504.05-114 METAL PICKET GATE 1/2" = 1'-0" 8' - 0 " 5' - 6 " 2" MCNICHOLS #14145120 GALV PERF SCREEN. SECURE TO INTERIOR SIDE OF GATE WITH 3/16" TAPPING SCREW AT MAX 8" O.C. END BRACKET GATE CLOSER 2'-0 1/4" HANDLE SHALL BE OPERABLE WITH ONE HAND AND SHALL NOT REQUIRE TIGHT GRASPING, PINCHING, OR TWISTING OF THE WRIST. THE FORCE REQUIRED TO ACTIVATE OPERABLE PARTS SHALL BE 5 POUNDS MAXIMUM. ADJACENT SURFACE, PER PLAN GATE LEAF POST - MIN. 2-1/2" x 12ga HINGES, LOCINOX MAMMOTH OR APPROVED EQUAL HINGES, LOCINOX MAMMOTH OR APPROVED EQUAL 3' - 4 " 3 3 4", TYP. 4'-0" 3' - 4 " 19 3 8" 8' - 0 " 1 LC501 METAL PICKET FENCE APPROACH SIDE (EXTERIOR TO PROPERTY) PUSH SIDE (INTERIOR TO PROPERTY) NOTES: 1.CONTRACTOR SHALL PRODUCE SHOP DRAWINGS FOR ALL WELDED CONNECTIONS. 2.ALL FENCING COMPONENTS SHALL BE POWDER COATED BLACK. 3.ALL PICKETS SHALL BE POINTED OUTWARD FROM THE PROPERTY. 1" X 14GA PICKET 33 4" 19 3 8" SCHLAGE HARDWARE W/ INTERCHANGEABLE CORE. 4' - 3 " 1'-0" 1'-0" 1'-0"1'-0" 4' - 3 " 5' - 6 " 1'-0" 3" M I N , C L R . T Y P . 3" M I N , C L R . T Y P . SCHLAGE DOUBLE CYLINDER DEADBOLT, BY OWNER 2'-0 1/4"4'-0" END BRACKET MCNICHOLS #14145120 GALV PERF SCREEN. SECURE TO INTERIOR SIDE OF GATE WITH 3/16" TAPPING SCREW AT MAX 8" O.C. PANIC BAR HARDWARE VON DUPRIN, OR APPROVED EQUAL 3 16" X 10" HIGH KICK PLATE WELDED TO BOTH SIDES OF GATE ADJACENT SURFACE, PER PLAN FENCE POST - MIN. 2-1/2" x 14ga GATE LEAF POST - MIN. 2-1/2" x 12ga RRM-2500-2504.05-1101 IV IV IV D IV EB EB WV IV IV IV D CO WM PP WM EV EV EV HO S E B I B WA L N U T S T . SANTA ROSA ST. WA L N U T S T . ELEC CITY SPECIFICATION NO. DATE: PR O J E C T T I T L E : SH E E T T I T L E : SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION AS NOTED SEPTEMBER, 2024 2504-05-PS23 2000577-02 90 % C O N S T R U C T I O N D O C U M E N T S 11 0 6 W A L N U T F E N C I N G I M P R O V E M E N T S N: \ 2 4 0 0 \ 2 5 0 4 - 0 5 - P S 2 3 - S L O - P D - N - B u i l d i n g - F e n c i n g \ L a n d s c a p e - A r c h i t e c t u r e \ T a s k - L 2 - C o n D o c s \ S h e e t - F i l e s \ L P - 2 5 0 4 - 0 5 . d w g , L P 0 0 1 , S e p 0 4 , 2 0 2 4 7 : 2 2 p m , L D W i e r s c h e m 9.9.24 LP001 SI T E R E F E R E N C E P L A N 0 20 40 60 feet 1"=20' 10 SEE SHEET - LP101 SEE SHEET - LP102 1.CONTRACTOR SHALL SUBMIT LABELED PHOTOS OF ALL PLANT MATERIAL, TREES AND GROUNDCOVERS. PHOTOS SHALL BE OF THE SPECIFIED CONTAINER SIZE. PHOTOS SHALL BE SUBMITTED AS A COMPLETE SUBMITTAL PACKAGE FOR REVIEW AND APPROVAL. INCLUDE PHOTOS OF ANY SUBSTITUTES, CLEARLY LABELED. 2.CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO FURNISH AND INSTALL PLANT MATERIAL AS SHOWN ON THE DRAWINGS AND AS DESCRIBED IN THE SPECIFICATIONS. 3.PLANT SCHEDULE ON THE DRAWINGS SHALL BE USED AS A GUIDE ONLY. CONTRACTOR SHALL TAKEOFF AND VERIFY SIZES AND QUANTITIES BY PLAN CHECK. NOTIFY PROJECT LANDSCAPE ARCHITECT OF ANY MAJOR DISCREPANCIES. 4.UNLESS DESIGNATED ON THE DRAWINGS OTHERWISE, ALL STRUCTURAL AND HARDSCAPE IMPROVEMENTS SHALL BE CONSTRUCTED AND FINISHED AHEAD OF PLANTING. 5.ADJUST PLANT MATERIAL AS NECESSARY AROUND UTILITY LOCATIONS. NOTIFY PROJECT LANDSCAPE ARCHITECT OF ANY MAJOR CONFLICTS OR NECESSARY ADJUSTMENTS. 6.SOILS SHALL BE PREPARED AND AMENDED PER THE SPECIFICATIONS. SOIL AMENDMENTS AND PREPARATION SHALL CONFORM TO STATE AB1881 AND LOCAL WATER EFFICIENT LANDSCAPE ORDINANCES. ALL WORK ON THE IRRIGATION SYSTEM INCLUDING OPERATIONAL TESTS, AND BACKFILLING OF TRENCHES SHALL BE COMPLETED AHEAD OF PLANTING. 7.LOCATIONS OF ALL PLANT MATERIAL SHALL BE REVIEWED ON SITE BY THE OWNER'S AUTHORIZED REPRESENTATIVE PRIOR TO PLANTING. THE REPRESENTATIVE RESERVES THE RIGHT TO MAKE ANY ADJUSTMENTS, SUBSTITUTIONS, ADDITIONS, AND DELETIONS TO THE PLANT LAYOUT AS WORK PROGRESSES. 8.ALL PLANTING AREAS TO RECEIVE 3" THICK MIN. LAYER OF ROCK MULCH. SEE SPECIFICATIONS FOR MULCH TYPE. PROVIDE SAMPLE FOR APPROVAL. 9.THESE PLANS COMPLY WITH THE CRITERIA OF THE MODEL WATER EFFICIENT LANDSCAPE ORDINANCE AND THE CRITERIA HAVE BEEN APPLIED FOR THE EFFICIENT USE OF WATER IN THE LANDSCAPE DESIGN PLAN. PLANTING NOTES IV IV IV EB WV IV IV IV WM EV EV HO S E B I B 115 246 . 5 4 FD 5 / 8 R B R W C A P WA L N U T S T . ELEC HW Y 1 0 1 SYMBOL BOTANICAL NAME COMMON NAME CONT WUCOLS QTY SHRUBS AGAVE ATTENUATA X OCAHUI 'BLUE GLOW'BLUE GLOW AGAVE 5 GAL LOW 5 BOUTELOUA GRACILIS 'BLONDE AMBITION'BLONDE AMBITION BLUE GRAMA 1 GAL LOW 9 CALLISTEMON X 'LITTLE JOHN'LITTLE JOHN DWARF BOTTLEBRUSH 5 GAL LOW 4 PENNISETUM SPATHIOLATUM SLENDER VELDT GRASS 5 GAL LOW 15 SYMBOL BOTANICAL NAME COMMON NAME CONT WUCOLS SPACING QTY GROUND COVERS TURF MARATHON MARATHON SOD 129 SF PLANT SCHEDULE CITY SPECIFICATION NO. DATE: PR O J E C T T I T L E : SH E E T T I T L E : SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION AS NOTED SEPTEMBER, 2024 2504-05-PS23 2000577-02 90 % C O N S T R U C T I O N D O C U M E N T S 11 0 6 W A L N U T F E N C I N G I M P R O V E M E N T S N: \ 2 4 0 0 \ 2 5 0 4 - 0 5 - P S 2 3 - S L O - P D - N - B u i l d i n g - F e n c i n g \ L a n d s c a p e - A r c h i t e c t u r e \ T a s k - L 2 - C o n D o c s \ S h e e t - F i l e s \ L P - 2 5 0 4 - 0 5 . d w g , L P 1 0 1 , S e p 0 4 , 2 0 2 4 7 : 2 3 p m , L D W i e r s c h e m 9.9.24 0 10 20 30 feet 1"=10' 5 MATCHLINE - LP102 LP101 PL A N T I N G P L A N D IV EB TW = 2 3 6 . 2 6 BEH I N D W A L L = 2 2 6 . 3 1 TW = 2 3 6 . 3 0 / 2 3 4 . 9 5 BEH I N D W A L L = 2 2 6 . 0 0 EG / F W = 2 3 1 . 5 0 ' EG / F W = 2 3 0 . 9 5 ' SANTA ROSA ST.SANTA ROSA ST EXISTING IRRIGATION TO REMAIN. ADJUST IRRIGATION PIPING AND SPRAY HEADS AS NEEDED TO ACCOMODATE NEW PLANTING. EXISTING IRRIGATION TO REMAIN. ADJUST IRRIGATION PIPING AND SPRAY HEADS AS NEEDED TO ACCOMODATE NEW PLANTING. ADJUST EXISTING VALVES, BOXES, SPRAY HEADS, PIPING IN THIS AREA TO ACCOMODATE FENCING/WALL IMPROVEMENTS. LAY DOWN SOD TO PATCH BACK TO EXISTING TURF. SYMBOL BOTANICAL NAME COMMON NAME CONT WUCOLS QTY DETAIL SHRUBS AGAVE ATTENUATA X OCAHUI 'BLUE GLOW'BLUE GLOW AGAVE 5 GAL LOW 5 1/LP501 BOUTELOUA GRACILIS 'BLONDE AMBITION'BLONDE AMBITION BLUE GRAMA 1 GAL LOW 9 1/LP501 CALLISTEMON X 'LITTLE JOHN'LITTLE JOHN DWARF BOTTLEBRUSH 5 GAL LOW 4 1/LP501 PENNISETUM SPATHIOLATUM SLENDER VELDT GRASS 5 GAL LOW 15 1/LP501 SYMBOL BOTANICAL NAME COMMON NAME CONT WUCOLS SPACING QTY DETAIL GROUND COVERS TURF MARATHON MARATHON SOD 129 SF PLANT SCHEDULE CITY SPECIFICATION NO. DATE: PR O J E C T T I T L E : SH E E T T I T L E : SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION AS NOTED SEPTEMBER, 2024 2504-05-PS23 2000577-02 90 % C O N S T R U C T I O N D O C U M E N T S 11 0 6 W A L N U T F E N C I N G I M P R O V E M E N T S N: \ 2 4 0 0 \ 2 5 0 4 - 0 5 - P S 2 3 - S L O - P D - N - B u i l d i n g - F e n c i n g \ L a n d s c a p e - A r c h i t e c t u r e \ T a s k - L 2 - C o n D o c s \ S h e e t - F i l e s \ L P - 2 5 0 4 - 0 5 . d w g , L P 1 0 2 , S e p 0 4 , 2 0 2 4 7 : 2 3 p m , L D W i e r s c h e m 9.9.24 0 10 20 30 feet 1"=10' 5 MATCHLINE - LP101 LP102 PL A N T I N G P L A N CITY SPECIFICATION NO. DATE: PR O J E C T T I T L E : SH E E T T I T L E : SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION AS NOTED SEPTEMBER, 2024 2504-05-PS23 2000577-02 90 % C O N S T R U C T I O N D O C U M E N T S 11 0 6 W A L N U T F E N C I N G I M P R O V E M E N T S N: \ 2 4 0 0 \ 2 5 0 4 - 0 5 - P S 2 3 - S L O - P D - N - B u i l d i n g - F e n c i n g \ L a n d s c a p e - A r c h i t e c t u r e \ T a s k - L 2 - C o n D o c s \ S h e e t - F i l e s \ L P - 2 5 0 4 - 0 5 . d w g , L P 5 0 1 , S e p 0 4 , 2 0 2 4 7 : 2 4 p m , L D W i e r s c h e m 9.9.24 LP501 PL A N T I N G D E T A I L S 2 TIMES ROOTBALL DIAMETER 1" MULCH PER PLANS BACKFILL MIX, AMENDED WITH COMPOST OR OTHER APPROVED ORGANIC MATERIAL UNDISTURBED NATIVE SOIL TOP OF ROOTBALL AT OR SLIGHTLY ABOVE FINISH GRADE SHRUB PLANTING 1 1/2" = 1'-0"RRM-2500-2504.05-70 1 ROCK MULCH IN PLANTING AREA 1 1/2" = 1'-0" 1 3 2 CRUSHED ROCK MULCH PER PLANS1 FILTER FABRIC2 PLANTING PER PLANS3 3" 2 RRM-2500-2504.05-11 S-101 SH E E T I N D E X , A B B R E V I A T I O N S , & S Y M B O L S DETAIL REFERENCE BUBBLE WITH LEADER DRAG STRUT CONNECTION MOMENT CONNECTION WIDE FLANGE STEEL COLUMN NUMBER OF EVENLY SPACED STEEL HSS TUBE COLUMN WELDED WIRE FABRIC ELEVATION OF WALL OR FRAME SLOPED SURFACE INDICATES SAND OR GROUT INDICATES GRAVEL EARTH LAYER NORTH ARROW SLOPE FULL HEIGHT SECTION INDICATOR DETAIL REFERENCE BUBBLE BEAM CAMBER AT MID-SPAN SPECIAL STUD SPACING SEE TYPICAL DOUBLE ANGLE BRACE STEEL IN CROSS SECTION FULL HEIGHT STIFFENER CONNECTION STEPPED FOOTING TOP/BOTTOM OF ELEVATIONS TOP OF STEEL ± ELEVATION MEMBER SPLICE STEEL HSS OR PIPE COLUMN (WWF LAYER) STEPPED SURFACE; FLOOR DEPRESSION ANGLE BRACE SHEAR STUDS STEEL DETAILS - S- BOT OF EL = (-X'-X") BOTTOM STEPPED FOOTING WOOD POST X XX'-X" INDICATES HEADER @ OPENING PER HEADER SCHEDULE INDICATES SPAN AND DIRECTION OF PREFABRICATED ROOF TRUSS (BY OTHERS) INDICATES SPAN AND DIRECTION OF ROOF RAFTER OR FLOOR JOIST WITH WEB STIFFENERXX INDICATES BEARING WALL SHADED AREA INDICATES CALIFORNIA FRAMING SHADED AREA INDICATES FOOTPRINT OF FLOOR ABOVE INDICATES SPAN AND DIRECTION OF ROOF RAFTER OR FLOOR JOISTXX INDICATES EXTENTS OF FRAMING OR OTHER STRUCTURAL ELEMENT INDICATES PAD FOOTING TYPE PER SCHEDULE 1x INDICATES SHEAR WALL STRAP / HOLDOWN TYPE PER SCHEDULE INDICATES BEARING CMU WALL BELOW INDICATES BEARING CMU WALL ABOVE INDICATES NON-BEARING CMU WALL BELOW INDICATES NON-BEARING CMU WALL ABOVE INDICATES EXISTING BEARING CMU WALL INDICATES BEARING CONCRETE WALL BELOW INDICATES EXISTING NON-BEARING CMU WALL INDICATES NON-BEARING CONCRETE WALL BELOW INDICATES BEARING CONCRETE WALL ABOVE INDICATES NON-BEARING CONCRETE WALL ABOVE INDICATES EXISTING NON-BEARING CONCRETE WALL INDICATES BEARING WOOD WALL BELOW INDICATES BEARING WOOD WALL ABOVE INDICATES PLYWOOD SIDE FOR SHEARWALL INDICATES NON-BEARING WOOD WALL BELOW INDICATES NON-BEARING WOOD WALL ABOVE INDICATES EXISTING BEARING WOOD WALL INDICATES EXISTING NON-BEARING WOOD WALL INDICATES EXISTING BEARING CONCRETE WALL KSI FOOTING HEIGHT INCLUDE INFORMATION INCL INFO JST INSP INT JOINT JOIST KIPS ID I-JST IN IF HT INCH GRADE BEAM HORIZONTAL GROUND HIGH POINT H or HORIZ HP GB GRND FACE OF MASONARY FOOT; FEET FOM FJ ELEVATOR EDGE NAIL EMBEDMENT EXISTING EXTERIOR EACH WAY EQUAL OR EQUIVALENT EXIST or (E) FDN EW ELEV ES EQUIP EQ STRUCTURAL STEEL SHAPES WT, ST, MT MC AMERICAN STD CHANNEL SHAPE MISC CHANNEL SHAPE THRU THK T & G T & B TOC TO TB STRUCT STIFF STL SW THREADED TEMPERATURE; TEMPORARY STIFFENERS STEEL STANDARD AMERICAN WOOD PRESERVERS ASSOCIATION CONSTRUCTION JOINT; CONTROL JOINT COMPLETE JOINT PENETRATION WELD DIAPHRAGM DRAWING DIAMETER DOWEL EACH FACE ELEVATION EF EL DWL EACH DIM DIAG CONTRACTOR CONSTRUCTION CUBIC FOOT PENNY (NAIL OR BAR DIA) CONNECTION; CONNECT CONCRETE DBL CU FT d DETAIL CONSTR CONTR CJP CONT CONN CONC BEARING CENTER OF GRAVITY CENTER TO CENTER CANTILEVER CAMBER COMPRESSION COLUMN CONCRETE MASONRY UNIT CLR COMP CMU CJ CL BTWN BLOCKING BN BM BLOCK BLDG ASTM AITC SPECS SN SPCG SHTG SEP PSI PVMT # PSL SHEATHING SHEET SECTION PARTIAL JOINT PENETRATION WELD REINFORCE; REINFORCING PARALLEL STRAND LUMBER PAVEMENT REFERENCE REQUIRED PLATE WASHER PREFABRICATED PLYWOOD ORIGINAL OD PI L PC OPP NO or # OC MIN (N) MFR PONDS PER LINEAL FOOT PROPERTY LINE PERPENDICULAR ADDL APPROXIMATE ARCHITECTURAL; ARCHITECT ADJACENT ARCH APA AESS ALUM ALT ADJ ANCHOR BOLT AMERICAN CONCRETE INSTITUTE AB LINEAL FOOT POUND(S) LOW POINT LEVEL OR LAMINATED VENEER LUMBER MACHINE BOLT MASONRY MATERIAL LINEAL; LINEAR LONG SLOTTED HOLES LONG LEG VERTICAL LF LT WT MAS MAX MATL LVL LLV LLH AMERICAN PLYWOOD ASSOCIATION) KIPS PER SQUARE INCH FTG HORIZONTALLY SLOTTED HOLESHSH INSIDE DIAMETER INSIDE FACE I-JOIST INSPECTION INTERIOR JT K GALVANIZED HANGER GLUED LAMINATED BEAM HGR GR GLB GALV GA GRADE GAUGE FACE OF CONCRETE FIELD NAIL FLANGE FLOOR JOIST FRAMING FACE OF WALL FACE OF STUD FT FRMG FOW FOS FN FOC FLG FLR FIN FLOOR FINISH ENGINEER EACH SIDE EQUIPMENT FOUNDATION EXT ENGR EN EMBED TYPICALTYP PIPE-X PIPE-XX HSS C PIPE L W WWF WD WP W/O W/ UNO VSH VERT UT DBL EXTRA STRONG PIPE SHAPE EXTRA STRONG PIPE SHAPE HOLLOW STRUCTURAL SECTION STANDARD PIPE SHAPE STRUCT TEE SHAPE ANGLE SHAPE W SHAPE WELDED WIRE FABRIC WORK POINT; WATERPROOF WOOD WITHOUT WITH VERTICAL SLOTTED HOLES ULTRA-SONIC TEST UNLESS NOTED OTHERWISE VERTICAL TOP or T THR TOW TOS TOF TEMP STIRR SYM SS SSL STGR STD SQ TOP OF STEEL/TOP OF SLAB TOP OF CURB; TOP OF CONCRETE THICKNESS/THICK THROUGH TOP OF WALL TOP TOP OF FOOTING TONGUE & GROOVE TOP AND BOTTOM TOP OF TIE BEAM SYMMETRICAL SHEAR WALL STRUCTURAL STIRRUP SHORT SLOTTED HOLES STAINLESS STEEL STAGGER SQUARE AWPA AMERICAN SOCIETY FOR TESTING MATERIALS AMERICAN INSTITUTE OF TIMBER CONSTRUCTION DOUGLAS FIR/LARCHDF DIMENSION DIAGONAL ELECTRICAL EXPANSION JOINT DWG ELEC EJ EA DIAPH DN DOWN CENTER DEPARTMENT DOUBLE COUNTERSINK; COUNTERSUNK CONTINUE; CONTINUOUS CTR DEPT DET CTSK BETWEEN CLEARANCE; CLEAR CENTER LINE CAST-IN-PLACE COL CIP BRG CAM OR C CANT CG CC BUILDING BOUNDARY NAIL BOTTOM AMERICAN WELDING SOCIETY BLK BOT OR B BRC BLKG BRACE BEAM AWS SOG SIM SCHED RF Ø SHT SECT REINF REF REQD PREFAB PLY PT PW PSF PJP PROP SPECIFICATIONS SLAB ON GRADE SHEAR NAIL SPACING SIMILAR ROUND; DIAMETER ROOF SEPARATION SCHEDULE POUNDS PER SQUARE INCH POUNDS PER SQUARE FOOT POUND; NUMBER PRESSURE TREATED PROPERTY MECHANICAL NEW NORTH ON CENTER NOT TO SCALE NUMBER OPENING OPPOSITE OUTSIDE FACE ORIENTED STRAND BOARD OPPOSITE HAND MINIMUM; MINUTE OUTSIDE DIAMETER MISCELLANEOUS MANUFACTURER PARA OR // PLF PL PLCS P OR PL. PERP OPNG OSB ORIG OH OF NTS MECH MISC N PLYWOOD INDEX PRECAST; PIECE PLATE PLACES PARALLEL ARCHITECTURAL EXPOSED STRUCTURAL STEEL AMERICAN NATIONAL STANDARDS INSTITUTE AMERICAN INSTITUTE OF STEEL CONSTRUCTION ADDITIONAL ANCHOR ALTERNATE ALUMINUM APPROVED ENGINEERED WOOD ASSOCIATION (FORMERLY THE ANCH APPROX APPVD ANSI AISC ACI LIGHTWEIGHT MAXIMUM LONG LEG HORIZONTAL MB LP LSH LIN LB(S) OR # DIA OR Ø LAMINATED STRAND LUMBERLSL ABOVE AND BELOWA & B RR ROOF RAFTER POST ABOVEPA FLOOR TIE ABOVEFTA KING POSTKP WO WHERE OCCURS ABOVEABV KING STUDKS TS TRIMMER STUD INDICATES CONTINUOUS FOOTING TYPE PER SCHEDULEC1 SHEET INDEXWALL TYPESSYMBOLS ABBREVIATIONS S-101 SHEET INDEX, ABBREVIATIONS, & SYMBOLS S-102 GENERAL NOTES S-103 GENERAL NOTES S-104 SPECIAL INSPECTION & TESTS S-301 TYPICAL CONCRETE DETAILS S-321 MASONRY DETAILS DO DO OVER HEADERHDR F1 X CITY SPECIFICATION NO. DATE: PR O J E C T T I T L E : SH E E T T I T L E : SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 11 0 6 W A L N U T F E N C I N G I M P R O V E M E N T S J. LONG J. MEADOWS AS NOTED 2504-05-PS23 2000577-02 E R P R No. 6488 S T UC T U R A LS TAT OF C A L I F O R NIA EGISTE R E D R O F E SS IONAL EN G I N E E RJESSICA M . MEA D O W S N: \ 2 4 0 0 \ 2 5 0 4 - 0 5 - P S 2 3 - S L O - P D - N - B u i l d i n g - F e n c i n g \ S t r u c t u r a l \ C o n D o c s \ S h e e t - F i l e s \ 2 5 0 4 - 0 5 - P S 2 3 - S 1 0 1 . d w g , S 1 0 1 , A u g 2 3 , 2 0 2 4 1 0 : 1 1 a m , j d l o n g AUGUST 23, 2024 10 0 % C O N S T R U C T I O N D O C U M E N T S INDICATES SHEAR TYPE AND LENGTH, PER SHEAR WALL SCHEDULE INDICATES TOP PLATE SPLICE NAILING PER SCHEDULE S-102 GE N E R A L N O T E S CITY SPECIFICATION NO. DATE: PR O J E C T T I T L E : SH E E T T I T L E : SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 11 0 6 W A L N U T F E N C I N G I M P R O V E M E N T S J. LONG J. MEADOWS AS NOTED 2504-05-PS23 2000577-02 E R P R No. 6488 S T UC T U R A LS TAT OF C A L I F O R NIA EGISTE R E D R O F E SS IONAL EN G I N E E RJESSICA M . MEA D O W S N: \ 2 4 0 0 \ 2 5 0 4 - 0 5 - P S 2 3 - S L O - P D - N - B u i l d i n g - F e n c i n g \ S t r u c t u r a l \ C o n D o c s \ S h e e t - F i l e s \ 2 5 0 4 - 0 5 - P S 2 3 - S 1 0 2 . d w g , S 1 0 2 , A u g 2 3 , 2 0 2 4 1 0 : 1 1 a m , j d l o n g AUGUST 23, 2024 10 0 % C O N S T R U C T I O N D O C U M E N T S ALL WORK SHALL BE PREFORMED IN CONFORMANCE WITH THESE PLANS, SPECIAL PROVISIONS PREPARED FOR THIS PROJECT, AND THE 2020 CITY OF SAN LUIS OBISPO STANDARD SPECIFICATIONS AND ENGINEERING STANDARDS, IN CONJUNCTION WITH THE STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS AND STANDARD PLANS, 2015 EDITION (UNREVISED), AND LATEST EDITION OF CALIFORNIA MUTCD. A.2022 CALIFORNIA BUILDING CODE, PART 2, VOLUME 2 OF 2, AND TITLE 24 C.C.R. 2022 EDITION AND LATEST REVISIONS (INCLUDING SUPPLEMENTS AND ERRATA) HEREIN REFERRED TO AS “THE CODE”. B.ANY OTHER REGULATING AGENCIES WHICH HAVE AUTHORITY OVER ANY PORTION OF THE WORK, INCLUDING THE STATE OF CALIFORNIA DIVISION OF OCCUPATIONAL SAFETY AND HEALTH (CAL/OSHA). 2.ALL DRAWINGS ARE CONSIDERED TO BE A PART OF THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REVIEW AND COORDINATION OF ALL DRAWINGS AND SPECIFICATIONS PRIOR TO THE START OF CONSTRUCTION. ANY DISCREPANCIES THAT OCCUR SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND CITY PRIOR TO START OF CONSTRUCTION SO THAT A CLARIFICATION CAN BE ISSUED. ANY WORK PERFORMED IN CONFLICT WITH THE CONTRACT DOCUMENTS OR ANY CODE REQUIREMENTS SHALL BE CORRECTED BY THE CONTRACTOR AT THEIR OWN EXPENSE AND AT NO EXPENSE TO THE CITY OR ARCHITECT. 3.NOTES AND DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL DETAILS. WHERE NO DETAILS ARE GIVEN, CONSTRUCTION SHALL BE AS SHOWN FOR SIMILAR WORK. 4.THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO STARTING CONSTRUCTION. THE ARCHITECT SHALL BE NOTIFIED OF ANY DISCREPANCIES OR INCONSISTENCIES. IN NO INSTANCE SHALL DIMENSIONS BE SCALED FROM THE DRAWINGS. 5.SEE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR THE FOLLOWING: A.PIPE RUNS, SLEEVES, HANGERS, TRENCHES, WALL AND SLAB OPENINGS, ETC., EXCEPT AS SHOWN OR NOTED. B.ELECTRICAL CONDUIT RUNS, BOXES, OUTLETS IN WALLS AND SLABS. C.CONCRETE INSERTS FOR ELECTRICAL, MECHANICAL OR PLUMBING FIXTURES. D.SIZE AND LOCATION OF MACHINE OR EQUIPMENT BASES, ANCHOR BOLTS FOR MOTOR MOUNTS. 7.THE CONTRACT STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO PROTECT THE STRUCTURE DURING CONSTRUCTION. SUCH MEASURES SHALL INCLUDE, BUT NOT BE LIMITED TO, BRACING, SHORING FOR LOADS DUE TO CONSTRUCTION EQUIPMENT ETC. THE CONTRACTOR IS RESPONSIBLE FOR PROVISION OF TEMPORARY SHORING AND OTHER CONSTRUCTION AIDS, INCLUDING ALL ENGINEERING OF SUCH SYSTEMS, FOR TEMPORARY SUPPORT OF NEW AND/OR EXISTING STRUCTURAL ELEMENTS AS REQUIRED FOR ERECTION AND OTHER CONTRACTOR'S MEANS AND METHODS OF CONSTRUCTION (UNO). OBSERVATION VISITS TO THE SITE BY THE STRUCTURAL ENGINEER SHALL NOT INCLUDE INSPECTION OF THE ABOVE ITEMS OR CONCERN CONSTRUCTION MEANS AND METHODS OR CONSTRUCTION SAFETY. 8.BACKFILL SHALL NOT BE PLACED BEHIND EXTERIOR AND INTERIOR RETAINING WALLS UNTIL THE CONCRETE / CMU HAS ACHIEVED FULL DESIGN STRENGTH. FOR BRACED WALLS SUPPORTED BY STRUCTURAL DIAPHRAGMS. BACKFILL SHALL NOT BE PLACED BEHIND THE WALL UNTIL THE DIAPHRAGM HAS BEEN INSTALLED , AND FOR CONCRETE DIAPHRAGMS, HAS ACHIEVED FULL DESIGN STRENGTH. 9.THE CONTRACT STRUCTURAL DRAWINGS SHOW THE BUILDING IN ITS FINAL INTENDED POSITION. CONTRACTOR SHALL MAKE PROVISIONS IN THE LAYOUT OF THE BUILDING TO TAKE INTO ACCOUNTS SHRINKAGE, CREEP, SHORTENING, ETC.. 10.OPENINGS, POCKETS, ETC., LARGER THAN 6" SHALL NOT BE PLACED IN CONCRETE SLABS, DECKS, WALLS, UNLESS SPECIALLY DETAILED ON THE STRUCTURAL DRAWINGS. NOTIFY THE STRUCTURAL ENGINEER WHEN DRAWINGS BY OTHERS SHOW OPENINGS, POCKETS, ETC., LARGER THAN 6" NOT SHOWN ON THE STRUCTURAL DRAWINGS, BUT WHICH ARE LOCATED IN STRUCTURAL MEMBERS. 11.ASTM SPECIFICATIONS ON THE DRAWINGS SHALL BE THE VERSION REFERENCED IN CHAPTER 35 OF THE CODE OR AS REFERENCED IN THE APPLICABLE DESIGN STANDARD. 12.CONTRACTOR SHALL INVESTIGATE SITE DURING CLEARING AND EARTHWORK OPERATIONS FOR FILLED EXCAVATIONS OR BURIED STRUCTURES, SUCH AS CESSPOOLS, CISTERNS, FOUNDATIONS, ETC. IF ANY SUCH STRUCTURES ARE FOUND, THE STRUCTURAL ENGINEER AND CITY ENGINEER SHALL BE NOTIFIED IMMEDIATELY. 13.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR OR PERMITTEE TO CONTACT "UNDERGROUND SERVICE ALERT OF NORTHERN/CENTRAL CALIFORNIA" BY PHONE AT 8-1-1 FORTY-EIGHT (48) HOURS PRIOR TO START OF CONSTRUCTION FOR LOCATION OF POWER, TELEPHONE, OIL, AND NATURAL GAS UNDERGROUND FACILITIES. CONTRACTOR OR PERMITEE SHALL ALSO CONTACT THE APPROPRIATE AGENCY FOR THE LOCATION OF CABLE T.V., WATER, SEWER, DRAINAGE OR UNDERGROUND FACILITIES. 14.THE CONTRACTOR SHALL ALLOW FOR SUFFICIENT TIME FOR THE ENGINEER OF RECORD TO THOROUGHLY REVIEW THE SUBMITTAL PACKAGES, IN ACCORDANCE WITH THE CITY'S STANDARD GUIDELINES. GENERAL 1.DIMENSIONS SHALL BE DEFINED TO INCLUDE BOTH HORIZONTAL DIMENSIONS AND VERTICAL DIMENSIONS (ELEVATIONS). 2.WRITTEN DIMENSIONS SHALL TAKE PRECEDENCE. DRAWINGS SHALL NOT BE SCALED. 3.SEE ARCHITECTURAL AND/OR CIVIL DRAWINGS FOR FINISH FLOOR ELEVATIONS. 4.THE CONTRACTOR SHALL REVIEW AND VERIFY ALL DIMENSIONS PRIOR TO STARTING CONSTRUCTION. THE ARCHITECT SHALL BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCIES OR INCONSISTENCIES. DIMENSIONS 1.WIND DESIGN DATA (2022 CBC SECTION 1603.1.4) : 2.EARTHQUAKE DESIGN DATA (2022 CBC SECTION 1603.1.5): 3.GEOTECHNICAL INFORMATION (2022 CBC SECTION 1603.1.6): REFER TO FOUNDATION GENERAL NOTES SITE AND OCCUPANCY PARAMETERS PARAMETER VALUE REFERENCE RISK CATEGORY IV 2022 CBC TABLE 1604.5 SEISMIC IMPORTANCE FACTOR I = 1.5 ASCE 7-16 TABLE 1.5-2 MAPPED SPECTRAL RESPONSE ACCELERATIONS: S S = 1.064 g 2022 CBC 1613.2.1 S 1 = 0.392 g SITE CLASS D (DEFAULT)2022 CBC 1613.2.2 SPECTRAL RESPONSE COEFFICIENTS: S DS = 0.851 g 2022 CBC 1613.2.4 S D1 = 0.499 g WIND DESIGN DATA PARAMETER VALUE REFERENCE ULTIMATE DESIGN WIND SPEED (3-SEC GUST)VULT = 102 MPH 2022 CBC FIG. 1609.3 NOMINAL DESIGN WIND SPEED (3-SEC GUST)VASD = 82 MPH 2022 CBC 1609.3.1 EXPOSURE CATEGORY C 2022 CBC 1609.4.3 INTERNAL PRESSURE COEFFICIENT:GCpi = ± 0.18 ASCE 7-16 TABLE 26.13-1 DESIGN INFORMATION 1.LATERAL EARTH PRESSURES: * SEISMIC SOIL PRESSURE APPLIES TO WALLS GREATER THAN 6 FEET IN HEIGHT MEASURED FROM TOP OF FOUNDATION ** FOR SLOPING BACKFILL ADD 1 PCF FOR EVERY 2 DEG. (ACTIVE CASE) AND 1.5 PCF FOR EVERY 2 DEG (AT REST) 2.SPREAD OR CONTINUOUS FOOTINGS: NOTES: A.THE ALLOWABLE CAPACITY MAY BE INCREASED BY ONE-THIRD WHEN CONSIDERING LOADS OF SHORT DURATION SUCH AS WIND OR SEISMIC FORCES. B.THE ALLOWABLE LATERAL RESISTANCE CAN BE TAKEN AS THE SUM OF THE FRICTIONAL RESISTANCE AND PASSIVE RESISTANCE WITH THE LESSER REDUCED BY 33 PERCENT. C.THE UPPER 6 INCHES OF SOIL NOT PROTECTED BY PAVEMENT SHALL BE NEGLECTED WHEN CALCULATING PASSIVE RESISTANCE. D.COMPACTED FILL SHOULD BE PREPARED PER SECTION 6.0 GEOTECHNICAL EVALUATION REPORT 3.WHERE NOT SHOWN ON THE DRAWINGS, CONTRACTOR TO PROVIDE FOR DESIGN AND INSTALLATION OF ALL CRIBBING, SHEATHING AND SHORING REQUIRED AND SHALL BE SOLELY RESPONSIBLE FOR ALL EXCAVATION PROCEDURES INCLUDING LAGGING, SHORING, AND PROTECTION OF ADJACENT PROPERTY, STRUCTURES, STREETS, AND UTILITIES IN ACCORDANCE WITH ALL NATIONAL, STATE AND LOCAL SAFETY ORDINANCES. 4.CONTRACTOR TO PROVIDE FOR DE-WATERING OF EXCAVATIONS FROM SURFACE WATER, GROUND WATER AND/OR SEEPAGE. 5.ALL EXCAVATIONS SHALL BE PROPERLY BACKFILLED. DO NOT PLACE BACKFILL BEHIND RETAINING WALLS BEFORE CONCRETE OR GROUT HAS ATTAINED FULL DESIGN STRENGTH. CONTRACTOR SHALL BRACE OR PROTECT ALL BUILDING AND PIT WALLS BELOW GRADE FROM LATERAL LOADS UNTIL ATTACHING FLOORS ARE COMPLETELY IN PLACE AND HAVE ATTAINED FULL DESIGN STRENGTH. CONTRACTOR SHALL PROVIDE FOR DESIGN, PERMITS AND INSTALLATION OF SUCH BRACING. 6.EXCAVATIONS SHALL BE CUT SQUARE AND SMOOTH, WITH LEVEL BOTTOMS. 7.FOOTING BACKFILL AND UTILITY TRENCH BACKFILL WITHIN BUILDING AREA SHALL BE MECHANICALLY COMPACTED IN LAYERS IN ACCORDANCE WITH THE GEOTECHNICAL INVESTIGATION REPORT AND APPROVED BY THE GEOTECHNICAL ENGINEER. FLOODING WILL NOT BE PERMITTED. ALL FILLS USED TO SUPPORT FOUNDATIONS SHALL BE INSPECTED BY THE GEOTECHNICAL ENGINEER REPRESENTATIVE PER SECTION 1705.6 OF THE CODE. 8.ALL ABANDONED FOOTINGS, UTILITIES, ETC. SHALL BE REMOVED. NEW FOOTINGS MUST EXTEND INTO UNDISTURBED SOILS. 9.PIPES WITHIN THE ZONE OF INFLUENCE OF BUILDING OR SITE ELEMENT FOUNDATIONS SHALL BE INCREASED IN LEAN CONCRETE AT THE DIRECTION OF THE GEOTECHNICAL ENGINEER OF RECORD. ELEMENT ALLOWABLE BEARING CAPACITY (PSF) A ALLOWABLE LATERAL RESISTANCE B PASSIVE RESISTANCE (PSF/FT BELOW GRADE) FRICTION RESISTANCE (COEFFICIENT OF FRICTION) BUILDING FOUNDATION 1,500 100 0.25 ACTIVE EARTH PRESSURE (CANTILEVER RETAINING WALLS) 50H 30H (PCF) FOUNDATION *SEISMIC NATIVE 50H (PCF) ENG FILLENG FILL EXISTING CONDITIONS 1.ALL INFORMATION SHOWN ON THE PLANS RELATIVE TO EXISTING CONDITIONS IS GIVEN AS THE BEST PRESENT KNOWLEDGE FROM PLANS SUPPLIED BY THE OWNER, BUT WITHOUT GUARANTEE OF ACCURACY. 2.WHERE ACTUAL CONDITIONS ARE NOT IN ACCORDANCE WITH THE INFORMATION PRESENTED, THE ARCHITECT AND/OR STRUCTURAL ENGINEER SHALL BE NOTIFIED IMMEDIATELY. NO MODIFICATIONS OF THE PLANS FOR NEW CONSTRUCTION SHALL BE MADE WITHOUT THE WRITTEN APPROVAL OF THE ARCHITECT. EXISTING UNDERGROUND UTILITIES 1.THE ARCHITECT AND ENGINEERS ARE NOT RESPONSIBLE FOR THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES WHETHER OR NOT SHOWN ON THE DRAWINGS. DRAWINGS, IF ANY, IS APPROXIMATE. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION IN EXCAVATING AND TRENCHING ON THE SITE. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ARCHITECT AND/OR STRUCTURAL ENGINEER SHOULD ANY SUCH UNIDENTIFIED CONDITIONS BE DISCOVERED. 2.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGES WHICH MAY RESULT FROM HIS FAILURE TO EXACTLY LOCATE AND PRESERVE ALL EXISTING UNDERGROUND UTILITIES. 3.AN UNDERGROUND SERVICE ALERT INQUIRY IDENTIFICATION NUMBER MUST BE OBTAINED AT LEAST TWO WORKING DAYS BEFORE STARTING WORK WITH THIS PERMIT. A.FOR PROJECTS IN SOUTHERN CALIFORNIA TELEPHONE NO. 1-800-422-4133. B.FOR PROJECTS IN NORTHERN CALIFORNIA TELEPHONE NO. 1-800-227-2600. MATERIAL ASTM STANDARD PORTLAND CEMENT (TYPE II)A C150 CONCRETE AGGREGATES (HARDROCK)C33 CONCRETE AGGREGATES (LIGHTWEIGHT)C C330 WATERB C1602 COAL FLY ASH OR POZOLLAN (CLASS F)C618 NATURAL OR MANUFACTURED SAND C33 SLAG C989 CONCRETE LOCATION IN STRUCTURE MINIMUM STRENGTH (PSI)DENSITY (PCF)MAX SLUMP (IN±1) MAX WATER/CEMENT RATIO SLAG/ FLY ASHA (MAX) CONCRETE FOUNDATIONS 3,000 150 4 0.5 0.25 1.ALL CONCRETE CONSTRUCTION SHALL CONFORM WITH CHAPTER 19 OF THE CODE AND WITH THE PROVISIONS OF ACI 318-19. 2.CONCRETE MATERIALS SHALL BE IN ACCORDANCE WITH THE FOLLOWING STANDARDS: A.FOR SOILS WITH HIGH CONCENTRATIONS OF SULFATES (EXPOSURES S2 OR S3 PER ACI 318-19 TABLE 19.3.2.1) PORTLAND CEMENT SHALL BE TYPE V. VERIFY WITH PROJECT GEOTECHNICAL REPORT. B.WATER SHOULD ONLY BE ADDED AT THE BATCH PLANT. IN NO CASE SHALL THE DESIGN WATER/ CEMENT RATIO BE EXCEEDED. C.PUMICE AGGREGATE SHALL NOT BE USED. 3.CONCRETE MIXES SHALL BE PROPORTIONED BASED ON SECTION 26.4.3 OF ACI 318-19, WHICH REFERENCES ACI 301-20 ARTICLE 4.2.3. MIX DESIGNS SHALL INCLUDE DOCUMENTATION OF MIX AVERAGE COMPRESSIVE STRENGTH THROUGH FIELD TEST DATA OR TRAIL MIXTURES IN ACCORDANCE WITH ACI 301-20 ARTICLE 4.2.3.4. SCHEDULE OF STRUCTURAL CONCRETE STRENGTHS AND LOCATIONS (UNO): A. AS MEASURED BY CEMENTITIOUS WEIGHT 4.READY MIXED CONCRETE SHALL BE MIXED AND DELIVERED IN ACCORDANCE WITH THE REQUIREMENTS OF ASTM C94 OR C685. 5.DEPOSITING AND CONVEYING OF CONCRETE SHALL CONFORM TO SECTION 26.5 OF ACI 318-19 AND PROJECT SPECIFICATIONS. 6.ALL CONCRETE SURFACES AGAINST WHICH NEW CONCRETE IS TO BE PLACED SHALL BE CLEANED AND ROUGHENED TO 1/4" AMPLITUDE. 7.ALL REINFORCING BARS, ANCHOR BOLT HOLDOWNS AND OTHER CONCRETE INSERTS SHALL BE WELL SECURED AND TIED IN POSITION PRIOR TO PLACING CONCRETE. IN NO CASE SHALL ANY REINFORCING BARS, ANCHOR BOLTS, HOLDOWNS OR OTHER CONCRETE INSERTS BE "WET SET" OR "WET-STABBED" INTO CONCRETE DURING THE POUR. 8.PROVIDE SLEEVES FOR PLUMBING AND ELECTRICAL OPENINGS IN CONCRETE BEFORE PLACING. DO NOT CUT ANY REINFORCING WHICH MAY CONFLICT. CORING IN CONCRETE IS NOT PERMITTED WITHOUT SEOR APPROVAL. NOTIFY THE SEOR IN ADVANCE OF CONDITIONS NOT SHOWN ON THE DRAWINGS. SEE THE DRAWINGS FOR ADDITIONAL RESTRICTIONS ON THE PLACEMENT OF OPENINGS IN SLABS AND WALLS. 9.PIPES EMBEDDED IN CONCRETE: A.CONCRETE a.PIPES LARGER THAN 1-1/2" DIAMETER SHALL NOT BE EMBEDDED IN STRUCTURAL CONCRETE EXCEPT WHERE SPECIFICALLY APPROVED BY SEOR. b.NO CONDUITS SHALL BE PLACED IN CONCRETE FILL OVER METAL DECK. c.PIPES SHALL NOT DISPLACE OR INTERRUPT REINFORCING BARS. d.DO NOT STACK CONDUITS, SPACE EMBEDDED PIPES AND CONDUITS AT A MINIMUM OF 3 DIAMETERS CLEAR FROM OTHER EMBEDDED PIPES/CONDUITS AND REBAR. 1.REINFORCING BARS SHALL CONFORM TO THE REQUIREMENTS OF CHAPTER 19 OF THE CODE AND WITH THE PROVISIONS OF ACI 318-19, ASTM A706, GRADE 60 UNO. ASTM A615 GR 60 STEEL MAY BE SUBSTITUTED FOR ASTM A706 GR60 STEEL PER ACI 318-19 SECTION 20.2.2.5 PROVIDED THE FOLLOWING CONDITIONS ARE MET: A.THE ACTUAL YIELD STRENGTH BASED ON MILL TESTS DOES NOT EXCEED THE SPECIFIED YIELD STRENGTH BY MORE THAN 18,000 PSI. B.THE RATIO OF THE ACTUAL ULTIMATE TENSILE STRESS TO THE ACTUAL YIELD STRENGTH IS NOT LESS THAN 1.25. C.WHERE REINFORCEMENT COMPLYING WITH ASTM A615 IS TO BE WELDED, CHEMICAL TESTS SHALL BE PERFORMED TO DETERMINE WELDABILITY IN ACCORDANCE WITH SECTION 26.6.4 OF ACI 318-19. 2.BARS SHALL BE CLEAN OF RUST, GREASE, OR OTHER MATERIALS LIKELY TO IMPAIR BOND. ALL REINFORCING BAR BENDS SHALL BE MADE COLD. 3.WELDED WIRE REINFORCEMENT (WWR), PLAIN OR DEFORMED, SHALL CONFORM TO ASTM A185. WELDED DEFORMED WIRE REINFORCEMENT (WWR) SHALL CONFORM TO ASTM A1064. ALL WWR FOR STAIR PANS AND ALL WWR FOR CONCRETE FILL ON METAL DECK TO BE PLAIN WWR. PROVIDE LAPS PER ACI 318-19 SECTION 25.5.3 OR 25.5.4 MINIMUM. WWR SHALL BE SUPPORTED ON APPROVED CHAIRS. 4.REINFORCING BAR LAP SPLICES SHALL BE MADE AS INDICATED ON THE DRAWINGS. LAP ALL HORIZONTAL BARS AT CORNERS AND INTERSECTIONS. STAGGER ALL SPLICES UNLESS NOTED OTHERWISE ON PLANS. A.MINIMUM LAP SPLICE LENGTH FOR REINFORCING STEEL BARS IN CONCRETE SHALL BE PER ACI 318-19 SECTION 25.5.2 AND THE REINFORCING SCHEDULE ON THE DRAWINGS. B.MINIMUM LAP SPLICE LENGTH FOR REINFORCING STEEL BARS IN MASONRY SHALL BE PER TMS 042-16 SECTION 6.1.6.1.1 AND THE REINFORCING SCHEDULE ON THE DRAWINGS. 5.ALL BARS SHALL BE MARKED SO THEIR IDENTIFICATION CAN BE MADE WHEN THE FINAL IN-PLACE INSPECTION IS MADE. ALL REINFORCING CONFORMING TO DIFFERING ASTM SPECIFICATIONS AND/OR OF DIFFERING GRADES SHALL BE CLEARLY MARKED TO DIFFERENTIATE THEM FROM OTHER REINFORCING STEEL IF CONCURRENTLY PRESENT ON SITE. 6.WHERE WELDING OF REINFORCING IS APPROVED BY THE STRUCTURAL ENGINEER, IT SHALL BE DONE BY AWS CERTIFIED WELDERS USING E80XX OR APPROVED ELECTRODES. WELDING PROCEDURES SHALL CONFORM TO THE REQUIREMENTS OF STRUCTURAL WELDING CODE- REINFORCING STEEL", AWS-D1.4-15. REINFORCING BARS TO BE WELDED SHALL CONFORM TO THE REQUIREMENTS OF ASTM A706. 7.REINFORCING STEEL SHALL BE ACCURATELY PLACED, ADEQUATELY SUPPORTED AND SHALL BE SECURED AGAINST DISPLACEMENT, AND TIED BEFORE THE CONCRETE IS PLACED DURING CONSTRUCTION WITHIN PERMITTED TOLERANCES. ADEQUATE SUPPORTS ARE ALSO NECESSARY TO KEEP THE REINFORCING STEEL AT THE PROPER DISTANCE FROM THE FORMS. USE WIRE BAR SUPPORTS, PRECAST CONCRETE SUPPORTS, SPACERS, BOLSTERS, REINFORCEMENT OR OTHER MEANS OF SUPPORT PER THE "CRSI MANUAL OF STANDARD PRACTICE", LATEST EDITION. 8.REINFORCING STEEL SHALL BE DETAILED IN ACCORDANCE WITH THE "CRSI MANUAL OF STANDARD PRACTICE FOR DETAILING REINFORCED CONCRETE STRUCTURES", LATEST EDITION. 9.COMPLETE AND DETAILED REINFORCING PLACEMENT DRAWINGS SHALL BE PREPARED AND SUBMITTED TO THE ARCHITECT FOR APPROVAL BY THE SEOR PRIOR TO FABRICATION IN ACCORDANCE WITH THE SPECIFICATIONS AND APPLICABLE CODES. THESE DRAWINGS SHALL BE AVAILABLE ON THE JOB SITE PRIOR TO PLACING OF CONCRETE. THE REINFORCING PLACEMENT DRAWINGS SHALL INCLUDE ALL PRIMARY REINFOREMENT, LAP SPLICES, TIES, DOWELS, HEADED U-DOWELS, EMBED PLATES, ANCHOR BOLTS, ETC. AREAS OF CONGESTION SHALL BE DETAILED SUFFICIENTLY TO DEMONSTRATE THAT PLACEMENT OF REBAR MEETS SPACING REQUIREMENTS OF ACI 318-19. 10.MILL TEST REPORTS FOR GRADE 60 BARS SHALL BE SUBMITTED TO THE INSPECTOR OF RECORD PRIOR TO PLACEMENT OF CONCRETE PER ACI 318-19 SECTION 26.13.2.3 OF THE CODE. 11.WHEN REQ'D, INSPECTION OF CONCRETE SHALL INCLUDE INSPECTION DURING INSTALLATION OF REINFORCING STEEL. INSPECTION SHALL BE SCHEDULED SO THAT PLACEMENT OF REINFORCING STEEL, CONDUIT, SLEEVES, AND EMBEDDED ITEMS MAY BE CORRECTED PRIOR TO PLACEMENT OF OVERLYING GRIDS OR REINFORCING STEEL. 12.CONCRETE PROTECTION FOR REINFORCEMENT 13.MECHANICAL BAR SPLICE CONNECTIONS SHALL CONFORM TO THE REQUIREMENTS OF ACI 318-19 SECTION 25.5.7 USE OF MECHANICAL CONNECTIONS SHALL BE APPROVED BY THE STRUCTURAL ENGINEER. SPLICES MUST BE TESTED AS INDICATED IN THE CONCRETE REINFORCEMENT SPECIFICATION. ACCEPTABLE PRODUCTS INCLUDE: LENTON STANDARD COUPLERS (IAPMO-ES 0129) LENTON FORM SAVERS, TYPE SA (IAPMO-ES 0129) LENTON WELDABLE HALF COUPLERS (IAPMO-ES 0129) LENTON LOCK COUPLERS PER (IAPMO-ES 0129) NOTE THAT REBAR ATTACHED TO PLATE USING LENTON WELDABLE HALF COUPLERS SHALL BE ASTM A706 PER IAPMO-ES 0129. ALL MECHANICAL BAR SPLICE CONNECTIONS IN SPECIAL STRUCTURAL WALLS, SPECIAL MOMENT FRAMES AND CONCRETE DIAPHRAGMS SHALL BE TYPE 2 CONFORMING TO THE REQUIREMENTS OF ACI 318-19 SECTION 18.2.7 & 18.12.7.4 THE FOLLOWING MINIMUM CONCRETE COVER SHALL BE PROVIDED FOR REINFORCEMENT IN CAST-IN-PLACE CONCRETE (NON-PRESTRESSED):MINIMUM COVER, IN. A. CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH 3 B. CONCRETE EXPOSED TO EARTH OR WEATHER: NO.6 THROUGH NO. 18 BAR NO.5 BAR, W31 OR D31 WIRE & SMALLER 2 1 12" C. CONCRETE NOT EXPOSED TO WEATHER OR IN CONTACT WITH GROUND: SLABS, WALLS, JOISTS: NO.14 AND NO.18 BARS NO.11 BAR & SMALLER BEAMS, COLUMNS: PRIMARY REINFORCEMENT TIES, STIRRUPS, SPIRALS 1 12" 3 4" 1 12" REINFORCING STEEL 1.MASONRY CONSTRUCTION AND MATERIALS SHALL CONFORM TO THE REQUIREMENTS OF "SPECIFICATION FOR MASONRY STRUCTURES" (TMS 402-16 ) PUBLISHED BY THE MASONRY SOCIETY AND WITH CHAPTER 21 OF THE CODE. 2.CONCRETE MASONRY UNITS SHALL COMPLY WITH SECTION 2103.1 OF THE CODE AND BE HOLLOW LOAD BEARING CONFORMING TO ASTM C90 AND MEET THE FOLLOWING REQUIREMENTS: 3.MORTAR SHALL CONFORM TO SECTION 2103.2 OF THE CODE AND ASTM C270 AND HAVE THE FOLLOWING PROPERTIES AND STRENGTHS: SEE NOTES UNDER "TEST AND INSPECTION REQUIREMENTS" FOR TESTING REQUIREMENTS. 4.GROUT SHALL COMPLY WITH SECTION 2103.3 OF THE CODE AND ASTM C476. GROUT SHALL MEET THE FOLLOWING REQUIREMENTS: SEE NOTES UNDER "TEST AND INSPECTION REQUIREMENTS" FOR TESTING REQUIREMENTS. 5.MORTAR AND GROUT COMPONENTS SHALL CONFORM WITH THE FOLLOWING: 6.ADMIXTURES SHALL NOT BE USED IN GROUT EXCEPT BY SPECIFIC CONSENT OF SEOR. SEE NOTES UNDER "TEST AND INSPECTION REQUIREMENTS" FOR TESTING REQUIREMENTS. 7.REINFORCING BARS - SEE NOTES UNDER "REINFORCING STEEL" FOR REQUIREMENTS. 8.PROVIDE A MINIMUM OF 1/2" CLEAR BETWEEN MAIN REINFORCING AND MASONRY UNITS. 9.ALL CELLS SHALL BE GROUTED SOLID. 10.DESIGN f'm = 2,000 PSI FOR CMU CONSTRUCTION, TYPICAL. PRISM TESTING SHALL BE PERFORMED AS PER THE REQUIREMENTS OF PROJECT SPECIFICATIONS. SEE ALSO NOTES UNDER "TEST AND INSPECTION REQUIREMENTS" FOR REQUIREMENTS. 11.USE RUNNING BOND PATTERN UNO BY ARCHITECT. USE OPEN ENDED UNITS FOR STACKED BOND PATTERN. 12.USE OF "HIGH-LIFT" GROUT CONSTRUCTION IS SUBJECT TO APPROVAL BY SEOR AND JURISDICTION. MAX GROUT LIFT HEIGHT SHALL BE 5'-4" IN ACCORDANCE WITH TMS 602-16 ARTICLE 3.5D. GROUT LIFT HEIGHT MAY BE INCREASED TO 12'-8" IF THE FOLLOWING CONDITIONS ARE MET: A.MASONRY HAS CURED FOR AT LEAST 4 HOURS B.GROUT SLUMP IS MAINTAINED BETWEEEN 10" - 11" C.NO BOND BEAMS OCCUR BETWEEN TOP AND BOTTOM OF POUR HEIGHT D.CLEANOUTS ARE PROVIDED AT 32" MAX OC FOR CLEANING AND INSPECTION PRIOR TO GROUTING PER TMS 602-16 ARTICLE 3.2F. 13.CONSOLIDATE GROUT AT TIME OF PLACEMENT USING MECHANICAL VIBRATION OR USE A SELF CONSOLIDATING GROUT 14.EMBEDDED PIPES AND CONDUITS A.CONDUITS, PIPES AND SLEEVES MAY BE EMBEDDED IN MASONRY ONLY IF COMPLYING WITH THE FOLLOWING REQUIREMENTS: a.THEY SHALL BE SPACED NO CLOSER THAN 3 DIAMETERS ON CENTER b.THE MAXIMUM AREA OF VERTICAL PIPES, CONDUITS, OR SLEEVES PLACED IN MASONRY COLUMNS OR PILASTERS SHALL NOT EXCEED 2 PERCENT OF THE CROSS SECTION c.THE MAXIMUM NUMBER OF PIPES ALLOWED IN A CELL FOR WALLS IS THE FOLLOWING: d.WRAP PIPES AND FITTINGS WITH 14" FOAM TAPE MIN. B.PIPES SHALL NOT BE EMBEDDED IN MASONRY WHEN: a.CONTAINING LIQUID GAS OR VAPORS AT TEMPERATURES HIGHER THAN 150° F b.UNDER PRESSURE IN EXCESS OF 55 PSI c.CONTAINING WATER OR OTHER LIQUIDS SUBJECT TO FREEZING C.ALUMINUM PIPES SHALL NOT BE EMBEDDED IN CMU 15.ALL INTERIOR EXPOSED CORNERS TO BE BULL NOSE BLOCK PROFILE, NOT REQUIRED AT EXTERIOR OR SPLICE FACE CONDTIONS, FIELD GRIND CORNERS TO ACCEPTED. COMPONENT ASTM NOTES SAND ASTM C144 LIME ASTM C207 PORTLAND CEMENT ASTM C150 TYPE I or II, LOW ALKALI, < 6 MONTHS OLD PEA GRAVEL ASTM C301 MASONRY WALL DESIGN STRENGTH NET AREA COMPRESSIVE STRENGTH OF CONCRETE MASONRY UNITS DENSITY f'm = 2,000 PSI 2,000 PSI MINIMUM MEDIUM WIEGHT f'm = 2,500 PSI 3,250 PSI MINIMUM MEDIUM WIEGHT WALL DESIGN STRENGTH MORTAR TYPE MORTAR 28 DAY COMPRESSIVE STRENGTH f'm = 2,000 PSI S 2,000 PSI MINIMUM f'm = 2,500 PSI M 2,500 PSI MINIMUM WALL DESIGN STRENGTH COMPRESSIVE STRENGTH GROUT 28 DAY MIX DESIGN f'm = 2,000 PSI 2,000 PSI 3 PARTS SAND 2 PARTS PEA GRAVEL 1 PART PORTLAND CEMENT 8-11 INCH SLUMP f'm = 2,500 PSI -SUBMIT MIX DESIGN WALL THICKNESS REINFORCED CELL UN-REINFORECED CELL 8"(2) 1 2" Ø (1) 3 4" Ø (3) 1 2" Ø (2) 3 4" Ø (1) 1" Ø 12" (4) 1 2" Ø (3) 3 4" Ø (2) 1" Ø (1) 1 14" Ø (5) 1 2" Ø (4) 3 4" Ø (3) 1" Ø (2) 1 1 4" Ø Ø* * S-103 GE N E R A L N O T E S CITY SPECIFICATION NO. DATE: PR O J E C T T I T L E : SH E E T T I T L E : SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 11 0 6 W A L N U T F E N C I N G I M P R O V E M E N T S J. LONG J. MEADOWS AS NOTED 2504-05-PS23 2000577-02 E R P R No. 6488 S T UC T U R A LS TAT OF C A L I F O R NIA EGISTE R E D R O F E SS IONAL EN G I N E E RJESSICA M . MEA D O W S N: \ 2 4 0 0 \ 2 5 0 4 - 0 5 - P S 2 3 - S L O - P D - N - B u i l d i n g - F e n c i n g \ S t r u c t u r a l \ C o n D o c s \ S h e e t - F i l e s \ 2 5 0 4 - 0 5 - P S 2 3 - S 1 0 3 . d w g , S 1 0 3 , A u g 2 3 , 2 0 2 4 1 0 : 1 1 a m , j d l o n g AUGUST 23, 2024 10 0 % C O N S T R U C T I O N D O C U M E N T S 1.STRUCTURAL STEEL SHALL BE DETAILED, FABRICATED AND ERECTED BY AN APPROVED AND LICENSED FABRICATOR IN ACCORDANCE WITH AISC 360-16 AND CHAPTER 22 OF THE CODE. 2.ALL STRUCTURAL STEEL SHALL CONFORM TO THE ASTM DESIGNATION AS INDICATED BELOW (UNO): 3.THE STRUCTURAL STEEL FABRICATOR SHALL FURNISH SHOP DRAWINGS OF ALL STEEL FOR REVIEW AND APPROVAL BY THE AOR AND SEOR PRIOR TO FABRICATION. 4.BOLT HOLES USED IN STEEL SHALL BE 1/16" LARGER IN DIAMETER THAN NOMINAL SIZE OF BOLT USED, EXCEPT AS NOTED. 5.ALL STRUCTURAL STEEL SURFACES THAT ARE ENCASED IN CONCRETE, MASONRY, SPRAY ON FIREPROOFING, OR ARE ENCASED BY BUILDING FINISH, SHALL BE LEFT UNPAINTED, EXCEPT AS REQUIRED FOR DESIGNATION OF PROTECTED ZONES. 6.PRIOR TO FABRICATING PLATES, MEMBERS, OR OTHER STEEL ASSEMBLIES ATTACHED TO REINFORCED CONCRETE/MASONRY USING POST-INSTALLED ANCHORS, CONTRACTOR SHALL LOCATE ALL REINFORCEMENT AND CONFIRM CONSTRUCTABILTY OF ANCHOR LOCATIONS. SHOULD CONFLICTS WITH REINFORCEMENT OCCUR, CONTRACTOR SHALL COORDINATE AND SUBMIT ALTERNATE ANCHOR LOCATIONS AND REVISED STEEL FABRICATIONS TO SEOR FOR REVIEW AND APPROVAL. DO NOT CUT OR DAMAGE EXISTING REINFORCEMENT. 7.REFER TO ARCHITECTURAL DRAWINGS FOR STEEL FINISH. ALL STRUCTURAL STEEL AND MISCELLANEOUS METAL EXPOSED TO THE WEATHER SHALL BE HOT DIP GALVANIZED AFTER FABRICATION. PROTECT FIELD WELDS EXPOSED TO THE WEATHER VIA PRIME AND PAINT OR BRUSH / COLD GALVANIZING. REFER TO ARCH DRAWINGS FOR STEEL FINISH. 8.ALL ARCHITECTURALLY EXPOSED STRUCTURAL STEEL (AESS) SHALL CONFORM TO REQUIREMENTS OF AISC 303-22. 9.ALL WELDING IS TO BE DONE BY CERTIFIED WELDERS USING E70XX ELECTRODES (UNO). ALL WELDS SHALL BE IN CONFORMANCE WITH THE PROJECT SPECIFICATIONS AND THE CODE FOR WELDING IN BUILDING CONSTRUCTION (AWS D1.1-15) OF THE AMERICAN WELDING SOCIETY. SEE SPECIAL INSPECTIONS SECTION FOR WELDING INSPECTION REQUIREMENTS. ALL WELDING FOR ELEMENTS OF THE LATERAL FORCE RESISTING SYSTEM SHALL PER AWS D1.8-16. 10.THE CONTRACTOR SHALL SUBMIT ALL WELDING PROCEDURE SPECIFICATIONS FOR REVIEW AND APPROVAL BY SEOR. THE SUBMITTED WELDING PROCEDURES SHALL INCLUDE ONLY THOSE PROCEDURES RELEVANT TO THIS PROJECT. ALL WELDED JOINTS SHALL BE PREQUALIFIED PER AWS OR BE QUALIFIED BY TEST PER AWS. A PROCEDURE QUALIFICATION RECORD (PQR) SHALL BE INCLUDED WITH THE WPS IF THE WELDING PROCEDURE OR JOINT IS QUALIFIED BY TESTING. THE ELECTRODE MANUFACTURER AND PRODUCT/TRADE NAME SHALL BE IDENTIFIED IN THE WPS IN ADDITION TO THE AWS ELECTRODE CLASSIFICATION NAME. A COPY OF THE ELECTRODE MANUFACTURER'S TECHNICAL DATA SHEETS WITH THE RECOMMENDED WELDING PARAMETERS SHALL BE SUBMITTED WITH THE WPS. 11.100 PERCENT ULTRASONIC TESTING IS REQUIRED FOR ALL COMPLETE JOINT PENETRATION GROOVE WELDS. 12.IF INTERMIXING OF WELD FILLER MATERIAL IS REQUIRED AT SPECIFIC WELDED JOINTS, AND IF ONE OF THE FILLER METALS IS FCAW-S, SUBMIT A WELDING PROCEDURE SPECIFICATION (WPS) AND QUALIFY BY TESTING. 13.DISCONTINUITIES IN WELDS CREATED BY ERRORS OR BY FABRICATION OR ERECTION OPERATIONS, SUCH AS TACK WELDS, ERECTION AIDS, AIR ARC GOUGING AND FLAME CUTTING SHALL BE REPAIRED AS REQUIRED BY SEOR. STRUCTURAL STEEL STRUCTURAL STEEL MATERIALS SHAPE ASTM/GRADE W SHAPES, WT SHAPES A992 PLATES (INCLUDING BASE PLATES)A572 ANGLES, CHANNELS A36 HSS A500 GRB HIGH STRENGTH BOLTES (AS NOTED ON DRAWINGS)A325/F1852, A490SC/F2280SC A325SC/F1852SC ANCHOR RODS (UNLESS NOTED ON DRAWINGS)F1554 GR36 COMMON/MACHINE BOLTS A307 GR A 1.CONDUCT TESTING OF POST- INSTALLED ANCHORS PER SECTION 1901.3.4 OF THE CODE. 2.WHERE THE MANUFACTURER'S INSTALLATION INSTRUCTIONS OR APPLICABLE ICC-ES EVALUATION SERVICES REPORT CALL FOR THE APPLICATION OF AN INSTALLATION TORQUE, THE SPECIFIED TORQUE SHALL BE APPLIED WITH A CALIBRATED TORQUE WRENCH. THE SPECIFIED INSTALLATION TORQUE SHALL NOT BE EXCEEDED. 3.THE SPECIAL INSPECTOR SHALL BE ON THE JOBSITE DURING ANCHOR INSTALLATIONS AS REQUIRED PER CHAPTER 17 OF THE CODE, UNLESS OTHERWISE NOTED IN ICC-ES ESR, TO VERIFY ANCHOR, ANCHOR DIMENSIONS, CONCRETE TYPE, CONCRETE COMPRESSIVE STRENGTH, HOLE DIMENSIONS, ANCHOR SPACING, EDGE DISTANCES, SLAB THICKNESS, ANCHOR EMBEDMENT, AND INSTALLATION TORQUE. 4.TEST LOAD: REQUIRED TEST LOADS SHALL BE DETERMINED BY ONE OF THE FOLLOWING METHODS: A.TWICE THE MAXIMUM ALLOWABLE TENSION LOAD OR ONE AND A QUARTER (1 1/4) TIMES THE MAXIMUM DESIGN STRENGTH PROVIDED BY THE ICC REPORT OR DETERMINED PER ACI 318. THE TENSION TEST LOAD NEED NOT TO EXCEED 80 PERCENT OF THE NOMINAL YIELD STRENGTH OF THE ANCHOR (0.8 As Fy). SEE STRUCTURAL DETAILS FOR DESIGN-BASED TENSION TEST LOADS FOR ADHESIVE ANCHORS. B.THE MANUFACTURER'S RECOMMENDED INSTALLATION TORQUE AS APPROVED BY THE ICC REPORT. 5.TENSION OR TORQUE TESTING OF POST-INSTALLED ANCHORS SHALL BE DONE IN THE PRESENCE OF THE SPECIAL INSPECTOR AND A REPORT OF THE TEST RESULTS SHALL BE SUBMITTED TO THE IOR AND ENFORCEMENT AGENCY. 6.THE SPECIAL INSPECTOR SHALL SELECT ANCHORS FOR TESTING AT RANDOM. 7.TEST FREQUENCY: APPLICATION QUANTITY STRUCTURAL 100% OF BOLTS NON-STRUCTURAL 50%; ALTERNATE BOLTS IN A GROUP (SUCH AS EQUIPMENT ANCHORAGE)(TEST AT LEAST HALF OF THE ANCHORS IN GROUP) SILL PLATE BOLTING 10% OF BOLTS EXCEPTIONS: A.UNDERCUT ANCHORS THAT ALLOW VISUAL CONFIRMATION OF FULL SET SHALL NOT REQUIRE TESTING. B.WHERE THE FACTORED DESIGN TENSION ON ANCHORS IS LESS THAN 100 LBS AND THOSE ANCHORS ARE CLEARLY NOTED ON THE APPROVED CONSTRUCTION DOCUMENTS. C.WHERE ADHESIVE ANCHOR SYSTEMS ARE USED TO INSTALL REINFORCING DOWEL BARS IN HARDENED CONCRETE, ONLY 25 PERCENT OF THE DOWELS SHALL BE TESTED IF ALL OF THE FOLLOWING CONDITIONS ARE MET: ·THE DOWELS ARE USED EXCLUSIVELY TO TRANSMIT SHEAR FORCES ACROSS JOINTS BETWEEN EXISTING AND NEW CONCRETE. ·THE NUMBER OF DOWELS IN ANY ONE MEMBER EQUALS OR EXCEEDS 12. ·THE DOWELS ARE UNIFORMLY DISTRIBUTED ACROSS SEISMIC FORCE RESISTING MEMBERS (SUCH AS SHEAR WALLS, COLLECTORS, AND DIAPHRAGMS). D.TESTING OF SHEAR DOWELS ACROSS COLD JOINTS IN SLAB ON GRADE, WHERE THE SLAB IS NOT PART OF THE LATERAL FORCE-RESISTING SYSTEM SHALL NOT BE REQUIRED. E.TESTING IS NOT REQUIRED FOR POWER ACTUATED FASTENERS USED TO ATTACH TRACKS OF INTERIOR NON-SHEAR WALL PARTITIONS FOR SHEAR ONLY, WHERE THERE ARE AT LEAST THREE FASTENERS PER SEGMENT OF TRACK. 8.TEST METHODS: TEST LOADS MAY BE APPLIED BY ANY METHOD THAT WILL EFFECTIVELY TRANSMIT A MEASURABLE TENSION LOAD TO THE ANCHOR. ACCEPTABLE METHODS INCLUDE: A.USE OF HYDRAULIC JACK, WHEREBY EITHER UNCONFINED OR CONFINED TESTING SHALL BE ACCEPTABLE; B.USE OF CALIBRATED SPRING LOADED DEVICES; OR C.USE OF A CALIBRATED TORQUE WRENCH FOR TORQUE-CONTROLLED EXPANSION ANCHORS. 9.TEST ACCEPTANCE CRITERIA: ACCEPTANCE CRITERIA FOR POST-INSTALLED ANCHORS SHALL BE BASED ON THE ICC REPORT OR MANUFACTURER'S WRITTEN INSTRUCTION AS ACCEPTABLE TO OSHPD. FIELD TESTS SHALL SATISFY THE FOLLOWING MINIMUM REQUIREMENTS: A.HYDRAULIC RAM METHOD: ANCHORS TESTED WITH A HYDRAULIC JACK OR SPRING LOADED DEVICES SHALL MAINTAIN THE TEST LOAD FOR A MINIMUM OF 15 SECONDS AND SHALL EXHIBIT NO DISCERNABLE MOVEMENT DURING THE TENSION TEST, E.G. AS EVIDENCED BY LOOSENING OF THE WASHER UNDER THE NUT. SCREW ANCHORS MAY BE LOOSENED A MAXIMUM ONE FULL TURN TO FACILITATE THE POSITIONING OF A TENSION TEST COLLAR. B.TORQUE WRENCH METHOD: ANCHORS TESTED WITH A CALIBRATED TORQUE WRENCH MUST ATTAIN THE SPECIFIED TORQUE WITHIN HALF (1/2) TURN OF THE NUT. EXCEPTIONS: ·WEDGE OR SLEEVE TYPE: ONE-QUARTER (1/4) TURN OF THE NUT FOR A 3/8 INCH ANCHOR ONLY. ·THREADED TYPE: ONE-QUARTER (1/4) TURN OF THE SCREW AFTER INITIAL SEATING OF THE SCREW HEAD. 10.IF ANY ANCHOR FAILS TESTING, TEST ALL ANCHORS OF THE SAME TYPE, INSTALLED BY THE SAME TRADE, AND NOT PREVIOUSLY TESTED UNTIL TWENTY (20) CONSECUTIVE ANCHORS PASS, THEN RESUME INITIAL TEST FREQUENCY. 11.REQUIRED TORQUE TEST LOADS SHALL BE EQUAL TO THE MANUFACTURER'S RECOMMENDED INSTALLATION TORQUE PROVIDED IN THE ICC-ESR FOR THE SPECIFIC ANCHOR. TEST TORQUE VALUES ARE SUMMARIZED IN THE TABLE BELOW: TESTING CRITERIA FOR POST-INSTALLED ANCHORS IN CONCRETE / MASONRY SIMPSON LOCATION IN STRUCTURE INSTALLATION TORQUE (FT-LBS) CONCRETE SUBSTRATE SIMPSON STRONG-BOLT2 (ICC ES ESR 3037) SIMPSON TITEN HD (ICC ES ESR-2713)INCHES 1 4 4 24 3 8 30 50 1 2 60 65 5 8 90 100 3 4 150 150 POST-INSTALLED ANCHORS IN CONCRETE / MASONRY 1.POST-INSTALLED ANCHOR CAPACITIES IN CONCRETE SHALL BE DETERMINED PER SECTION 1901.3 OF THE CODE AND ACI 318-19 CHAPTER 17 USING STRENGTH DESIGN. 2.POST INSTALLED ANCHORS IN CONCRETE AND MASONRY SHALL BE PREQUALIFIED FOR SEISMIC APPLICATIONS IN ACCORDANCE WITH THE FOLLOWING INSTALLATION OF POST-INSTALLED ANCHORS SHALL BE IN ACCORDANCE WITH THE LISTED APPLICABLE ICC EVALUATION REPORT. **LIMITATIONS OF USE OF POWER ACTUATED FASTENERS: PER SECTION 13.4.5 OF ASCE 7-16 POWER ACTUATED FASTENERS IN CONCRETE OR STEEL SHALL NOT BE USED FOR SUSTAINED TENSION LOADS OR FOR BRACE APPLICATIONS IN SEISMIC UNLESS APPROVED FOR SEISMIC LOADING. POWER ACTUATED FASTENERS IN MASONRY SHALL NOT BE PERMITTED UNLESS APPROVED FOR SEISMIC LOADING. EXCEPTION: POWER ACTUATED FASTENERS IN CONCRETE USED FOR SUPPORT OF ACOUSTICAL TILE OR LAY-IN PANEL SUSPENDED CEILING APPLICATIONS AND DISTRIBUTED SYSTEMS WHERE THE SERVICE LOAD ON ANY INDIVIDUAL FASTENER DOES NOT EXCEED 90 LB. 3.EXPANSION ANCHOR EMBEDMENTS IN THE DRAWINGS ARE MINIMUM "EFFECTIVE EMBEDMENTS" (hef) AS SHOWN IN THE ICC REPORT CORRESPONDING TO THE ANCHOR. 4.LOCATE ALL EXISTING REINFORCEMENT BY NON-DESTRUCTIVE MEANS (X-RAY, PACOMETER, GPR, ETC.) PRIOR TO DRILLING OR INSTALLING POST-INSTALLED ANCHORS. COORDINATE POST-INSTALLED ANCHOR LOCATIONS WITH LOCATIONS OF EXISTING REINFORCEMENT. DO NOT CUT OR DAMAGE EXISTING REINFORCEMENT. 5.ALL POST-INSTALLED ANCHORS USED IN DRY INTERIOR CONDITIONS SHALL BE CARBON STEEL, U.N.O 6.ALL POST-INSTALLED ANCHORS USED AT EXTERIOR CONDITIONS, EXPOSED TO THE ELEMENTS, OR USED IN A DAMP ENVIRONMENT (I.E. KITCHENS) SHALL BE STAINLESS STEEL, U.N.O. 7.WHERE POST-INSTALLED MECHANICAL ANCHORS ARE USED FOR NON-VIBRATION ISOLATED MECHANICAL EQUIPMENT RATED OVER 10 HP, THEY SHALL BE QUALIFIED IN ACCORDANCE WITH ACI 355.2. 8.IF THE CONCRETE CRACKS DURING THE INSTALLATION OF AN ANCHOR, THE ANCHOR SHALL BE REMOVED OR ABANDONED. FOR ABANDONED ANCHORS AND ABANDONED ANCHOR HOLES: A.FILL ALL EMPTY ABANDONED ANCHOR HOLES WITH A DRY-PACK MORTAR. B.FOR ABANDONED EXPANSION ANCHORS WHICH CANNOT BE REMOVED WITHOUT DAMAGING THE SUBSTRATE, CUT/BURN OFF THE END OF THE BOLT FLUSH WITH THE FACE OF CONCRETE/MASONRY AND THEN DRIVE ABANDONED ANCHOR TO BOTTOM OF HOLE. FILL REMAINDER OF HOLE WITH A DRY-PACK MORTAR. C.FOR ABANDONED ADHESIVE OR UNDERCUT ANCHORS WHICH CANNOT BE REMOVED WITHOUT DAMAGING THE SUBSTRATE, BURN OFF THE END OF THE BOLT/ROD 1" BELOW THE SURFACE OF CONCRETE/MASONRY AND FILL REMAINDER OF HOLE WITH A DRY-PACK MORTAR. D.ABANDONED ANCHOR HOLES (WHETHER FILLED WITH DRY-PACK OR CONTAINING ABANDONED ANCHORS) MAY NOT BE LOCATED ANY CLOSER THAN 3x DIAMETER CENTER-TO-CENTER TO ANY ANCHOR IN SERVICE. ANCHORS NOT MEETING THIS MINIMUM SPACING MAY HAVE REDUCED CAPACITY AND SHALL BE REVIEWED WITH THE SEOR. SUBSTRATE MATERIAL ANCHOR TYPE ANCHOR PRODUCT ICC EVALUATION REPORT ACCEPTANCE CRITERIA CONCRETE EXPANSION ANCHORS SIMPSON STRONGBOLT 2 ICC ESR-3037 AC193 CMU EXPANSION ANCHORS SIMPSON STRONGBOLT 2 IAPMO ES ER 240 AC01 OR AC106 CONCRETE SCREW ANCHOR SIMPSON TITEN HD ICC ESR-2713 AC193 CMU SCREW ANCHOR SIMPSON TITEN HD ICC ESR-1056 AC106 CONCRETE ADHESIVE ANCHORS SIMPSON SET-3G ICC ESR-4057 AC193 CMU ADHESIVE ANCHOR SIMPSON SET-3G ICC ESR-4844 AC58 CONCRETE POWER ACTUATED FASTENER**SIMPSON PDPAW ICC ESR-2138 AC70 S-104 SP E C I A L I N S P E C T I O N & T E S T S CITY SPECIFICATION NO. DATE: PR O J E C T T I T L E : SH E E T T I T L E : SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 11 0 6 W A L N U T F E N C I N G I M P R O V E M E N T S J. LONG J. MEADOWS AS NOTED 2504-05-PS23 2000577-02 E R P R No. 6488 S T UC T U R A LS TAT OF C A L I F O R NIA EGISTE R E D R O F E SS IONAL EN G I N E E RJESSICA M . MEA D O W S N: \ 2 4 0 0 \ 2 5 0 4 - 0 5 - P S 2 3 - S L O - P D - N - B u i l d i n g - F e n c i n g \ S t r u c t u r a l \ C o n D o c s \ S h e e t - F i l e s \ 2 5 0 4 - 0 5 - P S 2 3 - S 1 0 4 . d w g , S 1 0 4 , A u g 2 3 , 2 0 2 4 1 0 : 1 1 a m , j d l o n g AUGUST 23, 2024 10 0 % C O N S T R U C T I O N D O C U M E N T S 1.THIS STATEMENT OF SPECIAL INSPECTIONS HAS BEEN PREPARED PURSUANT TO SECTION 1704.3 OF THE CODE . THIS SECTION DETAILS BOTH REQUIRED SPECIAL INSPECTIONS AND TESTS INCLUDING TESTING PER SECTION 1705 OF THE CODE. THE FOLLOWING SHALL BE OBSERVED DURING THEIR IMPLEMENTATION: A.GENERAL: a.STRUCTURAL VERIFICATIONS, INSPECTIONS AND TESTS SHALL BE PERFORMED IN ACCORDANCE WITH CHAPTER 17 OF THE CODE AND/OR THE APPLICABLE REFERENCE STANDARD. B.OWNER REQUIREMENTS: a.THE OWNER OR OWNER'S AGENT SHALL EMPLOY ONE OR MORE APPROVED AGENCIES TO PERFORM INSPECTIONS DURING CONSTRUCTION ON THE TYPES OF WORK LISTED IN SECTION 1705 OF THE CODE AND IN THIS STATEMENT OF INSPECTIONS. C.SPECIAL INSPECTOR QUALIFICATIONS: a.THE SPECIAL INSPECTIONS SHALL PROVIDE WRITTEN DOCUMENTATION TO THE BUILDING OFFICIAL DEMONSTRATING HIS OR HER COMPETENCE AND RELEVANT EXPERIENCE OR TRAINING. THE EXPERIENCE OR TRAINING SHALL BE CONSIDERED RELEVANT WHEN THE DOCUMENTED EXPERIENCE OR TRAINING IS RELATED IN COMPLEXITY TO THE SAME TYPE OF SPECIAL INSPECTION ACTIVITIES FOR PROJECTS OF SIMILAR COMPLEXITY AND MATERIAL QUANTITIES. D.CONTRACTOR REQUIREMENTS: a.SPECIAL INSPECTION IS IN ADDITION TO THE CONTRACTOR'S QUALITY CONTROL INSPECTIONS AND TESTING. THE CONTRACTOR'S QUALITY CONTROL INSPECTIONS AND TESTING SHALL OCCUR PRIOR TO SPECIAL INSPECTION AND REPORTS SHALL BE AVAILABLE TO THE SPECIAL INSPECTOR. b.THE CONTRACTOR SHALL ENSURE THAT THE WORK FOR WHICH SPECIAL INSPECTION IS REQUIRED REMAINS ACCESSIBLE AND EXPOSED FOR SPECIAL INSPECTION PURPOSES UNTIL COMPLETION OF THE REQUIRED SPECIAL INSPECTION. c.ANY CONTRACTOR RESPONSIBLE FOR THE CONSTRUCTION OF THE MAIN WIND OR SEISMIC FORCE RESISTING SYSTEM SHALL SUBMIT A WRITTEN STATEMENT OF RESPONSIBILITY TO THE BUILDING OFFICIAL AND OWNER PRIOR TO COMMENCEMENT OF WORK ON THE SYSTEM OR COMPONENT. THE STATEMENT OF RESPONSIBILITY SHALL CONTAIN ACKNOWLEDGEMENT OF AWARENESS OF THE SPECIAL INSPECTION REQUIREMENTS CONTAINED IN THE STATEMENT OF SPECIAL INSPECTIONS. E.SPECIAL INSPECTOR REPORT REQUIREMENTS: a.THE SPECIAL INSPECTOR SHALL KEEP RECORD OF INSPECTIONS b.THE SPECIAL INSPECTOR SHALL FURNISH INSPECTION REPORTS TO THE BUILDING OFFICIAL AND TO THE ARCHITECT AND STRUCTURAL ENGINEER OF RECORD. c.REPORTS SHALL INDICATE THAT WORK INSPECTED WAS OR WAS NOT COMPLETED IN CONFORMANCE TO APPROVED CONSTRUCTION DOCUMENTS. d.DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE CONTRACTOR FOR CORRECTION. e.IF NOT CORRECTED DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE BUILDING OFFICIAL AND THE ARCHITECT AND STRUCTURAL ENGINEER OF RECORD PRIOR TO THE COMPLETION OF THAT PHASE OF WORK. f.A FINAL REPORT DOCUMENTING SPECIAL INSPECTIONS AND CORRECTION OF ANY DISCREPANCIES NOTED SHALL BE SUBMITTED TO THE BUILDING OFFICIAL. STATEMENT OF SPECIAL INSPECTIONSREQUIRED VERIFICATION AND INSPECTIONS REQUIRED VERIFICATION AND INSPECTIONS MASONRY LEVEL 3 QUALITY ASSURANCE MINIMUM TESTS PRIOR TO CONSTRUCTION, VERIFY CERTIFICATES OF COMPLIANCE USED IN MASONRY CONSTRUCTION IN ACCORDANCE WITH SPECIFICATION ARTICLE 1.5 VERIFICATION OF f'm AND f'AAC IN ACCORDANCE WITH SPECIFICATION ARTICLE 1.4 B PRIOR TO CONSTRUCTION AND FOR EVERY 5000 sq. ft. DURING CONSTRUCTION VERIFICATION OF PROPORTIONS OF MATERIALS IN PREMIXED OR PREBLENDED MORTAR, PRESTRESSING GROUT, AND GROUT OTHER THAN SELF-CONSOLIDATION GROUT, AS DELIVERED TO THE PROJECT SITE VERIFICATION OF SLUMP FLOW AND VISUAL STABILITY INDEX (VSI) AS DELIVERED TO THE PROJECT SITE IN ACCORDANCE WITH SPECIFICATION ARTICLE 1.5 & 1.6.3 FOR SELF-CONSOLIDATING GROUT MINIMUM SPECIAL INSPECTION INSPECTION TASK FREQUENCY (a)REFERENCE FOR CRITERIA CONT PERIODIC TMS 402 TMS 602 1. VERIFY COMPLIANCE WITH THE APPROVED SUBMITTALS X Art. 1.5 2. AS MASONRY CONSTRUCTION BEGINS, VERIFY THAT THE FOLLOWING ARE IN COMPLIANCE: a. PROPORTIONS OF SITE-PREPARED MORTAR X Art. 2.1, 2.6 A b. GRADE AND SIZE OF PRESTRESSING TENDONS AND ANCHORAGES X Art. 2.4 B, 2.4 H c. GRADE, TYPE AND SIZE OF REINFORCEMENT, CONNECTORS, ANCHOR BOLTS AND PRESTRESSING TENDONS AND ANCHORAGES X Art. 3.4, 3.6A d. PRESTRESSING TECHNIQUE X Art. 3.6 B e. PROPERTIES OF THIN-BED MORTAR FOR AAC MASONRY X Art. 2.1 C f. SAMPLE PANEL CONSTRUCTION X Art. 1.6 D 3. PRIOR TO GROUTING, VERIFY THAT THE FOLLOWING ARE IN COMPLIANCE: a. GROUT SPACE X Art. 3.2 D, 3.2 F b. PLACEMENT OF PRESTRESSING TENDONS AND ANCHORAGES X SEC. 10.8, 10.9 Art. 2.4, 3.6 c. PLACEMENT OF REINFORCEMENT, CONNECTORS AND ANCHOR BOLTS X SEC. 6.3.1, 6.3.6, 6.3.7 Art. 3.2 E, 3.4, d. PROPORTIONS OF SITE-PREPARED GROUT AND PRESTRESSING GROUT FOR BONDED TENDONS X Art. 2.6 B, 2.4 G.1.b 4. VERIFY DURING CONSTRUCTION: a. MATERIALS AND PROCEDURES WITH THE APPROVED SUBMITTALS X Art. 1.5 b. PLACEMENT OF MASONRY UNITS AND MORTAR JOINT CONSTRUCTION X Art. 3.3 B c. SIZE AND LOCATION OF STRUCTURAL ELEMENTS X Art. 3.3 F d. TYPE, SIZE AND LOCATION OF ANCHORS, INCLUDING OTHER DETAILS OF ANCHORAGE OF MASONRY TO STRUCTURAL MEMBERS, FRAMES OR OTHER CONSTRUCTION X SEC. 1.2.1(e), 6.1.4.3, 6.2.1 e. WELDING OF REINFORCEMENT X SEC. 6.1.6.2 f. PREPARATION, CONSTRUCTION AND PROTECTION OF MASONRY DURING COLD WEATHER (TEMPERATURE BELOW 40°F ) OR HOT WEATHER (TEMPERATURE ABOVE 90°F ) X Art. 1.8 C, 1.8 D g. APPLICATION AND MEASUREMENT OF PRESTRESSING FORCE X Art. 3.6 B h. PLACEMENT OF GROUT AND PRESTRESSING GROUT FOR BONDED TENDONS IS IN COMPLIANCE X Art. 3.5, 3.6 C i. PLACEMENT OF AAC MASONRY UNITS AND CONSTRUCTION OF THIN-BED MORTAR JOINTS X Art. 3.3 B.9, 3.3 F.1.b 5. OBSERVE PREPARATION OF GROUT SPECIMENS, MORTAR SPECIMENS AND/OR PRISMS X Art. 1.4 B.2.a.3, 1.4 B.2.b.3, 1.4 B.2.c.3, 1.4 B.3, 1.4 B.4 (a) FREQUENCY REFERS TO THE FREQUENCY OF SPECIAL INSPECTION, WHICH MAY BE CONTINUOUS DURING THE TASK LISTED OR PERIODIC DURING THE TASK LISTED, AS DEFINED IN THE TABLE (b) REQUIRED FOR THE FIRST 5000 SQ FT OF AAC MASONRY (c) REQUIRED AFTER THE FIRST 5000 SQ FT OF AAC MASONRY REQUIRED VERIFICATION AND INSPECTIONS STEEL WELDING INSPECTION TASKS PRIOR TO WELDING (AISC 360-16 N.5.4-1)QC QA AWS 2015 D1.1 REFERENCE 1. WELDING PROCEDURE SPECIFICATIONS (WPSs) AVAILABLE P P 6.3 2. MANUFACTURER CERTIFICATIONS FOR WELDING CONSUMABLES AVAIALABLE P P 6.2 3. WPS AVAILABLE P P - 4. MATERIAL IDENTIFICATION (TYPE/GRADE)O O 6.2 5. WELDER IDENTIFICATION SYSTEM O O 6.4 6. FIT-UP OF GROOVE WELDS (INCLUDING JOINT GEOMETRY) - JOINT PREPARATION - DIMENSIONS (ALIGNMENT, ROOT OPENING, ROOT FACE, BEVEL) - CLEANLINESS (CONDITION OF STEEL SURFACES) - TACKING (TACK WELD QUALITY AND LOCATION) - BACKING TYPE AND FIT (IF APPLICABLE) O O 6.5.2 5.22 5.15 5.18 5.10, 5.22.1.1 7. FIT-UP OF GROOVE WELDS OF HSS T-, Y-, AND K-JOINTS WITHOUT BACKING (INCLUDING JOINT GEOMETRY) - JOINT PREPARATION - DIMENSIONS (ALIGNMENT, ROOT OPENING, ROOT FACE, BEVEL) - CLEANLINESS (CONDITION OF STEEL SURFACES) - TACKING (TACK WELD QUALITY AND LOCATION) P O - - - - 8. CONFIGURATION AND FINISH OF ACCESS HOLES O O 6.5.2, 5.1.7 & AISC 360-16 J1.6 9. FIT-UP OF FILLET WELDS - DIMENSIONS (ALIGNMENT, GAPS AT ROOT) - CLEANLINESS (CONDITION OF STEEL SURFACES) - TACKING (TACK WELD QUALITY AND LOCATION) O O 5.22.1 5.15 5.18 10. CHECK WELDING EQUIPMENT O ___6.2, 5.11 INSPECTION TASKS DURING WELDING (AISC 360-16 N.5.4-2) 1. CONTROL AND HANDLING OF WELDING CONSUMABLES -PACKAGING -EXPOSURE CONTROL O O 6.2 5.3.1 5.3.2 (SMAW) 5.3.3 (SAW) 2. NO WELDING OVER CRACKED TACK WELDS O O 5.18 3. ENVIRONMENTAL CONDITIONS - WIND SPEED WITHIN LIMITS - PRECIPITATION AND TEMPERATURE O O 5.12.1 5.12.2 4. WPS FOLLOWED - SETTINGS ON WELDING EQUIPMENT - TRAVEL SPEED - SELECTED WELDING MATERIALS - SHIELDING GAS TYPE/FLOW RATE - PREHEAT APPLIED - INTERPASS TEMPERATURE MAINTAINED (MIN/MAX) - PROPER POSITIONS (F, V, H, OH) O O 6.3.3, 6.5.2, 5.5, 5.21 5.6, 5.7 5. WELDING TECHNIQUES - INTERPASS AND FINAL CLEANING - EACH PASS WITHIN PROFILE LIMITATIONS - EACH PASS MEETS QUALITY REQUIREMENTS O O 6.5.2, 6.5.3, 5.24 5.30.1 6. PLACEMENT AND INSTALLATION OF STEEL HEADED STUD ANCHORS P P - INSPECTION TASKS AFTER WELDING (AISC 360-16 N.5.4-3) 1. WELDS CLEANED O O 5.30.1 2. SIZE, LENGTH AND LOCATION OF WELDS P P 6.5.1 3. WELDS MEET VISUAL ACCEPTANCE CRITERIA - CRACK PROHIBITION - WELD/BASE-METAL FUSION - CRATER CROSS SECTION - WELD PROFILES - WELD SIZE - UNDERCUT - POROSITY P P 6.5.3 TABLE 6.1(1) TABLE 6.1(2) TABLE 6.1(3) TABLE 6.1(4), 5.24 TABLE 6.1(6) TABLE 6.1(7) TABLE 6.1(8) 4. ARC STRIKES P P 5.29 5. k-AREA P P AISC 360-16 CA3.1c & J10.8 6. WELD ACCESS HOLES IN ROLLED HEAVY SHAPES AND BUILT-UP HEAVY SHAPES [b]P P - 7. BACKING REMOVED AND WELD TABS REMOVED (IF REQUIRED)P P 5.10, 5.31 8. REPAIR ACTIVITIES P P 6.5.3, 5.26 9. DOCUMENT ACCEPTANCE OR REJECTION OF WELDED JOINT OR MEMBER P P 6.5.4, 6.5.5 10. NO PROHIBITED WELDS HAVE BEEN ADDED WITHOUT THE APPROVAL OF THE EOR O O - STEEL BOLTING INSPECTION TASKS PRIOR TO BOLTING (AISC 360-16 N.5.6-1)QC QA 2014 RCSC SPEC. REFERENCE 1. MANUFACTURER'S CERTIFICATIONS AVAILABLE FOR FASTENER MATERIALS O P 2.1, 9.1 2. FASTENERS MARKED IN ACCORDANCE WITH ASTM REQUIREMENTS O O FIGURE C-2.1, 9.1 (SEE ASTM STANDARDS) 3. CORRECT FASTENERS SELECTED FOR THE JOINT DETAIL (GRADE, TYPE, BOLT LENGTH IF THREADS ARE TO BE EXCLUDED FROM SHEAR PLANE)O O 2.3.2, 2.7.2, 9.1 4. CORRECT BOLTING DETAILS SELECTED FOR THE JOINT DETAIL.O O 4, 8 5. CONNECTING ELEMENTS, INCLUDING THE APPROPRIATE FAYING SURFACE CONDITION AND HOLE PREPARATION, IF SPECIFIED, MEET APPLICABLE REQUIREMENTS. O O 3, 9.1, 9.3 6. PRE-INSTALLATION VERIFICATION TESTING BY INSTALLATION PERSONNEL OBSERVED AND DOCUMENTED FOR FASTENER ASSEMBLIES AND METHODS USED. P O 7, 9.2 7. PROTECTED STORAGE PROVIDED FOR BOLTS, NUTS, WASHERS, AND OTHER FASTENER COMPONENTS O O 2.2, 8, 9.1 INSPECTION TASKS DURING BOLTING (AISC 360-16 N.5.6-2) 1. FASTENER ASSEMBLIES, PLACED IN ALL HOLES AND WASHERS AND NUTS ARE POSITIONED AS REQUIRED.O O 8.1, 9.1 2. JOINT BROUGHT TO THE SNUG-TIGHT CONDITION PRIOR TO THE PRE-TENSIONING OPERATION O O 8.1, 9.1 3. FASTENER COMPONENT NOT TURNED BY THE WRENCH PREVENTED FROM ROTATING O O 8.2, 9.2 4. FASTENERS ARE PRETENSIONED IN ACCORDANCE WITH THE RCSC SPECIFICATION PROGRESSING SYSTEMATICALLY FROM THE MOST RIGID POINT TOWARD THE FREE EDGES. O O 8.2, 9.2 INSPECTION TASKS AFTER BOLTING (AISC 360-16 N.5.6-3) 1. DOCUMENT ACCEPTANCE OR REJECTION OF BOLTED CONNECTIONS P P ___ CONCRETE CONSTRUCTION CODE TABLE 1705.3 SPECIAL INSPECTION OR TEST CO N T I N U O U S PE R I O D I C REFERENCED STANDARD CBC REFERENCE 1. INSPECT REINFORCMENT, INCLUDING PRESTRESSING TENDONS, AND VERIFY PLACEMENT.___X ACI 318: CH 20, 25.2, 25.3, 26.6.1-26.6.3 ___ 2. REINFORCING BAR WELDING: a. VERIFY WELDABILITY OF REINFORCING BARS OTHER THAN ASTM A706 b. INSPECT SINGLE-PASS FILLET WELDS, MAXIMUM 5 16" AND c. INSPECT ALL OTHER WELDS ___ ___ X X X ___ AWS D1.4 ACI 318: 26.6.4 ___ 3. INSPECT ANCHORS CAST IN CONCRETE ___X ACI 318: 26.7 ___ 4. INSPECT ANCHORS POST-INSTALLED IN HARDENED CONCRETE MEMBERS (b) (a) ADHESIVE ANCHORS INSTALLED IN HORIZONTALLY OR UPWARDLY INCLINED ORIENTATIONS TO RESIST SUSTAINED TENSION LOADS (b) MECHANICAL ANCHORS AND ADHESIVE ANCHORS NOT DEFINED IN 4.a. X ___ ___ X ACI 318: 26.7.1 ACI 318: 26.7.1 ___ ___ 5. VERIFY USE OF REQUIRED MIX DESIGN ___X ACI 318: CH. 19, 26.4.3, 26.4.4 1904.1, 1904.2 6. PRIOR TO CONCRETE PLACEMENT, FABRICATE SPECIMENS FOR STRENGTH TESTS, PERFORM SLUMP AND AIR CONTENT TESTS, AND DETERMINE THE TEMPERATURE OF THE CONCRETE. X ___ ASTM C 172 ASTM C 31 ACI 318: 26.5, 26.12 ___ 7. INSPECT CONCRETE AND SHOTCRETE PLACEMENT FOR PROPER APPLICATION TECHNIQUES X ___ACI 318: 26.5 ___ 8. VERIFY MAINTENANCE OF SPECIFIED CURING TEMPERATURE AND TECHNIQUES.___X ACI 318: 26.5.3- 26.5.5 ___ 9. INSPECT PRESTRESSED CONCRETE FOR: A. APPLICATION OF PRESTRESSING FORCES; AND B. GROUTING OF BONDED PRESTRESSING TENDONS X X ___ ___ACI 318: 26.10 ___ 10. INSPECT ERECTION OF PRECAST CONCRETE MEMBERS.___X ACI 318: 26.9 ___ 11. VERIFY IN-SITU CONCRETE STRENGTH, PRIOR TO STRESSING OF TENDONS IN POST-TENSIONED CONCRETE AND PRIOR TO REMOVAL OF SHORES AND FORMS FROM BEAMS AND STRUCTURAL SLABS ___X ACI 318: 26.11.2 ___ 12. INSPECT FORMWORK FOR SHAPE, LOCATION, AND DIMENSIONS OF THE CONCRETE MEMBER BEING FORMED. ___X ACI 318: 26.11.1.2 (b)___ SPECIAL INSPECTIONS LISTED FOR CONCRETE ALSO APPLY TO GROUTING OPERATIONS. a.WHERE APPLICABLE, SEE SECTION 1705.13. b.SPECIFIC REQUIREMENTS FOR SPECIAL INSPECTION SHALL BE INCLUDED IN THE RESEARCH REPORT FOR THE ANCHOR ISSUED BY AN APPROVED SOURCE IN ACCORDANCE WITH 17.8.2 IN ACI 318, OR OTHER QUALIFICATION PROCEDURES. WHERE SPECIFIC REQUIREMENTS ARE NOT PROVIDED, SPECIAL INSPECTION REQUIREMENTS SHALL BE SPECIFIED BY THE REGISTERED DESIGN PROFESSIONAL AND SHALL BE APPROVED BY THE BUILDING OFFICIAL PRIOR TO THE COMMENCEMENT OF THE WORK. 1.THE FOLLOWING SUBMITTALS SHALL BE SUBMITTED FOR REVIEW AND APPROVAL BY THE ENGINEER: A.REINFORCING STEEL B.CONCRETE MIX DESIGNS FOR ALL CONCRETE STRENGTHS 3,000 PSI AND ABOVE C.MASONRY INCLUDING BLOCKS, GROUT AND MORTAR 2.BEFORE SUBMITTING EACH SUBMITTAL, (INCLUDES SHOP DRAWINGS, PRODUCT DATA, SAMPLES AND SIMILAR SUBMITTALS), THE CONTRACTOR SHALL HAVE: A.REVIEWED AND COORDINATED EACH SUBMITTAL WITH OTHER SUBMITTALS AND WITH THE REQUIREMENTS OF THE WORK AND THE CONTRACT DOCUMENTS. THIS INCLUDES THE CONTRACTOR REVIEWING AND VERIFYING THAT THE SUBMITTAL IS COORDINATED AMONG ALL CONSTRUCTION TRADES: B.DETERMINED AND VERIFIED ALL FIELD MEASUREMENTS, QUANTITIES, DIMENSIONS , SPECIFIED PERFORMANCE AND DESIGN CRITERIA, INSTALLATION REQUIREMENTS, MATERIALS, CATALOG NUMBERS AND SIMILAR INFORMATION C.DETERMINED AND VERIFIED ALL INFORMATION RELATIVE TO THE CONTRACTOR'S RESPONSIBILITIES FOR MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES OF CONSTRUCTION, AND SAFETY PRECAUTIONS AND PROGRAMS. D.REVIEWED AND VERIFIED THAT THE ARCHITECT'S OR ENGINEER'S COMMENTS FROM PREVIOUS SUBMITTAL ROUNDS HAVE BEEN ADDRESSED. 3.EACH SUBMITTAL SHALL BEAR A STAMP OR SPECIFIC WRITTEN CERTIFICATION THAT THE CONTRACTOR HAS SATISFIED THEIR OBLIGATIONS UNDER THE CONTRACT DOCUMENTS WITH RESPECT TO THE CONTRACTOR'S REVIEW AND APPROVAL OF THAT SUBMITTAL. 4.THE CONTRACTOR'S OBLIGATION TO PERFORM AND COMPLETE THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS SHALL BE ABSOLUTE: a.REVIEW AND APPROVAL OF SHOP DRAWINGS BY THE ARCHITECT AND/OR ENGINEER DOES NOT CONSTITUTE APPROVAL OF A CHANGE REQUEST, SUBSTITUTION OR MODIFICATION TO THE CONTRACT DRAWINGS. b.THE ARCHITECT AND ENGINEER SHALL BE NOTIFIED OF CHANGE REQUESTS, SUBSTITUTIONS OR MODIFICATIONS TO THE CONTRACT DRAWINGS IN WRITING BEFORE AND SEPARATE FROM THE SUBMITTAL PRIOR TO SUBMISSION. 5.FABRICATION FOR ITEMS IN THESE DOCUMENTS SHALL NOT COMMENCE UNTIL THE SUBMITTAL HAS BEEN REVIEWED AND APPROVED BY THE ENGINEER. 6.THE CONTRACTOR SHALL ALLOW SUFFICIENT TIME FOR THE ENGINEER OF RECORD TO THOROUGHLY REVIEW SUBMITTAL PACKAGES (10 WORKING DAYS, MINIMUM). SUBMITTALS REINF DEVELOPMENT LENGTH AND SPLICES 2504-05-PS23 - S301 - 12 NTS NOTES: 1.VALUES ABOVE ARE FOR REINFORCEMENT WITH THE FOLLOWING PARAMETERS: A.GRADE 60 REINFORCEMENT B.NORMAL WEIGHT CONCRETE a.FOR LIGHTWEIGHT CONCRETE MULTIPLY THE VALUES ABOVE BY 1.3 C.NON-EPOXY COATED REINFORCEMENT D.HORIZONTAL BARS WITHOUT 12" OF CONCRETE BELOW (BOTTOM BARS), AND VERTICAL BARS a.FOR TOP BARS WITH 12" OR MORE OF CONCRETE BELOW THE BAR MULTIPLY THE VALUES ABOVE BY 1.3 E.CLEAR SPACING NOT LESS THAN db, CLEAR COVER NOT LESS THAN db AND STIRRUPS THROUGH Ld NOT LESS THAN MIN OR CLEAR SPACING NO LESS THAN 2db AND CLEAR COVER NOT LESS THAN db a.FOR OTHER SPACING AND COVER CONDITIONS MULTIPLY THE VALUES ABOVE BY 1.5 F.REINFORCEMENT NOT IN SHEAR WALLS a.FOR REINFORCEMENT IN SHEAR WALLS MULTIPLY THE VALUES ABOVE BY 1.25 2.THE MULTIPLIERS LISTED IN NOTE 1 ABOVE ARE CUMULATIVE INCREASES IN DEVELOPMENT/LAP SPLICE LENGTH. 3.ALL LAP SPLICES REFERENCED IN THE PLANS SHALL BE CLASS B UNLESS NOTED OTHERWISE. 4.WHEN REINFORCING BARS OF TWO SIZES ARE LAP-SPLICED IN TENSION, USE THE LARGER OF THE TENSION CLASS B, LAP SPLICE LENGTH (ls) OF THE SMALLER BAR, AND THE CLASS A, TENSION DEVELOPMENT LENGTH (ld) OF THE LARGER BAR. CONTACT LAP SPLICE (PREFERRED) NON-CONTACT LAP SPLICE LAP SPLICE MA X = L A R G E R O F CLASS B, UNOl s/5 O R 6 " REINFORCING TENSION DEVELOPMENT LENGTH AND LAP SPLICE SCHEDULE BAR SIZE DEVELOPMENT LENGTH, ld (CLASS A LAP SPLICE) LAP SPLICE, ls (CLASS B LAP SPLICE) f'c (psi)f'c (psi) 2,500 3,000 4,000 2,500 3,000 4,000 #3 1'-6"1'-5"1'-3"2'-0"1'-10"1'-7" #4 2'-0"1'-10"1'-7"2'-8"2'-5"2'-1" #5 2'-6"2'-4"2'-0"3'-3"3'-0"2'-7" #6 3'-0"2'-9"2'-5"3'-11"3'-7"3'-2" #7 4'-5"4'-0"3'-6"5'-9"5'-2"4'-6" #8 5'-0"4'-7"4'-0"6'-6"5'-11"5'-2" #9 5'-8"5'-2"4'-6"7'-4"6'-9"5'-10" #10 6'-5"5'-10"5'-1"8'-3"7'-7"6'-7" #11 7'-1"6'-6"5'-7"9'-2"8'-5"7'-3" db 6d b D 6d b * db D 135 HOOK 90 HOOK* * PROVIDE 10db EXTENSIONS IN LIEU OF 6db AT ALL FRAME COLUMNS, GIRDERS, SHEAR WALLS AND SHEAR WALL BOUNDARY MEMBERS BAR SIZE D #3 1 12" #4 2" #5 2 12" OR 3" MIN REINF TIES AND STIRRUPS 2504-05-PS23 - S301 - 13 NTS REINF HOOK DEVELOPMENT LENGTH AND BENDS 2504-05-PS23 - S301 - 22 NTS BAR SIZE D #3 THRU #8 6d #9 THRU #11 8d NOTES: 1.ALL HOOKED BARS SHALL EXTEND AS FAR AS POSSIBLE WITH A MINIMUM 2" END COVER AND WITH EMBEDMENT NOT LESS THAN SHOWN ON THE SCHEDULE UNLESS NOTED OTHERWISE ON PLANS. 2.MINIMUM SIDE COVER = 2 12". 3.FOR LIGHTWEIGHT CONCRETE MULTIPLY LENGTHS IN SCHEDULE BY 1.3. STANDARD HOOK DEVELOPMENT LENGTH "ldh" BAR SIZE D "lh" NORMAL WEIGHT 2,500 3,000 4,000 #3 2 1/4"6"0'-9"0'-9"0'-8" #4 3"8"1'-0"0'-11"0'-10" #5 3 3/4"10"1'-3"1'-2"1'-0" #6 4 1/2"12"1'-6"1'-5"1'-3" #7 5 1/4"1'-2"1'-9"1'-8"1'-5" #8 6"1'-4"2'-0"1'-10"1'-7" #9 9 1/2"1'-7 1/2"2'-3"2'-1"1'-10" #10 10 3/4"1'-10"2'-7"2'-4"2'-1" #11 12"2'-0 1/2"2'-10"2'-7"2'-3" ldh db 4db 2 12" MIN D D 12 d b "l h" 2" CLR MIN HOOK DEVELOPMENT LENGTH (SEE SCHEDULE) FACE OF CONCRETE FOC OR POUR JT @ STD HOOK db LAP SPLICE LAP SPLICE LA P S P L I C E LA P S P L I C E CONCRETE INTERSECTIONCONCRETE CORNER CONCRETE END 0" T Y P . 0" T Y P . 0" TYP 0" TYP DOWELS TO MATCH SIZE & SPCG OF HORIZ REINF, TYP 90 DEG HOOK @ INT BARS PROVIDE 90 DEG STD HOOK, A U-BAR MAY BE PROVIDED W/ LAP SPLICE TO HORIZ BARS IN LIEU OF END HOOKS NOTE: REINFORCEMENT SHOWN ON WALL ELEVATION(S), BOUNDARY REINFORCING DETAILS, AND OTHER SPECIFICALLY REFERENCED DETAILS SHALL TAKE PRECEDENCE OVER REINFORCEMENT SHOWN HERE. DOUBLE MAT LAP SPLICE LAP SPLICE LA P S P L I C E LA P S P L I C E CONCRETE INTERSECTIONCONCRETE CORNER CONCRETE END PROVIDE 90 DEG STD HOOK @ SHEAR WALLS (2) BARS TO MATCH WALL VERT REINF MIN (2) BARS TO MATCH WALL VERT REINF MIN (2) BARS TO MATCH WALL VERT REINF MIN DOWELS TO MATCH SIZE & SPCG OF HORIZ REINF, TYP ALT DOWEL DIRECTION @ INTERSECTION SINGLE MAT CONC REINF @ INTERSECTION 2504-05-PS23 - S301 - 32 NTS STEP FOOTING 2504-05-PS23 - S301 - 41 NTS NOTE: "SH" = 1'-6" MAX "SL" STEP LENGTH = 2 "SH" "S H " "S H " "D" + "SL" "D " DE P T H O F F T G FTG EL = SEE PLAN "S H " S T E P HE I G H T TOP REINF WHERE SHOWN PER PLAN "ls" LAP SPLICE TYP "D" + "SL" "SL" STEP LENGTH = 2 "SH" "ls" LAP SPLICE TYP S S STEP LONG REINF TO MATCH LONG REINF SIZE & SPCG STEP TRANS REINF TO MATCH TRANS REINF SIZE & SPCG FTG REINF PER PLAN & DETAILS "S H " S T E P HE I G H T S S LAP SPLICE DOWEL TO MATCH LONG REINF SIZE & SPCG PLAN CALLOUT STEPPED FOOTING (BOTTOM ONLY) 2504-05-PS23 - S301 - 42 NTS "ls" LAP SPLICE TYP "S H " "S H " "SL" STEP LENGTH = 2 "SH" "ls" LAP SPLICE TYP SB TOP REINF PER PLAN, WO FTG REINF PER PLAN & DETAILS NOTE: "SH" = 1'-6" MAX BOT OF FTG EL = PER PLAN "ld" DEV LENGTH TYP TOP OF FF EL = PER PLAN SB SB SB STEP LONG REINF TO MATCH LONG REINF SIZE & SPCG BOT OF FTG EL = PER PLAN PLAN CALLOUT CITY SPECIFICATION NO. DATE: PR O J E C T T I T L E : SH E E T T I T L E : SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 11 0 6 W A L N U T F E N C I N G I M P R O V E M E N T S J. LONG J. MEADOWS AS NOTED 2504-05-PS23 2000577-02 E R P R No. 6488 ST UC T U R A L S TAT OF C A L I F O R NIA EGISTERE D R O F E SS IONALEN G I N E E RJESSICA M . MEA D O W S N: \ 2 4 0 0 \ 2 5 0 4 - 0 5 - P S 2 3 - S L O - P D - N - B u i l d i n g - F e n c i n g \ S t r u c t u r a l \ C o n D o c s \ S h e e t - F i l e s \ 2 5 0 4 - 0 5 - P S 2 3 - S 3 0 1 . d w g , S 3 0 1 , A u g 2 3 , 2 0 2 4 1 0 : 1 1 a m , j d l o n g AUGUST 23, 2024 10 0 % C O N S T R U C T I O N D O C U M E N T S S-301 TY P I C A L C O N C R E T E D E T A I L S 12223242 13233343 41 SECTION 'A' FENCE ATTACHMENT TO (E) WOOD WALL 2504-05-PS23 - S321 - 43 1" = 1'-0" 2 12" x 2 12" x 12" GA POST W/ OPEN PICKETS BTWN POSTS @ 8'-0" OC (SEE AEGIS II FOR POST DETAILS)6' - 0 " M A X 18 " M I N 1 4" 23 4" TY P 112" TYP 912" 11 " 9 12" x 11" x 14" STL PL, EA FACE OF WOOD BOARD 5 8" Ø 'A307' BOLT (E) WOOD FENCE TO REMAIN A 1'-3" x 0'-9" x 1 4" THK STL PL EA FENCE POST (E) CMU WALL & REINF TO REMAIN 'SET-3G' W/ 3 8" Ø F1554 GR. 36 W/ 3" EMBED, MIN 10 12" MI N 6" 112" TYP A SECTION 'A' 14" 5' - 0 " M A X 2 12" x 2 12" x 12" GA POST W/ OPEN PICKETS BTWN POSTS @ 8'-0" OC (SEE AEGIS II FOR POST DETAILS) FENCE ATTACHMENT TO (E) CMU WALL 2504-05-PS23 - S321 - 33 1" = 1'-0" 112" TY P 112" TY P 12 " M I N 12 " M I N TO B A S E O F W A L L 6" TYP 4" MIN EMBED MASONRY WALL CORNER DETAIL 2504-05-PS23 - S321 - 31 NTS INTERSECTION CORNER/END STD 90° HOOK & ALTERNATE BREAK SHELL FOR FLOW OF GROUT OPEN END BLK (2) #5 VERT MIN STD 90° HOOK & ALTERNATE BREAK SHELL FOR FLOW OF GROUT OPEN END BLK PROVIDE 180° HOOK AT SHEAR WALL (2) #5 VERT, MIN PLAN - SINGLE MAT CMU SITE WALL 2504-05-PS23 - S321 - 32 1" = 1'-0" FINISH GRADE OR SURFACE (3) #4 BARS, T&B #4 @ 16" OC, T&B 2'-0" 1' - 4 " 8" M I N #4 @ 16" OC (2) #4 @ TOP OF WALL 8" FULLY GROUTED CMU WALL #5 VERTS @ 16" OC 3' - 0 " M A X H E I G H T CMU PILASTER 2504-05-PS23 - S321 - 42 1" = 1'-0" (3) #3 TIES @ TOP OF WALL SOLID CAP, WHERE OCCURS DOWEL TO MATCH SIZE & SPCG OF VERT REINF 1' - 4 " #5 @ 12" OC #5 @ 12" OC 3'-6" SQ ALT HOOK LOCATION, EVERY OTHER TIE STD 8" x 8" x 16" BLKS OR 16" x 8" x 16" PILASTER BLKS 12" CL R(4) #5 VERT BARS A PILASTER PLAN VIEW 8' - 0 " M A X COMPACTED FILL 8" M I N 1' - 4 " M I N I F R E Q ' D F O R L A N D S C A P I N G STD HOOK 3" C L R TY P LA P S P L I C E #3 TIES @ 8" OC 16" MAX LOWER SITE WALL PER DETAIL 32/- "d b" "6 d b" "D" "6 d b " * "d b" "D" 135 HOOK 90 HOOK* BAR SIZE D #3 1 12" #4 2" #5 2 12" O R 3 " M I N "ldh" "d b" "d b" "4 db" 2 12" MIN "D" "D" "1 2 d b" " l h" 12" MIN BAR SIZE D #3 THRU #8 6db #9 THRU #11 8db HOOK DEVELOPMENT LENGTH (SEE SCHED) FACE OF MASONRY BAR SIZE DEVELOPMENT LENGTH (ld) OR LAP SPLICE LENGTH (ls) HOOK DEVELOPMENT LENGTH (le) D ln #3 2'-3"0'-5"2 14 5" #4 3'-0"0'-7"3 8" #5 3'-9"0'-9"3 3 4 10" #6 4'-6"0'-10"4 12 1'-0" #7 5'-3"0'-12"5 1 4 1'-2" #8 6'-0"1'-1"6 1'-4" #9 6'-9"1'-3"9 1 2 1'-7 12" NOTES: 1.USE DEVELOPMENT LENGTH (ld) AND SPLICE LENGTH (ls) INDICATED IN SCHEDULE FOR ALL DOWEL LENGTHS NOT SHOWN ON PLANS UNLESS OTHERWISE PERMITTED BY THE SEOR AND JURISDICTION AGENCY 2.DEVELOPMENT LENGTHS (ld) AND SPLICE LENGTHS (ls) INDICATED IN SCHEDULE CORRESPOND TO GRADE 60 BARS IN 1,500 OR 2,500 psi NORMAL WEIGHT MASONRY 3.THIS SCHEDULE SHALL BE USED WHERE DEVELOPMENT AND SPLICE LENGTHS ARE NOT SPECIFICALLY DETAILS AND DIMENSIONED ON THE DRAWINGS 4.WHERE BARS OF DIFFERENT SIZES ARE LAP SPLICED, SPLICE LENGTH SHALL BE THE SPLICE LENGTH OF THE SMALLER BARS 5.NOTE THAT THE LAP SPLICES SHOWN ACCOUNT FOR THE INCREASE IN LAP SPLICE IN REGIONS OF MOMENT WHERE THE DESIGN TENSILE STRESSES IN THE REINFORCEMENT ARE GREATER THAN 80 PERCENT OF THE ALLOWABLE STEEL TENSION STRESS, Fs 6.D = FINISHED INSIDE BEND DIAMETER 7.db = NOMINAL BAR DIAMETER CONTACT LAP SPLICE (PREFERRED) NON-CONTACT LAP SPLICE LAP SPLICE PER SCHED MA X = S M A L L E R O F "l s"/ 5 " O R 8 " LAP SPLICE PER SCHED LAP SPLICE PER SCHED LAP SPLICE PER SCHED "d b" CL E A R SP C G CL E A R SP C G TYPICAL LAP SPLICES STAGGERED SPLICING FACE OF MASONRY OR JT @ STD HOOK 2 12 TYPICAL COLUMN BAR OFFSET MASONRY-LAP SPLICE / DEVELOPMENT LENGTH SCHED 2504-05-PS23 - S321 - 13 NTS TYP REINF AT TOP OF WALL 2504-05-PS23 - S321 - 21 NTS 12" TYP FROM INSIDE FACE OF CELL TOP OF WALL STD 90° HOOK TURN INTO PLANE OF WALL TYP HORIZ WALL REINF PER SCHED TYP VERT WALL REINF PER SCHED TYP HORIZ WALL REINF PER SCHED "U" BARS TO MATCH VERT REINF, TYP 2 BARS AT TOP MIN ( (2) #4 MIN) SINGLE MAT DOUBLE MAT CONCRETE MASONRY WALL PIERS 2504-05-PS23 - S321 - 22 NTS 'T' TO LESS THAN 3x'T' BL O C K T H I C K N E S S 'T ' 3T TO 5T JAMB REINF JAMB REINF EA END #3 TIES @ 8" OC TIES SAME SIZE & SPACING TO MATCH SPECIFIED REINF NOTE: TIE MAY BE TURNED UP AS NECESSARY TO FIT INSIDE WALL. BREAK WEBS AND/OR INTERIOR FACE SHELL AS REQUIRED BL O C K T H I C K N E S S 'T ' MASONRY ANCHOR BOLT SCHEDULE 2504-05-PS23 - S321 - 23 NTS MIN EMBED 1" M I N G R O U T AL L A R O U N D ANCHOR BOLT FACE OF MASONRY BOLT SIZE MINIMUM EMBEDMENT 12"4" 5 8"5" 3 4"6" 7 8"7" 1"8" 1 18"9" 1 14"10" NOTES: 1.MINIMUM BOLT SPACING SHALL BE 16 BOLT DIAMETERS WITH A MINIMUM EDGE DISTANCE OF 12 DIAMETERS, UNLESS NOTED OTHERWISE. 2.PROVIDE AN ADDITIONAL 2" OF EMBEDMENT FOR ANCHOR BOLTS LOCATED IN THE TOP OF COLUMNS. 3.ANCHOR BOLTS SHALL BE HEX HEADED WITH THE DIMENSIONS OF THE HEX CONFORMING TO ANSI/ASME B18.2.1 BENT BAR ANCHORS SHALL NOT BE USED. MAX FOR 8" MASONRY MAX FOR 12" MASONRY 1" CLR MIN CITY SPECIFICATION NO. DATE: PR O J E C T T I T L E : SH E E T T I T L E : SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION 11 0 6 W A L N U T F E N C I N G I M P R O V E M E N T S J. LONG J. MEADOWS AS NOTED 2504-05-PS23 2000577-02 E R P R No. 6488 S T UC T U R A LS TAT OF C A L I F O R NIA EGISTE R E D R O F E SS IONAL EN G I N E E RJESSICA M . MEA D O W S N: \ 2 4 0 0 \ 2 5 0 4 - 0 5 - P S 2 3 - S L O - P D - N - B u i l d i n g - F e n c i n g \ S t r u c t u r a l \ C o n D o c s \ S h e e t - F i l e s \ 2 5 0 4 - 0 5 - P S 2 3 - S 3 2 1 . d w g , S 3 2 1 , A u g 2 3 , 2 0 2 4 1 0 : 1 2 a m , j d l o n g AUGUST 23, 2024 10 0 % C O N S T R U C T I O N D O C U M E N T S S-321 MA S O N R Y D E T A I L S 223242 13233343 2131 S e p 1 1 , 2 0 2 4 - 1 0 : 3 0 p m - C h r i s - K : \ E N G \ 2 0 2 3 \ 2 3 - 8 1 4 6 \ 2 3 - 8 1 4 6 _ E 0 0 1 - G E N E R A L N O T E S L E G E N D A B B R E V I A T I O N S . d w g CITY SPECIFICATION NO. DATE: PR O J E C T T I T L E : SH E E T T I T L E : SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION AS NOTED SEPT 11, 2024 2504-05-PS23 2000577-02 90 % C O N S T R U C T I O N D O C U M E N T S 11 0 6 W A L N U T F E N C I N G I M P R O V E M E N T S EXPIRES: 09/30/24 THOMA #23-8146 ERE TYM.E C F NO. 20823 E L T S OE A T E SIGER EJ FTF RE A RO L I CRT IL FCA AIN H O M N A RE E G I N ORPD NA OIEFSS L CJ/JT TR CHRIS JOSE San Luis Obispo, CA 93406 P.O. Box 1167 - 3562 Empleo St. THOMA ELECTRIC, INC. Phone: (805) 543-3850 cad@thomaelec.com Fax: (805) 543-3829 GE N E R A L E L E C T R I C A L N O T E S , L E G E N D , A N D A B B R E V I A T I O N S E001 1.CODE COMPLIANCE: ALL WORK SHALL CONFORM TO AND BE PERFORMED IN ACCORDANCE WITH CODES, STANDARDS, AND ORDINANCES AS SET FORTH BY THE AUTHORITIES HAVING JURISDICTION AND THEIR LATEST ADOPTED EDITIONS (IN EFFECT AT TIME OF BUILDING PERMIT APPLICATION) OF THE FOLLOWING PUBLICATIONS: A.ALL WORK SHALL COMPLY WITH 2020 NATIONAL ELECTRICAL CODE (NEC) AS AMENDED BY THE 2022 CALIFORNIA ELECTRICAL CODE (CEC), 2022CALIFORNIA BUILDING CODE (CBC), 2022 CALIFORNIA ENERGY CODE (CEnC), CALIFORNIA FIRE CODE (CFC), 2022 CALIFORNIA MECHANICAL CODE (CMC), 2022 CALIFORNIA GREEN BUILDING STANDARDS (CGBC), AND ADOPTED ORDINANCES. B.AMERICANS WITH DISABILITIES ACT (ADA). 2.SAFETY: THE ELECTRICAL CONTRACTOR IS RESPONSIBLE TO MAINTAIN ALL EQUIPMENT IN A SAFE AND RESPONSIBLE MANNER. KEEP DEAD FRONT EQUIPMENT IN PLACE WHILE EQUIPMENT IS ENERGIZED. CONDUCT ALL CONSTRUCTION OPERATIONS IN A SAFE MANNER FOR EMPLOYEES AS WELL AS OTHER WORKPERSONS OR ANYONE VISITING THE JOB SITE. PROVIDE BARRIERS, FLAGS, TAPE, ETC. AS REQUIRED FOR SAFETY. THE CONTRACTOR SHALL HOLD ALL PARTIES HARMLESS OF NEGLIGENT SAFETY PRACTICES, WHICH MAY CAUSE INJURY TO OTHERS ON OR NEAR THE JOB SITE. 3.FIRE RATED ASSEMBLIES SHALL MAINTAIN RATINGS AS SPECIFIED IN THE CALIFORNIA BUILDING CODE CHAPTER 7. CONTRACTOR SHALL PROVIDE AND INSTALL PHYSICAL ENCLOSURE AROUND FIXTURES, PANELS, ETC. AS REQUIRED. ALL ASSEMBLIES TO BE PENETRATED SHALL BE INSTALLED WITH APPLICABLE THROUGH-PENETRATION FIRESTOP SYSTEM AS DETERMINED BY UL CLASSIFICATION. BEFORE CONSTRUCTION, VERIFY AND COMPLY WITH REQUIREMENTS OF LOCAL AUTHORITY HAVING JURISDICTION. 4.LABEL PANELS, CABINETS, BACKBOARDS, MAIN DEVICES, SAFETY SWITCHES, CONTACTORS AND OTHER SPECIFICALLY DESIGNATED EQUIPMENT SHOWN ON PLANS. USE ENGRAVED LAMINATED PLASTIC NAMEPLATES ATTACHED BY SCREWS OR RIVETS. FOR FEEDERS, NEATLY AND INDELIBLY LABEL CONDUIT DESTINATIONS ON BOTH VISIBLE ENDS OF CONDUIT RUNS WHERE CONDUITS TERMINATE AT DESIGNATED ENCLOSURES, STRUCTURES OR EQUIPMENT (INCLUDING PULL AND SPLICE BOXES). 5.THE ISSUANCE OF A PERMIT SHALL NOT PREVENT THE BUILDING OFFICIAL FROM REQUIRING THE CORRECTION OF ERROS ON THESE PLANS OR FROM PREVENTING ANY VIOLATION OF THE CODES ADOPTED BY THE CITY, RELEVANT LAWS, ORDINANCES, RULES AND/OR REGULATIONS. GENERAL NOTES DEMOLITION NOTES A.FUSING: ALL FUSIBLE SAFETY DISCONNECT SWITCHES SHALL BE PROVIDED WITH DUAL-ELEMENT TIME DELAY TYPE FUSES SIZED AND RATED PER EQUIPMENT MANUFACTURERS' RECOMMENDATIONS. VERIFY WITH EQUIPMENT NAMEPLATE BEFORE INSTALLATION. B.INSTALL SEPARATE NEUTRALS FOR EACH 120V BRANCH CIRCUIT. C.MOTOR OVERLOAD PROTECTION: WHERE REQUIRED BY NEC ARTICLE 430 PART C AND NOT SHOWN ON PLAN OR PROVIDED INTEGRAL WITH EQUIPMENT, PROVIDE AND INSTALL THERMAL OVERLOAD PROTECTION FOR ALL MOTORS. D.DEVICE LOCATIONS SHOWN ARE SCHEMATIC AND APPROXIMATE. EXACT LOCATIONS SHALL BE FIELD VERIFIED DURING ROUGH-IN WITH ARCHITECTURAL ELEVATIONS, CASEWORK SHOP DRAWINGS, FURNITURE, ETC. AND SHALL BE COORDINATED WITH OTHER TRADES TO AVOID CONFLICT WITH OTHER EQUIPMENT. E.ALL NEW OUTLETS MUST BE TAMPER PROOF. F.ALL 15 AND 20AMPERE RECEPTACLES FOR BOTH DAMP AND WET LOCATIONS REQUIRED TO BE LISTED WEATHER-RESISTANT (WR) TYPE PER CEC 406.9 (A) AND (B) G.CEC 406.9(A) RECEPTACLES IN DAMP LOCATIONS: RECEPTACLES INSTALLED OUTDOORS IN A LOCATION PROTECTED FROM THE WEATHER OR IN OTHER DAMP LOCATIONS SHALL BE AN ENCLOSURE FOR THE RECEPTACLE THAT IS WEATHERPROOF WHEN THE RECEPTACLE IS COVERED (ATTACHMENT PLUG CAP NOT INSERTED AND RECEPTACLE COVERS CLOSE) H.CEC 406.9(B) RECEPTACLES OF 15 AND 20AMP, 125 AND 250 VOLTS INSTALLED IN A WET LOCATION SHALL HAVE AN ENCLOSURE THAT IS WEATHERPROOF WHETHER OR NOT THE ATTACHMENT PLUG CAP IS INSERTED. AN OUTLET BOX HOOD INSTALLED FOR THIS PURPOSE SHALL BE LISTED AND SHALL BE IDENTIFIED AS 'EXTRA-DUTY" OTHER LISTED PRODUCTS, ENCLOSURES, OR ASSEMBLIES PROVIDING WEATHERPROOF PROTECTION THAT DO NOT UTILIZE AN OUTLET BOX HOOD NEED TO BE MARKED "EXTRA DUTY" EXCEPTION: 15 AND 20AMP, 125 THROUGH 250 VOLT RECEPTACLES INSTALLED IN A WET LOCATION AND SUBJECT TO ROUTINE HIGH-PRESSURE SPRAY WASHING SHALL BE PERMITTED TO HAVE AN ENCLOSURE THAT IS WEATHERPROOF WHEN THE ATTACHMENT PLUG IS REMOVED. RATED WALLS/ASSEMBLIES NOTES ELECTRICAL SHEET INDEX POWER NOTES 1.IN FIRE-RESISTANCE RATED WALLS, DETAIL THROUGH PENETRATIONS AND MEMBRANE PENETRATION PER CBC 714.4 AS NOTED BELOW: A.STEEL, FERROUS OR COPPER PIPES MAY PENETRATE FIRE-RESISTANCE RATED WALLS, PROVIDED THE OPENING IS PROTECTED AS FOLLOWS: (CBC 714.4.1) i. ITEM PENETRATING CONCRETE OR MASONRY WALLS IS A MAXIMUM 6 INCHES NOMINAL DIAMETER AND THE AREA OF THE OPENING THROUGH THE WALL DOES NOT EXCEED 144 SQUARE INCHES, CONCRETE, GROUT OR MORTAR IS PERMITTED WHERE IT IS INSTALLED THE FULL THICKNESS OF THE WALL OR THE THICKNESS REQUIRED TO MAINTAIN THE F IRE-RESISTANCE RATING; OR ii. WHEN THE ANNULAR SPACE IS PROTECTED WITH MATERIAL THAT MEETS ASTM E 119 OR UL 263. B. PENETRATIONS SHALL BE FIRE-STOPPED BY A SYSTEM INSTALLED AS TESTED IN ACCORDANCE WITH ASTM E 814 OR UL 1479, AND SHALL HAVE AN F RATING OF NOT LESS THAN THE REQUIRED FIRE-RESISTANCE RATING OF THE WALL PENETRATED. (CBC 714.4.1.2) C.MEMBRANE PENETRATIONS OF MAXIMUM 2-HOUR FIRE-RESISTANCE RATED WALLS BY STEEL ELECTRICAL BOXES ARE PERMITTED, PROVIDED THAT EACH DOES NOT ESCEED 16 SQUARE INCHES IN AREA AND THE TOTAL AREA OF SUCH OPENING DOES NOT EXCEED 100 SQUARE INCHES FOR ANY 100 SQUARE FEET OF WALL AREA, AND THE SPACE BETWEEN THE WALL MEMBRANE AND THE BOX DOES NOT EXCEED 1 8 INCH. ADDITIONALLY, OUTLET BOXES ON OPPOSITE SIDES OF THE WALL SHALL BE SEPARATED BY A HORIZONTAL DISTANCE OF NOT LESS THAN 24 INCHES (CBC 714.4.2 EXCEPTION 1). D.MEMBRANE PENETRATIONS BY LISTED ELECTRICAL BOXES OF ANY MATERIAL ARE PERMITTED, PROVIDED SUCH BOXES HAVE BEEN TESTED FOR USE IN FIRE-RESISTANCE RATED ASSEMBLIES, AND THE SPACE BETWEEN THE WALL MEMBRANE AND THE BOX DOES NOT EXCEED 1/8 INCH UNLESS LISTED OTHERWISE. ADDITIONALLY, OUTLET BOXES ON OPPOSED SIDES OF THE WALL SHALL BE SEPARATED BY A HORIZONTAL DISTANCE OF NOT LESS THAN 24 INCHES. (CBC 714.4.2 EXCEPTION 2) E.A FIRE SPRINKLER SHALL BE PERMITTED TO BE UNPROTECTED PROVIDED SUCH SPACE IS COVERED BY A METAL ESCUTCHEON PLATE. (CBC 714.4.2 EXCEPTION 5) F.WHERE WALLS ARE PENETRATED BY OTHER MATERIALS OR OPENINGS LARGER THAN THOSE MENTIONED ABOVE, THEY MUST BE QUALIFIED BY TEST IN ACCORDANCE WITH CBC 714.4.2 EXCEPTION 2. 2.IN FIRE-RESISTANCE HORIZONTAL ASSEMBLIES , DETAIL THROUGH PENETRATIONS AND MEMBRANE PENETRATION PER CBC 714.5 AS NOTED BELOW: A.STEEL, FERROUS OR COPPER CONDUITS MAY PENETRATE FIRE-RESISTANCE RATED FLOOR ASSEMBLY WHEN THE ANNULAR SPACE IS PROTECTED WITH MATERIAL THAT MEETS ASTM E 119 OR UL 263 (CBC 714.5.1 EXCEPTION 1) B.PENETRATING ITEMS, AS NOTED ABOVE, WITH A MAXIMUM 6 INCHES NOMINAL DIAMETER SHALL NOT BE LIMITED TO THE PENETRATION OF A SINGLE FIRE-RESISTANCE RATED FLOOR ASSEMBLY, PROVIDED THAT THE AREA OF THE OPENINGS DOES NOT EXCEED 144 SQUARE INCHES IN ANY 100 SQUARE FEET OF FLOOR AREA. (CBC 714.4.1.1 EXCEPTION 1) C.PENETRATIONS SHALL BE FIRE-STOPPED BY A SYSTEM INSTALLED AS TESTED IN ACCORDANCE WITH ASTM E 814 OR UL 1479. THE SYSTEM SHALL HAVE AN F RATING AND T RATING OF NOT LESS THAN 1-HOUR BUT NOT LESS THAN THE REQUIRED FIRE-RESISTANCE RATING OF THE FLOOR PENETRATED (CBC 714.5.1) D.MEMBRANE PENETRATIONS BY LISTED ELECTRICAL OUTLET BOXES ARE PERMITTED PROVIDED SUCH BOXES HAVE BEEN TESTED FOR USE IN FIRE-RESISTANCE RATED ASSEMBLIES, AND THE SPACE BETWEEN THE CEILING MEMBRANE AND THE BOX DOES NOT EXCEED 1/8 INCHESUNLESS LISTED OTHERWISE. (CBC 714.5.2 EXCEPTION 4) E.A FIRE SPRINKLER SHALL BE PERMITTED TO BE UNPROTECTED PROVIDED SUCH SPACE IS COVERED BY A METAL ESCUTCHEON PLATE. (CBC 714.5.2 EXCEPTION 5) 3.JOINTS INSTALLED IN OR BETWEEN FIRE-RESISTANCE RATED WALL, FLOOR OR FLOOR/CEILING ASSEMBLIES AND ROOFS OR ROOF/CEILING ASSEMBLIES SHALL BE PROTECTED AN APPROVED FIRE-RESISTANT JOINT SYSTEM WITH A FIRE-RESISTANCE RATING NOT LESS THAN THAT OF THE ASSEMBLY IN WHICH IT IS INSTALLED. PROVIDE DETAILS (CBC 7145.1) 4.FIRE DOORS AND FIRE-PROTECTION RATED GLAZING SHALL BEAR LABELS AS REQURIED BY CBC 716.2.9 AND 716.3.5. 5.FIRE DAMPERS SHALL BE THE MINIMUM FIRE PROTECTION RATING SPECIFIED IN CBC TABLE 717.3.2.1 FOR THE TYPE OF PENETRATION (CBC 717.3.2.1) 6.PROVIDE DAMPERS, SMOKE DAMPERS, COMBINATION FIRE/SMOKE DAMPERS AND CEILING RADIATION DAMPERS SHALL BE PROVIDE AS PRESCRIBED IN CBC 717. REFER TO SPECIFICATIONS 26 0519 FOR ADDITIONAL INFORMATION. 1. WIRE CONNECTORS SHALL BE MINIMUM 75 DEGREE CENTIGRADE RATED AND PROPERLY SIZED FOR THE NUMBER OF CONDUCTORS BEING CONNECTED, TERMINATED, SPLICED, ETC. ALL ABOVE GRADE CONNECTORS SHALL BE SOLDERLESS LUG OR PLASTIC WIRE NUT TYPE, SCREW ON, PRESSURE CABLE TYPE (WIRE UT OR SPRING NUT TYPE) 600 VOLT, 105 DEGREE C, WITH SKIRT TO COVER ALL PORTIONS OF STRIPPED WIRES. CONNECTOR SHALL BE U.L. RATED FOR NUMBER AND SIZE OF CONDUCTORS BEING JOINED TOGETHER AS SPLICED. 2. WIRES AND CABLES FOR LINE VOLTAGE SYSTEM AND CONTROLS. WIRE AND CABLE SHALL BE COPPER, 600 VOLT RATED THROUGH OUT. CONDUCTORS 14AWG OT 10AWG, SOLID OR STRANDED. CONDUCTORS 8 AWG AND LARGER, STRANDED 3. ALL CONDUCTORS SHALL BE COPPER UNLESS OTHERWISE NOTED. MINIMUM SIZE FOR INDIVIDUAL CONDUCTORS SHALL BE #12 AWG UNLESS OTHERWISE NOTED ON PANEL SCHEDULE OR PLANS. SIZE #8 AWG AND LARGER SHALL BE STRANDED CONDUCTOR. INDIVIDUAL CONDUCTORS SHALL BE INSULATED WITH TYPE, XHHW, THW, THHN/THWN 600 VOLT INSULATION UNLESS OTHERWISE NOTED. 4. PROPER INSULATION TYPE SHALL BE USED FOR THE PROPER ENVIRONMENTAL APPLICATION (I.E. WATERPROOF, WET LOCATION, PLENUM TEMPERATURE RATED). ALL CONDUCTORS, WIRING CABLE WHERE INSTALLED BELOW FLOOR, SLAB OR UNDERGROUND SHALL BE CONSIDERED WET LOCATIONS, AND SHALL BE RATED ACCORDINGLY. NON WATERPROOF CABLING IS NOT ALLOWED IN ANY BELOW GRADE OR WET APPLICATION. 5.GROUP THE COMMON NEUTRAL CONDUCTOR FOR MULTIPLE CIRCUITS WITH ITS ASSOCIATED UNGROUNDED CONDUCTORS WHEN CONTAINED IN THE SAME ENCLOSURE. CEC 200.4(B) 6.THE BRANCH CIRCUIT SERVING EMERGENCY LIGHTING AND POWER CIRCUITS SHALL NOT BE PART OF A MULTIWIRE BRANCH CIRCUIT. CEC 700.19. CONDUCTORS AND CABLES CONDUIT SYSTEMS NOTES CONDUIT SYSTEMS USED ON THIS PROJECT SHALL BE AS FOLLOWS 1. PVC SCHEDULE 40 - underground/below slab with GRS elbows and risers tape wrapped). 2.ELECTRICAL METALLIC CONDUIT (EMT) - above grade/slab in building construction and where exposed above 8'-0" aff. 3.GALVANIZED RIGID STEEL (GRS) - where exposed below 8'-0" aff. and/or where subject to physical damage. 4.FLEXIBLE STEEL CONDUIT - above ceilings and/or concealed in building construction (seal tight flex required in exterior locations). 6.MC CABLE ALLOWED WITHIN WALLS AND ABOVE T-BAR CEILING. REFER TO SECTION 260533 & 260500 OF SPECIFICATIONS FOR ADDITIONAL INFORMATION. CONDUITS SHALL BE MINIMUM 3/4" UNLESS OTHERWISE NOTED. CONDUIT SIZES, WHERE NOT NOTED ON THE DRAWINGS, SHALL BE SIZED FOR MAXIMUM 40% FILL PER CEC 310-6. ADDITIONAL CONDUIT REQUIREMENTS. -ROUTE CONDUIT(S) BELOW GRADE OR ABOVE CEILING SO THAT WALL OUTLETS, DEVICES, AND CONDUITS IN ALL EXPOSED BRICK WALL LOCATIONS SHALL BE RECESSED MOUNTED INSIDE BRICK. LOCATE DEVICES AT CELL WITH REINFORCEMENT CENTER AT BRICK AND/OR ONE CELL OVER AWAY FROM JAMB. REFER TO ARCHITECTURAL AND STRUCTURAL PLANS FOR CMU WALL LOCATIONS SECTIONS, AND DETAILS. - REFER TO ELECTRICAL DETAILS FOR METAL PIPE PENETRATION THRU FIRE RATED WALL. PENETRATION OF FIRE-RESISTIVE WALLS AND FLOOR CEILINGS SHALL BE PROTECTED AS REQUIRED IN CBC SECTION 714. - REFER TO ELECTRICAL DETAIL FOR DEVICE INSTALLATION FOR FIRE RATED WALLS. -NO CONDUITS OR PIPING IN ANY SPACE SHALL BE EXPOSED AT THE CEILING AND WALL (COORDINATE WITH ALL DISCIPLINES PRIOR TO CONSTRUCTION). LOCATE ALL CONDUIT WITHIN WALLS A. REFER TO LANDSCAPE DEMOLITION SHEETS FOR ADDITIONAL INFORMATION. B. EQUIPMENT SHOWN TO BE REMOVED IS SHOWN FOR REFERENCE ONLY. INFORMATION WAS OBTAINED FROM ORIGINAL BUILDING DRAWINGS AND LIMITED FIELD INVESTIGATION AND MAY NOT REPRESENT ALL ELECTRICAL DEMOLITION. FIELD VERIFY CONDITIONS AND DISCONNECT/REMOVE ALL EQUIPMENT AS REQUIRED TO MEET THE INTENT OF THAT SHOWN ON THE LIGHTING AND POWER/SIGNAL DRAWINGS. C. ALL ELECTRICAL EQUIPMENT SHOWN ON DRAWING (OR REQUIRED) TO BE DEMOLISHED SHALL BE DISCONNECTED, REMOVED AND DISPOSED OF BY ELECTRICAL CONTRACTOR. NO EQUIPMENT (RACEWAYS, BOXES, CABLING, ETC.) SHALL BE ABANDONED IN PLACE AND COVERED BY NEW CONSTRUCTION. D. SCHEDULE ANY OUTAGES WITH OWNER PRIOR TO DE-ENERGIZATION OF ANY BRANCH CIRCUITS OR FEEDERS. A.TRENCHING AND BACKFILLING FOR ALL CONDUIT SYSTEMS SHALL BE THE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR. ALL CONDUITS SHALL HAVE MINIMUM COVER REQUIREMENTS AS SPECIFIED IN CEC 300-5. MORE STRINGENT DEPTH REQUIREMENTS MAY BE IMPOSED BY UTILITY COMPANY AND / OR THIS SPECIFICATION. JOINT TRENCHING MAY BE UTILIZED WHERE PRACTICABLE AND WERE PERMITTED BY THIS SPECIFICATION. B.LOCATIONS OF EXISTING UNDERGROUND (UG) UTILITY SYSTEMS SHALL BE DETERMINED BY CALLING UNDERGROUND SERVICE ALERT (USA). WHEN PLANNING UNDERGROUND WORK, AND BEFORE YOU DIG, CONTACT UNDERGROUND SERVICE ALERT (USA) AT LEAST 48 HOURS PRIOR TO EXCAVATION (WEEKENDS EXCLUDED) FOR THE LOCATION OF UNDERGROUND GAS AND ELECTRIC LINES OR EQUIPMENT. C.MAINTAIN REQUIRED CLEARANCES FROM ALL SANITARY SEWER, WATER AND STORM DRAIN PIPING. REFER TO CIVIL PLANS FOR EXACT LOCATIONS AND DEPTHS OF PIPING. 3103 NUMBERED SHEET NOTES: REFERS TO NOTES ON SAME SHEET AS REFERENCE DETAIL REFERENCE: Z = DETAIL DESIGNATION X = SHEET NUMBER REFERENCE Z X FEEDER SCHEDULE DESIGNATION (EXAMPLE: 3103 = 310 AMPERE, 600V, 3 CURRENT CARRYING CONDUCTORS, PREFIXES: 'M' INDICATES MEDIUM VOLTAGE, 'CO14' INDICATES CONDUIT ONLY, QUANTITY (1) AND SIZE (4")) X MECHANICAL SYSTEMS TAG (REFER TO MECHANICAL SHEETS) Y = UNIT TYPE X = UNIT NUMBER Y X SITE PLAN NOTES DUCT SMOKE DETECTORDSD SD HORN- AUDIBLE DEVICE VISUAL- VISUAL DEVICE MANUAL PULL STATION END OF LINE RESISTOR HEAT DETECTOR SMOKE DETECTOR B H BELL P AUDIBLE/VISUAL FLOW SWITCH TAMPER SWITCH F AV T H V (R) UC UG UON (TBR) TYP NIC NL P POLE MSB MTTB (N) NEW ABBREVIATIONS AMPERE AMP FUSE RATING ABOVE FINISH FLOOR ABOVE FINISH GRADE AMPERES INTERRUPT CAPACITY AMP SWITCH RATING BELOW FINISH GRADE CIRCUIT BREAKER CIRCUIT CONDUIT EXISTING ELECTRICAL CONTRACTOR EXHAUST FAN CA. ELECTRICAL CODE (E) IN (N) LOCATION (E) TO BE (R) FIRE ALARM FIRE ALARM CONTROL PANEL GROUNDING CONDUCTOR GENERAL CONTRACTOR GROUND GALVANIZED RIGID STEEL MECHANICAL CONTRACTOR ISOLATED GROUND GANGED WITH SWITCH MAIN CIRCUIT BREAKER LIGHTING MAIN LUGS ONLY FUTURE (E) POWER HOMERUN POWER/COMM. SINGLE RECEPT. DUPLEX RECEPT. DUPLEX- HALF SWITCHED DOUBLE DUPLEX SPECIAL CONFIGURATION DUPLEX- FLOOR OUTLET LETTER ADJACENT INDICATES FIXTURE TYPE A RECESSED FLUOR. SURFACE FLUOR. FLUOR. STRIP UON TRACK LIGHT DIRECTIONAL FLOOD EXIT LIGHT- WALL EMERGENCY FIXTURE POLE LIGHT POLE LIGHT- DECORATIVE TANDEM-WIRED LAMPS (ARROW INDICATES DIRECTION) EXIT LIGHT- CEILING BOLLARD FA2DPST OCCUPANCY SENSOR W/THERMAL OVERLOAD DUAL LEVEL SWITCHING SWITCHLEG DESIGNATION P W/PILOT LIGHT KEY OPERATED ,a OS K 3-WAY 4-WAY DIMMER TIMER SWITCH D T 3 4 MC MCB MLO IG GWS LTG GFI GND GRS G FACP GC CONDUIT STUB (W/MARKER) VERTICAL CONDUIT RUN FLEXIBLE CONNECTION SURFACEMOUNT RACEWAY SWITCHES SPST CONDUIT SEAL LOW VOLTAGELV (E) (EXN) (EXR) (F) EC EF-# CEC CKT C AS BFG CB NOTE: INTERPRET IN CONTEXT LIGHT FIXTURES CEILING SURFACEMOUNT WALL SURFACEMOUNT RECESSED DOWNLIGHT RECESSED WALLWASH PENDANT MOUNT NEW POWER HOMERUN (3 HOTS & NEUT SHOWN) EXISTING TO REMAIN CONDUIT/WIRE ISOLATED GROUND E NEW AFF AFG AIC A AFUNDERGROUND PHONE/DATA COMBO OUTLET GROUND FAULT CIRCUIT INTERRUPTGFI MOUNTED ABOVE COUNTER* MOUNTED ABOVE COUNTER* FIRE ALARM CONTROL PANEL REMOTE POWER SUPPLYRPS CONDUIT ONLYC.O. PV PHOTOVOLTAIC FIRE ALARM J JUNCTION BOX MAIN SWITCHBOARD NOT IN CONTRACT NIGHT LIGHT RELOCATE(D) TO BE REMOVED TYPICAL UNDERCABINET UNDERGROUND VOLT AMPERES WATT, WIRE WEATHERPROOF (NEMA 3R) UNLESS OTHERWISE NOTED FUSIBLE SWITCH Ø GROUND PHASE TELEPHONE OUTLET DATA OUTLET SAFETY DISCONNECT TELEVISION OUTLET MISCELLANEOUS CIRCUIT BREAKER THERMOSTATT MOTOR TV VOLTV WP VA W SPEAKER/VISUALSV INTERMEDIATE DISTRIBUTION FRAMEIDF MAIN DISTRIBUTION FRAMEMDF SMOKE/CO DETECTORSDCO ACCESS POINTAP DOUBLE DUPLEX, HALF SWITCHED LEGEND GROUND FAULT CKT INTERRUPTER MAIN TELEPHONE TERMINAL BOARD CONVENTIONS SHEET NO.SHEET DESCRIPTION E001 ELECTRICAL GENERAL NOTES AND ABBREVIATIONS E002 ELECTRICAL DETAILS E003 LEVEL 2 EV CAR CHARGER SPECIFICATIONS E004 ELECTRICAL SPECIFICATIONS E101 ELECTRICAL SITE PLAN EXPIRES: 09/30/26 THOMA #23-8146 ERE TYM.E C F NO. 20823 EL T S OE A T E SIGER EJ FTF RE A RO L I CRT IL FCA AIN H O M N A RE E G I N ORPD NA OIEFSS L ERE TYM.E C F NO. 20823 EL T S OE A T E SIGER EJ FTF RE A RO L I CRT IL FCA AIN H O M N A RE E G I N ORPD NA OIEFSS L ERE TYM.E C F NO. 20823 EL T S OE A T E SIGER EJ FTF RE A RO L I CRT IL FCA AIN H O M N A RE E G I N ORPD NA OIEFSS L T-BAR CEILING BUILDING STRUCTURE (N) INTERIOR CONDUITS TO MATCH EXTERIOR PLAN AT REAR/SIDE OF PORTABLE (N) GRS CONDUIT(S) PER PLAN NEW LB CONDULET OR CABINET PER PLAN FINISHE GRADE (N) CONDUIT PENETRATIONS. CAULK OPENINGS AIRTIGHT FROM WALL SURFACE TO CONDUIT WITH NON-HARDENING ACOUSTICAL SEALANT BOTH SIDES OF WALL. PACK ANNULAR SPACE COMPLETELY WITH MINERAL FIBER. NO MULTIPLE CONDUIT PENETRATIONS ALLOWED. PACK AND CAULK EVERY CONDUIT INDIVIDUALLY. S e p 1 1 , 2 0 2 4 - 1 0 : 3 0 p m - C h r i s - K : \ E N G \ 2 0 2 3 \ 2 3 - 8 1 4 6 \ 2 3 - 8 1 4 6 _ E 0 0 2 - E L E C T R I C A L D E T A I L S . d w g CITY SPECIFICATION NO. DATE: PR O J E C T T I T L E : SH E E T T I T L E : SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION AS NOTED SEPT 11, 2024 2504-05-PS23 2000577-02 90 % C O N S T R U C T I O N D O C U M E N T S 11 0 6 W A L N U T F E N C I N G I M P R O V E M E N T S EXPIRES: 09/30/24 THOMA #23-8146 ERE TYM.E C F NO. 20823 E L T S OE A T E SIGER EJ FTF RE A RO L I CRT IL FCA AIN H O M N A RE E G I N ORPD NA OIEFSS L CJ/JT TR CHRIS JOSE San Luis Obispo, CA 93406 P.O. Box 1167 - 3562 Empleo St. THOMA ELECTRIC, INC. Phone: (805) 543-3850 cad@thomaelec.com Fax: (805) 543-3829 EL E C T R I C A L D E T A I L S E002 5 TYPICAL CONDUIT IN TRENCH, NON-TRAFFIC AREAS 6 TYPICAL CONDUIT IN TRENCH, TRAFFIC AREA 6" 24 " MINIMUM 6" CRUSHED ROCK 6" FINISHED GRADE REINFORCED BOX EXTENSION, AS REQUIRED GROUT OPENING ALTERNATE CONDUIT ENTRY WHERE NUMBER OF BENDS IN RUN ALLOWS 30 " MI N . C O N D U I T D E P T H MI N I M U M I N T E R I O R B O X D E P T H REINFORCED CONCRETE COVER (TO SUIT APPLICATION) WITH HOLD DOWN BOLTS (FROM MANUFACTURER). LABEL COVER AS REQUIRED. TRAFFIC RATED (AS REQUIRED) PRECAST REINFORCED CONCRETE BOX. SIZE PER PLANS. SEAL AROUND CONDUIT, BOX AND EXTENSION JUNCTION. BELL END, SEAL OR FOAM (TYP.) SEAL OR FOAM NOTES: 1.PULL BOXES SHALL BE INTERMITTENT TRAFFIC RATED (AS REQUIRED). 2.PULLBOXES CONSTRUCTED OF REINFORCED POLYMER WITH TRAFFIC RATING IF REQUIRED ARE ACCEPTABLE. CONDUIT RUN IS 150' GREATER TOP OF SLAB/FINISH GRADE PVC GRS, TAPE WRAPPED, TO EQUIPMENT OR BOX TERMINATION 18" MIN AT SLAB AND 24" MIN AT FINISH GRADE CONCRETE BLDG. PAD/SOIL GRS, TAPE WRAPPED TOP OF ELBOW FINISH GRADE PVC ELBOW PERMITTED U.O.N 18" MIN SOIL GRS, TAPE WRAPPED, OR PVC COATED RISER TO EQUIPMENT OR BOX TERMINATION PVC 24" MIN OR AS DEEMED BY APPLICATION WHICHEVER IS GREATER CONDUIT RUN IS LESS THAN 150' NOTES: UNDERGROUND CONDUITS AND TRANSITION TO ABOVE GRADE/SLAB SHALL BE AS FOLLOWS: 1.PVC ELBOWS ALLOWED IF TOP OF ELBOW IS MINIMUM 18" BFG OR BELOW TOP OF SLAB, OTHERWISE GRS, TAPE WRAPPED, ELBOWS ARE REQUIRED. 2.GRS ELBOWS ARE REQUIRED IF CONDUIT RUN IS 150' GREATER. 3.GRS RISERS ARE REQUIRED FROM ELBOW BELOW GRADE TO EQUIPMENT (DEVICE, OUTLET, PANEL, CABINET, ETC.) ABOVE GRADE. 4.GRS ELBOWS/RISERS TO BE TAPED WRAPPED (1/2" LAPPED) TO 3" ABOVE FINISH GRADE OR TOP OF SLAB. BELOW TOP OF SLAB GRS, TAPE WRAPPED, OR PVC COATED RISER TO EQUIPMENT OR BOX TERMINATION TOP OF SLAB TOP OF ELBOW PVC PVC ELBOW PERMITTED U.O.N 4"18" MIN CONCRETE BLDG. PAD CONDUIT RUN IS LESS THAN 150' 12 " CAN VARY DIMENSION 12" MIN 2" 4" 2" 18 " M I N 4" 8" WHERE OCCURRING (VERIFY SIZE AND QUANTITY) POWER CONDUITS SPARE CONDUIT DATA & SIGNAL CONDUITS (VERIFY AC PAVING AND/OR CONCRETE FINISHED GRADE 6"W ELECTRICAL MARKING TAPE (RED MYLAR, 6" MIN WIDTH) & 6"W COMMUNICATIONS MARKING TAPE (ORANGE MYLAR, 6" MIN WIDTH) CONDUITS PER PLAN 2" FEEDER OR COMMUNICATIONS 2 SACK SLURRY TO 3" ABOVE CONDUIT AS REQUIRED 2" 12 " 4" 2" WHERE OCCURRING AC PAVING AND/OR CONCRETE FINISHED GRADE JOINT TRENCH SINGLE TRENCH SIZE AND QUANTITY) 6"W ELECTRICAL MARKING TAPE (RED MYLAR, 6" MIN WIDTH) OR 6"W COMMUNICATIONS MARKING TAPE (ORANGE MYLAR, 6" MIN WIDTH), DEPENDING ON UTILITY TYPE NOTE: -CONTRACTOR SHALL VERIFY MINIMUM SEPARATION FOR WATER AND GAS WITH MECHANICAL/PLUMBING ENGINEER PRIOR TO EXCAVATION. -CONDUITS SHOWN ARE TYPICAL. VERIFY EXACT NUMBER OF CONDUITS FROM SITE PLAN AND SINGLE LINE DIAGRAM. -REFER TO STRUCTURAL SHEETS FOR CONDUIT CLEARANCE REQUIREMENTS TO BUILDING FOOTINGS. -WHEN POWER IS NOT BELOW COMMUNICATIONS, 12" MIN. HORIZONTAL SEPARATION SHALL BE MAINTAINED FROM ALL OTHER NEW UTILITY CONDUITS. -REFER TO CEC TABLE 300.5 FOR CONDITIONS THAT MAY PERMIT LESS THAN 18" MINIMUM COVER. 18 " M I N 12 " CAN VARY DIMENSION 12" MIN 2" 4" 2" 24 " M I N 4" 8" WHERE OCCURRING (VERIFY SIZE AND QUANTITY) POWER CONDUITS SPARE CONDUIT DATA & SIGNAL CONDUITS (VERIFY AC PAVING AND/OR CONCRETE FINISHED GRADE 6"W ELECTRICAL MARKING TAPE (RED MYLAR, 6" MIN WIDTH) & 6"W COMMUNICATIONS MARKING TAPE (ORANGE MYLAR, 6" MIN WIDTH) CONDUITS PER PLAN 2" FEEDER OR COMMUNICATIONS 2 SACK SLURRY MIX ABOVE CONDUITS AS REQUIRED 2" 12 " 4" 2" WHERE OCCURRING AC PAVING AND/OR CONCRETE FINISHED GRADE JOINT TRENCH SINGLE TRENCH SIZE AND QUANTITY) 6"W ELECTRICAL MARKING TAPE (RED MYLAR, 6" MIN WIDTH) OR 6"W COMMUNICATIONS MARKING TAPE (ORANGE MYLAR, 6" MIN WIDTH), DEPENDING ON UTILITY TYPE NOTE: -CONTRACTOR SHALL VERIFY MINIMUM SEPARATION FOR WATER AND GAS WITH MECHANICAL/PLUMBING ENGINEER PRIOR TO EXCAVATION. -CONDUITS SHOWN ARE TYPICAL. VERIFY EXACT NUMBER OF CONDUITS FROM SITE PLAN AND SINGLE LINE DIAGRAM. -REFER TO STRUCTURAL SHEETS FOR CONDUIT CLEARANCE REQUIREMENTS TO BUILDING FOOTINGS. -WHEN POWER IS NOT BELOW COMMUNICATIONS, 12" MIN. HORIZONTAL SEPARATION SHALL BE MAINTAINED FROM ALL OTHER NEW UTILITY CONDUITS. 24 " M I N DRAIN BASE SAND OR 2 SACK SLURRY NATIVE SOIL BACKFILL 95% COMPACTION NATIVE SOIL BACKFILL 95% COMPACTION OR 2 SACK SLURRY NATIVE SOIL BACKFILL 95% COMPACTION NATIVE SOIL BACKFILL 95% COMPACTION 2 SACK SLURRY TO 3" ABOVE CONDUIT 2 SACK SLURRY TO 3" ABOVE CONDUITS 2 SACK SLURRY TO 3" ABOVE CONDUIT 3 TYPICAL PULL BOX, 24"X36" AND SMALLER 4 TYP. UNDERGROUND CONDUITS AND TRANSITION ABOVE GRADE 1 SURFACE CONDUIT AT EXISTING BUILDING 2 (E)"MSB" LOAD CALCULATIONS EXPIRES: 09/30/26 THOMA #23-8146 ERE TYM.E C F NO. 20823 EL T S OE A T E SIGER EJ FTF RE A RO L I CRT IL FCA AIN H O M N A RE E G I N ORPD NA OIEFSS L ERE TYM.E C F NO. 20823 EL T S OE A T E SIGER EJ FTF RE A RO L I CRT IL FCA AIN H O M N A RE E G I N ORPD NA OIEFSS L ERE TYM.E C F NO. 20823 EL T S OE A T E SIGER EJ FTF RE A RO L I CRT IL FCA AIN H O M N A RE E G I N ORPD NA OIEFSS L S e p 1 1 , 2 0 2 4 - 1 0 : 3 0 p m - C h r i s - K : \ E N G \ 2 0 2 3 \ 2 3 - 8 1 4 6 \ 2 3 - 8 1 4 6 _ E 0 0 3 - L E V E L 2 E V C A R C H A R G E R S P E C I F I C A T I O N S . d w g CITY SPECIFICATION NO. DATE: PR O J E C T T I T L E : SH E E T T I T L E : SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION AS NOTED SEPT 11, 2024 2504-05-PS23 2000577-02 90 % C O N S T R U C T I O N D O C U M E N T S 11 0 6 W A L N U T F E N C I N G I M P R O V E M E N T S EXPIRES: 09/30/24 THOMA #23-8146 ERE TYM.E C F NO. 20823 E L T S OE A T E SIGER EJ FTF RE A RO L I CRT IL FCA AIN H O M N A RE E G I N ORPD NA OIEFSS L CJ/JT TR CHRIS JOSE San Luis Obispo, CA 93406 P.O. Box 1167 - 3562 Empleo St. THOMA ELECTRIC, INC. Phone: (805) 543-3850 cad@thomaelec.com Fax: (805) 543-3829 LE V E L 2 C A R E V C H A R G E R S P E C I F I C A T I O N S E003 FURNISHED AND INSTALL NEW LEVEL 2 FROM CHARGE POINT PER CITY OF SLO REQUIREMENTS. 50AMP DUAL PORT, PEDESTAL MOUNT, 18FT CABLE WITH EMV CHIP READER AND POWER MANAGEMENT KIT FOR LOAD SHARING, BOLLARD CONCRETE MOUNTING KIT, CHARGEPOINT ASSURE AND STATION ACTIVIATION AND CONFIGURATION SOFTWARE AND SERVICE EXPIRES: 09/30/26 THOMA #23-8146 ERE TYM.E C F NO. 20823 EL T S OE A T E SIGER EJ FTF RE A RO L I CRT IL FCA AIN H O M N A RE E G I N ORPD NA OIEFSS L ERE TYM.E C F NO. 20823 EL T S OE A T E SIGER EJ FTF RE A RO L I CRT IL FCA AIN H O M N A RE E G I N ORPD NA OIEFSS L ERE TYM.E C F NO. 20823 EL T S OE A T E SIGER EJ FTF RE A RO L I CRT IL FCA AIN H O M N A RE E G I N ORPD NA OIEFSS L S e p 1 1 , 2 0 2 4 - 1 0 : 3 0 p m - C h r i s - K : \ E N G \ 2 0 2 3 \ 2 3 - 8 1 4 6 \ 2 3 - 8 1 4 6 _ E 0 0 4 - E L E C T R I C A L S P E C I F I C A T I O N S . d w g CITY SPECIFICATION NO. DATE: PR O J E C T T I T L E : SH E E T T I T L E : SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION AS NOTED SEPT 11, 2024 2504-05-PS23 2000577-02 90 % C O N S T R U C T I O N D O C U M E N T S 11 0 6 W A L N U T F E N C I N G I M P R O V E M E N T S EXPIRES: 09/30/24 THOMA #23-8146 ERE TYM.E C F NO. 20823 E L T S OE A T E SIGER EJ FTF RE A RO L I CRT IL FCA AIN H O M N A RE E G I N ORPD NA OIEFSS L CJ/JT TR CHRIS JOSE San Luis Obispo, CA 93406 P.O. Box 1167 - 3562 Empleo St. THOMA ELECTRIC, INC. Phone: (805) 543-3850 cad@thomaelec.com Fax: (805) 543-3829 EL E C T R I C A L S P E C I F I C A T I O N S E004 SECTION 26 0500 - COMMON WORK RESULTS FOR ELECTRICAL PART 1 - GENERAL 1.1 RELATED DOCUMENTS A.Drawings and general provisions of this Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A.This Section Includes: 1.Materials and equipment shall be furnished and installed in support of electrical work described in these plans and specifications including but not limited to, raceways, boxes, enclosures, feeders, branch circuiting, supports, terminal cabinets, sleeves, gutters, panels, transformers, switchgear, lighting fixtures, controls, relays, contactors, in order to complete and make fully functional the systems described. 2.Raceways for all power and communications systems as shown and/or required. Duct banks shall include all trenching, racking, conduit, concrete, backfill, boxes, pads, substructures required for a fully developed and useable pathway for cables, conductors, as shown on site, etc. 3.Allocation of time to adequately train the Owner on the use and operation of all systems installed within the facility or on the property. Minimum two week advance notice shall be coordinated with the Owner and his representatives. Training shall be as outlined in individual system specifications identified to follow. B.Related Sections Under Other Divisions: 1.Painting of electrical equipment where exposed and required by the Architect to be painted as described elsewhere in the specification. 2.Access Control and Security Camera System: Shall be installed by Owner's vendor. Contractor shall provide conduits, boxes, stubs to accessible ceilings. 1.3 SYSTEM DESCRIPTION A.The electrical plans indicate the general layout and arrangement; the architectural drawings and field conditions shall determine exact locations. Field verify all conditions and modify as required to satisfy design requirements as well as code minimums. Maintain all required working clearances as described in CEC Article 110 as well as other applicable articles. B.Discrepancies shall be brought immediately to the attention of the Architect for clarification. The Architect shall approve any changes. Prior to rough-in, refer to architectural plans that shall take precedence over electrical plans with respect to locations. C.Verify all power and communications utility company requirements prior to commencement of utility work. Make proper adjustments to the construction to satisfy the serving utility requirements if they differ from the construction documents. It shall be the Contractor's responsibility to contact each utility company for obtaining finalized utility design drawings and/or approval, and for scheduling inspection of utility infrastructure installations. D.Charges imposed by the electric and communications utility companies shall be paid by Owner directly to utility companies. 1.4 SUBMITTALS AND SHOP DRAWINGS A.Before construction, submit in (accordance with the General Conditions of this Specification) a complete list of all materials proposed to be furnished and installed under this section. Any material procured without review and approval of the engineer and/or owner's representative, will solely be at the contractor's risk. B.Manufacturers' specifications, catalog cuts and shop drawings as required to demonstrate compliance with the specifications. Identify specific intended use for each component where submittal may be ambiguous. Submit entire bound submittal at one time; partial submittals will not be accepted. At a minimum, submittals will be required for the following: 1.20a/1p breaker. 2.Conduit including all fittings, etc. 3.Wiring and cable, terminations, etc. 4.Fire rating penetration materials, details, etc. C.The intent of these specifications is to establish a standard of quality for materials and equipment. Therefore, some items are identified by manufacturer or trade name designation. Substitutions shall be subject to the Architect's approval. Samples of the proposed and substitute materials may be required for inspection prior to approval. Costs, if any, for evaluation of substitutions shall be the Contractor's responsibility. The decision of the Architect shall be final. Where the substitution will affect other trades, coordinate all changes with those trades concerned and pay any additional costs incurred by them as a result of this substitution. Approval of substitutions shall not relieve the Contractor from providing an operational system in accordance with all applicable codes and ordinances. 1.Provide seismic details of seismic restraints and anchors; including number, size and locations for each piece of equipment. 1.5 DELIVERY, STORAGE AND HANDLING A.Storage of equipment for the job is the responsibility of the Electrical Contractor and shall be scheduled for delivery to the site, as the equipment is required. Damage to the equipment delivered to the site or in transport to the job shall be the responsibility of the Electrical Contractor. PART 2 - PRODUCTS 2.1 MATERIALS A.Materials shall be new and bear the label of or be listed by a nationally recognized testing laboratory. The quality and suitability of all materials shall conform to the standards and practices of this trade. B.Supplied materials shall be of a current manufactured product line. Discontinued products are not acceptable. Where products are identified on the contract documents by part number, supply the current product model or series which meets the specification and intended use of the specified component. 2.2 SUPPORTING DEVICES A.Hangers: Kindorf B-905-2A Channel, H-119-D washer, C105 strap, 3/8" rod with ceiling flange. B.Concrete Inserts: Kindorf D-255, cast in concrete for support fasteners for loads up to 800 lbs. C.Pipe Straps: Two-hole galvanized or malleable iron. PART 3 - EXECUTION 3.1 INSTALLATION A.Professionalism and appearance of installations shall be in accordance with accepted practices of this trade. Installation methods shall conform to manufacturers' specifications and recommendations. The Contractor shall man the job with qualified journeymen and helpers in this trade for the duration of the job. It is the Contractor's responsibility to communicate with and keep the job superintendent appraised of changes or clarifications, etc. B.Employment of any person on any job in the capacity of an electrician is not permitted unless such person has qualified for and holds a valid Journeyman Electrician Pocket Card or General Journeyman Electrician Certificate issued by the State of California Division of Apprenticeship Standards except, Contractor may employ electrical helpers or apprentices on any job of electrical construction, new or existing, when the work of such helpers or apprentices is performed under the direct and constant personal supervision of a journeyman electrician holding a valid Pocket Card accepted by the State of California Division of Apprenticeship Standards. 1.Each Pocket Card carrying journeyman electrician will be permitted to be responsible for the quality of workmanship for a maximum of one helper or apprentice during any same time period, provided the nature of work is such that good supervision can be maintained and the quality of workmanship is the best, as expected by Owner and implied by the latest edition of the National Electrical Code. 2.Before each journeyman electrician commences work, deliver to Owner at the project site, a photocopy of the journeyman's valid Pocket Card. C.Materials shall be installed in accordance with the manufacturers' specification and recommendations. They must conform to the approval AHJ adopted codes and standards, but not less than the 2019 CEC and all applicable codes and standards, including but not necessarily limited to California Code of Regulations Title 24, NFPA, National Electrical Manufacturers Association, ANSI, CBC, and any other adopted ordinances of applicable agencies having jurisdiction. Refer to general conditions of specifications. D.Electrical Contractor shall lay work out in advance in order to avoid unnecessary cutting, chasing, and drilling of floors, walls, ceilings and other surfaces. Work of this nature shall be carefully done so as not to damage work already performed by other trades. Any damage which results must be properly repaired at no extra cost to the Owner. Such alterations shall not depreciate the integrity of the structure. Approval for cuts or penetrations in structural members shall be by the Architect. E.Coordinate work with other trades as required to eliminate any delays during construction. Coordinate changes with other prime contractors to avoid construction conflicts. F.Engineer's Field Observation: Site visits during construction for field observations and reports will be conducted by electrical engineer when directed by the Architect. A list of items that need to be addressed will be submitted to the Architect for forwarding to the Contractor. A written response to all items shall be submitted for Owner's review once complete. When Electrical Engineering representative performs a field observation, the Electrical Contractor shall be present and available to remove equipment covers as needed. G.Drawings of Record: Provide a full and accurate set of field record drawings marked up in a neat and understandable manner submitted to the Owner Representative, Construction Manager, or Architect upon completion of the work and prior to issuance of a certificate of completion. The drawings shall dimension all electrical facilities including but not limited to underground conduit, vaults, boxes as well as conduit routing scaled to within 12" of actual field conditions and shall be kept up to date on a daily basis reflecting changes or deviations. Electrical facilities shall be accurately drawn on the plan to scale. Refer to the general conditions of these specifications for additional requirements. Record drawings shall be required to identify both horizontal and vertical dimensions to visible and fixed points such as concrete, asphalt, buildings, sidewalks, etc. H.Identification: Provide engraved laminated plastic nameplates for all switchboards, panelboards, fire alarm terminal cabinets, telephone and cable television backboards, main devices, control panels, time clocks, contactors and safety disconnect switches accurately identifying each device. Labels shall be attached to the equipment by means of screws or rivets. Self-adhering labels will not be acceptable. Refer to Section 26 0553, IDENTIFICATION OF ELECTRICAL SYSTEMS. I.Safety: The Electrical Contractor is responsible to maintain equipment in a safe and responsible manner. Keep dead front equipment in place while equipment is energized. Conduct construction operations in a safe manner for employees as well as other work persons or anyone visiting the job site. Provide barriers, trench plates, flags, tape, etc. The Contractor shall hold all parties harmless of negligent safety practices that may cause injury to others on or near the job site. J.Guarantees: Equipment and labor shall be guaranteed and warranted free of defects, unless otherwise stated to be more restrictive, for a period of one year from the date of final acceptance by the Owner. A written warranty shall be presented to the Architect at the time of completion prior to final acceptance. Equipment deemed to be damaged, broken or failed should be repaired or replaced at no additional cost to the Owner. Materials or system requiring longer than a one-year warranty as described herein shall be separately warranted in separate letters of guarantee stating the duration of warranty. K.Operating and Installation Manuals: Provide two copies each of manuals, operating and installation instructions for equipment indicated in submittal packages. Instruct the Owner's representative as to the operation and location of equipment necessary to allow them to operate the facility upon final acceptance. This instruction period shall be prearranged with the Owner's representative prior to occupancy of the facility and the weeks prior to training scheduled. END OF SECTION 26 0500 SECTION 26 0533 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A.Drawings and general provisions of this Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A.Section Includes: 1.Conduit and fittings. 2.Weatherproof outlet boxes. 3.Junction and pull boxes. 4.Cabinets, termination cabinets. 5.Gutters. 6.Concrete boxes and vaults. B.Related Work: 1.Installation of all wire, cable, conductor, boxes/gutters, pull ropes, fiber optic cable raceway, conduit, innerduct, cable sleeve and duct as described on the plans and/or as specified here-in. This scope shall include pathways to be installed underground on site and offsite, underslab, above grade, both concealed and exposed, overhead concealed and exposed as appropriately applied. Raceways/boxes shall be installed in accordance with their intended and allowed uses and as specified here-in whichever is more restrictive. Size and capacity of all raceway/boxes shall be as specified here-in or as depicted on the drawings, but shall not be less than that required by code. Larger raceway sizes may be specified than code would permit. The specifications shall govern. 2.Listed products for termination, coupling, extending, benching supports of raceways shall be used. 3.Raceways/boxes described by this section shall include, but not be limited to, power for site utilities and lighting, site and building communications, controls, fire alarm, security, access control, sound systems, data system, energy management systems, power distribution, lighting, lighting controls, video, CATV, voice communications, intercom, nurse call, HVAC and other building low voltage/communications systems controls as may be required. Raceways, boxes and duct paths required for utility companies shall be installed per plans unless utility company requirements are more restrictive at which time those requirements shall take precedence. 4.Protection of and cleanliness of pathways and raceways must be assured during the construction process in order to eliminate the possibility of debris entering the conduit, duct, pathway resulting in decreased wire capacity and potential damage to installed conductors and cables. 5.Pathways are shown in a diagrammatic way and are generally accurate as to routing, however, it is the Contractor's responsibility as a means and methods process to coordinate with all other trades that require space within a building. The Contractor shall obtain approval for installation of raceways routing through structural footings, retaining walls, columns, beams, purlins, grade beams, etc. 6.It is the Contractor's responsibility to insure that all raceway and boxes systems penetrate fire assemblies and sound rated assemblies in an approved manner using the appropriate and listed products for the purpose. 7.Trenching and backfilling for all underground conduit systems installed by the Electrical Contractor shall be the responsibility of the Contractor. Conduits shall have minimum cover requirement of 36" below finish grade with the exception of site lighting conduits which may be 24" below finish grade minimum. More stringent depth requirements may be imposed by the local agency and utility company and shall be adhered to, and / or this specification or as detailed on the plans. Joint trenching may be utilized where practicable and where permitted by this specification. Concrete, native material and sand shall be used as backfill material and shall be compacted in accordance with and coordinated with the grading and site preparation requirements. Conduits shall rest in a minimum of 4" bed of sand prior to backfill and compaction. Locations of existing underground (UG) utility systems shall be determined by calling Underground Service Alert (USA) at least 48 hours prior to any excavation. Also refer to Section 26 0546.13, ELECTRIC UTILITY SYSTEMS. 8.Minimum conduit size shall be 1/2" except if plan shows or code requires larger size. Exception: Use minimum 3/4" for underslab and below grade applications outside of building exterior walls. 9.All electrical, control, communications systems shall be installed in [metallic] conduit system. This shall include but not be limited to all systems described in Section B.3 above, except for voice and data systems which shall be installed as described on these plans and as specified here-in but shall not be less than the recommendations of EIA/TIA standards. 10.All line voltage wiring within the building shall be installed in metallic conduit. 11.All conduit, concrete pads, underground concrete or fiberglass substructures shall be furnished and installed with the approved materials and type for the application. Provide proper traffic control during construction as well as barriers and protection of all excavations and trenching. 12.Empty or future conduits shall be properly plugged with plastic caps or inserts with a 3/8" polyethylene pull rope. Plastic or "duct" tape will not be acceptable. 13.Exterior installations: After conductors are installed, seal conduit ends to prevent entrance of foreign material using pliable duct seal, caps or waterproof expanding foam. 14.All low voltage systems including intercom, fire alarm, public address, etc. shall be in dedicated conduit systems. Voice / Data and Direct Digital Control (DDC) systems for HVAC cabling shall be routed as specified in Section 27 1300, INTERCOMMUNICATIONS SYSTEMS and as recommended by EIA/TIA standards. It shall be the contractor's responsibility to provide raceway down walls to outlet boxes and to provide sleeves across inaccessible ceiling spaces. 15.Underground conduits entering building shall have the open end of conduit within building above the elevation of the conduit outside the building such that water cannot enter building through conduit. If such a condition exists, a pull box outside of building footprint shall be installed in conduit route before conduit enters building whereby top of pull box is below finish floor of building and moisture may exit box before entering building. 16.No single conduit run of any type shall exceed 300 degrees of radius bend from termination box to termination box. 17.Separate Raceway System: Provide a separate dedicated raceway system for each system installed, do not combine different systems into a raceway or cable tray system, unless otherwise noted or allowed. 18.Spare, Future Conduits: Conduits labeled conduit only, spare, or for future use, shall be provided with a pullrope, capped at each end, labeled as spare with destination marked, and turned over to the Owner in an unused state. Contractor shall not utilize these conduits for the installation of cabling or conductors as part of this scope of work. Contractor to verify and install at no additional cost to the Owner, additional conduits as required for the installation of the systems being installed. 19.Outlet System: Provide electrical boxes and fittings as required for a complete installation. Including but not limited to outlet boxes, junction boxes, pull boxes, bushings, locknuts, covers and all other necessary components. 20.Code Compliance: Comply with CEC as applicable to construction and installation of electrical boxes and fittings and size boxes according to CEC 312, 314 and 366 except as noted otherwise. 21.Outlets to be flush mounted: Maintain integrity of insulation and vapor barrier. Unless otherwise noted, flush mount all outlet boxes. 22.Provide putty pads of proper type around outlet boxes and/or as detailed on plan to meet sound transmission restrictions and fire ratings of walls. 1.3 SUBMITTALS A.Provide Shop Drawings and Product Data for the Following Equipment: 1.Conduit and fittings. 2.Junction and pull boxes. 3.Cabinets, termination cabinets. 4.Gutters. 5.Concrete boxes and vaults. 6.Putty pads. 7.Raceways 1.4 REGULATORY REQUIREMENTS A.Conform to requirements of the CEC, latest adopted version with amendments by local AHJs. B.Furnish products listed by UL or other independent and nationally recognized testing firm. PART 2 - PRODUCTS 2.1 MATERIALS A.Heavy wall Rigid Non-Metallic Conduit, shall be PVC schedule 40 manufactured in accordance with NEMA Standard TC-2, UL-651 and WC 1094A specifications. B.Extra heavy wall non-metallic conduit, shall be PVC schedule 80 manufactured in accordance with NEMA Standard TC-2, UL-651 and WC 1094A specifications. C.Galvanized Rigid Steel (GRS) conduit shall be hot dipped galvanized, zinc coated and shall comply with Underwriters Laboratories UL-6, ANSI Specification C-80.1 and Federal Specification WW-C-581E. D.Electrical Metallic Tubing (EMT) shall be zinc coated, with a protective coating applied to the inside surface and shall comply with Underwriter Laboratories UL-797 ANSI Specification C-80.3 and Federal Specification WW-C-563A. E.Electrical Non-Metallic Tubing (ENT), shall be listed to requirements of U.L. 1653, in accordance with CEC Article 362, and meet requirements of BI National Standard CAN/CSA-C22.2 No. 227.1-U.L. 1653. ENT shall be rated for 90 degrees C conductors and shall be recognized for use in 2-hour fire resistance non-load bearing and load bearing wall assemblies. ENT shall be recognized for through-penetration firestop systems as classified to meet U.L. and ICC building codes. F.Manufacturers: 1.Outlet Boxes: Bowers, Raco, Steel City or equal. 2.Weatherproof Outlet Boxes: Bell, Red Dot, [Carlon] or equal. 3.Floor Boxes: Wiremold/Walker, Hubbell, Steel City, or equal. 4.Junction and Pull Boxes: Circle AW, Hoffman, Wireguard or equal. 5.Box Extension Adapter: Bell, Red Dot, [Carlon] or equal. 6.Conduit Fittings: O-Z Gedney, Thomas & Betts, or equal. 7.Vaults: Christy, Brooks, Utility Vault or equal. 8.Putty pads: 3M, Hilti, or equal. 9.Heavy wall rigid non-metallic conduit, Carlon, Certainteed, R&G Sloane or equal. 10.Extra heavy wall non-metallic conduit, Carlon, Certainteed, R&G Sloane or equal. 11.Galvanized Rigid Steel (GRS) conduit shall be hot dipped galvanized, zinc coated and shall comply with Underwriters Laboratories UL-6, ANSI Specification C-80.1 and Federal Specification WW-C-581E. 12.Electrical Metallic Tubing (EMT) shall be zinc coated, with a protective coating applied to the inside surface and shall comply with Underwriter Laboratories UL-797 ANSI Specification C-80.3 and Federal Specification WW-C-563A. 13.Flexible Metal Conduit (FMC), Alflex, American Flexible Conduit or equal. 14.Liquid tight flexible metal conduit, Anacanda (type UA), Electri-flex Liquatite or equal. 15.Exterior In-Grade Boxes for Non-Utility Company, Precast concrete or polymer concrete, Utility Vault and Christy. 2.2 JUNCTION AND PULL BOXES A.Construction: Provide galvanized sheet steel junction and pull boxes, with screw-on covers; of the type shape and size, to suit each respective location and installation; with welded seams and equipped with steel nuts, bolts, screws and washers. B.Location: 1.Install junction boxes above accessible ceilings for drops into walls for receptacle outlets from overhead. 2.Install junction boxes and pull boxes as required to facilitate the installation of conductors and limiting the accumulated angular sum of bends between boxes, cabinets and appliances to 300 degrees. 3.Locations: Junction boxes shall be located only where necessary and only in equipment rooms, closets, and accessible attic and underfloor spaces. A horizontal distance of 24" shall separate outlet boxes on opposite sides of occupancy separation walls, fire-rated walls or partitions. 4.Labeling: Junction box covers shall be marked with indelible ink indicated the circuit numbers passing through the box. 2.3 EXTERIOR IN-GRADE BOXES FOR NON-UTILITY COMPANY USE SHALL BE: A.Precast concrete or polymer concrete type with full bottoms and draining into gravel drywell. . Open bottom splice/pull boxes 24" x 36" and smaller shall be open bottom, with minimum 12" of gravel below for drainage. B.Flushmount in hardscape and 1" above grade in softscape. C.Provided with correct traffic type lid, i.e., full vehicular, intermediate incidental vehicular or pedestrian-rated as applicable stamped with "ELECTRIC", "LIGHTING", COMMUNICATIONS", etc. cover identification as shown on the drawings or as applicable. All boxes or vaults located in streets, driveways, sidewalks wider than 8', and turf areas where mowing takes place shall be traffic rated. D.Provided with brass hold-down bolts in cover. E.Provided with necessary box extensions to gain proper depth. F.Seal all conduit in underground boxes with duct seal after conductors have been installed. 2.4 PUTTY PADS A.Intumescent moldable firestop putty designed to protect electrical outlet boxes. B.Designed to install around outside of outlet boxes. PART 3 - EXECUTION 3.1 INSTALLATION A.Conduit systems listed below are for use in installations where they are permitted to be used by CEC and/or other occupancy restrictions. The below installation methods do not intend to suggest that these materials be installed in conflict with any applicable code. Special attention to applications shall be made in building types such as Educational, Health Care, wet location, hazardous locations, assembly occupancy and multi-story, but not limited to these. Requirements which are more restrictive than the CEC may be called for by the drawings and / or these specifications. These requirements must be adhered to. The Electrical Contractor shall be responsible to use the proper conduit system for the application. Exposed conduit is not allowed below ceilings or above slab of floor, without the permission and approval of the Architect. All conduits shall be concealed except in electrical and telecommunication rooms or where shown to be surface mounted. Exposed conduit (where allowed) shall be run square and plumb with building lines in an approved manner. Support roofmount conduits, where allowed, with minimum 12" wide redwood blocks set in mastic unless otherwise detailed in roof requirements or as specified in roofing specification, by the Architect. Strap conduits to blocks with proper sized conduit straps. Spacing of support shall be a minimum as provided for in the CEC. All exposed conduit mounted below 8' above finished grade shall be strapped at a minimum of 5' spacing. B.Non-Metallic Rigid Conduit shall be used in concrete slabs, below concrete slabs on grade, or underground outside of a building slab or foundation. Maintain minimum depth requirements and cover with appropriate fill material. Minimum 4" of bedding and cover of backfill material 1/4" size grain and smaller maximum. Conduit shall be heavy wall Schedule 40 or 80, rigid PVC only. Rigid utility P&C duct shall not be used in any application. Properly sized grounding conductors shall be installed per CEC article 250, in all non-metallic conduit branch circuit and feeder runs. PVC conduit shall be formed or field bent only with the use of properly approved bending tools such as to not decrease the internal bore of the conduit. All conduits shall be cut square and reamed of burrs. Approved and compatible glue shall be used on all PVC fittings to attain watertight joints. All non-metallic conduit runs over 150' in length and over 1 1/4" trade size conduit shall utilize galvanized rigid steel elbows. C.Galvanized Rigid Steel (GRS) conduit shall be used where exposed less than 8'-0" above finished grade to 18" below finished grade and where subject to physical damage. Conduits shall be cut square and reamed to remove burrs and sharp edges. Strap conduit below 8' above grade at 5' intervals. Unless otherwise noted, threadless setscrew and threadless weathertight fittings may be used in lieu of threaded fittings. All threaded ends entering a junction box of any type shall require one locknut on the inside and one on the outside of the enclosure and be provided with a plastic bushing or grounding bushing where necessary for proper grounding. Where exposed to moisture, a watertight hub or other approved method shall be required. All conduits shall be stubbed up straight and uniform into junction boxes, panels, cabinets, etc., and shall be (GRS) properly supported and strapped. All GRS conduit located below grade, shall be tape wrapped. D.Electrical Metallic Tubing (EMT) shall be used as allowed by code and as permitted by this specification. It shall not be in contact with soil or the concrete slab on the ground floor of any structure. Connectors and couplings shall be [steel or diecast] [insulated/non-insulated] set screw type where installed in indoor dry locations not subject to moisture. Where the potential for moisture is present, compression type weathertight fittings are required. One hole conduit straps are permitted from 1/2" to 1" and two hole conduit straps are required for size 1 1/4" and larger. EMT shall not be allowed in areas subject to severe physical damage. Install copper ground wire sized per CEC 250-122 in all EMT conduits. E.where concealed in building construction or above dropped ceilings, but shall meet the following criteria: No individual circuit path from distribution panel to last device shall exceed a cumulative length of 30' of flexible conduit from start to end. Flexible conduit shall not exceed a total directional change of 270 bending degrees in any one run between conduit terminations. Squeeze type or Jake type steel flex fittings of a grounding type are required. Flexible conduit must be supported in accordance with CEC. Where exposed to the weather, moisture, or spray down flexible conduit shall be of the liquidtight type. Fittings shall be manufactured for use with liquidtight flexible conduit. All motor connections shall be made with liquidtight flex. Flexible conduit may not be used where exposed except for last 2' of equipment connection and unless otherwise noted or approved. A copper ground wire sized per CEC 250-122 shall be installed in all flexible conduit runs. Flexible conduit may not be used exposed. Weatherproof liquid tight conduit shall not be used at roof level for equipment connections with lengths exceeding 24" nor shall it be used to circumvent a rigid conduit system in a horizontal direction. Connect recessed lighting fixtures to conduit runs with a maximum of 6' of flexible metal conduit extending from junction box to fixture. "Master" "Slave" fixtures are permitted to use manufactured flexible cable of longer dimension up to 12' between "Master" and "Slave" only and only as a U.L. listed system component. F.Underground conduits and transition to above grade/slab shall be as follows: 1.PVC elbows allowed if top of elbow is minimum 18" BFG or below top of slab, otherwise GRS elbows are required. 2.GRS elbows are required if conduit run is 150' or greater. 3.GRS risers are required from elbow below grade to equipment (device, outlet, panel, cabinet, etc.) above grade. 4.GRS elbows/risers to be PVC coated or 10 MIL taped wrapped (1/2" lapped) to 3" above finish grade or top of slab. G.Conduit Supports: Conduit runs may be supported by one-hole and two-hole straps or supports as manufactured by Unistrut, Minerallac, Caddy or equals. Supports may be fastened by means of anchors, shields, beam clamps, toggle bolts, or other approved methods appropriate for the application and size of conduit. Pipe nailers (J-hooks) may only be used for 1" conduit and smaller and only in wood frame construction. Conduit support methods are subject to review by the engineer and authority having jurisdiction for adequacy. Installations deemed inadequate shall be corrected by the contractor at no cost to the Owner. H.Bends and offsets shall be made with approved tools for the type of conduit being utilized. Bends shall be made without kinking or destroying the smooth bore of the conduit. Parallel conduits shall be run straight and true with bends uniform and symmetrical. Minimum radii shall be per CEC 344-24. I.Conduit Stub-outs below grade shall be capped with plastic cap, and identified by placing a pull box marked with correctly identified utility such as "Elec", "Tel", etc. Dimension for exact location on field record drawings. Provide lids for proper field application (i.e. traffic, incidental, pedestrian). J.Conduit Seals: Where below grade conduits enter structure through slab or retaining wall of building or basement, seal the inside of each conduit as follows: 1.Provide damming material around conductors 3" into conduit. 2.Fill 3" of conduit with 3M #2123 sealing compound. 3.Wrap conductors where they exit the conduit with 3M #2229 "Scotch Seal" mastic tape. Lap tape to approximate diameter of the raceway and wrap outside of conduit opening with (minimum) one turn. 4.Use conduit sealing bushings type CSB (O-Z/Gedney) or equal. 5.Empty conduits shall be sealed with standard non-hardening duct seal compound and then capped to prevent entrance of moisture and gases and to meet fire resistance requirements. 6.Provide cable drip loop minimum 12" high. K.Marker tape: Place plastic yellow marker tape at 12" below finish grade along and above buried conduits. Label tape "CAUTION: ELECTRICAL LINES BELOW" or similar wording. L.Electrical and communications systems raceways routed underground shall not occupy the same trench as plumbing utilities such as sewer, water, storm drain, gas or other wet or dry gaseous utility system. A minimum of 12" of undisturbed earth is required. Where utilities must cross in closer proximity to each other due to physical constraints, 6" minimum crossing distances are allowed, however 18" on all sides of a utility crossing must be concrete encased. M.Duct bank defined here-in shall be four or more conduits in a common trench, conduit spacers and saddles shall be required in all trenches where more than two conduits over 2" in diameter travel in the same trench. Proper spacing between systems as outlined above shall be required and spacers shall be located each 5' (maximum) along trench route from point to point. N.Conduits, routed below footings, slabs, grade beams, columns, and other structural elements shall be installed in strict compliance with structural details and criteria shown on structural plans. Clearances below structural elements and sleeves through structural elements must be carefully planned to avoid conflict and must be approved by the structural engineer if conflict arises. O.All conduit or raceways passing through fire rated walls, floors, or ceilings shall be installed with a listed penetration method which protects the opening to the same rating as the assembly and is non hardening. P.Expansion Joints 1.Conduits 3" and larger, that are secured to the building structure on opposite sides of a building expansion joint, require expansion and deflection couplings. Install the couplings in accordance with the manufacturer's recommendations. 2.Provide conduits smaller than 3" with junction boxes on both sides of the expansion joint. Connect conduits to junction boxes with sufficient slack of flexible conduit to produce 5" vertical drop midway between the end. All conduit shall have a copper green grounding bonding conductor installed. Q.Seismic Joints 1.At seismic joints, provide conduits rigidly secured to the building structure on opposite sides of a building expansion joint with junction boxes or approved fittings, on both sides of the joint. Connect conduits to junction boxes with sufficient slack flexible conduit such that these slack conduits are 1 1/2 times the distance between conduit ends. Flexible conduit shall have a copper green ground bonding jumper installed. R.Location: Locate boxes and conduit bodies so as to ensure accessibility of electrical wiring. S.Anchoring: Secure boxes rigidly to the substrate upon which they are being mounted, or solidly embed boxes in concrete or masonry. T.Special Application: Provide weatherproof outlets for locations exposed to weather or moisture. U.Knockout Closures: Provide knockout closures to cap unused knockout holes where blanks have been removed. V.Coordinate all electrical device locations with the architectural floor plan and interior and exterior elevations to prevent mounting devices within elements that they may conflict such as cabinetry, mirrors, planters, etc. W.Size outlet and junction boxes to minimum wire fill space requirements. Upsize box as required to allow ease of wire installation and device installation. X.Outlet and junction boxes in fire rated walls shall be gauged and spaced so as not to exceed the maximum penetration allowed by the assembly without compromising the fire rating. If a conflict arises relative to a specific condition, the contractor shall follow the requirements of the fire authority and ask for guidance from the design team. At no time should a larger box be installed prior to resolution of conflict. END OF SECTION 26 0533 EXPIRES: 09/30/26 THOMA #23-8146 ERE TYM.E C F NO. 20823 EL T S OE A T E SIGER EJ FTF RE A RO L I CRT IL FCA AIN H O M N A RE E G I N ORPD NA OIEFSS L ERE TYM.E C F NO. 20823 EL T S OE A T E SIGER EJ FTF RE A RO L I CRT IL FCA AIN H O M N A RE E G I N ORPD NA OIEFSS L ERE TYM.E C F NO. 20823 EL T S OE A T E SIGER EJ FTF RE A RO L I CRT IL FCA AIN H O M N A RE E G I N ORPD NA OIEFSS L ELEC SD SD SD SD SD SD SD SD SD SD SD SD SD SD 9 1 E-002 11 8 12 5 E-002 2 3 (E)PANEL "B" 8 4 7 S E (TBR) (E) J 13 J J 17 5 18 16 3 E-002 6 TYP. 12 10 14 1515 19 6 E-002 20 5 E-002 5 E-002 IV IV IV D IV EB EB WV IV IV IV D C O WM PP WM EV EV EV HO S E B I B TW = 2 3 6 . 2 6 BEH I N D W A L L = 2 2 6 . 3 1 TW = 2 3 6 . 3 0 / 2 3 4 . 9 5 BEH I N D W A L L = 2 2 6 . 0 0 TW S T E P = 2 3 4 . 9 1 / 2 3 4 . 1 4 BEH I N D W A L L = 2 2 4 . 3 6 TW = 2 3 4 . 5 2 BEH I N D W A L L = 2 2 4 . 1 6 TW = 2 3 4 . 4 9 / 2 3 3 . 1 2 BEH I N D W A L L = 2 2 4 . 1 7 TW = 2 3 3 . 0 9 / 2 3 1 . 1 2 BEH I N D W A L L = 2 2 3 . 7 8 TW = 2 3 1 . 1 2 / T O P W D F N C = 2 3 3 . 8 4 BEH I N D F N C = 2 2 3 . 7 8 TO P W D F N C = 2 3 3 . 8 6 / 2 3 3 . 4 0 BEH I N D F N C = 2 2 7 . 2 6 TO P W D F N C = 2 3 3 . 2 8 BEH I N D F N C = 2 2 7 . 2 6 TO P W D F N C = 2 3 2 . 8 3 / 2 3 2 . 3 8 BEH I N D F N C = 2 2 6 . 7 3 TO P W D F N C = 2 3 1 . 5 4 BEH I N D F N C = 2 2 5 . 6 9 TO P W D F N C = 2 3 2 . 4 1 BEH I N D F N C = 2 2 6 . 7 1 TO P W A L L = 2 3 2 . 6 9 / 2 3 5 . 6 4 BEH I N D W A L L = 2 3 6 . 0 0 TO P W A L L = 2 3 2 . 3 7 BEH I N D W A L L = ? ? TO P W A L L = 2 3 6 . 7 2 BEH I N D W A L L = 2 3 6 . 7 2 TO P W A L L = 2 3 7 . 3 1 BEH I N D W A L L = 2 3 7 . 3 1 TO P WA L L = 2 3 7 . 2 2 / 2 3 8 . 1 6 BEH I N D W A L L = 2 3 2 . 5 1 TO P WAL L = 2 3 8 . 1 6 / 2 3 9 . 2 4 BEH I N D W A L L = 2 3 2 . 5 1 TO P WAL L = 2 3 9 . 2 1 / 2 4 0 . 5 2 BEH I N D W A L L = 2 3 2 . 5 5 TO P WAL L = 2 4 0 . 5 3 / 2 4 0 . 8 7 BEH I N D W A L L = 2 3 4 . 6 7 TO P WA L L = 2 4 0 . 8 7 / 2 4 1 . 8 6 BEH I N D W A L L = 2 3 6 . 8 6 EG / F W = 2 3 1 . 5 0 ' EG / F W = 2 3 0 . 9 5 ' EG / F W = 2 2 9 . 1 4 ' EG / F W = 2 2 9 . 0 7 ' EG / F W = 2 2 8 . 8 9 ' EG / F W = 2 2 8 . 2 8 ' EG / F W = 2 2 7 . 8 0 ' EG / F W = 2 2 7 . 1 6 ' EG / F W = 2 2 7 . 2 0 ' EG / F W = 2 2 6 . 4 8 ' EG / F W = 2 2 5 . 4 4 ' EG / F W = 2 2 4 . 6 5 ' EG / F W = 2 2 9 . 0 7 ' EG / F W = 2 3 0 . 6 4 ' EG / F W = 2 3 0 . 8 2 ' EG / F W = 2 3 1 . 2 2 ' EG / F W = 2 3 2 . 0 4 ' EG / F W = 2 3 3 . 2 3 ' EG / F W = 2 3 6 . 2 9 ' EG / F W = 2 3 8 . 7 1 ' EG / F W = 2 4 0 . 0 0 ' WA L N U T S T . SANTA ROSA ST. WA L N U T S T . ELEC SANTA ROSA ST WA L N U T S T HW Y 1 0 1 (E) "MSB" S e p 1 1 , 2 0 2 4 - 1 0 : 3 0 p m - C h r i s - K : \ E N G \ 2 0 2 3 \ 2 3 - 8 1 4 6 \ 2 3 - 8 1 4 6 _ E 1 0 1 - E L E C T R I C A L S I T E P L A N . d w g CITY SPECIFICATION NO. DATE: PR O J E C T T I T L E : SH E E T T I T L E : SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION AS NOTED SEPT 11, 2024 2504-05-PS23 2000577-02 90 % C O N S T R U C T I O N D O C U M E N T S 11 0 6 W A L N U T F E N C I N G I M P R O V E M E N T S EXPIRES: 09/30/24 THOMA #23-8146 ERE TYM.E C F NO. 20823 E L T S OE A T E SIGER EJ FTF RE A RO L I CRT IL FCA AIN H O M N A RE E G I N ORPD NA OIEFSS L CJ/JT TR CHRIS JOSE San Luis Obispo, CA 93406 P.O. Box 1167 - 3562 Empleo St. THOMA ELECTRIC, INC. Phone: (805) 543-3850 cad@thomaelec.com Fax: (805) 543-3829 REFERENCE NOTES EN L A R G E D E L E C T R I C A L S I T E P L A N E101 1 ENLARGE PLAN AT ROLLING GATE SCALE: 1/4" = 1'-0" 1.PROVIDE CONNECTION TO MOTORIZED GATE PER MANUFACTURER INSTALLATION INSTRUCTIONS. VERIFY REQUIREMENTS WITH GATE SUPPLIER. 2.NEW 3/4"C (PVC40) STUB(S) FOR LOOP DETECTORS. COORDINATE WITH GATE CONTRACTOR. 3.STANCHION MOUNT KEYPAD. PROVIDE 3/4"C.O BETWEEN MOTORIZED GATE AND KEYPAD VIA PULL BOX. WIRES BY GATE CONTRACTOR. 4.NEW 3/4"C (PVC 40) W/ (2) #12 THWN AND (1) #12 COPPER GROUND [120V BRANCH CIRCUIT] TO PANEL "B". PROVIDE NEW 20A/1P BREAKER TO MATCH EXISTING AND UPDATE PANEL SCHEDULE. 5.REMOVE EXISTING BRANCH CIRCUIT BETWEEN PULL BOX AND PANELBOARD, THEN RE-PULL EXISTING AND NEW TO CONDUCTORS AND RE-TERMINATE TO BREAKERS. HOMERUN TO EXISTING PANEL "B" 6.PROVIDE TWO 11"X17" PULLBOXES FLUSH IN GRADE. LABEL ONE "SIGNAL" AND ONE "ELECTRICAL" 7.NEW 2" (PVC40) FOR ACCESS CONTROLLER AT KEYPAD LOW VOLTAGE WIRING BY OWNER'S VENDOR. 8.NEW 2"C (PVC40) FOR SECURITY CAMERA WIRING BY OWNER'S VENDOR. 9.WALL MOUNT LB PER DETAIL AND STUB COMMUNICATION CONDUITS TO ACCESSIBLE SPACE ABOVE 1ST FLOOR AND EXTEND FEEDER CONDUIT TO "MSB". 10.POTHOLE TO EXPOSE EXISTING BRANCH CIRCUIT BETWEEN PULL BOX AND EXISTING POLE LIGHT. PRIOR TO DEMOING THE ROAD FOR THE ROLLING GATE, INTERCEPT EXISTING CONDUIT AND EXTEND NEW BRANCH CIRCUIT CONDUIT TO NEW PULL BOX. EXTEND EXISTING BRANCH CIRCUIT TO MATCH EXISTING. 11.NEW 1"C (PVC40) BETWEEN PULLBOX AND PILASTER. PLUMB CONDUIT TO PILASTER FOR FUTURE SECURITY CAMERA WIRING. COORDINATE WITH LANDSCAPE ARCHITECT.. 12.EXISTING ELECTRICAL PULL BOX FOR SITE LIGHTING. CONDUITS RUN TO PANEL "B". 13.NEW 3 4"C FOR SENSOR WIRING. REFER TO SHOP DRAWING FOR EXACT LOCATION PRIOR TO ROUGH-IN. 14.STUB 2"C (PVC 40) TO 8" ROUND PULL BOX FOR FUTURE SECURITY CAMERA. 15.EXISTING BRANCH CIRCUIT TO EXISTING POLE LIGHT TO BE PROTECTED. 16.CONNECT TO PEDESTAL MOUNT CHARGING STATION. PROVIDE 6" DEEP X 24" SQUARE CONCRETE BASE. COORDINATE WITH MANUFACTURER INSTALLATION FOR ANCHOR BOLT REQUIREMENTS PRIOR TO ROUGH-IN. ENSURE THE CONDUITS ARE PLUMB. 17.EXISTING LIGHT TO BE REMOVED. INTERCEPT EXISTING BRANCH CIRCUIT CONDUIT AND PROVIDE NEW 8" ROUND PULL BOX. 18.EXISTING LIGHT TO REMAIN. PROTECT EXISTING BRANCH CIRCUIT CONDUITS. 19.NEW (PVC 40) FEEDER CONDUIT FOR EV CHARGER PER SINGLE LINE DIAGRAM. 20.NEW 1" (PVC 40 BRANCH CIRCUIT CONDUIT) TO POWER THE EXISTING POLE LIGHT. RE-ROUTE EXISTING BRANCH CIRCUIT AND EXTEND. NORTH SCALE: OVERALL ELECTRICAL SITE PLAN 1" = 40'-0" 1 - 2 (E) "MSB" SINGLE LINE DIAGRAM (E) "MSB" M PRIMARY SECONDARY 800A BUS, 120/208V, 3 PHASE 4 WIRE (E) (E)PRIM (E)(SEC) (E)TRANSFORMER T-578 2 (E) 800A 3P, MAIN (N) 80A 2P 1 (N) LEVEL 2 EV CHARGER 3 L = 2 0 0 F T REFERENCE NOTES 1.PROVIDE NEW CIRCUIT BREAKER TO MATCH EXISTING. 2.PG&E METER #1006927320. REFER TO DETAIL 2/E-002 FOR LOAD DEMAND FOR ADDED LOAD. 3.PROVIDE AND INSTALL NEW LEVEL 2 EV CHARGER. SEE SITE PLAN NOTE 16 ON THIS SHEET FOR LOCATION. INSTALL PER MANUFACTURE REQUIREMENTS AND PROVIDE ALL ACCESSORIES AND CONCRETE BASE FOR A FULLY WORKING SYSTEM. REFER TO TO SHEET E003 FOR SPECIFICATION. PROVIDE WITH POWER MANAGEMENT KIT FOR POWER SHARING. PROGRAM OUTPUT TO 40AMP (8.32KW) SO LOAD DOES NOT INCREASE THE 800A SERVICE. OUTPUT CAN BE MODIFIED TO MAX LOAD AFTER A 30DAY RECORDING HAS BEEN ESTABLISHED TO VERIFY THE EXISTING DEMAND LOAD AT THE THE BUILDING. 4.1-1/2"C WITH (2)#4 THWN & (1)#8 CU GROUND DETAIL 2 DETAIL 1 4 EXISTING PANEL "B" ROUTE NEW 1-1/2" CONDUIT (EMT) ABOVE T-BAR CEILING. REFER TO SINGLE LINE DIAGRAM. INSTALL 24"SQ X 4" DEEP TERMINAL CABINET EXISTING METER SWITCHGEAR "MSB" EXISTING PANEL "A" EXISTING PG&E TRANSFORMER - E-003 EXPIRES: 09/30/26 THOMA #23-8146 (R ( TY0( & ) NO 0 ( L T S O( AT ( S,*( R (- )T )R( A RO L ,&RT ,L )&A A,N H O 0 N A R(( * , N OR3'NA O,()S S L(R ( TY0( & ) NO 0 ( L T S O( AT ( S,*( R (- )T )R( A RO L ,&RT ,L )&A A,N H O 0 N A R(( * , N OR3'NA O,()S S L(R ( TY0( & ) NO 0 ( L T S O( AT ( S,*( R (- )T )R( A RO L ,&RT ,L )&A A,N H O 0 N A R(( * , N OR3'NA O,()S S L