HomeMy WebLinkAbout11-21-2024 ATC Agenda Packet
Active Transportation Committee
AGENDA
Thursday, November 21, 2024, 6:00 p.m.
Council Hearing Room, 990 Palm Street, San Luis Obispo
The Active Transportation Committee holds in-person meetings. Zoom participation will not be
supported. Attendees of City Council or Advisory Body meetings are eligible to receive one hour of
complimentary parking; restrictions apply, visit Parking for Public Meetings for more details.
INSTRUCTIONS FOR PUBLIC COMMENT:
Public Comment prior to the meeting (must be received 3 hours in advance of the meeting):
Mail - Delivered by the U.S. Postal Service. Address letters to the City Clerk's Office at 990
Palm Street, San Luis Obispo, California, 93401.
Email - Submit Public Comments via email to advisorybodies@slocity.org. In the body of your
email, please include the date of the meeting and the item number (if applicable). Emails will not
be read aloud during the meeting.
Voicemail - Call (805) 781-7164 and leave a voicemail. Please state and spell your name, the
agenda item number you are calling about, and leave your comment. Verbal comments must be
limited to 3 minutes. Voicemails will not be played during the meeting.
*All correspondence will be archived and distributed to members, however, submissions received
after the deadline ma not be processed until the following day.
Public Comment during the meeting:
Meetings are held in-person. To provide public comment during the meeting, you must be
present at the meeting location.
Electronic Visual Aid Presentation. To conform with the City's Network Access and Use Policy,
Chapter 1.3.8 of the Council Policies & Procedures Manual, members of the public who desire
to utilize electronic visual aids to supplement their oral presentation must provide display-ready
material to the City Clerk by 12:00 p.m. on the day of the meeting. Contact the City Clerk's
Office at cityclerk@slocity.org or (805) 781-7114.
Pages
1.CALL TO ORDER
Chair Garrett Otto will call the Regular Meeting of the Active Transportation
Committee to order.
2.PUBLIC COMMENT FOR ITEMS NOT ON THE AGENDA
At this time, people may address the Committee about items not on the agenda.
Persons wishing to speak should come forward and state their name and
address. Comments are limited to three minutes per person. Items raised at this
time are generally referred to staff and, if action by the Committee is necessary,
may be scheduled for a future meeting.
3.CONSENT
Matters appearing on the Consent Calendar are expected to be non-
controversial and will be acted upon at one time. A member of the public may
request the Active Transportation Committee pull an item for discussion. The
public may comment on any and all items on the Consent Agenda within the
three-minute time limit.
3.a CONSIDERATION OF MINUTES - 06-27-24 and 10-17-24 ACTIVE
TRANSPORTATION COMMITTEE MINUTES
5
Recommendation:
To approve the Active Transportation Committee Minutes of 06-27-24
and 10-17-24.
4.BUSINESS ITEMS
4.a 2025 PAVING PROJECT 11
Review current design proposals for the 2025 Paving Project and
provide input to staff on the transportation elements to guide further
development of the project.
4.b COMMITTEE RECOMMENDATIONS FOR FY 2025-27 CITY BUDGET
GOALS
43
Recommend a prioritized list of budget goals for the upcoming FY 2025-
27 Financial Plan based on the Active Transportation Plan goals and
priority projects.
5.COMMENT AND DISCUSSION
5.a COMMITTEE MEMBER UPDATES
Receive a brief update from Active Transportation Committee members.
5.b STAFF UPDATES
Receive a brief update on Projects from Active Transportation Manager
Adam Fukushima.
5.c FUTURE AGENDA ITEMS
Active Transportation Manager Adam Fukushima will provide a forecast
of items coming before the Active Transportation Committee.
6.ADJOURNMENT
A Special Meeting of the Active Transportation Committee meeting is scheduled
for December 12, 2024 at 6:00 p.m. in the Council Hearing Room at City Hall,
990 Palm Street, San Luis Obispo.
The next Regular Meeting of the Active Transportation Committee meeting is
scheduled for January 16, 2025 at 6:00 p.m. in the Council Hearing Room at
City Hall, 990 Palm Street, San Luis Obispo.
LISTENING ASSISTIVE DEVICES are available -- see the Clerk
The City of San Luis Obispo wishes to make all of its public meetings accessible
to the public. Upon request, this agenda will be made available in appropriate
alternative formats to persons with disabilities. Any person with a disability who
requires a modification or accommodation in order to participate in a meeting
should direct such request to the City Clerk’s Office at (805) 781-7114 at least
48 hours before the meeting, if possible. Telecommunications Device for the
Deaf (805) 781-7410.
Agenda related writings or documents provided to the Active Transportation
Committee are available for public inspection on the City’s website:
https://www.slocity.org/government/mayor-and-city-council/agendas-and-
minutes. Meeting recordings may be found on the City’s website:
https://opengov.slocity.org/WebLink/Browse.aspx?id=60965
1
Active Transportation Committee Minutes
October 17, 2024, 6:00 p.m.
Council Hearing Room, 990 Palm Street, San Luis Obispo
Active Transportation
Committee Members
Present:
Member Dave Amos, Member Lea Brooks, Member Jill
Caggiano, Member Russell Mills, Vice Chair Kimmie Nguyen,
Chair Garrett Otto
ATC Members Absent: Member Francine Levin
City Staff Present: Active Transportation Manager Adam Fukushima, Recording
Secretary Lareina Gamboa
_____________________________________________________________________
1. CALL TO ORDER
A Special Meeting of the San Luis Obispo Active Transportation Committee was
called to order on October 17, 2024 at 6:00 p.m. in the Council Hearing Room at
City Hall, 990 Palm Street, San Luis Obispo, by Chair Otto.
2. PUBLIC COMMENT FOR ITEMS NOT ON THE AGENDA
Public Comment:
None.
--End of Public Comment--
3. PRESENTATIONS
3.a 2023 Bicycle Friendly Community Report Card
Receive the 2023 Bicycle Friendly Community Report Card.
Public Comment:
Myron Amerine
Helene Finger
Rick Elison
Kathryn Hicks
--End of Public Comment—
Motion by Member Amos
Page 5 of 69
2
Second by Member Brooks
Motion: Receive the 2023 Bicycle Friendly Community Report Card
Ayes (6): Member Dave Amos, Member Lea Brooks, Member Jill
Caggiano, Member Russell Mills, Vice Chair Kimmie Nguyen, Chair
Garrett Otto
Absent (1): Member Levin
CARRIED (6 to 0)
3.b Active Transportation Plan 2023 Progress Report Card
Receive the Active Transportation Plan 2023 Progress Report Card and
updated data from the Household Community Survey conducted earlier
this year.
Public Comment:
Myron Amerine
Rick Elison
--End of Public Comment—
Motion by Member Mills
Second by Vice Chair Nguyen
Motion: Receive the Active Transportation Plan 2023 Progress Report
Card
Ayes (6): Member Dave Amos, Member Lea Brooks, Member Jill
Caggiano, Member Russell Mills, Vice Chair Kimmie Nguyen, Chair
Garrett Otto
Absent (1): Member Levin
CARRIED (6 to 0)
4. COMMENT AND DISCUSSION
4.a COMMITTEE MEMBER UPDATES
Active Transportation Committee members provided a brief update.
Page 6 of 69
3
4.b STAFF UPDATES
Active Transportation Manager Adam Fukushima provided the following
update.
Updates on Complete Streets Projects for Higuera, Broad, and
Foothill
4.c FUTURE AGENDA ITEMS
Active Transportation Manager Adam Fukushima provided the following
agenda forecast:
November 21, 2024: 2025 Paving Project and Budget Goals for FY
2025-27
December Special Meeting (TBA): Vision Zero Report
January 16, 2025: 600 Tank Farm Road
5. ADJOURNMENT
The meeting was adjourned at 8:09 p.m. The next Regular Meeting of the Active
Transportation Committee is scheduled for November 21, 2024 at 6:00 p.m. in
the Council Hearing Room at City Hall, 990 Palm Street, San Luis Obispo.
_________________________
APPROVED BY ACTIVE TRANSPORTATION COMMITTEE: XX/XX/2024
Page 7 of 69
Page 8 of 69
Minutes – Active Transportation Committee Meeting of June 27, 2024 Page 1
Minutes - DRAFT
ACTIVE TRANSPORTATION COMMITTEE
Thursday, June 27, 2024 1
Special Meeting of the Active Transportation Committee 2
3
CALL TO ORDER 4
5
A Special Meeting of the San Luis Obispo Active Transportation Committee was called to order 6
on Thursday, June 27, 2024 at 6:00 p.m. in the Council Hearing Room located at 990 Palm Street, 7
San Luis Obispo, California, by Chair Otto. 8
9
ROLL CALL 10
11
Present: Committee Members Lea Brooks, Jill Caggiano, Russell Mills, Kimmie Nguyen 12
(vice chair), and Garrett Otto (chair) 13
14
Absent: Dave Amos, Francine Levin 15
16
Staff: Dana Ebe, Adam Fukushima, and Luke Schwartz 17
18
PUBLIC COMMENT ITEMS NOT ON THE AGENDA 19
None. 20
21
--End of Public Comment-- 22
23
ACTION ITEMS 24
25
1. Foothill Complete Streets Project - Request for Preliminary Design Input 26
Staff provided a presentation and responded to Committee inquiries. 27
28
ACTION: UPON MOTION BY COMMITTEE MEMBER MILLS, SECONDED BY 29
COMMITTEE MEMBER BROOKS, CARRIED 5-0, to move forward on the complete street 30
project for the Foothill corridor and that staff consider committee comments to help further the 31
project development. 32
33
Public Comment 34
Anne Hodges 35
Myron Amerine 36
Alan Martin 37
Kathy Godfrey 38
Steve Klisch 39
40
--End of Public Comment-- 41
42
43
Page 9 of 69
Minutes – Active Transportation Committee Meeting of June 27, 2024 Page 2
44
ADJOURNMENT 45
46
The meeting was adjourned at 8:18 p.m. The next Regular Active Transportation Committee 47
meeting is scheduled for Thursday, July 18, 2024 at 6:00 p.m. in the City Council Hearing Room, 48
990 Palm Street, San Luis Obispo, California. 49
50
51
52
APPROVED BY THE ACTIVE TRANSPORTATION COMMITTEE: XX/XX/2024 53
54
55
Page 10 of 69
City of San Luis Obispo, Agenda, Planning Commission
Active Transportation Committee
AGENDA REPORT ITEM 4A
DATE: November 21, 2024
FROM: Adam Fukushima, Active Transportation Manager
PREPARED BY: Adam Fukushima, Active Transportation Manager
Luke Schwartz, Transportation Manager
Hai Nguyen, Senior Engineer
SUBJECT: 2025 Paving Project
Recommendations:
Review current design proposals for the 2025 Paving Project and provide input to staff on the
transportation elements to guide further development of the project.
Discussion
As part of the City’s Pavement Management Program, specific streets are scheduled for
maintenance work each summer, typically alternating each year between local neighborhood
streets and arterial/collector streets. These projects provide excellent opportunities to incorporate
planned safety and complete street improvements as part of these larger maintenance activities,
which allows for more efficient and cost-effective implementation of priority active transportation
and safety improvements. During summer 2025, the following locations are planned for repaving
work:
Tank Farm Road (Broad Street to Orcutt Road)
Orcutt Road (Tank Farm Road to City/County Line)
Sacramento Drive (Industrial Road to Via Esteban)
Calle Joaquin (Motel 6 to City/County Line)
See Attachment 1:Project Area Map for reference.
Draft Design Concepts showing additional details are also provided for reference as Attachment 2.
Project Goals and Objectives
The following primary goals and objectives will guide the project designs, along with input from
the Active Transportation Committee (ATC) and other community stakeholders.
Overarching Project Goal:
Implement pavement maintenance treatments at selected public streets, while leveraging
opportunities to advance high-priority active transportation, accessibility and safety features.
Page 11 of 69
Active Transportation Committee Page 2
Specific Design Objectives:
1. Repair and reconstruct damaged pavement surfaces on selected streets to provide a smooth
road surface for driving, bicycling, riding transit, and walking across the street.
2. Implement the highest-priority (Tier 1) Active Transportation Plan (ATP) projects as part
of roadway sealing improvements, and advance lower-priority (Tier 2 and Tier 3) ATP
projects as resources allow.
3. Implement measures to reduce illegal speeding and other safety elements as identified in
the City’s Traffic Safety/Vision Zero Program as part of paving project, where resources
allow.
4. Retain on-street parking supply, unless where warranted for safety purposes.
5. Minimize inconveniences to residents and businesses during construction.
Proposed Active Transportation Design Elements
The following sections identify the preliminary scope of complete street and safety improvements
proposed as part of the 2025 Paving Project, as guided by the ATP and the Traffic Safety/Vision
Zero Program. Final designs will be refined based on input provided by the ATC, San Luis Obispo
Fire Department, neighborhood residents, and other community stakeholders.
All Streets in 2025 Paving Project
The following complete street/safety features are proposed for all streets within the 2025 Paving
Project limits:
1. Pavement Rehabilitation: Repair potholes, refresh striping, and reconstruct roadway
pavement to restore a smooth surface for driving, using transit, bicycling, and walking.
2. Curb Ramp Upgrades: Upgrade select curb ramps to current ADA standards
3. Pedestrian Crossing Treatments: Install high-visibility crosswalks at all existing and
proposed new marked pedestrian crosswalks.
4. Intersection Daylighting: Remove obstructions to lines-of-sight at all marked and
unmarked crosswalks to increase pedestrian visibility and safety at intersection corners and
midblock crossings. This is generally accomplished through vegetation trimming and
installing red curb paint and/or signage to prohibit parking at intersection corners adjacent
to crosswalks. California Assembly Bill 413 restricts parking within 20 feet of any marked
or unmarked crosswalk, with enforcement permitted starting in 2025 regardless of whether
signs or curb markings are present. The City will be proactively implementing curb
markings and signed parking restrictions where appropriate as part of annual paving
projects. These measures primarily apply to Sacramento Drive and side-street intersection
approaches on Tank Farm Road.
Tank Farm Road
Complete street improvements are proposed for Tank Farm Road to improve active transportation
facilities and safety for all road users. Tank Farm Road is identified as a Tier 1 (highest priority)
corridor in the City’s ATP, with recommendations to add protected bike lanes and pedestrian
crossing improvements. Further, City staff receives regular comments/complaints from
community members regarding the following concerns on Tank Farm Road:
Page 12 of 69
Active Transportation Committee Page 3
1. General complaints about high vehicle speeds and illegal speeding on Tank Farm Road,
including requests to lower posted speed limits.
2. Complaints about difficulty making left turns onto Tank Farm Road from side street
intersections due to high vehicle speeds on Tank Farm.
3. Concerns about vehicles failing to yield to pedestrians at existing marked crosswalks on
Tank Farm at Poinsettia and at the Righetti Ranch Road roundabout.
4. Requests for addition of an enhanced pedestrian crossing on Tank Farm between Poinsettia
and Righetti Ranch Road.
The most prominent modification proposed for Tank Farm Road as part of the 2025 Paving project
is a five-lane to three-lane road diet between Poinsettia and Righetti Ranch Road. Road diets are
one of the U.S. Department of Transportation’s proven safety countermeasures and have
consistently demonstrated effectiveness in reducing illegal speeding, crash frequency and severity.
According to the Federal Highway Administration (FHWA), road diets typically reduce total
collisions by 19%-47% on average.
The City has implemented several successful road diets at other streets, such as South Street, Marsh
Street, Laurel Lane, and Johnson Avenue (south of Bishop Street) where traffic demand did not
require the excess lane capacity that was previously provided and have seen clear reductions in
illegal speeding and collision trends. Tank Farm Road currently carries an average daily traffic
volume of 11,000 veh/day west of Righetti Ranch Road, and 5,600 veh/day east of Righetti Ranch
Road, which is well within the thresholds typically deemed appropriate for three-lane road diets
per state and federal guidelines (up to 18,000-25,000 veh/day).
Tank Farm Road – Proposed Road Diet Limits
A traffic operations analysis study was prepared to assess the viability of a proposed road diet on
Tank Farm Road. This study is near completion and will be provided as agenda correspondence
prior to the ATC Meeting. The analysis evaluates traffic conditions—specifically motor vehicle
congestion and delays—along the segment of Tank Farm Road where lane reductions are proposed
(Poinsettia to Righetti Ranch Road), considering both existing and future (Year 2040) traffic
conditions. The conclusions of the traffic analysis report are summarized as follows:
Page 13 of 69
Active Transportation Committee Page 4
The existing (2024) and projected future (2040) traffic volumes on Tank Farm Road are
well within the volume thresholds recommended for a five-lane to three-lane road diet.
Driver delays/congestion at intersections within the proposed road diet limits would remain
below the City’s adopted level of service (LOS) thresholds for existing (2024) conditions
with the proposed lane reductions.
o The most notable change in driver experience would be an increase in delay of 2-
6 seconds per vehicle on average turning left from side streets to Tank Farm Road
during AM and PM peak hours.
Under 2040 conditions, with buildout of the City’s General Plan land use forecasts,
including remaining development within the Orcutt Specific Plan Area and additional
growth outside of the city limits, all intersections within the road diet limits would operate
at acceptable levels of delay/congestion, with the exception of the Tank Farm/Poinsettia
intersection, where the northbound approach would operate at unacceptable level of service
(LOS) E during the afternoon peak hour period. Average delays for drivers making this
northbound left turn from Poinsettia to Tank Farm would increase from 35 seconds per
vehicle to 45 seconds per vehicle during the PM peak hour for 2040 condition with
proposed lane reductions.
o The traffic study recommends monitoring conditions at this intersection and
modifying striping to add a northbound left-turn acceleration lane when warranted
prior to the 2040 horizon year. While this acceleration lane is not proposed as part
of the 2025 Paving project, it is recommended as a future modification and
illustrated for reference in Attachment 3.
The intersection of Tank Farm/Morning Glory/Sunrose is an appropriate location to add a
marked pedestrian crosswalk, if additional safety features are incorporated into the design (i.e.
bulbouts, warning beacons, safety lighting, etc.).
Table Comparing Peak Hour Traffic Volumes vs the Road Diet Threshold
0 200 400 600 800 1000 1200 1400 1600 1800 2000
Tank Farm (Broad to Righetti Ranch)
Tank Farm (Righetti Ranch to Orcutt)
Tank Farm Road Peak Hour Volumes vs. Road Diet
Threshold
2024 - AM Peak Hour Volume (Two-Way)2024 - PM Peak Hour Volume (Two-Way)
2040 - AM Peak Hour Volume (Two-Way)2040 - PM Peak Hour Volume (Two-Way)
Re
c
o
m
m
e
n
d
e
d
R
o
a
d
D
i
e
t
Th
r
e
s
h
o
l
d
(1,
7
5
0
P
e
a
k
H
o
u
r
V
o
l
)
Page 14 of 69
Active Transportation Committee Page 5
In addition to the proposed road diet, the following design elements are currently proposed for
Tank Farm Road (see attached design drawings for additional detail):
1. ADA curb ramp upgrades.
2. Installation of radar speed feedback signs and additional speed limit signs (example
photo below).
Example of Radar Speed Feedback Sign
3. Upgrades to Tank Farm/Poinsettia pedestrian crossing:
Removal of the low-contrast decorative crosswalks, replace with high-visibility
“ladder-style” crosswalk markings for added contrast.
Potential for curb extensions (bulbouts) at the west leg of the intersection to
shorten pedestrian crossing distance/exposure
Installation of a new streetlight to better illuminate the pedestrian crosswalk on
Tank Farm.
Relocating the existing Rectangular Rapid Flashing Beacons (RRFBs) to new
corner extensions to increase visibility.
4. Installation of an enhanced pedestrian crossing at Tank Farm/Morning Glory/Sunrose:
Potential for curb extensions (bulbouts) at the west leg of the intersection to
shorten pedestrian crossing distance/exposure.
Addition of high-visibility “ladder-style” crosswalk markings.
Potential for curb extensions (bulbouts) at the west leg of the intersection to
shorten pedestrian crossing distance/exposure.
Installation of push-button RRFB system (see example photo below).
Page 15 of 69
Active Transportation Committee Page 6
Example of a Rectangular Rapid Flashing Beacon (RRFB)
5. Addition of RRFB beacons at the Righetti Ranch Roundabout for crosswalks crossing
Tank Farm Road, improving visibility for pedestrians crossing Tank Farm Road.
6. Striping modifications to the westbound Tank Farm Road approach at the Broad Street
intersection to provide one left-turn lane, one through lane and one shared through/right
turn lane. (reduces vehicle congestion/delays and eliminates need for westbound
cyclists to merge across high-speed/volume traffic lane).
7. Addition of green bike lane conflict markings at intersections and high-traffic
driveways.
8. Addition of striped bike lane buffers along the full segment between Broad Street and
Orcutt Road, and installation of flexible bollards separating bicyclists from motor
vehicle traffic where roadway width allows.
Typical street cross sections for Tank Farm Road are provided below for reference. 1
1 For all cross sections in this report, dimensions are typical and may vary by street segment.
Page 16 of 69
Active Transportation Committee Page 7
Existing Cross Section of Tank Farm Rd: Broad St to Poinsettia St
Proposed Cross Section of Tank Farm Rd: Broad St to Poinsettia St
Existing Cross Section of Tank Farm Rd: Poinsettia St to Righetti Ranch Rd
Proposed Cross Section of Tank Farm Rd: Poinsettia St to Righetti Ranch Rd
Page 17 of 69
Active Transportation Committee Page 8
Existing Cross Section of Tank Farm Rd: Righetti Ranch Rd to Orcutt Rd
Proposed Cross Section of Tank Farm Rd: Righetti Ranch Rd to Orcutt Rd
Orcutt Rd: Tank Farm Rd to City/County Line
Proposed improvements for this segment of Orcutt Road include pavement rehabilitation and
restriping only.
Sacramento Drive (Industrial Way to Via Esteban)
Sacramento Drive is designated as a commercial collector and serves both residential as well as
light industrial uses, including a high level of commercial delivery trucks. The City’s ATP calls
for retaining the striped bike lanes on Sacramento, which exist currently, and a potential future
intersection improvement in the form of an all-way stop at the Sacramento/Capitolio, which is
identified as a Tier 3 (lower priority) improvement. Public comments/complaints received by City
staff regarding Sacramento Drive in recent years primarily include the following:
1. Concerns with poor pavement condition, particularly within the northbound bike lane.
2. General complaints regarding high speeds and illegal speeding, including from larger
commercial trucks that frequent Sacramento Drive.
3. Concerns with large, parked vehicles/trucks encroaching into southbound bike lane.
4. Concerns with high vehicle speeds and encroachment into the bike lane along the curve in
the road north of the paving project limits (note that two community members traveling on
foot were tragically killed by a reckless driver along this curve in November 2022)
To address these concerns, primarily with illegal speeding on the corridor, the following design
elements are proposed as part of the 2025 Paving project for Sacramento Drive:
Page 18 of 69
Active Transportation Committee Page 9
1. Pavement reconstruction to repair potholes and cracking, providing a smooth road surface
for all users.
2. While outside of the paving project limits, plans include sign/striping modifications along
the roadway curve north of Via Esteban to reduce illegal speeds and vehicle encroachment
into the bike lane. Measures include addition of striped bikeway buffers and plastic flex
posts to separate vehicles from bicycles, centerline hardening (ceramic “bots dots” along
yellow centerline), and additional curve warning signage.
3. ADA curb ramp upgrades.
4. Installation of radar speed feedback signs and additional speed limit signs.
5. Addition of green bike lane conflict markings at intersections and high-traffic driveways.
6. Striping refinement to narrow auto lane widths (within City Engineering Standards), add
width to northbound bike lane, and add striped bike lane buffers, where width allows.
7. Moderate expansion of parking restrictions at intersection corners (“daylighting”) to
improve sight distance and safety for all road users.
8. Pilot installation of traffic calming measures between Via Esteban and Industrial Way to
reduce illegal speeding. Initial installation proposed using temporary bolt-down rubber
speed cushions to allow for monitoring of effectiveness and potential impacts to
commercial trucks and emergency response vehicles, with potential for further
modifications and permanent materials at a future date. (Note that final traffic calming
details require approval from the City Fire Department).
During preliminary planning for Sacramento Drive repaving, staff evaluated the intersection of
Sacramento/Capitolio to verify the feasibility of installing all-way stop control. However, based
on review of traffic volumes, collision history, and site conditions, the intersection does not
currently meet the thresholds or “warrants” that need to be satisfied per state engineering standards
in order to legally install an all-way stop at this intersection. A future all-way stop is recommended
for consideration in the City’s ATP; thus, staff will continue to monitor potential for this
modification in the future.
Typical cross sections for Sacramento Drive (looking north) are provided for reference below. 2
2 For all cross sections in this report, dimensions are typical and may vary by street segment.
Page 19 of 69
Active Transportation Committee Page 10
Sacramento Dr – Existing Cross Section
Sacramento Dr – Proposed Cross Section
Calle Joaquin (Motel 6 to City/County Line)
Along this stretch of Calle Joaquin southwest of the Motel 6, improvements include pavement
rehabilitation and restriping, with the only notable change from existing conditions being the
addition of striped edge lines for added visibility at night.
Example of Increased Nighttime Visibility with Addition of Edge Lines
Page 20 of 69
Active Transportation Committee Page 11
Public Outreach
For this project, a project webpage was created, where members of the community can find out
more info about the project as well as sign up for project specific updates. In addition, a press
release was sent out and over 2,600 postcards were sent to residents in the areas near the
proposed paving inviting input at the ATC meeting. Following the ATC meeting, members of the
community can still provide input by reaching out to the contacts listed on the project webpage.
Project Costs and Funding
This project currently has a budget of approximately $9.2 million. This includes allocation of
$200,000 from the Active Transportation Plan Implementation account for addition of ATP
elements. Most of the funding is from the Street Reconstruction and Resurfacing Capital
Improvement Project Account, which includes a mix of approximately $1.5 million in SB 1 (Gas
Tax) funding and $7.5 million in general funds. The current preliminary total project cost estimate
is approximately $9 million, which is within the total budget; however, detailed designs have not
yet been completed and final cost estimates may vary.
Next Steps
Following review and input from the ATC and community, staff will refine final project designs.
A project webpage has also been created for the public to gain further information, ask questions,
and provide further input. The project is scheduled to go to the City Council in spring 2025 to
approve final plans and authorize solicitation of construction bids. Construction of the project is
planned to begin in late summer 2025.
Recommendations:
Review current design proposals for the 2025 Paving Project and provide input to staff on the
transportation elements to guide further development of the project.
Attachments:
Attachment 1: Project Area Map
Attachment 2: Draft Design Concepts
Attachment 3: Potential Future Tank Farm/Poinsettia Left Turn Acceleration Lane
Page 21 of 69
Page 22 of 69
Airport
C alle Joaquin
2025 Paving Project
Paving of roadways includingmaintenance and striping
Safety and mobility improvements
Traffic Calming Measures
Project Location Roundabouts on Tank Farm Rd. notincluded since recently constructed((
R
o
c
k
v
i
e
w
P
l
.
Orcutt Rd.
O
r
c
u
t
t
R
d
.
Hu
c
k
l
e
b
e
r
r
y
Ln.
BuckeyeCt.
P
o
i
n
s
e
t
t
i
a
S
t
.
El Capita
n
W
y
.
Fuller Rd
.
Fiero Ln.
Airport Dr.
Tank Far
m
R
d
.
Industri
a
l
W
y
.
Tank Farm Rd.
Wav
e
r
t
r
e
e
S
t
.
Br
o
o
k
e
p
i
n
e
D
r
.
Ricar
d
o
Ct.
Capitolio
Wy.
Via
Esteb
a
n
R
o
b
e
r
t
o
C
t
.
M
i
g
u
e
l
i
t
o
C
t
.
Willow
C
r
.
Tiburon
W
y
.
B
u
l
l
o
c
k
L
n
.
B
r
o
a
d
S
t
.
B
r
o
a
d
S
t
.
Sacra
m
ento
D
r.
B o u g a i n v i l l e a St.
H
o
l
l
y
h
u
c
k
W
y.
Blueb ell W y .
Spanish Oaks Dr.
G o l d e n r od Ln.
M
o
r
n
i
n
g
Gl
o
r
y
W
y
.
Snapdragon Wy.
Poinsettia St .
I r o nbank St.
Su
n
fl
o
wer Wy.
A e r o D r .
L
o
s
O
s
o
s Valley Rd.Righetti
R
a
n
c
h
R
d
Page 23 of 69
Page 24 of 69
Reference Documents:
City Standard Specifications - XXX 2025 Edition
City Engineering Standards - XXX 2025 Edition
index to plans
sheet no.description
san luis obispo county, california
ROADWAY PAVING 2025
T1 VICINITY MAP, GENERAL NOTES
D1-2 DETAILS
C1-CURB RAMPS
S1-2 CALLE JOAQUIN
S3-5 SACRAMENTO
S6-8 TANK FARM (BROAD TO RIGHETTI)
APPROVED BY
SPECIFICATION NO.DATE
of
SHEET
Brian A. Nelson, City Engineer R.C.E. C79870 Approved Date
00DATE
XXXXX T1FILE NO./LOCATION
[MO DAY, YEAR]
S
T
ATE OF C A L I F O R NIA
R
E
GISTER E D P R O F ESSIONA
L
E
N
G
I
N
EER
C I V I L
B R I A N A . NEL
S
O
N
No. C 79870
1.ALL WORK SHALL BE PERFORMED IN CONFORMANCE WITH THESE PLANS, SPECIAL
PROVISIONS PREPARED FOR THIS PROJECT AND THE 2020 CITY OF SAN LUIS OBISPO
STANDARD SPECIFICATIONS AND ENGINEERING STANDARDS, IN CONJUNCTION WITH THE
STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS
AND STANDARD PLANS, 2015 EDITION (UNREVISED).
2.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR OR PERMITTEE TO CONTACT
"UNDERGROUND SERVICE ALERT OF NORTHERN/CENTRAL CALIFORNIA" BY PHONE AT
8-1-1 FORTY-EIGHT (48) HOURS PRIOR TO START OF CONSTRUCTION FOR LOCATION OF
POWER, TELEPHONE, OIL AND NATURAL GAS UNDERGROUND FACILITIES. CONTRACTOR
OR PERMITTEE SHALL ALSO CONTACT THE APPROPRIATE AGENCY FOR THE LOCATION
OF CABLE T.V., WATER, SEWER, DRAINAGE OR UNDERGROUND FACILITIES.
3.THE CONTRACTOR SHALL POSSESS A CLASS "A" OR "C12" LICENSE AT THE TIME THE BIDS
OPEN AND DURING THE ENTIRE LENGTH OF THE CONTRACT.
4.THESE PLANS DO NOT INDICATE ALL EXISTING FACILITIES IN THE VICINITY OF THE
PROPOSED WORK SUCH AS EXISTING IRRIGATION HEADS AND LINES, SHRUBBERY AND
VEGETATION, ETC. THE CONTRACTOR MUST USE CARE TO AVOID DAMAGE TO ANY
EXISTING IMPROVEMENTS OR VEGETATION IN THE VICINITY OF THE WORK, AND MUST
REPAIR ANY FACILITIES DAMAGE DURING CONSTRUCTION TO THE SATISFACTION OF THE
ENGINEER.
5.WHERE TRIMMING OF EXISTING VEGETATION IS REQUIRED DURING CONSTRUCTION IT
MUST BE DONE IN A MANNER TO REMOVE THE MINIMUM POSSIBLE AMOUNT OF
VEGETATION AND LEAVE THE REMAINING IN AN ATTRACTIVE CONDITION. CONTRACTOR
MUST COORDINATE WITH CITY ARBORIST PRIOR TO TRIMMING OF ANY VEGETATION.
6.THESE PLANS DO NOT INDICATE ALL OVERHEAD LINES. CONTRACTOR SHALL TAKE CARE
DURING CONSTRUCTION TO AVOID CONTACT WITH OR DAMAGE TO EXISTING OVERHEAD
LINES.
7.ANY EXISTING UTILITIES AND IMPROVEMENTS THAT BECOME DAMAGED DURING
CONSTRUCTION SHALL BE COMPLETELY RESTORED TO THE SATISFACTION OF THE
ENGINEER AT THE CONTRACTOR'S SOLE EXPENSE.
8.CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES AND AGENCIES WITH SERVICES
IN THE AREA PRIOR TO COMMENCING CONSTRUCTION ACTIVITIES AND COORDINATE
WITH THE UTILITY COMPANIES AFFECTED BY CONSTRUCTION.
9.PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR'S LICENSED LAND
SURVEYOR SHALL FILE A CORNER RECORD IN THE OFFICE OF THE SAN LUIS OBISPO
COUNTY SURVEYOR FOR EACH EXISTING MONUMENT WITHIN THE PROJECT AREA THAT
HAS THE POTENTIAL TO BE DISTURBED. PROTECT BENCHMARKS AND PROPERTY
CORNERS IN PLACE PER CITY STD SECTION 5-1.26.
10.PROTECT SURVEY MONUMENTS IN PLACE DURING CONSTRUCTION. THE CONTRACTOR
SHALL BE RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH THE REPLACEMENT OF
DAMAGED OR DISPLACED SURVEY MONUMENTS AND SHALL NOTIFY THE CITY FIVE (5)
WORKING DAYS PRIOR TO RESTORING MONUMENTS. MONUMENTS SHALL BE RESET BY A
CALIFORNIA LICENSED LAND SURVEYOR AND SHALL INCLUDE PREPARING AND FILING A
11.UNLESS OTHERWISE SHOWN HEREIN, ALL STRIPING AND MARKINGS SHALL BE PER
CALTRANS REVISED STANDARD PLANS 2015 - A20A, A20B, A20C, A20D, A24A, A24B, A24C,
A24D, AND A24E. ANY STRIPING NOT MARKED FOR REMOVAL SHALL BE PROTECTED IN
PLACE. SEE SPECIAL PROVISIONS SECTION 84.
12.GREEN BIKE LANE MARKINGS SHALL BE SEALMASTER SAFE RIDE OR CITY APPROVED
EQUIVALENT PER SECTION 84-6.01. INSTALLATION ON AC AND/OR CONCRETE SURFACE
SHALL BE PER MANUFACTURER'S SPECIFICATIONS.
13.CROSSWALKS SHALL BE 10' WIDE UNLESS OTHERWISE NOTED.
14.THERMOPLASTIC STRIPING PLACED ON CONCRETE REQUIRES A PRIMER COAT PRIOR TO
APPLICATION.
15.FLEX POST MUST BE PEXCO CITY POST MODEL EAC OR APPROVED EQUAL. FLEX POST
SPECIFICATIONS SHALL BE APPROVED BY ENGINEER PRIOR TO PROCUREMENT.
16.RECTANGULAR RAPID FLASHING BEACONS (RRFB) AND RADAR SPEED FEEDBACK SIGN
EQUIPMENT SUBMITTALS SHALL BE APPROVED BY THE ENGINEER PRIOR TO
PROCUREMENT
17.HYDRANT MARKERS MUST BE INSTALLED PER STD. 7920. DO NOT INSTALL IN BIKE LANES
18.DO NOT APPLY ROADWAY STRIPING OR PAVEMENT MARKINGS ON PCC UTILITY COLLARS
UNLESS OTHERWISE APPROVED BY THE ENGINEER.
general notes:
legend:
FIRE HYDRANT
HYDRANT MARKER
DRIVEWAY
SIGN POST
RECTANGULAR RAPID FLASHING BEACON (RRFB) SYSTEM
STORM DRAIN INLET
STORM DRAIN PIPE
GAS LINE
TREE PROTECTION
1.PROTECT TREE BRANCHES, TRUNK, ROOTS AND FOLIAGE THROUGH PROPER TRIMMING
AND CONSTRUCTION TECHNIQUES WHENEVER POSSIBLE PER CITY STANDARD
SPECIFICATIONS SECTION 20. CONTRACTOR TO HIRE CERTIFIED ARBORIST FOR TREE
TRIMMING TO ALLOW NECESSARY EQUIPMENT CLEARANCE AT NO ADDITIONAL COST TO
THE CITY. NOTIFY THE ENGINEER 48 HRS IN ADVANCE OF THE WORK.
2.WHERE TREES CANNOT BE TRIMMED TO AVOID CONFLICT WITH CONSTRUCTION
EQUIPMENT, THE FOLLOWING TECHNIQUES MAY BE UTILIZED TO MINIMIZE DAMAGE
DURING CONSTRUCTION ACTIVITIES:
a.USE EQUIPMENT THAT IS SHORTER IN HEIGHT OR WIDTH TO AVOID CONTACT WITH
TREES
b.BACK EQUIPMENT UNDER LIMBS AND FOLIAGE TO MINIMIZE CONTACT WITH
CONSTRUCTION EQUIPMENT
c.EMPLOY HAND TECHNIQUES TO AVOID USING EQUIPMENT UNDER VULNERABLE TREES
d.UNDER COORDINATION WITH THE CITY ARBORIST, PUSH INTERFERING TREE LIMBS
TEMPORARILY OUT OF THE WAY
LAYOUT APPROVAL
1.ALL STRIPING LAYOUTS, PLACEMENT OF VERTICAL ROADWAY ELEMENTS (I.E. FLEX
POSTS, MEDIANS, ETC.), PARKING STALL TEES AND CURB PAINTING LIMITS SHALL BE
MARKED BY THE CONTRACTOR AND APPROVED BY THE ENGINEER IN THE FIELD PRIOR
TO INSTALLATION.
2.NEW SIGN POSTS MUST BE INSTALLED PER ENG. STD. 7210 & 7215.
3.UNLESS OTHERWISE NOTED HEREIN, ALL LANE WIDTH DIMENSIONS ARE MEASURED
FROM CENTER OF STRIPE TO FACE OF CURB (OR EDGE OF PAVEMENT WHERE NO CURB
EXISTS AT OUTSIDE EDGE OF ROADWAY).
S9-10 TANK FARM (RIGHETTI TO ORCUTT)
S11-12 ORCUTT
Base Bid
Add. Alt. A
N
ADJUST TO FINISHED GRADE PER CITY STDs.
STORM or SEWER MANHOLE (PER 6040)
WATER VALVE (PER 6040)
MONUMENT (PER 9020)
TRAFFIC BOX
COMMUNICATIONS (PER 9030)
GAS COVER
HMA SURFACE 6" DEPTH PER DETAIL Z, SHEET D2
HMA SURFACE 10" DEPTH PER DETAIL Y, SHEET D2
REPLACE SSMH FRAME AND COVER PER ENG. STD.
6610 INSTALL NEW CONE AND GRADE RINGS AS
NECESSARY TO COMPLETE THE WORK.
REPLACE
REPLACE SSMH FRAME AND COVER PER
ENG. STD. 6610. INSTALL NEW CONE AND
GRADE RINGS AS NECESSARY TO
COMPLETE THE WORK.
Page 25 of 69
CASE 1
SOLID GREEN BIKE LANE
CASE 2
DASHED GREEN BIKE LANE EXTENSION
APPROACHING INTERSECTION RIGHT TURN
CONFLICT AREAS
CASE 3
DASHED GREEN BIKE LANE EXTENSION
THROUGH INTERSECTIONS AND ACROSS
DRIVEWAYS
GREEN BIKE LANE MARKINGS SHALL BE SEALMASTER SAFE RIDE OR
APPROVED EQUIVALENT
SEE GENERAL NOTES AND SPECIAL PROVISIONS FOR ADDITIONAL
REFERENCE
NOT TO SCALE
BIKE BUFFERA
NOT TO SCALE
MODIFIED CITY STD 7360E
NOT TO SCALE
CENTERLINE PAVEMENT MARKERSC
NOT TO SCALE
MODIFIED R10-15 SIGND
AUTO LANE
BIKE LANE
45°'
15'
WIDTH PER PLAN
6" WHITE STRIPE
WHITE BIKE LANE SYMBOL WITH PERSON AND BIKE ARROW
PER CALTRANS STANDARD
6" WHITE STRIPE
GREEN BIKE LANE PAVEMENT
COATING
6" WHITE STRIPE
GREEN BIKE LANE PAVEMENT
COATING
6" WHITE STRIPE
GREEN BIKE LANE PAVEMENT
COATING
2" YELLOW BOTS DOTS, TYPE AY MARKER
PER 2015 CALTRANS STANDARD PLAN A20A
EXISTING DETAIL 22
5'
HAI-L O N G Q . N
G
U
Y
E
N
No. C 84733
S
T
ATE OF CA L I F O R NIA
R
E
GISTER E D P R O F ESSION
A
L
E
N
G
I
N
EER
C I V I L
001
XXXXX
DATE
BN
WBH
KH
HN
RO
A
D
W
A
Y
P
A
V
I
N
G
2
0
2
5
PLAN FILE NO. / LOCATION
SCALE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
SHEET NO.
of
SH
E
E
T
T
I
T
L
E
:
PR
O
J
E
C
T
T
I
T
L
E
:
DATE:
CITY SPECIFICATION NO.
NTS
DE
T
A
I
L
S
D
30"
30"
NOT TO SCALE
BIKE BUFFER WITH POSTSB
AUTO LANE
45°'
15'
WIDTH PER PLAN
6" WHITE STRIPE
EXISTING DETAIL
27B BIKE LANE PEXCO CITY POST MODEL EAC, 36
WHITE WITH 2 LIGHT GREY WRAPS
15'
NOT TO SCALE
SPEED CUSHION DETAILF
CENTER OF
LAYOUT
3'
14'
CL
TRAVEL LANE
CURB FACE
TRAFFIC LANE
PARKING/BIKE LANE
CURB FACE
SPEED CUSHION NOTES:
1.SPEED CUSHION DIMENSIONS:
·WIDTH - 6'
·LENGTH - 14'
·HEIGHT - 3" (0.25')
2.SPEED CUSHION SPECIFICATIONS:
·BOLT-DOWN RUBBER MODULAR SYSTEM, TRAFFICLOGIX OR
APPROVED EQUAL
·100% RECYCLED SYNTHETIC AND NATURAL RUBBER COMPOSITE
·TENSILE STRENGTH - MINIMUM 500 PSI
·SHORE HARDNESS - MINIMUM 70A
·SPECIFIC GRAVITY - 1.1
·MARKINGS - ALL BLACK RUBBER MODULES WITH WHITE
RETROREFLECTIVE CHEVRON MARKINGS PER CA MUTCD
TRAFFIC LANE
PARKING/BIKE LANE
6'
WHITE THERMOPLASTIC LETTERING
8'
50' TYP
Page 26 of 69
WIDTH VARIES
(SEE PLAN)
(SEE NOTE 2)
(E) CURB AND GUTTER OR
EDGE OF PAVEMENT, TYP.
(SEE NOTE 5)
REMOVE 6" MIN. OF EXISTING MATERIAL
(AC, BASE, DIRT) TO ACCOMPLISH 1.5% TO
3% CROSS SLOPE. REPLACE WITH 6" OF
HMA (SEE NOTE 4)
℄
(E) AGGREGATE BASE
VARIES FROM 7-1/2" TO 8"
(SEE NOTE 2)
NOTES:
1.SEE PAVEMENT EVALUATION REPORT FOR EXISTING PAVEMENT CORING INFORMATION.
2.PAVEMENT CROSS SLOPES SHALL MATCH EXISTING EXCEPT THAT CROSS SLOPES SHALL BE LIMITED
TO 1.5% MINIMUM, 3% MAXIMUM, UNLESS OTHERWISE APPROVED BY THE ENGINEER.
3.DEPTH OF EXISTING HMA LAYER VARIES FROM 4 TO 6 INCHES.
4.PLACE 6 INCHES OF NEW HMA IN TWO LIFTS. THE INITIAL LIFT MUST BE 4 INCHES THICK (3/4"
AGGREGATE) AND FINAL LIFT MUST BE 2 INCHES THICK (1/2" AGGREGATE).
5.CONTRACTOR TO PAVE UP TO GUTTER LIP OR EDGE OF EXISTING PAVEMENT.
6.HMA AGGREGATE SIZE MUST COMPLY WITH SECTION 39-3.01.
7.APPLY TACK COAT PER SECTION 39-1.09C, INCLUDING BETWEEN HMA LIFTS
WIDTH VARIES
(SEE PLAN)
(SEE NOTE 2)
(E) CURB AND GUTTER OR
EDGE OF PAVEMENT, TYP.
(SEE NOTE 5)
REMOVE 12-1/2" MIN. OF EXISTING MATERIAL
(AC, BASE, DIRT) TO ACCOMPLISH 1.5% TO
3% CROSS SLOPE. REPLACE WITH 12-1/2" OF
HMA (SEE NOTE 4)
℄
(E) AGGREGATE BASE
VARIES FROM 6" TO
8-1/2"
(SEE NOTE 2)
NOTES:
1.SEE PAVEMENT EVALUATION REPORT FOR EXISTING PAVEMENT CORING INFORMATION.
2.PAVEMENT CROSS SLOPES SHALL MATCH EXISTING EXCEPT THAT CROSS SLOPES SHALL BE LIMITED TO 1.5%
MINIMUM, 3% MAXIMUM, UNLESS OTHERWISE APPROVED BY THE ENGINEER.
3.DEPTH OF EXISTING HMA LAYER VARIES FROM 10 TO 12 INCHES.
4.PLACE 12-1/2 INCHES OF NEW HMA IN FOUR LIFTS. THE INITIAL LIFT MUST BE 4 INCHES THICK (3/4" AGGREGATE)
MAXIMUM AND FINAL LIFT BE 2-1/2 INCHES THICK (1/2" AGGREGATE).
5.CONTRACTOR TO PAVE UP TO GUTTER LIP OR EDGE OF EXISTING PAVEMENT.
6.HMA AGGREGATE SIZE MUST COMPLY WITH SECTION 39-3.01.
7.APPLY TACK COAT PER SECTION 39-1.09C, INCLUDING BETWEEN HMA LIFTS
(E) NATIVE
MATERIAL
HAI-L O N G Q . N
G
U
Y
E
N
No. C 84733
S
T
ATE OF CA L I F O R NIA
R
E
GISTER E D P R O F ESSION
A
L
E
N
G
I
N
EER
C I V I L
002
XXXXX
DATE
BN
WBH
KH
HN
RO
A
D
W
A
Y
P
A
V
I
N
G
2
0
2
5
PLAN FILE NO. / LOCATION
SCALE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
SHEET NO.
of
SH
E
E
T
T
I
T
L
E
:
PR
O
J
E
C
T
T
I
T
L
E
:
DATE:
CITY SPECIFICATION NO.
NTS
DE
T
A
I
L
S
D
NOT TO SCALE
TYPICAL X-SECTION - TANK FARM, ORCUTT, AND SACRAMENTOY NOT TO SCALE
TYPICAL X-SECTION - CALLE JOAQUINZ
Page 27 of 69
SE
E
MA
T
C
H
L
I
N
E
BE
L
O
W
2.
5
'
2.
5
'
12
'
12
'
12
'
12
'
DOUBLE 5'x5' R.C.B.
DETAIL 39
1963 LF
DETAIL 39
1856 LF
DETAIL 22
1992 LF
REPLACE (3) W1-8(L) SIGNS
REPLACE W14-1 "DEAD END" SIGN.
INSTALL R26(S)(CA) "NO STOPPING
ANY TIME" SIGN ON SAME POST
N
SE
E
MA
T
C
H
L
I
N
E
AB
O
V
E
SE
E
MA
T
C
H
L
I
N
E
SH
E
E
T
S
0
2
3'
3'
12
'
12
'(E) 6'x7' R.C.B.
PROTECT IN PLACE
HEADWALL
DETAIL 39
1963 LF, Cont.
DETAIL 39
1856 LF, Cont.
REPLACE R26(S)(CA) SIGN ON
EXISTING POST
REPLACE R26(S)(CA) SIGN ON
EXISTING POST
REPLACE R26(S)(CA) SIGN ON
EXISTING POST
N
DETAIL 22
1992 LF, Cont.
HMA SURFACE 6" DEPTH PER DETAIL Z, SHEET D240200
S
T
ATE OF CA L I F O R NIA
R
E
GISTER E D P R O F ESSION
A
L
E
N
G
I
N
EER
C I V I L
B R I A N A . NEL
S
O
N
No. C 79870
XX01
2000615
2025
1" = 20'
BN
WBH
KH
HN
RO
A
D
W
A
Y
S
E
A
L
I
N
G
2
0
2
4
REVISION
SCALE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
SHEET NO.
of
SH
E
E
T
T
I
T
L
E
:
PR
O
J
E
C
T
T
I
T
L
E
:
DATE:
CITY SPECIFICATION NO.
LEGEND
CA
L
L
E
J
O
A
Q
U
I
N
S
RO
A
D
W
A
Y
P
A
V
I
N
G
2
0
2
5
Page 28 of 69
S
E
E
M
A
T
C
H
L
I
N
E
B
E
L
O
W
SE
E
MA
T
C
H
L
I
N
E
SH
E
E
T
S
0
1
1
.
5
'
1
2
'
1
2
'
1
.
5
'
4'
4'
12
'
12
'
DETAIL 39
1963 LF, Cont.
DETAIL 39
1856 LF, Cont.
REPLACE EXISTING ROAD EDGE
DELINEATORS WITH NEW DELINEATORS
(CLASS 1, TYPE E ) PER CALTRANS STD
PLN A73C SPACED 50 O.C., Typ.
REPLACE R26(S)(CA) SIGN ON
EXISTING POST
REPLACE R26(S)(CA) SIGN ON
EXISTING POST
N
DETAIL 22
1992 LF, Cont.
SE
E MA
T
C
H
L
I
N
E
AB
O
V
E
2
'
2
'
1
2
'
1
2
'
DETAIL 39
1963 LF, Cont.
DETAIL 39
1856 LF, Cont.
REPLACE R26(S)(CA) SIGN ON
EXISTING POST
N
DETAIL 22
1992 LF, Cont.
HMA SURFACE 6" DEPTH PER DETAIL Z, SHEET D240200
S
T
ATE OF CA L I F O R NIA
R
E
GISTER E D P R O F ESSION
A
L
E
N
G
I
N
EER
C I V I L
B R I A N A . NEL
S
O
N
No. C 79870
XX02
2000615
2025
1" = 20'
BN
WBH
KH
HN
RO
A
D
W
A
Y
S
E
A
L
I
N
G
2
0
2
4
REVISION
SCALE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
SHEET NO.
of
SH
E
E
T
T
I
T
L
E
:
PR
O
J
E
C
T
T
I
T
L
E
:
DATE:
CITY SPECIFICATION NO.
LEGEND
CA
L
L
E
J
O
A
Q
U
I
N
S
RO
A
D
W
A
Y
P
A
V
I
N
G
2
0
2
5
Page 29 of 69
6'
1.
5
'
10
.
5
'
10
.
5
'
1.
5
'
6'
6
0
'
REPLACE W1-8(R) SIGN ON EXISTING
PUNCH POST PER CITY STD 7210
REPLACE W1-8(R) SIGN ON EXISTING
PUNCH POST PER CITY STD 7210
REPLACE W1-8(L) SIGN ON EXISTING
PUNCH POST PER CITY STANDARD 7210
REMOVE EXISTING SIGNS AND INSTALL
W1-1a(R)(25) SIGN ON EXISTING PUNCH
POST PER CITY STANDARD 7210
INSTALL W1-8(R) SIGN ON
(N) PUNCH POST PER CITY
STANDARD 7210.
REPLACE W1-8(L) SIGN ON EXISTING
PUNCH POST PER CITY STANDARD 7210
INSTALL W1-8(L) SIGN ON (N) PUNCH
POST PER CITY STANDARD 7210.
INSTALL 24" X 24" W8-6 SIGN
AND W16-9P SIGN ON EXISTING
STREETLIGHT POLE WITH
STRAP & SADDLE BRACKET.
INSTALL 18" WIDE WHITE BICYCLE
BUFFER WITH FLEX POSTS AT 15'
SPACING ON EXISTING BICYCLE LANE
PER DETAIL B, SHEET D1
320 LF
INSTALL 18" WIDE WHITE BICYCLE BUFFER WITH
FLEX POSTS AT 15' SPACING ON EXISTING
BICYCLE LANE PER DETAIL B, SHEET D1
332 LF
N
2" DIAMETER YELLOW RAISED PAVEMENT
MARKERS (BOTS' DOTS) AT 5' SPACING ON
EXISTING CENTERLINE PER DETAIL C, SHEET D1
317 LF
SE
E
MA
T
C
H
L
I
N
E
SH
E
E
T
S
0
4
6.
5
'
5'
10
'
10
'
"HUMP" LEGEND
25 SQFT. Typ.
REMOVE (E) R3-7R SIGN, INSTALL MODIFIED R10-15
SIGN ON SAME POST (SEE DETAIL D, SHEET D1)
REMOVE (E) R4-4 SIGN
AND PUNCH POST
CASE 2 BIKE LANE PER
DETAIL E, SHEET D1
112 LF
INSTALL STREET NAME SIGNS
PER CITY STD 7250 ON TOP
OF (E) STOP SIGN POST
INSTALL W17-1 SIGN
ON (N) PUNCH POST
INSTALL W17-1 SIGN ON (N) PUNCH POST
INSTALL RUBBER MODULAR
SPEED CUSHION PER DETAIL
F, SHEET D1
CASE 2 BIKE LANE PER
DETAIL E, SHEET D1
100 LF
CASE 3 BIKE LANE PER
DETAIL E, SHEET D1
77 LF
INSTALL R2-1(35) SIGN
ON (E) STREET LIGHT
POLE WITH STRAP &
SADDLE BRACKET
REPLACE CURB RAMP PER SHEET C
REPLACE (E) SSMH COATING. REPLACE SSMH
FRAME AND COVER PER ENG. STD. 6610
N
DETAIL 22
328 LF
DETAIL 39
248 LF
DETAIL 39
346 LF
BIKE RIDER SYMBOL 2 SQFT, Typ.
BIKE ARROW 3.5 SQFT, Typ.
BIKE BUFFER PER
DETAIL A, SHEET D1
234 LF
HMA SURFACE 10" DEPTH PER DETAIL Y, SHEET D240200
S
T
ATE OF CA L I F O R NIA
R
E
GISTER E D P R O F ESSION
A
L
E
N
G
I
N
EER
C I V I L
B R I A N A . NEL
S
O
N
No. C 79870
XX03
2000615
2025
1" = 20'
BN
WBH
KH
HN
RO
A
D
W
A
Y
S
E
A
L
I
N
G
2
0
2
4
REVISION
SCALE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
SHEET NO.
of
SH
E
E
T
T
I
T
L
E
:
PR
O
J
E
C
T
T
I
T
L
E
:
DATE:
CITY SPECIFICATION NO.
LEGEND
SA
C
R
A
M
E
N
T
O
S
RO
A
D
W
A
Y
P
A
V
I
N
G
2
0
2
5
Page 30 of 69
SE
E
MA
T
C
H
L
I
N
E
BE
L
O
W
SE
E
MA
T
C
H
L
I
N
E
SH
E
E
T
S
0
3
8.
5
'
5'
1.
5
'
10
'
10
'
5'
PROTECT IN PLACE (E) 44"x72"
ELLIPTICAL CMP AND INLET
"HUMP" LEGEND
25 SQFT. Typ.
CASE 3 BIKE LANE PER DETAIL E, SHEET D1
87 LF
INSTALL RUBBER MODULAR
SPEED CUSHION PER DETAIL
F, SHEET D1
INSTALL W17-1 SIGN ON NEW 12' PUNCH POST
INSTALL W17-1 SIGN ON NEW 12' PUNCH POST
DETAIL 39
15 LF
CASE 2 BIKE LANE PER
DETAIL E, SHEET D1
100 LF
CASE 3 BIKE LANE PER
DETAIL E, SHEET D1
92 LF
REMOVE (E) PARKING SIGNS AND 12' PUNCH
POST, INSTALL (N) RADAR SPEED FEEDBACK
SIGN (TRAFFICLOGIX EVOLUTION 12FM W/
SOLAR KIT) ON (N) 14' PUNCH POST. INSTALL
(N) R26(CA) SIGN BELOW SPEED FEEDBACK
SIGN ON SAME POST.
CASE 3 BIKE LANE
PER DETAIL E,
SHEET D1
77 LF
N
BIKE BUFFER PER
DETAIL A, SHEET D1
573 LF
DETAIL 39
698 LF
DETAIL 22
406 LF
DETAIL 39
312 LF
BIKE RIDER SYMBOL 2 SQFT, Typ.
BIKE ARROW 3.5 SQFT, Typ.
SE
E
MA
T
C
H
L
I
N
E
SH
E
E
T
S
0
5
SE
E
MA
T
C
H
L
I
N
E
AB
O
V
E
5.
5
'
10
'
10
'
1.
5
'
5'
8.
5
'
PROTECT IN PLACE (E) 30" HDPE
PROTECT IN PLACE
(E) 24" HDPE
PROTECT IN PLACE (E) 24" HDPE
PROTECT IN PLACE (E) 17.7" HDPE "HUMP" LEGEND
25 SQFT. Typ.
CASE 3 BIKE LANE PER
DETAIL E, SHEET D1
92 LF
CASE 2 BIKE LANE PER
DETAIL E, SHEET D1
112 LF
BIKE BUFFER PER
DETAIL A, SHEET D1
364 LF
INSTALL R2-1(35) SPEED LIMIT
SIGN ON NEW 12' PUNCH POST
INSTALL RUBBER MODULAR
SPEED CUSHION PER DETAIL
F, SHEET D1
INSTALL W17-1 SIGN ON
NEW 12' PUNCH POST
INSTALL W17-1 SIGN ON
NEW 12' PUNCH POST
INSTALL R2-1(35) SPEED LIMIT
SIGN ON (E) STREET LIGHT POLE
WITH STRAP & SADDLE BRACKET
RED CURB 60 LF
RED CURB 100 LF
CASE 2 BIKE LANE PER
DETAIL E, SHEET D1
100 LF
REPLACE STREET NAME
SIGNS PER CITY STD 7250
REPLACE CURB RAMP PER SHEET C
N
DETAIL 22
1504 LF
DETAIL 39
662 LF
DETAIL 39
368 LF
BIKE RIDER SYMBOL
2 SQFT, Typ.
BIKE ARROW
3.5 SQFT, Typ.
HMA SURFACE 10" DEPTH PER DETAIL Y, SHEET D240200
S
T
ATE OF CA L I F O R NIA
R
E
GISTER E D P R O F ESSION
A
L
E
N
G
I
N
EER
C I V I L
B R I A N A . NEL
S
O
N
No. C 79870
XX04
2000615
2025
1" = 20'
BN
WBH
KH
HN
RO
A
D
W
A
Y
S
E
A
L
I
N
G
2
0
2
4
REVISION
SCALE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
SHEET NO.
of
SH
E
E
T
T
I
T
L
E
:
PR
O
J
E
C
T
T
I
T
L
E
:
DATE:
CITY SPECIFICATION NO.
LEGEND
SA
C
R
A
M
E
N
T
O
S
RO
A
D
W
A
Y
P
A
V
I
N
G
2
0
2
5
Page 31 of 69
S
E
E
M
A
T
C
H
L
I
N
E
A
B
O
V
E
REPLACE CURB RAMP PER SHEET C
REPLACE CROSS
GUTTER PER
SHEET C
RED CURB 20 LF
REPLACE CURB RAMP PER SHEET C
CASE 2 BIKE LANE PER
DETAIL E, SHEET D1
88 LF
INSTALL R81(CA) AND R81B(CA)
SIGNS ON NEW 12' PUNCH POST
NARROW BIKE LANE TO
AVOID VAULT EDGE
BIKE BUFFER PER
DETAIL A, SHEET D1 742
LF, Cont.
BIKE BUFFER PER
DETAIL A, SHEET D1
590 LF, Cont.
N
12" WHITE
27.5 LF
"STOP" LEGEND
22 SQFT, Typ.
DETAIL 22
1504 LF, Cont.
DETAIL 39
587 LF
BIKE RIDER SYMBOL 2 SQFT, Typ.
BIKE ARROW 3.5 SQFT, Typ.
SE
E MA
T
C
H
L
I
N
E
BE
L
O
W
SE
E
MA
T
C
H
L
I
N
E
SH
E
E
T
S
0
4
6'
10
'
10
'
1.
5
'
5'
8.
5
'
8.
5
'
5'
2'
10
'
10
'
2'
5'
DETAIL 39
662 LF, Cont.
INSTALL (N) RADAR SPEED FEEDBACK
SIGN (TRAFFICLOGIX EVOLUTION 12FM
W/ SOLAR KIT) ON (N) 12' PUNCH POST
BIKE BUFFER PER
DETAIL A, SHEET D1
742 LF
BIKE BUFFER PER
DETAIL A, SHEET D1
109 LF
DETAIL 22
1504 LF, Cont.
DETAIL 39
109 LF
CASE 2 BIKE LANE PER
DETAIL E, SHEET D1
40 LF
CASE 2 BIKE LANE PER
DETAIL E, SHEET D1
40 LF
BIKE BUFFER PER
DETAIL A, SHEET D1
590 LF
10'10'10'10'
HMA SURFACE 10" DEPTH PER DETAIL Y, SHEET D240200
S
T
ATE OF CA L I F O R NIA
R
E
GISTER E D P R O F ESSION
A
L
E
N
G
I
N
EER
C I V I L
B R I A N A . NEL
S
O
N
No. C 79870
XX05
2000615
2025
1" = 20'
BN
WBH
KH
HN
RO
A
D
W
A
Y
S
E
A
L
I
N
G
2
0
2
4
REVISION
SCALE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
SHEET NO.
of
SH
E
E
T
T
I
T
L
E
:
PR
O
J
E
C
T
T
I
T
L
E
:
DATE:
CITY SPECIFICATION NO.
LEGEND
SA
C
R
A
M
E
N
T
O
S
RO
A
D
W
A
Y
P
A
V
I
N
G
2
0
2
5
Page 32 of 69
7'
10'
10'
10'
10'
10'
VAR
16'
10'
10'
5'
10'
1.5'
2'
5'
5.5'
5.5'
2'
REFRESH CROSSWALKS AND
EXTENSION LINES
INSTALL W9-1 ON NEW
PUNCH POST.
INSTALL W4-2 ON NEW
PUNCH POST.
270' MERGE TAPER
8'
6'
10.5'
15'
10.5'
8'
20'20'
RELOCATE EX. RRFB
TO NEW STREET
LIGHT POLE
EX. BUS STOP TO REMAIN
EX. BUS STOP TO REMAIN
5.5'
10.5
10'
10'
6'
10'
2'
5'
20'20'
20'20'
10'
10'
10'
12'
10'
6'
5'
7'
10.5'
10.5'
7.5'
10.5'
5'
7'
INSTALL FLEX POSTS AT 15' SPACING
RELOCATE EX. RRFB
6'
INSTALL EX. R1-1 AND
NEW R10-15 ON NEW
PUNCH POST.NEW BULBOUT
NEW BULBOUT
11' MAX
INSTALL NEW
STREET LIGHT POLE
7201
2000615
NOVEMBER 2024
RJD
RJD
TLK
TLK
RO
A
D
W
A
Y
S
E
A
L
I
N
G
2
0
2
4
PLAN FILE NO. / LOCATION
SCALE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
SHEET NO.
of
SH
E
E
T
T
I
T
L
E
:
PR
O
J
E
C
T
T
I
T
L
E
:
DATE:
CITY SPECIFICATION NO.
1" = 20'
TA
N
K
F
A
R
M
NO
R
T
H
NO
R
T
H
SE
E
M
A
T
C
H
L
I
N
E
B
E
L
O
W
SE
E
M
A
T
C
H
L
I
N
E
A
B
O
V
E
SE
E
M
A
T
C
H
L
I
N
E
O
N
S
H
E
E
T
2
FOR REVIEW ONLY
65% DESIGN
NOVEMBER 2024
S06 of XX
RO
A
D
W
A
Y
P
A
V
I
N
G
2
0
2
5
RO
A
D
W
A
Y
P
A
V
I
N
G
2
0
2
5
INSTALL WHITE FLEX POSTS WITHIN
BIKE LANE BUFFERS SEPARATE BIKE
LANE FROM VEHICLE TRAFFIC (TYP).
GREEN DASHED BIKE LANES
THROUGH INTERSECTION AND
DRIVEWAY CONFLICT AREAS
(TYP)
MERGE FROM TWO TO ONE
THROUGH LANE EACH
DIRECTION EAST OF BROAD
STREET
INSTALL NEW STREETLIGHT
Page 33 of 69
8'
6'
10.5'
15'
10.5'
8'
8'
6'
10.5'
15'
10.5'
6'
8'
8'
6'
10.5'
10.5'
4.5'
10.5'
6'
8'
8'
6'
10.5'
10.5'
4.5'
10.5'
3'
5'
6'
INSTALL NEW RADAR
FEEDBACK SIGN
6'
INSTALL FLEX POSTS AT 15' SPACING
INSTALL RRFB ON NEW
STREET LIGHT POLE
EX. BUS STOP TO REMAIN
8'
6'
10.5'
10.5'
4.5'
10.5'
3'
5'
6'
19'21.5
'
20.5'19.5'
12'11.5'
14'
10.5'
15'
10.5'
6'
8'
5'
9'
10.5'
15'
6'
8'
6'
5'
3'
10.5'
10.5'
10.5'
8'
4.5'
5'
9'
10.5'
10.5'
10.5'
4.5'
6'
3'
INSTALL R9-3 AND R9-3B(R)
ON NEW PUNCH POST
INSTALL W11-2 & W16-9P
ON NEW PUNCH POST
INSTALL NEW RADAR
SPEED FEEDBACK SIGN
10.5'
6'
5'
INSTALL R9-3 AND R9-3B(L)
ON NEW PUNCH POST
NEW BULBOUT
NEW BULBOUT
INSTALL RRFB
7202
2000615
OCTOBER 2024
RJD
RJD
TLK
TLK
RO
A
D
W
A
Y
S
E
A
L
I
N
G
2
0
2
4
PLAN FILE NO. / LOCATION
SCALE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
SHEET NO.
of
SH
E
E
T
T
I
T
L
E
:
PR
O
J
E
C
T
T
I
T
L
E
:
DATE:
CITY SPECIFICATION NO.
1" = 20'
TA
N
K
F
A
R
M
NORTH
NORTH
SE
E
M
A
T
C
H
L
I
N
E
B
E
L
O
W
SE
E
M
A
T
C
H
L
I
N
E
A
B
O
V
E
SE
E
M
A
T
C
H
L
I
N
E
O
N
S
H
E
E
T
3
S
E
E
M
A
T
C
H
L
I
N
E
O
N
S
H
E
E
T
1
FOR REVIEW ONLY
65% DESIGN
NOVEMBER 2024
RO
A
D
W
A
Y
P
A
V
I
N
G
2
0
2
5
S07 of XX
INSTALL NEW STREETLIGHT
Page 34 of 69
3.5'
8'
6'
10.5'
15'
10.5'
6'
8'
6'
10'
19.5'
10'
VAR
6'
21.5'
10'
VAR
6'
INSTALL W11-2 & W16-9P
ON NEW PUNCH POST
EX. RAIL CROSSING BRIDGE
INSTALL R9-2 & R9-2bP(L)
ON NEW PUNCH POST
INSTALL R9-3 & R9-2bP(R)
ON NEW PUNCH POST
INSTALL R9-3 & R9-2bP(R)
ON NEW PUNCH POST
INSTALL R9-2 & R9-2bP(L)
ON NEW PUNCH POST
INSTALL R9-3 & R9-2bP(L)
ON NEW PUNCH POST
INSTALL R9-2 & R9-2bP(R)
ON NEW PUNCH POST
MAINTAIN 20' CLEAR WIDTH
FOR FIRE VEHCILES
3.5'
6'
6.5'
10'
15'
11'
5.5'
21.5'
10'
6'
10'
VAR
6'
VAR
INSTALL RRFB
(TYP.)INSTALL RRFB
(TYP.)
2.5'
2.5'
7203
2000615
OCTOBER 2024
RJD
RJD
TLK
TLK
RO
A
D
W
A
Y
S
E
A
L
I
N
G
2
0
2
4
PLAN FILE NO. / LOCATION
SCALE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
SHEET NO.
of
SH
E
E
T
T
I
T
L
E
:
PR
O
J
E
C
T
T
I
T
L
E
:
DATE:
CITY SPECIFICATION NO.
1" = 20'
TA
N
K
F
A
R
M
NOR
T
H
NORTH
S
E
E
M
A
T
C
H
L
I
N
E
B
E
L
O
W
S
E
E
M
A
T
C
H
L
I
N
E
A
B
O
V
E
SE
E
M
A
T
C
H
L
I
N
E
O
N
S
H
E
E
T
4
SE
E
M
A
T
C
H
L
I
N
E
O
N
S
H
E
E
T
2
FOR REVIEW ONLY
65% DESIGN
NOVEMBER 2024
RO
A
D
W
A
Y
P
A
V
I
N
G
2
0
2
5
S08 of XX
Page 35 of 69
6.5'
11'
15.5'
10'
5.5'
7'
3'
10.5'
11'
10.5'
3'
7'7'
3'
10.5'
11'
10.5'
10'
19.5'19.5'
INSTALL NEW RADAR
SPEED FEEDBACK SIGN
INSTALL NEW RADAR
SPEED FEEDBACK SIGN
2.5'
7.5'
3'
10.5'
11'
10.5'
3'
7'
7'
3'
10.5'
11'
10.5'
3'
7'
7204
2000615
OCTOBER 2024
RJD
RJD
TLK
TLK
RO
A
D
W
A
Y
S
E
A
L
I
N
G
2
0
2
4
PLAN FILE NO. / LOCATION
SCALE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
SHEET NO.
of
SH
E
E
T
T
I
T
L
E
:
PR
O
J
E
C
T
T
I
T
L
E
:
DATE:
CITY SPECIFICATION NO.
1" = 20'
TA
N
K
F
A
R
M
NORTH
NORTH
SE
E
M
A
T
C
H
L
I
N
E
B
E
L
O
W
SE
E
M
A
T
C
H
L
I
N
E
A
B
O
V
E
SE
E
M
A
T
C
H
L
I
N
E
O
N
S
H
E
E
T
5
SE
E
M
A
T
C
H
L
I
N
E
O
N
S
H
E
E
T
3
FOR REVIEW ONLY
65% DESIGN
NOVEMBER 2024
RO
A
D
W
A
Y
P
A
V
I
N
G
2
0
2
5
S09 of XX
Page 36 of 69
7'
3'
10.5'
11'
10.5'
3'
7.5'
17.5'18'
8.5'
12'
12'
12'
8'
8'
10.5'
11'
10.5'
10'
10'
7205
2000615
OCTOBER 2024
RJD
RJD
TLK
TLK
RO
A
D
W
A
Y
S
E
A
L
I
N
G
2
0
2
4
PLAN FILE NO. / LOCATION
SCALE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
SHEET NO.
of
SH
E
E
T
T
I
T
L
E
:
PR
O
J
E
C
T
T
I
T
L
E
:
DATE:
CITY SPECIFICATION NO.
1" = 20'
TA
N
K
F
A
R
M
NORTH
SE
E
M
A
T
C
H
L
I
N
E
O
N
S
H
E
E
T
4
FOR REVIEW ONLY
65% DESIGN
NOVEMBER 2024
RO
A
D
W
A
Y
P
A
V
I
N
G
2
0
2
5
S10 of XX
Page 37 of 69
SE
E
MA
T
C
H
L
I
N
E
BE
L
O
W
8.
5
'
12
'
12
'
8'12
'
5
'
10
'
10
'
1
0
'
5'
5
'
1
0
.
5
'
1
2
'
1
2
'
1
1
'
DETAIL 39
1838 LF
DETAIL 39
1864 LF
MAINTAIN 12' LANE THROUGH CURVE
DETAIL 29
183 LF
DETAIL 222
142 LF
TYPE IV ARROW
15 SQFT, Typ.
DETAIL 38
112 LF
DETAIL 24
38 LF
N
BIKE RIDER SYMBOL 2 SQFT, Typ.
BIKE ARROW 3.5 SQFT, Typ.
PROTECT IN PLACE (E) CONCRETE 20'x5' ARCH CULVERT
SE
E MA
T
C
H
L
I
N
E
SH
E
E
T
1
2
S
E
E
M
A
T
C
H
L
I
N
E
A
B
O
V
E
8
.
5
'
1
2
'
1
2
'
8
.
5
'
DETAIL 22
1524 LF
DETAIL 39
1838 LF, Cont.
DETAIL 39
1864 LF, Cont.
N
HMA SURFACE 10" DEPTH PER DETAIL Y, SHEET D240200
S
T
ATE OF CA L I F O R NIA
R
E
GISTER E D P R O F ESSION
A
L
E
N
G
I
N
EER
C I V I L
B R I A N A . NEL
S
O
N
No. C 79870
XX11
2000615
2025
1" = 20'
BN
WBH
KH
HN
RO
A
D
W
A
Y
S
E
A
L
I
N
G
2
0
2
4
REVISION
SCALE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
SHEET NO.
of
SH
E
E
T
T
I
T
L
E
:
PR
O
J
E
C
T
T
I
T
L
E
:
DATE:
CITY SPECIFICATION NO.
LEGEND
AD
D
.
A
L
T
.
O
R
C
U
T
T
S
RO
A
D
W
A
Y
P
A
V
I
N
G
2
0
2
5
Page 38 of 69
SE
E
MA
T
C
H
L
I
N
E
SH
E
E
T
1
1
SE
E
MA
T
C
H
L
I
N
E
BE
L
O
W
9'
12
'
12
'
7'
DETAIL 22
1524 LF, Cont.
DETAIL 39
1838 LF, Cont.
DETAIL 39
1864 LF, Cont.
N
SE
E
MA
T
C
H
L
I
N
E
AB
O
V
E
8.
5
'
12
'
12
'
8'
MATCH EXISTING STRIPING
DETAIL 22
1524 LF, Cont.
DETAIL 39
1838 LF, Cont.
DETAIL 39
1864 LF, Cont.
N
HMA SURFACE 10" DEPTH PER DETAIL Y, SHEET D240200
S
T
ATE OF CA L I F O R NIA
R
E
GISTER E D P R O F ESSION
A
L
E
N
G
I
N
EER
C I V I L
B R I A N A . NEL
S
O
N
No. C 79870
XX12
2000615
2025
1" = 20'
BN
WBH
KH
HN
RO
A
D
W
A
Y
S
E
A
L
I
N
G
2
0
2
4
REVISION
SCALE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
SHEET NO.
of
SH
E
E
T
T
I
T
L
E
:
PR
O
J
E
C
T
T
I
T
L
E
:
DATE:
CITY SPECIFICATION NO.
LEGEND
AD
D
.
A
L
T
.
O
R
C
U
T
T
S
RO
A
D
W
A
Y
P
A
V
I
N
G
2
0
2
5
Page 39 of 69
Page 40 of 69
7201
2000615
NOVEMBER 2024
RJD
RJD
TLK
TLK
RO
A
D
W
A
Y
S
E
A
L
I
N
G
2
0
2
4
PLAN FILE NO. / LOCATION
SCALE:
APPROVED BY:
CHECKED BY:
DRAWN BY:
DESIGNED BY:
SHEET NO.
of
SH
E
E
T
T
I
T
L
E
:
PR
O
J
E
C
T
T
I
T
L
E
:
DATE:
CITY SPECIFICATION NO.
1" = 20'
TA
N
K
F
A
R
M
NO
R
T
H
FOR REVIEW ONLY
65% DESIGN
NOVEMBER 2024
POINTSETTIA ST AND TANK FARM RD
ALTERNATE CONFIGURATION EXHIBIT A:
RO
A
D
W
A
Y
P
A
V
I
N
G
2
0
2
5
SXX of XX
PROVIDE
ACCELERATION LANE
FOR NORTHBOUND
LEFT TURNS FROM
POINSETTIA TO ALLOW
2-STAGE TURNS
Page 41 of 69
Page 42 of 69
City of San Luis Obispo, Agenda, Planning Commission
Active Transportation Committee
AGENDA REPORT ITEM 4B
DATE: November 21, 2024
FROM: Adam Fukushima, Active Transportation Manager
SUBJECT: COMMITTEE RECOMMENDATIONS FOR FY 2025-27 CITY BUDGET
GOALS
Recommendation
Recommend a prioritized list of budget goals for the upcoming FY 2025-27 Financial Plan based
on the Active Transportation Plan goals and priority projects.
Background
Every two years the City Council adopts a Financial Plan (sometimes called a two -year budget).
This Plan spells out how the City will spend money on programs and projects for the next two
years. As part of this process, all advisory groups are invited to submit budget goals for Council
consideration.
Discussion
Council goals, by their nature, usually tend to be broader in scope than the work programs
developed by advisory bodies. The City Council is seeking advisory body input on:
What are the most important goals the City should pursue in the next two years?
Why is each goal important as a community priority?
How might the goal be accomplished (creative funding or implementation ideas)?
Given the projected fiscal constraints for the next budget, the Finance Department is
recommending that goals which are already in progress take a higher priority than brand new goals.
In addition, the Finance Department has informed that there are no new sources of funding in this
upcoming budget cycle and that challenges with labor and cost escalations (both internally and
contractors) are expected to continue. Given existing staff resources as well as the number of
complete street infrastructure projects that are still in progress (Higuera, Broad, Foothill), of which
Higuera and Broad have grant obligations, staff recommends focusing budget priorities on
completing projects already in progress and incorporating new ATP priority improvements into
upcoming paving projects, as resources allow.
To help guide the Committee in identifying the most important projects or programs to pursue,
members should review the following:
Page 43 of 69
Active Transportation Committee Page 2
Advisory Bodies 2025-27 Financial Plan Goal Setting Parameters (Attachment 1)
Active Transportation Committee Budget Goal Recommendations for FY 2023-25
(Attachment 2)
List of funded active transportation projects from the 2023-25 Financial Plan. (Attachment 3).
Note that any costs identified beyond 2025 have not yet received funding approvals but are
included for planning and forecasting purposes.
“Budget in Brief: 2023-25 Financial Plan” outlines the “Major City Goals” in the City’s current
budget. (Attachment 4)
Active Transportation Plan Tier 1 projects with ATC prioritization (Attachment 5). The list
contains the top projects the City will pursue for funding which have the highest likelihood to
increase bicycling and walking in the City with a goal to complete the Tier 1 network by 2030.
The list was prioritized by the ATC on September 16, 2021. Please note that the Pavement
Management Plan, which staff has used to initiate many ATP Tier 1 improvements has changed
the scheduled years of some pavement areas and roadways. Given the changes, staff intends to
bring the ATP project prioritization list/schedule to the ATC for an update in early 2025.
Agenda and Staff Reports from the October 17, 2024 Special ATC Meeting, where the
committee received reports on the 2023 Bicycle Friendly Community Report Card and an
update on the Active Transportation Plan Performance Measures.
Staff Recommended Budget Goals
Given prior challenges the Committee has had in finding a consensus on budget goals, staff has
assembled a list of recommended budget goals based on the following:
1) The adopted Active Transportation Plan including tiered projects that correspond to the
upcoming paving schedule in the years 2025-27. Projects already in progress with obligated
grant funds have been given higher priority.
2) Projects from the Vision Zero program1.
3) Prior input from the Active Transportation Committee on issues of concern
The list of recommended budget goals is organized into projects and programs and is prioritized
from most to least important to fund as shown below:
Projects
1) Active Transportation Plan Tier 1 Project Deployment
a. Higuera Complete Streets Project: Complete design and construction. While this
project has been recommended $6.95 million of state Active Transportation Program
funds it would still require 20% local match funds. Given construction cost increases
since awarding of the grant, it is important that the project have complete funding.
Additional funding requests would be for potential construction contingency funds.
1 The City’s Draft Vision Zero Action Plan is planned for public release in early December 2024. The City’s High-
Injury Network, which is a primary focus area for safety improvements in the forthcoming Vision Zero Action Plan,
has been uploaded to the City’s Traffic Safety Website for early reference.
Page 44 of 69
Active Transportation Committee Page 3
b. Broad Street (South to Orcutt) Quick Build Project: Complete design and
construction of a quick-build demonstration project. This project was awarded
$400,000 in Federal Safe Streets and Roads for All (SS4A) funding for a demonstration
project. This project would require a combination of grant and city funds to advance
the following:
a. Preparation of a concept plan for the South Broad St Corridor
b. Implementation of a quick-build demonstration project
Budget requests in a future budget (2027-29) would ensure carrying out grant
deliverables as well as permanent improvements as part of scheduled paving of Broad
Street in 2027.
c. Foothill Blvd Quick Build Project: Complete design and Construction.
d. Pedestrian Crossing South/King: Project is funded via SLOCOG Community
Betterments Grant and is on schedule to advertise for construction in early 2025.
Additional funding requests would be for potential construction contingency funds.
e. Roundabout at California/Taft: This project is an ATP Tier 1 crossing improvement
and would provide a better connection across California Blvd to the Railroad Safety
Trail and improve safety at the California/Taft intersection. Planning and design is
substantially complete and right-of-way negotiations are in progress. Additional
funding would be for construction, assuming right-of-way acquisition is successful.
f. Railroad Safety Trail along Bullock Lane and Orcutt Rd Railroad Crossing
Improvements: This project would provide a continuous shared use path from Tank
Farm Rd to the train station but would likely require a city-initiated project to acquire
approvals from Union Pacific. Project was partially funded in the 2023-2025 Financial
Plan but deferred and partially defunded due to insufficient staffing resources and
funding needs for other shovel-ready capital projects.
g. Shared Use Path on Madonna Road Overpass: Conceptual plans and traffic analysis
has been prepared. Staff will be seeking input from Council in February 2025 on
whether to advance the shared use path option considering the projected traffic impacts.
If Council is supportive, the ATC could identify this project as a priority to fund to a
more detailed design.
h. Tank Farm Road Shared Use Path: Design, complete environmental study, acquire
right-of-way in FY 2023-25 and construct in an outlying year. The design and
environmental technical studies are conditions of approval for the 600 Tank Farm
project and are nearly complete. Historically, it was assumed that planned upgrades to
the Tank Farm corridor between Innovation Way and Santa Fe would be constructed
as part of the ultimate redevelopment of the Chevron Tank Farm site. However, given
that there are no immediate plans to develop this property, this project would initiate a
City-led capital improvement project to advance construction of a shared-use path as
an initial phase of larger corridor improvements. Note that there are significant
complexities and challenges to advancing this project at this time, including potential
contamination and remediation concerns and need for private right-of-way acquisition.
2) Complete Street Elements of Annual Paving Projects (2025-2027)*
a. Tank Farm Road (Broad Street to Orcutt Road) - 2025
b. Sacramento Drive (Industrial Road to Via Esteban) - 2025
c. Johnson Ave (Bishop St to Buchan St) - 2026
d. Mill St (Chorro St to California Blvd) - 2026
e. Broad St (Pacific St to Tank Farm Rd) - 2027
Page 45 of 69
Active Transportation Committee Page 4
f. Industrial Rd (Broad St to Railroad) - 2027
g. Pavement Area 2 (neighborhood streets in the general area south of the railroad station,
east of the railroad, and north of Orcutt Rd) - 2026
h. Pavement Area 3 (neighborhood streets in the general area south of South St and east
of the Margarita Area extending to Orcutt Rd and the southern city limit) - 2026
*Potential complete street elements identified for streets currently scheduled in the Draft
2024-29 Pavement Management Plan; however, actual street segments advanced with each
annual paving project will depend on funding resources and potential conflicts with
concurrent underground utility projects.
3) Continue Miscellaneous Annual Bike and Pedestrian Minor Improvements ($100k
for each mode)
4) Continue Funding for Resurfacing of Shared Use Paths
Programs
1) Continue and increase education regarding Active Transportation in partnership
with non-profit organizations and agency partners about safety topics and use of new
facilities.
Next Steps
The ATC’s recommended goals will be transmitted to the Finance Department and a master list of
all advisory body goal recommendations will be published ahead of the Council Goal Setting
Workshop in February 2025
Recommendation
Recommend a prioritized list of budget goals for the upcoming FY 2025-27 Financial Plan based
on the Active Transportation Plan goals and priority projects.
Attachments
1—Advisory Bodies 2025-27 Financial Plan Goal Setting Parameters
2—Active Transportation Committee Budget Goal Recommendations for FY 2023-25
3—List of funded active transportation projects from the 2023-25 Financial Plan
4—2023-25 Financial Plan at a Glance
5—Active Transportation Plan Tier 1 projects with ATC prioritization on 9/16/22
Page 46 of 69
Advisory Bodies
2025-27 Financial Plan
Goal Setting Parameters
1Page 47 of 69
San Luis Obispo is committed
to…
Good Fiscal Management Public Engagement Quality Services
Page 48 of 69
3
Policy Context
Section 802.
Annual Budget
Section 803.
Public Hearing on
the Budget
Financial Plan
Objectives
Two -Year Budget
City
Charter
Adopted
Budget
Policies
Second Year
Budget
Links resources to identified community needs and Council goals.
Establishes program policies and goals.
Reinforces the importance of long-range, strategic planning.
Promotes more orderly spending patterns.
Reduces time and resources allocated to budget preparation.
Council will review progress during the first year and approve
appropriations for the second fiscal year.
City Manager shall send to the Council a careful estimate of the
amounts required for business and proper conduct of all
departments/offices.
Council shall hold a public hearing on the proposed budget at
which interested persons desiring to be heard shall be given such
opportunity.
Page 49 of 69
A look-back on 2023-25 Financial Plan Objectives
Adopted Major City Goals:
4
Page 50 of 69
2024-25 Budget Highlights
Challenges Opportunities
Damages from Winter 2023 storms
necessitated costly repairs
Early identification of looming costs to allow
sufficient time to plan
Cost escalation for labor and materials,
internally and with contractors
Strong history of sound financial
management policies and practices
Limited financial and staff resources to
complete capital projects on schedule
FEMA and CalOES reimbursement for storm
expenditures to replenish reserves
5
Page 51 of 69
Overall Financial Forecast 6
All funds are in good financial standing based on current assumptions and recommendations
Revenue growth is expected to moderate
Expenditure growth needs to moderate as well
Limited ability to fund net new programs
Prior commitments are coming due and need to be budgeted for
Investment in existing ongoing services, programs, and infrastructure take priority
Page 52 of 69
7Considerations When Setting Goals
Financial Plan
Development
Financial
forecast
Major City
Goals
Community
input
Commitment
to fiscal
sustainability
Consideration
of service
levels
Measure
G-20
priorities
Mandates
Future
needs
City
Charter
Debt
service
obligations
Fiscal and
budget
policies
Advisory
Bodies
Strategic
plans
Local laws
Macroeconomic
conditions
General
Plan
Core service
requirements
Page 53 of 69
Goal-Setting & the Budget Process
The proposed Financial Plan Calendar will be presented to Council on 10/1/24
Page 54 of 69
QUESTIONS?
9
If you have any additional questions you can reach out to:
Riley Kuhn - Principal Budget Analyst rtkuhn@slocity.org
Emily Jackson - Finance Director ejackson@slocity.org
Page 55 of 69
Page 56 of 69
Page 1 of 3
DATE: December 5, 2022
TO: Emily Jackson, Director of Finance
FROM: Adam Fukushima, Staff Liaison to the Active Transportation Committee
SUBJECT: FY 2023-25 Active Transportation Committee Recommended Goals
On November 17, 2022 the Active Transportation Committee recommended its FY 2023-25
goals for Council consideration which are represented in the following table. Projects are ranked
in order of importance from most to least desired to fund based on proposed projects identified
in the Active Transportation Plan.
Recommended Goal Why Goal is Important Candidate Funding
ACTIVE
TRANSPORTATION PLAN
TIER 1 PROJECT
DEPLOYMENT
Higuera Complete Streets
Project
-Provide necessary matching
funds for this state funded
project
-Complete design and
construction
Foothill Blvd Quick Build
Project
-Complete design and
Construction
Pedestrian Hybrid Beacon
at South/King
-Program and construct
project
Roundabout at
California/Taft
-Complete design and
construct
Railroad Safety Trail Gap at
Bullock Lane
-Acquire approvals from
Union Pacific and construct
This projects improves north-south
cross-town connectivity for active
transportation and Safe Routes to
School improvements to Hawthorne
Elementary and Laguna Middle Schools
Improves east-west connectivity
between Cal Poly, residences, and
activity centers along Foothill
Improves connectivity to Hawthorne
Elementary School, Meadow Park, and
residences
Provides a safer connection to the
Railroad Safety Trail across California
Blvd
Fills a gap in the RRST between the
existing portion north of Orcutt Rd and
new segment south to Tank Farm Rd
Project Funding Sources:
State funds
Federal funds
General fund
City debt financing
Fundraising efforts
Measure G-20
Active Transportation Committee
Page 57 of 69
Page 2 of 3
Broad Street (South to
Orcutt) Quick Build Project
-Design and construct
Tank Farm Rd Shared Use
Path
-Complete design &
environmental study, acquire
right-of-way and construct in
an outlying year
Johnson St Improvements
for Sydney Crossing
-Complete design and
construction
COMPLETE STREETS
ELEMENTS OF ANNUAL
PAVING PROJECTS
Monterey St (Santa Rosa-
California)
California Blvd (Phillips-
Monterey)
Johnson St (Buchon-Laurel)
Santa Barbara St (Leff-Broad)
Palm St (Pepper to Santa
Rosa) including
Neighborhood Greenway
Orcutt Rd (Laurel-Johnson)
Pavement Areas 1 and 8
including Neighborhood
Greenway on Toro St
Misc. Pedestrian Facility
Improvements-
Maintain $100,000 in annual
funding for misc. projects
such as safe routes to
school, signing & striping
projects ideally incorporated
into other construction
projects
Misc. Bicycle Facility
Improvements-
Maintain $100,000 in annual
funding for misc. projects
such as safe routes to
Improves connectivity and safety along
this wide arterial street
Improves a low stress, east-west
connection for active transportation
Improves Safe Routes to School to
Sinsheimer Elementary School
Completing these projects as part of
other construction projects results in
substantial cost savings.
Completing these improvements as part
of other construction projects results in
substantial cost savings.
Completing these improvements as part
of other construction projects results in
substantial cost savings.
Page 58 of 69
Page 3 of 3
school, signing & striping
projects ideally incorporated
into other construction
projects.
Ped/Bikeway Maintenance:
Maintain $150,000 annually
for bicycle and pedestrian
facilities
Sidewalk Replacement and
Installation: Maintain
$250,000 annually for curb
ramp and sidewalk upgrades
Performing pavement maintenance and
weed control on pedestrian and bicycle
paths will increase the life of these
facilities and reduce the risk of collisions
Completing these improvements as part
of other construction projects results in
substantial cost savings.
PROGRAMS
Safe Routes to School:
Complete a Safe Routes to
School Plan for SLO High
School
It is a goal of the Active Transportation
Plan to complete, over time, a Safe
Routes to School Plan for each school
in the city. A plan for SLO High School
will help refine proposed active
transportation improvements around the
high school
Program Funding Sources:
State and Federal grants
Transportation Development
Act funds
General fund
Measure G
STAFFING
Active Transportation
Manager and
Transportation
Planner/Engineers:
Maintain positions.
The City has made a commitment to
complete a Tier 1 network identified in
the Active Transportation Plan. The
Active Transportation Manager and
Transportation Planner/Engineers are
critical in sufficiently implementing the
Tier 1 network projects and preparing
grant applications.
Staffing Funding Sources:
General fund
Measure G
Page 59 of 69
Page 60 of 69
Capital Improvement Plan (CIP)
CIP Expenditure by Project and Task
The tables below outline a complete list of all capital projects across all programs, departments, and
funding sources. The tables present project budgets and/or cost estimates for the next five fiscal years.
Although this Financial Plan only addresses budget allocations for Fiscal Year 2023-25, it is important to
understand the larger picture and future capital project investments into and beyond the five-year period.
The table is organized with the largest project budgets beginning in FY 2023-24, from top to bottom where
the blue rows represent a project, and the white rows represent a given task or subproject within that
project (if applicable).
ID CIP #Project/Task 2023-24 2024-25 2025-26 2026-27 2027-28 2-Year Totals 5-Year Totals
ϭ 1 Cultural Arts District Parking Structure 47,000,000$ 1,500,000$ 490,000$ -$ -$ 48,500,000$ 48,990,000$
Ϯ 2 Mid-Higuera Bypass 8,729,000$ 2,850,000$ -$ -$ -$ 11,579,000$ 11,579,000$
ϯ 3 ATP - Higuera Complete Street Project 8,251,000$ 750,000$ -$ -$ -$ 9,001,000$ 9,001,000$
ϰ 4 Street Reconstruction & Resurfacing 6,956,994$ 5,000,000$ 7,514,000$ 6,000,000$ 9,000,000$ 11,956,994$ 34,470,994$
ϱ 5 WRRF and Wastewater Collection Maintenance Facility 6,500,000$ -$ -$ -$ -$ 6,500,000$ 6,500,000$
ϲ 6 Waterline Replacement: Johnson - Iris to Bishop 3,300,000$ -$ -$ -$ -$ 3,300,000$ 3,300,000$
ϳ 7 Storm Response and Recovery 2,750,000$ -$ -$ -$ -$ 2,750,000$ 2,750,000$
ϴ 8 Bus Replacements with EV 2,701,500$ 2,226,000$ 3,055,110$ -$ 2,145,851$ 4,927,500$ 10,128,461$
ϵ 9 Mission Plaza Concept Plan Implementation 2,429,972$ 470,028$ 100,000$ 6,000,000$ 4,000,000$ 2,900,000$ 13,000,000$
ϭϬ 10 Storm Drain System Replacement 1,875,000$ 1,025,000$ 825,000$ 1,325,000$ 1,325,000$ 2,900,000$ 6,375,000$
ϭϭ 11 Transit Facility EV Charging Infrastructure 1,805,400$ 1,445,406$ 604,800$ -$ 414,000$ 3,250,806$ 4,269,606$
ϭϮ 12 Prado Road Interchange 1,435,260$ 2,750,000$ 91,350,000$ 6,585,000$ -$ 4,185,260$ 102,120,260$
ϭϯ 13
Sewer-main Replacements: Taft, Hathaway, Phillips, Buena Vista,
and Loomis 1,225,000$ -$ -$ -$ -$ 1,225,000$ 1,225,000$
ϭϰ 14 Major Facility Maintenance 1,152,000$ 423,178$ 625,000$ 1,928,776$ 2,015,000$ 1,575,178$ 6,143,954$
ϭϱ ϴϳϵ Dorro Ͳ ZooĨ ϭϬϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ͲΨ ϭϬϬ͕ϬϬϬΨ ϭϬϬ͕ϬϬϬΨ
ϭϲ dranƐition Plan Implementation ϭϱ͕ϬϬϬΨ ϭϱ͕ϬϬϬΨ ϭϱ͕ϬϬϬΨ ϭϱ͕ϬϬϬΨ ϭϱ͕ϬϬϬΨ ϯϬ͕ϬϬϬΨ ϳϱ͕ϬϬϬΨ
ϭϳ CitLJ CoƵntLJ CommƵnitLJ Zoom dI ͲΨ ͲΨ ϳϱ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϳϱ͕ϬϬϬΨ
ϭϴ CitLJ ,all roƵŐŚt dolerant >anĚƐĐapinŐ ͲΨ ͲΨ ͲΨ ͲΨ ϯϱ͕ϬϬϬΨ ͲΨ ϯϱ͕ϬϬϬΨ
ϭϵ CitLJ ,all &ire larm &ire larm Control Panel ͲΨ ͲΨ ͲΨ ϯϬ͕ϬϬϬΨ ͲΨ ͲΨ ϯϬ͕ϬϬϬΨ
ϮϬ CitLJͬCoƵntLJ >iďrarLJ Ĩront ƐtepƐ ͲΨ ͲΨ ͲΨ ϭϱ͕ϬϬϬΨ ϭϱϬ͕ϬϬϬΨ ͲΨ ϭϲϱ͕ϬϬϬΨ
Ϯϭ Corp zarĚ &Ƶel IƐlanĚ ^iĚinŐ ͬ ZeĐoatinŐ oĨ &Ƶel IƐlanĚ anĚ iƐpenƐerƐ ϮϱϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ͲΨ ϮϱϬ͕ϬϬϬΨ ϮϱϬ͕ϬϬϬΨ
ϮϮ Corp zarĚ ZooĨ CoatinŐ ͲΨ ͲΨ ϭϬ͕ϬϬϬΨ ϭϱϬ͕ϬϬϬΨ ͲΨ ͲΨ ϭϲϬ͕ϬϬϬΨ
Ϯϯ
merŐenĐLJ CommƵniĐationƐ Center torŬƐtationͬCarpet
ZeplaĐementƐ ͲΨ ͲΨ ͲΨ ϯϰϯ͕ϳϳϲΨ ͲΨ ͲΨ ϯϰϯ͕ϳϳϲΨ
Ϯϰ nerŐLJ DanaŐement ControlƐ hpŐraĚe ϭϭϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ͲΨ ϭϭϬ͕ϬϬϬΨ ϭϭϬ͕ϬϬϬΨ
Ϯϱ džiƐtinŐ ^>K ZepertorLJ dŚeater denant ImprovementƐ ͲΨ ͲΨ ͲΨ ͲΨ ϭϱϬ͕ϬϬϬΨ ͲΨ ϭϱϬ͕ϬϬϬΨ
Ϯϲ &aĐilitLJ Zoll hp oor ZeplaĐementƐ Ͳ sarioƵƐ >oĐationƐ ϭϱ͕ϬϬϬΨ ϮϬ͕ϬϬϬΨ ϮϬ͕ϬϬϬΨ ϮϬ͕ϬϬϬΨ ϮϬ͕ϬϬϬΨ ϯϱ͕ϬϬϬΨ ϵϱ͕ϬϬϬΨ
Ϯϳ &ire ^tation ηϭ ĚminiƐtration lĚŐ͘ ZooĨ ϲϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ͲΨ ϲϬ͕ϬϬϬΨ ϲϬ͕ϬϬϬΨ
Ϯϴ &ire ^tation ηϰ Ͳ džterior Paint Ϯϱ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ͲΨ Ϯϱ͕ϬϬϬΨ Ϯϱ͕ϬϬϬΨ
Ϯϵ &ire ^tation ϯ Θ ϰ Carpet ZeplaĐement ͲΨ ͲΨ ͲΨ ϰϬ͕ϬϬϬΨ ͲΨ ͲΨ ϰϬ͕ϬϬϬΨ
ϯϬ &leet >iĨtƐ ͲΨ ϱϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϱϬ͕ϬϬϬΨ ϱϬ͕ϬϬϬΨ
ϯϭ ,sC ir ,anĚler at ParŬinŐ ^erviĐeƐ ϮϯϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ͲΨ ϮϯϬ͕ϬϬϬΨ ϮϯϬ͕ϬϬϬΨ
ϯϮ ,LJĚration ^tationƐ Ϯϱ͕ϬϬϬΨ Ϯϱ͕ϬϬϬΨ Ϯϱ͕ϬϬϬΨ Ϯϱ͕ϬϬϬΨ Ϯϱ͕ϬϬϬΨ ϱϬ͕ϬϬϬΨ ϭϮϱ͕ϬϬϬΨ
ϯϯ Id Zoom ,eat PƵmp ZeplaĐementƐ ϭϮ͕ϬϬϬΨ ϭϱ͕ϬϬϬΨ ϭϱ͕ϬϬϬΨ ϮϬ͕ϬϬϬΨ ϮϬ͕ϬϬϬΨ Ϯϳ͕ϬϬϬΨ ϴϮ͕ϬϬϬΨ
ϯϰ :aĐŬ ,oƵƐe ZooĨ anĚ tiĚoǁƐ talŬ ZailinŐ ϮϱϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ͲΨ ϮϱϬ͕ϬϬϬΨ ϮϱϬ͕ϬϬϬΨ
ϯϱ >ƵĚǁiĐŬ anĚ ^enior Center Ͳ džterior Paint anĚ ^Śell ZeŚaď ͲΨ ϮϱϬ͕ϬϬϬΨ Ϯϱ͕ϬϬϬΨ ϮϱϬ͕ϬϬϬΨ ͲΨ ϮϱϬ͕ϬϬϬΨ ϱϮϱ͕ϬϬϬΨ
ϯϲ >ƵĚǁiĐŬ CommƵnitLJ Center Ͳ ZooĨ anĚ ^olar ZeplaĐement ͲΨ ͲΨ ͲΨ ϭϱϬ͕ϬϬϬΨ ϱϬϬ͕ϬϬϬΨ ͲΨ ϲϱϬ͕ϬϬϬΨ
ϯϳ ParŬƐ anĚ ZeĐreation ZooĨinŐ ^iĚinŐ anĚ džterior PaintinŐ ͲΨ ͲΨ ϲϬ͕ϬϬϬΨ ϮϱϬ͕ϬϬϬΨ ͲΨ ͲΨ ϯϭϬ͕ϬϬϬΨ
ϯϴ PoliĐe epartment ,sC PaĐŬaŐe hnit ZeplaĐement ͲΨ ͲΨ ϭϱ͕ϬϬϬΨ ϭϬϬ͕ϬϬϬΨ ͲΨ ͲΨ ϭϭϱ͕ϬϬϬΨ
ϯϵ PoliĐe epartment ,LJĚroniĐ ^LJƐtem PipinŐ ZeplaĐement ͲΨ ϭϱ͕ϬϬϬΨ ϴϱ͕ϬϬϬΨ ͲΨ ͲΨ ϭϱ͕ϬϬϬΨ ϭϬϬ͕ϬϬϬΨ
ϰϬ ZailroaĚ DƵƐeƵm ZooĨ ͲΨ ͲΨ ϯϬ͕ϬϬϬΨ ϭϱϬ͕ϬϬϬΨ ͲΨ ͲΨ ϭϴϬ͕ϬϬϬΨ
ϰϭ ZeĐreation ^iteƐ denant ImprovementƐ Ͳ CommƵnitLJ Zoomͬ>ƵĚǁiĐŬ ͲΨ ͲΨ ͲΨ ͲΨ ϭϬϬ͕ϬϬϬΨ ͲΨ ϭϬϬ͕ϬϬϬΨ
ϰϮ ^enior Center ZooĨ ͲΨ ͲΨ ϳϱ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϳϱ͕ϬϬϬΨ
ϰϯ ^ǁim Center atŚ ,oƵƐe CeilinŐ ͲΨ ͲΨ ͲΨ ϭϬϬ͕ϬϬϬΨ ͲΨ ͲΨ ϭϬϬ͕ϬϬϬΨ
ϰϰ ^ǁim Center eĐŬ ZeplaĐement ͲΨ ͲΨ ϭϬϬ͕ϬϬϬΨ ͲΨ ϭ͕ϬϬϬ͕ϬϬϬΨ ͲΨ ϭ͕ϭϬϬ͕ϬϬϬΨ
ϰϱ ^ǁim Center &ƵrnaĐeƐ (Ϯ &ƵrnaĐeƐ)ϰϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ͲΨ ϰϬ͕ϬϬϬΨ ϰϬ͕ϬϬϬΨ
ϰϲ ^ǁim Center DƵltipƵrpoƐe Zoom ĨloorinŐ ͲΨ ͲΨ ͲΨ ϮϬ͕ϬϬϬΨ ͲΨ ͲΨ ϮϬ͕ϬϬϬΨ
ϰϳ ^ǁim Center KlĚ atŚ ,oƵƐe ZooĨ ͲΨ ͲΨ ϳϱ͕ϬϬϬΨ ϮϬϬ͕ϬϬϬΨ ͲΨ ͲΨ Ϯϳϱ͕ϬϬϬΨ
ϰϴ ^ǁim Center KlLJmpiĐ Pool dŚermal lanŬetƐ ͲΨ ͲΨ ͲΨ ϱϬ͕ϬϬϬΨ ͲΨ ͲΨ ϱϬ͕ϬϬϬΨ
ϰϵ ^ǁim Center Pool tater CŚemiĐal ZeŐƵlator ϮϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ͲΨ ϮϬ͕ϬϬϬΨ ϮϬ͕ϬϬϬΨ
ϱϬ dŚerapLJ Pool ^ŚaĚe ^trƵĐtƵre Daterial ZeplaĐement ͲΨ ϯϯ͕ϭϳϴΨ ͲΨ ͲΨ ͲΨ ϯϯ͕ϭϳϴΨ ϯϯ͕ϭϳϴΨ
Table 69:
)LQDQFLDO 3ODQ 3DJH Page 61 of 69
Capital Improvement Plan (CIP)
ID CIP #Project/Task 2023-24 2024-25 2025-26 2026-27 2027-28 2-Year Totals 5-Year Totals
ϱϭ 15 IT Replacement 1,145,500$ 2,011,001$ 2,695,000$ 911,099$ 980,794$ 3,156,501$ 7,743,393$
ϱϮ ϵϭϭ PŚone ^LJƐtem ͲΨ ͲΨ ͲΨ Ϯϴϵ͕ϴϭϵΨ ͲΨ ͲΨ Ϯϴϵ͕ϴϭϵΨ
ϱϯ ĐĐeƐƐ Control (ƵtomatiĐ 'ate CarĚ ^LJƐtem) ͲΨ ͲΨ ͲΨ ͲΨ ϭϱϬ͕ϬϬϬΨ ͲΨ ϭϱϬ͕ϬϬϬΨ
ϱϰ ƐƐet DanaŐement (CitLJǁorŬƐ Ͳ htilitieƐ InteŐration)ͲΨ ϱϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϱϬ͕ϬϬϬΨ ϱϬ͕ϬϬϬΨ
ϱϱ ƵĚio ZeĐorĚinŐ ^LJƐtem ZeplaĐement ͲΨ ͲΨ ͲΨ ϭϳϯ͕ϴϵϭΨ ͲΨ ͲΨ ϭϳϯ͕ϴϵϭΨ
ϱϲ oĚLJ torn CameraƐ͕ siĚeo ^toraŐe anĚ Intervieǁ ZoomƐ ϱϬ͕ϬϬϬΨ ϱϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϭϬϬ͕ϬϬϬΨ ϭϬϬ͕ϬϬϬΨ
ϱϳ CͬZD^ ZeplaĐement ͲΨ ͲΨ ϵϬϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϵϬϬ͕ϬϬϬΨ
ϱϴ CͬZD^ ^tƵĚLJ ͲΨ ϭϬϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϭϬϬ͕ϬϬϬΨ ϭϬϬ͕ϬϬϬΨ
ϱϵ CitLJ ^E ͲΨ ͲΨ ͲΨ ϮϮϯ͕ϰϭϯΨ ͲΨ ͲΨ ϮϮϯ͕ϰϭϯΨ
ϲϬ iƐpatĐŚ ZaĚio ConƐoleƐ ϭϱϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ͲΨ ϭϱϬ͕ϬϬϬΨ ϭϱϬ͕ϬϬϬΨ
ϲϭ CC CompƵterƐ ͲΨ ϭϱϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϭϱϬ͕ϬϬϬΨ ϭϱϬ͕ϬϬϬΨ
ϲϮ CC ƵĚio siƐƵal ^LJƐtem ͲΨ ϯϱϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϯϱϬ͕ϬϬϬΨ ϯϱϬ͕ϬϬϬΨ
ϲϯ CC ƋƵipment ZeplaĐement ϯϱ͕ϬϬϬΨ ϯϱ͕ϬϬϬΨ ͲΨ ͲΨ ϯϵ͕ϯϵϯΨ ϳϬ͕ϬϬϬΨ ϭϬϵ͕ϯϵϯΨ
ϲϰ CC hP^ͲΨ ͲΨ ϭϲϭ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϭϲϭ͕ϬϬϬΨ
ϲϱ ƐĐriďe replaĐement ͲΨ ͲΨ ͲΨ ͲΨ ϰϬ͕ϬϬϬΨ ͲΨ ϰϬ͕ϬϬϬΨ
ϲϲ &ire ^tation lertinŐ ^LJƐtem ͲΨ ͲΨ ϯϰϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϯϰϬ͕ϬϬϬΨ
ϲϳ &ireǁall ZeplaĐement ͲΨ ϮϱϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϮϱϬ͕ϬϬϬΨ ϮϱϬ͕ϬϬϬΨ
ϲϴ Dotion ZP ϭϱϬ͕ϬϬϬΨ ϭϱϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϯϬϬ͕ϬϬϬΨ ϯϬϬ͕ϬϬϬΨ
ϲϵ EetǁorŬ ^eĐƵritLJ hpŐraĚe ͲΨ ϭϮϱ͕ϬϬϬΨ ͲΨ ͲΨ ϭϯϲ͕ϭϯϭΨ ϭϮϱ͕ϬϬϬΨ Ϯϲϭ͕ϭϯϭΨ
ϳϬ EetǁorŬ ^ǁitĐŚinŐ InĨraƐtrƵĐtƵre ƋƵipment ϱϱϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ͲΨ ϱϱϬ͕ϬϬϬΨ ϱϱϬ͕ϬϬϬΨ
ϳϭ ParŬƐ Θ ZeĐ ĐtiveEet ^oĨtǁare ZeplaĐement ͲΨ ͲΨ ϱϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϱϬ͕ϬϬϬΨ
ϳϮ P ^E ͲΨ ͲΨ ͲΨ ϭϲϯ͕ϭϵϵΨ ͲΨ ͲΨ ϭϲϯ͕ϭϵϵΨ
ϳϯ PͬCitLJ ďaĐŬƵp ƐtoraŐe͕ ƐeĐonĚarLJ ƐtoraŐe ϳϱ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ͲΨ ϳϱ͕ϬϬϬΨ ϳϱ͕ϬϬϬΨ
ϳϰ PoliĐe C ,arĚǁare (^erverƐ anĚ ^toraŐe)ͲΨ ͲΨ ͲΨ ͲΨ ϰϬϱ͕ϳϰϲΨ ͲΨ ϰϬϱ͕ϳϰϲΨ
ϳϱ PƵďliĐ ^aĨetLJ DC anĚ InͲCar siĚeo ZeplaĐement ͲΨ ϮϱϬ͕ϬϬϬΨ ϰϰϯ͕ϬϬϬΨ ͲΨ ͲΨ ϮϱϬ͕ϬϬϬΨ ϲϵϯ͕ϬϬϬΨ
ϳϲ PƵďliĐ ^aĨetLJ ^peĐialinjeĚ ^ƵrveillanĐe ĐameraƐ (PKƐ) ZeplaĐement ͲΨ ͲΨ ϲϯ͕ϬϬϬΨ ϲϬ͕ϳϳϳΨ ϱϬ͕ϲϰϴΨ ͲΨ ϭϳϰ͕ϰϮϱΨ
ϳϳ PƵďliĐ ^ƵrveillanĐe CameraƐ ͲĐitLJǁiĚe ϱ LJear replaĐe ϰϬ͕ϬϬϬΨ ͲΨ ϱϭ͕ϬϬϬΨ ͲΨ ͲΨ ϰϬ͕ϬϬϬΨ ϵϭ͕ϬϬϬΨ
ϳϴ PƵďliĐ ^ƵrveillanĐe CitLJǁiĚe CameraƐ ^toraŐe aĚĚ reĚƵnĚanĐLJ ϰϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ͲΨ ϰϬ͕ϬϬϬΨ ϰϬ͕ϬϬϬΨ
ϳϵ ZaĚio ,anĚŚelĚƐ Θ DoďileƐ ͲΨ ͲΨ ϭϰϱ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϭϰϱ͕ϬϬϬΨ
ϴϬ ZaĚioƐ͕ DoďileƐ anĚ ƐtationƐ not replaĐeĚ Ͳ & Θ Pt KnlLJ ͲΨ ϮϬϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϮϬϬ͕ϬϬϬΨ ϮϬϬ͕ϬϬϬΨ
ϴϭ ^eĐƵritLJ siĚeo ^LJƐtem ZeplaĐement (Camera ^oĨtǁare)ϱϱ͕ϱϬϬΨ ͲΨ ͲΨ ͲΨ ͲΨ ϱϱ͕ϱϬϬΨ ϱϱ͕ϱϬϬΨ
ϴϮ hninterrƵptiďle Poǁer ^ƵpplieƐ (hP^͛Ɛ ^erverƐ anĚ ^toraŐe)ͲΨ ϱϭ͕ϬϬϭΨ ͲΨ ͲΨ ϱϯ͕ϱϴϲΨ ϱϭ͕ϬϬϭΨ ϭϬϰ͕ϱϴϳΨ
ϴϯ htilitLJ illinŐ ^LJƐtem ͲΨ ϭϱϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϭϱϬ͕ϬϬϬΨ ϭϱϬ͕ϬϬϬΨ
ϴϰ sirtƵal Private EetǁorŬ ZeplaĐe ͲΨ ϭϬϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϭϬϬ͕ϬϬϬΨ ϭϬϬ͕ϬϬϬΨ
ϴϱ sDǁare InĨraƐtrƵĐtƵre hpŐraĚe ͲΨ ͲΨ ϮϰϮ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϮϰϮ͕ϬϬϬΨ
ϴϲ soIP delepŚone ^LJƐtem ͲΨ ͲΨ ϯϬϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϯϬϬ͕ϬϬϬΨ
ϴϳ tireleƐƐ ^LJƐtem CitLJǁiĚe ͲΨ ͲΨ ͲΨ ͲΨ ϭϬϱ͕ϮϵϬΨ ͲΨ ϭϬϱ͕ϮϵϬΨ
ϴϴ 16 Parks and Rec General Plan Implementation 800,000$ -$ -$ -$ -$ 800,000$ 800,000$
ϴϵ 17 Fleet Replacement: Public Works 770,000$ 395,000$ 612,000$ 1,110,000$ 1,385,000$ 1,165,000$ 4,272,000$
ϵϬ nŐineerinŐ CompaĐt PiĐŬƵp ͲΨ ͲΨ ͲΨ ͲΨ ϲϱ͕ϬϬϬΨ ͲΨ ϲϱ͕ϬϬϬΨ
ϵϭ nŐineerinŐ CompaĐt PiĐŬƵp ͲΨ ͲΨ ϲϱ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϲϱ͕ϬϬϬΨ
ϵϮ nŐineerinŐ CompaĐt PiĐŬƵp ͲΨ ͲΨ ϲϱ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϲϱ͕ϬϬϬΨ
ϵϯ &aĐilitieƐ DaintenanĐe ϯͬϰ ton PiĐŬƵp ǁitŚ htilitLJ eĚ ͲΨ ϳϱ͕ϬϬϬΨ ͲΨ ϳϱ͕ϬϬϬΨ ͲΨ ϳϱ͕ϬϬϬΨ ϭϱϬ͕ϬϬϬΨ
ϵϰ &leet Dotor Pool CompaĐt PiĐŬƵp ͲΨ ͲΨ ͲΨ ͲΨ ϳϬ͕ϬϬϬΨ ͲΨ ϳϬ͕ϬϬϬΨ
ϵϱ ParŬ DaintenanĐe Doǁer ͲΨ ͲΨ ͲΨ ϴϱ͕ϬϬϬΨ ͲΨ ͲΨ ϴϱ͕ϬϬϬΨ
ϵϲ ParŬinŐ CompaĐt PiĐŬƵp ͲΨ ϱϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϱϬ͕ϬϬϬΨ ϱϬ͕ϬϬϬΨ
ϵϳ ParŬinŐ ^ĐooterƐͬ>PZ eƋƵippeĚ veŚiĐle ϰϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ͲΨ ϰϬ͕ϬϬϬΨ ϰϬ͕ϬϬϬΨ
ϵϴ ParŬƐ Daint Doǁer ͲΨ ͲΨ ͲΨ ϴϱ͕ϬϬϬΨ ͲΨ ͲΨ ϴϱ͕ϬϬϬΨ
ϵϵ ParŬƐ Daint ZeĨƵƐe drƵĐŬ ͲΨ ͲΨ ͲΨ ϮϱϬ͕ϬϬϬΨ ͲΨ ͲΨ ϮϱϬ͕ϬϬϬΨ
ϭϬϬ ParŬƐ Daint dƵrĨ denĚer ͲΨ ͲΨ ϮϮ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϮϮ͕ϬϬϬΨ
ϭϬϭ ParŬƐ DaintenanĐe ϯͬϰ ton PiĐŬƵp ͲΨ ϭϰϬ͕ϬϬϬΨ ϳϱ͕ϬϬϬΨ ͲΨ ͲΨ ϭϰϬ͕ϬϬϬΨ Ϯϭϱ͕ϬϬϬΨ
ϭϬϮ ParŬƐ DaintenanĐe CompaĐt PiĐŬƵp ͲΨ ͲΨ ͲΨ ϲϱ͕ϬϬϬΨ ͲΨ ͲΨ ϲϱ͕ϬϬϬΨ
ϭϬϯ ParŬƐ DaintenanĐe CompaĐt PiĐŬƵp ͲΨ ͲΨ ϲϱ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϲϱ͕ϬϬϬΨ
ϭϬϰ ParŬƐ DaintenanĐe drailerƐ ͲΨ ͲΨ ϭϱ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϭϱ͕ϬϬϬΨ
ϭϬϱ Pt DaintenanĐe ^ƵperviƐor seŚiĐle ͲΨ ϱϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϱϬ͕ϬϬϬΨ ϱϬ͕ϬϬϬΨ
ϭϬϲ ^tormǁater CompaĐt PiĐŬƵp ͲΨ ͲΨ ͲΨ ͲΨ ϱϬ͕ϬϬϬΨ ͲΨ ϱϬ͕ϬϬϬΨ
ϭϬϳ ^tormǁater ,LJĚro Đleaner ϲϯϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ͲΨ ϲϯϬ͕ϬϬϬΨ ϲϯϬ͕ϬϬϬΨ
ϭϬϴ ^treetƐ Daint , ir raŬe drailer ͲΨ ϱϱ͕ϬϬϬΨ ϱϱ͕ϬϬϬΨ ͲΨ ͲΨ ϱϱ͕ϬϬϬΨ ϭϭϬ͕ϬϬϬΨ
ϭϬϵ ^treetƐ Daint CompaĐt PiĐŬƵp ͲΨ ͲΨ ͲΨ ϳϬ͕ϬϬϬΨ ͲΨ ͲΨ ϳϬ͕ϬϬϬΨ
ϭϭϬ ^treetƐ Daint , ZollͲKĨĨ drƵĐŬ ͲΨ ͲΨ ͲΨ ͲΨ ϯϱϬ͕ϬϬϬΨ ͲΨ ϯϱϬ͕ϬϬϬΨ
ϭϭϭ ^treetƐ Daint Paver ͲΨ ͲΨ ͲΨ ϮϱϬ͕ϬϬϬΨ ͲΨ ͲΨ ϮϱϬ͕ϬϬϬΨ
ϭϭϮ ^treetƐ DaintenanĐe ϯͬϰ ton PiĐŬƵp &ϭϱϬ eleĐtriĐͬŚLJďriĚ ͲΨ ͲΨ ͲΨ ϳϬ͕ϬϬϬΨ ͲΨ ͲΨ ϳϬ͕ϬϬϬΨ
ϭϭϯ ^treetƐ DaintenanĐe aĐŬŚoe ͲΨ ͲΨ ϮϱϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϮϱϬ͕ϬϬϬΨ
ϭϭϰ ^treetƐ DaintenanĐe CompaĐt PiĐŬƵp Ͳ ZeplaĐe ǁͬ san ͲΨ ͲΨ ͲΨ ͲΨ ϱϬ͕ϬϬϬΨ ͲΨ ϱϬ͕ϬϬϬΨ
ϭϭϱ ^treetƐ DaintenanĐe Zoller ͲΨ ͲΨ ͲΨ ϭϬϬ͕ϬϬϬΨ ͲΨ ͲΨ ϭϬϬ͕ϬϬϬΨ
ϭϭϲ ^treetƐ DaintenanĐe drailerƐ ͲΨ Ϯϱ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ Ϯϱ͕ϬϬϬΨ Ϯϱ͕ϬϬϬΨ
ϭϭϳ ^treetƐͲ ^ǁeeper ͲΨ ͲΨ ͲΨ ͲΨ ϴϬϬ͕ϬϬϬΨ ͲΨ ϴϬϬ͕ϬϬϬΨ
ϭϭϴ ^ƵpplieƐ͕ ^oĨtǁare anĚ doolƐ ϭϬϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ͲΨ ϭϬϬ͕ϬϬϬΨ ϭϬϬ͕ϬϬϬΨ
ϭϭϵ hrďan &oreƐt CompaĐt PiĐŬƵp ƐĐape ,LJď t Ĩor rďoriƐt ͲΨ ͲΨ ͲΨ ϲϬ͕ϬϬϬΨ ͲΨ ͲΨ ϲϬ͕ϬϬϬΨ
Table 69 (continued):
)LQDQFLDO 3ODQ 3DJH Page 62 of 69
Capital Improvement Plan (CIP)
ID CIP #Project/Task 2023-24 2024-25 2025-26 2026-27 2027-28 2-Year Totals 5-Year Totals
ϭϮϬ 18 Water Storage Tank Major Maintenance 755,000$ 1,000,000$ 127,000$ 1,100,000$ 1,100,000$ 1,755,000$ 4,082,000$
ϭϮϭ Ěna danŬ ZeĐoatinŐ ϴϬ͕ϬϬϬΨ ϭ͕ϬϬϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϭ͕ϬϴϬ͕ϬϬϬΨ ϭ͕ϬϴϬ͕ϬϬϬΨ
ϭϮϮ ZeƐervoir Ϯ Cover ZeplaĐement ϮϬϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ͲΨ ϮϬϬ͕ϬϬϬΨ ϮϬϬ͕ϬϬϬΨ
ϭϮϯ taƐŚ ǁater tanŬ ηϭ ϰϳϱ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ͲΨ ϰϳϱ͕ϬϬϬΨ ϰϳϱ͕ϬϬϬΨ
ϭϮϰ tater ^toraŐe danŬ DaintenanĐe ͲΨ ͲΨ ϭϮϳ͕ϬϬϬΨ ϭ͕ϭϬϬ͕ϬϬϬΨ ϭ͕ϭϬϬ͕ϬϬϬΨ ͲΨ Ϯ͕ϯϮϳ͕ϬϬϬΨ
ϭϮϱ 19 General Parking Structure Maintenance 700,000$ 700,000$ 1,000,000$ 1,100,000$ 1,100,000$ 1,400,000$ 4,600,000$
ϭϮϲ 20 Water Treatment Plant - Building Maintenance 650,000$ -$ -$ -$ -$ 650,000$ 650,000$
ϭϮϳ 21 Park Major Maintenance & Repairs 520,000$ 440,000$ 710,000$ 1,410,000$ 1,117,500$ 960,000$ 4,197,500$
ϭϮϴ dranƐition Plan Implementation ͲΨ ϮϬ͕ϬϬϬΨ ϮϬ͕ϬϬϬΨ ϮϬ͕ϬϬϬΨ ϮϬ͕ϬϬϬΨ ϮϬ͕ϬϬϬΨ ϴϬ͕ϬϬϬΨ
ϭϮϵ ConĐrete enĐŚ Θ daďle ZeplaĐement sarioƵƐ >oĐationƐ ϭϱ͕ϬϬϬΨ ϭϱ͕ϬϬϬΨ ϭϱ͕ϬϬϬΨ ϭϱ͕ϬϬϬΨ ϭϱ͕ϬϬϬΨ ϯϬ͕ϬϬϬΨ ϳϱ͕ϬϬϬΨ
ϭϯϬ evaƵl aƐŬetďall CoƵrt ZeplaĐement ͲΨ ͲΨ ͲΨ ͲΨ ϭϱ͕ϬϬϬΨ ͲΨ ϭϱ͕ϬϬϬΨ
ϭϯϭ IrriŐation Dainline >eaŬ Zepair ϯϱ͕ϬϬϬΨ ϯϱ͕ϬϬϬΨ ϯϱ͕ϬϬϬΨ ϯϱ͕ϬϬϬΨ ϯϱ͕ϬϬϬΨ ϳϬ͕ϬϬϬΨ ϭϳϱ͕ϬϬϬΨ
ϭϯϮ IƐlaLJ ParŬ ĨlatǁorŬ replaĐement ͲΨ ͲΨ ͲΨ ϰϬ͕ϬϬϬΨ ͲΨ ͲΨ ϰϬ͕ϬϬϬΨ
ϭϯϯ :aĐŬ ,oƵƐe rďor ϭϳϱ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ͲΨ ϭϳϱ͕ϬϬϬΨ ϭϳϱ͕ϬϬϬΨ
ϭϯϰ :oŚnƐon ParŬ ƐiĚeǁalŬ anĚ tree replaĐement ͲΨ ͲΨ ͲΨ ϭϬϬ͕ϬϬϬΨ ͲΨ ͲΨ ϭϬϬ͕ϬϬϬΨ
ϭϯϱ :oŚnƐon ParŬ ^iĚeǁalŬ ZeplaĐement ͲΨ ͲΨ ͲΨ ϳϱ͕ϬϬϬΨ ͲΨ ͲΨ ϳϱ͕ϬϬϬΨ
ϭϯϲ >aŐƵna >aŬe oĐŬƐ anĚ Zamp ͲΨ ͲΨ ϭϬϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϭϬϬ͕ϬϬϬΨ
ϭϯϳ >anĚƐĐape Controller ^LJƐtem hpŐraĚe to Cal ƐenƐe ͲΨ ϭϱϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϭϱϬ͕ϬϬϬΨ ϭϱϬ͕ϬϬϬΨ
ϭϯϴ DaĚonna ZoaĚ >anĚƐĐapinŐ anĚ IrriŐation ZeplaĐement ϱϬ͕ϬϬϬΨ ͲΨ ϯϬϬ͕ϬϬϬΨ ͲΨ ͲΨ ϱϬ͕ϬϬϬΨ ϯϱϬ͕ϬϬϬΨ
ϭϯϵ DaƐter salve anĚ &loǁ ^enƐinŐ InƐtallationƐ ϭϬϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ͲΨ ϭϬϬ͕ϬϬϬΨ ϭϬϬ͕ϬϬϬΨ
ϭϰϬ DeaĚoǁ ParŬ džerĐiƐeͬPar CoƵrƐe ƋƵipment ZeplaĐement ͲΨ ͲΨ ͲΨ ͲΨ ϮϬϬ͕ϬϬϬΨ ͲΨ ϮϬϬ͕ϬϬϬΨ
ϭϰϭ DiƐƐion Planja ZailinŐ hpŐraĚe ϯϱ͕ϬϬϬΨ ϯϱ͕ϬϬϬΨ ϯϱ͕ϬϬϬΨ ϯϱ͕ϬϬϬΨ ϯϱ͕ϬϬϬΨ ϳϬ͕ϬϬϬΨ ϭϳϱ͕ϬϬϬΨ
ϭϰϮ DitĐŚell ParŬ ZeplaĐement ZeƐtroom oorƐ ͲΨ ͲΨ ͲΨ ϭϬϬ͕ϬϬϬΨ ͲΨ ͲΨ ϭϬϬ͕ϬϬϬΨ
ϭϰϯ ParŬƐ PlaLJ ^ƵrĨaĐinŐ ϴϬ͕ϬϬϬΨ ϲϬ͕ϬϬϬΨ ϲϬ͕ϬϬϬΨ ϲϬ͕ϬϬϬΨ ϲϬ͕ϬϬϬΨ ϭϰϬ͕ϬϬϬΨ ϯϮϬ͕ϬϬϬΨ
ϭϰϰ ^anta ZoƐa arďeĐƵe ZeplaĐementƐ ͲΨ ͲΨ ϰϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϰϬ͕ϬϬϬΨ
ϭϰϱ ^anta ZoƐa ParŬ DonƵment ^iŐn ͲΨ ϮϬ͕ϬϬϬΨ ϳϱ͕ϬϬϬΨ ͲΨ ͲΨ ϮϬ͕ϬϬϬΨ ϵϱ͕ϬϬϬΨ
ϭϰϲ ^inƐŚeimer ,illƐiĚe tƵrĨ (ϱ LJear ĐLJĐle)ͲΨ ͲΨ ͲΨ ϳϱ͕ϬϬϬΨ ͲΨ ͲΨ ϳϱ͕ϬϬϬΨ
ϭϰϳ ^inƐŚeimer oƵtĨielĚ ǁall replaĐement ͲΨ ͲΨ ͲΨ ϳϱ͕ϬϬϬΨ ͲΨ ͲΨ ϳϱ͕ϬϬϬΨ
ϭϰϴ ^inƐŚeimer PlaLJŐroƵnĚ dƵrĨ anĚ ^oĨt ^ƵrĨaĐe ZeplaĐement ͲΨ ͲΨ ͲΨ ͲΨ ϳ͕ϱϬϬΨ ͲΨ ϳ͕ϱϬϬΨ
ϭϰϵ ^inƐŚeimer ^taĚiƵm leaĐŚerƐ ͲΨ ͲΨ ͲΨ ϭϬϬ͕ϬϬϬΨ ϳϬϬ͕ϬϬϬΨ ͲΨ ϴϬϬ͕ϬϬϬΨ
ϭϱϬ ^inƐŚeimer ^taĚiƵm &enĐinŐ ͲΨ ͲΨ ͲΨ ϱϬ͕ϬϬϬΨ ͲΨ ͲΨ ϱϬ͕ϬϬϬΨ
ϭϱϭ ^inƐŚeimer ^taĚiƵm >iŐŚtinŐ ĚĚition ͲΨ ϳϱ͕ϬϬϬΨ ͲΨ ϲϬϬ͕ϬϬϬΨ ͲΨ ϳϱ͕ϬϬϬΨ ϲϳϱ͕ϬϬϬΨ
ϭϱϮ tater ^tationƐ anĚ ^ƵpplLJ >ineƐ ϯϬ͕ϬϬϬΨ ϯϬ͕ϬϬϬΨ ϯϬ͕ϬϬϬΨ ϯϬ͕ϬϬϬΨ ϯϬ͕ϬϬϬΨ ϲϬ͕ϬϬϬΨ ϭϱϬ͕ϬϬϬΨ
ϭϱϯ 22 ATP - South/King Crossing 500,000$ -$ -$ -$ -$ 500,000$ 500,000$
ϭϱϰ 23 California & Taft Roundabout 500,000$ -$ 3,022,000$ -$ -$ 500,000$ 3,522,000$
ϭϱϱ 24 Development Related Park Improvements 500,000$ 5,423,642$ 250,000$ -$ -$ 5,923,642$ 6,173,642$
ϭϱϲ KrĐƵtt rea Ͳ >inear ParŬ ϱϬϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ͲΨ ϱϬϬ͕ϬϬϬΨ ϱϬϬ͕ϬϬϬΨ
ϭϱϳ KrĐƵtt rea Ͳ EeiŐŚďorŚooĚ ParŬ ͲΨ ϱ͕ϰϮϯ͕ϲϰϮΨ ͲΨ ͲΨ ͲΨ ϱ͕ϰϮϯ͕ϲϰϮΨ ϱ͕ϰϮϯ͕ϲϰϮΨ
ϭϱϴ KrĐƵtt rea Ͳ PoĐŬet ParŬ ͲΨ ͲΨ ϮϱϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϮϱϬ͕ϬϬϬΨ
ϭϱϵ 25 Active Transportation Plan Implementation 435,000$ 550,000$ 520,000$ 2,400,000$ 2,400,000$ 985,000$ 6,305,000$
ϭϲϬ Đtive dranƐportation Plan dier ϭ EetǁorŬ Implementation ϱϬ͕ϬϬϬΨ ϱϬ͕ϬϬϬΨ ϭϬϬ͕ϬϬϬΨ Ϯ͕ϬϬϬ͕ϬϬϬΨ Ϯ͕ϬϬϬ͕ϬϬϬΨ ϭϬϬ͕ϬϬϬΨ ϰ͕ϮϬϬ͕ϬϬϬΨ
ϭϲϭ rea ^ealinŐ ProũeĐtƐ Complete ^treet ComponentƐ Ϯϴϱ͕ϬϬϬΨ ϮϬϬ͕ϬϬϬΨ ϮϬϬ͕ϬϬϬΨ ϮϬϬ͕ϬϬϬΨ ϮϬϬ͕ϬϬϬΨ ϰϴϱ͕ϬϬϬΨ ϭ͕Ϭϴϱ͕ϬϬϬΨ
ϭϲϮ iĐLJĐle &aĐilitLJ ImprovementƐ ϱϱ͕ϬϬϬΨ ϭϱϬ͕ϬϬϬΨ ϭϬϬ͕ϬϬϬΨ ϭϬϬ͕ϬϬϬΨ ϭϬϬ͕ϬϬϬΨ ϮϬϱ͕ϬϬϬΨ ϱϬϱ͕ϬϬϬΨ
ϭϲϯ iŬeƐŚare ^LJƐtem Implementation ͲΨ ͲΨ ϮϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϮϬ͕ϬϬϬΨ
ϭϲϰ PeĚeƐtrian &aĐilitLJ ImprovementƐ ϰϱ͕ϬϬϬΨ ϭϱϬ͕ϬϬϬΨ ϭϬϬ͕ϬϬϬΨ ϭϬϬ͕ϬϬϬΨ ϭϬϬ͕ϬϬϬΨ ϭϵϱ͕ϬϬϬΨ ϰϵϱ͕ϬϬϬΨ
ϭϲϱ 26 Urban Forest Maintenance 420,000$ 440,000$ 450,000$ 450,000$ 450,000$ 860,000$ 2,210,000$
ϭϲϲ 27 Water Meters and Boxes 335,000$ 343,000$ 350,000$ 350,000$ 350,000$ 678,000$ 1,728,000$
ϭϲϳ 28 Parking Enforcement Equipment at Gate Entry 300,000$ -$ -$ -$ -$ 300,000$ 300,000$
ϭϲϴ 29
ATP - Railroad Safety Trail (Orcutt to Tiburon) and Bullock Culvert
Replacement 300,000$ 100,000$ 2,000,000$ -$ -$ 400,000$ 2,400,000$
ϭϲϵ 30 Parking Lot Maintenance 285,000$ 745,000$ 515,000$ 1,330,000$ 615,000$ 1,030,000$ 3,490,000$
ϭϳϬ amon 'arĐia ^portƐ &ielĚ Compledž ͲΨ ϭϯϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϭϯϬ͕ϬϬϬΨ ϭϯϬ͕ϬϬϬΨ
ϭϳϭ &ire ^tation Ϯ ϱϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ͲΨ ϱϬ͕ϬϬϬΨ ϱϬ͕ϬϬϬΨ
ϭϳϮ :oŚnƐon ParŬ ͲΨ ϱϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϱϬ͕ϬϬϬΨ ϱϬ͕ϬϬϬΨ
ϭϳϯ >aŐƵna >aŬe ͲΨ ͲΨ ϳϱ͕ϬϬϬΨ ϭ͕ϮϱϬ͕ϬϬϬΨ ͲΨ ͲΨ ϭ͕ϯϮϱ͕ϬϬϬΨ
ϭϳϰ >aŐƵna >aŬe 'olĨ CoƵrƐe ͲΨ ͲΨ ͲΨ ͲΨ Ϯϱ͕ϬϬϬΨ ͲΨ Ϯϱ͕ϬϬϬΨ
ϭϳϱ >ƵĚǁiĐŬ CommƵnitLJ Center ͲΨ ϭϬ͕ϬϬϬΨ ϰϬϬ͕ϬϬϬΨ ͲΨ ͲΨ ϭϬ͕ϬϬϬΨ ϰϭϬ͕ϬϬϬΨ
ϭϳϲ DeaĚoǁ ParŬ ϭϳϱ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ͲΨ ϭϳϱ͕ϬϬϬΨ ϭϳϱ͕ϬϬϬΨ
ϭϳϳ Dinor Zepair oĨ CitLJ ParŬinŐ >otƐ ϰϬ͕ϬϬϬΨ ϰϬ͕ϬϬϬΨ ϰϬ͕ϬϬϬΨ ϰϬ͕ϬϬϬΨ ϰϬ͕ϬϬϬΨ ϴϬ͕ϬϬϬΨ ϮϬϬ͕ϬϬϬΨ
ϭϳϴ DitĐŚell ParŬ anĚ ^>K ^enior CitinjenƐ Center ϭϬ͕ϬϬϬΨ ϯϱ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϰϱ͕ϬϬϬΨ ϰϱ͕ϬϬϬΨ
ϭϳϵ Eeǁ parŬinŐ lot DaintenanĐe ProũeĐtƐ ͲΨ ͲΨ ͲΨ ͲΨ ϮϬϬ͕ϬϬϬΨ ͲΨ ϮϬϬ͕ϬϬϬΨ
ϭϴϬ ^anta ZoƐa ParŬ ͲΨ ϰϬϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϰϬϬ͕ϬϬϬΨ ϰϬϬ͕ϬϬϬΨ
ϭϴϭ ^inƐŚeimer ParŬ ͲΨ ͲΨ ͲΨ ϰϬ͕ϬϬϬΨ ϯϱϬ͕ϬϬϬΨ ͲΨ ϯϵϬ͕ϬϬϬΨ
ϭϴϮ dŚroop ParŬ ϭϬ͕ϬϬϬΨ ϴϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϵϬ͕ϬϬϬΨ ϵϬ͕ϬϬϬΨ
ϭϴϯ 31 Water Utility Trench Repair 280,000$ 280,000$ 280,000$ 280,000$ 280,000$ 560,000$ 1,400,000$
ϭϴϰ 32 Water Valve Cover Adjustments 276,000$ 35,000$ 35,000$ 35,000$ 35,000$ 311,000$ 416,000$
ϭϴϱ 33 Sewer-main Replacement: Morro, Mill, Santa Rosa, and Chorro 253,000$ -$ -$ -$ -$ 253,000$ 253,000$
ϭϴϲ 34 Water Distribution System - Point Repairs 250,000$ -$ 250,000$ -$ 250,000$ 250,000$ 750,000$
Table 69 (continued)
)LQDQFLDO 3ODQ 3DJH Page 63 of 69
Capital Improvement Plan (CIP)
ID CIP #Project/Task 2023-24 2024-25 2025-26 2026-27 2027-28 2-Year Totals 5-Year Totals
ϭϴϳ 35 Water Treatment Plant – Asset Replacement 245,000$ 115,000$ 145,000$ 45,000$ 140,000$ 360,000$ 690,000$
ϭϴϴ ĐtiĨlo PolLJ lenĚ hnitƐ ϳϱ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ͲΨ ϳϱ͕ϬϬϬΨ ϳϱ͕ϬϬϬΨ
ϭϴϵ CŚlorine DeterinŐ PƵmp ^ŬiĚ at CŚemiĐal &eeĚ Zoom ϱϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ͲΨ ϱϬ͕ϬϬϬΨ ϱϬ͕ϬϬϬΨ
ϭϵϬ CitLJǁorŬƐ InteŐration (ǁater)ͲΨ ϵϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϵϬ͕ϬϬϬΨ ϵϬ͕ϬϬϬΨ
ϭϵϭ ContaĐt aƐin rain Zepair Ͳ Knjone ^LJƐtem ͲΨ ͲΨ ͲΨ ͲΨ ϵϱ͕ϬϬϬΨ ͲΨ ϵϱ͕ϬϬϬΨ
ϭϵϮ PaĐŬaŐe dŚiĐŬener ͲΨ Ϯϱ͕ϬϬϬΨ ϭϬϬ͕ϬϬϬΨ ͲΨ ͲΨ Ϯϱ͕ϬϬϬΨ ϭϮϱ͕ϬϬϬΨ
ϭϵϯ Pipe 'allerLJ CoatinŐƐ ͲΨ ͲΨ ϰϱ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϰϱ͕ϬϬϬΨ
ϭϵϰ PƵrĐŚaƐe ^pare dP^ pƵmp͕ motor͕ anĚ s&ϭϮϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ͲΨ ϭϮϬ͕ϬϬϬΨ ϭϮϬ͕ϬϬϬΨ
ϭϵϱ tater dreatment Plant Ͳ &aĐilitLJ ƐƐet ZeplaĐement ͲΨ ͲΨ ͲΨ ϰϱ͕ϬϬϬΨ ϰϱ͕ϬϬϬΨ ͲΨ ϵϬ͕ϬϬϬΨ
ϭϵϲ 36
Waterline Replacement: Santa Rosa - Stenner Creek Road to
Highland 30-inch Pipeline 230,000$ -$ 8,230,000$ -$ -$ 230,000$ 8,460,000$
ϭϵϳ 37 Annual Public Art Maintenance and Projects 225,000$ 200,000$ 100,000$ 100,000$ 100,000$ 425,000$ 725,000$
ϭϵϴ PƵďliĐ rt nnƵal ƐƐet DaintenanĐe ϯϬ͕ϬϬϬΨ ϯϬ͕ϬϬϬΨ ϯϬ͕ϬϬϬΨ ϯϬ͕ϬϬϬΨ ϯϬ͕ϬϬϬΨ ϲϬ͕ϬϬϬΨ ϭϱϬ͕ϬϬϬΨ
ϭϵϵ ^mall PƵďliĐ rt ProũeĐtƐ ϭϳϱ͕ϬϬϬΨ ϭϱϬ͕ϬϬϬΨ ϱϬ͕ϬϬϬΨ ϱϬ͕ϬϬϬΨ ϱϬ͕ϬϬϬΨ ϯϮϱ͕ϬϬϬΨ ϰϳϱ͕ϬϬϬΨ
ϮϬϬ htilitLJ odž eaƵtiĨLJ ϮϬ͕ϬϬϬΨ ϮϬ͕ϬϬϬΨ ϮϬ͕ϬϬϬΨ ϮϬ͕ϬϬϬΨ ϮϬ͕ϬϬϬΨ ϰϬ͕ϬϬϬΨ ϭϬϬ͕ϬϬϬΨ
ϮϬϭ 38 Fleet Replacement: Utilities 220,000$ 150,000$ 948,772$ 87,500$ 1,568,000$ 370,000$ 2,974,272$
ϮϬϮ &leet ^erviĐeƐ seŚiĐle >iĨt ͲΨ ͲΨ ͲΨ ͲΨ ϯ͕ϬϬϬΨ ͲΨ ϯ͕ϬϬϬΨ
ϮϬϯ ϴϳϵ ĚminiƐtration PriƵƐ ͲΨ ͲΨ ϰϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϰϬ͕ϬϬϬΨ
ϮϬϰ oat drailer ͲΨ ͲΨ ͲΨ ϳ͕ϱϬϬΨ ͲΨ ͲΨ ϳ͕ϱϬϬΨ
ϮϬϱ nvironmental ComplianĐe Ͳ PiĐŬƵp ͲΨ ͲΨ ͲΨ ͲΨ ϳϬ͕ϬϬϬΨ ͲΨ ϳϬ͕ϬϬϬΨ
ϮϬϲ nvironmental ComplianĐe Ͳ ^eĚan ͲΨ ͲΨ ͲΨ ϰϬ͕ϬϬϬΨ ͲΨ ͲΨ ϰϬ͕ϬϬϬΨ
ϮϬϳ &leet Ͳ ϰdžϰ ϯͬϰ don drƵĐŬ ǁͬhtilitLJ odž Θ Crane ͲΨ ͲΨ ϳϱ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϳϱ͕ϬϬϬΨ
ϮϬϴ &leet Ͳ ϰdžϰ ^hs Ͳ :eep ͲΨ ͲΨ ϲϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϲϬ͕ϬϬϬΨ
ϮϬϵ &leet Ͳ oƐton tŚaler ͲΨ ͲΨ ͲΨ ϰϬ͕ϬϬϬΨ ͲΨ ͲΨ ϰϬ͕ϬϬϬΨ
ϮϭϬ &leet Ͳ &ϭϱϬ ϰdžϰ PiĐŬͲƵp ͲΨ ͲΨ ϳϲ͕ϱϳϮΨ ͲΨ ͲΨ ͲΨ ϳϲ͕ϱϳϮΨ
Ϯϭϭ &leet ^erviĐeƐ seŚiĐle >iĨt ͲΨ ͲΨ Ϯ͕ϮϬϬΨ ͲΨ ͲΨ ͲΨ Ϯ͕ϮϬϬΨ
ϮϭϮ ^eǁer tZZ& CompaĐt PiĐŬƵp ͲΨ ͲΨ ͲΨ ͲΨ ϲϬ͕ϬϬϬΨ ͲΨ ϲϬ͕ϬϬϬΨ
Ϯϭϯ ^eǁer ttC> Portaďle PƵmp ϴϱ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ͲΨ ϴϱ͕ϬϬϬΨ ϴϱ͕ϬϬϬΨ
Ϯϭϰ taƐte tater ColleĐtionƐ Ƶmp drƵĐŬ ͲΨ ͲΨ ͲΨ ͲΨ ϮϱϬ͕ϬϬϬΨ ͲΨ ϮϱϬ͕ϬϬϬΨ
Ϯϭϱ taƐteǁater ColleĐtionƐ Caterpillar džĐavator ͲΨ ͲΨ ͲΨ ͲΨ ϳϬ͕ϬϬϬΨ ͲΨ ϳϬ͕ϬϬϬΨ
Ϯϭϲ tater iƐtriďƵtion aĐŬŚoe ͲΨ ͲΨ ͲΨ ͲΨ ϮϱϬ͕ϬϬϬΨ ͲΨ ϮϱϬ͕ϬϬϬΨ
Ϯϭϳ tater iƐtriďƵtion CompaĐt piĐŬƵp ͲΨ ͲΨ ϲϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϲϬ͕ϬϬϬΨ
Ϯϭϴ tater iƐtriďƵtion CompaĐt PiĐŬƵpƐ ͲΨ ͲΨ ϭϮϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϭϮϬ͕ϬϬϬΨ
Ϯϭϵ tater iƐtriďƵtion DeƐƐaŐe oarĚ ͲΨ ͲΨ ͲΨ ͲΨ ϰϬ͕ϬϬϬΨ ͲΨ ϰϬ͕ϬϬϬΨ
ϮϮϬ tater iƐtriďƵtion PiĐŬƵp ͲΨ ͲΨ ͲΨ ͲΨ ϳϬ͕ϬϬϬΨ ͲΨ ϳϬ͕ϬϬϬΨ
ϮϮϭ tater iƐtriďƵtion ^erviĐe drƵĐŬ ͲΨ ͲΨ ϱϬϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϱϬϬ͕ϬϬϬΨ
ϮϮϮ tater iƐtriďƵtion ^erviĐe drƵĐŬ ͲΨ ͲΨ ͲΨ ͲΨ ϯϳϱ͕ϬϬϬΨ ͲΨ ϯϳϱ͕ϬϬϬΨ
ϮϮϯ tater iƐtriďƵtion ^ŬiĚ >oaĚer ͲΨ ͲΨ ͲΨ ͲΨ ϲϬ͕ϬϬϬΨ ͲΨ ϲϬ͕ϬϬϬΨ
ϮϮϰ tater iƐtriďƵtion drailer ͲΨ ͲΨ ϭϱ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϭϱ͕ϬϬϬΨ
ϮϮϱ tater iƐtriďƵtion salve tƵrninŐ trailer ͲΨ ϭϱϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϭϱϬ͕ϬϬϬΨ ϭϱϬ͕ϬϬϬΨ
ϮϮϲ tŚale ZoĐŬ htilitLJ draĐtor ϳϱ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ͲΨ ϳϱ͕ϬϬϬΨ ϳϱ͕ϬϬϬΨ
ϮϮϳ tZZ& htilitLJ CartƐ ͲΨ ͲΨ ͲΨ ͲΨ ϭϲϱ͕ϬϬϬΨ ͲΨ ϭϲϱ͕ϬϬϬΨ
ϮϮϴ tdP ϭͬϮ ton Creǁ Caď ϰyϰ PiĐŬƵp ͲΨ ͲΨ ͲΨ ͲΨ ϳϱ͕ϬϬϬΨ ͲΨ ϳϱ͕ϬϬϬΨ
ϮϮϵ tdP CompaĐt PiĐŬƵp ϲϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ͲΨ ϲϬ͕ϬϬϬΨ ϲϬ͕ϬϬϬΨ
ϮϯϬ ttC PiĐŬƵp ͲΨ ͲΨ ͲΨ ͲΨ ϴϬ͕ϬϬϬΨ ͲΨ ϴϬ͕ϬϬϬΨ
Ϯϯϭ 39 Emerson Park Amenity Upgrades and Beautification 200,000$ -$ -$ -$ -$ 200,000$ 200,000$
ϮϯϮ 40 Fire Station 3&4 Remodel Space Study and Design 200,000$ -$ 1,000,000$ -$ -$ 200,000$ 1,200,000$
Ϯϯϯ 41 ATP - Foothill Boulevard Complete Street Project 200,000$ -$ 2,400,000$ -$ -$ 200,000$ 2,600,000$
Ϯϯϰ 42 ATP - Orcutt Road Railroad Crossing Upgrades 200,000$ -$ 500,000$ -$ -$ 200,000$ 700,000$
Ϯϯϱ 43 Sewer Lift Station Maintenance 200,000$ -$ 80,000$ -$ 80,000$ 200,000$ 360,000$
Ϯϯϲ 44 Development Agreement - City Share 200,000$ -$ 850,000$ 560,000$ 2,300,000$ 200,000$ 3,910,000$
Ϯϯϳ 45 Pismo Street Retaining Wall - Storm Response 200,000$ -$ 1,700,000$ -$ -$ 200,000$ 1,900,000$
Ϯϯϴ 46 Water Treatment Plant - Major Equipment Maintenance 189,000$ 180,000$ 180,000$ 180,000$ 180,000$ 369,000$ 909,000$
Ϯϯϵ CŚemiĐal ^LJƐtem DaintenanĐe ϯϯ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ͲΨ ϯϯ͕ϬϬϬΨ ϯϯ͕ϬϬϬΨ
ϮϰϬ Knjone ^LJƐtem DaintenanĐe ϭϱϲ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ͲΨ ϭϱϲ͕ϬϬϬΨ ϭϱϲ͕ϬϬϬΨ
Ϯϰϭ tdP Daũor DaintenanĐe ͲΨ ϭϴϬ͕ϬϬϬΨ ϭϴϬ͕ϬϬϬΨ ϭϴϬ͕ϬϬϬΨ ϭϴϬ͕ϬϬϬΨ ϭϴϬ͕ϬϬϬΨ ϳϮϬ͕ϬϬϬΨ
ϮϰϮ 47 Sewer Maintenance Cover Adjustments 180,000$ 30,000$ 30,000$ 30,000$ 30,000$ 210,000$ 300,000$
Ϯϰϯ 48 Higuera St. Widening - Bridge to Elks 180,000$ -$ -$ -$ -$ 180,000$ 180,000$
Ϯϰϰ 49 Electric Vehicle Charging Station at Various Facilities 175,000$ 100,000$ 150,000$ 150,000$ 150,000$ 275,000$ 725,000$
Ϯϰϱ 50 Open Space Acquisition 175,000$ 150,000$ 250,000$ 150,000$ 150,000$ 325,000$ 875,000$
Ϯϰϲ 51 Open Space Maintenance 170,000$ 170,000$ 170,000$ 170,000$ 320,000$ 340,000$ 1,000,000$
Ϯϰϳ 'eneral Kpen ^paĐe DaintenanĐe ϭϮϬ͕ϬϬϬΨ ϭϮϬ͕ϬϬϬΨ ϭϮϬ͕ϬϬϬΨ ϭϮϬ͕ϬϬϬΨ ϭϮϬ͕ϬϬϬΨ ϮϰϬ͕ϬϬϬΨ ϲϬϬ͕ϬϬϬΨ
Ϯϰϴ Kpen ^paĐe ClimateͲInĨormeĚ DaintenanĐe ͲΨ ͲΨ ͲΨ ͲΨ ϭϱϬ͕ϬϬϬΨ ͲΨ ϭϱϬ͕ϬϬϬΨ
Ϯϰϵ Kpen ^paĐe &enĐinŐ ϱϬ͕ϬϬϬΨ ϱϬ͕ϬϬϬΨ ϱϬ͕ϬϬϬΨ ϱϬ͕ϬϬϬΨ ϱϬ͕ϬϬϬΨ ϭϬϬ͕ϬϬϬΨ ϮϱϬ͕ϬϬϬΨ
ϮϱϬ 52 Bridge Preventative Maintenance 150,000$ 200,000$ 200,000$ 200,000$ 200,000$ 350,000$ 950,000$
Ϯϱϭ 53 Salinas Reservoir Transfer of Ownership Plan 150,000$ -$ -$ -$ -$ 150,000$ 150,000$
ϮϱϮ 54 Silt Removal 150,000$ 150,000$ 150,000$ 150,000$ 150,000$ 300,000$ 750,000$
Ϯϱϯ 55 WRRF Power Cogeneration Upgrade 150,000$ -$ 1,475,000$ -$ -$ 150,000$ 1,625,000$
Ϯϱϰ 56 WRRF - Building Maintenance 150,000$ -$ 825,000$ -$ -$ 150,000$ 975,000$
Ϯϱϱ >aď Ěmin ,sC ͲΨ ͲΨ ϳϱ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϳϱ͕ϬϬϬΨ
Ϯϱϲ tZZ& Ͳ ƵilĚinŐ DaintenanĐe ϭϱϬ͕ϬϬϬΨ ͲΨ ϳϱϬ͕ϬϬϬΨ ͲΨ ͲΨ ϭϱϬ͕ϬϬϬΨ ϵϬϬ͕ϬϬϬΨ
Table 69 (continued)
)LQDQFLDO 3ODQ 3DJH Page 64 of 69
Capital Improvement Plan (CIP)
ID CIP #Project/Task 2023-24 2024-25 2025-26 2026-27 2027-28 2-Year Totals 5-Year Totals
Ϯϱϳ 57 Vision Zero Program Implementation 140,000$ 120,000$ 120,000$ 120,000$ 120,000$ 260,000$ 620,000$
Ϯϱϴ 58 Pedestrian and Bicycle Pathway Maintenance 125,000$ 435,000$ 365,000$ 400,000$ 300,000$ 560,000$ 1,625,000$
Ϯϱϵ nĚreǁƐ anĚ :oŚnƐon iŬe PatŚ ͲΨ ϭϬ͕ϬϬϬΨ ϲϱ͕ϬϬϬΨ ͲΨ ͲΨ ϭϬ͕ϬϬϬΨ ϳϱ͕ϬϬϬΨ
ϮϲϬ rooŬpine anĚ ^paniƐŚ KaŬƐ drail ͲΨ ͲΨ ͲΨ ϮϱϬ͕ϬϬϬΨ ͲΨ ͲΨ ϮϱϬ͕ϬϬϬΨ
Ϯϲϭ PatŚǁaLJ DaintenanĐe sarioƵƐ >oĐationƐ ϭϮϱ͕ϬϬϬΨ ϭϱϬ͕ϬϬϬΨ ϭϱϬ͕ϬϬϬΨ ϭϱϬ͕ϬϬϬΨ ϭϱϬ͕ϬϬϬΨ Ϯϳϱ͕ϬϬϬΨ ϳϮϱ͕ϬϬϬΨ
ϮϲϮ Pavement rea Ϯ Θ ϯ iŬe PatŚ ^ealinŐ ͲΨ ͲΨ ͲΨ ͲΨ ϭϱϬ͕ϬϬϬΨ ͲΨ ϭϱϬ͕ϬϬϬΨ
Ϯϲϯ ZailroaĚ ^aĨetLJ drail ͲΨ Ϯϳϱ͕ϬϬϬΨ ϭϱϬ͕ϬϬϬΨ ͲΨ ͲΨ Ϯϳϱ͕ϬϬϬΨ ϰϮϱ͕ϬϬϬΨ
Ϯϲϰ 59 Wastewater Collections System - Point Repairs 120,000$ -$ 120,000$ -$ 120,000$ 120,000$ 360,000$
Ϯϲϱ 60 Sidewalk Replacement and Installation 100,000$ 150,000$ 250,000$ 250,000$ 250,000$ 250,000$ 1,000,000$
Ϯϲϲ CƵrď ZampƐ anĚ ^iĚeǁalŬƐ ϱϬ͕ϬϬϬΨ ϭϬϬ͕ϬϬϬΨ ϭϱϬ͕ϬϬϬΨ ϭϱϬ͕ϬϬϬΨ ϭϱϬ͕ϬϬϬΨ ϭϱϬ͕ϬϬϬΨ ϲϬϬ͕ϬϬϬΨ
Ϯϲϳ ^treet dree ^iĚeǁalŬƐ ϱϬ͕ϬϬϬΨ ϱϬ͕ϬϬϬΨ ϭϬϬ͕ϬϬϬΨ ϭϬϬ͕ϬϬϬΨ ϭϬϬ͕ϬϬϬΨ ϭϬϬ͕ϬϬϬΨ ϰϬϬ͕ϬϬϬΨ
Ϯϲϴ 61
Waterline Replacement: Chorro - Highland to Meinecke 24-inch
Pipeline Replacement 100,000$ 1,900,000$ -$ -$ -$ 2,000,000$ 2,000,000$
Ϯϲϵ 62 871 Marsh Street Structure Maintenance 100,000$ -$ -$ -$ -$ 100,000$ 100,000$
ϮϳϬ 63 Roundabout Public Art Installations 100,000$ 100,000$ 100,000$ 200,000$ 200,000$ 200,000$ 700,000$
Ϯϳϭ 64 842 Palm Parking Structure Maintenance 100,000$ -$ -$ -$ -$ 100,000$ 100,000$
ϮϳϮ 65 License Plate Recognition Replacement 97,000$ -$ -$ -$ -$ 97,000$ 97,000$
Ϯϳϯ 66 Bus Shelter Replacements 90,000$ 90,000$ 90,000$ 90,000$ 90,000$ 180,000$ 450,000$
Ϯϳϰ 67 Street Lights - Annual Asset Maintenance 75,000$ 75,000$ 75,000$ 80,000$ 80,000$ 150,000$ 385,000$
Ϯϳϱ 68 Fleet Replacement: Parks and Recreation 75,000$ -$ 70,000$ 80,000$ 85,000$ 75,000$ 310,000$
Ϯϳϲ 'olĨ CoƵrƐe Doǁer ͲΨ ͲΨ ͲΨ ϴϬ͕ϬϬϬΨ ͲΨ ͲΨ ϴϬ͕ϬϬϬΨ
Ϯϳϳ ParŬƐ anĚ ZeĐ Ěmin CompaĐt PiĐŬƵp ͲΨ ͲΨ ϳϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϳϬ͕ϬϬϬΨ
Ϯϳϴ ParŬƐͲ Doǁer ͲΨ ͲΨ ͲΨ ͲΨ ϴϱ͕ϬϬϬΨ ͲΨ ϴϱ͕ϬϬϬΨ
Ϯϳϵ ParŬƐ draĐtor ttaĐŚmentƐ ϳϱ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ͲΨ ϳϱ͕ϬϬϬΨ ϳϱ͕ϬϬϬΨ
ϮϴϬ 69 Traffic Signs & Striping Maintenance 75,000$ 75,000$ 75,000$ 75,000$ 75,000$ 150,000$ 375,000$
Ϯϴϭ 70 Sewer Lift Station Replacement - Silver City 70,000$ 100,000$ 1,980,000$ -$ -$ 170,000$ 2,150,000$
ϮϴϮ 71 Whale Rock Reservoir - Asset Replacement 67,542$ 128,923$ 45,398$ 20,000$ 220,000$ 196,465$ 481,863$
Ϯϴϯ vaporationͬteatŚer ^tationƐ ͲΨ ͲΨ Ϯϱ͕ϯϵϴΨ ͲΨ ͲΨ ͲΨ Ϯϱ͕ϯϵϴΨ
Ϯϴϰ ZeplaĐement oĨ PienjometerƐ ͲΨ ϭϬϴ͕ϵϮϯΨ ͲΨ ͲΨ ͲΨ ϭϬϴ͕ϵϮϯΨ ϭϬϴ͕ϵϮϯΨ
Ϯϴϱ ZeƐervoir &enĐinŐ ϮϬ͕ϬϬϬΨ ϮϬ͕ϬϬϬΨ ϮϬ͕ϬϬϬΨ ϮϬ͕ϬϬϬΨ ϮϬ͕ϬϬϬΨ ϰϬ͕ϬϬϬΨ ϭϬϬ͕ϬϬϬΨ
Ϯϴϲ ^tillinŐ aƐin ϰϳ͕ϱϰϮΨ ͲΨ ͲΨ ͲΨ ͲΨ ϰϳ͕ϱϰϮΨ ϰϳ͕ϱϰϮΨ
Ϯϴϳ salve ZeplaĐementƐ ͲΨ ͲΨ ͲΨ ͲΨ ϮϬϬ͕ϬϬϬΨ ͲΨ ϮϬϬ͕ϬϬϬΨ
Ϯϴϴ 72 Fire Hydrants 55,000$ 55,000$ 55,000$ 55,000$ 55,000$ 110,000$ 275,000$
Ϯϴϵ 73 Transportation Monitoring & Modeling Update 55,000$ 55,000$ 55,000$ 55,000$ 55,000$ 110,000$ 275,000$
ϮϵϬ 74 Whale Rock Transmission Pipeline Replacement 51,000$ -$ 60,000$ 510,000$ 550,300$ 51,000$ 1,171,300$
Ϯϵϭ 75 Waterline Abandonment & Connections 50,000$ 50,000$ 50,000$ 50,000$ 50,000$ 100,000$ 250,000$
ϮϵϮ 76 Neighborhood Traffic Improvements 45,000$ 30,000$ 30,000$ 30,000$ 30,000$ 75,000$ 165,000$
Ϯϵϯ 77 Banner Arms, Bench Arm Rests, Signs 25,000$ 25,000$ 25,000$ 25,000$ 25,000$ 50,000$ 125,000$
Ϯϵϰ 78 Sewer Utility Trench Repair 25,000$ 25,000$ 25,000$ 25,000$ 25,000$ 50,000$ 125,000$
Ϯϵϱ 79
Sewer-main Replacement: Serrano, Bressi, Dana and Higuera
Pipeline Replacement 25,000$ 1,275,000$ -$ -$ -$ 1,300,000$ 1,300,000$
Ϯϵϲ 80 Laguna Lake Golf Course Maintenance 20,000$ 20,000$ 20,000$ 20,000$ 20,000$ 40,000$ 100,000$
Ϯϵϳ 81 Water Treatment Plant - Water Meter Replacement 10,000$ 30,000$ 54,800$ -$ -$ 40,000$ 94,800$
Ϯϵϴ rLJinŐ eĚ DeterƐ ͲΨ ͲΨ ϰ͕ϴϬϬΨ ͲΨ ͲΨ ͲΨ ϰ͕ϴϬϬΨ
Ϯϵϵ ^alinaƐ tater Deter ͲΨ ͲΨ ϱϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϱϬ͕ϬϬϬΨ
ϯϬϬ tater dreatment Plant Ͳ tater Deter ZeplaĐement ϭϬ͕ϬϬϬΨ ϯϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϰϬ͕ϬϬϬΨ ϰϬ͕ϬϬϬΨ
ϯϬϭ 82 Buchon-Santa Rosa Intersection Improvements -$ -$ 100,000$ -$ -$ -$ 100,000$
ϯϬϮ 83 Sustainable Groundwater Management Act GSP -$ 150,000$ 150,000$ 150,000$ 150,000$ 150,000$ 600,000$
ϯϬϯ 84 Parking Lot Maintenance - Bus Yard -$ 25,000$ 500,000$ -$ -$ 25,000$ 525,000$
ϯϬϰ 85 WRRF - Demolish Old Effluent Structure -$ -$ -$ 50,000$ 495,000$ -$ 545,000$
ϯϬϱ 86 Dalidio Drive Access Improvements -$ -$ -$ 25,000$ 75,000$ -$ 100,000$
ϯϬϲ 87 WRRF Asset Replacement -$ 125,000$ 125,000$ 75,000$ 200,000$ 125,000$ 525,000$
ϯϬϳ CoatinŐ DaintenanĐe ͲΨ ͲΨ ͲΨ Ϯϱ͕ϬϬϬΨ ͲΨ ͲΨ Ϯϱ͕ϬϬϬΨ
ϯϬϴ džiƐtinŐ CoŐen DaintenanĐe (Dϳ)ͲΨ ͲΨ ͲΨ ͲΨ ϭϱϬ͕ϬϬϬΨ ͲΨ ϭϱϬ͕ϬϬϬΨ
ϯϬϵ ZeďƵilĚ InĨlƵent ^torm PƵmpƐ ͲΨ ϳϱ͕ϬϬϬΨ ϳϱ͕ϬϬϬΨ ͲΨ ͲΨ ϳϱ͕ϬϬϬΨ ϭϱϬ͕ϬϬϬΨ
ϯϭϬ hs Ƶlď ZeplaĐement (annƵal replaĐement)ͲΨ ϱϬ͕ϬϬϬΨ ϱϬ͕ϬϬϬΨ ϱϬ͕ϬϬϬΨ ϱϬ͕ϬϬϬΨ ϱϬ͕ϬϬϬΨ ϮϬϬ͕ϬϬϬΨ
ϯϭϭ 88 Waterline Replacement: Highland at UPRR and Cal Poly -$ -$ -$ 850,000$ -$ -$ 850,000$
ϯϭϮ 89 Emily Street Extension -$ -$ -$ -$ 200,000$ -$ 200,000$
ϯϭϯ 90 Prado Road Bridge & Road Widening -$ 18,373,000$ 7,750,000$ -$ -$ 18,373,000$ 26,123,000$
ϯϭϰ 91 Major Facility Replacements -$ 350,000$ 1,040,000$ 3,100,000$ 3,500,000$ 350,000$ 7,990,000$
ϯϭϱ Corporation zarĚ dI ͲΨ ͲΨ ϰϬ͕ϬϬϬΨ ϭ͕ϱϬϬ͕ϬϬϬΨ ͲΨ ͲΨ ϭ͕ϱϰϬ͕ϬϬϬΨ
ϯϭϲ eďt ^erviĐe Ͳ P ZeplaĐement ͲΨ ͲΨ ͲΨ ͲΨ ϯ͕ϱϬϬ͕ϬϬϬΨ ͲΨ ϯ͕ϱϬϬ͕ϬϬϬΨ
ϯϭϳ PoliĐe ƵilĚinŐ ^topͲ'ap ImprovementƐ ͲΨ ͲΨ ͲΨ ϲϬϬ͕ϬϬϬΨ ͲΨ ͲΨ ϲϬϬ͕ϬϬϬΨ
ϯϭϴ PoliĐe ^tation ZeplaĐement ͲΨ ϯϱϬ͕ϬϬϬΨ ϭ͕ϬϬϬ͕ϬϬϬΨ ϭ͕ϬϬϬ͕ϬϬϬΨ ͲΨ ϯϱϬ͕ϬϬϬΨ Ϯ͕ϯϱϬ͕ϬϬϬΨ
ϯϭϵ 92 Downtown Transit Center Rehabilitation (Transit Fund)-$ -$ -$ 140,000$ 1,500,000$ -$ 1,640,000$
ϯϮϬ 93 Climate Action Plan Support - Carshare Program -$ -$ -$ -$ 115,000$ -$ 115,000$
ϯϮϭ 94 Sewer Inflow/Infiltration Reduction -$ 250,000$ 250,000$ 250,000$ 250,000$ 250,000$ 1,000,000$
ϯϮϮ 95 Water Storage Tank Inspection and Cleaning -$ -$ -$ 50,000$ 250,000$ -$ 300,000$
ϯϮϯ 96 Laguna Lake Golf Course Irrigation Improvements -$ -$ -$ -$ 300,000$ -$ 300,000$
ϯϮϰ 97 Lead by Example -$ 100,000$ 78,000$ 765,000$ 570,000$ 100,000$ 1,513,000$
ϯϮϱ ƵilĚinŐ leĐtriĨiĐation Ͳ CitLJ ,all ,eat PƵmp ͲΨ ͲΨ ϳϴ͕ϬϬϬΨ ͲΨ ϱϭϴ͕ϬϬϬΨ ͲΨ ϱϵϲ͕ϬϬϬΨ
ϯϮϲ ƵilĚinŐ leĐtriĨiĐation Ͳ ^ǁim Center ,eat PƵmp ͲΨ ϭϬϬ͕ϬϬϬΨ ͲΨ ϳϲϱ͕ϬϬϬΨ ͲΨ ϭϬϬ͕ϬϬϬΨ ϴϲϱ͕ϬϬϬΨ
ϯϮϳ &ire ^tation ϭ leĐtriĨiĐation ͲΨ ͲΨ ͲΨ ͲΨ ϱϮ͕ϬϬϬΨ ͲΨ ϱϮ͕ϬϬϬΨ
Table 69 (continued)
)LQDQFLDO 3ODQ 3DJH Page 65 of 69
Capital Improvement Plan (CIP)
ID CIP #Project/Task 2023-24 2024-25 2025-26 2026-27 2027-28 2-Year Totals 5-Year Totals
ϯϮϴ 98 Waterline Replacement: Patricia, Highland, and La Entrada -$ -$ -$ 127,000$ 1,397,000$ -$ 1,524,000$
ϯϮϵ 99 City Hall Exterior Lighting -$ -$ 50,000$ 200,000$ -$ -$ 250,000$
ϯϯϬ 100 Old Garden Creek Retaining Wall -$ -$ 175,000$ -$ 800,000$ -$ 975,000$
ϯϯϭ 101 Fleet Replacement: Police -$ 90,000$ 350,000$ 482,000$ 1,201,500$ 90,000$ 2,123,500$
ϯϯϮ Ěmin ^eĚan ͲΨ ͲΨ ͲΨ ͲΨ ϰϱ͕ϬϬϬΨ ͲΨ ϰϱ͕ϬϬϬΨ
ϯϯϯ CommƵniĐationƐ >ieƵtenant seŚiĐle ͲΨ ͲΨ ͲΨ ϲϮ͕ϬϬϬΨ ͲΨ ͲΨ ϲϮ͕ϬϬϬΨ
ϯϯϰ &^d DaveriĐŬ ͲΨ ͲΨ ͲΨ ϲϱ͕ϬϬϬΨ ͲΨ ͲΨ ϲϱ͕ϬϬϬΨ
ϯϯϱ InveƐtiŐationƐ ^eĚan ͲΨ ͲΨ ͲΨ ͲΨ ϲϬ͕ϬϬϬΨ ͲΨ ϲϬ͕ϬϬϬΨ
ϯϯϲ InveƐtiŐationƐ ^eĚan ͲΨ ͲΨ ͲΨ ͲΨ ϲϬ͕ϬϬϬΨ ͲΨ ϲϬ͕ϬϬϬΨ
ϯϯϳ InveƐtiŐationƐ ^hs ͲΨ ͲΨ ͲΨ ϲϱ͕ϬϬϬΨ ͲΨ ͲΨ ϲϱ͕ϬϬϬΨ
ϯϯϴ PoliĐe &^d drƵĐŬ ͲΨ ͲΨ ͲΨ ͲΨ ϳϬ͕ϬϬϬΨ ͲΨ ϳϬ͕ϬϬϬΨ
ϯϯϵ PoliĐe InveƐtiŐationƐ nĐloƐeĚ drailer ͲΨ ͲΨ ͲΨ ͲΨ Ϯϱ͕ϬϬϬΨ ͲΨ Ϯϱ͕ϬϬϬΨ
ϯϰϬ PoliĐe InveƐtiŐationƐ ^eĚan ͲΨ ͲΨ ϰϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϰϬ͕ϬϬϬΨ
ϯϰϭ PoliĐe DotorĐLJĐleƐ ͲΨ ϮϬ͕ϬϬϬΨ ϰϬ͕ϬϬϬΨ ϮϬ͕ϬϬϬΨ ϮϬ͕ϬϬϬΨ ϮϬ͕ϬϬϬΨ ϭϬϬ͕ϬϬϬΨ
ϯϰϮ PoliĐe Patrol leĐtriĐ ^hs ͲΨ ͲΨ ϭϱϬ͕ϬϬϬΨ ϭϱϬ͕ϬϬϬΨ ϭϳϬ͕ϬϬϬΨ ͲΨ ϰϳϬ͕ϬϬϬΨ
ϯϰϯ PoliĐe Patrol ,LJďriĚ ^hs ͲΨ ϳϬ͕ϬϬϬΨ ϭϮϬ͕ϬϬϬΨ ϭϮϬ͕ϬϬϬΨ ϭϮϬ͕ϬϬϬΨ ϳϬ͕ϬϬϬΨ ϰϯϬ͕ϬϬϬΨ
ϯϰϰ PƵďliĐ ^aĨetLJ Doďile CommanĚ seŚiĐleͬCitLJ KC ͲΨ ͲΨ ͲΨ ͲΨ ϱϱϬ͕ϬϬϬΨ ͲΨ ϱϱϬ͕ϬϬϬΨ
ϯϰϱ drƵĐŬ to toǁ tŚe Doďile CommanĚ drailer ͲΨ ͲΨ ͲΨ ͲΨ ϴϭ͕ϱϬϬΨ ͲΨ ϴϭ͕ϱϬϬΨ
ϯϰϲ 102 Sewer-main Replacement: Bee Bee - South Street to Sandercock -$ -$ -$ 400,000$ -$ -$ 400,000$
ϯϰϳ 103 T-3 Water Storage Tank Replacement - High Pressure Zone -$ 900,000$ 500,000$ -$ -$ 900,000$ 1,400,000$
ϯϰϴ 104 Sewer-main Replacement: Broad, Murray, and Chorro -$ -$ -$ -$ 145,000$ -$ 145,000$
ϯϰϵ 105
Sewer-main Replacement: Buchon - Morro to Johnson Pipeline
Replacement -$ -$ -$ 135,000$ 2,485,000$ -$ 2,620,000$
ϯϱϬ 106 Downtown Zig-Zag Lighting -$ -$ -$ 1,100,000$ -$ -$ 1,100,000$
ϯϱϭ 107 Sewer-main Replacement: Chorro - Boysen to Rougeot -$ 250,000$ 2,750,000$ -$ -$ 250,000$ 3,000,000$
ϯϱϮ 108 Sewer-main Replacement: Foothill Siphon -$ -$ 200,000$ 250,000$ 2,750,000$ -$ 3,200,000$
ϯϱϯ 109 Parking Pay Station Installation -$ 600,000$ 600,000$ 600,000$ -$ 600,000$ 1,800,000$
ϯϱϰ 110 Fire Station 4 Metal Building Gym Space -$ -$ 200,000$ -$ -$ -$ 200,000$
ϯϱϱ 111 Corporation Yard Perimeter Fence Replacement -$ -$ 550,000$ -$ -$ -$ 550,000$
ϯϱϲ 112
Sewer-main Replacement: San Jose, Ramona, Monte Vista, and
California -$ 1,225,000$ -$ -$ -$ 1,225,000$ 1,225,000$
ϯϱϳ 113
Laguna Lake Dredging and Sediment Management Project
Implementation -$ 900,000$ -$ 900,000$ -$ 900,000$ 1,800,000$
ϯϱϴ 114 Fleet Replacement: Admin -$ 250,000$ 175,000$ 50,000$ 50,000$ 250,000$ 525,000$
ϯϱϵ CitLJ ,all 'enerator ('EͲϵϳϭϮ)ͲΨ ϭϮϱ͕ϬϬϬΨ ϭϮϱ͕ϬϬϬΨ ͲΨ ͲΨ ϭϮϱ͕ϬϬϬΨ ϮϱϬ͕ϬϬϬΨ
ϯϲϬ CommƵnitLJ s CŚarŐinŐ ͲΨ ͲΨ ϱϬ͕ϬϬϬΨ ϱϬ͕ϬϬϬΨ ϱϬ͕ϬϬϬΨ ͲΨ ϭϱϬ͕ϬϬϬΨ
ϯϲϭ oǁntoǁn CleaninŐ ƋƵipment ͲΨ ϭϮϱ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϭϮϱ͕ϬϬϬΨ ϭϮϱ͕ϬϬϬΨ
ϯϲϮ 115 SLO Creek Walk Maintenance - Lighting, Signage, Irrigation, Plants -$ 250,000$ -$ 250,000$ -$ 250,000$ 500,000$
ϯϲϯ 116 Playground Equipment Replacement -$ -$ 1,100,000$ 1,100,000$ 1,600,000$ -$ 3,800,000$
ϯϲϰ nŚolm PlaLJŐroƵnĚ ƋƵipment ZeplaĐement ͲΨ ͲΨ ͲΨ ϭϬϬ͕ϬϬϬΨ ϱϬϬ͕ϬϬϬΨ ͲΨ ϲϬϬ͕ϬϬϬΨ
ϯϲϱ esaƵl ZanĐŚ PlaLJŐroƵnĚ ͲΨ ͲΨ ϱϬϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϱϬϬ͕ϬϬϬΨ
ϯϲϲ &renĐŚ ParŬ PlaLJŐroƵnĚ ƋƵipment ZeplaĐement ͲΨ ͲΨ ͲΨ ͲΨ ϭϱϬ͕ϬϬϬΨ ͲΨ ϭϱϬ͕ϬϬϬΨ
ϯϲϳ >aŐƵna ,illƐ PlaLJŐroƵnĚ ͲΨ ͲΨ ϭϬϬ͕ϬϬϬΨ ϵϱϬ͕ϬϬϬΨ ͲΨ ͲΨ ϭ͕ϬϱϬ͕ϬϬϬΨ
ϯϲϴ DitĐŚell ParŬ PlaLJŐroƵnĚ ͲΨ ͲΨ ͲΨ ϱϬ͕ϬϬϬΨ ϵϱϬ͕ϬϬϬΨ ͲΨ ϭ͕ϬϬϬ͕ϬϬϬΨ
ϯϲϵ siƐta >aŐo Dini ParŬ PlaLJŐroƵnĚ ͲΨ ͲΨ ϱϬϬ͕ϬϬϬΨ ͲΨ ͲΨ ͲΨ ϱϬϬ͕ϬϬϬΨ
ϯϳϬ 117 Source Water Strategic Plan -$ 90,000$ -$ -$ -$ 90,000$ 90,000$
ϯϳϭ 118 Waterline Replacement: Rockview - Stoneridge to Broad -$ -$ 130,000$ 1,530,000$ -$ -$ 1,660,000$
ϯϳϮ 119 South Street Median Landscaping -$ -$ 550,000$ -$ -$ -$ 550,000$
ϯϳϯ 120 Waterline Replacement: Stenner Canyon at Reservoir -$ -$ 80,000$ 1,100,000$ -$ -$ 1,180,000$
ϯϳϰ 121 Whale Rock Pump Station Electrical Repairs (A and B)-$ 1,960,620$ -$ -$ -$ 1,960,620$ 1,960,620$
ϯϳϱ 122 Downtown Renewal -$ 200,000$ -$ 2,000,000$ -$ 200,000$ 2,200,000$
ϯϳϲ 123 Recycled Waterline at Orcutt Street - Fernwood to Laurel -$ 25,000$ 675,000$ -$ -$ 25,000$ 700,000$
ϯϳϳ 124 WRRF Asset Replacement - Screw Press -$ -$ -$ 200,000$ 3,360,000$ -$ 3,560,000$
ϯϳϴ 125 Recycled Waterline at Tank Farm - Long to Innovation Pipeline -$ -$ -$ 25,000$ 625,000$ -$ 650,000$
ϯϳϵ 126 Recycled Water Annual UV Bulb Replacement -$ 10,000$ 10,000$ 10,000$ 10,000$ 10,000$ 40,000$
ϯϴϬ 127 WTP - Filter Media Replacement and Underdrain Repairs -$ -$ 60,000$ 60,000$ 250,000$ -$ 370,000$
ϯϴϭ 128 Recycled Water Pump Station Maintenance -$ 60,000$ -$ -$ -$ 60,000$ 60,000$
ϯϴϮ 129 Recycled Water Storage Tank -$ -$ -$ -$ 20,000$ -$ 20,000$
383 CIP Reserve 4,000,000$ 4,000,000$ 4,000,000$ 4,000,000$ 4,000,000$ 8,000,000$ 20,000,000$
384 Grand Total 116,020,168$ 67,269,798$ 162,576,880$ 56,196,375$ 62,979,945$ 183,289,966$ 465,043,165$
Table 69 (continued)
)LQDQFLDO 3ODQ 3DJH Page 66 of 69
Administration/IT $10,850
City Attorney $1,425
Finance & Non-Departmental $3,880
Human Resources $2,141
Total $18,297
Internal Services (15%)
Fire $15,274
Police* $22,086
Total $37,360
Public Safety (31%)
Community Development $8,213
Parks & Recreation $5,706
Public Works $17,718
CSG Admin $740
Solid Waste Division $341
Total $32,719
Community Services (27%)
Capital Projects (25%)
$29,728
Debt $1,854
Insurance $6,000
Transfers Out/(In) ($9,930)
Projected Salary Savings ($1,710)
Storm Expenditures Estimate $4,500
CalPERS Additional Payment $2,000
Total $2,714
Other Operating Costs (2%)
General Fund Revenue
General Fund Expenditures
About the Budget
The City of San Luis Obispo follows a
nationally recognized two-year
Financial Plan process. The Financial
Plan links goals and objectives with
resources needed to accomplish
them. Council approval is required for
each year of the budget cycle in
order to appropriate the funding.
City of San Luis Obispo City Hall
919 Palm Street
San Luis Obispo, CA 93401
www. slocity.org | (805) 781-7100
Local Revenue Measure: $30.2 Million (FY 2023-24)
Your City Government at Work
The City of San Luis Obispo is Prepared
Keeps the City
operations running for
three months in case
of a disaster or
unanticipated event
CITY OF SAN LUIS OBISPO
2023-2025 FINANCIAL PLAN
BUDGET IN BRIEF
Budget Process
Community
Outreach Council Goal Setting Budget
Development Proposed Budget Adopted Budget
1 2 3 4 5
Housing and Homelessness
Climate Action, Open Space, and Sustainable Transportation
Diversity, Equity, Inclusion (DEI)
Economic Resiliency, Cultural Vitality and Fiscal Sustainability
MAJOR CITY GOALS In collaboration with local partners, implement initiatives that reinforce a thriving
and sustainable Local economy, support a diverse, inclusive, and vibrant
community, preserve arts and culture, and ensure fiscal responsibility and
sustainable operations
Further our commitment to making San Luis Obispo a welcoming and inclusive
city for all by continuing to incorporate diversity, equity, and inclusion into all
programs and policies.
Support the expansion of housing options for all, and continue to facilitate the production of housing, including the necessary
supporting infrastructure, with an emphasis on affordable and workforce housing as well as accessibly connected development.
Collaborate with local non-profit partners, non-governmental agencies, the county, the state, and federal governments to advocate
for increased funding and implementation of comprehensive and effective strategies to prevent and reduce homelessness.
Proactively address the climate crisis and increase resiliency through the implementation of the Climate Action Plan. Use resources
to reduce greenhouse gas emissions and reach carbon neutrality by 2035, with a focus on the preservation and enhancement of
convenient and equitable alternative and sustainable transportation, the preservation of open space, and equitable access to parks
and open space.
Where do your tax dollars and fee payments go? The City of San Luis Obispo is a full service City and the General Fund budget goes
towards providing essential services to the public. The total General Fund budgeted expenditures are approximately $121 million in FY 2023-
24 and $117 million in FY 2024-25. The FY 2023-24 budget is displayed below (in thousands). The total expenditure budget exceeds the
revenue budget because some one-time expenditures are paid for using the prior year's fund balance.
$120,817
Like most municipalities in California, various tax revenues
provide the largest source of revenue for the General Fund,
financing most general government services. User fees,
grants, and miscellaneous revenue make up the remainder
of the revenue budget. The total General Fund projected
revenues are approximately $116 million in FY 2023-24
and $119 million in FY 2024-25. The FY 2023-24 budget is
displayed at the right.
Sales & Use Tax, $53.3 M
Property Tax, $22.0 M
Transient Occupancy Tax (TOT), $10.7 M
Other Tax & Franchise Revenue, $11.9 M
Fees and Other Revenue, $14.0 M
Storm Reimbursement (Estimate), $4.2 M
Contact Information
Erica A.Stewart...............................Mayor
Jan Marx.................................Vice Mayor
Emily Francis..................Council Member
Michelle Shoresman.......Council Member
Andy Pease....................Council Member
City Manager: Derek Johnson
Finance Director: Emily Jackson
Principal Budget Analyst: Natalie Harnett
City Council
The Local Revenue Measure – also known as Measure G20 – is a one-
and-a-half percent local sales tax. It protects and maintains essential
services and facilities, such as open space preservation, bike lanes and
sidewalks, public safety, neighborhood street paving and code
enforcement, flood protection, senior programs, and other vital services
and capital improvement projects.
MAINTAIN*
*The City's Police Department provides more than traditional public
safety services associated with sworn patrol officers. It also provides
homelessness services, downtown services, a school resource
officer, and pro-active outreach efforts. In fact, over 25% of the
department's staffing costs are for civilian (or non-sworn) staff.
The City is prepared for economic downturns or other unanticipated costs with its reserves including:
General Fund
Reserve
$11.6 Million
Capital
Reserve
$4 Million
Revenue
Stabilization
Reserve
$2 Million
CalPERS 115
Trust Fund
$2 Million
Risk Management
Reserve
$1 Million
Repairs and maintains
City-owned assets if
no other funds are
available
Helps protect the
City from variety of
risks
Supports contribution
to CalPERS and
ensures the City is
able to make its
required unfunded
liability payments
Keeps the City nimble
in case of a potential
economic downturn
View the full 2023-25
Financial Plan at:
www.slocity.org
*Based on 2021-22 data
Page 67 of 69
2023-25 Capital Improvement Plan (CIP)Enterprise Funds
1
2
3
8
6
5
4
7
1
2
3
1
2
3
5
4
1 2
1
2
TRANSIT
UTILITIES
Bus Replacement with Electric Vehicles
Electric Vehicle Charging Infrastructure
1.
2.
WRRF/Wastewater Collection
Maintenance Facility
Waterline: Johnson - Iris to Bishop
WTP Building Maintenance
Water Storage Tank Maintenance
Sewer-main: Taft, Hathaway,
Phillips, Buena Vista, Loomis
1.
2.
3.
4.
5.
COMMUNITY
Mission Plaza Concept Plan
Development Parks Orcutt Area
1.
2.
TO VIEW THE CITY'S INTERACTIVE GIS MAP OF ACTIVE PROJECTS, VISIT SLOCITY.ORG OR SCAN HERE!
Storm Recovery
WATER FUND
SEWER FUND
PARKING FUND
TRANSIT FUND
WATER TREATMENT PLANT (WTP)
2023-25 Major Projects
IINFRASTRUCTURE &
TRANSPORTATION
PARKING 03
Cultural Arts District Parking Structure
Parking Structure Maintenance
Gateless Equipment
1.
2.
3.
2023 Arterial Roads
(various locations)
Storm Response
Prado Road Interchange
California Taft Roundabout
Mid-Higuera Bypass
ATP - Higuera Complete Street
ATP - Railroad Safety Trail
ATP - South/King Crossing
1.
2.
3.
4.
5.
6.
7.
8.
Enterprise Funds, often referred to as "Business Activities" are distinguished from
governmental funds by their similarity to private sector enterprises and are financed
solely through user charges. The City's four largest enterprise funds and their operating
budgets are:
Expenditures
2023-24: $32.0 Million
2024-25: $31.6 Million
Expenditures
2023-24: $23.0 Million
2024-25: $23.8 Million
Expenditures
2023-24: $57.7 Million
2024-25: $10.2 Million
Expenditures
2023-24: $10.3 Million
2024-25: $9.6 Million
The City experienced multiple storms
during the first few months of the 2023
calendar year and while initial damage
assessments have been done, the
number and scope of the repairs
continues to evolve as staff is able to
access impacted areas to fully assess
the extent of the damage. The
overarching strategy for the 2023-25
Financial Plan is to prioritize storm
recovery and prepare for future storm
events. Several emergency repair
projects are already underway and
some will begin in FY 2023-24 or FY
2024-25.
The CIP and its annual implementation of projects is one of the primary functions
of local government.
The CIP enables the City to plan, schedule, and finance capital projects to ensure cost
effectiveness and conformance with established plans and policies. Through its adopted
CIP, the City meets community needs by providing the infrastructure required for
economic vitality, neighborhood wellness, housing, transportation, sustainability, active
and passive recreation, public safety, cleanliness, and other basic amenities.
The map below highlights major upcoming projects and includes the status of projects
currently in progress (as of June 2023).
FY 2023-24:
$116 Million*
FY 2024-25:
$67 Million
Total CIP Budget
(All funding sources combined)
Revenue
2023-24: $28.2 Million
2024-25: $28.6 Million
Revenue
2023-24: $52.6 Million
2024-25: $20.8 Million
Revenue
2023-24: $56.5 Million
2024-25: $10.4 Million
Revenue
2023-24: $11.8 Million
2024-25: $11.9 Million
*Higher than FY 2024-25 due to construction of
Cultural Arts District Parking Structure
ANNUAL ASSET MAINTENANCE
ASSET REPLACEMENT
NEW ASSETS
Page 68 of 69
Tier 1 Network Project Implementation List
No.Project 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
1 RRST (Taft to Pepper)In Construction
2 Anholm Greenway
3 Higuera & Marsh (East of Santa Rosa & west of Nipomo)X
4 Higuera & Marsh (Nipomo to Santa Rosa)X
5 S. Higuera (Marsh to Madonna)X
7 S. Higuera (Madonna to Margarita)
8 S. Higuera (Margarita to Prado)
9 S. Higuera (Prado to Southern Limits)
6 Madonna/S. Higuera Intersection Improvements X
10 Madonna (US 101 Ramps to Higuera)X
11 Madonna (Shared-Use Path from US 101 to Oceanaire)X Complete
12 Oceanaire Greenway (North of Madonna)X In final design. Construction begins Summer 2022
13 Oceanaire Greenway (South of Madonna)In final design. Construction begins Summer 2022
14 Froom Ranch Way (Shared-Use Path from LOVR to Dalidio/Prado)X Complete
15 Prado/Dalidio (Madonna to Froom)X Complete
16 Morro Greenway (Marsh to Mill)X In final design. Construction begins Summer 2022
17 RRST (Tiburon to Orcutt) - Bullock Ranch X Dependent on Developer
18 Santa Barbara (Upham to Broad)X In design
32 Foothill Blvd (Western City Limit to Santa Rosa)
33 Foothill/Santa Rosa Intersection Improvements (Caltrans)
34 Foothill Blvd (Santa Rosa to California)
24 Broad Street (South to Orcutt)
31 California (Marsh to SLO High School)Focused SRTS Plan for SLO High should come first to guide improvements
25 Broad Street (Orcutt to Tank Farm)
26 Broad Street (Tank Farm to Farmhouse)
36 Madonna/Oceanaire Crossing Improvements Significant reconfiguration of complex intersection
29 Prado (Higuera to Serra Meadows)X
27 Prado (Froom to SLO Creek) - Prado I/C Construction date shown as year of completion
22 Tank Farm (Higuera to County Line & County Line to Orcutt)X
23 Tank Farm (Shared-Use Path from Innovation Wy to Santa Fe)600 Tank Farm required to significant design/planning
35 South Street (Broad to Higuera)
37 Tank Farm/Broad Protected Intersection
30 Prado (Serra Meadows to Broad Street)Dependent on Prado Road Extension
TIER 1 BIKEWAYS RANKED BY RIDERSHIP POTENTIAL
I 40%
C 36%
G 26%
E 20%
B 19%
H 17%
D 17%
A 11%
F 11%
Coordinate
w/ Paving
Project
Projects with a start of construction date in black are already budget programmed except for the
S. Higuera project which is a potential mid-budget request item.
Projects with a start of construction date in gray are not yet budget programmed.
START OF CONSTRUCTION
NotesDeveloper
Project
In final design. Construction begins Summer 2022
In design. Currently searching for construction grants
In early design
Item 3, Attachment 5, Page 1 of 1
Note: this list was prioritized by the ATC on 9/16/21 given the pavement schedule available at the time. Since then,the pavement schedule has
been updated and some pavement project timelines have changed. Given these changes, staff will bring this list back to the ATC in early 2025
for input.
Page 69 of 69