HomeMy WebLinkAbout2/8/2025 Item 4a - 2025 Goal Setting Workshop - Staff Agenda CorrespondenceCity of San Luis Obispo, Council Memorandum
City of San Luis Obispo
Council Agenda Correspondence
DATE: February 6, 2025
TO: Mayor and Council
FROM: Greg Hermann, Deputy City Manager
VIA: Whitney McDonald, City Manager
SUBJECT: ITEM # 4a - 2025 Goal Setting Workshop for the 2025-27 Financial Plan
As outlined in the 2025 Council Goal-Setting Workshop Agenda report, staff are providing
two additional documents via agenda correspondence ahead of the workshop. These
documents will support the Council's discussions during the workshop:
1. Major City Goal Update – A comprehensive update on the status of current Major
City Goal efforts, including a list of completed items.
2. Combined Council Pre-Work Submittals – A summary compiled by the third-party
facilitator, combining Councilmembers' pre-work submissions into an overarching
report. This feedback will help the facilitator prepare for Council discussions and
direction during the goal-setting meeting.
Staff are also recommending a slight adjustment to the agenda, which will allow more
time to present the Community Forum results and provide some additional budgetary
context to prepare the Council for the goal-setting discussion:
9:00 a.m. Welcome, Mayor
9:05 a.m Introduction and Budget Context, City Manager and Finance Director
9:20 a.m. Review of Community Input and Forum Results, Staff
9:35 a.m. Agenda Overview/Process and Guidelines, Facilitator
9:40 a.m. Discuss Goals for FY 2025-27 and Review Prioritization, Council
12:00 p.m. Break
12:30 p.m. Discuss Goals for FY 2025-27 and Review Prioritization, Council
2:00 p.m. Public Comment, City Clerk
2:30 p.m. Discuss Next Steps, Council/Staff
Attachments:
A- Major City Goal Update
B- Combined Council Pre-work Submittals
Page 7 of 131
Page 8 of 131
Staff Agenda Correspondence Attachment A:
Major City Goal Update
The tables on the following pages provide a comprehensive update on the status of current Major
City Goal initiatives, including a list of completed items from the 2021-23 Financial Plan, which had
the same overarching goals. The tables include:
1.The current status of the task and updated completion date (if applicable). The statuses are
color-coded:
2.The outcome of the task and whether it has been operationalized
3.Tasks that would require additional resources in the 2025-27 Financial Plan, should the
Council choose to continue them, are highlighted in orange in the right-hand column. Some
of these items were initially funded on a one-time basis during the 2023-25 Financial Plan.
The attachment is divided into four sections:
1.Economic Resiliency, Cultural Vitality and Fiscal Sustainability Page 2
2.Diversity Equity and Inclusion Page 7
3.Housing and Homelessness Page 10
4.Climate Action, Open Space, and Sustainable Transportation Page 14
5.Tasks completed during the 2021-23 Financial Plan Page 20
Historical Major City Goal Investments
The table below presents the estimated additional operating budget appropriations for Major City
Goals from the past two financial plans. However, it does not reflect the total investment in these
goals, as it excludes staff time and overhead costs, which are difficult to quantify. It also does not
account for costs already included in the City’s base budget before the 2021-23 Financial Plan.
On track
Task delayed or potential setbacks with workable solutions
Problems emerged with no solution yet
Major City Goal SOBCs FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25
One-time
DEI 427,232$ 435,102$ -$ -$
Economic Resiliency, Cultural Vitality & Fiscal Sustainability 1,619,857 841,744 606,000 556,000
Climate Action, Open Space, and Sustainable Transportation 269,972 133,337 50,000 50,000
Housing and Homelessness 662,326 595,826 305,000 350,000
Total One-time 2,979,386 2,006,009 961,000 956,000
Ongoing
DEI 178,898 194,995 20,000 25,000
Economic Resiliency, Cultural Vitality & Fiscal Sustainability 211,000 211,000 - -
Climate Action, Open Space, and Sustainable Transportation 327,405 342,265 - -
Housing and Homelessness 461,271 466,400 - -
Total Ongoing 1,178,574$ 1,214,661$ 20,000$ 25,000$ 1,239,661$
Estimated
Cumulative
Ongoing
1 Page 9 of 131
Task/ Action Completion
Date StatusOutcome
1.1 For All Members of the Community
a.Implement the relevant actions in the updated Economic
Development Strategic Plan (EDSP) focusing on those
relevant to Economic Resiliency, Cultural Vitality and Fiscal
Sustainability.
Ongoing
Progress on the EDSP implementation matrix is
published quarterly to the city's website.
https://www.slocity.org/business/economic‐
development/economic‐development‐strategic‐plan
b.Continue to partner with the Office of Sustainability to
implement the economic development related actions in
the Climate Action Plan (CAP) as well as the sustainability
related actions in the updated Economic Development
Strategic Plan (EDSP)
Ongoing The ED&T and Office of Sustainability meet monthly to
coordinate on work.
c.Continue to partner with the Office of Diversity, Equity
and Inclusion (DEI) to implement the economic
development related actions in the DEI major City goal and
planned DEI strategic framework as well as the DEI related
actions in the updated Economic Development Strategic
Plan (EDSP)
Ongoing
ED&T team meets monthly with DEI team to
coordiante. ED&T team met with recipients of the DEI
Business Grant to understand successes/challenges of
the program. Admin worked with the Chamber and Cal
Poly to host an Insight Studio related to DEI Business
Practices in 2024. ED team welcomed 9 new business
owners who are part of a minority community in SLO.
d.Continue to monitor local labor participation in major City
projects and adjust the City's efforts as needed to ensure
local labor participation through the use of Community
Workforce Agreements and other similar tools. Work to
finalize CWA for Prado Overpass and Public Safety Center.
Ongoing
Operationalized. CIP Engineering technician documents
local labor participation based upon contractor bids and
certified payroll on a quarterly basis. Latest data shows
76% of CIP project worker hours are perform by local
workers.
e.Continue to update the employment scorecard and the
economic activity scorecard.Ongoing
Operationalized. Responsibility of the Economic
Development Analyst. Published quarterly on City
website.
1.2 Business Support
a.Continue activations, promotions and programs like "Buy
Local Bonus", "Eat Local Bonus" and "Shop local" to build
economic resiliency through out the City and including
downtown.
Ongoing
Not operationalized. Current funding is one‐time. Buy
Local Bonus program finished 5th successful year in
2024, Restaurant Week hosted in 2024 and shifted to
Restaurant Month in 2025.
b.Continue to work with partners at the Chamber, REACH,
Cal Poly, Downtown SLO, SCORE and others to support the
business community through retention, creation, attraction,
education and communication efforts.
Ongoing
Operationalized. Regular check‐ins with Chamber and
Downtown SLO established. Support for Cal Poly CIE
and Score has continued.
c.Continue to promote the City to tourists, visitors and
locals through the efforts of the TBID and the PCC.Ongoing Ongoing. The Tourism Business Improvement (TBID)
adopted their 2025‐2030 Strategic Plan in January 2025.
d.Continue to focus on efficiency and transparency in the
permitting process through implementation of new tools,
performance management reporting, and enhanced
customer transparency tools. Report recurring performance
measures or permit processing times during General Plan
Annual Report.
Ongoing
Energov enhancements made as well as rolling out E‐
review for building permits. Adding planning and
engineering to E‐review would require additional time
and resources.
e.Ensure broad and inclusive engagement in area and
specific plans updated by the Community Development
Department to represent the needs of local businesses.
Ongoing
ED&T team supported CDD in outreach and
engagement with local businesses and hotel owners for
the Upper Monterey Area Plan work.
f.Conduct outreach and engagement with property owners
and businesses in the Upper Monterey Special Focus Area to
confirm scope in pursuing an area plan consistent with Land
Use Element Policy 8.2.2.
FY25 Q4, In
progress
Outreach and engagement with property owners and
businesses is currently being conducted (online
engagement is ongoing, meetings held on 1/16 and
1/30)
Economic Resiliency, Cultural Vitality &
Fiscal Sustainability
Items notated with orange will require additional
resources to continue in the 2025‐27 Financial Plan
2/8 Staff Agenda Correspondence Attachment A - MCG Update Economic Resilience, Cultural Vitality, Fiscal Sustainability
2 Page 10 of 131
Task/ Action Completion
Date StatusOutcome
g. Continue to support new and expanded private childcare
options through the use of grant funding and other
programs.
Ongoing
Not operationalized. Current funding is one‐time. To
date, the city's grant has created 11 newly licensed
businesses and 116 slots for children, with 8 applicants
pending licensure with potential to create an additional
92 slots.
h. Continue to support the childcare options for school age
children through the City's own programs and programs in
conjunction with other partners.
Ongoing
Youth Services has been able to expand the school
programs and average over 800 participants per day at
the school sites (5).
i. Proactively evaluate and implement after briefing council
on opportunities to partner with Cal Poly, San Luis Coastal
Unified School District and other major employers for
employer supported childcare programs.
Ongoing
Staff collaborated with CP, District, and County, on the
childcare facility feasibility study, as well as supported
the attempt by CP for a facility Uplift Grant (which was
unsuccessfulll in award)
j. Represent the interests of the business community during
the implementation of the broadband strategic plan. Ongoing The ED&T team participated in the evaluation and
selection of the City's partner.
1.3 Downtown Vitality
a. Continue to partner with Downtown SLO to ensure the
promotion, resiliency, growth, and vitality of the Downtown. Ongoing
Collaborated closely with DSLO in response to business
challenges including construction, parking and
visitation. Addressed two large vacancies downtown
through the site selection process and a meeting with a
property owner.
b. Continue to financially and operationally support
Downtown SLO during the winter holidays including
incentivizing private participation through the matching
program.
Complete
FY24: The 47th annual Holiday Parade had 15,000
attendees. FY25: The 48th annual Holiday Parade had
17,000 attendees. City supported activations of Mission
Plaza, including the holiday lights program.
c. Continue to support the Downtown SLO programs like
Clean & Safe, the Ambassadors and homelessness support. Ongoing
Annual contract in place with Downtown SLO along with
ongoing creative collaboration on program
implementation and business responsiveness. DSLO has
renewed the Tree Lighting and Plaque program, and
ED&T collaborated with Public Works to identify eligible
trees in the project area.
d. Develop a Council report and Study Session on downtown
vacancies, the status and possible options to address any
issues identified.
Complete Staff completed Council briefings on downtown
vacancies and vibrancy in Spring 2024.
e. Develop an implementation plan for the recently adopted
Access and Parking Management Plan and begin execution
of the plan.
Ongoing
Work is ongoing within the newly created Mobility
Services Division to execute strategies for Goal 1 of the
APMP (Promote mode shift by making other modes of
travel more attractive than driving alone). The Parking
Rate Study and Technology Roadmap have been
adopted. Rates were reduced and technology roadmap
recommendations are being implemented to execute
strategies for Goal 2 of the APMP (Use parking spaces
efficiently, promote fiscal responsibility, ensure
availability, and improve the customer experience).
f. Begin construction of the Cultural Arts District Parking
Structure.Complete
The Cultural Arts District Parking Structure broke
ground in November and construction is on schedule to
be completed in early 2026.
g. Replace the existing Mission Plaza Restrooms in
compliance with Mission Plaza Concept Plan and Council
Direction.
Q2 FY26 Work is underway and construction is expected to be
completed by end of calendar year 2025
1.4 Support Arts and Culture
2/8 Staff Agenda Correspondence Attachment A - MCG Update Economic Resilience, Cultural Vitality, Fiscal Sustainability
3 Page 11 of 131
Task/ Action Completion
Date StatusOutcome
a. Continue to work with our community partners to ensure
the Cultural Vitality of the City.Ongoing
Worked with over a dozen local arts & cultural
organizations to promote and implement ARTober.
ARTober will return in FY25 Q2. In July 2024, ED&T staff
wrote a letter of support for an Our Town Grant for the
SLO Film Festival at the Palm Theatre. Entered into a
collaborative agreement with ED&T, DSLO, and SLO
County Arts Council to amplify the Art after Dark
program. P&R conducted the local artist workshop
series at the Library Community Room and artist
showcases at the LCC
b. Continue to execute the City's public art master plan. Ongoing
The return of the Utility Box Art program occured in
summer and fall. Partnership with SLOMA brought the
annual rotating sculpture exhibit to Mission Plaza lawn,
and significant work contributed to the Garden Street
Alley art project
c. Ensure that the City promotes the various City and
privately owned art installations through programs like the
public art promotional plan developed by the PCC.
Ongoing
The 8‐month "Art Starts With" campaign was completed
in September which established 8 themed public art
promotional "reels" and garnered over 650k
impressions on social media. FY25 ongoing coordination
with Public Art Coordinator. Commissioned new
photography of additional art installations through the
TBID.
d. Continue to financially support the Arts and Cultural
Activities of the City through the PCC's program and the
additional grant funding via the PCC.
Ongoing
PCC has awarded $100,000 in grant funding to
organizations through the CACP program in FY24. FY25:
CACP program grants were awarded by Council in July
2024.
e. Continue the citywide banner program. Ongoing
Evaluating the addition of a street banner location on
Morro Street. New banners were added in FY25 Q1 for
Independence Day.
f. Continue to support the preservation of the City's adobes,
including work on the La Loma Adobe through a phased
approached intended to ensure that the structure is ready
for active stabilization efforts by 2025.
FY25 Q4
Two keys tasks are underway: 1.) the Friends of La Loma
Adobe (FLLA) have prepared plans for stabilization /
rehabilitation of the structure and developed a scope of
work and cost estimating for a four‐phase "pay as you
go" approach to the project, and 2.) staff have been
working with the neighboring Nelson family and their
consultant, as well as FLLA, to address the historic lot
line discrepency and will return to Council with
recommended next steps by Q4 2025.
g. Initiate implementation of the consultant recommended
phased approach to update the City's historic resources
inventory.
Complete
and ongoing
The City has initiated implementation of the phased
approach to udpate the historic resources inventory. A
consultant was hired in November 2023 and has
conducted multiple study sessions with the CHC. The
consultant is currently finalizing draft documents for
staff review. Staff anticipates bringing the update
forward for CHC review and recommendation in
Summer 2025.
h. Develop a Council Memorandum on the current base
level of economic support for Arts and Cultural activities
across the various departments in the City.
Complete A memo was completed and distributed to Council in
December 2023.
1.5 Practicing Fiscal Responsibility
2/8 Staff Agenda Correspondence Attachment A - MCG Update Economic Resilience, Cultural Vitality, Fiscal Sustainability
4 Page 12 of 131
Task/ Action Completion
Date StatusOutcome
a. Continue to implement and enhance the City's sound
financial management practices to support stability of the
organization and services provided to the community.
Ongoing
This ongoing task is core to the work that the Finance
Department does and will continue regardless of
adopted Major City Goals. In the last two years, staff
has updated various fiscal policies and procedures,
provided City‐wide trainings, developed a set of Budget
Balancing Strategies to guide staff in development of
the City's budget, and continued to make
enhancements to the Oracle ERP.
b. Conduct a Study Session on alternative capital project
delivery options and determine whether Council wishes to
proceed with a Charter Amendment.
Incomplete
This item was deferred due to timing and resource
constraints. Desire for a charter amendment could be
revisited with the next financial plan.
c. Implement a City fee program update.Complete
The User Fee Study and recommended fee changes
were presented to and adopted by Council on July 2,
2024. The updated fees went into effect on October 1,
2024.
d. Implement a Development impact fee (AB1600) study and
update. FY26 Q2
The Development Impact Fee Study has been delayed
due to turnover in staff managing this project. In
addition, there are number of policy level
considerations that need to be discussed with Council
and a study session on this topic is tentatively
scheduled for August 19, 2025. The outcome of the
study session will determine when the study can be
completed and when staff will return to Council for
adoption of the fees.
e. Monitor Public Banking advances and alert the City
Council to major changes. Ongoing
Staff has not provided any formal updates to Council
related to public banking. Due to considerable
economic uncertainty and liabilities associated with the
banking industry, staff would not recommend
establishment of a public bank.
f. Continue to support and prioritize employee development
and growth through investing in resources to train, develop,
and onboard new and transitioning employees.
Ongoing Operationalized and ongoing.
g. Continue to support employees in managing their
workloads by reviewing and prioritizing work efforts, goals,
and balancing trade‐offs for a new workload.
Ongoing Operationalized and ongoing.
h. Continue to evaluate and adjust internal meetings to
create more effective meeting practices.Ongoing Operationalized and ongoing.
i. Continue promoting cross‐department communication
and collaboration amongst employees.Ongoing Operationalized and ongoing.
2/8 Staff Agenda Correspondence Attachment A - MCG Update Economic Resilience, Cultural Vitality, Fiscal Sustainability
5 Page 13 of 131
Task/ Action Completion
Date StatusOutcome
j. Continue to evaluate and enhance the training and
usability of Oracle Cloud, the City's Enterprise Resource
Planning/Human Capital Management software.
Ongoing
The City continues to address compliance and usability
challenges with the Oracle Cloud Enterprise Resource
Planning (ERP) and Human Capital Management (HCM)
system. While progress has been made in resolving core
issues, outstanding concerns remain, particularly with
the payroll system and overall system usability. As a
Software‐as‐a‐Service (SaaS) platform, Oracle Cloud ERP
undergoes frequent updates that pose challenges for
City staff, as these changes are difficult to fully assess
before deployment in the live system. The City remains
committed to evaluating and enhancing training and
system usability to improve efficiency and compliance.
Despite ongoing challenges, in the last six months the
City recently experienced a loss of internal expertise as
two of the three System Application Specialists, the IT
technical resources for Oracle, resigned after securing
consulting positions to implement the Oracle product.
Having invested in their growth and development, the
City now faces the departure of key resources and
subject matter experts in the Oracle system.
2/8 Staff Agenda Correspondence Attachment A - MCG Update Economic Resilience, Cultural Vitality, Fiscal Sustainability
6 Page 14 of 131
Task/ Action Completion
Date StatusOutcome
2.1 Establish Office of DEI
a.Based on the completion of the DEI Strategic Plan, determine
the ongoing support structure needed in the Office of DEI to
optimally deliver organizational and community programs and
services.
Ongoing
Operationalized. The planned programs and operations
of the Office of DEI were evaluated and the contract
Management Fellow was converted to a regular Admin
Specialist position using existing program resources
b.Work with Cal Poly and Cuesta to host interns.Ongoing
Operationalized. The Office of DEI has hosted Cal Poly
students and will continue to expand this effort when
fully staffed.
c.Further develop purpose, role, activities, and enhance impact
of DEI Employee Committee, including equal standing and
priority to tasks and responsibilities assigned to the members
(e.g. ERGs, newsletters, cultural celebrations, trainings, internal
communication, public web pages, etc.).
Complete
Operationalized. The committee has continuously met
and produced internal newsletters in addition to other
activities. Upcoming work includes completing a
committee charter and clarifying roles and
responsibilites.
d.Continue to support and act as the staff liaison to the Human
Relations Commission (HRC).Complete Operationalized. Office of DEI staff will continue to
support for the HRC.
e.Continue to provide grant support to the HRC for DEI High
Impact Grants, Community Development Block Grants and
Human Services Grants and complete necessary follow up and
reporting with grant recipients.
Complete
Operationalized. Office of DEI staff will continue to
support the process for making DEI High Impact Grants,
Community Development Block Grants and Human
Services Grants .
2.2 Develop & Implement DEI Strategic Plan
a.Complete a DEI Strategic Plan for comprehensive DEI
initiatives and programming for the organization and
community based on needs, priorities, and resource
assessments.
Complete
Operationalized. The DEI Strategic Plan was presented to
and approved by Council in February 2024 and is being
implemented. A yearly progress report will presented to
Council.
b.Implementation of prioritized programs as outlined in the DEI
Strategic Plan within available resources.Ongoing Operationalized. Office of DEI staff will be responsibile for
implementing strategic plan tasks.
2.3 Workforce Recruitment & Retention
a.Continue to enhance job descriptions and recruiting materials
such as materials in Spanish or in different formats to easy
access.
Ongoing
Not Operationalized. If there is a desire to create
recruiting materials in Spanish, additional funding would
be required.
b.Assess and develop enhancements processes such as
implementing DEI‐focused screening and interviewing trainings
to personnel and interview panels.
FY25 Q4
Not Operationalized. This task is delayed due to the DEI
Manager turnover. This work will resumed when the
position is hired, but will not be completed this fiscal
year. The hiring managers are currently being
encouraged to include a DEI related interview question,
but it is not required, nor are the questions standardized.
c.Create and rollout DEI‐focused trainings for employees. FY25 Q4
Partially operationalized. Some efforts have been
completed and will be continued when Office of DEI is
fully staffed.
d.Examine policies and programs to support primary caretakers.Ongoing Ongoing effort and operationalized.
e.Continue communicating childcare options and resources for
City employees; additional to First 5 findings. Explore flex
schedules, job share, remote options, etc.
FY25 Q4
The City is continuing to assess childcare options for City
employees. The City does offer flex schedules and are
implementing a formal Telework Policy in FY25 Q3. A job
share program has not yet been developed.
2.4 Inclusive & Equitable Workplace
Diversity, Equity, and Inclusion
Items notated with orange will require additional
resources to continue in the 2025‐27 Financial Plan
2/8 Staff Agenda Correspondence Attachment A - MCG Update Diversity, Equity, Inclusion
7 Page 15 of 131
Task/ Action Completion
Date StatusOutcome
a. Develop and adopt a DEI statement for the organization. Complete
A DEI statement was developed and included in the DEI
Strategic Plan.
b. Develop and implement a DEI module in new hire onboarding
process.FY25 Q4 This task is on schedule to complete
c. Provide DEI‐related training for all staff of all levels (Council,
Commission, Advisory Board, Directors, Managers, Staff, etc.).Ongoing
Partially operationalized. Some efforts have been
completed and will be continued when Office of DEI is
fully staffed.
d. Complete a planning study for gender‐inclusive restroom and
sleeping facilities for Fire Stations 3 & 4. Process with design
work pending results of study.
Complete
Study is complete and gender inclusivity is being
incorporated into design of tenant improvements for Fire
Station 3 & 4.
2.5 Community‐based Policing & Restorative Practices
a. Promote DEI best practices in Police Department (PD)
recruiting and hiring efforts.Ongoing
Partially operationalized. Some efforts have been
completed and will be continued when Office of DEI is
fully staffed.
b. Work in partnership with Facilities and PD to ensure new
public safety building design is equitable and inclusive for the
community and all department employees.
Ongoing
Planning and design work for the Public Safety Building is
on hold until completion of Tenant Improvements at
1106 Walnut. Additional design work for the public safety
building is proposed to be funded as part of the next
Financial Plan CIP budget
c. Continue to work with community partners (PAC and
Roundtable) to give the community a voice in policing and that
21st Century Policing Recommendations are implemented
where possible.
Ongoing
Staff continue to collaborate with both PAC and the
Roundtable. Meetings are held bi‐monthly and quarterly
respectively.
d. Use Community partnerships to help build a 5‐year strategic
plan to create transparency and legitimacy.Complete
In 2024, Police finalized a 5‐Year Strategic Plan with goals
focused on: Service to Community, Community
Engagement, DEI, Recruitment & Retention, Health &
Wellness, and Improving Infrastructure, Equipment &
Technology
2.6 Cal Poly & Cuesta Partnerships
a. Establish bimonthly collaborative and informative meetings
with Cal Poly Office of University Diversity & Inclusion and
Cuesta College Office of Student Equity & Special Programs to
further explore partnerships around education and training.
Ongoing
Partially operationalized. Some efforts have been
completed and will be continued when Office of DEI is
fully staffed.
b. Utilize the Assistant VP for Strategic Planning and Network at
Cal Poly OUDI to research best practices, grants for internships,
programs, outreach, innovative practices, etc.
Ongoing Operationalized. Office of DEI staff are in regular
communication with Cal Poly OUDI.
c. Host City/Cal Poly quarterly roundtable (City & Cal Poly
leadership, DEI Employee Committe e, HRC, Cal Poly students,
DEI Leaders, Cuesta College, etc.) regarding community/student
experience, relationship‐building and partnership programs.
Ongoing
Partially operationalized. Some efforts have been
completed and will be continued when Office of DEI is
fully staffed.
d. Explore and develop shared multicultural programming,
activities, and events with Cal Poly, Cuesta College, and Non‐
profit partners through a pilot and/or pop up multicultural
center experience.
FY25 Q4
The 24‐25 Community Belonging Series is halfway
through. The Office of DEI is promoting the events in
partnership with Cal Poly.
e. Contract to develop a feasibility study for a multicultural
center.FY25 Q4
Recommendations regarding the utility of a multiculural
center will included as a part of the final report on the
Community Belonging Series.
2.7 Access, Inclusion, Support for Underrepresented
Communities
2/8 Staff Agenda Correspondence Attachment A - MCG Update Diversity, Equity, Inclusion
8 Page 16 of 131
Task/ Action Completion
Date StatusOutcome
a.Support the development and implementation of the
Broadband Strategic Plan to ensure access is equitable and
pursue funding to fill gaps.
Ongoing Operationalized. Grant funded implementation of the
Broadband Plan is underway.
b.Continue to provide Community Academy program in even
numbered years including application outreach to
underserved/underrepresented communities.
Complete Operationalized. The Community Academy was offered in
spring 2024.
c.Complete training for applicable staff on the City's updated
Public Engagement & Noticing (PEN) to ensure diverse
participation.
Ongoing
Operationalized. The Public Engagement and Noticing
Manual has been updated and intial trainings completed.
Training will continued to be offered by Communications
and Office of DEI staff.
2.8 Community Education & Programming
a.Review and embed DEI language into existing policies and
procedures, codes of conduct within facilities, parks, programs,
events, and rentals for services provided to the community.
Ongoing
Partially operationalized. Some efforts have been
completed and will be continued when Office of DEI is
fully staffed.
b.Include DEI Manager Financial Planning Steering Committee
meetings.Ongoing Partially operationalized. DEI Manager will be included
when hired.
c.Edit existing and create new policies and procedures that
reflect a DEI lens for internal processes to ensure all City
Departments support the DEI MCG.
Ongoing
Partially operationalized. Some efforts have been
completed and will be continued when Office of DEI is
fully staffed.
d.Provide financial assistance to qualified families through City
funded scholarships for youth related programs such as:
before/after‐school childcare, spring break & summer camps,
swim lessons, and after‐school sport programs.
Ongoing
Over $12,500 in financial scholarships were awarded
from July 1 ‐ January 31 to families for childcare and
youth related programming
2/8 Staff Agenda Correspondence Attachment A - MCG Update Diversity, Equity, Inclusion
9 Page 17 of 131
Task/ Action Completion
Date StatusOutcome
3.1 Housing Element Implementation:
a.Initiate a missing middle housing program that
enables "house‐scale" multi‐family housing
opportunities (duplex, tri‐plex, bungalow court, etc.) in
neighborhoods where existing infrastructure (e.g.
arterial and collector streets) can support additional
infill and intensification and promote complete
neighborhoods.
FY25 Q4
The missing middle housing program has been initiated
and is being implemented through leveraging key state
laws and focused implementation in geographic areas in
combination with other MCG tasks. Implementing state
legislation that directly promotes infill density for small
lot, multi‐unit dwellings and accessory dwelling units has
been accomplished through density bonus law, zoning
and subdivision regulation updates for single‐family
districts (SB9) completed in 2023, and expanding ADUs
and updates for multi‐family districts (SB684) scheduled
March 2025. Focusing additional capacity for missing
middle housing is being accomplished through the
Margarita Are a (3.1.b) and Airport Area (3.1.c) Specific
Plan updates.
b.Initiate an update to the Margarita Area Specific
Plan to include more housing options of all types
(affordable, multi‐family, mixed‐use) on undeveloped
land, and work with property owners on a plan for the
completion of the Prado Road extension to Broad
Street.
Complete
The update has been initiated, and began in July 2024.
The consultant is currently working on MASP
Amendments that would increase density on existing
residentially zoned land and specifically include
opportunities and incentives to develop “Missing Middle”
Housing types as well as allowing mixed‐use development
on commercially zoned land. Additional funding would be
needed to complete the environmental review and public
hearing process for the proposed specific plan
amendments.
c.Initiate an update to the Airport Area Specific Plan to
allow mixed‐use residential development, where
appropriate and consistent with the County Airport
Land Use Plan
Complete
The update has been initiated, and began in October
2024. Amendments to the AASP have been drafted to
allow mixed‐use development in the M and C‐S zones
with a CUP. Conceptual review of the amendment was
presented to the ALUC on January 15, 2025. The ALUC
will review the proposed amendements for conformance
with the ALUP on Feburary 19, 2025 and the Planning
Commission will review the amendments on February 26,
2025. The City Council is scheduled to review the AASP
amendments on May 6, 2025.
d.Conduct a Study Session with the City Council to
identify needs and opportunities across the housing
spectrum, including various types of transitional and
supportive housing options.
Complete Study Session was held on March 5, 2024
e.Develop a scope of work for possible funding as part
of the 2023‐25 Financial Plan Supplement to update
the City's parking requirements in consideration of best
practices that support housing production. Strategies
may include lowering parking minimums, establishing
parking maximums, reducing parking requirements in
areas close to services and transit facilities, and other
proven strategies.
Complete
Staff developed a scope of work for a parking study as
described and worked with several consultants to
understand the budget needed. It was estimated that the
project would cost more than $200,000. Due to this cost,
staff did not recommend that the project move forward
during the Financial Plan supplement process.
Housing and Homelessness
Items notated with orange will require additional
resources to continue in the 2025‐27 Financial Plan
2/8 Staff Agenda Correspondence Attachment A - MCG Update Housing and Homelessnes
10 Page 18 of 131
Task/ Action Completion
Date StatusOutcome
f. Implement Below Market Rate Housing best
practices including leveraging affordable housing fund
revenues, down payment assistance programs,
streamlined processing of loan documents, and
updated policies and procedures.
Complete and
ongoing
This task was completed on September 17, 2024 with the
adoption of an ordinance to update the City's
Development Impact Fee Deferral Program for Eligible
Affordable Housing Projects. Previous implementation
components of this task included leveraging affordable
housing revenues from the State’s Homekey and Pro‐
Housing Incentive programs, developing the Avila Ranch
Downpayment Assistance Program Guidelines, and
updating Below Market Rate Housing Purchase
Guidelines in October 2023.
3.2 Homelessness Response Strategic Plan (HRSP)
Implementation
a. Work collaboratively with County and key
stakeholders to coordinate regional encampment and
street outreach, including an expanded hotel voucher
program to ensure a bridge for temporary emergency
shelter
Complete and
ongoing
A hotel voucher program is funded by the City and
continues to be administered by CAPSLO to address
overflow needs at the 40 Prado Homelessness Services
Center. Emcampments are coordinated between the City,
the County and Caltrans as well as for critical
encampments on private property. This has become
operationalized through the Homelessness Response
Team, however ongoing funding is needed each year for
vouchers.
b. Increase homelessness response communications,
resource sharing, and education, including increased
public use of Ask SLO app
Complete and
ongoing
The City has communicated information to the public
regarding current practice to address homeless
encampments and consistency with recent Supreme
Court rulings and recent orders by the California
Govenor. In June, the City conducted a Community
Forum and distributed a resource guide and FAQs found
on the City's website. The Homelessness Response team
continually responds to public inquiries via AskSLO.
c. Expand implementation of digital encampment
management tool internally and for potential
countywide use or explore using other countywide
systems shared with other regional partners.
Complete and
ongoing
The City implements Compassionate Assistance
Mitigation and Prevention (CAMP) Standards as a
framework to help reduce the negative impacts of
homelessness and coordinates cleanup activities through
an internal management tool (Survey 123). Staff
continue to explore additional options for City outreach
staff to access regional platforms in coordination with
program goals, including HMIS and Octavia.
Homelessness Response staff are also working with the IT
Department to expand the City's internal management
tool to allow outreach teams to track client data and
coordinate outreach and referral efforts.
2/8 Staff Agenda Correspondence Attachment A - MCG Update Housing and Homelessnes
11 Page 19 of 131
Task/ Action Completion
Date StatusOutcome
d. Leverage additional funding from other partner
agencies for Mobile Crisis Unit (MCU) program, and
Community Action Team (CAT) and service expansion;
develop sustainable safe parking programs; and pilot
additional transitional shelter programs with regional
partners
Complete
City staff leverage funding programs include working with
County Behavioral Health and Licensed Pych Tech
program as well as the MediCal Enhanced Care
Management Outreach providers. A Homelessness
Reponse Annual Budget Summary has been developed to
track program funding and to assist in the ongoing dialog
with partner agencies regarding leveraging regional
funds. The Overnight Safe Parking Program at 40 Prado
was expanded to 12 spaces in FY2024 and the Rotating
Overnight Safe Parking Pilot Program for 12 additional
safe parking spaces was approved at Planning
Commission in January 2025. Funding for safe parking
programs would be needed to continue to provide
capacity.
e. Support County and regional partners in pursuing
and implementing funding resources as appropriate
given the City's role for services, and transitional and
permanent supportive housing, including Encampment
Resolution Funding and Project Homekey grants
Complete and
ongoing
The Calle Joaquin Homekey closed escow for acquisition
on September 13, 2024 for 75 units of supportive
housing; and the supportive housing units at the
Anderson Hotel that were at‐risk of loss, have reopened.
The City continues collaboration with SLO County on
transitional and supportive units, such as those expected
in the Welcome Home Village Project.
f. Continue to develop the City's Safe Housing Outreach
and Education Program, including preparation of a
Council Memo on options for protecting renters,
including homelessness prevention strategies.
Complete and
ongoing
On July 2, 2024 a Memorandum on Renter Protections
was released to address what protections are currently
available to renters and what additional measures cities
are permitted to take to protect their renting community.
This information can be found online at
www.slocity.org/housing. Code Enforcement continues to
develop educational materials and strategies for the
public, and these activities can be undertaken by code
enforcement as time and resources allow. Further
development of a program would require additional
resources.
g. Monitor and update the two‐year Homelessness
Response Strategic Plan to align with Countywide Plan
to Reduce Homelessness, other regional and state
opportunities, and in advance of next City financial
plan
Complete
On June 18, 2024 staff provided an update to City Council
on implementation of the 2022‐24 Homelessness
Response Strategic Plan and Council adopted the 2024‐26
plan, which included modifications to strategic objectives,
funding priorities, and key tasks.
3.3 Environmental Clean‐up in Creeks and Open Space
a. Environmental clean‐ups in creek and open space
areas associated with abandoned personal property
and trash. (Funding approved on March 7, 2023)
FY25 Q4
To date in FY24‐25, Parks & Recreation Ranger Services
has addressed 27 encampments in creeks and open
spaces, cleaning up 5,245 pounds of trash.
b. Environmental clean‐ups in City Parks and public
spaces associated with abandoned personal property
and trash. (Funding approved on March 7, 2023)
Ongoing
To date in FY24‐25, Public Works has addressed 71
encampments in City Parks and public spaces, cleaning up
over 50,000 pounds of trash.
3.4 Public Safety
2/8 Staff Agenda Correspondence Attachment A - MCG Update Housing and Homelessnes
12 Page 20 of 131
Task/ Action Completion
Date StatusOutcome
a. Maintain SLOPD bike patrol program as staffing
allows Ongoing
The department is diligently working to ensure the Bike
Patrol program remains staffed and operational in the
downtown area. While staffing challenges have
prevented the program from being fully staffed, we
continue to deploy bike patrols, and they are proving to
be effective. As we actively hire and bring on new
personnel, these staffing issues are being addressed, and
we anticipate improved coverage moving forward.
b. Implement the new Community Service Officer
program over the next fiscal year to ensure
effectiveness and improvements in quality of life
surrounding homelessness issues in the downtown
(funding approved on March 7, 2023)
Complete
The department increased the total number of
Community Service Officers from three to six. Expanding
the CSO program has enabled the department to provide
additional focus efforts in the downtown and still provide
ongoing support to the City. The department's CSO
program is robust and an effecitve use of personnel to
support Patrol, Traffic Safety and CAT.
2/8 Staff Agenda Correspondence Attachment A - MCG Update Housing and Homelessnes
13 Page 21 of 131
Task/ Action Completion
Date StatusOutcome
4.1 Implement the Climate Action Plan and Lead by Example 2023‐25 Work Plans
h.Continue to monitor impacts to Municipal Code 8.11
(All‐Electric New Buildings), and if necessary return to
Council with an alternative approach to achieving the
City's climate action goals as they relate to new buildings.
Complete
Operationalized. Council adopted a new buildings and existing
buildings reach code, which were completed with staff time
and 3CE technical support and are implemented via budgeted
staff time. These will require updating in 2025 and 2026,
which can be done with staff resources.
j.Continue SB 1383 implementation by developing an
inspection and enforcement program and complying with
procurement requirements for organic waste and paper
as called for in CAP Circular Economy task 1.1.A and
1.1.B.
Ongoing
Compliance with SB 1383 continues to be monitored and
enforced by City staff and through partnerships with San Luis
Garbage Company and the SLO County Integrated Waste
Management Authority.
k.Continue to support the IWMA on facilitating the City's
edible food recovery programs as called for in CAP
Circular Economy task 1.1.C, 1.2.A, and 1.3.A.
Ongoing Staff continues to support the IWMA on facilitating the City's
edible food recovery programs.
a.Continue to install electric vehicle chargers and replace
fleet vehicles as needed with all‐electric alternatives as
called for by CAP Lead by Example task 1.1.A .
Ongoing Operationalized. Projects are in the CIP, subject to approval
and funding.
b.Continue to electrify the bus fleet as called for by CAP
Lead by Example task 1.1.A.Ongoing Operationalized. Projects are in the CIP, subject to approval
and funding.
c.Complete installation of solar panels at the City's Bus
Yard, Fire Station 1, and Sinsheimer Pool as called for by
CAP Lead by Example task 1.1.A.
FY25 Q2 Staff updated contracts in 2024 and expect constructionto be
completed in 2025.
e.Apply the "Sustainable SLO" mark to City infrastructure
and assets and conduct a general awareness outreach
program as funding and staff resources allow, as called
for by CAP Lead by Example task 1.1.B.
Ongoing
Operationalized. Administered by Sustainability and Natural
Resources; implementation responsibility rests with owner of
each new asset for complying with the Sustainable SLO style
guide.
f.Provide ongoing support for Central Coast Community
Energy Policy and Operations Board Members, and
engage in staff level policy and program development, as
called for by CAP Clean Energy task 1.1.A
Ongoing
Operationalized. Morro Bay will represent the City of San Luis
Obispo in 2025 and 2026 per the Memorandum of
Understanding that identified how the shared board seat will
be filled. Staff continue to work with 3CE staff on effective
program deployment in the agency and in the community.
g.Pursue funding, and if feasible, create the "Green and
Healthy Buildings” service to educate the community and
connect building owners with resources, federal funding,
incentives, financing, contractors, and streamlined
permitting as called for by CAP Green Buildings Task
2.1.B, 2.1.C, and 2.1.D, and CASE Program HE‐4.7.
Ongoing
Staff obtained Department of Energy funding to implement
this task. The funding for staffing support will expire in
February of 2026 and the work will be carried forward by
existing staff resources.
i.Conduct a study session, and pending Council direction,
develop an equitable framework for cost effective
building electrification retrofit policies, with an initial
focus on additions and alterations, as called for by CAP
Green Buildings Task 2.1.E.
Ongoing
Staff completed the study session and completed an existing
builing reach code. Staff will continue to advocate for
equitable and impactful statewide building performance
standards and will advocate to bring voluntary statewide
home energy score programs to the City.
Items notated with orange will require additional resources
to continue in the 2025‐27 Financial Plan
Climate Action, Open Space and
Sustainable Transportation
2/8 Staff Agenda Correspondence Attachment A - MCG Update Climate Action, Open Space and Sustainable Transportation
14 Page 22 of 131
Task/ Action Completion
Date StatusOutcome
Sustain, Manage, and Enhance the City's Greenbelt and
Make Progress on Planting 10,000 trees by 2035 Ongoing
In support of tree planting, the City completed its first
Community Forest Plan, initiated and maintains an
interdepartmental "Keys for Trees" program in partnership
with ECOSLO wherein TBID allocates funds towards planting
trees, and the official 10Tall website, created in partnership
with Cal Poly, tracks progress on tree plantings and as of April
2024 reports that nearly 3,000 new trees have been planted in
both private and public spaces. Management of the City
Greenbelt open space properties is operationalized in
partnership with Ranger Service. Enhancement occurs on a
case‐by‐case basis as funding and resources are available (see
task 4.2.i).
4.2 Sustain, Manage, and Enhance the City's Greenbelt and Make Progress on Planting 10,000 trees by 2035
a. Actively implement opportunities to purchase open
space lands and permanent land conservation
agreements in furtherance of the City's Greenbelt
Protection Program as called for by CAP Natural Solutions
task 1.1.A.
Ongoing
The Greenbelt Protection Program is operationalized, although
each project is discrete and carried out in accordance with City
Council approval and guidance. The City has historically
enjoyed significant matching of CIP funding with outside grant
funds to complete land conservation purchases.
b. Complete installation of adopted trail systems at the
Irish Hills Natural Reserve and at Miossi Open Space.Ongoing
New and expanded trails were installed at Irish Hills Natural
Reserve (Bog Thistle Trail and King Trail) and significant storm‐
related repairs were required and completed at Miossi Open
Space before additional new trail work can be undertaken.
This work will continue beyond the 2025‐27 Financial Plan,
however, personnel, equipement, and volunteer resources are
operationalized.
c. Identify and implement trail alignment revisions, if
feasible, and other solutions to reduce erosion and wet
weather closures and address trail user safety and
enjoyment at Reservoir Canyon Natural Reserve.
Ongoing
The Bowden Ranch portion of Reservoir Canyon Natural
Reserve was significantly impacted by the Lizzie Fire, however
a realignment of the "Firefighter Trail" will begin in
winter/spring of 2025.
d. Continue Open Space education activities including the
"hikes with experts" series, Junior Ranger Camp, and
ongoing public information and programming, with
emphasis on equity and equitable access.
Ongoing
These programs are opererationalized, however increasing
opportunities for equity and equitable access is still in
development and staff are evaluating grant funding to provide
additional resources towards these goals. The Jr. Ranger
Camps qualify for financial funding assistance throught the
Parks & Rec youth scholarship program.
e. Continue implementation by Ranger Service staff of all
Open Space maintenance activities including establishing
a replacement schedule for Open Space trailhead
improvements, as well as replacement or repair of Open
Space fencing currently in disrepair, all as set forth in the
adopted Open Space Maintenance Plan
Ongoing
Ongoing and operationalized. Storm and fire related damage
have required additional attention and resources. Major
repair / restoration efforts have occurred at Righetti Hill, Cerro
San Luis, Miossi Open Space, and Reservoir Canyon.
Scheduled replacements of bridges and fencing have also been
implemented.
f. Continue ongoing Ranger Service patrol of Open Space
areas ensuring compliance with the City Open Space
regulations, the safety of users, and protection of natural
resources values and functions.
Ongoing Ongoing and operationalized.
g. Implement priority projects at Righetti Hill Open Space
consistent with the Conservation Plan (if adopted in May
2023).
Ongoing
Implementation of the second trail phase is scheduled for
winter / spring 2025 following repair of the erosion gulluy
above Hillside Drive and developer's installation of concrete
paths leading to the planned trailhead location.
h. Continue to work with community groups on tree
planting in creeks and open space areas toward the goal
of 10,000 trees by the year 2035 as called for in CAP
Natural Solutions task 2.1.A.
Ongoing
Ongoing and partially operationalized (staff are still developing
systems for mobile irrigation, maintenance, and tracking).
Significant tree planting as occured within Cerro San Luis,
Johnson Ranch, Terrace Hill.
2/8 Staff Agenda Correspondence Attachment A - MCG Update Climate Action, Open Space and Sustainable Transportation
15 Page 23 of 131
Task/ Action Completion
Date StatusOutcome
i. Continue to expand climate‐informed maintenance
practices in the Greenbelt through external funding and
partnerships, and conduct ongoing monitoring on carbon
sequestration results and other co‐benefits for existing
and potential future projects, as called for in CAP Natural
Solutions task 2.1.B.
Ongoing
The City was awarded $250,000 in grant funding to leverage
one‐time SOBC funding supporting restoration and
enhancement projects at Johnson Ranch Open Space. Ongoing
efforts will need to continue to rely on grant funding.
j. Continue to implement rehabilitation efforts
throughout the City's open space network where storm
damage has occurred to trails, access roads, and other
open space infrastructure.
Ongoing
Ongoing and staff have adequate equipment and personnel to
attend to most minor to medium level repairs on an as‐
needed basis.
k. Continue partnership with City Farm SLO to install site
security and access measures and to implement
California Farmland Conservancy Program grant scope of
work.
Ongoing
The City provided matching funds and in‐kind support for both
site security and access improvement (all‐weather roads
enabling four season farming) as well as the CA Farmland
Conservancy Program that supported the Prefumo Creek
Enhancement project. This partnership is operationalized and
the City's lease with City Farm SLO continues through 2065.
4.3 Preserve and Enhance Convenient and Equitable Alternative and Sustainable Transportation Options
a. Active Transportation Plan (ATP) Tier 1 Network ‐
Higuera Complete Street Project: Complete final design
and construction of active transportation and safety
improvements along Higuera Street corridor from Marsh
St. to Los Osos Valley Rd.
FY27 Q3
95% Plans are complete. Approximate $9.1 million in outside
funding secured. Approximately $1‐3 million in funding to be
requested in 25‐27 Financial Plan. Plan to start construction by
second half of FY2025‐26.
b. Active Transportation Plan (ATP) Tier 1 Network ‐
South/King Crossing: Complete design and construction
of a new protected bicycle/pedestrian crossing at the
intersection of South St. & King St., improving access to
Meadow Park, Hawthorne Elementary, and existing
active transportation routes.
FY26 Q2 Designs for a full traffic signal are underway with goal to start
construction in FY2025‐26.
c. Active Transportation Plan (ATP) Tier 1 Network ‐
Foothill Complete Street Project: Continue design of
active transportation and safety improvements along the
Foothill Blvd. corridor between the western city limits
and California Blvd., with goal to have shovel‐ready
project for construction in FY2025‐27.
FY26 Q3
Corridor planning underway, on track to have final concept
design recommendations by Q3 FY2025‐26. Request for PS&E
and Construction Funding in FY2025‐27 and beyond.
d. Active Transportation Plan (ATP) Tier 1 Network ‐
California/Taft Roundabout: Complete final design and
right‐of‐way acquisition for new roundabout at the
California Blvd. & Taft St. intersection, with goal to have
shovel‐ready project for construction in FY2025‐27.
FY26 Q2
Design 95% complete, pending right‐of‐way aquisition. Right‐
of‐way negotiations have not been successful to date.
Construction funding to be requested with 2025‐27 Financial
Plan, but construction date undetermined until right‐of‐way
issue is resolved
e. Active Transportation Plan (ATP) Tier 1 Network ‐
Paving Project Complete Street Elements: Implement
complete street and safety improvements as part of 2023
and 2024 summer paving projects as guided by the Active
Transportation Plan and Traffic Safety/Vision Zero
reports.
FY25 Q4
2023 Paving Project complete, included installation of
protected bike lanes on Santa Barbara, buffered bike lanes on
Orcutt and enhanced bicycle and pedestiran crossings on
Monterey Street. 2024 Paving Project in construction, includes
pilot road diet and protected bike lanes on Grand Avenue,
permantent road diet on Johnson Avenue and greenway
improvements to the Mill and Toro Greenway routes.
f. Active Transportation Plan (ATP) Tier 1 Network ‐
Railroad Safety Trail (Orcutt to Tiburon) Connection:
Initiate design and environmental review for a project
that will complete the gap in the Railroad Safety Trail in
the Orcutt Area between Tiburon Dr. and Orcutt Rd.,
including replacement of the narrow culvert on Bullock
Lane and pedestrian/bicycle safety improvements at the
Orcutt Road/Union Pacific Railroad Crossing.
Deferred
The project was deferred and partially defunded in 2024‐25.
Will require additional funding approval in future Financial
Plan and available staffing resources to manage project to
establish an updated ETA.
2/8 Staff Agenda Correspondence Attachment A - MCG Update Climate Action, Open Space and Sustainable Transportation
16 Page 24 of 131
Task/ Action Completion
Date StatusOutcome
g. Active Transportation Plan (ATP) Tier 1 Network ‐
Foothill/California Railroad Crossing Improvements:
Complete design and initiate construction of federally‐
funded pedestrian safety improvements at railroad
crossing.
FY26 Q4
Design and utility relocations in progress, at 65% complete
phase. Awaiting design review by Union Pacific Railroad.
Assuming Federal Section 130 funding is not impacted by new
federal executive administration, construction is fully grant
funded and on track to start FY26 Q1.
h. Active Transportation Plan (ATP) Tier 1 Network ‐
Prado Creek Bridge Replacement: Complete design of
new bridge, including sidewalks, protected bike lanes,
and additional vehicular lanes to accommodate existing
and future traffic demand. Includes reconstruction of S.
Higuera/Prado intersection with additional capacity and
protected intersection features to improve safety for
pedestrians and cyclists.
FY29 Q2
Project at 90% design phase and in progress with right‐of‐way
acquisition and utility coordination. Assuming funding is
available, construction start anticipated FY27 Q2.
i. Active Transportation Plan (ATP) Tier 1 Network ‐
Prado/US 101 Interchange: Complete project approval
and environmental document phase of project, and
initiate design phase for new interchange, which includes
extension of Prado Road over US 101 to Froom Ranch
Way, with new northbound on/off‐ramps, four auto
lanes, center median/left turn lanes, sidewalks and
protected bike lanes. Includes realignment of Elks Lane
and signalization of the Prado/Elks intersection.
FY33 Q2
Project approval and environental document complete.
Initiating final design (PS&E) phase. Construction start
estimated FY29 Q2, but significant funding gap curently exists.
j. Vision Zero Implementation ‐ Update annual Traffic
Safety Report to evolve into a 5‐Year Vision Zero Action
Plan and continue ongoing implementation of traffic
safety projects and programs, focusing efforts on the
City's high crash/injury network.
Ongoing
Vision Zero Action Plan will be presented to the City Council
March 18, 2025. Annual funding to implement plan
recommendations to be requested in forthcoming financial
plans.
k. Transit Innovation Study Implementation: Begin
planning implementation of strategies recommended in
Final Transit Innovation Study, including incorporation of
near‐term strategies as part of planned SLO Transit/RTA
Short Range Transit Plan update, as called for in CAP
Connected Community Task 4.2.A and in the APMP
Strategies 1.C.
Ongoing
Moved forward on implementation of SLO Transit Innovation
Study Recommendations including modifications to the
Downtown Access Pass Program, pursueing an open loop
payment system in coordination with RTA, investigating the
potential for a bikeshare program. Additionally,
recommendations from the Transit Innovation Study have
been incorporated into the recommendations of the Short
Range Transit Plan which will be presented to Council
February 25, 2025.
l. Reassess the viability of launching a citywide bikeshare
system, with ongoing coordination with Cal Poly as called
for in CAP Connected Communities Task 2.2.A and the
APMP strategy 1.B.1. Solicit potential bikeshare system
operators if staffing resources allow and this can be done
without diverting resources from delivering priority active
transportation infrastructure projects.
FY25 Q4
Request for Proposals was released in 2023, however
ultimately staff recommended against award. Further
investigation is necessary including monitoring and evaluating
the effectiveness and success of bike share systems in other
like communities, and researching funding opportunities
including grants, sponsorships, etc.
m. Public EV Chargers ‐ Enable public EV charger
deployment on City property, support EV charger
installation on private property, and deploy EV chargers
in low‐income areas of the City as called for in CAP
Connected Community Tasks 6.1.A, 6.1.B, and 6.1.D.
Ongoing
Operationalized. Using staff time, the City supported a third
party developer to operate publicly available high powered
fast charges at four City owned sites. These will become
operational in 2025. Staff continues to monitor for third party
resources and other non‐City funded opportunities to provide
e quitable access to EV chargers.
4.4 Increase Community Resilience
2/8 Staff Agenda Correspondence Attachment A - MCG Update Climate Action, Open Space and Sustainable Transportation
17 Page 25 of 131
Task/ Action Completion
Date StatusOutcome
f. Initiate the development of Wildland‐Urban‐Interface
Defensible Space and Home Hardening Program as called
for in CASE program FI‐5.15.
FY26 Q4
The Fire Department is actively working with Administration
and City Attorney's Office to develop a project plan to explore
these initiatives. The development of these programs is
achievable with existing staff resources, however
implementation would require additional resources and is not
operationalized.
a. In coordination with Zone 9, convene a working group
to assess the current creek flow monitoring system and
provide recommendations for enhancements, as called
for in CASE program FL‐3.13.
Ongoing
The assessment is operationalized: a team from
Administration, Utilities and Public Works has been formed
and is working with the County Zone 9 staff to develop a plan
for expanding the monitoring system. Implementation of team
recommendations would require additional resources and is
not operationalized.
b. Conduct a study session to consider options for
funding stormwater and / or creek maintenance and
flood preparedness in support of CASE programs 3.9,
3.10, 3.11, 3.12, 3.13, and 3.14.
Ongoing
Staff have hired a consultant to assist with a Council Study
Session, which is scheduled for Q2 FY 25. Should Council direct
staff to proceed with any of the identified options,
implementation would require additional resources and is not
operationalized.
d. Evaluate opportunities to integrate climate
considerations in the City's Engineering Standards and
Specifications as called for in CASE program MH‐1.6.
Ongoing
Operationalized. City engineering staff are currently working
on an update to the City Standards and are incorporating
Caltrans standards for high limestone concrete mixes to
reduce embodied carbon emissions.
e. Provide post‐disaster recovery resources and
emergency preparedness education to vulnerable
community members as called for in CASE program MH‐
1.10.
Ongoing
Not operationalized outside of emergency operations or post‐
disaster recovery plan context. Staff provided focused
outreach to community members affected by emergency level
events and conducted a community workshop on the topic,
however more attention is needed to provide resources and
education at the level contemplated in the Climate Adaptation
and Safety Element.
g. Monitor funding sources and if feasible pursue a
Climate Resilience Hub planning grant with community
partners, as called for in CASE program MH‐1.8.
Ongoing
The City applied for a California Strategic Growth Council grant
alongside Diversity Coalition and Undocusupport for a
Multicultural Center and Resilience Hub that was unsuccessful.
Due to statewide budget allocations through Prop 4, staff
anticipate reapplying to the same and/or similar funding
programs in the 2025‐27 Financial Plan.
h. In partnership with Zone 9, seek funding to initiate the
Waterway Management Plan update to incorporate
climate‐informed flood risk as called for in CASE program
FL‐3.7. Initial work in this Financial Plan period is
envisioned to include identifying and securing funding,
developing a project scope, and drafting a request for
proposals.
FY25 Q4
Operationalized. Staff from the County of SLO have secured
funding from Zone 9 to begin updating the Waterway
Management Plan and the City and County are updating the
reimbursement agreement for City staff to assit in the update
with consultant services. Implementation of updated plan
actions would require additional resources and is not
operationalized.
i. Develop an Urban Creeks Vegetation Management Plan
as called for in CASE program FL‐3.10.Ongoing
The City is in line to receive grant funding from the Coastal
Conservancy to work with a consultant to develop a
comprehensive Vegetation Management Plan (creeks and
open space) beginning Q1 FY 2025. Implementation of plan
actions would require additional resources and are not fully
operationalized.
j. Incorporate Traditional Ecological Knowledge into open
space management decisions as called for in CASE
program OP‐7.2.
Ongoing
The City has successfully implemented early pilot projects
(e.g., Johnson Ranch cultural burn), however this work will
require ongoing relationship building with tribes.
k. Implement the Mid‐Higuera Bypass Project.FY25 Q3 Mid‐Higuera Bypass Project started in January 2025.
2/8 Staff Agenda Correspondence Attachment A - MCG Update Climate Action, Open Space and Sustainable Transportation
18 Page 26 of 131
Task/ Action Completion
Date StatusOutcome
l. Implement the Laguna Lake Dredging and Sediment
Management Project.Ongoing
Contractor removed over 10,000 cubic yards of sediment from
Prefumo Arm following the winter storms of 2023. Staff are
currently working on lake survey and extending permits for
future dredging, which has been deferred to outer years of the
CIP.
m. Implement Silt Removal Projects from Priority Creek
Locations.Ongoing Operationalized. Staff have four locations identified for
maintenance to be completed in 2025.
n Implement existing Community Wildfire Protection Plan
and initiate focused update in 2024. FY25 Q4
Grant funding was sought out in 2024, likely to be issued in
Spring of 2025. Plan update should occur by the end of
calendar 2025 and include an integrated Vegetative Fuels
Management Plan encompassing all City Open Space and
green belts. Not yet operationalized and will need additional
resources to do so. Staff is currently seeking external
resources through a federal grant, but the durability of that
funding and outcome of application is unknown.
4.5 Continue to Build City and Community Capacity for Transformational Climate Action
f. Conduct GHG Emissions Inventory and Biennial CAP and
Lead by Example Progress Reports as called for in CAP
Administrative Action 2 and Lead by Example Plan
Administrative Action 2.
Complete
Operationalized. The Lead by Example biennial progress report
was completed and presented to Council in May 2024 and the
updated inventory and Lead by Example 2025‐29 Work
Program were presented to Council for adoption in February
of 2025.
i. Complete steps and present recommendations and
options to maximize the reuse of wastewater per the
"Road Map" presented to the City Council.
Ongoing This project is nearing completion per the adopted "Road
Map"
a. Participate in the Cal Poly Climate Corps Fellowship
program to build staff capacity as called for in the CAP. Ongoing
Operationalized. The Climate Corps Fellowship Program is a
regular resource for the City and staff is midway through a
second successful year with the fellows.
b. Manage the Green Team to Support Lead by Example,
Climate Adaptation and Safety Element of General Plan,
and Climate Action Plan implementation, as called for in
CASE program MH‐1.11 and OP‐7.9.
Ongoing
Operationalized. The Green Team has met regularly, per the
Greet Team charter, and collaborated on completing the Lead
by Example 2025‐29 Work Program.
c. Continue to support and empower community
collaboration for climate action, including support for the
Climate Coalition and the San Luis Obispo Climate Justice
Collaborative, as called for in CAP task 3.1.A.
Ongoing Operationalized. Staff meet regularly with community based
organizations including those named in the task.
d. Support regional efforts to develop the workforce
required to implement the Climate Action Plan as called
for in CAP task 2.2.A.
Ongoing
Staff have had initial discussions with the County Workforce
Development Board and the Buildings Upgrade Prize work
program has supported local contractor training on
electrification installations. Staff will continue to identify and
pursue opportinities to implement this task.
e. Initiate update to the Lead by Example plan to inform
the 2025‐27 Financial Plan as called for by CAP Lead by
Example task 1.1.A and Lead by Example Plan
Administrative Action 1
Complete
The Lead by Example 2025‐29 Work Program has been
completed and presented to Council for adoption in February
of 2025.
g. Continue to integrate climate action and resilience into
the 2025‐27 Financial Plan development process
consistent with Budget Policy A.6 and as called for by CAP
Lead by Example task 1.1. and CASE Program MH‐1.5.
Ongoing
Staff continue to evaluate CIP projects for consistency with the
Climate Action Plan and continue to look for new
opportunities to align spending with Council's climate action
priorities.
h. As authorized by City Council (December 13, 2022) and
as called for in CAP Administrative Action 6, pursue grant
and other external funding sources opportunistically and
strategically.
Ongoing Staff continues to pursue grant funding, rebates, and
incentives to implement Major City Goal tasks.
2/8 Staff Agenda Correspondence Attachment A - MCG Update Climate Action, Open Space and Sustainable Transportation
19 Page 27 of 131
StrategyMCG Tasks Completed in 2021‐23 Financial Plan Department
Economic Recovery, Resiliency & Fiscal Sustainability
1.1 h. Update the City's Economic Development Strategic plan ADM (ED)
1.1 i. Review the Economic Development program structure based on the outcome of the EDSP update. ADM (ED)
1.1 c. Evaluate and potentially establish a City Leadership/Chamber of Commerce / Minority Business Owners’
roundtable.ADM (ED/DEI)
1.1
d.Research, explore and potentially utilize innovative practices such as micro‐loans, targeted‐sector recruiting and
promotion, City facilitated lending, grants, private support and crowdfunding to support businesses owned by or
serving underserved/underrepresented communities. The City will also leverage its partner network, including the
Chamber, Downtown SLO, REACH and others to support the DEI initiatives as they relate to economic development
including creation, retention and attraction efforts.
ADM (ED/DEI)
1.1 a. Establish a process for the City to recognize and promote Minority‐owned businesses.ADM (ED/DEI)
1.1
b.Implement protocols within the City’s Office of Economic Development to reach out to existing and new Minority‐
owned/operated businesses to learn of their experiences operating in SLO, and to identify ways the City can be of
support.
ADM (ED/DEI)
1.1 g. Develop and implement a scorecard to track visitation to key areas of the City, employment, DEI economic efforts
and other relevant economic indicators.ADM (ED)
1.2 a‐6. Review transitioning the Business Ambassador program from a COVID response action to an ongoing program
with an available hotline as well as an online form option.ADM (ED)
1.2 b‐1. Continue to implement the TIPP‐FAST program to fast track tenant improvement permits and support business
recovery. Incorporate subsidies into program when funding is available.CDD
1.2 a‐5. Evaluate the continuation and/or modification of the Open SLO program Fitness in the Parks.P&R
1.2 c‐2. Set aside funding for the potential to expand the various Open Slo programs (Parklets, Street closures) to other
areas of the City to support business recovery. PW
1.2
b‐3. Develop a streamlined and easy to understand process for businesses to allow activities encouraged by Open
SLO, and other programs implemented in response to Covid‐19, to continue ‐ especially in relation to outdoor
dining.
PW/CDD
1.3 b. Support the recovery of Arts , Culture and Community programs through a PCC program similar to GIA. ADM (ED)
1.4 a‐4. Review, evaluate and execute on the outcomes from the Downtown Future Forum ensuring the required public
participation and Council approval as needed. ADM (ED)
1.4 a‐6. Support the restart of the various Downtown SLO activations like Farmers, Concerts in the Plaza and the
Holiday Parade. ADM (ED)/PW
1.4
b‐1. Part 1: Update the Zoning Regulations to allow for more flexible administration of allowed uses, especially
downtown, to support desired pop‐up, shared‐resource and new business model approaches to facilitate business
opportunities in the community.
CDD
1.4
b‐2. Part 2: Update the Zoning Regulations to allow for more flexible administration of allowed uses, especially
downtown, to support desired pop‐up, shared‐resource and new business model approaches to facilitate business
opportunities in the community.
CDD
1.4 e‐8. Downtown safety enhancements ‐ bollards PW
1.4 e‐9. Mission Plaza Railing Replacement PW
1.4 d‐11. Expansion of maintenance to ensure parking structures and adjoining areas remain safe, clean and orderly
(see above for fiscal impact)PW(Parking)
1.4 d‐9. Assist with the continuation of Open SLO parklets and courtesy curbside pick up locations PW(Parking)
1.4 d‐1. Develop and present a long‐term plan for the initiatives started under the Open SLO like parklets and street
closures in the downtown. PW/CDD
1.5 d. Complete benchmark compensation survey for SLOCEA, Management, and Confidentials groups.HR
2/8 Staff Agenda Correspondence Attachment A - MCG Update 2021-23 Financial Plan
20 Page 28 of 131
StrategyMCG Tasks Completed in 2021‐23 Financial Plan Department
1.7
b. Regional Transit Authority Analysis: The RTA is currently building a Regional Transit HUB 800 feet from the City’s
SLO Transit Bus Yard. Much of the infrastructure that supports SLO Transit is aged and nearing the end of its
lifespan. All transit providers are required to shift the fleet of transit vehicles to zero emission vehicles.
This funding would support the analysis and review of SLO Transit’s operations and infrastructure to determine if
there may be benefit to sharing infrastructure, equipment or centralizing services to provide increased community
services at the same or reduced purchasing requirements, alternative project delivery methods and other options
to support local businesses and employees. The Community Services Group will be leading this effort.
PW ‐ Transit
Diversity, Equity, Inclusion
2.1 i. Consultant ‐ DEI SME ‐ 360 total hours Admin‐DEI
2.1 a. Design DEI Administration, Function, and Operations of the Office Admin‐DEI
2.1 b. Develop DEI Base Operating Budget Admin‐DEI
2.1 c. Identify and secure office space (2000/mo @ 7 mos Y1, 12 mos Y2)Admin‐DEI
2.1 d. Develop positions; Hire Staff Admin‐DEI
2.1 e. Hire Diversity position ‐ 1.0 FTE Admin‐DEI
2.1 g. Hire CivicSparks Fellow ‐ Y2 ‐ .75 FTE Admin‐DEI
2.2
b. Utilize DEI Task Force Recommendations, Internal D&E Audit as foundation; Cal Poly Experience report and other
documents as reference and for benchmarking Admin‐DEI
2.3 e. Conduct Pay Equity Audit HR
2.3 f. Examine Policies and Programs to Support for Primary Caretakers HR
2.5
d. Review new Police Station building program and budget for opportunities to reduce costs to preserve resources
for community service investments
Admin / PD /
Public Works
2.5 a. Implement After Action Report recommendations PD
2.7
e. Support feasibility study for Multicultural Center; provide City liaison/staff support Admin‐DEI
2.7
f. Contribute to planning / feasibility study Admin‐DEI
2.7
j. Community Academy – second stage, longer program. Partner with Chamber, others. Test demand, develop. Pilot
Y2 Admin‐DEI
2.7
k. Develop “Undocu‐Friendly” logo for City documents, as allowable by law (cost of internal resources)Admin‐DEI
2.7
i. City 101 – first stage, short program, easy access/commitment. Overview of City, how to access, ways to be
involved. Extensive outreach to Underrepresented minorities, community‐based sessions. Design, pilot Y1 Admin‐DEI
2.7
g. Update City's formal Public Engagement & Noticing (PEN) procedures as well as other public outreach, input
efforts to increase diverse participation. Develop tactics and cost to implement Admin‐DEI
2.9
c.Establish a City Leadership/Chamber of Commerce / Minority Business Owners’ roundtable.
Admin‐Econ De
2.9
d. Research, explore and potentially utilize innovative practices such as micro‐loans, targeted‐sector recruiting and
promotion, City‐facilitated lending, grants, private support and crowdfunding to support
underserved/underrepresented communities. Leverage City's partner network, including the Chamber, Downtown
SLO, REACH and others to support the DEI initiatives as they relate to economic development including creation,
retention and attraction efforts.
Admin‐Econ De
Housing and Homelessness
3.1 e. Subdivision Regulations Update (HE 6.20)CDD; Attorney
3.1 g. Additional Housing Element Program Implementation (HE 2.16, 2.18, 3.10, 4.7 & 4.8)CDD
3.1 a. Inclusionary Housing Ordinance (HE programs 2.13 & 4.6)CDD; Attorney
3.1 m. CDD Fleet Replacement PW
3.1 b. Flexible Density Program (HE Program 2.15)CDD
3.1 c. Develop Objective Design Standards & Update Development Review Process (HE 6.22 & 6.23)CDD; Attorney
3.1 d. Zoning Regulations Update ‐ Housing (HE 5.5, 8.18, 8.23, 2.17 and AB 2345)CDD; Attorney
3.11 b. Support a 25% expansion of the number of beds at the 40 Prado Homeless Services Center.CDD
2/8 Staff Agenda Correspondence Attachment A - MCG Update 2021-23 Financial Plan
21 Page 29 of 131
StrategyMCG Tasks Completed in 2021‐23 Financial Plan Department
3.6 b. Develop a Strategic Plan to guide a sustained effort of engagement by regional partners, non‐profit partners, and
community members to identify and implement coordinated solutions to chronic homelessness.CDD
Climate Action, Open Space and Sustainable Transportation
4.1
a. To ensure consistent maintenance and adequate oversight of City Open Space lands, add one net new Ranger
Maintenance Worker to maintain level of service standards following recent Open Space acquisitions. The City's
level of service standard for Open Space is 1 Ranger per 1,000 acres.
P&R
4.1 b. To address Ranger Services staffing, recruitment, and retention, convert 5 Ranger Specialist positions (currently
limited benefit temporary) to full‐time regular permanent positions. P&R
4.2 a. Complete the Biennial Climate Action Plan Update, as called for by CAP Administrative Action 3.Admin
4.2 d. Update the Clean Energy Choice Program for New Buildings for consistency with the 2022 California Building
Code update, as called for by CAP Green Buildings task 1.1.CDD/Admin
4.3
b. Complete an Urban Forest Master Plan including a comprehensive update of tree inventory update, assessment
of tree canopy coverage, and implementation of an ongoing tracking system, as called for by CAP Natural Solutions
task 2.1.
Admin
4.3 j. Create the Righetti Hill Open Space Conservation Plan in order to guide the long‐term protection and appropriate
public use of this new City Open Space property.Admin
4.3
k. Implement priority projects at Righetti Hill Open Space consistent with the Conservation Plan.
P&R
4.3
l. Complete installation of adopted trail systems and establish regular Ranger Service patrol at Miossi Open Space.
P&R
4.3
h. Update the existing South Hills Natural Reserve Conservation Plan (2007), including a contemporary natural
resources inventory, mapping, policy review, and identification of land stewardship needs and priorities.
Admin
4.3
a. Working with the Coastal San Luis Resource Conservation District, complete existing planning efforts and pilot
program implementation at Johnson Ranch Open Space and City Farm intended to improve soil health and remove
and store carbon, as called for at CAP Natural Solutions task 1.1.
Admin
4.3 q. Implement Laguna Lake Dredging and Sediment Management and Shoreline Stabilizations Projects in order to
begin restoration of the lake for recreation and habitat improvement purposes PW/Admin
4.4 q. Replace SLO Transit bus shelters to maintain a quality environment for new and future transit users.Transit/PW
4.4 i. Complete construction of the Orcutt Road/Tank Farm Road Roundabout, reducing congestion and auto emissions
and improving access and safety for bicycles, pedestrians and drivers.PW
4.5
d. Replace or repair Open Space fencing that is currently in disrepair at Cerro San Luis Natural Reserve, Irish Hills
Natural Reserve, Bowden Ranch Open Space, and the Bob Jones Trail. (Includes existing Creek and Flood Protection
Staffing resources)
Admin/P&R
4.5
f. Conduct a microgrid feasibility assessment to identify City properties that could add solar, battery storage, and
controls to allow operation during times of electrical grid outages as an uninterruptable power supply. Admin/PW
4.5
a. Complete the "Resilient SLO" planning project (Safety Element Update and associated CEQA) to assess
community vulnerability to the impacts of climate change and adopt a resilience policy framework in the City's
General Plan, as required by California Senate Bill 379.
CDD/Admin
4.5
n. Project: Laguna Lake Dredging ‐ rerouting of Prefumo Creek has increased sediment deposits into the lake. This is
a pilot project to ascertain if dredging is a viable solution for Laguna Lake and could become a routine maintenance
activity.
Admin
4.5
i. Expand Technical Rescue Team roster from 3 to 6 firefighters to improve the City's open space rescue capabilities
and improve self‐sufficiency following the first 72 hours of a regional disaster such as earthquake or flood where
resources are often limited.
Fire
2/8 Staff Agenda Correspondence Attachment A - MCG Update 2021-23 Financial Plan
22 Page 30 of 131
StrategyMCG Tasks Completed in 2021‐23 Financial Plan Department
4.5
q. Water Treatment Plant ‐ Power Storage Units Tesla Battery Grant ‐ when emergency power is not required for
plant operations, the power storage units will allow plant staff to shift power needs during electrical time of use
periods having lower electrical rates, and lower carbon emissions associated with the transmission of electrical
power. The control module operating the power storage units will also monitor and track energy efficiencies of
existing pumps and the plant’s treatment units.
Utilities
3.10 a. Pair a crisis worker with an Emergency Medical Technician (EMT) to provide non‐emergency response and care to
unhoused community members. FD/CDD
2/8 Staff Agenda Correspondence Attachment A - MCG Update 2021-23 Financial Plan
23 Page 31 of 131
Page 32 of 131
2/8 Staff Agenda Correspondence Attachment B: Combined Council Pre-work
Attachment B: Combined Pre-work Page # 1
Pre-Workshop Worksheet
Consolidated Notes from Councilmembers
Background: The City of San Luis Obispo is a dynamic community embracing its future
while respecting its past with core values of civility, sustainability, diversity, inclusivity,
regionalism, partnership, and resiliency. Every two years, in alignment with the
financial plan, the City Council determines the most important and highest -priority goals
for the City to accomplish over the next two years beyond the City’s core services. Below
is feedback from City Councilmembers about the current four Major City Goals to be
considered in further discussion on February 8th at the City Council goal-setting workshop.
1. What edits to the Major City Goals would you make to focus on the most
important items in these goal areas?
Climate Action, Open Space & Sustainable Transportation
Proactively address the climate crisis and increase resiliency through the
implementation of the Climate Action Plan. Use reso urces to reduce greenhouse gas
emissions and reach carbon neutrality by 2035, with a focus on the preservation and
enhancement of convenient and equitable alternative and sustainable transportation,
the preservation of open space, and equitable access to parks and open space.
Proposed edits to Climate Action, Open Space & Sustainable Transportation goal:
Maybe keep this top line (highlighted above) and move the rest to work items.
Delete the following: it is all included in the CAP, do we need to repeat all of the CP in
our goal? Or can we hyperlink it?
, with a focus on the preservation and enhancement of convenient and equitable
alternative and sustainable transportation, the preservation of open space, and
equitable access to parks and open space.
I’ve been thinking about adding “Resilience,” perhaps substituting for “Action.” Not sure
though. Staff feedback would be helpful. Possible options:
Climate Resilience, Open Space & Sustainable Transportation
-or-
Climate Action & Resilience, Open Space & Sustainable Transportation [clunky]
I think we should say a little more in the description about preparing for and adapting to
the impacts of climate change.
I’ve been thinking about replacing “Sustainable Transportation” with “Safe
Transportation” [maybe too narrow] or “Vision Zero.” Not sure though.
Page 33 of 131
2/8 Staff Agenda Correspondence Attachment B: Combined Council Pre-work
Attachment B: Combined Pre-work Page # 2
I generally like how this goal’s language is written as is, but I would simplify the top line
to: “Climate Action and Sustainability”. Then, within that, I would list priority areas for
clarification as follows –
Acquisition and care for open space and park lands
Implementation of Climate Action Plan and Lead by Example tasks
Implementation of Active Transportation Plan, Education efforts related to
transportation mode shift and expansion of Mass Transit use.
“Sustainability in all practices” goals (operationalizing sustainability into policies,
procedures, capital planning, etc.)
Proposed work items to be considered or edited for the Climate Action, Open Space &
Sustainable Transportation goal:
ATP Tier 1 Broad Street and Broad Street Specific Plan transportation improvements.
Community bicycle education in partnership with Bike SLO County and Cal Poly.
Implementation of the Vision Zero Plan.
Implementation of LHMP and CWPP.
Implement a robust, ongoing program f or counting bikes and peds so that we can
develop better mode share estimates.
Fully staffed and operational traffic enforcement in PD.
Detailed work plan items in each priority area include:
Acquisition and care for open space and park lands
Trail system maintenance and improvements, first phase of Righetti Park and
finish Righetti hill trails, purchase properties to enhance greenbelt and access to
open space, improving bike facilities at Laguna Lake and Eucs
Implementation of Climate Action Plan and Lead by Example tasks
Tree planting initiatives, urban forestry and maintenance programs,
climate/emergency resilience actions, electrifying city fleet, adding public
charging infrastructure, green building policies for community and city
operations, carbon sequestration, tracking of embodied carbon, “greening”
sewer and waste practices
Implementation of Active Transportation Plan, education efforts related to
transportation mode shift and expansion of Mass Transit use
Complete Higuera, Foothill and Broad Complete Streets “next steps” with
completion of at least one of the three of these in 25 -27, Taft Roundabout,
provide education on use of bike infrastructure for riders and drivers, Transit
service improvements (including items as possible, from the Short Range
Transit and Transit Innovation Study)
“Sustainability in all practices” goals
Page 34 of 131
2/8 Staff Agenda Correspondence Attachment B: Combined Council Pre-work
Attachment B: Combined Pre-work Page # 3
Secure funding for making our internal processes more Climate friendly,
incorporate climate action in all policies, developing outcome measures to help
determine when we have met climate action goals.
Potential Measures:
Progress toward mode shift goals
Proximity to carbon neutrality by 2030/2035 goals
Vision Zero progress (reductions in traffic fatalities)
Reduction in vehicle miles traveled
Waste Diversion
Diversity, Equity and Inclusion (DEI)
Further our commitment to making San Luis Obispo a welcoming and inclusive city for
all by continuing to incorporate diversity, equity, and inclusion into all programs and
policies and advancing the recommendations of the DEI Task Force.
Proposed edits to Diversity, Equity and Inclusion (DEI) goal:
Keep this top line (highlighted above) and focus on fleshing out a new set of work items
for the coming budget cycle.
remove the following “recommendations of the DEI Task Force” and swap with the “DEI
Strategic Plan”.
None
Change to “Diverse, Inclusive and Culturally Vibrant.” Then, within that, I would list
priority areas for clarification as follows –
Continue to implement and advance recommendations of the DEI Task Force
Promote programs, grants and initiatives to support cultural diversity, inclusivity
and welcoming of differences
Promote and support the arts and historical resources
Promote civic engagement of those historically, or economically without a voic e
Proposed work items to be considered or edited for the Diversity, Equity and Inclusion
(DEI) goal:
Not at this time, though most work items should continue as operationalized.
I’m interested in possible increases to the grant program but I want to ti e that to clear
outcomes assessment of past grants. Ideally our grants are “investments” that local
CBOs grow into greater benefits for the community.
Page 35 of 131
2/8 Staff Agenda Correspondence Attachment B: Combined Council Pre-work
Attachment B: Combined Pre-work Page # 4
Detailed work plan items in each priority area include:
Continue to implement and advance recommendations of the DEI Task
Force
Equity in hiring practices, recruitment of diverse candidate pools, other Task
Force recommendations
Promote programs, grants and initiatives to support cultural diversity,
inclusivity and welcoming of differences
Continue DEI Business Grants, track development and sustainability of minority
owned businesses over time, continue cultural event grants through PCC,
Promote and support the arts and historical resources
Consider ways to grow public art, performance art, etc. through partn erships,
seek funding for such endeavors, continue to work with owners of historic
properties to preserve and protect these resources
Promote civic engagement of those historically, or economically without a
voice
Expand access to community academy and voter education for monolingual and
historically under-represented groups, as well as voter education for all voters,
find ways to engage those under 18 in local government,
Proposed measures:
Racial/Ethnic Diversity of City Workforce shift
Percentage of recruitments with diverse candidate pools
Diversity and Advisory Body membership
Economic Resiliency, Cultural Vitality and Fiscal Sustainability
In collaboration with local partners, implement initiatives that reinforce a thriving and
sustainable local economy, support a diverse, inclusive, and vibrant community,
preserve arts and culture, and ensure fiscally responsible and sustainable city
operations.
Proposed edits to Economic Resiliency, Cultural Vitality and Fiscal Sustainability goal:
Reinforce a thriving a sustainable local economy, as well as a diverse, inclusive and
vibrant community culture… needs work.
Update the following “, inclusive, culturally vibrant community, along with fiscally
responsible city operations.”
Cultural and Economic Vitality [city fiscal sustainability should be assumed]
Change to “Responsible Government and Economic Vitality.” Then, within that, I
would list priority areas for clarification as follows –
Provision of basic services and preparing for the future
Page 36 of 131
2/8 Staff Agenda Correspondence Attachment B: Combined Council Pre-work
Attachment B: Combined Pre-work Page # 5
Sustainable financial planning and payment of obligations including pension
Supporting business development and living wage jobs
Supporting projects that increase economic opportunity
Proposed work items to be considered or edited for the Economic Resiliency, Cultural
Vitality and Fiscal Sustainability goal:
Is 1.5.b referencing a design build charter amendment? If so, we should revisit a
discussion around the timing of this effort.
I want to discuss the programs such as “buy local” given the lack of dedicated funding.
Greater attention to the Cultural Arts District; both physical improvements and
programming.
Study of ideal TOT rate.
Another round of business incubator funding like the child care program.
Explore developing a conference center.
Advisory committee reform for staff effectiveness and cost savings.
Detailed work plan items in each priority area include:
Provision of basic services and preparing for the future
Maintain core services including provision of clean water, waste management,
public safety, parks, emergency planning, plan for new, 5 th fire station, maintain
roadways, sewer and water infrastructure, improve sewer infrastructure through
sewer laterals or other similar programs (all with consideration of city growth
needs), maintain and continue to improve and track use of ASK SLO, etc.
Sustainable financial planning and payment of obligations
Collection of fines and fees to cover costs whenever possible, low income
programs to support community members, ensure appropriate contin gencies,
keep up with pension obligation costs, continue to ensure enforcement of
homestay ordinance, etc.
Supporting business development and living wage jobs
Utilize TBID and PCC to support business development, research potential for
incentivizing needed businesses in certain areas of the city, consider zoning or
other changes to improve access to child/healthcare
Supporting projects that increase economic opportunity
Support businesses through downtown parking incentives, special programs like
“buy local bonus,” business development and special event grants, especially
for small businesses and non-profits
Potential measures:
Contingency levels maintained
Page 37 of 131
2/8 Staff Agenda Correspondence Attachment B: Combined Council Pre-work
Attachment B: Combined Pre-work Page # 6
Additional Pension Payment made
Maintenance or increase in head of household jobs created
Customer satisfaction rates at or above ??%
Housing and Homelessness
Support the expansion of housing options for all, and continue to facilitate the
production of housing, including the necessary supporting infrastructure, with an
emphasis on affordable and workforce housing as well as accessibly connected
development. Collaborate with local non-profit partners, non-governmental agencies,
the county, the state, and federal governments to advocate for increased funding and
implementation of comprehensive and effective strategies to prevent and reduce
homelessness.
Proposed edits to Housing and Homelessness goal:
“Support the creation (in place of expansion) of housing for all.”
Item 7 under homelessness: I know there is extensive staff level collaboration with the
county to align the strategic plans, but I would like to discuss whether there needs to be
policy-maker level collaboration. i.e. are we pushing in the same direction?
Missing Middle Housing: What barriers are left to achieving the goal of allowing mo re of
this type of housing to be built? Did we complete this goal?
Separate these two goals:
Increase Housing Quantity, Safety, and overall livability
Support the expansion of housing options for all, and continue to facilitate the
production of maintenance of safe and healthy housing, including the necessary
supporting infrastructure, with an emphasis on low-income, as well as accessible and
attainable-workforce housing
Reduce and Prevent Homelessness
Collaborate with local non-profit partners, non-governmental agencies, all level of
governments to advocate for increased funding and implementation of comprehensive
and effective strategies to prevent and reduce homelessness.
Housing, Homelessness, and Tenant Protection
Change to “Healthy, Safe, Livable.” Then, within that, I would list priority areas for
clarification as follows –
Support and partner with others to reduce and prevent homelessness
Promote deed-restricted affordable, missing middle and other non-traditional
housing types
Page 38 of 131
2/8 Staff Agenda Correspondence Attachment B: Combined Council Pre-work
Attachment B: Combined Pre-work Page # 7
Efforts to ensure housing is safe and healthy
Continue to strive for diverse, neighborhoods that foster safety and community building
Proposed work items to be considered or edited for the Housing and Homelessness
goal:
Tenant protections in evictions and safety buckets.
Rental registry.
Revision to STR ordinance to reduce abuses and provide avenues for addressing
issues.
Initiate a rental registration list.
Consider other ideas from the Tenants Union requests which I think staff has reviewed.
Detailed work plan items in each priority area include:
Support and partner with others to reduce and prevent homelessness
Continue HSG grants, CDBG funding for homeless and prevention services and
non-congregate shelters/transitional housing and PSH, advocate for funding
with state, national and county partners, continue with CAT and MCU
implementation, seek funding for these efforts,
Promote deed-restricted affordable, missing middle and other non-
traditional housing types
Continue to seek funding for affordable housing and partnerships with county
and state to fund, study session on housing policies like down payment
assistance and other mechanisms to support low-income workers in needed
fields (ex. Health care, child care).
Efforts to ensure housing is safe and healthy
Consider no smoking ordinances in multi-family housing, code enforcement of
safe housing issues, consider need for ordinances on mold, security,
incorporate services nearby neighborhoods that are walkable/bikable and
accessible by transit.
Continue to strive for diverse, neighborhoods that foster safety and
community building
Work with Cal Poly to continue to enforce zoning regulations related to
fraternities operating in neighborhoods, continue to advocate for Greek Life
housing on campus and education of students on expected behaviors in
neighborhoods (good neighbor policies), consider ways to continue to diversify
neighborhoods with different types of housing, services nearby, and household
types per housing element.
Possible measures:
RHNA goal status
Pro-Housing and other affordable housing development awards
Page 39 of 131
2/8 Staff Agenda Correspondence Attachment B: Combined Council Pre-work
Attachment B: Combined Pre-work Page # 8
Reduction in safe housing code enforcement fines/penalties by ??%
2. Are there any Major City Goals that need to be added? (Please note any
added/new goals may have trade-offs in the existing workplan or reducing core
services.)
Depending on how we reorganize the approach to major city goals. As value
statements, I like the current number and theme.
I’m open to discussing tradeoffs.
See discussion below. If we keep Major City Goals then I’m probably fine adjusting the
ones we have and not adding others. If we change to be more strategic then here are a
few things I might add:
General Plan Update
Public Communication and Outreach
Neighborhood Livability
Wildfire Mitigation
Public Safety Staffing
ADA and Walkable Community
Tenant Protection
No, just some tweaks, and would like to see us consider when something comes off the
list of “Major City Goals,” either because it’s been operationalized, or because it’s not
needed anymore because we have “solved” the iss ue. (If that’s even possible!)
3. Are there any work items that need to be added (besides what is listed above)?
(Please note any added/new work items may have trade -offs in the existing
workplan or reducing core services.)
I’m open to discussing tradeoffs.
Statistically valid community issues and priorities survey.
Some new ideas noted above including safe housing measures. Also need to refine
codes, policies and practices related to fraternities in neighborhoods.
4. Within the current Major City Goals or current work items, what do you think
could be stopped or deferred, if needed?
We may need to revisit a conversation around timing and pace. I’m getting the feeling
that staff feels exhausted again and while there aren’t many specific cuts I’m ready to
propose, a slower pace may achieve similar cost savings. Also, is it time to talk about
the golf course? How do we handle this resource?
This answer depends on our overall discussion and consensus of the city’s priorities
Page 40 of 131
2/8 Staff Agenda Correspondence Attachment B: Combined Council Pre-work
Attachment B: Combined Pre-work Page # 9
I’m not prepared to answer today. I’ll be prepared for this on Saturday, but nothing
jumps out.
I don’t know until I see status of workplan items completed and those that need to be
ongoing.
5. Would you be interested in changing the label of Major City Goals? The
intention behind relabeling the Major City Goals would be to create overarching
bodies of work, rather than value statements, with specific work items,
measurable goals, and timelines.
Yes, if there was still room to articulate the major city goals as pillars or foundations that
the work items are then seated under. In general, the existing goals are still relevant and
mean something to the community. I see this as an opportunity to restructure and retain
rather than scrap the language that exists.
Yes, I am willing to change the names/labels. Our community should be able to give a
30 second elevator pitch on the community in which they live. What are we doing in the
community and what do we want to stop or improve.
I’d rather use the term “Strategic Budget Priorities” or something like it. The use of
“Major City Goals” is misleading because things like clean reliable drinking water, public
safety, and other critically important city issues are excluded. Major City Goals should
be reserved for strategic planning and reflect all of the critical city issues.
I proposed some new “labels” or “Priority Areas” above as overarching categories of
priorities of:
Climate Action and Sustainability
Healthy, Safe and Livable
Diverse, Inclusive and Culturally Vibrant
Responsible Government and Economic Vitality
Under those, I have listed priority areas (these could be called something else, but are
meant to explain what those overarching categories include).
Then, under those, I have suggested sample work plan items.
I would also recommend we come up with benchmark measures, to help us determine
when we have reached our goals.
Councilmember Candidate Goals
Candidate Goal 1: Protection of Open Space and Natural Resources, Climate action
and Resilience.
Continue protection and maintenance of Open space
Continue protection of Natural Resources
Improve creek clean up and restoration, eliminating illegal camping in creek areas
Expand urban forest and tree planting
Page 41 of 131
2/8 Staff Agenda Correspondence Attachment B: Combined Council Pre-work
Attachment B: Combined Pre-work Page # 10
Laguna Lake maintenance & conservation easement over lake natural area
Continue to implement our climate action plan, focusing on resilience
Improve emergency preparedness for natural disasters: wildfire, flood, drought
Candidate Goal 2) Housing for Social, Economic and Neighborhood Balance
Continue to facilitate affordable, supportive, senior and workforce housing
Continue to work with partners to support services for the unhoused
Update and enforce neighborhood livability (wellness) policies, including the 2015
City/Cal Poly/Cuesta Civility agreement of 2015
Enforce removal of illegal fraternities from R-1 and R-2 neighborhoods
Establish renter protection policies, including establishing a mandatory Rental
Registration program
Add needed code enforcement and Community service officers
Candidate goal 3) Economic and Cultural Vitality
Support a thriving and sustainable local economy, including focus on the Downtown
Reduce Downtown vacancies by connecting landlords experiencing vacancies with
local businesses seeking brick and mortar premises
Encourage local culture, the arts and arts education, focusing on the Cultural Arts
District
Protect and maintain historical resources partnering with nonprofits
Candidate Goal 4) Strengthening Community Sense of Well Being
Complete and improve parks (shade retreats, splash pads, bike courses), including
Righetti park
Continue DEI policies in city administration and reach out to new residents,
permanent and student
Support youth, senior and mental health services, partnering with the county and
nonprofits.
Expand local volunteer opportunities
Make the city a “Family Friendly workplace” (improve childcare options for
employees)
Continue to facilitate high speed internet access for all residents
Candidate Goal 5) Improving Public Safety
Increase CAT, MCU and Community Service Officers, expand evening and weekend
coverage.
Hire more needed police officers
Determine a location for Fire House #5 and expedite construction
Hire an Emergency Operations Officer
Educate cell phone users that they need to sign up for reverse 911 service
Reinstate CERT and community emergency preparedness
Improve notification of evacuation routes, including that of senior and disabled
residents
Page 42 of 131
2/8 Staff Agenda Correspondence Attachment B: Combined Council Pre-work
Attachment B: Combined Pre-work Page # 11
Work with Cal Poly to end St. Fratty’s Day and prevent large student gatherings in
the neighborhoods.
Candidate Goal 6) Infrastructure and Transportation
Protect water security & improve ground water augmentation
Extend purple pipe to older neighborhoods to save potable water
Upgrade maintenance of streets for automobile, bicycle, and mass transportation
Conduct actual usage, traffic counts and “origin/destination” studies for need, before
building future permanent bike lanes or eliminating traffic lanes
Prioritize improvement of dangerous streets and intersections, as well as evacuation
routes
Improve the safety of the Broad Street corridor
Candidate Goal 7) Fiscal Responsibility and Sustainability
Continue to pay down PERS pension liability
Overhaul and improve collection of business license fees
Fully utilize measure Y (REOC) funds (as per statutory priorities) in the current
budget cycle
Analyze and improve fiscally responsible and sustainable city operation of essential
services
Pause or postpone expensive capital projects where feasible, if needed due budget
deficits
Avoid taking on more debt burden; refinance loans where possible
Page 43 of 131
Page 44 of 131