Loading...
HomeMy WebLinkAboutCODE-000007-20251150 Laurel 2025-03-07 Email RE asbuilt cross bracing reviewFrom:Loew, Michael Mloew@slocity.org Subject:RE: Laurel as-built cross bracing review Date:March 7, 2025 at 3:42 PM To :Chuck Braff chuck@westpacinv.com Cc:Tway, Timothea (Timmi)TTway@slocity.org Thanks Chuck, See you at 2pm on Monday. Michael Loew Deputy Director/Chief Building Official Community Development E Mloew@slocity.org T 805.781.7157 slocity.org Stay connected with the City by signing up for e-notifications From: Chuck Braff <chuck@westpacinv.com> Sent: Friday, March 7, 2025 2:44 PM To: Loew, Michael <Mloew@slocity.org> Subject: Fwd: Laurel as-built cross bracing review     This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Following up on our conversation yesterday afternoon. Please find below an email from our structural engineer after his review of the cross bracing/ structure. In short, the structural elements of the building remain intact and have not been altered/ removed. I also wanted to add that I have been addressing concerns raised by tenants over the past two days. HASLO informed me that they have vacated the building, stating that a city official advised them the building was unsafe to occupy due to "structural issues." They also mentioned that the City is expediting their relocation to an alternative space in an effort to help them out. A second tenant shared that the first was leaving (water cooler talk) and asked if they should be leaving as well.  We are working diligently on the fire line. Ownership has spent over 1MM in the past two months funding work per our outlined schedule shared with you previously. We would like to be moving faster. This is a complicated process and I think we’ll see work in place moving quickly again now that much of the management legwork has been completed. Our focus has been on the fire line and now that that it is mostly lined out for the work to be installed we are transitioning our energies to the interior AMMR scope. Thank you again for being patient and we are looking forward to completing the work. See you Tuesday at 2pm for our site walk. If the time needs to change please just call and I will make sure to be there (I pick up my son at 250pm but can come back to site immediately following).   Chuck Braff M: 310.990.6897   Begin forwarded message:   From: Truitt Vance <truitt@ashleyvance.com> Subject: Laurel as-built cross bracing review Date: March 7, 2025 at 9:41:21 AM PST To: Chuck Braff <chuckbraff@gmail.com> Cc: Laurel Creek <laurel_creek@ashleyvance.com>   Chuck, As you requested I reviewed the existing as-built plans and confirmed the bracing locations shown on the original structural drawings (For Construction, March 25, 1957, S-4) are also still in place in the field, based on a recent photo review. If it helps with some of the confusion you relayed to me, there was never any similar bracing designed in the transverse, or short direction of the building.  The lateral system in this direction utilized at the time was a combination of fixed truss to column as well as fixed base details (S-6) on the columns. The concrete wall panels that were partial height and that were removed during construction were not contributing to the lateral stability of the building in any way. The design of the new improvements were to be structurally independent of the building and do not rely on the building for support, not contribute to it's seismic load.   If you or anyone else has any other questions please let me know. Truitt --   Truitt Vance, PE d 805.592.2401  |  o  o 805.545.0010 x112 1229 Carmel | San Luis Obispo, CA 99999 www.ashleyvance.com