HomeMy WebLinkAboutItem 5b. Cathodic Protection Study of the Whale Rock PipelineCity of San Luis Obispo, Title, Subtitle
Whale Rock Commission Report
Whale Rock Commission Meeting – May 8, 2025
Agenda Item 4 – Cathodic Protection Study, Whale Rock Pipeline
FROM: Aaron Floyd, Utilities Director
PREPARED BY: Noah Evans, Whale Rock Supervisor
SUBJECT: Cathodic Protection Survey of the Whale Rock Pipeline
RECOMMENDATIONS
No action is requested of the Commission for this update/presentation.
DISCUSSION
Cathodic protection prevents corrosion in metal structures, such as pipelines and
tanks, by applying a low electrical current. This method has been utilized since the
1930s. We use sacrificial cathodic protection for the Whale Rock pipeline , where
magnesium sulfide acts as the anode, corroding in place of the pipeline to protect it.
In January, our team collaborated with a specialized consultant to conduct a
comprehensive survey of Whale Rock's cathodic protection system (CPS). The
survey's objective was to assess the effectiveness of the CPS by measuring pipeline-
to-soil electrical flows against established industry standards at various points along
the pipeline. Key factors influencing the performance of the CPS, including electrical
isolation, interference, and continuity, were evaluated.
SACRIFICIAL ANODE CATHODIC PROTECTION SYSTEM
Page 15 of 141
City of San Luis Obispo, Title, Subtitle
Whale Rock Commission Report
Whale Rock Commission Meeting – May 8, 2025
Agenda Item 4 – Cathodic Protection Study, Whale Rock Pipeline
The consultant's report provides the following recommendations aimed at enhancing
the functionality of the CPS:
Recommendations:
1. Replacement of Anodes: Seventeen anodes require replacement. Anodes are
sacrificial components that protect the pipeline from corrosion by corroding
themselves. Anodes are wired to the pipeline and buried nearby. The
replacement process will involve excavation, installation of new anodes, and
backfilling of the excavated areas.
2. Installation of Electrical Isolators: To improve performance and eliminate
any risk of interference with the City of San Luis Obispo Water Treatment
Plant's metal pipes, electrical isolators will be installed between the Whale
Rock pipeline and the Water Treatment Plant.
3. Re-establishment of Anode and Test Station Connections: Connections
between the anodes and test stations will be re -established at eleven specific
locations. This will enable assessing anode performance at these sites, some
of which may require new anode installations.
4. Installation of Additional CPS Test Stations: Six additional CPS test
stations will be installed along the pipeline. Currently, there are no CPS test
stations between Pump Station B and the SLO Water Treatment Plant, which
spans approximately four miles.
Staff plans to re-establish the anode-to-test station connections (Report
Recommendation #3) over the coming months and to install the six additional CPS
test stations (Report Recommendation #4) during the summer. Additionally, staff will
develop a project for the Commission's future consideration to address
Recommendations 1 and 2.
ATTACHMENTS:
A - Cathodic Protection Survey Whale Rock Pipeline
Page 16 of 141
ACUUS-J212126-RSV-0.0 Page | ii 2025-03-05
Rev. Date Issued For Summary of Changes Originator Reviewer Approver
0 2025-03-05 Review First Issue
Jason Riggins
Senior CP Technician
US CP Division
Lisseth Ocando
Corrosion Engineer
US CP Division
Matthew Buchynski
Engineering Manager US
CP Division
2025 Whale Rock 30” Waterline
Cathodic Protection Survey
Report – Cathodic Protection Services
Issued To: City of San Luis Obispo
Prepared By: Acuren Inspection Inc.
Issue Date: 2025-03-05
Document ID: ACUUS-J212126-RSV-0.0
Page 17 of 141
City of San Luis Obispo I Cathodic Protection Report
2025 Whale Rock 30” Waterline CP Survey
ACUUS-J212126-RSV-0.0 Page | iii 2025-03-05
Table of Contents
PURPOSE ....................................................................................................................... 1
CRITERIA ........................................................................................................................ 1
RECOMMENDATIONS .................................................................................................... 2
SYSTEM DESCRIPTION ................................................................................................... 3
4.1 CURRENT SOURCES ....................................................................................................... 3
4.2 TEST STATIONS .............................................................................................................. 5
RESULTS ......................................................................................................................... 6
5.1 STATUS OF CATHODIC PROTECTION .............................................................................. 6
5.2 SYSTEM REPAIRS ........................................................................................................... 6
5.3 ELECTRICAL ISOLATION ................................................................................................. 6
5.4 ELECTRICAL CONTINUITY AND INADEQUATE CATHODIC PROTECTION ......................... 6
5.5 SUMMARY ..................................................................................................................... 7
List of Tables
Table 1: Rectifier Output .............................................................................................................. 3
Table 2: Galvanic Anode Output .................................................................................................. 4
Table 3: Repairs Performed .......................................................................................................... 6
Table 4: Project Details ................................................................................................................. 7
List of Figures
Figure 1: Test Station Location ..................................................................................................... 5
Appendices
Appendix 1: Cathodic Protection Summary of Deficiencies
Appendix 2: Rectifier and Groundbed Data
Appendix 3: Structure-to-Electrolyte Potential Data
Appendix 4: Rectifier Surveillance Form
Appendix 5: List of Drawings
Appendix 6: Cathodic Protection Photo Log
Page 18 of 141
City of San Luis Obispo I Cathodic Protection Report
2025 Whale Rock 30” Waterline CP Survey
ACUUS-J212126-RSV-0.0 Page | 1 2025-03-05
ATTENTION: Noah Evans
RE: 2025 CATHODIC PROTECTION SURVEY REPORT
CITY OF SAN LUIS OBISPO – WHALE ROCK 30” WATERLINE
Authorization to proceed with the 2025 cathodic protection (CP) survey for the Whale Rock 30”
Pipeline was received electronically from Noah Evans. Acuren Inspection Inc. (Acuren) personnel
conducted the fieldwork between January 21, 2025 and January 23, 2025 to assess the status of
the CP system.
PURPOSE
The purpose of the survey was to evaluate the effectiveness of the CP system(s) by measuring
structure-to-electrolyte potentials against established industry criteria at all points of access as
per CFR Title 49, Part 195 Transportation of Hazardous Liquids by Pipeline. Additionally, critical
elements which influence the performance of a CP system, such as electrical isolation, electrical
interference, and continuity were evaluated. Any encountered deficiencies have been recorded
in this report. Minor repairs were completed where required and any remedial work identified
to ensure optimal performance of the CP system(s).
CRITERIA
To evaluate the effectiveness of CP systems, structure-to-electrolyte potential measurements are
recorded from all design structures and assessed against industry recognized criteria. Accepted
standards for the control of external and internal corrosion include, but are not limited to:
NACE SP0169-2024: Control of External Corrosion on Underground or Submerged Metallic
Piping Systems
The accepted criteria for corrosion control of buried or submerged steel structures in the above
standard(s) is generally defined as one of the following:
A minimum of 100 mV of cathodic polarization.
Page 19 of 141
City of San Luis Obispo I Cathodic Protection Report
2025 Whale Rock 30” Waterline CP Survey
ACUUS-J212126-RSV-0.0 Page | 2 2025-03-05
A polarized structure-to-electrolyte potential of -850 mV or more negative measured with
respect to a copper/copper sulphate reference electrode.
Use of the 100-mV criterion requires the measurement of either the formation or decay of
polarization. Measuring the formation of polarization requires an accurate static potential
reading for comparison at each test location. Static potentials can only be collected when CP
system(s) have been turned ‘OFF’ for a sufficient period to allow for complete depolarization.
Measuring the decay of polarization requires the establishment of polarized potentials with all
CP systems electrically continuous with an asset turned ‘ON’. Polarization decay can then be
measured by turning off all applicable CP current sources.
In some circumstances, environmental factors may affect cathodic polarization behavior,
requiring specific adjustments to the applicable criteria for adequate CP. Where non-ferrous
metals are present, adjustments to the criteria are necessary to preserve the external integrity
of the buried metal structure. Extensions of the criteria for these specific situations are further
described in the applicable standard(s).
RECOMMENDATIONS
The following are recommended in order to achieve optimum levels of CP for the Whale Rock
pipeline:
• Ensure that the remedial work outlined on the attached “Summary of Deficiencies” is
completed and notify Acuren as soon as practical if a re-evaluation of the problem area(s)
is desired.
• Continue to operate the impressed current CP system(s) at their respective target current
outputs. Ensure the rectifier readings are recorded on a bi-monthly basis.
• Ensure that the galvanic anode system(s) are monitored on a periodic basis and the data
collected is stored properly for reference.
• Ensure adequate access is available to all locations during the annual CP survey.
• Consider utilizing Acuren’s pipeline integrity services (Indirect Inspection, ECDA) for any
length of pipeline where coating condition, burial depth, or CP potentials are of concern.
Page 20 of 141
City of San Luis Obispo I Cathodic Protection Report
2025 Whale Rock 30” Waterline CP Survey
ACUUS-J212126-RSV-0.0 Page | 3 2025-03-05
• Notify Acuren of any changes, additions, or modifications to the facility operation which
may impact the operation of the CP system(s) or the status of CP on any protected
structures.
• Authorize Acuren to complete the annual CP survey of the facilities in 2026.
SYSTEM DESCRIPTION
The Whale Rock - Pump Station facilities assets (inlet/outlet headers) are protected by impressed
current cathodic protection (ICCP) systems. Specific details concerning the ICCP system design
were not available at the time of the survey. The 30” Whale Rock waterline is protected by a
series of galvanic anode placements.
4.1 CURRENT SOURCES
The status and output of the rectifier(s) in the Whale Rock – Pump Station facilities is listed in
‘Table 1’. It is recommended that the rectifier(s) operate within their target current output(s)
to ensure optimum performance of the CP system(s). Specifications and operational data for
each rectifier can be found in “Appendix 2”.
TABLE 1: RECTIFIER OUTPUT
Rectifier Description Location Target Output
(A)
Actual Output
(A) Notes
Alpha Pump Station
A 0.4-0.6 0.5 Protects Inlet & Outlet
Headers
Bravo Pump Station
B 0.6-0.8 0.7 Protects Inlet & Outlet
Headers
The location and status of the galvanic anodes along the 30” Whale Rock pipeline is listed in
‘Table 2’. Of the 20x anode test stations detailed only 2x locations have active anode
connections with potentials showing an influence of cathodic protection. Anode test station
deficiencies are detailed in the deficiency summary found in “Appendix 1”.
Page 21 of 141
City of San Luis Obispo I Cathodic Protection Report
2025 Whale Rock 30” Waterline CP Survey
ACUUS-J212126-RSV-0.0 Page | 4 2025-03-05
TABLE 2: GALVANIC ANODE OUTPUT
Galvanic Anode Description Location Anode Output
(mA) Notes
Magnesium 10+00 0.0 Anode disconnected
Magnesium 71+30 0.0 Anode depleted
Magnesium 96+30 0.0 Anode depleted
Magnesium 96+30 0.0 Anode disconnected (Rear)
Magnesium 130+00 NR Anode present and
functional
Magnesium 157+00 0.0 Anode disconnected
Magnesium 165+00 0.0 Anode depleted
Magnesium 180+25 0.0 Anode(s) disconnected
Magnesium 207+00 0.0 Anode(s) disconnected
Magnesium 227+00 0.0 Anode depleted
Magnesium 295+05 0.0 Anode disconnected
Magnesium 300+00 NR Anode present and
functional
Magnesium 310+90 0.0 Anode disconnected
Magnesium 313+90 0.0 Anode(s) disconnected
Magnesium 397+25 0.0 Anode(s) disconnected
Magnesium 515+00 0.0 Anode disconnected
Magnesium 559+30 0.0 Anode depleted
Magnesium 579+00 0.0 Anode disconnected
Magnesium 602+50 0.0 Anode disconnected
Magnesium 602+50 0.0 Anode disconnected (Rear)
Page 22 of 141
City of San Luis Obispo I Cathodic Protection Report
2025 Whale Rock 30” Waterline CP Survey
ACUUS-J212126-RSV-0.0 Page | 5 2025-03-05
4.2 TEST STATIONS
Test stations are essential pieces of monitoring equipment for evaluation of the performance
of a CP system. Test stations can provide additional CP data at locations where no other above
ground structures are present for measurement. It is recommended that test stations remain
in good working order to facilitate future data collection during annual surveys. Test stations
deficiencies should be addressed according to the priority rating in “Appendix 1”. Figure 1
shows the actual view of the location of these test stations.
FIGURE 1: TEST STATION LOCATION – ACTUAL VIEW
Test station placement along the 30” Whale Rock waterline begin at station# 10+00 and end
at station# 602+50. There are no additional test station locations between Pump Station “B”
and the termination of the waterline at the regional treatment plant, approximately 4.5 miles.
Page 23 of 141
City of San Luis Obispo I Cathodic Protection Report
2025 Whale Rock 30” Waterline CP Survey
ACUUS-J212126-RSV-0.0 Page | 6 2025-03-05
RESULTS
5.1 STATUS OF CATHODIC PROTECTION
The impressed current cathodic protection systems for Pump Station A & B showed moderate
levels of CP, assets meet 100mV criteria.
The galvanic anode cathodic protection systems for the 30” Whale Rock waterline showed
inadequate levels of CP; CP levels are expected to improve once the deficiencies noted in 4.1
are addressed.
5.2 SYSTEM REPAIRS
Minor repairs to the CP system were completed during the 2025 survey where possible.
Repairs completed are summarized in ‘Table 3’.
TABLE 3: REPAIRS PERFORMED
Asset
Repaired Location Deficiency Description Repair Performed
TR-Alpha Pump Station A Rectifier (Alpha) has a broken
negative structure cable. Established structure negative
5.3 ELECTRICAL ISOLATION
Electrical isolation devices are placed strategically along the 30” Whale Rock waterline to
prevent current drains to unintended structures, that could detrimentally affect the operation
of the CP system(s). Electrical isolation devices should be repaired or installed according to the
isolation deficiencies in “Appendix 1”. All procured isolation devices should be rated for oil
and gas environments, the appropriate services temperature and pressure rating, and their
specific application.
5.4 SUMMARY
At the time of the survey, the majority of the below ground design structures were not
receiving adequate CP as defined by NACE SP0169-2024 to mitigate external corrosion.
“Appendix 1” outlines the system repairs, modifications, and upgrades recommended at this
time.
Page 24 of 141
City of San Luis Obispo I Cathodic Protection Report
2025 Whale Rock 30” Waterline CP Survey
ACUUS-J212126-RSV-0.0 Page | 7 2025-03-05
Once the recommended repairs are completed, facilities requiring CP should be adequately
protected. ‘Table 6’ outlines the dates and personnel responsible for this project.
TABLE 4: PROJECT DETAILS
Project Dates:
Field: January 21, 2025 to January 23, 2025
Office: February 15, 2021 to March 5, 2025
Personnel :
Field: - Jason Riggins, Senior CP Technician
Office:
- Jason Riggins, Senior CP Technician
- Lisseth Ocando, Corrosion Engineer
- Matthew Buchynski, Engineering Manager
Acuren appreciates the opportunity to have completed this project and looks forward to working
with you again in the future. Should there be any questions, comments, or concerns regarding
the contents of this report, please contact the undersigned.
Respectfully,
ACUREN INSPECTION INC.
Matthew Buchynski, P.Eng., NACE CP3 Technologist
Engineering Manager – US CP
Phone: (587) 217-0466
Email: matthew.buchynski@acuren.com
Page 25 of 141
City of San Luis Obispo I Cathodic Protection Report
2025 Whale Rock 30” Waterline CP Survey
ACUUS-J212126-RSV-0.0 2025-03-05
APPENDIX 1: CATHODIC PROTECTION SUMMARY OF DEFICIENCIES
Page 26 of 141
CITY OF SAN LUIS OBISPO Priority:
WHALE ROCK - CATHODIC PROTECTION SURVEY 1 - Deficiency causes asset to not meet criteria. Asset out of compliance.
SUMMARY OF DEFICIENCIES 2 - Deficiency is not causing negative effects to asset at present but may in future.
2025 CP SURVEY - 30" WATERLINE 3 - Deficiency impacts the completion of the intended scope of work.
Deficiency ID Test Point ID Deficiency Type Priority Asset ID Description Recommended Action Cost Estimate Action
Assigned To
Additional
Reference Deficiency Status Target
Completion Date
Actual
Completion Date Comments
SOL-0001
Electrical
Insulation 1
Conveyance conduit is shorted to piping system
of the water treatment plant. This issue is a
concern and is reduce the life of the CP systems
and lowering CP protection levels on the water
system.
Recommended to install permanent isolators
and remeasure to ensure total isolation and
improved mechanical connection.
City of
San Luis Obispo
Water Treatment
Facility Incomplete 2025/12/30 2024/10/14
SOL-0002 System
Inadequate
Monitoring 2
Water Piping
System
Missing multiple periods of rectifier operational
data. Synchronous interruption require to gather
reliable IR free potentials required.
Install Remote Monitoring Units at each of the
three operational rectifiers or establish a bi-
monthly rectifier inspection/reporting program. SOL/Acuren Monitor 2025/12/30 Acuren to provide proposal
SOL-0003 System
Inadequate
Reference
Information 2 Facility
System drawings are missing updates and MOC
information.
Redline and update drawings after completion of
deficiency remediation, circuit reconfiguration,
and annual survey. Draft updates and install
printed copies in rectifiers/JBs. SOL/Acuren Incomplete 2025/03/30 Acuren to provide proposal
SOL-0004 System
Rectifier/Groundb
ed 1 TR‐Alpha
Rectifier (Alpha) has a broken negative structure
cable. Rectifier is functional, but not connected
to inlet/ outlet headers.
Establish structure negative, energize ICCP
system and allow to polarize. Update system
documentation to reflect system changes. Acuren Pump Station A Complete 2025/01/22 2025/01/23 Completed as part of project
SOL-0005 System
Inadequate
Cathodic
Protection 1 TR‐Bravo
Test point not meeting 100mV / 850mV
criterion.
Adjust system output. Update system
documentation to reflect system changes. Acuren Pump Station B Complete 2025/01/22 2025/01/23 Completed as part of project
SOL-0006 TP 10+00
Inadequate
Cathodic
Protection 1
Water Piping
System
Test point not meeting 100mV / 850mV
criterion.
Re-establish galvanic anode connection and
allow to polarize.Acuren Monitor 12/30/2025
SOL-0007 TP 48+00
Inadequate
Cathodic
Protection 1
Water Piping
System
Test point not meeting 100mV / 850mV
criterion. Consider installing galvanic anode at this location Acuren Monitor 12/30/2025
SOL-0008 TP 63+00
Inadequate
Cathodic
Protection 1
Water Piping
System
Test point not meeting 100mV / 850mV
criterion. Consider installing galvanic anode at this location Acuren Monitor 12/30/2025
SOL-0009 TP 65+85
Inadequate
Cathodic
Protection 1
Water Piping
System
Test point not meeting 100mV / 850mV
criterion. Consider installing galvanic anode at this location Acuren Monitor 12/30/2025
SOL-0010 TP 71+30
Inadequate
Cathodic
Protection 1
Water Piping
System
Test point not meeting 100mV / 850mV
criterion. Consider installing galvanic anode at this location Acuren Monitor 12/30/2025
SOL-0011 TP 96+30
Inadequate
Cathodic
Protection 1
Water Piping
System
Test point not meeting 100mV / 850mV
criterion.
Re-establish galvanic anode connection and
allow to polarize.Acuren Monitor 12/30/2025
SOL-0012 TP 139+00
Inadequate
Cathodic
Protection 1
Water Piping
System
Test point not meeting 100mV / 850mV
criterion. Consider installing galvanic anode at this location Acuren Monitor 12/30/2025
SOL-0013 TP 143+00
Inadequate
Cathodic
Protection 1
Water Piping
System
Test point not meeting 100mV / 850mV
criterion. Consider installing galvanic anode at this location Acuren Monitor 12/30/2025
SOL-0014 TP 157+00
Inadequate
Cathodic
Protection 1
Water Piping
System
Test point not meeting 100mV / 850mV
criterion.
Re-establish galvanic anode connection and
allow to polarize.Acuren Monitor 12/30/2025
SOL-0015 TP 160+00
Inadequate
Cathodic
Protection 1
Water Piping
System
Test point not meeting 100mV / 850mV
criterion. Consider installing galvanic anode at this location Acuren Monitor 12/30/2025
SOL-0016 TP 165+00
Inadequate
Cathodic
Protection 1
Water Piping
System
Test point not meeting 100mV / 850mV
criterion. Consider installing galvanic anode at this location Acuren Monitor 12/30/2025
SOL-0017 TP 176+00
Inadequate
Cathodic
Protection 1
Water Piping
System
Test point not meeting 100mV / 850mV
criterion. Consider installing galvanic anode at this location Acuren Monitor 12/30/2025
Page 27 of 141
CITY OF SAN LUIS OBISPO Priority:
WHALE ROCK - CATHODIC PROTECTION SURVEY 1 - Deficiency causes asset to not meet criteria. Asset out of compliance.
SUMMARY OF DEFICIENCIES 2 - Deficiency is not causing negative effects to asset at present but may in future.
2025 CP SURVEY - 30" WATERLINE 3 - Deficiency impacts the completion of the intended scope of work.
Deficiency ID Test Point ID Deficiency Type Priority Asset ID Description Recommended Action Cost Estimate Action
Assigned To
Additional
Reference Deficiency Status Target
Completion Date
Actual
Completion Date Comments
SOL-0018 TP 180+25
Inadequate
Cathodic
Protection 1
Water Piping
System
Test point not meeting 100mV / 850mV
criterion.
Re-establish galvanic anode connection and
allow to polarize.Acuren Monitor 12/30/2025
SOL-0019 TP 207+00
Inadequate
Cathodic
Protection 1
Water Piping
System
Test point not meeting 100mV / 850mV
criterion.
Re-establish galvanic anode connection and
allow to polarize.Acuren Monitor 12/30/2025
SOL-0020 TP 217+39.5
Inadequate
Cathodic
Protection 1
Water Piping
System
Test point not meeting 100mV / 850mV
criterion. Consider installing galvanic anode at this location Acuren Monitor 12/30/2025
SOL-0021 TP 227+00
Inadequate
Cathodic
Protection 1
Water Piping
System
Test point not meeting 100mV / 850mV
criterion. Consider installing galvanic anode at this location Acuren Monitor 12/30/2025
SOL-0022 TP 257+10
Inadequate
Cathodic
Protection 1
Water Piping
System
Test point not meeting 100mV / 850mV
criterion. Consider installing galvanic anode at this location Acuren Monitor 12/30/2025
SOL-0023 TP 295+05
Inadequate
Cathodic
Protection 1
Water Piping
System
Test point not meeting 100mV / 850mV
criterion.
Re-establish galvanic anode connection and
allow to polarize.Acuren Monitor 12/30/2025
SOL-0024 TP 310+90
Inadequate
Cathodic
Protection 1
Water Piping
System
Test point not meeting 100mV / 850mV
criterion.
Re-establish galvanic anode connection and
allow to polarize.Acuren Monitor 12/30/2025
SOL-0025 TP 313+90
Inadequate
Cathodic
Protection 1
Water Piping
System
Test point not meeting 100mV / 850mV
criterion.
Re-establish galvanic anode connection and
allow to polarize.Acuren Monitor 12/30/2025
SOL-0026 TP 358+00
Inadequate
Cathodic
Protection 1
Water Piping
System
Test point not meeting 100mV / 850mV
criterion. Consider installing galvanic anode at this location Acuren Monitor 12/30/2025
SOL-0027 TP 397+25
Inadequate
Cathodic
Protection 1
Water Piping
System
Test point not meeting 100mV / 850mV
criterion.
Re-establish galvanic anode connection and
allow to polarize.Acuren Monitor 12/30/2025
SOL-0028 TP 430+00
Inadequate
Cathodic
Protection 1
Water Piping
System
Test point not meeting 100mV / 850mV
criterion. Consider installing galvanic anode at this location Acuren Monitor 12/30/2025
SOL-0029 TP 461+47
Inadequate
Cathodic
Protection 1
Water Piping
System
Test point not meeting 100mV / 850mV
criterion. Consider installing galvanic anode at this location Acuren Monitor 12/30/2025
SOL-0030 TP 515+00
Inadequate
Cathodic
Protection 1
Water Piping
System
Test point not meeting 100mV / 850mV
criterion.
Re-establish galvanic anode connection and
allow to polarize.Acuren Monitor 12/30/2025
SOL-0031 TP 559+30
Inadequate
Cathodic
Protection 1
Water Piping
System
Test point not meeting 100mV / 850mV
criterion. Consider installing galvanic anode at this location Acuren Monitor 12/30/2025
SOL-0032 TP 579+00
Inadequate
Cathodic
Protection 1
Water Piping
System
Test point not meeting 100mV / 850mV
criterion. Consider installing galvanic anode at this location Acuren Monitor 12/30/2025
SOL-0033 TP 602+50
Inadequate
Cathodic
Protection 2
Water Piping
System
Test point not meeting 100mV / 850mV
criterion.
Re-establish galvanic anode connection and
allow to polarize.Acuren Monitor 12/30/2025
SOL-0034 PLEX-03
Inadequate
Cathodic
Protection 2
Water Piping
System
Test point not meeting 100mV / 850mV
criterion. Consider installing anode test station.Acuren Pipeline Exposure Monitor 12/30/2025
SOL-0035 PLEX-04
Inadequate
Cathodic
Protection 2
Water Piping
System
Test point not meeting 100mV / 850mV
criterion. Consider installing anode test station.Acuren Pipeline Exposure Monitor 12/30/2025
SOL-0036 PLEX-05
Inadequate
Cathodic
Protection 2
Water Piping
System
Test point not meeting 100mV / 850mV
criterion. Consider installing anode test station.Acuren Pipeline Exposure Monitor 12/30/2025
SOL-0037 PLEX-06
Inadequate
Cathodic
Protection 2
Water Piping
System
Test point not meeting 100mV / 850mV
criterion. Consider installing anode test station.Acuren Pipeline Exposure Monitor 12/30/2025
Page 28 of 141
CITY OF SAN LUIS OBISPO Priority:
WHALE ROCK - CATHODIC PROTECTION SURVEY 1 - Deficiency causes asset to not meet criteria. Asset out of compliance.
SUMMARY OF DEFICIENCIES 2 - Deficiency is not causing negative effects to asset at present but may in future.
2025 CP SURVEY - 30" WATERLINE 3 - Deficiency impacts the completion of the intended scope of work.
Deficiency ID Test Point ID Deficiency Type Priority Asset ID Description Recommended Action Cost Estimate Action
Assigned To
Additional
Reference Deficiency Status Target
Completion Date
Actual
Completion Date Comments
SOL-0038 PLEX-07
Inadequate
Cathodic
Protection 2
Water Piping
System
Test point not meeting 100mV / 850mV
criterion. Consider installing anode test station.Acuren Pipeline Exposure Monitor 12/30/2025
SOL-0039 PLEX-08
Inadequate
Cathodic
Protection 2
Water Piping
System
Test point not meeting 100mV / 850mV
criterion. Consider installing anode test station.Acuren Pipeline Exposure Monitor 12/30/2025
SOL-0040 Monitoring 3
Water Piping
System Need 2025 "off" potential Interrupted 2026 Annual Survey Acuren Incomplete 1/30/2026 Acuren to provide proposal
Page 29 of 141
City of San Luis Obispo I Cathodic Protection Report
2025 Whale Rock 30” Waterline CP Survey
ACUUS-J212126-RSV-0.0 2025-03-05
APPENDIX 2: RECTIFIER AND GROUNDBED DATA
Page 30 of 141
CITY OF SAN LUIS OBISPO
WHALE ROCK - CATHODIC PROTECTION SURVEY
RECTIFIER INSPECTION DATA
2025 CP SURVEY - 30" WATERLINE
Pr
o
j
e
c
t
N
a
m
e
Re
c
t
i
f
i
e
r
I
D
Re
c
t
i
f
i
e
r
L
o
c
a
t
i
o
n
D
e
s
c
r
i
p
t
i
o
n
Se
r
i
a
l
N
u
m
b
e
r
Mo
d
e
l
N
u
m
b
e
r
Ma
n
u
f
a
c
t
u
r
e
r
Re
c
t
i
f
i
e
r
R
e
a
d
i
n
g
D
a
t
e
Re
a
d
i
n
g
S
t
a
t
u
s
Ta
p
S
e
t
t
i
n
g
s
To
t
a
l
V
o
l
t
a
g
e
(
V
DC
)
To
t
a
l
A
m
p
e
r
a
g
e
(
A
)
Ci
r
c
u
i
t
R
e
s
i
s
t
a
n
c
e
(
Ω
)
Fi
e
l
d
C
o
m
m
e
n
t
s
Co
m
m
e
n
t
s
Sh
u
n
t
R
a
t
i
n
g
Ra
t
e
d
A
C
V
o
l
t
a
g
e
1
Ra
t
e
d
A
C
A
m
p
e
r
a
g
e
1
Fu
s
e
T
y
p
e
Nu
m
b
e
r
o
f
S
p
a
r
e
F
u
s
e
s
As
B
u
i
l
t
S
i
t
e
S
k
e
t
c
h
Re
c
t
i
f
i
e
r
S
c
h
e
m
a
t
i
c
Re
c
t
i
f
i
e
r
E
x
t
e
r
n
a
l
D
i
s
c
o
n
n
e
c
t
CP
W
a
r
n
i
n
g
S
i
g
n
s
In
s
p
e
c
t
i
o
n
C
o
m
p
a
n
y
In
s
p
e
c
t
o
r
N
a
m
e
SLO WHALE ROCK ALPHA PSA - MCC 932321 ES Universal Rectifiers 2025-01-22 AF Cl F2 7.63 0 NR No current output Trace Neg. attachment 1mv/ 0.2A 20 5 AC 0 No No No No Acuren J. Riggins
SLO WHALE ROCK ALPHA PSA - MCC 932321 ES Universal Rectifiers 2025-01-22 AA C1 F6 16.39 0 NR No Neg. Attachment Re-establish Neg. Attachment 1mv/ 0.2A 20 5 AC 0 No No No No Acuren J. Riggins
SLO WHALE ROCK ALPHA PSA - MCC 932321 ES Universal Rectifiers 2025-01-22 AL C1 F6 4.29 0.50 8.58 Neg. Established Allow to polarize - Re-survey 1mv/ 0.2A 20 5 AC 0 No No No No Acuren J. Riggins
SLO WHALE ROCK BRAVO PSB - MCC 932322 ES Universal Rectifiers 2025-01-22 AF C2 F1 10.42 0.2 52.10 Header potential low Adjust output 1mv/ 0.2A 20 5 AC 0 No No No No Acuren J. Riggins
SLO WHALE ROCK BRAVO PSB - MCC 932322 ES Universal Rectifiers 2025-01-22 AA C2 F6 16.39 0.4 40.98 Header potential low Adjust output 1mv/ 0.2A 20 5 AC 0 No No No No Acuren J. Riggins
SLO WHALE ROCK BRAVO PSB - MCC 932322 ES Universal Rectifiers 2025-01-22 AL C2 F6 17.36 0.70 24.80 Header potential low As-Left 1mv/ 0.2A 20 5 AC 0 No No No No Acuren J. Riggins
Page 31 of 141
City of San Luis Obispo I Cathodic Protection Report
2025 Whale Rock 30” Waterline CP Survey
ACUUS-J212126-RSV-0.0 2025-03-05
APPENDIX 3: STRUCTURE-TO-ELECTROLYTE POTENTIAL DATA
Page 32 of 141
CITY OF SAN LUIS OBISPO
WHALE ROCK - CATHODIC PROTECTION SURVEY
CP TEST POINT DATA
2025 CP SURVEY - 30" WATERLINE
Pr
o
j
e
c
t
N
a
m
e
Te
s
t
P
o
i
n
t
T
e
r
m
i
n
a
l
I
D
Te
s
t
P
o
i
n
t
L
e
a
d
I
D
Cl
i
e
n
t
A
s
s
e
t
D
e
s
i
g
n
a
t
i
o
n
Pi
p
e
l
i
n
e
L
i
c
e
n
s
e
N
u
m
b
e
r
Fr
o
m
L
o
c
a
t
i
o
n
To
L
o
c
a
t
i
o
n
Su
b
s
t
a
n
c
e
OD
(
i
n
)
Le
n
g
t
h
(
f
t
)
St
a
t
u
s
Ma
t
e
r
i
a
l
St
r
u
c
t
u
r
e
O
n
(
-
m
V
CS
E
)
St
r
u
c
t
u
r
e
O
f
f
(
-
m
V
CS
E
)
An
o
d
e
O
n
(
-
m
V
CS
E
)
An
o
d
e
O
f
f
(
-
m
V
CS
E
)
Re
f
e
r
e
n
c
e
C
e
l
l
L
o
c
a
t
i
o
n
Fi
e
l
d
C
o
m
m
e
n
t
s
Co
m
m
e
n
t
s
Me
a
s
u
r
e
m
e
n
t
S
t
a
t
u
s
Me
a
s
u
r
e
m
e
n
t
D
a
t
e
In
t
e
r
r
u
p
t
e
d
P
r
o
t
e
c
t
i
o
n
So
u
r
c
e
Te
c
h
n
i
c
i
a
n
N
a
m
e
Anode Test Station Lead #1 - Pipe 1 1x - Black CC -Reservoir Station A Water 30 -O -346 Port. Ref.AF 1/21/2025 N/A J. Riggins
10+00 Lead #2 - Anode 1x - Red ---------1415 Port. Ref.Anode not connected AF 1/21/2025 N/A J. Riggins
35.442646 Lead #0 - Empty ---------
-120.887133 Lead #0 - Empty ---------
Test Station Lead #1 - Pipe 1 1x - Bare CC -Reservoir Station A Water 30 -O -570 Port. Ref.No Anode at location 40+00 Insulating Coupling AF 1/21/2025 N/A J. Riggins
48+00 Lead #2 - Pipe 1 1x - Bare CC -Reservoir Station A Water 30 -O -570 Port. Ref.Confirm Isolation AF 1/21/2025 N/A J. Riggins
35.434807 Lead #3 - Pipe 1 1x - Bare CC -Reservoir Station A Water 30 -O -570 Port. Ref.AF 1/21/2025 N/A J. Riggins
-120.88579 Lead #4 - Pipe 1 1x - Bare CC -Reservoir Station A Water 30 -O -570 Port. Ref.AF 1/21/2025 N/A J. Riggins
Test Station Lead #1 - Pipe 1 1x - Black CC -Reservoir Station A Water 30 -O -475 Port. Ref.No Anode at location 63+00 Insulating Coupling AF 1/21/2025 N/A J. Riggins
63+00 Lead #2 - Pipe 1 1x - Black CC -Reservoir Station A Water 30 -O -475 Port. Ref.Confirm Isolation AF 1/21/2025 N/A J. Riggins
35.429397 Lead #0 - Empty ---------
-120.881814 Lead #0 - Empty ---------
Test Station Lead #1 - Pipe 1 1x - Black CC -Reservoir Station A Water 30 -O -430 Port. Ref.No Anode at location AF 1/21/2025 N/A J. Riggins
65+85 Lead #0 - Empty ---------AF 1/21/2025 N/A J. Riggins
35.428832 Lead #0 - Empty ---------
-120.881311 Lead #0 - Empty ---------
Anode Test Station Lead #1 - Pipe 1 1x - Black CC -Reservoir Station A Water 30 -O -330 Port. Ref.71+30 Insulating Coupling AF 1/21/2025 N/A J. Riggins
71+30 Lead #2 - Pipe 1 1x - Black CC -Reservoir Station A Water 30 -O -330 Port. Ref.AF 1/21/2025 N/A J. Riggins
35.427664 Lead #3 - Pipe 2 1x - White CC -Reservoir Station A Water 30 -O -449 Port. Ref.AF 1/21/2025 N/A J. Riggins
-120.880275 Lead #4 - Pipe 2 1x - White CC -Reservoir Station A Water 30 -O -449 Port. Ref.AF 1/21/2025 N/A J. Riggins
Lead #5 - Anode 1x - Black ---------449 Port. Ref.Anode Depleted AF 1/21/2025 N/A J. Riggins
Anode Test Station Lead #1 - Pipe 1 1x - Black CC -Reservoir Station A Water 30 -O -415 Port. Ref.Pump Station A AF 1/21/2025 N/A J. Riggins
96+30 Lead #2 - Anode 1 1x - Black ---------415 Port. Ref.Anode Depleted ICCP system installed/ Non-Functional AF 1/21/2025 N/A J. Riggins
35.421243 Lead #3 - Anode 2 1x - Black ---------415 Port. Ref.Anode Depleted Protects Inlet/ Outlet Header AF 1/21/2025 N/A J. Riggins
-120.876756 Lead #0 - Header 1 1x - Black CC -Station A Station A Water --O -250 Port. Ref.Establish structure negative AF 1/21/2025 N/A J. Riggins
Lead #0 - Header 2 1x - Black CC Station A Station A Water --O -246 Port. Ref.Headers not isolated from pipeline AF 1/21/2025 N/A J. Riggins
Lead #1 - Pipe 2 1x - Black CC Station A Station A Water --O -237 Port. Ref.AF 1/21/2025 N/A J. Riggins
Lead #2 - Anode 2 1x - Black ---------1200 Port. Ref.Anode not connected TP at Rear of station AF 1/21/2025 N/A J. Riggins
Anode Test Station Lead #1 - Pipe 1 1x - White CC -Station A Station B Water 30 -O -1279 Port. Ref.Active Anode location AF 1/21/2025 N/A J. Riggins
130+00 Lead #2 - Pipe 1 1x - White CC -Station A Station B Water 30 -O -1279 Port. Ref.AF 1/21/2025 N/A J. Riggins
35.416033 Lead #3 - Pipe 2 1x - White CC -Station A Station B Water 30 -O -713 Port. Ref.AF 1/21/2025 N/A J. Riggins
-120.874328 Lead #4 - Pipe 2 1x - White CC -Station A Station B Water 30 -O -713 Port. Ref.AF 1/21/2025 N/A J. Riggins
Lead #5 - Anode 1x - Red ---------1279 Port. Ref.Anode present AF 1/21/2025 N/A J. Riggins
Test Station Lead #1 - Pipe 1 1x - Black CC -Station A Station B Water 30 -O -385 Port. Ref.AF 1/21/2025 N/A J. Riggins
139+00 Lead #0 - Empty ---------No Anode at location
35.415255 Lead #0 - Empty ---------
-120.874005 Lead #0 - Empty ---------
Test Station Lead #1 - Pipe 1 1x - Black CC -Station A Station B Water 30 -O -439 Port. Ref.143+00 Insulating Coupling AF 1/21/2025 N/A J. Riggins
143+00 Lead #2 - Pipe 1 1x - Black CC -Station A Station B Water 30 -O -439 Port. Ref.Confirm Isolation AF 1/21/2025 N/A J. Riggins
35.411367 Lead #3 - Pipe 2 1x - Black CC -Station A Station B Water 30 -O -420 Port. Ref.AF 1/21/2025 N/A J. Riggins
-120.871147 Lead #4 - Pipe 2 1x - Black CC -Station A Station B Water 30 -O -420 Port. Ref.No Anode at location AF 1/21/2025 N/A J. Riggins
Anode Test Station Lead #1 - Pipe 1 1x - Black CC -Station A Station B Water 30 -O -439 Port. Ref.157+00 Insulating Coupling AF 1/21/2025 N/A J. Riggins
157+00 Lead #2 - Pipe 1 1x - Black CC -Station A Station B Water 30 -O -439 Port. Ref.Confirm Isolation AF 1/21/2025 N/A J. Riggins
35.41093 Lead #3 - Pipe 2 1x - Black CC -Station A Station B Water 30 -O -417 Port. Ref.AF 1/21/2025 N/A J. Riggins
-120.870125 Lead #4 - Pipe 2 1x - Black CC -Station A Station B Water 30 -O -417 Port. Ref.AF 1/21/2025 N/A J. Riggins
Lead #5 - Anode 1x - Black ---------1417 Port. Ref.Anode not connected AF 1/21/2025 N/A J. Riggins
Page 33 of 141
CITY OF SAN LUIS OBISPO
WHALE ROCK - CATHODIC PROTECTION SURVEY
CP TEST POINT DATA
2025 CP SURVEY - 30" WATERLINE
Pr
o
j
e
c
t
N
a
m
e
Te
s
t
P
o
i
n
t
T
e
r
m
i
n
a
l
I
D
Te
s
t
P
o
i
n
t
L
e
a
d
I
D
Cl
i
e
n
t
A
s
s
e
t
D
e
s
i
g
n
a
t
i
o
n
Pi
p
e
l
i
n
e
L
i
c
e
n
s
e
N
u
m
b
e
r
Fr
o
m
L
o
c
a
t
i
o
n
To
L
o
c
a
t
i
o
n
Su
b
s
t
a
n
c
e
OD
(
i
n
)
Le
n
g
t
h
(
f
t
)
St
a
t
u
s
Ma
t
e
r
i
a
l
St
r
u
c
t
u
r
e
O
n
(
-
m
V
CS
E
)
St
r
u
c
t
u
r
e
O
f
f
(
-
m
V
CS
E
)
An
o
d
e
O
n
(
-
m
V
CS
E
)
An
o
d
e
O
f
f
(
-
m
V
CS
E
)
Re
f
e
r
e
n
c
e
C
e
l
l
L
o
c
a
t
i
o
n
Fi
e
l
d
C
o
m
m
e
n
t
s
Co
m
m
e
n
t
s
Me
a
s
u
r
e
m
e
n
t
S
t
a
t
u
s
Me
a
s
u
r
e
m
e
n
t
D
a
t
e
In
t
e
r
r
u
p
t
e
d
P
r
o
t
e
c
t
i
o
n
So
u
r
c
e
Te
c
h
n
i
c
i
a
n
N
a
m
e
Test Station Lead #1 - Pipe 1 1x - Black CC -Station A Station B Water 30 -O -505 Port. Ref.AF 1/21/2025 N/A J. Riggins
160+00 Lead #0 - Empty ---------Port. Ref.No Anode at location AF 1/21/2025 N/A J. Riggins
35.410217 Lead #0 - Empty ---------Port. Ref.AF 1/21/2025 N/A J. Riggins
-120.86901 Lead #0 - Empty ---------
Anode Test Station Lead #1 - Pipe 1 1x - Black CC -Station A Station B Water 30 -O -587 Port. Ref.AF 1/21/2025 N/A J. Riggins
165+00 Lead #2 - Anode 1 1x - Black ---------587 Port. Ref.Anode depleted AF 1/21/2025 N/A J. Riggins
35.408715 Lead #3 - Anode 2 1x - Black ---------587 Port. Ref.Anode depleted AF 1/21/2025 N/A J. Riggins
-120.867843 Lead #0 - Empty ---------
Test Station Lead #1 - Pipe 1 1x - Black CC -Station A Station B Water 30 -O -578 Port. Ref.171+00 Insulating Coupling AF 1/21/2025 N/A J. Riggins
176+00 Lead #0 - Empty ---------No Anode at location Confirm Isolation
35.407844 Lead #0 - Empty ---------
-120.866588 Lead #0 - Empty ---------
Anode Test Station Lead #1 - Pipe 1 1x - Black CC -Station A Station B Water 30 -O -525 Port. Ref.180+25 Insulating Coupling AF 1/21/2025 N/A J. Riggins
180+25 Lead #2 - Pipe 1 1x - Black CC -Station A Station B Water 30 -O -525 Port. Ref.Confirm Isolation AF 1/21/2025 N/A J. Riggins
35.406898 Lead #3 - Anode 1 1x - Black ---------1324 Port. Ref.Anode not connected AF 1/21/2025 N/A J. Riggins
-120.865904 Lead #4 - Anode 2 1x - Black ---------1325 Port. Ref.Anode not connected AF 1/21/2025 N/A J. Riggins
Anode Test Station Lead #1 - Pipe 1 1x - Black CC -Station A Station B Water 30 -O -437 Port. Ref.207+00 Insulating Coupling AF 1/21/2025 N/A J. Riggins
207+00 Lead #2 - Pipe 1 1x - Black CC -Station A Station B Water 30 -O -437 Port. Ref.Confirm Isolation AF 1/21/2025 N/A J. Riggins
35.401691 Lead #3 - Pipe 2 1x - Black CC -Station A Station B Water 30 -O -426 Port. Ref.AF 1/21/2025 N/A J. Riggins
-120.859617 Lead #4 - Pipe 2 1x - Black CC -Station A Station B Water 30 -O -426 Port. Ref.AF 1/21/2025 N/A J. Riggins
Lead #5 - Anode 1x - Black ---------1315 Port. Ref.Anode not connected AF 1/21/2025 N/A J. Riggins
Lead #6 - Anode 1x - Black ---------1297 Port. Ref.Anode not connected AF 1/21/2025 N/A J. Riggins
Anode Test Station Lead #1 - Pipe 1 1x - Black CC -Station A Station B Water 30 -O -413 Port. Ref.AF 1/21/2025 N/A J. Riggins
217+39.5 Lead #2 - Anode 1x - Black ---------413 Port. Ref.Anode present 217+39.5 Bond station AF 1/21/2025 N/A J. Riggins
35.399405 Lead #0 - Empty ---------16" Foreign Line Crossing - Valley
-120.857469 Lead #0 - Empty ---------
Anode Test Station Lead #1 - Pipe 1 1x - Black CC -Station A Station B Water 30 -O -217 Port. Ref.227+00 Insulating Coupling AF 1/21/2025 N/A J. Riggins
227+00 Lead #2 - Pipe 1 1x - Black CC -Station A Station B Water 30 -O -217 Port. Ref.Confirm Isolation AF 1/21/2025 N/A J. Riggins
35.396956 Lead #3 - Anode 1x - Black ---------217 Port. Ref.Anode present AF 1/21/2025 N/A J. Riggins
-120.856558 Lead #0 - Empty ---------
Test Station Lead #1 - Pipe 1 1x - Black CC -Station A Station B Water 30 -O -545 Port. Ref.AF 1/21/2025 N/A J. Riggins
257+10 Lead #0 - Empty ---------No Anode at location 247+73 - 266+52 Parrallel Gas Main
35.380229 Lead #0 - Empty ---------
-120.847629 Lead #0 - Empty ---------
Anode Test Station Lead #1 - Pipe 1 1x - Black CC -Station A Station B Water 30 -O -497 Port. Ref.292+50 Insulating Coupling AF 1/21/2025 N/A J. Riggins
295+05 Lead #2 - Pipe 1 1x - Black CC -Station A Station B Water 30 -O -497 Port. Ref.295+05 Insulating Coupling AF 1/21/2025 N/A J. Riggins
35.378811 Lead #3 - Pipe 2 1x - Black CC -Station A Station B Water 30 -O -507 Port. Ref.Confirm Isolation AF 1/21/2025 N/A J. Riggins
-120.846187 Lead #4 - Pipe 2 1x - Black CC -Station A Station B Water 30 -O -507 Port. Ref.AF 1/21/2025 N/A J. Riggins
Lead #5 - Anode 1x - Black ---------1437 Port. Ref.Anode not connected AF 1/21/2025 N/A J. Riggins
Anode Test Station Lead #1 - Pipe 1 1x - Black CC -Station A Station B Water 30 -O -1182 Port. Ref.Active Anode location AF 1/21/2025 N/A J. Riggins
300+00 Lead #2 - Pipe 2 1x - Black CC -Station A Station B Water 30 -O -727 Port. Ref.302+50 Foreign Line Crossing - PG&E AF 1/21/2025 N/A J. Riggins
35.376827 Lead #3 - Anode 1x - Black ---------1182 Port. Ref.Anode present AF 1/21/2025 N/A J. Riggins
-120.844256 Lead #0 - Empty ---------
Anode Test Station Lead #1 - Pipe 1 1x - Black CC -Station A Station B Water 30 -O -582 Port. Ref.AF 1/21/2025 N/A J. Riggins
310+90 Lead #2 - Pipe 2 1x - Black CC -Station A Station B Water 30 -O -1543 Port. Ref.Anode not connected AF 1/21/2025 N/A J. Riggins
35.376827 Lead #3 - Anode 1x - Black ---------Port. Ref.AF 1/21/2025 N/A J. Riggins
-120.844256 Lead #0 - Empty ---------
Page 34 of 141
CITY OF SAN LUIS OBISPO
WHALE ROCK - CATHODIC PROTECTION SURVEY
CP TEST POINT DATA
2025 CP SURVEY - 30" WATERLINE
Pr
o
j
e
c
t
N
a
m
e
Te
s
t
P
o
i
n
t
T
e
r
m
i
n
a
l
I
D
Te
s
t
P
o
i
n
t
L
e
a
d
I
D
Cl
i
e
n
t
A
s
s
e
t
D
e
s
i
g
n
a
t
i
o
n
Pi
p
e
l
i
n
e
L
i
c
e
n
s
e
N
u
m
b
e
r
Fr
o
m
L
o
c
a
t
i
o
n
To
L
o
c
a
t
i
o
n
Su
b
s
t
a
n
c
e
OD
(
i
n
)
Le
n
g
t
h
(
f
t
)
St
a
t
u
s
Ma
t
e
r
i
a
l
St
r
u
c
t
u
r
e
O
n
(
-
m
V
CS
E
)
St
r
u
c
t
u
r
e
O
f
f
(
-
m
V
CS
E
)
An
o
d
e
O
n
(
-
m
V
CS
E
)
An
o
d
e
O
f
f
(
-
m
V
CS
E
)
Re
f
e
r
e
n
c
e
C
e
l
l
L
o
c
a
t
i
o
n
Fi
e
l
d
C
o
m
m
e
n
t
s
Co
m
m
e
n
t
s
Me
a
s
u
r
e
m
e
n
t
S
t
a
t
u
s
Me
a
s
u
r
e
m
e
n
t
D
a
t
e
In
t
e
r
r
u
p
t
e
d
P
r
o
t
e
c
t
i
o
n
So
u
r
c
e
Te
c
h
n
i
c
i
a
n
N
a
m
e
Anode Test Station Lead #1 - Pipe 1 1x - Black CC -Station A Station B Water 30 -O -727 Port. Ref.312+00 Insulating Coupling AF 1/21/2025 N/A J. Riggins
313+90 Lead #2 - Pipe 1 1x - Black CC -Station A Station B Water 30 -O -727 Port. Ref.Confirm Isolation AF 1/21/2025 N/A J. Riggins
35.376173 Lead #3 - Pipe 2 1x - Black CC -Station A Station B Water 30 -O -505 Port. Ref.AF 1/21/2025 N/A J. Riggins
-120.843635 Lead #4 - Pipe 2 1x - Black CC -Station A Station B Water 30 -O -508 Port. Ref.AF 1/21/2025 N/A J. Riggins
Lead #5 - Anode 1x - Black ---------1451 Port. Ref.Anode not connected AF 1/21/2025 N/A J. Riggins
Lead #6 - Anode 1x - Black ---------1468 Port. Ref.Anode not connected AF 1/21/2025 N/A J. Riggins
Anode Test Station Lead #1 - Pipe 1 1x - Black CC -Reservoir Station A Water 30 -O -482 Port. Ref.AF 1/21/2025 N/A J. Riggins
358+00 Lead #2 - Pipe 2 1x - Black CC -Reservoir Station A Water 30 -O -319 Port. Ref.AF 1/21/2025 N/A J. Riggins
35.369856 Lead #3 - Anode 1 1x - Black ---------482 Port. Ref.Anode present AF 1/21/2025 N/A J. Riggins
-120.831119 Lead #4 - Anode 2 1x - Black ---------319 Port. Ref.Anode present AF 1/21/2025 N/A J. Riggins
Pipeline Exposure SAI #1 - Pipe 1 1x - Pipeline CC -Reservoir Station A Water 30 -O -472 Port. Ref.AF 1/21/2025 N/A J. Riggins
PLEX-01 SAI #2 - Pipe 1 1x - Pipeline CC -Reservoir Station A Water 30 -O -NR AF 1/21/2025 N/A J. Riggins
35.369856 Lead #0 - Empty ---------
-120.831119 Lead #0 - Empty ---------
Anode Test Station Lead #1 - Pipe 1 1x - Black CC -Station A Station B Water 30 -O -195 Port. Ref.AF 1/21/2025 N/A J. Riggins
397+25 Lead #2 - Pipe 1 1x - Black CC -Station A Station B Water 30 -O -194 Port. Ref.397+25 Foreign Line Crossing - Unknown AF 1/21/2025 N/A J. Riggins
35.36237 Lead #3 - Pipe 2 1x - Black CC -Station A Station B Water 30 -O -207 Port. Ref.397+25 Bond Station - Unknown AF 1/21/2025 N/A J. Riggins
-120.808837 Lead #4 - Pipe 2 1x - Black CC -Station A Station B Water 30 -O -207 Port. Ref.418+60 Foreign Line Crossing - Valley AF 1/21/2025 N/A J. Riggins
Lead #5 - Anode 1 1x - Black ---------1291 Port. Ref.Anode not connected AF 1/21/2025 N/A J. Riggins
Lead #6 - Anode 2 1x - Black ---------1399 Port. Ref.Anode not connected AF 1/21/2025 N/A J. Riggins
Anode Test Station Lead #1 - Pipe 1 1x - White CC -Station A Station B Water 30 -O -200 Port. Ref.AF 1/21/2025 N/A J. Riggins
430+00 Lead #2 - Anode 1x - Red ---------200 Port. Ref.Anode not connected AF 1/21/2025 N/A J. Riggins
35.359801 Lead #0 - Empty ---------
-120.799179 Lead #0 - Empty ---------
Anode Test Station Lead #1 - Pipe 1 1x - Black CC -Station A Station B Water 30 -O -200 Port. Ref.AF 1/22/2025 N/A J. Riggins
461+47 Lead #1 - Foreign 1 1x - Green ---------50 Port. Ref.Unknown 461+47 Foreign Line Crossing - Gas AF 1/22/2025 N/A J. Riggins
35.359801 Lead #2 - Anode 1x - Red ---------50 Port. Ref.Anode not connected 461+47 Bond Station AF 1/22/2025 N/A J. Riggins
-120.799179 Lead #0 - Empty ---------
Anode Test Station Lead #1 - Pipe 1 1x - Black CC -Station A Station B Water 30 -O -346 Port. Ref.AF 1/22/2025 N/A J. Riggins
515+00 Lead #2 - Pipe 2 1x - Black CC -Station A Station B Water 30 -O -562 Port. Ref.AF 1/22/2025 N/A J. Riggins
35.359144 Lead #3 - Anode 1 1x - Black ---------1481 Port. Ref.Anode not connected AF 1/22/2025 N/A J. Riggins
-120.797544 Lead #4 - Anode 2 1x - Black ---------562 Port. Ref.Anode present AF 1/22/2025 N/A J. Riggins
Anode Test Station Lead #1 - Pipe 1 1x - Black CC -Station A Station B Water 30 -O -547 Port. Ref.559+30 Insulating Coupling AF 1/22/2025 N/A J. Riggins
559+30 Lead #2 - Pipe 1 1x - Black CC -Station A Station B Water 30 -O -547 Port. Ref.Confirm Isolation AF 1/22/2025 N/A J. Riggins
35.348159 Lead #3 - Pipe 2 1x - Black CC -Station A Station B Water 30 -O -325 Port. Ref.560+80 Foreign Line Crossing - Water AF 1/22/2025 N/A J. Riggins
-120.769263 Lead #4 - Pipe 2 1x - Black CC -Station A Station B Water 30 -O -325 Port. Ref.AF 1/22/2025 N/A J. Riggins
Lead #5 - Anode 1x - Black ---------547 Port. Ref.Anode present AF 1/22/2025 N/A J. Riggins
Anode Test Station Lead #1 - Pipe 1 1x - Black CC -Station A Station B Water 30 -O -547 Port. Ref.579+00 Insulating Coupling AF 1/22/2025 N/A J. Riggins
579+00 Lead #2 - Pipe 1 1x - Black CC -Station A Station B Water 30 -O -582 Port. Ref.Confirm Isolation AF 1/22/2025 N/A J. Riggins
35.345316 Lead #3 - Pipe 2 1x - Black CC -Station A Station B Water 30 -O -331 Port. Ref.569+30 Foreign Line Crossing - Gas AF 1/22/2025 N/A J. Riggins
-120.764613 Lead #4 - Pipe 2 1x - Black CC -Station A Station B Water 30 -O -332 Port. Ref.AF 1/22/2025 N/A J. Riggins
Lead #5 - Anode 1x - Black ---------582 Port. Ref.Anode present AF 1/22/2025 N/A J. Riggins
Pipeline Exposure SAI #1 - Pipe 1 1x - Pipeline CC -Station A Station B Water 30 -O -324 Port. Ref.AF 1/22/2025 N/A J. Riggins
PLEX-02 SAI #2 - Pipe 1 1x - Pipeline ---------Port. Ref.AF 1/22/2025 N/A J. Riggins
35.343491 Lead #0 - Empty ---------
-120.758687 Lead #0 - Empty ---------
Page 35 of 141
CITY OF SAN LUIS OBISPO
WHALE ROCK - CATHODIC PROTECTION SURVEY
CP TEST POINT DATA
2025 CP SURVEY - 30" WATERLINE
Pr
o
j
e
c
t
N
a
m
e
Te
s
t
P
o
i
n
t
T
e
r
m
i
n
a
l
I
D
Te
s
t
P
o
i
n
t
L
e
a
d
I
D
Cl
i
e
n
t
A
s
s
e
t
D
e
s
i
g
n
a
t
i
o
n
Pi
p
e
l
i
n
e
L
i
c
e
n
s
e
N
u
m
b
e
r
Fr
o
m
L
o
c
a
t
i
o
n
To
L
o
c
a
t
i
o
n
Su
b
s
t
a
n
c
e
OD
(
i
n
)
Le
n
g
t
h
(
f
t
)
St
a
t
u
s
Ma
t
e
r
i
a
l
St
r
u
c
t
u
r
e
O
n
(
-
m
V
CS
E
)
St
r
u
c
t
u
r
e
O
f
f
(
-
m
V
CS
E
)
An
o
d
e
O
n
(
-
m
V
CS
E
)
An
o
d
e
O
f
f
(
-
m
V
CS
E
)
Re
f
e
r
e
n
c
e
C
e
l
l
L
o
c
a
t
i
o
n
Fi
e
l
d
C
o
m
m
e
n
t
s
Co
m
m
e
n
t
s
Me
a
s
u
r
e
m
e
n
t
S
t
a
t
u
s
Me
a
s
u
r
e
m
e
n
t
D
a
t
e
In
t
e
r
r
u
p
t
e
d
P
r
o
t
e
c
t
i
o
n
So
u
r
c
e
Te
c
h
n
i
c
i
a
n
N
a
m
e
Anode Test Station Lead #1 - Pipe 1 1x - Black CC -Station A Station B Water 30 -O -615 Port. Ref.Pump station B AF 1/22/2025 N/A J. Riggins
602+50 Lead #2 - Anode 1 1x - Black ---------1615 Port. Ref.Anode not connected ICCP system installed/ Functional AF 1/22/2025 N/A J. Riggins
35.342727 Lead #3 - Anode 2 1x - Black ---------542 Port. Ref.Protects Inlet/ Outlet Header AF 1/22/2025 N/A J. Riggins
-120.756801 Lead #0 - Header 1 1x - Black CC -Station B Station B Water 30 -O -505 Port. Ref.Requires adjustment AF 1/22/2025 N/A J. Riggins
Lead #0 - Header 2 1x - Black CC -Station B Station B Water 30 -O -532 Port. Ref.Headers not isolated from pipeline AF 1/22/2025 N/A J. Riggins
Lead #1 - Pipe 2 1x - Black CC -Station B W. Plant Water 30 -O -1325 Port. Ref.Anode not connected 628+80 Foreign Line Crossing - Water AF 1/22/2025 N/A J. Riggins
Lead #2 - Anode 2 1x - Black
Pipeline Exposure SAI #1 - Pipe 1 1x - Pipeline CC -Station B W. Plant Water 30 -O -NR Port. Ref.No presence of CP 625+46 Pipeline Exposure AF 1/22/2025 N/A J. Riggins
PLEX-03 SAI #2 - Pipe 1 1x - Pipeline CC -Station B W. Plant Water 30 -O -NR Port. Ref.628+80 Foreign Line Crossing - Water AF 1/22/2025 N/A J. Riggins
35.340004 Lead #0 - Empty ---------
-120.750271 Lead #0 - Empty ---------
Pipeline Exposure SAI #1 - Pipe 1 1x - Pipeline CC -Station B W. Plant Water 30 -O -NR Port. Ref.No presence of CP 633+82 Pipeline Exposure AF 1/22/2025 N/A J. Riggins
PLEX-04 SAI #2 - Pipe 1 1x - Pipeline CC -Station B W. Plant Water 30 -O -NR Port. Ref.AF 1/22/2025 N/A J. Riggins
35.338695 Term #0 - Empty ---------
-120.738024 Term #0 - Empty ---------
Pipeline Exposure SAI #1 - Pipe 1 1x - Pipeline CC -Station B W. Plant Water 30 -O -NR Port. Ref.No presence of CP AF 1/22/2025 N/A J. Riggins
PLEX-05 SAI #2 - Pipe 1 1x - Pipeline CC -Station B W. Plant Water 30 -O -NR Port. Ref.AF 1/22/2025 N/A J. Riggins
35.333286 Term #0 - Empty ---------
-120.706171 Term #0 - Empty ---------
Pipeline Exposure SAI #1 - Pipe 1 1x - Pipeline CC -Station B W. Plant Water 30 -O -NR Port. Ref.No presence of CP AF 1/22/2025 N/A J. Riggins
PLEX-06 SAI #2 - Pipe 1 1x - Pipeline CC -Station B W. Plant Water 30 -O -NR Port. Ref.AF 1/22/2025 N/A J. Riggins
35.330842 Term #0 - Empty ---------
-120.701633 Term #0 - Empty ---------
Pipeline Exposure SAI #1 - Pipe 1 1x - Pipeline CC -Station B W. Plant Water 30 -O -NR Port. Ref.No presence of CP AF 1/22/2025 N/A J. Riggins
PLEX-07 SAI #2 - Pipe 1 1x - Pipeline CC -Station B W. Plant Water 30 -O -NR Port. Ref.AF 1/22/2025 N/A J. Riggins
35.325228 Term #0 - Empty ---------
-120.690598 Term #0 - Empty ---------
Pipeline Exposure SAI #1 - Pipe 1 1x - Pipeline CC -Station B W. Plant Water 30 -O -NR Port. Ref.No presence of CP AF 1/22/2025 N/A J. Riggins
PLEX-08 SAI #2 - Pipe 1 1x - Pipeline CC -Station B W. Plant Water 30 -O -NR Port. Ref.AF 1/22/2025 N/A J. Riggins
35.321939 Term #0 - Empty ---------
-120.684382 Term #0 - Empty ---------
Pipeline Exposure SAI #1 - Pipe 1 1x - Pipeline CC -Station B W. Plant Water 30 -O -348 Port. Ref.No presence of CP AF 1/22/2025 N/A J. Riggins
PLEX-09 SAI #2 - Pipe 1 1x - Pipeline CC -Station B W. Plant Water 30 -O -342 Port. Ref.AF 1/22/2025 N/A J. Riggins
35.321768 Term #0 - Empty ---------
-120.684148 Term #0 - Empty ---------
Page 36 of 141
City of San Luis Obispo I Cathodic Protection Report
2025 Whale Rock 30” Waterline CP Survey
ACUUS-J212126-RSV-0.0 2025-03-05
APPENDIX 4: RECTIFIER SURVEILLANCE FORM
Page 37 of 141
CLIENT
PROJECT
JOB ID
DESCRIPTION
RECTIFIER NAME:Latitude Longitude
RECTIFIER I.D.:35°25'16" N 120°52'36" W
RECTIFIER LOCATION:MODEL #
MANUFACTURED BY:SERIAL #
TYPE:MAX COARSE TAPS
MAX FINE TAPS
VOLTS AMPS PHASE RATED T (°F)
RECTIFIER INPUT AC:115 1.2 1 122
RECTIFIER OUTPUT DC:20 5
SHUNT SIZE:1 0.2
SHUNT FACTOR (A/mV):
2025-01-22 J. Riggins C1 F2 0.00 7.63 0 #DIV/0!No current output
2025-01-22 J. Riggins C1 F6 0.00 16.39 0 #DIV/0!No Neg. Attachment
2025-01-23 J. Riggins C1 F6 2.30 4.29 0.5 8.58 As-Left
SYSTEM TYPE ICCP
NUMBER OF ANODES Unknown
SHUNT TYPE None Anode #Current (A)Current (A)Current (A)Current (A)Current (A)Current (A)
1 NR
2 NR
3 NR
4 NR
5 NR
6 NR
7 NR
8 NR
9 NR
10 NR
Total:0.0 0.0 0.0 0.0 0.0 0.0
2025-01-22
Housing Excellent
Hasp Excellent
Gasket Seal Good
Panel Excellent
AC Breaker Good
Transformer Good
Oil Level Not Applicable
Oil Color Not Applicable
Oil Temperature Not Applicable
3
RECTIFIER DATA
Air Cooled
Advanced Services
Department
Tomball Office, Suite #100
14434 Medical Complex Dr
Tomball, TX 77377
United States
Phone: (936) 441-2288
City of San Luis Obispo
SLO WL - Cayucos - San Luis Obispo
Cathodic Protection Survey
RECTIFIER INSPECTION REPORT
932321
GPS
ES
ALPHA
932321
Pump Station A - MCC
PICTURES
OTHER CONDITIONS
Universal Rectifiers
No information on
groundbed, unknown
number of anodes, no
positive junction box
located.
ICCP protects
Inlet/Outlet headers.
Unknown if headers are
isolated from pipeline
segments.
REMARKS
Reading Date Bed # 1
6
GROUNDBED DATA
DATE
0.0002
DC AMPS CIRCUIT RESISTANCE
(Ohm)REMARKSTECHNICIANDC VOLTS
Reading Date
CONDITIONS
(IF APPLICABLE)
COARSE TAP FINE TAP SHUNT mV
Page 1
Page 38 of 141
CLIENT
PROJECT
JOB ID
DESCRIPTION
RECTIFIER NAME:Latitude Longitude
RECTIFIER I.D.:35°20'33" N 120°45'23" W
RECTIFIER LOCATION:MODEL #
MANUFACTURED BY:SERIAL #
TYPE:MAX COARSE TAPS
MAX FINE TAPS
VOLTS AMPS PHASE RATED T (°F)
RECTIFIER INPUT AC:115 1.2 1 122
RECTIFIER OUTPUT DC:20 5
SHUNT SIZE:1 0.2
SHUNT FACTOR (A/mV):
2025-01-22 J. Riggins C2 F1 1.10 10.42 0.2 52.10 As-Found
2025-01-22 J. Riggins C2 F6 1.80 16.39 0.4 40.98 Adjusted
2025-01-23 J. Riggins C3 F1 1.80 17.36 0.7 24.80 As-Left
SYSTEM TYPE ICCP
NUMBER OF ANODES Unknown
SHUNT TYPE None Anode #Current (A)Current (A)Current (A)Current (A)Current (A)Current (A)
1 NR
2 NR
3 NR
4 NR
5 NR
6 NR
7 NR
8 NR
9 NR
10 NR
Total:0.0 0.0 0.0 0.0 0.0 0.0
2025-01-22
Housing Excellent
Hasp Excellent
Gasket Seal Good
Panel Excellent
AC Breaker Good
Transformer Good
Oil Level Not Applicable
Oil Color Not Applicable
Oil Temperature Not Applicable
Advanced Services
Department
Tomball Office, Suite #100
14434 Medical Complex Dr
Tomball, TX 77377
United States
Phone: (936) 441-2288
City of San Luis Obispo
SLO WL - Cayucos - San Luis Obispo
Cathodic Protection Survey
0.0002
RECTIFIER INSPECTION REPORT
BRAVO GPS932322
Pump Station B - MCC ES
Universal Rectifiers 932322
Air Cooled 3
6
RECTIFIER DATA
DATE TECHNICIAN COARSE TAP FINE TAP SHUNT mV DC VOLTS DC AMPS CIRCUIT RESISTANCE
(Ohm)REMARKS
Reading Date
CONDITIONS
(IF APPLICABLE)
PICTURES
GROUNDBED DATA
Bed # 1 Reading Date
REMARKS
No information on
groundbed, unknown
number of anodes, no
positive junction box
located.
ICCP protects
Inlet/Outlet headers.
Unknown if headers are
isolated from pipeline
segments.
OTHER CONDITIONS
Page 2
Page 39 of 141
City of San Luis Obispo I Cathodic Protection Report
2025 Whale Rock 30” Waterline CP Survey
ACUUS-J212126-RSV-0.0 2025-03-05
APPENDIX 5: LIST OF DRAWINGS
Drawing Number Drawing Description
SLO-CC-0001 Conduit As-Built Station 0 to 255
SLO-CC-0002 Conduit As-Built Station 255 to 525
SLO-CC-0003 Conduit As-Built Station 555 to 810
SLO-CC-0004 Conduit As-Built Station 810 to 903 and detail drawings
SLO-CC-0005 Pump Station As-Built - Upgrade
Page 40 of 141
City of San Luis Obispo I Cathodic Protection Report
2025 Whale Rock 30” Waterline CP Survey
ACUUS-J212126-RSV-0.0 2025-03-05
APPENDIX 6: CATHODIC PROTECTION PHOTO LOG
Page 41 of 141
PHOTO SUMMARY
City of San Luis Obispo
Whale Rock
Cathodic Protection Survey
2025-01-20
Page 42 of 141
2025 CP Survey – TP 10+00
Page 43 of 141
2025 CP Survey – TP 48+00
Page 44 of 141
2025 CP Survey – TP 63+00
Page 45 of 141
2025 CP Survey – TP 65+85
Page 46 of 141
2025 CP Survey – TP 71+30
Page 47 of 141
2025 CP Survey – TP 96+30
Page 48 of 141
2025 CP Survey – TP 130+00
Page 49 of 141
2025 CP Survey – TP 139+00
Page 50 of 141
2025 CP Survey – TP 143+00
Page 51 of 141
2025 CP Survey – TP 157+00
Page 52 of 141
2025 CP Survey – TP 160+00
Page 53 of 141
2025 CP Survey – TP 165+00
Page 54 of 141
2025 CP Survey – TP 171+00
Page 55 of 141
2025 CP Survey – TP 176+00
Page 56 of 141
2025 CP Survey – TP 185+25
Page 57 of 141
2025 CP Survey – TP 207+00
Page 58 of 141
2025 CP Survey – TP 217+39.5
Page 59 of 141
2025 CP Survey – TP 227+00
Page 60 of 141
2025 CP Survey – TP 257+10
Page 61 of 141
2025 CP Survey – TP 295+05
Page 62 of 141
2025 CP Survey – TP 310+90
Page 63 of 141
2025 CP Survey – TP 313+90
Page 64 of 141
2025 CP Survey – TP 358+00
Page 65 of 141
2025 CP Survey – TP 397+25
Page 66 of 141
2025 CP Survey – TP 430+00
Page 67 of 141
2025 CP Survey – TP 461+47
Page 68 of 141
2025 CP Survey – TP 515+00
Page 69 of 141
2025 CP Survey – TP 559+30
Page 70 of 141
2025 CP Survey – TP 579+00
Page 71 of 141
2025 CP Survey – Pump Station A
Page 72 of 141
2025 CP Survey – Pump Station A
Page 73 of 141
2025 CP Survey – Pump Station B
Page 74 of 141