Loading...
HomeMy WebLinkAboutFMAP-0602-2022 20230405 01_20230213; Response Comments (Map Check R1) February 9th, 2023 Tract Map Review #1 TO: Coast Engineering & Survey ATTN: Cristi Fry, cristi@coast-inc.com (805) 242-6365 ext 55 CC: Wathen Castanos Homes ATTN: Chuck Braff, chuck@westpacinv.com FROM: Charles Weir, Senior Civil Engineer (805) 783-7704, cweir@slocity.org Project Address 1150 Laurel Lane  Project Name  PM‐0007   Application Number FMAP‐0602‐2022  Review of PM‐0007  Staff Response:           Review #1     Review #2      Review #3      Review #4 (Additional Fees)    Applicant Response:   Please respond to the following comments and any redline on the Map. Return the redline map for subsequent rechecks. Fees  Pay map check fee $11,996.00 (PAID IN FULL)  Improvement Plan Check Fee TBD  Construction Inspection Fee TBD  Parkland In-Lieu Fee Pay prior to map recordation (amount pending by city)  Park Improvement Fee Pending verification with building permit Plan check fee needs to be paid upon City’s approval of the engineer’s cost estimate for the public improvements. Construction inspection fee to be paid prior to improvement plan approval. Park fees shall be paid prior to map recordation. 1 2 3 4 Page 2 Engineering Charles Weir (805) 783-7704 | cweir@slocity.org ☐ Ready for Action ☒ Needs Resubmit (see below) On review of the proposed plans, the following comments are provided: NOTE: Full review comments will be provided with Review #2. Client has stated minor interior parcel line adjustment since Review #1 set provided. To expedite schedule, engineering will continue review in parallel and revise this section’s comments next round. Response (Include Sheet and Detail Number): Engineering Consultant Doug Rion (805) 704-6778 | slocorider@gmail.com ☐ Ready for Action ☒ Needs Resubmit (see below) On review of the proposed plans, the following comments are provided: 1. Sheet 3: a. More distinct heavy line around exterior boundary of subdivision. b. Dashed line for overall interior parcel outline. c. Provide inverse calculation to confirm tie shown to SLO Control Point #8085. 2. Sheet 4: a. Provide dimension from exterior boundary to ties shown from interior corner. b. Review the L2 line, the length value (68.80) in the Line table does not agree with the scaled length of approximately 160 feet. Does the L2 need revision to match the L58 through L67 on Sheet 5? 3. Sheet 5: a. Details needed to clarify what appear to be very short line segments at the northerly corner of Parcel 3 and the easterly corner of Parcel 2. b. Leader lines are the same lineweight as the parcel lines, thinner lineweight is preferable. c. Review various line labels for their locations/dimension values. (See L1, L35, L38, L58, L97, L43, L99, L147). 4. Sheet 6: a. Parcel 5 Upper Level Elevation Limit in the Table does not agree with Section A. See the attached marked up copy for comments/corrections in red ink. All pencil markings are just my notes and scribbles. Response (Include Sheet and Detail Number): Page 3 Planning Hannah Hanh (805) 781-7432 | hhanh@slocity.org ☐ Ready for Action ☒ Needs Resubmit (see below) On review of the proposed plans, the following comments are provided: 1. Previously approved entitlements allowed for the construction of 100 residential units in the project building. As of current, permits have either been issued or are under review for the phased construction of 75 residential units. Please confirm if the applicant is pursuing construction of the remaining 25 residential units. 2. Clarify if the design of this final map accounts for 75 or 100 residential units. 3. Clarify if utility installations included in the scope of issued building permit, BLDG-1885-2020, accounted for the project at full buildout. 4. It is noted there are slight differences for proposed Parcels 2, 3, and 4 between the approved tentative map and this final map. Please confirm if Parcels 2 and 3 are intended for the residential units and if Parcel 4 is intended for the commercial space. 5. Please clarify the viewpoints of Sections B and E on the final map (Sheet 6). Response (Include Sheet and Detail Number): Utilities Miguel Barcenas (805) 781-7507 | mbarcena@slocity.org ☐ Ready for Action ☒ Needs Resubmit (see below) On review of the proposed plans, the following comments are provided: NOTE: Full review comments will be provided with Review #2. Client has stated minor changes since Review #1 set provided. To expedite schedule, utilities will continue review in parallel and revise this section’s comments next round. Life of Tentative Map Vesting Tentative Tract Map approved on – 6/28/21 (please confirm) No further processing of final map is allowed after tentative map expires. Submit a request for extension to Planning prior to expiration date, if final map is not ready by then. “Ready” means all fees and bonds paid, including tax bond, and all agreements and map signed and in City’s hands. The only thing that can be done after expiration would be Council action and signatures on City’s end. If it needs to go back to developer for any reason, then a new tentative map would be required.