Loading...
HomeMy WebLinkAboutItem 7a. 1150 Laurel Lane_Attachment H - April 9, 2025, Project Plan ___________________________________________________________________________ Laurel Creek, LP SITE ADDRESS 505 Bath Street 1150 Laurel Lane Santa Barbara, CA 93101 San Luis Obispo, CA 93401 1 Laurel Creek Mixed-Use Building Project Plan – April 9, 2025 Summary The Laurel Creek Mixed-Use building is an existing 2-story, type III-B building that includes the following users/uses; warehouse tenants, Bang the Drum Brewery, SLO City Church, and commercial office tenants. Construction on the building had stalled for a significant amount of time and the building is currently under a Notice and Order requiring that the existing tenants, other than the warehousing tenants, vacate the premises due to unsafe conditions. The specifics associated with the Notice and Order are detailed in a letter issued by Michael Loew, the City of San Luis Obispo Chief Building Official dated March 10, 2025. Laurel Creek, LP, is the controlling party (owner). Laurel Creek, LP, is committed to completing the work necessary to close all open building permits and ensure a safe environment for full, permanent, occupancy of the building. This memo outlines the owner’s plan for completing the work. There are three phases proposed to complete the work. The first phase is focused on immediately completing the work necessary to ensure the safe occupancy of the building by the current tenants, except for the assembly functions associated with the church. The second phase will follow immediately after the first phase and includes the work necessary to add the SLO City Church assembly use to the building. The third phase will follow immediately after the first two phases and includes the work necessary to add the residential uses. At the conclusion of the third phase, all active permits will be closed out and a final certificate of occupancy will be requested for the completed project. Any future work will be applied for under separate cover after the work associated with the existing permits is completed. Phase 1 The work required to allow the existing tenants to remain in the building is beginning immediately. This work is scheduled to be completed no later than June 15, 2025. This work includes but is not limited to the following items: Fire Sprinklers/Alarm - Operational fire sprinklers throughout the building - Completed fire line loop around the building - No longer utilizing a temporary fire pump to ensure adequate pressure ___________________________________________________________________________ Laurel Creek, LP Site Address: 505 Bath Street 1150 Laurel Lane Santa Barbara, CA 93101 San Luis Obispo, CA 93401 2 Weatherproof building envelope - Replacing exterior metal siding that has been removed in large areas on the north side of the building - Installing new exterior metal siding at the vertical slots created to install fireproofing at the steel columns around the building - Completing the installation of metal siding at the Bang the Drum space and along the south elevation - Installing a new exterior wall with metal siding at the west elevation where the wall has been removed - Completing the stucco finish at the Bang the Drum space and along the south elevation - Sealing numerous penetrations through the exterior walls that were created to install various elements - Installing new roll-up door on the north elevation near the eastern corner of the building Exit Routes - Complete the installation of the doors within the first floor exit corridor including patching around the doors, and door hardware - Install all required exit signs and emergency lighting from all occupied spaces to the required exit doors - Install all required signage identifying spaces on, or adjacent to, the doors - Complete the installation of the drywall and general lighting in the corridor - Ensure a smooth floor surface from each occupied space to the required exit doors - Complete the exterior egress paths from the doors to safe dispersal areas Site Work - Repair the damaged asphalt paving in the areas serving the occupied portions of the building - Repair the damaged concrete walkways that are required for egress - Fill open holes and trenches - Clearly identify and restrict public access to construction areas Building Code Compliance - At the conclusion of phase 1 the building will be considered an unlimited area building per CBC Section 507.5 o The allowable occupancy groups are limited to Group B, F, M or S o The building is no more than two stories o The building is equipped with an NFPA-13 fire sprinkler system o The building is surrounded and adjoined by yards not less than 60 feet in width Conclusion of Phase 1 - At the conclusion of phase 1, the building will be safe for the continued occupancy of the warehouse tenants, Bang the Drum Brewery, and office tenants - The building will also be safe for the continued occupancy of the SLO City Church office uses but the SLO City Church assembly use will not be allowed - Residential uses will not be allowed Phase 2 The phase 2 work required to complete the building and allow for the SLO City Church assembly use to occupy the building will start concurrently with the phase 1 work but will have a longer duration. This work is scheduled to be completed no later than July 1, 2025 Building Interior - Complete interior work required for the SLO City Church tenant improvement ___________________________________________________________________________ Laurel Creek, LP Site Address: 505 Bath Street 1150 Laurel Lane Santa Barbara, CA 93101 San Luis Obispo, CA 93401 3 Exit Routes - Install all required exit signs and emergency lighting from all occupied spaces to the required exit doors - Install all required signage identifying spaces on, or adjacent to, the doors - Complete the installation of the drywall and general lighting in the exit passageway - Ensure a smooth floor surface from each occupied space to the required exit doors - Complete the exterior egress paths from the doors to safe dispersal areas - Complete the exit passageway from the SLO City Church assembly space to the exterior of the building Fire and Life Safety - Complete the installation of the fire walls separating the residential uses and assembly occupancies from the warehouse tenants - Confirm fireproofing of structural frame is complete Site Work - Repair parking lot asphalt areas required for church assembly use - Install required accessible parking stalls Building Code Compliance - At the conclusion of phase 2 the building will be considered three separate buildings due to the installation of two fire walls in compliance with CBC Section 706 as modified by approved Alternate Materials and Methods (AMM). o The fire walls are 3-hour rated o The building structural frame is provided with 3-hour rated protection o In compliance with the AMMR, residential uses are not in the same building (compartment) formed by fire walls as high-pile combustible storage warehousing or other uses deemed hazardous and not consistent with the City of SLO zoning code Conclusion of Phase 2 - At the conclusion of phase 2, the building will be safe for the occupancy of the SLO City Church assembly use Phase 3 The work required to complete the building and allow for the residential uses to occupy the building will start concurrently with the phases 1 & 2 work but will have a longer duration. This work is scheduled to be completed no later than August 1, 2025. Building Exterior - Complete residential balconies including railings, lighting and deck surfaces - Install the new electrical transformer required for the residential units Building Interior - Complete interior work required for the 31 residential units - Complete the installation of the additional electrical switchgear required for the residential units ___________________________________________________________________________ Laurel Creek, LP Site Address: 505 Bath Street 1150 Laurel Lane Santa Barbara, CA 93101 San Luis Obispo, CA 93401 4 Exit Routes - Complete the installation of the doors within the second floor exit corridor including patching around the doors, and door hardware - Install all required exit signs and emergency lighting from all occupied spaces to the required exit doors - Install all required signage identifying spaces on, or adjacent to, the doors - Complete the installation of the drywall and general lighting in the second floor corridor - Ensure a smooth floor surface from each occupied space to the required exit doors - Complete the exit stairs including handrails, tread striping, and signage - Complete the exterior egress paths from the doors to safe dispersal areas Fire and Life Safety - Complete the 1-hour horizontal assembly below the residential uses Site Work - Repair remaining parking lot asphalt - Install required accessible parking stalls - Install required EV chargers - Install accessible path to public right-of-way including required lighting - Install required landscaping - Remove all construction areas Building Code Compliance - The residential units will be a separated occupancy within the 2-story mixed-use building separated from the remainder of the overall building by a 3-hour rated fire wall. - The residential units will be separated from the first floor commercial office uses by a 1-hour horizontal assembly - The residential units will have two exit stairs that meet the requirements of CBC chapter 10 - The residential units will be on an accessible route via an elevator Conclusion of Phase 3 - At the conclusion of phase 3, the building will be safe for the occupancy of the 31 residential units Additional Notes - A building permit associated with the installation of 44 residential units (BLDG 2788-2022) was applied for and is ready to issue o This permit will no longer be pursued and the work associated with this permit will not be pursued at this time - A building permit associated with the installation of the required fire wall and other pre-work associated with the installation of 44 residential units (BLDG 2695-2022) was issued. o This work has started in the field o Since the 44 apartments are no longer being constructed the fire wall and associated pre-work will stop and not be completed o All incomplete work will be completed to the point where it does not create a hazard o This space will be acceptable for group B, F, M or S occupancies if a tenant improvement plan is submitted and approved later o Occupancy groups R & A will not be allowed in this space ___________________________________________________________________________ Laurel Creek, LP Site Address: 505 Bath Street 1150 Laurel Lane Santa Barbara, CA 93101 San Luis Obispo, CA 93401 5 Building Permit Summary - There are several building permits issued, or applied for, associated with this building. Below is a summary of the permits along with plan for each. This is followed by a more detailed description of the work associated with each building permit. o Pre-work (BLDG 2051-2020) o Lath and fireproofing (BLDG 2361-2020) o AMM work (BLDG 0813-2021) o Fire Line installation (FIRE 1268-2023) o 31 Residential units (BLDG 1885-2020) o Suite 180 - Kiva tenant improvement (BLDG 2531-2020) o Suite 186 – Ernest office tenant improvement (BLDG 0793-2020) o Suite 110 – Ernest warehouse tenant improvement (BLDG 0794-2020) o Suite 184 – Ernest office tenant improvement (BLDG 0795-2020) o Suite 175 – Cal Fire tenant improvement (BLDG 0188-2021) o Suite 160 – Bang the Drum landlord shell work (BLDG 3367-2022) o Suite 170 - Empire Electric landlord shell work (BLDG 1425-2023)  Not issued o South lobby and restroom improvements (BLDG 0556-2022) Construction Team Contacts Owner Laurel Creek, LP Patrick Smith (970) 987-1413 psmith@westpacinv.com Architect: Arris Studio Architects Thom Jess (805) 547-2240 x111 tjess@arris-studio.com Site Work: Kirk Construction Blair Kirk (805) 461-2060 blair@kirk-construction.net Fire Sprinklers: Alpha Fire Erik Reinisch (805) 541-2527 erik@alphafsa.com Summary of Progress by Building Permit Building Permit BLDG 2051-2020 (Prework for fire separation and sewer lateral and waste lines) - Work under this permit includes floor / ceiling separation at south side commercial units. Trenching for sewer line for future apartments. Also, waste and vent lines into floor / ceiling space above first floor. • Work Completed o Floor/ ceiling assembly on approximately 31,000 SF o Sewer and waste lines to second floor apartments o Sewer connection to city main in southwest side of property • Work Remaining o Floor ceiling assembly in suite 170. Approximately 5,240 SF ___________________________________________________________________________ Laurel Creek, LP Site Address: 505 Bath Street 1150 Laurel Lane Santa Barbara, CA 93101 San Luis Obispo, CA 93401 6 Building Permit BLDG 2361-2020 (Lath and fireproofing) - Work under this permit includes spray fireproofing and intumescent painting of primary structural columns. • Work Completed o Lath and fireproofing have been completed. o 3rd party reports were completed in 2022. • Work Remaining o Review Earth System’s fireproofing reports and provide to City. Building Permit BLDG 0813-2021 (AMM) - Work under this permit includes the addition of fire walls to extend from the slab to the roof structure, addition of 3-hour fire walls, modification of the southwest corridor, and path of travel/ site improvements. • Work Completed o The 3-hour fire walls have been built  There are some penetrations that need to be patched or repaired • Remaining work o Exiting corridors  Complete all doors & hardware  Complete sprinklers installation  Lighting in corridors  Signage  Fire alarm  Patch and repair any openings in fire walls o Site work  Parking lot striping  Flat work Building Permit FIRE 1268-2023 (Fire line) - Work under this permit includes installing a new fire pump, fire hydrants throughout the site, running the underground line around the building and connecting the loop to the building through 4 laterals and certifying the line. • Work Completed: o Fire pump- installed and ready to be certified. o Power to fire pump/ pump house installed. o Fire Hydrants installed o Approximately 65% of the underground fire line loop installed. • Work Remaining. o Fire line loop  Entrance – Confirmed complete and signed off on. Paving to start mid-May/ ASAP.  Complete south side of fire line loop. Approximately 750’  Complete riser laterals  Connect fire hydrants to loop.  Connect lateral to fire risers (w/ Alpha)  Connect to pump o Fire Line Building Connections  Connect loop to fire pump.  Connect with 4 risers  Remove temporary pump  Certification and testing of system ___________________________________________________________________________ Laurel Creek, LP Site Address: 505 Bath Street 1150 Laurel Lane Santa Barbara, CA 93101 San Luis Obispo, CA 93401 7 Building permit BLDG 1885-2020 (Addition of 31 residential units on second floor) - Work under this permit includes completing the 31 apartments on the second floor on the south side of the building. • Work Completed o 31 apartments are nearing completion.  Flooring, appliances, painting and light fixtures have been installed in 90% of units. o The elevator is installed but not operational o First floor Kitchenette including cabinets, counters, lights, plumbing and flooring. o PG&E site work is 95% complete. o All units and 95% of corridors have sprinkler heads installed. • Work Remaining o Existing glass lobby entrance walls need to be replaced with 1 hour rated walls. o Storage lockers require ceiling to be installed o Corridor flooring is to be installed o Elevator needs to have permanent power and to be inspected by the state o Sprinkler heads on balconies and at the ends of corridors to be installed • Exterior envelope throughout o South side stucco and siding per plan o West exterior wall • Fire alarm in all 31 residential units • East electrical room fill in concrete and prepare to complete switch gear Other Building Permits - Building permit BLDG 2531-2020 (Suite 180 KIVA tenant improvement) o TCO issued - Building permit BLDG 0793-2020 (Suite 186 Ernest Office tenant improvement) o TCO issued - Building permit BLDG 0794-2020 (Suite 110 Ernest Warehouse tenant improvement) o TCO issued - Building permit BLDG 0795-2020 (Suite 184 Ernest Office tenant improvement) o TCO issued - Building permit BLDG 0188-2021 (Suite 175 CalFire tenant improvement) o TCO issued - Building permit BLDG 3367-2022 (Suite 160 Bang the Drum landlord shell work) o TCO issued - Building permit BLDG 1425-2023 (Suite 170 Empire Electric tenant improvement o Not issued - Building permit BLDG 0556-2022 (South Lobby/ restroom o Open  Remaining work • Lobby walls to be upgraded to 1 hour fire rating Sincerely, Thom Jess Arris Studio Architects W E W☇ VA A/EV S S S S S S S S S S S S S S S S S S S S S S S SMH SMH SSSSSSSSSSSSSSSSS S S S S S S SSSSSSSS S S S S S S S S S S S S S S S S S/ E V S/ E V S S S S S S S S S S S S S S S S S S S S/ E V S/ E V S/ E V S/ E V S/ E V S/ E V S/ E V S/ E V S S S S S S S S/EVC S/EVC S/EVC S/EVC AM/EV S/EV S/EV S/EV S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVCS/EVC S/EVCS/EVC S/EVCS/EVC AA S S/ E V S S S S S S S S S S S S S S S S S S S S S S S C C C S S S S S MMMMMMMM V A A A VA/EV S S S S S S S S S S S C C C C S S S S S S C S/EVC S/EVC S S/EVC S/EVCS/EVC S/EVC S S S SS S C CS S C C S/EVC S/EVC S/EVC S/EVC S S S S S S C C S S S S S S/EVC S SS C S/EVC S/EVC S/EVC S/EVC S S S S S S C C S S S S S S S/EVC S S/EVC S S S S S S S S S C C S S S S S S C CC C C C C CC C C C S/ E V S/ E V S S S S C C C S S S S S S S S S S S S S C A S S S C S C C C VA A A A A/EV A VA S S/EV S/EV A/EV VA/EV S/EV S/EV S/EV S/EV S/EV S/EVC S/EVC S/EVC VA A A A S/EVC S/EVC S/EVC S/EVC S/EVC S/EV S MMMMMMMMMMMM S S S S S S S S S S/ E V S/ E V S/ E V S/ E V S S S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EV S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EV S/EV S/EV S/EV S/EVC VA/EV SSSSSSSSSSSSSSSS C C C C C C C C C C C C C C C C C C S S S S S S S S S S S/ E V S/ E V S/ E V S/ E V E 0253 3300 0253 0253 3301 3300 3300 3302 0253 LAUREL CREEK WAREHOUSE (E) BUILDING NOT A PART (E) BUILDING NOT A PART 1160 LAUREL LANE NOT A PART NORTHEAST LOT NOT A PART NORTH LOT 29 SPACES WEST LOT 95 SPACES (N) TRASH ENCLOSURE #2 (N) TRASH ENCLOSURE #3 (E) TRASH ENCLOSURE #1 W/ NEW COVER EAST LOT 60 SPACES 0253 3309 SOUTH LOT 209 SPACES UNIO N PACIFIC RAILRO AD T T R D LA U R E L L N 40 ' - 6 " (E) VACANT LOT NOT A PART SLO RAILROAD SAFETY TRAIL CANTEEN MATCH LINE /K12 A2.11 /K12 A2.13 CH LINE MATCH LINE/K12 A2.10 /K12 A2.12 MATCH LINE /K12 A2.10 /K12 A2.12 MA T C H L I N E / K1 2 A2 . 1 3 / K1 2 A2 . 1 2 MA T C H L I N E / K1 2 A2 . 1 3 / K1 2 A2 . 1 2 MA T C H L I N E / K1 2 A2 . 1 1 / K1 2 A2 . 1 0 MA T C H L I N E K1 2 K1 2 0207 0208 0200 0260 0204 0264 0284 0236 (N) MOTORCYCLE PARKING A2.21 F12 MI N . 26 ' - 0 " MIN. 20'-0" MIN. 20'-0" MIN. 20'-0" MIN. 26'-0" M I N . O . R . 4 6 ' - 0 " 3208 1107 1107 1107 3228 A2.30 D10 1313 1107 1107 1107 3240 R 3 0 '-6 " R 46'-0" 26 ' - 0 " 20'-0" 20'-0" 20'-0" 3243 25 3405 5'-0" 2250 1107 3312 N 57o 12' 41"W 1114.50' N 3 2 o 42 ' 2 9 " E 1 8 0 . 0 0 ' N 57o 17' 31"W 170.03' S 48o53' 54"E 64.17' N 57o 16' 14"W 337.08' S 57o 16' 14"W 303.15' 40 . 0 0 ' 11 7 . 7 7 ' S 3 4 o 33 ' 2 6 " W 2 9 2 . 7 0 ' N 3 2 o 42 ' 2 9 " E 4 0 9 . 1 3 ' 29 2 . 3 6 ' 40 . 0 0 ' S 57o 18' 18"E 347.67' S 57o 18' 18"E 314.02' N 47o44' 14"E 70.89' 35.08' S 57o 12' 35"E 402.82' S 3 2 o 47 ' 2 5 " E 1 6 6 . 0 7 ' S 32o 04' 16"E 503.58' N 3 2 o 38 ' 2 7 " E 4 0 8 . 5 4 ' S 32o 04' 16"E 462.64' S 41o 13' 29"W 494.04' PARCEL 3 PARCEL 2 PARCEL 1 PARCEL 4 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 Portion of Fire Loop to becompleted and tested Portion of Fire Loopinstalled and inspected, not tested. Laurel Creek Exterior cladding & weatherproofing Fire line loop & building connections Repair damaged asphalt Exterior egress paths to dispersal areas SSSS S/EVC S/EVC S/EV S/EV S/EV S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVCS/EVC S/EVCS/EVC S/EVCS/EVC S/ E V A/EV A S/ E V S/ E V S/ E V S/ E V S/EV S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EV S/EV S/EV S/EV VA/EV SSSS C C C C C C C C 1160 LAUREL LANE NOT A PART NORTHEAST LOT NOT A PART 2100 2100 EAST LOT 62 SPACES 2100 (E) VACANT LOT NOT A PART 3200 3200 3200 320032003200 32193219 3219 3219 S57°16'14"E 303.15' 64.17' S48°53'54"E 170.03' N57°17'31"W N3 2 ° 4 2 ' 2 9 " E 18 0 . 0 0 ' LAUREL CREEK WAREHOUSE NORTH LOT 12 SPACES MATCH LINE /K12 A2.12 MATCH LINE /K12 A2.12 S34°33'26"W 292.70' MA T C H L I N E / K1 2 A2 . 1 1 0284 TYP. 9'-0" TYP. 18'-0" 0286 3218 3204 3204 (E) TRANSFORMER AREA 3204 3204 3218 TYP. 16'-0"2'-0" TYP. 3218 0258 027402580274 0116 0292 TYP. TYP. TYP. TYP. 16'-0"33'-7 1/2"16'-0" 8'-6" 0200 3219 3219 0200 0286 0286 0286 0286 0286 (E) PEDESTRIAN PATH, S.C.D. 0286 3212 EXISTING STAIR ACCESS 20 0286 1107 TYP. TYP. 23 23 23 TRUE PROJECT Laurel Creek Exterior cladding & weatherproofing Fire line loop & building connections Repair damaged asphalt Exterior egress paths to dispersal areas Northeast portion of building Existing conditions of building exterior at Northeast quadrant. Portion of Fire Loop installed and inspected,not tested. Removed roll-up door to be replaced andopening sealed. VA A/EV S S S S S S S S S S S S S S S S S S S S S S S C C C S S/EV S/EV A/EV VA/EV S/EV S/EV S/EV S/EV S/EVC S/EVC VA A A A S/EVC S/EVC S/EVC S/EVC S/EVC S/EV S/ E V S/ E V S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC S/EVC VA/EV C C C C C C C C C C C C C S LAUREL CREEK WAREHOUSE NORTH LOT 30 SPACES WEST LOT 80 SPACES 0207 2100 0207 3208 3208 (E) ALL SPORT AMENITY COURT (E) VOLLEYBALL COURT 0208 2100 CANTEEN A0.23 H2 S41°13'29"W 494.04' MATCH LINE /K12 A2.13 MATCH LINE /K12 A2.13 MA T C H L I N E / K1 2 A2 . 1 0 MA T C H L I N E / K1 2 A2 . 1 0 0200 5'-0" 5'-0" 0280 TYP. 8'-0" TYP. 18'-0" 0286 0286 3200 0286 0286 321 320 0283 2100 4 '-0 " A0.23 H2 3228 3217 3217 A0.23 F2 EXISTING CURB RAMP EXISTING ADA PARKING 3205 0113 0113 0200 0286 N57°12'41W 1114.50' 26'-0" MP Grey 180 TRASH ENCLOSURE #3 A2.21 E9 TYP. 12'-0" TYP. 8'-0" 25 Laurel Creek Exterior cladding & weatherproofing Fire line loop & building connections Repair damaged asphalt Exterior egress paths to dispersal areas Northwest portion of building Portion of Fire Loop to be completed and tested Portion of Fire Loopinstalled and inspected, not tested. Existing conditions of building exterior at Northwest quadrant. New wall to infill opening whereprevious exterior wall was removed Existing conditions of building exterior at Southeast quadrant. Laurel Creek Exterior cladding & weatherproofing Fire line loop & building connections Repair damaged asphalt Exterior egress paths to dispersal areas Southeast portion of building S S S S S S S S S S S S/ E V S/ E V S S S S/ E V S/ E V S/ E V S/ E V S/ E V S/ E V S/ E V S/ E V S S S S S S S S/EVC S/EVC S/EVC S/EVC AM/EV MMMMMMMM VA/EV S S S S S/EVC S/EVC S S/EVC S/EVC S/EVC S/EVC S S S SSS C CSS C C S/EVC S/EVC S/EVC S/EVC S S S S S S C C S S S S S S/EVC S SS C S/EVC S/EVC S/EVC S/EVC S S S S S S C C S S S S S S S/EVC S S/EVC S S S S S S S S S C C S S S S S S C C C CC C C C S/ E V S/ E V CC S S C A S S C C C C VA A A A A/EV VA S S/ E V S/ E V S/ E V S/ E V K12 A5.00 3200 2100 (E) TRASH ENCLOSURE #1 W/ NEW COVER SOUTH LOT 209 SPACES A2.21 F12 027402740274 0274 S57°12'35"E 402.82' S57°18'18"E 347.67' S57°18'18"E 314.02' 312.59'35.08' 70.89' N47°44'14"E S34°33'26"W 292.70' LAUREL CREEK WAREHOUSE MATCH LINE/K12 A2.10 MATCH LINE/K12 A2.10 MA T C H L I N E / K1 2 A2 . 1 3 0276 02760276 0286 TYP. 0286 TYP. 0281 0281 3204 0284 02030203 18'-0"18'-0" 24' MIN. 24'-2"18'-0"18'-0" 24' MIN. 24'-0"18'-0"18'-0" 24' MIN. 24'-4 1/2"18'-0"18'-0" 24' MIN. 24'-1 1/2"18'-0"18'-0" 24' MIN. 24'-3"19'-1" 16'-0" 2'-0" TYP. 9'-0" MIN. 8'-0" MIN. 8'-0" TYP. 9'-0" 4'-0" MIN. WIDE 4'-3" MIN. 6'-5" TYP. 9'-0" TYP. 9'-0" TYP. 8'-7 1/2" TYP. 0" 9'-0" MIN. 8'-0" TYP. 8'-0" TYP. 9'-0" TYP. 9'-0" 24' MIN. 26'-4" 3223 3200 0200 0286 0286 0286 0286 0286 3204 0286 TYP. TYP. TYP.0286 0286 0318 10' MIN. 10'-6" 8'-0" 9'-0" (E) 4'-0" 0120 18 3204 25 Portion of Fire Loop to be completed and tested Finish exterior stucco and metal siding Portion of Fire Loop installed and inspected,not tested. Maintain exterior path ofegress to dispersal area Existing conditions of building exterior at Southwest quadrant. Southwest portion of building Laurel Creek Exterior cladding & weatherproofing Fire line loop & building connections Repair damaged asphalt Exterior egress paths to dispersal areas S S S S S S V A A S/EV S/EV S/EV S/EV S/EVC S S S H12 A5.00 3208 3208 UNION PACIFIC RAILROAD 0204 2100 0264 A2.20 K12 S3 2 ° 4 7 ' 2 5 " E 1 6 6 . 0 7 ' S32°04'16"E 462.64' LAUREL CREEK WAREHOUSE MATCH LINE /K12 A2.11 MA T C H L I N E / K1 2 A2 . 1 2 0522 3202 3202 3202 0284 20'-0" 0284 2601 3204 TRASH ENCLOSURE #2 2100 A2.21 E6 0286 0200 0286 3200 3243 0286 0286 0286 (E) ARTIFICIAL TURF 0286 0318 3236 3225 25 25 Portion of Fire Loop to be completed and tested New wall to infillopening where previous exteriorwall was removed Complete stucco finishwork along Southernelevation Laurel Creek Phase 1 Egress routes and corridors with hardware, lighting and signage Operable fire sprinklers in all areas DW F12 A6.01 A4.32 K12 CAL FIRE NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 175 (E) WOMEN (E) MEN (E) ELECTRICAL STAIR #4 (E) 2500# ELEV A7.00 K7 A7.01 K5 (VACANT) NO WORK IN THIS AREA PER THIS PERMIT (E) WAREHOUSE SUITE 100 ERNEST PACKAGING NO WORK IN THIS AREA PER THIS PERMIT (E) WAREHOUSE SUITE 110 (VACANT) NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 190 ERNEST PACKAGING NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 184 KIVA NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 180 BANG THE DRUM NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 160 MAIL LOBBY ENTRANCE #4 (E) ELEV EQUIP. MATCH LINE /K12 A4.31 MA T C H L I N E / K1 2 A4 . 3 2 MATCH LINE /E12 A4.30 /K12 A4.32 MA T C H L I N E / K1 2 A4 . 3 2 MATCH LINE /K12 A4.30 MA T C H L I N E / K1 2 A4 . 3 0 / E1 2 A4 . 3 0 MA T C H L I N E / E1 2 A4 . 3 0 / K1 2 A4 . 3 1 KODA NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 135 ACORN NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 140 CANTEEN MAINTENANCE STORAGEEGRESS CORRIDOREGRESS CORRIDOR A7.11 K6 NO WORK IN THIS AREA PER THIS PERMIT NORTH LOBBY (VACANT) NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 132 (VACANT) NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 120 (VACANT) NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 138 SOUTHWEST CORRIDOR (E) MEN'S (E) WOMEN'S 3500# ELEV. ELEV. LOBBY SOUTHWEST CORRIDOR (E) MEN'S (E) WOMEN'S 3500# ELEV. ELEV. LOBBY KODA NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 141 (VACANT) NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 150 (VACANT) NO WORK IN THIS AREA PER THIS PERMIT (E) UNOCCUPIED WAREHOUSE (E) SUITE 130 KITCHENETTE SUITE 200 CENTRAL CORRIDOR (VACANT) NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 125 K12 A6.01 A7.10 K7 HAPTX NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 170 BIKE STORAGESTO. (E) ELEC. ROOM ELEC. (E) WOMEN'S RESTROOM (E) MEN'S RESTROOM A7.12 D12 (VACANT) NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 115 STAIR #3 MSBR1 MSBR MTTB(N) EAST ELEC. RM. A7.12 K12 T-HP2 HP2 LCP2 I.T. RM. EAST CORRIDOR E. VEST. MSBC HP1LCP1 HPHT-HP1 (E) EQUIP DPC (N) NORTH ELEC K6 A6.02 KE E P C L E A R KEEP CLEAR STORAGE EX I T P A S S A G E W A Y F O R F U T U R E U S E K8 A6.02 B8 A9.10 SLO City Churchoffice space Ernest warehousespace Kiva officespace Ernest officespace Office space(vacant) Partially completed 3-hr fire wall per BLDG-2695-2022 to remain. Finish with atleast one layer drywall. Egress corridor and exit door CalFire officespaceOffice space(vacant) Bang the Drum Egress corridorand exit door Future SLO City Church assembly space Egress corridor and exit doorWarehousetenant space Phase 1 First Floor Plan Existing conditions of partial 3-hr fire wall 3-hr fire wall 3-hr fire wall 3-hr fire wall Existing conditions in egress corridor Portion available for occupancy Current partially builtresidential units to remainPhase 1 Second Floor Plan Partially completed 3-hr fire wall per BLDG-2695-2022 to remain. Finish with atleast one layer drywall. Laurel Creek Phase 1 Egress routes and corridors with hardware, lighting and signage Operable fire sprinklers in all areas 3-hr fire wall 3-hr fire wall 3-hr fire wall Portion available for occupancy Laurel Creek Phase 2 SLO City Church tenant improvement Egress routes and corridors with hardware, lighting and signage DW F12 A6.01 A4.32 K12 CAL FIRE NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 175 (E) WOMEN (E) MEN (E) ELECTRICAL STAIR #4 (E) 2500# ELEV A7.00 K7 A7.01 K5 (VACANT) NO WORK IN THIS AREA PER THIS PERMIT (E) WAREHOUSE SUITE 100 ERNEST PACKAGING NO WORK IN THIS AREA PER THIS PERMIT (E) WAREHOUSE SUITE 110 (VACANT) NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 190 ERNEST PACKAGING NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 184 KIVA NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 180 BANG THE DRUM NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 160 MAIL LOBBY ENTRANCE #4 (E) ELEV EQUIP. MATCH LINE /K12 A4.31 MA T C H L I N E / K1 2 A4 . 3 2 MATCH LINE /E12 A4.30 /K12 A4.32 MA T C H L I N E / K1 2 A4 . 3 2 MATCH LINE /K12 A4.30 MA T C H L I N E / K1 2 A4 . 3 0 / E1 2 A4 . 3 0 MA T C H L I N E / E1 2 A4 . 3 0 / K1 2 A4 . 3 1 KODA NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 135 ACORN NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 140 CANTEEN MAINTENANCE STORAGEEGRESS CORRIDOREGRESS CORRIDOR A7.11 K6 NO WORK IN THIS AREA PER THIS PERMIT NORTH LOBBY (VACANT) NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 132 (VACANT) NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 120 (VACANT) NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 138 SOUTHWEST CORRIDOR (E) MEN'S (E) WOMEN'S 3500# ELEV. ELEV. LOBBY SOUTHWEST CORRIDOR (E) MEN'S (E) WOMEN'S 3500# ELEV. ELEV. LOBBY KODA NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 141 (VACANT) NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 150 (VACANT) NO WORK IN THIS AREA PER THIS PERMIT (E) UNOCCUPIED WAREHOUSE (E) SUITE 130 KITCHENETTE SUITE 200 CENTRAL CORRIDOR (VACANT) NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 125 K12 A6.01 A7.10 K7 HAPTX NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 170 BIKE STORAGESTO. (E) ELEC. ROOM ELEC. (E) WOMEN'S RESTROOM (E) MEN'S RESTROOM A7.12 D12 (VACANT) NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 115 STAIR #3 MSBR1 MSBR MTTB(N) EAST ELEC. RM. A7.12 K12 T-HP2 HP2 LCP2 I.T. RM. EAST CORRIDOR E. VEST. MSBC HP1LCP1 HPHT-HP1 (E) EQUIP DPC (N) NORTH ELEC K6 A6.02 KE E P C L E A R KEEP CLEAR STORAGE EX I T P A S S A G E W A Y F O R F U T U R E U S E K8 A6.02 B8 A9.10 SLO City Churchoffice space Ernest warehousespace Kiva officespace Ernest officespace Office space(vacant) Egress corridor and exit door CalFire officespaceOffice space(vacant) Bang the Drum Egress corridorand exit door Egress corridor and exit doorWarehousetenant space Phase 2 First Floor Plan SLO City Church assembly space Partially completed 3-hr fire wall per BLDG-2695-2022 to remain. Finish with atleast one layer drywall. 3-hr fire wall 3-hr fire wall 3-hr fire wall Portion available for occupancy Phase 2 Second Floor Plan Current partially builtresidential units to remain Partially completed 3-hr fire wall per BLDG-2695-2022 to remain. Finish with atleast one layer drywall. Laurel Creek Phase 2 SLO City Church tenant improvement Egress routes and corridors with hardware, lighting and signage 3-hr fire wall 3-hr fire wall 3-hr fire wall Portion available for occupancy Laurel Creek Phase 3 31 residential units on 2nd floor Switchgear installation for residential use Egress routes and corridors with hardware, lighting and signage 1-hr horizontal assembly below units DW F12 A6.01 A4.32 K12 CAL FIRE NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 175 (E) WOMEN (E) MEN (E) ELECTRICAL STAIR #4 (E) 2500# ELEV A7.00 K7 A7.01 K5 (VACANT) NO WORK IN THIS AREA PER THIS PERMIT (E) WAREHOUSE SUITE 100 ERNEST PACKAGING NO WORK IN THIS AREA PER THIS PERMIT (E) WAREHOUSE SUITE 110 (VACANT) NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 190 ERNEST PACKAGING NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 184 KIVA NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 180 BANG THE DRUM NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 160 MAIL LOBBY ENTRANCE #4 (E) ELEV EQUIP. MATCH LINE /K12 A4.31 MA T C H L I N E / K1 2 A4 . 3 2 MATCH LINE /E12 A4.30 /K12 A4.32 MA T C H L I N E / K1 2 A4 . 3 2 MATCH LINE /K12 A4.30 MA T C H L I N E / K1 2 A4 . 3 0 / E1 2 A4 . 3 0 MA T C H L I N E / E1 2 A4 . 3 0 / K1 2 A4 . 3 1 KODA NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 135 ACORN NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 140 CANTEEN MAINTENANCE STORAGEEGRESS CORRIDOREGRESS CORRIDOR A7.11 K6 NO WORK IN THIS AREA PER THIS PERMIT NORTH LOBBY (VACANT) NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 132 (VACANT) NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 120 (VACANT) NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 138 SOUTHWEST CORRIDOR (E) MEN'S (E) WOMEN'S 3500# ELEV. ELEV. LOBBY SOUTHWEST CORRIDOR (E) MEN'S (E) WOMEN'S 3500# ELEV. ELEV. LOBBY KODA NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 141 (VACANT) NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 150 (VACANT) NO WORK IN THIS AREA PER THIS PERMIT (E) UNOCCUPIED WAREHOUSE (E) SUITE 130 KITCHENETTE SUITE 200 CENTRAL CORRIDOR (VACANT) NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 125 K12 A6.01 A7.10 K7 HAPTX NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 170 BIKE STORAGESTO. (E) ELEC. ROOM ELEC. (E) WOMEN'S RESTROOM (E) MEN'S RESTROOM A7.12 D12 (VACANT) NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 115 STAIR #3 MSBR1 MSBR MTTB(N) EAST ELEC. RM. A7.12 K12 T-HP2 HP2 LCP2 I.T. RM. EAST CORRIDOR E. VEST. MSBC HP1LCP1 HPHT-HP1 (E) EQUIP DPC (N) NORTH ELEC K6 A6.02 KE E P C L E A R KEEP CLEAR STORAGE EX I T P A S S A G E W A Y F O R F U T U R E U S E K8 A6.02 B8 A9.10 SLO City Churchoffice space Ernest warehousespace Kiva officespace Ernest officespace Office space(vacant) Egress corridor and exit door CalFire officespaceOffice space(vacant) Bang the Drum Egress corridorand exit door Egress corridor and exit door 3-hr fire wall 3-hr fire wall Warehousetenant space Phase 3 First Floor Plan SLO City Church assembly space Existing conditions of Empire tenant space Partially completed 3-hr fire wall per BLDG-2695-2022 to remain. Finish with atleast one layer drywall. 3-hr fire wall Portion available for occupancy 31 residential units to be completed 3-hr fire wall per BLDG-0813-2021 toremain as is. Phase 3 Second Floor Plan Egress corridor &exit stair/elevator Egress corridor & exit stair/elevator Egress corridor & exit stair 3-hr fire wall perBLDG-0813-2021 to remain as is. 3-hr fire wall per BLDG-0813-2021 toremain as is. Existing conditions of residential units Unit balconies to be completed Laurel Creek Phase 3 31 residential units on 2nd floor Switchgear installation for residential use Egress routes and corridors with hardware, lighting and signage 1-hr horizontal assembly below units Partially completed 3-hr fire wall per BLDG-2695-2022 to remain. Finish with atleast one layer drywall. Portion available for occupancy