HomeMy WebLinkAboutItem 7a. 1150 Laurel Lane_Attachment I - April 17, 2025, Project Plan ___________________________________________________________________________ Laurel Creek, LP SITE ADDRESS 505 Bath Street 1150 Laurel Lane Santa Barbara, CA 93101 San Luis Obispo, CA 93401 1 Laurel Creek Mixed-Use Building Project Plan Update – April 17, 2025 Phase 1 The work required to allow the existing tenants to remain in the building is beginning immediately. This work is scheduled to be completed no later than June 15, 2025. This work includes but is not limited to the following items: Fire Sprinklers/Alarm - Operational fire sprinklers throughout the building o (4/17/2025) - Audited system with sprinkler contractor. System is up and operational. Approx 300 sqft of sprinklers on the second floor require trim. This work will be complete by end of this week (April 18th). o (4/17/2025) - Remaining work to be completed will be the 31 decks (2 heads per deck) and the Empire commercial TI space. Alpha is submitting a revision to permit in the Empire commercial space. The decks have sprinklers installed with the plastic cap. Cap and will be removed and trim placed when stucco is completed. Sprinklers are wet. - Completed fire line loop around the building o (4/17/2025) - Subcontractor has ordered all materials. o (4/17/2025) - Balance of fire line has been laid out. o (4/17/2025) - Kirk is re-mobilizing this week. - No longer utilizing a temporary fire pump to ensure adequate pressure o (4/17/2025) – no update Weatherproof building envelope - Replacing exterior metal siding that has been removed in large areas on the north side of the building o (4/17/2025) – Architect and Engineer have been working on a wall detail. This includes for a new overhead door and man door on the West elevation. o (4/17/2025) – Partial material has been ordered. - Installing new exterior metal siding at the vertical slots created to install fireproofing at the steel columns around the building o (4/17/2025) – Work will commence April 21. Materials ordered. - Completing the installation of metal siding at the Bang the Drum space and along the south elevation o (4/17/2025) – We have walked the building with the metal siding contractor and material has been ordered. The material we do have will start going up on April 21. - Installing a new exterior wall with metal siding at the west elevation where the wall has been removed o (4/17/2025) – no update - Completing the stucco finish at the Bang the Drum space and along the south elevation o (4/17/2025) – We have walked the building with the stucco contractor and he is to start on April 17. - Sealing numerous penetrations through the exterior walls that were created to install various elements o (4/17/2025) – no update - Installing new roll-up door on the north elevation near the eastern corner of the building o (4/17/2025) – no update ___________________________________________________________________________ Laurel Creek, LP Site Address: 505 Bath Street 1150 Laurel Lane Santa Barbara, CA 93101 San Luis Obispo, CA 93401 2 Exit Routes - Complete the installation of the doors within the first floor exit corridor including patching around the doors, and door hardware o (4/17/2025) – Doors and frames are being installed. Hardware that is not onsite has been ordered. - Install all required exit signs and emergency lighting from all occupied spaces to the required exit doors o (4/17/2025) – no update - Install all required signage identifying spaces on, or adjacent to, the doors o (4/17/2025) – no update - Complete the installation of the drywall and general lighting in the corridor o (4/17/2025) – Scope has been shared with subcontractors and work to commence April 21. - Ensure a smooth floor surface from each occupied space to the required exit doors o (4/17/2025) – Work on going and will be complete April 18th. - Complete the exterior egress paths from the doors to safe dispersal areas o (4/17/2025) – Flat work being grinded where necessary. Site Work - Repair the damaged asphalt paving in the areas serving the occupied portions of the building o (4/17/2025) – Working with paving subs. So far the best schedule we’ve received is late May. - Repair the damaged concrete walkways that are required for egress o (4/17/2025) – no update - Fill open holes and trenches o (4/17/2025) – no update - Clearly identify and restrict public access to construction areas o (4/17/2025) – no update Building Code Compliance - At the conclusion of phase 1 the building will be considered an unlimited area building per CBC Section 507.5 o The allowable occupancy groups are limited to Group B, F, M or S o The building is no more than two stories o The building is equipped with an NFPA-13 fire sprinkler system o The building is surrounded and adjoined by yards not less than 60 feet in width Conclusion of Phase 1 - At the conclusion of phase 1, the building will be safe for the continued occupancy of the warehouse tenants, Bang the Drum Brewery, and office tenants - The building will also be safe for the continued occupancy of the SLO City Church office uses but the SLO City Church assembly use will not be allowed - Residential uses will not be allowed Phase 2 The phase 2 work required to complete the building and allow for the SLO City Church assembly use to occupy the building will start concurrently with the phase 1 work but will have a longer duration. This work is scheduled to be completed no later than July 1, 2025 - (4/17/2025) - No update Building Interior - Complete interior work required for the SLO City Church tenant improvement ___________________________________________________________________________ Laurel Creek, LP Site Address: 505 Bath Street 1150 Laurel Lane Santa Barbara, CA 93101 San Luis Obispo, CA 93401 3 Exit Routes - Install all required exit signs and emergency lighting from all occupied spaces to the required exit doors - Install all required signage identifying spaces on, or adjacent to, the doors - Complete the installation of the drywall and general lighting in the exit passageway - Ensure a smooth floor surface from each occupied space to the required exit doors - Complete the exterior egress paths from the doors to safe dispersal areas - Complete the exit passageway from the SLO City Church assembly space to the exterior of the building Fire and Life Safety - Complete the installation of the fire walls separating the residential uses and assembly occupancies from the warehouse tenants - Confirm fireproofing of structural frame is complete Site Work - Repair parking lot asphalt areas required for church assembly use - Install required accessible parking stalls Building Code Compliance - At the conclusion of phase 2 the building will be considered three separate buildings due to the installation of two fire walls in compliance with CBC Section 706 as modified by approved Alternate Materials and Methods (AMM). o The fire walls are 3-hour rated o The building structural frame is provided with 3-hour rated protection o In compliance with the AMMR, residential uses are not in the same building (compartment) formed by fire walls as high-pile combustible storage warehousing or other uses deemed hazardous and not consistent with the City of SLO zoning code Conclusion of Phase 2 - At the conclusion of phase 2, the building will be safe for the occupancy of the SLO City Church assembly use Phase 3 The work required to complete the building and allow for the residential uses to occupy the building will start concurrently with the phases 1 & 2 work but will have a longer duration. This work is scheduled to be completed no later than August 1, 2025. - (4/17/2025) - No update Building Exterior - Complete residential balconies including railings, lighting and deck surfaces - Install the new electrical transformer required for the residential units Building Interior - Complete interior work required for the 31 residential units - Complete the installation of the additional electrical switchgear required for the residential units ___________________________________________________________________________ Laurel Creek, LP Site Address: 505 Bath Street 1150 Laurel Lane Santa Barbara, CA 93101 San Luis Obispo, CA 93401 4 Exit Routes - Complete the installation of the doors within the second floor exit corridor including patching around the doors, and door hardware - Install all required exit signs and emergency lighting from all occupied spaces to the required exit doors - Install all required signage identifying spaces on, or adjacent to, the doors - Complete the installation of the drywall and general lighting in the second floor corridor - Ensure a smooth floor surface from each occupied space to the required exit doors - Complete the exit stairs including handrails, tread striping, and signage - Complete the exterior egress paths from the doors to safe dispersal areas Fire and Life Safety - Complete the 1-hour horizontal assembly below the residential uses Site Work - Repair remaining parking lot asphalt - Install required accessible parking stalls - Install required EV chargers - Install accessible path to public right-of-way including required lighting - Install required landscaping - Remove all construction areas Building Code Compliance - The residential units will be a separated occupancy within the 2-story mixed-use building separated from the remainder of the overall building by a 3-hour rated fire wall. - The residential units will be separated from the first floor commercial office uses by a 1-hour horizontal assembly - The residential units will have two exit stairs that meet the requirements of CBC chapter 10 - The residential units will be on an accessible route via an elevator Conclusion of Phase 3 - At the conclusion of phase 3, the building will be safe for the occupancy of the 31 residential units Sincerely, Heather Wiebe Arris Studio Architects DW 31 31 1 1 E E Q Q 2 2 F F G G H H I I J J K K L L M M N N O O P P 3 3 4 4 5 5 6 67 7 8 8 9 9 10 10 11 11 12 12 13 13 14 14 15 15 16 16 17 17 18 18 19 19 20 20 21 21 22 22 23 23 24 24 25 25 26 26 27 27 28 28 29 29 30 30 D D C C B B A A 24 0 ' - 0 " 20 ' - 0 " 20 ' - 0 " 20 ' - 0 " 20 ' - 0 " 20 ' - 0 " 20 ' - 0 " 20 ' - 0 " 20 ' - 0 " 20 ' - 0 " 20 ' - 0 " 20 ' - 0 " 20 ' - 0 " 600'-0" 20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0" 200'-0"400'-0" 20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0" 32 1 ' - 9 " 20 ' - 0 " 20 ' - 0 " 20 ' - 0 " 21 ' - 9 " 20 ' - 0 " 20 ' - 0 " 20 ' - 0 " 20 ' - 0 " 20 ' - 0 " 20 ' - 0 " 20 ' - 0 " 20 ' - 0 " 20 ' - 0 " 20 ' - 0 " 20 ' - 0 " 20 ' - 0 " F12 A6.01 D12 A6.00 K12 A6.00 A4.30 K12 A4.30 E12 A4.32 K12 A4.31 K12 E12 A5.00 G12 A5.00 H12 A5.00 K12 A5.00 CAL FIRE NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 175 (E) WOMEN (E) MEN (E) ELECTRICAL STAIR #4 (E) 2500# ELEV STAIR #5 A7.00 K7 A7.01 K5 A7.02 K7 (VACANT) NO WORK IN THIS AREA PER THIS PERMIT (E) WAREHOUSE SUITE 100 ERNEST PACKAGING NO WORK IN THIS AREA PER THIS PERMIT (E) WAREHOUSE SUITE 110 (VACANT) NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 190 ERNEST PACKAGING NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 184 KIVA NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 180 BANG THE DRUM NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 160 MAIL LOBBY ENTRANCE #4 (E) ELEV EQUIP. MATCH LINE /K12 A4.31 MA T C H L I N E / K1 2 A4 . 3 2 MATCH LINE /E12 A4.30 /K12 A4.32 MA T C H L I N E / K1 2 A4 . 3 2 MATCH LINE /K12 A4.30 MA T C H L I N E / K1 2 A4 . 3 0 / E1 2 A4 . 3 0 MA T C H L I N E / E1 2 A4 . 3 0 / K1 2 A4 . 3 1 F.R. KODA NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 135 ACORN NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 140 CANTEEN MAINTENANCE STORAGEEGRESS CORRIDOREGRESS CORRIDOR A7.11 K6 NO WORK IN THIS AREA PER THIS PERMIT NORTH LOBBY (VACANT) NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 132 (VACANT) NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 136 (E) SUITE 136 (VACANT) NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 138 SOUTHWEST CORRIDOR (E) MEN'S (E) WOMEN'S 3500# ELEV. ELEV. LOBBY ELEV EQUIP. SOUTHWEST CORRIDOR (E) MEN'S (E) WOMEN'S 3500# ELEV. ELEV. LOBBY ELEV EQUIP. KODA NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 145 (VACANT) NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 150 (VACANT) NO WORK IN THIS AREA PER THIS PERMIT (E) UNOCCUPIED WAREHOUSE (E) SUITE 130 KITCHENETTE CENTRAL CORRIDOR (VACANT) NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 125 K12 A6.01 A7.10 K7 HAPTX NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 170 BIKE STORAGE STO. (E) ELEC. ROOM ELEC. (E) WOMEN'S RESTROOM (E) MEN'S RESTROOM A7.12 D12 (VACANT) NO WORK IN THIS AREA PER THIS PERMIT (E) SUITE 115 STAIR #3 MSBR1 MSBR MTTB(N) EAST ELEC. RM. A7.12 K12 T-HP2 HP2 LCP2 I.T. RM. EAST CORRIDOR E. VEST. MSBC HP1LCP1 HPHT-HP1 (E) EQUIP DPC (N) NORTH ELEC K6 A6.02 KE E P C L E A R KEEP CLEAR STORAGE EX I T P A S S A G E W A Y F O R F U T U R E U S E K8 A6.02 B8 A9.10 1. SEE STRUCTURAL, MECHANICAL, ELECTRICAL, CIVIL AND LANDSCAPE PLANS FOR ADDITIONAL INFORMATION2. ALL DIMENSIONS ARE TO FACE OF CONCRETE OR FACE OF STUD ON EXTERIOR WALLS, AND FACE OF STUD AT INTERIOR WALLS. SEE WALL ASSEMBLIES FOR FURTHER INFORMATIONWALL TYPESTUD SIZE (VARIES, SEE FLOOR PLAN)FIRE RATING (SEE FLOOR PLAN)WALL TYPE DETAILEX-W1 EXTERIOR WALL W/ PLASTER IN-W3 INTERIOR WOOD STUD WALL IN-W1 INTERIOR WALL 1-HR RATEDIN-W2 INTERIOR WALL EX: EXTERIOR IN: INTERIOR C: CONCRETE M: METAL W: WOOD EX-W2 EXTERIOR WALL W/ CORRUGATED SIDINGIN-WF INTERIOR FURRED WALLIN-W0 INTERIOR WALL CONCRETE EX-C0 CONCRETE PANEL NON-RATED STEEL 2-HR RATED NON-RATEDEX-M0 EXTERIOR WALL W/ CORRUGATED SIDINGEXISTING WALLEXISTING WALLIN-M3 EXISTING 3-HR FIRE WALL (BLDG-0813-2021)/B8 A9.10/B6 A9.10/D6 A9.10/H10 A9.10/D10 A9.10/F12 A9.10/K4 A9.10A /H12 A9.10 /H6 A9.10 /K6 A9.10 IN-M2 INTERIOR WALL /D8 A9.10 /K2 A9.10A IN-W4 INTERIOR WALL @ FURRED WALLS /H4 A9.10A /H2 A9.10A IN-W5 INTERIOR WALL /D8 A9.10 Thomas E. JessLicensedArchite c t Stateof Ca li f o r niaExpires 9/2023License #C-27608 10 9 8 7 6 5 4 3 2 1AB C D E F G H 10 9 8 7 6 5 4 3 2 1 AB C D E F Cl i e n t Pr o j e c t NO.REVISION DATE Project Date Sheet TH E I N C L U D E D D R A W I N G S , S P E C I F I C A T I O N S , I D E A S , D E S I G NS & A R R A N G E M E N T S R E P R E S E N T E D T H E R E B Y A R E A N D S H A L L R E M A I N T H E P R O P E R T Y O F AR R I S S T U D I O A R C H I T E C T S A N D N O P A R T T H E R E O F S H A L L B E C O P I E D , D I S C L O S E D T O O T H E R S O R U S E D I N C O N N E C T I O N W I T H A N Y W O R K O R P R O J E CT O TH E R T H A N T H E S P E C I F I C P R O J E C T F O R W H I C H T H E Y H A V E BE E N P R E P A R E D A N D D E V E L O P E D W I T H O U T T H E W R I T T E N C O N SENT OF ARRIS STUDIO ARCHITECTS. VI S U A L C O N T A C T W I T H T H E S E D R A W I N G S O R S P E C I F I C A T I O N S S H A L L C O N S T I T U T E C O N C L U S I V E E V I D E N C E O F A C C E P T A N C E O F T H E S E R E S T R I C T I O N S . S U B M I T T A L O F T H E S E D O C U M E N T S F O R P U B L I C A G E N C Y R E VI E W S H A L L N O T B E C O N S I D E R E D A W A V E R O F A R R I S S T U D I O A R C H I T E C T S ' R I G H T S . AR R I S S T U D I O A R C H I T E C T S C O P Y R I G H T 2 0 2 0 Architect of Record/Consultant Consultant J K 1112 G H J K 1112 1327 ARCHER STREET, STE. 220SAN LUIS OBISPO, CA 93401THOMAS E. JESS ARCHITECT (CA) #C27608STEPHEN A. RIGOR ARCHITECT (CA) #C33672ADDRESS805.547.2240ARRIS-STUDIO.COMCONTACT BIM 3 6 0 : / / A 2 0 0 4 8 - L a u r e l C r e e k W a r e h o u s e A p a r t m e n t s/ D e s i g n C h a n g e s - L a u r e l C r e e k W a r e h o u s e A p t . r v t 10 / 1 5 / 2 0 2 1 9 : 4 9 : 4 7 A M A20048 03/11/2021 A3.11 WA R E H O U S E R E M O D E L LA U R E L C R E E K L L C 11 5 0 L A U R E L L A N E S T E . 1 2 0 SA N L U I S O B I S P O C A , 9 3 4 0 1 (7 1 4 ) 3 6 8 -77 2 4 FI R S T F L O O R P R O P O S E D P L A N WA R E H O U S E A P A R T M E N T S - P H A S E 1 11 5 0 L A U R E L L A N E , S A N L U I S O B I S P O , C A 9 3 4 0 1 GENERAL NOTESWALL LEGEND TRUE NORTH PROJECT NORTH 1" = 20'-0" FIRST FLOOR PLANK12 8 6AMMR/FIREWALL-1ST PLAN CHECK05/19/2021 8APARTMENT ADDENDUM-01 07/02/2021 FIRE SPRINKLER NOT FUNCTIONAL FIRE SPRINKLERS ARE FUNCTIONAL FIRE SPRINKLER NOT FULLY FUNCTIONAL FIRE SPRINKLER NOT FULLY FUNCTIONAL FIRE SPRINKLERS NOT FULLY FUNCTIONAL FIRE SPRINKLER NOT FULLY FUNCTIONAL FIRE SPRINKLERS ARE FUNCTIONAL FIRE SPRINKLER NOT FULLY FUNCTIONAL FIRE SPRINKLER NOT FULLY FUNCTIONAL FIRE SPRINKLERS NOT FULLY FUNCTIONAL FIRE SPRINKLER NOT FULLY FUNCTIONAL FIRE SPRINKLERS ARE FUNCTIONAL