Loading...
HomeMy WebLinkAboutItem 5l - Authorization to Transfer Funds from Sewer Fund Completed Projects and Award Foothill Santa Rosa Sewer Pipeline Replacement ProjectItem 5l Department: Utilities Cost Center: 6102 For Agenda of: 6/3/2025 Placement: Consent Estimated Time: N/A FROM: Aaron Floyd, Utilities Director Prepared By: Miguel Barcenas, Deputy Director Engineering and Planning SUBJECT: AUTHORIZATION TO TRANSFER FUNDS FROM SEWER FUND COMPLETED PROJECTS AND AWARD THE FOOTHILL-SANTA ROSA SEWER PIPELINE REPLACEMENT PROJECT, SPECIFICATION NO. 2000096 RECOMMENDATION 1.Authorize the transfer of $126,000 from Sewer Fund Completed Projects (602.9501.71501) to the Foothill-Santa Rosa Sewer Pipeline Replacement Project, Specification No. 2000096; and 2.Award a Construction Contract to Souza Engineering Contracting, Inc in the amount of $598,591.00 for the Foothill-Santa Rosa Sewer Pipeline Replacement Project, Specification No. 2000096; and 3.Authorize the Utilities Director to approve Contract Change Orders up to the available project budget and any amended budget subsequently approved by the City Manager up to $200,000. POLICY CONTEXT The action is consistent with General Plan Water and Wastewater Element Goal B 4.1 to collect and convey all wastewater under safe and sanitary conditions to the Water Resource Recovery Facility. On February 4, 2025, the City Council authorized the advertisement for bids for the Foothill–Santa Rosa Sewer Pipeline Replacement Project, Specification Number 2000096 (Project). City Council’s action also authorized the City Manager to award the construction contract pursuant to Municipal Code Section 3.24.190 if the lowest responsible bid is within the Engineer’s Estimate of $562,000. The lowest responsible bid exceeds the Engineer’s Estimate by $126,000 and requires subsequent consideration and authorization by City Council to award. DISCUSSION Background The City Utilities and Public Works Departments have been coordinating with the Page 239 of 243 Item 5l California Department of Transportation (Caltrans) regarding a City sewer line (constructed in 1965) that punctured and damaged an existing Caltrans storm drain within the Santa Rosa/Foothill Boulevard intersection. The sewer line runs approximately perpendicular to the storm drain. Based on the date of construction, the cause of the damage is unknown, but the location of the storm drain puncture was verified through video inspections of the pipe’s interior. The proposed plan to mitigate the conflict involves reconstructing approximately 464 linear feet of the sewer main within Foothill Boulevard to lower its elevation below the storm drain, improving vertical clearance between the utilities by one foot or more. This effort will resolve the existing utility conflict, enhance the functionality of both systems and ensure long-term reliability. The Project will also result in a reduction of maintenance activities and inflow and infiltration that have previously been recorded in this catchment area, and it will replace an existing deteriorated maintenance hole. Caltrans is proposing a separate project to replace approximately 20 feet of the existing storm drain culvert within Santa Rosa/State Route 1 in the summer of 2025 at no cost to the City. On February 4, 2025, the City Council authorized the advertisement for bids for the Project. City Council also authorized 1) the City Manager to award the construction contract if the lowest responsible bid is within the Engineer’s Estimate of $562,000 and 2) the City Engineer to approve Contract Change Orders up to the available project budget and any amended budget subsequently approved by the City Manager up to $200,000. Bid packages were opened May 8, 2025, and the lowest responsible base bid was received from Souza Construction in the amount of $598,591 (see table below, and Attachment A), which exceeds the Engineer’s Estimate and requires subsequent consideration and authorization by City Council to award. Engineer’s Estimate RCH Construction Souza Engineering Contracting, Inc Base Bid $562,000 $562,501.85 $598,591 Add. Alt. $12,000 $7,758.48 $20,674 Bid with Add. Alt. $574,000 $570,260.33 $619,265 After reviewing the bid packets, the Bid Bond for RCH Construction was found to be defective because the incorrect project name and scope were listed with the bid packet. The bidder’s bond provided by RCH does not evidence a sufficient security for the Foothill-Santa Rosa Sewer Pipeline Replacement Project. Therefore, the bid from RCH Construction is non-responsive per Public Contract Code Section 20170-20171, which requires all bids submitted by the deadline under a sealed cover to include a bidder’s bond executed by an admitted surety insurer for the proposed work. Bid documents for Souza Construction are in order, and project references meet the minimum requirements. Staff is recommending the award of the Base Bid construction contract to Souza Engineering Contracting, Inc., who are determined to be the lowest Page 240 of 243 Item 5l responsive and responsible bidder after review of the Bid Packet. The additive alternate is currently rejected to preserve available funds for construction contingencies. Previous Council or Advisory Body Action This Project was identified in the 2023-25 Financial Plan Supplement (Fiscal Year 2024- 25 Supplemental Budget) that was approved by Council on June 4, 2024, with a budget of $350,000. As summarized above, on February 4, 2025, the City Council authorized the advertisement for bids for the Project, including additional actions for funding, contract award, and the approval of potential subsequent change orders. Public Engagement The project was identified in the 2023-25 Financial Plan Supplement (Fiscal Year 2024- 25 Supplemental Budget), which was adopted by the City Council at a public meeting held on June 4, 2024. Public comment was open prior to and during the Council Meeting when the 2024-25 Supplemental Budget was approved. The Project was also presented on the City Council public meeting consent agenda (February 4, 2025), which provided the opportunity for public comment. No public comments were received on the item. CONCURRENCE The City, including the Utilities and Public Works Departments, have been coordinating with Caltrans regarding the proposed resolution to the utility conflict between the Caltrans storm drain and the City’s sewer main. Caltrans concurs with the City’s proposed plans, and the City will receive an encroachment permit from Caltrans prior to construction of the project. The project also has the concurrence of the Public Works Department. ENVIRONMENTAL REVIEW On February 4, 2025, the City Council found the Project categorically exempt from environmental review under California Environmental Quality Act (CEQA) Guidelines Sections 15303 (New Construction or Conversion of Small Structures) and 15304 (Minor Alterations of Land). The recommended action does not include any changes to the Project and is consistent with Council’s previous determination . FISCAL IMPACT Budgeted: Yes Budget Year: 2024-25 Funding Identified: Yes Fiscal Analysis: Funding Sources Total Budget Available Current Funding Request Remaining Balance Annual Ongoing Cost Foothill-Santa Rosa Sewer Pipeline $562,000 $0 $0 N/A Page 241 of 243 Item 5l Replacement, Project (2000096): Sewer Fund Completed Projects (602-9501-71501) $356,331 $126,000 $230,331 Total $918,331 $126,000 $230,331 N/A Foothill-Santa Rosa Sewer Replacement (2000096) Construction Base Bid $598,591 Contingencies $74,000 Material Testing $9,600 Permitting $5,000 Printing $809 Total Cost of Project $688,000 Total Available Funding $562,000 Additional Funding $126,000 Remaining Balance $0 The Foothill-Santa Rosa Sewer Pipeline Replacement Project was budgeted in the 2023- 25 Financial Plan Supplement (Fiscal Year 2024-2025 Supplemental Budget, Page 60) where it was allocated $350,000. On February 4, 2025, the City Council authorized the transfer of $212,000 in funding from the Sewer Fund to the Project; therefore, funding for this project has a current balance of $562,000 . Staff is recommending an additional reallocation of $126,000 from the Sewer Fund Completed Projects account for a total project budget of $688,000. ALTERNATIVES Deny transfer of $126,000 from the Sewer Fund to the Project. The City Council may choose to deny the transfer of additional funding to the Project. If the additional funding is denied, the bid would not be awarded and the Project would not be constructed . If the Project is not constructed, the existing 1965 City-owned sewer main would remain in conflict with the Caltrans storm drain. This action would halt the subsequent Caltrans storm drain culvert replacement project and would leave the City’s existing sewer main out of compliance with City Standard Specifications and Engineering Standards. Forgoing this project would inhibit the City’s ability to improve maintenance accessibility, address degradation of the existing maintenance hole, and minimize inflow and infiltration into the affected wastewater collection system. ATTACHMENTS A - Foothill-Santa Rosa Sewer Pipeline Replacement, Specification Number 2000096 Bid Tabulations Page 242 of 243 Bid Opening 5/9/2025 Item #Item Description Unit of Measure Estimated Quantity Item Price Total Item Price Total Item Price Total 1 TRAFFIC CONTROL PLAN AND IMPLEMENTATION LS 1 $ 50,000.00 $ 50,000.00 $ 79,773.89 $ 79,773.89 $ 47,900.00 $ 47,900.00 2 POTHOLING LS 1 $ 12,000.00 $ 12,000.00 $ 7,947.53 $7,947.53 $ 22,320.00 $ 22,320.00 3 REPLACE TRAFFIC STRIPING & MARKERS LS 1 $ 25,000.00 $ 25,000.00 $ 10,203.02 $ 10,203.02 $ 22,420.00 $ 22,420.00 4 OBTAIN AND COMPLY WITH NIGHT WORK PERMIT LS 1 $ 10,000.00 $ 10,000.00 $ 6,198.89 $6,198.89 $ 22,020.00 $ 22,020.00 5 WATER POLLUTION CONTROL AND EROSION/SEDIMENT CONTROL PLAN LS 1 $ 5,200.00 $ 5,200.00 $ 6,462.14 $6,462.14 $ 2,385.00 $ 2,385.00 6 SHEETING, SHORING, AND BRACING LS 1 $ 16,000.00 $ 16,000.00 $ 27,487.22 $ 27,487.22 $ 9,150.00 $ 9,150.00 7 COMPLY WITH OSHA LS 1 $ 15,000.00 $ 15,000.00 $ 6,198.89 $6,198.89 $ 6,457.00 $ 6,457.00 8 PUBLIC NOTIFICATION LS 1 $ 7,000.00 $ 7,000.00 $ 6,198.89 $6,198.89 $ 710.00 $710.00 9 REPAIR TRAFFIC SIGNAL LOOPS LS 1 $ 19,000.00 $ 19,000.00 $ 17,430.17 $ 17,430.17 $ 10,720.00 $ 10,720.00 10 ABANDON SEWERLINE, MANHOLES AND FACILITIES LS 1 $ 25,000.00 $ 25,000.00 $ 22,359.97 $ 22,359.97 $ 29,230.00 $ 29,230.00 11 SEWER BYPASS PUMPING LS 1 $ 28,000.00 $ 28,000.00 $ 48,850.10 $ 48,850.10 $ 20,855.00 $ 20,855.00 12 ROCK EXCAVATION CY 50 $ 200.00 $ 10,000.00 $ 354.08 $ 17,704.00 $ 212.00 $ 10,600.00 13 REMOVE EXISTING SEWERLINE AND INSTALL NEW 6" HDPE SEWERLINE LF 13 $ 400.00 $ 5,200.00 $ 1,336.60 $ 17,375.80 $ 1,598.00 $ 20,774.00 14 REMOVE EXISTING SEWERLINE AND INSTALL NEW 8" HDPE SEWERLINE LF 250 $ 450.00 $ 112,500.00 $ 286.80 $ 71,700.00 $ 398.00 $ 99,500.00 15 INSTALL NEW 8" HDPE SEWERLINE TRENCHLESS METHOD LF 200 $ 450.00 $ 90,000.00 $ 282.25 $ 56,450.00 $ 484.00 $ 96,800.00 16 INSTALL NEW MANHOLE EA 3 $ 20,000.00 $ 60,000.00 $ 12,913.42 $ 38,740.26 $ 26,650.00 $ 79,950.00 17 INSTALL COATING ON SEWER MANHOLE EA 3 $ 4,500.00 $ 13,500.00 $ 17,141.30 $ 51,423.90 $ 5,370.00 $ 16,110.00 18 REMOVE EXISTING MANHOLE EA 1 $ 3,000.00 $ 3,000.00 $ 10,971.64 $ 10,971.64 $ 3,466.00 $ 3,466.00 19 CONNECT EXISTING SEWER LATERAL TO SEWER MAIN EA 2 $ 2,000.00 $ 4,000.00 $ 4,445.81 $8,891.62 $ 9,417.00 $ 18,834.00 20 RE-GRADE AND EXTEND SEWER LATERAL LF 20 $ 80.00 $ 1,600.00 $ 543.87 $ 10,877.40 $ 1,200.00 $ 24,000.00 21 REPLACE DRIVEWAY RAMP PER ENG. STD. 2110 AND SIDEWALK TIE- IN EA 1 $ 25,000.00 $ 25,000.00 $ 14,354.92 $ 14,354.92 $ 17,400.00 $ 17,400.00 22 CURB AND GUTTER REPAIRS AND REPLACEMENTS LS 1 $ 25,000.00 $ 25,000.00 $ 24,901.60 $ 24,901.60 $ 16,990.00 $ 16,990.00 $ 562,000.00 $ 562,501.85 $ 598,591.00 ADDITIVE ALTERNATE 23 CUT AND CAP EXISTING SEWER AND REPAIR STORM PIPE PER DETAIL 2 AND 4 LS 1 $ 12,000.00 $ 12,000.00 $ 7,758.48 $7,758.48 $ 20,674.00 $ 20,674.00 $ 574,000.00 $ 570,260.33 $ 619,265.00 Note 1 - Bid totals corrected by City during audit and bid evaluation are shown in italics. Foothill-Santa Rosa Sewer Pipeline Replacement, Specification No. 2000096 Total Project Bid Engineer's Estimate RCH Construction Souza Construction Base Project Bid Page 243 of 243