COUNCIL AGENDA REPORTn-EM NUMB
FROM: David F . Romero ,-. cane Wilson Prepar d by : David P . Pierce
Public Works Dir . Parks and Buildings Projects Mgr .
SUBJECT :
Mission Plaza Walkway and Patio
CAO RECOMMENDATION :
By resolution approve the award of a contract to Whitaker
Construction in the amount of $74 , 697 . 60 to complete project -
Mission Plaza Walkway and Patio - City Plan Nos . M-02Y and M-03Y ;
direct the transfer of $30 , 000 to account 040-9547-091-572 from
Mission Plaza Reserve CRP Appropriations ; and appropriatp an
additional $50 , 000 to this project from Mission Plaza Reserves
BACKGROUND :
The FY 1987-89 Capital Reinvestment Plan identified $30 , 000 in FY
1987-88 for the Mission Plaza patio and walkway and $10 , 000 in FY
1988-89 for the kiosk.
On February 9 , 1988 , City Council approved the plans and
specifications with reservations on the construction of a Kiosk . The
project was bid with the kiosk and directories as an alternate .
On April 21 , 1988 , the bids were opened . A summary of the bids is
attached (Attachment 1 ) . All four bids are over the estimate of the
landscape architect who prepared the plans and specifications .
The apparent low bid submitted by Complete Development Services , Inc .
is not responsive . This firm does not have a Class A Contractors
License as required by the specifications . Staff has reviewed the
Contractors Licensing Law and has confirmed that a Class A license is
the only appropriate license for the contractor performing this work .
0 tions
1 . Appropriate $50 , 000 and award the contract without the kiosk to
the lowest qualified bidder - contract cost $74 , 697 . 60 .
2 . Appropriate $60 , 000 and award the contract with the kiosk to the
lowest qualified bidder - contract cost $84 , 589 . 80 .
3 . Reject all bids and redesign the project for a lower cost .
4 . Reject all bids and cancel the project .
Pros_and_Cons
1 . It is unlikely that this project can be accomplished at a lower
cost . A comparison of these bids with other recent bids
indicates that the estimate was low. Recent experience with
rebidding of projects has been that the low bids increase on the
second bidding. This is very likely with the wide spread in the
bids .
0-4�L
o��h��NN��lllfll��l ���ll city of San 1UI S OBISPO
Wft 4A COUNCIL AGENDA REPORT
Mission Plaza Walkway and Patio
Page 2
The use of the property on which the project is being constructed has
been donated to the City by Evins and Dorothy Naman for the construc-
tion of a walkway and seating area . The landscape architect has
discussed the bids and alternatives with the Namans ' . They said that
the gift of the use of the land was made with the understanding that
the City would construct a walk and seating area .
2 . The kiosk and directories increase the contract cost $9 , 900 which
is excesive for the contribution they will make to the plaza .
3 . The possibility of redesigning the project has been reviewed with
the landscape architect . Significant cost savings are not
possible if the project is to provide a walkway . A walkway
through this area requires a retaining wall , guard rails and
lighting to highlight the steps .
4 . Cancellation of the project would save the City the cost of the
project . However , the City would then need to address the gift
of the use of the land which was made with the understanding that
the walk would be constructed . The landscaping in this area
would still need major renovation that could be accomplished as
part of the normal maintenance of the area .
Purchasing_Contral_Procedure
Purchasing Control Procedure 403-3 applies to this contract .
Fiscal_Impact
Contract bid $74 , 697 . 60
Engineer ' s estimate. $42 , 774 . 60
Approved Financial Plan Funds :
CRP Project Naman Patio
Account Number 040-9547-091-572 $30 , 000 . 00
FY 88-89 CRP Project Kiosk Construction $101000_00
$40 , 000 . 00
Additional funds need to be appropriated from Mission Plaza Reserves
Recommendation
By resolution approve the award of a contract to Whitaker
Construction in the amount of $74 , 697 .60 to complete project -
Mission Plaza Walkway and Patio - City Plan Nos . M-02Y and M-03Y ;
direct the transfer of $30 , 000 to Account 040-9547-091-572 from
Mission Plaza Reserve CRP Appropriations ; and appropriate an
additional $50 ,000 to this project from Mission Plaza Reserves .
C-4-2
►►►�►r��������►��P° 91UIII city of sai I IDIS OBISPO
NNIGN COUNCIL AGENDA REPORT
Mission Plaza Walkway and Patio
Page 3
APPROVED :
----=- --------------------- Date :-
---------------
ty Ad inistrative Officer
i
IL
City Attorney Finance Director
Attachments : Bid Summary S
Resolution -
g : naman-ag
C-4t-3
RESOLUTION NO. (1988 SERIES)
A RESOLUTION OF THE COUNCIL OF THE
CITY OF SAN LUIS OBISPO APPROPRIATING
FUNDS AND AWARDING A PROJECT
WHEREAS, the City requested bids for the construction of a walkway and
patio in the Mission Plaza; and
WHEREAS, bids were received from four contractors on April 21, 1988;
and
WHEREAS, Complete Development Services, Inc. , which submitted the
J
lowest bid, does not have a Class "A" Contractors License as required by
the Specifications and by the Contractor's Licensing Law; and
WHEREAS, the low responsive bid was submitted by Whitaker Construction
for the amount of $74,697.60; and
WHEREAS, the agreement with the Namans' for the use of the land
commits the City to construction of a walkway and seating area;
NOW THEREFORE BE IT RESOLVED by the Council of the City of San Luis
Obispo as follows:
SECTION 1. The bid submitted by Complete Development Services, Inc.
is not responsive because the contractor is not properly licensed for this
class of work.
SECTION 2. An additional $50,000.00 is appropriated from Mission
Plaza Reserves and the Finance Director is to transfer the present
$30,000.00 from Mission Plaza Reserve CRP Appropriations to the Project
Account 040-9547-091-572.
SECTION 3. The award of a contract to Whitaker Construction, Inc. in
the amount $74,897.60 is approved and the Mayor is authorized to sign the
contract.
C-4-4
Resolution No. (1988 Series)
Page Two
SECTION 4. The City Clerk shall furnish a copy of this resolution to
the Director of the Public Works and Finance Departments.
On motion of seconded by
and of the following roll call note:
AYES:
NOES:
ABSENT:
the foregoing Resolution was passed and adopted this day of
198 .
MAYOR RON DUNIN
ATTEST:
CITY CLERK PAM VOGES
s s s s s s s s
APPROVED:
City istrative Officer City Attdrde
F ce rector Public Works Director
City Engineer Project Manager
g:namanres
C-4-S
THE FOLLOWING BIDS WERE RECEIVED IN THE CITY CLERK'S OFFICE FOR
"MISSION PLAZA WALKWAY/PATIO/KIOSK AND DIRECTORIES" CITY PLAN NOS.
M02Y AND M03Y. BIDS WERE OPENED ON APRIL 21 , 1988, AT 3:00 P.M.
• V
ENGINEER'S ESTIMATES: $49,890.00 (Alt. A)
$42,774.60 (Alt. B)
r-
1 . Whittaker Construction Co. $84,589.80 (A)
.San Luis Obispo $74,697.60 (B)
2. Development Services $70,706.65 (A)
San Luis Obispo $60, 133.05 (B)
3. Madonna Construction $105,062.00 (A)
San Luis Obispo S 89.368.00 (B)
4. Nick Pokrajac, Inc. $112,586.41 (A)
San Luis Obispo $ 96,099.94 (B)