HomeMy WebLinkAbout06/06/1988, C-7 - SCOPE OF SERVICES FOR WASTEWATER MANAGEMENT PLAN IMPLIMENTATION CONTRACT SCOPE OF SERVICES FOR
WASTEWATER MANAGEMENT PLAN IMPLEMENTATION CONTRACT
Previously authorized tasks:
1.0 Project Management
1. 1 Prepare Project Management Plan
1.2 Coordinate State Revolving Fund Financing
2.1 Conduct "kick-off" meeting
2.2 Conduct a brainstorming session
2 .3 Prepare geotechnical report
2.4 Prepare site survey report
2 .5 Evaluate implementation of a stream enhancement
program
2 .6 Evaluate use of reclaimed water for agriculture
irrigation and landscape irrigation
2 .7 Evaluate indirect (subsurface) discharge of effluent
to Laguna Lake
2.8 Review existing source detection data
2.9 Initial field work
2. 10 Develop alternative to handle I/I flows
2 . 11 Evaluate alternatives to handle I/I flows
~� Tasks authorized with this action:
2. 12 Develop collection system preliminary design and
implementation program
2. 13 Prepare treatment plant basis-of-design report
2. 14 Predesign review
3. 1 Identify underground utilities
3.2 Prepare plans and specifications for bidding purposes
3 . 3 Design reviews
3 .4 Prepare project schedule
3 . 5 Prepare construction cost estimates
3 . 6 value engineering
3 .7 Cost planning and monitoring
3 .8 Prepare bidding plans and specifications
4 .1 Provide bidding assistance
5.0 Special engineering services:
a. prepare as-built construction plans
b. prepare a separate construction package for
advance wastewater treatment
c. incorporate review comments
d. public hearings
e. emergency power
f. value engineering recommendation
wwmptasks/wth#6
jj I