Loading...
HomeMy WebLinkAboutItem 7a. Attachment E - Pavement Plan (2021-27)MADO N N A GRA N D BR O A D SOUTH SA N T A R O S A SAN T A B A R B A R A MONTE R E Y HIG U E R A MARSH LAU R E L J O H N S O N C A L I F O R N I A FOOTHILL D A L I D I O OS O S NI P O M O CH O R R O L O S O S O S V A L L E Y TANK FARM HIGH L A N D OR C U T T SA N L U I S BUCKLEY MADO N N A MADON N A Sewer Water *UTILITY PROJECTS FALL WITHIN THE 2-YEAR ROAD CUT MORATORIUM FOR THE INDICATED YEAR OF AREA SEALING. DELAY THESE STREETS 2 YEARS. UTILITY PROJECT CONFLICTS* AREA 6 (2022) AREA 7 (2022) AREA 9 (2022) AREA 8 (2024) AREA 1 (2024) AREA 2 (2026) AREA 3 (2026) NEIGHBORHOOD BASE REPAIR AND ROADWAY SEALING 1 HIGUERA (2021) 2 MARSH (2021) 3 JOHNSON/PHILLIPS/PEPPER (2021) 4 NIPOMO (2021) 5 MONTEREY/JOHNSON/GRAND (2023) 6 SANTA BARBARA (2023) 7 JOHNSON (2023) 8 HIGUERA/MADONNA (2023) 9 ORCUTT (2023) 10 TANK FARM (2025) 11 TANK FARM/ORCUTT (2025) 12 HIGUERA/PRADO (2027) 13 LOVR/FROOM/MADONNA (2027) NO LEGENDARTERIAL ROADWAY BASE REPAIR AND SEALING 1,2 3 4 5 6 7 8 9 10 11 12 13