Loading...
HomeMy WebLinkAbout09/27/1988, 3 - STATUS REPORT ON MITCHELL PARK WALL IMPROVEMENT --MEETING AUNUA DATE DEP 27 88 ITEM # M Denotes action by Lead Perso I TuE LAw OFFICES OF Respond by. g GEORGE B. O'NE[LL �TEILL BC TTEILL citODANIEL J. O'NEILL 1014 PALM STREETSAN Luis OBISPO�CALIFORNIA 1)3401 (80-5) sa3-7e9sierk-arig. W-D. koniE,elo Z-% 7- September September 22, 1988 Honorable Ron Dunin City Hall San Luis Obispo, CA 93401 To The Honorable Ron Dunin: The undersigned do hereby request that demolition and reconstruction of the World War II Memorial to our fallen San Luis Obispo County soldiers be deferred until after the next San Luis Obispo City Council meeting on October 4, 1988. We believe the memorial is not only a historical landmark in the city of San Luis Obispo but a tribute to our young men who gave their lives to defend this country. It is our hope that perhaps some alternative can be pursued to modify or defer destruction of this memorial. a P2�rs�o�.�- 1)c 7ae��v5� �GnrS, /nl c Fr; OL � y Gg c�ta,e: b sip a , RECElVEDI SEP 2 2 1988 .. CITY CLERK SAN LUIS 085"0.CA MEETING DATE: ��m�INIiIIVIIIIIII�IA�IIUIII city Of San llua OBISPO September 27 198 Rto COUNCIL AGENDA REPORT ITEM N BER: FROM: Dave Romero, Public Works Director SUBJECT: Status Report on Mitchell Park Wall and Improvements CAO RECOMMENDATION: By motion, direct staff to proceed with project as expeditiously as possible BACKGROUND: Previous History Feb. 2, 1988 Wall issue raised at City Council meeting Mar. 15, 1988 Staff agenda report considered. Council action was to appoint committee (Council action implied removal of wall) May 17, 1988 Committee met - determined to hire architect to prepare concept plans May 24, 1988 Contract negotiated and awarded to Sedes for concept study (Est. $1,075, actual $1,238) July 14, 1988 Plans (6 concepts) and estimates submitted to City for review by committee Aug. 12, 1988 Committee review of plans and agreement on concept and work to be done(Attachment A) Sept. 8, 1988 Contract negotiated for final design of Mitchell Park improvements ($4,500). Ready for final signature after the City Council meeting Probable Future Schedule See Attachment "Schedule" DISCUSSION: Staff has several areas of concern regarding this project. 1. If we followed our normal construction practice, the wall would be removed just prior to award of an improvement contract in February or March 1989. However, since removal of the wall has become a more pressing issue, staff has made arrangements to have the CCC move in Wednesday, September 21, and the site should be cleared by the end of the month. Staff will attempt to make the site as presentable as possible, until a replacement structure is installed. 2. Staff wishes to inform the Council of the cost and time consequences of the replacement project (Attachment B). The architect's concept rendering will be available at the meeting. 3. At this point, architect fees are expected to approach $6,000, with a total construction cost exceeding $60,000, in excess of the $25,000 budgeted. If the project is to proceed as currently envisioned, a supplemental appropriation of approximately $45,000 will be required prior to award of the construction contract. ��►�►�►ruiuIIIIIII�I►1°► ��U�U city Of SATrLuis OBISPO ftpf C®UNCIL AGEND--A REPORT Mitchell Park Wall Page Two RECOMMENDATION: Staff recommends that Council direct staff'to a.proceed with design. and necessary approvals following Council,review of cost and timing implications. rmtchell/dfr#1'2 MI'ICHELr• PARK NEMORIAL WC W SCHED F. BEST MOST PROBABLE Contract with SEDES (Clete) September 28 September 28 Preliminary plan for (1 1/2 wk) October 11 October 11 ARC Review ARC Review October 17 November 7 Begin construction October 18 November 8 doccments Complete construction (3 weeks) November 8 (3 weeks Navenber 29 documents after ARC) Plan Review (1 week) November 15 (2 weeks) December 13 Prepare bid docents (1 week) November 22 (2 weeks) December 29 City Council Agenda December 20 January 17 Advertise December 27 January 21 Advertising period (4 weeks) (4 weeks) Open bids January 26 February 23 Review bids (4 weeks) (4 weeks) City Council =rtract February 21 Mare 21 award Start contract (1 month) March 20 (1 month) April 20 Complete construction (2 months) May 20 (2 months) June 20 schedule memorial/dfr#12 �►������ ii�►�i►Illilllll II ��@►� ii�ll � city of sAn suis oBispo , _ B _ II' 990 Palm Street/Post Office Box 8100 • San Luis Obispo, CA 93403-8100 August 22, 1988 MEMORANDUM T0: Dave Romero FROM: John Dunn SUBJECT: Meeting of City Council Subcommittee on Mitchell Park Wall on Friday. August 12, 1988 Attendance: Councilmembers Pinard and Reiss , John Dunn, Lane Wilson, Dora Harder, Marion Morganson . and Dutch VanHarreveld. After much discussion, the subcommittee agreed to move the wall , with the following replacement program: 1 . The brick from the removed wall , is to be used for plan A2, for the columns or pillars, for the pedestal for the plaque, and for the arbor floor and adjacent walkways. 2. The plaque and its supporting pedestal are to be located in the center of the arbor area. 3. The balance of the project is to be- as stated in the attached letter of August 12, 1988 from Mrs. Harder, Mr. Morganson and Councilmember Pinard. 4. At least one of the lights in the arbor, if not several , are to focus on the Veterans Memorial Plaque. 5. We are to save the unused brick for either this project or for other City purposes. 6. We are to photograph the existing wall for historical purposes before tearing it down making Certain that it is well documented. 7. It was suggested that we might want to have a raised planting area around the flagpole with low flowers in the planted area. It was generally agreed that the high shrubbery needs to be replaced, that high visibility is the desired objective. Based on the above, the architect is to finalize the design and to present it to the Architectural Review Commmission. After the design is approved, the Director of Public Works is to coordinate construction for the replacement program using community resources and volunteer labor as available. kq C: Councilmembers, Lane Wilson, Toby Ross Attachment: Wilson Memo f �►►��►►ilii►Illlilllllllllllll���������'fllllllll�Ill I��� city Of sAn suis OBIS po Rim Ei e-1 990 Palm Street/Post Office Box 8100 • San Luis Obispo, CA 93403.8100 August 17 , 1988 MEMORANDUM TO: Dave Romero FROM: Lane Wilson SUBJECT: Mitchell Park - Memorial Wall A meeting was held on August 12 , 1988 at 10 :00 a.m. to review and give direction to staff regarding the changes that are to occur to this area. The following people were present : Councilwoman Pinard, Councilman Reiss , Mr. Morganson, Mrs. Harter, Mr. Van Harreveld, City Administrative Officer John Dunn, and Lane Wilson. The outcome of our discussion is as follows: 1 . Concept Option A2 was accepted as the basic design. 2 . The existing memorial structure should be memorialized with photographs . 3 . The brick wall is to be dismantled with as many bricks being reused as possible to construct the plaque pedestal , the columns and paving of the area. The CCC or CMC could be used to dismantle the wall . 4 . The memorial plaque is to be placed on a brick pedestal and centered in the entrance from the street. 5 . The concrete area is to be reduced and the turf area increased. 6. The area shall have lighting with the memorial area having both indirect and direct lighting and a spotlight on the memorial plaques . 7 . Landscaping shall be low groundcover combined with trees. 8 . The play area should be expanded with equipment for small children. 9 . The flag pole area is to have all plants removed and is to be replanted with low plants and lots of color. Mitchell Park Page 2 10. Plans of Concept Option A2 are to be sent to Mr. Morganson and Mr . Van Harreveld. 11 . Visibility is the prime concern. 12 . The chain link fence is to be extended with gates that can be closed when children are present . Attachment : Mitchell Park Wall Committee, memorandum 8/12/88 dh b/wilson/mitchell P` August 12, 1988 To : Mitchell Park Wall Committee Attn: Mr. Dave Romero We prefer the drawing of A-2. If the Veterans organization does not want to re-use the bricks, than the A-1 plan would be acceptable. The wall bricks can be re-used for the monument pedestal. The cost of concrete ranges from $8,460 to $14, 000. We suggest the use of the lesser amount - $8,460. ' The park sign (which should be placed at the top of the arbor) cost is listed at $1, 500, this appears to be an excessive amount. An extension of the chain link fence at the corner of Santa Rosa and Pismo Streets with a double gate that could be locked while children are in attendance at the playground is a necessity. Is there sufficient change in the electrical work to warrant a cost of $8, 500? The landscaping should be held to a minimum, no low shmbbery, perhaps several trees could be planted around the area. Is it possible to utilize city crews and city equipment to demolish the wall? We know of many people who would demolish this wall for less than $7, 200. ,.t Page Two of Six Mitchell Park/Preliminary Cost Estimates SCHEME DFSCRIPTION/ITEMS OST A2 Memorial Corner & Plaza (Smaller Scale Plaza than A1 ) Demolition, Clearing $ 7,200 Earthwork, Grading 2,880 Paving: Concrete 8,460 Parkway/s.w. Fencing: New Decorative Chain Link 2, 112 Modified Existing Chain Link Structure: Arbor w/Brick Columns 16) 128 Park Sign 1 ,500 Pedestal Monument 1 ,300 Electrical/Lighting 8,500 Landscape: Planting/Irrigation 2,700 SUBTOTAL. $ 50,780 CONTINGENCY (257o): 12.695 TOTAL: $ 63,475