HomeMy WebLinkAbout09/27/1988, 3 - STATUS REPORT ON MITCHELL PARK WALL IMPROVEMENT --MEETING AUNUA
DATE DEP 27 88 ITEM # M Denotes action by Lead Perso I
TuE LAw OFFICES OF Respond by.
g
GEORGE B. O'NE[LL �TEILL BC TTEILL citODANIEL J. O'NEILL 1014 PALM STREETSAN Luis OBISPO�CALIFORNIA 1)3401
(80-5) sa3-7e9sierk-arig.
W-D. koniE,elo
Z-% 7-
September
September 22, 1988
Honorable Ron Dunin
City Hall
San Luis Obispo, CA 93401
To The Honorable Ron Dunin:
The undersigned do hereby request that demolition and
reconstruction of the World War II Memorial to our fallen San
Luis Obispo County soldiers be deferred until after the next San
Luis Obispo City Council meeting on October 4, 1988. We believe
the memorial is not only a historical landmark in the city of San
Luis Obispo but a tribute to our young men who gave their lives
to defend this country. It is our hope that perhaps some
alternative can be pursued to modify or defer destruction of this
memorial.
a P2�rs�o�.�- 1)c 7ae��v5� �GnrS, /nl c
Fr; OL � y Gg c�ta,e: b sip
a ,
RECElVEDI
SEP 2 2 1988 ..
CITY CLERK
SAN LUIS 085"0.CA
MEETING DATE:
��m�INIiIIVIIIIIII�IA�IIUIII city Of San llua OBISPO September 27 198
Rto
COUNCIL AGENDA REPORT ITEM N BER:
FROM: Dave Romero, Public Works Director
SUBJECT: Status Report on Mitchell Park Wall and Improvements
CAO RECOMMENDATION:
By motion, direct staff to proceed with project as expeditiously as possible
BACKGROUND:
Previous History
Feb. 2, 1988 Wall issue raised at City Council meeting
Mar. 15, 1988 Staff agenda report considered. Council action was to appoint committee
(Council action implied removal of wall)
May 17, 1988 Committee met - determined to hire architect to prepare concept plans
May 24, 1988 Contract negotiated and awarded to Sedes for concept study (Est. $1,075,
actual $1,238)
July 14, 1988 Plans (6 concepts) and estimates submitted to City for review by committee
Aug. 12, 1988 Committee review of plans and agreement on concept and work to be
done(Attachment A)
Sept. 8, 1988 Contract negotiated for final design of Mitchell Park improvements ($4,500).
Ready for final signature after the City Council meeting
Probable Future Schedule
See Attachment "Schedule"
DISCUSSION:
Staff has several areas of concern regarding this project.
1. If we followed our normal construction practice, the wall would be removed just prior to
award of an improvement contract in February or March 1989. However, since removal of the
wall has become a more pressing issue, staff has made arrangements to have the CCC move in
Wednesday, September 21, and the site should be cleared by the end of the month. Staff
will attempt to make the site as presentable as possible, until a replacement structure
is installed.
2. Staff wishes to inform the Council of the cost and time consequences of the replacement
project (Attachment B). The architect's concept rendering will be available at the
meeting.
3. At this point, architect fees are expected to approach $6,000, with a total construction
cost exceeding $60,000, in excess of the $25,000 budgeted. If the project is to proceed
as currently envisioned, a supplemental appropriation of approximately $45,000 will be
required prior to award of the construction contract.
��►�►�►ruiuIIIIIII�I►1°► ��U�U city Of SATrLuis OBISPO ftpf
C®UNCIL AGEND--A REPORT
Mitchell Park Wall
Page Two
RECOMMENDATION:
Staff recommends that Council direct staff'to a.proceed with design. and necessary approvals
following Council,review of cost and timing implications.
rmtchell/dfr#1'2
MI'ICHELr• PARK NEMORIAL
WC W SCHED F.
BEST MOST PROBABLE
Contract with SEDES (Clete) September 28 September 28
Preliminary plan for (1 1/2 wk) October 11 October 11
ARC Review
ARC Review October 17 November 7
Begin construction October 18 November 8
doccments
Complete construction (3 weeks) November 8 (3 weeks Navenber 29
documents after ARC)
Plan Review (1 week) November 15 (2 weeks) December 13
Prepare bid docents (1 week) November 22 (2 weeks) December 29
City Council Agenda December 20 January 17
Advertise December 27 January 21
Advertising period (4 weeks) (4 weeks)
Open bids January 26 February 23
Review bids (4 weeks) (4 weeks)
City Council =rtract February 21 Mare 21
award
Start contract (1 month) March 20 (1 month) April 20
Complete construction (2 months) May 20 (2 months) June 20
schedule
memorial/dfr#12
�►������ ii�►�i►Illilllll II ��@►� ii�ll �
city of sAn suis oBispo ,
_ B
_ II'
990 Palm Street/Post Office Box 8100 • San Luis Obispo, CA 93403-8100
August 22, 1988
MEMORANDUM
T0: Dave Romero
FROM: John Dunn
SUBJECT: Meeting of City Council Subcommittee on Mitchell Park Wall on
Friday. August 12, 1988
Attendance: Councilmembers Pinard and Reiss , John Dunn, Lane Wilson,
Dora Harder, Marion Morganson . and Dutch VanHarreveld.
After much discussion, the subcommittee agreed to move the wall , with the
following replacement program:
1 . The brick from the removed wall , is to be used for plan A2, for the columns
or pillars, for the pedestal for the plaque, and for the arbor floor and
adjacent walkways.
2. The plaque and its supporting pedestal are to be located in the center of the
arbor area.
3. The balance of the project is to be- as stated in the attached letter of
August 12, 1988 from Mrs. Harder, Mr. Morganson and Councilmember Pinard.
4. At least one of the lights in the arbor, if not several , are to focus on the
Veterans Memorial Plaque.
5. We are to save the unused brick for either this project or for other City
purposes.
6. We are to photograph the existing wall for historical purposes before tearing
it down making Certain that it is well documented.
7. It was suggested that we might want to have a raised planting area around the
flagpole with low flowers in the planted area. It was generally agreed that
the high shrubbery needs to be replaced, that high visibility is the desired
objective.
Based on the above, the architect is to finalize the design and to present it
to the Architectural Review Commmission. After the design is approved, the
Director of Public Works is to coordinate construction for the replacement
program using community resources and volunteer labor as available.
kq
C: Councilmembers, Lane Wilson, Toby Ross
Attachment: Wilson Memo
f �►►��►►ilii►Illlilllllllllllll���������'fllllllll�Ill I��� city Of sAn suis OBIS
po
Rim
Ei e-1
990 Palm Street/Post Office Box 8100 • San Luis Obispo, CA 93403.8100
August 17 , 1988
MEMORANDUM
TO: Dave Romero
FROM: Lane Wilson
SUBJECT: Mitchell Park - Memorial Wall
A meeting was held on August 12 , 1988 at 10 :00 a.m. to review and
give direction to staff regarding the changes that are to occur to
this area. The following people were present : Councilwoman Pinard,
Councilman Reiss , Mr. Morganson, Mrs. Harter, Mr. Van Harreveld, City
Administrative Officer John Dunn, and Lane Wilson.
The outcome of our discussion is as follows:
1 . Concept Option A2 was accepted as the basic design.
2 . The existing memorial structure should be memorialized with
photographs .
3 . The brick wall is to be dismantled with as many bricks being
reused as possible to construct the plaque pedestal , the columns
and paving of the area. The CCC or CMC could be used to
dismantle the wall .
4 . The memorial plaque is to be placed on a brick pedestal and
centered in the entrance from the street.
5 . The concrete area is to be reduced and the turf area increased.
6. The area shall have lighting with the memorial area having both
indirect and direct lighting and a spotlight on the memorial
plaques .
7 . Landscaping shall be low groundcover combined with trees.
8 . The play area should be expanded with equipment for small
children.
9 . The flag pole area is to have all plants removed and is to be
replanted with low plants and lots of color.
Mitchell Park
Page 2
10. Plans of Concept Option A2 are to be sent to Mr. Morganson and
Mr . Van Harreveld.
11 . Visibility is the prime concern.
12 . The chain link fence is to be extended with gates that can be
closed when children are present .
Attachment : Mitchell Park Wall Committee, memorandum 8/12/88
dh
b/wilson/mitchell
P`
August 12, 1988
To : Mitchell Park Wall Committee
Attn: Mr. Dave Romero
We prefer the drawing of A-2. If the Veterans organization
does not want to re-use the bricks, than the A-1 plan would
be acceptable. The wall bricks can be re-used for the
monument pedestal.
The cost of concrete ranges from $8,460 to $14, 000. We
suggest the use of the lesser amount - $8,460. '
The park sign (which should be placed at the top of the
arbor) cost is listed at $1, 500, this appears to be an
excessive amount.
An extension of the chain link fence at the corner of Santa
Rosa and Pismo Streets with a double gate that could be
locked while children are in attendance at the playground
is a necessity.
Is there sufficient change in the electrical work to warrant
a cost of $8, 500?
The landscaping should be held to a minimum, no low shmbbery,
perhaps several trees could be planted around the area.
Is it possible to utilize city crews and city equipment to
demolish the wall? We know of many people who would
demolish this wall for less than $7, 200.
,.t
Page Two of Six
Mitchell Park/Preliminary Cost Estimates
SCHEME DFSCRIPTION/ITEMS OST
A2 Memorial Corner & Plaza
(Smaller Scale Plaza than A1 )
Demolition, Clearing $ 7,200
Earthwork, Grading 2,880
Paving: Concrete 8,460
Parkway/s.w.
Fencing: New Decorative Chain Link 2, 112
Modified Existing Chain Link
Structure: Arbor w/Brick Columns 16) 128
Park Sign 1 ,500
Pedestal Monument 1 ,300
Electrical/Lighting 8,500
Landscape: Planting/Irrigation 2,700
SUBTOTAL. $ 50,780
CONTINGENCY (257o): 12.695
TOTAL: $ 63,475