HomeMy WebLinkAboutBLDG-2520-2023 Stamped WPCPWater Pollution Control Plan (WPCP)
Community Development T 805.781.7180
Building and Safi Division F 805.781.7173
919 Palm Street, San uis Obispo, CA 93401-3218 www.slocity.org
(For Select Building Projects Less Than 1 Acre)
PURPOSE: This plan can only be used for minor buildin,gprjects (SFR - nex, remodels, additions; and/or commercial remodels).
Newly constructed commercial buildings under 2019 CalGreen Codes require the development and implementation
of a WPCP similar to the standards of a State submitted SWPPP. This plan is only to serve as a guide, if the
applicant elects to use it. The BMPS specified herein shall be considered just the "Minimum BMPs" and during the
course of the project additional BMPs (Necessary BNIPs may be re uired to tc v r ality. Please note that
an in -fill new single family home project may require a tL Ip islb�e used in accordance with
CGP 2009-0009-DW19 City Stormwater Permit & 2019 !
E COMPLIANCE
Ni P L !ANC E
GENERAL INFORMATION: C OC�
Project Address: 133 East Foothill Blvd
Description of Work: orw Rt nr r]T/�AI TIJC It1R ATdI I TIMES
r H1 i S' 9% B E KE -TT►11-ri-rf. vv 8 r
Estimate total disturbed soil areas in squar&f�k':' r �'"'�"' ` '�
A y4 1`� easures are required.
Applicant's Name: Temblor LLC Dry $��� q
pp Applicant's Tele No. ( )
Emergency Contact: Sterling Twisselman pl___ „hall „ab;iB(„ 4b,tQi6� hoUt -
Contractor's Name: . wo;..r'natinn from MVBWl�dift9LB1'Wc8#fet,PiyisLon.
Contractor's Mailing Address: Aporaval of plans shall not be construed to be a permit
rvw,,.1wna11 approval okw,.pny violatiop q any (Zp)
Type of Project- Check One city ordinance or state law
Commercial / Industrial: ❑ Alternations ❑ New Con. ❑ Site -work El Tenant Improvement
❑ Other: ' `'*.'
Residential: ❑ Additions ❑ New Con. EJ Remodel ❑ Other:
SCHEDULE: Anticipated Project Schedule (Calendar Days e'er Hours):
Calendar days:
Hours: (From) (To)
BEST MANAGEMENT PRACTICES OR "BMPS" are procedures that help prevent pollutants from
entering the City's stormwater conveyance system and creeks. Indicate by checking T�ATED BMPS
that must be incorporated into the project to ensure the protection of waterw y d t t Lcei v yanee
systems (i.e. gutters, streets, storm drain inlets, storm drains, catch basins, creeks, culverts and seasonal streams). nl:ormational
brochures on various project types and BMPs are available on the City website list �hgreip, �or detailed
information on the Best Management Practices listed herein refer to: UUII.. I // L20
Ca General Construction Permit
Ca Green Building Codes hip:llimfvlvaterboards.ca8ov/)paler hpq.r Q� ra ,s(rtormwaler
Ca State Water Resources Control Board htp://rvww.bse.cagov/CALGreen/dtfJr,'d �h/r f J �1T 1 U l ..;-)ON
Ca Stormwater Quality Association* hrrp.// Yrwrcb.cagoa/water issuer/pr�g�{r ?�t% tip?en;�[ p
Caltrans Stormwater Pollution Templates bnp.1/unvv.wsga.o,V/
Caltrans Supplement to Traffic Control Guide hitp.1/wwiudot.ca.gov/hq/construt/stormwaterltemplates/.btm
City of San Ltus Obispo BMP Guides* hltp.//nnyly dot.cagov/hq/traffops/signtech/mutcdsupp htps.-I /bit.ly/3rW DzAa
City of San Luis Obispo Municipal Code bttp.-II)P)i,)P.codepublij-bing.com/ca/i-an/uisobispo/
City of SLO Stormwater Management Plan blt Drl/bit.lyl3s1S3m9
City of SLO Waterway Management - Plan I htps./l bit.lyl3oX9vlR
City of SLO Stream Management & - Plan II hops.//billy/3sJBE0V
City of SLO Drainage Design Man. - Plan III httprll bil.lyl3uWlmice
City of SLO WPCP Guide* bttpr://bil.lyl3GYMpRY
City Specifications blips.//bit, ly/3t81VNOc
Construction Industry Compliance Asst Center blip:/lwwlxacacenter..org/swt/swt2.cfms?st=CA
State Specifications - DOT http.//www.dot.ca.gov/hq/esc/oe/standardsphp
❑ Proximity to Storm Drains, Creeks & Known Underground Springs or Seeps: If the project site is within
close proximity (< 150) to a creek, storm drain inlet down gradient of the site and/or includes underground
springs or seeps on site, the site plan may need to include the locations of each and additional specific BMPs
may be required throughout the course of the project. Please consult with a Qualified Professional and/or
Building Staff for guidance.
1 of 4
iY/D/`D Dl. {.- A/F. ,.. R... U...., D_.,;1
11 • ; water ronution Lontroi rian twmr)
Community Development T 805.781.7180
Building and Safety Division F 805,781.7173
919 Palrn Street, San Luis Obispo, CA 93401-3218 vwvw.slocity.org
ANTICIPATED BMPS NOTE: A "N" indicates mandatory BMPs for all projects.
Good Housekeeping: Keep site clean & organized Run-on & Run-off Control Measures: Overland
at all times. flow of storm water both on and off -site must be
❑ Pre -inventory BMPs: Develop a list all effectively managed.
materials to be used on site to determine F1 Stormwater nin-on BMP.,
proper storage to avoid exposure to the
elements as appropriate.
❑ Material stockpile BMPs
❑ Chemical storage BMPs
❑ Inclement weather — materials storage BMPs
❑x Impervious surface sweeping BMPs
® Spill management & reporting BMPs.
Waste Management Plan: All waste products must
be containerized & covered at all times.
® Waste management BMPs
N Concrete, paint, plaster residue BMPs (lined
washoutpit, cover during rain events)
❑ Hazardous spill management BMPs
❑ Landscape materials BMPs
❑x Potential pollutant source list: Detailed list of
chemicals, solvents, paints & fertilizers to be
used on the site.
❑ Painting BMPs (lined vwshoutpit, cover daily)
IN Completed City C&D Plan
E9 Portable toilet BMPs
❑ Equipment / vehicle BMPs
Erosion Control Measures - to prevent sediment
from becoming dislodged due to rain & wind event.
❑ Riparian protection BMPs
❑ Temporary soil stabilization BMPs
❑ Temporary curb access BMPs
❑ Vegetation preservation BMPs
❑ Slope stabilization BMPs
❑ Wind erosion BMPs
❑ Dust control BMPs
❑ Permanent soil stabilization BMPs
❑ Phased construction BMPs
❑ Steep slope BMPs
❑ Post storm erosion control BMPs
Sediment Control Measures — to control & detain
dislodged sediment from leaving the site.
❑ Creek protection BMPs
❑ Site perimeter BMPs
❑ Sediment basin BMPs
❑ Stabilized construction exit(s) / entrance(s)
❑ Storm drain inlet protection BMPs
❑ Waterway & stabilized drainage way BMPs
❑ Rapid soil stabilization BMPs
❑ Advanced settling devices
❑ Post storm event sediment control BMPs
LJ Stormwater run-off BMPs
Non-Stormwater Management: For work
performed in the street, or to temporarily store
materials in the street or on the sidewalk you must
secure an encroachment permit.
❑ Equipment tool washout BMPs
❑ Encroachment permits
❑ Potential non-stormwater discharge BMPs
❑ Saw -cutting BMPs
N Scheduling BMPs
Site Schematic: To reflect the location of all BMPs
to be used on site. For example, depict the location
of all perimeter control measures, such as silt
fencing or straw wattles on a schematic.
❑x For all construction projects with outside
activities.
Water Efficient Landscape Plans Submittal: For
new construction sites a water efficient landscape
plan may be required.
❑ Refer to Utilities Conservation
Post Construction Stormwater Devices
❑ Pre & post stormwater run-off calculation
❑ A post construction maintenance plan
❑ A private stormwater conveyance system
agreement, and
❑ A post construction site schematic required
Inspect, Maintain, Clean, Repair & Report — all
site BMP's on active and inactive construction
sites weekly. Repairs must be made as necessary.
Document all activities in a log.
® Weekly inspection schedule
® Pre & post storm event inspections
❑x BMP cleaning schedule
N BMP maintenance schedule
® BMP repair protocol
N Documentation & records management
protocol
N Reporting protocol
Project Specific BMPs
El
El
El
[YWPCP Plan for Minor Building Projects 2 of 4
Water Pollution Control Plan (WPCP)
r 11 1
Community Development T 805.781.7180
Building and S�fet�r Division F 805,781.7173
919 Palm Street, San uis Obispo, CA 93401-3218 www.slocity.org
SITE SCHEMATIC
Required for all projects that include grading activities include a reasonable sketch depicting where all required and
necessary BMPs shall be placed on and off site. Be sure to include: a directional arrow, slope directions reflecting
after grading is complete, scale used, the location of all structures on site, the location of all waterways on and / or
abutting the site, location of closest storm drain inlet, frontage and side streets and wild lands. Note additional
requirements (i.e. erosion and grading plans, port construction stormwater device elements) may be required, so please refer to
City Building staff for direction.
F-007 HT7L-L L—V D .
-FahP Pogr►4aLE �
TDBL-F-r _y
�iRSNO�T p=T
AF;EA OF WORK
(F) P?a:VE7-WRY
WPCP Plan for Minor Building Projects
3 of 4
Water Pollution Control Plan (WPCP)
CommunityDevelopment T 805,781.7180
Building and Sdeq Division F 805.781.7173
919 Palm Street, San uis Obispo, CA 93401-3218 www.slocity.org
WPCP PLAN FOR BUILDING PROJECTS LESS THAN I ACRE
The following sections of the City Municipal Code, City Standard Specifications, Storm Water Management
Regulations, 2019 Green Building Codes and Fish & Game Regulations shall be reviewed by the permittee, and the
permittee shall receive approval of this Minor WPCP prior to the commencement of work on the site. Plan BMPs
shall be implemented on site at all times and verified for compliance. Permittee is required to maintain a log of all
routine inspections, cleanings, maintenance and repairs made to all BMPs on site at all times for review by any
representative of the City upon request. Failure to adhere to the WPCP, State and Federal Regulations may result in
a Notice of Violation and/or an Administrative Citation and/or a Stop Work Order issued until the site is in
conformance with the requirements of this plan.
APPLICABLE SPECIFICATIONS:
San Luis Obispo Municipal Code
■ 8.04 Solid Waste Disposal
• Tide 12 Streets, Sidewalks and Public Places
■ 12.08 Urban Storm Water Quality
Management and Discharge Control
■ 12.23 Creek Protection Ordinance
■ 13.08.130 Stormwater & unpolluted drainage
■ 15.04.010 All disturbed surfaces
■ 17.17.05 Neighborhood preservation
City Specifications
■ Section 3-1.03A, Encroachment Permit
City Specifications (Continued)
■ Section 1010B, Uniform Design Criteria —
Drainage and Erosion Control
■ 19-1.07 Sawcutting
■ 20.3 Erosion Control
Storm Water Regulations
■ Federal Water Pollution Control Act (CWA)
■ California Construction Stormwater Permit
■ California Porter Cologne Act of 2002
• California Green Building Codes (Chp 4 & 5)
■ City of SLO WPCP Guide
■ 4-1.07 Work Site Maintenance ■ City of SLO Construction BMP Guide
• 6-1.03 Storage of Materials • Fish and Game Regulations: 1600, 1602, 5650,
■ Section 7-1.01G Water Pollution 5651 & 5652
Building Regulations
■ J103.1 & J103.2 —Grading permits required
I agree to follow the requirements as set forth in this Guide (WPCP), the City of San Luis Obispo's Stormwater
Management Plan, the State of California's General Construction Permit, 2019 California Green Building Codes
(Chapters 4 & 5) the Federal Clean Water Act and all applicable specifications. In addition, I understand and agree to
the following: (1) Dynamic Plan: additional BMPs, both temporary and permanent may be required during the
course of the project at the discretion of the City Inspector(s) in order to ensure the protection of local water
quality, (2) it is permittee's obligation to take additional corrective actions when required to protect local water
quality, (3) failure to comply with all the requirements could cause the permit to be revoked; the issuance of a stop
work order, a notice to comply, a notice of violation and/or a citation; (4) the doing of any work under this permit
shall constitute an acceptance of the provisions of this permit and all attachments and documents referenced herein,
(5) a copy of this signed approved Guide shall remain at the job site at all times available for review by any public
official, and (6) overland flow storm water run-off & run-on has been adequately designed for & managed.
Applicant:
Temblor LLC
Permit #:
Check One: 14 Owner ❑ Contractor ❑ Design Professional ❑ Legal Representative
Signature: 18, Date:
9-22-23
If you require assistance in completing this "Plan" please contact
Notes: An * indicates a construction reference source specific to Stormwater BMPs. Please refer to the City's website for
"BMP Descriptions for Minor Building Projects" handout. Use of this template plan is at the discretion of City personnel.
OFFICE USE ONLY: Received By: Date: Approved By: Date:
Denied: By: Date: Comments:
PROJECT FEE:
4 of 4
LP/P/'. P Pl.. A, n�;,,�,- R„aia;n� n,-�,o�r,