HomeMy WebLinkAboutFigure 15 New Capacity Constrained Area (1), formerly Foothill with some modificationsProposed Area 1 Wastewater Capacity Constrained Area
, � y
1 � �1111511 .
1
�i
I • - 11 I • 11� l l llyyl _LT
11 N 11111{11 I� 11{�, I
3 Ip /111K rrl�ir .1 Hilll4 I'411yti— ' r' li '_
` II 111IM flllll— I II'i11 � 1 yl I
7/.�•, 11111{1�= l 1 1 ' _! _ FOOTHILL
+IA 11' y{4 ! 'Illlli {'1 I`t __" Y'%
•IIIIItr Mr�y,1i1`o t' Itilll� �IIIII� �: It — 1
Itol
ile loll 1 niti��IN1�JIM
,og
.d1Y —5
to
•••✓
' ,
Sr
r
„
101
Service Laterals Condition
GOOD (719) FAIR (35)
POOR (174) NO (1,048)
DATA
Proposed Capacity
Constrained Area
0 SLO City Limit
Capacity Constrained Areas were generated by a
third party consultant. Proposed Aug. 2025.
0 0.25 0.5 Miles
N
W E SLOGIS
s JULY 2025