HomeMy WebLinkAboutFigure 16 New Capacity Constrained Area (3), formerly Downtown, with a significant relocation northwardProposed Area 3 Wastewater Capacity Constrained Area
'' �• 1IK
z ,
�htill = -
.�o
zm
\V
,
xv,
� tis
oti
Service Laterals Condition
GOOD (332) FAIR (24)
-POOR (62) NO (658)
DATA
Proposed Capacity
Constrained Area
0 SLO City Limit
Capacity Constrained Areas were generated by a
third party consultant. Proposed Aug. 2025.
0 0.25 0.5 Miles
i i
N
,,, SLOGIS
s JULY 2025