Loading...
HomeMy WebLinkAboutItem 6e - Approval of the Final Map for Tract 3089 Phase 5 Avila Ranch 175 Venture Drive FMAP-0132-2024 Item 6e Department: Community Development Cost Center: 4003 For Agenda of: 9/16/2025 Placement: Consent Estimated Time: N/A FROM: Timmi Tway, Community Development Director Prepared By: Gabriel Munoz-Morris, Supervising Civil Engineer SUBJECT: APPROVAL OF THE FINAL MAP FOR TRACT 3089 PHASE 5, AVILA RANCH, 175 VENTURE DRIVE (FMAP-0132-2024) RECOMMENDATION Adopt a Draft Resolution entitled, “A Resolution of the City Council of the City of San Luis Obispo, California, approving the final map for Tract 3089 Phase 5, Avila Ra nch, including an addendum to the Final Environmental Impact Report clarifying the timing of transportation mitigation measures, and authorizing the Mayor to execute a Subdivision Agreement in a form subject to the approval of the City Attorney (175 Ventur e Drive, FMAP-0132-2024).” (Attachment A) REPORT-IN-BRIEF A vesting tentative map for Avila Ranch (Tract 3089) was approved by the City Council on September 19, 2017, by Resolution No. 10832 (2017 Series). The Phase 1 final map was approved by the City Council on December 4, 2018 , by Resolution No. 10968 (2018 Series). The Phase 2-3 final map was approved by the City Council on January 23, 2024, by Resolution No. 11472 (2024 Series). Phase 5 will create 101 single-family R-1 residential lots, 2 commercial/mixed use lots, and various lots for parks, open space, and agricultural use. The City and the Developer have entered into a Development Agreement (DA), adopted by City Council on October 3, 2017, by Ordinance No. 1639 (2017 Series). A Community Facilities District (CFD) was approved on November 21, 2017, by Ordinance No. 1642 (2017 Series) for Tract 3089 to close the gap between anticipated general fund reve nue to be generated by the development and projected costs to provide public services and facilities maintenance within the development. The Developer is proposing to construct Phase 5 of Tract 3089 ahead of Phase 4. In addition, the Developer is eliminating Phase 6 and incorporating elements of Phase 6 into Phases 5 and 4. Modified phasing construction was contemplated by the Development Agreement, which states that the phasing plan and phased installation of project infrastructure may be amended by an agreement between the Developer and the City. A Development Agreement Memorandum of Agreement (Attachment B) has been drafted Page 105 of 615 Item 6e to reflect build out of the modified phasing, and a Third Addendum to the Avila Ranch Final Environmental Impact Report (FEIR) (Attachment C), including a Transportation Analysis of the modified phasing (Attachment D), has been drafted to clarify the required timing of offsite improvement construction due to the proposed modification in phasing. Staff worked closely with the Developer to ensure that the modified phasing does not negatively impact the timing of offsite improvements. The original project approvals included several transportation infrastructure improvements that were required to be constructed prior to or in conjunctio n with Phase 4 of the development. With approval of the Phase 5 final map and proposal to advance Phase 5 development ahead of Phase 4, staff is recommending the following clarifications to timing of transportation improvements: 1. Horizon Lane Improvements: Improvements to Horizon Lane between Suburban Road and Avila Ranch project boundary are required per Mitigation Measure TRANS-4 and Condition of Approval #106. Improvements were previously required with Phase 4. Staff recommends retaining timing of improvements with Phase 4 as the need for these improvements is triggered by the housing proposed in Phase 4. 2. Suburban Road Improvements: Improvements to Suburban Road between Earthwood and Horizon Lane are required per Mitigation Measure TRANS -4 and Condition of Approval #102. Improvements previously were required with Phase 4. Staff recommends retaining timing of improvements with Phase 4 as the need for these improvements is triggered by the housing proposed in Phase 4. 3. Buckley Road Frontage Improvements: Widening of Buckley Road east of the Tank Farm Creek Bridge along project frontage is required per Condition of Approval #107. Improvements were previously required with Phase 4. Staff recommends requiring improvements with Phase 4 or 5, whichever come s first. Note that this improvement requires that the Developer dedicate land to the County to facilitate the widening of Buckley Road. The Developer has submitted an Offer of Dedication to the County and that document has been approved by the County. The City and County will enter into a Maintenance Agreement for this portion of Buckley Road which will memorialize maintenance responsibilities for the improved portions of Buckley Road. 4. Buckley Bicycle Bridge (South Side): Addition of bicycle bridges on both the north and south sides of Buckley Road crossing Tank Farm Creek are required per Mitigation Measure TRANS-11 and Condition of Approval #109. Original approvals required construction of both bridges with Phase 2. With approval of the Phase 2- 3 final map, the timing of southern bridge was deferred to Phase 4 to be constructed concurrent with Buckley Road Widening. Staff recommends requiring construction of the southern bridge with Phase 4 or 5, whichever comes first. Page 106 of 615 Item 6e 5. Jespersen/Venture & Jespersen/Wright Brothers Roundabouts: Construction of roundabouts at Jespersen/Venture and Jespersen/Wright Brothers intersections is required per Condition of Approval #110. Improvements were previously required with Phase 4. Staff recommends requiring improvements with Phase 4 or 5, whichever comes first. Further discussion on these transportation infrastructure improvements is provided later in this report. A Phase 5 Affordable Housing Agreement is not required because Phase 5 does not include deed restricted affordable units, as outlined in the Avila Ranch Development Agreement. Phases 1, 2, 3, and 4 meet the tract’s affordable housing requirement, with the majority of the affordable units to be provided in the multifamily (R-4 and R-3) portions of Phases 3 and 4. The original project conditions required that Park G, which is in Phase 4, be constructed before the end of Phase 4, which was originally planned ahead of Phase 5. This would have meant that 580 of the 680 market-rate units in Avila Ranch would have been occupied by the time Park G was constructed. In response to the Developer’s request to modify phasing and construct Phase 5 ahead of Phase 4, City staff negotiated updated timing triggers for Park G. Park G will now be required to commence construction prior to issuance of occupancy permits for the 500th market rate unit and must be constructed prior to the issuance of occupancy permits for the 550th market rate unit. This advances the completion of construction for Park G compared to the original condition’s timing and ensures that the development meets or exceeds the original ratio of park acreage per 1,000 residents contemplated during project approval. These new timing requirements for Park G are also consistent with timing requirements for the completion of Buckley Road widening and bicycle bridge improvements and construction of affordable housing units. POLICY CONTEXT This item supports the development of 101 Phase 5 housing units, which directly advances a Major City Goal for additional housing. The Subdivision Map Act requires City Council approval for subdivision final maps 1. DISCUSSION Tract 3089 Phase 5 Avila Ranch (FMAP-0132-2024) is located at 175 Venture Drive as shown on the Vicinity Map provided as Attachment E. 1 “The legislative body shall, at the meeting at which it receives the map or, at its next regular meeting after the meeting at which it receives the map, approve the map if it conforms to all the requirements of this chapter and any local subdivision ordinance applicable at the time of approval or conditional approval of the tentative map and any rulings made thereunder. If the map does not conform, the legislative body shall disapprove the map.” Govt. Code 66458(a). Page 107 of 615 Item 6e Background A vesting tentative map for Tract 3089 was approved by the City Council on September 19, 2017, by Resolution No. 10832 (2017 Series). The approved tentative map (Attachment F) showed a total of 424 lots consisting of 398 single-family lots (R-1 and R- 2 zone), nine multi-family lots for up to 322 units (R-3 and R-4 zone), 11 park lots, two open space lots, two commercial lots, and two public facilities lots. At that same meeting, an Ordinance to adopt a Development Agreement was introduced and a Resolution of Intention to establish the Community Facilities District (CFD) was approved. The City and the Developer entered into a Development Agreement (DA), adopted by City Council on October 3, 2017 by Ordinance No. 1639 (2017 Series). The final steps to implement the CFD occurred at the November 21, 2017 Council meeting where the City Council adopted Ordinance No. 1642 (2017 Series) establishing a Special Tax for the CFD. The CFD was required to close the gap between anticipated general fund revenue to be generated by the development and projected costs to provide services to the development, such as police and fire, and to maintain the public infrastructure within Tract 3089 including parks, streets, sidewalks, parkways, open space, and storm drainage systems. The previous Phase 1 final map was approved by Resolution No. 10968 (2018 Series) on December 4, 2018. Phase 1 created 179 single-family residential lots, three lots for 125 multi-family units, a lot for an interim fire station, and various lots for parks and public facilities. The Phase 2-3 final map was approved by Resolution No. 11472 (2024 Series) on January 23, 2024. The Phase 2-3 map created 121 single family residential lots, one large multi-family lot, two park lots, and an open space lot. Although the tentative map shows up to 723 residential units being constructed, the resolution approving the tentative map and the Development Agreement both state that only 720 residential units are approved. A density bonus was approved by Planning Commission on February 14, 2024 with Resolution PC-1083-2024 for the affordable housing R-4 component to increase the total density to 740 units within the Specific Plan area, as allowed by State Density Bonus Law. At this time, 160 homes have been completed, 64 permits are issued for construction, and 60 permits are under review for the development as a whole. The majority of the completed homes are in the Phase 1 area and active construction of homes in Phase 2 - 3 areas is ongoing. The remaining homes to complete Phase 1 will be constructed last to avoid impacts to homeowners due to proximity to the Phase 1-3 model homes. All Phase 1 affordable units are complete and occupied, including 6 moderate -income for sale homes and 8 workforce housing units, as required by the Development Agreement. Two workforce units are currently under construction in Phase 2-3. A total of 3 moderate income homes and 5 workforce housing units will be provided in Phase 2 -3. All parks in Phase 1 are complete and two parks in Phase 2-3 are under construction and nearing completion. Phasing At the time of tentative map submittal, the subdivider proposed to develop the project as shown on the Phasing Plan provided as Attachment G, and a Phased Vesting Tentative Page 108 of 615 Item 6e Tract Map was approved with public improvements and infrastructure required for each respective phase. The conditions and mitigation measures were developed based on this phasing plan. The subdivider is not required to adhere to the phasing plan , but creating lots out of phase could result in subsequent environmental review and new or modified conditions in order to properly mitigate the impacts and provide for orderly development. The Avila Ranch Development Plan and Exhibits E-1 through E-4 and J of the Development Agreement describe the project’s backbone infrastructure, which was planned to be designed and constructed in six (6) phases. Section 6.01.3 of the Development Agreement states that “The Phasing Plan may be amended by agreement of the Parties to take advantage of new technologies, to respond to changes in the underlying land use assumptions upon which the plan is based, or for such other reasons as the Parties may agree.” Phase 5 is currently proposed for final map recordation and construction ahead of Phase 4. Phase 5 includes up to 101 low density R -1 zoned single family lots. Based on the recommendation of the Architectural Review Commission (ARC), the Planning Commission (PC) approved architectural review of the R-1 product in Phase 5 on August 10, 2022, by Resolution PC-1065-2022. Phase 4 is designated for up to 197 R-3 zoned multifamily townhome style units at the northeast side of the Avila Ranch development area. An application was recently submitted for Phase 4 architectural review by the ARC and Planning Commission, and the Phase 4 final map and public improvement plans have been submitted for City review and plan check. Phase 6 was merged into Phases 4 and 5, and no maps will be recorded with a Phase 6 designation. The two commercial parcels in Phase 6 have been incorporated into Phase 5. The Phase 6 agricultural/open space parcels have been incorporated into Phases 4 and 5. A Transportation Analysis has been prepared by Central Coast Transportation Consulting (dated July 16, 2025) to evaluate the proposed modified phasing (Attachment H) and an Addendum to the Avila Ranch Final EIR (Attachment C) has been prepared by the City to clarify the timing of the transportation improvements required in Phases 4 and 5. A Development Agreement Memorandum of Agreement (Attachment B) has been prepared by the developer to reflect the modified phasing and timing of required infrastructure, which is visually depicted in the Transportation Improvement Phasing Plan (Attachment H) dated May 8, 2025. The modifications to the transportation improvement installation timing are described in more detail in this report below. The Tract 3089 Phase 5 map is creating a total of 109 lots consisting of:  101 single-family residential units (Lots 331 to 385 and 387 to 425 and 427 to 433)  Two public park lots (Lots 386 and 426)  Four lots for public open space and/or agriculture (Lots 434, 435, 438, and 439)  Two commercial lots (Lots 436 and 437) Page 109 of 615 Item 6e Minor Corrections to Approved Tentative Map City Municipal Code Section 16.10.160 grants the Community Development Director the authority to approve minor corrections to an approved tentative map or conditions of approval if all the following are true: 1. No lots, units or building sites are added or deleted; and 2. The proposed changes are consistent with the intent and spirit of the original tentative map approval; and 3. The proposed changes are consistent with the zoning regulations, the building code, the General Plan, and the Subdivision Map Act. Under the authority listed above, the Community Development Director has approved the following minor corrections for Tract 3089: 1. Revision of the lot numbering from tentative map to final map so that the numbering would be consecutive on the final map as required by Section 16.14.040.H of the San Luis Obispo Municipal Code. 2. Modifications to timing requirements for certain transportation improvement conditions of approval where related to the proposed modified phasing construction (Phase 5 construction ahead of Phase 4). The construction timing modifications are also reflected in the FEIR Third Addendum (Attachment C), the Development Agreement Memorandum of Agreement (Attachment B), and explained in more detail in the following section of this staff report. 3. Modification to the timing requirement for the construction of Park G due to the proposed modified phasing construction (Phase 5 construction ahead of Phase 4). Park G, which is to be built with Phase 4, will now be required to commence construction prior to issuance of occupancy permits for the 500th market rate unit and must be constructed prior to the issuance of occupancy permits for the 550th market rate unit. This advances the completion of construction for Park G compared to the original condition’s timing and ensures that the development meets or exceeds the original ratio of park acreage per 1,000 residents contemplated during project approval. Modifications to Timing of Transportation Improvement COAs and Mitigation The original project approvals included several transportation infrastructure improvements that were required to be constructed prior to or in conjunction with Phase 4 of the development. With approval of the Phase 5 final map and proposal to advance Phase 5 development ahead of Phase 4, staff has included the following clarifications to timing of transportation improvements. These clarifications are reflected in the FEIR Third Addendum (Attachment C) and the Development Agreement Memorandum of Agreement (Attachment B). 1. Timing of Mitigation Measure TRANS-4 and Condition of Approval #106: Horizon Lane Improvements (Suburban Road to Avila Ranch Project Boundary) Page 110 of 615 Item 6e  Previous Approval: Per Mitigation Measure TRANS-4 and Condition of Approval #106, the Developer is required to construct/improve Horizon Road between Suburban Lane and the project boundary to City Engineering Standards for a commercial collector street, with designs completed prior to Phase 4 final map recordation, construction initiation prior to issuance of Phase 4 building permits, and construction completion prior to issuance of occupancy permits for the 100th residential unit of Phase 4 development.  Timing: No modifications proposed. Advancing Phase 5 ahead of Phase 4 does not trigger need for Horizon Lane improvements between Suburban Road and the project boundary. A Transportation Analysis Memorandum has been prepared by Central Coast Transportation Consulting (Attachment D), which confirms that no transportation impacts are anticipated by advancing Phase 5 prior to Phase 4 without the Horizon Lane improvements in place. Phase 5 is located on the south side of the development, adjacent to Buckley Road, and it is expected that Phase 5 traffic would predominantly use Buckley Road since this route provides a shorter path than a route north through the rest of the development via slower speed roads. 2. Timing of Mitigation Measure TRANS-4 and Condition of Approval #102: Suburban Road Improvements (Earthwood to Horizon/Jespersen)  Previous Approval: Per Mitigation Measure TRANS-4 and Condition of Approval #102, the Developer is required to improve Suburban Road between Earthwood Lane and Horizon/Jespersen Road to City Engineering Standards for a commercial collector street, with design and construction initiation prior to issuance of 1st building permits for Phase 4, and construction completion prior to issuance of occupancy permits for the 100th residential unit of Phase 4 development and prior to the connection of Horizon Lane with the project site.  Timing: No modifications proposed. Advancing Phase 5 ahead of Phase 4 does not trigger need for Suburban Road improvements east of Earthwood, as development is not anticipated to add traffic to this segment of Suburban until Phase 4 development and extension of Horizon Lane between Suburban and Avila Ranch. A Transportation Analysis Memorandum has been prepared by Central Coast Transportation Consulting (Attachment D), which confirms that no transportation impacts are anticipated by advancing Phase 5 prior to Phase 4 without the Horizon Lane improvements in place. 3. Timing of Condition of Approval #107: Buckley Road Frontage Improvements  Previous Approval: Per Condition of Approval #107, the Developer is required to construct frontage improvements along Buckley Road from the Tank Farm Creek Bridge to the eastern site boundary, including addition of on -street Class II bike lanes/shoulders on both sides of the street, and an off -street Class I shared-use path on the north side of Buckley Road. Improvements are required to be designed prior to issuance of building permits for Phase 4 and Page 111 of 615 Item 6e construction completed prior to issuance of occupancy permits for the 50 th residential unit of Phase 4.  Timing Modification: Design of Buckley Road frontage improvements shall be required prior to issuance of any building permits for Phase 4 or Phase 5, whichever comes first. Construction shall be completed prior to issuance of occupancy permits for the 50th cumulative residential unit with Phase 4 or Phase 5, whichever comes first.  Note that this improvement requires that the Developer dedicate land to the County to facilitate the widening of Buckley Road. The Developer has submitted an Offer of Dedication to the County and that document has been approved by the County. The City and County will enter into a Maintenance Agreement for this portion of Buckley Road which will memorialize maintenance responsibilities for the improved portions of Buckley Road. Initial discussions between City and County staff have begun and the agreement itself is being finalized. The final agreement will be presented to the City Council and Board of Supervisors for approval. 4. Timing of Mitigation Measure TRANS-11 and Condition of Approval #109: Buckley Road Bicycle Bridges  Previous Approval: Per project Mitigation Measure TRANS-11 and Condition of Approval #109, the Developer is required to construct two bicycle bridges over Tank Farm Creek located north and south of Buckley Road. Construction of both bridges was originally required prior to Phase 2. With previous Council approval of the Phase 2-3 final map (Resolution No. 11472), the required timing for construction of the bicycle bridge south of Buckley Road was modified to coincide with the Buckley Road frontage improvements required with Phase 4 in order to minimize construction impacts on properties to the south where a construction easement and right-of-way acquisition is needed. Discussions with the property owner regarding the needed right-of-way are underway at this time. The northern bicycle bridge remains a requirement with Phase 2. The FEIR First Addendum was prepared with the Phase 2 -3 final map approval to reflect this change, which can be reviewed along with additional discussion on the modified timing of Mitigation Measure TRANS-11 in the January 23, 2024, City Council Agenda Report packet.  Timing Modification: Completion of construction of the bicycle bridge over Tank Farm Creek south of Buckley Road shall be required prior to issuance of the 50th occupancy permit for Phase 4 or Phase 5, whichever occurs first. This modification is intended to ensure that the timing of construction of this bicycle bridge remains consistent with previous City Council approvals, even if Phase 5 is advanced ahead of Phase 4. 5. Timing of Condition of Approval #110: Jespersen/Venture & Jespersen/Wright Brothers Roundabouts Page 112 of 615 Item 6e  Previous Approval: Per Condition of Approval #110, the Developer is required to construct single lane roundabouts at the Jespersen/Venture and Jespersen/Wright Brothers intersections, with design substantially complete prior to recordation of the Phase 4 final map and construction prior to issuance of building permits for Phase 4.  Timing Modification: Design of the roundabouts to be substantially co mplete prior to recordation of Phase 4 or Phase 5 final map, whichever comes first, and construction complete prior to issuance of any building permits for Phase 4 or Phase 5. An Addendum to the FEIR (Attachment C) has been prepared to address a minor change to the timing of Mitigation Measure TRANS-11 (Buckley Road South Bicycle Bridge) from Phase 4 to Phase 4 or 5 (whichever comes sooner), and to document that the Horizon Lane and Suburban Road Improvements required with Phase 4 per Mitigation Measure TRANS-4 are not triggered/warranted if Phase 5 is advanced ahead of Phase 4. A Memorandum of Agreement to the project Development Agreement has also been prepared (Attachment B) to reflect these timing clarifications 2. As required by Mitigation Measure TRANS-2, a Transportation Improvement Phasing Plan (Attachment H) has been prepared to graphically reflect the timing of offsite transportation improvements by phase as currently proposed for construction . Community Facilities District The Community Facilities District (CFD) for Avila Ranch was established by Council Ordinance No. 1642 (2017 Series) for Tract 3089 to fund both services and infrastructure maintenance. The CFD closes the gap between anticipated general fund revenue generated by the development and projected costs to provide services to the development, such as police and fire, and public infrastructure maintenance including parks, streets, sidewalks, parkways, open space, and storm drainage systems. Maintenance of water and sewer infrastructure in Tract 3089 will be funded via the enterprise program consistent with the rest of the citywide systems. This is the City’s first CFD established for the purpose of ongoing maintenance. The CFD also helps to cover the cost of City services associated with this residential development such as Fire, Police, and infrastructure maintenance. A property tax exchange with the County of San Luis Obispo was established for this property when it was annexed in 2008 and was based on the County’s master tax exchange agreement for commercial land. This tax exchange does not provide the City with any property tax increment as the 2 Section 6.01 of the Development Agreement states that while the project’s backbone infrastructure is planned to be designed and constructed in six (6) phases, further analysis may result in a more cost - effective approach to the provisions of such infrastructure to adequately serve development within the Project Area. Section 6.01.1 states that the infrastructure design and construction phasing may be revised with a written agreement (Memorandum of Agreement) signed by both the City an d the Developer, and that such revisions shall not require amendment to this Development Agreement. Additionally, Section 6.01.3 of the Development Agreement provides: “The Phasing Plan may be amended by agreement of the Parties to take advantage of new technologies, to respond to changes in the underlying land use assumptions upon which the plan is based, or for such other reasons as the Parties may agree.” Page 113 of 615 Item 6e property is developed. Therefore, the CFD ensures adequate funding is available for the City to maintain the public facilities and services that will serve this new neighborhood. The funds for the CFD are collected by the County with the regular property tax assessments, beginning with the issuance of the building permit on each lot. The County disperses the CFD funds to the City twice per year. Affordable Housing The Avila Ranch Affordable/Workforce Housing Plan (Exhibit G of the Development Agreement) identifies the quantity, affordability level, and location of the project’s required affordable and inclusionary housing units. Overall, the Avila Ranch project will provide a total of 32 low-income, 35 moderate-income, 25 workforce, and 19 additional density bonus affordable units. The Development Agreement also includes design and development strategies that serve to provide a range of additional affordable housing in excess of standard inclusionary ordinance requirements. Phase 5 of Avila Ranch does not include any deed restricted affordable or inclusionary housing units. Phases 1, 2, 3, and 4 meet that requirement for the tract, with the majority of the affordable units to be provided in the multifamily (R-4 and R-3) portions of Phases 3 and 4. Given that the Development Agreement contemplated the possibility of project phases being constructed out of order, timing triggers were included in the project’s Affordable Housing Agreements (AHA) at the time of recordation in order to ensure affordable units are constructed earlier in the project, rather than at the end of the project. The most recent Affordable Housing Agreement was recorded for Phase 3, which includes a requirement of 59 affordable units on a site dedicated to an affordable housing develope r for development. In order to ensure that these affordable units are completed, the Affordable Housing Agreement requires construction of the affordable housing project in Phase 3 to begin prior to the issuance of a building permit for Avila’s 500th unit and requires the affordable project to be substantially completed by the issuance of a building permit for Avila’s 550th unit. The market rate developer has transferred the Phase 3 affordable housing site to C&C Development, an affordable housing developer , who will construct the 59 affordable units. There are 740 total residential units within Avila Ranch; therefore, building permits will not be issued for the last 240 units until the affordable housing site in Phase 3 is under construction. These types of timing triggers ensure that affordable housing is constructed at the same time as the market rate units, regardless of which phase is constructed first, as the timing triggers are not tied to a specific phasing plan but rather to total unit count. At this time, 160 homes have been completed, 64 permits are issued for construction, and 60 permits are under review for the development. Parks Section 7.03 of the DA requires the subdivider to dedicate land in excess of that ordinarily required by the City to construct public parks in south San Luis Obispo, an area of the City that presently has a deficiency of park area. In particular, Tract 3089 shall provide 18.25 acres of public park land, 1.76 acres in excess of City requirements. As shown on the Park Layout provided as Attachment I, a total of nine park lots labeled Park A through Page 114 of 615 Item 6e Park I are proposed in Tract 3089. The Parks and Recreation Commission (PRC) reviewed the conceptual plans for Parks A through I on January 4, 2017, and recommended approval to the Council. The City Council approved the Avila Ranch Parks Master Plan on September 19, 2017 as Appendix B of the Avila Ranch Development Plan. The PRC also reviewed and approved detailed park plans for Parks A, B, and C at that time. Parks D and E are being constructed in Phase 2-3. Parks H and I are proposed to be constructed in Phase 5. Phase 5 provides sufficient parkland and park improvements to meet City requirements based on the projected population and housing onsite, so there would be no "in-lieu" park fees needed. Project-related fees, taxes and assessments are described in Section 5.04 of the Development Agreement . Parks are not among the identified fee-generators in this section. Parks F and G will be constructed in Phase 4, which will be constructed after Phase 5. Park G is an 11-acre sports complex that was originally required to be constructed before the end of construction of Phase 4. This would have meant that 580 of the 680 market-rate units in Avila Ranch would have been occupied by the time Park G was constructed. In response to the Developer’s request to modify phasing and construct Phase 5 ahead of Phase 4, City staff negotiated updated timing triggers for Park G. Park G will now be required to commence construction prior to issuance of occupancy permits for the 500th market rate unit and must be constructed prior to the issuance of occupancy permits for the 550th market rate unit. This advances the completion of construction for Park G compared to the original condition’s timing and ensures that the development meets or exceeds the original ratio of park acreage per 1,000 residents contemplated during project approval. This change is memorialized in the attached MOA. Off-Site Transportation Improvements Per the subdivision conditions of approval, mitigation measures, and the DA, Tract 3089 is required to complete multiple off -site transportation improvements to mitigate for the increase in traffic generated by the development. Many of these improvements were constructed with Phase 1 of the tract, including construction of the Buckley Road Extension, extension of the northbound right-turn lane at the Higuera/South intersection, addition of bicycle lanes on Vachell Lane, addition of sidewalks on S. Higuera between Los Osos Valley Road and Vachell Lane, and improvements to the S. Higuera/Tank Farm intersection. The Subdivider has also paid fair share mitigation fees with Phase 1 and Phase 2-3 for additional off-site projects that are not triggered solely by this development but will ultimately be needed upon build-out of the City, including contributions towards future improvements along the Buckley Road corridor beyond the project site and the Highway 227/Buckley Road intersection. Off-site improvements required with Phase 2 -3 of the development include installation of a permanent median and left-turn access restrictions at the S. Higuera/Vachell Lane intersection [Condition #104], construction of sidewalk on the east side of S. Higuera Street from Los Osos Valley Road to the southern City Limits [Condition #111], and construction of the bicycle bridge over Tank Farm Creek on the north side of Buckley Road [Mitigation Measure TRANS-11 and Condition #109]. Page 115 of 615 Item 6e Phase 5 is subject to additional off-site improvement requirements, which were described previously in this report and summarized again as follows:  Buckley Road Widening – Widen Buckley Road along project frontage east of the Tank Farm Creek Bridge to provide on-street Class II bike lanes/shoulders and an off-street Class I path on the north side of the street. Completion required prior to issuance of occupancy permits for the 50th residential unit of Phase 4 or Phase 5, whichever comes sooner [Condition #107, based on modified phasing plan].  Buckley Road Bicycle Bridges at Tank Farm Creek (South Side) – Construction of the bicycle bridge on the south side of Buckley Road to be constructed in conjunction with the project’s Buckley Road frontage improvements, with improvement completion required prior to issuance of occupancy permits for the 50th residential unit of Phase 4 or Phase 5, whichever comes sooner [Mitigation Measure TRANS-11 and Condition #109, based on modified phasing]. The timing requirements for these offsite improvements is reflected in a FEIR Addendum (Attachment C) and the Development Agreement Memorandum of Agreement (Attachment B). The Developer will enter into the draft Subdivision Agreement provided as Attachment K, which includes bonding requirements if the Phase 5 improve ments are not completed at time of map recordation.  Fees: o Buckley/Vachell Fair Share Mitigation – Funds fair share contribution towards future intersection control upgrades (roundabout or signal). Fees due with map recordation of each phase based on percent of total traffic generated by phase. Total for full build out is $108,798. The fee allocation for Phase 5 is $13,884.05 and $25,024.17 for Phase 6, which is now included in Phase 5 and will be paid at time of Phase 5 final map recordation. o Citywide and Los Osos Valley Road Subarea Transportation Impact Fees (TIF). Fees are vested into the TIF rate schedule that is in effect at time of final map recordation for each phase. Fees are paid with each building permit issuance while accounting for available fee credits remaining for eligible infrastructure improvements constructed by Avila Ranch. There are other improvements identified in the conditions, mitigation measures, and the DA where the Subdivider is required to pay a fee for the project’s fair share o f the improvement instead of constructing the improvement. Some of these fees are for future intersection improvements along Buckley Road, the extension of the Bob Jones Trail, improvements at the S. Higuera/Los Osos Valley Road intersection, and the recent improvements to the Los Osos Valley Road interchange. Other required fair share fees have been moved into the Citywide TIF, so payment of the current Citywide TIF by the Subdivider would satisfy those requirements. Unless otherwise allowed in the project approvals, the fair share fees will be paid at map recordation. Interim Fire Station Page 116 of 615 Item 6e The interim fire station is required to be constructed prior to occupancy of the 361st unit (occupancy of 50% of the development), as identified in the Final EIR. City staff has been meeting with the Avila Ranch developer and their design engineer to prepare a preliminary design for the fire station. Programing and site layout is in process. The fire station design will be reviewed by the City’s Architectural Review Commission (ARC). It is expected to take approximately 1 year to construct, which is anticipated to begin by spring 2027. The targeted date for fire station to be open and operational is May 2028. Reimbursement Agreements As outlined in the Development Agreement and the conditions of approval, some of the infrastructure improvements being constructed with Tract 3089 are eligible for reimbursement. All local funding contributions towards reimbursement obligations to Avila Ranch have already been allocated in previous Financial Plans. To facilitate these reimbursements, a Public Reimbursement Agreement was approved by the City Counc il on December 4, 2018 by Resolution 10968 (2018 Series), and a Private Reimbursement Agreement was approved on June 18, 2019 by Resolution 11022 (2019 Series). Wetlands Phase 5 will not be disturbing any wetlands, therefore no easement documents for wetlands will need to be prepared. Agricultural and Open Space Conservation To compensate for the loss of onsite agricultural lands and to meet the open space objectives of the General Plan, Section 7.04 of the Development Agreement requires Tract 3089 to dedicate at least 50 acres of on-site open space and/or agricultural land and preserve at least 50 acres of offsite open space and/or agricultural land. The Subdivider previously recorded an easement for 30.5 acres of on-site agricultural land with the Phase 1 map, although this land was located in Phases 4 and 5 and not part of the Phase 1 subdivision. The Phase 1 final map included 5.46 acres of open space dedication, and the Phase 2-3 final map included 3.6 acres of open space dedication. Phase 5 will dedicate 14.34 acres of open space and/or agriculture land, located on lots 434, 435, 438, and 439 to the City. The balance of on-site agricultural lands and open space will be dedicated as 25.48 acres of agricultural land in Phase 4, as shown on the approved tentative map (Phase 6 has been eliminated and distributed to Phase 4 and 5 final maps). The Avila Ranch project opted to satisfy a portion of its open space conservation requirements through an in-lieu fee, which has been received with Phase 1 map recordation and is paid in full. The resolution approving the final map authorizes the City Clerk to accept an offer of dedication in fee for Lots 434, 438, and 439 for open space purposes, and Lots 426 and 386 for Public Park Purposes with the signature of the Clerk on the final map. Lot 435 will be dedicated in fee to the City by a separate irrevocable offer of dedication for open space/agricultural purposes. The resolution approving the final map authorizes t he Mayor to accept this offer at any future date based on the recommendation of the Natural Resources Manager that the required due-diligence investigations have been completed. This ensures that the City does not accept fee ownership of agricultural land without Page 117 of 615 Item 6e confirmation that the land does not create new liability for the City. The offer for Lot 435 must remain open but the City is not required to accept the dedication at any future date. The acceptance of the fee offers will provide for all potential uses of that site, including drainage, pedestrian and bicyclist access, public utilities, and bridges. The land that will become Lots 386, 426, 435, and 438 has traditionally been agricultural land while the land that will become Lots 434 and 439 has served as Tank Farm Creek traditionally. Approving the Final Map Although tentative maps typically have an initial two-year life per Municipal Code Section 16.10.150, approval of a Development Agreement allows for that lifespan to be extended pursuant to Government Code Section 66452.6(a)(1). Section 8.04 of the Development Agreement extends the life of the tentative map to the later of (i) the expiration or earlier termination of the Development Agreement or (ii) the date upon which the tentative map would expire under the laws of the State of California. According to Section 1.03.1 of the Development Agreement, the duration of the Development Agreement could extend to the year 2047. The final map for Tract 3089 Phase 5 (Attachment J) is ready to be approved. There may be minor revisions still required for technical accuracy and condition compliance, to be completed before the map records. Pursuant to Section 16.14.080 of the Municipal Code, the Public Works Director has determined that the final map is in sub stantial compliance with the tentative map and approved modifications thereof. California Government Code Section 66474.1 states that “a Legislative body shall not deny approval of a final or parcel map if it has previously approved a tentative map for the proposed subdivision and if it finds that the final or parcel map is in substantial compliance with the previously approved tentative map.” The approval of a final map is considered a ministerial action. Appropriate securities will be submitted prior to map recordation to guarantee completion of the required subdivision improvements as shown in the Subdivision Agreement (Attachment K). The Subdivision Agreement is still in draft form as some details still need to be confirmed with the Subdivider such as amount and timing of fee payments, bonds, and specific language in the agreement. The resolution approving the final map also authorizes the Mayor to sign the Subdivision Agreement requiring the Subdivider to complete the subdivision improvements. Public Engagement Public notification for the tentative map, environmental document, and underlying entitlements occurred with the Planning Commission hearings on June 28, 2017, June 29, 2017, July 12, 2017, and August 9, 2017 , and at the City Council meeting on September 19, 2017. Approval of the final map is considered a ministerial action, so a public hearing to approve the final map for this Phase 5 map is not required. CONCURRENCE Page 118 of 615 Item 6e The Director of Public Works, the Director of Parks and Recreation, the Fire Chief, and the Natural Resources Manager concur with the recommended action. ENVIRONMENTAL REVIEW The Avila Ranch Development Plan (ARDP) and associated Final Environmental Impact Report (FEIR) were approved and certified by the City Council on September 19, 2017, pursuant to Resolution No. 10832 (2017 Series). The significance of each impact resulting from implementation of the Project was determined based on impact significance criteria and applicable CEQA Guidelines for each impact topic. The EIR found that the Project would result in significant and unavoidable construction-related and long-term impacts to air quality, construction-related noise, and long-term transportation and traffic impacts. Mitigation measures were adopted to reduce the potential impacts where feasible, and the City Council adopted CEQA findings and a Statement of Overriding Conditions to address the identified significant and unavoidable impacts described in the Final EIR. All mitigation measures adopted as part of the ARDP FEIR that are applicable to the project are carried forward and applied to the project to effectively mitigate the impacts that were previously identified. A First Addendum to the Final EIR was prepared in January 2024 to address a change in timing of the implementation of Mitigation Measure TRANS-11, which established an obligation for the project to install two separated bicycle bridges on each side of Buckley Road at Tank Farm Creek to improve access to safe bicycle routing along Buckley Road. The timing of the southern bicycle bridge was modified to coincide with the Buckley Road frontage improvements required with Phase 4. The City Council approved the FEIR First Addendum on January 23, 2024. A Second Addendum to the Final EIR was prepared in February 2024 to document an affordable housing density bonus to increase the density of the R -4 project component from 125 to 145 units. The transportation analysis fo r the density bonus found that the addition of 20 affordable housing units would not result in new impacts to Vehicle Miles Traveled (VMT) and would not result in additional transportation impacts. The Planning Commission approved the FEIR Second Addendum on February 14, 2024. A Third Addendum to the Final EIR has been prepared, pursuant to CEQA Guidelines Sections 15164 and 15162, to address the timing for buildout of the six (6) phases of the Vesting Tentative Tract Map. The Developer is proposing to construct Phase 5 of Tract 3089 ahead of Phase 4. Phase 6 has been eliminated and absorbed by Phases 4 and 5. Modified phasing construction was contemplated by Article 6 of the Avila Ranch Development Agreement, which states that the phasing plan and phased insta llation of project infrastructure may be amended by an agreement between the Developer and the City. An addendum to a previously certified Final EIR is appropriate when minor technical changes or additions are necessary and none of the conditions described in CEQA Guidelines Section 15162 have occurred. The FEIR Third Addendum addresses updated timing requirements related to the construction of the south bicycle bridge on Buckley Road (Mitigation Measure TRANS-11) and improvements to Horizon Lane and Suburban Road (Mitigation Measure TRANS-4). The south bicycle bridge will be constructed in Page 119 of 615 Item 6e Phase 4 or 5, whichever comes first, concurrent with the bicycle lanes and road widening on Buckley. Improvements to Horizon Lane and Suburban Road will remain tied to Phase 4 final map construction. The FEIR and associated Addendum s constitute the complete environmental determination for the project. The final map is substantially in conformance with the tentative map evaluated with this prior environmental determinatio n. Approval of the final map is statutorily exempt under the California Environmental Quality Act (CEQA) pursuant to Section 15268(b)(3) Ministerial Projects (approval of final subdivision maps) of Title 14 of the California Code of Regulations (State CE QA Guidelines). Therefore, no further environmental review is required. FISCAL IMPACT Budgeted: Yes Budget Year: 2026-Ongoing Funding Identified: Yes Fiscal Analysis: Funding Sources Total Budget Available Current Funding Request Remaining Balance Annual Ongoing Cost General Fund $0 $0 $0 $0 State Federal Fees Other: CFD Total $0 $0 $0 $0 There are no fiscal impacts directly associated with approval of the final map for Tract 3089 Phase 5. The City will eventually incur costs upon acceptance of the improvements by the City, which will occur by separate Council action once the subdivision improvements are deemed complete. The CFD structure is designed to be revenue neutral to the City to fund the cost of services, such as police and fire, and infrastructure maintenance. The CFD is analyzed each year and taxes are levied to cover projected costs which will increase incrementally as more of the CFD-maintained services and improvements come online. An analysis of the annual costs to provide the services and infrastructure maintenance to the Avila Ranch development, including administration, is currently estimated to be $1.7 million annually at buildout. The City is collecting Special Taxes from the developed parcels within Avila Ranch and incorporates this funding into a maintenance budget for the improvements at the development. Currently, the CFD is estimated to generate $1.7 million in annual revenue at buildout, therefore there is no net fiscal impact anticipated for the City’s budget. Costs for maintenance of the new open space and public park lots included in the Phase 5 final map will be incorporated into the CFD services budget, which is $721,520 for FY 25-26, as well Page 120 of 615 Item 6e as future financial plans. The CFD at Avila Ranch was established in-lieu of a Homeowners Association, and therefore the CFD funds of approximately $200 per month per unit provides the maintenance of roads, parks, and other infrastructure within the development. This cost has previously been determined to be within the City’s financial plan policy limits for total property tax burden. ALTERNATIVES Deny approval of the final map. Denying approval of the final map is appropriate only if findings are made that the requirements or conditions of the tentative map have not been met or performed (Section 66473 of the Subdivision Map Act) or if findings are made that the final map is not in substantial compliance with the previously approve d tentative map (Section 66474.1 of the Subdivision Map Act). Because the final map is in substantial compliance with the tentative map and all the conditions of the map will be met or securities deposited prior to map recordation, Sections 66474.1 and 664 73 of the Subdivision Map Act require that the City Council approve the map. ATTACHMENTS A - Draft Resolution approving Avila Ranch Tract 3089 Phase 5 Final Map B - Development Agreement Memorandum of Agreement: Modified Phasing Buildout C - Third Addendum to the Avila Ranch Final EIR D - Transportation Analysis, May 9, 2025 by Central Coast Transportation Consulting E - Vicinity Map F - Tentative Map (Tract 3089) G - Phasing Plan (Tract 3089) H - Transportation Improvement Phasing Plan and Off -Site Construction Requirements dated July 16, 2025 I - Park Layout (Tract 3089) J - Draft Final Map Tract 3089 Phase 5 K - Draft Subdivision Agreement Tract 3089 Phase 5 Page 121 of 615 Page 122 of 615 R ______ RESOLUTION NO. _____ (2025 SERIES) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN LUIS OBISPO, CALIFORNIA, APPROVING THE FINAL MAP FOR TRACT 3089 PHASE 5, AVILA RANCH, INCLUDING AN ADDENDUM TO THE FINAL ENVIRONMENTAL IMPACT REPORT CLARIFYING THE TIMING OF TRANSPORTATION MITIGATION MEASURES, AND AUTHORIZING THE MAYOR TO EXECUTE A SUBDIVSION AGREEMENT IN A FORM SUBJECT TO THE APPROVAL OF THE CITY ATTORNEY (175 VENTURE DRIVE, FMAP-0132-2024) WHEREAS, the City Council made certain findings concerning the phased vesting tentative map for Tract 3089, as prescribed in Resolution No. 10832 (2017 Series); and WHEREAS, the City Council entered into a Development Agreement with the Subdivider of Tract 3089 with Ordinance No. 1639 (2017 Series); and WHEREAS, the Community Development Director approved minor corrections to the tentative map as allowed by the City Municipa l Code and California Government Code; and WHEREAS, the Subdivider has requested that the Council approve the final map for Tract 3089 Phase 5; and WHEREAS, there are certain lots that are offered to the City in fee for public purposes; and WHEREAS, Tract 3089 is required to preserve at least 50 acres of on -site open space and/or agricultural land and preserve at least 50 acres of offsite open space and/or agricultural land by the recordation of deed restrictions, but only a portion of that is required to be preserved with Phase 5; and WHEREAS, the Subdivider will be constructing certain improvements that are eligible for fee credits per the project’s development approval documents and the City’s AB1600 fee program; and WHEREAS, the Subdivider will submit appropriate securities to guarantee installation of the required subdivision improvements as shown on the approved plans prior to map recordation, and the required fees will be received prior to map recordation, as prescribed in the Subdivision Agreement, the Development Agreement, and the project approvals; and WHEREAS, all requirements, conditions and mitigation measures required per said Council Resolution No. 10832 (2017 Series) approving the tentative map and Ordinance No. 1639 (2017 Series) app roving the Development Agreement have been Page 123 of 615 Resolution No. _____ (2025 Series) Page 2 R ______ completed or appropriate securities will be in place to guarantee their completion prior to Phase 5 map recordation; and WHEREAS, the Avila Ranch Development Plan and associated Final Environmental Impact Report were approved and certified by the City Council on September 19, 2017, pursuant to Resolution No. 10832 (2017 Series); and WHEREAS, a First Addendum to the Final EIR was approved by the City Council on January 23, 2024 to address a change in timing of the implementation of Mitigation Measure TRANS-11; and WHEREAS, a Second Addendum to the Final EIR was approved by the Planning Commission on February 14, 2024 to document an affordable housing density bonus which increased the density of the Avila Ranch R-4 project component from 125 to 145 units; and WHEREAS, a Third Addendum to the Final EIR has been prepared to evaluate the modified phasing plan for Avila Ranch with Phase 5 to be constructed ahead of Phase 4, including clarifications and minor modifications to the required timing of the project’s transportation mitigation measures; and WHEREAS, approval of the final map is statutorily exempt under the California Environmental Quality Act (CEQA) pursuant to Section 15268(b)(3) Ministerial Projects (approval of final subdivision maps) of Title 14 of the California Code of Regulations (State CEQA Guidelines), therefore, no further environmental review is required for approval of the Tract 3089 Phase 5 final map. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of San Luis Obispo as follows: SECTION 1. The final map for Tract 3089 Phase 5 is found to be in substantial conformance with the tentative map. SECTION 2. Phase 5 provides sufficient parkland and park improvements to meet City requirements based on the projected population and housing onsite, so there are no "in-lieu" park fees required. SECTION 3. The City Clerk is authorized to accept fee offers for the open space and park lots dedicated on the map with the signing of the final map. SECTION 4. The Mayor is authorized to accept the irrevocable offer of dedication in fee for Lot 435 for open space/agricultural purposes dedicated by separate instrument to record concurrently with the map at any future date based on the recommendation by the City’s Natural Resources Manager that the required due-diligence investigations have been completed. Page 124 of 615 Resolution No. _____ (2025 Series) Page 3 R ______ SECTION 5. Approval of the final map for Tract 3089 Phase 5 is hereby granted with the understanding that minor changes to the final map for technical accuracy and condition compliance are still needed. The Public Works Director is authorized to approve these changes and record the map when it is deemed to be complete, and all conditions and mitigation measures are complied with. SECTION 6. The Mayor is authorized to approve revisions to the Subdivision Agreement for Tract 3089 Phase 5 and execute the agreement in a form substantially the same as shown in Attachment K of the staff report. SECTION 7. Pursuant to the FEIR Third Addendum provided as Attachment C of the Council Agenda Report, the timing of Mitigation Measure TRANS-4 and TRANS-11 has been modified and clarified based on the modified project phasing plan, and s aid modification does not trigger one of the events in Section 15162 of the CEQA Guidelines and therefore an addendum is appropriate. SECTION 8. The Public Works Director is authorized to reduce or release securities for the public improvements once the requirements for release are met and is authorized to cause the improvements to be accepted into the City’s maintenance system. SECTION 9. The City Manager is authorized to execute a Memorandum of Agreement in a form that is substantially the same as shown in Attachment B of the staff report. SECTION 10. The Mayor and City staff are authorized to take action necessary to carry out the intent of this resolution. Page 125 of 615 Resolution No. _____ (2025 Series) Page 4 R ______ SECTION 11. Environmental Review. The Avila Ranch Development Plan (ARDP) and associated Final Environmental Impact Report, together with the three (3) FEIR Addendums, constitute the complete environmental determination for the project, and the Third Addendum is hereby approved. All mitigation measures adopted as part of the ARDP FEIR that are applicable to the project are carried forward and applied to the project to effectively mitigate the impacts that were previously identified. The final map is substantially in conformance with the tentative map evaluated with these prior environmental determinations. Approval of the final map is statutorily exempt under the California Environmental Quality Act (CEQA) pursuant to Section 15268(b)(3) Ministerial Projects (approval of final subdivision maps) of Title 14 of the California Code of Regulations (State CEQA Guidelines). Therefore, no further environmental review is required. Upon motion of Council Member ___________, seconded by Council Member ___________, and on the following roll call vote: AYES: NOES: ABSENT: The foregoing resolution was adopted this _____ day of _______________ 20 25. ___________________________ Mayor Erica A. Stewart ATTEST: ______________________ Teresa Purrington City Clerk APPROVED AS TO FORM: ______________________ J. Christine Dietrick City Attorney IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of San Luis Obispo, California, on ______________________. ___________________________ Teresa Purrington City Clerk Page 126 of 615 1 RECORDING REQUESTED BY AND WHEN RECORDED RETURN TO: City of San Luis Obispo Community Development 919 Palm St., San Luis Obispo, CA 93401-3218 Attn: _________________ No fee pursuant to Government Code Sect. 6103 No Documentary Transfer Tax per R & T Code Sect. 11922 No Recording Fee per Government Code Sect. 27383 MEMORANDUM OF AGREEMENT This Memorandum of Agreement ("MOA No. 2") is made this ___ day of August, 2025, by and among Trumark Construction Services, Inc., a California corporation (“Developer”) MRP HTMB, LLC, a Delaware limited liability company, doing business in California as Millrose California Holdings, LLC ("Owner”) and the City of San Luis Obispo, a municipal corporation and charter city (“City"). Developer, Owner, and City are sometimes collectively referred to as “Parties.” 1. On October 3, 2017, City adopted that certain agreement entitled “Development Agreement by and Between the City of San Luis Obispo and Avila Ranch, LLC, relating to the Avila Ranch Specific Plan” (“Development Agreement”) (amended by the certain Amendment No. 1 dated April 16, 2019) in conjunction with the development of approximately 152 acres of real property located north of Buckley Road and east of Vachell Road, in the City of San Luis Obispo, commonly referred to as Avila Ranch (the “Avila Ranch Project” or “Project”). 2. The Development Agreement provides that the Avila Ranch Project will be constructed in six (6) phases (Phases 1 through 6) as illustrated in Exhibit “D” to the Development Agreement. 3. On and after June 14, 2019, Avila Ranch Developers, Inc., acquired ownership of approximately 59 acres west of Tank Farm Creek making up Phase 1, 2 and 3 of the Avila Ranch Project and the rights to develop the Avila Ranch Project pursuant to the entitlements approved by the City, including, but not limited to the Development Agreement. 4. On or about November 6, 2020, 104 Investments, LLC, a California limited liability company (“104”), Wathen Castanos Peterson Coastal, LP, a California limited partnership (“WCP Coastal”), Joshua Elof Peterson and Cory Jessica Malone, as Co-Trustees of the Peterson Family Trust, established under Declaration of Trust dated January 7, 2015 (the “Peterson Trust”), FG2 Holdings, LLC, a California limited liability company (“FG2”) Avila Ranch EA, LLC, a California limited liability company (“AREA”) and CJ Holdings, LP, a California limited partnership (“CJ Holdings”) (collectively “Investcos”) acquired ownership of approximately 92 acres, east of Tank Farm making up Phases 4, 5 and 6 of the Avila Ranch Project (“Phase 4-6 Property”) pursuant to the entitlements approved by the City, including, but not limited to the Development Agreement. 5. On or about September 8, 2021, Avila Ranch Developers, Inc., a California corporation, as the “Developer”, together with Investcos, and City entered that certain Memorandum of Agreement, for the Page 127 of 615 2 purposes of establishing the terms and conditions upon which Developer would advance Phases 4 and 5 ahead of Phases 2 and 3, attached hereto as Exhibit “A” (“MOA No. 1”). 6. Notwithstanding MOA No. 1, Phases 4 & 5 were not constructed in advance of Phases 2 & 3; nevertheless, the Project remains in compliance with paragraph 10 of MOA No. 1 with respect to the timing and completion of those certain identified conditions of approval (“COA”) described therein. 7. On October 12, 2023, Trumark Companies (“Trumark”), acquired the home building business of WCP Developers, LLC, including that of Avila Ranch Developers, Inc. and certain portions of the Avila Ranch Project, including the balance of Phase 1, the property included in the Phase 2 & 3 Final Map, excluding the multi-family portions (Lot 327). 8. On February 14, 2025, TH Avila Ranch, a Trumark related entity, acquired the Phase 4-6 Property. 9. On March 25, 2025, in conjunction with the recordation of the Phase 2 & 3 Final Map, City and TH Avila Ranch entered into the “Avila Ranch Phase 3 Affordable Housing Agreement and Declaration of Restrictive Covenants” (“Phase 3 Affordable Housing Agreement”) wherein Section 2.2 provides: Construction of R-4 Affordable Housing Project. The Parties have agreed that the Affordable Housing Provider will construct the R-4 Affordable Housing Project, consisting of thirty-two (32) rental units to Lower-Income Households (including, without limitation, eight (8) two-bedroom/1-bath rental units to Low-Income Households), twenty-seven (27) rental units to Moderate-Income Households (including, without limitation, eight (8) two- bedroom/1-bath rental units to Moderate-Income Households), and one (1) manager’s unit, for a total of sixty (60) rental units, in the approximate location shown and described on Exhibit B in conformance with the provisions of Article 5 herein. 10. Furthermore, Article 5 of the Phase 3 Affordable Housing Agreement, the terms of which are incorporated herein by reference, imposed a timeframe within which the construction of the R -4 For- Rent Affordable Units was to commence and be completed; specifically Section 5.5 provides: Construction Timing of Affordable Housing Project. For purposes of this Agreement, the term “Commence Construction” means issuance by the City of a “ready to issue” letter for a building permit for the R-4 Affordable Housing Project, the only condition for which is the payment of City fees. For purposes of this Agreement, the term “Substantially Complete Construction” means completion of seventy-five percent (75%) of the construction of the R-4 Affordable Housing Project as demonstrated by the construction budget attached to the first lender construction loan documents for the R-4 Affordable Housing Project and draw requests approved by the first lender. In order to ensure that the Affordable Housing Project is completed earlier in the Project, as opposed to the last phase of the Project, the City reserves the right to withhold the issuance of building permits to ARD if the Affordable Housing Provider has not Commenced Construction by the issuance of a building permit for ARD’s 500th unit, and/or if the Affordable Housing Provider has not Substantially Completed Construction by the issuance of a building permit for ARD’s 550th unit. Page 128 of 615 3 11. On March 30, 2025, in a land banking arrangement, TH Avila Ranch, transferred title to the Phase 4-6 Property to MRP California, LLC (“MRP California”), a Delaware limited liability company, doing business in California as Millrose California Holdings, LLC, with the understanding that Trumark, by and through its general contracting entity, Trumark Construction Services, Inc, a California corporation, would continue to construct and develop the Phase 4-6 Property in accordance with the Development Agreement and all other Project entitlements. 12. On May 9, 2025, MRP California, changed its name to MRP HTMB, LLC, a Delaware limited liability company, doing business in California as Millrose California Holdings, LLC (“MRP”) 13. Section 6.01 of the Development Agreement provides that the Project’s Backbone Infrastructure is planned to be designed and constructed in six (6) phases, as described in Exhibit E-1 through E-4 and J of the Development Agreement. 14. Notwithstanding the foregoing, the Development Agreement further provides: The Parties acknowledge that further analysis may result in a more cost -effective approach to the provisions of such infrastructure to adequately serve development within the Project Area, and that Exhibit E-1 through E-4 and J may be revised accordingly by agreement of the Parties and that such revisions shall not require amendment to this Development Agreement. (Development Agreement Section 6.01.1) 15. Additionally, Section 6.1.3 of the Development Agreement provides: The Phasing Plan may be amended by agreement of the Parties to take advantage of new technologies, to respond to changes in the underlying land use assumptions upon which the plan is based, or for such other reasons as the Parties may agree. 16. All COA’s relating to Phase 1 have been completed and the COA’s relating to the development of Phases 2 & 3 have commenced and are complete or nearly complete. 17. Developer is separately processing both the Phase 4 (R-3) and Phase 5 (R-1) Final Maps and desires to commence construction of Phase 5 in advance of Phase 4. 18. In advancing Phase 5 ahead of Phase 4, Developer, with the consent of Owner, agrees to implement the following Conditions as indicated below: A. Horizon Lane Improvements: Improvements to Horizon Lane between Suburban Road and the Avila Ranch project boundary required per MM TRANS-4 and COA #106 is an improvement required with Phase 4.  Developer requests to retain timing of this improvement with Phase 4, as outlined in the CCTC memo dated July 16, 2025. The specific timing requirements identified in TRANS- 4 and COA #106 which tie improvement milestones to permit issuance and occupancy at certain points in Phase 4 will remain. B. Suburban Road Improvements: Improvements to Suburban Road between Earthwood and Horizon Lane required per MM TRANS-4 and COA #102 is an improvement required with Phase 4. Page 129 of 615 4  Developer requests to retain timing of this improvement with Phase 4, as outlined in the CCTC memo dated July 16, 2025. The specific timing requirements identified in TRANS- 4 and COA #102 which tie improvement milestones to permit issuance and occupancy at certain points in Phase 4 will remain. C. Buckley Road Frontage Improvements: Widening of Buckley Road east of Tank Farm Creek Bridge along project frontage required per COA #107 includes Class 1 bike path on north side of road and Class II bike lanes on the south side of the road. Per COA #107, these improvements are required to be initiated prior to issuance of building permits for Phase 4, and improvements shall be completed no later than the 50th residential unit occupancy of Phase 4 development.  Per this MOA No. 2, Developer requests that these improvements will be installed with Phase 4 or 5, whichever comes first. For the avoidance of doubt, these improvements will be initiated prior to issuance of building permits for Phase 4 or Phase 5, and these improvements will be completed no later than the 50th residential unit occupancy in Phase 4 or Phase 5, whichever comes first. D. Buckley Bicycle Bridge (South Side): The addition of a bicycle bridge on north and south sides of Buckley Road crossing Tank Farm Creek are required per MM TRANS-11 and COA #109. Original approvals required construction of both bridges prior to Phase 2. With the approval of Phase 2-3 Final Map, the timing of southern bridge was deferred to, prior to Phase 4 and concurrent with Buckley Road Widening.  Per this MOA No. 2, Developer requests that the southern bridge will be constructed with Buckley Road Widening, prior to the issuance of occupancy permits for the 50th residential unit in Phase 4 or 5, whichever comes first. E. Jespersen/Venture & Jespersen/Wright Brothers Roundabouts: The construction of roundabouts at Jespersen/Venture and Jespersen/Wright Brothers intersections required per COA #110 require the improvements to be installed prior to issuance of building permits in Phase 4.  Per this MOA No. 2, Developer requests that these improvements will be installed prior to issuance of building permits in Phase 4 or 5, whichever comes first. F. 9.5 Acre Neighborhood Park: The construction of a 9.5-acre neighborhood park was proposed as part of Phase 4. The 9.5-acre park comprises half of the total parkland required for the Project. The Environmental Impact Report determined there would be less than significant impacts related to parks and recreation facilities because the Project would meet the required ratio of ten acres of park land per 1000 residents.  Per this MOA No. 2, the 9.5-acre neighborhood park shall be completed prior to completion of the 550th unit of the Project. G. Construction of R-4 Affordable Housing. City and Owner acknowledge Article 5 of the Phase 3 Affordable Housing Agreement and further acknowledge and agree that the terms of Article 5, Page 130 of 615 5 specifically Section 5.5, are not only applicable to the R-4 Property (Phase 3) identified in Exhibit “A” attached thereto, but to the entirety of the Avila Ranch project. 19. City agrees that advancing Phase 5 ahead of Phase 4 is beneficial to the Project and the health, safety and welfare of the City as it (a) advances the construction of Backbone Infrastructure which would otherwise be deferred; (b) does not create new or additional impacts not previously assessed or mitigated; (c) does not defer or otherwise delay the development of infrastructure necessary to mitigate impacts created by the Project; and (d) is consistent with the terms and conditions of the Avila Ranch Development Agreement. 20. Based on the foregoing, and consistent with the terms of the Development Agreement, the Parties agree that Developer may develop Phase 5 ahead of Phase 4. 21. This MOA No. 2, which shall be recorded upon final execution against the real property described in Exhibit “B” attached hereto, may be executed in two or more fully or partially executed counterparts, each of which will be deemed an original binding the signer thereof against the other signing parties, but all counterparts together will constitute one and the same instrument. This MOA No. 2 is binding on and inures to the benefit of the Parties and their respective legal representatives, successors, and assigns. 22. The intent of this MOA No. 2 and the recordation thereof is to make it a matter of public record, providing notice to others of its existence and contents of MOA No. 1, the Phase 3 Affordable Housing Agreement, Developers agreement regarding the timing of construction of certain improvements. Nothing in this MOA No. 2 is intended to amend any previously agreed upon document between the City and Developer, including, but not limited to, the Development Agreement, MOA No. 1, or the Phase 3 Affordable Housing Agreement, each of which remains in full force and effect as originally written. In the event of a conflict between this MOA No. 2 and any previously agreed upon document between the City and Developer, the previously agreed upon document will prevail. [signatures commence on following page] Page 131 of 615 6 CITY OF SAN LUIS OBISPO, a municipal corporation and charter city By: ___________________________ Whitney McDonald, City Manager TRUMARK CONSTRUCTION SERVICES, INC., a California corporation By: ____________________________ Joshua E. Peterson, Authorized Agent MRP HTMB, LLC a Delaware limited liability company doing business in California as Millrose California, LLC By: __________________________ [Name] _______________________ Authorized Agent Page 132 of 615 7 EXHIBIT "A" MOA NO. 1 The Original MOA No. 1 is maintained with the City Clerk Page 133 of 615 8 EXHIBIT “B” LEGAL DESCRIPTION OF PROPERTY The land referred to is situated in the County of San Luis Obispo, City of San Luis Obispo, State of California, and is described as follows: Parcel 4 of Certificate of Compliance for Lot Line Adjustment No. COAL 01-0097 in the City of San Luis Obispo, County of San Luis Obispo, State of California recorded April 9, 2003 in Document No. 2003-035675 of Official Records in the Office of the County Recorder, County of San Luis Obispo, State of California. Excepting that portion of Parcel 4 of Certificate of Compliance for Lot Line Adjustment No. COAL 01-0097 in the City of San Luis Obispo, County of San Luis Obispo, State of California, recorded April 9, 2003 in Document No. 2003-035675 of Official Records in the Office of the County Recorder, County of San Luis Obispo, State of California, lying Northerly and Westerly of the line described as follows: Beginning at a point being North 10° 13’ 54” East, a distance of 154.30 feet from the Southerly terminus of the Line described as “S 10° 13’ 54” W, 296.48” feet of said Parcel 4; thence North 41° 07’ 43” East, a distance of 294.58 feet; thence, South 72° 09’ 02” East, a distance of 436.26 feet; thence North 58° 23’ 53” East, a distance of 65.56 feet; thence North 9° 51’ 38” East, a distance of 273.28 feet; thence North 42° 06’ 40” East, a distance of 401.67 feet; thence North 81° 05’ 41” East, a distance of 229.24 feet to the East line of Lot 27 of Harford & Chapman’s Subdivision in the City of San Luis Obispo, County of San Luis Obispo, State of California, filed in Book B of Maps at Page 30 in the Office of the County Recorder, County of San Luis Obispo, State of California. Thence North along said East Line North 0° 15’ 35” East, a distance of 600.63 feet to the Northerly Line of said Parcel 4. This legal description is made pursuant to that certain Certificate Approving a Lot Line Adjustment, designated as “Parcel B” in Certificate No. SLO AL 18-00013 (Fmap-1552-2018), recorded June 22, 2018 as Instrument No. 2018-25711 of Official Records. APN: 053-259-008 Page 134 of 615 Third Addendum to the Final Environmental Impact Report for the Avila Ranch Development Plan June, 2025 1. Project Title: Avila Ranch Development Plan 2. Lead Agency Name and Address: City of San Luis Obispo 990 Palm Street San Luis Obispo, CA 93401 3. Contact Person and Phone Number: Callie Taylor, Senior Planner 805-781-7016 4. Project Location: 175 Venture Drive San Luis Obispo, CA 93401 5. Project Applicant and Representative Name and address: Avila Ranch Trumark Homes Dan Garson, Director of Land Development 735 Tank Farm Rd Suite 100, San Luis Obispo, CA 93401 6. General Plan Designation: Special Focus Area SP-4. Per Avila Ranch Development Plan: Low-Density Residential, Medium-Density Residential, Medium-High Density Residential, High-Density Residential, Neighborhood Commercial, Open Space, Park 7. Zoning: Per Avila Ranch Development Plan: R-1 Low-Density Residential, R-2 Medium-Density Residential, R-3 Medium-High Density Residential, R-4 High-Density Residential, C-N Neighborhood Commercial, Conservation/Open Space C/OS, PF Public Facility, Airport Area Specific Plan Page 135 of 615 8. Description of the Project: The Avila Ranch Development Plan was approved by the San Luis Obispo City Council on September 19, 2017. Project entitlements included certification of the Final EIR, approval of the Avila Ranch Development Plan, Airport Area Specific Plan Amendment, General Plan Amendment, Phased Vesting Tentative Tract Map, Zone Change, Development Agreement, and establishment of a Community Facilities District. The project includes 740 residential units, 15,000 square feet of neighborhood commercial, open space, and parks on a 150-acre area which is to be developed within six (6) phases of development with a phased final map. 9. Project Entitlements Requested: Previously approved by the City Council on September 19, 2017. Project implementation, Final Map recordation, permits, and construction are in process. 10. Previous Environmental Review : The Avila Ranch Development Plan (ARDP) and associated Final Environmental Impact Report (FEIR) were approved and certified by the City Council on September 19, 2017, pursuant to Resolution No. 10832 (2017 Series). The significance of each impact resulting from implementation of the Project was determined based on impact significance criteria and applicable CEQA Guidelines for each impact topic. The EIR found that the Project would result in significant and unavoidable construction-related and long-term impacts to air quality, construction-related noise, and long-term transportation and traffic impacts. Mitigation measures were adopted to reduce the potential impacts where feasible, and the City Council adopted CEQA findings and a Statement of Overriding Conditions to address the identified significant and unavoidable impacts described in the Final EIR. An Addendum to the Final EIR (“First Addendum”) was prepared in January 2024 to address a change in timing of the implementation of Mitigation Measure TRANS-11, which established an obligation for the project to install two separated bicycle bridges on each side of Buckley Road at Tank Farm Creek to improve access to safe bicycle routing along Buckley Road. The timing of the southern bicycle bridge was modified to coincide with the Buckley Road frontage improvements required with Phase 4 in order to minimize construction impacts on properties to the south where a construction easement and right- of-way acquisition is needed. The northern bicycle bridge remains a requirement with Phase 2. The City Council approved the FEIR First Addendum on January 23, 2024. A Second Addendum to the Final EIR was prepared in February 2024 to document an affordable housing density bonus to increase the density of the R-4 project component from 125 to 145 units. The transportation analysis for the density bonus found that the addition of 20 affordable housing units would not result in new impacts to Vehicle Miles Traveled (VMT) and would not result in additional transportation impacts . The mitigation measures incorporated with the original 2017 FEIR and the 2024 FEIR First Addendum Page 136 of 615 are sufficient to mitigate the impacts of the project. The Planning Commission approved the FEIR Second Addendum on February 14, 2024. Buildout of the project is currently underway. Phase 1 and 2 residential units are currently under construction. On- and off-site improvements have been constructed as part of Phase 1 and 2, including transportation improvements to mitigate for the increase in traffic generated by the Tract 3089 development. 11. Purpose of the Addendum: Section 15164 of the State CEQA Guidelines allows a lead agency to prepare an addendum to a Final EIR when only “minor technical changes or additions” are necessary to address the effects of a minor change to the approved project since the Final EIR was certified. In addition, the lead agency is required to explain its decision not to prepare a subsequent EIR pursuant to State CEQA Guidelines Section 15162, which require s subsequent EIRs when proposed changes would require major revisions to the previous EIR “due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects.” Subsequent to certification of the ARDP Final EIR, additional information has been identified regarding the preferred timing for buildout of the six (6) phases of the Vesting Tentative Tract Map. The sequencing of the phased buildout evaluated in the ARDP Final EIR is now proposed to be modified with Phase 5 being constructed ahead of Phase 4. In addition, Phase 6, which originally included the commercial and agricultural parcels, is proposed to be mapped in Phases 4 and 5, eliminating the need for a Phase 6. Modified phasing construction was contemplated by Article 6 of the Avila Ranch Development Agreement, which states that the phasing plan and phased installation of project infrastructure may be amended by an agreement between the Developer and the City to take advantage of new technologies, to respond to changes in the underlying land use assumptions upon which the plan is based, or for such other reasons as the parties may agree. A DA Memorandum of Agreement has been prepared, as required by Article 6 of the DA, to reflect the modified phasing plan and approve this change to the sequencing for project buildout. Once signed by both the City and the Developer, the DA Memorandum of Agreement, in conjunction with th is EIR Addendum, would allow for the alternative project phasing as currently proposed. The purpose of this Addendum is to document the revised phasing buildout, to clarify the timing of on- and off-site improvements that are tied to each phase, and to discuss the potential effects associated with this change. The analysis herein concludes that this phasing change would not result in any new or more severe significant environmental effects not previously analyzed in the Final EIR, nor any new or modified mitigation measures. The evaluation below discusses the issue areas that are relevant to this Addendum and covered by the previously approved Final EIR. Page 137 of 615 12. Addendum Requirements: Pursuant to Section 21166 of CEQA and Section 15162 of the State CEQA Guidelines, when a lead agency has adopted an EIR for a project, a subsequent EIR does not need to be prepared for the project unless the lead agency determines that one or more of the following conditions are met: 1. Substantial project changes are proposed that will require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; 2. Substantial changes would occur with respect to the circumstances under which the project is undertaken that require major revisions to the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; or 3. New information of substantial importance that was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was adopted shows any of the following: a. The project will have one or more significant effects not discussed in the previous EIR; or b. Significant effects previously examined will be substantially more severe than identified in the previous EIR; or c. Mitigation measures or alternatives previously found not to be feasible would in fact be feasible, and would substantially reduce one or more significant effects of the project, but the project proponent declines to adopt the mitigation measures or alternatives; or d. Mitigation measures or alternatives that are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponent declines to adopt the mitigation measures or alternatives. Preparation of an Addendum to an EIR is appropriate when none of the conditions specified in Section 15162 (above) are present and some minor technical changes to the previously certified EIR are necessary to address minor changes to an approved project. Because the new information would not result in any new or more severe significant impacts, an Addendum is the appropriate CEQA document. Page 138 of 615 NEW INFORMATION AND UPDATED PROJECT ELEMENTS NEW INFORMATION NOT CONSIDERED IN THE FINAL EIR The Avila Ranch Development Plan (ARDP) and the Phased Vesting Tentative Tract Map (Tract 3089), approved by the San Luis Obispo City Council on September 19, 2017, included a phasing plan which identified six (6) phases for development of the 150-acre plan area. Avila Ranch Development Plan: Figure 9 Phasing Plan As identified in the ARDP, the original project phasing was primarily determined by the required location of sewer and circulation facilities, existing road improvements, and site topography. Phase descriptions are as follows: Phase 1: 179 R-2 units (detached single family homes) Phase 2: 29 R-2 units (detached single family homes) Phase 3: 89 R-2 units (detached single family homes) and 145 R-4 units (for-rent apartments) Phase 4: 197 R-3 units (duplex units and townhomes) Phase 5: 101 R-1 units (detached single family homes with ADUs) Phase 6: 15,000 sq. ft. of neighborhood commercial The sequencing of the phased buildout evaluated in the ARDP Final EIR is now proposed to be modified with Phase 5 being constructed ahead of Phase 4. Phase 5 includes construction of 101 R-1 zoned single family units, which will now be constructed ahead of the 197 R-3 multifamily townhome units in Phase 4. In addition, Phase 6 has been merged into Phases 4 and 5, therefore no maps will be recorded with a Phase 6 designation. The two (2) commercial parcels in Phase 6 have been incorporated into Phase 5. The Phase 6 agricultural/open space parcels (totaling approximately 30 acres) have been incorporated into both Phases 4 and 5. Modified phasing is allowed by the Avila Ranch Development Agreement, provided that both the Developer and the City agree in writing. The modified phasing buildout is the subject of this Addendum. Page 139 of 615 CHANGED BASELINE CONDITIONS AND UPDATED PROJECT ELEMENTS This Addendum considers the potential effects of constructing Phase 5, including 101 R -1 zoned single family units, ahead of the 197 R-3 zoned multifamily townhomes in Phase 4. The total number of units and areas of development remain consistent with previous project approvals and 2017 Final EIR, including the First and Second Addendum. Other project elements, including roadways, backbone infrastructure, utilities, and other public improvements identified in the ARDP will be constructed as previously required. The modified phasing order would not alter any portion of the ARDP that was intended to be left in open space or agriculture under the original 2017 approval. MINOR TECHNICAL CHANGES TO THE FINAL EIR The project phasing revisions noted above would result in minor changes to the approved project and Final EIR and are therefore evaluated in this Addendum in the analysis that follows. Environmental Issues for Consideration The proposed change to the project phasing does not anticipate any new development or ground disturbance in any area within the ARDP that was not already evaluated in the Final EIR. Total project buildout remains the same, with only the order of phases proposed for modification. For that reason, impacts associated with issues related to ground disturbance and/or total buildout will not change from what was described in the FEIR, including agricultural resources, air quality and greenhouse gas emissions, biological resources, cultural resources, hazards, hydrology/water quality, and noise. These issues will not be analyzed further in this Addendum. Other impacts that are linked to the phasing plan and/or timing of improvements are discussed in the paragraphs that follow. These include the issues of population and housing, public services, transportation and traffic, and utilities. Analysis For all issues, there were no new significant impacts, no increase in the severity of a previously identified significant impact, nor any new mitigation measures required. Modifications and clarifications to the timing of some transportation mitigation measures have been incorporated in order to respond to the modified phasing buildout. The following analysis of each issue discusses this in more detail and provides support for this conclusion. Population and Housing. The FEIR did not identify any significant impacts related to this issue. Its conclusion that development will occur within the City’s adopted growth rate (Impact PH-1) is still true for the proposed project phasing modification, because development would still be subject to the City’s policies related to growth, and subject to market constraints, as it is part of a long-term phased buildout of the ARDP. As a project that provides housing, other im pacts related to improving jobs-housing balance and the provision of affordable housing were found to be beneficial. Increased housing opportunities would reinforce these conclusions. Page 140 of 615 Public Services. The FEIR did not identify any significant impacts related to this issue. Increased demand for police and fire services (Impacts PS -1 and PS-2) were found to be significant but mitigable with the payment of required fees to offset potential impacts, and in the case of impacts to law enforcement, the creation of a Security Plan for the ARDP. The modified phasing would still be subject to the same mitigation requirements. No increase in severity of impacts or new mitigation measures would be required. An interim fire station will be constructed within the Avila Ranch project by the occupancy of the 361st residential unit (50% buildout), consistent with the original 2017 FEIR project description. Phasing does not impact the timing of the interim fire station construction. Impacts related to schools and public parks (Impacts PS-3 and PS-4) were found to be less than significant. Neighborhood parks are included in each phase of the development and will be built in conjunction with housing in each phase. Impacts would remain less than significant. Transportation and Traffic. The FEIR identified the following significant transportation impacts that could be affected by an increase in population or housing:  TRANS-1. Short-term construction traffic.  TRANS-2. Transportation deficiencies.  TRANS-3. Turning movement conflicts and intersections and driveways.  TRANS-4. Transportation volume threshold exceedances on certain roads.  TRANS-5. Buckley/227 Operation.  TRANS-6. South Street/Higuera impacts.  TRANS-7. S. Higuera intersections impacts.  TRANS-8. LOVR intersections.  TRANS-10. Pedestrian level of service.  TRANS-11. Bicycle facility demand.  TRANS-12. Transit demand.  TRANS-13. Near-term Buckley/227 Operation.  TRANS-14. Near-term bike and pedestrian facility demand.  TRANS-15. Cumulative impacts to intersections. Some of these impacts were found to be significant and unavoidable, including those related to the operation of the intersection of Buckley Road/SR 227 (Impacts TRANS -5 and TRANS-13). All other impacts were all found to be significant but mitigable, either through the payment of appropriate fees toward future improvements, or by making some of those roadway improvements directly as requirements of project approval. These improvements are programmed into the approved Development Agreement for the project. The impact to operations on US 101 (Impact TRANS-9) was found to be less than significant. A Phase 4/5 Transportation Analysis, dated May 9, 2025, prepared by Central Coast Transportation Consulting (CCTC) and reviewed by City staff, shows that the modified development phasing plan would not change any of the conclusions or required mitigation measures described in the FEIR at project buildout. That memorandum concludes that no new transportation impacts would occur, nor would any new or modified mitigation measures be Page 141 of 615 required. The CCTC Transportation Analysis evaluates vehicle trips for Phases 4 and 5 in order to determine timing of on- and off-site improvement mitigation measures related to each phase. The original project approvals included several transportation infrastructure improvements that were required to be constructed prior to or in conjunction with Phase 4 of the development. With approval of the Phase 5 Final Map and proposal to adva nce Phase 5 construction ahead of Phase 4, the following modifications and clarifications to required timing of transportation improvements are incorporated with this Addendum and with the DA Memorandum of Agreement: 1. Timing of Mitigation Measure TRANS-4 and Condition of Approval #106: Horizon Lane Improvements (Suburban Road to Avila Ranch Project Boundary)  Previous Approval: Per Mitigation Measure TRANS-4 and Condition of Approval #106, the Developer is required to construct/improve Horizon Road betwee n Suburban Lane and the project boundary to City Engineering Standards for a commercial collector street, with designs completed prior to Phase 4 Final Map recordation, construction initiation prior to issuance of Phase 4 building permits, and construction completion prior to issuance of occupancy permits for the 100th residential unit of Phase 4 development.  Timing Clarification: No modifications proposed. Advancing Phase 5 ahead of Phase 4 does not trigger the need for the Horizon Lane improvements between Suburban Road and the project boundary prior to Phase 4. A Transportation Analysis Memorandum has been prepared by Central Coast Transportation Consulting, which confirms that no transportation impacts are anticipated by advancing Phase 5 prior to Phase 4 without the Horizon Lane improvements in place. Phase 5 is located on the south side of the development, adjacent to Buckley Road, and it is expected that Phase 5 traffic would predominantly use Buckley Road since this route provides a shorter path than a route northward through the rest of the development via slower speed roads. No increase in severity of impacts or new mitigation measures would be required. Impacts would remain less than significant with existing mitigation and modified phasing. 2. Timing of Mitigation Measure TRANS-4 and Condition of Approval #102: Suburban Road Improvements (Earthwood to Horizon/Jespersen)  Previous Approval: Per Mitigation Measure TRANS-4 and Condition of Approval #102, the Developer is required to improve Suburban Road between Earthwood Lane and Horizon/Jespersen Road to City Engineering Standards for a commercial collector street, with design and construction initiation prior to issuance of 1 st building permits for Phase 4, and construction completion prior to issuance of occupancy permits for the 100th residential unit of Phase 4 development and prior to the connection of Horizon Lane with the project site.  Timing Clarification: No modifications proposed. Advancing Phase 5 ahead of Phase 4 does not trigger the need for the Suburban Road improvements east of Earthwood Page 142 of 615 prior to Phase 4, as development is not anticipated to add traffic to this segment of Suburban until Phase 4 development and extension of Horizon Lane between Suburban and Avila Ranch. A Transportation Analysis Memorandum has been prepared by Central Coast Transportation Consulting, which confirms that no transportation impacts are anticipated by advancing Phase 5 prior to Phase 4 without the Horizon Lane improvements in place. No increase in severity of impacts or new mitigation measures would be required. Impacts would remain less than significant with existing mitigation and modified phasing. 3. Timing of Condition of Approval #107: Buckley Road Frontage Improvements  Previous Approval: Per the 2017 FEIR project description and Condition of Approval #107, the Developer is required to construct frontage improvements along Buckley Road from the Tank Farm Creek Bridge to the eastern site boundary, including addition of on-street Class II bike lanes/shoulders on both sides of the street, and an off-street Class I shared-use path on the north side of Buckley Road. As required by Condition of Approval #107, improvements are required to be designed prior to issuance of building permits for Phase 4 and construction completed prior to issuance of occupancy permits for the 50th residential unit of Phase 4.  Timing Modification: Design of Buckley Road frontage improvements shall be required prior to issuance of any building permits for Phase 4 or Phase 5, whichever comes first. Construction shall be completed prior to issuance of occupancy permits for the 50th cumulative residential unit with Phase 4 or Phase 5. No changes are needed to the FEIR project description for implementation. Th is timing modification is reflected in the Avila Ranch Development Agreement Memorandum of Agreement and the Transportation Improvement Phasing Plan. No increase in severity of impacts or new mitigation measures would be required. Impacts would remain less than significant with modified phasing. 4. Timing of Mitigation Measure TRANS-11 and Condition of Approval #109: Buckley Road Bicycle Bridges  Previous Approval: Per project Mitigation Measure TRANS-11 and Condition of Approval #109, the Developer is required to construct two bicycle bridges over Tank Farm Creek located north and south of Buckley Road. Construction of both bridges was originally required prior to Phase 2. With previous Council approval of the Phase 2-3 Final Map (Resolution No. 11472), the required timing for construction of the bicycle bridge south of Buckley Road was modified to coincide with the Buckley Road frontage improvements with Phase 4 in order to minimize construction impacts on properties to the south where a construction easement and right-of-way acquisition is needed. The northern bicycle bridge remains a requirement with Phase 2. The First FEIR Addendum was prepared with the Phase 2-3 Final Map approval, which can be reviewed along with additional discussion on the modified timing of Mitigation Measure TRANS-11 in the January 23, 2024, City Council Agenda Report packet. Page 143 of 615  Timing Modification: Construction of the bicycle bridge over Tank Farm Creek south of Buckley Road shall be required prior to issuance of occupancy permits for for the 50th occupancy permit for Phase 4 or Phase 5, whichever occurs first. As noted above, traffic from Phase 5 is expected to utilize Buckley Road to access the site , and therefore will increase traffic on Buckley. This timing modification to tie Buckley improvements to either Phase 4 or Phase 5, whichever comes first, is intended to ensure that the timing of construction of the south bicycle bridge remains consistent with previous City Council approvals, even if Phase 5 is advanced ahead of Phase 4 . No increase in severity of impacts or new mitigation measures would be required. Impacts would remain less than significant with existing mitigation and modified phasing. 5. Timing of Condition of Approval #110: Jespersen/Venture and Jespersen/Wright Brothers Roundabouts  Previous Approval: The 2017 FEIR project description identifies single lane roundabouts at the Jespersen/Venture and Jespersen/Wright Brothers intersections to provide internal circulation connecting the east and west sides of the project across Tank Farm Creek and providing secondary project access to Buckley Road. Per Condition of Approval #110, design of Jespersen/Venture and Jespersen/Wright Brothers roundabouts is required to be substantially complete prior to recordation of the Phase 4 Final Map and construction shall be complete prior to issuance of building permits for Phase 4.  Timing Modification: Design of the roundabouts shall be substantially complete prior to recordation of Phase 4 or Phase 5 Final Map, whichever comes first, and construction shall be completed prior to issuance of any building permits for Phase 4 or Phase 5 residential units. This timing modification is reflected in the Development Agreement Memorandum of Agreement and the Transportation Improvement Phasing Plan. No increase in severity of impacts or new mitigation measures would be required. Impacts would remain less than significant with modified phasing. Therefore, with this Addendum, Mitigation Measure TRANS -11 (Buckley Road South Bicycle Bridge) is modified from Phase 4 to Phase 4 or 5 (whichever comes sooner), and the Horizon Lane and Suburban Road Improvements remain required with Phase 4 per Mitigation Measure TRANS-4 and are not triggered/warranted if Phase 5 is advanced ahead of Phase 4. A Memorandum of Agreement has been prepared to reflect these timing clarifications. As required by Mitigation Measure TRANS-2, a Transportation Improvement Phasing Plan has been prepared to graphically reflect the timing of major on- and off-site transportation improvements by phase as currently proposed for construction. No increase in severity of impacts or new mitigation measures would be required. Impacts would remain less than significant with existing mitigation and modified phasing. Utilities. The FEIR did not identify any significant impacts related to this issue. Impacts related wastewater collection (Impact UT -1) were found to be less than significant. Increased demand for utility infrastructure (Impact UT-2) was found to be significant but mitigable with a variety of mitigation measures to offset potential impacts, including city review and approval of Page 144 of 615 infrastructure plans. The modified phasing plan would still be subject to the same mitigation requirements as each phase develops. Fair share mitigation and development impact fees are paid by the project Developer as each phase is constructed. All backbone utility infrastructure, including main sewer lines, water lines, and the sewer lift station, have already been installed. Reimbursement agreements are in place for oversized infrastructure. No increase in severity of impacts or new mitigation measures would be required. DETERMINATION In accordance with Section 15164 of the State CEQA Guidelines, the City of San Luis Obispo has determined that this Addendum to the certified Final EIR is necessary to document changes or additions that have occurred since the Final EIR was originally certified. The changes proposed would not result in any new significant environmental effects or a substantial increase in the severity of previously identified significant effects. Additionally, no new information of substantial importance that was not known and could not have been known with the exercise of reasonable diligence at the time the previous Final EIR was adopted has been identified. The preparation of a subsequent environmental document is not necessary because: 1. None of the circumstances included in Section 15162 of the CEQA Guidelines have occurred which require a subsequent environmental document: a. The project changes do not result in new or substantially more severe environmental impacts. b. The circumstances under which the project is undertaken will not require major changes to the IS/MND. c. The modified project does not require any substantive changes to previously approved mitigation measures. 2. The changes are consistent with City General Plan goals and polices that promote provision of additional housing within the City. The City has reviewed and considered the information contained in this Addendum and finds that the preparation of subsequent CEQA analysis that would require public circulation is not necessary. This Addendum does not require circulation because it does not provide significant new information that changes the adopted Final EIR in a way that deprives the public of a meaningful opportunity to comment upon a substantial adverse environmental effect of th e project or a feasible way to mitigate or avoid such an effect. The City shall consider this Addendum with the certified Final EIR as part of the basis for potential approval of on- and off- site subdivision improvements for the Avila Ranch Project. Attachment 1: Avila Ranch Phase 4/5 Transportation Analysis, May 9, 2025 Attachment 2: Avila Ranch Transportation Improvement Phasing Plan & Off-Site Construction Requirements Phases 3 to 6, May 8, 2025 Page 145 of 615 Page 146 of 615 (805) 316-0101 895 Napa Avenue, Suite A-6, Morro Bay, CA 93442 MEMORANDUM Date: July 16, 2025 To: Dan Garson, WCP Developers From: Joe Fernandez and Michelle Matson, CCTC Subject: Avila Ranch Phase 4/5/6 Analysis Avila Ranch seeks to advance Phases 5 and 6 of the development prior to Phase 4. The project’s Transportation Impact Study (TIS, CCTC, 2016) recommended roadway connections so volumes would remain within the Circulation Element’s daily volume thresholds. This memorandum evaluates the proposed phasing change as it relates to these thresholds and other identified project impacts. BACKGROUND Venture Drive and Earthwood Lane near the project are evaluated in the TIS as residential collectors, with a daily volume threshold of 3,000 daily vehicles in the Circulation Element. The TIS (page 39) notes that Venture Drive and Earthwood Lane could exceed these daily volume thresholds upon occupancy of Phase 4. The TIS recommends that the project complete the Horizon Lane/Jesperson Road connection to the north prior to Phase 4 to spread traffic so that volumes remain below the thresholds. The project proposes to construct Horizon Lane/Jesperson Road from Venture Drive to Buckley Road for Phases 5 and 6 access. The Horizon Lane/Jesperson Road connection to Suburban Road and improvements to Suburban Road east of Earthwood Lane are proposed following Phases 5 and 6, prior to Phase 4 conditions for design (tied to building permits) and construction (tied to occupancy of the 100th unit). ANALYSIS Combined, Phases 1, 2, and 3 would generate approximately 2,500 daily trips which would be distributed to the local roadways as shown in the image below from the TIS (page 44). Page 147 of 615 2 Avila Ranch Phasing Change –Transportation Analysis Central Coast Transportation Consulting July 16, 2025 With Phases 1, 2, and 3, Earthwood Lane is forecast to carry 1,306 daily vehicles from the project, while Venture Drive is forecast to carry a maximum of 1,314 daily vehicles from the project. Through traffic would increase these volumes, but these flows are expected to be negligible now that the Buckley Road extension is complete. Accordingly, more than 1,500 additional daily trips would be needed to trigger the Circulation Element thresholds on these roadways. Phase 4 would generate 1,195 daily vehicle trips, with 992 daily trips assigned to Venture Drive as shown on the image below (Appendix G of the TIS). Phase 5 would generate 1,098 daily vehicle trips and Phase 6 would generate 1,979 daily vehicle trips. The image below (Appendix G of the TIS) shows the daily traffic volumes with Phases 1-6. The highest volume is on Venture Drive west of Horizon Road/Jesperson Road, where 3,980 daily vehicles are forecast with Phases 1- 6. Without Phase 4 this would be reduced by 992 vehicles for a total 2,988 daily vehicles, below the Circulation Element threshold. Page 148 of 615 3 Avila Ranch Phasing Change –Transportation Analysis Central Coast Transportation Consulting July 16, 2025 Phase 4 is located near the north end of the Avila Ranch development, so the shortest path for those trips to and from destinations to the north would be via Earthwood Lane and Venture Drive. Phases 5 and 6 are located on the south side of the development, adjacent to Buckley Road. Phases 5 and 6 traffic would predominantly use Buckley Road since this route provides a shorter path than a route through the rest of the development via slower speed roads. Similarly, Phases 5 and 6 traffic would not use the segment of Suburban Road east of Earthwood Lane, so the improvements this segment of Suburban Road are not required as a part of Phases 5 and 6. The addition of Phases 5 and 6 traffic to Phases 1, 2, and 3, would not exceed the Circulation Element thresholds. CONCLUSIONS Advancing Phases 5 and 6 so that they are built prior to Phase 4 would not trigger the extension of Horizon Lane/Jesperson Road to Suburban Road since Phase 5 and 6 traffic will primarily use Buckley Road instead of Earthwood Lane and Venture Drive and volumes would remain below Circulation Element thresholds. Similarly, Phases 5 and 6 would not trigger improvements to Suburban Road east of Earthwood Lane. This change to the project phasing would not trigger any new improvements since the Buckley Road extension and Vachel Lane turn restrictions are in place, and the supporting bicycle and pedestrian infrastructure is complete or underway. Please let us know if you have any questions. Page 149 of 615 Page 150 of 615 ATTACHMENT B      Page 151 of 615 Page 152 of 615 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863Page 153 of 615 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863Page 154 of 615 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863Page 155 of 615 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863Page 156 of 615 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863Page 157 of 615 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863Page 158 of 615 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863Page 159 of 615 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863Page 160 of 615 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863Page 161 of 615 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863Page 162 of 615 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863Page 163 of 615 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863Page 164 of 615 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863Page 165 of 615 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863Page 166 of 615 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863Page 167 of 615 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863Page 168 of 615 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863Page 169 of 615 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863Page 170 of 615 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863Page 171 of 615 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863Page 172 of 615 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863Page 173 of 615 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863Page 174 of 615 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863Page 175 of 615 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863Page 176 of 615 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863Page 177 of 615 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863Page 178 of 615 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863Page 179 of 615 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863Page 180 of 615 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863Page 181 of 615 6RXWKZRRG'ULYH6DQ/XLV2ELVSR&$3)Page 182 of 615 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863Page 183 of 615 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863Page 184 of 615 6RXWKZRRG'ULYH6DQ/XLV2ELVSR&$3)Page 185 of 615 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863Page 186 of 615 6RXWKZRRG'ULYH6DQ/XLV2ELVSR&$3)Page 187 of 615 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863Page 188 of 615 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863Page 189 of 615 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863Page 190 of 615 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863Page 191 of 615 1050 Southwood DriveSan Luis Obispo, CA 93401P 805.544.7407 F 805.544.3863Page 192 of 615 TRACT 3089 PHASING PLAN Page 193 of 615 Page 194 of 615 Page 195 of 615 Page 196 of 615 AVILA RANCH PARK LAYOUT PHASE 2-3 PARKS Lot Number on Tract Map Acreage presented to PRC Acreage shown on tract map Park E 326 0.81 0.82 Park D 330 0.38 0.99 Total 1.19 1.81 Other parks shown on exhibit are in phases other than 2-3. PRC = Parks and Recreation Commission Page 197 of 615 Page 198 of 615 612 CLARION COURTwww.wallacegroup.usPLANNINGCONSTRUCTION MANAGEMENTLANDSCAPE ARCHITECTUREMECHANICAL ENGINEERINGPUBLIC WORKS ADMINISTRATIONSURVEYING / GIS SOLUTIONSWATER RESOURCES®OF SHEETS114WE, THE UNDERSIGNED, HEREBY STATE THAT WE ARE ALL THE OWNERS OF, AND ALLRECORD HOLDERS OF SECURITY INTEREST IN, AND ALL PARTIES HAVING ANYRECORD TITLE INTEREST IN THE REAL PROPERTY INCLUDED WITHIN THE SUBDIVISIONAND PROJECT SHOWN ON THIS MAP, AND THAT EACH OF US DOES HEREBY CONSENTTO THE FILING AND RECORDATION OF THIS MAP.THE REAL PROPERTY DESCRIBED BELOW IS DEDICATED AS AN EASEMENT FORPUBLIC PURPOSES: YEAGER COURT, WRIGHT BROTHERS WAY, EARHART WAY,DOOLITTLE DRIVE, COLEMAN LANE, JESPERSON ROAD, VENTURE DRIVE AND HUGHESLANE AND ALSO THE EASEMENTS FOR STREET TREES, BICYCLE TRAIL, ABUTMENTSAND FOOTINGS, PEDESTRIAN ACCESS, DRAINAGE, SANITARY SEWER, AND WATERDESIGNATED AS SHOWN ON THIS MAP.WE HEREBY DEDICATE TO THE PUBLIC FOR PUBLIC USE AND THE BENEFIT OF THESEVERAL PUBLIC UTILITY COMPANIES WHICH ARE AUTHORIZED TO SERVE IN SAIDSUBDIVISION AS DELINEATED ON THIS MAP AS PUBLIC UTILITY EASEMENT OR "P.U.E.".THE REAL PROPERTY DESCRIBED BELOW IS DEDICATED IN FEE SIMPLE:LOTS 386 AND 426 FOR PUBLIC PARK PURPOSES.LOTS 434, 438, AND 439 FOR OPEN SPACE PURPOSES.LOT 435 FOR OPEN SPACE AND AGRICULTURAL PURPOSES.WE HEREBY RESERVE TO OURSELVES, OUR HEIRS, AND ASSIGNS THE PRIVATERECIPROCAL VEHICLE ACCESS, PEDESTRIAN ACCESS, LANDSCAPE, WATER, SEWERAND HOME OWNER'S ASSOCIATION (HOA) LANDSCAPE, IRRIGATION ANDMAINTENANCE EASEMENTS FOR THE USE AND THE BENEFIT OF PRESENT ANDFUTURE OWNERS OF LOTS AFFECTED BY SUCH EASEMENTS DELINEATED ON THISMAP. WE ALSO HEREBY RESERVE TO OURSELVES, OUR HEIRS, AND ASSIGNS THEPRIVATE DRAINAGE EASEMENT FOR THE USE AND BENEFIT OF THE PRESENT ORFUTURE OWNERS OF THE LOTS AFFECTED BY SUCH EASEMENTS AS DELINEATED ONSAID MAP.MRP CALIFORNIA, LLC,A DELAWARE LIMITED LIABILITY COMPANY,DOING BUSINESS IN CALIFORNIA AS MILLROSE CALIFORNIA HOLDINGS, LLCBY: ___________________________________________________NAME:TITLE: AUTHORIZED AGENTOWNER'S STATEMENTVICINITY MAPN.T.S.AIRPORTBUCKLEY RDTANKFARM RDS HIGUERA ST227I, THE UNDERSIGNED, CLERK OF THE CITY OF SAN LUIS OBISPO, STATE OF CALIFORNIA, HEREBY STATETHAT THE CITY COUNCIL OF THE AFORESAID CITY DID ON THE ________DAY OF ________,20___,APPROVE THE MAP OF TRACT NO. 3089 PHASE 5 SHOWN HEREON IN ACCORDANCE WITH THEPROVISIONS OF THE SUBDIVISION MAP ACT AND AGREE TO ACCEPT ON BEHALF OF THE PUBLICEASEMENTS UPON COMPLETION OF THE IMPROVEMENTS TO THE SATISFACTION OF THE CITY:FOR STREET PURPOSES, YEAGER COURT, WRIGHT BROTHERS WAY, EARHART WAY, DOOLITTLE DRIVE,COLEMAN LANE, JESPERSON ROAD, VENTURE DRIVE AND HUGHES LANE DELINEATED ON THIS MAP.THE STREET TREE EASEMENTS, THE BICYCLE TRAIL EASEMENT, THE ABUTMENTS AND FOOTINGSEASEMENT, THE PEDESTRIAN ACCESS EASEMENT, DRAINAGE EASEMENTS, SANITARY SEWEREASEMENT, AND WATER EASEMENT SO DESIGNATED ON THIS MAP.PUBLIC UTILITY EASEMENTS OR "PUE" DELINEATED ON THIS MAP FOR PUBLIC USE AND THE BENEFIT OFTHE SEVERAL PUBLIC UTILITY COMPANIES WHICH ARE AUTHORIZED TO SERVE IN SAID SUBDIVISION.WE AGREE TO ACCEPT THE REAL PROPERTY DESCRIBED BELOW DEDICATED IN FEE SIMPLE UPONCOMPLETION OF THE IMPROVEMENTS TO THE SATISFACTION OF THE CITY:LOTS 386 AND 426 FOR PUBLIC PARK PURPOSES.LOTS 434, 438, AND 439 FOR OPEN SPACE PURPOSES.LOT 435 FOR OPEN SPACE AND AGRICULTURAL PURPOSES.________________________________TERESA PURRINGTON, CITY CLERK ___________________________CITY OF SAN LUIS OBISPO DATED:STATE OF CALIFORNIACITY CLERK'S STATEMENTSURVEYOR'S STATEMENTTHIS MAP WAS PREPARED BY ME OR UNDER MY DIRECTION AND IS BASED UPON AFIELD SURVEY IN CONFORMANCE WITH THE REQUIREMENTS OF THE SUBDIVISIONMAP ACT AND LOCAL ORDINANCE AT THE REQUEST OF ADRIENNE BURNS ON MARCH3, 2021. I HEREBY STATE THAT ALL THE MONUMENTS ARE OF THE CHARACTER ANDOCCUPY THE POSITIONS INDICATED OR THAT THEY WILL BE SET IN THOSE POSITIONSWITHIN ONE YEAR FROM RECORDATION OF THIS MAP, AND THAT THE MONUMENTSARE, OR WILL BE, SUFFICIENT TO ENABLE THE SURVEY TO BE RETRACED, AND THATTHIS FINAL MAP SUBSTANTIALLY CONFORMS TO THE CONDITIONALLY APPROVEDTENTATIVE MAP.______________________________CLAYTON L. BRADSHAW LS 8298DATED:FOR REVIEWPHASE 5 OF MULTIPLE PHASESIN THE CITY OF SAN LUIS OBISPO, COUNTY OF SAN LUIS OBISPO, STATEOF CALIFORNIA. BEING A SUBDIVISION OF A PORTION OF PARCEL B OFTHE AGREEMENT DECLARATION OF LOT LINE ADJUSTMENT SLO AL18-0013 RECORDED IN DOCUMENT NO. 2018-025711 OF OFFICIALRECORDS IN THE OFFICE OF THE COUNTY RECORDER'S OFFICE,COUNTY OF SAN LUIS OBISPO, CALIFORNIA.TRACT MAP NO. 3089PHASE 5No. 8298CITY ENGINEER'S STATEMENTI, GABRIEL MUNOZ-MORRIS, ACTING ON BEHALF OF THE CITY ENGINEER OF THE CITY OF SAN LUIS OBISPO,HEREBY STATE THAT I HAVE EXAMINED THIS MAP. THAT THE SUBDIVISION SHOWN HEREON IS SUBSTANTIALLYTHE SAME AS IT APPEARED ON THE TENTATIVE MAP AND ANY ALTERATIONS THEREOF, AND THAT ALLPROVISIONS OF THE SUBDIVISION MAP ACT AND LOCAL ORDINANCE HAVE BEEN COMPLIED WITH.____________________________________________________GABRIEL MUNOZ-MORRIS, R.C.E. 87574 DATESUPERVISING CIVIL ENGINEERI, DOUGLAS A. RION, ACTING ON BEHALF OF THE CITY ENGINEER OF THE CITY OFSAN LUIS OBISPO, AS ALLOWED UNDER SECTION 66416.5 (C) OF THE SUBDIVISION MAP ACT, DO HEREBY STATETHAT I HAVE EXAMINED THE MAP SHOWN HEREON AND THAT I AM SATISFIED THAT THIS MAP IS TECHNICALLYCORRECT.____________________________________________DOUGLAS A. RION, LS 8546 DATEACTING CITY SURVEYORFILED THIS ______ DAY OF __________, 20_____, AT ________ __.M. IN BOOK ______ OF MAPS, ATPAGE ______, AT THE REQUEST OF CLAYTON L. BRADSHAW.DOCUMENT NO ______________ FEE : $____________________________________COUNTY RECORDER BY:___________________________ DEPUTYCOUNTY RECORDER'S STATEMENTSIGNATURE OMISSIONSTHE SIGNATURES OF THE FOLLOWING HAVE BEEN OMITTED UNDER THE PROVISIONS OFSECTION 66436 (a)-(3)-(A) OF THE SUBDIVISION MAP ACT AS THEIR INTEREST IS SUCH THATIT SHOULD NOT RIPEN INTO FEE TITLE, AND SAID SIGNATURES ARE NOT REQUIRED BY THEGOVERNING BODY.EASEMENT FOR PUBLIC UTILITIES AND INCIDENTAL PURPOSES TO THE SOUTHERNCALIFORNIA GAS COMPANY PER BOOK 2593, PAGE 706 OF OFFICIAL RECORDS.DIOPTICS MEDICAL PRODUCTS, INC., A CALIFORNIA CORPORATION, AN INCIDENTAL RIGHTSOF INGRESS AND EGRESS TO THE EXTENT NECESSARY TO USE THE WELL AND PIPELINEEASEMENT, WHICH ARE LOCATED OUTSIDE THE EXTERIOR BOUNDARY OF THIS MAP, PERINSTRUMENT NO. 2003-126916 OF OFFICIAL RECORDS.UNKNOWN PERSONS, AN EASEMENT FOR INGRESS AND EGRESS PER DOCUMENT NUMBER2001-014104 AND MODIFICATION THEREOF PER DOCUMENT NUMBER 2012-036861 OFOFFICIAL RECORDS.COUNTY OF SAN LUIS OBISPO, AN AVIGATION EASEMENT PER INSTRUMENT NO. 2019-004691OF OFFICIAL RECORDS.TITLE REPORT NO. O.R.T.C. 1421003960PA-DB FEBRUARY 21, 2025RECORDER'S DISCLAIMER:THE TABULATION, LISTING AND NUMBERING OF ANY SEPARATE DOCUMENTS AUTHORIZED TO BERECORDED CONCURRENTLY WITH THIS MAP HAVE BEEN PROVIDED BY THE SUBDIVIDER OR BY THELOCAL AGENCY APPROVING THE MAP. THE COUNTY RECORDER MAKES NO REPRESENTATIONSREGARDING THE ACCURACY OF THE TABULATION, LISTING AND NUMBERING OF ANY SEPARATEDOCUMENTS REFERRED TO ON THE MAP.NOTE: THE FOLLOWING DOCUMENTS AFFECTING THE PROPERTY DENOTED HEREON ARE BEINGRECORDED CONCURRENTLY HEREWITH;1. GRANT DEED PER INSTRUMENT NO. ___________________________________________________________________________2. OFFER OF DEDICATION FOR PUBLIC ROAD EASEMENT (BUCKLEY ROAD) PER INSTRUMENT NO. __________________________________3. OFFER OF DEDICATION FOR DRAINAGE PURPOSES PER INSTRUMENT NO. ________________________________________________4. PRIVATE IMPROVEMENT ENCROACHMENT AGREEMENT PER INSTRUMENT NO. ____________________________________________5. PRIVATE STORMWATER CONVEYANCE SYSTEM AGREEMENT PER INSTRUMENT NO. ________________________________________6. DECLARATION OF ANNEXATION PER INSTRUMENT NO. _________________________________________________________________7. PRIVATE ENCROACHMENT AGREEMENT (NC) PER INSTRUMENT NO. ______________________________________________________8. PRIVATE STORMWATER CONVEYANCE SYSTEM AGREEMENT (NC) PER INSTRUMENT NO. _____________________________________Page 199 of 615 612 CLARION COURTwww.wallacegroup.usPLANNINGCONSTRUCTION MANAGEMENTLANDSCAPE ARCHITECTUREMECHANICAL ENGINEERINGPUBLIC WORKS ADMINISTRATIONSURVEYING / GIS SOLUTIONSWATER RESOURCES®OF SHEETS214ACKNOWLEDGMENTA NOTARY PUBLIC OR OTHER OFFICER COMPLETING THISCERTIFICATE VERIFIES ONLY THE IDENTITY OF THEINDIVIDUAL WHO SIGNED THE DOCUMENT TO WHICH THISCERTIFICATE IS ATTACHED, AND NOT THE TRUTHFULNESS,ACCURACY, OR VALIDITY OF THAT DOCUMENTTRACT MAP NO. 3089PHASE 5SOILS REPORTSOILS ENGINEERING REPORT UPDATEAVILA RANCH DEVELOPMENT PHASE II-VI, BUCKLEY ROAD ANDVACHELL LANEPROJECT: SL09304-10DATED: JANUARY 26, 2022PREPARED FOR: AVILA RANCH DEVELOPERS. INC.PREPARED BY: GEOSOLUTIONS, INC.1021 TAMA LANE, SUITE 105SANTA MARIA, CALIFORNIA 93454(805) 614-6333PHASE 5 OF MULTIPLE PHASESIN THE CITY OF SAN LUIS OBISPO, COUNTY OF SAN LUIS OBISPO, STATEOF CALIFORNIA. BEING A SUBDIVISION OF A PORTION OF PARCEL B OFTHE AGREEMENT DECLARATION OF LOT LINE ADJUSTMENT SLO AL18-0013 RECORDED IN DOCUMENT NO. 2018-025711 OF OFFICIALRECORDS IN THE OFFICE OF THE COUNTY RECORDER'S OFFICE,COUNTY OF SAN LUIS OBISPO, CALIFORNIA.STATE OF CALIFORNIACOUNTY OF _____________________________ON ___________________, 2025, BEFORE ME, ______________________________________________ (INSERT NAME AND TITLE OF THE OFFICER)PERSONALLY APPEARED ____________________________________________________, WHO PROVEDTO ME ON THE BASIS OF SATISFACTORY EVIDENCE TO BE THE PERSON(S) WHOSE NAME(S) IS/ARESUBSCRIBED TO THE WITHIN INSTRUMENT AND ACKNOWLEDGED TO ME THAT HE/SHE/THEYEXECUTED THE SAME IN HIS/HER/THEIR AUTHORIZED CAPACITY(IES), AND THAT BY HIS/HER/THEIRSIGNATURE(S) ON THE INSTRUMENT THE PERSON(S), OR THE ENTITY UPON BEHALF OF WHICH THEPERSON(S) ACTED, EXECUTED THE INSTRUMENT.I CERTIFY UNDER PENALTY OF PERJURY UNDER THE LAWS OF THE STATE OF CALIFORNIA THATTHE FOREGOING PARAGRAPH IS TRUE AND CORRECT.WITNESS MY HAND___________________________________________SIGNATURENAME OF NOTARY PRINTED ________________________________COUNTY OF PRINCIPAL PLACE OF BUSINESS _________________________COMMISSION EXPIRATION DATE _______________1. AVIGATION EASEMENT OVER ALL OF TRACT 3089 PHASE 5 FOR THE COUNTY OF SAN LUISOBISPO PER DOC#2019004691EXISTING EASEMENTPage 200 of 615 99121.31FD 5RB YPC BEN RCE 1???5 DN 1.0132114.17FD 2IN BC CR-10 AVERAGED POSITION147105.53FD 1.25IP YPC ILL DN 2.0 023-CR-107C LS 5 1 3 9 D N . 4 0 2 3 - C R - 1 0 7 149120.76FD 2BC LS 5139 023-CR-107169122.56FD RB YPC ILL TAC AC RTK TREE172114.96FD 1.25IP ID NT LS 3982 DN .6173115.58FD 5RB BEN RCE 12545174116.45FD .7 5 I P I D R C E 9 4 2 5 D N 1 . 1 1760.00FD 5RB BEN RCE 12545 YPC178121.40FD 1.25IP ID NT RCE 9425DN 1.0180114.14FD 1.5IP LS 3982181114.3 4 FD 5 R B N O C A P 1 0 0 - R S - 0 1 4 182115.99FD 5RB EDA LS 5693 UP 0.2 100-RS-014183115.71 FD 5RB BEN RCE 12545184115.40FD 3BC UNION LS 2019 1070103.7 5 FD 5R B 4 2 8 3 R P C1086116.17FD 5RB 6192 OPC DN 0.7FD 5/8" REBAR CAPPED PER RCE 12545 (R7), HELD FORPOINT ON NORTH LINE OF BUCKLEY ROAD N 1°29'01" E20.00' FROM CENTERLINE INTERSECTION##FD 3.5" BRASS CAP INSCRIBED "U.O. NO.11 RHJ LS 2019" IN CONCRETE (R6)60.00' PRIVATE ROADEASEMENT PERDOC#2001-01410415.00' SOCAL GASEASEMENT PER 2593/OR/706439110.96FD5RBLS7561440110.51FD5RBLS7561FD 5/8 " REBAR WITH CAPTAGGED RCE 12545 (R7)S 1° 29' 01" W 1998.39' MS 0° 08' 07" W 1998.48' (R3)CITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LSNF (R3). HELD RECORD DISTANCEOF 20.00' ALONG PROLONGATIONSEE DETAIL 4B, SHEET 4SEE DETAIL 4A, SHEET 4N 77°15'53" E 103.03' MN 77°15'53" E [103.55'](R1)N 56°55'29" E [321.07'] M&(R1)N 38°53'59" E [206.27'] M&(R1)N 53°09'19" E [246.33'] M&(R1)N 11°35'26" E [154.29'] M&(R1)N 42°29'15" E [294.56'] M&(R1)S 70°47'31" E 436.23' M&(R2)N 59°45'25" E 65.56' M&(R2)N 11°13'10" E 273.26' M&(R2)N 43°28'12" E 401.65' M&(R2)N 1°37'01" E 601.54' M&(R2)S 88°32'08" E 54.75' MN 88°42'07" W [54.74'] (R1)N 88°38'54" E 161.73' MN 88°41'58 W 161.81' (R5)14.64'147.09'S 1°19'47" W 231.84'S 6°47'40" E 159.26'S 1°19'46" W 194.95'S 33°03'21" E 307.79'L=137.85', R=295.00',Δ=26°46'27"S 12°26'33" E 48.80'S 88° 42' 44" E 1319.38' M S 89°56'32" W 1319.50' (R3)FD 5/8" REBAR WITH ORANGEPLASTIC CAP LS 6192 DOWN 0.7' (R5)FD 2.5" BRASS DISK IN CONCRETE TAGGED "SLO CO CR. 10 R-78" IN CONCRETE,ACCEPTED FOR BRASS DISK"SLO CO" PER (R1), HELD FOR POINT ON NORTHLINE OF BUCKLEY ROAD, N 1°37'01" E 20.00' FROM CENTERLINE INTERSECTIONBUCKLEY ROADN 1°37'01" E 1978.73' M&(R2)N 82°27'13" E 229.10' M&(R2)L=182.73', R=330.00',Δ=31°43'35"N 88° 22' 25" W42.83'N 1° 37' 01" E58.32'N 1° 37' 01" E20.00'SEE DETAIL 4C, SHEET 4FD 5/8" REBAR WITHCAP RCE 12545 (R2).N 88° 42' 44" W 1319.34' MN 88°42'48" W [1319.40'] (R1)N 83° 43' 07" WRADIAL40' DEDICATION FOR PUBLIC ROAD EASEMENTFROM WILLIAM BUCKLEY, ET AL TO COUNTYOF SAN LUIS OBISPO PER R9612 CLARION COURTwww.wallacegroup.usPLANNINGCONSTRUCTION MANAGEMENTLANDSCAPE ARCHITECTUREMECHANICAL ENGINEERINGPUBLIC WORKS ADMINISTRATIONSURVEYING / GIS SOLUTIONSWATER RESOURCES®OF SHEETS3140BOUNDARY SHEETFD 5/8" REBAR CAPPED RCE12545 PER (R7), MONUMENT#4 ON DETAIL 4C, SHEET 4DIAGRAM NOT TO SCALEPT#8109PT#8091N 76° 51' 47" E 10,889.07'N 16° 56' 51" E3,642.14'BASIS OF BEARINGSBASIS OF BEARINGSTHE BASIS OF BEARINGS FOR THIS SURVEY IS THE BEARING BETWEEN THE CITY OF SAN LUISOBISPO'S JANUARY 2007 HORIZONTAL CONTROL NETWORK POINT #8109 AND POINT #8091,BEARING BEING NORTH 76°51'47" EAST CALCULATED FROM (R4). FOUND #8109 IS A BRASSSCREW IN CONCRETE IN MONUMENT WELL AT THE CENTERLINE INTERSECTION OF LASPRADERAS AND MARIPOSA/CHUPARROSA STREETS, NORTHING: 2286220.263' EASTING:5762972.262'. FOUND #8091 IS A PIN IN CONCRETE IN A MONUMENT WELL AT THE CENTERLINEINTERSECTION OF INDUSTRIAL WAY AND SACRAMENTO STREETS, NORTHING: 2288695.139'EASTING: 5773576.358'. CALIFORNIA COORDINATE SYSTEM ZONE 5, 1991.35 EPOCH ADJUSTMENTOF THE NORTH AMERICAN DATUM OF 1983.DISTANCES SHOWN HEREON, ARE GRID DISTANCES. TO CALCULATE GROUND DISTANCES DIVIDETHE DISTANCES SHOWN BY THE COMBINATION FACTOR 0.9999585868TRACT MAP NO. 3089 PHASE 5N 35° 12' 37" E2,384.57'N 63° 50 50" E9,099.08'FD 5/8" REBAR WITH CAP RCE 12545 PER (R2)BEING THE NORTHWEST CORNER OF PROJECTPHASE 5 OF MULTIPLE PHASESIN THE CITY OF SAN LUIS OBISPO, COUNTY OF SAN LUIS OBISPO, STATEOF CALIFORNIA. BEING A SUBDIVISION OF A PORTION OF PARCEL B OFTHE AGREEMENT DECLARATION OF LOT LINE ADJUSTMENT SLO AL18-0013 RECORDED IN DOCUMENT NO. 2018-025711 OF OFFICIALRECORDS IN THE OFFICE OF THE COUNTY RECORDER'S OFFICE,COUNTY OF SAN LUIS OBISPO, CALIFORNIA.FOUND MONUMENT AS NOTEDSET NAIL AND TAG LS 8298 PRODUCED INTO THE STREET 0.20' FROMTHE TRUE CORNER, SEE DETAIL 10B ON SHEET 10 FOR OFFSETINFORMATIONSET 1" IRON PIPE CAPPED LS 8298, UNLESS OTHERWISE NOTEDSET 2.5" BRASS CAP INSCRIBED LS 8298 IN STANDARD CITYCENTERLINE MONUMENT WELLM MEASUREDRAD RADIALR1 041/MB/048, DISTANCES REDUCE TO GRIDR2 TRACT 3089 PHASES 2 & 3, SURVEY IN PROGRESSR3 076/RS/006R4 CITY OF SAN LUIS OBISPO HORIZONTAL CONTROL NETWORK (2007)R5 028/CR/084R6 002/RS/055R7 081/RS/032R8 099/RS/044R9 6/DEEDS/49LEGENDNOTE: THE SCALE FACTOR SHOWN ON R1 IS INCORRECT. R1 DISTANCESIN BRACKETS [ ] ARE REDUCED TO GRID, USING THE CORRECT SCALEFACTOR OF 0.999942147.TRACT BOUNDARYCITY LIMITSCITY-LPage 201 of 615 WRIGHT BROTHERS WAYS 10° 03' 39" E57.84'L =5 9 .4 8 ',R =1 1 2 .87'Δ =3 0 °1 1 '2 8 "S 33° 00' 10" E6.25'L=6.39', R=32.87'Δ=11° 07' 46"L=63.90',R=92.87'Δ=39°25'24"S 89° 11' 42" W35.27'L=22.91', R=179.13'Δ=7° 19' 45"N 83° 28' 33" W28.09'S 59° 18' 30" W10.65'S 88° 03' 48" W57.83'L=48.23', R=112.88'Δ=24° 28' 49"L=18.33', R=32.87'Δ=31° 57' 07"L=52.58', R=92.87'Δ=32° 26' 10"S 0° 48' 19" E35.27'L=22.91', R=179.12'Δ=7° 19' 45"S 6° 31' 26" W26.99'S 88° 03' 48" W54.64'S 1° 19' 47" W48.00'N 56° 28' 45" W11.08'N 88° 40' 13" W17.72'S 1° 19' 46" W194.95'S 6° 47' 40" E159.26'#1N 56°55'29" E 321.07' MN 56°55'29" E [321.06'](R1)SNF (R3). HELD RECORD DISTANCE OF 20.00' ALONG PROLONGATION15.00' SOCAL GAS EASEMENTPER 2593/OR/706S 88° 42' 44" E392.42'BUCKLEY ROADN 77°15'53" E 103.03' MN 77°15'53" E [103.55'](R1)N 88°42'44" W 1711.81' MN 89°55' W 1710.6' (R9)S 82°57'56" W 199.35' MS 81°38' W 199.2' (R9)N 88°42'45" W 1319.35' MN 88°42'48" W [1319.40'] (R1)S 89°56'32" ' W 1319.50' (R3)N 88°42'45" W 726.36' MN88°42'48"W [725.89' ](R1)VACHELL LANE40' DEDICATION FOR PUBLIC ROAD EASEMENT FROM WILLIAMBUCKLEY, ET AL TO COUNTY OF SAN LUIS OBISPO PER R920'20'N 88°42'44" W 593.07' M N88°42'48"W [593.51'] CF(R1)N 88°42'44" W 1319.34' MN88°42'48"W [1319.40'] (R1)63.98'138.19'N 1° 29' 01" E20.00'N 1°37'01" E 20.00' MN 1°36'56" E [20.00'] (R1)N 88°42'44" W 1319.39' M S 89°56'32" W 1319.50' R7SNF (R7). HELD RECORD DISTANCEOF 20.00' ALONG PROLONGATIONN 87°11'04" W 707.00' MN 88°31' W 706.5' (R9)17'23'N 0°51'28" E 1982.22' MN 0°29'19" W 1982.42' CF(R8)#2#3#4#540' ROAD DEDICATIONPER 6/DEEDS/4961.16'N 88°42'47" W 2618.83' M S 89°56'32"W 2619.00' R2CITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LC.R. NO. 4C.R. NO. 8 - 20' NORTH OF SECTION LINEC.R. NO. 1020' RIGHT OF WAY PER R7N 67°47'47" E 25.09' MN 66°30'05" E 25.08' CF(R9)BB529.09'VENTURE DRIVES 24° 52' 43" E6.25'S 1° 56' 13" E57.84'L=48.23', R=112.88'Δ=24° 28' 50"L=18.33', R=32.88'Δ=31° 57' 05"S 78° 53' 34" E19.04'N 66° 23' 36" E2.45'L=31.29', R=90.88'Δ=19° 43' 41"N 89° 11' 42" E35.27'L=22.91', R=179.13'Δ=7° 19' 40"S 83° 28' 33" E29.81'S 51° 48' 02" E9.58'N 88° 03' 48" E54.64'N 59° 18' 30" E10.65'N 88° 03' 48" E57.83'S 75° 37' 38" W12.33'L=23.41', R=110.87'Δ=12° 05' 50"L=28.97', R=30.88'Δ=53° 45' 27"L=20.73', R=90.87'Δ=13° 04' 20"S 2° 59' 00" W19.04'S 8° 55' 45" E35.27'L=22.91', R=179.13'Δ=7° 19' 45"S 1° 36' 00" E26.99'S 88° 40' 13" E17.72'S 1° 19' 47" W48.00'S 6° 47' 40" E159.26'S 1° 19' 47" W231.84'N 30° 45' 05" ERADIALN 11° 01' 24" ERADIALS 0° 48' 13" ERADIALS 87° 06' 02" ERADIALS 8° 10' 25" ERADIAL612 CLARION COURTwww.wallacegroup.usPLANNINGCONSTRUCTION MANAGEMENTLANDSCAPE ARCHITECTUREMECHANICAL ENGINEERINGPUBLIC WORKS ADMINISTRATIONSURVEYING / GIS SOLUTIONSWATER RESOURCES®OF SHEETS414BOUNDARY SHEETTRACT MAP NO. 3089 PHASE 5PHASE 5 OF MULTIPLE PHASESIN THE CITY OF SAN LUIS OBISPO, COUNTY OF SAN LUIS OBISPO, STATEOF CALIFORNIA. BEING A SUBDIVISION OF A PORTION OF PARCEL B OFTHE AGREEMENT DECLARATION OF LOT LINE ADJUSTMENT SLO AL18-0013 RECORDED IN DOCUMENT NO. 2018-025711 OF OFFICIALRECORDS IN THE OFFICE OF THE COUNTY RECORDER'S OFFICE,COUNTY OF SAN LUIS OBISPO, CALIFORNIA.DETAIL 4BSCALE 1" = 40'SCALE 1" = 50'DETAIL 4CFOUND MONUMENT AS NOTEDSET NAIL AND TAG LS 8298 PRODUCED INTO THE STREET 0.20' FROM THETRUE CORNER, SEE DETAIL 10A ON SHEET 10 FOR OFFSET INFORMATIONSET 1" IRON PIPE CAPPED LS 8298, UNLESS OTHERWISE NOTEDSET 2.5" BRASS CAP INSCRIBED LS 8298 IN STANDARD CITY CENTERLINEMONUMENT WELLMONUMENT TO BE SET PER R1. NO MONUMENT PRESENT AT TIME OFSURVEYM MEASUREDBB BEARING/BEARING INTERSECTIONRAD RADIALR1 041/MB/048, DISTANCES REDUCE TO GRIDR2 TRACT 3089 PHASES 2 & 3, SURVEY IN PROGRESSR3 076/RS/006R4 CITY OF SAN LUIS OBISPO HORIZONTAL CONTROL NETWORK (2007)R5 028/CR/084R6 002/RS/055R7 081/RS/032R8 099/RS/044R9 6/DEEDS/49LEGENDNOTE: THE SCALE FACTOR SHOWN ON R1 IS INCORRECT. R1 DISTANCESIN BRACKETS [ ] ARE REDUCED TO GRID, USING THE CORRECT SCALEFACTOR OF 0.999942147.TRACT BOUNDARYCITY LIMITSCITY-LSURVEY NOTES:1. BUCKLEY ROAD IS SHOWN HEREON PER 6/DEEDS/49.1.a. A CHAINING INDEX HAS BEEN USED AND APPLIED EQUALLY FOR THETHREE COURSES BETWEEN C.R. 10 AND C.R. 4.1.b. GRANT LINE ADJUSTMENT USED BETWEEN C.R. NO. 8 AND C.R. NO. 42. THE CITY LIMITS IS MAPPED PER DOCUMENT NO. 2008032825. SAIDDOCUMENT FOLLOWS THE NORTH LINE OF BUCKLEY ROAD AS SHOWN ON(R3).DETAIL 4ASCALE 1" = 40'MONUMENTS:#1. FOUND 5/8" REBAR WITH PLASTIC CAP IN ASPHALT, ILLEGIBLE. ACCEPTED PER (R8)#2. FOUND 5/8" REBAR WITH PLASTIC CAP WITH ILLEGIBLE SCRIBING ACCEPTED ASQUARTER CORNER OF SECTIONS 10 & 15 PER (R8).#3. FOUND 5/8" REBAR WITH PLASTIC CAP WITH ILLEGIBLE SCRIBING. ACCEPTED ASCORNER USED FOR CITY LIMITS PER DOC. NO. 2008032825.#4. FOUND 5/8" REBAR WITH PLASTIC CAP INSCRIBED "RCE 12545". ACCEPTED PER (R7)#5. FOUND 2.5" BRASS DISK TAGGED "SLO CO C.R. 10 R-78" IN CONCRETE, ACCEPTED FORBRASS DISK "SLO CO" PER (R1), HELD FOR POINT ON NORTH LINE OF BUCKLEY ROAD.Page 202 of 615 352353354351350349348347346345344343342341340339337336335334333332331362365363360359358357356355380379378377376375374373372370381382383384385386391392390389388387403402404425405424401400407406408399420409398397410419418411396395394393412413414417416415433432431430429428427426368369366367386 434434435423422421361434HUGHES LANEEARHART WAYCOLEMAN LANEYEAGERCOURTWRIGHT BROTHERS WAYSHEET 6SHEET 8SHEET 9SHEET 10371364338DOOLITTLE DRIVESHEET 7SHEET 13CITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-L 436 437 438 439SHEET 12SHEET 11JESPERSEN ROADVENTURE DRIVEBUCKLEY ROAD612 CLARION COURTwww.wallacegroup.usPLANNINGCONSTRUCTION MANAGEMENTLANDSCAPE ARCHITECTUREMECHANICAL ENGINEERINGPUBLIC WORKS ADMINISTRATIONSURVEYING / GIS SOLUTIONSWATER RESOURCESOF SHEETS5140TRACT MAP NO. 3089 PHASE 5PHASE 5 OF MULTIPLE PHASESIN THE CITY OF SAN LUIS OBISPO, COUNTY OF SAN LUIS OBISPO, STATEOF CALIFORNIA. BEING A SUBDIVISION OF A PORTION OF PARCEL B OFTHE AGREEMENT DECLARATION OF LOT LINE ADJUSTMENT SLO AL18-0013 RECORDED IN DOCUMENT NO. 2018-025711 OF OFFICIALRECORDS IN THE OFFICE OF THE COUNTY RECORDER'S OFFICE,COUNTY OF SAN LUIS OBISPO, CALIFORNIA.INDEX SHEET®Page 203 of 615 N 38° 53' 59" E206.27' M & (R1)TLPTA1PTWASWPTCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LPTPTLO66LOT 3386650 S.F.LOT 3376650 S.F.LOT 3366650 S.F.LOT 3356650 S.F.LOT 3346611 S.F.LOT 3337514 S.F.LOT 3327900 S.F.LOT 3317900 S.F.LOT 3654750 S.F.LOT 3644750 S.F.LOT 3634750 S.F.LOT 3724750 S.F.LOT 3714750 S.F.LOT 3704750 S.F.LOT 3685204 S.F.LOT 3694750 S.F.LOT 3664750 S.F.LOT 3675204 S.F.LOT 434OPEN SPACE6.28 ACRESRAD121.00'20.00'20.00'HUGHES LANEDOOLITTLE DRIVECOLEMAN LANELOT 435OPEN SPACE/AGRICULTRAL7.32 ACRESBUCKLEY ROAD27.00'RAD229.00'29.00'29.00'10.00'10.00'29.00'SEE DETAIL 7A, SHEET 720.00'5.00'15.00' SOCAL GAS EASEMENT PER 2593/OR/706OFFER OF DEDICATION FOR PUBLIC ROAD EASEMENT.RECORDED CONCURRENTLY WITH THIS MAP.15.00PER 2EASEMENT FOR DRAINAGE PURPOSES.RECORDED CONCURRENTLY WITH THISMAP.N 88°42'44 W 1319.34' MS 89°56'32" 1319.50' (R7)N 88°42'44 W 1319.34' MN 88°42'48" W [1319.40'] (R1)SEE DETAIL 4C, SEE SHEET 4FD 5/8" REBAR WITH PLASTIC CAPINSCRIBED "RCE 12545" PER (R7)10.00'10.00'10.00'N 1° 19' 47" E170.00'C11L=8.33', R=45.00''=10° 36' 04"N 1° 19' 47" E97.15'C4C6C5C8C3N 11° 35' 26" E 154.29' M & (R1)N 53° 09' 19" E 246.33' M & (R1)N 56° 55' 29" E 321.07' M & (R1)N 1° 16' 58" E145.14'N 66° 24' 22" E220.54'149.26'22.88'L9L13L=40.33', R=72.00''=32° 05' 47"L1L2L3L4C10L817.33'10.15'L5L6L12L7S 88° 40' 13" E657.58'L=21.31', R=72.00''=16° 57' 40"L10N 57° 36' 16" W90.83'L=24.90', R=190.50''=7° 29' 18"N 50° 06' 58" W252.57'L=113.32',R=169.94'D=38°12'22"N 89° 47' 28" W484.62'S 88° 42' 44" E314.99'N 88° 42' 44" W77.45'N 1° 19' 47" E158.00'N 1° 19' 47" E158.00'N 1° 19' 47" E158.00'N 01° 19' 47" E134.98'N 01° 19' 47" E133.00'N 01° 19' 47" E133.00'N 01° 19' 47" E133.00'N 01° 19' 47" E133.00'N 01° 19' 47" E133.00'50.00'50.00'50.00'50.00'50.00'50.00'50.00'50.050.00'50.00'50.00'50.00'50.00'50.00'50S 88° 40' 13" E954.10'S 88° 40' 13" E 1203.97'55.00'50.00'50.00'C1C2C3C7C945.00'50.00'50.00'50.00'50.00'50.00'50.00'85.00'85.00'45.00'50.00'50.00'50.00'50.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'4.87'N 88° 40' 13" W675.00'98.06'23.34'N 88° 40' 13" W100.00'10.00' PRIVATE DRAINAGE EASEMENT PER THIS MAP5.00' PRIVATE DRAINAGE EASEMENT PER THIS MAPS 1° 19' 47" W27.89'N 53° 10' 59" W46.21'N 23° 57' 06" W65.22'N 31° 52' 37" W75.68'10.00'S 88° 40' 13" E1150.00'133.60'5.00'39.68'L1140.11'LS 01° 19' 47" W122.93'S 60° 51' 04" E11.44'S 86° 22' 37" ES 31° 54' 24" E12.31'S 12° 43' 35" E6.74'S 81° 21' 08" E254.11'9.89'1163.8623.34'40' DEDICATION FOR PUBLIC ROAD EASEMENT FROM WILLIAMBUCKLEY, ET AL TO COUNTY OF SAN LUIS OBISPO PER R920.00'20.00'PTTLA1WASWPTEASEMENT LEGENDPUBLIC UTILITY EASEMENT AND STREET TREE EASEMENT PER THIS MAPBICYCLE TRAIL EASEMENT PER THIS MAPPRIVATE RECIPROCAL VEHICLE AND PEDESTRIAN ACCESS,DRAINAGE, WATER AND SEWER EASEMENTS AND PUE PER THIS MAPPUBLIC SEWER & WATER EASEMENT PER THIS MAPPRIVATE RECIPROCAL WATER EASEMENT PER THIS MAPPUBLIC UTILITY EASEMENT PER THIS MAPSTREET TREE EASEMENT PER THIS MAPLLANDSCAPE, IRRIGATION, AND MAINTENANCE EASEMENT PER THIS MAPLINE TABLELINEL1L2L3L4L5L6L7L8L9L10L11L12L13LENGTH125.68'99.85'74.95'74.94'21.61'24.17'50.47'36.39'42.20'119.39'14.27'21.06'40.53'BEARINGS88° 42' 36"EN88° 42' 36"WS51° 20' 53"WN51° 20' 53"ES88° 40' 13"EN88° 40' 13"WS1° 19' 47"WS55° 07' 01"EN1° 19' 47"EN88° 40' 13"WN59° 53' 18"EN53° 09' 19"EN55° 07' 01"WCURVE TABLECURVE #C1C2C3C4C5C6C7C8C9C10C11LENGTH8.33'37.37'49.53'21.64'98.80'21.64'15.71'21.64'15.71'52.84'8.33'RADIUS45.00'72.00'72.00'75.00'46.00'75.00'10.00'75.00'10.00'72.00'45.00'DELTA10°36'04"29°44'29"39°25'06"16°31'42"123°03'24"16°31'42"90°00'00"16°31'44"90°00'00"42°02'53"10°36'25"RADIAL TABLELINE #RAD1RAD2DIRECTIONS20° 28' 12"WS59° 53' 18"W612 CLARION COURTwww.wallacegroup.usPLANNINGCONSTRUCTION MANAGEMENTLANDSCAPE ARCHITECTUREMECHANICAL ENGINEERINGPUBLIC WORKS ADMINISTRATIONSURVEYING / GIS SOLUTIONSWATER RESOURCES®OF SHEETS61405010025SCALE1 INCH = 50 FEETSHEET 7TRACT MAP NO. 3089 PHASE 5LEGENDSHEET 10FOUND MONUMENT AS NOTEDSET 1" IRON PIPE CAPPED LS 8298, UNLESS OTHERWISE NOTEDSET NAIL AND TAG LS 8298 PRODUCED INTO THE STREET 0.20' FROM THETRUE LOT CORNER. SEE DETAIL 10A ON SHEET 10 FOR OFFSETINFORMATIONSET NAIL AND TAG LS 8298 PRODUCED 1.00' FROM THE TRUE LOT CORNER ALONG THE LOT LINE. SEE DETAIL 10B, SHEET 10 FOR OFFSETINFORMATIONSET 2.5" BRASS CAP INSCRIBED LS 8298 IN STANDARD CITY CENTERLINEIN MONUMENT WELLM MEASUREDRAD RADIALR1 041/MB/048, DISTANCES REDUCE TO GRIDR2 TRACT 3089 PHASES 2 & 3, SURVEY IN PROGRESSR7 081/RS/032R9 6/DEEDS/49PHASE 5 OF MULTIPLE PHASESIN THE CITY OF SAN LUIS OBISPO, COUNTY OF SAN LUIS OBISPO, STATEOF CALIFORNIA. BEING A SUBDIVISION OF A PORTION OF PARCEL B OFTHE AGREEMENT DECLARATION OF LOT LINE ADJUSTMENT SLO AL18-0013 RECORDED IN DOCUMENT NO. 2018-025711 OF OFFICIALRECORDS IN THE OFFICE OF THE COUNTY RECORDER'S OFFICE,COUNTY OF SAN LUIS OBISPO, CALIFORNIA.FOR INFORMATIONAL PURPOSES, LOT 434 OR PORTIONS THEREOF, ARE IN THECURRENT 100-YEAR FLOOD PLAIN. PORTIONS OF LOT 434 WILL BE OUT OF THE 100-YEARFLOOD PLAIN AFTER SITE GRADING IS PERFORMED AND THE REVISED FLOODPLAIN ISRECOGNIZED BY FEMA (CLOMR CASE 22-09-0955R), AS SHOWN ON SHEET 14100-YEAR FLOOD PLAIN NOTES 88° 40' 13" 651.00'N 86° 22' 37" W 161.34'Page 204 of 615 TLA2A2A2PTPTPTCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LPTPTPTPTPTPTPTLOT 356650 SLOT 3506650 S.F.LOT 3496650 S.F.LOT 3486650 S.F.LOT 3476650 S.F.LOT 3466650 S.F.LOT 3456650 S.F.LOT 3446650 S.F.LOT 3436650 S.F.LOT 3426650 S.F.LOT 3416650 S.F.LOT 3406650 S.F.LOT 3396650 S.F.LOT 3386650 S.F.LOT 3376650 S.F.LOT 3624750 S.F. 3650 S.F.LOT 3644750 S.F.LOT 3634750 S.F.LOT 3614750 S.F.LOT 3605462 S.F.LOT 3595462 S.F.LOT 3584750 S.F.LOT 3574750 S.F.LOT 3564750 S.F.LOT 3555183 S.F.LOT 3805183 S.F.LOT 3794750 S.F.LOT 3784750 S.F.LOT 3774750 S.F.LOT 3765462 S.F.LOT 3755462 S.F.LOT 3744750 S.F.LOT 3734750 S.F.LOT 3724750 S.F.LOT 3714750 S.F.T 3700 S.F.LOT 3965938 S.F.LOT 3954750 S.F.LOT 3944750 S.F.LOT 3935192 S.F.20.0015.00'LANEHUGHES LANEEARHART WAYOOLITTLE DRIVE29.00'29.00'10.00'10.00'29.00'29.00'29.00'29.00'29.00'29.0010.00'7.50'7.50'20.00'15.00' SOCAL GAS EASEME15.00' SOCAL GAS EASEMENTPER 2593/OR/70621.00'BUCKLEY ROADEASEMENT FOR DRAINAGE PURPOSES.RECORDED CONCURRENTLY WITH THISMAP.N 88°42'44 W 1319.34' MS 89°56'32" 1319.50' (R7)N 88°42'44 W 1319.34' MN 88°42'48" W [1319.40'] (N 88°42'44 W 1319.34' MS 89°56'32" 1319.50' (R7)N 88°42'44 W 1319.34' MN 88°42'48" W [1319.40'] (R1)OFFER OF DEDICATION FOR PUBLIC ROADEASEMENT. RECORDED CONCURRENTLYWITH THIS MAP.DOOLITTLE DRIVE5.00' PRIVATE DRAINAGE EASEMENT PER THIS MAP10.00'N 88° 40' 13" W651.00'N 88° 40' 13" W651.00'N 1° 19' 47" E162.00'N 88° 40' 13" W240.63'C19 N 88° 40' 13" W657.58'N 88° 40' 13" WN 88° 40' 13" W657.58'N 1° 19' 47" E587.67'248.00'N 88° 40' 13" W954.10'S 01° 19' 47" W581.09'N 01° 19' 47" E605.09'N 89° 47' 28" W484.62'N 88° 38' 43" W158.47'L=39.78', R=169.50''=13° 26' 46"S 77° 54' 31" W80.06'L=45.56', R=190.50''=13° 42' 08"N 88° 23' 21" W214.22'N 01° 19' 47" E133.00'N 01° 19' 47" E133.00'N 01° 19' 47" E133.00'N 01° 19' 47" E133.00'N 01° 19' 47" E133.00'N 01° 19' 47" E133.00'N 01° 19' 47" E133.00'N 01° 19' 47" E133.00'N 01° 19' 47" E133.00'N 01° 19' 47" E133.00'N 01° 19' 47" E133.00'N 01° 19' 47" E133.00'N 01° 19' 47" E133.00'N 01° 19' 47" E133.00'N 01° 19' 47" E133.00'50.00'50.00'50.00'50.00'50.00'50.00'50.00'50.00'50.00'50.00'50.00'50.00'50.00'50.00'50.050.00'50.00'50.00'50.00'50.00'50.00'50.00'50.00'50.00'50.00'50.00'50.00'50.00'50.00'50.00'954.10'0.00'50.00'50.00'50.00'50.00'50.00'50.00'50.00'N 88° 40' 13" W1203.97'57.50'57.50'50.00'50.00'50.00'41.00'50.00'57.50'57.50'50.00'50.00'50.00'55.00'0'50.00'50.00'50.00'50.00'57.50'57.50'50.00'50.00'50.00'41.00'81.00'81.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 1° 19' 47" E95.00'55.09'50.00'50.00'62.50'41.09'50.00'50.00'62.50'62681.00'N 88° 40' 13" W95.00'N 8N 88° 1N 88° 40' 13" W95.00'N 88° 40' 13" W95.00'N 88° 40' 13" W95.00'N 88° 40' 13" W675.00'C13 C12S 88° 40S 88°5.00'10.00'10.00'10.00'10.00'10.00'5.00'29.00'29.00'S 88° 40' 13" E1150.00'S 88° 40' 1LL5.00' PRIVATE DRAINAGE EASEMENT PER THIS MAP147.93'S 86° 22' 37" E161.34'S 87° 00' 22" E116.24'S 87° 47' 47" E53.68'S 89° 48' 35" E60.08'S 89° 48' 57" E418.98'N SEE23.34'LOT 435OPEN SPACE/AGRICULTRAL7.32 ACRESLOT 435OPEN SPACE/AGRICULTRAL7.32 ACRES40' DEDICATION FOR PUBLIC ROAD EASEMENT FROM WILLIAMBUCKLEY, ET AL TO COUNTY OF SAN LUIS OBISPO PER R920.00'20.00'40' DEDICATION FOR PUBLIC ROAD EASEAL TO COUNTY OF SAN LUIS OBISPO PE20.00'20.00'CURVE TABLECURVE #C10C12C13C19LENGTH52.84'21.99'21.99'21.99'RADIUS72.00'14.00'14.00'14.00'DELTA42°02'53"90°00'00"90°00'00"90°00'00"A1A2PTTLWASWPTPRIVATE RECIPROCAL VEHICLE AND PEDESTRIAN ACCESS,DRAINAGE, WATER AND SEWER EASEMENTS AND PUE PER THIS MAPPRIVATE RECIPROCAL LANDSCAPE, DRAINAGE, WATER, SEWER &PEDESTRIAN ACCESS EASEMENT PER THIS MAPPUBLIC UTILITY EASEMENT AND STREET TREE EASEMENT PER THIS MAPEASEMENT LEGENDBICYCLE TRAIL EASEMENT PER THIS MAPPUBLIC SEWER & WATER EASEMENT PER THIS MAPPRIVATE RECIPROCAL WATER EASEMENT PER THIS MAPPUBLIC UTILITY EASEMENT PER THIS MAPSTREET TREE EASEMENT PER THIS MAPDDRAINAGE EASEMENT PER THIS MAPLLANDSCAPE, IRRIGATION, AND MAINTENANCE EASEMENT PER THIS MAPLINE TABLELINEL5L6L7L9L10L11LENGTH21.61'24.17'50.47'42.20'119.39'14.27'BEARINGS88° 40' 13"EN88° 40' 13"WS1° 19' 47"WN1° 19' 47"EN88° 40' 13"WN59° 53' 18"ERADIAL TABLELINE #RAD2DIRECTIONS59° 53' 18"WWASWSWWAA1RAD2LOT 3317900 S.F.LOT 3327900 S.F.LOT 434OPEN SPACE6.18 ACRES27.00'20.00'20.00'EASEMENT FOR DRAINAGE PURPOSES.RECORDED CONCURRENTLY WITH THISMAP.20.00'L9L10S 1° 19' 47" W39.00'L11N 88° 40' 13" W100.00'23.50N 32° 36' 22" E14.04'S 88° 40' 13" E28.21'31.47N 88° 40' 13" W139.39'L720.0050.00'50.00'L616.89'20.00L=21.31', R=72.00''=16° 57' 40"N 1° 19' 47" E158.00'S 1° 19' 47" W158.00'N 1° 19' 47" E158.00'L5C10D10.00'PT612 CLARION COURTwww.wallacegroup.usPLANNINGCONSTRUCTION MANAGEMENTLANDSCAPE ARCHITECTUREMECHANICAL ENGINEERINGPUBLIC WORKS ADMINISTRATIONSURVEYING / GIS SOLUTIONSWATER RESOURCES®OF SHEETS7140 50 10025SCALE1 INCH = 50 FEETTRACT MAP NO. 3089 PHASE 5SHEET 6SHEET 10SHEET 8SET NAIL AND TAG LS 8298 PRODUCEDINTO THE STREET 0.20' FROM THE TRUELOT CORNER. SEE DETAIL 10A ON SHEET10 FOR OFFSET INFORMATIONSET NAIL AND TAG LS 8298 PRODUCED1.00' FROM THE TRUE LOT CORNER ALONGTHE LOT LINE. SEE DETAIL 10B, SHEET 10FOR OFFSET INFORMATIONSET 2.5" BRASS CAP INSCRIBED LS 8298 INSTANDARD CITY CENTERLINE INMONUMENT WELLM MEASUREDRAD RADIALR1 041/MB/048, DISTANCES REDUCE TO GRIDR2 TRACT 3089 PHASES 2 & 3, SURVEY INPROGRESSR7 081/RS/032R9 6/DEEDS/49PHASE 5 OF MULTIPLE PHASESIN THE CITY OF SAN LUIS OBISPO, COUNTY OF SAN LUIS OBISPO, STATEOF CALIFORNIA. BEING A SUBDIVISION OF A PORTION OF PARCEL B OFTHE AGREEMENT DECLARATION OF LOT LINE ADJUSTMENT SLO AL18-0013 RECORDED IN DOCUMENT NO. 2018-025711 OF OFFICIALRECORDS IN THE OFFICE OF THE COUNTY RECORDER'S OFFICE,COUNTY OF SAN LUIS OBISPO, CALIFORNIA.SHEET 9DETAIL 7ASCALE 1" = 20'LEGENDFOUND MONUMENT AS NOTEDSET 1" IRON PIPE CAPPED LS 8298, UNLESSOTHERWISE NOTEDFOR INFORMATIONAL PURPOSES, LOT 434 OR PORTIONS THEREOF, ARE IN THE CURRENT 100-YEAR FLOOD PLAIN. PORTIONS OF LOT 434WILL BE OUT OF THE 100-YEAR FLOOD PLAIN AFTER SITE GRADING IS PERFORMED AND THE REVISED FLOODPLAIN IS RECOGNIZED BY FEMA(CLOMR CASE 22-09-0955R), AS SHOWN ON SHEET 14100-YEAR FLOOD PLAIN NOTESHEET 8N 81° 21' 08" W 254.11'Page 205 of 615 TLA2A2PTA1PTPTCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LPPPTPTPTPTPTPTPTPTLOT 3526650 S.F.LOT 3536650 S.F.LOT 3549961 S.F.LOT 3516650 S.F.LOT 3506650 S.F.LOT 3496650 S.F.LOT 3486650 S.F.LOT 3476650 S.F.LOT 3466650 S.F.LOT 3456650 S.F.LOT 3446650 S.F.OT 35850 S.F.LOT 3574750 S.F.LOT 3564750 S.F.LOT 3555183 S.F.LOT 3805183 S.F.LOT 3794750 S.F.LOT 3784750 S.F.T 3770 S.F.LOT 4186875 S.F.LOT 4118125 S.F.LOT 3965938 S.F.LOT 3954750 S.F.LOT 3944750 S.F.LOT 3935192 S.F.LOT 4126500 S.F.LOT 4136500 S.F.LOT 4147162 S.F.LOT 4175500 S.F.LOT 4165500 S.F.LOT 4156560 S.F.LOT 426PUBLIC PARK1.64 ACRESL=99.12',R=179.00'∆=31°43'34"20.00'20.00'HUGHES LANEEARHART WAY29.00'29.00'29.00'29.00'29.00'29.0SEE DETAIL 8A, SHEET 8ALLEY 2420.00'10.00'10.00'10.00'10.00'JESPERSEN ROADFD 2" BRASS DISK IN CONCRETE TAGGED"SLO CO CR. 10 R-78" IN CONCRETE (R5)15.00' SOCAL GAS EASEMENT PER 2593/OR/706BUCKLEY ROAD(COUNTY ROAD A2089)30.00'30.00'21.00'EASEMENT FOR DRAINAGE PURPOSES.RECORDED CONCURRENTLY WITH THISMAP.N 88°42'44 W 1319.34' MS 89°56'32" 1319.50' (R7)N 88°42'44 W 1319.34' MN 88°42'48" W [1319.40'] (R1)1)10' PRIVATE PEDESTRIANACCESS EASEMENT BENEFITINGLOTS 415-425 PER THIS MAP3.00'3.00'E30.00'10.00'N 1° 19' 47" E424.47'N 1° 19' 47" E162.00'N 88° 40' 13" W240.63'C19RAD3 L15N 88° 40' 13" W283.63'N 1° 19' 47" E587.67'248.00'RAD4L=126.26', R=355.00''=20° 22' 38"L=67.00',R=121.00'D=31°43'34"N 88° 40' 13" W954.10'S 01° 19' 47" W581.09'RAD6RAD7RAD5C17S 56° 56' 39" E81.25'N 01° 19' 47" E605.09'N 01° 19' 47" E605.09'N 12° 26' 33" W48.80'N 33° 03' 21" E307.79'L=166.12',R=300.00'D=31°43'35"L=31.08', R=325.00''=5° 28' 46"N 01° 37' 01" E101.63'N 01° 37' 01" E20.00'L=147.28', R=325.00''=25° 57' 55"N 88° 38' 43" W158.47'L=39.78', R=169.50''=13° 26' 46"S 77° 54' 31" W80.06'L=45.56', R=190.50''=13° 42' 08"N 88° 23' 21" W214.22'S 16° 12' 14" W59.82'30.12'29.70'N 88° 22' 25" W43.38'N 88° 22' 25" W42.83'58.32'23.31'97.55'210.24'33.00N 01° 19' 47" E133.00'N 01° 19' 47" E133.00'N 01° 19' 47" E133.00'N 01° 19' 47" E133.00'N 01° 19' 47" E133.00'N 01° 19' 47" E133.00'N 01° 19' 47" E133.00'N 01° 19' 47" E133.00'N 01° 19' 47" E133.00'N 01° 19' 47" E133.00'50.00'50.00'50.00'50.00'50.00'50.00'50.00'50.00'50.00'50.00'50.00'50.00'50.00'50.00'50.00'50.00'50.00'50.00'50.00'49.23'88° 40' 13" W1203.97'00'50.00'50.00'41.00'50.00'50.00'50.00'55.00'50.00'50.00'50.00'41.00'81.00'81.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 1° 19' 47" E95.00'55.09'50.00'50.00'62.50'50.00'50.00'55.09'41.09'50.00'50.00'62.50'74.15'50.00'50.00'62.50'662.50'681.00'130.00'29.63'N 88° 40' 13" W95.00'N 88° 40' 13" W130.00'N 88° 40' 13" W110.00'N 88° 40' 13" W110.00'N 88° 40' 13" W130.00'N 88° 40' 13" W95.00'N 88° 40' 13" W95.00'S 88° 40' 13" E130.00'S 88° 40' 13" E110.00'N 88° 40' 13" W110.00'N 88° 40' 13" W130.00'N 88° 40' 13" W95.00'C13 C12S 88° 40' 13" E954.10'L14C16C15C18N 33° 03' 21" E162.24'L=15.76', R=179.00''=5° 02' 44"S 88° 40' 13" E 1203.97'53.97'49.55'36.97L=149.51', R=270.00''=31° 43' 35"5.00'10.00'10.00'10.00'10.00'10.00'5.00'29.00'29.00'10.00'S 88° 40' 13" E1150.00'S 88° 40' 13" E1150.00'DN 01°5.00'L5.00' PRIVATE DRAINAGE EASEMENT PER THIS MAP66.29'147.93'N 82° 47' 49" WRADIALLL=182.73', R=330.00''=31° 43' 35"S 89° 48' 35" E60.08'S 89° 48' 57" E418.98'N 72° 29' 01" E47.55'C14SEE DETAIL 8B, SHEET 8S 35° 07' 27" W106.91'30.00'1163.86LOT 435OPEN SPACE/AGRICULTRAL7.32 ACRESL=137.85', R=295.00''=26° 46' 27"S 33° 03' 21" W307.79' EASEMENT FROM WILLIAMAN LUIS OBISPO PER R940' DEDICATION FOR PUBLIC ROAD EASEMENT FROM WILLIAM BUCKLEY, ETAL TO COUNTY OF SAN LUIS OBISPO PER R920.00'20.00'LINE TABLELINEL14L15LENGTH32.25'32.25'BEARINGS56° 56' 39"ES56° 56' 39"ECURVE TABLECURVE #C14C15C16C17C18C19C38C39LENGTH55.11'33.92'29.85'83.06'29.85'21.99'49.85'16.80'RADIUS355.00'355.00'19.00'150.00'19.00'14.00'355.00'355.00'DELTA8°53'42"5°28'31"90°00'00"31°43'34"90°00'00"90°00'00"8°02'42"2°42'40"A1A2PTTLPEASEMENT LEGENDPRIVATE RECIPROCAL VEHICLE AND PEDESTRIAN ACCESS,DRAINAGE, WATER AND SEWER EASEMENTS AND PUE PER THIS MAPPRIVATE RECIPROCAL LANDSCAPE, DRAINAGE, WATER, SEWER &PEDESTRIAN ACCESS EASEMENT PER THIS MAPPUBLIC UTILITY EASEMENT AND STREET TREE EASEMENT PER THIS MAPBICYCLE TRAIL EASEMENT PER THIS MAPPUBLIC UTILITY EASEMENT PER THIS MAPTSTREET TREE EASEMENT PER THIS MAPLANDSCAPE, IRRIGATION, AND MAINTENANCE EASEMENT PER THIS MAPLRADIAL TABLELINE #RAD3RAD4RAD5RAD6RAD7DIRECTIONN28° 00' 37"EN62° 25' 13"WN56° 56' 41"WN1° 41' 34"EN33° 03' 33"ERAD6LOT 353LOT 354S 88° 40' 13" E954.10'S 88° 40' 13" E49.23'L=67.00',R=121.00'∆=31°43'34"L=0.77', R=121.00'Δ=0° 21' 47"L=66.23',R=121.00'∆=31°21'47"N 1° 19' 47" E133.00'C14C38C39DPTLLOT 3549961 S.F.LOT 435OPEN SPACE7.32 ACRES.LOT 3536650 S.F.LN 72° 29' 01" E47.55'S 89° 48' 57" E418.98'S 71° 56' 39" E20.30'10.00'N 75° 05' 35" W25.12'N 25° 0 8' 3 5" W 56.29'N 88° 40' 13" W53.97'45.318.66'RAD4S 35° 07' 27" W106.91'L=4.50', R=355.00''=0° 43' 34"C15N 88° 40' 13" W50.00'5.00' PRIVATE DRAINAGEEASEMENT PER THIS MAPS 88° 40' 13" E56.55'S 01° 19' 47" W28.34'5.00'S 73° 54' 09" ERADIALS 70° 27' 55" ERADIALLD612 CLARION COURTwww.wallacegroup.usPLANNINGCONSTRUCTION MANAGEMENTLANDSCAPE ARCHITECTUREMECHANICAL ENGINEERINGPUBLIC WORKS ADMINISTRATIONSURVEYING / GIS SOLUTIONSWATER RESOURCES®OF SHEETS81405010025SCALE1 INCH = 50 FEETTRACT MAP NO. 3089 PHASE 5SHEET 7SHEET 9LEGENDFOUND MONUMENT AS NOTEDSET 1" IRON PIPE CAPPED LS 8298, UNLESS OTHERWISE NOTEDSET NAIL AND TAG LS 8298 PRODUCED INTO THE STREET 0.20' FROMTHE TRUE LOT CORNER. SEE DETAIL 10A ON SHEET 10 FOR OFFSETINFORMATIONSET NAIL AND TAG LS 8298 PRODUCED 1.00' FROM THE TRUE LOT CORNER ALONG THE LOT LINE. SEE DETAIL 10B, SHEET 10 FOROFFSET INFORMATIONSET 2.5" BRASS CAP INSCRIBED LS 8298 IN STANDARD CITYCENTERLINE IN MONUMENT WELLM MEASUREDRAD RADIALR1 041/MB/048, DISTANCES REDUCE TO GRIDR2 TRACT 3089 PHASES 2 & 3, SURVEY IN PROGRESSR5 028/CR/084R7 081/RS/032R9 6/DEEDS/49PHASE 5 OF MULTIPLE PHASESIN THE CITY OF SAN LUIS OBISPO, COUNTY OF SAN LUIS OBISPO, STATEOF CALIFORNIA. BEING A SUBDIVISION OF A PORTION OF PARCEL B OFTHE AGREEMENT DECLARATION OF LOT LINE ADJUSTMENT SLO AL18-0013 RECORDED IN DOCUMENT NO. 2018-025711 OF OFFICIALRECORDS IN THE OFFICE OF THE COUNTY RECORDER'S OFFICE,COUNTY OF SAN LUIS OBISPO, CALIFORNIA.DETAIL 8ASCALE 1" = 5'10.00'10.00'10.00'OFFER OF DEDICATION FOR PUBLICROAD EASEMENT. RECORDEDCONCURRENTLY WITH THIS MAP.SHEET 11EASEMENT FOR DRAINAGEPURPOSES. RECORDEDCONCURRENTLY WITH THIS MAP.DETAIL 8BSCALE 1" = 20'23.34'Page 206 of 615 TLA2A2A2A2A1PTPTPTPTPTPTPPPPPTPTPTPTTPPTTTPPTLOT 3805183 S FLOT 375LOT 374LOT 3914698 S.F.LOT 3925418 S.F.LOT 3904750 S.F.LOT 3894750 S.F.LOT 3884750 S.F.LOT 3875183 S.F.LOT 4035204 S.F.LOT 4024750 S.F.LOT 4047150 S.F.LOT 4256050 S.F.LOT 4056500 S.F.LOT 4245500 S.F.LOT 4014750 S.F.LOT 4005700 S.F.LOT 4077800 S.F.LOT 4066500 S.F.LOT 4226600 S.F.LOT 4087800 S.F.LOT 3995700 S.F.LOT 4216600 S.F.LOT 4205500 S.F.LOT 4096500 S.F.LOT 3984750 S.F.LOT 3975938 S.F.LOT 4108125 S.F.LOT 4196875 S.F.LOT 4186875 S.F.LOT 4118125 S.F.LOT 3965938 S.F.LOT 4335178 S.F.LOT 4325019 S.F.LOT 4315019 S.F.LOT 4305499 S.F.LOT 4295019 S.F.LOT 4285499 S.F.LOT 4275450 S.F.LOT 4235500 S.F.LOT 426PUBLIC PARK1.64 ACRES20.00'20.00'20.00'20.00'20.00'YEAGER COURTEARHART WAYWRIGHT BROTHERS WAYLOT 386PUBLIC PARK9807 S.F.SEE DETAIL 10C, SHEET 105.00'10.00'29.00'29.00'ALLEY 2420.00'10.00'10.00'29.00'29.00'10.00'10.00'JESPERSEN ROADSEE DETAIL 11A, SHEET 11LOT 4360.84 ACRESLOT 4370.92 ACRESOPEN SPACE10.00'10.00'WRIGHT BROTHERS WAY30.00'30.00'30.00'LOT 434OPEN SPACE6.28 ACRESLOT 434OPEN SPACE6.28 ACRES10' PRIVATE PEDESTRIANACCESS EASEMENT BENEFITINGLOTS 415-425 PER THIS MAP3.00'3.00'3.00'3.00'DOOLITTLE DRIVE29.00'29.00'5.00'L=156.37',R=46.00'∆=194°45'48"N 88° 40' 13" W651.00'N 88° 40' 13" W125.97'5.15'N 1° 19' 47" E228.99'N 11° 34' 22" E65.47'N 1° 19' 47" E581.09'N 1° 19' 47" E605.09'N 1° 19' 47" E605.09'C32RAD10N 1° 19' 47" E105.00'40.63'RAD119.98'N 88° 40' 13" W657.58'N 1° 19' 47" E587.67'339.67'N 88° 40' 13" W288.58'C30C28C27N 1° 19' 47" E144.13'C23 RAD8N 59° 45' 25" E65.56' M & (R2)N 11° 13' 10" E 273.26' M & (R2)N 43° 28' 12" E 401.65' M & (R2)N 82° 27' 13" E 229.10' M & (R2)L=22.15', R=90.00''=14° 05' 58"N 37° 05' 28" W8.06'L=27.06', R=109.98''=14° 05' 58"N 37° 05' 28" W8.06'115.45'159.20'129.38'S 70° 47' 31" E436.23' M & (R2)20.07'L=135.56',R=72.00'∆=107°52'24"L=20.06', R=72.00''=15° 58' 02"266.14'RAD915.32'0'N 88° 40' 13" W222.99'N 06° 47' 40" W522.87'N 01° 19' 46" E391 65'S 6° 47' 23" E68.24'S 01° 19' 46" W61.77'N 24° 52' 43" W6.25'N 01° 56' 13" W25.87'L=48.23', R=112.88''=24° 28' 50"L=52.58', R=92.88''=32° 26' 11"S 89° 11' 42" W35.27'N 01° 56' 13" W31.97'S 1° 19' 47" W245.63'S 88° 40' 13" E153.49'N 1° 19' 47" E199.68'N 044.68'S 06° 47' 24" E26.33'N 6° 47' 24" 74.24'L=18.33', R=32.87''=31° 57' 03"50.00'57.50'57.50'50.00'50.00'50.00'41.00'1.00'E95.00'E95.00'47" E95.00'7" E95.00'7" E95.00'E95.00'62.50'62.50'62.50'62.50'50.00'62.50'62.50'62.50'62.50'50.00'60.00'60.00'60.00'60.00'60.00'50.00'50.00'60.00'50.00'60.00'60.00'50.00'50.00'50.00'95.00'S 88° 40' 13" ES 88° 40'N 88° 40' 13" W110.00'N 88° 40' 13" W130.00'N 88° 40' 13" W95.00'N 88° 40' 13" W95.00'S 88° 40' 13" E130.00'S 88° 40' 13" E110.00'N 88° 40' 13" W110.00'N 88° 40' 13" W130.00'N 88° 40' 13" W95.00'N 88° 40' 13" W95.00'N 88° 40' 13" W130.00'N 88° 40' 13" W95.00'N 88° 40' 13" W130.00'N 88° 40' 13" W110.00'N 88° 40' 13" W110.00'N 88° 40' 13" W130.00'N 88° 40' 13" W95.00'N 88° 40' 13" W95.00'N 88° 40' 13" W130.00'N 88° 40' 13" W110.00'55.00'55.00'55.00'45.00'50.00'50.00'50.00'50.00'110.00'130.00'85.00'S 84° 43' 33" E92.23'N 84° 35' 36" E95.14'N 61° 02' 29" E85.32'30.97'S 88° 40' 13" E95.00'S 88° 40' 13" E95.00'S 88° 40' 13" E95.00'S 88° 33' 38" E90.27'S 88° 33' 38" E83.31'N 01° 26' 22" E25.17'38.85'26.62'23.99'50.00'50.00'50.00'N 88° 40' 13" W627.46'81.00'41.00'50.00'50.00'50.00'50.01'63.41'C13N 01° 24' 10" E91.77'S 88° 40' 13" E100.38'S 88° 40' 13" E100.38'N 79° 12' 58" E56.26'42.70'90.38'C20C21C22 C24S 88° 40' 13" E115.50'S 88° 40' 13" E100.38'S 88° 40' 13" E100.38'N 88° 40' 13" W100.38'N 88° 40' 13" W90.38'N 1° 19' 47" E160.91'45.00'50.00'50.00'15.91'50.00'45.00'50.00'50.00'50.00'55.00'C25C26C29C31N 51° 11' 01" W59.16'N 51° 11' 25" W60.79'N 88° 40' 13" W325.00'S 1° 19' 47" W309.57'55.00'N 88° 40' 13" W192.99'N 02° 39' 27" W14.82'N 01° 19' 46" E36.97'L=149.51', R=270.00''=31° 43' 35"N 31° 10' 44" W47.90'S 87° 56' 29" W57.85'L=36.12', R=112.88''=18° 20' 02"L=30.84', R=32.88''=53° 45' 27"L=40.36', R=92.88''=24° 54' 02"S 08° 55' 45" E85.75'S 10° 15' 30" W16.83'10.00'10.00'10.00'10.00'5.00'10.00'10.00'10.00'5.00'10.00'10.00'P10.00'10.00'PT10.00'PTN 4° 36' 50" E19.76'N 01° 19' 47" E424.47'N 1° 19' 47" E104.98'S 88° 40' 13" E133.08'N 88° 40' 13" W110.00'SEE DETAIL 12B, SHEET 1295.00'S 1° 56' 12" ERADIALCURVE TABLECURVE #C20C21C22C23C24C25C26C27C28C29C30C31C32LENGTH15.71'15.71'38.39'59.17'18.57'8.33'4.19'21.64'98.80'15.71'21.64'8.33'21.99'RADIUS10.00'10.00'46.11'100.00'17.00'45.00'72.00'75.00'46.00'10.00'75.00'45.00'14.00'DELTA90°00'00"90°00'00"47°42'45"33°54'06"62°35'33"10°36'25"3°20'04"16°31'43"123°03'27"90°00'00"16°31'43"10°36'04"90°00'00"RADIAL TABLELINE #RAD8RAD9RAD10RAD11DIRECTIONN57° 25' 41"EN48° 58' 36"WS8° 36' 07"WN43° 30' 02"EDA1A2PTTLPEASEMENT LEGENDDRAINAGE EASEMENT PER THIS MAPPRIVATE RECIPROCAL VEHICLE AND PEDESTRIAN ACCESS,DRAINAGE, WATER AND SEWER EASEMENTS AND PUE PER THIS MAPPRIVATE RECIPROCAL LANDSCAPE, DRAINAGE, WATER, SEWER &PEDESTRIAN ACCESS EASEMENT PER THIS MAPPUBLIC UTILITY EASEMENT AND STREET TREE EASEMENT PER THIS MAPBICYCLE TRAIL EASEMENT PER THIS MAPPUBLIC UTILITY EASEMENT PER THIS MAPTSTREET TREE EASEMENT PER THIS MAPPHASE 5 OF MULTIPLE PHASESIN THE CITY OF SAN LUIS OBISPO, COUNTY OF SAN LUIS OBISPO, STATEOF CALIFORNIA. BEING A SUBDIVISION OF A PORTION OF PARCEL B OFTHE AGREEMENT DECLARATION OF LOT LINE ADJUSTMENT SLO AL18-0013 RECORDED IN DOCUMENT NO. 2018-025711 OF OFFICIALRECORDS IN THE OFFICE OF THE COUNTY RECORDER'S OFFICE,COUNTY OF SAN LUIS OBISPO, CALIFORNIA.612 CLARION COURTwww.wallacegroup.usPLANNINGCONSTRUCTION MANAGEMENTLANDSCAPE ARCHITECTUREMECHANICAL ENGINEERINGPUBLIC WORKS ADMINISTRATIONSURVEYING / GIS SOLUTIONSWATER RESOURCES®OF SHEETS9140 50 10025SCALE1 INCH = 50 FEETTRACT MAP NO. 3089 PHASE 5LEGENDFOUND MONUMENT AS NOTEDSET 1" IRON PIPE CAPPED LS 8298, UNLESSOTHERWISE NOTEDSET NAIL AND TAG LS 8298 PRODUCED INTO THESTREET 0.20' FROM THE TRUE LOT CORNER. SEEDETAIL 10A ON SHEET 10 FOR OFFSET INFORMATIONSET NAIL AND TAG LS 8298 PRODUCED 1.00' FROM THETRUE LOT CORNER ALONG THE LOT LINE. SEE DETAIL10B, SHEET 10 FOR OFFSET INFORMATIONSET 2.5" BRASS CAP INSCRIBED LS 8298 IN STANDARDCITY CENTERLINE IN MONUMENT WELLM MEASUREDRAD RADIALR1 041/MB/048, DISTANCES REDUCE TO GRIDR2 TRACT 3089 PHASES 2 & 3, SURVEY IN PROGRESSSHEET 7SHEET 8SHEET 1010.00'10.00'10.00'10.00'SHEET 11SHEET 11FOR INFORMATIONAL PURPOSES, LOTS 386-392, 398-401, AND 434, OR PORTIONS THEREOF, ARE INTHE CURRENT 100-YEAR FLOOD PLAIN. LOTS 386-292 AND 398-401 AND PORTIONS OF LOT 434 WILLBE OUT OF THE 100-YEAR FLOOD PLAIN AFTER SITE GRADING IS PERFORMED AND THE REVISEDFLOODPLAIN IS RECOGNIZED BY FEMA (CLOMR CASE 22-09-0955R), AS SHOWN ON SHEET 14100-YEAR FLOOD PLAIN NOTEDOOLITTLE DRIVEPage 207 of 615 A2PTWAPTPTPTPTPTPTPTPTPTPTPTTLOT 3624750 S.F.LOT 3654750 S.F.LOT 3644750 S.F.LOT 3634750 S.F.LOT 3614750 S.F.LOT 3605462 S.F.LOT 3595462 S.F.LOT 3584750 S.F.LOT 3574750 S.F.LOT 3564750 S.F.LOT 3555183 S.F.LOT 3805183 S.F.LOT 3794750 S.F.LOT 3784750 S.F.LOT 3774750 S.F.LOT 3765462 S.F.LOT 3755462 S.F.LOT 3744750 S.F.LOT 3734750 S.F.LOT 3724750 S.F.LOT 3714750 S.F.LOT 3704750 S.F.LOT 3815409 S.F.LOT 3825135 S.F.LOT 3835357 S.F.LOT 3844902 S.F.LOT 3854664 S.F.LOT 3914698 S.F.LOT 3904750 S.F.LOT 3894750 S.F.LOT 3884750 S.F.LOT 3875183 S.F.LOT 3685204 S.F.LOT 3694750 S.F.LOT 3664750 S.F.LOT 3675204 S.F.RAD115.00'HUGHES LANEDOOLITTLE DRIVECOLEMAN LANELOT 386PUBLIC PARK9807 S.F.27.00'SEE DETAIL 10C, SHEET 10RAD229.00'29.00'10.00'.00'29.0029.00'29.00'29.00'20.00'5.00'00'7.50'7.50'10.00'LOT 434OPEN SPACE6.28 ACRESDOOLITTLE DRIVELOT 386PUBLIC PARK9807 S.F.10.00'5.00'0'10.00'10.00'N 88° 40' 13" W651.00'N 88° 40' 13" W651.00'N 1° 19' 47" E162.00'N 1° 19' 47" E170.00'N 79° 59' 39" E113.69'RAD13RAD12L17C11N 88° 40' 13" W125.97'L=8.33', R=45.00''=10° 36' 04"N 1° 19' 47" E228.99'N C32N 1° 19' 47" E97.15'C4C6N 88° 40' 13" W657.58'C5C8C33C34248 00'N 42° 29' 15" E 294.56' M & (R1)N 11° 35' 26" E 154.29' M & (R1)N 59° 45' 25" E65.56' M & (R2)N 11° 13' 10" E 222.88'L9L13L=40.33', R=72.00''=32° 05' 47"C10L8L6L12L7L=21.31', R=72.00''=16° 57' 40"L10S 70° 47' 31" E436.23' M & (R2)55.00'50.00'50.00'C7C945.00'50.00'50.00'50.00'50.00'50.00'50.00'50.00'50.00'50.00'57.50'57.50'50.00'50.00'50.00'41.00'50.00'57.50'57.50'50.00'50.00'50.00'55.00'85.00'85.00'45.00'50.00'50.00'50.00'50.00'50.00'50.00'57.50'57.50'50.00'50.00'50.00'41.00'81.00'81.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 01° 19' 47" E95.00'N 1° 19' 47" E95.00'N 01° 19' 47" E132.20'S 1° 19' 47" W98.64'S 1° 19' 47" W108.63'S 1° 19' 47" W101.79'S 1° 19' 47" W95.56'S 01° 19' 47" W91.01'50.99'11.70'39.60'11.74'S 84° 43' 33" E92.23'N 84° 35' 36" E95.14'N 61° 02' 29" E85.32'30.97'S 88° 40' 13" E95.00'S 88° 40' 13" E95.00'S 88° 40' 13" E95.00'2623.99'50.00'50.00'50.00'N 88° 40' 13" W627.46'N 88° 40' 13" W627.46'11.47'50.00'50.00'50.00'384.99'81.00'41.00'50.00'50.00'50.00'50.01'N 88° 40' 13" W675.00'N 88° 40' 13" W675.00'C13 C12S 1° 19' 47" W309.57'55.00'C35C36C37N 88° 40' 13" W100.00'L18L19L20L21 L2250.99'5.00'10.00'10.00'10.00'10.00'10.00'5.00' PRIVATE DRAINAGE EASEMENT PER THIS MAP10.00'L11S 01° 19' 47" W122.93'95.00'180°180°RADIAL 0.20'RADIAL0.20'0.20'0.20'STREETSTREETLOTLOTLOTTYPICAL MONUMENTATION DETAIL ALONG STREETS0.20'0.20'0.20'TRUE LOT CORNER0.20'180°LOTWHERE LOT LINES AT CORNERS ARE COINCIDENT AND PARALLEL ASSHOWN, MONUMENT IS SET 1.00' WESTERLY ALONG THE LOT LINEFROM THE TRUE LOT CORNER. WHERE LOT LINES AT CORNERS ARESTAGGERED, MONUMENT IS SET 1.00' FROM THE TRUE LOT CORNERALONG THE LOT LINELOTLOTLOTLOTLOTLOTALLEYALLEYTYPICAL MONUMENTATION DETAIL ALONG ALLEYSLOT1.00'1.00'1.00'1.00'RADIAL TABLELINE #RAD12RAD13DIRECTIONN67° 10' 30"WN12° 19' 16"WLINE TABLELINEL12L13L17L18L19L20L21L22LENGTH21.06'40.53'51.33'38.74'50.21'33.56'42.21'52.14'BEARINGN53° 09' 19"EN55° 07' 01"WS75° 19' 13"ES83° 27' 45"ES83° 27' 45"ES58° 00' 15"ES32° 45' 14"ES51° 07' 32"E0.81'S 84° 43' 33" E92.23'N 84° 35' 36" E95.14'N 88° 40' 13" W384.99'CURVE TABLECURVE #C6C7C8C9C11C32C33C34C35C36C37LENGTH21.64'15.71'21.64'15.71'8.33'21.99'98.80'21.64'68.93'30.48'8.33'RADIUS75.00'10.00'75.00'10.00'45.00'14.00'46.00'75.00'72.00'72.00'45.00'DELTA16°31'42"90°00'00"16°31'44"90°00'00"10°36'25"90°00'00"123°03'27"16°31'44"54°51'14"24°15'28"10°36'25"A2PTEASEMENT LEGENDPRIVATE RECIPROCAL LANDSCAPE, DRAINAGE, WATER, SEWER &PEDESTRIAN ACCESS EASEMENT PER THIS MAPPUBLIC UTILITY EASEMENT AND STREET TREE EASEMENT PER THIS MAPPPUBLIC UTILITY EASEMENT PER THIS MAPTSTREET TREE EASEMENT PER THIS MAP612 CLARION COURTwww.wallacegroup.usPLANNINGCONSTRUCTION MANAGEMENTLANDSCAPE ARCHITECTUREMECHANICAL ENGINEERINGPUBLIC WORKS ADMINISTRATIONSURVEYING / GIS SOLUTIONSWATER RESOURCES®OF SHEETS10 140 50 10025SCALE1 INCH = 50 FEETTRACT MAP NO. 3089 PHASE 5DETAIL 10ANOT TO SCALEDETAIL 10BNOT TO SCALEDETAIL 10CSCALE 1" = 5LEGENDFOUND MONUMENT AS NOTEDSET 1" IRON PIPE CAPPED LS 8298, UNLESS OTHERWISE NOTEDSET NAIL AND TAG LS 8298 PRODUCED INTO THE STREET 0.20' FROM THETRUE LOT CORNER. SEE DETAIL 10A ON SHEET 10 FOR OFFSETINFORMATIONSET NAIL AND TAG LS 8298 PRODUCED 1.00' FROM THE TRUE LOT CORNER ALONG THE LOT LINE. SEE DETAIL 10B, SHEET 10 FOR OFFSETINFORMATIONSET 2.5" BRASS CAP INSCRIBED LS 8298 IN STANDARD CITY CENTERLINEIN MONUMENT WELLM MEASUREDRAD RADIALR1 041/MB/048, DISTANCES REDUCE TO GRIDR2 TRACT 3089 PHASES 2 & 3, SURVEY IN PROGRESSPHASE 5 OF MULTIPLE PHASESIN THE CITY OF SAN LUIS OBISPO, COUNTY OF SAN LUIS OBISPO, STATEOF CALIFORNIA. BEING A SUBDIVISION OF A PORTION OF PARCEL B OFTHE AGREEMENT DECLARATION OF LOT LINE ADJUSTMENT SLO AL18-0013 RECORDED IN DOCUMENT NO. 2018-025711 OF OFFICIALRECORDS IN THE OFFICE OF THE COUNTY RECORDER'S OFFICE,COUNTY OF SAN LUIS OBISPO, CALIFORNIA.SHEET 7SHEET 6N 01° 19' 47" WSHEET 9FOR INFORMATIONAL PURPOSES, LOTS AND 386-387, AND 434 OR PORTIONS THEREOF, ARE IN THECURRENT 100-YEAR FLOOD PLAIN. LOTS 386-387 AND PORTIONS OF LOT 434 WILL BE OUT OF THE100-YEAR FLOOD PLAIN AFTER SITE GRADING IS PERFORMED AND THE REVISED FLOODPLAIN ISRECOGNIZED BY FEMA (CLOMR CASE 22-09-0955R), AS SHOWN ON SHEET 14100-YEAR FLOOD PLAIN NOTEPage 208 of 615 PTPTPTPT5F.0F.LOT 426PUBLIC PARK1.64 ACRES10.00'JESPERSEN ROADSEE DETAIL 11A, SHEET 11LOT 4360.84 ACRESLOT 4370.92 ACRES0.73 ACRESOPEN SPACE10.00'10.00'WRIGHT BROTHERS WAY30.00'30.00'30.00'30.00'10' PRIVATE PEDESTRIANACCESS EASEMENT BENEFITINGLOTS 415-425 PER THIS MAP40.63'15.32'N 88° 40' 13" W224.88'N 88° 40' 13" W222.99'N 06° 47' 40" W522.87'N 01° 19' 46" E391.65'S 6° 47' 23" E68.24'24.00'24.00'S 01° 19' 46" W61.77'N 24° 52' 43" W6.25'N 01° 56' 13" W25.87'L=48.23', R=112.88''=24° 28' 50"L=52.58', R=92.88''=32° 26' 11"S 89° 11' 42" W35.27'N 01° 56' 13" W31.97'S 1° 19' 47" W245.63'S 88° 40' 13" E153.49'N 1° 19' 47" E199.68'N 06° 444.68'S 06° 47' 24" E26.33'N 6° 47' 24" W74.24'L=18.33', R=32.87''=31° 57' 03"62.50'62.50'50.00'60.00'60.00'50.00'3" W" W55.00'50.00'15.50'.38'00.38'00.38'0.38'50.00'50.00'50.00'55.00'N 88° 40' 13" W192.99'N 02° 39' 27" W14.82'N 01° 19' 46" E36.97'L=149.51', R=270.00''=31° 43' 35"S 87° 56' 29" W57.85'L=36.12', R=112.88''=18° 20' 02"L=30.84', R=32.88''=53° 45' 27"L=40.36', R=92.88''=24° 54' 02"S 08° 55' 45" E85.75'S 10° 15' 30" W16.83'10.00'N 4° 36' 50" E19.76'N 01° 19' 47" E424.47'SEE DETAIL 12B, SHEET 12S 10° 03' 39" E57.84'L=59.48', R=112.87''=30° 11' 28"S 33° 00' 10" E6.25'L=6.39', R=32.87''=11° 07' 46"L=63.90', R=92.87''=39° 25' 24"S 89° 11' 42" W35.27'L=22.91', R=179.13''=7° 19' 45"N 83° 28' 33" W28.09'N 56° 28' 45" W11.08'N 88° 40' 13" W17.72'S 88° 03' 48" W54.64'S 59° 18' 30" W10.65'S 88° 03' 48" W57.83'L=48.23', R=112.88''=24° 28' 49"L=18.33', R=32.87''=31° 57' 07"L=52.58', R=92.87''=32° 26' 10"S 00° 48' 19" E35.27'L=22.91', R=179.12''=7° 19' 45"S 06° 31' 26" W26.99'S 01° 19' 46" W194.95'S 01° 19' 47" W48.00'S 06° 47' 40" E159.26'L=22.91', R=179.13''=7° 19' 45"S 01° 36' 00" E26.99'L=182.73', R=330.00''=31° 43' 35"S 1° 56' 12" ERADIALPTPUBLIC UTILITY EASEMENT AND STREET TREE EASEMENT PER THIS MAPEASEMENT LEGENDPT10.00'N 18° 19' 32" E6.31'N 01° 21' 59" E20.00'N 88° 34' 37" W4.00'L=10.38', R=35.00''=16° 59' 41"S 88° 34' 36" E3.99'N 1° 20' 04" E40.00'L=15.75', R=35.00''=25° 46' 43"N 88° 40' 09" WRADIALN 88° 37' 41" W192.99'N 4° 36' 50" E19.76'N 2° 39' 27" W14.82'S 65° 33' 21" WRADIALLOT 4261.65 ACRESPUBLIC PARKPHASE 5 OF MULTIPLE PHASESIN THE CITY OF SAN LUIS OBISPO, COUNTY OF SAN LUIS OBISPO, STATEOF CALIFORNIA. BEING A SUBDIVISION OF A PORTION OF PARCEL B OFTHE AGREEMENT DECLARATION OF LOT LINE ADJUSTMENT SLO AL18-0013 RECORDED IN DOCUMENT NO. 2018-025711 OF OFFICIALRECORDS IN THE OFFICE OF THE COUNTY RECORDER'S OFFICE,COUNTY OF SAN LUIS OBISPO, CALIFORNIA.612 CLARION COURTwww.wallacegroup.usPLANNINGCONSTRUCTION MANAGEMENTLANDSCAPE ARCHITECTUREMECHANICAL ENGINEERINGPUBLIC WORKS ADMINISTRATIONSURVEYING / GIS SOLUTIONSWATER RESOURCES®OF SHEETS11 140 50 10025SCALE1 INCH = 50 FEETTRACT MAP NO. 3089 PHASE 5LEGENDFOUND MONUMENT AS NOTEDSET 1" IRON PIPE CAPPED LS 8298, UNLESSOTHERWISE NOTEDSET NAIL AND TAG LS 8298 PRODUCED INTO THESTREET 0.20' FROM THE TRUE LOT CORNER. SEEDETAIL 10A ON SHEET 10 FOR OFFSET INFORMATIONSET NAIL AND TAG LS 8298 PRODUCED 1.00' FROM THETRUE LOT CORNER ALONG THE LOT LINE. SEE DETAIL10B, SHEET 10 FOR OFFSET INFORMATIONSET 2.5" BRASS CAP INSCRIBED LS 8298 IN STANDARDCITY CENTERLINE IN MONUMENT WELLM MEASUREDRAD RADIALR1 041/MB/048, DISTANCES REDUCE TO GRIDR2 TRACT 3089 PHASES 2 & 3, SURVEY IN PROGRESSSHEET 8SHEET 9DETAIL 11ASCALE 1" = 20'N 88°40'13" W 15.30'S 83°28' 33" W 38.04'N 87°57'15" W 61.79'SHEET 12L=166.12', R=300.00''=31° 43' 35"L=22.91', R=179.13',Δ= 7°19'45"FOR INFORMATIONAL PURPOSES, LOT 437 OR PORTIONS THEREOF, ARE IN THE CURRENT 100-YEARFLOOD PLAIN. PORTIONS OF LOT 437 WILL BE OUT OF THE 100-YEAR FLOOD PLAIN AFTER SITEGRADING IS PERFORMED AND THE REVISED FLOODPLAIN IS RECOGNIZED BY FEMA (CLOMR CASE22-09-0955R), AS SHOWN ON SHEET 14100-YEAR FLOOD PLAIN NOTEPage 209 of 615 20.17'CITYCITY-L CITY-LPTPT####JESPERSEN ROAD30.00'30.00'N 88° 32' 08" W 54.75' MN 88° 42' 07" E [54.74'] (R1)FD 3.5" BRASS DISK CAP UNION OIL CO.NO. 11 MON. IN CONCRETE LS 2019 (R5)FD #5 REBAR WITH ORANGE PLASTICCAP LS 6192 DOWN 0.7' (R7)FD #5 REBAR WITH CAP TAGGED RCE 12545 (R2)S 11° 14' 51" W RADIALLOT 4380.73 ACRESOPEN SPACE10.00'LOT 4391.16 ACRESOPEN SPACE10.00'VENTURE DRIVEBB30.00'30.00'∆=194°45'48"40.63'RAD11° 27' 13" E 229.10' M & (R2)N 88° 40' 13" W173.83'23" E'S 01° 19' 47" W231.84'S 24° 52' 43" E6.25'S 1° 56' 13" E57.84'L=48.23', R=112.88''=24° 28' 50"L=18.33', R=32.87''=31° 57' 05"S 78° 53' 34" E19.04'N 66° 23' 36" E2.45'L=31.29', R=90.88''=19° 43' 41"S 88° 40' 13" E153.49'N 01° 19' 47" E398.77'N 06° 47' 40" W522.87'224.88'S 88° 40' 13" EN 88° 38' 54" W147.09'87.09'60.00'S 1° 19' 47" W202.08'S 06° 31' 27" W26.99'L=22.91', R=179.12''=7° 19' 45"S 00° 48' 18" E35.27'L=52.58', R=92.88''=32° 26' 11"L=18.33', R=32.87''=31° 57' 05"S 88° 03' 48" W43.94'S 06° 47' 24" E26.33'S 1° 37' 01" W 601.54'S 1° 37' 01" W168.87'N 1° 37' 01" E368.18'N 88° 36' 04" W116.64'N 21° 10' 13" W36.66'S 68° 49' 47" W13.12'25.19'S 66° 10' 13" E10.61'N 86° 14' 54" E15.82'L=66.96', R=91.43''=41° 57' 43"L=6.16', R=30.88''=11° 25' 41"S 22° 29' 48" E12.33'S 10° 03' 39" E57.84'N 6° 47' 24" W74.24'148.69'S 88° 40' 13" E116.02'N 23° 49' 47" E30.66'L=48.23', R=112.88''=24° 28' 50"L=46.31', R=110.87''=23° 55' 44"S 88° 40' 13" E115 50'N 31° 10' 44" W47.90'L=42.21', R=161.34''=14° 59' 21"24.00'24.00'S 88° 38' 54" E14.64'33.73'30.77'SEE DETAIL 12B, SHEET 12E159.26'N 89° 11' 42" E35.27'L=22.91', R=179.13''=7° 19' 40"S 83° 28' 33" E29.81'S 51° 48' 02" E9.58'N 88° 03' 48" E54.64'N 59° 18' 30" E10.65'N 88° 03' 48" E57.83'S 75° 37' 38" W12.33'L=23.41', R=110.87''=12° 05' 50"L=28.97', R=30.88''=53° 45' 27"S 88° 40' 13" E17.72'L=20.73', R=90.87''=13° 04' 20"S 02° 59' 00" W19.04'S 8° 55' 45" E35.27'L=22.91', R=179.13''=7° 19' 45"S 01° 36' 00" E26.99'S 01° 19' 47" W48.00'S 30° 45' 05" WRADIALS 11° 01' 24" WRADIALN 0° 48' 13" WRADIALN 8° 10' 25" WRADIALN 87° 06' 02" WRADIALS 3° 44' 30" ERADIALN 3° 37' 00" WRADIALPTDBPUBLIC UTILITY EASEMENT AND STREET TREE EASEMENT PER THIS MAPEASEMENT LEGENDDRAINAGE EASEMENT PER THIS MAPPUBLIC FOOTINGS AND ABUTMENTS EASEMENT PER THIS MAPL=5.43', R=19.00''=16° 22' 47"N 88° 54' 21" W13.00'S 50° 41' 27" W5.37'N 88° 40' 04" W3.82'S 1° 19' 47" WRADIALS 88° 03' 48" W43.94'LOT 4391.16 ACRESOPEN SPACEPT10.00'DS 33° 02' 39" E6.27'S 83° 12' 20" W2.00'S 06° 47' 16" E53.54'N 83° 12' 44" E4.78'S 6° 47' 24" E 74.24'PT10.00'47.91'LOT 4380.74 ACRESOPEN SPACES 10° 03' 39" E57.84'PHASE 5 OF MULTIPLE PHASESIN THE CITY OF SAN LUIS OBISPO, COUNTY OF SAN LUIS OBISPO, STATEOF CALIFORNIA. BEING A SUBDIVISION OF A PORTION OF PARCEL B OFTHE AGREEMENT DECLARATION OF LOT LINE ADJUSTMENT SLO AL18-0013 RECORDED IN DOCUMENT NO. 2018-025711 OF OFFICIALRECORDS IN THE OFFICE OF THE COUNTY RECORDER'S OFFICE,COUNTY OF SAN LUIS OBISPO, CALIFORNIA.612 CLARION COURTwww.wallacegroup.usPLANNINGCONSTRUCTION MANAGEMENTLANDSCAPE ARCHITECTUREMECHANICAL ENGINEERINGPUBLIC WORKS ADMINISTRATIONSURVEYING / GIS SOLUTIONSWATER RESOURCES®OF SHEETS12 1405010025SCALE1 INCH = 50 FEETTRACT MAP NO. 3089 PHASE 5LEGENDFOUND MONUMENT AS NOTEDSET 1" IRON PIPE CAPPED LS 8298, UNLESSOTHERWISE NOTEDSET NAIL AND TAG LS 8298 PRODUCED INTO THESTREET 0.20' FROM THE TRUE LOT CORNER. SEEDETAIL 10A ON SHEET 10 FOR OFFSET INFORMATIONSET NAIL AND TAG LS 8298 PRODUCED 1.00' FROM THETRUE LOT CORNER ALONG THE LOT LINE. SEE DETAIL10B, SHEET 10 FOR OFFSET INFORMATIONSET 2.5" BRASS CAP INSCRIBED LS 8298 IN STANDARDCITY CENTERLINE IN MONUMENT WELLM MEASUREDRAD RADIALR1 041/MB/048, DISTANCES REDUCE TO GRIDR2 TRACT 3089 PHASES 2 & 3, SURVEY IN PROGRESSR5 028/CR/084R7 081/RS/032SHEET 9SHEET 11SHEET 9DETAIL 12ASCALE 1" = 10'SEE DETAIL 12A, THIS SHEETN 31°10'44" W 47.90'N 06°47'40" W159.26'FOR INFORMATIONAL PURPOSES, LOTS 438 AND 439, OR PORTIONS THEREOF, ARE IN THECURRENT 100-YEAR FLOOD PLAIN. PORTIONS OF THESE LOTS WILL BE OUT OF THE100-YEAR FLOOD PLAIN AFTER SITE GRADING IS PERFORMED AND THE REVISEDFLOODPLAIN IS RECOGNIZED BY FEMA (CLOMR CASE 22-09-0955R), AS SHOWN ON SHEET 14100-YEAR FLOOD PLAIN NOTEDETAIL 12BSCALE 1" = 20'Page 210 of 615 LOT 426PUBLIC PARK1.64 ACRESLOT 434OPEN SPACE 6.28 ACRESHUGHES LANEHUGHES LANEEARHART WAYYEAGER COURTEARHART WAYDOOLITTLE DRIVECOLEMAN LANEWRIGHT BROTHERS WAYLOT 435OPEN SPACE7.32 ACRESPUBLIC PARK9789 S.F.LOT 386352353354351350349348347346345344343342341340339337336335334333332331362365363360359358 357356355380379378377376375374373372370381382383384385386391392390389388387403402404425405424401400407406408399420409398397410419418411396395394393412413414417416415433432431430429428427368369366367386423422421361371364338SEE SHEET 9SEE DETAIL 4C, SHEET 4LOT 434OPEN SPACE 6.28 ACRESTLS 77°15'53" W 103.03'N 56°55'29" W 321.07' M&(R1)N 38°53'59" W206.27' M&(R1)N 53°09'19" E246.33' M&(R1)N 11°35'26" E154.29' M&(R1)N 42°29'15" E294.56' M&(R1)S 70°47'31" E 436.23' M&(R2)N 59°45'25" E65.56' M&(R2)N 11°13'10" E273.26' M&(R2)N 43°28'12" E 401.65' M&(R2)N 82°27'13" E 229.10'M&(R2)S 31°10'44" E 47.90'LOT 4360.84 ACRESLOT 4370.92 ACRESLOT 4380.74 ACRESPUBLIC OPENSPACECITY-LCITY-LN 82° 47' 49" WRADIALCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LBUCKLEY ROADOFFER OF DEDICATION FOR PUBLIC ROAD EASEMENT.RECORDED CONCURRENTLY WITH THIS MAP.SEE DETAIL11A, SHEET 11DN 61° 02' 29" E85.32N 84° 35' 36" E95.14S 83° 27' 45" E88.95N 66° 24' 22" E220.54'N 88° 40' 13" W1203.97'N 1° 16' 58" E145.14'N 1° 19' 47" E158.00'S 88° 40' 13" E100.00'N 1° 19' 47" E173.99'S 1° 19' 47" W122.93'L11C11L=8.33', R=45.00''=10° 36' 04"N 1° 19' 47" E132.20'N 79° 59' 39" E113.69'L17L20L21 L22S 84° 43' 33" E92.23S 88° 40' 13" E30.97'N 11° 34' 22" E65.47'L16S 88° 33' 38" E83.31'N 33° 03' 21" E162.24C18L15L=15.76', R=179.00''=5° 02' 44"RAD3L=126.26', R=355.00'∆=20° 22' 38"L=40.33', R=72.00''=32° 05' 47"C10S 88° 40' 13" E192.99'S 1° 19' 47" W424.61'L=149.51', R=270.00''=31° 43' 35"N 88° 22' 25" W43.38'S 01° 37' 01" W58.31'S 16° 12' 14" W59.82'S 88° 42' 44" E1319.38'S 88° 42' 44" E314.99'N 88° 42' 44" W77.45'N 01° 19' 47" E40.63'PRIVATE DRAINAGE EASEMENT PER THIS MAPEASEMENT FOR DRAINAGE PURPOSES.RECORDED CONCURRENTLY WITH THIS MAPLL40' DEDICATION FOR PUBLIC ROAD EASEMENT FROM WILLIAMBUCKLEY, ET AL TO COUNTY OF SAN LUIS OBISPO PER R920'20'EASEMENT LEGENDTLTRAIL EASEMENT PER THIS MAPBPUBLIC FOOTINGS AND ABUTMENTS EASEMENT PER THIS MAPPTPUBLIC UTILITY EASEMENT AND STREET TREE EASEMENT PER THIS MAPLLANDSCAPE, IRRIGATION, AND MAINTENANCE EASEMENT PER THIS MAPCURVE TABLECURVE #C10C11C18LENGTH52.84'8.33'29.85'RADIUS72.00'45.00'19.00'DELTA42°02'53"10°36'25"90°00'00"LINE TABLELINEL11L15L17L20L21L22LENGTH14.27'32.25'51.33'33.56'42.21'52.14'BEARINGN59° 53' 18"ES56° 56' 39"ES75° 19' 13"ES58° 00' 15"ES32° 45' 14"ES51° 07' 32"ELINE TABLELINE #RAD3DIRECTIONS28° 00' 37"W612 CLARION COURTwww.wallacegroup.usPLANNINGCONSTRUCTION MANAGEMENTLANDSCAPE ARCHITECTUREMECHANICAL ENGINEERINGPUBLIC WORKS ADMINISTRATIONSURVEYING / GIS SOLUTIONSWATER RESOURCES®OF SHEETS13 14010020050SCALE1 INCH = 100 FEETTRACT MAP NO. 3089 PHASE 5LEGENDFOUND MONUMENT AS NOTEDSET 1 -INCH IRON PIPE CAPPED LS 8298, UNLESS OTHERWISE NOTEDSET NAIL AND TAG LS 8298 PRODUCED INTO THE STREET 0.20' FROM THETRUE LOT CORNER. SEE DETAIL 10A ON SHEET 10 FOR OFFSETINFORMATIONSET NAIL AND TAG LS 8298 PRODUCED 1.00' FROM THE TRUE LOT CORNER ALONG THE LOT LINE. SEE DETAIL 10B, SHEET 10 FOR OFFSETINFORMATIONSET 2" BRASS CAP INSCRIBED LS 8298 IN STANDARD CITY CENTERLINEIN MONUMENT WELLM MEASUREDRAD RADIALR1 041/MB/048, DISTANCES REDUCE TO GRIDR2 TRACT 3089 PHASE 2 & 3, SURVEY IN PROGRESSR9 6/DEEDS/49PHASE 5 OF MULTIPLE PHASESIN THE CITY OF SAN LUIS OBISPO, COUNTY OF SAN LUIS OBISPO, STATEOF CALIFORNIA. BEING A SUBDIVISION OF A PORTION OF PARCEL B OFTHE AGREEMENT DECLARATION OF LOT LINE ADJUSTMENT SLO AL18-0013 RECORDED IN DOCUMENT NO. 2018-025711 OF OFFICIALRECORDS IN THE OFFICE OF THE COUNTY RECORDER'S OFFICE,COUNTY OF SAN LUIS OBISPO, CALIFORNIA.FOR INFORMATIONAL PURPOSES, LOTS 386-392, 398-401, 434, 438 AND 439 OR PORTIONS THEREOF, ARE IN THECURRENT 100-YEAR FLOOD PLAIN, LOTS 386-392, 398-401, AND PORTIONS OF LOTS 434, 438, AND 439 WILL BE OUTOF THE 100-YEAR FLOOD PLAIN AFTER SITE GRADING IS PERFORMED AND THE REVISED FLOODPLAIN ISRECOGNIZED BY FEMA (CLOMR CASE 22-09-0955R), AS SHOWN ON SHEET 14100-YEAR FLOOD PLAIN NOTELOTS MAY HAVE THE BUILDING ENCROACH INTO THE FRONT YARD SETBACK UP TO 4.00 FEET.LOTS MAY HAVE THE BUILDING ENCROACH INTO THE REAR YARD SETBACK UP TO 1.50 FEET.BUILDING SETBACK NOTESSHEET 12Page 211 of 615 CITCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LCITY-LHUGHES LANEEARHART WAYCOLEMAN LANEYEAGER CT.DOOLITTLE DRIVEVENTURE DR.LANGLEY ST.WRIGHT BROTHERS WAYJESPERSEN RD.FOXTROT CT.PIPER LN.VENTURE DR.CESSNA CT.KITTY HAWK CT.MEMPHIS BELLE WAYEARTHWOOD LNJESPERSEN RD.EARTHWOOD LNTANGO WAYSKY KING DR.BRAVO ST.ALPHA LN.VENTURE DR.CURRENT FEMA 100-YEARFLOOD PLAIN BOUNDARY FIRMMAP 06079C1331H (06/06/2024)TANK FARM CREEK100-YEAR FLOOD PLAIN BOUNDARY PERAVILA RANCH DEVELOPMENT PHASES 2-6CLOMR REPORT PREPARED BY WALLACEGROUP (FEMA CASE NO. 22-09-0955R)352353354351350349348347346345344343342341340339337336335334333332331362365363360359358357356355380379378377376375374373372370381382383384385386391392390389388387403402404425405424401400407406408399420409398397410419418411396395394393412413414417416415433432431430429428427426368369366367386 434434435423422421361434371364338 436 437 438 439TANK FARM CREEKBUCKLEY ROAD(COUNTY ROAD A2089)VACHELL LN612 CLARION COURTwww.wallacegroup.usPLANNINGCONSTRUCTION MANAGEMENTLANDSCAPE ARCHITECTUREMECHANICAL ENGINEERINGPUBLIC WORKS ADMINISTRATIONSURVEYING / GIS SOLUTIONSWATER RESOURCES®OF SHEETS14 140ADDITIONAL MAP SHEETTRACT MAP NO. 3089 PHASE 5LEGENDARTERIAL STREETS - ROAD CLASSIFICATIONLOCAL RESIDENTIAL STREETS - ROAD CLASSIFICATIONFEMA 100-YEAR FLOOD PLAIN BOUNDARY (EXISTING)FEMA FUTURE CLOMR 100 YEAR BOUNDARY LINESCITY LIMITSTHE ADDITIONAL INFORMATION IS FOR INFORMATIONAL PURPOSES,DESCRIBING CONDITIONS AS OF THE DATE OF FILING, AND IS NOTINTENDED TO AFFECT RECORD TITLE INTEREST.THE ADDITIONAL INFORMATION IS DERIVED FROM PUBLIC RECORDSOR REPORTS AND DOES NOT IMPLY THE CORRECTNESS ORSUFFICIENCY OF THOSE RECORDS OR REPORTS BY THEPREPARER OF THE ADDITIONAL MAP SHEET.SUMMARY TABLENUMBER OF LOTS(LOTS 331-439)AVERAGE SINGLEFAMILY LOT SIZE(LOTS 331-385,387-425, 427-433)OPEN SPACELAND (LOTS 434,435, 438 & 439)PUBLIC PARK LAND(LOTS 386 AND 426)1095834SQUAREFEET1.87 ACRES15.50 ACRESLOTS MAY HAVE THE BUILDING ENCROACH INTO THE FRONT YARD SETBACK UP TO 4.00 FEET.LOTS MAY HAVE THE BUILDING ENCROACH INTO THE REAR YARD SETBACK UP TO 1.50 FEET.BUILDING SETBACK NOTESNOTICE OF REQUIREMENTS1. THE OWNERS OF ALL LOTS AND UNITS WITHIN THIS MAP ARE NOT ELIGIBLE FORFUTURE RESIDENTIAL PARKING DISTRICT OR NEIGHBORHOOD TRAFFICMANAGEMENT PROGRAM PROCESSING.2. THE OWNERS OF ALL LOTS WHERE SIGHT LINES ARE SHOWN ON THE PUBLICIMPROVEMENT PLANS ON FILE AT THE CITY OR ARE REQUIRED BY THE CITY'SMUNICIPAL CODE SHALL MAINTAIN SAID SIGHT LINES BY RESTRICTING FENCE ANDPLANTING HEIGHTS IN THOSE AREAS.3. A FINAL LETTER OF MAP REVISION (LOMR) SHALL BE SUBMITTED WITHIN SIX (6)MONTHS OF THE COMPLETION OF GRADING AND THE LOMR MUST BE APPROVEDBY FEMA PRIOR TO BUILDING PERMIT ISSUANCE.NEIGHBORHOODCOMMERCIAL LOTS(LOT 436 AND 437)1.75 ACRESCITY-LPHASE 5 OF MULTIPLE PHASESIN THE CITY OF SAN LUIS OBISPO, COUNTY OF SAN LUIS OBISPO, STATEOF CALIFORNIA. BEING A SUBDIVISION OF A PORTION OF PARCEL B OFTHE AGREEMENT DECLARATION OF LOT LINE ADJUSTMENT SLO AL18-0013 RECORDED IN DOCUMENT NO. 2018-025711 OF OFFICIALRECORDS IN THE OFFICE OF THE COUNTY RECORDER'S OFFICE,COUNTY OF SAN LUIS OBISPO, CALIFORNIA.Page 212 of 615 1 SUBDIVISION AGREEMENT – TRACT 3089 PHASE 5 THIS SUBDIVISION AGREEMENT—TRACT 3089 PHASE 5 (this “Agreement”) is dated this ______ day of ___________2025 by and between MRP HTMB, LLC, a Delaware limited liability company, herein referred to as "Subdivider," and the CITY OF SAN LUIS OBISPO, herein referred to as the "City." RECITALS REFERENCE IS HEREBY MADE to that certain proposed subdivision of real property in the City of San Luis Obispo, County of San Luis Obispo, State of California, a description of which is shown on the Final Map of Tract 3089 Phase 5, City of San Luis Obispo, California, as approved by the City Council on the ____ day of ___________, 2025 (this “Subdivision”) . The Subdivider desires that said Tract 3089 Phase 5 be accepted and approved as a Final Map pursuant to the Subdivision Regulations of the City of San Luis Obispo (Title 16 of the San Luis Obispo Municipal Code), and It is a condition of said regulations that the Subdivider agree to install the Subdivision Improvements as set forth on the plans therefore. TERMS AND CONDITIONS: In consideration of the foregoing, the Subdivider does hereby agree to construct and install the following Subdivision Improvements (collectively “Subdivision Improvements”) in accordance with said Subdivision Regulations, and in accordance with approved plans and specifications on file in the office of the City Engineer, City of San Luis Obispo, (“Subdivision Improvement Plans and Specifications”) to wit: Page 213 of 615 2 1. CURB, GUTTERS AND SIDEWALKS 2. STREET BASE AND SURFACING 3. WATER MAINS, RECYCLED WATER MAINS and SEWER MAINS, including sewer laterals to the property line and water services to the curb stop. 4. LANDSCAPING 5. DRAINAGE STRUCTURES 6. STREET LIGHTS 7. ELECTRIC, GAS, TELEPHONE AND CABLE TELEVISION: In addition to the inspection and approval of such facilities by the City, each public utility shall be required to file a letter stating that the Subdivider has properly installed all facilities to be provided by him, and that the said utility is prepared to provide service to residents upon request. 8. ANY & ALL OTHER IMPROVEMENTS shown on the Subdivision Improvement Plans and Specifications or required by project approvals. All of the above facilities shall be installed in the locations designated by the City and in accordance with the Subdivision Improvement Plans and Specifications. The lines and grades for all of said Subdivision Improvements shall be established by the Subdivider in accordance with the Subdivision Improvement Plans and Specifications. The Subdivider agrees that the work of installing the above Subdivision Improvements shall begin within thirty (30) days from the date of recording of the final map, and that the work shall be completed within twenty-four (24) months of said recording date, unless an extension has been granted by the City, provided that if completion of said work is delayed by acts of God or labor disputes resulting in strike action, the Subdivider shall have an additional period of time equivalent to such period of delay in which to complete such work. Any extension of time hereunder shall not operate to release the surety on the Improvement Security (“Improvement Security” shall mean, collectively, the “Performance Page 214 of 615 3 Credit/Bond, Materials Bond, and/or Warranty Bond”) filed pursuant to this agreement. In this connection, the surety waives the provisions of Section 2819 of the Civil Code of the State of California. No building permits will be issued nor occupancy granted after the expiration date of this Agreement, taking into account any authorized extensions, until completion and acceptance of all Subdivision Improvements unless specifically approved by the City. The Subdivider does also agree to comply with the conditions established by the City Council and has paid the necessary fees as indicated on the attached Exhibits 1 and 2. Setting of new survey monuments or resetting of disturbed monuments shall be in accordance with Article 5, paragraph 8771 et seq., of the Professional Land Surveyors Act, Chapter 15 of the Business and Professions Code of the State of California. The Subdivider attaches hereto, as an integral part hereof, and as security for the performance of this Agreement, instrument(s) of credit or bond approved by and in favor of the City of San Luis Obispo, and conditional upon the faithful performance of this Agreement (“Performance Credit/Bond”). Said instrument(s) of credit or bond is/are in the amount(s) shown in Exhibit 2, which is the amount of the estimated cost of said Subdivision Improvements. Subdivider agrees to remedy any defects in the Subdivision Improvements arising from faulty workmanship or materials or defective construction of said Subdivision Improvements occurring within twelve (12) months after acceptance thereof (“Warranty Period”). In accordance with Sections 66499.7 and 66499.9 of the Government Code of the State of California, upon final completion and acceptance of the work, City will release all but 10% of the Improvement Security in the form acceptable to the City as a warranty bond (“Warranty Bond”), with that amount being deemed sufficient to guarantee faithful Page 215 of 615 4 performance by the Subdivider of his obligation to remedy any defects in the Subdivision Improvements arising within a period of one year following the completion and acceptance thereof. The Subdivider shall submit a formal request to the City at the end of the warranty period and City shall provide Subdivider with a comprehensive list of any outstanding defects to be remedied by Subdivider. City shall release the Warranty Bond upon re- inspection and confirmation of the completion of listed repairs. Until such time as the Improvements are accepted by the City, The Subdivider shall be responsible for and bear the risk of loss to any of the improvements constructed or installed and will be responsible for the care of, maintenance of, and any damage to such improvements. The City shall not, nor shall any officer or employee thereof, be liable or responsible for any accident, loss or damage, regardless of the cause, happening or occurrence to the Improvements specified in this Agreement prior to the acceptance of the Improvements. All such risks shall be the responsibility of, and are hereby assumed by, the Subdivider. City’s acceptance of the improvements shall be deemed to have occurred on the date which the City Council shall, by resolution duly passed and adopted, accept said Subdivision Improvements according to the Subdivision Plans and Specifications, and any approved modifications thereto. Neither periodic nor progress inspections or approvals shall bind the City to accept said Subdivision Improvements or waive any defects in the same or any breach of this agreement. “AS -BUILT” record drawings are to be submitted within four weeks of completion of construction and prior to City acceptance of the public improvements. If the Subdivider fails to complete the work within the prescribed time, the Subdivider agrees that City may, at its option, declare the instrument of credit or bond Page 216 of 615 5 which has been posted by Subdivider to guarantee faithful performance, forfeited and utilize the proceeds to complete said Subdivision Improvements , or City may complete said Subdivision Improvements and recover the full cost and expense thereof from the Subdivider or his surety. The Subdivider has deposited with the City a labor and materials surety or sureties in the amount of 50% of the above described Subdivision Improvements in accordance with State law (“Materials Bond”). Said Subdivider shall pay an inspection fee for City to inspect the installation of said Subdivision Improvements, and to verify that they have been completed in accordance with the Subdivision Plans and Specifications. If off-site dedication of property is necessary to facilitate the construction of the required Subdivision Improvements, the Subdivider and City shall adhere to the requirements of Section 6.04 of the Development Agreement adopted by the City Council on October 3, 2017 by Ordinance No. 1639 (2017 Series) with regards to acquiring said off-site dedication. Pursuant to Title 16 of the San Luis Obispo Municipal Code, entitled "Subdivisions," the Subdivision Plans and Specifications, and all other documents filed with the City by the Subdivider and approved by the City Engineer, shall be referred to for further particulars in interpreting and defining the obligations of the Subdivider under this agreement. Pursuant to Government Code Section 66474.9(b), the Subdivider shall defend, indemnify and hold harmless the City and/or its agents, officers and employees from any claim, action or proceeding against the City and/or its agents, officers or employees to attack, set aside, void or annul, the approval by the City of this Subdivision, and all actions Page 217 of 615 6 relating thereto, including but not limited to environmental review (“Indemnified Claims”). The City shall promptly notify the Subdivider of any Indemnified Claim upon being presented with the Indemnified Claim and City shall fully cooperate in the defense against an Indemnified Claim. Nothing in this Agreement waives or is intended to waive any enforcement right or remedy afforded the City by the Subdivision Map Act, including, but not limited to, reversion as provided in Government Code Section 66499.12. It is understood and agreed by and between the Subdivider and the City hereto that this Agreement shall bind the heirs, executors, administrators, successors and assigns of the respective Parties to this Agreement. [signatures on following page] Page 218 of 615 7 IN WITNESS WHEREOF, this agreement has been executed by: SUBDIVIDER MRP HTMB, LLC, A Delaware limited liability company, By:____________________________ Name: Ed Hadley Its: Authorized Signatory CITY OF SAN LUIS OBISPO MAYOR Erica A. Stewart ATTEST: CITY CLERK Teresa Purrington APPROVED AS TO FORM: CITY ATTORNEY Christine Dietrick Page 219 of 615 8 EXHIBIT 1 TRACT 3089 PHASE 5 SUBDIVISION AGREEMENT 1. The Subdivider has deposited a monumentation security in the amount of $78,000 to guarantee the installation of survey monuments in accordance with the approved map and payment for same. Said guarantee will be released once the installation of monuments has been verified and that existing monuments have not been disturbed, and upon receipt by the City of a letter from the Surveyor indicating that they have completed the work and have been paid. Subdivider shall adhere to the requirements of California Business and Professions Code Section 8771 with regards to monument preservation. The monumentation security also guarantees the replacement of any monuments that were disturbed during construction, along with filing of Records of Survey or Corner Records required by said Section 8771. 2. Phase 5 provides sufficient parkland and park improvements to meet City requirements based on the projected population and housing onsite, so there are no "in-lieu" park fees required. 3. Water Impact Fees for irrigation water meters shown on the subdivision improvement plans shall be paid prior to subdivision improvement plan approval per Condition #59. 4. The Subdivider has elected to pay a roadway maintenance fee to satisfy the Conditions of Approval. The fee of $10,000 was approved by the City Engineer in accordance with City Engineering Standards and guidelines. 5. The Subdivider shall comply with all requirements of Council Resolution No. 10832 (2017 Series) approving the tentative map and Ordinance No. 1639 (2017 Series) approving the Development Agreement. The original project approvals included several transportation infrastructure improvements that were required to be constructed prior to or in conjunction with Phase 4 of the development. With approval of the Phase 5 Final Map and proposal to advance Phase 5 development ahead of Phase 4, staff is recommending that the Council approve modifications to the project conditions of approval and Final Environmental Impact Report (FEIR) mitigation measures as follows: 6. Horizon Lane Improvements: Improvements to Horizon Lane between Suburban Road and Avila Ranch project boundary required per Mitigation Measure TRANS-4 and Condition of Approval #106. Improvements previously required with Phase 4. Recommend retaining timing of improvements with Phase 4. Therefore, this item is not involved with Phase 5. 7. Suburban Road Improvements: Improvements to Suburban Road between Earthwood and Horizon Lane required per Mitigation Measure TRANS-4 and Condition of Approval #102. Improvements previously required with Phase 4. Recommend retaining timing of improvements with Phase 4. Therefore, this item is not involved with Phase 5. 8. Buckley Road Frontage Improvements: Widening of Buckley Road east of Tank Farm Creek Page 220 of 615 9 Bridge along project frontage required per Condition of Approval #107. Improvements previously required with Phase 4. Recommend modifying Conditions of Approval to require improvements with Phase 4 or Phase 5, whichever comes first. Design and Construction of all Buckley Road improvements along the project frontage from the Tank Farm Creek Bridge to the eastern site boundary, including but not limited to, a Class I path to the north side of the road and Class II bike lanes, shall be initiated prior to issuance of building permits for Phase 4 or Phase 5 development, whichever comes first. Improvements shall be completed no later than the issuance of an occupancy permit for the 50th residential unit of Phase 4 or Phase 5 development, whichever comes first. 9. Buckley Bicycle Bridge (South Side): Addition of bicycle bridge on north and south sides of Buckley Road crossing Tank Farm Creek required per Mitigation Measure TRANS-11 and Condition of Approval #109. Original approvals required construction of both bridges with Phase 2. With approval of Phase 2-3 Final Map, timing of southern bridge was deferred to Phase 4 to be constructed concurrent with Buckley Road Widening. Recommend modifying Conditions of Approval to require construction of southern bridge prior to the issuance of an occupancy permit for the 50th residential unit in Phase 4 or 5, whichever comes first. Note that the bond for condition #109 was already collected with the Phase 2-3 final map recordation so no bond is needed for recordation of the Phase 5 map for the construction of the Buckley Bicycle Bridge (South Side). 10. Jespersen/Venture & Jespersen/Wright Brothers Roundabouts: Construction of roundabouts at Jespersen/Venture and Jespersen/Wright Brothers intersections required per Condition of Approval #110. Improvements previously required with Phase 4. Recommend modifying Conditions of Approval to require improvements with Phase4 or 5, whichever comes first. Page 221 of 615 10 EXHIBIT 2 TRACT 3089 PHASE 5 - FEE AND BOND LIST 175 VENTURE Amount Form Date Received Bond Release Status Bonds and Guarantees: On-Site Faithful Performance: Can be released upon City Council acceptance of improvements, deposit of one-year warranty surety, and approval of record drawings. Subdivision Improvements (FMAP-0382-2022) Includes all Parks $31,295,400 Bond Off-Site Faithful Performance: Can be released upon Public Works Director acceptance of improvements, deposit of one-year warranty surety, and approval of record drawings. Buckley Road Frontage Improvements (COA 107) is a County permit and bonding will be satisfied as required by County N/A N/A Horizon Lane Improvements: Improvements to Horizon Lane between Suburban Road and Avila Ranch project boundary required per Mitigation Measure TRANS-4 and Condition of Approval #106 N/A N/A for bond since #106 goes with Phase 4 Suburban Road Improvements: Improvements to Suburban Road between Earthwood and Horizon Lane required per Mitigation Measure TRANS-4 and Condition of Approval #102 N/A N/A for bond since #102 goes with Phase 4 Buckley Bicycle Bridge (South Side): Addition of bicycle bridge on north and south sides of Buckley Road crossing Tank Farm Creek required per Mitigation Measure TRANS-11 and Condition of Approval #109 N/A N/A for bond since #109 goes with Phase 2-3 already bonded for. Jespersen/Venture & Jespersen/Wright Brothers Roundabouts: Construction of roundabouts at Jespersen/Venture and Jespersen/Wright Brothers intersections required per Condition of Approval #110 N/A N/A for bond since scope of work is part of subdivision improvement plans under FMAP-0382-2022 Labor & Materials (50% of cost of each of the above improvements) Can be released 90 days after acceptance of improvements, if no claims. (Civil Code Section 8412) Page 222 of 615 11 Subdivision Improvements (FMAP-0382-2022) Includes all Parks $31,295,400/2 = $15,647,700 Bond Off-Site Labor & Materials: Can be released upon Public Works Director acceptance of improvements, deposit of one-year warranty surety, and approval of record drawings. Buckley Road Frontage Improvements (COA 107) is a County permit and bonding will be satisfied as required by County N/A N/A Jespersen/Venture & Jespersen/Wright Brothers Roundabouts: Construction of roundabouts at Jespersen/Venture and Jespersen/Wright Brothers intersections required per Condition of Approval #110 N/A Monument Guarantee $78,000 CD or Letter of Credit Can be released upon verification that monuments have been set and surveyor has been paid. 10% Warranty 10% of On-Site Faithful Performance above To be collected prior to release of Faithful Performance Bonds Can be released one-year after acceptance of improvements. Page 223 of 615 12 Fees: Plan and Map Check Fees: Map Check Fee FMAP-0132-2024 Balance Due $39,221.07 $0 Check 3/20/2024 Paid in full (includes $1,160.80 in IT Surcharge fees) Improvement Plan check Fee: FMAP‐0382-2022 Design Exceptions (3 X $330.81) IT surcharge Total $135,458.96 $992.43 $4,171.86 $140,623.25 Check Check Check 8/1/2022 7/14/2025 7/14/2025 Paid in full Paid in full Paid in full Construction Inspection Fees Construction Inspection Fee: FMAP‐0382-2022 Balance Due IT surcharge: N/A $381,471.05 Check 7/14/2025 Paid in full Impact Fees Roadway Maintenance Fee $10,000 To be deposited in Acct # 40050300- 90346953 Streets Reconstruction and Resurfacing Master per Matt Horn Water Impact Fees for irrigation meters Park H, 1” Recycled Irrigation Service $30,091.36 2” Recycled Irrigation Service for Jespersen Streetscape $95,586.53 3/4” Recycled Irrigation Service for Berm in Lot 435 $17,701.14 Park I, 1” Domestic Irrigation Service $30,091.36 2” Domestic Irrigation Service for Streetscape and Paseo $95,586.53 Commercial Lots – 1” Recycled Irrigation Service at each Lot N/A DEFERRED Water Impact fee for commercial lots deferred. To be paid with building permits for these locations, at fee cost in place at time of issuance. Ad Hoc and Mitigation Fees Page 224 of 615 13 Buckley/Vachell Fair Share Mitigation (COA 116.g) $13,884.05 Mitigation fees for Phase 5 residential units due with map recordation. Based on % of total unit count in that phase (relative portion of $108,798). Buckley/Vachell Fair Share Mitigation (COA 116.g) $25,024.17 Mitigation fees for Phase 6 commercial units due with map recordation. Phase 6 units now part of Phase 5 map. Based on % of total unit count in that phase (relative portion of $108,798). Other Ad Hoc and Mitigation Fees Paid with Phase 1 Avila Ranch Affordable Housing Requirements See Affordable Housing Agreement Water Impact Fee1 To be collected with building permit Wastewater Impact Fee1 To be collected with building permit Transportation Impact Fee1 To be collected with building permit 1 All Impact Fees are adjusted annually (July 1) based on CPI. Credit given for demolished units. Page 225 of 615 Page 226 of 615