Loading...
HomeMy WebLinkAbout03/19/1991, C-3 - PLANS AND SPECIFICATIONS FOR CRACK REPAIR PROJECT FOR PALM STREET AND MARSH STREET PARKING STRUCTURES. �II�N���I�II�IIIIIIIII II '�'�/ I" MEETING DATE:c� o San LUIS OBISPO 3 -i9- 91 COUNCIL AGENDA REPORT ITEM NUMBER: FROM: Dave Romero Wayne Peterson Prepared by: �K ie� Opalewski Public Works City Engineer Parking Manager SUBJ: Plans and Specifications for Crack Repair Project for Palm Street and Marsh Street Parking Structures. CAO RECOMMENDATION: By motion, approve the plans and specifications for crack repair for the Palm Street and Marsh Street Parking Structures and authorize soliciting of bids and awarding of contract if lowest responsible bid is within Engineer's estimate. BACKGROUND: Since the completion of the Palm Street Parking Structure in March 1988, there have been a number of structural cracks in the walls and floors. This is common with structures of this construction. These cracks are easily penetrated by water which is causing deterioration of the concrete and metal reinforcement in the walls and floors. If allowed to continue unchecked, this water penetration could cause serious damage and costly reconstruction to the structure. There have been similar cracks in the floor area of the new Marsh Street facility, but to a lesser degree. DISCUSSION: Through an epoxy injection system the floors and walls of both structures can be sealed to prevent further water damage. Approximately 3100 linear feet will have to sealed in the Palm Structure and 200 linear feet in the Marsh Structure. This application process in the most cost-effective and can be done with a minimum of disruption to the operations of each structure. The life expectancy of this project is unknown because of the nature of post-tension concrete contruction. Periodic inspections will be required to determine if additional repairs are needed. CONCURRENCES: The Engineering and Parking Divisions concur with the recommendation to epoxy seal the walls and floors. FISCAL IMPACT: The Engineer's estimate for the project is $42,000. This is a new project and monies have not been allocated for this repair work in (' - 7 -/ �i�►��►b►►►�IIIIIIIIII�°�1p��UIU city of San Luis osIspo COUNCIL AGENDA REPORT Council Agenda Report Page Two the current budget. Funds will have to be allocated from the undesignated fund balance of the parking program. As reflected in the recent mid-year budget review, adequate balances are projected at year end to fund this project. However, the long-term financial status of the parking system continues to be a concern, and any unprogrammed outlay reduces the funds available for future capital purchases, such as acquisition of a third parking site. ALTERNATIVES: 1. Delay the project to a later date 2. Reduce the scope of the project 3 . Cancel the project PROS AND CONS It is possible to postpone the project, especially in light of our limited rainfall. However, any additional moisture from condensation or light rain will only accelerate the concrete deterioration. The longer we wait, the more costly for future repairs. Repairing only part of the cracks or completing only one structure would be less expensive in the short-term, but more costly in the long-term since the bidding and contract process would have to be repeated. Cancelling the project would be short sighted and only cause more serious problems in the future. Plans and specification are available in the Council Office for review. _ I 3-oZ