Loading...
HomeMy WebLinkAbout04/16/1991, 1A-PT.2 - RECONNAISSANCE REPORT ON NACIMIENTO RESERVOIR WATER DIVERSION AS A WATER SUPPLY FOR THE CITY OF SAN LUIS OBISPO. �II�IUI�yIIIWIIIIIIIuIiIIUIU ".7 r MEETING DATE: Cio san lues osispo April 16, 1991 COUNCIL AGENDA REPORT ITEM1.4 NUMIfff BER: FROM: William T. Hetland, Utilities Director U� Kenneth M. Weathers, Water Division Manage Gary W. Henderson, Utilities Enginee3�� SUBJECT: RECONNAISSANCE REPORT ON NACIMIENTO RESERVOIR WATER DIVERSION AS A WATER SUPPLY FOR THE CITY OF SAN LUIS OBISPO. CAO RECOMMENDATION: Staff recommends that the City pursue as expeditiously as possible obtaining water from Nacimiento Reservoir. The initial step is to obtain a formal water entitlement from the County and determine the feasibility of other agencies participating in a joint project. Preliminary design and environmental review would then be contracted for with outside firms. REPORT IN BRIEF The County of San Luis Obispo has entitlement to water at the Nacimiento Reservoir. The City of San Luis Obispo in interested in obtaining a portion of those rights to meets its long term and short term emergency water needs. This is a reconnaissance level report which reviewed the feasibility of using Nacimiento water. The report relied heavily on existing data. It identifies two alternatives for obtaining water from Nacimiento Reservoir. The first is a pipeline alignment that goes from the Nacimiento Reservoir south to the Whale Rock Reservoir where the existing conveyance system would send it into San Luis i Obispo. The second alignment would run south from Nacimiento reservoir to an afterbay, then to the Cuesta Grade where it would tie into the existing Salinas Reservoir pipeline then to the City's treatment plant. It was assumed that only the City would participate in this project. Inter governmental agreements were identified as a potential problem. Some environmental concerns were identified including construction and growth inducing impacts. The project is estimate to cost $25, 000,000 and would take approximately 45 months to complete. BACKGROUND At the March 19, 1991 City Council meeting, Council requested staff to provide information for a meaningful and in- depth discussion of the Nacimiento Project from existing information. Staff efforts included studying existing reports, updating information, determining adequacy of existing reports, and meeting with county and city officials. This report addresses two alternatives for providing water to the City from San Luis Obispo County's allocation of water in Nacimiento Reservoir. For simplification the alternatives assume that the City would develop a system to deliver 3, 000 of per year �►►�ai�►►�IIIIIII�I��II�III city of San tuts OBISPO COUNCIL AGENDA REPORT with no participating agencies to share in the delivery expense of water. The assumption was also made that the County would provide a 3, 000 of allocation to the City. GENERAL PROJECT INFORMATION Nacimiento Dam and Reservoir are owned and operated by the Monterey County Flood Control and Water Conservation District (Monterey District) . San Luis Obispo County is entitled to 17, 500 acre-feet of water from Nacimiento Reservoir under an agreement between San Luis Obispo County Flood Control and Water Conservation District (District) and the Monterey District executed in 1959. 11300 acre-feet has been contracted for use around the lake area, leaving 16, 200 acre-feet available for distribution to other parts of the County. There has been no allocation of the remaining 16, 200 acre- feet to potential users within the County. In 1979, steps were initiated for a vote by the electorate on a bond issue for constructing a distribution system to deliver water from Nacimiento Reservoir throughout the county. At that time the water was 45% oversubscribed for by potential water agencies within the County. Because the District holds an entitlement to Nacimiento water, it is making payments to the District. These include $9 per acre-foot as capital repayment for construction of the dam and approximately $3 to $4 per acre-foot for operation and maintenance. The capital portion of the cost will be fully repaid by 2004. This results in a total annual cost of $39, 000 for 3, 000 AF. The cost of distribution would be added when facilities are built. There have been no treatment or transportation facilities built to distribute this water. RELIABILITY The capacity of Nacimiento Reservoir is 350, 000 of with annual releases of approximately 190,000 of per year to Monterey County. The agreement with Monterey District provides that under critical conditions San Luis Obispo County has first priority for its water entitlement and further, that at least one-half of the water required for the following years' entitlement will be held over in storage in the lake. Since the reservoir was completed in 1957 the County's entire 17,500 acre foot allotment could have been delivered with the possible exception of 1977. Additional analysis is needed to verify the reliability. In this extended period of drought the City is very conscious of water sources dependent upon local rainfall. Any Nacimiento alternative is dependent on rainfall in this region. WATER QUALITY Water quality in the lake is affected by the recreational facilities around the lake, seasonal drawdowns, and periods of rapid runoff in the winter months. Water quality would be ���ti�ib►►►�NIIIII�� �����II MY Of san tuts OBISPO COUNCIL AGENDA REPORT improved through settlement by retention in Nacimiento and Whale Rock reservoirs. The mineral content of the Nacimiento water is slightly better than either the Salinas or Whale Rock reservoirs. All additional drinking water quality standards have been tested by San Luis County. All presently regulated water quality standards, including Mercury levels, are well below Maximum Contaminant Levels. The County has no records which would indicate whether the Nacimiento water would meet proposed standards for THM levels. COUNTY PARTICIPATION As stated earlier the San Luis Obispo County Flood Control and Water Conservation District has the entitlement to the Nacimiento water. Any utilization of the District's Nacimiento rights by the city of San Luis Obispo could occur only with cooperation of the District. At the very least this would involve an allocation being made to San Luis Obispo for the City to transport water in any way it deemed feasible. At the most, the City would be one part of a larger project and would share in an allocation of water and expenses of the project undertaken by the District. In the former case the City would control the pace of the project. In the latter case the County would most likely be the lead agency. The present permit from the State Water Rights Board addresses diversion of Nacimiento water to "Zone 211 . This zone does not include the City, therefore transportation of water to the City would require that the County obtain approval from the State Water Rights Board. The County has not yet made a decision on the State Water Project. The "San Luis Obispo County Master Water Plan Update, " March 1986, recommended several actions. The first action was to "request that the Department of Water Resources conduct a study of implementation of the State Water Project's Coastal Branch for San Luis Obispo County's full entitlement; this would meet the projected demand (with conservation) for the supplemental water to about year 2010. " The sixth action was to "Start planning now to develop local resources to meet water demands beyond year 2010. specifically, consider construction of a pipeline to bring water from Nacimiento Reservoir as the next logical step for meeting demand up to about 2025 . . . . ". It is unclear how the County would view use of part of their Nacimiento allocation relative to the proposed State Water Project. OTHER PARTICIPATING AGENCIES For the purpose of this report it has been assumed that the City could not participate with other agencies. There exists a potential of participation with either alternative. Alternative No. - 1 (Whale Rock) has a clear potential of participation with Cayucos, Morro Bay, CMC, Cal Poly, the County, and possibly others. Alternative No. 2 (Cuesta Grade) has a clear potential i��N���i►►�Illllll�p1iP11u���Ulll city of san Luis osIspo Wii% COUNCIL AGENDA REPORT of participation with Paso Robles, Templeton, Atascadero, Santa Margarita, the County, and possibly others. Participation with other agencies has the advantage of recognizing economies of scale in construction and sharing operating and maintenance costs. Participating with other agencies may also have a benefit in obtaining support from the County. Participation also has disadvantages of contributing to the complexity of the project, requiring inter-agency agreements, and significantly increasing the growth inducing environmental impact. All of these factors would add delays to implementation of any project. Participating with other agencies would most likely result in the County being the lead agency in the project. ALTERNATIVE SUPPLY ROUTES This report will address two alternative supply routes. Although other routes may be possible, existing reports and studies do not provide sufficient detail to accurately compare other alternatives. The two routes are the Nacimiento to Whale Rock Reservoir route (Alt 1) , and the Nacimiento to San Luis Obispo route via Paso Robles and Cuesta Grade (Alt 2) . Schematic drawings of the approximate route locations are enclosed as attachments #1 and #2 respectively. ROUTE COMPARISON The two alternate routes are compared relative to their construction cost, operating and maintenance (O & M) cost, environmental considerations, and total time to obtain water. Some of the cost factors used are common to cost factors used in the desalination study. This was done in order to provide some scale of comparison of these two alternative routes with the cost of desalination. Both of these alternatives were evaluated assuming no other agency was participating in the project. Both of these alternatives have some potential for power recovery but that has not been addressed in this report because of limited information. The scope of all previous studies was different than the City of San Luis Obispo would probably undertake. Costs used in this report are general in nature and were derived from existing studies. Preliminary engineering has not been completed on either of these alternatives. For these reasons care should be taken in making direct comparisons between these alternatives and other alternatives. a - ����i���H►�IIIIIII�Pp1 ��I�U City OF San tins OBISPO COUNCIL AGENDA REPORT ALTERNATE NO. 1 (Nacimiento to Whale Rock Reservoir) GENERAL: The Nacimiento water is pumped through 24 .4 miles of 18" diameter high pressure pipe from Nacimiento Reservoir to a tributary creek just above Whale Rock Reservoir. The water then gravity flows down into Whale Rock Reservoir (see Attachment #1) . From Whale Rock Reservoir it is pumped through the existing Whale Rock pipeline to the City water treatment plant. In evaluating this alternative it is assumed that the existing Whale Rock facilities are capable of transporting the Nacimiento water in addition to the Whale Rock water. If alternative No. 1 was selected the Whale Rock agreement would most likely need revision. The revisions might compensate the other participants in the Whale Rock project for capital and operating costs and would also revise operating procedures. COST FACTORS - CONSTRUCTION The major facilities constructed include pipeline and a pump station. The construction cost estimate for all facilities was derived from existing reports. Base costs for similar projects with similar facilities were used with adjustments made using ENR Construction Cost Index. Percentage (%) cost factors for engineering, legal, administration, and contingencies were the same as used in the desalination project. This was done to facilitate comparison between the alternatives. Each cost was developed using several approaches to insure that the final costs were correct in order of magnitude. Details of the capital costs are included in Atch. No. 3 . Total capital cost for Alt. # 1 was $25, 631, 000. Amortized over twenty years at eight (8%) percent interest would result in an annual cost of $2,417,795 or $806 per acre foot. COST FACTORS - Operating and maintenance (O&M) The operation of this system would be similar to that presently undertaken by City employees at Whale Rock Reservoir. The major O&M costs include labor and materials, replacement costs, County reimbursement fees, and power consumption. There were no studies found which contained sufficient information to develop reliable O&M costs for Alt. No. 1. Reliable cost information for Alt. No. 2 . appears later in this report. Some general statements comparing the O&M cost of the two alternatives can be made. Relative to Alt. No. 2, Alt. 1 has less head to pump, has more distance to pump, and less opportunity for power recovery. The general conclusion is that power consumption may be slightly less for Alt. No. 1. Alt. No. 1 could utilize the present facilities, equipment, and personnel at Whale Rock. This would avoid some duplication and improve efficiency on a per AF basis relative to Alt. No. 2. '��Hai�►►►�IIIiI(Ipp��u►�����N MY of San lU1S OBISp0 COUNCIL AGENDA REPORT Utilization of these personnel and facilities would require an agreement with the Whale Rock Commission. Overall labor costs for Alt. No. 1 should be less than Alt. No. 2 . Replacement cost for Alt. No. 1 would be slightly less than Alt. No. 2 because there would be fewer capital facilities. There would be some cost incurred in Alt. No. 1 to reimburse Whale Rock Commission for the use of their capital facilities. The shared cost with the Whale Rock Commission on Whale Rock's portion of the line may reduce the per AF replacement cost. County reimbursement charges would be the same for either alternative. Because of the lack of more precise information we can conclude that O&M cost for Alt. No. 1 are probably less than Alt. No. 2 . The total O&M cost for Alt. No. 2 is $246/AF. ENVIRONMENTAL CONSIDERATIONS: The construction of pump stations and pipe lines raises issues of disturbance of soils and plants. These issues would be addressed in an EIR. Water diversion between basins may be determined to be a significant impact. White Bass presently exist in Nacimiento lake and do not exist in Whale Rock Reservoir. The introduction of White Bass into Whale Rock through pumping of water would be detrimental to the present fish population in Whale Rock Reservoir. This item would have to be addressed in the EIR. Additional stream flow would be added to a tributary to Whale Rock Reservoir. It is not known if this would be a significant impact. If it is determined that this would be a significant impact the pipe line could be extended an additional 2 miles to the reservoir. Growth inducement is a factor that has to be addressed in relation to any new permanent water source. Participation with other water agencies on this project would increase and complicate the growth inducing impact and would require additional environmental review. Economic effect on the recreational value of Nacimiento Reservoir could be negative. Much of the recreational value of the reservoir relies upon a volume of water in the reservoir which is conducive to water sports and is aesthetically pleasing. Any use of water by any County water agency could be detrimental to the recreational value of the reservoir. This impact would be more severe in a period of drought. Economic effect on property values of the land adjoining and in the immediate vicinity of Nacimiento Reservoir could be negative. Much of the value of this property is derived from its proximity to the lake and its recreational value. There is at least one group of property owners in the area (N.R.W.M.A.C. ) who have expressed concern about the present and future diversions lA � 11111111IIIIIIIIP� 11111 city of San LUIS OBIS130 COUNCIL AGENDA REPORT from the reservoir. ESTIMATED TIME SCHEDULE: The estimate of time to complete this project is based upon past experience with similar projects and from other sources. For clarity the total project time schedule is broken into blocks of time for different phases. These phases include governmental agreements, preliminary design, E. I.R./permits, design/R.O.W./permits, and shop drawings/construction. A time line for all of these phases is shown in Atch. #5. Governmental agreements include the time to negotiate and obtain an agreement between the City and the County of San Luis Obispo. This includes the minimum time for preliminary communications, meetings, public hearings, decision making, formal negotiations, and final agreements. Participation with other agencies would extend this schedule considerably. The estimate of 6 months for this process is a minimum time estimate. There are many factors which could extend this time considerably. Preliminary design includes the time to select engineering firm, develop and analyze alternative designs, hold public hearing, and select a preferred alternative. This process should not begin until the governmental agreements are complete. The preliminary design phase is estimated to require 9 months. Environmental Impact Statement/permits include the time to prepare and process the E.I.R. Writing the E.I.R. could commence when the preliminary design is approximately two-thirds complete and a scope of project has been defined. The County Environmental Coordinator estimated that this would require 10 to 12 months. Design/R.O.W./bidding includes the selection of an engineering firm, R.O.W. definition and acquisition, preparation of plans and specifications, and bidding of the construction project. This process could commence when the E.I.R. was approximately one-half complete. The design is estimated to require 12 months to complete. Shop drawing/construction includes the entire process of construction from award of bid to completion. This phase could not begin until design is complete. Shop drawings for a project of this size would take about 4 months. Pipe manufacturers have estimated it would take about 8-10 weeks to begin delivery of this pipe and that it could be produced at the rate of 1, 000 feet per day. Construction would not start until a significant supply of pipe was in inventory on site. Actual construction is estimated to progress at a rate of 1,200 feet per day using three crews, each installing 400 feet per day. Total time to complete this project is estimated at 44.5 months. If the project commenced on May 1, 1991, water could flow into the City on Jan. 15, 1995. !&A) r "1111NVIIIII�$IXI111 city of San Luis OBlspo 1 COUNCIL AGENDA REPORT ALTERNATE NO. 2 (Nacimiento to San Luis Obispo via Paso Robles and Cuesta Grade) GENERAL: The water is pumped by two pump stations through -33 miles of 18" diameter high pressure pipe from Nacimiento Reservoir through Paso Robles, down Hwy 101 to a point where it connects with the existing City water line from Salinas Reservoir. This point of connection is approximately 3 miles north of the Cuesta tunnel. From this point the water gravity flows through the tunnel and on to the City water treatment plant at San Luis Obispo. A 500 of afterbay would be constructed to hold the water for a total of 30 days after leaving Nacimiento. (see attachment #2) . The afterbay is required by the State since Nacimiento is a body contact reservoir. In evaluating this alternative it was assumed that the existing City water line from Salinas Reservoir has sufficient capacity to carry the additional water from Nacimiento. Additional analysis will be necessary to verify this. Modification to the existing Cuesta tunnel may also have to be made since the State Water Project Coastal Branch is currently designed to share use of the tunnel. COST FACTORS - CONSTRUCTION The major facilities constructed include pipeline, an afterbay, and two pump stations. The construction cost estimate for all facilities was derived from existing reports. Base costs for similar projects with similar facilities were used with adjustments made using ENR Construction Cost Index. Percentage (%) cost factors for engineering, legal, administration, and contingencies were the same as used in the desalination project to facilitate comparison between the alternatives. Each cost was developed using several approaches to insure that the final costs were correct in order of magnitude. Details of capital costs are included in Atch. #4 . Total capital cost for Alt. # 2 was $36,980, 000. Amortized over twenty years at eight (8%) percent interest would result in an annual cost of $3,488. 092 or $1, 163 per acre foot. COST FACTORS - OPERATION AND MAINTENANCE (O&M) The operation of this system would be similar to that presently undertaken by City employees at Whale Rock Reservoir. The major O&M costs include labor and materials, replacement costs, County reimbursement fees, and power consumption. All cost estimates presented are the best preliminary estimates that staff is able to develop from available information. More accurate cost estimates depend upon completion of preliminary design. Power consumption is the major component of operating costs. The cost of power is based upon a $ . 10 per KWH power rate plus a "����►�►ii�llillll�In ���pl MY Of San lues OBI SPO UNCas COUNCIL AGENDA REPORT 10% demand charge. The California Energy Commission estimates the cost of power to increase 6-10 % per year for the next 5-10 years. There is a possibility that energy costs could be reduced by constructing an additional storage reservoir on the south side of Cuesta Grade and thereby taking advantage of a 50% savings for non-peak hour power rates. This alternative was not evaluated in past reports or studies. Energy recovery was factored into this cost analysis. Labor and material cost estimates were based upon the estimated personnel requirements plus 35% for labor overhead and 60% for general expenses. Employee duties would be similar to those performed at Whale Rock Reservoir. An annual cost allowance was made for contributions to a replacement of pumps and power recovery equipment during the project repayment period. The County pays fees to the Monterey District and also may incur additional costs relative to this project which it would pass on to any agency using water. The charges to the County from the Monterey District include a $9 per AF capital improvements charge and a Monterey District 0&M charge of about $4/AF/Yr. In addition, there is an assumption that there may be an additional charge by San Luis Obispo County estimated at $4 /AF/Yr. All AF costs were based upon 3,000 AF/Yr. Labor costs per AF would decrease if the amount of water pumped per year was increased due to participation with other agencies. OPERATING AND MAINTENANCE COST SUMMARY Cost Est. Description Per AF Power consumption $ 121 Labor 91 Replacement 17 County reimbursements 17 Total $ 246 ENVIRONMENTAL CONSIDERATIONS: The construction of pump stations and pipe lines raises issues of disturbance of soils and plants. These issues would be addressed in an EIR. These issues are directly proportional to the amount of disturbance of land for construction for new facilities. For this reason Alt. No. 2 could have a more significant impact than Alt. No. 1. Water diversion between basins may be determined to be a significant impact. ������►�N►�IIIIIII�I►il���l city of San tins OBlspo COUNCIL AGENDA REPORT White Bass are not a significant environmental consideration in Alt. No. 2 Growth inducement is a factor that has to be addressed in relation to any new water source. Participation with other water agencies on this project would increase and complicate the growth inducing impact and would require additional environmental review. Economic effect on the recreational value of Nacimiento Reservoir could be negative. Much of the recreational value of- the Reservoir relies upon a volume of water in the Reservoir which is conducive to water sports and is aesthetically pleasing. Any use of water by any County water agency could be detrimental to the recreational value of the reservoir. This impact would be more severe in a period of drought. Economic effect on property values of the land adjoining and in the immediate vicinity of Nacimiento Reservoir could be negative. Much of the value of this property is derived from its proximity to the lake and its recreational value. There is at least one group of property owners in the area (N.R.W.M.A.C. ) who have expressed concern about the present and future diversions from the reservoir. ESTIMATED TIME SCHEDULE: The estimate of time to complete Alt. #2 is the same as that for Alt. No. i except for two major time factors. Alt. #2 includes the construction of a dam and afterbay. This facility would require significantly more time for dam permitting and environmental review. This additional time is estimated at 6 months. Alt. #2 includes 8. 6 more miles of pipeline to construct than Alt. #1. It is estimated that this would require about 2 more months to construct. Total time to complete this project is estimated at 52.5 months. If the project commenced on May 1, 1991, water could flow into the City on Sept. 15, 1995. r A ������►►i�ullllllllll�►'�°►9�U111 city of San Luis OBlspo AMara COUNCIL AGENDA REPORT SUMMARY ---------------------------------------------------------------- DESCRIPTION ALT NO. 1 ALT NO. 2 --------------------------------------------------------------- Capital Cost $25, 631, 000 $36,980, 000 (total) Capital Cost $806 $1, 163 (per AF) O&M Cost less than $246 $246 (per AF) ----------------------------------------------------------------- Total Cost (per AF) less than $1, 052 $1, 409 ---------------------------------------------------------------- Time Schedule 44 .5 mos. 52.5 mos. "Completion Date" Jan. 15, 1995 Sept. 15, 1995 Other Significant Factors Whale Rock comm. Afterbay White Bass Power consumption 8.6 miles pipeline Cuesta tunnel PROJECT ALTERNATIVES Nacimiento Reservoir offers a viable alternative to the City for increased water resources, even though the above analysis shows Nacimiento to be expensive if the City does it on its own. Alternative approaches to the Nacimiento Reservoir currently available to the City are summarized below: • Approach the County to develop 3000 AF of the Nacimiento Reservoir Project as a permanent water resource for the City. • Approach the County to develop the Nacimiento Reservoir Project in conjunction with other local agencies that may also be interested in development in the near-term future. ►►H�i�►►��IlNlll�lli�u'ui�����U city of San IDIS OBISpo COUNCIL AGENDA REPORT • Negotiate a separate independent agreement with Monterey County to expand Nacimiento Reservoir. • Do not pursue developing the Nacimiento Reservoir at this time but keep it as one of the City's potential long term water resources. The City has identified that an additional safe annual yield of 6,540 acre feet is necessary to meet the needs of the community based on the current general plan. In order to meet this requirement the City will need to bring on line a number of new water resource projects. Nacimiento Reservoir has always been one of the City's long term water resource options and is now the only large scale project available to the City. Using Nacimiento water is consistent with the Council 's policy of having multi- source water resources. There also exists a possibility of the enlargement of Nacimiento Dam. The enlargement could add 3 , 300 - 4, 000 af. at $730 - $1130 per of development cost (per SLOC March 1986 cost) . This could be an alternative for the City in the event that the County would not provide the City with an allotment from their existing allocation. This alternative would require that the City negotiate directly with Monterey County for additional rights. In addition, the current reservoir storage has about 18 months of supply until the City may be in the same position that it was in November 1990; limited reservoir supplies and potential for the continuation of the drought. That would require us to again have to decide that the only option left would be to develop a desalination facility. Since it is estimated to take three and half years to develop the Nacimiento Reservoir it is necessary that we begin immediately. At this time, the City should pursue the development of the Nacimiento Project as quickly as possible. a -I o�na�rNl�lllllll�l►jIIUI�I city of San Luis OBISpo COUNCILAGENDA REPORT --------------------APPENDIX------------------------------------ ---------------------------------------------------------------- SOURCE INFORMATION 1. ) Engineering-Science "City of San Luis Obispo Water Supply Study", April 1977. 2. ) Dept of Water Resources study "San Luis Obispo County Master Water Plan Update", March 1986. (SLOCA) 3. ) Mtg. with SLO County engineering staff. 4. ) Mtg. with SLO County environmental coordinator. 5. ) Co. of SIA Engr. Dept. "Facts about the Nacimiento Water Supply Project, Measure IN"' Nov. 5, 1974. 6. ) SLO Co. Flood Control and Water Conservation District, "Report on Feasibility of Utilization of Water from Nacimiento River within SLO County. " Vol. I, II, and III April 1965. 7. ) Engineering letter from Bookman-Edmonston Engineering, Inc. dated March 11, 1980 to San Luis Obispo Co. , subject "Estimate of Cost for Nacimiento Water Supply" . / a - M 0 N T E R EY ,° C 0 U N T Y SAN L U I S ( O B I S P 0 C O U N T Y �iJ SAN \ ' MIGUEL \ I I NACIMIENTO O p `� PUMPING PLANT NACIMiMO Is 1 L_t RESERVOIR 1...—I 7 O : N E I J PASO ( r R08LE5 ,I NACIMIENTO- r� Q WHALE ROCK CONDUIT ' r..—_.J T W r J J J,CCN i 1, CAMBRIA �•�\�} ' �'•• , �'dL" 0.)TEMPLETON I Aa CRrc O ATASCADERO 1 4 WHALE ROCK •l I RESERVOIR Cl 1 Q GARDEN FARMS \ I ,n \ .SANTA MARGARITA Q li ( SAUNAS � MORRO RESERVOIR � ` ` �•••�� BAYyrs L r�+ 7,� 0 SAN LUIS\ ��� 1 EXISTING OBISPO ` I'^-' 7 WHALE ROCK Or "`•.. CONDUIT 9 SCALE IN MILES V ,y I O I x 3 + s ALTERNATE NO. 1 L E O E N 0 RECONNAISSANCE REPORT PROPOSED CONDUITS EIISTING CONOIRTS on . I PROPOSED PUMPING PLANTS PROPOSED RES[IIYOIRS NACIMIENTO . CWTINO RESERVOIRS INCLUDED IN PLAN WATER DIVERSION ESISTING RESERVOIRS NOT INCLUDED IN PLAN ATTACHMENT 1 M , CR c •ra° C O T S SAN l U l i 0.'B I S P 0C0UNT T ° SAN MIGUEL c L o NACIMIENTO \`-, —PUMPING PLANT AND AFTEItBAY y \.°b of as t•° NKIYICNTO RESCRVOIR SAN SIMEON �a•/ PASO J ROBLEL o* �•,• cAMBwA •�` .�� �"� NAMIENTO- f•1_ aF + SANCILUIS OBISPO t CONDUIT "�i •• TEYPL[TON fir• t•tt. ° . S " \�ATASCADERO �� ew CATUCOS _ O J SANTA MARGARITA '�•, WHALE ROCK a+'� PUMPING PLANT RESERVOIR O GAq DEN FARMS c= ° SANTA MARGARITA a SAUNAS 4 CUCSTA RESERVOIR YORRO BAT WATER '••'\ TUNNEL t P •0 c°tt' / 1 .p BATTIOOD SAN LUIS \ PARK OBISPO O zm a��.,••Y_ E' .000/ ••4 1 AVILA �} +� L L N ^ �� 9 a+� y SHELL BCKN r ° PISYO BEACH O O.�r GROVER CITY O / ARROYO GRANDE OCCANO ') 7 H R E E. NIPOYO 1_ O /� •°•at .. .wt, .00 I a I L . • t ALTERNATE NO. 2 L It t 1 ° 0 RECONNAISSANCE REPORT .AA.Auo •...... ��,/ On ♦P� +IMOf[P A/ttwOwt I,N,I°I Attl+T,ue +if I° Mft,, NACIMIENTO tsnH+rMU bI PCloS[0 W +Y W + WATER DIVERSION ATTACHMENT 2 . NAC IMIENTO RESERVOIR WATER DIVERSION PROJECT Alternative No. 1 Pipelines: assumptions - 18" dia. steel, 24.4 miles, $16,104,000 $125 per foot based on consultant estimates of $110-125 per foot (pipe cost at factory = $65/ft.) Pump Station: from 1977 Engineering Science Report (ES),the $850,000 cost was $450,000, based on the ENA Construction Cost Index: 1977 = 3161.75 and 1991 = 5930.24, therefore the cost was increased by 1.88 based on the ratio of these values. SUBTOTAL $16,954,000 Environmental Impact Report and Permitting: based on the cost $200,000 of the desalination EIR and permitting which was $252,000. Engineering, Legal, and Administration (30%)*: $5,086,200 Contingencies (20%)*: $3,390,000 * Based on values used for the desalination project TOTAL $25,631,000 ATTACHMENT- 3 NACIMIENTO RESERVOIR WATER DIVERSION PROJECT Alternative No. 2 Pipelines: assumptions - 18" dia. steel, 33 miles, $219780,000 $125 per foot based on consultant estimates of$110-125 per foot (pipe cost at factory = $65/ft.) Pump Station: from 1977 Engineering Science Report (ES), the $1,700,000 cost was $450,000, based on the ENR Construction Cost Index: 1977 = 3161.75 and 1991 = 5930.241 therefore the cost was increased by 1.88 based on the ratio of these values. This alternative requires two pump stations. Afterbay: from ES report the cost was $500,000 which was $940,000 increased by 1.88 as noted above. Pressure Reduction Station: from ES report the cost was $55,000 $100,000 which was increased by 1.88. SUBTOTAL $24,520,000 Environmental Impact Report and Permitting: based on the cost $200,000 of the desalination EIR and permitting which was $252,000. Engineering, Legal, and Administration (30%)*: $7,356,000 Contingencies (20%)*: $4,904,000 * Based on values used for the desalination project TOTAL $36,9803000 ATTACHMENT 4 sHINOW 9*"�loi O a N o: _ _(1) O �11 LUo Cc _ o>. 0 y v, w W CA J m U H Z Q co 0 2 LL Z Z ty rz p F- LLJ o: v Lui z r O ss}: J I: : > 41 I. Q W LLI _ n<: S W CL T{. rj I s. W - o'< w0 J _ � � W Qto ktU p y fry. 0 0 V• r •214,- Cl 4 'KLL _ _ m # r N O �L d FJ- t a . �R Q Q +� ATTA/^LA■C1JT e MEETINGAGENDA DATE NREM /ACZ April 16, 1991 Mr. David Blakely, Chair San Luis Obispo County Board of Supervisors County Government Center F San Luis Obispo, CA 93408 Dear Chairman Blakely: The City of San Luis Obispo is presently pursuing permanent alternative water supply sources. The City has reviewed a number of alternative water resource projects. We believe that Nacimiento Reservoir offers an effective local water resource that should be developed. On April 16, 1991, the San Luis Obispo City Council directed staff to pursue development of a San Luis Obispo County Nacimiento Project. Since the City potentially would need an additional water supply within the next three-to-four years if the drought were to continue, the City would like to pursue one of two alternatives with the County. The first would be to participate with the County and other agencies in a water diversion project from Nacimiento for the benefit of all agencies. The second alternative would be for the County to provide a portion of their existing 17,500 AF allotment to the City. The City could then develop a project to deliver this entitlement to the City in the most feasible manner. The City requests that initial discussions commence concerning these two, or possibly other alternatives that could provide Nacimiento water to the City of San Luis Obispo. The purpose of this discussion would be to outline alternatives whereby the City and any other agencies with an interest in near-term permanent water could commence in developing a delivery project. By this letter the City of San Luis Obispo is making a formal request for the County to initiate the planning, design, water and cost allocation of the Nacimiento Lake Water Project. Please let us know at your earliest convenience your suggestions for how the County and the City should proceed on this matter of mutual concern. COPHSTO: Sincerely, ❑•D=Ws Amon L�X11 M rd' CAO FQV.DIR CAO 0 FM QEF RON DUNIN ;: EC F eI sw du 0 Pouac t Mayor MGMT.TEM 11RXI DR AP��RLL11"``1 A 1991 ��D� CITY CLERK ''AN LUIS OBISPO,CA