Loading...
HomeMy WebLinkAboutGeneral Inspection Report 19971 I Gtyofsanluls ontspo FIRE DEPARTMENT 2160 Santa Barbara Avenue . San Luis Obispo, CA 93401'5240 o 805/781-7380 "Courcesy E Seruice" GENERAL MONITORING INSPECTION CHECKLIST IN ACCORDANCE WITH THE STATE OF CALIFORNIA HEALTH AND SAFETY CODE, DIVISION 20, CHAPTER 6.7, SECTION 25280 et. seq., AN INSPECTION OF EVERY UNDERGROUND STORACE FACILITY SHALL BE CONDUCTED TO DETERMINE WHETHER THE TANK SYSTEM(S) COMPLIES WITH THE APPLICABLE REQUIREMENTS AND REGULATIONS AND TO DETERMINE WHETHER THE TANK SYSTEM(s) IS IN A SAFE OPERATING CONDITION. l' recnrrY NAME:FACILITY ID NI]MBER: 4O A FACILITY ADDRESS:INSPECTION DATE: FACILITY PHONE NUMBER:INSPECTION TYPE:Y FOLLOW-UP: BID:/rl lo TIME IN:Q ^ettt TIME OUTr qt-o ]ot *J 0 Au)v v ,rJS \u/. +"fi:pgr"a" Deadlines \5 tt 41 01-01-84 0vb' Cutoff date for new and existing USTs. Existing USTs must install monitoring system (H&SC 25292 (a)), Secondary containment required for piping connected to tanl<s installed after this date (exceptions) (CCR 2636 (a). Evidence of responsibiity for UST system by owner/operator for corrective action release (H&sc 25292.2 (a)). Existing pressurized piping equipped with automatic leak line detector (H&SC 25292 (e), (ccR 2666 (b)). Operative date for violations; civil/criminal penalties (H&SC ?5299 (g))' Permits issued shall comply with H&SC 25299.3. Independent approval for primary conlainment construction and design of UST components (ccR 2631 (b)). Independent approval for primary containment construction and design of UST piping components (CCR 2631 (b)). Tank lining material and process listed/certihed by and independent testing organization (CCR 2663 (e)). Manual inventory reconciliation allowable only when the underlying groundwater is at a depth greater than 20 feet below the bottom of the UST (CCR 2646 (b). Automatic tank gauge systems installed after this date are to generate a hard copy of the calculated leak rate and leak threshold (CCR 2643 (bxl)). Existing UST(s) replace<l or upgraded to prevent releases due to corrosion, spills, and overf,rlls (H&SC 25292 (d), CCR 2665). All single wall tanks (steel) are retrofitte<l rvith secondary containment or by one of the following options (CCR 2662 (b)): 1. Interior lining and cathodic protection 2. Bladder system, interior lining, and cathodic protection Existing pressurized piping is retrofitted with secondary containment (CCR 2666 (b). Audible/visual alarm attached to pressurized piping (CCR 2666 (c)). $Pb 0741-85 o 07-01-87 0 10-26-90 0 12-22-90 0 01-01-91 0 01-01-91 0 07-01-91 0 01-01-92 0 08-09-92 0 01-01-93 0 01-01-95 0 12-22-98 0 o o o @ 4 flf 't5 \ \bo \ 4 )l yv 1 ob + ,l {p ?J,"1 l" 0o o Manual iank gauging no longer an acceptable method of non-visual monitoring for UST systems having a capacity of 1,000 gallons or greater (CCR 26a5 (c)). o Manual inventory reconciliation.is no longer acceptable (CCR 2646 (b)) o Striker plate installecl uncler all openings used for manual dipsticking (drop tube-mountej bottom protector is acceptable) (CCR 2662 (d)) fl B +|3.co'#fJf,g,5;i'3i,',:?"d; ify#lit S.jTJii?]|." disabred in a| of its services' prosrams and activities @ COMMENTS <3 NOTB: VIOLATIONS NEED TO BE CORRECTED }VITHIN 30 DAYS OF DATE SIGNED BELOW RE-INSPECTION DATE:RECEIVED BY: . TELEPHONE NUMBER:-INSPECTOR: H&SC : CHAPTER 6.7, HEALTH AND SAFETY CODE CCR : TITLE 23, DIVISION 3, CHAPTER 16, CALIFORNIA CODE OF REGULATIONS (MAY 5, T994) UFC : UNIFORM FIRE CODE (1994 UNLESS NOTED) cwnc/prcwnl/wp/pdlii. fm GENEBAT MONITORING INSPECTION CHECKIIST lf thb lrcility hrr mora lhrn 4 trnls, plersc photocopy th's chccklst before complotion. H&SC - CHAPIER 8.7, CALIFORNIA HTATTH & SAFIIY COOE ccR - TTTLE 23, 0rvrstoN 3, cHAPTER 18, CALIFoRNIA C00E 0t RtGULATloilS il9S41 FCR - TITLT 40, FE()ERAL COt)T (]F REGUTATIONS UFC - UNIFORM FIRE C00E 11904 unless notedl bq\4 '5pL 4v' '0,rg u Z r0, n*, /)/UL n*, | )l/L h( 0.r ,6?'-r&.,'8q o,, /Z,k tu.ks" /2 /( TANK 3TANK 1 TANK 2 TANK 4BEOUIREMENTS PRE.INSPECTION DOCUMENT BEVIEW Permit Applications and Fees to 0perate: l.,l{ Forms A&8 submitted (H&SC 25286(a), CCR 2711, UFC 7S01.3.1(l)(4 C submitted CCR 2 ccR 2ir 125287IatinI ees a ccR ll P nsCurrent Perm State aid (H&SC 2528 Beco submitted llH ln ccR 27Previous viola a usrness lan to miti ale a release or 0n e Statement o 2.2submitted2ncial res onsib &sc 25293 ccR 26Written contract exists belween owner written routine monitorin IAlan submitted ccR 263 hours (H&SC 252 ccRUnaulhorized release 0 I 800 I .3).nau an submifledrel ease nse (H&SC 252 ccn 27rChae ln owner wr-7dxh /(H anges t0 operatinglmonitoring procedures of UST system teported within 30 days cct2lll(b), uFc 7901.3 .1 (5),7e02.1.21.&sc 25286(d), otection ins n recorded. 0n I Cathodic Correclive Ac 1. Corrections specified in the previous inspection implemented within 30 days of receivin0 the inspection report (CCR 2712,ln. V/ork n submitted n272- S. C0rreciive action process initiated for reported unauthorized release (CCR 2721(a)). 4. Corrective action complies with policies f or water quality control plans (CCR 2i2l (b), (c)). 5. Corrective action includes at least one of the following phases: (CCR 27221a\\ Prelimin ary sile assessment. Soil and water investigation. C orreclrve actron p lan implementation. Verification monitorinq phase. $gj$..ffiriffi ffi s ;s:i:r,:t:{.!!iii:n*}t\l}: Approved monitoring system installed and operating under permit conditions 6. lnterim remedial itiated (CCR 2722lbll.an and actron tn M o nito o rtsnMethods and Be (H &SC 2523 I 25292 UFC 7901.8.4.4.1)25293(a), CCR 2632 2 641 ln te Testi )(r), UFC 7s01.8.4.4Tank test in last 12 months H&SC 1 ({)).&sc 2test in last 12 months (CCR 2643 tr)Pressurized eti tness test in last 3 s ccR 2643(d)). rpe lesl rn last 2 years (CCR 2643(e)). X. Iest results submitted urithin 30 days (CCR 2643(q), UFC i902.6 16.3). tectionon line leakAnnmalntenance an dlor calibration ffi intcontacted 48 hours ilor lo a tan 0nCa rit test (CCR 26Local c Protec ic protection provided for second ol tank and for UST piping l(d), 2636(b), UFC 7S01.11{ccR l. Ca ary contarnmenl 7902.6.1 5.1 ) ion tested lvithin 6 months of installation and every 3 years theieafter (CC 5(a){2){A)) 2, Cathodic 3. Records of sacrificia)'anqde system tests indicate that the system is functioning properly. 27 \l'\) l) TAIIK 2 TANK 3 TANK 4TANK 1REOUIREMENTS ntinuous mo tn IoflsefCR dr,fi:.afit.ft.,n ryin:fttDllVII.SR ffir$st$stbwg ffis,sw,ffiffio duct 3(d}l. ess test CR Manual lnventor Beconciliat tankPerlormedth an annua erlormed dail cR 264 s agency wr 24 hour lotngthe allowable R 264 I ffi,ffi,'$ffi $,S$.S.,K&N.ffiffiffis ffi,.,.ffi..ffi 3. Annu allow limits didn't exceed ng lhe allowable nvent Reco nci li atio nStat verilying that data on monthly reportsal rep dates and limes of releases exceediable limits, or a R 2646( R 264. Performed biennial tank liohtness test rts2. Annua c 6.1 )). orted (CCR 2646.1onclusive invento t3.te uent or 2 or more ess test4. Ta results CR - ManualTank Gauging Tffiltank inWity tili piiioimed (ccR 26a5(b)). . Automatic Tank Gauging ffi,-ffi.ffi ffi.ffi or to 264 1Ivlonthlautomatic tank rades a rs Any unau zed release(s)as results mrtt reported to the local agency R 2661(a)).s 2. Non.metal piping and ta tness tested within 30 days of rep s (ccR 2661 ffi-Rffir,,9-€#Fg$tsgl'l.4$$j"{sih\rfs been tested within 6 su r8 on for ta Ta cessation of thesA 3. Repa systernsIthodicaectronpro t ous substances CR 2670(e))sto ra CCR 2660(n)).r sure submitted within 90 ws,sffii:Rdtl.li*S.+l*{ri(rj ce with tank closure regula within 30Proposal of co of closure .._t ii'{t]ff#fflixiil* riuanl to Article 3 and 4 until actual ReleaseDetection of Leak or Unauthor 2 etion closure (CCR 2670 1.0 eteclr on an unauthorized release been r cR 2652tb)).orted to the local a c within 24 hours su en loss of product has 2. A full written report has been submitted by the owner agency within 5 working days of detecting an unauthorized telease Ioperator to the lo (CCF 2652(c)) 3. Update reports submilted to the local agency quarter ly, or more lrequently, to provide updates re0arding cleanup and initial abate ment actions (CCR 2652(d)). ON.SITE DOCUMENT REVIEW and PlansCurrent Permits Becor 01.3.r),86, CCR 271 UFCetao n.sit e & r2(b))2 641&SC 25293(a), CCR 2630(dWritten records tarn ed on'site atures of the antor can verbaerlan onres0nse 0 cR 2712 (b)).roleclion records t lor 6.5 s ars {CCR 2712tlor5siemserformance claims for release detec tlon s e life ol the UST cR 2712(b))de records on.site lorandRearrlini and trf,records on lile. Methods and Re ortsonitorin Safet 27 r 2 (b))tenance records k for 3 earszt Monitorin lnterstitialMonitori Tank monitored visually at r irequency (H&SC 252S2(b), CCR 2632,l cX1),26.11(d),26'1 UFC 7901.8.4.4.1)or 2. Continuous non.visual interstitial monitoring {or double'lvalled ta nks 2611{i)).{H&SC 25291{b), CCR 2 d at the time of inspection (CCR 2632(c)Liquid level in the tank rec3 orde {1)(B)(C)) ^o/o )l TANK 1REOUIREMENTS TANK 2 TAIIK 3 TANK 4 Cathodic Protection I ressed current st ect ca ard s ccR )(A 0i enser Meters 0ispenser metets artment ol weiqhts and measures er sti ck ers es ccR 2646fi)). ffi.--.--qffi'ffi-E ffiffi enser meters calibrated annua CC 0 els,a suctron and. su do not 0w s that a ase ma h ave occured. Pi 1. Continuous mo ol s e rlo c 2 I )(l)). al monit suctio n roduct erf orme R 2643 Manual lnvent H e co ncil iat n anual ciliation monrh (ccR 64 HW.''trffi r{raEfiElii((dtfiMl St\i+{S*!*SN1$1E59{$ry ffi 2. US quan measurements sed on liquid n measurement uirements 2643.1 264 r )(cl, (0)). Sta tis ca nve nto Recon iatio n L Statistical reconcili ation er month ccn 2646.1 'r'.E..j.iti.lr--T.,ifits ffiru\t&\N&+\\t!!sA\wl$K%:ds 2 ent or 2 0r more lncon clusive inventories ed 6.1 3. Tank ess test erfomed lor n c0n ts {CCR 2645.1 anual Tank Gau Annu t rit test A rmed (CCR2645(b)). nual tank 000 G 0r 2 3. Tank en out ol service hours, and at least l2 hours belore gauging be,:ns (CCR 2645(a ll. 4. Manual tank gauging measurements exceed the weekly or mon v in 2 consecutive tests and a tank integrity test has been perlormed within 72 hours cR 264 d)(3)). Automatic Tan Gau -1 . Monthly aulomatic tank gauging reiults submitted ccR 2643(b)(1)). .Tank Closurs.I. UST system contatn ed and monitored pursuant lo cle 3 and 4 c letion closure CR 2670(e)) FACILITY W LKTHBOU GH lnterst la lMonitori lnterstitial mo checklist com let e d. Cathodic Protection 1 currenl stalled and era ti CR 2635(a)(2XA)). Dispenser Melers 0 artment ot ts and Measures ins sti ck ers esent and current (ccR 2646(i)). P n 1 Conlinuous mo of ts erf ormed c 2636(f){r),2 I ffi 2.ary containment of pipi ng rs p resent (CCR 2636(a), UFC 7902.6.1 1). 3. Monitori ol erlormed in R )(l)). 4. Automatic line leak detection ment inslalled (H&SC 252S1 25252 (b)(4)(cl, 252 I cc 2636(f }(2), UFC i902.6.1 2). 5. Leak det n checklist lor I c0m ed Groun ter monitorin l. Monitori wells checklist co leted U rades and atrs l Approved UST system upgrades andlor repairs made (H&SC 25292.1(c), 25298, CCR 2660.2666). 2.t n t eflor linin of the tank re laced no more an 0nce R 2661 3. Holes r0 e ccR 2666 r{d)) 4. iVletal piping, littings, and tank fittings that have released product have been I laced CR 2661(e)). 5. Vapor or groundurater monitoring system installed to continuou y monrtor containment exists (CCR 266 Ilanks re ired b lin in if no secondar 29 )l REOUIREMENTS TANK 1 TANK 2 TANK 3 TANK 4 (cont.)rades and Repairsffi(ccn2o62(b),uFc7so 2.6.1 1, 800 t.4.5.1.2). / }uerlillprevention' uFc 7902.6.s.3). equipment installed (H&SC 25291(c), CCR 2665,2635(b), Spill (H&SC 25291(c),2 2525 2665, uFc 7901.8.1 79 /Audible and visual alarms are connected to the continuous monitoring system (ccn 2632(c){2)(B}, UFc 7901.s.4.4.1). TLS 7 fo 1[ Automatic pump shut-otl capability (CCH '1,1( Pioe ioints a re liquid tisht (U FC 790 I .1 1 .Bl. UTmersency shear valvttipioviaeA at aispenser/ .'9r uFc coDEsl. base IUFC 79.904(e}(2) Tzn*QIosure 7902.1.7.2,8001.11 0ther 30