Loading...
HomeMy WebLinkAboutBid Results - 91439-01Bid Opening 10/3/2024 Item # Item Description Unit of Measure Estimated Quantity Item Price Total Item Price Total 1 TRAFFIC AND PEDESTRIAN CONTROL LS 1 --- $ 42,531.36 --- $ 43,312.50 2 WATER POLLUTION CONTROL LS 1 --- $ 19,117.25 --- $ 30,937.50 3 STREET SWEEPING LS 1 --- $ 14,989.03 --- $ 18,562.50 4 (S) 5 HAZARDOUS MATERIALS ABATEMENT IN COMPLIANCE WITH OSHA LS 1 --- $ 4,371.80 --- $ 6,187.50 6 CLEAR AND GRUB LS 1 --- $ 14,364.48 --- $ 4,331.25 7 TREE REMOVAL EA 4 $ 3,210.15 $ 12,840.60 $ 1,234.50 $ 4,938.00 8 CONSTRUCTION SURVEYING LS 1 --- $ 19,985.37 --- $ 24,750.00 9 CONSTRUCTION FENCING LS 1 --- $ 8,587.46 --- $ 37,125.00 10 POTHOLE EXISTING UTILITIES EA 20 $ 1,400.00 $ 28,000.00 $ 309.38 $ 6,187.60 11 OSHA COMPLIANCE FOR TRENCHING LS 1 --- $ 1,873.63 --- $ 6,187.50 12 TEMPORARY POWER LS 1 --- $ 26,605.52 --- $ 75,877.31 13 SECURITY AND PATHWAY LIGHTING DURING NON-WORKING HOURS LS 1 --- $ 14,739.21 --- $ 59,171.06 14 TEMPORARY IRRIGATION AND CONTROLLER LS 1 --- $ 19,922.91 --- $ 16,087.50 15 (S) 16 (S) 17 (S) 18 TREE PROTECTION MEASURES LS 1 --- $ 15,301.30 --- $ 1,856.25 19 RELOCATE OLIVE TREE LS 1 --- $ 5,171.21 --- $ 9,900.00 20 CONCRETE CURB AND GUTTER LF 70 $ 146.00 $ 10,220.00 $ 87.42 $ 6,119.40 21 STREET PAVING SQFT 550 $ 80.00 $ 44,000.00 $ 23.51 $ 12,930.50 22 CURB PAINT LF 70 $ 19.00 $ 1,330.00 $ 18.56 $ 1,299.20 23 4” WHITE TRAFFIC STRIPE LF 215 $ 19.00 $ 4,085.00 $ 24.75 $ 5,321.25 24 RELOCATE STREET SIGN EA 1 $ 749.45 $ 749.45 $ 371.25 $ 371.25 25 4" PVC STORM DRAIN LF 85 $ 306.00 $ 26,010.00 $ 74.25 $ 6,311.25 26 4” PERFORATED PVC STORM DRAIN LF 90 $ 306.00 $ 27,540.00 $ 123.75 $ 11,137.50 27 12” SQUARE CATCH BASIN AND GRATE EA 4 $ 387.00 $ 1,548.00 $ 1,237.50 $ 4,950.00 28 POP UP EMITTER WITH RIPRAP EA 2 $ 1,558.00 $ 3,116.00 $ 3,093.75 $ 6,187.50 29 TRENCH DRAIN LF 6 $ 128.00 $ 768.00 $ 371.25 $ 2,227.50 ROUGH GRADING CUT CY (F) 80 $ 453.00 $ 36,240.00 DEMOLITION OF EXISTING IMPROVEMENTS LS 1 --- $ 159,720.56 PRECISE GRADING SQFT 6700 $ 7.00 $ 46,900.00 ROUGH GRADING FILL CY (F) 70 $ 517.00 $ 36,190.00 $ 7.43 $ 49,781.00 Quincon, Inc. Edwards --- $ 24,131.25 $ 19,800.00 $ 309.38 $ 21,656.60 MISSION PLAZA ENHANCEMENTS, SPECIFICATION NO. 91439-01 30 TRENCH DRAIN GRATE COVER LF 6 $ 12.50 $ 75.00 $ 371.25 $ 2,227.50 31 2” WATER SERVICE EA 1 $ 56,008.99 $ 56,008.99 $ 14,850.00 $ 14,850.00 32 2” BACKFLOW PREVENTION DEVICE EA 1 $ 8,418.84 $ 8,418.84 $ 4,950.00 $ 4,950.00 33 4” PVC SEWER LATERAL LF 50 $ 493.00 $ 24,650.00 $ 99.00 $ 4,950.00 34 SEWER CLEANOUTS EA 2 $ 312.00 $ 624.00 $ 495.00 $ 990.00 35 DECORATIVE UTLITY LID COVER EA 17 $ 3,123.00 $ 53,091.00 $ 3,275.74 $ 55,687.58 36 (S) 37 (S) 38 (S) 39 (S) 40 (S) 41 MOW CURB LF 82 $ 165.00 $ 13,530.00 $ 90.47 $ 7,418.54 42 (S) 43 (S) 44 (S) 45 (S) 46 (S) 47 (S) 48 TRIPLE STREAM WASTE RECEPTACLE EA 2 $ 5,839.00 $ 11,678.00 $ 10,766.25 $ 21,532.50 49 PLANTER POT A EA 2 $ 1,561.00 $ 3,122.00 $ 2,858.63 $ 5,717.26 50 PLANTER POT B EA 1 $ 1,686.27 $ 1,686.27 $ 2,041.88 $ 2,041.88 51 BIKE RACK EA 1 $ 624.54 $ 624.54 $ 3,093.75 $ 3,093.75 52 DRINKING FOUNTAIN & ASSOCIATED UNDER-GROUND PLUMBING LINES EA 1 $ 25,194.05 $ 24,194.05 $ 19,057.50 $ 19,057.50 53 BRONZE PLAQUE EA 1 $ 1,498.90 $ 1,498.90 $ 6,930.00 $ 6,930.00 54 (S) 55 BRICK UNIT PAVING – PERMEABLE SECTION SQFT 310 $ 99.00 $ 30,690.00 BRICK UNIT PAVING SQFT 3330 $ 41.00 $ 136,530.00 BRICK EDGE BAND LF 610 $ 31.00 $ 18,910.00 GRANITECRETE PAVING SQFT 960 $ 43.00 $ 41,280.00 GRANITE PLANTER CURB LF 72 $ 159.00 $ 11,448.00 BRICK EDGE BAND AT PERMEABLE BRICK LF 40 $ 42.00 $ 1,680.00 CONCRETE RETAINING CURB LF 60 $ 290.00 $ 17,400.00 BRICK STEPS SQFT 70 $ 252.00 $ 17,640.00 STONE SEATWALL LF 28 $ 562.00 $ 15,736.00 BRICK SEATWALL LF 66 $ 647.00 $ 42,702.00 PLANTING – SHRUB AREA SQFT 1740 $ 11.00 $ 19,140.00 BENCH EA 2 $ 1,874.00 $ 3,748.00 PLANTING – GRASS SOD SQFT 750 $ 14.00 $ 10,500.00 $ 28.24 $ 94,039.20 $ 24.75 $ 7,672.50 $ 115.16 $ 8,291.52 $ 136.39 $ 9,547.30 $ 208.91 $ 12,534.60 $ 39.96 $ 38,361.60 $ 68.74 $ 41,931.40 $ 142.62 $ 5,704.80 $ 12.38 $ 21,541.20 $ 11.14 $ 8,355.00 $ 315.00 $ 20,790.00 $ 1,988.84 $ 55,687.52 $ 7,672.50 $ 15,345.00 (S) 56 TREES – 24” BOX EA 1 $ 2,387.00 $ 2,387.00 $ 1,231.31 $ 1,231.31 57 TREES – 48” BOX EA 2 $ 3,541.00 $ 7,082.00 $ 4,578.75 $ 9,157.50 58 TREE – 60” BOX EA 1 $ 7,363.00 $ 7,363.00 $ 10,518.75 $ 10,518.75 59 TREE – 72” BOX EA 4 $ 30,403.00 $ 121,612.00 $ 19,800.00 $ 79,200.00 60 (S) 61 ROOT BARRIER LF 124 $ 220.00 $ 27,280.00 $ 103.70 $ 12,858.18 62 INSTALL SOIL AND PLANTS IN FENCED PLANTING AREA EA 2 $ 26,221.00 $ 52,442.00 $ 2,475.00 $ 4,950.00 63 DECORATIVE PICKET FENCE LF 80 $ 1,130.00 $ 90,400.00 $ 1,119.95 $ 89,596.00 64 PLANTER FENCE LF 32 $ 500.00 $ 16,000.00 $ 495.00 $ 15,840.00 65 STAIR HANDRAIL LF 20 $ 405.00 $ 8,100.00 $ 400.95 $ 8,019.00 66 BAR COUNTER LF 34 $ 792.00 $ 26,928.00 $ 2,712.49 $ 92,224.66 67 MISSION STYLE RAILING LS 1 --- $ 34,452.28 --- $ 34,132.73 68 STRING LIGHT POST, CABLE, AND FOUNDATION EA 5 $ 630.00 $ 3,150.00 $ 10,023.75 $ 50,118.75 69 LANDSCAPE BOULDER EA 17 $ 709.00 $ 12,053.00 $ 2,413.13 $ 41,023.13 70 1 YEAR PLANT ESTABLISHMENT AND MAINTENANCE PERIOD LS 1 --- $ 73,396.26 --- $ 35,887.50 71 (S) 72 (S) 73 PRIVACY SCREENS AND TRASH ENCLOURE LS 1 --- $ 100,988.56 --- $ 20,272.73 74 (S) 75 (S) 76 TEMPORARY SERVICE COORDINATION WITH PG&E LS 1 --- $ 3,997.07 --- $ 6,998.06 77 ELECTRONIC ART KIOSK DIRECTORY LS 1 --- $ 23,108.09 --- $ 18,995.63 78 DECORATIVE LIGHT POLE, FOUNDATION AND LUMINARE LS 1 --- $ 316,268.44 --- $ 46,072.13 79 SECURITY CAMERA POLE AND FOUNDATION EA 2 $ 5,121.00 $ 10,242.00 $ 13,488.75 $ 26,977.50 80 COMPLIANCE WITH ARCHEOLOGICAL MONITORING PLAN LS 1 --- $ 6,245.43 --- $ 1,856.25 81 ADOBE PRESERVATION LS 1 --- $ 55,410.68 --- $ 127,041.75 IRRIGATION SYSTEM LS 1 --- $ 76,069.30 PLANTING – GRASS SOD SQFT 750 $ 14.00 $ 10,500.00 KIOSK BUILDING LS 1 --- $ 498,449.97 RESTROOM BUILDING LS 1 --- $ 953,794.09 PERMANENT ELECTRICAL SERVICE AND METERS LS 1 --- $ 43,468.17 ELECTRICAL AND COMMUNICATION IMPROVEMENTS LS 1 --- $ 398,395.81 --- $ 21,532.50 --- $ 1,318,246.88 --- $ 613,694.81 --- $ 347,564.25 $ 11.14 $ 8,355.00 --- $ 90,337.50 82 PERMANENT SERVICE COORDINATION WITH PG&E LS 1 --- $ 3,997.07 --- $ 34,897.50 83 COMPLIANCE WITH BUILDING PERMIT REQUIREMENTS LS 1 --- $ 6,245.43 --- $ 942,243.54 84 STAGING AREA RESTORATION LS 1 --- $ 13,802.39 --- $ 30,937.50 85 PULL FIBER THROUGH EXISTING CONDUIT LF 1200 $ 20.00 $ 24,000.00 $ 29.08 $ 34,896.00 $5,174,205.86 Total Project Bid $ 4,230,551.77