Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Mid-Higuera Bypass - 2090649 Bid Tabulation
Public Bid Opening: 10/10/2024 at 11:00 AM ITEM NO. ITEM DESCRIPTION UNIT OF MEASURE ESTIMATED QUANTITY UNIT PRICE ITEM PRICE UNIT PRICE ITEM PRICE 1 OSHA COMPLIANCE LS 1 ----- $5,500.00 -----$25,000.00 2 CALTRANS ENCROACHMENT PERMIT COMPLIANCE LS 1 ----- $2,800.00 -----$21,000.00 3 REGULATORY PERMIT COMPLIANCE LS 1 ----- $5,500.00 -----$15,000.00 4 COORDINATTE WITH NON-HIGHWAY FACILITIES (UTILITIES)LS 1 ----- $14,000.00 -----$15,000.00 5 CONSTRUCTION SURVEY LS 1 ----- $44,000.00 -----$53,000.00 6 EASEMENT SURVEY AND COMPLIANCE LS 1 ----- $25,000.00 -----$25,000.00 7 LEAD COMPLIANCE PLAN LS 1 ----- $3,305.00 -----$2,200.00 8 FURNISH FIELD OFFICE LS 1 ----- $95,000.00 -----$42,000.00 9 CONSTRUCTION AREA SIGNS LS 1 ----- $8,814.00 -----$10,000.00 10 TRAFFIC CONTROL PLAN AND IMPLEMENTATION LS 1 ----- $85,604.00 -----$821,866.94 11 PREPARE AND EXECUTE STORMWATER POLLUTION PREVENTION PLAN LS 1 ----- $112,656.00 -----$115,000.00 12 TEMPORARY CREEK DIVERSION SYSTEM AND DEWATERING LS 1 ----- $591,921.84 -----$545,000.00 13 APCD COMPLIANCE LS 1 ----- $5,509.29 -----$25,000.00 14 EXCAVATION, MONITORING, AND TRANSPORTATION PLAN (HAZARDOUS WASTE)LS 1 ----- $12,000.00 -----$25,000.00 15 SAMPLING AND ANALYSIS PLAN (HAZARDOUS WASTE) LS 1 ----- $7,713.00 -----$25,000.00 16 COMPLIANCE WITH EXCAVATION AND MONITORING PLAN (PALEONTOLOGICAL RESOURCES)LS 1 ----- $3,305.00 -----$30,000.00 17 REMOVE INVASIVE PLANT SPECIES LS 1 ----- $32,104.00 -----$18,000.00 18 REMOVE EXISTING TRASH AND DEBRIS LS 1 ----- $15,000.00 -----$25,000.00 19 REMOVE BUILDING (306 HIGUERA STREET) LS 1 ----- $61,000.00 -----$83,000.00 20 (F) REMOVE RETAINING WALL (RAILROAD TIE AND CONCRETE RUBBLE) LF 65 140.00$ $9,100.00 862.00$ $56,030.00 21 (F) TEMPORARY HIGH-VISIBILITY FENCE LF 2,930 13.30$ $38,969.00 8.00$ $23,440.00 22 TEMPORARY CONSTRUCTION ACCESS (SOUTH STREET) LS 1 ----- $43,787.00 -----$92,000.00 23 TEMPORARY WATER SERVICE EA 1 17,578.00$ $17,578.00 16,000.00$ $16,000.00 24 CLEARING AND GRUBBING LS 1 ----- $251,782.00 -----$83,000.00 25 (F) ROADWAY EXCAVATION (BIANCHI LANE) CY 377 64.00$ $24,128.00 125.00$ $47,125.00 26* ROADWAY EXCAVATION (MATTHEWS OPEN SPACE) CY 187 54.00$ $10,098.00 212.00$ $39,644.00 27* ROADWAY EXCAVATION (TYPE Z-2) (LEAD) CY 43 357.00$ $15,351.00 504.00$ $21,672.00 28* ROADWAY EXCAVATION (TYPE CM) (HYDROCARBONS) CY 48 300.00$ $14,400.00 510.00$ $24,480.00 29* ROADWAY EXCAVATION (MATTHEWS OPEN SPACE) (TOPSOIL) CY 80 144.00$ $11,520.00 259.00$ $20,720.00 30 (F) STRUCTURE EXCAVATION (TYPE A) CY 455 122.00$ $55,510.00 150.00$ $68,250.00 31 (F) STRUCTURE EXCAVATION (TYPE D) CY 227 362.00$ $82,174.00 230.00$ $52,210.00 32 (F) STRUCTURE BACKFILL (BRIDGE) CY 375 342.00$ $128,250.00 297.00$ $111,375.00 33 (F) DITCH EXCAVATION (BYPASS CHANNELS) CY 19,570 35.00$ $684,950.00 53.75$ $1,051,887.50 34 (F) DITCH EXCAVATION (BENCHES) CY 3,062 159.00$ $486,858.00 95.00$ $290,890.00 35* DITCH EXCAVATION (MARSH STREET SEDIMENT REMOVAL)CY 150 170.00$ $25,500.00 228.00$ $34,200.00 36* ROADWAY EXCAVATION (TYPE CM) (HYDROCARBONS) CY 184 133.00$ $24,472.00 347.00$ $63,848.00 37* DITCH EXCAVATION (BENCHES)(TYPE COM) (LEAD) CY 48 500.00$ $24,000.00 450.00$ $21,600.00 38 (F) DITCH EXCAVATION (BYPASS CHANNELS) (TOPSOIL) CY 506 75.00$ $37,950.00 138.00$ $69,828.00 39 HIGHWAY PLANTING LS 1 ----- $169,695.00 -----$154,000.00 40 THREE YEAR PLANT ESTABLISHMENT AND IRRIGATION SYSTEM MAINTENANCE QTR 12 11,900.00$ $142,800.00 10,800.00$ $129,600.00 41* PRUNE TREE EA 29 506.00$ $14,674.00 500.00$ $14,500.00 MID-HIGUERA BYPASS, SPECIFICATION NO. 2090649 Souza Construction Papich Construction Company, Inc. Mid-Higuera Bypass - 2090649 Bid Tabulation Pg. 1 of 4 Public Bid Opening: 10/10/2024 at 11:00 AM ITEM NO. ITEM DESCRIPTION UNIT OF MEASURE ESTIMATED QUANTITY UNIT PRICE ITEM PRICE UNIT PRICE ITEM PRICE Souza Construction Papich Construction Company, Inc. 42* PRUNE TREE AND TREE ROOTS EA 2 551.00$ $1,102.00 300.00$ $600.00 43* REMOVE TREE (LESS THAN 48" DBH) EA 68 507.00$ $34,476.00 2,000.00$ $136,000.00 44* REMOVE TREE (48" DBH AND LARGER) EA 3 882.00$ $2,646.00 3,000.00$ $9,000.00 45* REMOVE TREE TO EXISTING GROUND EA 4 551.00$ $2,204.00 2,500.00$ $10,000.00 46* REMOVE STUMP AND ROOTS EA 9 500.00$ $4,500.00 1,600.00$ $14,400.00 47* REMOVE STUMP TO EXISTING GROUND EA 9 500.00$ $4,500.00 2,000.00$ $18,000.00 48* SALVAGE TREE TRUNK TO OWNER EA 1 4,000.00$ $4,000.00 5,000.00$ $5,000.00 49 3' x 5' x 3' BOULDER EA 8 2,000.00$ $16,000.00 1,250.00$ $10,000.00 50 4' x 6' x 2' BOULDER EA 7 2,200.00$ $15,400.00 1,250.00$ $8,750.00 51 ROOT WAD EA 3 2,000.00$ $6,000.00 12,500.00$ $37,500.00 52 IRRIGATION SYSTEM DESIGN AND INSTALLATION LS 1 ----- $138,511.00 -----$125,700.00 53 QUICK COUPLER VALVE & BOX EA 2 826.00$ $1,652.00 750.00$ $1,500.00 54 IRRIGATION SERVICE ASSEMBLY EA 2 12,341.00$ $24,682.00 11,200.00$ $22,400.00 55 (F) ROLLED EROSION CONTROL PRODUCT (BLANKET) (BYPASS CHANNELS) SQFT 80,550 1.12$ $90,216.00 1.02$ $82,161.00 56 (F) ROLLED EROSION CONTROL PRODUCT (BLANKET) (BENCHES) SQFT 27,460 1.20$ $32,952.00 1.05$ $28,833.00 57 (F) HYDROSEED MIX A (WITHIN GRADING LIMITS) SQFT 136,320 0.10$ $13,632.00 0.10$ $13,632.00 58 (F) HYDROSEED MIX B (WITHIN GRADING LIMITS) SQFT 19,130 0.25$ $4,782.50 0.20$ $3,826.00 59 HYDROSEED (DISTURBED AREAS) LS 1 ----- $6,000.00 -----$4,840.00 60 CLASS 3 AGGREGATE SUBBASE CY 317 124.00$ $39,308.00 105.00$ $33,285.00 61 CLASS 2 AGGREGATE BASE CY 272 116.00$ $31,552.00 111.00$ $30,192.00 62 HOT MIX ASPHALT (TYPE A) TON 250 217.00$ $54,250.00 278.00$ $69,500.00 63 REMOVE BASE AND SURFACING SQFT 21,719 1.00$ $21,719.00 2.50$ $54,297.50 64 TEMPORARY BRIDGE (LOCATION A) LS 1 ----- $462,000.00 -----$380,000.00 65 TEMPORARY SHORING LS 1 ----- $207,000.00 -----$206,000.00 66 PERMANENT STEEL CASING EA 3 6,611.00$ $19,833.00 6,000.00$ $18,000.00 67* 30" CAST-IN-DRILLED-HOLE CONCRETE PILING LF 347 783.00$ $271,701.00 800.00$ $277,600.00 68* 48" CAST-IN-DRILLED-HOLE CONCRETE PILING LF 36 3,028.00$ $109,008.00 2,400.00$ $86,400.00 69* 30" CIDH CONCRETE PILING (ROCK SOCKET) LF 259 818.00$ $211,862.00 837.00$ $216,783.00 70* 48" CIDH CONCRETE PILING (ROCK SOCKET) LF 57 2,293.00$ $130,701.00 1,785.00$ $101,745.00 71 SEAL COURSE CONCRETE CY 61 960.00$ $58,560.00 750.00$ $45,750.00 72 (F) STRUCTURAL CONCRETE, BRIDGE FOOTING CY 85 966.00$ $82,110.00 825.00$ $70,125.00 73 (F) STRUCTURAL CONCRETE, BRIDGE CY 161 2,029.00$ $326,669.00 1,750.00$ $281,750.00 74 (F) STRUCTURAL CONCRETE, BRIDGE (POLYMER FABRIC) CY 52 3,422.00$ $177,944.00 1,800.00$ $93,600.00 75 (F) STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) CY 18 2,485.00$ $44,730.00 2,400.00$ $43,200.00 76 (F) STRUCTURAL CONCRETE, HEADWALL CY 12 5,500.00$ $66,000.00 3,600.00$ $43,200.00 77 (F) MINOR CONCRETE (MINOR STRUCTURE) (CRASH CUSHION PAD) CY 9 1,208.00$ $10,872.00 2,500.00$ $22,500.00 78 PRECAST PRESTRESSED CONCRETE SLAB (TYPE SIV) SQFT 3,318 97.00$ $321,846.00 113.00$ $374,934.00 79 PRECAST CONCRETE GIRDER EA 16 4,198.00$ $67,168.00 9,500.00$ $152,000.00 80 JOINT SEAL (MR 1")LF 50 206.00$ $10,300.00 191.00$ $9,550.00 81 BAR REINFORCING STEEL (BRIDGE) LB 121,930 1.77$ $215,816.10 1.55$ $188,991.50 82 CAMERA POLE EA 1 12,336.00$ $12,336.00 10,000.00$ $10,000.00 83 BRIDGE REMOVAL LS 1 ----- $105,442.00 -----$155,000.00 84 48" HDPE (TYPE S)LF 167 400.00$ $66,800.00 323.00$ $53,941.00 85 48" REINFORCED CONCRETE PIPE LF 8 600.00$ $4,800.00 583.00$ $4,664.00 Mid-Higuera Bypass - 2090649 Bid Tabulation Pg. 2 of 4 Public Bid Opening: 10/10/2024 at 11:00 AM ITEM NO. ITEM DESCRIPTION UNIT OF MEASURE ESTIMATED QUANTITY UNIT PRICE ITEM PRICE UNIT PRICE ITEM PRICE Souza Construction Papich Construction Company, Inc. 86 54" RCP LF 116 608.00$ $70,528.00 527.00$ $61,132.00 87 24" HDPE RISER LF 2 8,152.00$ $16,304.00 2,850.00$ $5,700.00 88 48" CONCRETE FLARED END SECTION EA 1 5,712.00$ $5,712.00 6,300.00$ $6,300.00 89 STORM DRAIN MANHOLE (DWG 3510) EA 1 31,832.00$ $31,832.00 21,500.00$ $21,500.00 90 REMOVE STORM DRAIN (54" RCP) LF 115 76.00$ $8,740.00 91.00$ $10,465.00 91 REMOVE STORM DRAIN (48" CMP, 52" STEEL) LF 68 55.00$ $3,740.00 153.00$ $10,404.00 92 REMOVE STORM DRAIN (24" HDPE, 18" CMP) LF 110 45.00$ $4,950.00 68.00$ $7,480.00 93 REMOVE STORM DRAIN HEADWALL (ROCK AND SACK CONCRETE) EA 1 2,700.00$ $2,700.00 6,000.00$ $6,000.00 94 LOCATE AND EXPOSE STORM DRAIN OUTFALL EA 2 2,400.00$ $4,800.00 6,000.00$ $12,000.00 95 ABANDON STORM DRAIN INLET (EXISTING PAVEMENT) EA 1 5,000.00$ $5,000.00 3,000.00$ $3,000.00 96 ABANDON STORM DRAIN INLET (UNPAVED AREAS) EA 1 3,000.00$ $3,000.00 3,000.00$ $3,000.00 97 REMOVE PRIVATE STORM DRAIN EA 2 3,000.00$ $6,000.00 3,000.00$ $6,000.00 98 (F) ROCK SLOPE PROTECTION GRAVEL FILTER CY 638 195.00$ $124,410.00 199.00$ $126,962.00 99 (F) CLASS III VEGETATED ROCK SLOPE PROTECTION CY 502 270.00$ $135,540.00 305.00$ $153,110.00 100 (F) CLASS IV VEGETATED ROCK SLOPE PROTECTION CY 1,674 187.00$ $313,038.00 275.00$ $460,350.00 101 (F) ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 90 38.00$ $3,420.00 15.00$ $1,350.00 102 (F) CLASS III ROCK SLOPE PROTECTION (GROUTED CY 5 1,000.00$ $5,000.00 500.00$ $2,500.00 103 MINOR CONCRETE (CURB AND GUTTER) LF 77 88.00$ $6,776.00 1,120.00$ $86,240.00 104 MINOR CONCRETE (SIDEWALK AND DRIVEWAY) SF 803 18.00$ $14,454.00 26.00$ $20,878.00 105 MISCELLANEOUS METAL (BRIDGE) LB 200 242.00$ $48,400.00 18.00$ $3,600.00 106 24" INLET FRAME AND GRATE EA 1 600.00$ $600.00 5,000.00$ $5,000.00 107 REMOVE WATERLINE LF 115 42.00$ $4,830.00 65.00$ $7,475.00 108 REMOVE WATER SERVICE LATERAL LF 265 30.00$ $7,950.00 74.00$ $19,610.00 109 CUT AND CAP WATER SERVICE LATERAL EA 2 533.00$ $1,066.00 3,200.00$ $6,400.00 110 REMOVE WATER METER EA 1 251.00$ $251.00 6,500.00$ $6,500.00 111 REMOVE FIRE HYDRANT ASSEMBLY EA 1 1,800.00$ $1,800.00 6,500.00$ $6,500.00 112 6-INCH FLEXIBLE EXPANSION JOINT EA 2 8,400.00$ $16,800.00 13,900.00$ $27,800.00 113 6-INCH LINEAR EXPANSION JOINT EA 2 4,068.00$ $8,136.00 16,900.00$ $33,800.00 114 6-INCH WATERLINE (DIP) LF 135 107.00$ $14,445.00 282.00$ $38,070.00 115 6-INCH WATERLINE (PVC) LF 84 326.00$ $27,384.00 342.00$ $28,728.00 116 3/4" WATER SERVICE AND METER (EXISTING PAVEMENT)EA 1 13,025.00$ $13,025.00 9,600.00$ $9,600.00 117 3/4" WATER SERVICE AND METER (UNPAVED AREAS) EA 1 2,579.00$ $2,579.00 9,600.00$ $9,600.00 118 2" WATER SERVICE AND METER EA 1 15,307.00$ $15,307.00 11,000.00$ $11,000.00 119 1" COMBINATION AIR VACUUM VALVE EA 1 1,584.00$ $1,584.00 9,600.00$ $9,600.00 120 FIRE HYDRANT ASSEMBLY EA 2 13,653.00$ $27,306.00 12,000.00$ $24,000.00 121 REMOVE SEPTIC SYSTEM EA 1 5,000.00$ $5,000.00 13,000.00$ $13,000.00 122 CUT AND CAP ELECTRICAL SERVICE EA 1 500.00$ $500.00 6,500.00$ $6,500.00 123 REMOVE GAS LINE LF 350 14.00$ $4,900.00 37.00$ $12,950.00 124 RELOCATE MAILBOX EA 2 530.00$ $1,060.00 1,000.00$ $2,000.00 125 TEMPORARY FENCE (TYPE CL) LS 1 ----- $39,668.00 -----$36,000.00 126* FENCE (TYP CL)LF 56 68.00$ $3,808.00 62.14$ $3,479.84 127* RECONSTRUCT FENCE (TYPE CL) LF 398 69.00$ $27,462.00 62.14$ $24,731.72 128* SALVAGE FENCE TO OWNER (TYPE CL) LF 146 11.00$ $1,606.00 10.00$ $1,460.00 129 12' BARRIER GATE EA 1 2,800.00$ $2,800.00 2,500.00$ $2,500.00 130 BARRIER GATE RECEIVER POST EA 2 275.00$ $550.00 250.00$ $500.00 Mid-Higuera Bypass - 2090649 Bid Tabulation Pg. 3 of 4 Public Bid Opening: 10/10/2024 at 11:00 AM ITEM NO. ITEM DESCRIPTION UNIT OF MEASURE ESTIMATED QUANTITY UNIT PRICE ITEM PRICE UNIT PRICE ITEM PRICE Souza Construction Papich Construction Company, Inc. 131 INSTALL ROADSIDE SIGN (PLAQUE) EA 1 3,305.00$ $3,305.00 4,500.00$ $4,500.00 132 RESET ROADSIDE SIGN (METAL POST) EA 1 331.00$ $331.00 250.00$ $250.00 133 RESET ROADSIDE SIGN (TWO METAL POST) EA 1 441.00$ $441.00 300.00$ $300.00 134 RELOCATE ROADSIDE SIGN (METAL POST) EA 2 441.00$ $882.00 250.00$ $500.00 135 RELOCATE ROADSIDE SIGN (TWO WOOD POST) EA 1 551.00$ $551.00 300.00$ $300.00 136 CRASH CUSHION (QUADGUARD II 1-BAY) EA 4 10,406.00$ $41,624.00 15,644.00$ $62,576.00 137 TUBULAR BICYCLE RAILING LF 271 44.00$ $11,924.00 65.00$ $17,615.00 138 4" THERMOPLASTIC TRAFFIC STRIPE LF 35 110.00$ $3,850.00 6.00$ $210.00 139 12" THERMOPLASTIC TRAFFIC STRIP (LIMIT LINE) LF 11 110.00$ $1,210.00 10.00$ $110.00 140 CALIFORNIA ST-75 BRIDGE RAIL LF 299 556.00$ $166,244.00 553.00$ $165,347.00 141* ROCK EXCAVATION (BYPASS CHANNELS) ALLOWANCE CY 300 145.00$ $43,500.00 230.00$ $69,000.00 142 TEMPORARY CONSTRUCTION ACCESS (BIANCHI LANE) LS 1 -----$250,478.00 -----$62,000.00 BID TOTAL $8,546,961.73 $9,700,000.00 Mid-Higuera Bypass - 2090649 Bid Tabulation Pg. 4 of 4