HomeMy WebLinkAbout08/20/1991, 7 - THE 1991 - 1992 WATER OPERATIONAL PLAN. II�N���iI��YllllllllllAllulll "J r MEETING GATE:
�►iu�ui► cio san suis oB�spo August 20, 1991
NNaMe COUNCIL AGENDA REPORT FE''NUMBEA:
FROM: William T. HetlandPREPARED BY: Sue Baasch, Admin Analyst
Utilities Director Gary Henderson, Utilities Engineer esow"
Ron Munds, Water Consery Coordinator
SUBJECT: The 1991 - 1992 Water Operational Plan.
CAO RECOMMENDATION:
Though the March rains gave the City a brief reprieve, the drought is not over. The City
must continue its aggressive water management program of new supply development and
water conservation. Assuming the drought will continue, staff recommends:
1. Receive and file the 1991 - 1992 Water Operational Plan;
2. Implement a multi-activity program, including acceptance of a loan of 1,000 acre feet
of water from Cal Poly, and defer the desalination decision to April, 1993;
3. Modify the Action Levels to a three stage system (15%, 35% and 50% levels) to be
implemented on a yearly basis depending on reservoir storage status;
4. Continue the CiO aggressive water conservation program;
5. Work with the County to expedite the implementation process for the Nacimiento
Project.
REPORT IN BRIEF:
San Luis Obispo was entering the fifth year of drought and was prepared to proceed with a
desalination plant for an emergency supply of water when March rains and April inflow
added 13,587 AF to total storage, a gain of 180% over the existing supply. This significant
gain triggered two actions: the easing of the level of mandatory conservation from 35% to
15% and the delay by one year of the critical decision regarding a desalination plant.
Two challenges underlay the development of this 1991/92 Water Operational Plan. How
could City water resources be managed to allow the desalination decision to be pushed
further into the future, and what kind of permanent programs could be implemented to
assure sufficient water availability in the future?
The 1991/92 Water Operational Plan developed a revised set of Action Levels, reducing the
five levels to three stages (15%, 35% and 50%). As described in the Plan, staff continues
to implement long-term water supply projects, including cloud seeding, groundwater
production, the Salinas Reservoir expansion, the Nacimiento diversion project and the
Wastewater Reclamation Program. The plan identifies a multi-activity program to manage
the City's water resources so the decision on the desalination project can be deferred
following two winter rain seasons. This program includes two 500 acre feet loans from Cal
il��ll�llllllil��iai���ll city of San JIS OBISpo
COUNCIL AGENDA REPORT
Poly, revised conservation levels and continued groundwater production. Water conservation
is the basis for the City's water management program and the extensive long-term water
efficient water use program identifies a mandatory toilet retrofit program (to be presented to !
Council in September, 1991); a xeriscape landscaping and water efficient irrigation awareness
program; an in-school education program; a greywater systems analysis program; irrigation
audits on City-maintained turf areas; public information and drought patrol.
DISCUSSION:
i
In April, 1991, when the Council voted to delay the desalination decision for one year,
Council asked if it was possible to manage resources so that the decision point could be
moved to April, 1993, allowing for the potential of two winter rains to replenish available
reservoir and groundwater storage.
Upon analysis of the available short term options, there seems to be no single available
immediate water resource to add to the current program to assure another year of water
supply; however, staff has developed a multi-activity program that should achieve this goal.
This program includes continued maximum pumping of groundwater supplies; coordinated
use of the reservoir supplies; continuation of cloud seeding and mandatory conservation;
adoption of revised action levels which would trigger a higher level of mandatory
conservation sooner and would remain in place longer; and an interagency water loan. With
this combination, the reservoir storage curve (Figure 7) predicts that the City's current supply
of water, with very conservative estimates of annual spring rain, would last through the
winter of 1994.
FISCAL IMPACT: j
The identified programs, if not currently reflected in the 1991/93 Financial Plan, will be
! presented individually for Council consideration. No additional appropriation is required to
support these activities at this time.
CONCURRENCES:
The Community Development Department has reviewed and approved this plan.
I
I �
i
I
Attachment: 1991-1992 Water Operational Plan
I
City of San Luis Obispo
1991-1992 WATER OPERATIONAL PLAN
I. INTRODUCTION
The first Water Operational Plan Policy Statement was adopted in 1985 as a means of
monitoring the City's water supply and reviewing current programs to address possible
diminishing supplies. This 1991 - 1992 annual report reviews current and projected reservoir
storage situations both from the viewpoint of continuation of the drought and from strategic
programming to promote long-term water use efficiency. While the spring rains and runoff
brought temporary relief to the water situation, it is important to remember that the drought
may continue and, even if rainfall returns to pre-drought levels, indoor and outdoor water
use efficiency will continue to be a high priority for the City. Long-term water use
efficiency is the theme statewide as many communities, including ours, remain in some level
of water conservation. In response to the findings of a federal study funded by the
Environmental Protection Agency regarding the statewide impact of the drought, State
Resources Secretary Douglas Wheeler notes: "...the lesson of the drought is first, it's not
always best to assume the best and second, we do have a need now, if we didn't five years
ago, for long-term policy." (LOS ANGELES TIMES, Friday, August 2, 1991.)
II. EXISTING WATER SUPPLY STATUS
As of e Salinas
Reservolirywas 54% full ANNUAL RESERVOIR RAINFALL
at 12,637.10 AF 1980 - 1991
capacity. As of July 1,
the City's proportionate
share of Whale Rock
storage was 7,364.27
AF, or 33%. The
combined total of Z
20,00137 AF, is 44% of Q 35.
the maximum City o
storage. This is a little 0
over three years of w
water supply. Prior to z ,
the March rains, the
City had 7,533 AF in
storage, or 16% of the 5
possible maximum 1980 ,ee, ,vez 1983 1984 IMS 1989 1997 1988 1989 �-
storage. '°° ""
March Rains SE Salinas Dam Whale Rock
The 1991 rainfall is
- .._. _- .._
20.01 inches at the Figure 1 Reservoir Rainfall 1980 to 1991
Salinas Reservoir and
�-3
1991/92 Water Operational Plan
Page 2
15.27 inches at Whale Rock Reservoir. It was only the very unusual March rains that
dropped 11 inches of rain at Whale Rock and 14 inches of rain at Salinas Reservoir that
significantly helped the storage in the City's reservoirs. The March rains did not end the
drought, and the City must continue to develop new supplies and to conserve, to have
sufficient water available to use in the short-term future.
Reservoir storage is augmented by groundwater. At this time, approximately half of the
water used within the City each month comes from wells. It is expected that this level of
production will decline as the groundwater basin is lowered. New wells to augment the
groundwater program are currently being tested. It is hoped that new wells will offset any
decline in production from existing wells.
m
IBM In
LL
O
Q
1
tl
O
AM r.�+,r wus.p ou xw o,c Jn s.e w•nl I++r.u.+q rgeCq ou ra.oCC,n rm W b UNM"
1989 to Present-3.3S733 Acre Feet
O_ ij Alao vakway IS-9 P=each,,—u
®Fn Sla 4 M Cab Joann Q WCW Pork
Figure 2 Groundwater Production 1989 to Present
Table 1 Well Production, 4/89 - 6/90
WPI Total AFOn-lin
Dalidio 736.50 9/89
Auto-Park 1,454.04 10/89
Pacific Beach 1 466.41 4/89
Fre Station 4 184.38 4/89
Calle Joaquin 361.87 4/90
Firing Range 20.68 9/89
Pacific Beach 2 116.65 5/90
Mitchell Park 17.00 5/91
Total Production 3,357.53
7' 7
1991/92 Water Operational Plan
Page 3
Water Consumption and Conservation
The City of San Luis
Obispo has been WATER CONSERVATION REPORT CARD
outstanding in its efforts 90/91 Use Compared to 1987 Base
to cut water
consumption. Even
though mandatory water &)0- -
conservation was
reduced to 15% in 700- 53%
April, 1991, water 6W- 411-4
46%
consumption hasU 411
continued to be 45 to I- 25 353 36%
50% below 1987 levels. 4W-
X-A
Figure 4 shows what zoo
our history has been
too-
regarding water o---- 111
over the last year -1- I ---
July Aug Sep Oct Nw 13� Jan Feb Mw Apr MAY Jun YTDconservation. Staff feels PerCent Conserved (YTD since July 1990)
there are at least two
reasons for the
continued high level of -RWa--Water r
1987 Base
conservation.
Consumers are still Figtoe 3 1990/91 Conservation Report Card
taking a very cautious
approach to increasing
water use and realize the drought is not
over. Secondly, it appears that conservative
water use habits have been adopted by CITY OF SAN LUIS OBISPO
most of the community. The retrofitting of 1990/91 Water Use
toilets, shower heads, and more efficient
irrigation systems have increased water 1990 Jul 434.92 AF
efficiency and will continue to conserve Aug 444.88 AF
water, even after the drought is over. The Sept 409.13 AF
City is currently using about 420 acre feet Oct 427.15 AF
per month (Figure 4). Nov 374.82 AF
Dec 317.81 AF
1991 Jan 333.63 AF
Feb 316.83 AF
Mar 307.69 AF
Apr 348.56 AF
May 434.78 AF
Jun 411.36 AF
Fogure,4 San Luis Obispo 90/91 Water use
1991/92 Water Operational Plan
Page 4
III. MULTI-SOURCE WATER SUPPLY PROJECTS
In November, 1990, the Council adopted a multi-source water supply policy. This policy
stated that the City would not rely on a single source of water to meet its permanent water
needs. At that time, staff also identified a supplemental water requirement of 6,540 AF to
serve the full build-out capacity of the City as represented in the General Plan and create a
water supply contingency. To this end, numerous short and long-term water supply projects
are under development at this time. The following is a status report on each of these
projects:
Salinas Reservoir Expansion
The initial feasibility study including seismic analysis and initial environmental review have
been completed. This work showed that the project was technically feasible, cost effective
and environmentally sound. Staff has met with the staff of some of the north county
communities to discuss the project and review concerns those communities may have.
Formal public presentations to the various north county councils and boards have been
scheduled. At the completion of those presentations, City staff will return to the San Luis
Obispo City Council and request authorization to prepare the draft environmental impact
report and to begin with design of the facilities.
Coastal Streams Diversion Project
The Coastal Streams Project is losing support as more information becomes available.
Fortunately, the rainfall in March finally provided adequate streamflow to complete the
required fisheries analysis. The consultants are currently completing the fisheries analysis
and are scheduled to provide the preliminary Draft Environmental Impact Report by
October, 1991. The Morro Bay City Council has removed this project from its list of
potential water supply sources. The City of San Luis Obispo has had an independent
analysis of this project which showed high costs and low potential yields. Pending the
completion of the Draft ETR, no further action is proposed.
State Water Project
Much activity occurred in the State Water Project this past year. The Draft Environmental
Impact Report was published in May, 1991. An advisory election was held in San Luis
Obispo in April, 1991, and the vote was of 52% (4,198 votes) to 47% (3,716 votes) in
opposition to the project. Elections in Santa Barbara County resulted in a number of
communities choosing to join the State Water Project. This will result in the State Water
Project proceeding with design and construction. The Draft Environmental Impact Report
for the Local Projects was also completed and is currently under public review. The County
has stated that San Luis Obispo City Council must make a formal determination on
participation in the State Water Project. The County is asking for this decision by
December, 1991, but, legally, the final date may be extended to April, 1992.
Nacimiento Diversion Project
The City 'of San Luis Obispo investigated the possibility of developing a Nacimiento water
supply project. This project became more attractive after the April advisory election on the
State Water Project indicated a citizen preference that the project not be approved, and
1991/92 Water Operational Plan
Page 5
March rains allowed the City to delay a final decision on its desalination project. The
Nacimiento project is technically feasible for the City to pursue alone, but the City realized
the significant regional concerns and requested that San Luis Obispo County be the lead
agency and begin development of a regional project Shortly, the County will formally
request an indication of participation from any agency within the county interested in the
project. Interested agencies must give the County their water "planning subscriptions" by
January, 1992, so the County can place a bond issue on the November, 1992, election. If
the bond election is successful, design will begin in 1993 with construction starting in 1994.
Completion of construction and start up on the project is estimated for 1997.
This time schedule is not what the City had hoped for, especially if the drought continues.
Staff is currently discussing with the County additional possibilities to expedite the project.
Hansen and Gularte Creek
Hansen and Gularte Creeks are two small creeks which run off the Cuesta Grade north of
San Luis Obispo. The City obtained rights on the creeks from private property owners in
the early 1900's. The supply was used for many years by adding chlorine for disinfection
and discharging the water to Reservoir #1, located near the base of Cuesta Grade. In 1976,
the City discontinued use of this supply due to changes in treatment required by the State
Department of Health Services. Staff has investigated the possibility of reactivating this
water supply.
The City has retained legal counsel specializing in water rights to evaluate our rights to
utilize the supply. The preliminary determination is that the City has probably lost its rights
under its pre-1914 agreements, due to lack of use. The water has to be put to beneficial
use (ie. domestic, irrigation, etc.) without a disruption of more than five years. Since the
City has not been putting this water to direct use, the pre-1914 rights have been lost and
reactivation would require the City to obtain an appropriative right. Since San Luis Obispo
Creek has been designated as a "fully-appropriated stream" and these creeks are tributary to
San Luis Creek, it is unlikely that the State would issue an appropriation.
Council approved a contract with Tenera Environmental Services to prepare an
environmental impact report (EIR) for the project. The draft EIR identified significant
impacts on fisheries, wildlife habitat, and reduced creek flows through the City, especially
significant in the Mission area. It is scheduled to be submitted to Council for their
consideration on September 3, 1991.
Groundwater Wells
The current groundwater program utilizes seven municipal wells and two or more irrigation
wells. At this time, wells are producing approximately 200 acre-feet (af) per month which
represents about 48% of the total City water demand. The current rate of production is
expected to drop off if the drought continues. Prior to the March rains, a number of the
wells showed sharp declines in pumping water elevation and were operated at reduced
capacity (two of the wells had to be shut down temporarily). After the March rains, the
groundwater levels rose to the same levels that were encountered at the start of the City's
Groundwater Development Program in 1989. As expected, groundwater levels have been
7-7
1991/92 Water Operational Plan
Page 6
slowly dropping since April. Due to lowering levels, a couple of the our lower producing
wells are being operated at reduced capacity.
The City is still pursuing the use of some private wells in order to spread out the wells
within the basin. Staff has been meeting with the property owners of one large producing
well (700 gallons per minute, about 1,000 afy). Water sample analysis from this well
indicate high nitrates and other possible contaminants. A rough preliminary cost estimate to
provide treatment facilities is $1,000,000. Staff is currently developing a staff report on this
project for Council action.
Hathway Pump Station
Groundwater is currently being distributed throughout the lower Higuera and Laguna Lake
pressure zones, the Terrace Hill tank zone, and a large part of the downtown zone. To
increase the use of groundwater, it is necessary to distribute the water to additional zones.
Staffs analysis determined that revising the Hathway pump station would allow additional
groundwater to be delivered to the Foothill zone. Staff is performing field tests and will
then make changes to the pump station.
Desalination
A desalination project feasibility report was presented at the December 11, 1990, City
Council meeting. Council directed staff to proceed with the project and to begin the
environmental impact report. A "fast-track" schedule was developed for the project to meet
a completion date of July, 1992. This schedule was necessary based on worst case
projections of the City's available water which indicated that Whale Rock Reservoir would
reach minimum pool in the fall of 1992. (Salinas Reservoir was already at minimum pool.)
The schedule allowed for a "Go-No Go" decision in April 1991, so that the water supply
status could be assessed prior to full project commitment. Because of the significant
increase in available storage due to the Spring rains, Council elected to place the short term
desalination project on hold for one year, and authorized staff to terminate consultant
contracts at appropriate points. James Montgomery Consulting Engineers have completed
the preliminary design, the draft water supply agreement and request for proposals for a
private developer/owner of the plant. Woodward Clyde Consultants had been retained to
prepare the environmental impact report and had begun work. Woodward-Clyde completed
the project description and the "Notice of Preparation" for the project. Both consultants
were asked to terminate their projects at points that would the allow the project to be easily
reactivated. Staff estimates it would take 24 months to have a desalination plant operational
following any re-authorization of the project.
Wastewater Reclamation
Reclaimed or recycled water is intended to be a long-term water source for the City. The
current quality of the effluent from the City's Wastewater Treatment Plant (WWTP) meets
secondary treatment standards. The $35 million WWTP upgrade that is underway will
improve the effluent quality to an advanced level, so that a full water reclamation program
can be implemented. At this advanced level of treatment, the reclaimed water can be used
for park and playground irrigation, landscape or recreational impoundments, industrial
applications, construction use and other beneficial non-potable uses.
—O
1991/92 Water Operational Plan
Page 7
By using treated wastewater effluent for non-potable water demand such as landscape
irrigation, the City's potable water will be made available for uses that require a higher
quality of water. Staff has estimated that reclaimed water could offset 800 to 1200 acre feet
per year of existing potable water demand by existing non-potable uses.
The water reclamation program is in the conceptual phase of its development. In this phase
market research is being performed, regulations are being researched and a feasibility study
is being performed. This phase of the water reclamation program is due to be completed by
mid-1992.
Before reclaimed water can be delivered to customers, the following must be accomplished:
prepare and certify the environmental documents; prepare an engineering report and its
submittal to the Department of Health Services (DHS) and the Regional Water Quality
Control Board; establish user contracts; establish revenue program; perform a detailed design
of storage, pumping and distribution facilities; and construction of those facilities. Staff has
estimated that reclaimed water to meet the DHS requirements for unrestricted public contact
will be delivered to the first customers in late 1994.
Cloud Seeding
In January, 1991, the City Council approved an agreement with Atmospherics Incorporated
of Fresno, California to provide a three-year cloud seeding program. The program "target
areas" are the Salinas reservoir and Lopez Lake watersheds. The County of San Luis
Obispo participated in the project and agreed to pay 37.8% of the total costs. During the
operational period, seven airborne seeding flights were conducted. Four were rated by the
cloud seeding pilot and radar meteorologist as presenting good seedability, two were listed as
fair, and the remaining flight was listed as poor. Aircraft operations logged a total of 20.5
hours, dispensing a total of 1,740 grams of silver iodide.
A total of 31 units within the ground generator network were activated during ten of the
seedable storm periods. Seedability was rated from fair to excellent when ground generator
operations were in progress. Total time logged for ground generator operations was 233
hours, dispensing some 2,330 grams of silver iodide.
The effectiveness of the first year of cloud seeding operations was determined by reviewing
radar echoes and analyzing historic records. Characteristics of radar echoes associated with
both the seeded clouds and simultaneously occurring non-seeded clouds adjacent to the
target area have been examined. Using standard radar equations from this data, there is a
strong indication the cloud seeding program operated during the 1991 period did produce
significant increases in precipitation. If one extrapolates these radar echo characteristics to
precipitation on the ground, an average increase of 12% to 16% is well within reasonable
limits. In terms of the season's snow/rainfall totals over the target area in 1990/91, this
percentage increase would mean slightly more than two inches of supplemental precipitation.
The consultant also studied historic records of rainfall and streamflow measurement in the
area. From the initial study, there is some reasonable evidence of average increases in
precipitation on the order of 8% to 13%. This range is somewhat less than the figures
developed from the radar echoes but is consistent with results from similar studies conducted
7- 9
1991/92 Water Operational Plan
Page 8
in other areas in California. Based on the streamflow figures to date for the 1990/91 water
year, the data suggest an apparent increase in supplemental water that may be in the range
of 1,500 to 2,500 acre-feet. (This is the total combined amount for both reservoirs.)
Using the 1,500 acre-foot production value, the total cost for the first season equates to
approximately $50/AF.
IV. WATER CONSERVATION
Since the implementation of the mandatory water conservation program in April, 1989, the
City's water customers have sustained a high level of conservation. For the calendar year of
1990, water consumption was down an average of 44% from 1987 usage. So far in 1991,
water usage is down 46%.
Increasingly, throughout the State, the expression "water conservation" is being replaced with
the term "water efficiency". As the City moves further into the 1990's, water efficiency will
become a key factor in insuring the water future for our community. The following is a
summary of the direction the water conservation program will pursue to obtain this efficiency
in the upcoming year.
CONTINUING PROGRAMS
In addition to the Water Conservation Coordinator, a regular, full-time position, the Water
Conservation program is budgeted for eight contract positions. These positions are filled
depending on workload requirements. Currently, there are five employees on staff with
three vacancies. The water conservation staff are involved in a wide array of continuing and
new programs.
Mandatory Water Conservation
Implemented in April, 1989, mandatory water conservation has been the essential component
of the City's ability to maintain water supplies during this record-setting drought. The
continuance of this program will be imperative until the water supply situation changes. The
program currently requires 15% water conservation though City conservation continues at the
45% to 50% level as compared to the 1987 level of use.
Hotline
Instituted in April, 1989, the Hotline continues to provide a vital service for the water
customer of San Luis Obispo. This is a key link between the public and the City and
provides a high level of customer service and information for our citizens. In addition to
the information services, Hotline staff evaluate all water allocation adjustment requests and
work closely with our customers to insure that the program is administered in an equitable
manner. Since May, 1991, Hotline has answered over 2,500 telephone inquiries and
processed over 600 allocation adjustment forms.
? . /O
1y91/92 Water Operational Plan
Page 9
Drought Patrol of water waste was the primary objective of this
Educating the public on eliminationhave been issued. To date, none
program Since May, 1989, approximately 700 warnings uently, no fines have been levied.
have resulted in court appearance citations, and, conseq
Trained field staff evaluate the customer's irrigation practices and make recommendations on
and correct problems. Again, positive customer service s the
ways to improve efficiency riority.
water conservation representative's foremost p
Jul 1990. In the past year, water
Residential/Commercial Water AuditsInduring Y•
1990-
This program was developed and Implemented roach
conservation staff has conducted ran ou00 ts�ding ublicsrelations and outreach app water
conservation tool, but has also been
for the water conservation program.
Toilet Rebate Program implemented in June, 1990. Since that time, 1,725 toilets
This program was developed and imp of s approximately in
60
have been replaced. To date, approximately $66,000 out of $200,
000 remains available m
the toilet rebate fund. The retrofit represents along-term ct water about $350 r acrepfoot,
acre feet annual water use, equating to a program
excluding staff costs.
Ongoing Public Information Program water
Since the inception of mandatory
and
conservation program, public
information have been an integral part of
the plan. Water conservation staff and the
marketing firm of Barnett, Cox and
Associates have developed aninnovative
e
The for this outreach program.
new characters, "Les, and Lo Flo", will be
used in our media advertising and in the
educational programs.
NEW PROGRAMS
Xeriscape and Water Efficient Irrigation
Systems Awareness Program
Water conservation staff has organized local
nurseries to assist the City in promoting FWm s �$ �d Flo ,u,a Me�ee
water efficient landscapes. The l�tsries
tag or identify drought tolerant to their
q offer
free information and suggince to support
ts on
customers on how to incorporate nervation staffs s developing a media acampa offer
n91 n condiscout nue
these plants. In return, water co
the nurseries' efforts. Ths program is scheduled to begin in mid-August 19
to November 1991.
1991/92 Water Operational Plan
Page 10
Informational Workshops
A series of workshops will compliment the above program as well as provide other
information on topics concerning water conservation. Initially, the workshops will focus on
landscape water efficiency. Topics will include: 1) principles of xeriscape design; 2)
drought tolerant plant selection; 3) efficient irrigation design; 4) how to maintain a
drought-tolerant landscape; and, 5) the incorporation of hardscapes into a functional design.
The first workshop was scheduled for August 8, 1991, and dealt with the principal of
xeriscape design. Additional workshops are being arranged.
Greywater Systems Analysis Program
Staff is establishing a monitoring program, in conjunction with businesses, to evaluate the
latest technology in greywater systems. The intention of this initial monitoring program is to
observe the benefits and potential environmental effects of using ozone-treated greywater for
above ground irrigation. The ozone-treated greywater may offer expanded opportunities for
irrigation, thus reducing the amount of wastewater which requires treatment. The City's
energy coordinator is working with the water conservation staff to determine a full cost to
benefit analysis for these systems.
Xeriscape Demonstration Gardens
Staff has identified the first location for the initial garden. Located at the comer of Santa
Barbara and Broad Streets, this site offers both a reasonably-sized area and high visibility.
The design has been donated by a local landscape designer and is currently in the review
process by the Parks Department. Staff is also identifying other potential sites for
development of Xeriscape demonstration gardens. Projected installation date is fall 1991.
Irrigation Audits on City Maintained Turf Areas
This program was implemented in May, 1991. The intent is to evaluate irrigation efficiency
in the City parks facilities. The water conservation staff is working closely with the parks
staff to achieve irrigation efficiency in all City-maintained areas. It is our goal to set an
example for the rest of the community, and, eventually, offer similar services to both
residential and commercial water customers. Completed audits include the Jack House,
Osos Street Park, Mission Plaza, Throop Park, and Vista Lago Park. Upcoming audits will
encompass the larger park facilities such as Meadow Park, Mitchell Park and Santa Rosa
Park.
Comprehensive Retrofit Plan
Staff has prepared an aggressive plan to retrofit all existing higher gallonage water fixtures
within the City with water efficient hardware. Estimated annual water savings for the long
term is approximately 1,000 acre feet annual water use. A staff report outlining the
proposed program will be presented to Council in September, 1991.
Water Efficient Irrigation and Landscape Ordinance
The State will require by January, 1993, that every water purveyor develop and implement a
water efficient irrigation and landscape ordinance. Though the City does have landscape
standards, these will have to be expanded to meet the State's requirements. Staff is
7-/�
1991/92 Water Operational Plan
Page 11
researching information and identifying the State's requirements to make a recommendation
for such an ordinance.
In-school Education Program
In the past, the water conservation office supplied the school district with teaching guides
and curriculum packages on water conservation. During the past year, more and more
teachers have contacted the office requesting assistance in teaching water conservation in the
classroom. In response to this, staff is developing an in-school presentation to be performed
by water conservation personnel for elementary school children, starting this fall.
V. PROJECTED WATER SUPPLY SITUATION
Reservoir Storage Curve
The City's Reservoir Storage Curve has been the basis for the City's water management
decisions. The curve predicts reservoir storage based on certain conservative assumptions.
Over the years, the City has modified the curve and the water action levels in response to
new information and additional experience. This year, staff has made some changes to the
model which will make it more accurate. The model continues to assume very conservative
rainfall and inflow estimates based on 1989 weather patterns. As discussed earlier, the
action levels were revised. Portions of the model were modified to more equitably distribute
total discharge (other releases, evaporation and demand) among the three Whale Rock
Reservoir agencies. The model has been developed so that each year relates to a master
total storage spreadsheet; this reorganization facilitates the forecasting of storage using
various assumptions regarding conservation, groundwater production and weather.
Action bevels
The Action Levels, an integral part of the Reservoir Storage curve, have undergone a review
based on the City's experience over the last couple of years. Staff recommends the action
levels be reduced from the previous five to three action levels to better represent how the
City has operated the last two years. Each April, after winter rains, when the reservoir
storage is known, staff can predict future supply and the corresponding conservation level,
based on the storage curve. If the City were to enter another level before the next winter,
Council would authorize that level of conservation to begin immediately to gain the
advantage of the summer high water use period. Staff recommends this approach become
the standard method of operations for reviewing water conservation levels. The system of
five different action levels occurring at approximately six-months intervals was cumbersome
and confusing. Since the storage analysis and recommendation would occur each April, staff
recommends that (1) the number of conservation levels be reduced to three; (2) each level
be referred to as a stage; and, (3) the percentage of conservation savings be revised
accordingly. Table II below shows the current and the proposed action levels.
Exhibit A shows the proposed Action Levels. The three levels were derived by a calculation
as follows: consumption based on the appropriate conservation goal for each level is
subtracted from the base year consumption of 8,050 afy. That amount is further reduced by
the level of projected well production (in this case 1,800 afy) and minimum pool, 3,100 af.
Stage I or 15% mandatory conservation will be triggered when the City has three years of
�-/3
1991/92 Water Operational Plan
Page 12
water supply less the annual well capacity and minimum pool. Stage 11 is triggered when
there is two years of supply, and Stage III when there is one year of supply. The higher
exiting levels assure that the City will not leave a level of conservation and return to it
within nine months.
Extending "GO/NO GO" Decision
Figure 6 shows the reservoir storage curve 1TeWe I Revisions to ACTION LEVELS
presented to Council in April, 1991. The
curve indicated that the City would have to ACTION LEVELS
revisit the desalination decision again in
April, 1992, since it looked like reservoir Existing Proposed
storage would only last to September, 1994,
and staff estimates it would take 24 months Minor 5% Stage 1 15%
to get a desalination project operational. Moderate 15% Stage 11 35%
The Council directed staff to investigate Serious 25% Stage III 50%
ways to extend or add additional storage Severe 35%
that could move the decision point to April, Critical 50%
1993. Figure 7 shows the most current
reservoir model that illustrates a multi-
activity program to extend the desalination
point beyond April, 1993. This model
includes the following assumptions:
21-
2D-
19-
is-
11t Molc mlc 1 -
15.
r
14-
I Serif us 25%
N ^
0 12.
' LL m 11
o t Se re 35%
Ujalq
Q 7 GiLin150%
5.
4
Minimum Pool
1
1191 4191 7 10191 1/92 4/92 7192 10/92 1190 4/93 7197 10193 1194 4/94 7194 10!94
PROJECTION WITH 1,800 AF WELLS
Fgm 6 April 1991 - Reservoir Storage Curve
Well production is estimated at 2,400 of the first year, then reducing to 1,800 afy
thereafter as the groundwater table is drawn down.
1991/92 Water Operational Plan
Page 13
• Cal Poly has agreed to loan the City 1000 of of water. The first loan of 500 of
would occur on 4/93 providing the City is at 50% conservation and a second loan
would occur on 4/94, if necessary.
• Mandatory conservation is currently at 15% but the actual level is closer to 45 to
50%. Staff is therefore, conservatively assuming a 25% conservation through 4/92.
With a continuation of the drought the City will go to 35% in 4/93 and then to 50%
thereafter.
• Rainfall, evaporation, and inflow based on recent experience.
• The recommended revised action levels at 15%, 35%, and 50% are also used.
RESERVOIR STORAGE CURVE
stage 7 IS% Aaampltoow
Wdls 12 mes 2.400 AF
20- 8alaose I.WAF
Cow 25% 1191
35%V92
I— 50% 4193
L11 l
W Cal Poly See AF 1193
SOO AF 4194
llg Sra II J%
i
U.1
a
t
U '
Q
s� In sop
miffs m pool
1/91 4/617161larol tna 4/182 7/182 tom 1 4/W 7/ntaaa ,w 7ros tap 1/KNM 7/186 lass 1/w
Wells; New Action Levels; Cal Poly Loan
�— Actual Level Predicted Level
Figure 7 Current Reservoir Storage Curve
-/S
CITY OF SAN LUIS OBISPO Exhibit
August 1991 1991/92 Water
Operational Plan
ACTION LEVELS
Action Level Definition Storage(AF)
Entering Exiting
Action Levels Action Levels
MAX STORAGE Total City's storage in both 45,630
Salinas and Whale Rock Reservoirs
STAGE I 3.0 years of supply less annual 21,900 28,100
well capacity plus minimum pool
(15%conservation)
STAGE II 2.0 years of supply less annual 13,200 18,200
well capacity plus minimum pool.
(35%conservation)
STAGE III 1.0 years of supply less annual 6,500 10,000
well capacity plus minimum pool.
(50%conservation)
Minimum Pool 3,100
The storage levels are based on a base year consumption of 8,050 AFY,and then reduced consumption based
on the appropriate conservation goal for each action level,1,800 AFY of well production and minimum pool
of 3,100 AF.
Entering Action Levels
In April of each year,staff will evaluate water supply. If City storage will hit action level
within the next nine months,the new conservation level will be implemented in May.
••
• �---ss�ocee.eW
�------�eoeoeeeeaa
�---��—�e�em�:00000eaoao
-------------
............
---a.acaeeen—.—.wemme memmmx •
1
.-----------�oe�ecoaaer000 ww�owwn
---ee—�---�weowoaawoewe wveeaaeax
-----------�mmeeeeeaeeeee mmmmme ••
----------vam.eeeeeeeeeeem�weeneoeoee
• .-----------�avaeecmmeceooeoo:= •
------aa---�xmeeaeeieeeeeeeeeeavoo= ■
�-------��—�mmeoeeemee.cememneeae eeaaaeenex
. �-----------�—�oe0000uoouee.owwoeooeaoa0000n
-----��---ate 000eooioex
• �—�—���—� mmoeoeee� •
-----------s-- waaaaawao
-------------� aaaaeeeeea
ammmme
•
ATE�N HIDA
ON/
��III�IIH�IIIIIII Ipllllllllll -,Z-m
�IIIlflllll� 11�
Cl O Sa1�1 MIS OBIS
A �
955 Morro Street • San Luis Obispo, CA 93401
August 13, 1991
TO: Council Members
John Dunn
FROM: William T. Hetland Uv
Utilities Director
SUBJECT: 1991 - 1992 WATER OPERATIONAL PLAN
Please add the attached graph to your 1991 - 1992 Water Operational Plan,
distributed with the August 20, 1991 City Council Agenda Packet.
COPIESTO:
❑•pe+w�s nMm ❑ FY[
❑ CDD DIR
CAO ❑ FIN.DU
1.ACAO ❑ FIRE CHEF
FW D
❑ DRc�alvoRlC. ❑ FoLlacn
❑ MGMT.TE"l �EJ XC DIIL
RF}LP FILE LlbUTI�%�
RECEIVE ®
AUG� 1991
• CITY CLERK
S LUI OBISPO•CA
r
oLo01 CD 46
O
Ch
ti N g a a Q
�J�q`' re u � v` � d � W
V / o N m WA In in ct
NLa
IIIW
W a a
o � $ �
" J
C� $ CD
o-
CE: 19 a N
0 a
o
(l1 ; o
0 Q
s Q
ct 5
Cl) O N Z J
H cr. N N
W � � U
o �
W a Q
a
N C6
(spuwnoy.0
133 - 380V
DATMEETING 9 AGENDA
L-ITEC#_.._._
RRM DESIGN GR O U P
August 19, 1991 Architecture•Ph7m1117g'E.'Ipwcrfn7,�- hitc7iCi'5'Landscape:ichifeCNPP
Airport Area Property Owner's Association
SUBJECT: EXPANSION OF CALIFORNIA CITIES WATER COMPANY BOUNDARY
Dear Property Owner:
On July 23, 1991, the Technical Advisory Committee expressed an interest in contacting
California Cities Water Company to determine their willingness to expand their boundaries
to incorporate the entire 1,700 acre Airport Area. As a result of that meeting, RRM
Design Group has contacted Mr. Floyd Wicks, President of California Cities Water
Company, who has indeed expressed interest in expanding the service area and going
through the California Public Utilities Commission to do so.
Accordingly, RRM Design Group formally communicated to Mr. Wicks that it was likely
that the Airport Area property owners would be most interested in becoming a part of and
being served in the future by California Cities Water Company.
To become part of an entity that will be a purveyor of State water represents a major
opportunity to the Airport Area Property Owner's Association. With Santa Barbara's
recent approval to bring State water into their county, it is likely that the water project will
proceed. Accordingly, California Cities Water Company has indicated that they will be
able to up their requested allotment for State water to enable them to serve the Airport
Area with water.
Mr. Wicks has requested that the Airport Area Property Owners formally petition his
company to request expansion of their service area to include the Airport Area. A formal
letter to California Cities Water Company, signed by the members of the Technical
Advisory Committee will serve this purpose, but we need the overall Association to
formally vote to authorize the Technical Committee to send such a letter. Those who
attend the AAPOA meeting will be asked for their preferences by a count of hands.
Representatives of California Cities Water Company, Don Saddoris and Jim Carson, :;iL'
be attending our August 29th AAPOA meeting to answer any questions property owners
might have of their company and to present how expansion of their service area might be
accomplished.
As your consultants, we strongly recommend that the Property Owner's vote to approve
this direction. Should you have any questions or concerns regarding this matter, please
don't hesitate to give me a call. Otherwise, we'll see you at the meeting.
RECEIVED
Sincerely, COPI�sse
y AUG 2 01991 °' esAetion,,__,,,,//❑ �
�D DM.
RRM DESIGN GRO CIT CLERK opo
rrl]V.DIR.
S4N L OBISPO,CA ACRO ❑ FIREM F
�'�'E' O ra Da
■ CLERK/O,^.IG. ❑ PCLICECI-L
T. Keith Gurnee ❑ MCMT-TEAM �./PZCDIP-
❑ C READ FILE r .UrIL D R
Senior Vice Presi nt F
3oa6 Snuth Higuera Street.San Luis Obispo,California 93401 805/543-3794 C" g-aapoa. tr
Planning Division toix-rtth Street.Modesto,Califomia 95354 209/54-7794
A CaLI.•mi-0.1-11—.'11,11,M,-.,1.1,y..4,hnrn-La,-S—m,,CvuI ,
. ANNOUNCING
AIRPORT'AREA PROPERTY OWNERS ASSOCIATION.MEETING
WHEN: 'August 29, I991
WHERE: City/County Library,_Community
995 Palin Street,
.San Luis Obispo
- .
TIME: 6:30p.m.
p•m.
-WHY: The prirpose.of this.meeting is to provide
` a progress report to the properly owners
.* regarding CitylCounty policies that affect.
_ the Airport area
R}ZIvi Design CYroup would like to announce a generahmeeting between the Auport Area
Property Owners and the City"and County of San Luis Obispo Planning Departments.::.:.
r : SomeYof the it to,be_discussed are:.
1: City Land Use Element Update
2 County of San Luis Obispo Ai ea Plan Update
`3. Status of CSA-22 funds and appropriations.
*4. .'a, , Ca1.Cities Water service to the Airport area when supplied by state water project
5'-- .•_Design Guidelines and Development Standards for the Airportarea.
This rs antopportnnity for property_owners t :voice their`position.''on these issues. We
...'----.-—urge. you,to attend this meeting and look forward to-seeing you these! I
*Attached B a letter requesting pioperty owners, to 'vote on whether. Cal Cities_should
and.fheu sernce area to include the A� ort area Please be re ared to vote on this`
Pn _ .th §,r iP P P.
issue at elmeeting
I.A 4 -gyp•'•h SF l .G- Y L i _ - r - 4 v 4 .� ! _ z.
vJdc'aapoa:mtgyl ] f
tq
�` RC1 r f'L� _ 1 ...1 + f - J • " ♦. 1
J.S wrr..i �£ .� ]� 9:° v . q � "+';'{ rt ..,�� L A••h.'r; y, 7 -'L.r ti4-.�;c ..r .. r •7. ca^ lc
r�r;; �•.. •Y- Jq i] � 3 1. a] A ^�r,+R - n'd .�' •i' 1 cY'', IR-p
'• w-. -M � ._ ] + -•.t n �a � I Y+w y `•w L F a,r r .Y+ f Y i 1,, `. 1 ,. ( � i 'S_'-.'