Item #Item Description Unit of Measure Estimated Quanity Item price Total
1 DEMOLITION LS 1 ---$50,028.72
2 REMOVAL OF EXISITING CONCRETE RAISED
CURB LF 40 $207.11 $8,284.40
3 STRUCTURAL REPAIRS LS 1 ---$149,787.24
4 PAINTING OF FUEL ISLAND STRUCTURE,
BOLLARDS AND CURB
LS 1 ---$170,503.93
5
COATING OF TANKS EXTERIOR SURFACES AND
SADDLES,FILL PIPING,CONTAINMENT BOXES,
AND DISPENSER BOXES
LS 1 ---$86,198.73
6 NEW WALL PANELS LS 1 ---$70,157.33
7 DOOR REPLACEMENT EA 2 $9,809.31 $19,618.62
8 REPLACEMENT OF EXISTING DOWNSPOUT EA 2 $213.51 $427.02
9 INSTALLATION OF THE BIRD NETTING FOR
ENTIRE STRUCTURE LS 1 ---$17,839.77
10 INSTALLATION OF GALVANIZED STEEL LOUVER EA 1 ---$1,421.37
11 NEW 6" CURB LF 150 $293.60 $44,040.00
12 NEW RMI ROOFING MEMBRANE LS 1 ---$152,827.64
13 REMOVAL AND DISPOSAL OF EXISTING SIGNAGE
AND INSTALLATION OF NEW SIGNAGE LS 1 ---$1,988.70
14 TEMPORARY FUEL TANK AND PUMP WEEK 1 ---$21,961.15
15 GUTTER ALLOWANCE LF 50 $12.20 $610.00
$795,694.62
Corporation Yard Fuel Island and Wash Station Rehabilitation, SPECIFICATION NO. 2000075-9.01
Total Bid Amount
** Total bid amount is based on item price. Per section 2-1.33A, in the case of arithmetic discrepancy between item prices and total
prices, items prices prevail over total prices.