Loading...
HomeMy WebLinkAbout2000075-9.01 Bid Results - Corp Yard Fuel IslandBid Opening: 12/19/2023 Item #Item Description Unit of Measure Estimated Quanity Item price Total 1 DEMOLITION LS 1 ---$50,028.72 2 REMOVAL OF EXISITING CONCRETE RAISED CURB LF 40 $207.11 $8,284.40 3 STRUCTURAL REPAIRS LS 1 ---$149,787.24 4 PAINTING OF FUEL ISLAND STRUCTURE, BOLLARDS AND CURB LS 1 ---$170,503.93 5 COATING OF TANKS EXTERIOR SURFACES AND SADDLES,FILL PIPING,CONTAINMENT BOXES, AND DISPENSER BOXES LS 1 ---$86,198.73 6 NEW WALL PANELS LS 1 ---$70,157.33 7 DOOR REPLACEMENT EA 2 $9,809.31 $19,618.62 8 REPLACEMENT OF EXISTING DOWNSPOUT EA 2 $213.51 $427.02 9 INSTALLATION OF THE BIRD NETTING FOR ENTIRE STRUCTURE LS 1 ---$17,839.77 10 INSTALLATION OF GALVANIZED STEEL LOUVER EA 1 ---$1,421.37 11 NEW 6" CURB LF 150 $293.60 $44,040.00 12 NEW RMI ROOFING MEMBRANE LS 1 ---$152,827.64 13 REMOVAL AND DISPOSAL OF EXISTING SIGNAGE AND INSTALLATION OF NEW SIGNAGE LS 1 ---$1,988.70 14 TEMPORARY FUEL TANK AND PUMP WEEK 1 ---$21,961.15 15 GUTTER ALLOWANCE LF 50 $12.20 $610.00 $795,694.62 Corporation Yard Fuel Island and Wash Station Rehabilitation, SPECIFICATION NO. 2000075-9.01 Total Bid Amount ** Total bid amount is based on item price. Per section 2-1.33A, in the case of arithmetic discrepancy between item prices and total prices, items prices prevail over total prices. Quincon, Inc.