Loading...
HomeMy WebLinkAbout2090742-1 Bid ResultsItem No. SS Item Description Unit of Measure Estimated Quantity Unit Price Total Unit Price Total Unit Price Total 1 7, 12 TRAFFIC CONTROL LS 1 21,000.00$ 21,000.00$ 25,000.00$ 25,000.00$ 4,773.00$ 4,773.00$ 2 17 CLEARING AND DEMOLITION LS 1 21,000.00$ 21,000.00$ 12,000.00$ 12,000.00$ 17,547.00$ 17,547.00$ 3 21 EROSION CONTROL AND CREEK PROTECTION LS 1 3,300.00$ 3,300.00$ 7,500.00$ 7,500.00$ 2,258.00$ 2,258.00$ 4 77 POTHOLING EA 5 850.00$ 4,250.00$ - 9,250.00$ 1,534.40$ 7,672.00$ 5 72 RESET ROCK WALL LS 1 6,000.00$ 6,000.00$ 2,500.00$ 2,500.00$ 6,398.00$ 6,398.00$ 6 37, 77 6 INCH ASPHALT CONCRETE FULL DEPTH REPLACEMENT SQFT 1640 17.00$ 27,880.00$ 18.00$ 29,520.00$ 18.61$ 30,520.40$ 7 39 TYPE "D" HMA DIKE PER CLATRANS STD PLAN A87B LF 150 50.00$ 7,500.00$ 100.00$ 15,000.00$ 103.23$ 15,484.50$ 8 20 4" MIN THICK DECOMPOSED GRANITE SQFT 950 3.00$ 2,850.00$ 25.00$ 23,750.00$ 19.48$ 18,506.00$ 9 INSTALL WOOD RETAINING WALL LF 30 100.00$ 3,000.00$ 250.00$ 7,500.00$ 298.43$ 8,952.90$ 10 73 CURB RAMP: SE CORNER RUTH AND IRIS LS 1 33,000.00$ 33,000.00$ 30,000.00$ 30,000.00$ 19,463.00$ 19,463.00$ 11 15 REMOVE (E) STORM DRAIN PIPE AND BACKFILL PER ENG. STD. 6020 AND 6030 LF 52 150.00$ 7,800.00$ 166.00$ 8,632.00$ 632.37$ 32,883.24$ 12 15 REMOVE (E) DRAINAGE INLET EA 1 3,700.00$ 3,700.00$ 7,500.00$ 7,500.00$ 6,965.00$ 6,965.00$ 13 77 INSTALL 12" PVC (C900) DRAIN PIPE LF 195 210.00$ 40,950.00$ 250.00$ 48,750.00$ 401.36$ 78,265.20$ 14 77 INSTALL (N) CATCH BASIN PER ENG. STD. 3355 EA 1 15,000.00$ 15,000.00$ 17,000.00$ 17,000.00$ 22,058.00$ 22,058.00$ 15 77 INSTALL (N) CATCH BASIN PER ENG. STD. 3360 EA 1 24,500.00$ 24,500.00$ 19,000.00$ 19,000.00$ 45,371.00$ 45,371.00$ 16 77 INSTALL (N) MODIFIED CATCH BASIN PER DETAIL 3, SHEET 3 EA 1 16,500.00$ 16,500.00$ 20,000.00$ 20,000.00$ 22,255.00$ 22,255.00$ 17 77 INSTALL (N) STORM DRAIN MANHOLE PER ENG. STD. 3530 EA 2 3,500.00$ 7,000.00$ 18,000.00$ 36,000.00$ 7,711.00$ 15,422.00$ 18 15 ADJUST WATER VALVE TO FINISHED SURFACE EA 2 1,200.00$ 2,400.00$ 950.00$ 1,900.00$ 4,519.50$ 9,039.00$ 19 77 REPLACE WATER METER BOX PER ENG. STD. 6210 EA 3 380.00$ 1,140.00$ 2,213.00$ 6,639.00$ 2,323.00$ 6,969.00$ 20 51 12" CONCRETE FLARED END SECTION EA 1 3,000.00$ 3,000.00$ 5,500.00$ 5,500.00$ 4,981.00$ 4,981.00$ 21 72 PLACE RIP RAP (20 LB, CLASS I, METHOD B)CY 1.8 700.00$ 1,260.00$ 500.00$ 900.00$ 2,295.56$ 4,132.01$ 22 68 SIDEWALK UNDERDRAIN EA 1 800.00$ 800.00$ 9,000.00$ 9,000.00$ 1,270.00$ 1,270.00$ 23 77 TREE REMOVAL EA 1 900.00$ 900.00$ 2,000.00$ 2,000.00$ 318.00$ 318.00$ 24 20 REPLANT (E) TREE EA 1 3,000.00$ 3,000.00$ 2,500.00$ 2,500.00$ 2,136.00$ 2,136.00$ 25 20 PLANT ESTABLISHMENT AND MAINTENANCE LS 1 2,500.00$ 2,500.00$ 5,000.00$ 5,000.00$ 635.00$ 635.00$ 26 73 ADDITIONAL CURB AND GUTTER ALLOWANCE LF 10 250.00$ 2,500.00$ 100.00$ 1,000.00$ 457.90$ 4,579.00$ 27 73 ADDITIONAL SIDEWALK ALLOWANCE SQFT 50 35.00$ 1,750.00$ 50.00$ 2,500.00$ 108.08$ 5,404.00$ 28 20 ADDITIONAL DECOMPOSED GRANITE ALLOWANCE SQFT 50 4.00$ 200.00$ 50.00$ 2,500.00$ 29.82$ 1,491.00$ 29 39 ADDITIONAL TYPE 'D' HMA DIKE ALLOWANCE LF 10 45.00$ 450.00$ 100.00$ 1,000.00$ 234.40$ 2,344.00$ 359,341.00$ JJ Fisher 398,092.25$ Seamair Construction, Inc. BASE BID ITEMS R. Burke Corporation 265,130.00$ TOTAL PROJECT BID