Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2000188 Bid Results
MITCHELL PARK REVITALIZATION PROJECT, SPECIFICATION NO. 2000188 Bid Opening: 11/16/2023 UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL No.ITEM UNIT QUAN PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE 1 COMPLY WITH BUILDING PERMIT REQUIREMENTS LS 1 $610.50 $610.50 $11,947.55 $11,947.55 $10,000.00 $10,000.00 $1,500.00 $1,500.00 2 DEMOLITION AND REMOVAL OF EXISTING IMPROVEMENT LS 1 $32,600.93 $32,600.93 $29,480.23 $29,480.23 $35,800.00 $35,800.00 $30,000.00 $30,000.00 3 EXCAVATION AND GRADING LS 1 $52,753.68 $52,753.68 $20,580.79 $20,580.79 $39,300.00 $39,300.00 $34,000.00 $34,000.00 4 TREE TRIMMING LS 1 $10,803.48 $10,803.48 $10,213.95 $10,213.95 $10,000.00 $10,000.00 $6,000.00 $6,000.00 5 INSTALL IRRIGATION PIPING AND SPRINKLER SYSTEM LS 1 $14,912.18 $14,912.18 $23,173.05 $23,173.05 $5,200.00 $5,200.00 $26,400.00 $26,400.00 6 TURF AREA SEEDING LS 1 $3,052.52 $3,052.52 $14,035.35 $14,035.35 $8,000.00 $8,000.00 $15,000.00 $15,000.00 7 30 DAY PLANT ESTABLISHMENT PERIOD LS 1 $4,424.94 $4,424.94 $7,133.95 $7,133.95 $4,000.00 $4,000.00 $5,500.00 $5,500.00 8 INSTALL (N) CONCRETE WALKWAY SQFT 2400 $18.69 $44,856.00 $20.31 $48,744.00 $34.00 $81,600.00 $27.00 $64,800.00 9 INSTALL (N) RAISED STAGE EA 1 $15,152.72 $15,152.72 $21,385.55 $21,385.55 $28,100.00 $28,100.00 $19,000.00 $19,000.00 10 INSTALL FENCE LF 80 $177.05 $14,164.00 $248.19 $19,855.20 $225.00 $18,000.00 $225.00 $18,000.00 11 INSTALL GATE EA 1 $1,831.51 $1,831.51 $6,135.15 $6,135.15 $3,400.00 $3,400.00 $2,500.00 $2,500.00 12 INSTALL LIGHT POST AND CONDUIT PER CITY STD. 7915 EA 4 $12,033.04 $48,132.16 $9,653.99 $38,615.96 $13,000.00 $52,000.00 $15,500.00 $62,000.00 13 INSTALL LIGHT PULL BOX PER CITY STD. 7915 EA 6 $2,743.20 $16,459.20 $4,162.66 $24,975.96 $720.00 $4,320.00 $900.00 $5,400.00 14 INSTALL BOCCE BALL COURT (8 FT X 45 FT)EA 1 $18,217.45 $18,217.45 $35,870.35 $35,870.35 $33,000.00 $33,000.00 $56,500.00 $56,500.00 15 INSTALL SHADE STRUCTURE (21 FT X 26 FT)EA 1 $51,709.72 $51,709.72 $53,575.95 $53,575.95 $42,500.00 $42,500.00 $67,000.00 $67,000.00 16 INSTALL 6 FT BENCH EA 1 $3,853.50 $3,853.50 $7,375.95 $7,375.95 $4,500.00 $4,500.00 $4,500.00 $4,500.00 $333,534.49 $373,098.94 $379,720.00 $418,100.00 17 INSTALL FENCE LF 142 $177.05 $25,141.10 $180.00 $25,560.00 $185.00 $26,270.00 $200.00 $28,400.00 18 REMOVE EXISTING FENCE LF 142 $28.55 $4,054.10 $29.00 $4,118.00 $23.00 $3,266.00 $56.00 $7,952.00 19 INSTALL PICNIC TABLE EA 3 $3,500.63 $10,501.89 $2,757.00 $8,271.00 $4,200.00 $12,600.00 $4,700.00 $14,100.00 20 INSTALL ADA PICNIC TABLE EA 1 $5,741.18 $5,741.18 $3,428.00 $3,428.00 $4,100.00 $4,100.00 $4,800.00 $4,800.00 21 INSTALL CHESS TABLE EA 3 $4,665.07 $13,995.21 $5,247.00 $15,741.00 $5,900.00 $17,700.00 $5,300.00 $15,900.00 22 INSTALL CHESS TABLE SEAT EA 6 $806.68 $4,840.08 $711.00 $4,266.00 $980.00 $5,880.00 $700.00 $4,200.00 $64,273.56 $61,384.00 $69,816.00 $75,352.00 $397,808.05 $434,482.94 $449,536.00 $493,452.00TOTAL PROJECT BID BASE BID Quincon, Inc. ADDITIVE ALTERNATE "A" BID TOTAL R. Burke Corporation Brough Construction, Inc BASE BID TOTAL RCH Construction