Loading...
HomeMy WebLinkAboutBid ResultsUnit Total  Item No.  Unit Quantity  Price ($) Price ($) 1LS1‐‐‐$30,000.00 2LS1‐‐‐$10,000.00 3LS1‐‐‐$40,000.00 4LS1‐‐‐$10,000.00 5LS1‐‐‐$3,000.00 6LS1‐‐‐$2,000.00 7LS1‐‐‐$28,000.00 8LS1‐‐‐$23,000.00 9LS1‐‐‐$21,500.00 10 LS 1 ‐‐‐$16,500.00 11 LS 1 ‐‐‐$20,000.00 12 LS 1 ‐‐‐ $20,000.00 13 LS 1 ‐‐‐$18,000.00 14 LS 1 ‐‐‐$15,000.00 15 LS 1 ‐‐‐$15,500.00 16 LS 1 ‐‐‐$13,000.00 17 LS 1 ‐‐‐$17,000.00 18 SQFT 707 $40.00 $28,280.00 19 EA 1 $7,000.00 $7,000.00 20 EA 1 $13,000.00 $13,000.00 21 LS 1 ‐‐‐$3,000.00 22 LS 1 ‐‐‐$7,500.00 23 SQFT 5700 $2.00 $11,400.00 24 EA 4 $600.00 $2,400.00 25 EA 5 $700.00 $3,500.00 26 SQFT 250 $30.00 $7,500.00 DOD Construction LTD  ITEM Construction Survey  Pothole and Dip Manholes BASE BID A CDBG Curb Ramp Project 2022‐Specification NO. 2000576  Bid Opening: 6/08/2023  SW Curb Ramp :                            Augusta St. and Greta Pl.  Traffic Control  Water Pollution Control Program  Compliance with Federal Grant Fund  Requirements  Compliance with Environmental Mitigation  Measures  NE Curb Ramp:                             Augusta St. and Sydney ST.  SE Curb Ramp:                             Augusta St. and Sydney ST.  NW Curb Ramp:                            Augusta St. and Sydney ST.  SW Curb Ramp:                            Augusta St. and Sydney ST.  East Curb Ramp : Midblock Crossing   Augusta St. and Gerda St.  SE Curb Ramp :                             Augusta St. and Gerda St.  NW Curb Ramp :                           Augusta St. and Greta Pl.  Aditional Sidewalk Replacement Allowance  NE Curb Ramp :                            Augusta St. and San Marcus St. SE Curb Ramp :                             Augusta St. and San Marcus St. Remove & Replace: Concrete Cross Gutter  Remove & Replace: Asphalt Pavement  Section (Sydney St) Remove and Abandon Fire Hydrant  Assembly   Install Fire Hydrant Assembly  Striping Removal  Striping and Markings  Fog Seal Relocating Sign and Post  Installing New Sign and Post  27 LF 50 $80.00 $4,000.00 28 SQFT 250 $60.00 $15,000.00 29 SGFT 100 $50.00 $5,000.00 $410,080.00 30 LS 1 ‐‐‐$10,000.00 31 LS 1 ‐‐‐$3,500.00 32 LS 1 ‐‐‐$10,000.00 33 LS 1 ‐‐‐$2,500.00 34 LS 1 ‐‐‐$2,500.00 35 LS 1 ‐‐‐$2,500.00 36 LS 1 ‐‐‐$18,000.00 37 LS 1 ‐‐‐$20,000.00 38 LS 1 ‐‐‐$20,000.00 39 LS 1 ‐‐‐$13,000.00 40 LS 1 ‐‐‐$13,000.00 41 LS 1 ‐‐‐$15,000.00 42 LS 1 ‐‐‐$18,000.00 43 LS 1 ‐‐‐$15,000.00 44 LS 1 ‐‐‐$15,000.00 45 LS 1 ‐‐‐$13,000.00 46 LS 1 ‐‐‐$3,500.00 47 LS 1 ‐‐‐$10,000.00 48 SQFT 4850 $3.00 $14,550.00 49 EA 1 $600.00 $600.00 50 EA 3 $700.00 $2,100.00 Additive Alternative BID (A) Total Cost of Base Bid (A) in ($) NW Curb Ramp:                            Augusta St. and San Carlos Dr. Aditional Cuorb and Gutter Replacement   Allowance  Aditional Cross Gutter Allowance  Additional Paveout Allowance               (10' thickness) Additive Alternative Construction Survey  Additive Alternative Pothole and Dip  Manholes Additive Alternative Traffic Control  Additive Alternative Water Pollution  Control Program  Additive Alternative Compliance with  Federal Grant Fund Requirements  Additive Alternative Compliance with  Environmental Mitigation Measures  NW Curb Ramp:                            Augusta St. and Reba ST.  NW Curb Ramp:                            Augusta St. and Reba ST.  SE Curb Ramp:                             Augusta St. and Bishop ST.  SW Curb Ramp:                            Augusta St. and Bishop ST.  NE Curb Ramp:                             Augusta St. and Cecelia  Ct.  Additive Alternative Relocating Sign and  Post  Additive Alternative Installing New Sign  and Post  SE Curb Ramp:                             Augusta St. and Cecelia  Ct.   NW Curb Ramp:                           Augusta St. and San Mateo  Dr.  SW Curb Ramp:                            Augusta St. and San Mateo  Dr.  Additive Alternative Striping Removal  Additive Alternative Striping and Markings  Additive Alternative Fog Seal SW Curb Ramp:                            Augusta St. and San Carlos Dr. 51 SQFT 250 $30.00 $7,500.00 52 LF 50 $80.00 $4,000.00 53 SQFT 250 $60.00 $15,000.00 54 SQFT 100 $50.00 $5,000.00 $253,250.00 $663,330.00 Total Cost of  Additive Alternative Bid "A" in ($) Total Project Cost: ( Base Bid A + Additive Alternative Bid "A") in ($) Additive Alternative Aditional Sidewalk  Replacemnet Allowance  Additive Alternative Aditional Cuorb and  Gutter Replacement  Allowance  Additive Alternative Aditional Cross Gutter  Allowance  Additive Alternative Additional Paveout  Allowance   (10' thickness)