HomeMy WebLinkAbout20251126 Responsive PW Documents (Ready)Date:November 26, 2025 Job #25-007-p East Airport Park Assoc. PIPs M T W T F S S M T W T F S S M T W T F WORK DESCRIPTION 9/15/259/16/259/17/259/18/259/19/259/20/259/21/259/22/259/23/259/24/259/25/259/26/259/27/259/28/259/29/259/30/2510/1/2510/2/2510/3/25Status / % Complete Notes / Resources Meetings / Inspection Weekly Meeting Construction Private PRVs - (Aerovista, Airport, Broad, Farmhouse)Complete Concrete Repairs on Morabito Complete Morabito DI Repair Complete Water Meters & Water Meter Concrete Aprons on Interior Streets X X X X X Fill-in Work - Supplemental Notice to be provided Farmhouse Lane Sewer Potholing Complete Day Work Farmhouse Lane Sewer Complete Day Work Sewer Manhole on Propsect Complete Day Work Sewer Manhole Lining Complete Farmhouse Lane Domestic Water Potholing Complete Day Work Farmhouse Lane Domestic Water (across Broad St)Complete Night Work Farmhouse Lane Domestic Water Complete Day Work Farmhouse Lane Domestic Water Connection on Farmhouse X Complete Night Work Farmhouse Lane New Domestic Water Line Testing Complete Day Work - Existing Water Line & RW Line Testing X X Pending Test Procedure for RW Line Repair Water Line Leak X X X Farmhouse Lane Reclaimed Water Potholing Complete Day Work Farmhouse Lane Reclaimed Water (across Broad St)Complete Night Work Farmhouse Lane Reclaimed Water (Remaining Portion)Complete Farmhouse Lane Reclaimed Water Connection on Broad St Complete Night Work Farmhouse Lane New Reclaimed Water Line Testing - Complete Farmhouse Lane 4" RPP Backflow Connection to RW X Pending Water Line Leak Repairs HMA Trench Repairs X X X X X at completion of underground work Utility Removals and Abandonments X X Day Work Airport PRV Complete Water Well Abandonments X X X X X Wells 2, 5 & 9 pending competion of E. Water Line Testing Meeting Holidays Last Week Delivery (Complete on Thur. or Fri. of each week) Date:November 26, 2025 Job #25-007-p East Airport Park Assoc. PIPs M T W T F S S M T W T F S S M T W T F WORK DESCRIPTION 9/15/259/16/259/17/259/18/259/19/259/20/259/21/259/22/259/23/259/24/259/25/259/26/259/27/259/28/259/29/259/30/2510/1/2510/2/2510/3/25Status / % Complete Notes / Resources Meeting Holidays Last Week Delivery Pond Fence Repairs Complete Install Signs Complete Slurry Seal Pending E. RW Line Testing & Repairs Striping & Marking Following Slurry Seal X = Planned Work Day, R = Rain Day, H = Holiday, D = Delay (Complete on Thur. or Fri. of each week) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:08/13/2025 08:56:31 Page 1 Diary: Date - 08/04/2025 (Monday)Foreman - working on acquiring water meters and fixing that leak on Allene Time Card: Date - 08/04/2025 (Monday)Foreman - Revision - 0 Shift - 1 Cost Codes 013 Description WATER METERS AND Prod. Qty.0 LS Code Name Class Totals Cesar Martinez LA1 0 00507 2020 Freightliner Bobtail 0 LA1 0 00246 2020 Ram 5500 (Richar 0 OPF 0 00608 CAT 315F Excavator 0 OP8 0 OP8 8 8 LA1 0 00236 2016 GMC 3/4- (Yard) 0 ABALUI Luis Abarca OP8 0 00813 John Deere 410J Backh 0 OP8 0 00216 2002 Ford F350 (Yard) 0 00611 Cat 305 Excavator 0 00608 CAT 315F Excavator 0 Totals for Labor Hours:8 Worked:8 Broken Out:(8/0/0) Totals for Equipment Hours:0 Worked:0 Broken Out:(0/0/0) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:08/13/2025 08:56:31 Page 2 Time Card Notes: Date - 08/04/2025 (Monday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes 06:30 12:00-12:30 17:00 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:08/13/2025 08:56:31 Page 3 Diary: Date - 08/05/2025 (Tuesday)Foreman - Replacing meters. Time Card: Date - 08/05/2025 (Tuesday)Foreman - REXJAK Revision - 0 Shift - 1 Cost Codes 013 99 Description WATER METERS AND Extra Work Prod. Qty.0 LS 0 Code Name Class Totals LA1 0 00507 2020 Freightliner Bobtail 0 LA1 0 00246 2020 Ram 5500 (Richar 0 OPF 0 00244 2021 GMC 1-Ton(S.Sou 0 00813 John Deere 410J 0 00608 CAT 315F Excavator 0 LA1 0 00236 2016 GMC 3/4- (Yard) 0 00508 Freightliner 2k Water Tr 0 Compa 0 0 00608 CAT 315F Excavator 0 Totals for Labor Hours:10 Worked:10 Broken Out:(8/2/0) Totals for Equipment Hours:0 Worked:0 Broken Out:(0/0/0) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:08/13/2025 08:56:31 Page 4 Time Card Notes: Date - 08/05/2025 (Tuesday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes 06:00 12:00-12:30 17:30 Cost Code Notes:Date - 08/05/2025 (Tuesday)Foreman - Code Slot Notes 99 2 Inspector NoteInstalled water meters and they were the wrong size. Had to remove and install 1" water meters Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:08/13/2025 08:56:31 Page 5 Time Card: Date - 08/06/2025 (Wednesday)Foreman - Revision - 0 Shift - 1 Cost Codes 99 Description Extra Work Prod. Qty.0 Code Name Class Totals LA1 0 00507 2020 Freightliner Bobtail 0 0 OPF 0 00244 2021 GMC 1-Ton( 0 00608 CAT 315F Excavator 0 00813 John Deere 410J Backh 0 0 (Yard) 0 00608 CAT 315F Excavator 0 00815 CAT 299D2XHP Compa 0 Totals for Labor Hours:10 Worked:10 Broken Out:(8/2/0) Totals for Equipment Hours:0 Worked:0 Broken Out:(0/0/0) Time Card Notes: Date - 08/06/2025 (Wednesday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes 06:30 12:00-12:30 16:00 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report Time Card Notes: Date - 08/06/2025 (Wednesday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:08/13/2025 08:56:31 Page 6 06:00 12:00-12:30 16:30 Cost Code Notes:Date - 08/06/2025 (Wednesday)Foreman - Code Slot Notes 99 1 Inspector NoteInstalling upsized and downsized water meters Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:08/13/2025 08:56:31 Page 7 Time Card: Date - 08/07/2025 (Thursday)Foreman - Revision - 0 Shift - 1 Cost Codes 99 Description Extra Work Prod. Qty.0 Code Name Class Totals LA1 0 00507 2020 Freightliner Bobtail 0 LA1 0 00246 2020 Ram 5500 (Richar 0 OPF 0 00244 2021 GMC 1-Ton( 0 00608 CAT 315F Excavator 0 OP8 8 8 0 Compa 0 OP8 0 00216 2002 Ford F350 (Yard) 0 00608 CAT 315F Excavator 0 Totals for Labor Hours:8 Worked:8 Broken Out:(8/0/0) Totals for Equipment Hours:0 Worked:0 Broken Out:(0/0/0) Time Card Notes: Date - 08/07/2025 (Thursday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes 07:00 12:00-12:30 15:30 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report Time Card Notes: Date - 08/07/2025 (Thursday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:08/13/2025 08:56:31 Page 8 04:00 12:00-12:30 16:00 Cost Code Notes:Date - 08/07/2025 (Thursday)Foreman - Code Slot Notes 99 1 Inspector NoteInstalling upsized or downsized water meters Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:08/20/2025 08:43:38 Page 1 Diary: Date - 08/11/2025 (Monday)Foreman - 55 and Rising Job 25-015 concrete test panelHolliday rock could not make the colorThey did not have white cement Calportland did not have white cementItem 056 Job 25- 007 restart meter boxesItem 013 Time Card: Date - 08/11/2025 (Monday)Foreman - Revision - 0 Shift - 1 Cost Codes 013 99 Description WATER METERS AND Extra Work Prod. Qty.0 LS 0 Code Name Class Totals CS 2.5 2.5 5 Totals for Labor Hours:15 Worked:15 Broken Out:(15/0/0) Time Card Notes: Date - 08/11/2025 (Monday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes 07:00 12:00-12:30 15:30 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:08/20/2025 08:43:38 Page 2 99 2 Inspector NoteDig out in back of back flow devicesDemo concrete on back flow deviceTo incorporate with water meter Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:08/20/2025 08:43:38 Page 3 Time Card: Date - 08/11/2025 (Monday)Foreman - Revision - 0 Shift - 1 Cost Codes 013 99 Description WATER METERS AND Extra Work Prod. Qty.0 LS 0 Code Name Class Totals 00239 2016 Ford F450 ( 2.5 2.5 5 00569 Concrete Form Trailer 2.5 2.5 5 Totals for Equipment Hours:10 Worked:10 Broken Out:(10/0/0) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:08/20/2025 08:43:38 Page 4 Diary: Date - 08/11/2025 (Monday)Foreman - Mob Time Card: Date - 08/11/2025 (Monday)Foreman - Revision - 5 Shift - 1 Cost Codes 017 019 Description 8" HDPE SDR-17 SEW 10" C900 (CL165) PVC Prod. Qty.0 LF 0 LF Code Name Class Totals OP8 0 Totals for Labor Hours:4.5 Worked:4.5 Broken Out:(3.5/0.5/0.5) Time Card Notes: Date - 08/11/2025 (Monday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes 06:00 12:00-12:30 17:00 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:08/20/2025 08:43:38 Page 5 Time Card: Date - 08/11/2025 (Monday)Foreman - Revision - 5 Shift - 1 Cost Codes 017 019 Description 8" HDPE SDR-17 SEW 10" C900 (CL165) PVC Prod. Qty.0 LF 0 LF Code Name Class Totals 00506 2008 Freightliner Bobtail 0 00246 2020 Ram 5500 ( 0 00608 CAT 315F Excavator 0 00813 John Deere 410J Backh 0 00504 1998 Peterbuilt W/T (Pu 2 2 4 00236 2016 GMC 3/4- (Yard) 0 00507 2020 Freightliner Bobtail 0 00216 2002 Ford F350 (Yard) 0 00611 Cat 305 Excavator 0 Totals for Equipment Hours:4 Worked:4 Broken Out:(4/0/0) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:08/20/2025 08:43:39 Page 6 Diary: Date - 08/12/2025 (Tuesday)Foreman - Normal Conditions;55 and Rising 25-007 set up water meters 25-015 pour test panel Time Card: Date - 08/12/2025 (Tuesday)Foreman - Revision - 0 Shift - 1 Cost Codes 013 Description WATER METERS AND Prod. Qty.0 LS Code Name Class Totals CS 4 4 Totals for Labor Hours:12 Worked:12 Broken Out:(12/0/0) Time Card Notes: Date - 08/12/2025 (Tuesday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes VELCRI Cristian Velasco 07:00 12:00-12:30 15:30 07:00 12:00-12:30 15:30 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:08/20/2025 08:43:39 Page 7 Time Card: Date - 08/12/2025 (Tuesday)Foreman - Revision - 0 Shift - 1 Cost Codes 013 Description WATER METERS AND Prod. Qty.0 LS Code Name Class Totals 00239 2016 Ford F450 ( 4 4 00569 Concrete Form Trailer 4 4 Totals for Equipment Hours:8 Worked:8 Broken Out:(8/0/0) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:08/20/2025 08:43:39 Page 8 Diary: Date - 08/12/2025 (Tuesday)Foreman - Layout and sawcut for the extended rcw connection and for the 48" manhole to be installed on Kendall.Chipped and grouted manhole to make it work for 8" end of line Time Card: Date - 08/12/2025 (Tuesday)Foreman - Revision - 2 Shift - 1 Cost Codes 020 99 Description 48" DIA. MANHOLE Extra Work Prod. Qty.0 EA 0 Code Name Class Totals OP8 0 Totals for Labor Hours:20 Worked:20 Broken Out:(20/0/0) Time Card Notes: Date - 08/12/2025 (Tuesday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes 06:30 12:00-12:30 15:30 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:08/20/2025 08:43:39 Page 9 99 2 Inspector NoteSetup traffic, layout, sawcut for the extended rcw connection Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:08/20/2025 08:43:39 Page 10 Time Card: Date - 08/12/2025 (Tuesday)Foreman - Revision - 2 Shift - 1 Cost Codes 020 99 Description 48" DIA. MANHOLE Extra Work Prod. Qty.0 EA 0 Code Name Class Totals 00216 2002 Ford F350 (Yard) 2 2 00258 2025 GMC 3500 ( 2 2 00579 Ditch Witch HX75 800ga 0 00504 1998 Peterbuilt W/T ( 0 00236 2016 GMC 3/4- (Yard) 0 00216 2002 Ford F350 (Yard) 0 Totals for Equipment Hours:4 Worked:4 Broken Out:(4/0/0) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:08/20/2025 08:43:39 Page 11 Diary: Date - 08/13/2025 (Wednesday)Foreman - Install 4" and 8" rcw. Time Card: Date - 08/13/2025 (Wednesday)Foreman - Revision - 0 Shift - 1 Cost Codes 003 018 016 013 Description TRAFFIC CONTROL 4" C900 (CL165) PVC P 8" CLASS 350 DIP REC WATER METERS AND Prod. Qty.0 LS 72 LF 20 LF 0 LS Code Name Class Totals OP8 0 Totals for Labor Hours:44 Worked:44 Broken Out:(31/11/2) Time Card Notes: Date - 08/13/2025 (Wednesday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes 06:30 10:30 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report Time Card Notes: Date - 08/13/2025 (Wednesday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:08/20/2025 08:43:39 Page 12 06:00 12:00-12:30 14:30 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:08/20/2025 08:43:39 Page 13 Time Card: Date - 08/13/2025 (Wednesday)Foreman - Revision - 0 Shift - 1 Cost Codes 003 018 016 013 Description TRAFFIC CONTROL 4" C900 (CL165) PVC P 8" CLASS 350 DIP REC WATER METERS AND Prod. Qty.0 LS 72 LF 20 LF 0 LS Code Name Class Totals 00216 2002 Ford F350 (Yard) 1 1 00246 2020 Ram 5500 ( 3 3 6 00507 2020 Freightliner Bobtail 1 1 2 00258 2025 GMC 3500 ( 0 00608 CAT 315F Excavator 2 2 4 00611 Cat 305 Excavator 1 1 00813 John Deere 410J Backh 1 1 2 00216 2002 Ford F350 (Yard) 0 00504 1998 Peterbuilt W/T ( 0 00579 Ditch Witch HX75 800ga 0 Totals for Equipment Hours:16 Worked:16 Broken Out:(16/0/0) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:08/20/2025 08:43:39 Page 14 Diary: Date - 08/14/2025 (Thursday)Foreman - Installed the 4" from the tee to the temp blow off at the 4" double check. Time Card: Date - 08/14/2025 (Thursday)Foreman - Revision - 2 Shift - 1 Cost Codes 003 018 99 007 Description TRAFFIC CONTROL 4" C900 (CL165) PVC P Extra Work DEMOLITION Prod. Qty.0 LS 0 LF 0 0 LS Code Name Class Totals LA1 0 Totals for Labor Hours:32 Worked:32 Broken Out:(24/6.5/1.5) Time Card Notes: Date - 08/14/2025 (Thursday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes 06:00 12:00-12:30 18:30 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:08/20/2025 08:43:39 Page 15 99 3 Inspector NoteThere are utilities not show on the plans that we had to contend with to put in this rcw line. Gas and PGE conduits. Time to excavate around them and install pipearound them Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:08/20/2025 08:43:39 Page 16 Time Card: Date - 08/14/2025 (Thursday)Foreman - Revision - 2 Shift - 1 Cost Codes 003 018 99 007 Description TRAFFIC CONTROL 4" C900 (CL165) PVC P Extra Work DEMOLITION Prod. Qty.0 LS 0 LF 0 0 LS Code Name Class Totals 00216 2002 Ford F350 (Yard) 1 1 00507 2020 Freightliner Bobtail 2 1 3 00246 2020 Ram 5500 ( 2 2 4 00258 2025 GMC 3500 ( 2 2 00815 CAT 299D2XHP Compa 0 00504 1998 Peterbuilt W/T ( 0 00236 2016 GMC 3/4- (Yard) 2 2 00611 Cat 305 Excavator 4 2 6 00813 John Deere 410J Backh 2 2 00216 2002 Ford F350 (Yard) 0 00611 Cat 305 Excavator 0 00507 2020 Freightliner Bobtail 0 Totals for Equipment Hours:20 Worked:20 Broken Out:(20/0/0) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:08/20/2025 08:43:39 Page 17 Diary: Date - 08/15/2025 (Friday)Foreman - Excavated the clean out in preparation for a 48" end-of-line manhole.Installed manhole and vac tested. Passed. Brought manhole to finish.Installed water meters.Pressure tested the 4" rcw line, passed.Had one 10 wheeler hauling spoils to perozzi. Time Card: Date - 08/15/2025 (Friday)Foreman - Revision - 2 Shift - 1 Cost Codes 020 013 018 003 Description 48" DIA. MANHOLE WATER METERS AND 4" C900 (CL165) PVC P TRAFFIC CONTROL Prod. Qty.1 EA 0 LS 0 LF 0 LS Code Name Class Totals OP8 7.5/1 0.5 8/1 Totals for Labor Hours:52.5 Worked:52.5 Broken Out:(48/4/0.5) Time Card Notes: Date - 08/15/2025 (Friday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes 06:30 12:00-12:30 16:00 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:08/20/2025 08:43:39 Page 18 Time Card: Date - 08/15/2025 (Friday)Foreman - Revision - 2 Shift - 1 Cost Codes 020 013 018 003 Description 48" DIA. MANHOLE WATER METERS AND 4" C900 (CL165) PVC P TRAFFIC CONTROL Prod. Qty.1 EA 0 LS 0 LF 0 LS Code Name Class Totals 00507 2020 Freightliner Bobtail 4 4 00246 2020 Ram 5500 (Richar 2 2 4 00258 2025 GMC 3500 (Rexfor 0 00236 2016 GMC 3/4- (Yard) 2 2 00216 2002 Ford F350 (Yard) 0.5 0.5 00608 CAT 315F Excavator 5 5 Totals for Equipment Hours:15.5 Worked:15.5 Broken Out:(15.5/0/0) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:08/27/2025 10:53:10 Page 1 Diary: Date - 08/18/2025 (Monday)Foreman - Had 2 supers running spoils.Brought in 75 ton of fill sand and 25 ton of 3/4 rock.Had PPC on site for their vac services.Installed 80' of 8" sewer Time Card: Date - 08/18/2025 (Monday)Foreman - Revision - 2 Shift - 1 Cost Codes 003 004 011 017 99 Description TRAFFIC CONTROL SHEETING, SHORING SEWER CONNECTION,8" HDPE SDR-17 SEW Extra Work Prod. Qty.0 LS 0 LS 0 LS 80 LF 0 Code Name Class Totals OP8 2 4.5 1.5/3.5 8/3.5 Cost Codes 013 Description WATER METERS AND Prod. Qty.0 LS Code Name Class Totals OP8 8/3.5 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report Time Card: Date - 08/18/2025 (Monday)Foreman - Revision - 2 Shift - 1 Cost Codes 013 Description WATER METERS AND Prod. Qty.0 LS Code Name Class Totals x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:08/27/2025 10:53:10 Page 2 Totals for Labor Hours:69 Worked:69 Broken Out:(48/21/0) Time Card Notes: Date - 08/18/2025 (Monday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes 06:00 02:00 Cost Code Notes:Date - 08/18/2025 (Monday)Foreman - Code Slot Notes 99 5 Inspector NoteContending with utilities not shown on the plans: 4" plastic gas lineGoing under the 36" rcp storm drain, not overPGE power and fiber lines(2) more conduit crossings with no marks And time for having to vac down to rock grade for sewer for a 12' section of trench due to a high priority fiber line. Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:08/27/2025 10:53:10 Page 3 Time Card: Date - 08/18/2025 (Monday)Foreman - Description TRAFFIC CONTROL SHEETING, SHORING SEWER CONNECTION,8" HDPE SDR-17 SEW Extra Work Prod. Qty.0 LS 0 LS 0 LS 80 LF 0 Code Name Class Totals 00507 2020 Freightliner Bobtail 2 4 6 00246 2020 Ram 5500 ( 4 5 9 00258 2025 GMC 3500 ( 2 5 7 00608 CAT 315F Excavator 2 5 7 00813 John Deere 410J Backh 2 5 7 00216 2002 Ford F350 (Yard) 2 2 00813 John Deere 410J Backh 1 1 00608 CAT 315F Excavator 2 2 Cost Codes 013 Description WATER METERS AND Prod. Qty.0 LS Code Name Class Totals 00507 2020 Freightliner Bobtail 6 00246 2020 Ram 5500 ( 7 00608 CAT 315F Excavator 7 00813 John Deere 410J Backh 7 00216 2002 Ford F350 (Yard) 2 00813 John Deere 410J Backh 1 00608 CAT 315F Excavator 2 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report Time Card: Date - 08/18/2025 (Monday)Foreman - Revision - 2 Shift - 1 Cost Codes 013 Description WATER METERS AND Prod. Qty.0 LS Code Name Class Totals x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:08/27/2025 10:53:11 Page 4 Totals for Equipment Hours:41 Worked:41 Broken Out:(41/0/0) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:08/27/2025 10:53:11 Page 5 Diary: Date - 08/19/2025 (Tuesday)Foreman - Went to lay pipe to the manhole and progress was impeded by the sewer force main in our way. Only got to install 40'3 ten wheelers and 150 ton of fill sand brought in Time Card: Date - 08/19/2025 (Tuesday)Foreman - Revision - 0 Shift - 1 Cost Codes 003 017 013 99 Description TRAFFIC CONTROL 8" HDPE SDR-17 SEW WATER METERS AND Extra Work Prod. Qty.0 LS 40 LF 1 LS 0 Code Name Class Totals OP8 2 4 6 Totals for Labor Hours:61 Worked:61 Broken Out:(54/7/0) Time Card Notes: Date - 08/19/2025 (Tuesday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes 10:00 12:00-14:00 04:00 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:08/27/2025 10:53:11 Page 6 99 4 Inspector NoteCame into a conflict with the existing force sewer main while installing the 8" main.To install our pipe we would have had to undermine the 90 fitting and thrust block on the 4" line, and with guys having to work underneath that, i wasn't going to do it.So there was down time figuring out what we were going to do and time included for plating the remaining length of trench.(8) 5x10's from united(10) 5' rail shoring jacks to be able to safely plate the length of trench we had open. Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:08/27/2025 10:53:11 Page 7 Time Card: Date - 08/19/2025 (Tuesday)Foreman - Revision - 0 Shift - 1 Cost Codes 003 017 013 99 Description TRAFFIC CONTROL 8" HDPE SDR-17 SEW WATER METERS AND Extra Work Prod. Qty.0 LS 40 LF 1 LS 0 Code Name Class Totals 00236 2016 GMC 3/4- (Yard) 1 1 00246 2020 Ram 5500 (Richar 4 1.5 5.5 00258 2025 GMC 3500 ( 1 3 4 00608 CAT 315F Excavator 3 3 00813 John Deere 410J Backh 0 00608 CAT 315F Excavator 2 2 00815 CAT 299D2XHP Compa 2 1.5 3.5 Totals for Equipment Hours:19 Worked:19 Broken Out:(19/0/0) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report 06:30 12:00-12:30 18:00 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report Time Card Notes: Date - 08/20/2025 (Wednesday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:08/27/2025 10:53:11 Page 9 12:00 18:00 Cost Code Notes:Date - 08/20/2025 (Wednesday)Foreman - Code Slot Notes 99 5 Inspector NoteFRM was supposed to be on site at 7 am with a vac truck to suck down the lift station to allow us to remove the force main. they were late so someone showed up onfoot to turn on the pumps manually to get down to that level which was supposed to be enough room to last until the truck showed up..We removed the force main.Around 930-1000am I made it to the last plug of dirt to be removed for our open trenching and I'm the guy in the hole cutting a lateral out of our way so i can dig andwater surrounds my feet.The manhole was being back fed by the lift station that was now full. Luckily i had a plug of dirt still in the way of the flow so we had the spill contained.After many frantic phone calls frm shows with the vac and it wasnt enough to give us the time we needed for the tie in so while the vac was containing the spill i hadrounded up our trash pump and hoses and did a flow through block on both lines coming into the manhole.This ticket will include the time for dealing with all this. Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:08/27/2025 10:53:11 Page 10 Time Card: Date - 08/20/2025 (Wednesday)Foreman - Description TRAFFIC CONTROL SEWER LATERAL CCT 8" HDPE SDR-17 SEW SEWER CONNECTION,Extra Work Prod. Qty.0 LS 1 LS 96 LF 1 LS 0 Code Name Class Totals 00216 2002 Ford F350 (Yard) 1 1 00246 2020 Ram 5500 ( 1 2 4 7 00608 CAT 315F Excavator 2 2 4 8 00815 CAT 299D2XHP Compa 2 2 4 00813 John Deere 410J Backh 2 2 00504 1998 Peterbuilt W/T (Pu 1 1 00579 Ditch Witch HX75 800ga 1 1 00236 2016 GMC 3/4- (Yard) 4 4 00507 2020 Freightliner Bobtail 3 4 7 00608 CAT 315F Excavator 2 2 Totals for Equipment Hours:44 Worked:44 Broken Out:(44/0/0) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:09/03/2025 09:26:30 Page 1 Time Card: Date - 08/29/2025 (Friday)Foreman - Revision - 2 Shift - 1 Cost Codes 99 Description Extra Work Prod. Qty.0 Code Name Class Totals LA1 8 8 Totals for Labor Hours:16 Worked:16 Broken Out:(16/0/0) Time Card Notes: Date - 08/29/2025 (Friday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes 06:30 12:00-12:30 15:00 Cost Code Notes:Date - 08/29/2025 (Friday)Foreman - Code Slot Notes 99 1 Inspector NoteTried to pinpoint the leak but to no avail.Mob and de mob equipment to the job. Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:09/03/2025 09:26:30 Page 2 Time Card: Date - 08/29/2025 (Friday)Foreman - Revision - 2 Shift - 1 Cost Codes 99 Description Extra Work Prod. Qty.0 Code Name Class Totals 00258 2025 GMC 3500 ( 0 00507 2020 Freightliner Bobtail 0 00246 2020 Ram 5500 ( 0 00506 2008 Freightliner Bobtail 0 00216 2002 Ford F350 (Yard) 0 00611 Cat 305 Excavator 0 00236 2016 GMC 3/4- (Yard) 8 8 00565 500 Gal Water Tank/Trai 8 8 Totals for Equipment Hours:16 Worked:16 Broken Out:(16/0/0) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:09/10/2025 09:40:08 Page 1 Diary: Date - 09/04/2025 (Thursday)Foreman - Trying to find the leak! Time Card: Date - 09/04/2025 (Thursday)Foreman - Revision - 1 Shift - 1 Cost Codes 99 Description Extra Work Prod. Qty.0 Code Name Class Totals OP8 0 Totals for Labor Hours:16 Worked:16 Broken Out:(16/0/0) Time Card Notes: Date - 09/04/2025 (Thursday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes 06:00 16:30 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:09/10/2025 09:40:08 Page 2 99 1 Inspector NotePotholing and pressure testing different legs coming off the main by PGE. Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:09/10/2025 09:40:08 Page 3 Time Card: Date - 09/04/2025 (Thursday)Foreman - Revision - 1 Shift - 1 Cost Codes 99 Description Extra Work Prod. Qty.0 Code Name Class Totals 00246 2020 Ram 5500 ( 0 R340EX CAT 340 Excavator - 0 00504 1998 Peterbuilt W/T (Pu 6 6 00579 Ditch Witch HX75 800ga 6 6 00611 Cat 305 Excavator 0 00815 CAT 299D2XHP Compa 0 Totals for Equipment Hours:12 Worked:12 Broken Out:(12/0/0) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:09/10/2025 09:40:08 Page 4 Time Card: Date - 09/05/2025 (Friday)Foreman - Revision - 0 Shift - 1 Cost Codes 99 Description Extra Work Prod. Qty.0 Code Name Class Totals OP8 0 Totals for Labor Hours:16 Worked:16 Broken Out:(16/0/0) Time Card Notes: Date - 09/05/2025 (Friday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes 06:30 12:00-12:30 16:30 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:09/10/2025 09:40:08 Page 5 99 1 Inspector NoteAll kinds of work potholing and digging trying to be ready to pressure test Monday and find this leak Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:09/10/2025 09:40:09 Page 6 Time Card: Date - 09/05/2025 (Friday)Foreman - Revision - 0 Shift - 1 Cost Codes 99 Description Extra Work Prod. Qty.0 Code Name Class Totals 00246 2020 Ram 5500 ( 0 00605 CAT 305E2CR Mini Exc 0 00504 1998 Peterbuilt W/T (Pu 0 00579 Ditch Witch HX75 800ga 0 00236 2016 GMC 3/4- (Yard) 0 R340EX CAT 340 Excavator - So 0 00815 CAT 299D2XHP Compa 0 Totals for Equipment Hours:8 Worked:8 Broken Out:(8/0/0) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:09/17/2025 13:30:54 Page 1 Time Card: Date - 09/08/2025 (Monday)Foreman - Revision - 0 Shift - 1 Cost Codes 99 Description Extra Work Prod. Qty.0 Code Name Class Totals CBF 8 8 Totals for Labor Hours:8 Worked:8 Broken Out:(8/0/0) Time Card Notes: Date - 09/08/2025 (Monday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes 07:00 12:00-12:30 15:30 Cost Code Notes:Date - 09/08/2025 (Monday)Foreman - Code Slot Notes 99 1 Inspector NoteLooked at the site. Loaded material from Hayward lumber. Demoed the broken concrete. Cleaned the frame and grate.formed the inside of the DI. Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:09/17/2025 13:30:54 Page 2 Time Card: Date - 09/08/2025 (Monday)Foreman - Revision - 0 Shift - 1 Cost Codes 99 Description Extra Work Prod. Qty.0 Code Name Class Totals 00242 2019 Ford F450 ( 8 8 00813 John Deere 410J Backh 2 2 00813A Hoe Ram Breaker 410 2 2 Totals for Equipment Hours:12 Worked:12 Broken Out:(12/0/0) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:09/17/2025 13:30:55 Page 3 Time Card: Date - 09/08/2025 (Monday)Foreman - Revision - 1 Shift - 1 Cost Codes 99 Description Extra Work Prod. Qty.0 Code Name Class Totals OP8 4 4 Totals for Labor Hours:4 Worked:4 Broken Out:(4/0/0) Time Card Notes: Date - 09/08/2025 (Monday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes 07:00 12:00-12:30 16:00 Cost Code Notes:Date - 09/08/2025 (Monday)Foreman - Code Slot Notes 99 1 Inspector NoteFixing DI Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:09/17/2025 13:30:55 Page 4 Time Card: Date - 09/08/2025 (Monday)Foreman - Revision - 1 Shift - 1 Cost Codes 99 Description Extra Work Prod. Qty.0 Code Name Class Totals 00507 2020 Freightliner Bobtail 0 00246 2020 Ram 5500 ( 0 00611 Cat 305 Excavator 0 00216 2002 Ford F350 (Yard) 0 00236 2016 GMC 3/4- (Yard) 0 Totals for Equipment Hours:0 Worked:0 Broken Out:(0/0/0) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:09/17/2025 13:30:55 Page 5 Time Card: Date - 09/09/2025 (Tuesday)Foreman - Revision - 1 Shift - 1 Cost Codes 99 Description Extra Work Prod. Qty.0 Code Name Class Totals 8/1.5 8/1.5 Totals for Labor Hours:17.5 Worked:17.5 Broken Out:(16/1.5/0) Time Card Notes: Date - 09/09/2025 (Tuesday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes 07:00 12:00-12:30 15:00 Cost Code Notes:Date - 09/09/2025 (Tuesday)Foreman - Code Slot Notes 99 1 Inspector NoteDrilled 12 inches deep on all #4 dowels 18 inches on center. Tied all the rebar. Formed the back wall wings and top of curb. Cleaned up the mess and hauled trashback to the yard. Scheduled concrete through Cal Portland using mix design 590GN1040. Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:09/17/2025 13:30:55 Page 6 Time Card: Date - 09/09/2025 (Tuesday)Foreman - Revision - 1 Shift - 1 Cost Codes 99 Description Extra Work Prod. Qty.0 Code Name Class Totals 00242 2019 Ford F450 ( 8 8 Totals for Equipment Hours:8 Worked:8 Broken Out:(8/0/0) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:09/17/2025 13:30:55 Page 7 Time Card: Date - 09/10/2025 (Wednesday)Foreman - Revision - 0 Shift - 1 Cost Codes 013 99 Description WATER METERS AND Extra Work Prod. Qty.0 LS 0 Code Name Class Totals LA1 4 4 8 Totals for Labor Hours:24 Worked:24 Broken Out:(24/0/0) Time Card Notes: Date - 09/10/2025 (Wednesday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes 07:00 12:00-12:30 15:30 Cost Code Notes:Date - 09/10/2025 (Wednesday)Foreman - Code Slot Notes 99 2 Inspector NoteSet up curb and gutter to storm drain and pour Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:09/17/2025 13:30:55 Page 8 Time Card: Date - 09/10/2025 (Wednesday)Foreman - Revision - 0 Shift - 1 Cost Codes 013 99 Description WATER METERS AND Extra Work Prod. Qty.0 LS 0 Code Name Class Totals 00239 2016 Ford F450 ( 4 4 8 Totals for Equipment Hours:8 Worked:8 Broken Out:(8/0/0) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:09/17/2025 13:30:55 Page 9 Time Card: Date - 09/11/2025 (Thursday)Foreman - Revision - 0 Shift - 1 Cost Codes 99 Description Extra Work Prod. Qty.0 Code Name Class Totals OP8 0 Totals for Labor Hours:8 Worked:8 Broken Out:(8/0/0) Time Card Notes: Date - 09/11/2025 (Thursday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes 07:00 12:00-12:30 18:00 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:09/17/2025 13:30:55 Page 10 Cost Code Notes:Date - 09/11/2025 (Thursday)Foreman - Code Slot Notes 99 1 Inspector NoteFinding that leak! Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:09/17/2025 13:30:55 Page 11 Time Card: Date - 09/11/2025 (Thursday)Foreman - Revision - 0 Shift - 1 Cost Codes 99 Description Extra Work Prod. Qty.0 Code Name Class Totals 00216 2002 Ford F350 (Yard) 0 00246 2020 Ram 5500 ( 0 00507 2020 Freightliner Bobtail 0 00608 CAT 315F Excavator 0 00258 2025 GMC 3500 (Rexfor 0 69916 Rice-Hydro Hydrostatic 8 8 00236 2016 GMC 3/4- (Yard) 0 00815 CAT 299D2XHP Compa 0 00611 Cat 305 Excavator 0 Totals for Equipment Hours:8 Worked:8 Broken Out:(8/0/0) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:09/24/2025 10:04:11 Page 1 Time Card: Date - 09/15/2025 (Monday)Foreman - Revision - 1 Shift - 1 Cost Codes 99 Description Extra Work Prod. Qty.0 Code Name Class Totals OP8 0 Totals for Labor Hours:1 Worked:1 Broken Out:(0/1/0) Time Card Notes: Date - 09/15/2025 (Monday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes 06:30 12:00-12:30 16:00 Cost Code Notes:Date - 09/15/2025 (Monday)Foreman - Code Slot Notes 99 1 Inspector NoteShowed up after work to look at sampling station for parts list Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:09/24/2025 10:04:11 Page 2 Time Card: Date - 09/15/2025 (Monday)Foreman - Revision - 1 Shift - 1 Cost Codes 99 Description Extra Work Prod. Qty.0 Code Name Class Totals 00246 2020 Ram 5500 ( 1 1 R340EX CAT 340 Excavator - So 0 00504 1998 Peterbuilt W/T ( 0 00579 Ditch Witch HX75 800ga 0 Totals for Equipment Hours:1 Worked:1 Broken Out:(1/0/0) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:09/24/2025 10:04:12 Page 3 Time Card: Date - 09/17/2025 (Wednesday)Foreman - Revision - 1 Shift - 1 Cost Codes 99 Description Extra Work Prod. Qty.0 Code Name Class Totals OP8 3/1.5 3/1.5 Totals for Labor Hours:8.5 Worked:8.5 Broken Out:(6/2.5/0) Time Card Notes: Date - 09/17/2025 (Wednesday)Foreman - 06:30 12:00-12:30 16:30 Cost Code Notes:Date - 09/17/2025 (Wednesday)Foreman - Code Slot Notes 99 1 Inspector NoteDig up the sampling station to see what could be reused and found that the stainless riser was rusted out so had to call prw steel in paso and have a custom length1/2" riser made. Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report Cost Code Notes: Date - 09/17/2025 (Wednesday)Foreman - Code Slot Notes x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:09/24/2025 10:04:12 Page 4 Fix it tomorrow Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:09/24/2025 10:04:12 Page 5 Time Card: Date - 09/17/2025 (Wednesday)Foreman - Revision - 1 Shift - 1 Cost Codes 99 Description Extra Work Prod. Qty.0 Code Name Class Totals 00246 2020 Ram 5500 ( 0 R340EX CAT 340 Excavator - 0 00607 CAT 325F Excavator 0 00504 1998 Peterbuilt W/T ( 0 00579 Ditch Witch HX75 800ga 0 00236 2016 GMC 3/4- (Yard) 4 4 00611 Cat 305 Excavator 2 2 Totals for Equipment Hours:6 Worked:6 Broken Out:(6/0/0) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:09/24/2025 10:04:12 Page 6 Diary: Date - 09/18/2025 (Thursday)Foreman - Grading for boxes Time Card: Date - 09/18/2025 (Thursday)Foreman - Revision - 0 Shift - 1 Cost Codes 99 013 Description Extra Work WATER METERS AND Prod. Qty.0 0 LS Code Name Class Totals OP8 8/0.5 8/0.5 Totals for Labor Hours:21 Worked:21 Broken Out:(20/1/0) Time Card Notes: Date - 09/18/2025 (Thursday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes 06:30 12:00-12:30 15:30 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:09/24/2025 10:04:12 Page 7 99 1 Inspector NoteHad run to prw steel in paso to get the 1/2 stainless nipple needed to repair the sampling station.Station has been fixed, painted and backfilled. Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:09/24/2025 10:04:12 Page 8 Time Card: Date - 09/18/2025 (Thursday)Foreman - Revision - 0 Shift - 1 Cost Codes 99 013 Description Extra Work WATER METERS AND Prod. Qty.0 0 LS Code Name Class Totals 00246 2020 Ram 5500 ( 0 00504 1998 Peterbuilt W/T ( 0 00579 Ditch Witch HX75 800ga 0 00236 2016 GMC 3/4- (Yard) 8.5 8.5 00813 John Deere 410J Backh 2 2 Totals for Equipment Hours:10.5 Worked:10.5 Broken Out:(10.5/0/0) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:09/24/2025 10:04:12 Page 9 Diary: Date - 09/19/2025 (Friday)Foreman - Prepping sidewalk behind di that broke apart.Pressure testing. Time Card: Date - 09/19/2025 (Friday)Foreman - Revision - 0 Shift - 1 Cost Codes 99 029 031 Description Extra Work CONCRETE SIDEWAL CLASS 2 AGGREGATE Prod. Qty.0 0 SF 0 CY Code Name Class Totals OP8 4/1 4 8/1 Totals for Labor Hours:36.5 Worked:36.5 Broken Out:(34/2.5/0) Time Card Notes: Date - 09/19/2025 (Friday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes 06:30 12:00-12:30 16:00 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:09/24/2025 10:04:12 Page 10 99 1 Inspector NotePressure testing.. passed Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:09/24/2025 10:04:12 Page 11 Time Card: Date - 09/19/2025 (Friday)Foreman - Revision - 0 Shift - 1 Cost Codes 99 029 031 Description Extra Work CONCRETE SIDEWAL CLASS 2 AGGREGATE Prod. Qty.0 0 SF 0 CY Code Name Class Totals 00246 2020 Ram 5500 ( 0 00504 1998 Peterbuilt W/T ( 2.5 2.5 00579 Ditch Witch HX75 800ga 0 00236 2016 GMC 3/4- (Yard) 2 2 4 00813 John Deere 410J Backh 2 2 Totals for Equipment Hours:8.5 Worked:8.5 Broken Out:(8.5/0/0) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/02/2025 11:43:34 Page 1 Time Card: Date - 09/23/2025 (Tuesday)Foreman - Revision - 1 Shift - 1 Cost Codes 99 Description Extra Work Prod. Qty.0 Code Name Class Totals LA1 0 Totals for Labor Hours:9.5 Worked:9.5 Broken Out:(8/1.5/0) Cost Codes 99 Description Extra Work Prod. Qty.0 Code Name Class Totals 00258 2025 GMC 3500 ( 0 R340EX CAT 340 Excavator - So 0 00608 CAT 315F Excavator 0 00236 2016 GMC 3/4- (Yard) 0 Totals for Equipment Hours:0 Worked:0 Broken Out:(0/0/0) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/02/2025 11:43:34 Page 2 Time Card Notes: Date - 09/23/2025 (Tuesday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes 19:00 23:00 Cost Code Notes:Date - 09/23/2025 (Tuesday)Foreman - Code Slot Notes 99 1 Inspector NotePressure tested the rcw line, fixed leak and it passed Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/02/2025 11:43:34 Page 3 Diary: Date - 09/24/2025 (Wednesday)Foreman - Completed the domestic water tie in.Figured out the parts and game plan for connecting the rcw line tomorrow at the double check and in the street. Time Card: Date - 09/24/2025 (Wednesday)Foreman - REXJAK Jake Rexford Revision - 0 Shift - 1 Cost Codes 018 019 012 Description 4" C900 (CL165) PVC P 10" C900 (CL165) PVC 4" RPP BACKFLOW DE Prod. Qty.0 LF 0 LF 0 LS Code Name Class Totals OP8 0 Totals for Labor Hours:41.5 Worked:41.5 Broken Out:(32/9.5/0) Cost Codes 018 019 012 Description 4" C900 (CL165) PVC P 10" C900 (CL165) PVC 4" RPP BACKFLOW DE Prod. Qty.0 LF 0 LF 0 LS Code Name Class Totals 00246 2020 Ram 5500 ( 0 00608 CAT 315F Excavator 0 00611 Cat 305 Excavator 2 2 00813 John Deere 410J Backh 2 2 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report Time Card: Date - 09/24/2025 (Wednesday)Foreman - Revision - 0 Shift - 1 Cost Codes 018 019 012 Description 4" C900 (CL165) PVC P 10" C900 (CL165) PVC 4" RPP BACKFLOW DE Prod. Qty.0 LF 0 LF 0 LS Code Name Class Totals x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/02/2025 11:43:34 Page 4 00236 2016 GMC 3/4- (Yard) 4 4 Totals for Equipment Hours:8 Worked:8 Broken Out:(8/0/0) Time Card Notes: Date - 09/24/2025 (Wednesday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes 16:00 18:30 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/02/2025 11:43:34 Page 5 Diary: Date - 09/25/2025 (Thursday)Foreman - Completed the rcw tie in at the double check and in the street. Time Card: Date - 09/25/2025 (Thursday)Foreman - Revision - 1 Shift - 1 Cost Codes 018 012 99 Description 4" C900 (CL165) PVC P 4" RPP BACKFLOW DE Extra Work Prod. Qty.0 LF 0 LS 0 Code Name Class Totals LA1 2/1.5 4 2 8/1.5 Totals for Labor Hours:28.5 Worked:28.5 Broken Out:(24/4.5/0) Cost Codes 018 012 99 Description 4" C900 (CL165) PVC P 4" RPP BACKFLOW DE Extra Work Prod. Qty.0 LF 0 LS 0 Code Name Class Totals 00246 2020 Ram 5500 ( 0 RDMP10YD Rental 10 Yard Dump Tr 0 00258 2025 GMC 3500 ( 0 00607 CAT 325F Excavator 0 00611 Cat 305 Excavator 2 2 2 6 00236 2016 GMC 3/4- (Yard) 5.5 2 7.5 00571 Ditch Witch HX30 2 2 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report Time Card: Date - 09/25/2025 (Thursday)Foreman - Revision - 1 Shift - 1 Cost Codes 018 012 99 Description 4" C900 (CL165) PVC P 4" RPP BACKFLOW DE Extra Work Prod. Qty.0 LF 0 LS 0 Code Name Class Totals x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/02/2025 11:43:35 Page 6 Totals for Equipment Hours:15.5 Worked:15.5 Broken Out:(15.5/0/0) Time Card Notes: Date - 09/25/2025 (Thursday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes MARCES Cesar Martinez 06:30 12:00-12:30 22:30 06:30 12:00-12:30 19:30 Cost Code Notes:Date - 09/25/2025 (Thursday)Foreman - Code Slot Notes 99 3 Inspector NoteHad to re arrange the 4" double check in order to miss the conduits that were in the exact alignment that we wanted to be in to tie in. The conduits are not on the plans. Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/02/2025 11:43:35 Page 7 Diary: Date - 09/26/2025 (Friday)Foreman - Abandoned lift station and associated ligaments. Time Card: Date - 09/26/2025 (Friday)Foreman - Revision - 0 Shift - 1 Cost Codes 007 99 Description DEMOLITION Extra Work Prod. Qty.0 LS 0 Code Name Class Totals LA1 5.5/1.5 2.5 8/1.5 Totals for Labor Hours:19 Worked:19 Broken Out:(16/3/0) Cost Codes 007 99 Description DEMOLITION Extra Work Prod. Qty.0 LS 0 Code Name Class Totals 00246 2020 Ram 5500 ( 0 00607 CAT 325F Excavator 0 00820 Case 570 Skip & Drag 4 2.5 6.5 00236 2016 GMC 3/4- (Yard) 5 2.5 7.5 Totals for Equipment Hours:14 Worked:14 Broken Out:(14/0/0) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/02/2025 11:43:35 Page 8 Time Card Notes: Date - 09/26/2025 (Friday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes 06:30 12:00-12:30 16:30 Cost Code Notes:Date - 09/26/2025 (Friday)Foreman - Code Slot Notes 99 2 Inspector NoteBackfilling and slurrying the potholes where we were looking for the leak by PGE Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/15/2025 15:42:04 Page 1 Diary: Date - 09/29/2025 (Monday)Foreman - Abandonment of water service at the lift station Time Card: Date - 09/29/2025 (Monday)Foreman - Revision - 1 Shift - 1 Cost Codes 007 001 Description DEMOLITION MOBILIZATION/DEMO Prod. Qty.0 LS 0 LS Code Name Class Totals LA1 0 Totals for Labor Hours:8 Worked:8 Broken Out:(8/0/0) Cost Codes 007 001 Description DEMOLITION MOBILIZATION/DEMO Prod. Qty.0 LS 0 LS Code Name Class Totals 00246 2020 Ram 5500 ( 2 2 00604 CAT 336EL Excavator 0 00236 2016 GMC 3/4- (Yard) 0 Totals for Equipment Hours:2 Worked:2 Broken Out:(2/0/0) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/15/2025 15:42:04 Page 2 Time Card Notes: Date - 09/29/2025 (Monday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes 06:30 12:30 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/15/2025 15:42:04 Page 3 Time Card: Date - 09/29/2025 (Monday)Foreman - Revision - 5 Shift - 1 Cost Codes 016 017 018 019 Description 8" CLASS 350 DIP REC 8" HDPE SDR-17 SEW 4" C900 (CL165) PVC P 10" C900 (CL165) PVC Prod. Qty.0 LF 0 LF 0 LF 0 LF Code Name Class Totals OP8 2 2 2 2//0.5 8/0/0.5 Totals for Labor Hours:48 Worked:48 Broken Out:(47.5/0/0.5) Cost Codes 016 017 018 019 Description 8" CLASS 350 DIP REC 8" HDPE SDR-17 SEW 4" C900 (CL165) PVC P 10" C900 (CL165) PVC Prod. Qty.0 LF 0 LF 0 LF 0 LF Code Name Class Totals 00230 2013 GMC Sierra 3/4- ( 2 2 2 2.5 8.5 00820 Case 570 Skip & Drag 2 2 2 2.5 8.5 00237 2016 GMC Sierra 3/4-(G 2 2 2 2.5 8.5 00431 Tack Pot (Leeboy L250T 0.5 0.5 0.5 0.5 2 00609 CAT 308 Excavator 1 1 1 1 4 00717 CAT CB34 Vibratory Co 0.5 0.5 0.5 0.5 2 00247 2022 Ram 5500 (T. Sou 2 2 2 2.5 8.5 Totals for Equipment Hours:42 Worked:42 Broken Out:(42/0/0) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/15/2025 15:42:05 Page 4 Diary: Date - 09/30/2025 (Tuesday)Foreman - Clean up. Potholing for abandonment information Time Card: Date - 09/30/2025 (Tuesday)Foreman - Revision - 1 Shift - 1 Cost Codes 007 99 Description DEMOLITION Extra Work Prod. Qty.0 LS 0 Code Name Class Totals OP8 6 2/3 8/3 Totals for Labor Hours:27 Worked:27 Broken Out:(18/9/0) Cost Codes 007 99 Description DEMOLITION Extra Work Prod. Qty.0 LS 0 Code Name Class Totals RDMP10YD Rental 10 Yard Dump Tr 0 00246 2020 Ram 5500 (Richar 0 00258 2025 GMC 3500 ( 0 00604 CAT 336EL Excavator 0 00236 2016 GMC 3/4- (Yard) 0 00504 1998 Peterbuilt W/T (Pu 5 5 00579 Ditch Witch HX75 800ga 2 5 7 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report Time Card: Date - 09/30/2025 (Tuesday)Foreman - Revision - 1 Shift - 1 Cost Codes 007 99 Description DEMOLITION Extra Work Prod. Qty.0 LS 0 Code Name Class Totals x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/15/2025 15:42:05 Page 5 Totals for Equipment Hours:12 Worked:12 Broken Out:(12/0/0) Time Card Notes: Date - 09/30/2025 (Tuesday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes 06:30 12:00-12:30 19:30 Cost Code Notes:Date - 09/30/2025 (Tuesday)Foreman - Code Slot Notes 99 2 Inspector NoteMet up with Wallace and asked for direction for locating the lines coming out of the pump station that are to be abandoned due to the fact that no one marked theexisting utilities. This is time for looking for these utilities outside of the normal amount of time that it would take to pothole if we were provided with accurate marks Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/15/2025 15:42:05 Page 6 Time Card: Date - 09/30/2025 (Tuesday)Foreman - Revision - 1 Shift - 1 Cost Codes 99 019 Description Extra Work 10" C900 (CL165) PVC Prod. Qty.0 0 LF Code Name Class Totals OP8 3 5 8 Totals for Labor Hours:44 Worked:44 Broken Out:(40/2/2) Cost Codes 99 019 Description Extra Work 10" C900 (CL165) PVC Prod. Qty.0 0 LF Code Name Class Totals 00230 2013 GMC Sierra 3/4- ( 3 5.5 8.5 00820 Case 570 Skip & Drag 3 6.5 9.5 00237 2016 GMC Sierra 3/4-(G 3 6.5 9.5 00431 Tack Pot (Leeboy L250T 3 6.5 9.5 00611 Cat 305 Excavator 1 2 3 00247 2022 Ram 5500 (T. Sou 3 5 8 Totals for Equipment Hours:48 Worked:48 Broken Out:(48/0/0) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/15/2025 15:42:05 Page 7 Diary: Date - 10/01/2025 (Wednesday)Foreman - Find all the lines and prep for capping tomorrow Time Card: Date - 10/01/2025 (Wednesday)Foreman - Revision - 3 Shift - 1 Cost Codes 007 Description DEMOLITION Prod. Qty.0 LS Code Name Class Totals LA1 8/3 8/3 Totals for Labor Hours:34.5 Worked:34.5 Broken Out:(24/9/1.5) Cost Codes 007 Description DEMOLITION Prod. Qty.0 LS Code Name Class Totals 00246 2020 Ram 5500 (Richar 0 00258 2025 GMC 3500 ( 0 00216 2002 Ford F350 (Yard) 6 6 Totals for Equipment Hours:6 Worked:6 Broken Out:(6/0/0) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/15/2025 15:42:05 Page 8 Time Card Notes: Date - 10/01/2025 (Wednesday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes 06:00 12:00-12:30 17:30 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/15/2025 15:42:05 Page 9 Time Card: Date - 10/01/2025 (Wednesday)Foreman - Revision - 0 Shift - 1 Cost Codes 007 009 Description DEMOLITION POTABLE WATER CO Prod. Qty.0 LS 0 LS Code Name Class Totals OPF 4//0.5 4/0.5 8/0.5/0.5 Totals for Labor Hours:9 Worked:9 Broken Out:(8/0.5/0.5) Cost Codes 007 009 Description DEMOLITION POTABLE WATER CO Prod. Qty.0 LS 0 LS Code Name Class Totals 00810 CASE 570 Skip & Drag 2 2 4 00807 CAT 950GII Loader 2 2 4 Totals for Equipment Hours:8 Worked:8 Broken Out:(8/0/0) Cost Code Notes:Date - 10/01/2025 (Wednesday)Foreman - Code Slot Notes 007 1 Inspector NoteHaul off rubble, Kritz furnished 3 trucks Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/15/2025 15:42:05 Page 10 Diary: Date - 10/02/2025 (Thursday)Foreman - Abandonments!! Time Card: Date - 10/02/2025 (Thursday)Foreman - Revision - 0 Shift - 1 Cost Codes 007 Description DEMOLITION Prod. Qty.0 LS Code Name Class Totals LA1 /4/0.5 0/4/0.5 Totals for Labor Hours:28 Worked:28 Broken Out:(16/11.5/0.5) Cost Codes 007 Description DEMOLITION Prod. Qty.0 LS Code Name Class Totals 00508 Freightliner 2k Water Tr 0 00258 2025 GMC 3500 (Rexfor 0 00236 2016 GMC 3/4- (Yard) 6 6 00611 Cat 305 Excavator 4 4 Totals for Equipment Hours:10 Worked:10 Broken Out:(10/0/0) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/15/2025 15:42:05 Page 11 Time Card Notes: Date - 10/02/2025 (Thursday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes 06:30 12:00-12:30 19:30 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/15/2025 15:42:05 Page 12 Diary: Date - 10/03/2025 (Friday)Foreman - Mob equipment for Monday Time Card: Date - 10/03/2025 (Friday)Foreman - Revision - 1 Shift - 1 Cost Codes 028 Description CONCRETE CURB & G Prod. Qty.0 LF Code Name Class Totals LA1 0 Totals for Labor Hours:3 Worked:3 Broken Out:(0/3/0) Cost Codes 028 Description CONCRETE CURB & G Prod. Qty.0 LF Code Name Class Totals 00258 2025 GMC 3500 ( 0 00608 CAT 315F Excavator 0 RDMP10YD Rental 10 Yard Dump Tr 0 00236 2016 GMC 3/4- (Yard) 0 00508 Freightliner 2k Water Tr 0 00579 Ditch Witch HX75 800ga 0 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report Time Card: Date - 10/03/2025 (Friday)Foreman - Revision - 1 Shift - 1 Cost Codes 028 Description CONCRETE CURB & G Prod. Qty.0 LF Code Name Class Totals x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/15/2025 15:42:06 Page 13 Totals for Equipment Hours:0 Worked:0 Broken Out:(0/0/0) Time Card Notes: Date - 10/03/2025 (Friday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes MARCES Cesar Martinez 07:00 12:00-12:30 17:30 06:30 12:00-12:30 18:00 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/15/2025 15:49:16 Page 1 Time Card: Date - 10/06/2025 (Monday)Foreman - Revision - 1 Shift - 1 Cost Codes 016 017 029 Description 8" CLASS 350 DIP REC 8" HDPE SDR-17 SEW CONCRETE SIDEWAL Prod. Qty.0 LF 0 LF 0 SF Code Name Class Totals CS 3 2.5 2.5 8 Totals for Labor Hours:56 Worked:56 Broken Out:(56/0/0) Cost Codes 016 017 029 Description 8" CLASS 350 DIP REC 8" HDPE SDR-17 SEW CONCRETE SIDEWAL Prod. Qty.0 LF 0 LF 0 SF Code Name Class Totals 00239 2016 Ford F450 ( 3 2.5 2.5 8 00569 Concrete Form Trailer 3 2.5 2.5 8 Totals for Equipment Hours:16 Worked:16 Broken Out:(16/0/0) Time Card Notes: Date - 10/06/2025 (Monday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes PINCAR Carlos Pina-Gutierrez 06:30 12:00-12:30 15:00 06:30 12:00-12:30 15:00 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report Time Card Notes: Date - 10/06/2025 (Monday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/15/2025 15:49:16 Page 2 06:30 12:00-12:30 15:00 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/15/2025 15:49:16 Page 3 Diary: Date - 10/06/2025 (Monday)Foreman - Garrett and johnny demo spandrel and prep for Ruben.Hammered out collars.Pressure tested the last leg of rcw, passed.Clean up Time Card: Date - 10/06/2025 (Monday)Foreman - Description TRAFFIC CONTROL DEMOLITION FIRE HYDRANT MODIF CONCRETE CURB & G FLUSH, DISINFECT, P- Prod. Qty.0 LS 0 LS 0 LS 0 LF 0 DAY Code Name Class Totals OP8 1 1 Totals for Labor Hours:22 Worked:22 Broken Out:(19/3/0) Cost Codes 003 007 015 028 034 Description TRAFFIC CONTROL DEMOLITION FIRE HYDRANT MODIF CONCRETE CURB & G FLUSH, DISINFECT, P- Prod. Qty.0 LS 0 LS 0 LS 0 LF 0 DAY Code Name Class Totals 00246 2020 Ram 5500 ( 2 2 00608 CAT 315F Excavator 0 00236 2016 GMC 3/4- (Yard) 0 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report Time Card: Date - 10/06/2025 (Monday)Foreman - Description TRAFFIC CONTROL DEMOLITION FIRE HYDRANT MODIF CONCRETE CURB & G FLUSH, DISINFECT, P- Prod. Qty.0 LS 0 LS 0 LS 0 LF 0 DAY Code Name Class Totals x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/15/2025 15:49:17 Page 4 00216 2002 Ford F350 (Yard) 1 1 Totals for Equipment Hours:7 Worked:7 Broken Out:(7/0/0) Time Card Notes: Date - 10/06/2025 (Monday)Foreman - 06:00 07:00 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/15/2025 15:49:17 Page 5 Diary: Date - 10/08/2025 (Wednesday)Foreman - De mob Time Card: Date - 10/08/2025 (Wednesday)Foreman - Revision - 1 Shift - 1 Cost Codes 001 Description MOBILIZATION/DEMO Prod. Qty.0 LS Code Name Class Totals LA1 8 8 Totals for Labor Hours:16 Worked:16 Broken Out:(16/0/0) Cost Codes 001 Description MOBILIZATION/DEMO Prod. Qty.0 LS Code Name Class Totals Totals for Equipment Hours:0 Worked:0 Broken Out:(0/0/0) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/15/2025 15:49:17 Page 6 Time Card Notes: Date - 10/08/2025 (Wednesday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes 07:00 12:00-12:30 15:30 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/15/2025 15:49:17 Page 7 Diary: Date - 10/09/2025 (Thursday)Foreman - Mob out Time Card: Date - 10/09/2025 (Thursday)Foreman - Revision - 3 Shift - 1 Cost Codes 001 Description MOBILIZATION/DEMO Prod. Qty.0 LS Code Name Class Totals OP8 8/2.5 8/2.5 Totals for Labor Hours:10.5 Worked:10.5 Broken Out:(8/2.5/0) Cost Codes 001 Description MOBILIZATION/DEMO Prod. Qty.0 LS Code Name Class Totals 00246 2020 Ram 5500 ( 0 00236 2016 GMC 3/4- (Yard) 0 00608 CAT 315F Excavator 0 00611 Cat 305 Excavator 0 00504 1998 Peterbuilt W/T ( 4 4 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report Time Card: Date - 10/09/2025 (Thursday)Foreman - Revision - 3 Shift - 1 Cost Codes 001 Description MOBILIZATION/DEMO Prod. Qty.0 LS Code Name Class Totals x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/15/2025 15:49:17 Page 8 Totals for Equipment Hours:4 Worked:4 Broken Out:(4/0/0) Time Card Notes: Date - 10/09/2025 (Thursday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes 07:00 12:00-12:30 17:30 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/29/2025 09:35:12 Page 1 Diary: Date - 10/15/2025 (Wednesday)Foreman - Normal Conditions Set and pour item 027 Time Card: Date - 10/15/2025 (Wednesday)Foreman - Revision - 0 Shift - 1 Cost Codes 027 Description CONCRETE CURB (DO Prod. Qty.0 LF Code Name Class Totals CS 8 8 Totals for Labor Hours:56 Worked:56 Broken Out:(56/0/0) Cost Codes 027 Description CONCRETE CURB (DO Prod. Qty.0 LF Code Name Class Totals 00239 2016 Ford F450 ( 8 8 00569 Concrete Form Trailer 8 8 Totals for Equipment Hours:16 Worked:16 Broken Out:(16/0/0) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/29/2025 09:35:12 Page 2 Time Card Notes: Date - 10/15/2025 (Wednesday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes 07:00 12:00-12:30 15:30 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/29/2025 09:35:12 Page 3 Diary: Date - 10/15/2025 (Wednesday)Foreman - Vac tested manhole, passed Time Card: Date - 10/15/2025 (Wednesday)Foreman - Revision - 2 Shift - 1 Cost Codes 020 Description 48" DIA. MANHOLE Prod. Qty.0 EA Code Name Class Totals OP8 0 Totals for Labor Hours:2 Worked:2 Broken Out:(2/0/0) Cost Codes 020 Description 48" DIA. MANHOLE Prod. Qty.0 EA Code Name Class Totals 00246 2020 Ram 5500 ( 1 1 RDMP10YD Rental 10 Yard Dump Tr 0 00611 Cat 305 Excavator 0 00236 2016 GMC 3/4- (Yard) 0 00579 Ditch Witch HX75 800ga 0 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report Time Card: Date - 10/15/2025 (Wednesday)Foreman - Revision - 2 Shift - 1 Cost Codes 020 Description 48" DIA. MANHOLE Prod. Qty.0 EA Code Name Class Totals x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/29/2025 09:35:12 Page 4 00507 2020 Freightliner Bobtail 0 00504 1998 Peterbuilt W/T ( 0 00571 Ditch Witch HX30 0 Totals for Equipment Hours:1 Worked:1 Broken Out:(1/0/0) Time Card Notes: Date - 10/15/2025 (Wednesday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes 06:30 12:00-12:30 14:30 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/29/2025 09:35:12 Page 5 Time Card: Date - 10/16/2025 (Thursday)Foreman - Revision - 2 Shift - 1 Cost Codes 99 Description Extra Work Prod. Qty.0 Code Name Class Totals APP1 0 Totals for Labor Hours:2 Worked:2 Broken Out:(0/2/0) Cost Codes 99 Description Extra Work Prod. Qty.0 Code Name Class Totals 00254 2024 GMC K3500 ( 2 2 00573 500 Gallon Water Trailer 0 00828 Case 570N-EP Skip & D 0 00214 2001 Ford F350 Diesel ( 0 00450 Vermac Arrowboard 0 00606 CAT 308E2CR SB 0 00504 1998 Peterbuilt W/T (Pu 0 00579 Ditch Witch HX75 800ga 0 Totals for Equipment Hours:2 Worked:2 Broken Out:(2/0/0) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/29/2025 09:35:12 Page 6 Time Card Notes: Date - 10/16/2025 (Thursday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes HANSAM Sam Hanley 06:30 12:00-12:30 17:00 07:00 12:00-12:30 15:30 Cost Code Notes:Date - 10/16/2025 (Thursday)Foreman - Code Slot Notes 99 1 Inspector NoteEquipment mob back to site to remove panels with bad concrete (backcharge calportland) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/29/2025 09:35:12 Page 7 Diary: Date - 10/16/2025 (Thursday)Foreman - Normal Conditions Dig out , set and pour water meter boxes Time Card: Date - 10/16/2025 (Thursday)Foreman - Revision - 0 Shift - 1 Cost Codes 013 99 Description WATER METERS AND Extra Work Prod. Qty.0 LS 0 Code Name Class Totals CS 7 1 8 Totals for Labor Hours:56 Worked:56 Broken Out:(56/0/0) Cost Codes 013 99 Description WATER METERS AND Extra Work Prod. Qty.0 LS 0 Code Name Class Totals 00239 2016 Ford F450 ( 7 1 8 00569 Concrete Form Trailer 7 1 8 Totals for Equipment Hours:16 Worked:16 Broken Out:(16/0/0) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/29/2025 09:35:12 Page 8 Time Card Notes: Date - 10/16/2025 (Thursday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes 07:00 12:00-12:30 15:30 Cost Code Notes:Date - 10/16/2025 (Thursday)Foreman - Code Slot Notes 99 2 Inspector NotePurchase 36" water meter boxTo replace missing concrete boxOn Morabito placeKirk Construction grading slopeNext to utility water boxes.Boxes where form set ,only lidWas on location reset boxAnd reform Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/29/2025 09:35:12 Page 9 Time Card: Date - 10/17/2025 (Friday)Foreman - Revision - 3 Shift - 1 Cost Codes 99 Description Extra Work Prod. Qty.0 Code Name Class Totals APP1 0 Totals for Labor Hours:9 Worked:9 Broken Out:(9/0/0) Cost Codes 99 Description Extra Work Prod. Qty.0 Code Name Class Totals 00605 CAT 305E2CR Mini Exc 3 3 00506 2008 Freightliner Bobtail 0 00254 2024 GMC K3500 ( 3 3 00214 2001 Ford F350 Diesel ( 0 00606 CAT 308E2CR SB 0 00813 John Deere 410J Backh 3 3 00813A Hoe Ram Breaker 410 3 3 00504 1998 Peterbuilt W/T ( 0 00579 Ditch Witch HX75 800ga 0 Totals for Equipment Hours:12 Worked:12 Broken Out:(12/0/0) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/29/2025 09:35:12 Page 10 Time Card Notes: Date - 10/17/2025 (Friday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes 07:00 12:00-12:30 13:30 Cost Code Notes:Date - 10/17/2025 (Friday)Foreman - Code Slot Notes 99 1 Inspector NoteBackcharge calportland Demo'd, loaded and hauled off concrete panels in need of removal due to bad concrete near Kendall & Prospect st. Re-graded and compacted grade before re-pouring Cole farms provided trucking -(1) super ten Rubble was hauled to Martin Marietta Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/29/2025 09:35:12 Page 11 Diary: Date - 10/17/2025 (Friday)Foreman - Normal Conditions Demo set and pour replacement panels Time Card: Date - 10/17/2025 (Friday)Foreman - Revision - 0 Shift - 1 Cost Codes 013 030 99 Description WATER METERS AND CONCRETE CURB RA Extra Work Prod. Qty.0 LS 0 EA 0 Code Name Class Totals LEMLUI Luis Lemus-Ceballos CM 8 8 CS 2 2 4 8 Totals for Labor Hours:56 Worked:56 Broken Out:(56/0/0) Cost Codes 013 030 99 Description WATER METERS AND CONCRETE CURB RA Extra Work Prod. Qty.0 LS 0 EA 0 Code Name Class Totals 00239 2016 Ford F450 ( 2 2 4 8 00569 Concrete Form Trailer 2 2 4 8 Totals for Equipment Hours:16 Worked:16 Broken Out:(16/0/0) Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:10/29/2025 09:35:13 Page 12 Time Card Notes: Date - 10/17/2025 (Friday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes LEMLUI Luis Lemus-Ceballos 07:00 12:00-12:30 15:30 07:00 12:00-12:30 15:30 Souza Construction Inc. Job Name:EAST AIRPORT PARK ASSOCIATION - REV 1 Job Code 25-007-P Daily Report x_________________________________________________________ Date: __________________ 'c' - indicates a completed item. '(R)' - indicates a rework quantity. '(o)' - indicates a percentage override.Printed on:11/06/2025 13:23:29 Page 1 Time Card: Date - 10/31/2025 (Friday)Foreman - Revision - 0 Shift - 1 Cost Codes 013 016 029 001 Description WATER METERS AND 8" CLASS 350 DIP REC CONCRETE SIDEWAL MOBILIZATION/DEMO Prod. Qty.0 LS 0 LF 0 SF 0 LS Code Name Class Totals LA1 1 1 1 1 4 Totals for Labor Hours:12 Worked:12 Broken Out:(12/0/0) Cost Codes 013 016 029 001 Description WATER METERS AND 8" CLASS 350 DIP REC CONCRETE SIDEWAL MOBILIZATION/DEMO Prod. Qty.0 LS 0 LF 0 SF 0 LS Code Name Class Totals 00254 2024 GMC K3500 ( 1 1 1 3 00506 2008 Freightliner Bobtail 0 00813 John Deere 410J Backh 1 1 1 1 4 00606 CAT 308E2CR SB 0 Totals for Equipment Hours:7 Worked:7 Broken Out:(7/0/0) Time Card Notes: Date - 10/31/2025 (Friday)Foreman - Meter Per Code Name Begin End Start Break (1)Lunch Break (2)Meal (2)End Diem Subsistence Notes 07:00 12:00-12:30 15:30