Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BIDSYNC - 91639 Bid Results
CHORRO/MURRAY/MEINECKE SEWER REPLACEMENT PROJECT, SPECIFICATION NO. 91639 Bid Opening: 6/16/2022 UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL No. ITEM UNIT QUAN PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE 1 TRAFFIC CONTROL LS 1 $53,000.00 $53,000.00 $141,600.00 $141,600.00 $83,000.00 $83,000.00 $40,000.00 $40,000.00 2 POTHOLING LS 1 $25,000.00 $25,000.00 $34,300.00 $34,300.00 $102,000.00 $102,000.00 $15,000.00 $15,000.00 3 REPLACE TRAFFIC STRIPING & MARKERS LS 1 $8,088.00 $8,088.00 $7,750.00 $7,750.00 $7,400.00 $7,400.00 $44,000.00 $44,000.00 4 COMPLY WITH OSHA LS 1 $14,441.00 $14,441.00 $40,000.00 $40,000.00 $18,400.00 $18,400.00 $45,000.00 $45,000.00 5 BYPASS PUMPING LS 1 $32,000.00 $32,000.00 $78,000.00 $78,000.00 $96,000.00 $96,000.00 $25,000.00 $25,000.00 6 COMPLY WITH CALTRANS ENCROACHMENT PERMIT LS 1 $2,311.00 $2,311.00 $1,000.00 $1,000.00 $3,000.00 $3,000.00 $10,000.00 $10,000.00 7 ROCK EXCAVATION CY 100 $135.00 $13,500.00 $100.00 $10,000.00 $400.00 $40,000.00 $50.00 $5,000.00 8 RESTORE LANDSCAPING AND IRRIGATION (SHEET C6)LS 1 $15,000.00 $15,000.00 $35,000.00 $35,000.00 $21,700.00 $21,700.00 $5,000.00 $5,000.00 9 REPLACE (E) FENCE (SHEET C6)LF 40 $115.00 $4,600.00 $270.00 $10,800.00 $142.00 $5,680.00 $140.00 $5,600.00 10 REPLACE (E) CONCRETE WALKWAY (SHEET C6)SQFT 165 $52.00 $8,580.00 $60.00 $9,900.00 $152.00 $25,080.00 $55.00 $9,075.00 11 REPLACE (E) 6" RETAINING CURB (SHEET C6)LF 27 $115.00 $3,105.00 $180.00 $4,860.00 $183.00 $4,941.00 $165.00 $4,455.00 12 REMOVE EXISTING AND RESET PAVERS SQFT 600 $31.50 $18,900.00 $43.00 $25,800.00 $123.00 $73,800.00 $25.00 $15,000.00 13 INSTALL NEW 8" HDPE SEWERLINE BY PIPE BURSTING LF 121 $334.00 $40,414.00 $325.00 $39,325.00 $506.00 $61,226.00 $735.00 $88,935.00 14 INSTALL NEW 8" HDPE SEWERLINE BY OPEN TRENCHING LF 1837 $277.50 $509,767.50 $240.00 $440,880.00 $414.00 $760,518.00 $505.00 $927,685.00 15 INSTALL NEW 6" HDPE SEWERLINE BY OPEN TRENCHING LF 20 $253.00 $5,060.00 $350.00 $7,000.00 $410.00 $8,200.00 $502.00 $10,040.00 16 INSTALL NEW SEWER MANHOLE EA 11 $18,500.00 $203,500.00 $25,000.00 $275,000.00 $17,250.00 $189,750.00 $28,000.00 $308,000.00 17 INSTALL MANHOLE COATING EA 11 $2,900.00 $31,900.00 $3,500.00 $38,500.00 $3,600.00 $39,600.00 $3,125.00 $34,375.00 18 REMOVE EXISTING AND INSTALL NEW CLEANOUT EA 1 $4,423.00 $4,423.00 $4,050.00 $4,050.00 $8,400.00 $8,400.00 $2,500.00 $2,500.00 19 INSTALL POLYMER FRAME AND COVER EA 2 $2,387.00 $4,774.00 $3,600.00 $7,200.00 $1,450.00 $2,900.00 $2,500.00 $5,000.00 20 REMOVE EXISTING MANHOLE EA 7 $1,911.00 $13,377.00 $3,235.00 $22,645.00 $4,700.00 $32,900.00 $9,000.00 $63,000.00 21 REMOVE EXISTING SEWER MAIN LF 216 $6.00 $1,296.00 $21.00 $4,536.00 $142.00 $30,672.00 $37.00 $7,992.00 22 CONNECT EXISTING SEWER LATERAL TO NEW SEWERLINE EA 5 $2,120.00 $10,600.00 $1,450.00 $7,250.00 $3,250.00 $16,250.00 $5,400.00 $27,000.00 23 CHANGEABLE MESSAGE SIGN EA 2 $3,418.00 $6,836.00 $7,000.00 $14,000.00 $1,000.00 $2,000.00 $7,500.00 $15,000.00 24 RE‐GRADE SEWER LATERAL BEYOND 5 FEET LF 10 $335.00 $3,350.00 $100.00 $1,000.00 $124.00 $1,240.00 $200.00 $2,000.00 25 REMOVE EXISTING AND INSTALL NEW WATER METER BOX EA 2 $977.00 $1,954.00 $2,700.00 $5,400.00 $2,000.00 $4,000.00 $2,500.00 $5,000.00 26 REMOVE EXISTING AND INSTALL NEW 12" DIP STORMDRAIN BY OPEN TRENCHING LF 139 $229.00 $31,831.00 $600.00 $83,400.00 $241.00 $33,499.00 $240.00 $33,360.00 27 INSTALL NEW 3'X2' DRAINAGE INLET EA 2 $6,621.00 $13,242.00 $9,000.00 $18,000.00 $3,750.00 $7,500.00 $4,375.00 $8,750.00 28 CONNECT TO EXISTING STORMDRAIN STRUCTURE PER ENG. STD. 3540 EA 3 $1,314.00 $3,942.00 $1,700.00 $5,100.00 $1,600.00 $4,800.00 $5,500.00 $16,500.00 29 REMOVE EXSTING DRAINAGE INLET EA 1 $1,542.00 $1,542.00 $2,050.00 $2,050.00 $1,400.00 $1,400.00 $2,500.00 $2,500.00 30 REMOVE EXISTING AND INSTALL NEW CURB AND GUTTER LF 53 $83.00 $4,399.00 $218.00 $11,554.00 $176.00 $9,328.00 $185.00 $9,805.00 31 REINSTALL (E) GATE (SHEET C6)EA 1 $924.00 $924.00 $560.00 $560.00 $1,000.00 $1,000.00 $6,500.00 $6,500.00 $1,091,656.50 $1,386,460.00 $1,696,184.00 $1,797,072.00 Specialty Construction Addison‐Miller IncJohn Madonna Construction TOTAL PROJECT BID BASE BID Souza Engineering Contracting