HomeMy WebLinkAbout01/21/1992, C-4 - SEWER MAIN IMPROVEMENT PROJECT: HIGH ST. - BEEBEE TO PARKER, CITY PLAN NO. P-42RMEETING OATS
1111
19111`1 city Of San . -41S 0B1SPO rJa NUMBER 1992
COUNCIL AGENDA REPOT Za
FROM: ! .;
David F. Romero Public Works Director''
William T. Hetland, Utilities Director oTt
Prepared by: Morris D. Witbeck, Engineering Assistant's 2r
SUBJECT:
Sewer Main Improvement Project: High St. - Beebee to Parker, City
Plan No. P -42R
OMMENDATION:
By motion, approve plans
Improvement Project, High
42R, authorize soliciting
lowest responsible bid is
BACKGROUND:
and specifications for Sewer Main
St. - Beebee to Parker, City Plan No. P-
of bids and contract award by CAO if the
within the Engineer's Estimate.
The existing sewerline is in a deteriorated condition and requires
frequent cleaning and maintenance. The proposed project will reverse
the direction of flow, reducing tiLe length of the sewerline by 50 %. A
number of dead laterals will be eliminated, thereby reducing
infiltration of water into the system.
ALTERNATIVES:
1. Proceed with the replacement of the deteriorated line, preventing
further infiltration, and reducing maintenance.
2. Do not proceed with the replacement at this time, with the
infiltration and maintenance continuing.
FISCAL IMPACT:
The engineer's estimate for this project is $34,700. The CIP for
1991/92 (Page E -7) includes $120,000 for sewer main improvement
projects.
Plans and Specifications are
Available in Council Office for Review
mdvi2 1p42r -sr
by