Loading...
HomeMy WebLinkAbout1000196 - Bid Results BidSyncItem #Item Description Quantity Unit of Measure Unit Price Item Total 1 REMOVE (E) & REPLACE WITH (N) RAILING POSTS PER ENGR. STD. 4240 EA 7 $826.00 $5,782.00 2 REMOVE (E) & REPLACE WITH (N) MISSION STYLE RAILING PER ENGR. STD. 4240 LF 34 $289.00 $9,826.00 3 REMOVE (E) HEADERBOARD & INSTALL (N) 6" ADOBE COLOR CONCRETE RETAINING CURB LF 21 $44.00 $924.00 4 REMOVE (E) CONCRETE PAVERS & INSTALL (N) ADOBE COLOR REINFORCED CONCRETE WALKWAY WITH CLASS II BASE, 6" MIN. DEPTH SQFT 138 $92.00 $12,696.00 5 12" WIDE ADOBE COLOR CONTINUOUS FOOTING WALL PER ENGR. STD. 4240 LF 17 $294.00 $4,998.00 6 INSTALL (N) ADOBE COLOR RETAINING WALL PER STATE STD. PLANS B3-3 TYPE 1A LF 16 $2,431.00 $38,896.00 7 REMOVE (E) SHRUB & VEGETATION LS 1 $500.00 $500.00 8 INSTALL (N) HANES 12" COIR FIBER LOG OR APPROVED EQUAL LF 40 $26.00 $1,040.00 9 COMPLIANCE WITH ARCHAEOLOGICAL MONITORING PLAN LS 1 $1,820.00 $1,820.00 10 COMPLY WITH OSHA LS 1 $600.00 $600.00 $77,082.00 Total Bid Amount Mission Plaza Railing Upgrade, Specification No. 1000196 Bid Opening: 8/19/21 Taylor Jane Construction LP