HomeMy WebLinkAbout03/17/1992, C-2 - CORPORATION YARD EXTERIOR PAINTING, CITY PLAN NO. S-28X. IIIII�I�IIIIVI�IIIIIIII A IIIIII city f San Og�sMEETING DATE: C� � �(, , p� March 17, 1992 COUNCIL AGENDA REPORT ITEM NUMBER^ From: David F. Romero, Public Works Director Prepared by: Lane Wilson, Parks and Buildings Manage' David P. Pierce, Projects Manager Subiect: Corporation Yard Exterior Painting, City Plan No. S-28X. CAO RECOMMENDATION By motion, approve plans and specifications for Project "Corporation Yard Exterior Painting" ' City Plan No. S-28X and authorize soliciting of bids and contract award by the CAO, if the lowest responsible bid is within the Engineer's cost estimate. DISCUSSION The Corporation Yard was completed in 1984 . Specifications for the original construction called for a 10 year paint guarantee on the siding. However, some surfaces have deteriorated to the point that it is necessary to repaint. Other surfaces are approaching that point. After long negotiations, the Contractor paid $13 , 900 to settle the City's claim that the prefinished siding did not hold up as required by the specifications. This money was paid into the General Fund. Since some of the finishes have deteriorated and others are approaching the end of their useful life, it was determined that the entire facility should be painted. Thus the appearance and expected life of the finishes will be consistent for all buildings at the Corporation Yard. The project will provide a high quality coating applied in accordance with specific instructions to be provided by the manufacture. The manufacture will inspect the work and will warrantee the finish for 10 years. This project does not paint the metal roof that is hidden by the parapets. CONCURRENCES This maintenance work does not require an environmental assessment. The colors will match the existing colors that were approved by the Architectural Review Committee prior to construction. FISCAL IMPACT Engineer's Estimate $57, 000 Contingencies 3 . 000 60, 000 The FY 1991-92 Budget includes $60, 000 for this project. (FY 1991-93 Financial Plan page E-10) Plans and Specifications are available for review in the City Council Office. g:s2B.agd