Loading...
HomeMy WebLinkAboutBid Results_1000167 BidSyncBASE BID (PAVING AREAS A, B, & C) Bid Item Description Measurement Quantity Unit Cost Total Cost 1 TYPE II SLURRY SEAL SQYD 18,530 4.50$ 83,385.00$ 2 PNEUMATIC TIRE ROLLER COMPACTION LS 1 4,000.00$ 4,000.00$ 3 3/8 MIX LEVELING COURSE TON 460 200.00$ 92,000.00$ 4 1/2 MIX HMA SURFACE COURSE TON 1,910 150.00$ 286,500.00$ 5 3/4 MIX HMA BASE COURSE TON 640 155.00$ 99,200.00$ 6 REMOVE (E) AC [HIGUERA & MARSH]SQYD 34,720 5.00$ 173,600.00$ 7 REMOVE 6" (E) MATERIAL [NIPOMO]SQYD 2,830 10.00$ 28,300.00$ 8 PAVING GRID SQYD 8,090 11.00$ 88,990.00$ 9 REMOVE & REPLACE AC PER DETAIL I SHEET 24 SQFT 2,730 7.00$ 19,110.00$ 10 EDGE GRIND LF 350 25.00$ 8,750.00$ 11 REMOVE CURB AND GUTTER LF 1,050 19.00$ 19,950.00$ 12 CURB AND 18"GUTTER LF 555 83.00$ 46,065.00$ 13 CURB AND 24"GUTTER LF 215 89.00$ 19,135.00$ 14 REMOVE AND REPLACE DRIVEWAY EA 10 8,600.00$ 86,000.00$ 15 REMOVE AND REPLACE SIDEWALK SQFT 4,150 20.00$ 83,000.00$ 16 REMOVE AND REPLACE WITH REINFORCED SIDEWALK SQFT 550 23.00$ 12,650.00$ 17 INSTALL SIDEWALK UNDERDRAIN EA 3 6,700.00$ 20,100.00$ 18 RE-GRADE PLANTED MEDIAN SQFT 1,180 2.50$ 2,950.00$ 19 REMOVE AND REPLACE BRICK MEDIAN SQFT 330 26.00$ 8,580.00$ 20 GRADING AND LANDSCAPING TO MATCH EXISTING GRADE SQFT 730 5.00$ 3,650.00$ 21 GRADING AND HMA TO MATCH EXISTING GRADE SQFT 200 7.00$ 1,400.00$ 22 GRADING AND CONCRETE WALKWAY TO MATCH EXISTING GRADE SQFT 80 18.00$ 1,440.00$ 23 GRADING AND CONCRETE DRIVEWAY TO MATCH EXISTING GRADE SQFT 240 25.00$ 6,000.00$ 24 REMOVE EXISTING STRIPING SQFT 200 18.00$ 3,600.00$ 25 CONCRETE BULBOUTS (HIGUERA/JOHNSON & MARSH/TORO)EA 4 8,000.00$ 32,000.00$ 26 DETAIL 1 LF 485 0.60$ 291.00$ 27 DETAIL 9 LF 2,545 0.70$ 1,781.50$ 28 DETAIL 22 LF 1,120 2.20$ 2,464.00$ 29 DETAIL 27B LF 6,240 0.70$ 4,368.00$ 30 DETAIL 28 LF 45 4.50$ 202.50$ 31 DETAIL 37B LF 270 1.40$ 378.00$ 32 DETAIL 38 LF 145 1.10$ 159.50$ 33 DETAIL 39 LF 4,990 0.80$ 3,992.00$ 34 DETAIL 39A LF 110 0.80$ 88.00$ 35 DETAIL 40 LF 260 0.60$ 156.00$ 36 DETAIL 41 LF 55 0.60$ 33.00$ 37 DOUBLE 4" WHITE LF 260 1.10$ 286.00$ 38 12" WHITE LF 1,705 3.30$ 5,626.50$ 39 24" WHITE LF 1,265 6.50$ 8,222.50$ 40 12" YELLOW LF 115 3.30$ 379.50$ 41 24" YELLOW LF 85 6.70$ 569.50$ 42 GREEN MMA SQFT 3,730 7.80$ 29,094.00$ 43 GREEN BIKE LANE MARKINGS CASE 1 LF 235 5.60$ 1,316.00$ 44 GREEN BIKE LANE MARKINGS CASE 2 LF 300 5.60$ 1,680.00$ 45 BIKE BUFFER LF 1,200 1.10$ 1,320.00$ 46 BIKE MEDIAN LF 1,240 1.10$ 1,364.00$ 47 NO PARKING BUFFER SQFT 12,990 1.10$ 14,289.00$ 48 PARKING "L"EA 91 28.00$ 2,548.00$ R. Burke Corporation 49 PARKING "T"EA 84 28.00$ 2,352.00$ 50 BLUE PARKING MARKS EA 8 140.00$ 1,120.00$ 51 ADA SPACE MARKING EA 6 280.00$ 1,680.00$ 52 ADA SIGN & POST EA 6 370.00$ 2,220.00$ 53 BLUE CURB LF 135 2.20$ 297.00$ 54 PAINTED CURB LF 2,915 2.20$ 6,413.00$ 55 SPEED TABLE EA 1 11,000.00$ 11,000.00$ 56 STORM DRAIN FRAME AND COVER PLATES EA 22 2,400.00$ 52,800.00$ 57 RAPID RECTANGULAR FLASHING BEACON EA 6 8,800.00$ 52,800.00$ 58 TREE GRATE EA 3 3,400.00$ 10,200.00$ 59 BLUE HYDRANT MARKERS PER CITY STD 7920 EA 34 11.00$ 374.00$ 60 UPGRADE/ADJUST WATER VALVE TO FINISHED GRADE EA 55 1,300.00$ 71,500.00$ 61 REMOVE AND REPLACE WATER METER EA 16 1,300.00$ 20,800.00$ 62 UPGRADE/ADJUST SANITARY SEWER MANHOLE OR CLEANOUT TO FINISHED GRADE EA 13 2,300.00$ 29,900.00$ 63 UPGRADE/ADJUST STORM DRAIN MANHOLE TO FINISHED GRADE EA 6 2,300.00$ 13,800.00$ 64 UPGRADE/ADJUST COMMUNICATIONS MANHOLE TO FINISHED GRADE EA 1 2,700.00$ 2,700.00$ 65 UPGRADE/ADJUST TRAFFIC BOX TO FINISHED GRADE EA 5 1,900.00$ 9,500.00$ 66 MODIFIED TYPE 24-10S STORM DRAIN GRATES EA 7 950.00$ 6,650.00$ 67 REMOVE AND REPLACE FIRE HYDRANT EA 2 8,000.00$ 16,000.00$ 68 RESET BENCHMARK EA 1 1,500.00$ 1,500.00$ 69 REMOVE AND REPLACE SIGN POST EA 4 280.00$ 1,120.00$ 70 12' PUNCH POST EA 31 260.00$ 8,060.00$ 71 R1-2 SIGN EA 3 310.00$ 930.00$ 72 R4-1 SIGN EA 1 310.00$ 310.00$ 73 R10-15 SIGN MOD.EA 8 310.00$ 2,480.00$ 74 W4-2 SIGN EA 1 310.00$ 310.00$ 75 W9-1 SIGN EA 1 310.00$ 310.00$ 76 W11-2 SIGN EA 6 370.00$ 2,220.00$ 77 W84 (CA) SIGN EA 2 370.00$ 740.00$ 78 25 MPH SIGN EA 1 310.00$ 310.00$ 79 30 MPH SIGN EA 2 310.00$ 620.00$ 80 CUSTOM CLASS IV BIKE SIGN EA 6 310.00$ 1,860.00$ 81 TYPE K-I (CA) OBJECT MARKER OM2-1H EA 24 165.00$ 3,960.00$ 82 WHITE PAVEMENT MARKING SQFT 1,680 5.50$ 9,240.00$ 83 CURB RAMP HIGUERA & NIPOMO SW CORNER LS 1 27,000.00$ 27,000.00$ 84 SIDEWALK REPAIR NORTH SIDE OF HIGUERA NEAR NIPOMO LS 1 27,000.00$ 27,000.00$ 85 HIGUERA MIDBLOCK CROSSWALK SHEET 6 LS 1 43,000.00$ 43,000.00$ 86 CURB RAMP HIGUERA & CARMEL SE CORNER LS 1 25,000.00$ 25,000.00$ 87 CROSS GUTTER HIGUERA & CARMEL SOUTH SIDE SQFT 620 43.00$ 26,660.00$ 88 SIDEWALK REPAIR NORTH SIDE OF MARSH NEAR HIGUERA LS 1 27,000.00$ 27,000.00$ 89 CURB RAMP MARSH & CARMEL SW CORNER LS 1 19,000.00$ 19,000.00$ 90 CURB RAMP MARSH & CARMEL NE CORNER LS 1 21,000.00$ 21,000.00$ 91 CURB RAMP MARSH & BEACH SW CORNER LS 1 25,000.00$ 25,000.00$ 92 CURB RAMP MARSH & BEACH SE CORNER LS 1 25,000.00$ 25,000.00$ 93 CURB RAMP NIPOMO & BUCHON SE CORNER LS 1 24,000.00$ 24,000.00$ 94 CURB RAMP NIPOMO & BUCHON SW CORNER LS 1 24,000.00$ 24,000.00$ 95 CURB RAMP NIPOMO & ISLAY NE CORNER LS 1 32,000.00$ 32,000.00$ 96 CURB RAMP NIPOMO & ISLAY NW CORNER LS 1 26,000.00$ 26,000.00$ 97 CURB RAMP NIPOMO & ISLAY SE CORNER LS 1 25,000.00$ 25,000.00$ 98 CURB RAMP NIPOMO & ISLAY SW CORNER LS 1 25,000.00$ 25,000.00$ 99 CURB RAMP NIPOMO & LEFF NE CORNER LS 1 22,000.00$ 22,000.00$ 100 CURB RAMP NIPOMO & LEFF NW CORNER LS 1 22,000.00$ 22,000.00$ 101 HMA BASE REPAIR ALLOWANCE - NIPOMO STREET SQFT 5,000 8.00$ 40,000.00$ 102 LATERAL REPLACEMENT ALLOWANCE EA 5 4,500.00$ 22,500.00$ 103 CONCRETE BASE REPAIR ALLOWANCE DETAIL C, SHEET 24 SQFT 1,000 30.00$ 30,000.00$ 104 CHANGEABLE MESSAGE SIGN (CMS)EA 2 4,500.00$ 9,000.00$ 105 STREET SWEEPING IN SLURRY AREAS (1 DAY)LS 1 6,800.00$ 6,800.00$ 106 STREET SWEEPING IN SLURRY AREAS (30 DAYS)LS 1 6,800.00$ 6,800.00$ 107 CONSTRUCTION SURVEY LS 1 30,000.00$ 30,000.00$ 108 COMPLY WITH NIGHT WORK PERMIT LS 1 11,000.00$ 11,000.00$ 109 TRAFFIC CONTROL PLAN AND IMPLEMENTATION LS 1 269,000.00$ 269,000.00$ 110 COMPLY WITH CALTRANS ENCROACHMENT PERMIT LS 1 5,000.00$ 5,000.00$ 2,552,799.50$ ADDITIVE ALTERNATIVE "1" (PAVING AREA D) Bid Item Description Measurement Quantity Unit Cost Total Cost 1A 1/2 MIX HMA SURFACE COURSE TON 370 150.00$ 55,500.00$ 2A 3/4 MIX HMA BASE COURSE TON 1,990 135.00$ 268,650.00$ 3A REMOVE 14.25" (E) MATERIAL [JOHNSON]SQYD 2,950 24.00$ 70,800.00$ 4A REMOVE AND REPLACE WITH REINFORCED SIDEWALK SQFT 170 42.00$ 7,140.00$ 5A INSTALL SIDEWALK UNDERDRAIN EA 2 2,100.00$ 4,200.00$ 6A DETAIL 1 LF 200 0.60$ 120.00$ 7A DETAIL 24 LF 25 0.60$ 15.00$ 8A 12" WHITE LF 80 3.30$ 264.00$ 9A PAINTED CURB LF 120 2.20$ 264.00$ 10A CROSS GUTTER SQFT 220 74.00$ 16,280.00$ 11A BLUE HYDRANT MARKERS PER CITY STD 7920 EA 3 11.00$ 33.00$ 12A UPGRADE/ADJUST WATER VALVE TO FINISHED GRADE EA 6 1,400.00$ 8,400.00$ 13A UPGRADE/ADJUST SANITARY SEWER MANHOLE OR CLEANOUT TO FINISHED GRADE EA 3 2,400.00$ 7,200.00$ 14A RESET BENCHMARK EA 1 1,500.00$ 1,500.00$ 15A 12' PUNCH POST EA 4 280.00$ 1,120.00$ 16A R1-1 SIGN EA 2 310.00$ 620.00$ 17A R1-3 SIGN EA 2 280.00$ 560.00$ 18A R1-3P SIGN EA 1 280.00$ 280.00$ 19A R6-1 SIGN EA 2 280.00$ 560.00$ 20A W3-1 SIGN EA 2 310.00$ 620.00$ 21A WHITE PAVEMENT MARKING SQFT 90 5.50$ 495.00$ 22A CURB RAMP JOHNSON & MILL NE CORNER LS 1 25,000.00$ 25,000.00$ 23A CURB RAMP JOHNSON & MILL NW CORNER LS 1 25,000.00$ 25,000.00$ 24A CURB RAMP JOHNSON & PEACH NE CORNER LS 1 25,000.00$ 25,000.00$ 25A CURB RAMP JOHNSON & PEACH SW CORNER LS 1 22,000.00$ 22,000.00$ 26A CURB RAMP JOHNSON & PEACH SE CORNER LS 1 22,000.00$ 22,000.00$ 27A CURB RAMP JOHNSON & PHILLIPS SE CORNER LS 1 26,000.00$ 26,000.00$ 28A CONSTRUCTION SURVEY LS 1 5,000.00$ 5,000.00$ 29A TRAFFIC CONTROL PLAN AND IMPLEMENTATION LS 1 40,000.00$ 40,000.00$ 634,621.00$ ADDITIVE ALTERNATIVE "2" (PAVING AREA D) Bid Item Description Measurement Quantity Unit Cost Total Cost 1B 1/2 MIX HMA SURFACE COURSE TON 490 160.00$ 78,400.00$ 2B 3/4 MIX HMA BASE COURSE TON 780 150.00$ 117,000.00$ 3B REMOVE 10.5" (E) MATERIAL [PEPPER]SQYD 1,380 24.00$ 33,120.00$ 4B REMOVE 5" (E) MATERIAL [PHILLIPS]SQYD 1,630 11.00$ 17,930.00$ 5B REMOVE & REPLACE AC PER DETAIL E SHEET 24 SQFT 1,090 17.00$ 18,530.00$ 6B DETAIL 22 LF 140 2.20$ 308.00$ 7B 12" WHITE LF 40 3.30$ 132.00$ 8B PAINTED CURB LF 230 2.20$ 506.00$ 9B BLUE HYDRANT MARKERS PER CITY STD 7920 EA 2 11.00$ 22.00$ 10B UPGRADE/ADJUST WATER VALVE TO FINISHED GRADE EA 8 1,300.00$ 10,400.00$ 11B UPGRADE/ADJUST SANITARY SEWER MANHOLE OR CLEANOUT TO FINISHED GRADE EA 6 2,400.00$ 14,400.00$ 12B WHITE PAVEMENT MARKING SQFT 40 5.50$ 220.00$ 13B TRAFFIC CONTROL PLAN AND IMPLEMENTATION LS 1 41,000.00$ 41,000.00$ 331,968.00$ Base Bid Total:2,552,799.50$ Additive Alternate "A" Total:634,621.00$ Additive Alternate "B" Total:331,968.00$ Total Project Bid:3,519,388.50$