Loading...
HomeMy WebLinkAboutBid ResultsItem #Item Description Unit of Measure Estimated Quantity Item Price Total Item Price Total Item Price Total 1 16” Ductile Iron Pressure Reducing Valve Inlet Piping (Bishop Street) LS 1 $60,000.00 $60,000.00 $77,000.00 $77,000.00 $68,800.00 $68,800.00 2 16” Ductile Iron Piping, STA 1+00 to STA 5+20.02 LF 420 $325.00 $136,500.00 $354.00 $148,680.00 $310.00 $130,200.00 3 1” Air Release and Vacuum Valve EA 1 $5,500.00 $5,500.00 $4,800.00 $4,800.00 $8,000.00 $8,000.00 4 Pressure Reducing Valve Station LS 1 $107,000.00 $107,000.00 $109,000.00 $109,000.00 $131,075.00 $131,075.00 5 Pipe & Appurtenances Abandonment LS 1 $10,000.00 $10,000.00 $23,000.00 $23,000.00 $15,000.00 $15,000.00 6 8” and 16” Waterline Connections at Bishop Street LS 1 $40,000.00 $40,000.00 $30,500.00 $30,500.00 $20,000.00 $20,000.00 7 Connection at Boulevard Del Campo LS 1 $13,000.00 $13,000.00 $10,000.00 $10,000.00 $12,500.00 $12,500.00 8 Connection at Sylvia Court LS 1 $14,000.00 $14,000.00 $11,000.00 $11,000.00 $10,000.00 $10,000.00 9 Connection at Helena Street LS 1 $17,000.00 $17,000.00 $16,000.00 $16,000.00 $15,000.00 $15,000.00 10 Pressure Reducing Valve Site Improvements LS 1 $40,000.00 $40,000.00 $11,000.00 $11,000.00 $50,000.00 $50,000.00 11 Rolled Curb, Gutter & Sidewalk LS 1 $16,000.00 $16,000.00 $31,000.00 $31,000.00 $12,000.00 $12,000.00 12 AC Trench Paving – Bishop Street (10” Thick) LF 172 $80.00 $13,760.00 $79.00 $13,588.00 $60.00 $10,320.00 13 AC Trench Paving – Boulevard Del Campo (6” Thick) LF 145 $60.00 $8,700.00 $69.00 $10,005.00 $50.00 $7,250.00 14 Grind and Overlay – Bishop Street SQFT 2070 $10.00 $20,700.00 $10.00 $20,700.00 $10.00 $20,700.00 15 Electrical and Communication Conduits LS 1 $10,000.00 $10,000.00 $19,000.00 $19,000.00 $7,500.00 $7,500.00 16 Excavation in Rock CY 30 $200.00 $6,000.00 $400.00 $12,000.00 $500.00 $15,000.00 17 Retaining Wall LS 1 $38,000.00 $38,000.00 $45,200.00 $45,200.00 $60,000.00 $60,000.00 18 Curb and Gutter per City Engineering Standard 4030 LS 1 $2,000.00 $2,000.00 $1,600.00 $1,600.00 $6,000.00 $6,000.00 19 Curb, Gutter and Sidewalk per City Engineering Standard 4110 LS 1 $2,000.00 $2,000.00 $1,600.00 $1,600.00 $6,000.00 $6,000.00 20 Survey of Pipeline LS 1 $10,000.00 $10,000.00 $4,700.00 $4,700.00 $8,000.00 $8,000.00 21 Temporary and Permanent Erosion Control LS 1 $2,000.00 $2,000.00 $6,800.00 $6,800.00 $5,000.00 $5,000.00 22 New Fire Hydrant @ Station 4+95 LS 1 $7,500.00 $7,500.00 $6,500.00 $6,500.00 $11,800.00 $11,800.00 23 OSHA Compliance LS 1 $2,000.00 $2,000.00 $5,700.00 $5,700.00 $5,000.00 $5,000.00 24 Night Work during Waterline Tie-ins LS 1 $4,000.00 $4,000.00 $7,500.00 $7,500.00 $15,000.00 $15,000.00 $585,660.00 $626,873.00 $650,145.00 Total Bid Amount Bid Opening: 11/6/20 Raminha Construction, Inc Specialty Construction, Inc HPS Mechaical, Inc Terrace Hill Pipeline and Pressure Reducing Valve Rehabilitation Project, Specification No. 91425