HomeMy WebLinkAbout_2025-07-09-Doc_Enclave Lot 25_WPCP_signed_v1 (1) (For Select Building Projects Less Than 1 Acre)
PURPOSE: This plan can only be used for minor building projects (SFR - new, remodels, additions; and/or commercial remodels).
Newly constructed commercial buildings under 2019 CalGreen Codes require the development and implementation
of a WPCP similar to the standards of a State submitted SWPPP. This plan is only to serve as a guide, if the
applicant elects to use it. The BMPS specified herein shall be considered just the “Minimum BMPs” and during the
course of the project additional BMPs (Necessary BMPs) may be required to protect water quality. Please note that
an in-fill new single family home project may require additional plan elements. This plan shall be used in accordance with
CGP 2009-0009-DWQ, City Stormwater Permit & 2019 CalGreen Building Codes.
GENERAL INFORMATION:
WPCP Plan for Minor Building Projects)
1 of 4
Project Address: ________________________________________________________________________
Description of Work: ___________________________________________________________________
_____________________________________________________________________________________
Estimate total disturbed soil areas in square feet: __________ ** Erosion & Sediment Control Measures are required.
Applicant’s Name: __________________________________ Applicant’s Tele No. (____) _____-_________
Emergency Contact: ______________________________ Tele: (___) ____-_____ Cell: (___) _____-______
Contractor’s Name: __________________________________ Contractor’s Tel No. (____) ____-_________
Contractor’s Mailing Address: ______________________________________________________________
(Street Address) (City) (State) (Zip)
Type of Project - Check One
Commercial / Industrial: Alternations New Con. Site-work Tenant Improvement
Other: __________________________________________________________________
Residential: Additions New Con. Remodel Other: _______________________
SCHEDULE: Anticipated Project Schedule (Calendar Days & Hours):
Calendar days: __________________________________________________________________________
Hours: (From) ________________________________ (To) ______________________________________
BEST MANAGEMENT PRACTICES OR “BMPS” are procedures that help prevent pollutants from
entering the City’s stormwater conveyance system and creeks. Indicate by checking ALL ANTICIPATED BMPS
that must be incorporated into the project to ensure the protection of waterways and stormwater conveyance
systems (i.e. gutters, streets, storm drain inlets, storm drains, catch basins, creeks, culverts and seasonal streams). Informational
brochures on various project types and BMPs are available on the City website listed herein. For detailed
information on the Best Management Practices listed herein refer to:
Ca General Construction Permit
Ca Green Building Codes
Ca State Water Resources Control Board
Ca Stormwater Quality Association*
Caltrans Stormwater Pollution Templates
Caltrans Supplement to Traffic Control Guide
City of San Luis Obispo BMP Guides*
City of San Luis Obispo Municipal Code
City of SLO Stormwater Management Plan
City of SLO Waterway Management - Plan I
City of SLO Stream Management & - Plan II
City of SLO Drainage Design Man. - Plan III
City of SLO WPCP Guide*
City Specifications
Construction Industry Compliance Asst Center
State Specifications - DOT
http://www.waterboards.ca.gov/water_issues/programs/stormwater
http://www.bsc.ca.gov/CALGreen/default.htm
http://www.swrcb.ca.gov/water_issues/programs/stormwater
http://www.casqa.org/
http://www.dot.ca.gov/hq/construc/stormwater/templates1.htm
http://www.dot.ca.gov/hq/traffops/signtech/mutcdsupp https://bit.ly/3rWDzAa
http://www.codepublishing.com/ca/sanluisobispo/
https://bit.ly/3sIS3m9
https://bit.ly/3oX9vlR
https://bit.ly/3sJBE0V
https://bit.ly/3uWmice
https://bit.ly/3GYMpRY
https://bit.ly/3t8NNOc
http://www.cicacenter.org/swt/swt2.cfm?st=CA
http://www.dot.ca.gov/hq/esc/oe/standards.php
Proximity to Storm Drains, Creeks & Known Underground Springs or Seeps: If the project site is within
close proximity (< 150’) to a creek, storm drain inlet down gradient of the site and/or includes underground
springs or seeps on site, the site plan may need to include the locations of each and additional specific BMPs
may be required throughout the course of the project. Please consult with a Qualified Professional and/or
Building Staff for guidance.
Water Pollution Control Plan (WPCP)Community DevelopmentBuilding and Safety Division919 Palm Street, San Luis Obispo, CA 93401-3218
T 805.781.7180 F 805.781.7173 www.slocity.org
03/15/2022
1424 Hansen Lane
New single family residence with attached garage, covered patio, and retaining walls.
10,737
Vellum Design & Build 805 784
760Paul Abbott 784 0487 641 4077
Vellum Design & Build 805 784 0487
3590 Broad Street, Ste 130, SLO, CA 93401
365 DAYS
7:00 AM 5:00 PM
80
0487
WPCP Plan for Minor Building Projects 2 of 4
ANTICIPATED BMPS NOTE: A “” indicates mandatory BMPs for all projects.
Good Housekeeping: Keep site clean & organized
at all times.
Pre-inventory BMPs: Develop a list all
materials to be used on site to determine
proper storage to avoid exposure to the
elements as appropriate.
Material stockpile BMPs
Chemical storage BMPs
Inclement weather – materials storage BMPs
Impervious surface sweeping BMPs
Spill management & reporting BMPs.
Waste Management Plan: All waste products must
be containerized & covered at all times.
Waste management BMPs
Concrete, paint, plaster residue BMPs (lined
washout pit, cover during rain events)
Hazardous spill management BMPs
Landscape materials BMPs
Potential pollutant source list: Detailed list of
chemicals, solvents, paints & fertilizers to be
used on the site.
Painting BMPs (lined washout pit, cover daily)
Completed City C&D Plan
Portable toilet BMPs
Equipment / vehicle BMPs
Erosion Control Measures - to prevent sediment
from becoming dislodged due to rain & wind event.
Riparian protection BMPs
Temporary soil stabilization BMPs
Temporary curb access BMPs
Vegetation preservation BMPs
Slope stabilization BMPs
Wind erosion BMPs
Dust control BMPs
Permanent soil stabilization BMPs
Phased construction BMPs
Steep slope BMPs
Post storm erosion control BMPs
Sediment Control Measures – to control & detain
dislodged sediment from leaving the site.
Creek protection BMPs
Site perimeter BMPs
Sediment basin BMPs
Stabilized construction exit(s) / entrance(s)
Storm drain inlet protection BMPs
Waterway & stabilized drainage way BMPs
Rapid soil stabilization BMPs
Advanced settling devices
Post storm event sediment control BMPs
Run-on & Run-off Control Measures: Overland
flow of storm water both on and off-site must be
effectively managed.
Stormwater run-on BMPs
Stormwater run-off BMPs
Non-Stormwater Management: For work
performed in the street, or to temporarily store
materials in the street or on the sidewalk you must
secure an encroachment permit.
Equipment tool washout BMPs
Encroachment permits
Potential non-stormwater discharge BMPs
Saw-cutting BMPs
Scheduling BMPs
Site Schematic: To reflect the location of all BMPs
to be used on site. For example, depict the location
of all perimeter control measures, such as silt
fencing or straw wattles on a schematic.
For all construction projects with outside
activities.
Water Efficient Landscape Plans Submittal: For
new construction sites a water efficient landscape
plan may be required.
Refer to Utilities Conservation
Post Construction Stormwater Devices
Pre & post stormwater run-off calculation
A post construction maintenance plan
A private stormwater conveyance system
agreement, and
A post construction site schematic required
Inspect, Maintain, Clean, Repair & Report – all
site BMP’s on active and inactive construction
sites weekly. Repairs must be made as necessary.
Document all activities in a log.
Weekly inspection schedule
Pre & post storm event inspections
BMP cleaning schedule
BMP maintenance schedule
BMP repair protocol
Documentation & records management
protocol
Reporting protocol
Project Specific BMPs
_________________________________
_________________________________
_________________________________
_________________________________
_________________________________
_________________________________
Water Pollution Control Plan (WPCP)Community DevelopmentBuilding and Safety Division919 Palm Street, San Luis Obispo, CA 93401-3218
T 805.781.7180 F 805.781.7173 www.slocity.org
03/15/2022
WPCP Plan for Minor Building Projects
3 of 4
SITE SCHEMATIC
Required for all projects that include grading activities include a reasonable sketch depicting where all required and
necessary BMPs shall be placed on and off site. Be sure to include: a directional arrow, slope directions reflecting
after grading is complete, scale used, the location of all structures on site, the location of all waterways on and / or
abutting the site, location of closest storm drain inlet, frontage and side streets and wild lands. Note additional
requirements (i.e. erosion and grading plans, post construction stormwater device elements) may be required, so please refer to
City Building staff for direction.
Water Pollution Control Plan (WPCP)Community DevelopmentBuilding and Safety Division919 Palm Street, San Luis Obispo, CA 93401-3218
T 805.781.7180 F 805.781.7173 www.slocity.org
03/15/2022
WPCP Plan for Minor Building Projects
4 of 4
OFFICE USE ONLY: Received By: _______________ Date: __________ Approved By: _______________ Date: ____________
Denied: By: _______________ Date: __________ Comments: ___________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
PROJECT FEE: _____________
WPCP PLAN FOR BUILDING PROJECTS LESS THAN 1 ACRE
The following sections of the City Municipal Code, City Standard Specifications, Storm Water Management
Regulations, Green Building Codes and Fish & Game Regulations shall be reviewed by the permittee, and the
permittee shall receive approval of this Minor WPCP prior to the commencement of work on the site. Plan BMPs
shall be implemented on site at all times and verified for compliance. Permittee is required to maintain a log of all
routine inspections, cleanings, maintenance and repairs made to all BMPs on site at all times for review by any
representative of the City upon request. Failure to adhere to the WPCP, State and Federal Regulations may result in
a Notice of Violation and/or an Administrative Citation and/or a Stop Work Order issued until the site is in
conformance with the requirements of this plan.
APPLICABLE SPECIFICATIONS:
San Luis Obispo Municipal Code
8.04 Solid Waste Disposal
Title 12 Streets, Sidewalks and Public Places
12.08 Urban Storm Water Quality
Management and Discharge Control
12.23 Creek Protection Ordinance
13.08.130 Stormwater & unpolluted drainage
15.04.010 All disturbed surfaces
17.17.05 Neighborhood preservation
City Specifications
Section 3-1.03A, Encroachment Permit
4-1.07 Work Site Maintenance
6-1.03 Storage of Materials
Section 7-1.01G Water Pollution
Building Regulations
J103.1 & J103.2 – Grading permits required
City Specifications (Continued)
Section 1010B, Uniform Design Criteria –
Drainage and Erosion Control
19-1.07 Sawcutting
20.3 Erosion Control
Storm Water Regulations
Federal Water Pollution Control Act (CWA)
California Construction Stormwater Permit
California Porter Cologne Act of 2002
California Green Building Codes (Chp 4 & 5)
City of SLO WPCP Guide
City of SLO Construction BMP Guide
Fish and Game Regulations: 1600, 1602, 5650,
5651 & 5652
I agree to follow the requirements as set forth in this Guide (WPCP), the City of San Luis Obispo’s Stormwater
Management Plan, the State of California’s General Construction Permit, California Green Building Codes
(Chapters 4 & 5) the Federal Clean Water Act and all applicable specifications. In addition, I understand and agree to
the following: (1) Dynamic Plan: additional BMPs, both temporary and permanent may be required during the
course of the project at the discretion of the City Inspector(s) in order to ensure the protection of local water
quality, (2) it is permittee’s obligation to take additional corrective actions when required to protect local water
quality, (3) failure to comply with all the requirements could cause the permit to be revoked; the issuance of a stop
work order, a notice to comply, a notice of violation and/or a citation; (4) the doing of any work under this permit
shall constitute an acceptance of the provisions of this permit and all attachments and documents referenced herein,
(5) a copy of this signed approved Guide shall remain at the job site at all times available for review by any public
official, and (6) overland flow storm water run-off & run-on has been adequately designed for & managed.
Applicant: Permit #:
Check One: Owner Contractor Design Professional Legal Representative
Signature: Date:
If you require assistance in completing this “Plan” please contact
Notes: An * indicates a construction reference source specific to Stormwater BMPs. Please refer to the City’s website for
“BMP Descriptions for Minor Building Projects” handout. Use of this template plan is at the discretion of City personnel.
(805) 781-7180
Water Pollution Control Plan (WPCP)Community DevelopmentBuilding and Safety Division919 Palm Street, San Luis Obispo, CA 93401-3218
T 805.781.7180 F 805.781.7173 www.slocity.org
2019
2019
03/15/2022
VELLUM, INC.BLDG-0438-2025
07/01/2025
EROSION CONTROL LEGEND
EC1.0
EROSION &
SEDIMENT
CONTROL PLAN
Know what'sbelow.before you dig.Call811
00 10'20'
10'SCALE: 1" =
D A T E I S S U E
NOT FOR
CONSTRUCTION
LOT 24 HANSEN LANESAN LUIS OBISPO, CA 934012025.04.21 CITY COMMENTS & REDLINES
EC2.0
EROSION &
SEDIMENT
CONTROL
DETAIL
Know what'sbelow.before you dig.Call811
00 20'40'
20'SCALE: 1" =
D A T E I S S U E
NOT FOR
CONSTRUCTION
LOT 24 HANSEN LANESAN LUIS OBISPO, CA 934012025.04.21 CITY COMMENTS & REDLINES