HomeMy WebLinkAbout_Permit Corrections Report (1)PERMIT CORRECTIONS REPORT (BLDG-0438-2025)
FOR CITY OF SAN LUIS OBISPO
PARCEL:004-719-024PERMIT ADDRESS:1424 Hansen Ln
San Luis Obispo, CA 93401
APPLICATION DATE:02/19/2025
EXPIRATION DATE:
SQUARE FEET: 4,584.00
VALUATION:$525,000.00
DESCRIPTION:NEW 3,818.7 SQ.FT. SINGLE-FAMILY RESIDENCE
WITH 4 BEDROOMS, 4 BATHROOMS, AN ATTACHED
765.2 SQ.FT. 2-CAR GARAGE, 367.3 SQ.FT.
COVERED PATIO, AND 367.3 SQ.FT. ROOF DECK ON
THE UPPER FLOOR. THE PROPOSED IMPROVEMENTS
INCLUDE 136 LINEAR FEET OF RETAINING WALL.
CONTACTS NAME COMPANY ADDRESS
Applicant Sherman Damuag Vellum Design & Build 3590 Broad Street, Suite 130
San Luis Obispo, CA 93401
Other Permits Vellum VELLUM, INC.
Jamie Hess Vellum Design + Build 3590 Broad St, Suite 130
San Luis Obispo, CA 93401
Jamie Hess Vellum Design + Build 3590 Broad St
San Luis Obispo, CA 93401
Owner Paul Abbott 3590 Broad St, 130
San Luis Obispo, CA 93401
(R) Single Family
REVIEW ITEM STATUS REVIEWER
Addressing v.1 Vanessa Nichols Ph: 8057817588 email: vnichols@slocity.org Ready for Action
General - Addressing
Building (Consultant) v.1 Vanessa Nichols Ph: 8057817588 email: vnichols@slocity.org Needs Resubmit
Fees v.1 Vanessa Nichols Ph: 8057817588 email: vnichols@slocity.org Needs Resubmit
General - Fees
Correction: Administration - Vanessa Nichols (3/24/25) - Not Resolved
Comments: Vanessa Nichols
vnichols@slocity.org
805-781-7588
Correction: Administration - Vanessa Nichols (3/24/25) - Not Resolved
Comments: #1 Please note the water meter as "New" in Water Key Note #2, Sheet C4.0.
Correction: Administration - Vanessa Nichols (3/24/25) - Not Resolved
Comments: #2 Final fees pending response to comments and other department reviews.
Planning v.1 Walter Oetzell Ph: (805) 781-7593 email: woetzell@slocity.org Ready for Action
General - Planning
Private Sewer Lateral v.1 Not Required
Private Sewer Lateral Inspection requirements (per Muni Code section 13.08.395)
Public Works Permit Review v.1 Melissa Savage email: msavage@slocity.org Needs Resubmit
General - Public Works
Correction: Engineering Standards Compliance - Melissa Savage (3/24/25) - Not Resolved
Comments: 0)Melissa Savage msavage@slocity.org (805) 781-7206
Correction: Engineering Standards Compliance - Melissa Savage (3/24/25) - Not Resolved
Comments: 1)On the coversheet, please reference the City permit/application numbers associated with this project for reference:
ARCH-0457-2024 Architectural Review – Lots 23, 24 & 34 Enclave at Righetti single family dwellings
FMAP-1955-2018 Tract 3063 Phase 3 - On-Site & Improvement Plans & revisions
Correction: Engineering Standards Compliance - Melissa Savage (3/24/25) - Not Resolved
Comments: 2)Verify that the following Public Works Notes are included (or revised) on the cover sheet of the building plans:
a.All work located within the public right-of-way or within the jurisdiction of the Utilities and Public Works Departments shall comply with the
most current edition of the Engineering Standards and Standard Specifications dated August 2020.
b.Contact the Public Works inspection hotline at 781-7554 with at least a 48-hour notice prior to starting work in the right-of-way and for any
required encroachment permit inspection or final inspection.
c.The public improvements shall be substantially complete to the satisfaction of the Public Works Director prior to final inspection approvals
and/or occupancy of any building.
d.Any existing survey monuments shall be protected in place or shall be tied out by a licensed land surveyor prior to disturbance and then
replaced prior to occupancy in accordance with Section 8771 of the California Business and Professions Code.
Correction: Engineering Standards Compliance - Melissa Savage (3/24/25) - Not Resolved
Comments: 3)Provide a Water Pollution Control Plan (WPCP) in the format provided by the Building Division for minor projects less than 1 acre.
Page 1 of 3City of San Luis ObispoMarch 31, 2025
PERMIT CORRECTIONS REPORT (BLDG-0438-2025)
Contact the Building Division at (805) 781-7180 for questions on any additional plan requirements and for a copy of the form. Otherwise, the form
may be found at http://www.slocity.org/home/showdocument?id=7147
Correction: Engineering Standards Compliance - Melissa Savage (3/24/25) - Not Resolved
Comments: 4)Provide bearings and distances for all property lines in accordance with the Tract 3063 Phase 3 map.
Correction: Engineering Standards Compliance - Melissa Savage (3/24/25) - Not Resolved
Comments: 5)Please refer to the Tract 3063 Phase 3 Improvement Plans. Tract plans indicate wrought iron boundary fencing and interior privacy
fencing are to be installed by homebuilder. Clarify locations and types of fencing in this plan set. Clarify and coordinate locations and types of
fencing on the Grading and Arch plans. Verify which fence details are used where.
Correction: Engineering Standards Compliance - Melissa Savage (3/24/25) - Not Resolved
Comments: 6)Show pad elevations on the grading plan for lot 24 per tract 3063 Phase 3 Improvement Plans.
Correction: Engineering Standards Compliance - Melissa Savage (3/24/25) - Not Resolved
Comments: 7)Show and label all existing easements on plans. Include the private sewer easement on the northeastern corner of the property
per Tract Map No. 3063 Phase 3. Show proposed building outside of all easements.
Correction: Engineering Standards Compliance - Melissa Savage (3/24/25) - Not Resolved
Comments: 8)Show on plans the existing stormwater and sanitary sewer mains and laterals serving lots 24 and 22 per 3063 Phase 3
Improvement Plans. Include invert elevations.
Correction: Engineering Standards Compliance - Melissa Savage (3/24/25) - Not Resolved
Comments: 9)If existing utilities are proposed to be moved, show on plans as proposed utility locations and clarify who is proposing to move or
relocate the existing utilities. Provide invert elevations, and horizontal and vertical controls for proposed utilities.
Correction: Engineering Standards Compliance - Melissa Savage (3/24/25) - Not Resolved
Comments: 10)Plans show a proposed retaining wall within the private storm drain and sewer easement at the northeast corner of the
property. Revise the retaining wall to be outside of the easement or provide details showing how existing utilities will remain accessible to the
neighboring property (lot 22).
Correction: Engineering Standards Compliance - Melissa Savage (3/24/25) - Not Resolved
Comments: 11)Plans show a proposed retaining wall within the 14’ public utility and public pedestrian access easement on the southwestern
edge of the property. Show the retaining wall outside of the easement.
Correction: Engineering Standards Compliance - Melissa Savage (3/24/25) - Not Resolved
Comments: 12)Verify that the retaining wall footing/heel (and/or the 12” wide gravel drains) based on detail 2/C6.0 does not cross over the
property line on the easterly side of the property. Show the dimension of the wall to the property line.
Correction: Engineering Standards Compliance - Melissa Savage (3/24/25) - Not Resolved
Comments: 13)Show and label new ADA compliant driveway approach. See city standard #2116 for reference.
Correction: Engineering Standards Compliance - Melissa Savage (3/24/25) - Not Resolved
Comments: 14)Per stormwater control plan for the tract, roof drains are to be disconnected and drain in a non-erosive manner to vegetated
areas. Revise compliance strategy if roof drains are to be hard tied into storm drains as proposed in detail 7 on sheet C6.0 and note 4 on sheet
C4.0. Complete and submit the PCR checklist available at the following link: http://www.slocity.org/home/showdocument?id=5190
Correction: Engineering Standards Compliance - Melissa Savage (3/24/25) - Not Resolved
Comments: 15)Provide a Stormwater Compliance/Special Inspection Block on the title sheet that identifies Performance Requirement (PR) and
Stormwater Control Measures (SCMs) used for compliance consistent with plans. Fill in the blanks with the measure used for compliance such
as, disconnecting roof drains, etc. For PR1 projects use the following block. Insert on the title Sheet T1.1: (Also verify method of compliance
agrees with submitted SWCP which states compliance via “directing roof run off to vegetated areas.”)
STORMWATER COMPLIANCE SUMMARY:
The Project is subject to the following Performance Requirements (PR) of Regional Water Quality Control Board Resolution R3-2013-0032 “Post
Construction Stormwater Management Requirements for Development Projects in the Central Coast Region”:
☒ PR 1 Site Design/Runoff Reduction through use of (fill in the blank). Sheet ______
Stormwater Control Plan by__________________ dated___________________
City Field Verification. Prior to final acceptance, contact the City for field verification of installed Structural Control Measures (SCMs) and/or other
required elements as proposed in the project Stormwater Control Plan.
Correction: Engineering Standards Compliance - Melissa Savage (3/24/25) - Not Resolved
Comments: 16)Add note to plans: Stormwater and drainage system certification is required from the engineer of record prior to final
inspection approvals. The engineer shall certify that the drainage and stormwater system components have been inspected and are in general
conformance with the drainage report, system design, and the approved plans, including all final elevations, component sizing, level spreaders,
drainage piping, inlets, weir elevations, and orifices.
Correction: Engineering Standards Compliance - Melissa Savage (3/24/25) - Not Resolved
Comments: 17)A CAL-OSHA permit is required for excavations or trenching greater than 5 feet in depth. A copy of the annual, provisional, or
temporary permit shall be provided to the Building Division prior to building, utility, and/or grading permit issuance if applicable. CA Health and
Safety Code Section 17922.5
Correction: Engineering Standards Compliance - Melissa Savage (3/24/25) - Not Resolved
Comments: 18)Show the location of the existing street trees on the site plan for reference. Include the tree diameter, species, and show the
tree canopy to scale for reference. Clarify whether the proposed construction, construction staging, scaffolding, etc. will require safety pruning
of the existing tree. Note on the plans to contact the City Arborist at 781-7578 to review and approve any required or proposed pruning of street
trees.
Correction: Engineering Standards Compliance - Melissa Savage (3/24/25) - Not Resolved
Comments: 19)Tree protection measures for existing street trees shall be implemented to the satisfaction of the City Arborist. The City
Arborist shall review and approve the proposed tree protection measures to be incorporated into the building plans. Contact the City Arborist at
Page 2 of 3City of San Luis ObispoMarch 31, 2025
PERMIT CORRECTIONS REPORT (BLDG-0438-2025)
(805) 781-7578 to schedule a site visit. Tentative plans shall be provided to the arborist for review either prior to or at the time of the field
investigation.
Correction: Engineering Standards Compliance - Melissa Savage (3/24/25) - Not Resolved
Comments: 20)Please revise vicinity map on sheet T1.1 to better reflect project location.
Correction: Engineering Standards Compliance - Melissa Savage (3/24/25) - Not Resolved
Comments: 21)Revise sheets C3.0 and C4.0 to show proposed walkway to not overlapping with existing sidewalk.
Correction: Engineering Standards Compliance - Melissa Savage (3/24/25) - Not Resolved
Comments: 22)Show and label existing sidewalk underdrains.
Correction: Engineering Standards Compliance - Melissa Savage (3/24/25) - Not Resolved
Comments: 23)Provide reference(s) in place of “by others” (typical). See sheet C4.0 sanitary sewer key note 4, sheet C5.0 redline, and
sheet C6.0 detail 2 for examples.
Correction: Engineering Standards Compliance - Melissa Savage (3/24/25) - Not Resolved
Comments: 24)Show existing utility locations and elevations on sheet RW1.0. Include sanitary sewer and storm drain mains and laterals, if
applicable.
Correction: Engineering Standards Compliance - Melissa Savage (3/24/25) - Not Resolved
Comments: 25)Show backflow preventer location on plans. Provide reference to standard 6550 on sheet L3.0.
Correction: Engineering Standards Compliance - Melissa Savage (3/24/25) - Not Resolved
Comments: 26)Show distance from footing to property line on detail 16, sheet S-400.
Recycling v.1 Rachelle Paris email: rparis@slocity.org Needs Resubmit
General - Recycling
Correction: Recycling - Rachelle Paris (3/12/25) - Not Resolved
Comments: Please submit your project's Recycle Plan online at https://forms.slocity.org/Forms/recyclingplan
Corrective Action: Rachelle Paris - RecycleRight@slocity.org
Site Grading/PW v.1 Melissa Savage email: msavage@slocity.org Needs Resubmit
General - Site Grading/PW
Correction: Engineering Standards Compliance - Melissa Savage (3/24/25) - Not Resolved
Comments: See Public Works Permit Review comments.
Stormwater (Engineering-CDD) v.1 Melissa Savage email: msavage@slocity.org Needs Resubmit
General - Stormwater/PW
Correction: Engineering Standards Compliance - Melissa Savage (3/24/25) - Not Resolved
Comments: See Public Works Permit Review comments.
Utilities (Consultant) v.1 Geraldine Seng email: gseng@slocity.org Not Required
Wastewater Offset v.1 Geraldine Seng email: gseng@slocity.org Not Required
Wastewater Offset
Water (Building) v.1 Vanessa Nichols Ph: 8057817588 email: vnichols@slocity.org Needs Resubmit
General - Water
Page 3 of 3City of San Luis ObispoMarch 31, 2025