Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
1000166 - Bid Results - Bullock Lane CMP Replacement
Bullock CMP Replacement Bid Results Item # Item Description Unit Qty. Unit Price Item Total Unit Price Item Total Unit Price Item Total Unit Price Item Total Unit Price Item Total Unit Price Item Total 1 Remove Existing CMP Line LF 74 58.00 4,292.00 72.40 5,357.60 400.00 29,600.00 383.88 28,407.12 30.00 2,220.00 36.96 2,735.04 2 Install 54” SD HDPE line per City STD 6020 and connect to existing Catch Basin LF 58 782.00 45,356.00 1,137.51 65,975.58 650.00 37,700.00 910.67 52,818.86 1,400.00 81,200.00 1,170.43 67,884.94 3 Remove tree stumps LS 1 - 2,050.00 - 5,661.45 - 2,100.00 - 3,717.00 - 1,300.00 - 3,692.00 4 Remove existing concrete sack headwalls LS 1 - 3,501.00 - 5,712.05 - 2,500.00 - 7,380.00 - 1,520.00 - 4,558.00 5 10’ Headwall per CalTrans detail D-90 LS 1 - 35,368.00 - 36,852.90 - 29,000.00 - 78,650.00 - 25,000.00 - 46,696.00 6 12’ Headwall per Caltrans detail D-90 LS 1 - 53,027.00 - 92,196.65 - 56,000.00 - 122,719.00 - 47,000.00 - 115,060.00 7 Cable Railing per Caltrans Detail B11-47 LF 78 159.50 12,441.00 62.70 4,890.60 56.00 4,368.00 187.05 14,589.90 55.00 4,290.00 121.26 9,458.28 8 AC Curb per City STD 4030 LF 75 82.00 6,150.00 59.80 4,485.00 28.00 2,100.00 62.53 4,689.75 40.00 3,000.00 22.79 1,709.25 9 24” Rock slope protection TON 7 449.00 3,143.00 248.64 1,740.48 150.00 1,050.00 710.29 4,972.03 180.00 1,260.00 626.72 4,387.04 10 12”, Rock slope protection TON 11 300.00 3,300.00 181.37 1,995.07 120.00 1,320.00 544.36 5,987.96 140.00 1,540.00 626.73 6,894.03 11 6” Rock slope protection TON 6 838.00 5,028.00 283.64 1,701.84 150.00 900.00 787.83 4,726.98 140.00 840.00 626.67 3,760.02 12 Class two aggregate TON 42 152.00 6,384.00 3,723.36 156,381.12 50.00 2,100.00 1,089.02 45,738.84 114.00 4,788.00 56.98 2,393.16 13 Earthwork and grading LS 1 - 12,392.00 - 4,545.95 - 40,000.00 - 17,655.00 - 45,000.00 - 82,563.00 14 Clearing and Grubbing LS 1 - 4,594.00 - 4,644.85 - 29,800.00 - 3,861.00 - 2,200.00 - 2,849.00 15 Permanent erosion control measures LS 1 - 5,386.00 - 9,216.10 - 2,000.00 - 3,554.00 - 1,700.00 - 2,849.00 16 Traffic Control LS 1 - 4,742.00 - 36,305.50 - 20,000.00 - 2,541.00 - 8,400.00 - 22,790.00 17 Tree Protection LS 1 - 929.00 - 362.25 - 700.00 - 1,061.00 - 1,320.00 - 2,849.00 18 APCD Permit Compliance LS 1 - 8,641.00 - 21,000.00 - 500.00 - 2,571.00 - 850.00 - 359.00 19 Health and Saftey Plan LS 1 - 2,986.00 - 402.50 - 300.00 - 1,899.00 - 230.00 - 1,709.00 20 Hauling and Disposal of Contaminated Material LS 1 - 25,454.00 - 34,632.25 - 9,000.00 - 26,082.00 - 11,600.00 - 10,255.00 21 Comply with OSHA LS 1 - 14,991.00 - 4,542.50 - 350.00 - 12,420.00 - 230.00 - 5,697.00 22 Army Corp 404 Permit Compliance LS 1 - 3,254.00 - 11,025.00 - 350.00 - 1,486.00 - 125.00 - 570.00 23 CDFW 1600 Permit Compliance LS 1 - 4,446.00 - 4,200.00 - 3,500.00 - 15,270.00 - 115.00 - 570.00 24 RWQCB 401 Permit compliance LS 1 - 1,254.00 - 4,200.00 - 300.00 - 400.00 - 115.00 - 570.00 25 UPRR Permit Compliance LS 1 - 33,442.00 - 10,350.00 1,500.00 10,000.00 - 7,284.00 - 3,500.00 - 570.00 26 Railroad Flagging & Monitoring DAYS 20 969.00 19,380.00 920.00 18,400.00 1,200.00 24,000.00 1,395.00 27,900.00 1,000.00 20,000.00 1,652.25 33,045.00 TOTAL $321,931 $541,420 $309,538 $498,381 $269,343 $436,473 Vernon Edwards ConstructionD-KAL Engineering JJ Fisher Construction Inc. R.Burke Corporation Seamair Construction Souza Engineering