90480 Bid Results - Marsh Street Bridge Replacement
CITY OF SAN LUIS OBISPO: BID SUMMARY SHEETProject: Marsh Street Bridge Replacement Spec.No.:90480Bid Opening:20-Feb-20Contact: Mike McGuireEstimated followup dates:Award: Request for bonds/ins:Engineer's Estimate Souza ConstructionBID ITEM & DESCRIPTION UNIT TOTAL UNIT TOTALNo. ITEM UNIT QUAN PRICE PRICE PRICE PRICE1Lead Compliance Plan LS1 2500.00 $2,500.00 18150.00 $18,150.002Progress Schedule (CPM) LS1 5000.00 $5,000.00 3300.00 $3,300.003Construction Water LS1 5000.00 $5,000.00 5500.00 $5,500.004Construction Area Signs LS1 10000.00 $10,000.00 8250.00 $8,250.005Traffic Control System LS1 100000.00 $100,000.00 18000.00 $18,000.006Temp. Pavement Marking (Paint) SQFT376 20.00 $7,520.00 7.15 $2,688.407Temp. Traffic Stripe (Paint) LF979 0.70 $685.30 8.80 $8,615.208Channelizer (Surface Mounted) EA16 40.00 $640.00 55.00 $880.0096" Temporary Pipe Bollard EA4 2000.00 $8,000.00 1900.00 $7,600.0010Portable Changeable Message Sign EA3 20000.00 $60,000.00 8000.00 $24,000.0011Temporary Railing (Type K) LF40 50.00 $2,000.00 86.00 $3,440.0012Job Site Management LS1 20000.00 $20,000.00 80000.00 $80,000.0013Prepare SWPPP & Execution LS1 40000.00 $40,000.00 15000.00 $15,000.0014Temp. Creek Diversion System EA1 20000.00 $20,000.00 107000.00 $107,000.0015Water Quality Sampling & Analysis Day EA20 450.00 $9,000.00 2310.00 $46,200.0016Water Quality Monitoring Report EA5 500.00 $2,500.00 440.00 $2,200.0017Water Quality Annual Report EA1 1300.00 $1,300.00 1100.00 $1,100.0018Temp. High-Visibility Fence LF452 5.00 $2,260.00 10.00 $4,520.0019Resident Engineers Office LS1 40000.00 $40,000.00 32450.00 $32,450.0020Clearing & Grubbing LS1 60000.00 $60,000.00 17000.00 $17,000.0021Roadway Excavation CY355 40.00 $14,200.00 110.00 $39,050.0022Structure Excavation (Type D) CY1452 350.00 $508,200.00 108.00 $156,816.0023Structure Excavation (Soldier Pile Wall) CY88 275.00 $24,200.00 83.00 $7,304.0024Structure Backfill (Bridge) CY784 200.00 $156,800.00 253.00 $198,352.0025Structure Backfill (Slurry Cement) CY18 200.00 $3,600.00 419.00 $7,542.0026Structure Backfill (Soldier Pile Wall) CY19 300.00 $5,700.00 117.00 $2,223.0027Concrete Backfill (Soldier Pile Wall) CY20 350.00 $7,000.00 540.00 $10,800.0028Lean Concrete Backfill CY8 300.00 $2,400.00 1107.00 $8,856.0029Remove & Replace With 24" Box Marina Madrone EA1 1000.00 $1,000.00 2310.00 $2,310.0030Hydroseed SQFT10600 1.00 $10,600.00 0.37 $3,922.0031Class 2 Aggregate Base CY89 95.00 $8,455.00 296.00 $26,344.00 Engineer's Estimate Souza ConstructionBID ITEM & DESCRIPTION UNIT TOTAL UNIT TOTALNo. ITEM UNIT QUAN PRICE PRICE PRICE PRICE32Hot Mix Asphalt (Type A) TON462 100.00 $46,200.00 168.00 $77,616.0033Hot Mix Asphalt (Leveling Course) TON112 100.00 $11,200.00 188.00 $21,056.0034Remove Asphalt & Concrete Paving CY285 12.00 $3,420.00 45.00 $12,825.0035Steel Soldier Pile (W14 X 132) LF198 110.00 $21,780.00 153.00 $30,294.003624" Drilled Hole LF193 220.00 $42,460.00 336.22 $64,890.4637Micropile EA83 10000.00 $830,000.00 8110.00 $673,130.0038Structural Concrete, Bridge Footing CY142 500.00 $71,000.00 562.00 $79,804.0039Structural Concrete, Bridge CY300 1000.00 $300,000.00 995.00 $298,500.0040Structural Concrete, Bridge (Polymer Fiber) CY308 1100.00 $338,800.00 1000.00 $308,000.0041Structural Concrete, Barrier Slab CY20 1100.00 $22,000.00 2014.00 $40,280.0042Precast Concrete Lagging EA52 750.00 $39,000.00 890.00 $46,280.0043Bar Reinforcing Steel (Bridge) LB143820 1.20 $172,584.00 1.65 $237,303.0044Bar Reinforcing Steel (Galvanized) LB1598 2.00 $3,196.00 4.00 $6,392.0045Pedestrian Barricade EA8 1000.00 $8,000.00 800.00 $6,400.0046Clean & Paint Steel Soldier Pile LS1 10000.00 $10,000.00 12299.10 $12,299.1047Bridge Removal LS1 60000.00 $60,000.00 195000.00 $195,000.0048Vibration Monitoring LS1 20000.00 $20,000.00 33000.00 $33,000.004918" Plastic Pipe LF13 150.00 $1,950.00 125.00 $1,625.0050Catch Basin (Type 3355) EA1 3000.00 $3,000.00 9000.00 $9,000.0051Remove Pipe LF155 50.00 $7,750.00 56.00 $8,680.0052Remove Catch Basin EA1 500.00 $500.00 1300.00 $1,300.0053Modify Catch Basin EA2 2500.00 $5,000.00 6000.00 $12,000.0054Gabion CY2 500.00 $1,000.00 1400.00 $2,800.0055Rock Slope Protection (300 lb., Class IV, Method B) (CY) CY303 150.00 $45,450.00 149.00 $45,147.0056Rock Slope Protection Fabric (Class 8) SQYD548 7.00 $3,836.00 11.00 $6,028.0057Minor Concrete (Curb) (LF) LF20 100.00 $2,000.00 126.00 $2,520.0058Minor Concrete (Curb & Gutter) LF773 100.00 $77,300.00 61.00 $47,153.0059Minor Concrete (Driveway Ramp) SF719 60.00 $43,140.00 30.00 $21,570.0060Minor Concrete (Mission Style Sidewalk) LF353 200.00 $70,600.00 303.00 $106,959.0061Remove Concrete Curb LF20 50.00 $1,000.00 10.00 $200.0062Remove Concrete (Curb & Gutter) LF421 20.00 $8,420.00 16.00 $6,736.0063Remove Concrete (Curb, Gutter & Sidewalk) LF353 10.00 $3,530.00 46.00 $16,238.0064Parking Bumper (Precast Concrete) EA3 250.00 $750.00 101.00 $303.0065Abandon Sewer LS1 2500.00 $2,500.00 5500.00 $5,500.0066Relocate Parking Meter EA6 1000.00 $6,000.00 448.00 $2,688.0067Reset Bike Rack EA1 1000.00 $1,000.00 1000.00 $1,000.00 Engineer's Estimate Souza ConstructionBID ITEM & DESCRIPTION UNIT TOTAL UNIT TOTALNo. ITEM UNIT QUAN PRICE PRICE PRICE PRICE68Install Sewer Syphon (6" Plastic Pipe) LF255 800.00 $204,000.00 634.00 $161,670.006910" Plastic Pipe (Sewer) LF19 320.00 $6,080.00 880.00 $16,720.00708" Ductile Iron Pipe LF97 250.00 $24,250.00 352.00 $34,144.0071Replace Utility Cover EA1 600.00 $600.00 2619.00 $2,619.0072Remove Utility Cover EA1 400.00 $400.00 800.00 $800.007315" Plastic Pipe (Sewer) LF17 350.00 $5,950.00 229.00 $3,893.00746" Plastic Pipe LF80 300.00 $24,000.00 107.00 $8,560.0075Water Service Box & Cover EA3 1000.00 $3,000.00 433.00 $1,299.0076Install Utility Cover EA2 1000.00 $2,000.00 1500.00 $3,000.0077Pipe Sealant EA2 800.00 $1,600.00 1500.00 $3,000.0078Manhole Cover & Access Box EA1 1000.00 $1,000.00 1700.00 $1,700.0079Tree Well EA4 1200.00 $4,800.00 3500.00 $14,000.0080Restraint Harness EA24 2000.00 $48,000.00 1000.00 $24,000.00838" Gate Valve EA2 2500.00 $5,000.00 2500.00 $5,000.00818" Temporary Blowoff Valve EA2 3000.00 $6,000.00 6200.00 $12,400.0082Manhole Frame & Cover EA4 2000.00 $8,000.00 1600.00 $6,400.0083Manhole EA4 15000.00 $60,000.00 24906.72 $99,626.8884Install Wye & Connect to Sewer Lateral EA2 4000.00 $8,000.00 1800.00 $3,600.0085Sewer Bypass LS1 2000.00 $2,000.00 25000.00 $25,000.0086Place Parking Meter EA2 1500.00 $3,000.00 441.00 $882.0087Manhole Cover & Access Box EA1 1000.00 $1,000.00 2500.00 $2,500.0088Adjust Utility Cover To Grade EA9 500.00 $4,500.00 440.00 $3,960.0089Non Sacrificial Anti-Graffiti Coating LS1 5000.00 $5,000.00 4600.00 $4,600.0090Temporary Fence (Type CL-6) LF338 30.00 $10,140.00 37.95 $12,827.10914' Chain Link Gate (Type CL-6) EA2 1500.00 $3,000.00 660.00 $1,320.009210' Chain Link Gate (Type CL-6) EA4 2000.00 $8,000.00 962.50 $3,850.0093Remove Fence LF20 15.00 $300.00 33.00 $660.0094Reconstruct Wood Fence LF20 30.00 $600.00 55.00 $1,100.0095Remove Pavement Marker EA18 2.00 $36.00 38.50 $693.0096Pavement Marker (Retro Reflective) EA39 10.00 $390.00 44.00 $1,716.0097Remove Roadside Sign EA10 100.00 $1,000.00 159.50 $1,595.0098Remove Foundation, Reset Pole & Mast Arm Per ES-7K EA1 8000.00 $8,000.00 4000.00 $4,000.0099Furnish Single Sheet Aluminum Sign (0.063" Unframed) SF35 25.00 $875.00 22.00 $770.00100Roadside Sign - One Post EA10 180.00 $1,800.00 330.00 $3,300.00101Install Roadside Sign (Strap & Saddle Bracket Method) EA1 200.00 $200.00 385.00 $385.00102Midwest Guardrail System LF37.5 150.00 $5,625.00 77.00 $2,887.50 Engineer's Estimate Souza ConstructionBID ITEM & DESCRIPTION UNIT TOTAL UNIT TOTALNo. ITEM UNIT QUAN PRICE PRICE PRICE PRICE103Chain Link Railing Type 7 (MOD) LF20 100.00 $2,000.00 132.00 $2,640.00104Concrete, Sidewalk (Bridge, Mission Style) LF111 200.00 $22,200.00 282.00 $31,302.00105Concrete Railing Type C411 LF98 350.00 $34,300.00 910.00 $89,180.00106Concrete Barrier (Type 742) LF40 350.00 $14,000.00 480.00 $19,200.00107Bridge Plaque LS1 1500.00 $1,500.00 4100.00 $4,100.001084" Thermoplastic Traffic Stripe LF1084 1.25 $1,355.00 5.00 $5,420.001096" Thermoplastic Traffic Stripe LF750 1.50 $1,125.00 6.00 $4,500.001108" Thermoplastic Traffic Stripe LF255 2.00 $510.00 7.00 $1,785.00111Thermoplastic Pavement Marking SQFT980 3.60 $3,528.00 12.00 $11,760.00112Remove Thermoplastic Traffic Stripe LF1071 1.50 $1,606.50 8.00 $8,568.00113Remove Thermoplastic Pavement Marking SQFT271 6.00 $1,626.00 10.00 $2,710.00114Signal & Lighting (Temporary) LS1 50000.00 $50,000.00 18000.00 $18,000.00115Bridge & Street Lighting LS1 120000.00 $120,000.00 102000.00 $102,000.00116Mobilization LS1 335177.20 $335,177.20 250000.00 $250,000.00$4,480,000.00 $4,335,571.64 Listed Subs Kellie Avila Const. ServicesPacific Steel GroupCondon Johnson & AssociatesLee Wilson Electric Co.LT Directional BoringSuper Seal & StripeABSL ConstructionCommentsTOTAL