Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2000616 Bid Results
2025 PAVING PROJECT, SPECIFICATION NO. 2000616 Bid Opening: 7/10/2025 UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL No. ITEM UNIT QUAN PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE 1 TRAFFIC CONTROL PLAN AND IMPLEMENTATION LS 1 $500,000 $500,000.00 $478,000.00 $478,000.00 $867,499.75 $867,499.75 $1,680,750.00 $1,680,750.00 2 TEMPORARY STRIPING AND PAVEMENT MARKINGS LS 1 $100,000 $100,000.00 $192,000.00 $192,000.00 $230,000.00 $230,000.00 $265,000.00 $265,000.00 3 COMPLY WITH NIGHT WORK PERMIT LS 1 $1,609 $1,608.91 $15,000.00 $15,000.00 $50,000.00 $50,000.00 $28,750.00 $28,750.00 4 TREE TRIMMING LS 1 $5,356 $5,356.24 $9,000.00 $9,000.00 $45,000.00 $45,000.00 $48,750.00 $48,750.00 5 POTHOLING ON TANK FARM LS 1 $50,000 $50,000.00 $30,000.00 $30,000.00 $35,000.00 $35,000.00 $46,500.00 $46,500.00 6 DUST CONTROL PLAN (FDR)LS 1 $10,000 $10,000.00 $12,000.00 $12,000.00 $25,000.00 $25,000.00 $35,500.00 $35,500.00 7 CONSTRUCTION PHASING PLAN (FDR) LS 1 $10,000 $10,000.00 $32,000.00 $32,000.00 $50,000.00 $50,000.00 $127,000.00 $127,000.00 8 CURB RAMP TANK FARM AND BROAD NE LS 1 $40,000 $40,000.00 $33,000.00 $33,000.00 $18,992.40 $18,992.40 $29,310.00 $29,310.00 9 CURB RAMP TANK FARM AND TETRA TECH SE LS 1 $40,000 $40,000.00 $33,000.00 $33,000.00 $17,700.00 $17,700.00 $29,465.00 $29,465.00 10 CURB RAMP TANK FARM AND MARIGOLD MAIN NW LS 1 $40,000 $40,000.00 $37,000.00 $37,000.00 $20,300.00 $20,300.00 $31,160.00 $31,160.00 11 CURB RAMP TANK FARM AND MARIGOLD MAIN NE LS 1 $40,000 $40,000.00 $36,000.00 $36,000.00 $18,400.00 $18,400.00 $31,860.00 $31,860.00 12 CURB RAMP TANK FARM AND MARIGOLD ALLEY NW LS 1 $40,000 $40,000.00 $37,000.00 $37,000.00 $18,500.00 $18,500.00 $30,694.00 $30,694.00 13 CURB RAMP TANK FARM AND MARIGOLD ALLEY NE LS 1 $40,000 $40,000.00 $36,000.00 $36,000.00 $18,330.00 $18,330.00 $31,125.00 $31,125.00 14 CURB RAMP TANK FARM AND HOLLYHOCK NW LS 1 $40,000 $40,000.00 $27,000.00 $27,000.00 $16,850.00 $16,850.00 $27,745.00 $27,745.00 15 CURB RAMP TANK FARM AND HOLLYHOCK NE LS 1 $40,000 $40,000.00 $25,000.00 $25,000.00 $16,500.00 $16,500.00 $28,105.00 $28,105.00 16 CURB RAMP TANK FARM AND POINSETTIA NW LS 1 $40,000 $40,000.00 $35,000.00 $35,000.00 $20,400.00 $20,400.00 $31,650.00 $31,650.00 17 CURB RAMP TANK FARM AND POINSETTIA NE LS 1 $40,000 $40,000.00 $34,000.00 $34,000.00 $23,200.00 $23,200.00 $29,800.00 $29,800.00 18 CURB RAMP TANK FARM AND POINSETTIA SE LS 1 $40,000 $40,000.00 $28,000.00 $28,000.00 $19,400.00 $19,400.00 $31,240.00 $31,240.00 19 CURB RAMP TANK FARM AND SUNROSE NW LS 1 $40,000 $40,000.00 $45,000.00 $45,000.00 $22,100.00 $22,100.00 $31,125.00 $31,125.00 20 CURB RAMP TANK FARM AND SUNROSE NE LS 1 $40,000 $40,000.00 $35,000.00 $35,000.00 $17,800.00 $17,800.00 $35,960.00 $35,960.00 21 CURB RAMP TANK FARM AND MORNING GLORY SW LS 1 $40,000 $40,000.00 $39,000.00 $39,000.00 $19,700.00 $19,700.00 $31,240.00 $31,240.00 22 CURB RAMP TANK FARM AND MORNING GLORY SE LS 1 $40,000 $40,000.00 $40,000.00 $40,000.00 $22,000.00 $22,000.00 $33,775.00 $33,775.00 23 CURB RAMP TANK FARM AND BROOKPINE SW LS 1 $40,000 $40,000.00 $29,000.00 $29,000.00 $16,800.00 $16,800.00 $28,490.00 $28,490.00 24 CURB RAMP TANK FARM AND BROOKPINE SE LS 1 $40,000 $40,000.00 $26,000.00 $26,000.00 $16,800.00 $16,800.00 $28,760.00 $28,760.00 25 CURB RAMP TANK FARM AND WAVERTREE SW LS 1 $40,000 $40,000.00 $28,000.00 $28,000.00 $16,500.00 $16,500.00 $29,140.00 $29,140.00 26 CURB RAMP TANK FARM AND WAVERTREE SE LS 1 $40,000 $40,000.00 $27,000.00 $27,000.00 $18,400.00 $18,400.00 $27,850.00 $27,850.00 27 CURB RAMP SACRAMENTO AND RICARDO NE LS 1 $40,000 $40,000.00 $42,000.00 $42,000.00 $18,900.00 $18,900.00 $32,040.00 $32,040.00 28 CURB RAMP SACRAMENTO AND CAPITOLIO NORTH LS 1 $40,000 $40,000.00 $40,000.00 $40,000.00 $18,400.00 $18,400.00 $30,715.00 $30,715.00 29 CURB RAMP SACRAMENTO AND CAPITOLIO SOUTH LS 1 $40,000 $40,000.00 $25,000.00 $25,000.00 $16,000.00 $16,000.00 $27,895.00 $27,895.00 30 CURB RAMP SACRAMENTO AND INDUSTRIAL NW LS 1 $40,000 $40,000.00 $38,000.00 $38,000.00 $18,400.00 $18,400.00 $31,025.00 $31,025.00 31 CURB RAMP SACRAMENTO AND INDUSTRIAL NE LS 1 $40,000 $40,000.00 $44,000.00 $44,000.00 $18,500.00 $18,500.00 $31,135.00 $31,135.00 32 CURB RAMP SACRAMENTO AND VIA ESTEBAN NORTH LS 1 $40,000 $40,000.00 $39,000.00 $39,000.00 $18,000.00 $18,000.00 $28,090.00 $28,090.00 33 CURB RAMP SACRAMENTO AND VIA ESTEBAN EAST LS 1 $40,000 $40,000.00 $24,000.00 $24,000.00 $16,000.00 $16,000.00 $31,330.00 $31,330.00 34 CURB RAMP SACRAMENTO AND VIA ESTEBAN WEST LS 1 $40,000 $40,000.00 $33,000.00 $33,000.00 $15,000.00 $15,000.00 $28,365.00 $28,365.00 35 DETECTABLE WARNING SURFACE SACRAMENTO AND VIA ESTABAN SOUTH CORNER SQFT 12 $10 $120.00 $82.00 $984.00 $61.50 $738.00 $90.00 $1,080.00 36 CROSS GUTTER PER ENG. STD. 4310 SQFT 253 $60 $15,180.00 $70.00 $17,710.00 $110.00 $27,830.00 $120.00 $30,360.00 37 WATER SERVICE REPAIR ALLOWANCE EA 10 $5,000 $50,000.00 $1,670.00 $16,700.00 $6,000.00 $60,000.00 $5,750.00 $57,500.00 38 ADDITIONAL SIDEWALK/CURB RAMP ALLOWANCE SQFT 500 $60 $30,000.00 $33.00 $16,500.00 $50.00 $25,000.00 $55.00 $27,500.00 39 ADDITIONAL CURB AND GUTTER ALLOWANCE LF 300 $60 $18,000.00 $73.00 $21,900.00 $120.00 $36,000.00 $90.00 $27,000.00 40 UNSUITABLE MATERIAL REMOVAL ALLOWANCE CY 100 $100 $10,000.00 $51.00 $5,100.00 $500.00 $50,000.00 $185.00 $18,500.00 41 COLD PLANE (6 INCHES)SQYD 1,261 $9 $11,349.00 $19.50 $24,589.50 $40.00 $50,440.00 $39.13 $49,342.93 42 COLD PLANE (13.5 INCHES)SQYD 10,288 $20 $208,332.00 $23.00 $236,624.00 $30.00 $308,640.00 $22.54 $231,891.52 43 16" PRE‐PULVERIZATION AND DISPOSAL OF 8.5" MATERIAL (FDR ‐ SEQUENCE 1) SQYD 26,789 $22 $578,642.40 $16.00 $428,624.00 $11.00 $294,679.00 $18.16 $486,488.24 44 PULVERIZATION AND CEMENT/ LIME TREATEMENT OF 16" MATERIAL (FDR ‐ SEQUENCE 2) SQYD 26,789 $22 $578,642.40 $7.00 $187,523.00 $12.00 $321,468.00 $14.77 $395,673.53 45 LIME TREATMENT (FDR)TON 425 $280 $119,000.00 $708.00 $300,900.00 $330.00 $140,250.00 $254.79 $108,285.75 46 CEMENT TREATMENT (FDR)TON 425 $200 $85,000.00 $432.00 $183,600.00 $245.00 $104,125.00 $517.44 $219,912.00 47 3/4 MIX HOT MIX ASPHALT COURSE TON 15,168 $180 $2,730,240.00 $156.00 $2,366,208.00 $166.00 $2,517,888.00 $162.76 $2,468,743.68 48 1/2 MIX HOT MIX ASPHALT COURSE TON 5,177 $180 $931,860.00 $170.00 $880,090.00 $150.00 $776,550.00 $178.77 $925,492.29 49 BLUE HYDRANT MARKERS PER CITY STD 7920 EA 28 $10 $280.00 $12.00 $336.00 $10.00 $280.00 $10.00 $280.00 50 ADJUST COMMUNICATIONS MANHOLE TO FINISHED GRADE EA 1 $2,500 $2,500.00 $1,614.00 $1,614.00 $2,100.00 $2,100.00 $2,025.00 $2,025.00 51 ADJUST COMMUNICATIONS VAULT TO FINISHED GRADE EA 3 $3,500 $10,500.00 $1,827.00 $5,481.00 $5,500.00 $16,500.00 $6,400.00 $19,200.00 Papich ConstructionCalPortland Construction BASE BID Engineer's Estimate Souza Construction 52 ADJUST GAS VALVE TO FINISHED GRADE EA 2 $1,000 $2,000.00 $1,300.00 $2,600.00 $1,850.00 $3,700.00 $1,675.00 $3,350.00 53 RESET CENTERLINE MONUMENT PER ENG. STD. 9020 EA 14 $1,000 $14,000.00 $4,600.00 $64,400.00 $1,850.00 $25,900.00 $1,675.00 $23,450.00 54 ADJUST STORM DRAIN MANHOLE TO FINISHED GRADE EA 4 $2,500 $10,000.00 $1,700.00 $6,800.00 $1,950.00 $7,800.00 $2,025.00 $8,100.00 55 ADJUST MANHOLE OR CLEANOUT TO FINISHED GRADE EA 9 $2,500 $22,500.00 $1,650.00 $14,850.00 $1,850.00 $16,650.00 $2,025.00 $18,225.00 56 REMOVE AND REPLACE SANITARY SEWER MANHOLE FRAME AND COVER EA 13 $5,000 $65,000.00 $2,300.00 $29,900.00 $1,950.00 $25,350.00 $2,025.00 $26,325.00 57 ADJUST WATER VALVE TO FINISHED GRADE EA 78 $1,500 $117,000.00 $1,300.00 $101,400.00 $1,850.00 $144,300.00 $1,675.00 $130,650.00 58 SOLAR FLASHING YELLOW BEACON EA 4 $2,000 $8,000.00 $5,715.00 $22,860.00 $4,960.00 $19,840.00 $5,500.00 $22,000.00 59 RAPID RECTANGULAR FLASHING BEACON SYSTEMS ‐ POINSETTIA LS 1 $35,000 $35,000.00 $33,467.00 $33,467.00 $29,045.00 $29,045.00 $35,000.00 $35,000.00 60 RAPID RECTANGULAR FLASHING BEACON SYSTEMS ‐ RIGHETTI LS 1 $60,000 $60,000.00 $26,000.00 $26,000.00 $22,823.00 $22,823.00 $45,000.00 $45,000.00 61 RAPID RECTANGULAR FLASHING BEACON SYSTEMS ‐ SUNROSE LS 1 $35,000 $35,000.00 $33,489.00 $33,489.00 $29,064.00 $29,064.00 $29,000.00 $29,000.00 62 6" WHITE LF 229 $3 $735.09 $3.00 $687.00 $2.00 $458.00 $2.00 $458.00 63 6" YELLOW LF 306 $3 $982.26 $3.00 $918.00 $2.00 $612.00 $2.00 $612.00 64 8" YELLOW LF 1,823 $4 $7,802.44 $3.50 $6,380.50 $3.00 $5,469.00 $3.00 $5,469.00 65 12" WHITE LF 2,570 $6 $16,499.40 $4.60 $11,822.00 $4.00 $10,280.00 $4.00 $10,280.00 66 12" YELLOW PER DETAIL A, SHEET P07 LF 82 $7 $567.44 $4.60 $377.20 $4.00 $328.00 $4.00 $328.00 67 24" WHITE LF 1,230 $13 $15,793.20 $9.25 $11,377.50 $8.00 $9,840.00 $8.00 $9,840.00 68 DETAIL 9 LF 1,362 $1 $1,275.17 $1.15 $1,566.30 $1.00 $1,362.00 $1.00 $1,362.00 69 DETAIL 22 LF 4,246 $6 $27,259.32 $2.30 $9,765.80 $2.00 $8,492.00 $2.00 $8,492.00 70 DETAIL 25 LF 1,299 $3 $4,169.79 $1.15 $1,493.85 $1.00 $1,299.00 $1.00 $1,299.00 71 DETAIL 27B LF 1,519 $3 $4,875.99 $1.15 $1,746.85 $1.00 $1,519.00 $1.00 $1,519.00 72 DETAIL 29 LF 3,556 $13 $45,659.04 $4.60 $16,357.60 $4.00 $14,224.00 $4.00 $14,224.00 73 DETAIL 32 LF 2,458 $7 $17,752.91 $4.00 $9,832.00 $3.50 $8,603.00 $3.50 $8,603.00 74 DETAIL 38 LF 2,475 $3 $7,944.75 $2.30 $5,692.50 $2.00 $4,950.00 $2.00 $4,950.00 75 DETAIL 39 LF 6,204 $3 $19,914.84 $1.15 $7,134.60 $1.00 $6,204.00 $1.00 $6,204.00 76 DETAIL 39A LF 672 $1 $719.04 $1.15 $772.80 $1.00 $672.00 $1.00 $672.00 77 DETAIL 40 LF 388 $0 $177.93 $4.60 $1,784.80 $4.00 $1,552.00 $4.00 $1,552.00 78 6" WHITE PAINT LF 509 $2 $816.95 $2.30 $1,170.70 $2.00 $1,018.00 $2.00 $1,018.00 79 12" WHITE PAINT LF 875 $3 $2,808.75 $4.60 $4,025.00 $4.00 $3,500.00 $4.00 $3,500.00 80 12" WHITE PAINT PER DETAIL A, SHEET S07 LF 118 $4 $437.78 $4.60 $542.80 $4.00 $472.00 $4.00 $472.00 81 DETAIL 9 PAINT LF 16,525 $0 $7,735.77 $0.86 $14,211.50 $0.75 $12,393.75 $0.75 $12,393.75 82 DETAIL 22 PAINT LF 2,662 $3 $8,545.02 $1.15 $3,061.30 $1.00 $2,662.00 $1.00 $2,662.00 83 DETAIL 24 PAINT LF 1,672 $2 $2,683.56 $0.70 $1,170.40 $0.60 $1,003.20 $0.60 $1,003.20 84 DETAIL 29 PAINT LF 372 $6 $2,388.24 $2.30 $855.60 $2.00 $744.00 $2.00 $744.00 85 DETAIL 32 PAINT LF 4,472 $4 $16,149.51 $2.30 $10,285.60 $2.00 $8,944.00 $2.00 $8,944.00 86 DETAIL 37B PAINT LF 513 $1 $329.35 $1.75 $897.75 $1.50 $769.50 $1.50 $769.50 87 DETAIL 38 PAINT LF 2,246 $2 $3,604.83 $1.75 $3,930.50 $1.50 $3,369.00 $1.50 $3,369.00 88 DETAIL 39 PAINT LF 13,373 $2 $21,463.67 $0.70 $9,361.10 $0.60 $8,023.80 $0.60 $8,023.80 89 DETAIL 39A PAINT LF 1,326 $1 $709.41 $0.70 $928.20 $0.60 $795.60 $0.60 $795.60 90 DETAIL 40 PAINT LF 113 $0 $25.91 $3.50 $395.50 $3.00 $339.00 $3.00 $339.00 91 DETAIL 41 PAINT LF 120 $0 $27.51 $3.50 $420.00 $3.00 $360.00 $3.00 $360.00 92 BIKE BUFFER LF 8,355 $3 $21,472.35 $4.60 $38,433.00 $4.00 $33,420.00 $4.00 $33,420.00 93 DAYLIGHTING BUFFER PER DETAIL F, SHEET D1 LF 245 $4 $980.00 $4.60 $1,127.00 $4.00 $980.00 $4.00 $980.00 94 GREEN BIKE LANE CASE 1 LF 1,253 $35 $43,905.12 $106.00 $132,818.00 $92.00 $115,276.00 $92.00 $115,276.00 95 GREEN BIKE LANE CASE 2 LF 1,784 $34 $60,138.64 $57.60 $102,758.40 $50.00 $89,200.00 $50.00 $89,200.00 96 GREEN BIKE LANE CASE 3 LF 1,303 $34 $43,924.13 $57.60 $75,052.80 $50.00 $65,150.00 $50.00 $65,150.00 97 TRAFFIC LOGIX RUBBER CURB LF 74 $40 $2,960.00 $69.00 $5,106.00 $60.00 $4,440.00 $60.00 $4,440.00 98 RED CURB PAINT LF 703 $2 $1,406.00 $5.00 $3,515.00 $4.00 $2,812.00 $4.00 $2,812.00 99 YELLOW CURB PAINT LF 43 $2 $86.00 $5.00 $215.00 $4.00 $172.00 $4.00 $172.00 100 BOTTS DOTS EA 260 $8 $2,147.60 $6.00 $1,560.00 $5.00 $1,300.00 $5.00 $1,300.00 101 YELLOW FLEX POSTS EA 60 $144 $8,640.00 $460.00 $27,600.00 $400.00 $24,000.00 $400.00 $24,000.00 102 REMOVE EXISTING AND INSTALL 12' PUNCH POST EA 48 $365 $17,520.00 $460.00 $22,080.00 $400.00 $19,200.00 $400.00 $19,200.00 103 REMOVE EXISTING AND INSTALL 14' PUNCH POST EA 3 $350 $1,050.00 $518.00 $1,554.00 $450.00 $1,350.00 $450.00 $1,350.00 104 NEW STREET LIGHT POLE EA 2 $10,000 $20,000.00 $24,323.00 $48,646.00 $21,109.00 $42,218.00 $25,000.00 $50,000.00 105 R1‐1 SIGN EA 10 $283 $2,830.00 $288.00 $2,880.00 $250.00 $2,500.00 $250.00 $2,500.00 106 R1‐5 18x18 SIGN EA 4 $283 $1,132.00 $288.00 $1,152.00 $250.00 $1,000.00 $250.00 $1,000.00 107 R2‐1 (25) SIGN EA 3 $283 $849.00 $288.00 $864.00 $250.00 $750.00 $250.00 $750.00 108 R2‐1 (30) SIGN EA 1 $283 $283.00 $288.00 $288.00 $250.00 $250.00 $250.00 $250.00 109 R2‐1 (35) SIGN EA 4 $283 $1,132.00 $288.00 $1,152.00 $250.00 $1,000.00 $250.00 $1,000.00 110 R2‐1 (40) SIGN EA 1 $283 $283.00 $288.00 $288.00 $250.00 $250.00 $250.00 $250.00 111 R7‐9 SIGN EA 22 $283 $6,226.00 $288.00 $6,336.00 $250.00 $5,500.00 $250.00 $5,500.00 112 R9‐3 SIGN EA 6 $283 $1,698.00 $288.00 $1,728.00 $250.00 $1,500.00 $250.00 $1,500.00 113 R9‐3B SIGN EA 6 $283 $1,698.00 $288.00 $1,728.00 $250.00 $1,500.00 $250.00 $1,500.00 114 MODIFIED R10‐15 SIGN EA 2 $283 $566.00 $288.00 $576.00 $250.00 $500.00 $250.00 $500.00 115 R26 SIGN EA 13 $283 $3,679.00 $288.00 $3,744.00 $250.00 $3,250.00 $250.00 $3,250.00 116 R81(CA) SIGN EA 2 $283 $566.00 $288.00 $576.00 $250.00 $500.00 $250.00 $500.00 117 R81B(CA) SIGN EA 1 $283 $283.00 $288.00 $288.00 $250.00 $250.00 $250.00 $250.00 118 W1‐1a(L)(25) SIGN EA 1 $283 $283.00 $288.00 $288.00 $250.00 $250.00 $250.00 $250.00 119 W1‐8(L) SIGN EA 4 $283 $1,132.00 $288.00 $1,152.00 $250.00 $1,000.00 $250.00 $1,000.00 120 W1‐8(R) SIGN EA 4 $283 $1,132.00 $288.00 $1,152.00 $250.00 $1,000.00 $250.00 $1,000.00 121 W2‐6 SIGN EA 1 $283 $283.00 $288.00 $288.00 $250.00 $250.00 $250.00 $250.00 122 W8‐6 SIGN EA 1 $283 $283.00 $288.00 $288.00 $250.00 $250.00 $250.00 $250.00 123 W9‐1 SIGN EA 2 $283 $566.00 $288.00 $576.00 $250.00 $500.00 $250.00 $500.00 124 W11‐2 SIGN EA 6 $283 $1,698.00 $288.00 $1,728.00 $250.00 $1,500.00 $250.00 $1,500.00 125 W16‐7P SIGN EA 4 $283 $1,132.00 $288.00 $1,152.00 $250.00 $1,000.00 $250.00 $1,000.00 126 W16‐9P SIGN EA 3 $283 $849.00 $288.00 $864.00 $250.00 $750.00 $250.00 $750.00 127 RADAR SPEED FEEDBACK SIGN EA 6 $8,000 $48,000.00 $6,643.00 $39,858.00 $5,766.00 $34,596.00 $7,000.00 $42,000.00 128 STREET NAME SIGN EA 7 $283 $1,981.00 $288.00 $2,016.00 $250.00 $1,750.00 $250.00 $1,750.00 129 OM1‐3 OBJECT MARKER EA 3 $283 $849.00 $288.00 $864.00 $250.00 $750.00 $250.00 $750.00 130 WHITE PAINT PAVEMENT MARKINGS/LEGENDS (ARROWS, WORDS, SYMBOLS, ETC.) SQFT 1,608 $3 $5,161.68 $9.20 $14,793.60 $8.00 $12,864.00 $8.00 $12,864.00 131 WHITE PAVEMENT MARKINGS/LEGENDS (ARROWS, WORDS, SYMBOLS, ETC.) SQFT 2,251 $5 $11,255.00 $12.00 $27,012.00 $10.00 $22,510.00 $10.00 $22,510.00 132 COMPLY WITH CALTRANS ENCROACHMENT PERMIT (MADONNA ROAD) LS 1 $1,500 $1,500.00 $3,000.00 $3,000.00 $25,000.00 $25,000.00 $6,650.00 $6,650.00 $8,066,525.32 $7,429,311.55 $7,499,828.00 $9,101,045.79 133 TRAFFIC CONTROL PLAN AND IMPLEMENTATION LS 1 $86,042 $86,042.12 $25,000.00 $25,000.00 $111,500.00 $111,500.00 $150,000.00 $150,000.00 134 TEMPORARY STRIPING AND PAVEMENT MARKINGS LS 1 $20,000 $20,000.00 $5,100.00 $5,100.00 $13,000.00 $13,000.00 $45,000.00 $45,000.00 135 TREE TRIMMING LS 1 $382 $382.41 $1,000.00 $1,000.00 $11,467.00 $11,467.00 $20,000.00 $20,000.00 136 CURB RAMP ORCUTT AND SPANISH OAKS SW LS 1 $40,000 $40,000.00 $37,000.00 $37,000.00 $18,000.00 $18,000.00 $40,000.00 $40,000.00 137 COLD PLANE (8.5 INCHES)SQYD 8,763 $13 $113,919.00 $21.00 $184,023.00 $10.00 $87,630.00 $20.00 $175,260.00 138 3/4 MIX HOT MIX ASPHALT COURSE TON 2,859 $180 $514,620.00 $167.00 $477,453.00 $162.00 $463,158.00 $180.00 $514,620.00 139 1/2 MIX HOT MIX ASPHALT COURSE TON 1,191 $180 $214,380.00 $178.50 $212,593.50 $148.00 $176,268.00 $200.00 $238,200.00 140 REGRADE, RECOMPACT AND INSTALL JUTE NETTING SQFT 5,366 $20 $107,320.00 $5.00 $26,830.00 $8.00 $42,928.00 $8.00 $42,928.00 141 BLUE HYDRANT MARKERS PER CITY STD 7920 EA 1 $10 $10.00 $12.00 $12.00 $10.00 $10.00 $10.00 $10.00 142 RESET CENTERLINE MONUMENT PER ENG. STD. 9020 EA 1 $1,000 $1,000.00 $4,600.00 $4,600.00 $1,800.00 $1,800.00 $1,675.00 $1,675.00 143 DETAIL 22 LF 1,667 $6 $10,702.14 $2.30 $3,834.10 $2.00 $3,334.00 $2.00 $3,334.00 144 DETAIL 24 LF 38 $3 $121.98 $1.15 $43.70 $1.00 $38.00 $1.00 $38.00 145 DETAIL 29 LF 184 $13 $2,362.56 $4.60 $846.40 $4.00 $736.00 $4.00 $736.00 146 DETAIL 38 LF 112 $3 $359.52 $2.30 $257.60 $2.00 $224.00 $2.00 $224.00 147 DETAIL 39 LF 3,704 $3 $11,889.84 $1.15 $4,259.60 $1.00 $3,704.00 $1.00 $3,704.00 148 HMA DIKE (TYPE A)LF 2,967 $5 $14,241.60 $9.00 $26,703.00 $8.00 $23,736.00 $12.00 $35,604.00 149 WHITE FLEX POSTS EA 3 $144 $432.00 $460.00 $1,380.00 $400.00 $1,200.00 $400.00 $1,200.00 150 12' PUNCH POST EA 2 $365 $730.00 $460.00 $920.00 $400.00 $800.00 $400.00 $800.00 151 R81(CA) SIGN EA 2 $283 $566.00 $288.00 $576.00 $250.00 $500.00 $250.00 $500.00 152 R81A(CA) SIGN EA 1 $283 $283.00 $288.00 $288.00 $250.00 $250.00 $250.00 $250.00 153 R81B(CA) SIGN EA 1 $283 $283.00 $288.00 $288.00 $250.00 $250.00 $250.00 $250.00 154 WHITE PAVEMENT MARKINGS/LEGENDS (ARROWS, WORDS, SYMBOLS, ETC.) SQFT 114 $5 $570.00 $12.00 $1,368.00 $10.00 $1,140.00 $10.00 $1,140.00 $1,140,215.17 $1,014,375.90 $961,673.00 $1,275,473.00 155 TRAFFIC CONTROL PLAN AND IMPLEMENTATION LS 1 $64,911 $64,910.65 $18,000.00 $18,000.00 $89,500.00 $89,500.00 $90,000.00 $90,000.00 156 TEMPORARY STRIPING AND PAVEMENT MARKINGS LS 1 $10,000 $10,000.00 $2,300.00 $2,300.00 $10,000.00 $10,000.00 $35,000.00 $35,000.00 157 TREE TRIMMING LS 1 $382 $382.41 $1,000.00 $1,000.00 $8,680.00 $8,680.00 $10,500.00 $10,500.00 BASE BID TOTAL ADDITIVE ALTERNATE "A" BID TOTAL 158 COLD PLANE (6 INCHES)SQYD 6,611 $9 $59,499.00 $13.50 $89,248.50 $10.00 $66,110.00 $15.00 $99,165.00 159 3/4 MIX HOT MIX ASPHALT COURSE TON 1,438 $180 $258,840.00 $171.00 $245,898.00 $185.00 $266,030.00 $200.00 $287,600.00 160 1/2 MIX HOT MIX ASPHALT COURSE TON 719 $180 $129,420.00 $188.00 $135,172.00 $166.00 $119,354.00 $226.00 $162,494.00 161 HMA DIKE (TYPE A)LF 1,305 $5 $6,264.00 $9.00 $11,745.00 $8.00 $10,440.00 $15.00 $19,575.00 162 BLUE HYDRANT MARKERS PER CITY STD 7920 EA 1 $10 $10.00 $12.00 $12.00 $10.00 $10.00 $10.00 $10.00 163 DETAIL 22 LF 1,856 $6 $11,915.52 $2.30 $4,268.80 $2.00 $3,712.00 $2.00 $3,712.00 164 DETAIL 39 LF 3,822 $3 $12,268.62 $1.15 $4,395.30 $1.00 $3,822.00 $1.00 $3,822.00 165 DELINEATOR CLASS 1 TYPE E EA 7 $2 $14.00 $173.00 $1,211.00 $150.00 $1,050.00 $150.00 $1,050.00 166 R26 SIGN EA 9 $283 $2,547.00 $288.00 $2,592.00 $250.00 $2,250.00 $250.00 $2,250.00 167 W1‐8(L) SIGN EA 6 $283 $1,698.00 $288.00 $1,728.00 $250.00 $1,500.00 $250.00 $1,500.00 168 W14‐1 SIGN EA 1 $283 $283.00 $288.00 $288.00 $250.00 $250.00 $250.00 $250.00 $558,052.20 $517,858.60 $582,708.00 $716,928.00 $9,764,792.69 $8,961,546.05 $9,044,209.00 $11,093,446.79TOTAL PROJECT BID ADDITIVE ALTERNATE "B" BID TOTAL