Loading...
HomeMy WebLinkAboutCollins Monthly Permit Report.csvPermit Number ENCR-2250-2025 ENCR-2652-2025 ENCR-2635-2025 ENCR-2451-2025 ENCR-2315-2025 ENCR-2098-2025 ENCR-2543-2025 ENCR-2345-2025 ENCR-2532-2025 ENCR-2368-2025 ENCR-2129-2025 ENCR-2162-2025 ENCR-2234-2025 TRAN-2216-2025 ENCR-2112-2025 ENCR-2232-2025 ENCR-2185-2025 ENCR-1642-2025 ENCR-2180-2025 ENCR-2118-2025 ENCR-1629-2025 ENCR-2111-2025 SAPP-1877-2025 EPM-2045-2025 SAPP-2093-2025 BLDG-1263-2025 EPM-1929-2025 SAPP-2095-2025 SAPP-1837-2025 FIRE-1154-2025 BLDG-1936-2025 EPM-1715-2025 TRAN-1902-2025 SAPP-1488-2025 EPM-1705-2025 ENCR-1912-2025 ENCR-1948-2025 SIGN-1985-2025 ENCR-1896-2025 ENCR-1891-2025 FIRE-1851-2025 EPM-1598-2025 ENCR-1998-2025 ENCR-1861-2025 EPM-1622-2025 EPM-1628-2025 BLDG-1569-2025 FIRE-1576-2025 ENCR-1746-2025 EPM-2078-2025 TRAN-1886-2025 FIRE-1778-2025 ENCR-1481-2025 EPM-2029-2025 TRAN-1830-2025 ENCR-1521-2025 EPM-1843-2025 ENCR-1681-2025 ENCR-1678-2025 TRAN-1369-2025 EPM-1719-2025 SAPP-1907-2025 EPM-1701-2025 EPM-1539-2025 SAPP-1775-2025 EPM-1707-2025 FIRE-0304-2025 EPM-1480-2025 SAPP-1505-2025 TRAN-1813-2025 EPM-1708-2025 BLDG-1522-2025 ENCR-2105-2025 ENCR-1520-2025 EPM-2100-2025 BLDG-1449-2025 EPM-1765-2025 EPM-1983-2025 EPM-1364-2025 TRAN-1800-2025 ENCR-1867-2025 EPM-2037-2025 EPM-1611-2025 TRAN-1507-2025 TRAN-1814-2025 TRAN-1900-2025 EPM-1550-2025 SAPP-1812-2025 TRAN-1833-2025 BLDG-1755-2025 FIRE-2023-2025 BLDG-1450-2025 EPM-1888-2025 TRAN-2060-2025 EPM-1436-2025 FIRE-1988-2025 EPM-1571-2025 SAPP-1658-2025 BLDG-1696-2025 EPM-1748-2025 SAPP-1884-2025 ENCR-1456-2025 TRAN-1863-2025 TRAN-1691-2025 BLDG-1591-2025 FIRE-1244-2025 BLDG-1743-2025 EPM-2084-2025 BLDG-1451-2025 SAPP-1935-2025 EPM-1757-2025 BLDG-1378-2025 EPM-2083-2025 EPM-1508-2025 EPM-1736-2025 EPM-1541-2025 SAPP-1595-2025 SAPP-2110-2025 EPM-1439-2025 EPM-1937-2025 ENCR-1564-2025 FIRE-1237-2025 SIGN-1625-2025 FIRE-1143-2025 EPM-2091-2025 EPM-1791-2025 FIRE-1352-2025 ENCR-2050-2025 FIRE-2024-2025 EPM-1584-2025 EPM-1506-2025 FIRE-1853-2025 SAPP-1845-2025 BLDG-1881-2025 BLDG-1514-2025 BLDG-1515-2025 ENCR-2081-2025 BLDG-2665-2024 ENCR-1485-2025 BLDG-2086-2025 EPM-1797-2025 ENCR-1632-2025 EPM-1680-2025 ENCR-2041-2025 ENCR-1987-2025 EPM-1648-2025 ENCR-1932-2025 BLDG-1589-2025 FIRE-2025-2025 ENCR-1750-2025 EPM-1668-2025 EPM-2125-2025 BLDG-1475-2025 ENCR-2018-2025 ENCR-2054-2025 ENCR-1850-2025 EPM-1509-2025 EPM-1473-2025 ENCR-1563-2025 ENCR-1438-2025 ENCR-1730-2025 TRAN-1692-2025 SAPP-1337-2025 EPM-1612-2025 EPM-2031-2025 BLDG-2027-2025 BLDG-1490-2025 SAPP-1501-2025 EPM-1573-2025 ENCR-1898-2025 EPM-1864-2025 SIGN-1399-2025 TRAN-1426-2025 BLDG-1594-2025 ENCR-1631-2025 BLDG-1590-2025 ENCR-2109-2025 ENCR-1676-2025 EPM-1554-2025 SAPP-1854-2025 EPM-1874-2025 BLDG-1500-2025 EPM-1771-2025 ENCR-2075-2025 EPM-1555-2025 BLDG-1981-2025 EPM-1720-2025 ENCR-1887-2025 EPM-1684-2025 EPM-1532-2025 BLDG-1633-2025 ENCR-1882-2025 TRAN-1663-2025 ENCR-1947-2025 ENCR-1693-2025 ENCR-1992-2025 TRAN-1991-2025 BLDG-1651-2025 EPM-1414-2025 EPM-1718-2025 FIRE-1574-2025 ENCR-1938-2025 EPM-1685-2025 EPM-1878-2025 BLDG-0716-2025 BLDG-2032-2025 ENCR-1862-2025 EPM-1552-2025 ENCR-1801-2025 ENCR-2021-2025 EPM-1557-2025 ENCR-1933-2025 TRAN-1662-2025 SAPP-1781-2025 EPM-1513-2025 ENCR-1980-2025 EPM-1870-2025 EPM-1944-2025 FIRE-1561-2025 EPM-1577-2025 EPM-2047-2025 BLDG-1524-2025 ENCR-1656-2025 SAPP-1616-2025 EPM-2077-2025 BLDG-1441-2025 EPM-2079-2025 BLDG-1897-2025 EPM-1636-2025 EPM-1476-2025 EPM-1893-2025 BLDG-2104-2025 ENCR-1606-2025 TRAN-1825-2025 ENCR-1641-2025 BLDG-1496-2025 EPM-1789-2025 FIRE-1443-2025 ENCR-2026-2025 FIRE-1455-2025 EPM-1459-2025 ENCR-1683-2025 TRAN-1828-2025 EPM-1562-2025 TRAN-1799-2025 ENCR-1453-2025 EPM-1491-2025 BLDG-0040-2024 BLDG-1239-2025 EPM-1600-2025 EPM-1613-2025 TRAN-1829-2025 BLDG-1653-2025 EPM-2066-2025 EPM-1387-2025 EPM-1804-2025 TRAN-1690-2025 EPM-1821-2025 ENCR-1754-2025 ENCR-1652-2025 ENCR-2097-2025 SAPP-1914-2025 ENCR-1682-2025 ENCR-1503-2025 EPM-1869-2025 EPM-1908-2025 EPM-1846-2025 EPM-1467-2025 FIRE-1575-2025 GRAD-1265-2025 SAPP-2061-2025 BLDG-2042-2025 EPM-1534-2025 SAPP-1906-2025 EPM-1749-2025 BLDG-1314-2025 EPM-1895-2025 EPM-1939-2025 BLDG-1542-2025 EPM-1873-2025 TRAN-1472-2025 BLDG-1844-2025 FIRE-1990-2025 EPM-1795-2025 EPM-1621-2025 TRAN-2103-2025 EPM-1687-2025 ENCR-1502-2025 SAPP-1842-2025 TRAN-1688-2025 BLDG-1487-2025 EPM-2102-2025 TRAN-1826-2025 EPM-1547-2025 ENCR-1982-2025 ENCR-1675-2025 BLDG-2101-2025 ENCR-1447-2025 EPM-1824-2025 BLDG-1586-2025 EPM-1543-2025 EPM-2072-2025 TRAN-1839-2025 SAPP-1637-2025 DEMO-1565-2025 BLDG-1296-2025 BLDG-1454-2025 EPM-1787-2025 SAPP-1697-2025 EPM-1695-2025 BLDG-1703-2025 BLDG-1841-2025 EPM-1546-2025 EPM-1558-2025 FIRE-1649-2025 ENCR-1604-2025 EPM-1583-2025 BLDG-0717-2025 EPM-1332-2025 ENCR-2065-2025 BLDG-1597-2025 BLDG-1773-2025 ENCR-1412-2025 SIGN-1764-2025 BLDG-1592-2025 SAPP-2119-2025 ENCR-1657-2025 EPM-1711-2025 BLDG-1751-2025 ENCR-1413-2025 EPM-1909-2025 ENCR-1567-2025 FIRE-1408-2025 EPM-1474-2025 FIRE-1218-2024 BLDG-3317-2023 BLDG-0095-2023 BLDG-2666-2023 BLDG-2096-2024 BLDG-0546-2024 BLDG-3185-2023 BLDG-2774-2022 BLDG-0459-2024 BLDG-2775-2022 BLDG-2740-2022 EPM-1260-2025 BLDG-1270-2025 BLDG-1359-2025 TRAN-1394-2025 ENCR-1274-2025 EPM-1015-2025 BLDG-1417-2025 BLDG-1146-2025 SAPP-1282-2025 EPM-1328-2025 SAPP-1373-2025 BLDG-0849-2025 SAPP-1374-2025 ENCR-1353-2025 ENCR-1396-2025 BLDG-1392-2025 TRAN-1250-2025 FIRE-0822-2025 EPM-1228-2025 SAPP-1377-2025 EPM-1347-2025 ENCR-1301-2025 ENCR-1395-2025 EPM-1261-2025 EPM-1160-2025 BLDG-1063-2025 EPM-1284-2025 TRAN-1249-2025 ENCR-1383-2025 BLDG-1440-2025 SAPP-1348-2025 ENCR-1061-2025 BLDG-1255-2025 ENCR-1264-2025 BLDG-1272-2025 ENCR-1232-2025 SAPP-1298-2025 ENCR-1398-2025 ENCR-1014-2025 SAPP-1368-2025 SAPP-1317-2025 EPM-1262-2025 EPM-1183-2025 BLDG-0899-2025 TRAN-1229-2025 SAPP-1321-2025 EPM-1309-2025 EPM-1222-2025 SAPP-1329-2025 EPM-1238-2025 BLDG-1370-2025 ENCR-1223-2025 BLDG-1421-2025 BLDG-1201-2025 ENCR-1357-2025 SAPP-1407-2025 FIRE-0461-2025 ENCR-1371-2025 EPM-1038-2025 EPM-1280-2025 SAPP-1320-2025 BLDG-1036-2025 EPM-1406-2025 BLDG-1639-2024 EPM-1107-2025 ENCR-1306-2025 ENCR-1248-2025 ENCR-2868-2025 SAPP-1319-2025 BLDG-1384-2025 EPM-1245-2025 ENCR-1344-2025 ENCR-1346-2025 SAPP-1367-2025 BLDG-0666-2025 SAPP-1322-2025 BLDG-0721-2023 FIRE-0937-2025 EPM-1293-2025 SAPP-1305-2025 BLDG-1156-2025 EPM-1218-2025 FIRE-1215-2025 SAPP-1358-2025 SAPP-1330-2025 FIRE-1185-2025 ENCR-1401-2025 SAPP-1339-2025 EPM-1304-2025 ENCR-1235-2025 EPM-0992-2025 BLDG-1386-2025 SIGN-0958-2025 EPM-1240-2025 BLDG-0785-2025 EPM-1243-2025 EPM-1340-2025 EPM-1277-2025 BLDG-1397-2025 BLDG-1026-2025 EPM-1177-2025 FIRE-1120-2025 BLDG-1273-2025 EPM-1259-2025 SIGN-0956-2025 FIRE-1130-2025 ENCR-1372-2025 ENCR-1415-2025 SAPP-1323-2025 BLDG-1246-2025 FIRE-0649-2025 ENCR-1325-2025 SAPP-1295-2025 BLDG-1247-2025 SAPP-1345-2025 BLDG-1420-2025 EPM-1278-2025 BLDG-1213-2025 EPM-1405-2025 SAPP-1281-2025 ENCR-1382-2025 BLDG-1390-2025 EPM-1279-2025 BLDG-0989-2025 BLDG-1071-2025 SAPP-1335-2025 EPM-1231-2025 TRAN-1251-2025 SAPP-1355-2025 SAPP-1327-2025 EPM-1425-2025 DEMO-1354-2025 SAPP-1361-2025 ENCR-1311-2025 EPM-1276-2025 BLDG-1419-2025 ENCR-1350-2025 EPM-1196-2025 BLDG-1179-2023 EPM-1241-2025 EPM-1341-2025 SAPP-1427-2025 BLDG-1124-2025 FIRE-1128-2025 TRAN-1360-2025 ENCR-1268-2025 BLDG-1119-2025 EPM-1252-2025 BLDG-1072-2025 BLDG-1233-2025 ENCR-1310-2025 FIRE-0642-2025 EPM-1126-2025 BLDG-0825-2025 EPM-1925-2025 ENCR-1858-2025 BLDG-2010-2025 FIRE-1617-2025 ENCR-1770-2025 EPM-1872-2025 ENCR-2862-2025 ENCR-2465-2025 BLDG-2565-2025 BLDG-1806-2025 TRAN-2577-2025 FIRE-2396-2025 TRAN-2680-2025 ENCR-2645-2025 TRAN-2727-2025 TRAN-2088-2025 EPM-2438-2025 BLDG-2674-2025 ENCR-2474-2025 TRAN-2404-2025 TRAN-2559-2025 EPM-2258-2025 EPM-2264-2025 ENCR-2198-2025 FIRE-2070-2025 ENCR-2192-2025 ENCR-2732-2025 BLDG-2360-2025 TRAN-2745-2025 SAPP-2502-2025 EPM-2260-2025 EPM-2499-2025 TRAN-2403-2025 TRAN-2768-2025 TRAN-2777-2025 ENCR-2113-2025 EPM-2194-2025 EPM-2598-2025 ENCR-2657-2025 EPM-2290-2025 SAPP-2323-2025 ENCR-2640-2025 BLDG-2510-2025 TRAN-2263-2025 FIRE-2055-2025 TRAN-2664-2025 BLDG-2004-2025 EPM-2331-2025 EPM-2324-2025 SAPP-2299-2025 BLDG-1805-2025 SAPP-2679-2025 EPM-2278-2025 ENCR-2477-2025 ENCR-2693-2025 EPM-2708-2025 BLDG-2189-2025 EPM-2625-2025 EPM-2333-2025 BLDG-2288-2025 ENCR-2765-2025 BLDG-2387-2025 TRAN-2694-2025 EPM-2759-2025 ENCR-2437-2025 BLDG-2540-2025 TRAN-2398-2025 EPM-2670-2025 SIGN-2728-2025 EPM-2262-2025 BLDG-2317-2025 EPM-2348-2025 SAPP-2319-2025 TRAN-2087-2025 TRAN-2397-2025 SAPP-2346-2025 BLDG-2826-2025 TRAN-2467-2025 EPM-2200-2025 TRAN-2516-2025 TRAN-2202-2025 EPM-2311-2025 EPM-2505-2025 SAPP-2719-2025 ENCR-2669-2025 EPM-2503-2025 TRAN-2786-2025 ENCR-2338-2025 TRAN-2576-2025 EPM-2525-2025 EPM-2188-2025 ENCR-2384-2025 FIRE-2293-2025 ENCR-2172-2025 TRAN-2352-2025 SAPP-2528-2025 SAPP-2231-2025 EPM-2618-2025 TRAN-2807-2025 SAPP-2609-2025 EPM-2726-2025 EPM-2400-2025 FIRE-1868-2025 EPM-1927-2025 ENCR-2594-2025 EPM-2710-2025 EPM-2297-2025 BLDG-2676-2025 TRAN-2539-2025 TRAN-2509-2025 ENCR-2642-2025 TRAN-2096-2025 EPM-2007-2025 SAPP-2230-2025 EPM-2484-2025 BLDG-2149-2025 SIGN-2237-2025 TRAN-2705-2025 EPM-2659-2025 BLDG-2677-2025 ENCR-2542-2025 TRAN-2681-2025 TRAN-2806-2025 TRAN-2517-2025 EPM-2341-2025 FIRE-2056-2025 BLDG-2524-2023 EPM-2563-2025 EPM-2439-2025 EPM-2597-2025 ENCR-2442-2025 BLDG-2464-2025 ENCR-2233-2025 ENCR-2723-2025 ENCR-2219-2025 EPM-2617-2025 SAPP-2824-2025 TRAN-2357-2025 ENCR-2307-2025 ENCR-2473-2025 ENCR-2717-2025 FIRE-2347-2025 TRAN-2354-2025 BLDG-2675-2025 EPM-2393-2025 ENCR-2570-2025 SAPP-2448-2025 FIRE-2707-2025 TRAN-2308-2025 BLDG-1807-2025 TRAN-2203-2025 ENCR-2608-2025 EPM-2629-2025 SAPP-2238-2025 EPM-2249-2025 BLDG-2201-2025 SAPP-2549-2025 TRAN-2328-2025 EPM-2619-2025 BLDG-2306-2025 BLDG-2292-2025 EPM-2700-2025 TRAN-2742-2025 EPM-2535-2025 EPM-2259-2025 SAPP-2479-2025 BLDG-1809-2025 DEMO-2039-2025 TRAN-2405-2025 EPM-2605-2025 FIRE-2673-2025 EPM-2120-2025 EPM-2614-2025 TRAN-2515-2025 ENCR-2487-2025 EPM-2374-2025 ENCR-2833-2025 TRAN-2486-2025 TRAN-2491-2025 ENCR-2795-2025 EPM-2725-2025 EPM-2265-2025 EPM-2772-2025 TRAN-2574-2025 EPM-2186-2025 ENCR-2443-2025 ENCR-2478-2025 TRAN-2184-2025 TRAN-2353-2025 SAPP-2236-2025 EPM-2183-2025 TRAN-2722-2025 EPM-2197-2025 ENCR-2390-2025 FIRE-2350-2025 BLDG-1808-2025 TRAN-2573-2025 TRAN-2213-2025 SAPP-2527-2025 TRAN-2468-2025 EPM-2215-2025 EPM-2613-2025 FIRE-2049-2025 SAPP-2193-2025 TRAN-2526-2025 BLDG-2672-2025 TRAN-2665-2025 ENCR-2276-2025 SIGN-2800-2025 TRAN-2575-2025 SAPP-2187-2025 TRAN-2578-2025 ENCR-2206-2025 ENCR-2794-2025 ENCR-2475-2025 TRAN-2554-2025 EPM-2507-2025 TRAN-2220-2025 ENCR-2545-2025 TRAN-2583-2025 EPM-2033-2025 ENCR-2551-2025 BLDG-2792-2025 EPM-2724-2025 EPM-2522-2025 SAPP-2381-2025 FIRE-2711-2025 ENCR-2371-2025 BLDG-2361-2025 ENCR-2599-2025 ENCR-2388-2025 FIRE-2044-2025 TRAN-2810-2025 TRAN-2714-2025 EPM-2713-2025 EPM-2280-2025 BLDG-2270-2025 DEMO-0501-2024 EPM-2531-2025 TRAN-2787-2025 BLDG-2365-2025 EPM-2459-2025 EPM-2394-2025 EPM-2555-2025 SAPP-2550-2025 TRAN-2212-2025 ENCR-2454-2025 EPM-2385-2025 ENCR-2813-2025 BLDG-2363-2025 ENCR-2449-2025 EPM-2287-2025 FIRE-2706-2025 FIRE-2332-2025 TRAN-2643-2025 ENCR-2304-2025 SAPP-2359-2025 EPM-2330-2025 SAPP-2511-2025 SAPP-2513-2025 ENCR-2595-2025 ENCR-2313-2025 SAPP-2567-2025 EPM-2382-2025 ENCR-2757-2025 EPM-2616-2025 ENCR-2318-2025 EPM-2301-2025 EPM-2222-2025 EPM-2744-2025 SAPP-2440-2025 ENCR-2221-2025 SAPP-2607-2025 TRAN-2843-2025 EPM-2480-2025 EPM-2630-2025 TRAN-2541-2025 ENCR-2601-2025 TRAN-2844-2025 ENCR-2322-2025 FIRE-2709-2025 TRAN-2808-2025 TRAN-2648-2025 EPM-2569-2025 SAPP-2519-2025 TRAN-2117-2025 ENCR-2376-2025 ENCR-2682-2025 ENCR-2283-2025 ENCR-2831-2025 ENCR-2244-2025 EPM-1312-2025 TRAN-2860-2025 BLDG-1761-2025 ENCR-2337-2025 ENCR-2266-2025 ENCR-2799-2025 TRAN-2380-2025 ENCR-2455-2025 ENCR-2791-2025 ENCR-2395-2025 ENCR-2546-2025 BLDG-2257-2025 SIGN-2321-2025 ENCR-2495-2025 BLDG-2362-2025 EPM-2209-2025 SAPP-2819-2025 EPM-2521-2025 TRAN-2441-2025 FIRE-2327-2025 FIRE-2295-2025 TRAN-2620-2025 ENCR-2639-2025 ENCR-2485-2025 EPM-2310-2025 EPM-1726-2025 EPM-2588-2025 TRAN-2749-2025 SIGN-2624-2025 EPM-2214-2025 FIRE-0641-2025 TRAN-2845-2025 ENCR-2518-2025 FIRE-2135-2025 EPM-2140-2025 ENCR-2150-2025 EPM-2160-2025 EPM-2167-2025 ENCR-1918-2025 EPM-2144-2025 EPM-2082-2025 FIRE-2133-2025 FIRE-0640-2025 FIRE-2136-2025 EPM-2115-2025 DEMO-1626-2025 FIRE-2122-2025 BLDG-2154-2025 FIRE-2121-2025 FIRE-2123-2025 EPM-2128-2025 TRAN-2179-2025 EPM-2139-2025 FIRE-2137-2025 FIRE-2124-2025 TRAN-2176-2025 TRAN-2177-2025 EPM-2164-2025 EPM-2166-2025 TRAN-2178-2025 SAPP-2159-2025 EPM-1527-2025 FIRE-2138-2025 BLDG-2157-2025 FIRE-2134-2025 ENCR-2132-2025 ENCR-2163-2025 BLDG-2156-2025 EPM-2147-2025 ENCR-1871-2025 EPM-2171-2025 BLDG-2181-2025 EPM-2151-2025 SAPP-1921-2025 BLDG-1428-2025 SAPP-1484-2025 EPM-1875-2025 BLDG-2052-2025 EPM-1519-2025 EPM-1920-2025 EPM-1689-2025 EPM-2085-2025 ENCR-1889-2025 EPM-1627-2025 TRAN-2059-2025 FIRE-1852-2025 EPM-1483-2025 BLDG-1404-2025 ENCR-1187-2025 BLDG-1901-2025 ENCR-1671-2025 EPM-1793-2025 ENCR-1931-2025 TRAN-1894-2025 ENCR-1551-2025 SAPP-1784-2025 ENCR-1416-2025 EPM-1582-2025 EPM-1915-2025 BLDG-1593-2025 EPM-1664-2025 BLDG-1499-2025 ENCR-1926-2025 EPM-1418-2025 FIRE-1989-2025 SIGN-2034-2025 EPM-1659-2025 TRAN-2058-2025 EPM-1535-2025 EPM-1523-2025 EPM-1777-2025 ENCR-2022-2025 ENCR-1860-2025 EPM-1819-2025 EPM-1457-2025 ENCR-1566-2025 EPM-1333-2025 EPM-1498-2025 ENCR-1673-2025 ENCR-1446-2025 FIRE-1287-2025 TRAN-1904-2025 EPM-1477-2025 ENCR-2106-2025 EPM-2043-2025 ENCR-1822-2025 ENCR-1581-2025 EPM-1478-2025 EPM-1545-2025 SAPP-1471-2025 SAPP-1724-2025 EPM-2030-2025 TRAN-1831-2025 EPM-2057-2025 BLDG-1047-2025 EPM-1661-2025 TRAN-1816-2025 ENCR-1838-2025 EPM-1548-2025 EPM-1832-2025 TRAN-1759-2025 SAPP-1479-2025 ENCR-1865-2025 BLDG-0283-2024 ENCR-1785-2025 EPM-2116-2025 EPM-2028-2025 SAPP-1732-2025 EPM-1540-2025 BLDG-1686-2025 TRAN-1497-2025 ENCR-1820-2025 BLDG-0553-2025 BLDG-0526-2025 FIRE-0077-2025 BLDG-0298-2025 BLDG-2889-2024 BLDG-0600-2025 ENCR-1677-2025 ENCR-1752-2025 ENCR-2006-2025 ENCR-1782-2025 ENCR-1917-2025 ENCR-1706-2025 ENCR-1363-2025 ENCR-1531-2025 ENCR-1890-2025 ENCR-1903-2025 ENCR-1530-2025 ENCR-1431-2025 ENCR-2053-2025 ENCR-1529-2025 ENCR-1385-2025 ENCR-1430-2025 ENCR-2099-2025 ENCR-2016-2025 ENCR-1667-2025 ENCR-1403-2025 ENCR-1434-2025 ENCR-2017-2025 ENCR-1930-2025 ENCR-2003-2025 ENCR-1949-2025 ENCR-2002-2025 ENCR-1788-2025 ENCR-1492-2025 ENCR-1433-2025 ENCR-1848-2025 ENCR-1916-2025 ENCR-2013-2025 ENCR-1610-2025 ENCR-1516-2025 ENCR-1679-2025 ENCR-1362-2025 ENCR-1774-2025 ENCR-1291-2025 ENCR-1402-2025 ENCR-2064-2025 ENCR-1391-2025 ENCR-1623-2025 ENCR-1786-2025 ENCR-1410-2025 ENCR-1666-2025 ENCR-2089-2025 ENCR-1717-2025 ENCR-2020-2025 ENCR-1602-2025 ENCR-1639-2025 ENCR-1603-2025 ENCR-1640-2025 ENCR-1922-2025 ENCR-1445-2025 ENCR-1342-2025 ENCR-1504-2025 ENCR-1698-2025 ENCR-1810-2025 ENCR-2011-2025 ENCR-1605-2025 EPM-2040-2025 ENCR-1714-2025 ENCR-1986-2025 ENCR-1745-2025 ENCR-1432-2025 ENCR-1376-2025 ENCR-1448-2025 ENCR-1331-2025 ENCR-2074-2025 ENCR-2015-2025 ENCR-2014-2025 ENCR-1256-2025 ENCR-1234-2025 ENCR-1302-2025 ENCR-1289-2025 ENCR-1326-2025 ENCR-1266-2025 ENCR-1257-2025 ENCR-1290-2025 ENCR-1324-2025 ENCR-2731-2025 ENCR-2752-2025 ENCR-2763-2025 ENCR-2712-2025 ENCR-2820-2025 ENCR-2766-2025 ENCR-2797-2025 ENCR-2658-2025 ENCR-2764-2025 ENCR-2805-2025 ENCR-2170-2025 ENCR-2788-2025 BLDG-1642-2024 ENCR-2073-2025 ENCR-2649-2025 ENCR-2562-2025 ENCR-2019-2025 ENCR-2247-2025 BLDG-1506-2024 ENCR-2544-2025 ENCR-2641-2025 ENCR-2370-2025 ENCR-2277-2025 BLDG-2375-2025 ENCR-2636-2025 ENCR-1609-2025 ENCR-2634-2025 ENCR-2285-2025 ENCR-2646-2025 ENCR-2557-2025 ENCR-2644-2025 ENCR-2342-2025 ENCR-2303-2025 ENCR-2603-2025 ENCR-2585-2025 ENCR-2514-2025 ENCR-2561-2025 ENCR-2291-2025 ENCR-2161-2025 BLDG-2651-2025 ENCR-2560-2025 ENCR-2623-2025 FIRE-0533-2025 ENCR-2600-2025 ENCR-2391-2025 ENCR-2538-2025 ENCR-2638-2025 ENCR-2536-2025 ENCR-2447-2025 ENCR-1753-2025 ENCR-2373-2025 ENCR-2534-2025 ENCR-2389-2025 ENCR-2602-2025 ENCR-2632-2025 ENCR-1411-2025 BLDG-1630-2025 ENCR-1429-2025 ENCR-1734-2025 ENCR-1783-2025 ENCR-1725-2025 ENCR-1462-2025 ENCR-1713-2025 ENCR-1338-2025 EPM-2842-2025 EPM-2462-2025 EPM-2372-2025 EPM-2256-2025 ENCR-2746-2025 FIRE-1470-2025 EPM-2876-2025 EPM-2872-2025 ENCR-2883-2025 ENCR-2889-2025 TRAN-2890-2025 ENCR-2884-2025 ENCR-2887-2025 EPM-2142-2025 BLDG-2486-2024 ENCR-2897-2025 BLDG-0967-2025 ENCR-2903-2025 ENCR-2899-2025 BLDG-0455-2025 EPM-2891-2025 BLDG-0209-2025 BLDG-2626-2025 BLDG-0210-2025 ENCR-2704-2025 BLDG-0736-2025 EPM-2564-2025 ENCR-2846-2025 ENCR-2913-2025 ENCR-2667-2025 FIRE-2369-2025 SAPP-2126-2025 SAPP-2199-2025 ENCR-2914-2025 SIGN-2246-2025 TRAN-2919-2025 ENCR-2920-2025 EPM-2815-2025 SAPP-2767-2025 SAPP-1928-2025 TRAN-2922-2025 TRAN-2923-2025 EPM-1738-2025 BLDG-2406-2025 BLDG-2358-2025 BLDG-2407-2025 BLDG-2408-2025 BLDG-2410-2025 EPM-2935-2025 BLDG-2275-2025 ENCR-2945-2025 FIRE-2386-2025 EPM-2661-2025 ENCR-2702-2025 SAPP-1704-2025 EPM-2937-2025 BLDG-2296-2025 BLDG-2298-2025 EPM-2512-2025 EPM-1464-2025 EPM-2695-2025 TRAN-2953-2025 SAPP-2927-2025 BLDG-1803-2025 EPM-2811-2025 EPM-2949-2025 BLDG-2005-2025 BLDG-2699-2025 ENCR-2957-2025 BLDG-2063-2025 EPM-2615-2025 ENCR-2918-2025 BLDG-0868-2025 BLDG-1085-2025 EPM-2461-2025 BLDG-0735-2025 ENCR-2962-2025 ENCR-2964-2025 ENCR-2980-2025 BLDG-0604-2025 TRAN-2987-2025 ENCR-2985-2025 BLDG-2433-2025 BLDG-2434-2025 BLDG-2435-2025 BLDG-2436-2025 BLDG-2418-2025 BLDG-2419-2025 BLDG-2425-2025 EPM-2235-2025 BLDG-2431-2025 BLDG-2429-2025 BLDG-2430-2025 BLDG-2421-2025 BLDG-2423-2025 BLDG-2424-2025 BLDG-2420-2025 BLDG-2422-2025 BLDG-2670-2024 BLDG-2879-2025 BLDG-2426-2025 BLDG-2427-2025 BLDG-2428-2025 ENCR-2928-2025 BLDG-2432-2025 ENCR-2925-2025 BLDG-2416-2025 BLDG-2417-2025 BLDG-2411-2025 BLDG-2415-2025 BLDG-2414-2025 BLDG-2412-2025 BLDG-2413-2025 ENCR-2926-2025 ENCR-2931-2025 ENCR-2476-2025 TRAN-2934-2025 BLDG-1815-2025 BLDG-1859-2025 BLDG-2448-2024 BLDG-1315-2025 EPM-2552-2025 EPM-2309-2025 ENCR-2863-2025 BLDG-2190-2025 ENCR-2930-2025 EPM-2647-2025 EPM-1536-2025 EPM-2894-2025 EPM-2494-2025 ENCR-2932-2025 BLDG-0809-2025 FIRE-2463-2025 ENCR-2692-2025 BLDG-0201-2025 ENCR-1269-2025 ENCR-2999-2025 BLDG-1285-2025 ENCR-2905-2025 ENCR-2992-2025 ENCR-3004-2025 FIRE-2339-2025 EPM-2801-2025 EPM-1849-2025 ENCR-2988-2025 TRAN-3007-2025 ENCR-3014-2025 BLDG-0748-2025 BLDG-1614-2025 BLDG-0485-2025 SAPP-2655-2025 SAPP-2145-2025 SAPP-2683-2025 SAPP-2684-2025 EPM-2524-2025 BLDG-2207-2025 EPM-2758-2025 EPM-2660-2025 EPM-2715-2025 EPM-2798-2025 EPM-2572-2025 SAPP-2741-2025 EPM-2877-2025 BLDG-1556-2025 EPM-2146-2025 ENCR-2107-2025 ENCR-3008-2025 ENCR-2637-2025 TRAN-0029-2026 ENCR-2663-2025 ENCR-0021-2026 ENCR-2284-2025 FIRE-2281-2025 FIRE-2282-2025 ENCR-2896-2025 ENCR-0026-2026 TRAN-0009-2026 BLDG-1021-2025 ENCR-3017-2025 ENCR-2924-2025 BLDG-1351-2025 ENCR-0007-2026 TRAN-0011-2026 ENCR-3011-2025 TRAN-0008-2026 BLDG-1665-2025 ENCR-2500-2025 ENCR-0015-2026 BLDG-2302-2025 EPM-2267-2025 SAPP-2364-2025 EPM-3045-2025 FIRE-2343-2025 FIRE-2127-2025 BLDG-2332-2024 FIRE-0044-2026 FIRE-0043-2026 SIGN-0042-2026 ENCR-0040-2026 BLDG-2753-2024 ENCR-0039-2026 BLDG-0952-2025 EPM-2279-2025 EPM-2830-2025 ENCR-2497-2025 EPM-2094-2025 EPM-2747-2025 EPM-2974-2025 EPM-2748-2025 BLDG-0216-2025 FIRE-2933-2025 FIRE-2812-2025 BLDG-1220-2025 BLDG-2952-2025 ENCR-0063-2026 FIRE-0262-2025 ENCR-0066-2026 EPM-2155-2025 EPM-2168-2025 EPM-2736-2025 EPM-2908-2025 EPM-0017-2026 ENCR-0051-2026 BLDG-0807-2024 ENCR-0054-2026 BLDG-0904-2025 EPM-0003-2026 ENCR-0053-2026 BLDG-1155-2025 ENCR-0055-2026 ENCR-0056-2026 EPM-2631-2025 BLDG-0575-2025 ENCR-0032-2026 ENCR-0059-2026 FIRE-0041-2026 ENCR-0071-2026 BLDG-0048-2026 EPM-2067-2025 BLDG-2069-2025 EPM-0052-2026 ENCR-0076-2026 ENCR-0079-2026 BLDG-2861-2025 BLDG-2402-2025 ENCR-0080-2026 EPM-0942-2025 TRAN-0081-2026 BLDG-1580-2025 FIRE-0049-2026 FIRE-0050-2026 ENCR-0089-2026 TRAN-0010-2026 ENCR-2898-2025 ENCR-0085-2026 FIRE-2294-2025 BLDG-2671-2025 FIRE-2340-2025 ENCR-2996-2025 EPM-0025-2026 EPM-2822-2025 EPM-0030-2026 EPM-2253-2025 TRAN-0094-2026 BLDG-2773-2025 BLDG-3025-2025 BLDG-3026-2025 BLDG-2946-2025 EPM-3018-2025 EPM-3020-2025 EPM-3019-2025 EPM-0002-2026 DEMO-1579-2025 EPM-2336-2025 SAPP-0004-2026 EPM-0077-2026 EPM-0070-2026 TRAN-0110-2026 ENCR-0104-2026 EPM-2804-2025 EPM-2344-2025 EPM-0106-2026 BLDG-2470-2025 BLDG-1379-2025 BLDG-0542-2025 SAPP-2579-2025 EPM-2951-2025 EPM-2972-2025 BLDG-0808-2025 EPM-3038-2025 EPM-2720-2025 EPM-2530-2025 SAPP-2841-2025 SAPP-2881-2025 EPM-2990-2025 SAPP-3044-2025 EPM-2865-2025 BLDG-0749-2025 BLDG-0751-2025 BLDG-0750-2025 EPM-0117-2026 BLDG-0105-2026 EPM-0005-2026 BLDG-0115-2026 BLDG-0019-2026 BLDG-1624-2025 EPM-0006-2026 BLDG-1465-2025 BLDG-1910-2025 GRAD-2466-2025 BLDG-2947-2025 EPM-0109-2026 EPM-2158-2025 ENCR-0127-2026 EPM-0099-2026 EPM-0086-2026 EPM-0078-2026 EPM-0096-2026 EPM-0087-2026 ENCR-1236-2025 EPM-0083-2026 ENCR-0126-2026 BLDG-2556-2025 ENCR-0128-2026 ENCR-0129-2026 BLDG-0094-2023 BLDG-0481-2025 BLDG-1048-2025 BLDG-1041-2025 BLDG-1157-2025 BLDG-1380-2025 BLDG-1744-2025 BLDG-1737-2025 BLDG-1756-2025 BLDG-1885-2025 BLDG-2366-2025 BLDG-2324-2022 BLDG-2851-2024 EPM-0979-2025 EPM-1381-2025 EPM-1253-2025 EPM-1186-2025 EPM-1267-2025 EPM-1638-2025 EPM-1549-2025 EPM-1635-2025 EPM-1650-2025 EPM-1526-2025 EPM-1643-2025 EPM-1469-2025 EPM-1518-2025 EPM-1733-2025 EPM-1537-2025 EPM-1883-2025 EPM-1798-2025 EPM-1792-2025 EPM-1847-2025 EPM-1856-2025 EPM-2271-2025 EPM-1899-2025 EPM-2204-2025 EPM-2080-2025 EPM-2195-2025 EPM-2196-2025 EPM-1940-2025 EPM-2582-2025 FIRE-1200-2025 FIRE-1645-2025 FIRE-1300-2025 FIRE-1299-2025 FIRE-1647-2025 FIRE-1646-2025 FIRE-1660-2025 FIRE-1740-2025 FIRE-1758-2025 FIRE-1741-2025 FIRE-1742-2025 FIRE-1763-2025 FIRE-1739-2025 FIRE-1779-2025 FIRE-1762-2025 FIRE-1760-2025 FIRE-1670-2025 GRAD-0521-2024 BLDG-0945-2024 BLDG-2941-2025 BLDG-1495-2025 TRAN-0168-2026 BLDG-0588-2025 BLDG-2537-2025 ENCR-0318-2024 EPM-0023-2026 EPM-0024-2026 EPM-2628-2025 BLDG-0151-2026 BLDG-0150-2026 BLDG-1710-2025 GRAD-0141-2026 ENCR-1588-2025 EPM-0068-2026 EPM-0124-2026 EPM-0114-2026 TRAN-0182-2026 BLDG-0090-2026 BLDG-1318-2025 EPM-0789-2025 ENCR-0028-2026 EPM-2991-2025 FIRE-3016-2025 BLDG-2316-2025 BLDG-0824-2024 EPM-0091-2026 TRAN-0210-2026 TRAN-0211-2026 EPM-0143-2026 EPM-2790-2025 BLDG-2136-2024 BLDG-2137-2024 BLDG-1393-2025 EPM-0034-2026 EPM-2888-2025 SAPP-0198-2026 BLDG-1790-2025 SAPP-2954-2025 BLDG-1956-2025 BLDG-1955-2025 EPM-0213-2026 SAPP-2939-2025 TRAN-0217-2026 BLDG-1957-2025 BLDG-1042-2025 EPM-2917-2025 BLDG-0754-2025 SAPP-0103-2026 BLDG-0753-2025 BLDG-0752-2025 ENCR-2827-2025 BLDG-0755-2025 FIRE-2251-2025 ENCR-2335-2025 EPM-0167-2026 SAPP-1489-2025 EPM-2498-2025 ENCR-0218-2026 EPM-2269-2025 TRAN-0222-2026 TRAN-0242-2026 TRAN-0118-2026 BLDG-0319-2024 ENCR-0214-2026 ENCR-0253-2026 ENCR-0256-2026 ENCR-0252-2026 ENCR-0254-2026 ENCR-0260-2026 BLDG-0763-2025 ENCR-0238-2026 FIRE-2936-2025 ENCR-0266-2026 BLDG-0852-2025 BLDG-1905-2025 ENCR-0125-2026 ENCR-0130-2026 ENCR-0027-2026 TRAN-0134-2026 ENCR-0045-2026 BLDG-0135-2026 BLDG-2134-2024 ENCR-2809-2025 BLDG-2133-2024 BLDG-0606-2025 TRAN-0057-2026 FIRE-1618-2025 ENCR-0148-2026 EPM-2165-2025 EPM-2456-2025 BLDG-2342-2024 BLDG-2343-2024 FIRE-2816-2025 FIRE-2892-2025 ENCR-0146-2026 BLDG-2356-2025 BLDG-3051-2025 ENCR-0060-2026 BLDG-1570-2025 BLDG-3050-2025 BLDG-2062-2025 EPM-3024-2025 EPM-3023-2025 FIRE-2445-2025 EPM-3021-2025 EPM-3022-2025 EPM-0092-2026 BLDG-2788-2024 BLDG-0312-2025 EPM-0014-2026 EPM-0013-2026 EPM-0038-2026 ENCR-0163-2026 FIRE-2501-2025 EPM-0012-2026 EPM-0020-2026 TRAN-0162-2026 ENCR-0165-2026 FIRE-1463-2025 EPM-0098-2026 TRAN-0195-2026 TRAN-0196-2026 TRAN-0194-2026 EPM-0197-2026 FIRE-1294-2025 TRAN-0202-2026 TRAN-0201-2026 TRAN-0082-2026 EPM-0200-2026 EPM-2174-2025 BLDG-0175-2026 FIRE-2776-2025 ENCR-0189-2026 EPM-0169-2026 BLDG-1217-2025 SIGN-1544-2025 SAPP-2944-2025 TRAN-0220-2026 EPM-0145-2026 EPM-0113-2026 EPM-0144-2026 BLDG-2916-2025 EPM-1437-2025 EPM-1525-2025 SAPP-2666-2025 EPM-2718-2025 EPM-2901-2025 SAPP-0224-2026 SAPP-1343-2025 TRAN-0227-2026 EPM-3031-2025 ENCR-0284-2026 FIRE-1219-2025 EPM-2739-2025 EPM-2751-2025 BLDG-0331-2025 BLDG-1435-2025 BLDG-2761-2025 BLDG-2793-2025 EPM-0225-2026 TRAN-0241-2026 EPM-0142-2026 BLDG-0761-2025 EPM-0138-2026 EPM-2496-2025 ENCR-0047-2026 ENCR-0302-2026 ENCR-0107-2026 ENCR-2915-2025 BLDG-0574-2025 BLDG-1486-2025 FIRE-2444-2025 EPM-2771-2025 BLDG-0759-2025 FIRE-2446-2025 BLDG-2893-2025 EPM-0171-2026 SAPP-2870-2025 TRAN-0290-2026 BLDG-0757-2025 BLDG-0756-2025 BLDG-0758-2025 EPM-0016-2026 EPM-0137-2026 EPM-0236-2026 EPM-2612-2025 BLDG-0760-2025 ENCR-0297-2026 TRAN-0298-2026 BLDG-1398-2024 BLDG-1356-2025 BLDG-2409-2025 SAPP-0295-2026 BLDG-0011-2025 BLDG-2814-2025 BLDG-2038-2025 BLDG-1747-2025 BLDG-0065-2026 BLDG-0762-2025 BLDG-2132-2024 BLDG-2135-2024 EPM-0272-2026 EPM-2182-2025 SIGN-1655-2025 BLDG-3029-2025 BLDG-1953-2025 BLDG-1958-2025 BLDG-1959-2025 BLDG-1960-2025 BLDG-1961-2025 BLDG-1962-2025 BLDG-1963-2025 ENCR-0335-2026 EPM-0233-2026 EPM-0281-2026 EPM-0257-2026 EPM-0235-2026 EPM-0234-2026 ENCR-0343-2026 BLDG-0009-2025 BLDG-1923-2025 BLDG-0808-2024 BLDG-0334-2026 FIRE-1409-2025 EPM-0294-2026 BLDG-0381-2025 BLDG-2070-2023 ENCR-0327-2026 BLDG-1099-2025 BLDG-1423-2025 BLDG-1772-2025 BLDG-2943-2025 EPM-0172-2026 BLDG-1954-2025 EPM-2148-2025 BLDG-2130-2024 ENCR-0258-2026 TRAN-0354-2026 ENCR-0221-2026 ENCR-2255-2025 BLDG-0939-2025 ENCR-2488-2025 FIRE-2243-2025 ENCR-0303-2026 FIRE-2520-2025 ENCR-0199-2026 ENCR-0310-2026 ENCR-0230-2026 BLDG-3310-2023 ENCR-0318-2026 ENCR-0319-2026 EPM-2653-2025 BLDG-2129-2024 BLDG-2379-2025 ENCR-2902-2025 ENCR-0315-2026 ENCR-0317-2026 BLDG-2210-2025 BLDG-2128-2024 ENCR-0251-2026 ENCR-0325-2026 ENCR-0036-2026 ENCR-0320-2026 BLDG-1510-2025 ENCR-0326-2026 TRAN-0330-2026 ENCR-0324-2026 ENCR-2504-2025 EPM-2481-2025 EPM-2737-2025 EPM-2273-2025 BLDG-0764-2025 SAPP-0161-2026 SIGN-2108-2025 EPM-3048-2025 SAPP-0136-2026 ENCR-2774-2025 BLDG-0769-2025 BLDG-0871-2025 ENCR-1224-2025 EPM-0299-2026 EPM-2983-2025 FIRE-2345-2024 ENCR-0316-2026 EPM-0226-2026 EPM-0097-2026 EPM-0100-2026 EPM-0073-2026 EPM-0093-2026 EPM-0174-2026 EPM-0173-2026 BLDG-1195-2025 EPM-0183-2026 EPM-0184-2026 EPM-0179-2026 EPM-0180-2026 EPM-0157-2026 EPM-0187-2026 EPM-0186-2026 EPM-0329-2026 EPM-0176-2026 EPM-0177-2026 EPM-0178-2026 EPM-0072-2026 EPM-0155-2026 EPM-0156-2026 EPM-0154-2026 EPM-0108-2026 EPM-0153-2026 EPM-0208-2026 EPM-0188-2026 ENCR-0121-2026 SIGN-1654-2025 EPM-0206-2026 EPM-0205-2026 EPM-0207-2026 EPM-0192-2026 BLDG-0719-2025 BLDG-0720-2025 EPM-0203-2026 EPM-0190-2026 EPM-0191-2026 BLDG-2940-2025 BLDG-0097-2024 BLDG-0098-2024 BLDG-0846-2024 SAPP-1587-2025 ENCR-0357-2026 BLDG-2373-2021 EPM-0069-2026 TRAN-0244-2026 TRAN-0245-2026 SAPP-1615-2025 SAPP-1608-2025 BLDG-0121-2025 EPM-2300-2025 BLDG-1767-2025 DEMO-1511-2025 DEMO-2451-2024 DEMO-2452-2024 BLDG-1162-2025 ENCR-2289-2025 BLDG-2650-2025 SAPP-0084-2026 BLDG-1168-2025 BLDG-0603-2025 BLDG-0705-2025 BLDG-1044-2025 DEMO-3041-2025 BLDG-2680-2024 BLDG-0754-2023 EPM-2606-2025 EPM-2835-2025 SAPP-2654-2025 BLDG-1514-2024 BLDG-0911-2024 BLDG-1952-2025 BLDG-1067-2025 ENCR-0364-2026 ENCR-0365-2026 BLDG-0765-2025 BLDG-1951-2025 BLDG-3338-2023 BLDG-0910-2024 ENCR-2377-2025 BLDG-0766-2025 BLDG-0767-2025 BLDG-1494-2025 ENCR-0373-2026 ENCR-0372-2026 BLDG-0982-2025 FIRE-0287-2026 FIRE-0288-2026 FIRE-0289-2026 BLDG-2579-2024 BLDG-0406-2025 DEMO-0311-2026 EPM-0312-2026 BLDG-1093-2025 EPM-0367-2026 EPM-0322-2026 EPM-0355-2026 EPM-0333-2026 TRAN-0344-2026 BLDG-0358-2026 BLDG-0309-2026 BLDG-0308-2026 EPM-2593-2025 EPM-0088-2026 ENCR-0378-2026 EPM-2955-2025 SIGN-0371-2026 BLDG-2457-2025 BLDG-2399-2025 EPM-2904-2025 ENCR-0380-2026 EPM-2217-2025 ENCR-0379-2026 SAPP-0001-2026 EPM-2392-2025 EPM-2586-2025 TRAN-0381-2026 BLDG-1204-2025 BLDG-0131-2025 BLDG-1546-2024 BLDG-1493-2025 BLDG-2123-2024 BLDG-2143-2025 BLDG-2138-2024 BLDG-2139-2024 SAPP-0383-2026 BLDG-2122-2024 BLDG-2604-2025 BLDG-2580-2025 BLDG-1705-2024 BLDG-0999-2025 BLDG-0484-2025 BLDG-2131-2024 SIGN-2989-2025 BLDG-2698-2025 FIRE-0123-2026 TRAN-0384-2026 BLDG-0925-2025 BLDG-0377-2025 ENCR-0390-2026 EPM-0359-2026 EPM-0031-2026 BLDG-0144-2025 BLDG-2840-2025 TRAN-0391-2026 FIRE-2252-2025 EPM-0392-2026 BLDG-0018-2026 FIRE-1303-2025 BLDG-0576-2025 BLDG-2268-2025 EPM-2506-2025 BLDG-0768-2025 BLDG-2756-2025 EPM-0331-2026 EPM-2755-2025 EPM-0204-2026 EPM-0337-2026 ENCR-0389-2026 BLDG-2533-2025 BLDG-1934-2025 EPM-0339-2026 BLDG-1644-2025 FIRE-0954-2025 EPM-2169-2025 BLDG-0368-2026 BLDG-1601-2025 EPM-2175-2025 ENCR-0396-2026 Permit Type Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Transportation Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Building Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Photovoltaic (SolarAPP) Fire Construction Building Electrical, Plumbing, Mechanical (EPM) Transportation Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Encroachment Encroachment Sign Encroachment Encroachment Fire Construction Electrical, Plumbing, Mechanical (EPM) Encroachment Encroachment Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Building Fire Construction Encroachment Electrical, Plumbing, Mechanical (EPM) Transportation Fire Construction Encroachment Electrical, Plumbing, Mechanical (EPM) Transportation Encroachment Electrical, Plumbing, Mechanical (EPM) Encroachment Encroachment Transportation Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Fire Construction Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Transportation Electrical, Plumbing, Mechanical (EPM) Building Encroachment Encroachment Electrical, Plumbing, Mechanical (EPM) Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Transportation Encroachment Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Transportation Transportation Transportation Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Transportation Building Fire Construction Building Electrical, Plumbing, Mechanical (EPM) Transportation Electrical, Plumbing, Mechanical (EPM) Fire Construction Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Building Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Encroachment Transportation Transportation Building Fire Construction Building Electrical, Plumbing, Mechanical (EPM) Building Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Encroachment Fire Construction Sign Fire Construction Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Fire Construction Encroachment Fire Construction Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Fire Construction Photovoltaic (SolarAPP) Building Building Building Encroachment Building Encroachment Building Electrical, Plumbing, Mechanical (EPM) Encroachment Electrical, Plumbing, Mechanical (EPM) Encroachment Encroachment Electrical, Plumbing, Mechanical (EPM) Encroachment Building Fire Construction Encroachment Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Building Encroachment Encroachment Encroachment Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Encroachment Encroachment Encroachment Transportation Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Building Building Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Encroachment Electrical, Plumbing, Mechanical (EPM) Sign Transportation Building Encroachment Building Encroachment Encroachment Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Building Electrical, Plumbing, Mechanical (EPM) Encroachment Electrical, Plumbing, Mechanical (EPM) Building Electrical, Plumbing, Mechanical (EPM) Encroachment Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Building Encroachment Transportation Encroachment Encroachment Encroachment Transportation Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Fire Construction Encroachment Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Building Building Encroachment Electrical, Plumbing, Mechanical (EPM) Encroachment Encroachment Electrical, Plumbing, Mechanical (EPM) Encroachment Transportation Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Encroachment Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Fire Construction Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Building Encroachment Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Building Electrical, Plumbing, Mechanical (EPM) Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Building Encroachment Transportation Encroachment Building Electrical, Plumbing, Mechanical (EPM) Fire Construction Encroachment Fire Construction Electrical, Plumbing, Mechanical (EPM) Encroachment Transportation Electrical, Plumbing, Mechanical (EPM) Transportation Encroachment Electrical, Plumbing, Mechanical (EPM) Building Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Transportation Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Transportation Electrical, Plumbing, Mechanical (EPM) Encroachment Encroachment Encroachment Photovoltaic (SolarAPP) Encroachment Encroachment Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Fire Construction Grading/Site Improvements Photovoltaic (SolarAPP) Building Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Building Electrical, Plumbing, Mechanical (EPM) Transportation Building Fire Construction Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Transportation Electrical, Plumbing, Mechanical (EPM) Encroachment Photovoltaic (SolarAPP) Transportation Building Electrical, Plumbing, Mechanical (EPM) Transportation Electrical, Plumbing, Mechanical (EPM) Encroachment Encroachment Building Encroachment Electrical, Plumbing, Mechanical (EPM) Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Transportation Photovoltaic (SolarAPP) Demolition Building Building Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Building Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Fire Construction Encroachment Electrical, Plumbing, Mechanical (EPM) Building Electrical, Plumbing, Mechanical (EPM) Encroachment Building Building Encroachment Sign Building Photovoltaic (SolarAPP) Encroachment Electrical, Plumbing, Mechanical (EPM) Building Encroachment Electrical, Plumbing, Mechanical (EPM) Encroachment Fire Construction Electrical, Plumbing, Mechanical (EPM) Fire Construction Building Building Building Building Building Building Building Building Building Building Electrical, Plumbing, Mechanical (EPM) Building Building Transportation Encroachment Electrical, Plumbing, Mechanical (EPM) Building Building Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Building Photovoltaic (SolarAPP) Encroachment Encroachment Building Transportation Fire Construction Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Encroachment Encroachment Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Building Electrical, Plumbing, Mechanical (EPM) Transportation Encroachment Building Photovoltaic (SolarAPP) Encroachment Building Encroachment Building Encroachment Photovoltaic (SolarAPP) Encroachment Encroachment Photovoltaic (SolarAPP) Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Building Transportation Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Building Encroachment Building Building Encroachment Photovoltaic (SolarAPP) Fire Construction Encroachment Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Building Electrical, Plumbing, Mechanical (EPM) Building Electrical, Plumbing, Mechanical (EPM) Encroachment Encroachment Encroachment Photovoltaic (SolarAPP) Building Electrical, Plumbing, Mechanical (EPM) Encroachment Encroachment Photovoltaic (SolarAPP) Building Photovoltaic (SolarAPP) Building Fire Construction Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Building Electrical, Plumbing, Mechanical (EPM) Fire Construction Photovoltaic (SolarAPP) Photovoltaic (SolarAPP) Fire Construction Encroachment Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Encroachment Electrical, Plumbing, Mechanical (EPM) Building Sign Electrical, Plumbing, Mechanical (EPM) Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Building Building Electrical, Plumbing, Mechanical (EPM) Fire Construction Building Electrical, Plumbing, Mechanical (EPM) Sign Fire Construction Encroachment Encroachment Photovoltaic (SolarAPP) Building Fire Construction Encroachment Photovoltaic (SolarAPP) Building Photovoltaic (SolarAPP) Building Electrical, Plumbing, Mechanical (EPM) Building Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Encroachment Building Electrical, Plumbing, Mechanical (EPM) Building Building Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Transportation Photovoltaic (SolarAPP) Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Demolition Photovoltaic (SolarAPP) Encroachment Electrical, Plumbing, Mechanical (EPM) Building Encroachment Electrical, Plumbing, Mechanical (EPM) Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Building Fire Construction Transportation Encroachment Building Electrical, Plumbing, Mechanical (EPM) Building Building Encroachment Fire Construction Electrical, Plumbing, Mechanical (EPM) Building Electrical, Plumbing, Mechanical (EPM) Encroachment Building Fire Construction Encroachment Electrical, Plumbing, Mechanical (EPM) Encroachment Encroachment Building Building Transportation Fire Construction Transportation Encroachment Transportation Transportation Electrical, Plumbing, Mechanical (EPM) Building Encroachment Transportation Transportation Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Encroachment Fire Construction Encroachment Encroachment Building Transportation Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Transportation Transportation Transportation Encroachment Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Encroachment Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Encroachment Building Transportation Fire Construction Transportation Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Building Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Encroachment Encroachment Electrical, Plumbing, Mechanical (EPM) Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Building Encroachment Building Transportation Electrical, Plumbing, Mechanical (EPM) Encroachment Building Transportation Electrical, Plumbing, Mechanical (EPM) Sign Electrical, Plumbing, Mechanical (EPM) Building Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Transportation Transportation Photovoltaic (SolarAPP) Building Transportation Electrical, Plumbing, Mechanical (EPM) Transportation Transportation Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Encroachment Electrical, Plumbing, Mechanical (EPM) Transportation Encroachment Transportation Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Encroachment Fire Construction Encroachment Transportation Photovoltaic (SolarAPP) Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Transportation Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Fire Construction Electrical, Plumbing, Mechanical (EPM) Encroachment Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Building Transportation Transportation Encroachment Transportation Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Building Sign Transportation Electrical, Plumbing, Mechanical (EPM) Building Encroachment Transportation Transportation Transportation Electrical, Plumbing, Mechanical (EPM) Fire Construction Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Encroachment Building Encroachment Encroachment Encroachment Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Transportation Encroachment Encroachment Encroachment Fire Construction Transportation Building Electrical, Plumbing, Mechanical (EPM) Encroachment Photovoltaic (SolarAPP) Fire Construction Transportation Building Transportation Encroachment Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Building Photovoltaic (SolarAPP) Transportation Electrical, Plumbing, Mechanical (EPM) Building Building Electrical, Plumbing, Mechanical (EPM) Transportation Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Building Demolition Transportation Electrical, Plumbing, Mechanical (EPM) Fire Construction Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Transportation Encroachment Electrical, Plumbing, Mechanical (EPM) Encroachment Transportation Transportation Encroachment Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Transportation Electrical, Plumbing, Mechanical (EPM) Encroachment Encroachment Transportation Transportation Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Transportation Electrical, Plumbing, Mechanical (EPM) Encroachment Fire Construction Building Transportation Transportation Photovoltaic (SolarAPP) Transportation Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Fire Construction Photovoltaic (SolarAPP) Transportation Building Transportation Encroachment Sign Transportation Photovoltaic (SolarAPP) Transportation Encroachment Encroachment Encroachment Transportation Electrical, Plumbing, Mechanical (EPM) Transportation Encroachment Transportation Electrical, Plumbing, Mechanical (EPM) Encroachment Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Fire Construction Encroachment Building Encroachment Encroachment Fire Construction Transportation Transportation Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Building Demolition Electrical, Plumbing, Mechanical (EPM) Transportation Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Transportation Encroachment Electrical, Plumbing, Mechanical (EPM) Encroachment Building Encroachment Electrical, Plumbing, Mechanical (EPM) Fire Construction Fire Construction Transportation Encroachment Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Photovoltaic (SolarAPP) Encroachment Encroachment Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Encroachment Electrical, Plumbing, Mechanical (EPM) Encroachment Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Encroachment Photovoltaic (SolarAPP) Transportation Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Transportation Encroachment Transportation Encroachment Fire Construction Transportation Transportation Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Transportation Encroachment Encroachment Encroachment Encroachment Encroachment Electrical, Plumbing, Mechanical (EPM) Transportation Building Encroachment Encroachment Encroachment Transportation Encroachment Encroachment Encroachment Encroachment Building Sign Encroachment Building Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Transportation Fire Construction Fire Construction Transportation Encroachment Encroachment Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Transportation Sign Electrical, Plumbing, Mechanical (EPM) Fire Construction Transportation Encroachment Fire Construction Electrical, Plumbing, Mechanical (EPM) Encroachment Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Encroachment Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Fire Construction Fire Construction Fire Construction Electrical, Plumbing, Mechanical (EPM) Demolition Fire Construction Building Fire Construction Fire Construction Electrical, Plumbing, Mechanical (EPM) Transportation Electrical, Plumbing, Mechanical (EPM) Fire Construction Fire Construction Transportation Transportation Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Transportation Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Fire Construction Building Fire Construction Encroachment Encroachment Building Electrical, Plumbing, Mechanical (EPM) Encroachment Electrical, Plumbing, Mechanical (EPM) Building Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Building Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Encroachment Electrical, Plumbing, Mechanical (EPM) Transportation Fire Construction Electrical, Plumbing, Mechanical (EPM) Building Encroachment Building Encroachment Electrical, Plumbing, Mechanical (EPM) Encroachment Transportation Encroachment Photovoltaic (SolarAPP) Encroachment Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Building Electrical, Plumbing, Mechanical (EPM) Building Encroachment Electrical, Plumbing, Mechanical (EPM) Fire Construction Sign Electrical, Plumbing, Mechanical (EPM) Transportation Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Encroachment Encroachment Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Encroachment Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Encroachment Encroachment Fire Construction Transportation Electrical, Plumbing, Mechanical (EPM) Encroachment Electrical, Plumbing, Mechanical (EPM) Encroachment Encroachment Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Transportation Electrical, Plumbing, Mechanical (EPM) Building Electrical, Plumbing, Mechanical (EPM) Transportation Encroachment Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Transportation Photovoltaic (SolarAPP) Encroachment Building Encroachment Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Building Transportation Encroachment Building Building Fire Construction Building Building Building Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Electrical, Plumbing, Mechanical (EPM) Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Building Encroachment Encroachment Encroachment Encroachment Encroachment Building Encroachment Encroachment Encroachment Encroachment Building Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Building Encroachment Encroachment Fire Construction Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Building Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Encroachment Fire Construction Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Encroachment Encroachment Transportation Encroachment Encroachment Electrical, Plumbing, Mechanical (EPM) Building Encroachment Building Encroachment Encroachment Building Electrical, Plumbing, Mechanical (EPM) Building Building Building Encroachment Building Electrical, Plumbing, Mechanical (EPM) Encroachment Encroachment Encroachment Fire Construction Photovoltaic (SolarAPP) Photovoltaic (SolarAPP) Encroachment Sign Transportation Encroachment Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Photovoltaic (SolarAPP) Transportation Transportation Electrical, Plumbing, Mechanical (EPM) Building Building Building Building Building Electrical, Plumbing, Mechanical (EPM) Building Encroachment Fire Construction Electrical, Plumbing, Mechanical (EPM) Encroachment Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Building Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Transportation Photovoltaic (SolarAPP) Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Building Building Encroachment Building Electrical, Plumbing, Mechanical (EPM) Encroachment Building Building Electrical, Plumbing, Mechanical (EPM) Building Encroachment Encroachment Encroachment Building Transportation Encroachment Building Building Building Building Building Building Building Electrical, Plumbing, Mechanical (EPM) Building Building Building Building Building Building Building Building Building Building Building Building Building Encroachment Building Encroachment Building Building Building Building Building Building Building Encroachment Encroachment Encroachment Transportation Building Building Building Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Encroachment Building Encroachment Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Encroachment Building Fire Construction Encroachment Building Encroachment Encroachment Building Encroachment Encroachment Encroachment Fire Construction Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Encroachment Transportation Encroachment Building Building Building Photovoltaic (SolarAPP) Photovoltaic (SolarAPP) Photovoltaic (SolarAPP) Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Building Electrical, Plumbing, Mechanical (EPM) Encroachment Encroachment Encroachment Transportation Encroachment Encroachment Encroachment Fire Construction Fire Construction Encroachment Encroachment Transportation Building Encroachment Encroachment Building Encroachment Transportation Encroachment Transportation Building Encroachment Encroachment Building Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Fire Construction Fire Construction Building Fire Construction Fire Construction Sign Encroachment Building Encroachment Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Encroachment Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Building Fire Construction Fire Construction Building Building Encroachment Fire Construction Encroachment Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Encroachment Building Encroachment Building Electrical, Plumbing, Mechanical (EPM) Encroachment Building Encroachment Encroachment Electrical, Plumbing, Mechanical (EPM) Building Encroachment Encroachment Fire Construction Encroachment Building Electrical, Plumbing, Mechanical (EPM) Building Electrical, Plumbing, Mechanical (EPM) Encroachment Encroachment Building Building Encroachment Electrical, Plumbing, Mechanical (EPM) Transportation Building Fire Construction Fire Construction Encroachment Transportation Encroachment Encroachment Fire Construction Building Fire Construction Encroachment Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Transportation Building Building Building Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Demolition Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Transportation Encroachment Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Building Building Building Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Building Building Building Electrical, Plumbing, Mechanical (EPM) Building Electrical, Plumbing, Mechanical (EPM) Building Building Building Electrical, Plumbing, Mechanical (EPM) Building Building Grading/Site Improvements Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Encroachment Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Encroachment Electrical, Plumbing, Mechanical (EPM) Encroachment Building Encroachment Encroachment Building Building Building Building Building Building Building Building Building Building Building Building Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Fire Construction Fire Construction Fire Construction Fire Construction Fire Construction Fire Construction Fire Construction Fire Construction Fire Construction Fire Construction Fire Construction Fire Construction Fire Construction Fire Construction Fire Construction Fire Construction Fire Construction Grading/Site Improvements Building Building Building Transportation Building Building Encroachment Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Building Building Building Grading/Site Improvements Encroachment Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Transportation Building Building Electrical, Plumbing, Mechanical (EPM) Encroachment Electrical, Plumbing, Mechanical (EPM) Fire Construction Building Building Electrical, Plumbing, Mechanical (EPM) Transportation Transportation Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Building Building Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Building Photovoltaic (SolarAPP) Building Building Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Transportation Building Building Electrical, Plumbing, Mechanical (EPM) Building Photovoltaic (SolarAPP) Building Building Encroachment Building Fire Construction Encroachment Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Encroachment Electrical, Plumbing, Mechanical (EPM) Transportation Transportation Transportation Building Encroachment Encroachment Encroachment Encroachment Encroachment Encroachment Building Encroachment Fire Construction Encroachment Building Building Encroachment Encroachment Encroachment Transportation Encroachment Building Building Encroachment Building Building Transportation Fire Construction Encroachment Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Building Building Fire Construction Fire Construction Encroachment Building Building Encroachment Building Building Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Fire Construction Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Building Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Encroachment Fire Construction Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Transportation Encroachment Fire Construction Electrical, Plumbing, Mechanical (EPM) Transportation Transportation Transportation Electrical, Plumbing, Mechanical (EPM) Fire Construction Transportation Transportation Transportation Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Building Fire Construction Encroachment Electrical, Plumbing, Mechanical (EPM) Building Sign Photovoltaic (SolarAPP) Transportation Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Photovoltaic (SolarAPP) Transportation Electrical, Plumbing, Mechanical (EPM) Encroachment Fire Construction Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Building Building Building Building Electrical, Plumbing, Mechanical (EPM) Transportation Electrical, Plumbing, Mechanical (EPM) Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Encroachment Encroachment Encroachment Encroachment Building Building Fire Construction Electrical, Plumbing, Mechanical (EPM) Building Fire Construction Building Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Transportation Building Building Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Building Encroachment Transportation Building Building Building Photovoltaic (SolarAPP) Building Building Building Building Building Building Building Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Sign Building Building Building Building Building Building Building Building Encroachment Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Encroachment Building Building Building Building Fire Construction Electrical, Plumbing, Mechanical (EPM) Building Building Encroachment Building Building Building Building Electrical, Plumbing, Mechanical (EPM) Building Electrical, Plumbing, Mechanical (EPM) Building Encroachment Transportation Encroachment Encroachment Building Encroachment Fire Construction Encroachment Fire Construction Encroachment Encroachment Encroachment Building Encroachment Encroachment Electrical, Plumbing, Mechanical (EPM) Building Building Encroachment Encroachment Encroachment Building Building Encroachment Encroachment Encroachment Encroachment Building Encroachment Transportation Encroachment Encroachment Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Building Photovoltaic (SolarAPP) Sign Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Encroachment Building Building Encroachment Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Fire Construction Encroachment Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Encroachment Sign Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Building Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Building Building Building Building Photovoltaic (SolarAPP) Encroachment Building Electrical, Plumbing, Mechanical (EPM) Transportation Transportation Photovoltaic (SolarAPP) Photovoltaic (SolarAPP) Building Electrical, Plumbing, Mechanical (EPM) Building Demolition Demolition Demolition Building Encroachment Building Photovoltaic (SolarAPP) Building Building Building Building Demolition Building Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Photovoltaic (SolarAPP) Building Building Building Building Encroachment Encroachment Building Building Building Building Encroachment Building Building Building Encroachment Encroachment Building Fire Construction Fire Construction Fire Construction Building Building Demolition Electrical, Plumbing, Mechanical (EPM) Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Transportation Building Building Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Encroachment Electrical, Plumbing, Mechanical (EPM) Sign Building Building Electrical, Plumbing, Mechanical (EPM) Encroachment Electrical, Plumbing, Mechanical (EPM) Encroachment Photovoltaic (SolarAPP) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Transportation Building Building Building Building Building Building Building Building Photovoltaic (SolarAPP) Building Building Building Building Building Building Building Sign Building Fire Construction Transportation Building Building Encroachment Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Building Building Transportation Fire Construction Electrical, Plumbing, Mechanical (EPM) Building Fire Construction Building Building Electrical, Plumbing, Mechanical (EPM) Building Building Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Electrical, Plumbing, Mechanical (EPM) Encroachment Building Building Electrical, Plumbing, Mechanical (EPM) Building Fire Construction Electrical, Plumbing, Mechanical (EPM) Building Building Electrical, Plumbing, Mechanical (EPM) Encroachment Permit Issue Date 9/26/2025 11/13/2025 11/12/2025 10/17/2025 10/6/2025 9/5/2025 10/31/2025 10/8/2025 10/30/2025 10/13/2025 9/11/2025 9/16/2025 9/25/2025 9/23/2025 9/9/2025 9/24/2025 9/18/2025 7/15/2025 9/18/2025 9/10/2025 7/14/2025 9/9/2025 8/14/2025 9/2/2025 9/5/2025 7/22/2025 8/19/2025 9/8/2025 8/7/2025 8/26/2025 8/22/2025 7/28/2025 8/14/2025 6/26/2025 7/23/2025 8/15/2025 8/20/2025 8/21/2025 8/14/2025 8/14/2025 8/11/2025 8/12/2025 8/26/2025 8/11/2025 7/16/2025 7/31/2025 7/8/2025 7/10/2025 7/31/2025 9/4/2025 8/13/2025 11/7/2025 6/25/2025 8/27/2025 8/6/2025 7/1/2025 8/14/2025 8/25/2025 8/4/2025 6/13/2025 8/7/2025 8/15/2025 8/13/2025 8/7/2025 8/4/2025 7/30/2025 9/9/2025 6/26/2025 6/30/2025 8/5/2025 8/7/2025 7/15/2025 9/9/2025 7/1/2025 9/23/2025 6/24/2025 7/30/2025 10/7/2025 6/26/2025 8/4/2025 8/12/2025 8/27/2025 7/17/2025 6/30/2025 8/5/2025 8/19/2025 8/7/2025 8/5/2025 8/6/2025 7/30/2025 8/27/2025 6/24/2025 8/13/2025 9/3/2025 6/24/2025 8/27/2025 7/8/2025 7/16/2025 8/21/2025 7/29/2025 8/13/2025 6/23/2025 8/11/2025 7/22/2025 7/28/2025 6/25/2025 10/1/2025 9/4/2025 6/24/2025 8/20/2025 8/12/2025 8/27/2025 9/4/2025 7/1/2025 7/28/2025 8/12/2025 7/9/2025 9/11/2025 7/9/2025 8/27/2025 8/1/2025 7/2/2025 9/3/2025 7/14/2025 9/5/2025 8/4/2025 7/7/2025 8/28/2025 8/27/2025 7/9/2025 8/26/2025 8/11/2025 8/11/2025 8/29/2025 7/11/2025 8/13/2025 9/4/2025 10/8/2025 6/25/2025 12/4/2025 8/4/2025 7/14/2025 8/21/2025 9/3/2025 8/21/2025 7/22/2025 8/19/2025 7/28/2025 8/27/2025 7/29/2025 7/17/2025 9/10/2025 8/19/2025 8/26/2025 8/29/2025 8/11/2025 8/13/2025 7/8/2025 8/1/2025 7/15/2025 7/25/2025 7/22/2025 7/2/2025 7/15/2025 9/4/2025 8/29/2025 6/26/2025 6/27/2025 7/29/2025 8/14/2025 8/25/2025 6/27/2025 6/19/2025 7/28/2025 7/14/2025 7/28/2025 9/10/2025 7/21/2025 7/11/2025 8/21/2025 8/12/2025 8/12/2025 8/6/2025 9/5/2025 7/17/2025 8/28/2025 8/7/2025 8/13/2025 8/28/2025 7/28/2025 7/14/2025 8/13/2025 7/17/2025 8/20/2025 8/14/2025 8/21/2025 8/21/2025 8/7/2025 6/24/2025 8/7/2025 7/10/2025 8/20/2025 8/25/2025 9/9/2025 9/10/2025 8/28/2025 8/11/2025 8/29/2025 8/5/2025 8/26/2025 7/11/2025 8/19/2025 7/17/2025 8/4/2025 7/28/2025 8/21/2025 8/19/2025 8/20/2025 7/11/2025 8/12/2025 9/9/2025 7/2/2025 7/25/2025 7/11/2025 9/4/2025 7/17/2025 9/9/2025 8/15/2025 8/18/2025 6/26/2025 8/18/2025 9/10/2025 7/10/2025 8/6/2025 7/15/2025 6/27/2025 8/5/2025 7/22/2025 8/28/2025 7/22/2025 7/1/2025 7/22/2025 8/6/2025 7/7/2025 8/4/2025 7/14/2025 6/26/2025 8/18/2025 7/1/2025 7/14/2025 7/15/2025 8/6/2025 7/16/2025 9/3/2025 6/23/2025 8/14/2025 7/22/2025 8/20/2025 7/29/2025 8/4/2025 9/5/2025 8/18/2025 7/21/2025 6/30/2025 8/12/2025 8/15/2025 9/4/2025 6/24/2025 7/10/2025 8/11/2025 8/29/2025 8/28/2025 8/13/2025 8/15/2025 7/29/2025 12/1/2025 8/14/2025 8/20/2025 8/19/2025 8/15/2025 6/25/2025 12/8/2025 8/27/2025 8/4/2025 7/14/2025 9/8/2025 7/22/2025 7/1/2025 8/7/2025 7/22/2025 6/27/2025 9/8/2025 8/6/2025 8/12/2025 8/21/2025 7/21/2025 9/8/2025 6/23/2025 8/6/2025 7/28/2025 8/12/2025 9/3/2025 8/7/2025 7/15/2025 7/7/2025 12/1/2025 6/23/2025 8/18/2025 7/22/2025 7/23/2025 7/23/2025 8/7/2025 8/6/2025 7/15/2025 8/4/2025 7/10/2025 8/12/2025 9/22/2025 7/24/2025 9/2/2025 7/28/2025 11/6/2025 7/1/2025 8/11/2025 7/28/2025 9/10/2025 7/17/2025 7/23/2025 8/5/2025 11/21/2025 8/18/2025 7/8/2025 6/24/2025 7/1/2025 9/9/2025 6/30/2025 11/6/2025 8/18/2025 5/29/2025 7/23/2025 11/25/2025 6/30/2025 11/25/2025 6/30/2025 6/30/2025 6/5/2025 6/4/2025 11/17/2025 6/17/2025 6/5/2025 6/17/2025 6/18/2025 6/24/2025 6/4/2025 6/10/2025 6/13/2025 7/2/2025 6/13/2025 6/13/2025 6/17/2025 8/13/2025 6/2/2025 5/29/2025 5/29/2025 6/13/2025 6/12/2025 6/9/2025 6/17/2025 6/5/2025 6/12/2025 7/9/2025 6/30/2025 6/2/2025 6/17/2025 6/20/2025 6/11/2025 6/17/2025 6/2/2025 6/3/2025 6/4/2025 5/29/2025 6/8/2025 6/18/2025 6/17/2025 6/12/2025 6/9/2025 6/9/2025 5/29/2025 7/16/2025 5/29/2025 6/9/2025 6/9/2025 5/30/2025 6/10/2025 6/10/2025 6/13/2025 6/3/2025 8/4/2025 6/25/2025 6/12/2025 6/17/2025 6/24/2025 6/13/2025 7/2/2025 6/5/2025 6/9/2025 9/29/2025 6/18/2025 6/18/2025 6/5/2025 6/9/2025 6/2/2025 12/9/2025 6/9/2025 6/17/2025 6/2/2025 6/11/2025 6/11/2025 6/12/2025 9/9/2025 6/9/2025 6/11/2025 6/24/2025 6/17/2025 6/9/2025 6/17/2025 6/20/2025 6/6/2025 6/12/2025 6/10/2025 6/23/2025 6/17/2025 6/10/2025 6/16/2025 6/5/2025 7/15/2025 6/16/2025 10/14/2025 6/9/2025 8/13/2025 6/2/2025 6/13/2025 6/5/2025 6/17/2025 8/12/2025 6/9/2025 6/3/2025 6/4/2025 6/5/2025 6/26/2025 6/17/2025 6/13/2025 6/18/2025 6/9/2025 6/3/2025 6/4/2025 6/10/2025 6/6/2025 6/3/2025 6/11/2025 6/18/2025 6/5/2025 5/30/2025 6/18/2025 6/4/2025 6/16/2025 6/17/2025 6/5/2025 6/4/2025 8/19/2025 6/10/2025 6/19/2025 6/2/2025 6/12/2025 6/10/2025 6/19/2025 6/12/2025 6/12/2025 6/9/2025 6/5/2025 6/18/2025 6/12/2025 6/2/2025 6/16/2025 5/30/2025 7/1/2025 6/19/2025 6/2/2025 6/5/2025 6/12/2025 6/16/2025 6/10/2025 6/5/2025 8/19/2025 5/29/2025 6/9/2025 8/11/2025 7/2/2025 10/6/2025 8/18/2025 8/11/2025 8/29/2025 9/8/2025 7/31/2025 9/11/2025 12/9/2025 10/21/2025 11/19/2025 12/1/2025 11/5/2025 11/12/2025 11/14/2025 11/17/2025 11/19/2025 9/4/2025 12/2/2025 11/18/2025 11/25/2025 10/17/2025 11/4/2025 10/30/2025 10/6/2025 9/23/2025 11/3/2025 9/19/2025 12/1/2025 10/13/2025 11/24/2025 10/27/2025 12/8/2025 11/10/2025 10/16/2025 11/26/2025 12/1/2025 10/23/2025 9/22/2025 11/18/2025 11/13/2025 10/15/2025 10/6/2025 11/12/2025 10/27/2025 9/29/2025 9/24/2025 11/14/2025 9/25/2025 10/7/2025 10/6/2025 10/2/2025 12/1/2025 11/14/2025 10/1/2025 12/3/2025 11/17/2025 11/18/2025 10/3/2025 11/13/2025 10/9/2025 10/1/2025 12/4/2025 11/12/2025 11/17/2025 12/3/2025 10/17/2025 10/31/2025 10/16/2025 11/18/2025 11/19/2025 9/29/2025 10/7/2025 10/16/2025 10/6/2025 9/4/2025 10/20/2025 10/8/2025 12/4/2025 10/21/2025 9/22/2025 10/30/2025 9/22/2025 11/18/2025 10/30/2025 11/19/2025 11/14/2025 10/27/2025 12/1/2025 10/23/2025 11/5/2025 10/29/2025 9/26/2025 10/20/2025 10/8/2025 9/22/2025 10/9/2025 10/29/2025 9/25/2025 11/12/2025 12/2/2025 11/7/2025 11/20/2025 10/16/2025 9/22/2025 11/10/2025 11/6/2025 11/18/2025 10/2/2025 11/18/2025 10/31/2025 10/27/2025 11/12/2025 9/5/2025 11/4/2025 9/29/2025 10/24/2025 9/19/2025 9/25/2025 11/18/2025 11/18/2025 11/18/2025 11/3/2025 11/14/2025 12/2/2025 10/28/2025 10/8/2025 9/22/2025 10/6/2025 11/5/2025 10/17/2025 11/18/2025 10/17/2025 12/5/2025 9/25/2025 11/19/2025 9/24/2025 11/12/2025 12/4/2025 10/10/2025 10/3/2025 10/22/2025 11/19/2025 12/3/2025 10/9/2025 11/18/2025 10/16/2025 11/5/2025 10/17/2025 11/20/2025 10/2/2025 12/1/2025 9/22/2025 11/7/2025 11/13/2025 9/25/2025 10/30/2025 9/22/2025 10/31/2025 10/7/2025 11/12/2025 10/14/2025 10/14/2025 11/17/2025 11/24/2025 11/18/2025 9/29/2025 10/22/2025 12/1/2025 11/4/2025 10/17/2025 11/26/2025 11/21/2025 10/14/2025 11/25/2025 10/30/2025 10/27/2025 10/14/2025 12/9/2025 10/23/2025 10/23/2025 12/9/2025 11/19/2025 10/1/2025 12/1/2025 11/5/2025 10/8/2025 10/17/2025 10/23/2025 9/18/2025 10/9/2025 9/29/2025 10/8/2025 11/21/2025 9/26/2025 10/27/2025 10/24/2025 12/1/2025 11/5/2025 9/23/2025 10/30/2025 10/21/2025 9/24/2025 11/25/2025 11/5/2025 9/22/2025 10/30/2025 11/18/2025 11/14/2025 10/1/2025 12/8/2025 11/5/2025 9/22/2025 11/5/2025 9/23/2025 12/2/2025 12/8/2025 11/6/2025 10/30/2025 9/24/2025 11/10/2025 11/5/2025 9/26/2025 11/3/2025 12/2/2025 11/19/2025 11/17/2025 10/14/2025 11/20/2025 10/13/2025 10/15/2025 11/6/2025 10/17/2025 10/15/2025 12/3/2025 11/18/2025 11/18/2025 10/1/2025 9/30/2025 9/29/2025 11/7/2025 12/1/2025 10/20/2025 10/28/2025 10/16/2025 11/12/2025 11/3/2025 9/23/2025 10/20/2025 10/21/2025 12/3/2025 10/15/2025 10/27/2025 10/1/2025 11/20/2025 11/12/2025 11/12/2025 10/2/2025 10/10/2025 10/7/2025 10/27/2025 10/27/2025 11/6/2025 10/3/2025 11/4/2025 10/17/2025 12/1/2025 11/12/2025 10/6/2025 10/2/2025 10/2/2025 11/26/2025 10/17/2025 9/24/2025 11/7/2025 12/8/2025 10/29/2025 11/13/2025 10/31/2025 11/6/2025 12/8/2025 10/6/2025 11/20/2025 12/2/2025 11/12/2025 11/5/2025 10/28/2025 9/10/2025 10/14/2025 11/14/2025 10/1/2025 12/8/2025 11/5/2025 10/14/2025 12/9/2025 10/31/2025 10/8/2025 9/29/2025 12/8/2025 10/14/2025 10/20/2025 12/1/2025 10/16/2025 11/10/2025 10/7/2025 10/6/2025 10/24/2025 10/15/2025 10/7/2025 12/4/2025 10/30/2025 10/17/2025 12/5/2025 10/8/2025 11/12/2025 11/12/2025 10/23/2025 10/3/2025 9/26/2025 11/10/2025 11/24/2025 11/10/2025 9/24/2025 11/13/2025 12/8/2025 10/29/2025 9/17/2025 9/15/2025 9/15/2025 9/17/2025 9/17/2025 9/16/2025 9/12/2025 9/16/2025 9/17/2025 9/11/2025 9/17/2025 9/11/2025 10/28/2025 9/11/2025 9/15/2025 9/11/2025 9/11/2025 9/16/2025 9/18/2025 9/11/2025 9/17/2025 9/11/2025 9/18/2025 9/18/2025 9/17/2025 9/17/2025 9/18/2025 9/18/2025 9/12/2025 9/17/2025 9/16/2025 9/17/2025 9/11/2025 9/17/2025 9/16/2025 9/18/2025 11/18/2025 9/17/2025 9/19/2025 9/15/2025 8/18/2025 6/25/2025 6/25/2025 8/12/2025 9/2/2025 7/9/2025 8/19/2025 7/22/2025 9/4/2025 8/13/2025 7/31/2025 9/2/2025 8/11/2025 6/25/2025 6/24/2025 7/1/2025 8/15/2025 7/18/2025 8/11/2025 8/19/2025 8/14/2025 7/2/2025 8/21/2025 7/22/2025 7/10/2025 8/18/2025 7/28/2025 7/25/2025 8/7/2025 8/20/2025 6/24/2025 8/27/2025 8/27/2025 7/17/2025 9/2/2025 7/15/2025 7/9/2025 8/4/2025 8/26/2025 8/11/2025 8/27/2025 6/24/2025 7/8/2025 7/21/2025 6/30/2025 7/21/2025 6/24/2025 7/28/2025 8/15/2025 6/26/2025 9/9/2025 8/28/2025 8/5/2025 7/11/2025 9/2/2025 8/12/2025 6/24/2025 7/25/2025 8/27/2025 8/6/2025 8/29/2025 6/25/2025 9/3/2025 8/5/2025 8/7/2025 8/12/2025 8/6/2025 7/30/2025 6/25/2025 8/11/2025 7/1/2025 8/4/2025 9/10/2025 8/27/2025 7/28/2025 8/7/2025 8/21/2025 6/27/2025 8/5/2025 6/23/2025 6/18/2025 6/11/2025 11/13/2025 6/12/2025 7/24/2025 8/26/2025 7/29/2025 8/25/2025 8/4/2025 8/18/2025 7/23/2025 6/12/2025 7/1/2025 8/13/2025 8/14/2025 7/1/2025 6/19/2025 8/29/2025 7/1/2025 6/16/2025 6/19/2025 9/5/2025 8/26/2025 7/17/2025 6/17/2025 6/19/2025 8/26/2025 8/19/2025 8/25/2025 8/20/2025 8/25/2025 8/4/2025 6/26/2025 6/19/2025 8/8/2025 8/18/2025 8/26/2025 7/10/2025 6/30/2025 7/21/2025 6/12/2025 7/31/2025 6/5/2025 6/17/2025 9/2/2025 6/16/2025 7/11/2025 8/4/2025 6/18/2025 7/17/2025 9/4/2025 7/24/2025 8/26/2025 7/9/2025 7/15/2025 7/9/2025 7/17/2025 8/18/2025 6/23/2025 6/11/2025 6/30/2025 7/22/2025 8/5/2025 8/26/2025 7/9/2025 8/28/2025 7/24/2025 8/21/2025 7/29/2025 6/19/2025 6/13/2025 6/23/2025 6/10/2025 9/3/2025 8/26/2025 8/26/2025 6/2/2025 5/29/2025 6/9/2025 6/5/2025 6/10/2025 6/3/2025 6/3/2025 6/5/2025 6/10/2025 11/19/2025 11/24/2025 11/25/2025 11/18/2025 12/4/2025 11/25/2025 12/2/2025 11/13/2025 11/25/2025 12/2/2025 9/17/2025 12/1/2025 6/4/2025 9/3/2025 11/12/2025 11/4/2025 8/26/2025 9/26/2025 6/30/2025 10/31/2025 11/12/2025 10/13/2025 10/1/2025 10/20/2025 11/12/2025 7/9/2025 11/12/2025 10/1/2025 11/12/2025 11/4/2025 11/12/2025 10/8/2025 10/2/2025 11/6/2025 11/5/2025 10/28/2025 11/4/2025 10/1/2025 9/16/2025 11/13/2025 11/4/2025 11/10/2025 10/27/2025 11/6/2025 10/15/2025 10/30/2025 11/12/2025 10/30/2025 10/17/2025 7/29/2025 10/13/2025 10/30/2025 10/15/2025 11/6/2025 11/12/2025 6/18/2025 7/15/2025 6/19/2025 7/28/2025 8/4/2025 7/25/2025 6/24/2025 7/24/2025 6/10/2025 12/8/2025 10/30/2025 11/14/2025 10/27/2025 11/26/2025 10/6/2025 12/11/2025 12/10/2025 12/11/2025 12/11/2025 12/11/2025 12/11/2025 12/12/2025 12/9/2025 6/19/2025 12/12/2025 12/12/2025 12/12/2025 12/12/2025 6/11/2025 12/12/2025 6/17/2025 11/13/2025 6/17/2025 11/18/2025 7/2/2025 11/24/2025 12/9/2025 12/15/2025 11/14/2025 11/4/2025 9/16/2025 9/22/2025 12/15/2025 12/16/2025 12/16/2025 12/16/2025 12/10/2025 11/26/2025 8/19/2025 12/16/2025 12/16/2025 11/19/2025 12/16/2025 12/16/2025 12/16/2025 12/16/2025 12/16/2025 12/18/2025 12/1/2025 12/18/2025 12/18/2025 11/20/2025 11/18/2025 7/23/2025 12/19/2025 10/2/2025 10/2/2025 10/28/2025 6/24/2025 11/20/2025 12/19/2025 12/16/2025 10/24/2025 12/9/2025 12/19/2025 10/16/2025 11/17/2025 12/19/2025 9/2/2025 12/15/2025 12/19/2025 6/25/2025 6/26/2025 10/28/2025 7/2/2025 12/19/2025 12/19/2025 12/22/2025 9/18/2025 12/22/2025 12/22/2025 12/16/2025 12/16/2025 12/16/2025 12/16/2025 12/16/2025 12/16/2025 12/16/2025 10/2/2025 12/16/2025 12/16/2025 12/16/2025 12/16/2025 12/16/2025 12/16/2025 12/16/2025 12/16/2025 12/16/2025 12/16/2025 12/16/2025 12/16/2025 12/16/2025 12/16/2025 12/16/2025 12/16/2025 12/16/2025 12/16/2025 12/16/2025 12/16/2025 12/16/2025 12/16/2025 12/16/2025 12/16/2025 12/16/2025 12/16/2025 12/16/2025 11/26/2025 12/12/2025 6/25/2025 6/10/2025 11/19/2025 10/13/2025 12/12/2025 12/9/2025 12/17/2025 11/13/2025 8/12/2025 12/15/2025 10/27/2025 12/17/2025 12/17/2025 12/17/2025 11/17/2025 6/18/2025 6/5/2025 12/22/2025 8/25/2025 12/12/2025 12/22/2025 12/23/2025 10/9/2025 12/22/2025 9/4/2025 12/22/2025 12/23/2025 12/23/2025 6/24/2025 10/27/2025 6/5/2025 11/13/2025 9/12/2025 11/15/2025 11/16/2025 10/31/2025 12/2/2025 11/26/2025 11/17/2025 11/18/2025 12/3/2025 11/14/2025 11/24/2025 12/11/2025 12/22/2025 9/23/2025 9/9/2025 12/23/2025 11/12/2025 1/6/2026 11/14/2025 1/5/2026 1/5/2026 1/6/2026 1/6/2026 12/12/2025 1/6/2026 1/5/2026 6/24/2025 1/5/2026 12/16/2025 12/10/2025 1/5/2026 1/5/2026 1/5/2026 1/5/2026 12/1/2025 11/17/2025 1/5/2026 10/3/2025 10/17/2025 10/10/2025 1/6/2026 1/7/2026 12/5/2025 9/5/2025 1/8/2026 1/8/2026 1/7/2026 1/7/2026 7/28/2025 1/7/2026 7/14/2025 10/30/2025 1/6/2026 10/24/2025 9/25/2025 11/24/2025 12/22/2025 11/24/2025 6/19/2025 1/9/2026 1/9/2026 6/26/2025 1/12/2026 1/12/2026 7/23/2025 1/12/2026 11/4/2025 1/9/2026 12/26/2025 12/15/2025 1/5/2026 1/8/2026 7/23/2025 1/9/2026 7/7/2025 1/9/2026 1/9/2026 11/24/2025 1/9/2026 1/9/2026 11/18/2025 10/2/2025 1/6/2026 1/12/2026 1/8/2026 1/13/2026 1/13/2026 9/4/2025 11/19/2025 1/13/2026 1/13/2026 1/13/2026 1/5/2026 1/13/2026 1/13/2026 1/14/2026 1/14/2026 10/27/2025 1/13/2026 1/13/2026 1/14/2026 1/5/2026 12/12/2025 1/14/2026 10/8/2025 11/17/2025 10/9/2025 12/22/2025 1/15/2026 12/22/2025 1/15/2026 1/13/2026 1/18/2026 12/10/2025 1/15/2026 1/15/2026 1/15/2026 1/13/2026 1/13/2026 1/13/2026 1/15/2026 10/17/2025 10/15/2025 1/2/2026 1/16/2026 1/16/2026 1/21/2026 1/16/2026 12/3/2025 10/17/2025 1/16/2026 11/20/2025 10/9/2025 5/30/2025 11/5/2025 12/19/2025 12/22/2025 12/17/2025 12/30/2025 11/25/2025 11/10/2025 12/8/2025 12/11/2025 12/23/2025 12/30/2025 12/9/2025 6/17/2025 6/17/2025 6/17/2025 1/20/2026 1/20/2026 1/15/2026 1/20/2026 1/5/2026 10/30/2025 1/15/2026 10/1/2025 1/20/2026 1/20/2026 12/18/2025 1/20/2026 9/23/2025 1/21/2026 1/21/2026 1/21/2026 1/21/2026 1/21/2026 1/21/2026 5/29/2025 1/21/2026 1/21/2026 11/26/2025 1/21/2026 1/21/2026 11/6/2025 10/13/2025 8/29/2025 8/20/2025 8/29/2025 8/29/2025 8/13/2025 12/2/2025 9/15/2025 9/18/2025 12/22/2025 6/5/2025 12/12/2025 7/15/2025 6/19/2025 6/5/2025 6/3/2025 7/15/2025 9/9/2025 8/7/2025 7/15/2025 7/22/2025 7/15/2025 7/16/2025 8/11/2025 7/1/2025 8/21/2025 8/7/2025 8/13/2025 8/29/2025 9/9/2025 8/29/2025 8/18/2025 12/15/2025 8/21/2025 9/26/2025 9/22/2025 11/10/2025 9/29/2025 8/20/2025 11/20/2025 7/1/2025 7/16/2025 6/10/2025 6/10/2025 7/16/2025 7/16/2025 7/17/2025 9/9/2025 9/12/2025 9/9/2025 9/9/2025 7/31/2025 9/9/2025 11/7/2025 7/31/2025 7/31/2025 8/18/2025 8/19/2025 10/13/2025 1/23/2026 8/26/2025 1/26/2026 11/25/2025 11/5/2025 11/25/2025 1/15/2026 1/15/2026 11/18/2025 1/26/2026 1/26/2026 12/18/2025 1/22/2026 7/10/2025 1/26/2026 1/26/2026 1/26/2026 1/27/2026 1/14/2026 12/19/2025 1/27/2026 1/6/2026 1/9/2026 1/26/2026 1/26/2026 1/27/2026 1/28/2026 1/28/2026 1/28/2026 1/22/2026 12/2/2025 9/18/2025 9/18/2025 12/18/2025 1/21/2026 1/6/2026 1/28/2026 8/19/2025 12/19/2025 1/9/2026 1/9/2026 1/29/2026 12/17/2025 1/29/2026 1/9/2026 8/21/2025 1/8/2026 6/24/2025 1/16/2026 6/17/2025 6/17/2025 12/5/2025 6/24/2025 12/5/2025 10/8/2025 1/29/2026 6/26/2025 11/7/2025 1/29/2026 10/1/2025 2/2/2026 2/2/2026 1/20/2026 1/20/2026 2/3/2026 2/3/2026 2/3/2026 2/3/2026 2/3/2026 2/3/2026 7/30/2025 2/2/2026 2/3/2026 2/3/2026 9/23/2025 12/10/2025 1/21/2026 1/21/2026 1/6/2026 1/21/2026 1/7/2026 1/21/2026 9/18/2025 1/21/2026 9/18/2025 8/26/2025 1/12/2026 8/5/2025 1/22/2026 9/26/2025 10/20/2025 1/20/2026 1/20/2026 1/9/2026 1/22/2026 1/22/2026 1/22/2026 1/14/2026 1/12/2026 9/30/2025 1/14/2026 10/24/2025 1/13/2026 1/13/2026 10/22/2025 1/13/2026 1/13/2026 1/15/2026 6/30/2025 7/3/2025 1/22/2026 1/22/2026 1/15/2026 1/26/2026 10/27/2025 1/22/2026 1/22/2026 1/26/2026 1/26/2026 9/9/2025 1/21/2026 1/28/2026 1/28/2026 1/28/2026 1/28/2026 7/2/2025 1/28/2026 1/28/2026 1/14/2026 1/28/2026 10/21/2025 1/27/2026 1/28/2026 1/29/2026 1/29/2026 6/10/2025 7/2/2025 12/18/2025 1/29/2026 1/30/2026 1/30/2026 1/30/2026 12/15/2025 8/20/2025 7/9/2025 11/14/2025 12/19/2025 12/16/2025 1/30/2026 6/11/2025 1/30/2026 1/16/2026 2/3/2026 7/24/2025 12/22/2025 12/18/2025 9/18/2025 9/3/2025 11/25/2025 2/3/2026 2/3/2026 2/4/2026 2/3/2026 7/30/2025 1/26/2026 1/7/2026 1/14/2026 2/4/2026 1/16/2026 2/4/2026 8/18/2025 1/29/2026 10/22/2025 12/1/2025 7/30/2025 10/22/2025 12/15/2025 1/28/2026 12/9/2025 2/4/2026 7/30/2025 7/30/2025 7/30/2025 1/5/2026 1/26/2026 2/2/2026 11/13/2025 7/30/2025 2/4/2026 2/4/2026 8/28/2025 10/30/2025 12/16/2025 2/4/2026 6/3/2025 12/3/2025 11/12/2025 12/17/2025 1/12/2026 7/30/2025 9/18/2025 9/18/2025 2/4/2026 10/27/2025 7/16/2025 1/13/2026 1/9/2026 2/4/2026 2/4/2026 2/4/2026 2/4/2026 2/4/2026 2/4/2026 2/9/2026 2/3/2026 2/4/2026 2/3/2026 2/3/2026 2/3/2026 2/10/2026 6/9/2025 12/8/2025 7/23/2025 2/10/2026 7/3/2025 2/9/2026 7/17/2025 7/29/2025 2/10/2026 7/30/2025 8/14/2025 1/12/2026 1/6/2026 2/9/2026 1/9/2026 9/15/2025 9/18/2025 2/9/2026 2/11/2026 1/29/2026 9/29/2025 7/21/2025 10/23/2025 11/18/2025 2/4/2026 10/29/2025 1/28/2026 2/5/2026 1/30/2026 6/19/2025 2/6/2026 2/6/2026 12/10/2025 9/18/2025 10/16/2025 12/12/2025 2/6/2026 2/6/2026 12/3/2025 9/18/2025 2/3/2026 2/6/2026 1/7/2026 2/6/2026 8/22/2025 2/9/2026 2/9/2026 2/9/2026 11/12/2025 1/5/2026 12/16/2025 1/12/2026 7/30/2025 1/26/2026 9/9/2025 1/6/2026 1/21/2026 12/1/2025 7/30/2025 8/7/2025 8/20/2025 2/4/2026 1/6/2026 2/9/2026 2/9/2026 2/3/2026 2/9/2026 2/9/2026 2/9/2026 2/9/2026 2/9/2026 2/9/2026 9/8/2025 2/9/2026 2/9/2026 2/9/2026 2/9/2026 2/9/2026 2/9/2026 2/9/2026 2/9/2026 2/9/2026 2/9/2026 2/9/2026 2/9/2026 2/9/2026 2/9/2026 2/9/2026 2/9/2026 2/9/2026 2/9/2026 2/9/2026 1/26/2026 7/16/2025 2/9/2026 2/9/2026 2/9/2026 2/9/2026 9/30/2025 9/17/2025 2/9/2026 2/9/2026 2/9/2026 12/18/2025 10/21/2025 10/21/2025 10/30/2025 7/9/2025 2/11/2026 1/26/2026 2/11/2026 2/2/2026 2/2/2026 7/11/2025 7/9/2025 8/20/2025 12/8/2025 12/3/2025 12/5/2025 9/17/2025 9/17/2025 2/11/2026 10/3/2025 1/16/2026 1/14/2026 11/26/2025 12/15/2025 8/25/2025 10/28/2025 1/13/2026 7/24/2025 10/13/2025 12/4/2025 12/8/2025 11/13/2025 7/28/2025 10/22/2025 1/9/2026 11/21/2025 2/12/2026 2/12/2026 7/30/2025 1/9/2026 11/12/2025 10/22/2025 10/14/2025 7/30/2025 7/30/2025 12/15/2025 2/12/2026 2/12/2026 7/23/2025 2/5/2026 2/5/2026 2/5/2026 2/5/2026 5/29/2025 2/5/2026 2/5/2026 2/4/2026 2/12/2026 2/10/2026 2/11/2026 2/9/2026 2/12/2026 2/12/2026 2/9/2026 2/9/2026 1/5/2026 1/21/2026 2/13/2026 2/12/2026 2/12/2026 10/20/2025 2/13/2026 2/2/2026 2/13/2026 10/2/2025 2/13/2026 1/2/2026 10/16/2025 1/20/2026 2/13/2026 9/5/2025 8/12/2025 6/23/2025 12/1/2025 6/17/2025 10/28/2025 9/18/2025 9/18/2025 2/13/2026 6/17/2025 12/17/2025 1/7/2026 6/30/2025 10/6/2025 7/8/2025 9/18/2025 1/5/2026 11/17/2025 2/10/2026 2/13/2026 7/28/2025 6/20/2025 2/17/2026 2/12/2026 1/14/2026 7/23/2025 1/29/2026 2/17/2026 10/21/2025 2/17/2026 1/5/2026 11/4/2025 11/12/2025 2/12/2026 11/12/2025 7/30/2025 1/12/2026 2/17/2026 12/3/2025 2/9/2026 2/9/2026 2/17/2026 2/17/2026 1/26/2026 2/17/2026 10/30/2025 7/24/2025 9/22/2025 2/12/2026 10/6/2025 9/18/2025 2/17/2026 Contact Company Name Sprouse Communications Pacific Gas & Electric Company (PG&E) Pacific Gas and Electric (PG&E) Pacific Gas & Electric Company (PG&E) Southern California Gas Company Pacific Gas & Electric Company (PG&E) Pacific Gas & Electric Company (PG&E) West Coast Arborists, Inc. SoCal Gas Pacific Gas and Electric (PG&E) AT&T Pacific Gas & Electric Company (PG&E) Pacific Gas & Electric Company (PG&E) Downtown SLO AT&T Pacific Gas and Electric (PG&E) Pacific Gas & Electric Company (PG&E) COASTAL CONSTRUCTION & ENGINEERING INC R. Burke Corporation Lee Wilson Electric Company, Inc. SoCalGas Pacific Gas & Electric Company (PG&E) SUNRUN Solarponics, Inc A.M.Sun Solar Photon Brothers, Inc. San Luis Electric Superior Fire Sprinkler Systems, Inc JT Construction Mike Lowrie Transport Action Rooter L&D Maksoudian Inc., DBA: Mak Family Construction SLO Promenade LLC Borland Built & Managed LLC LSE Fire Protection, Inc. LIFESTYLE SOLAR INC AT&T SLO Trenchless DW Auto Sales AVILA RANCH DEVELOPERS INC A CA CORP ECHEVARRIA ROOFING LSE Fire Protection, Inc. Chris Sunderland Engineering Co. Charged Up EVs Hartill Heavy Haul A-Plus Fire Protection Action Rooter Charged Up EVs Bragg Crane Service L&D Maksoudian Inc., DBA: Mak Family Construction Aztech Concrete Construction SLO Trenchless Hartill Heavy Haul Staples Energy SUNRUN LIFESTYLE SOLAR INC Axiom 360 LLC A.M.Sun Solar A-Plus Fire Protection Pacific Heating and Sheet Metal SUNRUN Bragg Crane Service Templeton Electric Inc A-1 GLASS, LLC SLO Trenchless SLO Trenchless Nexus Energy Systems Kanyon Construction TD ELECTRIC Solarponics, Inc Mike Lowrie Transport Inland Engineering Services Solarponics, Inc Williams Scotsman Bragg Crane Service Anderson Trucking LIFESTYLE SOLAR INC SUNRUN Bennett Motor Express MURRAY STATION LP A CA LP LSE FIRE PROTECTION, INC. Kanyon Construction TADA Services Anderson Trucking Water Fixers Plumbing & Filtration LSE FIRE PROTECTION, INC. SLO Trenchless San Luis Electric Nexus Energy Systems COASTAL CONSTRUCTION & ENGINEERING INC. B.E. McCarty & Sons Superior Modular Transport Mid-Coast Fire Protection, Inc RSPaul Company Charged Up EVs Kanyon Construction SUNRUN Central Coast Renovations SPAULDING FAMILY TRUST PIPEDREAMS VENTURES HOLDINGS LLC - WIGHTON'S PLUMBING HEATING & AIR CONDITIONING Charged Up EVs LIFESTYLE SOLAR INC SUNRUN SUNRUN KAWAMOTO ELIZABETH Greg Peterson General Contractor Alpha Fire Unlimited GAVIOTA ENTERPRISES A CA LP Cadwell & Co. AVILA RANCH DEVELOPERS INC A CA CORP RANDS BARRY RLH Fire Protection Patriot Plumbing and Drain Cleaning LSE FIRE PROTECTION, INC. INACTIVE SUNRUN LSE Fire Protection, Inc. SUN SOLAR Permit Services Inc. CCWiley Construction Hab Design Group Ed Cuming Custom Homes HIVE Engineering Excel Construction Services, Inc. Burcheri Construction Patriot Plumbing and Drain Cleaning Jason Poch dba Suncore Solar Leo Tidwell Excavating Corp. (LTEC) Foster Enterprises PIPEDREAMS VENTURES HOLDINGS LLC - WIGHTON'S PLUMBING HEATING & AIR CONDITIONING LSE FIRE PROTECTION, INC. Coastal Tree Experts, Inc Electricraft, Inc. HAMAGUCHI STEVEN & CORAZON LIVING TRUST 2005 MATTUCCI PLUMBING INCORPORATED COASTAL CONSTRUCTION & ENGINEERING INC Action Rooter L&D Maksoudian Inc., DBA: Mak Family Construction SUNRUN PIPEDREAMS VENTURES HOLDINGS LLC - WIGHTON'S PLUMBING HEATING & AIR CONDITIONING Pacific Builders Action Rooter Superior Modular Transport AVILA RANCH DEVELOPERS INC A CA CORP Charged Up EVs Doc Miller's Heating and Air Permit Services Inc. AMC Construction Pacific Solar Homes Bright Planet Solar DONALD PLUMB SIGNS Hartill Heavy Haul Patriot Plumbing and Drain Cleaning Greenvale Tree Co. INACTIVE Wicks Roofing and Solar LLC Solarponics, Inc SLO Trenchless INACTIVE RICHARD HEATH & ASSOCIATES Greenvale Tree Company SUNRUN SUNRUN Nieporte Roofing Inc COASTAL CONSTRUCTION & ENGINEERING INC Madrigal Transport L&D Maksoudian Inc., DBA: Mak Family Construction M.C. Etter Painting Anderson Trucking PACIFIC HEATING AND SHEET METAL RICHARD HEATH & ASSOCIATES LSE Fire Protection, Inc. L&D Maksoudian Inc., DBA: Mak Family Construction SUNRUN SUNRUN LAPIDUS DANIEL E SPECIALTY CONSTRUCTION INC. Patriot Plumbing and Drain Cleaning INACTIVE California Mobile Home Service SLO Craft Builders TESLA INC L&D Maksoudian Inc., DBA: Mak Family Construction Bright Planet Solar Charged Up EVs MONTEREY & MORRO, LLC LIFESTYLE SOLAR INC Bright Planet Solar A-1 GLASS, LLC B Walker Signs & Lighting, Inc. SUNRUN Charged Up EVs Nativity of Our Lady Catholic Church AAA Design and Construction, LLC Solarponics, Inc Pacific Heating and Sheet Metal Sprouse Communications Bragg Crane Service Action Rooter Permit Services Inc. Johnson Fire Protection B&T Construction, Inc. COASTAL CONSTRUCTION & ENGINEERING INC Bragg Crane Service JOHNSON DALE M LIVING TRUST EZE Trucking LLC DBA Rig Runner Leo Tidwell Excavating Corp. (LTEC) Triad Property Management BE RIGHT THERE HEATING & AIR CONDITIONING INC Fast Concepts Bragg Crane Service Wave Electric Bright Planet Solar Superior Modular Transport Bright Planet Solar KGM Construction SLO Trenchless Action Rooter Axiom 360 LLC SLO Trenchless A.M.Sun Solar Roto Rooter Wicks Roofing and Solar LLC Holland Realty LSE Fire Protection, Inc. SPECIALTY CONSTRUCTION INC. SUNRUN BOUDREAU PROPERTIES LLC A CA LLC SUNRUN SUNRUN NIEL DILWORTH, ARCHITECT L&D Maksoudian Inc., DBA: Mak Family Construction Charged Up EVs KEVIN BOHRER & PETER FALZON Solarponics, Inc Hartill Heavy Haul Daniel J Kallal LSE FIRE PROTECTION, INC. Todd Bartolome Anderson Trucking Solarponics, Inc L&D Maksoudian Inc., DBA: Mak Family Construction SUNRUN Superior Modular Transport Coast Roofing Inc Bragg Crane Service LIFESTYLE SOLAR INC M Johnson Construction, Inc. Greenvale Tree Co. Permit Services Inc. Pacific Gas & Electric Company (PG&E) LIFESTYLE SOLAR INC Live Oak Electric Inc McDonald Transport Inc. SUNRUN Robbins Build NIEL DILWORTH, ARCHITECT Jack In The Box Inc #3290 Bright Planet Solar John J Schroder AIA A.M.Sun Solar Permit Services Inc. TH AVILA RANCH LLC Tekton Electric Inc Smith's Alarms & Electronics Inc. Browder Painting Company, Inc. LIFESTYLE SOLAR INC MAIN KEVIN R TRE ETAL DS Marigold LP SLOCA LLC A CA LLC SLO Trenchless Pacific Premier Bank Solarponics, Inc Tricamo Construction Inc WURSTER ROBERT & KIM TRUST A-1 GLASS, LLC SLO Trenchless Knecht's Plumbing & Heating, Inc. L&D Maksoudian Inc., DBA: Mak Family Construction Mid-Coast Fire Protection, Inc TESLA INC Alpha Fire Unlimited ERNST MICHAEL J & KIMBERLY J Michael J McGuire Architecture + Engineering Cadwell & Co. ROD CO. ROD CO. ROD CO. KENDALL ROAD LLC LIVESEY SHARON TRUST Ryan Brockett Architect Inc. Seamair Construction L&D Maksoudian Inc., DBA: Mak Family Construction PJ Designs SunWork Renewable Energy Projects LEWIS FAMILY TRUST LIFESTYLE SOLAR INC COASTAL CONSTRUCTION & ENGINEERING INC. LIFESTYLE SOLAR INC Astound Broadband LLC B&T Construction, Inc. BCCI Construction, LLC Dalton Trucking Perfection Fire Protection Solarponics, Inc LIFESTYLE SOLAR INC Electricraft, Inc. COASTAL CONSTRUCTION & ENGINEERING INC. B&T Construction, Inc. KENDALL ROAD LLC BE RIGHT THERE HEATING & AIR CONDITIONING INC PJ Designs RIDER MARY S McDonald Transport Inc. B&T Construction, Inc. Wage Builders LIFESTYLE SOLAR INC Leo Tidwell Excavating Corp. (LTEC) SICANOFF FAMILY TRUST Action Rooter Action Rooter SunWork Renewable Energy Projects COASTAL CONSTRUCTION & ENGINEERING INC. Souza Engineering Contracting - Souza Construction LIFESTYLE SOLAR INC SunWork Renewable Energy Projects PIPEDREAMS VENTURES HOLDINGS LLC - WIGHTON'S PLUMBING HEATING & AIR CONDITIONING PIPEDREAMS VENTURES HOLDINGS LLC - WIGHTON'S PLUMBING HEATING & AIR CONDITIONING Always Measure Twice Triple B Transportation, LLC SunWork Renewable Energy Projects High Tide Electric PIPEDREAMS VENTURES HOLDINGS LLC - WIGHTON'S PLUMBING HEATING & AIR CONDITIONING LIFESTYLE SOLAR INC Central Coast Electric, Inc. MCLEAN ROOFING INC Semmes & Co Builders, Inc. Circus Vargas SunWork Renewable Energy Projects La Cuesta Inn Sprouse Communications LIFESTYLE SOLAR INC SunWork Renewable Energy Projects SunWork Renewable Energy Projects Self Charged Up EVs CWA Studios Staples Energy People's Self Help Housing Corp Coastal Tree Experts, Inc Southern California Gas Company SunWork Renewable Energy Projects SUNSTONE HOME CALIFORNIA LLC dba SUNSTONE SPECTRUM LIGHTING SERVICES INCORPORATED dba SO CAL LIGHTING SERVICES Action Rooter LIFESTYLE SOLAR INC GANNAGE DESIGN SunWork Renewable Energy Projects SLO Cider LLC TESLA INC SUNRUN Bixler Builders RICHARD HEATH & ASSOCIATES Mid-Coast Fire Protection, Inc LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC Action Rooter SunWork Renewable Energy Projects SLO Circuit Electrical SLO Trenchless SUNRUN WINTERMEYER GARY A Eventide Ventures, LLC TEN OVER STUDIO PIPEDREAMS VENTURES HOLDINGS LLC - WIGHTON'S PLUMBING HEATING & AIR CONDITIONING SunWork Renewable Energy Projects SunWork Renewable Energy Projects 196 Architects Property Management Jason Poch dba Suncore Solar A-Plus Fire Protection JM Construction KENDALL ROAD LLC CURRIE ROSS E & JOANNIE M FAMILY TRUST Alpha Fire Unlimited Leo Tidwell Excavating Corp. (LTEC) Action Rooter SunWork Renewable Energy Projects Kanyon Construction Alpha Fire Unlimited SunWork Renewable Energy Projects LIFESTYLE SOLAR INC GIN FAMILY REVOCABLE TRUST SunWork Renewable Energy Projects Code 4 Roofing Specialist LIGHTHOUSE ELECTRICAL SERVICES INC SunWork Renewable Energy Projects A CLASS CONSTRUCTION PASO ROBLES GLASS SunWork Renewable Energy Projects Nwesto DBA Gettler-Ryan D H CONSTRUCTION SunWork Renewable Energy Projects Dalton Trucking LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC Goldman Electric LIFESTYLE SOLAR INC Kain Building and Design Group, LLC SunWork Renewable Energy Projects Coastal Tree Experts, Inc ELLIOTT LISA L LIVING TRUST % LINDA P ELLIOTT Templeton Electric Inc Alpha Fire Unlimited Piazza Trucking C3 Construction and Development Inc. TESLA INC Pacific Redwood Investments AHEARN FAMILY REVOCABLE TRUST-SURVIVORS TRUST COASTAL CONSTRUCTION & ENGINEERING INC. Wayne Perry, Inc. LIFESTYLE SOLAR INC Charged Up EVs SLO Trenchless Tomasini Construction PFC, Inc. Cencal Enterprises, Inc. Bright Planet Solar AT&T SLO Trenchless AP SANDMAN, LLC NIEL DILWORTH, ARCHITECT Zac's Transport Bixler Fire Protection OST Truck and Crane Foster Enterprises Bennett Motor Express Bragg Crane Service RITTER CONSTRUCTION Pacific Gas & Electric Company (PG&E) Mike's Mobile Moving Bennett Motor Express PIPEDREAMS VENTURES HOLDINGS LLC dba Bright Planet Solar F&H Construction Alpha Fire Unlimited Andy's Concrete Estero Bay Roofing Company McDonald Transport Inc. A.M.Sun Solar Link Electrix Trumark homes Zac's Transport Bennett Motor Express McDonald Transport Inc. Action Rooter Solarponics, Inc PIPEDREAMS VENTURES HOLDINGS LLC dba Knecht's Plumbing & Heating, Inc. A.M.Sun Solar Photon Brothers, Inc. Greenvale Tree Co. Custom Machine Inc California Mobile Home Service Alpha Fire Unlimited Landstar Ranger Outriders West Apple Farm Charged Up EVs Axiom 360 LLC NIEL DILWORTH, ARCHITECT SUNRUN Goldman Electric Charter Communications Action Rooter KRILL BRYAN M FAMILY TRUST FOUNDATION SOLUTIONS Jason Poch dba Suncore Solar HOOVER LIVING TRUST Greenvale Tree Co. Jack In The Box Inc #3290 EZE Trucking LLC DBA Rig Runner SMITH STEVEN G Action Rooter Bennett Motor Express BENNETT TIMOTHY J TRE ETAL KAMM KORINER PATRICIA TRUST JT Construction Wicks Roofing and Solar LLC Photon Brothers, Inc. Bragg Crane Service McDonald Transport Inc. Photon Brothers, Inc. INACTIVE ZEEMER FAMILY TRUST ATS Specialized Solarponics, Inc EZE Trucking LLC DBA Rig Runner Reeve Trucking Company, Inc. P2EG Solarponics, Inc SUNRUN Roho Construction Wave Electric OST Truck and Crane Action Rooter AC Trucking PIPEDREAMS VENTURES HOLDINGS LLC - WIGHTON'S PLUMBING HEATING & AIR CONDITIONING Downtown SLO Association LSE FIRE PROTECTION, INC. EZE Trucking LLC DBA Rig Runner A.M.Sun Solar Axiom 360 LLC LIFESTYLE SOLAR INC Tenhet & Sons Mobile Home Transport SUN SOLAR NRG Clean Power GORDON CONSTRUCTION Smith's Alarms & Electronics Inc. WIRE RUN ELECTRIC Vellum Design Build Alan Roinestad Construction RITTER CONSTRUCTION Bennett Motor Express Reimer Transport COASTAL CONSTRUCTION & ENGINEERING INC David Crye General Engineering Contractor, Inc 4640 Broad St LLC SUNRUN LK Graphics, Inc. (dba The Sign Place) Seamair Construction HALL BUILDERS, INC RITTER CONSTRUCTION Meyers Constructors, Inc. OST Truck and Crane Tenhet & Sons Mobile Home Transport Quality Home Transport LLC R L H FIRE PROTECTION INC Arris Studio Architects Alco Building Solutions Charged Up EVs PIPEDREAMS VENTURES HOLDINGS LLC dba COASTAL CONSTRUCTION & ENGINEERING INC Coastal Tree Experts, Inc L&D Maksoudian Inc., DBA: Mak Family Construction WATHEN CASTANOS HYBRID HOMES II, INC. discounted solar Bennett Motor Express J.R. Spencer Construction Inland Engineering Services, Inc. Alpha Fire Unlimited Reeve Trucking Co RITTER CONSTRUCTION Charged Up EVs Roto Rooter TESLA INC LSE FIRE PROTECTION, INC. Reeve Trucking Co NIEL DILWORTH, ARCHITECT Reeve Trucking Company, Inc. Roto Rooter Photon Brothers, Inc. Photon Brothers, Inc. PIPEDREAMS VENTURES HOLDINGS LLC - WIGHTON'S PLUMBING HEATING & AIR CONDITIONING SUN SOLAR Seamair Construction LIFESTYLE SOLAR INC Steven Rogall Painting, Inc. J.R. Spencer Construction Bennett Motor Express PIPEDREAMS VENTURES HOLDINGS LLC dba BE RIGHT THERE HEATING & AIR CONDITIONING INC Solarponics, Inc NIEL DILWORTH, ARCHITECT Golden State Modular WATHEN CASTANOS HYBRID HOMES II, INC. LIFESTYLE SOLAR INC EZE Trucking LLC DBA Rig Runner High Tide Electric COASTAL CONSTRUCTION & ENGINEERING INC. Bragg Crane Service Landstar Ranger Action Rooter Specialized Transportation Bright Planet Solar RSH Construction, Inc. AT&T Dalton Trucking Reeve Trucking Co SUNRUN Reeve Trucking Co Wathen Castanos Home HP Communications Costco Wholesale #741 NIEL DILWORTH, ARCHITECT Golden State Modular Madrigal Transport SLO Craft Builders Hammer Trucking Solarponics, Inc LIFESTYLE SOLAR INC San Luis Obispo County Templeton Electric Inc EZE Trucking LLC DBA Rig Runner RITTER CONSTRUCTION Bennett Motor Express Joseph Construction and Consulting, Inc. DBA: Joseph Engineering SLOLife Studio & Mercantile AC Trucking Solarponics, Inc Mike's Mobile Moving Inland Engineering Services, Inc. Foster Enterprises Pacific Gas & Electric (PG&E) Bennett Motor Express PIPEDREAMS VENTURES HOLDINGS LLC - WIGHTON'S PLUMBING HEATING & AIR CONDITIONING Isco Machinery Greenvale Tree Co. B.E. McCarty & Sons PIPEDREAMS VENTURES HOLDINGS LLC - WIGHTON'S PLUMBING HEATING & AIR CONDITIONING B&T Construction, Inc. Construction Inc. Axiom 360 LLC Photon Brothers, Inc. LSE FIRE PROTECTION, INC. Holland and Knapp Construction Estero Bay Roofing Company J.R. Spencer Construction Whittle Fire Protection OST Truck and Crane City Motors Towing CRITTENDEN GRACE REVOCABLE TRUST Greg Moore Construction, Inc. Kimbell & Brown Construction, Inc. Staples Energy OST Truck and Crane TESLA INC Charged Up EVs Wicks Roofing and Solar LLC SUNRUN California Mobile Home Service Pacific Builders Water Fixers Plumbing & Filtration Action Rooter Estero Bay Roofing Company Greenvale Tree Co. LSE FIRE PROTECTION, INC. J M G SECURITY SYSTEMS INC City Motors Towing Sprouse Communications SUN SOLAR Templeton Electric Inc Solarponics, Inc Action Rooter Action Rooter UDSEN NIELS TRE ETAL Arbor First WATHEN CASTANOS HYBRID HOMES II, INC. SLO Trenchless Rice Heating & Air Conditioning Wathen Castanos Home SUNRUN SUNRUN Ed Cuming Custom Homes SUNRUN McDonald Transport Inc. Solarponics, Inc Solarponics, Inc Piazza Trucking Patriot Plumbing and Drain Cleaning EZE Trucking LLC DBA Rig Runner SLO Trenchless LSE FIRE PROTECTION, INC. Tenhet & Sons Mobile Home Transport Hatton's Crane & Rigging Rexs Rooter plumbing Inc. Axiom 360 LLC Isco Machinery COASTAL CONSTRUCTION & ENGINEERING INC Lamassu Utility Services, Inc. Rising Tide Companies, LLC Pacific Gas & Electric Company (PG&E) Staples Energy Reeve Trucking Co Cenco Enterprises, LLC N Brent Knowles Construction Action Rooter Bennett Motor Express Action Rooter Goodwin Construction Group, Inc. B&T Construction, Inc. Greenvale Tree Co. Permit Services Inc. SLOCA, LLC L&D Maksoudian Inc., DBA: Mak Family Construction Estero Bay Roofing Company Wicks Roofing and Solar LLC SUNRUN PIPEDREAMS VENTURES HOLDINGS LLC dba McDonald Transport Inc. Securitas Technology LSE FIRE PROTECTION, INC. EZE Trucking LLC DBA Rig Runner N Brent Knowles Construction Tricamo Construction PIPEDREAMS VENTURES HOLDINGS LLC dba WATHEN CASTANOS HYBRID HOMES II, INC. California Mobile Home Service MADDALENA ROLAND C EXEMPTION TRUST Solarponics, Inc Superior Fire Sprinkler Systems, Inc McDonald Transport Inc. Action Rooter LSE FIRE PROTECTION, INC. Bright Planet Solar Coastal Tree Experts, Inc FOWLER PEGGY (AKA 1) RICHARD HEATH & ASSOCIATES N Brent Knowles Construction Charged Up EVs SUNRUN LSE FIRE PROTECTION, INC. Superior Fire Sprinkler Systems, Inc LSE FIRE PROTECTION, INC. Central Coast Heating and Air INC PJ Designs LSE Fire Protection, Inc. Pacific Builders LSE Fire Protection, Inc. LSE Fire Protection, Inc. Solarponics, Inc Reeve Trucking Company, Inc. LSE FIRE PROTECTION, INC. LSE Fire Protection, Inc. Reeve Trucking Company, Inc. Reeve Trucking Company, Inc. ALPERT IRA R & MARSHA L REVOCABLE 1993 TRUST Reeve Trucking Company, Inc. SUNRUN Photon Brothers, Inc. LSE FIRE PROTECTION, INC. LSE FIRE PROTECTION, INC. L&D Maksoudian Inc., DBA: Mak Family Construction Permit Services Inc. Bright Planet Solar Specialty Construction Foster Enterprises PRISTINE ROOFING Erik, Dane & Michelle Lindgren Wicks Roofing and Solar LLC SUNRUN Rooftop Co Energy Masters Charged Up EVs Action Rooter AVILA RANCH DEVELOPERS INC A CA CORP Bragg Crane Service LSE Fire Protection, Inc. Kain Building and Design Group, LLC PASO ROBLES GLASS MAINO CONSTRUCTION COMPANY INCORPORATED AAA Design and Construction, LLC SLO Trenchless Solarponics, Inc Bennett Motor Express SLO Craft Builders Chris Sunderland Engineering Co. H POOR AND COMPANY INC DBA ALLSTAR HEATING AND AIR CONDITIONING Solarponics, Inc HALL BUILDERS, INC Action Rooter LSE Fire Protection, Inc. LK Graphics, Inc. (dba The Sign Place) Hansen Construction Bragg Crane Service Adams Heating & Cooling On Point Plumbing Heating & Air Conditioning Inc. COASTAL CONSTRUCTION & ENGINEERING INC SLO Trenchless SUNRUN COASTAL CONSTRUCTION & ENGINEERING INC. Action Rooter DS Marigold LP PIPEDREAMS VENTURES HOLDINGS LLC - WIGHTON'S PLUMBING HEATING & AIR CONDITIONING JW Design & Construction, Inc. SLO Trenchless LAGUNA VILLAGE SHOPPING CENTER LLC EZA Trucking, LLC. DBA: Rig Runner Pacific Heating and Sheet Metal SLO Trenchless Action Rooter COASTAL CONSTRUCTION & ENGINEERING INC Hayward Lumber Company LIFESTYLE SOLAR INC TESLA INC SUNRUN Solarponics, Inc Bragg Crane Service Charged Up EVs SUNRUN Bragg Crane Service Greenvale Tree Co LIFESTYLE SOLAR INC Seamair Construction Templeton Electric Inc Attala Properties LLC Paradise Tree Services Charged Up EVs Charged Up EVs SUNRUN LIFESTYLE SOLAR INC City Motors Towing MORRISON FAMILY TRUST 2000 EXCEL CONSTRUCTION SERVICES INC MATHERLY FIRE PROTECTION HALL BUILDERS, INC RSVC COMPANY Pacific Gas and Electric (PG&E) Pacific Gas & Electric (PG&E) Pacific Gas & Electric Company (PG&E) AT&T Pacific Gas & Electric Company (PG&E) Pacific Gas and Electric (PG&E) Sprouse Communications R. Burke Corporation Toste Construction Inc. Pacific Gas & Electric Company (PG&E) PG&E West Coast Arborists, Inc. Sprouse Communications Souza Construction Pacific Gas & Electric Company (PG&E) West Coast Arborists, Inc. Pacific Gas and Electric (PG&E) Pacific Gas and Electric (PG&E) PG&E Pacific Gas and Electric (PG&E) AT&T Pacific Gas & Electric Company (PG&E) SoCal Gas Pacific Gas & Electric (PG&E) SoCal Gas Pacific Gas & Electric Company (PG&E) AT&T Souza Construction Pacific Gas & Electric Company (PG&E) Pacific Gas and Electric (PG&E) AT&T Pacific Gas & Electric Company (PG&E) AT&T Bunyon Bros. Tree Service PG&E Southern California Gas Company Pacific Gas and Electric (PG&E) Greenvale Tree Co. Sprouse Communications Pacific Gas and Electric (PG&E) Pacific Gas & Electric Company (PG&E) Sprouse Communications Leo Tidwell Excavating Corp. (LTEC) Pacific Gas & Electric Company (PG&E) Pacific Gas & Electric (PG&E) Coastal Community Builders Inc AT&T Pacific Gas & Electric Company (PG&E) Pacific Gas and Electric (PG&E) Sprouse Communications Sprouse Communications Trumark Homes AT&T AT&T Sprouse Communications Yeh and Associates Southern California Gas Company Pacific Coast Well Drilling, Inc AT&T Davey Tree Surgery Co. Wicks Roofing and Solar LLC Pacific Gas & Electric (PG&E) Southern California Gas Company Pacific Gas & Electric Company (PG&E) West Coast Arborists, Inc. Southern California Gas Company (SoCal Gas) AT&T Southern California Gas Company Pacific Gas & Electric Company (PG&E) PG&E Pacific Gas & Electric Company (PG&E) Pacific Gas and Electric (PG&E) Turn Around Communications PG&E Pacific Gas & Electric Company (PG&E) PG&E PG&E AT&T PG&E Pacific Gas & Electric Company (PG&E) Pacific Gas & Electric Company (PG&E) Pacific Gas & Electric, PG&E Turn Around Communications Pacific Gas & Electric (PG&E) Pacific Gas & Electric Company (PG&E) Pacific Gas & Electric Company (PG&E) Toste Construction, Inc. G F Garcia and Sons, Inc. Southern California Gas Company Pacific Gas & Electric Company (PG&E) Greenvale Tree Co West Coast Arborists, Inc. City of San Luis Obispo Southern California Gas Company AT&T Southern California Gas Company Southern California Gas Company (SoCal Gas) Earth Systems Pacific Pacific Gas & Electric Company (PG&E) Pacific Gas and Electric (PG&E) Pacific Gas & Electric Company (PG&E) Pacific Gas & Electric Company (PG&E) Cencal Enterprises, Inc. Pacific Gas and Electric (PG&E) Pacific Gas and Electric (PG&E) Pacific Gas and Electric (PG&E) Turn Around Communications PG&E Sprouse Communications Pacific Gas and Electric (PG&E) Southern California Gas Company AT&T PG&E Pacific Gas & Electric Company (PG&E) Pacific Gas & Electric Company (PG&E) Pacific Gas & Electric (PG&E) Pacific Gas & Electric Company (PG&E) AT&T NEUKIRCH ULRICH W TRE ETAL Pacific Gas & Electric Company (PG&E) Adept Events External Test Pacific Gas & Electric Company (PG&E) Pacific Gas & Electric Company (PG&E) SoCal Gas AT&T Pacific Gas & Electric Company (PG&E) Sprouse Communications AT&T Pacific Gas & Electric Company (PG&E) Pacific Gas & Electric Company (PG&E) Southern California Gas Company Pacific Gas & Electric Company (PG&E) Pacific Gas & Electric Company (PG&E) Sprouse Communications STIMSON SCOTT D & BARBARA M West Coast Arborists, Inc. AT&T PG&E Souza Construction Pacific Gas and Electric (PG&E) Souza Engineering Contracting - Souza Construction AT&T PoorBoy Electric & Lighting Greenwave Solutions Thoma Electric Inc. A.M.Sun Solar M.E. Avila Construction Advanced Fire Protection Pacific Heating and Sheet Metal PACIFIC HEATING AND SHEET METAL JNE Concrete Seamair Construction, Inc. DBA: Seamair General Engineering Seamair Construction Action Rooter Kirk Construction RCM Building Systems AT&T 3W CONSTRUCTION, INC. AT&T Sprouse Communications Central Coast Renovations PIPEDREAMS VENTURES HOLDINGS LLC - WIGHTON'S PLUMBING HEATING & AIR CONDITIONING Trumark Homes Kanyon Construction TH AVILA RANCH LLC Padre Associates PJ Designs Pacific Builders AT&T Coastal Demo, Inc. Everon SUNRUN Solarponics, Inc Pacific Gas & Electric (PG&E) Independent Electric Supply Inc EZE Trucking LLC DBA Rig Runner Lee Wilson Electric Company, Inc. Roto Rooter SUNRUN SUNRUN City Motors Towing City Motors Towing Steele Drive 32, LLC SKYLINE SERVICES LLC HAB Design Group SKYLINE SERVICES LLC HAB Design Group HAB Design Group Pacific Heating and Sheet Metal CWA Studios Foster Enterprises Whittle Fire Protection SUNRUN Knecht's Plumbing & Heating, Inc. SUNRUN John & Joan Rinell MURRAY MANAGEMENT ENTERPRISES LLC %ELAINE F BAUER ETCON DORADO ELECTRIC INC. San Luis Electric Travis Robson Bennett Motor Express Bison Energy Solutions Sevan Multi-Site Solutions Solarponics, Inc Joe Rowles Construction Pacific Gas & Electric (PG&E) PERL KRISTIN & PATRICK FAMILY TRUST LIFESTYLE SOLAR INC Coastal Tree Experts, Inc EsserStudios Architecture and Design EsserStudios Architecture and Design TESLA INC PJ Designs Pacific Gas & Electric (PG&E) Pacific Gas & Electric (PG&E) Southern California Gas Company Exceed Bennett Motor Express Southern California Gas Company HAB Design Group HAB Design Group HAB Design Group HAB Design Group HAB Design Group HAB Design Group HAB Design Group HAB Design Group HAB Design Group HAB Design Group HAB Design Group HAB Design Group HAB Design Group HAB Design Group HAB Design Group HAB Design Group HAB Design Group HAB Design Group HAB Design Group Southern California Gas Company HAB Design Group SoCal Gas HAB Design Group HAB Design Group HAB Design Group HAB Design Group HAB Design Group HAB Design Group HAB Design Group SoCal Gas Patriot Plumbing and Drain Cleaning Southern California Gas Company (SoCal Gas) EZE Trucking LLC DBA Rig Runner SLOCA Properties LLC Andrew Goodwin Design Lepell, Joshua trust Kanyon Construction Photon Brothers, Inc. Arbor First SLO Cider LLC COASTAL CONSTRUCTION & ENGINEERING INC Solarponics, Inc LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC Solarponics, Inc Greenvale Tree Co. Aztec Fire and Security, Inc. Action Rooter TH AVILA RANCH LLC Turn Around Communications Sprouse Communications MONTEREY & MORRO, LLC Pacific Gas & Electric (PG&E) Pacific Gas and Electric (PG&E) LSE Fire Protection, Inc. Cowen Consulting, Inc. Bright Planet Solar Action Rooter Seamair Construction PG&E TH AVILA RANCH LLC GANNAGE DESIGN SUN SOLAR Wicks Roofing and Solar LLC SLO Craft Builders SLO Craft Builders Jessie Skidmore Art & Design LEWIS FAMILY TRUST Zurriola Studio Axiom 360 LLC RILEY TIM & MARY A FAMILY TRUST SUNRUN Axiom 360 LLC Action Design-Build Maddalena Realty SLO Trenchless Pacific Gas & Electric (PG&E) Pacific Gas & Electric Company (PG&E) Seamair Construction SLO Trenchless Pacific Gas and Electric (PG&E) Leo Tidwell Excavating Corp. (LTEC) Shaffer Fire Protection Shaffer Fire Protection Pacific Gas & Electric Company (PG&E) M Johnson Construction, Inc. Seamair Construction Jessica Lehrbaum, Architect Browder Painting Company, Inc. Pacific Gas & Electric Company (PG&E) Cebulla Associates Pacific Gas and Electric (PG&E) EZE Trucking LLC DBA Rig Runner COASTAL CONSTRUCTION & ENGINEERING INC Reeve Trucking Co Dwellinart MAIN LINE ENGINEERING CONSTRUCTION INC COASTAL CONSTRUCTION & ENGINEERING INC PJ Designs OLSON T BRIAN American Eco Services Johnson Fire Protection GOODWILL INDUSTRIES OF SNTA CRZ,SLO & MNTRY CNTYS Steve Johnson LSE FIRE PROTECTION, INC. LSE FIRE PROTECTION, INC. MASONIC HALL ASSN Pacific Gas & Electric Company (PG&E) Pacific Builders Southern California Gas Company, SoCal Gas Always Measure Twice PIPEDREAMS VENTURES HOLDINGS LLC - WIGHTON'S PLUMBING HEATING & AIR CONDITIONING LIFESTYLE SOLAR INC Pacific Gas & Electric Company (PG&E) 1ST TEAM AIR CONDITIONING INC J HERRERA CONSTRUCTION INC TH AVILA RANCH LLC Alpha Fire Unlimited Alpha Fire Unlimited Permit Services Inc. Pacific Gas & Electric Company (PG&E) JORGENSEN & SONS INC Pacific Gas & Electric Company (PG&E) PIPEDREAMS VENTURES HOLDINGS LLC - WIGHTON'S PLUMBING HEATING & AIR CONDITIONING PIPEDREAMS VENTURES HOLDINGS LLC - WIGHTON'S PLUMBING HEATING & AIR CONDITIONING PACIFIC HEATING AND SHEET METAL John Olejczak Souza Construction Inc. Pacific Gas & Electric Company (PG&E) PIPEDREAMS VENTURES HOLDINGS LLC dba Pacific Gas & Electric (PG&E) Pacific Gas & Electric Company (PG&E) Pacific Gas & Electric Company (PG&E) PIPEDREAMS VENTURES HOLDINGS LLC - WIGHTON'S PLUMBING HEATING & AIR CONDITIONING ROB'S RESTORATION & RENOVATION Pacific Gas & Electric Company (PG&E) West Coast Arborists, Inc. LSE FIRE PROTECTION, INC. Southern California Gas Company A-1 GLASS, LLC West Coast Air Conditioning BA Start PIPEDREAMS VENTURES HOLDINGS LLC dba Mike Mitchell Construction, Inc. Newton Construction KENT HARVEY Action Rooter Quaglino Properties LLC B.E. McCarty & Sons LSE FIRE PROTECTION, INC. LSE FIRE PROTECTION, INC. Greenskies Clean Energy Williams Scotsman Pacific Gas & Electric (PG&E) AT&T LSE FIRE PROTECTION, INC. Central Plumbing Inc Service and Repair LSE Fire Protection, Inc. SLO Trenchless LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC 805 Electric LLC Landstar Inway, Inc. Kanyon Construction Kanyon Construction Rarig Construction, Inc LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC Wicks Roofing and Solar LLC Abington Concrete PACIFIC HEATING AND SHEET METAL TESLA INC PIPEDREAMS VENTURES HOLDINGS LLC dba SUNRUN McDonald Transport Inc. Twisselman and Fernandes Inc. LIFESTYLE SOLAR INC Wicks Roofing and Solar LLC Classic Services PJ Designs Gordon construction A.M.Sun Solar Charged Up EVs Charged Up EVs San Luis Electric A.M.Sun Solar SUNRUN SUNRUN SUNRUN LIFESTYLE SOLAR INC Bison Energy Solutions Central Coast Electric, Inc. Trumark homes Trumark Homes TH AVILA RANCH LLC Permit Services Inc. LIFESTYLE SOLAR INC Permit Services Inc. H GALE KYLE INC DBA KYLE COMPANY ROOFING PJ Designs LIFESTYLE SOLAR INC JW Design & Construction, Inc. JW Design & Construction, Inc. Farmer & Ready Law Corp. PIPEDREAMS VENTURES HOLDINGS LLC dba KORSGAARD RICHARD & CHARLENE LIVING TRUST SoCal Gas LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC Pacific Gas & Electric Company (PG&E) A.M.Sun Solar SoCal Gas MASONIC HALL ASSN Davey Tree Surgery Davey Tree Surgery Michael J McGuire Architecture + Engineering Foster Enterprises SLOBISPO REMODELERS Ryan Brockett Architect Inc. TWO BROTHERS SAN LUIS ENTERPRISES LLC A CA LLC bid joe California north inc Hunter Smith Architecture Andrew Goodwin Design Smitty Built, Inc SUNRUN Wicks Roofing and Solar LLC TESLA INC Permit Services Joe & Dorothy Boudreau SUNRUN LIFESTYLE SOLAR INC Charged Up EVs PIPEDREAMS VENTURES HOLDINGS LLC - WIGHTON'S PLUMBING HEATING & AIR CONDITIONING Solarponics, Inc SunWork Renewable Energy Projects LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC Charged Up EVs Bright Planet Solar SUNRUN Bright Planet Solar Bright Planet Solar A.M.Sun Solar A.M.Sun Solar Bright Planet Solar Citadel Roofing and Solar LIFESTYLE SOLAR INC Bright Planet Solar COASTAL CONSTRUCTION & ENGINEERING INC. Travis Robson PFC, Inc. LSE FIRE PROTECTION, INC. LSE Fire Protection, Inc. LSE Fire Protection, Inc. LSE FIRE PROTECTION, INC. LSE FIRE PROTECTION, INC. LSE Fire Protection, Inc. Alpha Fire Unlimited CENTRAL COAST FIRE SUPPRESSION LLC Alpha Fire Unlimited Alpha Fire Unlimited LSE Fire Protection, Inc. Alpha Fire Unlimited A-Plus Fire Protection LSE Fire Protection, Inc. LSE Fire Protection, Inc. MATHERLY FIRE PROTECTION Law Office Of Marshall E Ochylski TEN OVER STUDIO Carecraft Pools Bennett Motor Express SLO CITY CAPITAL IMPROVEMENT BOARD Construction Inc. San Luis Obispo Museum of Art (SLOMA) LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC PIPEDREAMS VENTURES HOLDINGS LLC - WIGHTON'S PLUMBING HEATING & AIR CONDITIONING A-1 GLASS, LLC A-1 GLASS, LLC Exceed Doug Ross Inc. DBA Central Valley Asphalt Viola Construction, Inc Solarponics, Inc Wicks Roofing and Solar LLC Wicks Roofing and Solar LLC Bennett Motor Express ALAN ROINESTAD CONSTRUCTION AND MANAGEMENT INC SLOCO Heating and Cooling, Inc. SLO Trenchless PIPEDREAMS VENTURES HOLDINGS LLC dba Alpha Fire Unlimited Always Measure Twice LIFESTYLE SOLAR INC Bennett Truck Transport Bennett Truck Transport Charged Up EVs Solarponics, Inc TH AVILA RANCH LLC TH AVILA RANCH LLC Solarponics, Inc APPLIANCE CLINIC HEATING & AIR CONDITIONING SUNRUN A-1 GLASS, LLC SUNRUN Trumark Homes Trumark Homes Solarponics, Inc SUNRUN Williams Scotsman, Inc. Trumark Homes Hunter Smith Architecture Axiom 360 LLC TH AVILA RANCH LLC SUNRUN TH AVILA RANCH LLC Trumark Homes N Brent Knowles Construction TH AVILA RANCH LLC Shaffer Fire Protection HP Communications Bright Planet Solar SUNRUN Greenvale Tree Company Papich Construction Company Inc McDonald Transport Inc. Quality Home Transport LLC JW Design & Construction, Inc. FRANKLIN NANCY S FAMILY TRUST SoCal Gas Pacific Gas & Electric Company (PG&E) Pacific Gas & Electric Company (PG&E) Pacific Gas & Electric Company (PG&E) Sprouse Communications TH AVILA RANCH LLC Pacific Gas & Electric Company (PG&E) Securitas Technology Sprouse Communications Sprouse Communications Pacific Gas & Electric Company (PG&E) SLO Trenchless Mike O'Brien Specialized Hauling Inc. Total Plumbing Heating & Air TH AVILA RANCH LLC Central Coast Concrete TH AVILA RANCH LLC NewGen Energy Cal Lowbed A-Plus Fire Protection Brough Construction Inc. PIPEDREAMS VENTURES HOLDINGS LLC dba Griffin Plumbing JW Design & Construction, Inc. JW Design & Construction, Inc. ALAN ROINESTAD CONSTRUCTION AND MANAGEMENT INC Rarig Construction, Inc Wicks Roofing and Solar LLC Greenvale Tree Co. Studio Design Group Architects Wicks Roofing and Solar LLC Studio Design Group Architects LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC LSE Fire Protection, Inc. LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC Daniel J Kallal Specialty Construction, Inc LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC Action Rooter LSE Fire Protection, Inc. LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC EZE Trucking LLC DBA Rig Runner Greenvale Tree Company Alpha Fire Unlimited LIFESTYLE SOLAR INC Reeve Trucking Co Reeve Trucking Co Reeve Trucking Co RUSSELL CRAIG H Alpha Fire Unlimited McDonald Transport Inc. McDonald Transport Inc. Cal Lowbed AJM ELECTRICAL TADA Services A&B Carpet & Cleaning Mid-Coast Fire Protection, Inc Twisselman and Fernandes Inc. PACIFIC HEATING & SHEET METAL Pults & Associates LK Graphics, Inc. (dba The Sign Place) SUNRUN Williams Scotsman PIPEDREAMS VENTURES HOLDINGS LLC dba PIPEDREAMS VENTURES HOLDINGS LLC dba PIPEDREAMS VENTURES HOLDINGS LLC dba BACKMAN VICKIE A FAMILY TRUST Staples Energy BACKMAN VICKIE A FAMILY TRUST A.M.Sun Solar ADX Consulting Cynthia M White Trust Solarponics, Inc LIFESTYLE SOLAR INC Bennett Motor Express Solarponics, Inc Pacific Gas & Electric Company (PG&E) ADX Consulting Bright Planet Solar STUDIO 2G ARCHITECTS LLP Central Pacific Construction MUICK TAYLOR FAMILY TRUST AVES ELECTRIC Bennett Motor Express Wicks Roofing and Solar LLC TH AVILA RANCH LLC Solarponics, Inc RICHARD HEATH & ASSOCIATES M Johnson Construction, Inc. Pacific Gas & Electric (PG&E) Action Rooter RCH Construction Transitions-Mental Health Association W. L. Butler Construction, inc. LSE Fire Protection, Inc. A.M.Sun Solar TH AVILA RANCH LLC LSE Fire Protection, Inc. A-1 GLASS, LLC Solarponics, Inc On Point Electric EZE Trucking LLC DBA Rig Runner TH AVILA RANCH LLC TH AVILA RANCH LLC TH AVILA RANCH LLC BE RIGHT THERE HEATING & AIR CONDITIONING INC Solarponics, Inc Charged Up EVs SIMS LIVING TRUST TH AVILA RANCH LLC Pacific Gas and Electric (PG&E) Bennett Motor Express RRM Design Group PJ Designs HAB Design Group SUN SOLAR DMA INVESTMENTS LTD PTP A NV LTD PTP TH AVILA RANCH LLC TH AVILA RANCH LLC TH AVILA RANCH LLC HALL BUILDERS, INC LK Graphics, Inc. (dba The Sign Place) FOUNDATION SOLUTIONS Trumark Homes TH AVILA RANCH LLC TH AVILA RANCH LLC TH AVILA RANCH LLC TH AVILA RANCH LLC TH AVILA RANCH LLC TH AVILA RANCH LLC Pacific Gas & Electric Company (PG&E) Trumark Homes Charged Up EVs Trumark Homes Trumark Homes Scoggins Site Development and Engineering OSR Holding Company Securitas Technology Cowen Consulting, Inc. Kimbell & Brown Construction, Inc. Judson Ventures, LLC Bear Electrical Solutions LLC Specialty Construction, Inc. Permit Services Inc. Trumark Homes Drube Electric TH AVILA RANCH LLC Chris Sunderland Engineering Co. EZE Trucking LLC DBA Rig Runner Pacific Gas & Electric Company (PG&E) Raminha Construction, Inc. Scout 30882 Inc Santa Cruz Underground & Paving, Inc. Whittle Fire Protection Bear Electrical Solutions LLC Rincon Inspection Group Inc Action Rooter Coastal Tree Experts, Inc SLO Trenchless Sprouse Communications Pacific Gas & Electric Company (PG&E) TH AVILA RANCH LLC A-1 GLASS, LLC Sprouse Communications West Coast Arborists, Inc. SLO Trenchless TH AVILA RANCH LLC J. Terra Construction, Inc. Turn Around Communications L&D Maksoudian Inc., DBA: Mak Family Construction Greenvale Tree Co. J W DESIGN & CONSTRUCTION INC SLO Trenchless Landstar Ranger N Brent Knowles Construction AT&T Vellum Inc. Transitions Mental Health TH AVILA RANCH LLC SUNRUN LK Graphics, Inc. (dba The Sign Place) Generations Electric LLC SUNRUN TH AVILA RANCH LLC BRIGNOLO RICHARD C Veteran Pipeline Construction Bright Planet Solar COASTAL CONSTRUCTION & ENGINEERING INC LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC Trumark Construction Services, Inc. LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC L&D Maksoudian Inc., DBA: Mak Family Construction LK Graphics, Inc. (dba The Sign Place) LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC ALAN ROINESTAD CONSTRUCTION AND MANAGEMENT INC NKT Commercial LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC LIFESTYLE SOLAR INC Expansive Investments LLC WHITEFORD MICHAEL & ANDREA REVOCABLE TRUST WHITEFORD MICHAEL & ANDREA REVOCABLE TRUST Frantz Construction, Inc. SUNRUN Diversified Construction RSPAUL COMPANY INC Triple B Transportation Triple B Transportation SUNRUN SUNRUN Vellum, Inc Electricraft, Inc. Gemlato Oasis Associates, Inc. AbbottReed Inc ABBOTT I REED INC. Specialty Construction, Inc KW Construction SUNRUN Wollenman Exceed Love Architecture DW Construction, Inc. (Dream Werks Construction) Costco Wholesale Corporation Ambient Communities Generations Electric LLC Thoma Electric Inc. Pacific Solar Homes Specialty Construction, Inc Trumark Homes COASTAL CONSTRUCTION & ENGINEERING INC Southern California Gas Company TH AVILA RANCH LLC TH AVILA RANCH LLC Specialty Construction, Inc KJH ELECTRIC TH AVILA RANCH LLC TH AVILA RANCH LLC Always Measure Twice JJ Fisher Construction, Inc. Associated Traffic Safety John Dittenhoefer LSE FIRE PROTECTION, INC. LSE FIRE PROTECTION, INC. LSE FIRE PROTECTION, INC. Studio IV, Inc. RLH Construction VENTERRA ENVIRONMENTAL INC Teague Electric, Inc. A Stireman's Labor Service SLO LIFE Magazine Thoma Electric Inc. EZE Trucking LLC DBA Rig Runner Permit Services Inc. Permit Services Inc. LIFESTYLE SOLAR INC Asplundh Construction, LLC Solarponics, Inc LK Graphics, Inc. (dba The Sign Place) David Zuvic Construction Pacific Gas & Electric Company (PG&E) CONNERS KATHLEEN A TRE ETAL Echelcon Inc. Wicks Roofing and Solar LLC Wicks Roofing and Solar LLC Paso Robles Tank GOUIN CONSTRUCTION & DEVELOPMENT Paul Rhodes Construction Paul Rhodes Construction TH AVILA RANCH LLC D H CONSTRUCTION TH AVILA RANCH LLC TH AVILA RANCH LLC SUNRUN TH AVILA RANCH LLC Jessica Lehrbaum, Architect PJ Designs Vellum Design Build John J Schroder AIA TH AVILA RANCH LLC Signs Of Success, Inc RP Framing Apex Fire Control EZE Trucking LLC DBA Rig Runner Kristin Perl Jessica Lehrbaum, Architect Simple Homes Simple Living Roto Rooter Bright Planet Solar ONE ARCH Paul Rhodes Construction EZE Trucking LLC DBA Rig Runner Lenhart Fire Protection ON SITE PLUMBING & SEPTIC Adames Design Group TH AVILA RANCH LLC Quaglino Properties LLC LIFESTYLE SOLAR INC Bright Planet Solar LIFESTYLE SOLAR INC Solarponics, Inc SLO Trenchless Manzanita Construction PJ Designs A-Plus Fire Protection Pacific Heating and Sheet Metal Exceed PSR WEST COAST BUILDERS INC Lepell, Joshua trust COASTAL CONSTRUCTION & ENGINEERING INC Address 1697 Tanglewood Dr San Luis Obispo, CA 93401 1559 Royal Wy San Luis Obispo, CA 93405 2443 Broad St San Luis Obispo, CA 93401 1304 Pacific St San Luis Obispo, CA 93401 1804 Osos St San Luis Obispo, CA 93401 607 Grand Ave San Luis Obispo, CA 93401 12165 Los Osos Valley Rd San Luis Obispo, CA 93405 796 Higuera St San Luis Obispo, CA 93401 250 Bonetti Dr San Luis Obispo, CA 93401 167 Foothill Blvd San Luis Obispo, CA 93405 899 Pacific St San Luis Obispo, CA 93401 411 Foothill Blvd San Luis Obispo, CA 93405 841 Patricia Dr San Luis Obispo, CA 93405 475 High St San Luis Obispo, CA 93401 887 Nipomo St San Luis Obispo, CA 93401 11 South Tassajara Dr San Luis Obispo, CA 93405 1343 Bishop St San Luis Obispo, CA 93401 1892 Oceanaire Dr San Luis Obispo, CA 93405 50 Higuera St San Luis Obispo, CA 93401 12398 Los Osos Valley Rd San Luis Obispo, CA 93405 651 Foothill Blvd San Luis Obispo, CA 93405 4568 Spanish Oaks Dr San Luis Obispo, CA 93401 10 La Entrada Ave San Luis Obispo, CA 93405 1792 Alrita St San Luis Obispo, CA 93401 1321 Osos St San Luis Obispo, CA 93401 959 Humbert Ave San Luis Obispo, CA 93401 1004 Forest St San Luis Obispo, CA 93405 203 Carpenter St San Luis Obispo, CA 93401 260 Westmont Ave San Luis Obispo, CA 93405 441 Pismo St San Luis Obispo, CA 93401 1172 Atascadero St San Luis Obispo, CA 93405 4362 Wavertree St San Luis Obispo, CA 93401 182 Tango Wy San Luis Obispo, CA 93401 248 Almond St San Luis Obispo, CA 93405 482 Sandercock St San Luis Obispo, CA 93401 445 Madonna Rd Unit: A San Luis Obispo, CA 93405 731 Grove St San Luis Obispo, CA 93401 1525 Slack St San Luis Obispo, CA 93405 229 Foxtrot Ct San Luis Obispo, CA 93401 213 Foxtrot Ct San Luis Obispo, CA 93401 1810 Hope St San Luis Obispo, CA 93405 210 Lincoln Ave San Luis Obispo, CA 93405 3924 Carissa Ct San Luis Obispo, CA 93401 202 Kitty Hawk Ct San Luis Obispo, CA 93401 785 Lincoln Ave San Luis Obispo, CA 93405 217 Foxtrot Ct San Luis Obispo, CA 93401 233 Granada Dr San Luis Obispo, CA 93401 1069 Legacy Ln San Luis Obispo, CA 93405 11343 Los Osos Valley Rd Unit: A San Luis Obispo, CA 93405 228 Mission Ln San Luis Obispo, CA 93405 1452 Noveno Ave San Luis Obispo, CA 93401 132 Crandall Wy San Luis Obispo, CA 93405 290 Kentucky St San Luis Obispo, CA 93405 875 Mission St San Luis Obispo, CA 93405 1728 Santa Rosa St San Luis Obispo, CA 93401 1591 Royal Wy San Luis Obispo, CA 93405 319 Margarita Ave San Luis Obispo, CA 93401 30 Chuparrosa Dr San Luis Obispo, CA 93401 228 Foxtrot Ct San Luis Obispo, CA 93401 321 Tolosa Wy San Luis Obispo, CA 93405 2291 Exposition Dr San Luis Obispo, CA 93401 523 Cuesta Dr San Luis Obispo, CA 93405 1472 Ashmore St San Luis Obispo, CA 93401 3193 Cherry Ln San Luis Obispo, CA 93401 1347 Ironbark St San Luis Obispo, CA 93401 1313 Broad St San Luis Obispo, CA 93401 434 Islay St San Luis Obispo, CA 93401 459 North Tassajara Dr San Luis Obispo, CA 93405 1529 Tanglewood Dr San Luis Obispo, CA 93401 431 Chorro St San Luis Obispo, CA 93405 3767 Park Ridge Ln San Luis Obispo, CA 93401 2583 Greta Pl San Luis Obispo, CA 93401 868 Upham St San Luis Obispo, CA 93401 3050 Broad St San Luis Obispo, CA 93401 2432 Sunset Dr San Luis Obispo, CA 93401 1010 San Carlos Dr San Luis Obispo, CA 93401 219 Foxtrot Ct San Luis Obispo, CA 93401 1350 Marsh St San Luis Obispo, CA 93401 1262 Murray Ave San Luis Obispo, CA 93405 212 Kitty Hawk Ct San Luis Obispo, CA 93401 742 Center St San Luis Obispo, CA 93405 1185 Foothill Blvd Unit: 17 San Luis Obispo, CA 93405 2250 King Street Unit: 4 San Luis Obispo, CA 93401 235 Foxtrot Ct San Luis Obispo, CA 93401 153 Broad St San Luis Obispo, CA 93405 321 Ramona Dr San Luis Obispo, CA 93405 1792 Alrita St San Luis Obispo, CA 93401 1243 Mill St San Luis Obispo, CA 93401 1529 Tanglewood Dr San Luis Obispo, CA 93401 1532 Gulf St San Luis Obispo, CA 93405 437 Kentucky St Unit: D San Luis Obispo, CA 93405 848 Monterey St San Luis Obispo, CA 93401 187 Tank Farm Rd Unit: 110 San Luis Obispo, CA 93401 1282 Fernwood Dr San Luis Obispo, CA 93401 2322 Flora St San Luis Obispo, CA 93401 1414 Smith St San Luis Obispo, CA 93401 2407 Boulevard Del Campo Blvd San Luis Obispo, CA 93401 1116 Orcutt Rd San Luis Obispo, CA 93401 785 Buchon St San Luis Obispo, CA 93401 1490 Descanso St Unit: 2 San Luis Obispo, CA 93405 1115 Terra Wy San Luis Obispo, CA 93405 236 Foxtrot Ct San Luis Obispo, CA 93401 1389 Fairway Dr San Luis Obispo, CA 93405 2035 Rachel St San Luis Obispo, CA 93401 85 Encanto Ln San Luis Obispo, CA 93401 362 Calle Lupita San Luis Obispo, CA 93401 767 Chorro St Unit: A San Luis Obispo, CA 93401 1321 Garden St San Luis Obispo, CA 93401 3000 Broad St Unit: 209 San Luis Obispo, CA 93401 1132 Olive St San Luis Obispo, CA 93405 195 Cessna Ct San Luis Obispo, CA 93401 49 Mariposa Dr San Luis Obispo, CA 93401 3850 Long St San Luis Obispo, CA 93401 1145 Murray Ave San Luis Obispo, CA 93405 216 Kitty Hawk Ct San Luis Obispo, CA 93401 209 Tango Wy San Luis Obispo, CA 93401 4200 La Posada San Luis Obispo, CA 93401 237 Foxtrot Ct San Luis Obispo, CA 93401 2018 Skylark Ln San Luis Obispo, CA 93401 945 Bougainvillea St San Luis Obispo, CA 93401 611 Mitchell Dr San Luis Obispo, CA 93401 1186 Olive St San Luis Obispo, CA 93405 1043 George St San Luis Obispo, CA 93401 645 Tank Farm Rd San Luis Obispo, CA 93401 1445 Calle Joaquin San Luis Obispo, CA 93405 725 Serrano Dr San Luis Obispo, CA 93405 1245 Ella St San Luis Obispo, CA 93401 762 Lincoln Ave San Luis Obispo, CA 93405 364 Montrose Dr San Luis Obispo, CA 93405 1144 Chorro St San Luis Obispo, CA 93401 308 San Miguel Ave San Luis Obispo, CA 93405 1333 Madonna Rd San Luis Obispo, CA 93405 1215 Peach St Unit: B San Luis Obispo, CA 93401 437 Kentucky St Unit: B San Luis Obispo, CA 93405 222 Kitty Hawk Ct San Luis Obispo, CA 93401 591 Highland Dr San Luis Obispo, CA 93405 1315 Woodside Dr San Luis Obispo, CA 93401 966 Tarragon Ln San Luis Obispo, CA 93401 3375 Sequoia Dr San Luis Obispo, CA 93401 2041 Hays St San Luis Obispo, CA 93405 188 Cuesta Dr San Luis Obispo, CA 93405 1245 Ella St San Luis Obispo, CA 93401 4755 Snapdragon Wy San Luis Obispo, CA 93401 1088 Pauline Wy San Luis Obispo, CA 93401 767 Chorro St Unit: A San Luis Obispo, CA 93401 654 Mountain View St San Luis Obispo, CA 93405 1176 Seaward St San Luis Obispo, CA 93405 215 Foxtrot Ct San Luis Obispo, CA 93401 1336 Fernwood Dr San Luis Obispo, CA 93401 1190 Bedford Ct San Luis Obispo, CA 93401 1695 Crestview Cir San Luis Obispo, CA 93401 1339 Sawleaf Ct San Luis Obispo, CA 93401 3029 Arezzo Dr San Luis Obispo, CA 93401 624 Mission Ln San Luis Obispo, CA 93405 850 Casitas Ct San Luis Obispo, CA 93405 1286 Rich Ct San Luis Obispo, CA 93401 1433 Calle Joaquin San Luis Obispo, CA 93405 437 Kentucky St Unit: G San Luis Obispo, CA 93405 2045 Hope St San Luis Obispo, CA 93405 437 Kentucky St Unit: C San Luis Obispo, CA 93405 777 Boysen Ave San Luis Obispo, CA 93405 1446 Nipomo St San Luis Obispo, CA 93401 1135 Islay St San Luis Obispo, CA 93401 279 Lawrence Dr San Luis Obispo, CA 93401 644 Patricia Dr San Luis Obispo, CA 93405 130 Orange Dr San Luis Obispo, CA 93405 2916 Johnson Ave San Luis Obispo, CA 93401 1545 Oceanaire Dr San Luis Obispo, CA 93405 197 Tango Wy San Luis Obispo, CA 93401 1185 Foothill Blvd Unit: 25 San Luis Obispo, CA 93405 758 Grove St Unit: A San Luis Obispo, CA 93401 886 Alyssum Ct San Luis Obispo, CA 93401 1198 Seaward St San Luis Obispo, CA 93405 4613 Snapdragon Wy San Luis Obispo, CA 93401 804 Meinecke Ave San Luis Obispo, CA 93405 2042 Hays St San Luis Obispo, CA 93405 474 Sandercock St San Luis Obispo, CA 93401 849 Higuera St San Luis Obispo, CA 93401 1511 Morro St San Luis Obispo, CA 93401 1511 Morro St San Luis Obispo, CA 93401 1127 Iris St San Luis Obispo, CA 93401 1943 Devaul Ranch Dr San Luis Obispo, CA 93405 209 Foxtrot Ct San Luis Obispo, CA 93401 28 South Tassajara Dr San Luis Obispo, CA 93405 836 Vista Del Arroyo San Luis Obispo, CA 93405 1011 Legacy Ln San Luis Obispo, CA 93405 1023 Chorro St San Luis Obispo, CA 93401 3933 Carissa Ct San Luis Obispo, CA 93401 1463 Bishop St San Luis Obispo, CA 93401 637 Oakridge Dr San Luis Obispo, CA 93405 646 Caudill St San Luis Obispo, CA 93401 522 Broad St San Luis Obispo, CA 93405 1139 Islay St San Luis Obispo, CA 93401 1861 Devaul Ranch Dr San Luis Obispo, CA 93405 646 Caudill St San Luis Obispo, CA 93401 1850 Alrita St San Luis Obispo, CA 93401 402 Luneta Dr San Luis Obispo, CA 93405 1518 Balboa St San Luis Obispo, CA 93405 162 Earthwood Ln San Luis Obispo, CA 93401 951 Monterey St San Luis Obispo, CA 93401 217 Foxtrot Ct San Luis Obispo, CA 93401 1939 Huasna Dr San Luis Obispo, CA 93405 327 Highland Dr San Luis Obispo, CA 93405 877 Palm St San Luis Obispo, CA 93401 1435 Ironbark St San Luis Obispo, CA 93401 1439 Hansen Ln San Luis Obispo, CA 93401 221 Daly Ave San Luis Obispo, CA 93405 1415 Hansen Ln San Luis Obispo, CA 93401 1135 Islay St San Luis Obispo, CA 93401 1588 Eto Cir San Luis Obispo, CA 93405 403 High St San Luis Obispo, CA 93401 150 Del Norte Wy San Luis Obispo, CA 93405 1095 San Adriano St San Luis Obispo, CA 93405 581 Higuera St San Luis Obispo, CA 93401 1615 Lima Dr San Luis Obispo, CA 93405 172 Twin Ridge Ct San Luis Obispo, CA 93405 218 Patricia Ct San Luis Obispo, CA 93405 990 Palm St San Luis Obispo, CA 93401 1615 Phillips Ln San Luis Obispo, CA 93401 1144 Chorro St San Luis Obispo, CA 93401 132 Earthwood Ln San Luis Obispo, CA 93401 1941 Chorro St San Luis Obispo, CA 93401 249 Tank Farm San Luis Obispo, CA 93401 555 Chorro St San Luis Obispo, CA 93405 830 Boysen Ave San Luis Obispo, CA 93405 382 Albert Dr Unit: A San Luis Obispo, CA 93405 102 Santa Rosa St San Luis Obispo, CA 93405 1909 Ruth St San Luis Obispo, CA 93401 538 Mitchell Dr San Luis Obispo, CA 93401 1134 Montalban St San Luis Obispo, CA 93405 264 Daly Ave San Luis Obispo, CA 93405 1256 Sydney St San Luis Obispo, CA 93401 171 Cerro Romauldo Ave San Luis Obispo, CA 93405 683 Patricia Dr San Luis Obispo, CA 93405 248 Foothill Blvd San Luis Obispo, CA 93405 2916 Johnson Ave San Luis Obispo, CA 93401 2407 Boulevard Del Campo Blvd San Luis Obispo, CA 93401 1159 Islay St San Luis Obispo, CA 93401 1205 Ella St San Luis Obispo, CA 93401 530 Serrano Dr San Luis Obispo, CA 93405 602 Al Hil Dr San Luis Obispo, CA 93405 1761 Monterey St San Luis Obispo, CA 93401 1533 Hillcrest Pl San Luis Obispo, CA 93401 1833 Vicente Dr San Luis Obispo, CA 93405 215 Foxtrot Ct San Luis Obispo, CA 93401 1463 Bishop St San Luis Obispo, CA 93401 1159 Leff St San Luis Obispo, CA 93401 274 Buchon St San Luis Obispo, CA 93401 2279 Exposition Dr San Luis Obispo, CA 93401 1376 Sonrisa Ct San Luis Obispo, CA 93405 706 Foothill Blvd San Luis Obispo, CA 93405 1239 Foothill Blvd Unit: 206 San Luis Obispo, CA 93405 1245 Ella St San Luis Obispo, CA 93401 3727 Park Ridge Ln San Luis Obispo, CA 93401 2333 Helena St San Luis Obispo, CA 93401 1328 Royal Wy San Luis Obispo, CA 93405 2063 Sierra Wy San Luis Obispo, CA 93401 218 Kitty Hawk Ct San Luis Obispo, CA 93401 1327 Tanglewood Dr San Luis Obispo, CA 93401 3317 Rockview Ct San Luis Obispo, CA 93401 2424 Cumbre Ct San Luis Obispo, CA 93401 1529 Tanglewood Dr San Luis Obispo, CA 93401 1376 Ironbark St San Luis Obispo, CA 93401 822 Murray Ave San Luis Obispo, CA 93405 299 Hermosa Wy San Luis Obispo, CA 93405 227 Foxtrot Ct San Luis Obispo, CA 93401 618 Grove St San Luis Obispo, CA 93401 902 Peach St San Luis Obispo, CA 93401 913 Rachel Ct San Luis Obispo, CA 93401 1604 Monterey St San Luis Obispo, CA 93401 140 Earthwood Ln San Luis Obispo, CA 93401 437 Kentucky St Unit: A San Luis Obispo, CA 93405 235 Foxtrot Ct San Luis Obispo, CA 93401 232 Lincoln Ave San Luis Obispo, CA 93405 1158 Forest St San Luis Obispo, CA 93405 1427 Beach St San Luis Obispo, CA 93401 1239 Foothill Blvd Unit: 205 San Luis Obispo, CA 93405 390 Santa Rosa St San Luis Obispo, CA 93405 1722 Devaul Ranch Dr San Luis Obispo, CA 93405 374 Corrida Dr San Luis Obispo, CA 93401 155 Anacapa Cir San Luis Obispo, CA 93405 672 Serrano Dr San Luis Obispo, CA 93405 3094 Arezzo Dr San Luis Obispo, CA 93401 229 Foxtrot Ct San Luis Obispo, CA 93401 1850 Viewmont St San Luis Obispo, CA 93401 1061 Murray Ave San Luis Obispo, CA 93405 811 Palm St San Luis Obispo, CA 93401 211 Foxtrot Ct San Luis Obispo, CA 93401 726 Higuera St San Luis Obispo, CA 93401 3940 Broad St San Luis Obispo, CA 93401 865 Morro St San Luis Obispo, CA 93401 437 Kentucky St Unit: H San Luis Obispo, CA 93405 328 Leroy Ct Unit: A San Luis Obispo, CA 93405 2684 Johnson Ave San Luis Obispo, CA 93401 1144 Morro St San Luis Obispo, CA 93401 437 Kentucky St Unit: E San Luis Obispo, CA 93405 1751 Oceanaire Ct San Luis Obispo, CA 93405 1029 Chorro St San Luis Obispo, CA 93401 541 Couper Dr San Luis Obispo, CA 93405 477 Sandercock St San Luis Obispo, CA 93401 698 Higuera St San Luis Obispo, CA 93401 778 Higuera St San Luis Obispo, CA 93401 1528 Tanglewood Dr San Luis Obispo, CA 93401 1127 Broad St San Luis Obispo, CA 93401 1690 Royal Wy San Luis Obispo, CA 93405 1800 Monterey St San Luis Obispo, CA 93401 1236 Monte Vista Pl Unit: 19 San Luis Obispo, CA 93405 1625 Garden St San Luis Obispo, CA 93401 380 Albert Dr San Luis Obispo, CA 93405 1132 Olive St San Luis Obispo, CA 93405 2023 San Luis Dr Unit: A San Luis Obispo, CA 93401 474 Broad St San Luis Obispo, CA 93401 1236 Monte Vista Pl Unit: 18 San Luis Obispo, CA 93405 472 Broad St San Luis Obispo, CA 93405 1236 Monte Vista Pl Unit: 17 San Luis Obispo, CA 93405 1236 Monte Vista Pl Unit: 16 San Luis Obispo, CA 93405 1140 Kendall Rd Unit: C San Luis Obispo, CA 93401 670 Buchon St San Luis Obispo, CA 93401 20 Buena Vista Ave San Luis Obispo, CA 93405 28 South Tassajara Dr San Luis Obispo, CA 93405 1497 Slack St San Luis Obispo, CA 93405 3271 Rockview Pl San Luis Obispo, CA 93401 580 Serrano Dr San Luis Obispo, CA 93405 262 Highland Dr San Luis Obispo, CA 93405 1292 Sawleaf St San Luis Obispo, CA 93401 174 Bravo St San Luis Obispo, CA 93401 1326 Pacific St San Luis Obispo, CA 93401 178 Bravo St San Luis Obispo, CA 93401 811 Palm St San Luis Obispo, CA 93401 319 Ramona Dr San Luis Obispo, CA 93405 1194 Pacific St Unit: 100 San Luis Obispo, CA 93401 1823 Johnson Ave San Luis Obispo, CA 93401 1831 Portola St San Luis Obispo, CA 93405 170 Bravo St San Luis Obispo, CA 93401 1459 Ella St San Luis Obispo, CA 93401 294 Craig Wy San Luis Obispo, CA 93405 201 Carpenter St San Luis Obispo, CA 93401 1140 Kendall Rd Unit: D San Luis Obispo, CA 93401 466 Woodbridge St San Luis Obispo, CA 93401 2042 Hays St Unit: A San Luis Obispo, CA 93405 495 Broad St San Luis Obispo, CA 93405 1650 Palm St San Luis Obispo, CA 93401 498 Stoneridge Dr San Luis Obispo, CA 93401 193 Cessna Ct San Luis Obispo, CA 93401 895 Monterey St San Luis Obispo, CA 93401 1720 Johnson Ave San Luis Obispo, CA 93401 529 Hathway St San Luis Obispo, CA 93405 102 Santa Rosa St San Luis Obispo, CA 93405 1313 Broad St San Luis Obispo, CA 93401 830 Venable St San Luis Obispo, CA 93405 1306 Chorro St San Luis Obispo, CA 93401 845 Fiero Ln San Luis Obispo, CA 93401 183 Cessna Ct San Luis Obispo, CA 93401 1348 Fernwood Dr San Luis Obispo, CA 93401 239 Rosita St San Luis Obispo, CA 93405 82 La Loma Ct San Luis Obispo, CA 93405 415 Dana St Unit: 1 San Luis Obispo, CA 93401 1769 San Luis Dr San Luis Obispo, CA 93401 1845 Hays St San Luis Obispo, CA 93405 554 Al Hil Dr San Luis Obispo, CA 93405 186 Bravo St San Luis Obispo, CA 93401 1470 Tanglewood Ct San Luis Obispo, CA 93401 1217 Mill St San Luis Obispo, CA 93401 2030 Rachel St San Luis Obispo, CA 93401 418 Mitchell Dr San Luis Obispo, CA 93401 100 Madonna Rd San Luis Obispo, CA 93405 293 Albert Dr San Luis Obispo, CA 93405 111 Chorro St San Luis Obispo, CA 93405 2074 Monterey St San Luis Obispo, CA 93401 847 Monterey St San Luis Obispo, CA 93401 207 Foxtrot Ct San Luis Obispo, CA 93401 30 Chorro St San Luis Obispo, CA 93405 3242 Johnson Ave San Luis Obispo, CA 93401 1961 Oceanaire Dr San Luis Obispo, CA 93405 3661 Rock Garden Ln San Luis Obispo, CA 93401 1617 Santa Rosa St San Luis Obispo, CA 93401 1320 Phillips Ln San Luis Obispo, CA 93401 3750 Bullock Ln San Luis Obispo, CA 93401 1313 Broad St San Luis Obispo, CA 93401 1647 Mccollum St San Luis Obispo, CA 93405 2161 Sierra Wy San Luis Obispo, CA 93401 4586 Spanish Oaks Dr San Luis Obispo, CA 93401 253 Madonna Rd San Luis Obispo, CA 93405 1336 Sweetbay Ln San Luis Obispo, CA 93401 257 Patricia Ct San Luis Obispo, CA 93405 182 Bravo St San Luis Obispo, CA 93401 125 Longview Ln Unit: A San Luis Obispo, CA 93405 1325 Pacific St San Luis Obispo, CA 93401 3419 Roberto Ct Unit: C San Luis Obispo, CA 93401 233 Granada Dr San Luis Obispo, CA 93401 1322 Noveno Ave San Luis Obispo, CA 93401 167 Cuesta Dr San Luis Obispo, CA 93405 2449 Ladera Ct San Luis Obispo, CA 93401 1735 Welsh Ct San Luis Obispo, CA 93405 1127 Broad St San Luis Obispo, CA 93401 185 Cessna Ct San Luis Obispo, CA 93401 195 Cessna Ct San Luis Obispo, CA 93401 1000 Olive St San Luis Obispo, CA 93405 534 Highland Dr San Luis Obispo, CA 93405 657 Cerro Romauldo Ave San Luis Obispo, CA 93405 245 Bridge St San Luis Obispo, CA 93401 755 Santa Rosa St San Luis Obispo, CA 93401 66 Las Praderas Dr San Luis Obispo, CA 93401 1639 Frambuesa Dr San Luis Obispo, CA 93405 848 Higuera St San Luis Obispo, CA 93401 586 Cuesta Dr San Luis Obispo, CA 93405 1326 Higuera St San Luis Obispo, CA 93401 833 Bougainvillea St San Luis Obispo, CA 93401 1608 Karen Dr San Luis Obispo, CA 93405 2063 Sierra Wy San Luis Obispo, CA 93401 2045 Skylark Ln San Luis Obispo, CA 93401 560 Higuera St Unit: H San Luis Obispo, CA 93401 993 Bluebell Wy San Luis Obispo, CA 93401 4111 Broad St San Luis Obispo, CA 93401 781 Marsh St Unit: 270 San Luis Obispo, CA 93401 1140 Kendall Rd Unit: B San Luis Obispo, CA 93401 1491 Monterey St San Luis Obispo, CA 93401 899 Pacific St Unit: 100 San Luis Obispo, CA 93401 1250 Peach St San Luis Obispo, CA 93401 392 Santa Maria Ave San Luis Obispo, CA 93405 1640 El Cerrito Ct San Luis Obispo, CA 93401 153 Broad St San Luis Obispo, CA 93405 2600 Broad St San Luis Obispo, CA 93401 2350 Meadow St San Luis Obispo, CA 93401 879 Church St San Luis Obispo, CA 93401 1129 George St San Luis Obispo, CA 93401 191 Cessna Ct San Luis Obispo, CA 93401 852 El Capitan Wy San Luis Obispo, CA 93401 2161 Sierra Wy San Luis Obispo, CA 93401 1347 Ironbark St San Luis Obispo, CA 93401 1716 Oceanaire Dr San Luis Obispo, CA 93405 1320 Vista Del Lago San Luis Obispo, CA 93405 289 Ramona Dr San Luis Obispo, CA 93405 1260 Ella St San Luis Obispo, CA 93401 367 Hill St San Luis Obispo, CA 93405 872 Morro St San Luis Obispo, CA 93401 262 Foothill Blvd San Luis Obispo, CA 93405 1270 Vista Del Lago San Luis Obispo, CA 93405 1316 Diablo Dr San Luis Obispo, CA 93405 187 Cessna Ct San Luis Obispo, CA 93401 197 Cessna Ct San Luis Obispo, CA 93401 1350 Marsh St San Luis Obispo, CA 93401 1029 Chorro St San Luis Obispo, CA 93401 194 Bravo St San Luis Obispo, CA 93401 888 Monterey St San Luis Obispo, CA 93401 2556 Gail Pl San Luis Obispo, CA 93401 968 Walnut St San Luis Obispo, CA 93401 777 Chorro St San Luis Obispo, CA 93401 2864 Flora St San Luis Obispo, CA 93401 3 La Entrada Ave Unit: A San Luis Obispo, CA 93405 1245 Coral St San Luis Obispo, CA 93405 1362 Aralia Ct San Luis Obispo, CA 93401 1347 Ironbark St San Luis Obispo, CA 93401 230 Broad St San Luis Obispo, CA 93405 899 Pacific St Unit: 100 San Luis Obispo, CA 93401 315 Patricia Dr San Luis Obispo, CA 93401 2432 Sunset Dr San Luis Obispo, CA 93401 225 La Canada Dr San Luis Obispo, CA 93405 262 Foothill Blvd Unit: A San Luis Obispo, CA 93405 964 Johnson Ave San Luis Obispo, CA 93401 767 Chorro St Unit: A San Luis Obispo, CA 93401 1540 Froom Ranch Wy San Luis Obispo, CA 93405 237 Foxtrot Ct San Luis Obispo, CA 93401 1861 Devaul Ranch Dr Unit: A San Luis Obispo, CA 93405 1206 Oceanaire Dr San Luis Obispo, CA 93405 580 Serrano Dr San Luis Obispo, CA 93405 11343 Los Osos Valley Rd San Luis Obispo, CA 93405 1055 Monterey St San Luis Obispo, CA 93401 1350 Osos St San Luis Obispo, CA 93401 1357 Ironbark St San Luis Obispo, CA 93401 1136 Walnut St San Luis Obispo, CA 93401 562 Couper Dr San Luis Obispo, CA 93405 855 Aerovista Pl San Luis Obispo, CA 93401 1239 Foothill Blvd Unit: 202 San Luis Obispo, CA 93405 3450 Broad St San Luis Obispo, CA 93401 231 Kentucky St San Luis Obispo, CA 93405 1304 Sydney St San Luis Obispo, CA 93401 107 Mustang Dr San Luis Obispo, CA 93405 1219 Woodside Dr San Luis Obispo, CA 93401 1219 Woodside Dr San Luis Obispo, CA 93401 11050 Los Osos Valley Rd San Luis Obispo, CA 93405 650 Sweeney Ln San Luis Obispo, CA 93401 1440 Ella St San Luis Obispo, CA 93401 795 Islay St San Luis Obispo, CA 93401 1080 Grove St San Luis Obispo, CA 93401 1601 Devaul Ranch Dr San Luis Obispo, CA 93405 380 Christina Wy San Luis Obispo, CA 93405 232 Foxtrot Ct San Luis Obispo, CA 93401 777 Pismo St San Luis Obispo, CA 93401 1831 Portola St San Luis Obispo, CA 93405 1633 Crestview Cir San Luis Obispo, CA 93401 887 Higuera St San Luis Obispo, CA 93401 133 Del Sur Wy San Luis Obispo, CA 93405 2023 Sierra Wy San Luis Obispo, CA 93401 479 Broad St San Luis Obispo, CA 93405 855 Via Esteban San Luis Obispo, CA 93401 1194 Pacific St Unit: 100 San Luis Obispo, CA 93401 100 Madonna Rd San Luis Obispo, CA 93405 2015 Monterey St San Luis Obispo, CA 93401 2082 Fixlini St San Luis Obispo, CA 93401 4320 Larkspur St San Luis Obispo, CA 93401 1239 Foothill Blvd Unit: 204 San Luis Obispo, CA 93405 1731 Pico Ct San Luis Obispo, CA 93405 1130 Atascadero St San Luis Obispo, CA 93405 1320 Oceanaire Dr San Luis Obispo, CA 93405 1901 Devaul Ranch Dr San Luis Obispo, CA 93405 667 Hill St San Luis Obispo, CA 93405 364 Montrose Dr San Luis Obispo, CA 93405 305 Chaplin Ln San Luis Obispo, CA 93405 3008 Arezzo Dr San Luis Obispo, CA 93401 710 Foothill Blvd San Luis Obispo, CA 93405 390 Santa Rosa St San Luis Obispo, CA 93405 3406 Sycamore Dr San Luis Obispo, CA 93401 2744 El Cerrito San Luis Obispo, CA 93401 1230 Higuera St San Luis Obispo, CA 93401 1930 Castillo Ct San Luis Obispo, CA 93405 737 Higuera St San Luis Obispo, CA 93401 1824 Castillo Ct San Luis Obispo, CA 93405 750 Chorro St San Luis Obispo, CA 93401 1150 Marsh St San Luis Obispo, CA 93401 2019 Sierra Wy San Luis Obispo, CA 93401 1257 Chaparral Cir San Luis Obispo, CA 93401 713 Grand Ave San Luis Obispo, CA 93401 1750 Conejo Ave San Luis Obispo, CA 93401 1090 Court St San Luis Obispo, CA 93401 405 Jaycee Dr San Luis Obispo, CA 93405 1755 Diablo Dr San Luis Obispo, CA 93405 1330 Buchon St San Luis Obispo, CA 93401 595 Patricia Dr San Luis Obispo, CA 93405 1432 Tanglewood Ct San Luis Obispo, CA 93401 211 Chorro St San Luis Obispo, CA 93405 777 Chorro St Unit: 2 San Luis Obispo, CA 93401 1135 Chorro St San Luis Obispo, CA 93401 204 Foxtrot Ct San Luis Obispo, CA 93401 2088 Price St San Luis Obispo, CA 93401 1151 San Carlos Dr San Luis Obispo, CA 93401 3060 Lucca Ln San Luis Obispo, CA 93401 222 Kitty Hawk Ct San Luis Obispo, CA 93401 1611 Colina Ct San Luis Obispo, CA 93401 1115 Oceanaire Dr San Luis Obispo, CA 93405 1190 Buchon St San Luis Obispo, CA 93401 955 Monterey St San Luis Obispo, CA 93401 1990 Hays St San Luis Obispo, CA 93405 890 Marsh St San Luis Obispo, CA 93401 4051 Broad St San Luis Obispo, CA 93401 1215 Sponza Dr Unit: 2 San Luis Obispo, CA 93401 116 Mustang Dr San Luis Obispo, CA 93405 2028 King Street San Luis Obispo, CA 93401 4600 Broad St San Luis Obispo, CA 93401 954 Lobelia Ln San Luis Obispo, CA 93401 1907 Ruth St San Luis Obispo, CA 93401 4337 Poinsettia St San Luis Obispo, CA 93401 1531 Monterey St San Luis Obispo, CA 93401 1330 Buchon St San Luis Obispo, CA 93401 127 Mustang Dr San Luis Obispo, CA 93405 2125 Story St San Luis Obispo, CA 93401 2460 Augusta St San Luis Obispo, CA 93401 343 Grand Ave San Luis Obispo, CA 93405 2855 Mcmillan Ave San Luis Obispo, CA 93401 1026 Palm St Unit: 101 San Luis Obispo, CA 93401 3894 Hayfield Loop San Luis Obispo, CA 93401 24 Las Praderas Dr San Luis Obispo, CA 93401 1531 Monterey St San Luis Obispo, CA 93401 103 Stenner St San Luis Obispo, CA 93405 2391 Lawton Ave San Luis Obispo, CA 93401 3481 Sycamore Dr San Luis Obispo, CA 93401 2011 Chorro St San Luis Obispo, CA 93401 216 Kitty Hawk Ct San Luis Obispo, CA 93401 1052 Vista Del Collados San Luis Obispo, CA 93405 2475 Victoria Ave San Luis Obispo, CA 93401 865 Morro St San Luis Obispo, CA 93401 775 Capitolio Wy San Luis Obispo, CA 93401 2800 Broad St Unit: 110 San Luis Obispo, CA 93401 110 Mustang Dr San Luis Obispo, CA 93405 770 Haystack Pl San Luis Obispo, CA 93405 868 Higuera St San Luis Obispo, CA 93401 1639 Frambuesa Dr San Luis Obispo, CA 93405 252 Memphis Belle Wy San Luis Obispo, CA 93401 1239 Foothill Blvd Unit: 203 San Luis Obispo, CA 93405 868 Higuera St San Luis Obispo, CA 93401 11295 Los Osos Valley Rd Unit: 27 San Luis Obispo, CA 93405 241 Westmont Ave San Luis Obispo, CA 93405 672 Serrano Dr Unit: 4 San Luis Obispo, CA 93405 755 Chorro St San Luis Obispo, CA 93401 1287 Descanso St San Luis Obispo, CA 93405 218 Kitty Hawk Ct San Luis Obispo, CA 93401 1750 Diablo Dr San Luis Obispo, CA 93405 865 Morro St San Luis Obispo, CA 93401 1236 Monte Vista Pl Unit: 1 San Luis Obispo, CA 93405 1221 Drake Cir San Luis Obispo, CA 93405 4330 Sunflower Wy San Luis Obispo, CA 93401 1283 San Carlos Dr San Luis Obispo, CA 93401 1239 Foothill Blvd Unit: 207 San Luis Obispo, CA 93405 176 Chorro St San Luis Obispo, CA 93405 218 Foxtrot Ct San Luis Obispo, CA 93401 3442 Empresa Dr San Luis Obispo, CA 93401 1422 Monterey St San Luis Obispo, CA 93401 216 Foxtrot Ct San Luis Obispo, CA 93401 311 Margarita Ave San Luis Obispo, CA 93401 1105 Vista Del Lago San Luis Obispo, CA 93405 995 Higuera St San Luis Obispo, CA 93401 1936 McCollum St San Luis Obispo, CA 93405 451 Mitchell Dr San Luis Obispo, CA 93401 1200 Oceanaire Dr San Luis Obispo, CA 93405 1420 Garcia Dr San Luis Obispo, CA 93405 1334 Diablo Dr San Luis Obispo, CA 93405 261 Cuesta Ave San Luis Obispo, CA 93405 2122 Harris St San Luis Obispo, CA 93401 2276 Broad St San Luis Obispo, CA 93401 207 Foxtrot Ct San Luis Obispo, CA 93401 11545 Los Osos Valley Rd San Luis Obispo, CA 93405 1561 Froom Ranch Wy San Luis Obispo, CA 93405 1239 Foothill Blvd Unit: 201 San Luis Obispo, CA 93405 4696 Snapdragon Wy San Luis Obispo, CA 93401 1750 Conejo Ave San Luis Obispo, CA 93401 222 Foxtrot Ct San Luis Obispo, CA 93401 1055 Monterey St San Luis Obispo, CA 93401 2383 Florence Ave San Luis Obispo, CA 93401 76 Mustang Dr San Luis Obispo, CA 93405 748 Marsh St San Luis Obispo, CA 93401 12340 Los Osos Valley Rd San Luis Obispo, CA 93405 1118 Buchon St San Luis Obispo, CA 93401 3610 Sacramento Dr San Luis Obispo, CA 93401 1430 Garden St San Luis Obispo, CA 93401 254 Luneta Dr San Luis Obispo, CA 93405 552 California Blvd San Luis Obispo, CA 93405 600 Cuesta Dr San Luis Obispo, CA 93405 210 Lincoln Ave San Luis Obispo, CA 93405 670 Grove St San Luis Obispo, CA 93401 1287 Cayucos Dr San Luis Obispo, CA 93405 857 Casitas Ct San Luis Obispo, CA 93405 431 San Vincenzo Dr San Luis Obispo, CA 93401 242 Memphis Belle Wy San Luis Obispo, CA 93401 767 Chorro St Unit: A San Luis Obispo, CA 93401 1090 Grove St San Luis Obispo, CA 93401 1528 Mill St San Luis Obispo, CA 93401 865 Morro St San Luis Obispo, CA 93401 1106 Walnut St Unit: 110 San Luis Obispo, CA 93401 1665 Tanglewood Dr San Luis Obispo, CA 93401 1198 Oceanaire Dr San Luis Obispo, CA 93405 1426 Broad St San Luis Obispo, CA 93401 1841 Slack St San Luis Obispo, CA 93405 1282 West Newport St San Luis Obispo, CA 93405 1746 Chorro St San Luis Obispo, CA 93401 2121 Harris St San Luis Obispo, CA 93401 4127 Bernardo Dr San Luis Obispo, CA 93401 1649 Mccollum St San Luis Obispo, CA 93401 1309 Vega Wy San Luis Obispo, CA 93405 336 Buchon St San Luis Obispo, CA 93401 788 Azalea Ct San Luis Obispo, CA 93401 1505 Balboa St San Luis Obispo, CA 93405 1630 Higuera St San Luis Obispo, CA 93401 1911 Johnson Ave San Luis Obispo, CA 93401 2416 Sendero Ct San Luis Obispo, CA 93401 246 Memphis Belle Wy San Luis Obispo, CA 93401 202 Tank Farm Rd San Luis Obispo, CA 93401 1490 Descanso St San Luis Obispo, CA 93405 1844 San Luis Ranch Rd San Luis Obispo, CA 93405 586 Buchon St San Luis Obispo, CA 93401 2121 Harris St San Luis Obispo, CA 93401 1760 San Luis Dr San Luis Obispo, CA 93401 777 Pismo St San Luis Obispo, CA 93401 1236 West Newport St San Luis Obispo, CA 93405 1537 La Cita Ct San Luis Obispo, CA 93401 1720 Morro St San Luis Obispo, CA 93401 720 Leff St San Luis Obispo, CA 93401 212 Kitty Hawk Ct San Luis Obispo, CA 93401 769 Upham St San Luis Obispo, CA 93401 2416 Santa Clara St Unit: A San Luis Obispo, CA 93401 209 Foxtrot Ct San Luis Obispo, CA 93401 56 Los Palos Dr San Luis Obispo, CA 93401 3205 Calle Jazmin San Luis Obispo, CA 93401 1043 George St San Luis Obispo, CA 93401 1771 Cordova Dr San Luis Obispo, CA 93405 1283 San Carlos Dr San Luis Obispo, CA 93401 1741 Lima Dr San Luis Obispo, CA 93405 1344 Balboa St San Luis Obispo, CA 93405 1846 Conejo Ave San Luis Obispo, CA 93401 244 Memphis Belle Wy San Luis Obispo, CA 93401 1426 Marsh St San Luis Obispo, CA 93401 857 Casitas Ct San Luis Obispo, CA 93405 1218 Woodside Dr San Luis Obispo, CA 93401 442 Buchon St San Luis Obispo, CA 93401 1001 Foothill Blvd San Luis Obispo, CA 93405 652 Lincoln Ave San Luis Obispo, CA 93405 1750 Diablo Dr San Luis Obispo, CA 93405 2176 Santa Ynez Ave San Luis Obispo, CA 93405 390 North Chorro St Unit: 3 San Luis Obispo, CA 93405 530 Couper Dr San Luis Obispo, CA 93405 382 Broad St San Luis Obispo, CA 93405 401 Junipero Wy San Luis Obispo, CA 93401 383 Buena Vista Ave San Luis Obispo, CA 93405 2744 El Cerrito San Luis Obispo, CA 93401 1220 Mill St San Luis Obispo, CA 93401 11590 Los Osos Valley Rd San Luis Obispo, CA 93405 361 Lincoln Ave San Luis Obispo, CA 93405 723 Higuera St San Luis Obispo, CA 93401 3428 Sycamore Dr San Luis Obispo, CA 93401 1620 Higuera St San Luis Obispo, CA 93401 244 Foothill Blvd San Luis Obispo, CA 93405 1367 Diablo Dr San Luis Obispo, CA 93405 661 Pasatiempo Dr San Luis Obispo, CA 93405 102 Mustang Dr Unit: 101 San Luis Obispo, CA 93405 200 Foxtrot Ct San Luis Obispo, CA 93401 1401 Cazadero St San Luis Obispo, CA 93401 1033 Chorro St San Luis Obispo, CA 93401 1342 Oceanaire Dr San Luis Obispo, CA 93405 273 Almond St San Luis Obispo, CA 93405 233 Foxtrot Ct San Luis Obispo, CA 93401 3195 South Higuera St San Luis Obispo, CA 93401 176 Chorro St San Luis Obispo, CA 93405 1401 Cazadero St San Luis Obispo, CA 93401 777 Pismo St San Luis Obispo, CA 93401 210 Foxtrot Ct San Luis Obispo, CA 93401 2348 Johnson Ave San Luis Obispo, CA 93401 386 Broad St San Luis Obispo, CA 93405 71 Las Praderas Dr San Luis Obispo, CA 93401 1134 Forest St San Luis Obispo, CA 93405 3160 Johnson Ave San Luis Obispo, CA 93401 1069 Terra Wy San Luis Obispo, CA 93405 940 Del Rio Ave San Luis Obispo, CA 93405 218 Foxtrot Ct San Luis Obispo, CA 93401 2744 El Cerrito San Luis Obispo, CA 93401 222 Foxtrot Ct San Luis Obispo, CA 93401 390 Santa Rosa St San Luis Obispo, CA 93405 1220 Mill St San Luis Obispo, CA 93401 232 Foxtrot Ct San Luis Obispo, CA 93401 111 Twin Ridge Dr San Luis Obispo, CA 93405 236 Foxtrot Ct San Luis Obispo, CA 93401 240 Foxtrot Ct San Luis Obispo, CA 93401 1037 Tiburon Wy San Luis Obispo, CA 93401 978 Valecito Ct San Luis Obispo, CA 93405 206 Foxtrot Ct San Luis Obispo, CA 93401 228 Foxtrot Ct San Luis Obispo, CA 93401 1701 Devaul Ranch Dr San Luis Obispo, CA 93405 860 Skyline Dr San Luis Obispo, CA 93405 3195 Lirio Ct San Luis Obispo, CA 93401 2060 Parker St San Luis Obispo, CA 93401 216 Foxtrot Ct San Luis Obispo, CA 93401 1213 West Newport St San Luis Obispo, CA 93405 214 Foxtrot Ct San Luis Obispo, CA 93401 234 Broad St San Luis Obispo, CA 93405 380 Christina Wy San Luis Obispo, CA 93405 1415 Cazadero St San Luis Obispo, CA 93401 1794 Partridge Dr San Luis Obispo, CA 93405 4805 Morabito Pl San Luis Obispo, CA 93401 11560 Los Osos Valley Rd Unit: 190 San Luis Obispo, CA 93405 3000 Mcmillan Ave San Luis Obispo, CA 93401 377 Branch St San Luis Obispo, CA 93401 632 Patricia Dr San Luis Obispo, CA 93405 2432 Sunset Dr San Luis Obispo, CA 93401 1684 Alrita St San Luis Obispo, CA 93401 2220 Exposition Dr Unit: 55 San Luis Obispo, CA 93401 1546 Palm St San Luis Obispo, CA 93401 1002 Parkview Pl San Luis Obispo, CA 93405 1741 Lima Dr San Luis Obispo, CA 93405 1427 Broad St San Luis Obispo, CA 93401 3814 Hatchery Ln Unit: 1 San Luis Obispo, CA 93401 1027 Peach St San Luis Obispo, CA 93401 234 Memphis Belle Wy San Luis Obispo, CA 93401 231 Foxtrot Ct San Luis Obispo, CA 93401 2015 Monterey St San Luis Obispo, CA 93401 1015 Bluebell Wy San Luis Obispo, CA 93401 1144 Chorro St San Luis Obispo, CA 93401 1139 Islay St San Luis Obispo, CA 93401 743 Buchon St San Luis Obispo, CA 93401 270 Luneta Dr San Luis Obispo, CA 93405 2145 Price St San Luis Obispo, CA 93401 691 Lincoln Ave San Luis Obispo, CA 93405 665 Grove St San Luis Obispo, CA 93401 308 San Miguel Ave San Luis Obispo, CA 93405 169 Earthwood Ln San Luis Obispo, CA 93401 495 Broad St San Luis Obispo, CA 93405 437 Kentucky St Unit: F San Luis Obispo, CA 93405 1347 Avalon St San Luis Obispo, CA 93405 130 Orange Dr San Luis Obispo, CA 93405 2023 San Luis Dr San Luis Obispo, CA 93401 3242 Johnson Ave San Luis Obispo, CA 93401 233 Foxtrot Ct San Luis Obispo, CA 93401 11560 Los Osos Valley Rd Unit: 190 San Luis Obispo, CA 93405 1529 Tanglewood Dr San Luis Obispo, CA 93401 1185 Foothill Blvd Unit: 17 San Luis Obispo, CA 93405 2432 Sunset Dr San Luis Obispo, CA 93401 3960 South Higuera St Unit: 13 San Luis Obispo, CA 93401 2432 Sunset Dr San Luis Obispo, CA 93401 483 Sandercock St San Luis Obispo, CA 93401 411 Foothill Blvd San Luis Obispo, CA 93405 1532 Gulf St San Luis Obispo, CA 93405 1612 Lima Dr San Luis Obispo, CA 93405 3910 Broad St San Luis Obispo, CA 93401 679 Funston Ave San Luis Obispo, CA 93401 581 Higuera St San Luis Obispo, CA 93401 1003 Buchon St San Luis Obispo, CA 93401 11560 Los Osos Valley Rd Unit: 190 San Luis Obispo, CA 93405 188 Los Cerros Dr San Luis Obispo, CA 93405 751 Buchon St San Luis Obispo, CA 93401 167 Foothill Blvd San Luis Obispo, CA 93405 595 Leff St San Luis Obispo, CA 93401 105 Fel Mar Dr San Luis Obispo, CA 93405 236 Higuera St San Luis Obispo, CA 93401 231 Foxtrot Ct San Luis Obispo, CA 93401 120 Serrano Heights San Luis Obispo, CA 93405 537 Jeffrey Dr San Luis Obispo, CA 93405 1645 Corona Ct San Luis Obispo, CA 93401 1354 San Marcos Ct San Luis Obispo, CA 93401 3158 Spring Ct San Luis Obispo, CA 93401 798 Clearview Ln San Luis Obispo, CA 93405 795 Lincoln Ave San Luis Obispo, CA 93405 221 Foxtrot Ct San Luis Obispo, CA 93401 233 Sandercock St San Luis Obispo, CA 93401 1347 Ironbark St San Luis Obispo, CA 93401 2220 Exposition Dr San Luis Obispo, CA 93401 1502 Higuera St San Luis Obispo, CA 93401 3061 Johnson Ave San Luis Obispo, CA 93401 230 Marlene Dr San Luis Obispo, CA 93405 4013 Bernardo Dr San Luis Obispo, CA 93401 1545 Huckleberry Ln San Luis Obispo, CA 93401 240 Foxtrot Ct San Luis Obispo, CA 93401 1792 Alrita St San Luis Obispo, CA 93401 161 Henderson Ave San Luis Obispo, CA 93405 1525 Slack St Unit: A San Luis Obispo, CA 93405 1445 Calle Joaquin San Luis Obispo, CA 93405 3981 Steel Wy San Luis Obispo, CA 93401 1330 Buchon St San Luis Obispo, CA 93401 1529 Tanglewood Dr San Luis Obispo, CA 93401 1531 Froom Ranch Wy San Luis Obispo, CA 93405 1144 Chorro St San Luis Obispo, CA 93401 2120 Santa Barbara Avenue San Luis Obispo, CA 93401 305 Hathway Ave San Luis Obispo, CA 93405 1055 California Blvd San Luis Obispo, CA 93401 1042 Walnut St San Luis Obispo, CA 93401 550 Foothill Blvd San Luis Obispo, CA 93405 3442 Empresa Dr San Luis Obispo, CA 93401 795 Lincoln Ave San Luis Obispo, CA 93405 2138 Broad St San Luis Obispo, CA 93401 717 Grand Ave San Luis Obispo, CA 93401 335 San Miguel Ave San Luis Obispo, CA 93405 2074 Monterey St San Luis Obispo, CA 93401 3426 Empresa Dr San Luis Obispo, CA 93401 5 Santa Rosa St San Luis Obispo, CA 93405 1315 Aralia Ct San Luis Obispo, CA 93401 1239 Osos St San Luis Obispo, CA 93401 3071 South Higuera St San Luis Obispo, CA 93401 313 Patricia Dr San Luis Obispo, CA 93405 2071 Hope St San Luis Obispo, CA 93405 1865 Monterey St San Luis Obispo, CA 93401 1302 Osos St San Luis Obispo, CA 93401 374 Ramona Dr San Luis Obispo, CA 93405 675 Clarion Ct San Luis Obispo, CA 93401 1695 Calle Joaquin San Luis Obispo, CA 93405 333 Elks Ln San Luis Obispo, CA 93401 3000 Augusta St San Luis Obispo, CA 93401 1124 Nipomo St San Luis Obispo, CA 93401 755 Chorro St San Luis Obispo, CA 93401 1132 Olive St San Luis Obispo, CA 93405 420 Cuesta Dr San Luis Obispo, CA 93401 500 Marsh St San Luis Obispo, CA 93401 3122 Flora St San Luis Obispo, CA 93401 3701 South Higuera St San Luis Obispo, CA 93401 1102 Madonna Rd San Luis Obispo, CA 93405 1865 Monterey St San Luis Obispo, CA 93401 1841 Slack St San Luis Obispo, CA 93405 11050 Los Osos Valley Rd San Luis Obispo, CA 93405 11050 Los Osos Valley Rd San Luis Obispo, CA 93405 2156 Sierra Wy San Luis Obispo, CA 93401 881 Francis Ave San Luis Obispo, CA 93401 2730 Mcmillan Ave San Luis Obispo, CA 93401 283 Madonna Rd San Luis Obispo, CA 93405 445 Prado Rd San Luis Obispo, CA 93401 2474 Augusta St San Luis Obispo, CA 93401 1292 Foothill Blvd San Luis Obispo, CA 93405 110 Grand Ave San Luis Obispo, CA 93405 125 Grand Ave San Luis Obispo, CA 93405 482 Sandercock St San Luis Obispo, CA 93401 1526 Mill St San Luis Obispo, CA 93401 1238 Foothill Blvd San Luis Obispo, CA 93405 1490 Descanso St San Luis Obispo, CA 93405 175 Venture Dr San Luis Obispo, CA 93401 333 Buchon St San Luis Obispo, CA 93401 1301 Calle Joaquin San Luis Obispo, CA 93405 350 Elks Ln San Luis Obispo, CA 93401 25 Prado Rd San Luis Obispo, CA 93401 1626 Osos St San Luis Obispo, CA 93401 3 Chuparrosa Dr San Luis Obispo, CA 93401 290 Madonna Rd San Luis Obispo, CA 93405 755 Chorro St San Luis Obispo, CA 93401 667 Upham St San Luis Obispo, CA 93401 2053 Hays St San Luis Obispo, CA 93405 500 Westmont Ave San Luis Obispo, CA 93405 184 Suburban Rd San Luis Obispo, CA 93401 1035 Monterey St San Luis Obispo, CA 93401 46 South Tassajara Dr San Luis Obispo, CA 93405 265 South St San Luis Obispo, CA 93401 1407 Cazadero St San Luis Obispo, CA 93401 1402 Prefumo Canyon Rd San Luis Obispo, CA 93405 140 South St San Luis Obispo, CA 93401 3195 South Higuera St San Luis Obispo, CA 93401 123 Casa St San Luis Obispo, CA 93405 110 Tank Farm Rd San Luis Obispo, CA 93401 309 Madonna Rd San Luis Obispo, CA 93405 282 Chorro St San Luis Obispo, CA 93405 2021 Skylark Ln San Luis Obispo, CA 93401 145 Henderson Ave San Luis Obispo, CA 93405 587 Marsh St San Luis Obispo, CA 93401 100 Madonna Rd San Luis Obispo, CA 93405 3741 Orcutt Rd San Luis Obispo, CA 93401 2265 Broad St San Luis Obispo, CA 93401 1780 Fixlini St San Luis Obispo, CA 93401 583 Marsh St San Luis Obispo, CA 93401 1783 Southwood Dr San Luis Obispo, CA 93401 2462 Johnson Ave San Luis Obispo, CA 93401 2052 Johnson Ave San Luis Obispo, CA 93401 210 Grand Ave San Luis Obispo, CA 93405 11950 Los Osos Valley Rd San Luis Obispo, CA 93405 1901 Santa Barbara Avenue San Luis Obispo, CA 93401 165 Grand Ave San Luis Obispo, CA 93405 899 Higuera St San Luis Obispo, CA 93401 560 Higuera St San Luis Obispo, CA 93401 1106 Walnut St San Luis Obispo, CA 93401 160 Brook St San Luis Obispo, CA 93401 899 Higuera St San Luis Obispo, CA 93401 667 Upham St San Luis Obispo, CA 93401 2803 Johnson Ave San Luis Obispo, CA 93401 591 Highland Dr San Luis Obispo, CA 93405 1106 Walnut St San Luis Obispo, CA 93401 1423 Descanso St San Luis Obispo, CA 93405 1057 Buchon St San Luis Obispo, CA 93401 446 Luneta Dr San Luis Obispo, CA 93405 591 Highland Dr San Luis Obispo, CA 93405 900 Southwood Dr San Luis Obispo, CA 93401 267 Foothill Blvd San Luis Obispo, CA 93405 1361 Stafford St San Luis Obispo, CA 93405 1380 Broad St San Luis Obispo, CA 93401 1023 Mill St San Luis Obispo, CA 93401 428 Corrida Dr San Luis Obispo, CA 93401 1557 Oceanaire Dr San Luis Obispo, CA 93405 2141 Broad St San Luis Obispo, CA 93401 1126 Buchon St San Luis Obispo, CA 93401 2161 Broad St San Luis Obispo, CA 93401 233 Sandercock St San Luis Obispo, CA 93401 1443 Marsh St San Luis Obispo, CA 93401 4370 Larkspur St San Luis Obispo, CA 93401 333 Madonna Rd San Luis Obispo, CA 93405 1367 Higuera St San Luis Obispo, CA 93401 153 Cross St San Luis Obispo, CA 93401 1308 Royal Wy San Luis Obispo, CA 93405 859 California Blvd San Luis Obispo, CA 93401 989 Chorro St San Luis Obispo, CA 93401 990 Palm St San Luis Obispo, CA 93401 2276 Augusta St San Luis Obispo, CA 93401 11491 Los Osos Valley Rd San Luis Obispo, CA 93405 1413 Monterey St San Luis Obispo, CA 93401 1124 Nipomo St San Luis Obispo, CA 93401 4600 Broad St San Luis Obispo, CA 93401 1240 Southwood Dr San Luis Obispo, CA 93401 4385 Orcutt Rd San Luis Obispo, CA 93401 1490 Southwood Dr San Luis Obispo, CA 93401 11860 Los Osos Valley Rd San Luis Obispo, CA 93405 668 Branch St San Luis Obispo, CA 93401 1630 Fairview St San Luis Obispo, CA 93401 1951 Monterey St San Luis Obispo, CA 93401 3316 Johnson Ave San Luis Obispo, CA 93401 1239 Osos St San Luis Obispo, CA 93401 698 Marsh St San Luis Obispo, CA 93401 1333 Kentwood Dr San Luis Obispo, CA 93401 711 Tank Farm Rd San Luis Obispo, CA 93401 1025 Farmhouse Ln San Luis Obispo, CA 93401 680 Broad St San Luis Obispo, CA 93401 66 Higuera St San Luis Obispo, CA 93401 1750 Diablo Dr San Luis Obispo, CA 93405 2322 Flora St San Luis Obispo, CA 93401 888 Morro St San Luis Obispo, CA 93401 2435 Ladera Ct San Luis Obispo, CA 93401 337 High St San Luis Obispo, CA 93401 2800 Broad St San Luis Obispo, CA 93401 1373 Fredericks St San Luis Obispo, CA 93405 1772 Calle Joaquin San Luis Obispo, CA 93405 228 Mission Ln San Luis Obispo, CA 93405 2094 Mccollum St San Luis Obispo, CA 93405 777 Pismo St San Luis Obispo, CA 93401 277 Bridge St San Luis Obispo, CA 93401 2027 Swazey St San Luis Obispo, CA 93401 1487 Smith St San Luis Obispo, CA 93401 920 Olive St San Luis Obispo, CA 93405 650 Sweeney Ln San Luis Obispo, CA 93401 899 Pacific St San Luis Obispo, CA 93401 3271 South Higuera St San Luis Obispo, CA 93401 2407 Boulevard Del Campo Blvd San Luis Obispo, CA 93401 1414 Quarry Ct San Luis Obispo, CA 93401 218 Foxtrot Ct San Luis Obispo, CA 93401 1744 Southwood Dr San Luis Obispo, CA 93401 222 Foxtrot Ct San Luis Obispo, CA 93401 214 Higuera St San Luis Obispo, CA 93401 319 Ramona Dr San Luis Obispo, CA 93405 1108 Poppy Ln San Luis Obispo, CA 93401 2474 Augusta St San Luis Obispo, CA 93401 1021 Murray Ave San Luis Obispo, CA 93405 651 Buchon St San Luis Obispo, CA 93401 201 Madonna Rd San Luis Obispo, CA 93405 121 Twin Ridge Dr San Luis Obispo, CA 93405 1750 Conejo Ave San Luis Obispo, CA 93401 3165 Broad St San Luis Obispo, CA 93401 4540 Broad St San Luis Obispo, CA 93401 675 California Blvd San Luis Obispo, CA 93401 628 Grove St San Luis Obispo, CA 93401 847 Mirada Dr San Luis Obispo, CA 93405 832 Marigold Ct San Luis Obispo, CA 93401 3981 Steel Wy San Luis Obispo, CA 93401 60 Casa St Unit: A1 San Luis Obispo, CA 93405 60 Casa St Unit: B32 San Luis Obispo, CA 93405 60 Casa St Unit: A2 San Luis Obispo, CA 93405 60 Casa St Unit: A3 San Luis Obispo, CA 93405 60 Casa St Unit: B5 San Luis Obispo, CA 93405 660 Lawrence Dr San Luis Obispo, CA 93401 661 Pasatiempo Dr San Luis Obispo, CA 93405 1237 Archer St San Luis Obispo, CA 93401 4051 Broad St San Luis Obispo, CA 93401 121 Twin Ridge Dr San Luis Obispo, CA 93405 887 Higuera St San Luis Obispo, CA 93401 820 Marigold Ct San Luis Obispo, CA 93401 1281 Oceanaire Dr San Luis Obispo, CA 93405 1363 Marsh St San Luis Obispo, CA 93401 1209 Murray Ave San Luis Obispo, CA 93405 1518 Balboa St San Luis Obispo, CA 93405 1363 Marsh St San Luis Obispo, CA 93401 332 Patricia Dr San Luis Obispo, CA 93405 1153 Terra Wy San Luis Obispo, CA 93405 313 Madonna Rd San Luis Obispo, CA 93405 2469 Gerda St San Luis Obispo, CA 93401 710 Murray Ave San Luis Obispo, CA 93401 1190 Buchon St San Luis Obispo, CA 93401 1426 Marsh St San Luis Obispo, CA 93401 1740 Fixlini St San Luis Obispo, CA 93401 901 Lawrence Dr San Luis Obispo, CA 93401 200 Foxtrot Ct San Luis Obispo, CA 93401 1445 Prefumo Canyon Rd San Luis Obispo, CA 93405 2943 Johnson Ave San Luis Obispo, CA 93401 2943 Johnson Ave Unit: A San Luis Obispo, CA 93401 1206 Twin Creek Rd San Luis Obispo, CA 93401 319 Ramona Dr Unit: A San Luis Obispo, CA 93405 1675 Calle Joaquin San Luis Obispo, CA 93405 1828 Fixlini St San Luis Obispo, CA 93401 241 Hathway St San Luis Obispo, CA 93405 3850 Long St Unit: 200 San Luis Obispo, CA 93401 830 Capitolio Wy San Luis Obispo, CA 93401 60 Casa St Unit: G19 San Luis Obispo, CA 93405 60 Casa St Unit: G20 San Luis Obispo, CA 93405 60 Casa St Unit: G21 San Luis Obispo, CA 93405 60 Casa St Unit: G22 San Luis Obispo, CA 93405 60 Casa St Unit: C13 San Luis Obispo, CA 93405 60 Casa St Unit: C14 San Luis Obispo, CA 93405 60 Casa St Unit: E24 San Luis Obispo, CA 93405 204 Foxtrot Ct San Luis Obispo, CA 93401 60 Casa St Unit: G17 San Luis Obispo, CA 93405 60 Casa St Unit: F15 San Luis Obispo, CA 93405 60 Casa St Unit: F16 San Luis Obispo, CA 93405 60 Casa St Unit: D29 San Luis Obispo, CA 93405 60 Casa St Unit: D31 San Luis Obispo, CA 93405 60 Casa St Unit: E23 San Luis Obispo, CA 93405 60 Casa St Unit: D28 San Luis Obispo, CA 93405 60 Casa St Unit: D30 San Luis Obispo, CA 93405 1234 Archer St San Luis Obispo, CA 93401 60 Casa St San Luis Obispo, CA 93405 60 Casa St Unit: E25 San Luis Obispo, CA 93405 60 Casa St Unit: E26 San Luis Obispo, CA 93405 60 Casa St Unit: E27 San Luis Obispo, CA 93405 3355 Broad St San Luis Obispo, CA 93401 60 Casa St Unit: G18 San Luis Obispo, CA 93405 652 Mitchell Dr San Luis Obispo, CA 93401 60 Casa St Unit: C11 San Luis Obispo, CA 93405 60 Casa St Unit: C12 San Luis Obispo, CA 93405 60 Casa St Unit: B6 San Luis Obispo, CA 93405 60 Casa St Unit: C10 San Luis Obispo, CA 93405 60 Casa St Unit: C9 San Luis Obispo, CA 93405 60 Casa St Unit: B7 San Luis Obispo, CA 93405 60 Casa St Unit: B8 San Luis Obispo, CA 93405 1908 Ruth St San Luis Obispo, CA 93401 561 Luneta Dr San Luis Obispo, CA 93405 299 Albert Dr Unit: A San Luis Obispo, CA 1223 Stafford St San Luis Obispo, CA 93405 1547 Oceanaire Dr San Luis Obispo, CA 93405 1124 Buchon St San Luis Obispo, CA 93401 1257 Chaparral Cir San Luis Obispo, CA 93401 1432 Tanglewood Ct San Luis Obispo, CA 93401 265 Broad St San Luis Obispo, CA 93405 755 Monterey St San Luis Obispo, CA 93401 641 Caudill St San Luis Obispo, CA 93401 2030 Rachel St San Luis Obispo, CA 93401 210 Foxtrot Ct San Luis Obispo, CA 93401 214 Foxtrot Ct San Luis Obispo, CA 93401 212 Warren Wy San Luis Obispo, CA 93405 375 Chorro St San Luis Obispo, CA 93405 343 Grand Ave San Luis Obispo, CA 93405 1531 Froom Ranch Wy San Luis Obispo, CA 93405 777 Pismo St San Luis Obispo, CA 93401 232 Foxtrot Ct San Luis Obispo, CA 93401 895 Industrial Wy San Luis Obispo, CA 93401 1815 Osos St San Luis Obispo, CA 93401 1635 El Caserio Ct San Luis Obispo, CA 93401 951 Monterey St San Luis Obispo, CA 93401 1500 Lizzie St San Luis Obispo, CA 93401 1545 Oceanaire Dr San Luis Obispo, CA 93405 232 Memphis Belle Wy San Luis Obispo, CA 93401 1250 Coral St San Luis Obispo, CA 93405 378 Chorro St San Luis Obispo, CA 93405 2125 Sierra Wy San Luis Obispo, CA 93401 4115 Vachell Ln San Luis Obispo, CA 93401 232 Memphis Belle Wy San Luis Obispo, CA 93401 1335 Cavalier Ln San Luis Obispo, CA 93405 927 Bougainvillea St San Luis Obispo, CA 93401 1860 Homestead Pl San Luis Obispo, CA 93405 667 Upham St San Luis Obispo, CA 93401 2299 Flora St San Luis Obispo, CA 93401 2250 Flora St San Luis Obispo, CA 93401 3935 Kilbern Wy San Luis Obispo, CA 93401 3783 Rock Garden Ln San Luis Obispo, CA 93401 3641 Lawnwood Dr San Luis Obispo, CA 93401 1318 Pacific St San Luis Obispo, CA 93401 2574 Marian Wy San Luis Obispo, CA 93401 1120 Vista Del Lago San Luis Obispo, CA 93405 190 Loma Bonita Dr San Luis Obispo, CA 93401 1234 San Carlos Dr San Luis Obispo, CA 93401 199 Tango Wy San Luis Obispo, CA 93401 2664 Flora St San Luis Obispo, CA 93401 1329 Broad St San Luis Obispo, CA 93401 1963 Partridge Dr San Luis Obispo, CA 93405 2400 Loomis St San Luis Obispo, CA 93405 1957 San Luis Dr San Luis Obispo, CA 93401 1770 Viewmont St San Luis Obispo, CA 93401 1480 Monterey St San Luis Obispo, CA 93401 1144 Chorro St San Luis Obispo, CA 93401 1649 Mccollum St San Luis Obispo, CA 93401 1647 Mccollum St San Luis Obispo, CA 93405 1220 Mill St San Luis Obispo, CA 93401 333 Luneta Dr San Luis Obispo, CA 93405 521 Princeton Pl Unit: A San Luis Obispo, CA 93405 460 Marsh St San Luis Obispo, CA 93401 1299 Fredericks St San Luis Obispo, CA 93405 3591 Sacramento Dr Unit: 125 San Luis Obispo, CA 93401 308 San Miguel Ave San Luis Obispo, CA 93405 1400 Madonna Rd San Luis Obispo, CA 93405 1335 Tanglewood Dr San Luis Obispo, CA 93401 374 Ramona Dr San Luis Obispo, CA 93405 2183 San Luis Dr San Luis Obispo, CA 93401 77 Chorro St San Luis Obispo, CA 93405 2330 Santa Ynez Ave San Luis Obispo, CA 93405 1528 Mill St San Luis Obispo, CA 93401 171 North Tassajara Dr San Luis Obispo, CA 93405 424 Higuera St San Luis Obispo, CA 93401 880 Industrial Wy San Luis Obispo, CA 93401 1232 Murray Ave Unit: A San Luis Obispo, CA 93405 248 Memphis Belle Wy San Luis Obispo, CA 93401 250 Memphis Belle Wy San Luis Obispo, CA 93401 863 Marsh St San Luis Obispo, CA 93401 600 Tank Farm Rd San Luis Obispo, CA 93401 257 Patricia Ct San Luis Obispo, CA 93405 12424 Los Osos Valley Rd San Luis Obispo, CA 93405 232 Lincoln Ave San Luis Obispo, CA 93405 14 Mariposa Dr San Luis Obispo, CA 93401 215 Kitty Hawk Ct San Luis Obispo, CA 93401 2094 Mccollum St San Luis Obispo, CA 93405 1510 Froom Ranch Wy San Luis Obispo, CA 93405 296 Warren Wy San Luis Obispo, CA 93405 544 Stoneridge Dr San Luis Obispo, CA 93401 619 Grove St San Luis Obispo, CA 93401 200 Foxtrot Ct San Luis Obispo, CA 93401 4051 Broad St Unit: 120 San Luis Obispo, CA 93401 3427 Roberto Ct Unit: 110 San Luis Obispo, CA 93401 132 Crandall Wy Unit: A San Luis Obispo, CA 93405 324 Corrida Dr San Luis Obispo, CA 93401 2501 Broad St San Luis Obispo, CA 93401 313 Madonna Rd Unit: A San Luis Obispo, CA 93405 1306 Johnson Ave San Luis Obispo, CA 93401 2744 El Cerrito San Luis Obispo, CA 93401 1701 Fixlini St San Luis Obispo, CA 93401 901 Lawrence Dr San Luis Obispo, CA 93401 648 Mitchell Dr San Luis Obispo, CA 93401 2144 Price St San Luis Obispo, CA 93401 2401 Broad St San Luis Obispo, CA 93401 670 Branch St Unit: A San Luis Obispo, CA 93401 261 Cuesta Ave San Luis Obispo, CA 93405 623 Mitchell Dr San Luis Obispo, CA 93401 1270 Vista Del Lago San Luis Obispo, CA 93405 801 Grand Ave San Luis Obispo, CA 93401 1672 Colina Ct San Luis Obispo, CA 93401 1323 Garden St San Luis Obispo, CA 93401 1463 Bishop St San Luis Obispo, CA 93401 250 Highland Dr San Luis Obispo, CA 93405 2078 Parker St Unit: 110 San Luis Obispo, CA 93401 1983 Slack St San Luis Obispo, CA 93405 837 Marsh St San Luis Obispo, CA 93401 228 Memphis Belle Wy San Luis Obispo, CA 93401 4300 Broad St San Luis Obispo, CA 93401 2916 Augusta St San Luis Obispo, CA 93401 1304 Ella St San Luis Obispo, CA 93401 647 Higuera St San Luis Obispo, CA 93401 3596 Broad St Unit: 200 San Luis Obispo, CA 93401 1880 Santa Barbara Avenue San Luis Obispo, CA 93401 29 Prado Rd San Luis Obispo, CA 93401 2036 Skylark Ln San Luis Obispo, CA 93401 980 Church St San Luis Obispo, CA 93401 864 Mission St San Luis Obispo, CA 93405 755 Fiero Ln San Luis Obispo, CA 93401 1344 Mill St Unit: A San Luis Obispo, CA 93401 254 Memphis Belle Wy San Luis Obispo, CA 93401 256 Memphis Belle Wy San Luis Obispo, CA 93401 972 Nipomo St San Luis Obispo, CA 93401 208 Higuera St San Luis Obispo, CA 93401 3729 Orcutt Rd San Luis Obispo, CA 93401 226 Memphis Belle Wy San Luis Obispo, CA 93401 1910 Chorro St San Luis Obispo, CA 93401 230 Memphis Belle Wy San Luis Obispo, CA 93401 1253 Cayucos Dr San Luis Obispo, CA 93405 223 Kitty Hawk Ct San Luis Obispo, CA 93401 1953 Oceanaire Dr San Luis Obispo, CA 93405 217 Kitty Hawk Ct San Luis Obispo, CA 93401 2023 San Luis Dr Unit: A San Luis Obispo, CA 93401 956 Pismo St San Luis Obispo, CA 93401 172 Broad St San Luis Obispo, CA 93405 773 Johnson Ave San Luis Obispo, CA 93401 1010 Broad St San Luis Obispo, CA 93401 230 Memphis Belle Wy San Luis Obispo, CA 93401 226 Memphis Belle Wy San Luis Obispo, CA 93401 228 Memphis Belle Wy San Luis Obispo, CA 93401 237 Catalina Dr San Luis Obispo, CA 93405 1530 Calle Joaquin San Luis Obispo, CA 93405 4696 Snapdragon Wy San Luis Obispo, CA 93401 475 Corrida Dr San Luis Obispo, CA 93401 1030 Trevor Wy San Luis Obispo, CA 93401 53 Chorro St San Luis Obispo, CA 93405 418 Jeffrey Dr San Luis Obispo, CA 93405 209 Kitty Hawk Ct San Luis Obispo, CA 93401 3985 Poinsettia St San Luis Obispo, CA 93401 806 Rougeot Pl San Luis Obispo, CA 93405 561 Luneta Dr San Luis Obispo, CA 93405 276 Craig Wy San Luis Obispo, CA 93405 1190 Buchon St San Luis Obispo, CA 93401 1727 Chorro St San Luis Obispo, CA 93401 908 Legacy Ln San Luis Obispo, CA 93405 1111 Tiburon Wy San Luis Obispo, CA 93401 345 Grand Ave San Luis Obispo, CA 93405 241 Hathway St San Luis Obispo, CA 93405 1950 San Luis Dr San Luis Obispo, CA 93401 1742 Devaul Ranch Dr San Luis Obispo, CA 93405 1644 Phillips Ln San Luis Obispo, CA 93401 1755 Diablo Dr San Luis Obispo, CA 93405 232 Memphis Belle Wy San Luis Obispo, CA 93401 1040 Forest St San Luis Obispo, CA 93405 290 Clover Dr San Luis Obispo, CA 93405 230 Memphis Belle Wy San Luis Obispo, CA 93401 226 Memphis Belle Wy San Luis Obispo, CA 93401 228 Memphis Belle Wy San Luis Obispo, CA 93401 33 Chorro St San Luis Obispo, CA 93405 1320 Ironbark St San Luis Obispo, CA 93401 207 Kitty Hawk Ct San Luis Obispo, CA 93401 1253 Peach St San Luis Obispo, CA 93401 1303 Higuera St San Luis Obispo, CA 93401 1220 Mill St San Luis Obispo, CA 93401 213 Kitty Hawk Ct San Luis Obispo, CA 93401 178 Chorro St San Luis Obispo, CA 93405 1413 Palm St San Luis Obispo, CA 93406 1426 Monterey St San Luis Obispo, CA 93401 870 Broad St San Luis Obispo, CA 93401 166 Los Cerros Dr San Luis Obispo, CA 93405 1345 Oakwood Ct San Luis Obispo, CA 93401 561 Lawrence Dr San Luis Obispo, CA 93401 201 Kitty Hawk Ct San Luis Obispo, CA 93401 227 Kitty Hawk Ct San Luis Obispo, CA 93401 244 Memphis Belle Wy San Luis Obispo, CA 93401 262 Memphis Belle Wy San Luis Obispo, CA 93401 211 Kitty Hawk Ct San Luis Obispo, CA 93401 4600 Broad St San Luis Obispo, CA 93401 1100 Grove St San Luis Obispo, CA 93401 3419 Roberto Ct San Luis Obispo, CA 93401 859 Marsh St San Luis Obispo, CA 93401 700 Grand Ave San Luis Obispo, CA 93401 120 Venture Dr San Luis Obispo, CA 93401 1629 Garden St San Luis Obispo, CA 93401 231 Kentucky St San Luis Obispo, CA 93405 994 Mill St Unit: 250 San Luis Obispo, CA 93401 677 Lawrence Dr San Luis Obispo, CA 93401 3427 Roberto Ct San Luis Obispo, CA 93401 2450 Boulevard Del Campo Blvd San Luis Obispo, CA 93401 1519 Nipomo St San Luis Obispo, CA 93401 3981 Steel Wy San Luis Obispo, CA 93401 1425 Sydney St San Luis Obispo, CA 93401 233 Sandercock St San Luis Obispo, CA 93401 344 Henderson Ave Unit: A San Luis Obispo, CA 2183 San Luis Dr San Luis Obispo, CA 93401 710 Murray Ave San Luis Obispo, CA 93401 19 Mariposa Dr San Luis Obispo, CA 93401 1533 Hillcrest Pl San Luis Obispo, CA 93401 4165 Bernardo Dr San Luis Obispo, CA 93401 2886 Rockview Pl San Luis Obispo, CA 93401 1817 Garden St San Luis Obispo, CA 93401 840 El Capitan Wy San Luis Obispo, CA 93401 223 Foxtrot Ct San Luis Obispo, CA 93401 905 Madonna Road Unit: 28 San Luis Obispo, CA 93405 1963 Devaul Ranch Dr San Luis Obispo, CA 93405 182 Tango Wy San Luis Obispo, CA 93401 1155 Oceanaire Dr San Luis Obispo, CA 93405 3870 Broad St San Luis Obispo, CA 93401 1588 Eto Cir San Luis Obispo, CA 93405 225 Foxtrot Ct San Luis Obispo, CA 93401 206 Foxtrot Ct San Luis Obispo, CA 93401 669 Palm St San Luis Obispo, CA 93401 1420 Palm St San Luis Obispo, CA 93401 1681 Devaul Ranch Dr San Luis Obispo, CA 93405 1681 Royal Wy San Luis Obispo, CA 93405 1359 Cavalier Ln San Luis Obispo, CA 93405 1450 Madonna Rd San Luis Obispo, CA 93405 1064 Isabella Wy San Luis Obispo, CA 93405 679 Funston Ave San Luis Obispo, CA 93401 1422 Monterey St San Luis Obispo, CA 93401 205 Foxtrot Ct San Luis Obispo, CA 93401 1753 Tonini Dr San Luis Obispo, CA 93405 1550 Madonna Rd San Luis Obispo, CA 93405 1344 Nipomo St San Luis Obispo, CA 93401 614 Monterey St San Luis Obispo, CA 93401 211 Foxtrot Ct San Luis Obispo, CA 93401 207 Foxtrot Ct San Luis Obispo, CA 93401 205 Foxtrot Ct San Luis Obispo, CA 93401 225 Foxtrot Ct San Luis Obispo, CA 93401 219 Foxtrot Ct San Luis Obispo, CA 93401 213 Foxtrot Ct San Luis Obispo, CA 93401 1198 Tiburon Wy San Luis Obispo, CA 93401 2030 Rachel St San Luis Obispo, CA 93401 1194 Tiburon Wy San Luis Obispo, CA 93401 1196 Tiburon Wy San Luis Obispo, CA 93401 227 Foxtrot Ct San Luis Obispo, CA 93401 1192 Tiburon Wy San Luis Obispo, CA 93401 11343 Los Osos Valley Rd Unit: A San Luis Obispo, CA 93405 221 Foxtrot Ct San Luis Obispo, CA 93401 223 Foxtrot Ct San Luis Obispo, CA 93401 3981 Steel Wy San Luis Obispo, CA 93401 667 Monterey St San Luis Obispo, CA 93401 790 Marsh St San Luis Obispo, CA 93401 1194 Lexington Ct San Luis Obispo, CA 93401 4050 Box Spring Rd San Luis Obispo, CA 93401 990 Palm St San Luis Obispo, CA 93401 391 Cerro Romauldo Ave San Luis Obispo, CA 93405 1997 Heirloom Pl San Luis Obispo, CA 93405 219 Kitty Hawk Ct San Luis Obispo, CA 93401 221 Kitty Hawk Ct San Luis Obispo, CA 93401 4535 Wavertree St San Luis Obispo, CA 93401 1140 Wisteria Ln San Luis Obispo, CA 93401 1304 Sydney St San Luis Obispo, CA 93401 3885 South Higuera St San Luis Obispo, CA 93401 212 Madonna Rd San Luis Obispo, CA 93405 1321 Garden St San Luis Obispo, CA 93401 20 Buena Vista Ave San Luis Obispo, CA 93405 1669 Colina Ct San Luis Obispo, CA 93401 808 Mission St San Luis Obispo, CA 93405 33 Chorro St San Luis Obispo, CA 93405 4051 Broad St San Luis Obispo, CA 93401 865 Murray Ave San Luis Obispo, CA 93405 421 Branch St San Luis Obispo, CA 93401 2081 Sierra Wy San Luis Obispo, CA 93401 888 Marsh St San Luis Obispo, CA 93401 84 Benton Wy San Luis Obispo, CA 93405 362 Islay St San Luis Obispo, CA 93401 225 Kitty Hawk Ct San Luis Obispo, CA 93401 1733 Spooner Dr San Luis Obispo, CA 93405 1735 De Anza Ct San Luis Obispo, CA 93405 217 Kitty Hawk Ct San Luis Obispo, CA 93401 223 Kitty Hawk Ct San Luis Obispo, CA 93401 199 Del Norte Wy San Luis Obispo, CA 93405 547 Buchon St San Luis Obispo, CA 93401 1445 Prefumo Canyon Rd Unit: 1 San Luis Obispo, CA 93405 3572 Cedar Ct San Luis Obispo, CA 93401 123 Buena Vista Ave San Luis Obispo, CA 93405 832 Marigold Ct San Luis Obispo, CA 93401 233 Kitty Hawk Ct San Luis Obispo, CA 93401 235 Kitty Hawk Ct San Luis Obispo, CA 93401 2220 Exposition Dr Unit: 54 San Luis Obispo, CA 93401 1545 Huckleberry Ln San Luis Obispo, CA 93401 241 Kitty Hawk Ct San Luis Obispo, CA 93401 652 Lincoln Ave Unit: A San Luis Obispo, CA 93405 3850 Long St San Luis Obispo, CA 93401 238 Memphis Belle Wy San Luis Obispo, CA 93401 1794 San Luis Dr San Luis Obispo, CA 93401 236 Memphis Belle Wy San Luis Obispo, CA 93401 234 Memphis Belle Wy San Luis Obispo, CA 93401 3160 Johnson Ave San Luis Obispo, CA 93401 240 Memphis Belle Wy San Luis Obispo, CA 93401 506 High St San Luis Obispo, CA 93401 153 Cross St San Luis Obispo, CA 93401 175 High St San Luis Obispo, CA 93401 3148 Johnson Ave San Luis Obispo, CA 93401 629 Mission Ln San Luis Obispo, CA 93405 1179 Toro St San Luis Obispo, CA 93401 4363 Sky King Dr San Luis Obispo, CA 93401 1422 Monterey St San Luis Obispo, CA 93401 2125 Sierra Wy San Luis Obispo, CA 93401 525 Marsh St San Luis Obispo, CA 93401 353 Grand Ave San Luis Obispo, CA 93405 1480 Monterey St San Luis Obispo, CA 93401 3480 South Higuera St San Luis Obispo, CA 93401 11555 Los Osos Valley Rd San Luis Obispo, CA 93405 256 Memphis Belle Wy San Luis Obispo, CA 93401 777 Pismo St San Luis Obispo, CA 93401 3418 Sacramento Dr San Luis Obispo, CA 93401 101 Bridge St San Luis Obispo, CA 93401 1688 Mill St Unit: A San Luis Obispo, CA 93401 424 South St Unit: A San Luis Obispo, CA 93401 1023 Monterey St San Luis Obispo, CA 93401 1490 Prefumo Canyon Rd San Luis Obispo, CA 93405 460 Pacific St San Luis Obispo, CA 93401 1000 Mill St San Luis Obispo, CA 93401 234 North Tassajara Dr San Luis Obispo, CA 93405 213 Kitty Hawk Ct San Luis Obispo, CA 93401 1642 El Cerrito Ct San Luis Obispo, CA 93401 207 Kitty Hawk Ct San Luis Obispo, CA 93401 222 Elks Ln San Luis Obispo, CA 93401 1545 Higuera St San Luis Obispo, CA 93401 1037 Tiburon Wy San Luis Obispo, CA 93401 3561 Johnson Ave San Luis Obispo, CA 93401 1844 Vicente Dr San Luis Obispo, CA 93405 1424 Monterey St San Luis Obispo, CA 93401 1401 Palm St San Luis Obispo, CA 93401 4051 Broad St Unit: 130 San Luis Obispo, CA 93401 760 Francis Ave San Luis Obispo, CA 93401 1010 Broad St San Luis Obispo, CA 93401 2454 Augusta St San Luis Obispo, CA 93401 2449 Ladera Ct San Luis Obispo, CA 93401 899 Pacific St San Luis Obispo, CA 93401 188 Cuesta Dr Unit: A San Luis Obispo, CA 93405 494 Bluerock Dr San Luis Obispo, CA 93401 188 Cuesta Dr San Luis Obispo, CA 93405 240 Memphis Belle Wy San Luis Obispo, CA 93401 238 Memphis Belle Wy San Luis Obispo, CA 93401 236 Memphis Belle Wy San Luis Obispo, CA 93401 234 Memphis Belle Wy San Luis Obispo, CA 93401 236 Memphis Belle Wy San Luis Obispo, CA 93401 3105 Arezzo Dr San Luis Obispo, CA 93401 597 Serrano Dr San Luis Obispo, CA 93405 888 Marsh St San Luis Obispo, CA 93401 252 Memphis Belle Wy San Luis Obispo, CA 93401 242 Memphis Belle Wy San Luis Obispo, CA 93401 250 Memphis Belle Wy San Luis Obispo, CA 93401 2668 Flora St San Luis Obispo, CA 93401 238 Memphis Belle Wy San Luis Obispo, CA 93401 246 Memphis Belle Wy San Luis Obispo, CA 93401 248 Memphis Belle Wy San Luis Obispo, CA 93401 75 Higuera St Unit: 100 San Luis Obispo, CA 93401 4600 Broad St San Luis Obispo, CA 93401 208 Kitty Hawk Ct San Luis Obispo, CA 93401 652 Lincoln Ave San Luis Obispo, CA 93405 1422 Monterey St San Luis Obispo, CA 93401 525 Dana St San Luis Obispo, CA 93401 1214 Ella St San Luis Obispo, CA 93401 133 North Tassajara Dr San Luis Obispo, CA 93405 3860 Broad St San Luis Obispo, CA 93401 621 Grove St San Luis Obispo, CA 93401 575 Stoneridge Dr San Luis Obispo, CA 93401 3000 Broad St San Luis Obispo, CA 93401 1029 Chorro St San Luis Obispo, CA 93401 3961 Sunrose Ln San Luis Obispo, CA 93401 1760 Royal Wy San Luis Obispo, CA 93405 857 Casitas Ct San Luis Obispo, CA 93405 1334 Marsh St San Luis Obispo, CA 93401 1108 Poppy Ln San Luis Obispo, CA 93401 370 Lemon St San Luis Obispo, CA 93405 1108 Poppy Ln San Luis Obispo, CA 93401 439 San Vincenzo Dr San Luis Obispo, CA 93401 1530 Calle Joaquin San Luis Obispo, CA 93405 648 Mitchell Dr San Luis Obispo, CA 93401 72 Chorro St San Luis Obispo, CA 93405 189 Cessna Ct San Luis Obispo, CA 93401 4600 Broad St San Luis Obispo, CA 93401 1418 Johnson Ave San Luis Obispo, CA 93401 1957 San Luis Dr San Luis Obispo, CA 93401 1585 Calle Joaquin San Luis Obispo, CA 93405 3537 Sycamore Dr San Luis Obispo, CA 93401 11343 Los Osos Valley Rd San Luis Obispo, CA 93405 1029 Chorro St San Luis Obispo, CA 93401 3731 Orcutt Rd San Luis Obispo, CA 93401 949 Higuera St San Luis Obispo, CA 93401 1840 Alrita St San Luis Obispo, CA 93401 1332 Pismo St San Luis Obispo, CA 93401 248 Memphis Belle Wy San Luis Obispo, CA 93401 1002 Goldenrod Ln San Luis Obispo, CA 93401 6055 Lewis Ln San Luis Obispo, CA 93401 595 Serrano Dr San Luis Obispo, CA 93405 1499 San Luis Dr San Luis Obispo, CA 93401 856 Mission St San Luis Obispo, CA 93405 2414 Johnson Ave San Luis Obispo, CA 93401 291 Foothill Blvd San Luis Obispo, CA 93405 1540 Froom Ranch Wy San Luis Obispo, CA 93405 234 Memphis Belle Wy San Luis Obispo, CA 93401 157 Del Norte Wy San Luis Obispo, CA 93405 252 Memphis Belle Wy San Luis Obispo, CA 93401 240 Memphis Belle Wy San Luis Obispo, CA 93401 312 Sandercock St San Luis Obispo, CA 93401 2038 Royal Wy San Luis Obispo, CA 93405 140 Country Club Dr San Luis Obispo, CA 93401 244 Memphis Belle Wy San Luis Obispo, CA 93401 246 Memphis Belle Wy San Luis Obispo, CA 93401 242 Memphis Belle Wy San Luis Obispo, CA 93401 855 Mirada Dr San Luis Obispo, CA 93405 1730 De Anza Ct San Luis Obispo, CA 93405 174 Tango Wy San Luis Obispo, CA 93401 1350 Cecelia Ct San Luis Obispo, CA 93401 250 Memphis Belle Wy San Luis Obispo, CA 93401 665 Grove St San Luis Obispo, CA 93401 424 Higuera St San Luis Obispo, CA 93401 415 Graves Ave San Luis Obispo, CA 93405 60 Casa St Unit: A4 San Luis Obispo, CA 93405 408 Margarita Ave San Luis Obispo, CA 93401 248 Almond St Unit: A San Luis Obispo, CA 93405 1421 Garden St San Luis Obispo, CA 93401 324 Cuesta Dr San Luis Obispo, CA 93405 1126 Buchon Unit: A San Luis Obispo, CA 93401 255 Rosita St San Luis Obispo, CA 93405 254 Memphis Belle Wy San Luis Obispo, CA 93401 209 Kitty Hawk Ct San Luis Obispo, CA 93401 215 Kitty Hawk Ct San Luis Obispo, CA 93401 2077 Hope St San Luis Obispo, CA 93405 680 Hill St San Luis Obispo, CA 93405 2640 Broad St San Luis Obispo, CA 93401 2357 Banderola Ct San Luis Obispo, CA 93401 229 Kitty Hawk Ct San Luis Obispo, CA 93401 243 Kitty Hawk Ct San Luis Obispo, CA 93401 245 Kitty Hawk Ct San Luis Obispo, CA 93401 251 Kitty Hawk Ct San Luis Obispo, CA 93401 247 Kitty Hawk Ct San Luis Obispo, CA 93401 255 Kitty Hawk Ct San Luis Obispo, CA 93401 259 Kitty Hawk Ct San Luis Obispo, CA 93401 424 South St San Luis Obispo, CA 93401 255 Kitty Hawk Ct San Luis Obispo, CA 93401 3864 Righetti Ranch Rd San Luis Obispo, CA 93401 2060 Skylark Ln San Luis Obispo, CA 93401 278 Memphis Belle Wy San Luis Obispo, CA 93401 241 Kitty Hawk Ct San Luis Obispo, CA 93401 421 Branch St San Luis Obispo, CA 93401 2030 Rachel St San Luis Obispo, CA 93401 1877 Lima Dr San Luis Obispo, CA 93405 670 Branch St Unit: B San Luis Obispo, CA 93401 11990 Los Osos Valley Rd San Luis Obispo, CA 93405 2945 Mcmillan Ave San Luis Obispo, CA 93401 1148 Atascadero St San Luis Obispo, CA 93405 3450 Broad St San Luis Obispo, CA 93401 524 Dana St San Luis Obispo, CA 93401 1422 Monterey St San Luis Obispo, CA 93401 888 Marsh St San Luis Obispo, CA 93401 12350 Los Osos Valley Rd San Luis Obispo, CA 93405 561 Branch St San Luis Obispo, CA 93401 315 Mira Sol Dr San Luis Obispo, CA 93405 556 Foothill Blvd San Luis Obispo, CA 93401 237 Kitty Hawk Ct San Luis Obispo, CA 93401 1908 Chorro St San Luis Obispo, CA 93401 205 Kitty Hawk Ct San Luis Obispo, CA 93401 808 Mission St San Luis Obispo, CA 93405 1 Higuera St San Luis Obispo, CA 93401 670 Branch St Unit: A San Luis Obispo, CA 93401 506 High St Unit: A San Luis Obispo, CA 93401 1426 Monterey St San Luis Obispo, CA 93401 12350 Los Osos Valley Rd San Luis Obispo, CA 93405 4029 South Higuera St San Luis Obispo, CA 93401 1540 Froom Ranch Wy San Luis Obispo, CA 93405 1127 Fernwood Dr San Luis Obispo, CA 93401 1703 Chorro St San Luis Obispo, CA 93401 504 Cuesta Dr San Luis Obispo, CA 93405 418 Jeffrey Dr Unit: A San Luis Obispo, CA 93405 1290 Alder Ct San Luis Obispo, CA 93401 1254 Joyce Ct San Luis Obispo, CA 93401 2221 King Street Unit: 32 San Luis Obispo, CA 93401 203 Kitty Hawk Ct San Luis Obispo, CA 93401 241 Westmont Ave San Luis Obispo, CA 93405 1400 Madonna Rd San Luis Obispo, CA 93405 1306 Johnson Ave San Luis Obispo, CA 93401 841 Grove St San Luis Obispo, CA 93401 1724 Southwood Dr San Luis Obispo, CA 93401 201 Kitty Hawk Ct San Luis Obispo, CA 93401 3580 Bullock Ln San Luis Obispo, CA 93401 748 Marsh St San Luis Obispo, CA 93401 335 San Miguel Ave San Luis Obispo, CA 93405 1100 Tank Farm Rd San Luis Obispo, CA 93401 2800 Broad St Unit: 110 San Luis Obispo, CA 93401 339 Patricia Dr San Luis Obispo, CA 93405 1200 Monterey St San Luis Obispo, CA 93401 101 Graves Ave San Luis Obispo, CA 93405 1620 Chorro St San Luis Obispo, CA 93401 1421 Hansen Ln San Luis Obispo, CA 93401 1511 Osos St San Luis Obispo, CA 93401 258 Memphis Belle Wy San Luis Obispo, CA 93401 2336 Banderola Ct San Luis Obispo, CA 93401 1025 Farmhouse Ln Unit: 2F San Luis Obispo, CA 93401 1185 Pismo St San Luis Obispo, CA 93401 478 Corrida Dr San Luis Obispo, CA 93401 274 Craig Wy San Luis Obispo, CA 93405 262 Memphis Belle Wy San Luis Obispo, CA 93401 1846 Conejo Ave San Luis Obispo, CA 93401 333 Elks Ln San Luis Obispo, CA 93401 184 Twin Ridge Dr San Luis Obispo, CA 93405 1686 La Vineda Ct San Luis Obispo, CA 93401 296 Warren Wy San Luis Obispo, CA 93405 176 Chorro St San Luis Obispo, CA 93405 189 Cessna Ct San Luis Obispo, CA 93401 202 Kitty Hawk Ct San Luis Obispo, CA 93401 203 Kitty Hawk Ct San Luis Obispo, CA 93401 266 Memphis Belle Wy San Luis Obispo, CA 93401 254 Memphis Belle Wy San Luis Obispo, CA 93401 245 Kitty Hawk Ct San Luis Obispo, CA 93401 243 Kitty Hawk Ct San Luis Obispo, CA 93401 1430 Tanglewood Ct San Luis Obispo, CA 93401 255 Memphis Belle Wy San Luis Obispo, CA 93401 257 Memphis Belle Wy San Luis Obispo, CA 93401 261 Memphis Belle Wy San Luis Obispo, CA 93401 253 Memphis Belle Wy San Luis Obispo, CA 93401 241 Kitty Hawk Ct San Luis Obispo, CA 93401 249 Memphis Belle Wy San Luis Obispo, CA 93401 247 Memphis Belle Wy San Luis Obispo, CA 93401 552 Perkins Ln San Luis Obispo, CA 93401 251 Kitty Hawk Ct San Luis Obispo, CA 93401 247 Kitty Hawk Ct San Luis Obispo, CA 93401 255 Kitty Hawk Ct San Luis Obispo, CA 93401 268 Memphis Belle Wy San Luis Obispo, CA 93401 235 Kitty Hawk Ct San Luis Obispo, CA 93401 233 Kitty Hawk Ct San Luis Obispo, CA 93401 237 Kitty Hawk Ct San Luis Obispo, CA 93401 205 Kitty Hawk Ct San Luis Obispo, CA 93401 229 Kitty Hawk Ct San Luis Obispo, CA 93401 277 Memphis Belle Wy San Luis Obispo, CA 93401 251 Memphis Belle Wy San Luis Obispo, CA 93401 973 Buchon St San Luis Obispo, CA 93401 2600 Broad St San Luis Obispo, CA 93401 265 Memphis Belle Wy San Luis Obispo, CA 93401 273 Memphis Belle Wy San Luis Obispo, CA 93401 269 Memphis Belle Wy San Luis Obispo, CA 93401 285 Memphis Belle Wy San Luis Obispo, CA 93401 4051 Broad St San Luis Obispo, CA 93401 4051 Broad St Unit: 120 San Luis Obispo, CA 93401 281 Memphis Belle Wy San Luis Obispo, CA 93401 289 Memphis Belle Wy San Luis Obispo, CA 93401 293 Memphis Belle Wy San Luis Obispo, CA 93401 1464 Gulf St Unit: A San Luis Obispo, CA 93405 1841 Slack St San Luis Obispo, CA 93405 1843 Slack St San Luis Obispo, CA 93401 601 Sweeney Ln Unit: C San Luis Obispo, CA 93401 3156 Johnson Ave San Luis Obispo, CA 93401 864 Santa Rosa St San Luis Obispo, CA 93401 3980 Steel Wy San Luis Obispo, CA 93401 362 Woodbridge St San Luis Obispo, CA 93401 3160 Johnson Ave San Luis Obispo, CA 93401 3152 Johnson Ave San Luis Obispo, CA 93401 1469 Hansen Ln San Luis Obispo, CA 93401 253 Elks Ln San Luis Obispo, CA 93401 1028 Chorro St San Luis Obispo, CA 93401 3355 Broad St San Luis Obispo, CA 93401 3584 Bullock Ln San Luis Obispo, CA 93401 3580 Bullock Ln San Luis Obispo, CA 93401 888 Marsh St San Luis Obispo, CA 93401 424 Higuera St San Luis Obispo, CA 93401 171 North Santa Rosa St Unit: A San Luis Obispo, CA 93405 53 Chorro St San Luis Obispo, CA 93405 505 Princeton Pl San Luis Obispo, CA 93405 3850 Long St Unit: 100 San Luis Obispo, CA 93401 325 Cerro Romauldo Ave San Luis Obispo, CA 93405 1407 Cazadero St San Luis Obispo, CA 93401 2357 Banderola Ct San Luis Obispo, CA 93401 1540 Froom Ranch Wy San Luis Obispo, CA 93405 1192 Tiburon Wy San Luis Obispo, CA 93401 3049 Arezzo Dr San Luis Obispo, CA 93401 1292 San Mateo Dr San Luis Obispo, CA 93401 1555 Cordova Dr San Luis Obispo, CA 93405 1444 Higuera St Unit: A San Luis Obispo, CA 93401 1109 Kendall Rd San Luis Obispo, CA 93401 227 Kitty Hawk Ct San Luis Obispo, CA 93401 1513 Eto Cir San Luis Obispo, CA 93405 25 Buena Vista Ave San Luis Obispo, CA 93405 2083 Cypress St San Luis Obispo, CA 93401 260 Memphis Belle Wy San Luis Obispo, CA 93401 225 Kitty Hawk Ct San Luis Obispo, CA 93401 294 Lincoln Ave San Luis Obispo, CA 93405 4805 Morabito Pl San Luis Obispo, CA 93401 990 Palm St San Luis Obispo, CA 93401 268 Memphis Belle Wy San Luis Obispo, CA 93401 266 Memphis Belle Wy San Luis Obispo, CA 93401 80 Benton Wy San Luis Obispo, CA 93405 2250 King Street San Luis Obispo, CA 93401 1630 Fairview St San Luis Obispo, CA 93401 1236 West Newport St Unit: A San Luis Obispo, CA 93405 268 Memphis Belle Wy San Luis Obispo, CA 93401 266 Memphis Belle Wy San Luis Obispo, CA 93401 264 Memphis Belle Wy San Luis Obispo, CA 93401 12350 Los Osos Valley Rd San Luis Obispo, CA 93405 337 High St San Luis Obispo, CA 93401 3825 South Higuera St San Luis Obispo, CA 93401 215 Meissner Ln San Luis Obispo, CA 93401 1549 Mill St San Luis Obispo, CA 93401 2060 Hope St San Luis Obispo, CA 93405 1111 Fernwood Dr San Luis Obispo, CA 93401 159 North Tassajara Dr San Luis Obispo, CA 93405 2299 Santa Ynez Ave San Luis Obispo, CA 93405 1945 Oceanaire Dr San Luis Obispo, CA 93405 228 Daly Ave San Luis Obispo, CA 93405 2126 Price St San Luis Obispo, CA 93401 972 Nipomo St San Luis Obispo, CA 93401 264 Memphis Belle Wy San Luis Obispo, CA 93401 115 Mustang Dr San Luis Obispo, CA 93405 1656 Monterey St San Luis Obispo, CA 93401 848 Monterey St San Luis Obispo, CA 93401 1210 Carmel St San Luis Obispo, CA 93401 1280 Bond St San Luis Obispo, CA 93405 522 Broad St San Luis Obispo, CA 93405 900 Southwood Dr San Luis Obispo, CA 93401 1895 Partridge Dr San Luis Obispo, CA 93405 1422 Monterey St San Luis Obispo, CA 93401 1815 Sydney St San Luis Obispo, CA 93401 333 Tolosa Wy San Luis Obispo, CA 93405 1209 Vista Del Lago San Luis Obispo, CA 93405 1450 Madonna Rd Unit: A San Luis Obispo, CA 93405 1221 Calle Joaquin San Luis Obispo, CA 93405 352 Foothill Blvd Unit: A San Luis Obispo, CA 93401 354 Foothill Blvd San Luis Obispo, CA 93405 208 Kitty Hawk Ct San Luis Obispo, CA 93401 380 Christina Wy Unit: A San Luis Obispo, CA 93405 221 Kitty Hawk Ct San Luis Obispo, CA 93401 219 Kitty Hawk Ct San Luis Obispo, CA 93401 1637 Southwood Dr San Luis Obispo, CA 93401 202 Kitty Hawk Ct San Luis Obispo, CA 93401 236 Hermosa Wy San Luis Obispo, CA 93405 89 Palomar Ave San Luis Obispo, CA 93405 398 San Miguel Ave San Luis Obispo, CA 93405 1429 Parsons Wy San Luis Obispo, CA 93401 1213 West Newport St Unit: A San Luis Obispo, CA 93405 211 Kitty Hawk Ct San Luis Obispo, CA 93401 134 Tank Farm Rd San Luis Obispo, CA 93401 1104 Iris St San Luis Obispo, CA 93401 134 Tank Farm Rd San Luis Obispo, CA 93401 1238 Coral St Unit: A San Luis Obispo, CA 93405 260 Westmont Ave Unit: A San Luis Obispo, CA 93405 344 Henderson Ave San Luis Obispo, CA 93405 1552 Oceanaire Dr San Luis Obispo, CA 93405 864 Mission St San Luis Obispo, CA 93405 1105 Vista Del Lago San Luis Obispo, CA 93405 3485 Sacramento Dr Unit: E San Luis Obispo, CA 93401 1029 Chorro St San Luis Obispo, CA 93401 1350 Marsh St San Luis Obispo, CA 93401 1370 Broad St San Luis Obispo, CA 93401 313 Madonna Rd San Luis Obispo, CA 93405 12300 Los Osos Valley Rd San Luis Obispo, CA 93405 312 Luneta Dr Unit: A San Luis Obispo, CA 93405 1304 Sydney St San Luis Obispo, CA 93401 264 Memphis Belle Wy San Luis Obispo, CA 93401 1796 Corralitos Ave San Luis Obispo, CA 93401 259 Kitty Hawk Ct San Luis Obispo, CA 93401 2442 Boulevard Del Campo Blvd San Luis Obispo, CA 93401 263 Memphis Belle Wy San Luis Obispo, CA 93401 4698 Poinsettia St San Luis Obispo, CA 93401 1940 San Luis Dr San Luis Obispo, CA 93401 64 Broad St San Luis Obispo, CA 93405 460 Pacific St Unit: A San Luis Obispo, CA 93401 2220 Exposition Dr Unit: 97 San Luis Obispo, CA 93401 1222 Mill St Unit: 100 San Luis Obispo, CA 93401 777 Pismo St San Luis Obispo, CA 93401 2830 Flora St San Luis Obispo, CA 93401 134 Tank Farm Rd San Luis Obispo, CA 93401 3977 South Higuera St San Luis Obispo, CA 93401 1545 Oceanaire Dr San Luis Obispo, CA 93405 1652 Encino Ct San Luis Obispo, CA 93401 Permit Valuation 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 24906 4350 64000 29700 0 71000 13000 500 20000 0 0 18400 2500 0 0 14000 0 0 2600 20000 0 0 15000 0 12000 2600 0 2060 0 1200000 0 2600 0 0 18560 0 0 0 15000 27580 15000 11000 20000 21000 2000 18900 19011 0 500 22492.51 0 0 3000 0 500 17800 58645 0 0 10000 47534 0 0 0 12000 33764.5 0 35000 2300 5426.64 3000 0 14000 2700 10360 7000 34000 0 41000 0 0 0 5000 4944 20000 4800 6684.44 39059 4408 5000 820 3000 2100 11000 20300 17127 3000 12265 0 13500 2000 100000 10000 15000 19700 0 2000 15000 24698.5 2700 9803 7122 15000 25000 0 15000 0 85000 4500 0 3500 0 0 6000 0 5000 2000 0 11888 3800 750 0 0 0 13925.5 6000 0 0 0 0 11000 2500 26238 1683.17 8000 34000 36276 0 20200 1207.51 0 5000 0 5000 0 0 26794 2000 0 20000 35944 0 11000 500 15000 0 19464 37054 30165 0 0 0 0 0 0 50000 19071 15000 2300 0 22127 7000 1120 70000 2500000 76000 0 0 21141 0 0 37921 44000 0 35580 2700 5000 20000 23020 2897.19 0 13500 2800 0 15636 12000 4700 25000 2500 5000 0 0 0 14167 1200 10000 0 45000 24950 0 0 900000 0 0 15000 160000 20000 13387 2800 0 2500 2500 18560 12000 0 18480 0 0 0 25000 0 0 10000 10000 200 2000 2400 2500000 22843 10800 34269 15569 5500 35000 4000 2220 18700.78 49343 0 100000 2300 4500 16400 0 2900 0 14011 0 18000 1200 0 11000 0 0 2023 0 2700 5000 11000 3000 0 20232 1000 35000 1000 18480 20000 10000 77970 3500 12000 1200 5081.53 0 20000 1120 640000 0 5000 75000 0 12000 5000 16900 0 3000 7340.31 0 99100 0 1105.31 10950 11900 1500 350000 225000 100000 50000 220000 1500 150000 1500 1500 3800 18550 150000 0 0 3000 8000 40000 13250 0 20000 100000 20000 0 0 35000 0 7500 21495 20000 8899 0 0 3800 27717 50000 5000 0 0 27000 20000 0 2765 0 100000 0 3900 0 0 1100 6850 8600 12000 140000 0 4250 500 11208 11000 4500 20000 0 10000 20000 0 6650 5000 0 28960 6200 7450 75000 2700 16200 15000 0 0 0 3250 4620 1200 0 0 11000 35000 5900 10000 12000 24940 19464 80000 15000 23827 25000 20000 450 0 3600 3500 0 22069.12 2400 3000 7300 66900 16815.95 3550 6200 30000 330500 3500 2000 15000 3600 12000 19000 0 0 5750 7597.73 6500 0 6250 7129.29 20000 40 5550 10500 4000 10200 0 4850 6200 628855 10000 5150 4000 0 20000 20000 3500 25000 11000 0 6200 4500 0 13000 0 3000 6600 2000 0 2500 0 0 25000 44940 50000 2000 0 0 28960 160000 4210 0 30000 0 0 20200 0 0 500 35000 0 40000 0 100000 0 0 15000 7500 0 0 0 3500 21290 0 2500 0 0 4900 0 20000 2800 15000 0 0 0 8000 21495 15500 0 30000 28544.55 0 45000 0 8975 0 3000 20000 3910 58247 35000 31237.5 3500 0 0 27554 159100 3000 20000 2800 0 16000 0 20480 0 15650 0 13995 6240 4000 10000 2000 32722.57 0 0 30359 0 0 6000 0 0 120000 27505 24312 400000 3000 0 0 0 0 4100 0 2300 0 0 30000 30444 9000 0 32825 14000 0 2404.05 0 0 0 2565 7500 0 0 0 0 151138 19312 9543 19001.25 4900 0 6500 7500 0 0 0 0 3000 0 1200000 5000 4196 8200 19000 1000 0 0 0 9000 10000 0 0 0 0 4262.5 0 7500 2599 0 30000 2700 0 35000 0 0 37102 75968 5800 8000 26543 0 10000 5000 15000 0 0 6900 14936 39755 35000 5000 0 11000 3000000 1000 10000 0 0 500 0 0 0 300000 10000 23000 3000 0 20480 0 0 0 0 14011 35004.59 0 28960 0 119168 35000 0 0 64016 0 2650 11000 50000 1000 0 7500 0 0 3807.42 0 34138 0 0 0 0 0 7300 0 0 0 6700 0 0 0 2500 36152.64 2400 0 6000 0 0 2000 0 0 16000 10000 24150 15000 15000 0 47481 30000 3944 2000 17386.5 0 0 2621 0 6200 0 5000 2700 20689 0 0 22700 3000 1500 16981 0 0 36000 40295.28 0 10000 0 5000 10000 7000 12386.5 0 20464.5 0 1800 8345 0 0 0 0 2600 0 0 2000 33950 0 0 0 0 0 0 15000 0 2000 0 0 0 0 0 0 0 0 7444 15000 0 4900 2000 17386.5 32000 0 9500 2700 0 0 0 0 25000 11000 0 3000 2650 5000 0 0 2500 18560 0 15000 15000 0 2884 7000 2500 5000 2400 10000 1200 2500 20000 2500 2400 1250 0 28300 2400 2400 0 0 15000 2650 0 13925.5 67000 2300 13254 2500 0 0 11574 22100 1750000 9000 40850 7000 2000 20000 38846 2750 4000 15000 13941 3965 2800 0 0 0 2700 393 10150 0 4000 0 44864 0 0 0 45478 0 15000 16000 5000 18144 35000 0 17000 2500 18400 4125 0 14000 20000 3500 0 0 13232 0 0 120000 35000 0 0 7500 0 22800 0 0 0 0 30000 12000 44940 14011 2650 0 5500 10000 19312 0 0 11000 2000 0 1500 0 20000 0 3933 2650 21022 11000 1800 0 0 75000 200000 15000 400000 10000 20000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 800000 0 0 0 0 0 747705 0 0 0 0 26100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 17000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15000 0 0 0 0 0 0 0 3500 4500 14000 25000 0 9325 20000 42000 0 0 0 0 0 25000 84000 0 20000 0 0 75000 8800 190000 9972.18 181100 0 150000 8000 1150000 0 0 799 33033 37584 0 8970 0 0 10000 15464.5 19856 0 0 74986 100000 100000 100000 100000 100000 19000 57000 0 5000 45624 0 13232 15000 6500 1525 3200 1000 23500 0 1500 100000 60044 0 119398 5800 0 12265 12000 0 28000 50000 30000 70000 0 0 0 122420 0 0 100000 100000 100000 100000 100000 100000 100000 15000 100000 100000 100000 100000 100000 100000 100000 100000 200000 50000 100000 100000 100000 0 100000 0 100000 100000 100000 100000 100000 100000 100000 0 0 0 0 75000 75000 74000 5678.14 30359 30000.06 0 20000 0 30742 11000 12000 17495 0 0 5000 0 190000 0 0 20000 0 0 0 2000 7800 18560 0 0 0 81900 20000 90000 21277 2000 48943 28550 13150 300 20676 5000 16600 14724 14444 27390 7150 150000 17142 0 0 0 0 0 0 0 3500 6500 0 0 0 44000 0 0 5000 0 0 0 0 150000 0 0 30000 5000 15000 2000 30000 2900 225000 2500 2600 13000 0 140000 0 300000 4000 12000 0 30550 4000 2800 4000 227300 9975 9250 118000 10000 0 0 0 64234 9000 8300 7000 9000 0 150000 0 25000 6400 0 100000 0 0 26800 12000 0 0 2300 0 3683.06 17000 5000 4200 0 0 175000 100000 0 176594 0 125000 2300 2300 0 0 0 0 2300 5000 2300 0 12000 3738 13000 2500 0 2000 6401.24 5321.58 0 10000 10000 10000 2000 7530 18768 10000 8000 1499 0 500000 12000 5000 2000 7000 40000 120000 20000 21750 2200 500000 900 30000 7000 17868 28159.5 12000 1500 5000 160900 170800 160900 175 22348 13000 30089.46 24968 157500 13000 200000 0 0 10000 6900 23720 0 11000 12000 12000 10000 11000 0 30000 0 158123 0 0 250000 100000 44800 165000 700000 25000 1000 26379 30000 3765 75000 450000 250000 29138.18 23000 44940 36240 3000 22390 12000 2900 3800 30000 2650 268199 5300 28000 11000 5142 19380 14011 18560 19380 100000 27000 31820 34000 25770 20480 40000 61000 0 2700 2700 2500 2700 2700 2600 5500 3000 5500 5500 2400 5500 1200000 2500 2600 20000 150000 24000 50000 30000 0 10000 14381.44 10000 12000 13000 11300 6456.73 23812.1 34000 120000 0 45293 2000 2000 0 200 9500000 20802.96 0 15060 9975 100000 200000 10000 0 0 2929 2200 190000 170800 5000 2650 3000 22906 2669.25 29138 181100 206600 2000 24464 0 190000 300000 37455 81900 25376 160900 170800 0 116900 3000 0 20560 25685 25000 0 1200 0 0 0 775000 0 0 0 0 0 0 160900 0 2900 0 118000 320000 0 0 0 0 0 369810 181100 0 190000 428405.61 0 3000 0 4500 36467 3900000 600000 76250 3450 0 50000 37461 0 81000 22690 9000 9000 9000 2300 10000 10000 2918 475000 100000 12000 11000 12000 0 2000 12000 11000 0 0 5125 11000 0 0 0 0 40000 0 0 0 1800 3500 19500 21035 500000 15000 20000 5300 13688 0 8900 6900 7400 5000 15000 2000 23000 225000 2100 30439 20000 0 151137 0 6500 131400 20480 1200000 80000 500 250000 1500 0 2000 190000 2200 15000 0 0 0 0 500000 652735 2300 40000 227300 2100 2534.69 16996 11345 0 206600 227300 181100 12056 2650 2234 5695 206600 0 0 200000 300000 100000 69179 85000 2000 40000 150000 5000 170800 206600 206600 4000 71000 20000 32499 181100 227300 170800 181100 170800 181100 190000 0 0 2785 5500 0 0 320000 850000 16000 150000 293430 3900 5000 9500000 50000 0 100000 68000 400000 11645 2000 190000 4500 170800 0 0 0 0 110000 9000000 5000 0 20000 0 0 0 500000 0 0 1750 206600 13896.72 0 0 0 40000 181100 0 0 0 0 74000 0 0 0 0 3500 51939 5000 160900 18688 3465 4500 19011 0 170800 100000 0 13000 24660 3000 0 20000 11000 12000 9000 10000 13000 13000 112000 20000 20000 20000 20000 15000 13000 13000 2500 13000 13000 13000 9000 15000 15000 15000 13000 15000 20000 13000 0 20000 20000 20000 20000 20000 7000000 1000000 20000 20000 20000 0 635400 250000 5000 26500 0 805425 1500 0 0 26000 25000 525000 1005234 2500 8000 15000 15000 100000 200000 450000 17868 10000 63000 400000 0 10000 9209257 1200000 550 4000 48000 700000 2300000 206600 96000 0 0 116900 170800 100000 7000000 0 116900 81900 390000 0 0 50000 2100 2000 2300 500000 450000 357251 0 94000 0 5000 1000 1499 0 10000 11679 15648 0 10000 0 76051 1787 250000 200000 5000 0 46400 0 0 1000 900 0 250000 150000 268000 118000 190000 100000 227300 170800 38359 190000 5000 100000 150000 525000 185000 190000 3000 6000 3500 0 50000 80000 0 5300 21380 30000 38000 0 2000 7000 0 105000 50000 68000 2000 160900 90000 15000 37770 20000 3500 0 300000 100000 16000 225000 8000 17000 8900 500000 2500 0 Permit Description Sprouse Communication for Charter-Spectrum to overlash fiber on existing poles. Standard working hours are 7am-4pm. No new poles or anchors are permitted with this work. Permittee must obtain permission from the utility pole owner(s)/PG&E to attach. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35661544. PG&E to perform minor service install. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 2010338. PG&E to trim trees. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 2010338. PG&E to perform routine tree maintenance. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. SoCal Gas NOT # 2043562317. SoCal Gas to perform service replacement. Work requires (1) 4'x3' asphalt cut. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 2010338. PG&E to perform routine tree maintenance at multiple locations. Working hours at some locations are restricted to what is listed on the attached traffic control plan. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 2010338. PG&E to trim trees. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Tree trimming at multiple locations along Higuera. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call Eric Baker at 805-781-7014 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. SoCal Gas work order # 520003557851. SoCal Gas after-the-fact permit for emergency leak repair. Work requires (1) 6'x6' concrete cut. Final paving is required for this permit to be finaled. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 2010338. PG&E to trim tree near overhead lines. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. AT&T job # A05ATHE. AT&T to access manhole # 3208, pole # 01336, and FAP. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 2010338. PG&E to perform routine tree trimming and maintenance at multiple locations. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35643988. PG&E to install fault indicators. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. AT&T job # A05AEJ6. AT&T to remove old pole tags to newly placed poles. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35655161. PG&E to remove and install anchors and down guys and reframe poles. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E after-the-fact permit for emergency tree trimming. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Contact City Public Works inspector James Yanez at 805-503-8011 to coordinate job inspections and information. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call James Yanez at 805-503-8011 to coordinate wye installation two working days in advance. A separate encroachment permit will need to be pulled, with fees, if the work is not completed by August 8, 2025 to be in advance of CIP Spec. 2000539 project. Silt Removal 2025 project, Specification No. 2000198-3. All work to be done per City CIP Specification No. 2000198-3 and City Standard Specifications & Engineering Standards. A traffic and pedestrian control plan must be submitted, reviewed, and approved prior to each phase of the work. Traffic and pedestrian controls must be per an approved plan and City Appendix G & MUTCD Standards. Contact City Public Works inspector Trae Christensen at 805-458-1339 to coordinate job inspections and information. Permittee is responsible for calling for final inspection so the permit can be closed. Madonna Rd and Caltrans driveway streetlight repair. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. SoCal Gas to drill two 1/2" holes for surveying. This work must be performed at night. A separate night work permit is required from the Planning Division. Public Works overtime inspection fees must be paid in advance of the work. A check for 8 hours of Public Works overtime inspection fees has been received. Must schedule work ahead of time with the Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 2010338. PG&E to perform routine maintenance for tree trimming. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PV Roof Mount 5.74KW, 14 Modules, 2 Inverter, 2 Tesla PW3 ESS Install EV Charger level 2 (1), 125A Garage Sub Panel 18.36kW Photovoltaic System W/ 40.5kWh ENERGY STORAGE SYSTEM roof Mounted, Grid-Tied Four pedestrian gates and one vehicle entry gate at 1321 Osos. 45 linear feet to match black wrought iron fencing next door at SLO Adventist Church at 1301 Osos. The walkway between church and building will remain open. INSTALL 3 UNDER CABINET LEDL IGHTS TO EXISTING CIRCUIT & SWITCH - WITHDRAWN PER APPLICANT Roof Mounted 10.32 kW PV System with (2) ESS and (2) ESS Expansion Packs Installation of 10 425watt modules with 5 DS3-S micro inverters Add 2 Heads for Remodel of home Replace rotted beam & framing, reinstall stucco & lath waterproofing REMOVING 36' OF EXISTING SEWER LINE Solar installation: System Size: 7.360KW (16) Modules (16) Microinverters (3) Batteries EV Charger Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. TWO SETS OF LED CHANNEL LETTERS ATTACHED TO FRONT AND BACK OF SUITE Place U-haul storage containers in public right-of-way. Anticipated dates are: 08/16/25-08/21/25, however, permit is to remain open until 08/29/25 in case of delays. U-haul containers must be maintained in a clean and safe manner. U-haul containers must be reflectorized. A copy of this permit must be placed on the U-haul containers. All work to be done to applicable City Standard Specifications & Engineering Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the U-haul containers are removed so the permit can be closed. Replace sewer lateral to the main in back of the property via trenching. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. MASTER PLOT PLAN (PERMIT#FIRE-0705-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 217; PLOT PLAN 3; TRACT 3089 Installation of a 5.4 kW-DC PHOTOVOLTAIC SYSTEM using: (12) CANADIAN SOLAR CS6.1-54TM-450H + (12) ENPHASE IQ8PLUS-72-2-US <On 11/13/25, permit updated to include additional scope of work. TCP attached.> AT&T job # A02CZS5. AT&T to trench and place CPC from cabinet to existing pole. Accessing manholes # 1032 and 1018 and pole # 01805. Must pothole all utilities being crossed. Must install 7' below the top of curb or 3' below the deepest utility being crossed, whichever is deeper. No new poles or anchors are permitted with this work. Permittee must obtain permission from the utility pole owner(s)/PG&E to attach. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. Addition of one 13.5 kWh (ESS) Energy Storage System and associated hardware to the main dwelling unit TEMPORARY POWER POLE REROOF REPLACE SHINGLES AND SHEATHING MASTER PLOT PLAN (PERMIT#FIRE-0705-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 211; PLOT PLAN 3; TRACT 3089 Replace double check backflow preventer in planter on private property for 223 and 233 Granada. All work in on private property. Standard working hours are 7am-4pm. A pre-construction meeting with the Public Works inspector is required. All work to be done per approved plans FIRE-0937-2025 and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Install 32A Tesla Universal Wall Connector on interior of garage on 40A circuit. Renovation of existing handball structure (2,862 SF) into a community center for apartment complex. Replace sewer lateral to the main using trenchless technology on Broad. Trenchless lateral replacements require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. Install 48A Tesla Wall Connector on interior of garage on 60A circuit. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. PV solar roof mount, 8 modules, 3.28kw, comp. shingle, existing main 100A, SolarEdge Battery with BUI, 125A loads panel Remove and replace driveway approach, and sidewalk at 859, 867, and 875 Mission. This work is in response to a Notice to Correct (NTC) for all addresses. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. ADDITION OF ONE NEW 13.5KW (ESS) ENERGY STORAGE SYSTEM AND ASSOCIATED HARDWARE TO THE MAIN DWELLING UNIT PV Roof Mount 8.2KW, 20 Modules, 1 Inverter, 1 Tesla PW3 ESS, 1 Tesla PW3 Expansion INSTALLATION OF ONE 13.5 KWH (ESS) ENERGY STORAGE SYSTEM, AND ASSOCIATED HARDWARE TO THE MAIN DWELLING. Project address: 228 FOXTROT COURT, SAN LUIS OBISPO, CA, 93401. Avila Ranch Lot 225. Installation of a 4.95 kW-DC PV System, using (11) CANADIAN SOLAR MODULES + (11) ENPHASE Microinverters. Residential Roof Mounted Solar (PV) 4.8kwDC and (1) ESS 5.94kW Photovoltaic System W/ 13.5kWh ENERGY STORAGE SYSTEM roof Mounted, Grid-Tied (1) ev charger New SFR 13D Fire Sprinkler system for a n existing residence with a new addition. Replace gas furnace with ducted heat-pump, like for like; existing location PV Roof Mount 3.69KW, 9 Modules, 1 Tesla PW3 with integrated inverter, 1 Tesla PW3 Ex pack Installation of Enphase IQ 50 EV Charger with J1772 Connector. Supply and Install (3) Replacement Windows into EXISTING Openings. No opening modifications to be made. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. MPU New 200amp panel Voluntary Seismic Retrofit In Accordance With Plan Set (A) ADD EXT RECEPTICAL PLUS REROUTE ONE BRANCH CIRCUIT 12 - 400W Solar Panels (4.8kW PV ) 12 - Enphase Microinverters 1 - 15kWh battery Install 13.53kW DC roof mount Photovoltaic System and Energy Storage System (2) Bore and trench Level 3 Communications - Lumen conduit across Broad Street. Remove and replace full panels of sidewalk. Excavate approximately five 3'x5' potholes to repair sections of conduit. Place new vault. Tie into Level 3 conduit and existing vault. Access Level 3 vaults and manholes. All work to be done per the approved plans and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved plan and City Appendix G & MUTCD Standards. 40 hours of Public Works overtime inspection fees have been received for night-work. Must confirm night-work inspection coverage in advance; also, call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. REPLACE SEWER LATERAL TO CITY MAIN SEWER Install 7.04kW DC roof mount Photovoltaic system, Energy Storage (1), Electric Vehicle Charger (1) Project address: 219 FOXTROT COURT, SAN LUIS OBISPO, CA, 93401. Avila Ranch Lot 212. Installation of a 5.4 kW-DC PV System, using (12) CANADIAN SOLAR MODULES + (12) ENPHASE Microinverters. PV Roof Mount 11.455KW, 29 modules, 1 Inverter, 1 Tesla PW3 ESS, 1 Tesla PW3 Expansion pack LIKE FOR LIKE REPLACEMENT OF 8 COLUMNS (FIRST AND SECOND FLOOR), HANDRAIL REFRAMING MASTER PLOT PLAN (PERMIT#FIRE-0700-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 245; PLOT PLAN 3; TRACT 3089 Voluntary Seismic Retrofit in Accordance with Plan Set (A) Electrical Panel upgrade from 100 amp to 200 amp Replace 28' of sewer line from house to inside of garage using 3' ABS sewer pipe. Excavate ground from house to garage wall, cut and remove section of concrete floor inside garage. Reinstate concrete floor once sewer line is replaced. MASTER PLOT PLAN (PERMIT#FIRE-0706-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 220; PLOT PLAN 4; TRACT 3089 REPLACE SEWER LATERAL TO EXISTING PVC RISER PROVIDED BY CITY OF SLO BEHIND NEW RETAINING WALL 2.55KW roof top photovoltaic Re-Roof the existing roof on the main living structure. UPDATE ELECTRICAL PANEL AND PLUMBING LEAK Install 3.05kw solar system, 7 panels 7 Micro-Inverters, 2 Enphase batteries Replace sewer lateral to the main using trenchless technology. Also, bore a new 1" water service lateral to serve a future water meter. A separate utility work-order with separate fees must be obtained from the Building Division prior to placement of the water meter. Trenchless lateral replacements require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. DECK REPAIR - UNIT D Modify existing Ansul system MFG date 2017 hood 8"x54" , duct 14" Appliances: Fryer 23"×14" griddle 24"x20" salmander above griddle 8"X24" 6B Range 36"x24" back self pasta cooker Connecting Gas Valve to Ansul System with Conduit & Cable Add Link Detection Bracket & Link at End of Line Add Link Detection Bracket & Link in middle of existing Link Brackets x2 Add Nozzle to existing Branch Line (or Plenum/ Duct) x3 Connect new Appliance Nozzle (or Plenum/ Duct) to Main Hood Supply above Hood x 3 manual pull station is not on the way of egress need to be relocated to other side of the hood. customer is removing pasta cooker and put a stock pot instead need to add two more nozzle Tenant Improvement to add chiropractic treatment rooms. Install 48A Tesla Universal Wall Connector on exterior of garage on 60A circuit. Voluntary Seismic Retrofit In Accordance with Plan Set (A) PV Roof Mount 8.61KW, 21 Modules, 2 Inverter, 2 Tesla PW3 ESS, 1 Expansion, MPR Replace existing 100A main electrical panel with new 200A panel in same location. Work includes new breakers, grounding, and reconnection of existing circuits. No relocation of service equipment. Standard panel swap for residential use. Repair Damage from Vehicle at area between front door and window in studio apartment at 1116 #B Orcutt Rd WATER HEATER REPLACEMENT AND WATER SUPPLY LINES REPLACEMENT LIKE FOR LIKE WATER HEATER REPLACEMENT. REPLACE 50 G NATURAL GAS WATER HEATER IN EXISTING LOCATION Install 40A Tesla Wall Connector on interior of garage on 50A circuit. Project address: 236 FOXTROT COURT, SAN LUIS OBISPO, CA, 93401. Avila Ranch Lot 222. Installation of a 4.95 kW-DC PV System, using (11) CANADIAN SOLAR MODULES + (11) ENPHASE Microinverters. PV SRM 3.28KW, (8)Modules, (2)ESS PV Roof Mount 5.33KW, 13 Modules, 1 Inverter, 1 Lunar ESS Replace existing 50-gallon natural gas water heater in same location. INSTALL LOPI NEXGEN-FYRE WOOD BURNING STOVE AND VENT PIPE. ADD AC TO EXISTING HVAC SYSTEM Fire sprinkler for installed per NFPA 13 D INSTALLATION OF 1 EXTERIOR BUILDING SIGN (BLACK ACRYLIC) AND 1 A-FRAME THAT WILL BE BROUGHT INSIDE EACH DAY. NO ELECTRICAL OR STRUCTURAL MODIFICATION TO THE BUILDING. New Manufactured Unit to be installed at 1132 Olive in place of previous home that was burned in fire. Installation of new MFH has been approved with the City of SLO under BLDG-2096-2024. Fire Sprinkler plans were a deferred submittal. Fire Sprinkler plans for the Manufactured Home have already been reviewed and approved through PFS as indicated on the plans, Approval #PFS-25-003635 INSTALLATION OF (1) CANADIAN EP CUBE BATTERY OF 9.9KWH Addition of one 13.5 kWh (ESS) Energy Storage System and associated hardware to the main dwelling unit Bonetti Ranch T.I. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. MASTER PLOT PLAN (PERMIT#FIRE-0702-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 246; PLOT PLAN 5; TRACT 3089 Addition of one 13.5 kWh (ESS) Energy Storage System and associated hardware to the main dwelling unit PV Roof Mount 9.315KW, 23 Modules, 1 Lunar system MASTER PLOT PLAN (PERMIT#FIRE-0706-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 219; PLOT PLAN 4; TRACT 3089 Installation of roof mounted PV system. Hall Bath - Replace existing shower/tub with new walk-in shower - no change in footprint, drain will not be moved. Drywall patching (C-9) finish carpentry (C-6) Change a light switch (C-10) A GARAGE REMODEL FOR AN EXISTING SINGLE-FAMILY RESIDENCE. THIS PROJECT WILL INCLUDE THE REMOVAL AND REPLACEMENT OF EXTERIOR SIDING ON AN EXISTING RESIDENCE BUILDING Place rolloff dumpster in public right-of-way. Anticipated dates are: 09/04/25-09/18/25, however, permit is to remain open until 09/26/25 in case of delays. Dumpster must be maintained in a clean and safe manner. Dumpster must be reflectorized. A copy of this permit must be placed on the dumpster. All work to be done to applicable City Standard Specifications & Engineering Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the dumpster is removed so the permit can be closed. NEW FIRE WATER CONNECTION TO THE CITY SUPPLY <On 07/10/25, permit extended to 07/18/25.> Place rolloff dumpster in public right-of-way. Anticipated dates are: 06/30/25-07/11/25. Dumpster must be maintained in a clean and safe manner. Dumpster must be reflectorized. A copy of this permit must be placed on the dumpster. All work to be done to applicable City Standard Specifications & Engineering Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the dumpster is removed so the permit can be closed. 338 sq. ft. shop addition to existing detached 2-car garage RELOCATE GAS METER Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. Removal and reinstall existing PV system. Complete conduit/vault repair for Astound Broadband LLC. Install conduit by open trenching and directional boring. Work includes intercepting existing conduit, wye cast, and place new vault. Work must be completed at night. A separate night work permit from the Planning Division is required. Work must be scheduled ahead of time with the Public Works inspector, with Public Works overtime inspection fees to be paid. All work to be done per the attached plans and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. 45 hours of Public Works overtime inspection fees have been paid for. Install San Miguel driveway approach and sidewalk underdrain. A separate encroachment permit with separate fees is required for the remaining concrete work required with BLDG-2838-2018. All work to be done per the approved building plans, BLDG-2838-2018, and All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. removing a 40-gallon natural gas water heater and installing an EZTR50 natural gas tankless water heater Place U-haul storage containers in public right-of-way. Anticipated dates are 08/28/25-09/08/25, however, permit is to remain open until 09/15/25 in case of delays. U-haul storage containers must be maintained in a clean and safe manner. U-haul storage containers must be reflectorized. A copy of this permit must be placed on the U-haul storage containers. All work to be done to applicable City Standard Specifications & Engineering Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the U-haul storage containers are removed so the permit can be closed. DECK REPAIR - UNIT B MASTER PLOT PLAN (PERMIT#FIRE-0702-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 247; PLOT PLAN 5; TRACT 3089 General tree maintenance. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Upgrade 100 amp panel to 200 amp. Add 50 amp circuit. PLUMBING REPAIR-WATER MAIN REPLACEMENT Replace gas meter, will be moved to meet current code Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations will be performed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made for holidays as needed. Contractors must schedule wye installations by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. PV Roof Mount 3.645KW, 9 Modules, 1 Lunar System Remove 40 gallon natural gas tank water heater install Noritz EZTR50DV tankless in existing location See "parking meter bags" case - 2 commercially licensed trucks. Install new driveway approach and sidewalk per BLDG-0841-2023. All work to be done per the approved building plans and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. Installation of a 4.95 kW-DC PV System, using (11) CANADIAN SOLAR MODULES + (11) ENPHASE Microinverters. Install 24A Tesla Wall Connector on interior of garage on 30A circuit. 5.95 KW-DC, 14 panel photo-voltaic electric system Replacing 1 window with retrofit window REPLACE EXISTING WINDOWS & SKYLIGHT 6KW Roof Mounted PV System W/ 1 Tesla Powerwall & EV Charger 6.075 kW DC Roof Mount Photovoltaic System with Energy Storage (1) Place POD storage container in the street. Anticipated duration is about two weeks, starting on September 19, 2025. The permit is active until October 14, 2025, in case of delays. POD must be maintained in a clean and safe manner. POD must be reflectorized. A copy of this permit must be placed on the POD. All work to be done to applicable City Standard Specifications & Engineering Standards. Call the Public Works inspection hotline at 805-781-7554 (voice message system) to notify two working days prior to placement. Also, call the inspection hotline after the POD is removed so the permit can be closed. PV solar roof mount, 10 modules, 4.1kw, comp shingles, new 200A MPU, 5.0kw SolarEdge battery, BUI Directory Sign DECK REPAIR - UNIT G Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. DECK REPAIR - UNIT C Place U-haul pod storage container in public right-of-way. Anticipated dates are: 09/13/25-09/15/25, however permit is to remain open until 09/24/25 in case of delays. U-haul pod must be maintained in a clean and safe manner. U-haul pod must be reflectorized. A copy of this permit must be placed on the U-haul pod. All work to be done to applicable City Standard Specifications & Engineering Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the U-haul pod is removed so the permit can be closed. General tree maintenance. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Roof Mount 3.240kW Photovoltaic System with (1) Enphase IQ Battery 5P New Photovoltaic system ESS:1 UPGRADE ELECTRIC PANEL FROM 100AMPS TO 200AMPS Minor interior remodel of bathroom and kitchen. 5.28 kW DC Roof Mount Photovoltaic System with Energy Storage (1) Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. ADDING NEW - EP CUBE HYBRID INVERTER & ESS 7.6KW with ESS (9.9 KWH). 1 CANADIAN SOLAR EP CUBE SMART GATEWAY. 1 100A NEW BACK UP LOAD CENTER. AC DISCONECTED 240V. -TO EXISTING PV SOLAR SYSTEM 12 CANADIAN SOLAR PV MODULES 12 ENPHASE MICROINVERTERS. CONVERT STORAGE LOFT TO STUDY LOFT ADDITION OF ONE 13.5KW (ESS) ENERGY STORAGE SYSTEM AND ASSOCIATED HARDWARE TO THE MAIN DWELLING UNIT General tree maintenance on Tank Farm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PV INSTALL 6.56KW, 16 MODULES, 1 ESS, NEW GEN. PANEL PV Install 6.075KW DC, 15 Modules, 1 Inverter, 1 Battery Roof tear off and hauling away of debris. Installation of new CertainTeed Landmark shingle roof. Replace sewer lateral to the main using trenchless technology. Also directional bore new 1" water service lateral from the main in the street to feed a new 1" water meter. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done per Building plans and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. Exterior painting and wood repair. Standard working hours are 7am-4pm, no setup in the right-of-way is permitted before 7am. The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications for details (attached). No traffic control setup, noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed and approved by the Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. <On 09/29/2025, permit extended to 10/13/2025, however permit is to remain open until 10/17/2025 in case of delays. No further extensions will be allowed.> <Permit updated with new dates: 09/11/25-09/25/25, however permit is to remain open until 10/02/25 in case of delays.> Place rolloff dumpster in public right-of-way. Anticipated dates are: 09/02/25-09/16-25, however permit is to remain open until 09/23/25 in case of delays. Dumpster must be maintained in a clean and safe manner. Dumpster must be reflectorized. A copy of this permit must be placed on the dumpster. All work to be done to applicable City Standard Specifications & Engineering Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the dumpster is removed so the permit can be closed. BATHROOM REMODEL INCLUDING RELOCATION OF TOILET, SINK, & PANTRY Replace existing gas furnace with ducted heat-pump ADDITION OF ONE 13.5KW (ESS) ENERGY STORAGE SYSTEM AND ASSOCIATED HARDWARE TO THE MAIN DWELLING UNIT MASTER PLOT PLAN (PERMIT#FIRE-0700-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 209; PLOT PLAN 3; TRACT 3089 Remove and replace driveway approach, upgrading to current City standards. The property line is 6' behind face of curb. If the ADA path is not fully in the public right-of-way, a separate easement must be recorded prior to this encroachment permit being finaled and prior to the building permit being finaled. All work to be done per BLDG-2560-2024 and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PV INSTALL 5.33KW, 13 MODULES, 1 ESS, 1 EXPANSION Addition of (1) 200A Backup gateway into an already existing Solar + Storage system. PUT UP TENTS FOR RAIN - LUNA RED REPLACEMENT WINDOWS (23) AND SIDING <On 8/28/2025, updated to include gas service and landscape water service per the attached. A utility work-order and fees are required for water meters.> A separate utility work-order must be obtained from the Building Division (building@slocity.org or 805-781-7180) prior to the installation of the 4" water meter; separate fees apply. All work is on the Bishop Street side. Welcome Home Village utilities - Install new 6" sewer lateral, connecting to new sewer main. The new sewer main is a separate CIP. Install a 6" fire service lateral. Install a 4" water service lateral to serve a 4" water meter (separate utility work-order required prior to installation of water meter). All work to be done per GRAD-1265-2025 and City Standard Specifications & Engineering Standards. A traffic control plan must be submitted, reviewed, and approved prior to the start of the work. Traffic and pedestrian controls must be per an approved plan and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Installation of 13.65kW DC Solar with 40.5kWh of energy storage Place Uhaul pod storage containers in public right-of-way. Anticipated dates are: 08/07/2025-08/08/2025, but permit is to remain open until 08/15/25 in case of delays. Uhaul pods must be maintained in a clean and safe manner. Uhaul pods must be reflectorized. A copy of this permit must be placed on the Uhaul pods. All work to be done to applicable City Standard Specifications & Engineering Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the Uhaul pods are removed so the permit can be closed. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. Roof Mount 2.430kW Photovoltaic System with (1) Enphase IQ Battery 5P Place rolloff dumpster in public right-of-way. Anticipated dates are: 09/04/25-09/18/25, however, permit is to remain open until 09/25/25 in case of delays. Dumpster must be maintained in a clean and safe manner. Dumpster must be reflectorized. A copy of this permit must be placed on the dumpster. All work to be done to applicable City Standard Specifications & Engineering Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the dumpster is removed so the permit can be closed. 6.5KW Rooftop PV Solar System w/ ESS Roof mounted solar 4.1 KW; 2 Energy Storage Systems; Trench- VOID OUTSIDE CITY LIMITS Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. PV solar roof mount, 19 modules, 7.79kw, comp shingles, existing 100A MSP, (2) 5.0kw SolarEdge Battery, BUI Install 48A Wallbox Pulsar Plus on interior of garage on 60A circuit. Minor alteration to existing system Installation of a 5.4 kW-DC PHOTOVOLTAIC SYSTEM using: 12 CANADIAN SOLAR CS6.1-54TM-450H + 12 ENPHASE IQ8PLUS-72-M-US PV solar roof mount, 11 modules, 4.51kw, comp shingles, existing 100A MSP, tesla powerwall 3 Supply and Install 1 Replacement Window into an EXISTING Openings. No opening modifications to be made. Servicing sign at Hotel San Luis Obispo. The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications for details (attached). No traffic control setup, noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed and approved by the Public Works inspector. Any displaced parking spaces will require separate fees. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PV Solar roof mount 3.24KW, (8)Modules, (1)ESS, (1) Inverter Install 48A Tesla Universal Wall Connector on interior of garage on 60A circuit. TEMPORARY TENT - NATIVITY JUBILEE - NATIVITY OF OUR LADY CATHOLIC CHURCH ROOF MOUNT 5.74KW PHOTOVOLTAIC SYSTEM, GRID TIED, NO ESS. remove old Composition roofing and replace with new comp roofing Install Level 2 Electric Vehicle Charger and new sub panel Replace existing furnace with heat pump. Replace existing 100 AMP Service Panel TO 200 AMP service Panel WE WANT TO REMOVE A WINDOW, RE FRAME THE R.O TO ACCOMODATE A SLIDING DOOR (SAME WIDTH AS THE EXISTING WINDOW, THEN THERE WILL BE MINIMAL STRUCTURAL CHANGES; WE'LL KEEP THE SAME HEADER SIZE.) Sprouse Communication for Charter-Spectrum to directional bore to pull cable. The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications for details (attached). No traffic control setup, noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed and approved by the Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. Replacement of 2 windows with retrofit windows. No Construction. No Framing. Like for Like. upgrade exisitng 100 amp meter main to 200 amp meter main for future capacity FIRE SPRINKLER TENANT IMPROVEMENT Install new 1" water service lateral to serve a new 3/4" water meter. A separate utility work order for the water meter must be obtained from the Building Department prior to installation of the water meter. Remove and replace 10' driveway approach and install 25' of sidewalk. All work to be done per BLDG-2644-2024 and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Demo out existing lines and raise/re-locate fire sprinkler lines 1 ENERGY STORAGE SYSTEM & 1 TESLA WALL CONNECTOR Install new 1" water service lateral from the main in the street to serve a new 1" water meter. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. CHANGE METER CAN Astound Broadband LLC to install new fiber optic cable from existing vault to new vault via trenching and boring and wye cast existing conduit. A separate night work permit is required from the Planning Division. Public Works overtime inspection fees must be paid in advance of the work. A check for 24 hours of Public Works overtime inspection fees has been received. Must schedule work ahead of time with the Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. ELECTRICAL PANEL UPGRADE; LIKE FOR LIKE; 400A-400A CONSTRUCTION OF NEW 2 STORY 940 SF ADU REPLACE ROTTEN OUTSIDE DECKING, 228 SQ FT BUILDING FASCIA replacing wall furnace with ductless mini split in backyard with one head Install 48A Wallbox Pulsar Plus on interior of garage on 60A circuit. REPLACED DAMANGED DRY ROTTED 2X14S W/LVL'S Main service panel upgrade from 100amp to 200 amp panel with no additional load PV solar roof mount, 8 modules, 3.28kw, comp shingle, existing 200A MSP, 5.0kw solaredge battery, BUI, New 125A Sub panel 7.11 kw solar system 18 panels pv solar roof mount, 8 modules, 3.24kw, comp shingle, existing 200A MSP, 1 ESS, 1 BUI Remove and replace panel of sidewalk to upsize the water service lateral between the meter and property line from 3/4" to 1 1/4". Also, upsize water meter from 5/8" to 3/4". All work to be done per BLDG-1781-2024 and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. Residential Roof Mounted Solar (PV) 8.5kw DC and (1) ESS Place storage container in the street. Container will be in place for 3 days with the start date anticipated to be between 7/24/2025 and 7/28/2025. The permit is valid until 8/12/2025, in case ofContainer must be maintained in a clean and safe manner. Container must be reflectorized. A copy of this permit must be placed on the container. All work to be done to applicable City Standard Specifications & Engineering Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the container is removed so the permit can be closed. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. 13.5KW ENERGY STORAGE SYSTEM - GRID TIED SEWER REPAIR 2-4FT OF PIPE 4" Ev Charger: 40A UPGRADE ELECTRICAL BOX MASTER PLOT PLAN (PERMIT#FIRE-0703-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 210; PLOT PLAN 1; TRACT 3089 City utilities connections for a County Project PV Roof Mount 6.97KW, 17 Modules, 1 Inverter, 1 Lunar ESS, Trenching required WALL/ELECTRIC PV INSTALL 3.645KW DC 9 MODULES 1 INVERTER 1 ESS PV Roof Mount 4.51KW, 11 Modules, 1 Inverter, 1 Tesla PW3 ESS ELECTRICAL PANEL UPGRADE (3 METERS) - UNITS A, B, & C REPAIR WATER DAMAGE TO AN EXISTING EXTERIOR DECK SEWER LATERAL REPLACEMENT Install 48A Tesla Wall Connector on interior of garage on 60A circuit. Supply and Install 3 Replacement Windows into Existing Openings. No opening modifications to be made. 6.9 kW DC roof mount Photovoltaic w/ Energy Storage(1),EV Charger,Sub Panel,Water Heater Replacement KITCHEN REMODEL AND STRUCTURAL ROOF BEAM MASTER PLOT PLAN (PERMIT#FIRE-0700-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 248; PLOT PLAN 3; TRACT 3089 upgrade existing electrical service to 200amps (1) ENERGY STORAGE SYSTEM 13.5kWh Install Level 2 EV Charger (1) Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. PV Roof Mount 3.69KW,9 Modules,1 Invereter,1 Tesla PW3 ESS Full tear off reroof comp shingle upgrade panel from 125 tro 200 amps for future. Project address: 227 FOXTROT COURT, SAN LUIS OBISPO, CA, 93401. Avila Ranch Lot 216. Installation of a 4.95 kW-DC PV System, using (11) CANADIAN SOLAR MODULES + (11) ENPHASE Microinverters. Abandon existing driveway approach, replacing with sidewalk, curb, and gutter. Install new driveway approach in new location. Install two sidewalk underdrains. All work to be done per BLDG-1470-2023 and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. General tree maintenance for 902, 930, and 940 Peach. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Replace 2 windows with retrofit vinyl windows. PG&E PM # 35449268. PG&E to trench to install conduit duct, primary w/ conduit, and install minor equipment. For secondary power, conduit depth shall be 3’ minimum below crossing utilities or 7’ below top of curb, whichever is deeper. Primary power must be 1' deeper than secondary power, reference Standard 6010. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. INSTALL 50A HOT TUB DISCONNECT, RECONFIGURE EV CHARGER TO 32A ON 40A CIRCUIT DECK REPAIR - UNIT A Project address: 235 FOXTROT COURT, SAN LUIS OBISPO, CA, 93401. Avila Ranch Lot 220. Installation of a 5.4 kW-DC PV System, using (12) CANADIAN SOLAR MODULES + (12) ENPHASE Microinverters. Panel Upgrade 100 to 200 amps, same location Roof Mount PV system 3.28KW DC, (8) Panel, (2) Inverter with integrated ESS REMOVAL OF DRY WALL FOR EXPLORATORY. Repair water damage to an exterior deck. TEMP SHORING AT DAMAGED COLUMN - NORTHEAST ENTRY - 1 LOCATION PV solar roof mount, 8 modules, 3.24kw, existing main 150A, new subpanel 125A, loads panel 125A, SolarEdge Battery with BUI Install 20 PV modules to roof and two storage batteries to the garage wall. 13.5KW ENERGY STORAGE SYSTEM, GRID-TIED Replacement of 14 windows and 2 patio doors. No construction. No Framing. Like for Like. INSTALLATION OF A MANFUFACTURED PERGOLA Project address: 229 FOXTROT COURT, SAN LUIS OBISPO, CA, 93401. Avila Ranch Lot 217. Installation of a 5.4 kW-DC PV System, using (12) CANADIAN SOLAR MODULES + (12) ENPHASE Microinverters. Install potential maximum 50 amp dedicated circuit to an AmpUp EV charger Sprinkler Monitoring alarm Painting sides of the building along Palm and Chorro. The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications for details (attached). No traffic control setup, noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed and approved by the Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Installation of a 5.4 kW-DC PHOTOVOLTAIC SYSTEM using: (12) CANADIAN SOLAR CS6.1-54TM-450H + (12) ENPHASE IQ8PLUS-72-2-US PUT UP TENTS FOR RAIN - NOVO Install a 177.59kW roof mounted grid-tied solar photovoltaic (PV) system Place storage container on Mill Street. Anticipated dates are 9/3/2025-9/4/2025 (Wednesday morning to Thursday afternoon, but the permit is active until 9/15/2025, in case of delays. Container must be maintained in a clean and safe manner. Container must be reflectorized. A copy of this permit must be placed on the container. All work to be done to applicable City Standard Specifications & Engineering Standards. Call the Public Works inspection hotline at 805-781-7554 prior to placement. Also, call the inspection hotline after the container is removed so the permit can be closed. DECK REPAIR - UNIT H new attached ADU garage conversion Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. REPLACEMENT OF SIGNAGE DECK REPAIR - UNIT E INSTALL 4.4KW DC ROOF MOUNT PHOTOVOLTAIC SYSTEM Painting exterior of the building and stucco patching for 1029 and 1033 Chorro. The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications for details (attached). No traffic control setup, noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed and approved by the Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. UPGRADE PANEL FROM 100 AMP TO 200 AMP Supply and Install (1) Skylight into an Existing Opening. No opening modifications to be made. Replace sewer lateral to the main using trenchless technology on Broad. Trenchless lateral replacements require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications for details (attached). No traffic control setup, noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed and approved by the Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. Replace (2) existing 20 ton roof mounted cooling only package AC units. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. Modifications to existing Ansul System: Add (2) Nozzles over Lava Rock Char broiler Remove Flex Conduit on Pull Station Line reroute Pull Station to go around Wall if necessary Remove & plug 5 Drops that are no longer required 1 ENERGY STORAGE SYSTEM Provide and install dedicated function fire alarm for elevators A & B. No change to existing. This will provide recall and alternative recall. (12 devices) CHANGE UNIT BALCONIES BACK TO ORIGINAL DESIGN NEW SFR/DRIVEWAY/PARKING SPACES NEW SINGLE FAMILY HOME AND ADU ON EXISTING SINGLE FAMILY LOT Original Residence was burned in a fire. This is a new manufactured home to be installed in its place on a permanent foundation system. CONVERSION OF ATTACHED GARAGE TO ADU DEMO EXISTING NON CONFORMING GARAGE AND REPLACE WITH NEW ADU CHANGE UNIT BALCONY BACK TO ORIGINAL DESIGN remodel / addition to existing single family residence. CONVERT ILLEGAL SUNROOM BACK TO CODE COMPLIANT BALCONY; REMOVE WINDOW & INSTALL SLIDING DOOR CONVERT ILLEGAL SUNROOM BACK TO CODE COMPLIANT BALCONY; REMOVE WINDOW & INSTALL SLIDING DOOR INSTALL 48A (11.5KW, AC) TESLA UNIVERSAL WALL CONNECTOR ON EXTERIOR OF BUILDING ON 60A CIRCUIT WITH LOAD MANAGEMENT. Remove 2 layers of shingles, the first one is composition shingles, and the second one is wood shake shingles. We will be adding plywood on the entire roof and new CertainTeed Solaris shingles. Interior remodel of existing single-family residence; add bedroom, remodel 2 full baths, relocate laundry, add powder Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. Replace Pushmatic panel with new 100A panel. REPLACE/REPLACE 2X4 WELLS W/WOOD TO 2X6 WALLS. FROM TERMITE DAMAGE & NEW ELECTRICAL PER CODE & SHEET ROCK/NEW SIDING 25 SF Addition to Living & 72 SF Bathroom Remodel 4.745 kW grid-tied rooftop solar PV system (13 solar PV panels w/ microinverters) Install new dryer circuit (30AMP) Installation of a 4.95 kW-DC PHOTOVOLTAIC SYSTEM using: (11) CANADIAN SOLAR CS6.1-54TM-450H + (11) ENPHASE IQ8PLUS-72-2-US REPLACE ALL EXISTING CONTINUOUS CONCRETE FOOTINGS SUPPORTING THE RAISED FOUNDATION. EXISTING FLOOR FRAMING TO REMAIN. PROVIDE SMOKE & CARBON MONOXIDE ALARMS AND LOW FLOW PLUMBING FIXTURES. Installation of a 4.95 kW-DC PHOTOVOLTAIC SYSTEM using: (11) CANADIAN SOLAR CS6.1-54TM-450H + (11) ENPHASE IQ8PLUS-72-2-US <On 09/22/25, permit updated to be 10' of trenching to intercept City conduit, install a City box, and pull 725' of new cable per the attached plans.> The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications for details (attached). No traffic control setup, noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed and approved by the Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Install new 2" water service to serve three 1" water meters. Work is for 319, 319A, and 321 Ramona. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Installation of phone pods/booths inside an existing office space. REMODEL AN INTERIOR REMODEL IN AN EXISTING NON-HOSPITAL MEDICAL OFFICE BUILDING. THE SCOPE OF THE PROJECT INCLUDES NEW INTERIOR NON-LOAD BEARING WALLS, EXAM / TREATMENT ROOMS, AND OTHER SUPPORT SPACES. SCOPE INCLUDES COORDINATING MECHANICAL, PLUMBING, AND ELECTRICAL UPGRADES, AS WELL AS STRUCTURAL SUPPORT FOR A PAIR OF SPECT IMAGING GANTRY / TABLES AND WATER HEATERS. PROJECT IS AN OSHPD3 CLINIC. ENERGY STORAGE (1) MAIN SERVICE PANEL UPGRADE-WITHDRAWN Installation of a 5.4 kW-DC PHOTOVOLTAIC SYSTEM using: (12) CANADIAN SOLAR CS6.1-54TM-450H + (12) ENPHASE IQ8PLUS-72-M-US 2.52kw Rooftop PV with micro inverters Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. Install driveway approach. Install sidewalk underdrain. Replace sewer lateral to the main. Install new 2" water service to serve two 1" meters. Work is for 201 and 203 Carpenter. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. INSTALL 48A (11.5KW, AC) TESLA UNIVERSAL WALL CONNECTOR ON EXTERIOR OF BUILDING ON 60A CIRCUIT WITH LOAD MANAGEMENT. Replacing heat pump like for like same location 4-ton heat pump in backyard 19 EER2SEER2 air handler in attic 8 HSPF2 Remodel Existing Garage to ADU relocate and upgrade from 100 amp to 200amp main panel Remove and replace panel(s) of sidewalk to install sidewalk underdrain. Remove and replace panel(s) of sidewalk to install new water meter box and replace the water service between the meter and property line. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Remove existing flat BUR roof and tile roof approximately 2700 square ft. Apply new 3ply torch down rood 18 squares Replace plywood sheathing approximately 85 sheets Install new flat tile roof 10 squares Interior drywall patching Interior painting Flooring repairs Exterior paint Installation of a 4.95 kW-DC PV System, using: (11) CANADIAN SOLAR MODULES + (11) ENPHASE MICROINVERTERS. Astound Broadband LLC to install fiber optic cable and conduit via trenching and directional boring. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. REPLACEMENT WINDOWS Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. FIX ROT DAMAGE ON ROOF Installing a cleanout in the sidewalk. Remove and replace panel(s) of sidewalk. This permit is for sidewalk closure only; any work extending beyond the sidewalk will require a separate traffic control plan to be submitted, reviewed, and approved. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. 1.095 kW addition to existing grid-tied rooftop solar PV system (3 new solar PV panels w/ microinverters), total combined system size is 3.705 kW Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. Potholing existing utilities in 7 locations along Broad and Fiero to verify project design. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Installation of a, 4.95 kW-DC PHOTOVOLTAIC SYSTEM using? (11) CANADIAN SOLAR CS6.1-54TM-450H + (11) ENPHASE IQ8PLUS-72-M-US 2.555 kW addition to existing grid-tied rooftop solar PV system (7 new solar PV panels w/ microinverters), total combined system size is 5.455 kW Remove and dispose of existing furnace. Install 20' of new supply ducting in top level attic. Install new furnace in crawl space. Install new thermostat. Operate and monitor for proper. Install condenser wall mounted in back yard. Install coil on furnace. Run electrical to condenser. Install line set. Install new thermostat. Operate and monitor for proper function. INTERIOR RECONFIGURATION OF (E) 206 SF BEDROOM, (E) 150 SF BEDROOM , (E) 66 SF BATHROOM TO CREATE (N) 132 SF BEDROOM, (N) 140 SF BEDROOM, (N) 72 SF BATHROOM, (N) 48 SF BATHROOM, & (N) 30 SF HALL AREA; CONVERSION OF (E) 162 SF LOFT TO (N) 162 SF BEDROOM 1.460 kW addition to existing grid-tied rooftop solar PV system (4 new solar PV panels w/ microinverters), total combined system size is 8.500 kW Replace Electric panel. Same location Install Lennox furnace. Like for like change out. Installation of a new home roof-mounted 4.95 kW-DC PV System, using (11) CANADIAN SOLAR MODULES + (11) ENPHASE Microinverters. 100 amp to 200 amp panel change Remove existing 3 layers of roofing and install new OSB panels, install new comp. shingles Install driveway approach and curb, gutter, and sidewalk along the frontage. Install dry utilities within the sidewalk area. Upsize water meter to 3/4". Install new water meter box and upgrade water service lateral between the water meter and the property line. Also, stage equipment and materials within the public right-of-way, but not within any driving lanes. All work to be done per BLDG-0009-2025 and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. A pre-construction meeting is required prior to the start of work; call the Public Works inspection hotline at 805-781-7554 (voice message system) to schedule. Also, call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Remove kitchenette and remodel bathroom from accessory dwelling unit (Rumpus room) Erect a Circus Big Top with the intention of conducting Circus Vargas performances at the Meadows lot at The Madonna Inn Encroachment for 3 parking spaces in the public right-of-way from 06/16/25-09/30/25, Monday-Fridays. Staging area to have No Parking signs posted in front of the property for the duration of the project. Post No Parking signs with: address, start and end date, start and end time, company name, contact information, and reason for the posting. To create a legal tow-away zone, call the police dept. at 805-781-7312 in advance to have them view and log the posting a full 24 hours prior to the start. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. 2.555 kW addition to existing grid-tied rooftop solar PV system (7 new solar PV panels w/ microinverters), total combined system size is 4.655 kW Upsize existing fire sprinkler piping and replace existing fire sprinklers in basement area. Sprouse Communication for Charter-Spectrum to directional bore, pull cable through existing duct, remove and restore concrete, and replace vault. Any displaced parking stalls will need to be paid for separately. The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications for details (attached). No traffic control setup, noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed and approved by the Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Installation of a 5.4 kW-DC PV System, using (12) CANADIAN SOLAR MODULES + (1) CANADIANSOLAR EP CUBE HYBRID (9.9 kw) INVERTER & ESS + NEW BACKUP SUB PANEL 100A+ (1)NEW EP CUBE SMART GATEWAY 120/240V new 240V 30A 66G electric heat pump water heater replacing gas-fired water heater in same location (garage) 2.920 kW addition to existing grid-tied rooftop solar PV system (8 new solar PV panels w/ microinverters), total combined system size is 6.400 kW minor interior remodel, remove and replace flatwork, replace wall heater with new heat pump fau, install garage door at carport. Install 48A Tesla Universal Wall Connector on exterior of garage on 60A circuit. Code Enforcement Remediation and Foundation Retrofit NEW 13.5 KWH TESLA POWERWALL AND BACKUP GATEWAY Remove and replace driveway approach to current City and ADA standards. Total driveway including the wings is approximately 26 ft wide. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. General tree maintenance. All displaced parking meters must be paid for separately. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. SoCal Gas NOT # 33744613. SoCal Gas to install piping. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. 1.095 kW addition to existing grid-tied rooftop solar PV system (3 new solar PV panels w/ microinverters), total combined system size is 4.865 kW PARTIAL Re-Roof - 4sq (400sqft) Tile Relay - Remove existing tiles & underlayment, install new synthetic underlayment, then reinstall the existing tiles. Changing out electrical components within the electrical panel Place rolloff dumpster in public right-of-way. Anticipated dates are: 06/12/25-06/30/25. Dumpster must be maintained in a clean and safe manner. Dumpster must be reflectorized. A copy of this permit must be placed on the dumpster. All work to be done to applicable City Standard Specifications & Engineering Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the dumpster is removed so the permit can be closed. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. Installation of a new home roof-mounted 4.95 kW-DC PV System, using (11) CANADIAN SOLAR MODULES + (11) ENPHASE Microinverters. Convert existing workshop into accessory dwelling unit (1 bedroom & 1 bath) 2.190 kW addition to existing grid-tied rooftop solar PV system (6 new solar PV panels w/ microinverters), total combined system size is 6.990 kW SLO CIDER - INSTALLATION OF (6) NEW FERMENTATION TANKS Fire sprinkler system added to existing buildings. roof mounted 4.92 KW & 2 Energy Storage systems system size 6.56KW DC 9.6KW AC MODUES (16) ESS (1) Window replacement and stucco repair. NEW 13.5 KWH ENERGY STORAGE SYSTEM ON EXISTING SINGLE-FAMILY DWELLING Design, engineer & install a pre-engineered (kitchen hood fire suppression) Amerex system per Manufacturers Recommendation for the following: (20) Korean BBQ Tables (3) Independent Exhaust Systems Heat Sensors instead of Fusible Link mechanical detection. Electric Gas Shut off already installed by others. Installation of a 5.4 kW-DC PHOTOVOLTAIC SYSTEM, using: (12) CANADIAN SOLAR CS6.1-54TM-450H + (12) ENPHASE IQ8PLUS-72-M-US Installation of a 4.5 kW-DC PV System, using: (10) CANADIAN SOLAR MODULES + (10) ENPHASE MICROINVERTERS. Installing cell unit for alarm communication. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. 1.095 kW addition to existing grid-tied rooftop solar PV system (3 new solar PV panels w/ microinverters), total combined system size is 5.495 kW Replace 200A main panel with new 200A main panel Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. PV INSTALL 3.28 KWDC, 8 MODULES, 1 TESLA PW3 ESS AND 1 TESLA POWERWALL EXPANSION PACK REROOF 100% WITH CLASS A COMP SHINGLE AND NEW FLASHING INSTALL EXTERIOR SIGNAGE FOR BUSINESS 66k BTU furnace changeout like for like same location in attic 96 AFUE Renovation of an existing detached garage to storage/laundry room Install York Heat Pump & Air Handler on hanging straps. (Furnace located in the attic/Heat pump located in backyard.) 1.460 kW addition to existing grid-tied rooftop solar PV system (4 new solar PV panels connecting to existing inverter), total combined system size is 4.060 kW new 240V 30A 80G electric heat pump water heater replacing gas-fired water heater in same location (garage) remove tar and gravel install new torch down on the back side install metal roof in the front 33 squares Tenant Improvements - 2 Suites Removal and reinstall existing PV system to accommodate new roofing at existing location. Addition of 4 new pendant fire sprinkler heads to accommodate new hallway. REPLACE FIRE DAMAGED BATHROOM DRYWALL, FIXTURES AND FLOORING; LIKE FOR LIKE INSTALL 48A (11.5 KW, AC) TESLA UNIVERSAL WALL CONNECTOR ON EXTERIOR OF BUILDING ON 60A CIRCUIT. INSTALL ALUMINUM CABINET WITH NEON AND INSTALL NON-ILLUMINATED BLADE SIGN Project: First American Title TI Modify existing fire alarm system. All existing devices to replaced with new intelligent devices. fully detection and temporal 3 occupant Notification. Building is not sprinklered. No tamper or waterflow to monitor. Astound Broadband LLC to install aerial fiber optic cable to existing utility poles from splice point to customer building. Work to occur along Walnut and Toro to the rear easement of 1250 Peach. No new poles or anchors are permitted with this work. Permittee must obtain permission from the utility pole owner(s)/PG&E to attach. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. No road closures are allowed with this permit. A minimum 10' travel lane must be maintained with flagging at all times. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. 2.190 kW addition to existing grid-tied rooftop solar PV system (6 new solar PV panels w/ microinverters), total combined system size is 6.285 kW Voluntary Seismic Retrofit In Accordance with Plan Set (A) Install new automatic Fire sprinkler monitoring system Building 1 and building 2 Place moving truck/trailer in public right-of-way. Anticipated dates are: 06/17/25-06/19/25, however, permit is to remain open until 06/24/25 in case of delays. Moving truck/trailer must be maintained in a clean and safe manner. Moving truck/trailer must be reflectorized. A copy of this permit must be placed on the moving truck/trailer. All work to be done to applicable City Standard Specifications & Engineering Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the moving truck/trailer is removed so the permit can be closed. 2.190 kW addition to existing grid-tied rooftop solar PV system (6 new solar PV panels w/ microinverters), total combined system size is 4.510 kW Voluntary Seismic Retrofit In Accordance With Plan Set (A) Installation of a 5.4 kW-DC PV System, using: (12) CANADIAN SOLAR MODULES + 12 ENPHASE MICROINVERTERS. FILLING IN OPENING IN HOUSE new 120V plug-in 66G electric heat pump water heater replacing gas-fired water heater in same location (garage) Remove existing tiles. Replace sheathing as needed. Install 30# felt. Install new tiles by Eagle, CAPISTRANO - SMC 8822 SAN BUENAVENTURA, CRRC #:0918-0067. SRI: 24. 100Amp panel upgrading to 200Amp panel 3.650 kW grid-tied rooftop solar PV system (10 solar PV panels w/ microinverters) Remove and replace panels of sidewalk to install two sidewalk underdrains. Core through the face of the curb and grout around the pipe at the face of the curb. All work to be done per the attached plans and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Unit 4 Retrofit Windows, no modification to structure new 240V 30A 80G electric heat pump water heater replacing gas-fired water heater in same location (garage) UST tank top and piping upgrade. Existing fuel pumps and TLS demolished. Disconnect power and preserve circuits. Provide power to new fueling pumps and TLS from existing circuits Interior bedroom remodel of 211 sf to an existing single family residence. 1.825 kW addition to existing grid-tied rooftop solar PV system (5 new solar PV panels w/ microinverters), total combined system size is 5.665 kW Remove and re-install 9 existing PV panels. Installation of a 4.95 kW-DC PV System, using: (11) CANADIAN SOLAR MODULES + (11) ENPHASE MICROINVERTERS. Installation of a 5.4 kW-DC PV System, using: (12) CANADIAN SOLAR MODULES + (12) ENPHASE MICROINVERTERS. 100-200A ELECTRICAL UPGRADE Remove Tenant improvements and architectural finishes to restore space to cold shell condition. Installation of a new home roof-mounted 4.95 kW-DC PV System, using (11) CANADIAN SOLAR MODULES + (11) ENPHASE Microinverters. Remove and replace panel(s) of sidewalk to tie-in fire service lateral from the existing fire-service lateral stub-out in the sidewalk to the building. Any displaced parking spaces will require separate fees. The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications for details (attached). No traffic control setup, noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed and approved by the Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. new 240V 30A 66G electric heat pump water heater replacing gas-fired water heater in same location (garage) STUCCO REPAIRS General tree maintenance. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. ADD AIR CONDITIONING TO EXISTING GAS FURNACE SYSTEM. ADU APPROVAL ATTACHED GARAGE CONVERSION replace existing 100 amp panel with new 200 amp panel in same location Gas heater replacement with electric heat pump indoor and outdoor. Reconnected to existing flexible, ductwork New PV System: 4.1 kW DC, 11.500kW AC New Energy Storage System: 13.500kWh Repair stucco on two walls of basement; repair/replace windows in those walls; replace unsafe exterior staircase from back patio to backyard This project invoices a unique condition. The existing building is unsprinklered, but due the remodel , a new exterior step has been added at an egress path. To address this, the architect received approval to install a single exterior sidewall sprinkler to cover, the designated assisted rescue area adjacent to the stair. This sprinkler will be supplied by 1" CPVC. tied into the existing domestic water line. Refer to the plan for the tie-in location and routing of the CPVC pipe. Approved architecture plan used. Remove and replace panel(s) of sidewalk to install a sidewalk underdrain per City Standards. Core through the face of the curb and grout around the pipe at the face of the curb. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. remove existing button board, upgrade electrical, add insulation to 2 bedrooms, bathroom, hallway, and living room Roof mounted solar 4.1 KW & 1 Energy storage system New 438 sf ADU converted from an existing single family residence attached garage. CODE CASE - REPAIR RAILING TOP CAP WALKING SURFACE Install (2) new 1" water service laterals to feed (2) new 1" water meters by directional boring. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Costco fuel facility expansion project with 10 new dispensers, additive tank removal and replacement, all new piping, new vent stacks, and new additive injection system Installation of a 5.4 kW-DC PV System, using (12) CANADIAN SOLAR MODULES + (1) CANADIANSOLAR EP CUBE HYBRID (9.9 kw) INVERTER & ESS. THE CONSTRUCTION OF AN ATTACHED 1000 SF ACCESSORY DWELLING UNIT IN THE SIDE YARD OF A SINGLE FAMILY RESIDENCE. THE ADU WILL SHARE A SIDE WALL WITH THE EXISTING RESIDENCE AND INCLUDE FOUR BEDROOMS, TWO FULL BATHROOMS, A FULL KITCHEN AND A LAUNDRY AREA. + SB 9 REMODEL OF AN EXISTING RESIDENCE TO ENCLOSE A LIVING AND DINING ROOM INTO TWO NEW BEDROOMS. Install 48A Tesla Universal Wall Connector with Load Management on exterior of garage on 60A circuit. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. Replace damaged materials like for like EXISTING FIRE SPRINKLER SYSTEM TO BE MODIFIED USING EXISTING BULL HEADED TEES AND NEW MECHANICAL TEES (WHERE REQUIRED) AS PER TENANT IMPROVEMENTS. EXISTING FIRE SPRINKLER SYSTEM IS DESIGNED TO ACCOMMODATE ORDINARY HAZARD IN KITCHENS AND LIGHT HAZARD IN ALL OTHER AREAS. NEW TENANT IMPROVEMENT FIRE SPRINKLER SYSTEM CLASSIFICATIONS TO REMAIN THE SAME PRIOR TO REMODEL. SEE PLAN FOR NEW SPRINKLER LOCATIONS. pv solar roof mount, 10 modules, 4.1kw, S-tile, existing 100A MSP, 1 ESS, 1 BUI AT&T job # A05C6JY. AT&T to access manholes # 1004 and 1026, sub-box # 1136, and perform aerial placement. Some work hour restrictions apply. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. remove existing exit sign Repair water damage to an exterior deck. Tenant Improvement on existing fire sprinkler system Install driveway approach and sidewalk, curb, and gutter. All work to be done per the approved building plans, BLDG-0481-2025, and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Replace the (e) deteriorated sewer lateral serving the residence at 1304 Sydney Street, identified as being in very poor condition. Scope includes abandoning a portion of the existing line, installing a new ABS/PVC lateral from the existing main tie-in to the cleanout (to accommodate a future additional dwelling unit), and providing a new sewer connection to the public main for the existing residence. Units 107, 108, and 109 Add a washer and dryer 2026 Blanket Encroachment Permit - This permit covers fees for maintenance work, which includes: new services, mainline repairs, pole relocations, sidewalk repairs/replacements, splice box repairs/replacements, and all general system activities. New mainline installations require a separate encroachment permit with separate fees. Traffic and pedestrian controls must be per MUTCD and City Standards. When applicable, traffic control plans and/or improvement plans must be submitted, reviewed, and approved prior to the start of work. Each job involving excavation, traffic control, or requiring any other inspection requires a separate encroachment permit and traffic control application. For each separate permit issued under the blanket, contact the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so each permit can be closed. WATER HEATER REPLACEMENT 40G NAT GAS PV solar roof mount,9modules, 3.645kw, Comp shingles, existing Subpanel 100A, TESLA Powerwalls3 Install a new fire service lateral - anticipated/approximate dates are between 9/25/2025 and 10/15/2025. Also, modify existing water service. Water service modifications to take place during summer of 2026. All work to be done per the approved plans, FMAP-0775-2024, and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Design and install overhead fire sprinkler in office Spaces Place rolloff dumpster in public right-of-way. Anticipated dates are: 09/22/25-09/26/25, however, permit is to remain open until 10/03/25 in case of delays. Dumpster must be maintained in a clean and safe manner. Dumpster must be reflectorized. A copy of this permit must be placed on the dumpster. All work to be done to applicable City Standard Specifications & Engineering Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the dumpster is removed so the permit can be closed. Remove and replace panels of sidewalk, about 75 ft. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Remove two layers of existing asphalt shingles, plus one layer of wood shingles. Install 7/16 OSB sheathing. Install GAF HDZ (limited life-time) asphalt shingles with GAF Pros-starter. 5.4kW Photovoltaic System W/ 13.5kWh ENERGY STORAGE SYSTEM Roof Mounted, Grid-Tied Upgrade 100A panel to 200A Installation of a 4.95 Kw DC Pv system, Using (11) Pv modules of 450W + EP Cube hybird inverter + batteries 9.9Kw. Install new 2" fire service. Install new 2" water service to serve (2) new 1" water meters to be manifolded. Existing water service is to remain; the existing 1" commercial water meter is to be changed to a residential water meter. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done per BLDG-2271-2023, FIRE-0954-2025, and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. ENERGY STORAGE SYSTEM like for like furnace & AC changeout Traffic control set up to replace AC units on the roof. Due to the Downtown area's holiday moratorium, no work is allowed to occur between 11/27/25-01/01/26. The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications for details (attached). Proof of notice distribution must be provided to the Public Works inspector prior to the start of work. No traffic control setup, noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed and approved by the Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. 4.86kW Photovoltaic System W/ 13.5kWh ENERGY STORAGE SYSTEM ROOF Mounted, Grid-Tied Install roof mounted 4.3kW PV System with (1) ESS General tree maintenance. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. TEAR OFF EXISTING ROCK ROOF AND INSTALL NEW TPO ROOF SYSTEM Project: Amazon Phone booth Provide sprinkler coverage in new phone booth., Coverage is light hazard occupancy, this is a isolated compartment, and does not change the design classification of the existing system Install temporary performance stage for Madonna Meadows Concert Series on September 24 - 25, 2025. Stage used is a Stageline SL260 portable stage with a stage size of 32' x 24 (768 Square Feet) UNDERGROUND SEWER PIPE REPAIR Install 48A Tesla Universal Wall Connector on interior of garage on 60A circuit. Residential Rooftop 11 kw DC Judkins Repair water damage to an exterior deck. PV Roof Mount 10.125KW, 25 Modules, 1 Inverter, 1 Tesla PW3 ESS, 1 Tesla PW3 Expansion pack, New 225 subpanel installed 100-200A overhead electrical service upgrade 120/240 3 wire single phase No solar no added load and no barriers to access 2026 Blanket Encroachment Permit - This permit covers fees for maintenance work, which includes: new services, mainline repairs, pole relocations, sidewalk repairs/replacements, splice box repairs/replacements, and all general system activities. New mainline installations require a separate encroachment permit with separate fees. Traffic and pedestrian controls must be per MUTCD and City Standards. When applicable, traffic control plans and/or improvement plans must be submitted, reviewed, and approved prior to the start of work. Each job involving excavation, traffic control, or requiring any other inspection requires a separate encroachment permit and traffic control application. For each separate permit issued under the blanket, contact the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so each permit can be closed. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. INSTALL TESLA POWERWALL 3 WITH EXPANSION PACK AND TESLA BACKUP SWITCH ON INTERIOR OF GARAGE ON 60A CIRCUIT. Foundation repair with Ram Jack Steel Piers Solar inverter replacement. Replace approx. 40' of 4" Main Sewer Line from Cleanout to property line using Trenchless Technology using DR 17 Pipe. INSTALLATION OF PREFABRICATED METAL PERGOLA OF 26 SQ FT General tree work. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Repair damage column at exterior of building PV solar roof mount, 3.24kw, 8 modules, comp shingles, existing 100A MSP, Tesla Powerwall3 Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. Remove and replace all shingles with Certainteed Landmark Solaris - Replace all plywood Energy Storage (1) Add Battery to Existing Energy Storage System NEW SIGNAGE INSTALL RPP BACLFLOW ASSEMBLY Replace rotted siding and trim ADD ON ESS TO EXISTING PV, ESS : 2 Install roof mounted 6.02kW PV System with (1) ESS Install roof mounted 2.15kW PV System with (1) ESS REPLACE GUARDRAIL 100A Service with 125A buss relocated directly around exterior corner from existing Service Panel location REMOVE AND REPLACE (3) INDOOR AHU'S LIKE FOR LIKE Energy Storage(1),EV Charger (1) PV Roof Mount 6.48KW, 16 Modules, 1 Inverter, 1 Tesla PW3 ESS, 1 Tesla Expansion pack Install a new sewer lateral and new 1" water service lateral to serve a new 3/4" water meter. Replace driveway approach and install sidewalk, curb, and gutter. Install sidewalk underdrain. All work is on the Buchon side. All work to be done per BLDG-0298-2025 and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations will be performed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made for holidays as needed. Contractors must schedule wye installations by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. Panel upgrade from 100amp to 200amp service Remove and replace panel(s) of sidewalk to install the storm water drain/sidewalk underdrain. Abandon existing water service at the main in the street and replace with a new 2" water service lateral to manifold existing 5/8" water meter to serve 1418 Tanglewood and a new 1" water meter to serve 1432 Tanglewood. Core through the face of the curb to install storm water drain/sidewalk underdrain. Grout around the pipe at the face of the curb. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. REPAIR SEWER LATERAL 40g water heater changeout Permit to remain open and be extended with updated insurance and annual fees. Encroachment permit expiration date is tied to expiration date of insurance documents. Stage in the public right-of-way for sidewalk sales events. Retail merchandise will be displayed on the sidewalk on a table display or on a clothing rack. All displays will protrude no more than 4 feet from the front of a building and there will be 5 feet of ADA clearance maintained at all times. Setup shall be per DIR-0711-2025 and applicable City Standard Specifications & Engineering Standards. Email encroachment@slocity.org to update insurance documents, pay annual fees, and extend this encroachment permit. MASTER PLOT PLAN (PERMIT#FIRE-0700-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 232; PLOT PLAN 3; TRACT 3089 Place POD storage container in the street. Delivery date is 10/7/2025 with a duration of about 3 weeks, and an expiration date of 11/7/2025, in case of delays. POD must be maintained in a clean and safe manner. POD must be reflectorized. A copy of this permit must be placed on the POD. All work to be done to applicable City Standard Specifications & Engineering Standards. Call the Public Works inspection hotline at 805-781-7554 (voice message system) two working days prior to placement. Also, call the inspection hotline after the POD is removed so the permit can be closed. 5.40kW Photovoltaic System W/ 13.5kWh ENERGY STORAGE SYSTEM roof Mounted, Grid-Tied Residential Roof Mount Solar 5.72 kW DC + (1) ESS Installation of a 4.05 Kw DC roof mount Pv system, Using (9) Pv modules of 450W + (9) ENPHASE IQ8PLUS-72-M-US microinverters. Rooftop Mounted Solar Energy System PV+ST 12 CS6.1-54TM-455H solar modules 1 1707000-XX-Y {240V, 11.5kW} inverter 1 1707000-XX-Y {11.5kW} ESS New Busbar count - 1 System Size: 5.46 kW DC (11.51 kW AC) Solar Roof Mount 5.52kW, 12 Modules. 1 Tesla Solar Inverter (7.6kW) 100 amp to 200 amp adding sounders and hornstrobes to cafe of hotel WORKSHOP AT 1990 HAYS HAS EXISTING ELECTRICAL (30+ YEARS OLD) THAT CITY DOES NOT HAVE IN RECORDS OVERHEAD ELECTRICAL TO ON SITE JOB TRAILER Install 48A Tesla Wall Connector on interior of garage on 60A circuit. Units 116, 117, 118, 120, 121, 122, 123, 124, 125, 126 Add washer and dryer Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. Installation of Level 3 DC Fast EV Charger PV Roof Mount 6.48KW, 16 Modules, 1 Inverter, 1 Tesla PW3 ESS, (1) 200 A Tesla Powerwall backup gateway 8 HSPF2 / 14.3 SEER2 1 TON DUCTLESS HEAT PUMP MINISPLIT CHANGE OUT IN BEDROOM AND BACKYARD. Replacing 11 windows and 3 patio doors with retrofit windows and doors. HALO LIT CHANNEL LETTERS AND NON LIT HANGING SIGN PV system on new ADU. ADU Permit #BLDG-0298-2025 Units 127, 128, 130, 131, 132 Add washer and dryer Road closure for off loading and deliveries. Work hours are restricted per the attached traffic control plan. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. UNDERGROUND ELECTRIC FEED Install a new fire sprinkler system in a residence. NEW 2-STORY AND WAREHOUSE, PARTIAL 2nd FLOOR OFFICE AND STORAGE UNDER MINOR USE PERMIT. PUBLIC ACCESS EASEMENT, SIDEWALK, CURB AND GUTTER, DRIVEWAY ENTRY Upgrade electrical panel to allow for quicker EV charging. Install 48A Tesla Wall Connector on interior of garage on 60A circuit. like for like furnace change out Install new 4" fire service lateral. Install new 1" water service lateral to serve a new 3/4" water meter. Abandon existing water service and meter box per City standards. All work to be done per FIRE-0901-2025, BLDG-2233-2023, and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Installation of a guardrail at top of interior stairs. I received a notice to correct Code violation General tree maintenance. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. Place rolloff dumpster in public right-of-way. Anticipated dates are: 09/24/25-09/29/25, however, permit is to remain open until 10/06/25 in case of delays. Dumpster must be maintained in a clean and safe manner. Dumpster must be reflectorized. A copy of this permit must be placed on the dumpster. All work to be done to applicable City Standard Specifications & Engineering Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the dumpster is removed so the permit can be closed. Installation of a 4.05 Kw DC roof mount Pv system, Using (9) Pv modules of 450W + (9) ENPHASE IQ8PLUS-72-M-US microinverters. Rooftop Mounted Solar Energy System PV+ST 19 CS1Y-400MS solar modules 19 IQ8PLUS-72-M-US {240V} microinverters 1 IQBATTERY-10C-1P-NA ESS Existing System: Yes New Busbar count - 1 System Size: 7.6 kW DC (5.51 kW AC) Place POD storage container in public right-of-way. Anticipated dates are: 10/14/25-10/17/25, however, permit is to remain open until 10/24/25 in case of delays. POD must be maintained in a clean and safe manner. POD must be reflectorized. A copy of this permit must be placed on the POD. All work to be done to applicable City Standard Specifications & Engineering Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the POD is removed so the permit can be closed. Trench from existing vault in the sidewalk to the property line to install Level 3 Communications - Lumen Technologies conduit. Remove and replace full panel(s) of sidewalk. All work to be done per the approved and attached plans and City Standard Specifications & Engineering Standards. This encroachment permit only covers work in the public right-of-way. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. BMX- TI- Install occupant notification throughout tenant improvement space that is fully sprinklered. Alpha fire Unlimited currently monitors existing fire alarm system Units 110, 111, 112, 113, 114, 115 Add washer and dryer Install 48A Tesla Wall Connector on interior of garage on 60A circuit with load sharing. Roof mounted solar 6.15 KW & 1 Energy storage System MASTER PLOT PLAN (PERMIT#FIRE-0706-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 301; PLOT PLAN 4; TRACT 3089 Repair water damage to an exterior deck. Install roof mounted 6.02kW PV System with (1) ESS Roof mounted 9.46kW PV System with (1) ESS and (1) ESS Exp Pack water heater changeout, 40g nat gas THE OLD SHINGLE ROOF WILL BE REMOVED AND NEW PLYWOOD AND NEW SHINGLES WILL BE INSTALLED. Rooftop Mounted Solar Energy System PV+ST 8 CS6.1-54TM-455H solar modules 1 1707000-XX-Y {240V, 11.5kW} inverter 1 1707000-XX-Y {11.5kW} ESS System Size: 3.64 kW DC (11.51 kW AC) Installation of a 4.5 Kw DC roof mount Pv system, Using (10) Pv modules of 450W + (10) ENPHASE IQ8PLUS-72-M-US microinverters. Damaged shear wall will be replaced. No additional square footage or structural expansions will be made. Foundation repair utilizing Chance helical piers on an existing apartment building. Electrical Service panel upgrade Units 1-19, 100amp to 100amp each, underground Replacement of ductwork only. No equipment is being replaced, relocated, or modified. All existing HVAC equipment remains in place and unchanged. ADD NEW 16.2 SEER 2 3 TON HEAT PUMP LEDFT SIDE OF YEARD ADD NEW COIL GARAGE 6.48 kW DC Roof Mount Photovoltaic with Energy Storage(1) Repair water damage to an exterior deck. Demolition of detached single car garage wood-framed structure building Installation of a 4.95 Kw DC roof mount Pv system, Using (11) Pv modules of 450W + (11) ENPHASE IQ8PLUS-72-M-US microinverters. Fire Alarm / Sprinkler Supervisory System Replacement due to equipment failure. 200 AMP OVERHEAD TEMP POWER POLE Installation of a 4.5 Kw DC roof mount Pv system, Using (10) Pv modules of 450W + (10) ENPHASE IQ8PLUS-72-M-US microinverters. Place rolloff dumpster in public right-of-way. Anticipated date is: 10/29/2025, however, permit is to remain open until 11/05/2025 in case of delays. Dumpster must be maintained in a clean and safe manner. Dumpster must be reflectorized. A copy of this permit must be placed on the dumpster. All work to be done to applicable City Standard Specifications & Engineering Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the dumpster is removed so the permit can be closed. Replace electric panel. Same location Remove and replace a panel(s) of sidewalk to replace sidewalk underdrain. An exception to the downtown holiday permit restrictions was approved for this emergency work, for maximum of two working days in December. The portion of sidewalk removed for the repair must be temporarily backfilled with cold-mix asphalt at the end of each working day to maintain pedestrian access. Final concrete restoration shall be completed January 5, 2026 or later, after the holiday restrictions. The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications for details. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the attached and approved plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Install new 1" water service lateral to serve a new 1" water meter. All work to be done per PLREV-0965-2025 and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. SPA INSTALL IN LANDSCAPE - ABOVE GROUND 1198 Oceanaire Dr: Replace (5) existing 125A Zinsco sub-panels, to be replaced in same location, to New 125A Square D subpanels. All breaker sizes and quantities to remain to the same and existing branch wiring to be reconnected. 1200 Oceanaire Dr: Replace (5) existing 125A Zinsco sub-panels, to be replaced in same location, to New 125A Square D subpanels. All breaker sizes and quantities to remain to the same and existing branch wiring to be reconnected. Replace aged service panel (like for like) PV solar roof mount, 8Mods, kw, Comp shingle, Existing main service panel 200A,TESLA Powerwall3 Remove and replace panels of sidewalk. Abandon mid-block curb ramp, replacing with sidewalk, curb, and gutter. Stage in the public right-of-way for onsite work. All work is on the Felton frontage. All work to be done per the attached plans and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 (voice message system) to schedule a required pre-construction meeting. Also, call the Public Works inspection hotline two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. 2026 Blanket Encroachment Permit - This permit covers fees for maintenance work, which includes: new services, mainline repairs, pole relocations, sidewalk repairs/replacements, splice box repairs/replacements, and all general system activities. New mainline installations require a separate encroachment permit with separate fees. Traffic and pedestrian controls must be per MUTCD and City Standards. When applicable, traffic control plans and/or improvement plans must be submitted, reviewed, and approved prior to the start of work. Each job involving excavation, traffic control, or requiring any other inspection requires a separate encroachment permit and traffic control application. For each separate permit issued under the blanket, contact the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so each permit can be closed. PV Roof Mount 3.69KW, 9 Modules, 1 Inverter, 1 Tesla PW3 ESS, 1 Tesla Backup Gateway Replacing a 10 ton unit on the roof with a like for like model including same refrigerant type. Installation of a 5.4 kW-DC PV System, using: (12) Modules + (1) EP CUBE HYBRID INVERTER + BATTERY 9.9KWh. (1) NEW BACKUP SUB PANEL 100A+ (1) NEW EP CUBE SMART GATEWAY 120/240V. ADDED Emergency stop outside. Hp Communications for Astound Broadband LLC to install fiber optic cable to (2) existing utility poles. No new poles or anchors are permitted with this work. Permittee must obtain permission from the utility pole owner(s)/PG&E to attach. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Installation of new Fire Sprinkler System Repair water damage to an exterior deck. Rooftop Mounted Solar Energy System PV+ST 26 HiS-T440NF(BK) solar modules 1 1707000-XX-Y {11.5kW} inverter 1 1707000-XX-Y {11.5kW} ESS + 2 1807000-XX-Y DC batteries expansion System Size: 11.44 kW DC (11.5 kW AC) Installation of Level 2 EV Charger Installation of a 4.950 Kw DC roof mount Pv system, Using (11) Pv modules of 450W + (11) ENPHASE IQ8PLUS-72-M-US microinverters. Install a new automatic alarm system where required per plans. NEW ROOF MOUNTED PHOTOVOLTAIC SYSTEM 9.46KW DC 11.5KW AC WITH ENERGY STORAGE DEVICE 13.5 KWH Add washer and dryer Replace sewer lateral to the main and install cleanout. A separate building permit is required for any sewer lateral replacement on private property. The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications for details (attached). No traffic control setup, noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed and approved by the Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. Illuminated Channel Logo Shape - white acrylic face with printed opaque graphics (1st surface) INSTALL 4.86KW DC ROOF MOUNTED PHOTOVOLTAIC SYSTEM AND ENERGY STORAGE SYSTEM (1) Level 3 Communication to tie into (1) existing manhole, remove and replace a panel of sidewalk, and install cable through existing underground conduit. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Remove and replace a panel of sidewalk to repair gas leak between the gas meter and the property line. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. 2026 Vegetation Management Blanket Encroachment Permit - this permit applies only to local streets, as defined in the Streets Classification Diagram. For local streets, as defined in the Streets Classification Diagram, PG&E may work under the annual blanket vegetation management permit without submitting a custom traffic control application, as long as the work does not affect school drop-offs or pick-ups and there are no full street closures. PG&E must notify the Public Works inspection hotline at 805-781-7554 and encroachment@slocity.org of the locations and schedules at least two working days in advance. A custom traffic control plan and traffic control application must be submitted, reviewed, and approved and a separate sub-permit must be issued for every job that involves a street closure, affects school drop-offs or pick-ups, or affects any street classification other than local as defined in the Streets Classification Diagram. replace water heater with Noritz EZTR50 PRO General tree maintenance. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. like for like furnace swap Install sidewalk in front of house. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. 1 PICTURE WINDOW - 48 1/2 X 18 1/2; SILL HEIGHT 66" RELOCATE 100 AMP SERVICE TO NEW LOCATION EV Charger Install roof mounted 4.73kW PV System with (1) ESS MASTER PLOT PLAN (PERMIT#FIRE-0703-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 300; PLOT PLAN 1; TRACT 3089 Remove and replace driveway approach per City standards and PLREV-0215-2024. All work to be done per PLREV-0215-2024 and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Remove two layers of existing asphalt shingles, plus one layer of wood shingles. Install 7/16 OSB sheathing. Install GAF HDZ (limited life-time) asphalt shingles with GAF Pros-starter. Upsize existing 5/8" water meter with new 3/4" water meter. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done per BLDG-3409-2022 and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. Modify existing fire sprinkler system. (add 2 new sprinklers, relocate 4 sprinklers, & adjust sprinkler head heights 9 sprinklers) INSTALL TESLA POWERWALL 3 WITH TESLA BACKUP SWITCH ON EXTERIOR OF HOUSE ON 60A CIRCUIT Replace (5) unsafe subpanels with (5) new subpanels, like for like TEAR OFF ALL EXISTING ROOFING RESHEET WITH 7/16 OSB INSTALL ASPHALT SHINGLES DEMOLISH EXISTING SINGLE FAMILY RESIDENCE (1643 SF LIVING) DEMOLISH EXISTING SECONDARY DWELLING UNIT (486 SF LIVING) DEMOLISH EXISTING STRUCTURE (150 SF) NEW 13.5 KWH ESS INSTALLED ON AN EXISTING SINGLE-FAMILY HOME. 1 NEW TESLA AC POWERWALL, 1 NEW TESLA BACKUP GATEWAY WITH ASSOCIATED HARDWARE REMOVE AND REPLACE PIER FOUNDATIONS AND SUPPORT POSTS WHERE INDICATED ON THE REPAIR PLAN. Roof mounted solar 4.51 KW & 1 Energy storage systems Install 48A Tesla Universal Wall Connector on interior of garage on 60A circuit with load management. New roof mounted photovoltaic system 5.66kW PV Roof Mount 2.835KW, 7 Modules, 1 Tesla PW3 ESS, 1 Tesla PW3 Expansion pack, New 225A subpanel installed, Existing Solar system installed Abandon existing water service lateral and install new 2" water service lateral to serve existing 5/8" water meter and (2) new 3/4" water meters. Install sidewalk underdrain. All work to be done per PLREV-0219-2025 and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Replace 40 Gallon Wtr Htr in same existing location in garage Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations will be performed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made for holidays as needed. Contractors must schedule wye installations by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. Remove two layers of existing asphalt shingles, plus one layer of wood shingles. Install 7/16 OSB sheathing. Install GAF HDZ (limited life-time) asphalt shingles with GAF Pros-starter. General tree maintenance. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. UPGRADE TO ELECTRICAL PANEL FROM 100 AMP TO 200 AMP OR 320 A MASTER PLOT PLAN (PERMIT#FIRE-0706-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 298; PLOT PLAN 4; TRACT 3089 Install a new non-required manual and automatic fire alarm system at this facility Sprouse Communication for Charter-Spectrum to directional bore to place fiber and overlash fiber on existing poles. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Installation of roof mounted (5.92kW) PV system with (13) CS 455's, (13) Enphase IQ8AC Microinverters. ELECTRICAL PANEL UPGRADE NEW PHOTOVOLTAIC SYSTEM 4.840KW DC 13.5KWH PHOTOVOLTAIC WITH 13.5KWH ESS STORAGE 4.10 kW DC Roof Mount Photovoltaic System Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations will be performed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made for holidays as needed. Contractors must schedule wye installations by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. 23 REC460AA Pure-RX solar modules 23 IQ8X-80-M-US {240V} microinverters 1 IQBATTERY-10C-1P-NA ESS Install roof mounted 9.24kW PV System with (1) ESS Staging in the right-of-way for tree removal. A separate tree removal permit is required from the Planning Division. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Installation of a 4.5 Kw DC roof mount Pv system, Using (10) Pv modules of 450W + (10) ENPHASE IQ8PLUS-72-M-US microinverters. Remove and replace panel(s) of sidewalk to install the sidewalk underdrain(s). Core through the face of the curb to install sidewalk underdrain(s). Grout around the pipe at the face of the curb. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. INSTALLATION OF A MINI-SPLIT HEATING AND AIR CONDITIONING UNIT Installation of a 4.5 kW-DC PV System, using: (10) PV Modules of (450W) + (10) ENPHASE MICROINVERTERS + New 125A IQ combiner panel Retrofit project with 1 Tesla PW3 ESS, Existing solar system installed, New 225A subpanel installed PV Roof Mount 2.835KW, 7 Modules, 1 Inverter, 1 Tesla PW3 ESS, (1)Tesla Backup Gateway Place rolloff dumpster in public right-of-way. Anticipated dates are: 09/26/25-10/03/2025, however, permit is to remain open until10/08/2025 in case of delays. Dumpster must be maintained in a clean and safe manner. Dumpster must be reflectorized. A copy of this permit must be placed on the dumpster. All work to be done to applicable City Standard Specifications & Engineering Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the dumpster is removed so the permit can be closed. PV Roof Mount 4.455KW, 11 Modules, 1 Inverter, 1 Tesla PW3 ESS, 1 Tesla PW3 Expansion pack Level 2 EV Charger Removal of gas water heater. Install electric hybrid water heater replacement. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. Sewer lateral replacement on private property in the utility easement in the back of the property. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. MASTER PLOT PLAN (PERMIT#FIRE-0705-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 299; PLOT PLAN 3; TRACT 3089 REPLACE WATER HEATER 4.4 kW DC + 1xESS Place rolloff dumpster in public right-of-way. Anticipated dates are: 10/15/2025-10/29/2025, however, permit is to remain open until 11/05/2025 in case of delays. Dumpster must be maintained in a clean and safe manner. Dumpster must be reflectorized. A copy of this permit must be placed on the dumpster. All work to be done to applicable City Standard Specifications & Engineering Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the dumpster is removed so the permit can be closed. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. Setup traffic control in City right-of-way related to a Caltrans project. Construction staging is in Caltrans right-of-way. Clean and CCTV pipes under Caltrans 05-1N3804 in Caltrans right-of-way. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Abandon existing water service and meter. Install new 1" water service to serve a new 1" water meter. All work to be done per BLDG-1042-2025 and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35663474. PG&E to trench to install conduit, install cable, abandon old conduit, and remove cable. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. NEW 13.5 KWH TESLA POWERWALL AND BACK UP SWITCH Remove existing failed waterproof decking systems at Upstairs Unit-3 Backyard Upper Deck and Upstairs Unit-4 Backyard Upper Deck. Repair and replace any damaged or deteriorated framing members in kind, per inspection report findings. Reinstall new waterproof deck systems over the existing wood framing to restore structural integrity and provide proper waterproofing protection. All repairs will match existing structural configuration unless otherwise noted in the inspection report. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. Place POD storage container in public right-of-way. Anticipated dates are: 12/11/25-12/23/25, however permit is to remain open until 12/29/25 in case of delays. POD must be maintained in a clean and safe manner. POD must be reflectorized. A copy of this permit must be placed on the POD. All work to be done to applicable City Standard Specifications & Engineering Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the POD is removed so the permit can be closed. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. Install driveway approach, sidewalk, curb, and gutter. Work may include utility service connections or replacements, all within the sidewalk area only. All work to be done per the building plans, BLDG-2022-2024, fire plans, FIRE-0640-2025, and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Abandon existing water service at the main in the street and abandon water meter box. Trench to install a new 2" water service lateral to serve four new 1" water meters; a utility work-order must be obtained from the Building Division, building@slocity.org, prior to the installation of the water meters. Replace sidewalk panels related to water service lateral and sewer lateral; contractor and Public Works inspector to coordinate on sections of required and possibly voluntary concrete frontage replacement. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached traffic control plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. General tree maintenance. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Replacement of 1 window. No Construction. No Framing. Like for like. NEW NEON SIGN Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations will be performed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made for holidays as needed. Contractors must schedule wye installations by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. Remove two layers of existing asphalt shingles, plus one layer of wood shingles. Install 7/16 OSB sheathing. Install GAF HDZ (limited life-time) asphalt shingles with GAF Pros-starter. Add on ESS to existing PV system ESS:1 PV Roof Mount 2.835, 7 Modules, 1 Inverter, 1 Tesla PW3 ESS, 1 Tesla PW3 Expansion pack, Existing solar system installed Remove existing system. Install new air handler with MERV11 filter in attic, new supply and return ducting, and outdoor condenser on roof with electrical and refrigerant connections. Install 9K wall-mount head in master bedroom with new pad-mounted condenser. All lines sealed, wired, and tested for proper operation. we are upgrading existing fire alarm system MASTER PLOT PLAN (PERMIT#FIRE-0706-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 233; PLOT PLAN 4; TRACT 3089 Install new 1" water service lateral from the main in the street to serve a new 1" water meter. All work to be done per BLDG-0141-2025 and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Place concrete pump hose across the sidewalk. Ramp over the hose to keep sidewalk open. Work shall be between 7:00 am and 11:00 am for one morning only. Work is not approved after 11:00 am. The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications for details (attached). All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. WATER HEATER Install Lennox Dual Fuel System, Furnace and evaporator coil. New install heat pump. Furnace is a changeout. Installation of a 4.95 Kw DC Pv system, Using (11) Pv modules of 450W + (11) Enphase MicroInverters. Plan 2B. NON-ILLUMINATED MONUMENT SIGN Installation of Level 2 EV Charger NFPA 13D Fire Sprinklers MASTER PLOT PLAN (PERMIT#FIRE-0704-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 231; PLOT PLAN 2; TRACT 3089 PV solar roof mount, 8 modules, 3.28kw, comps shingles, existing 200A MSP, 5.0kw SolarEdge battery, BUI General tree maintenance. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. ADDITION OF ONE 13.5 KW (ESS) ENERGY STORAGE SYSTEM AND ASSOCIATED HARDWARE TO THE MAIN DWELLING UNIT Addition of one 13.5 kWh (ESS) Energy Storage System and associated hardware to the main dwelling unit A separate encroachment permit with separate fees is required for the concrete work from the approved Building plans. Trench for new gas line from the main in the street; SoCal Gas will install. Remove and abandon existing water service, water meter, and water meter box. Install 2" water lateral in the street to serve four new 1" water meters. Replace sewer lateral to the main using trenchless technology, upsizing from 4" to 6". Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. Install 48A Tesla Universal Wall Connector on interior of garage on 60A circuit. RETROFIT PROJECT WITH 1 TESLA PW3 ESS MASTER PLOT PLAN (PERMIT#FIRE-0704-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 226; PLOT PLAN 2; TRACT 3089 NFPA 13D Fire Sprinklers MASTER PLOT PLAN (PERMIT#FIRE-0703-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 227; PLOT PLAN 1; TRACT 3089 Replace rooftop HVAC units DEMO EXISTING RESIDENCE (580 SF) DEMO EXISTING WORKSHOP (416 SF) MASTER PLOT PLAN (PERMIT#FIRE-0704-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 224; PLOT PLAN 2; TRACT 3089 Kitchen Remodel - All items to remain AS-IS. Electrical to comply with 2022 Electrical Code. MASTER PLOT PLAN (PERMIT#FIRE-0704-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 222; PLOT PLAN 2; TRACT 3089 MASTER PLOT PLAN (PERMIT#FIRE-0703-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 223; PLOT PLAN 1; TRACT 3089 Install Level 2 EV Charger INSTALL TESLA POWERWALL 3 WITH TESLA BACKUP SWITCH AND SPAN SMART PANEL ON INTERIOR OF GARAGE MASTER PLOT PLAN (PERMIT#FIRE-0703-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 230; PLOT PLAN 1; TRACT 3089 MASTER PLOT PLAN (PERMIT#FIRE-0703-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 225; PLOT PLAN 1; TRACT 3089 ADDITION OF ONE 13.5 KW (ESS) ENERGY STORAGE SYSTEM AND ASSOCIATED HARDWARE TO THE MAIN DWELLING UNIT INSTALL LEVEL 2 ELECTRIC VEHICLE CHARGER PV Roof Mount 3.645KW, 9 Modules, 1 Inverter, 1 Tesla PW3 ESS, (1) 200A Tesla PW3 Backup Gateway Photovoltaic System (22.79kW) / 53 Modules. MASTER PLOT PLAN (PERMIT#FIRE-0700-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 228; PLOT PLAN 3; TRACT 3089 Replacement of 2 patio doors. No Construction. No Framing. Like for like. MASTER PLOT PLAN (PERMIT#FIRE-0704-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 229; PLOT PLAN 2; TRACT 3089 Place rolloff dumpster in public right-of-way. Anticipated dates are: 09/12/25-09/19/25, however, permit is to remain open until 09/26/25 in case of delays. Dumpster must be maintained in a clean and safe manner. Dumpster must be reflectorized. A copy of this permit must be placed on the dumpster. All work to be done to applicable City Standard Specifications & Engineering Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the dumpster is removed so the permit can be closed. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. Replacement of 1 patio door PV solar roof mount, 10Mods, 4.05kw, Comp shingles, Existing Subpanel 100A, TESLA Powerwall3 Remove and replace two driveway approaches. Install fire service lateral. Pothole utilities. All work to be done per the approved GRAD-0914-2024 plans and to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. EMERGENCY GAS LINE REPAIRS - UNITS 110, 130, 150, 160, 190, 200, 220, 280, & 290 Remove the existing BUR roof and felt liner down to the wood decking. Inspect the wood decking and replace as needed. And any wood damage. Replace Zinsco sub panels for insurance purposes. Panels will be replaced in the same location with no added load. New Photovoltaic System 7.31kW ESS:1 Restucco and replacement of windows and exterior doors with like kind. PV INSTALL 11.48KW DC 28 MODULES, 1 INVERTER 1 ESS Install 32A Tesla Universal Wall Connector on interior of garage on 40A circuit. Remove existing roof on back house, Install 15/32 osb sheathing and install new class A comp shingle roof ADDITION OF 1 13.5 KWH (ESS) ENERGY STORAGE SYSTEM AND ASSOCIATED HARDWARE TO THE MAIN DWELLING UNIT Installing 9BTU ductless mini split w/ (2) air handlers (9btu each)+ 220V electric circuit Install 48A Tesla Universal Wall Connector on exterior of house on 60A circuit. Install 48A Tesla Universal Wall Connector on interior of garage on 60A circuit. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. TEMPORARY POWER POLE MASTER PLOT PLAN (PERMIT#FIRE-0706-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 218; PLOT PLAN 4; TRACT 3089 INSTALL 2 DISCONNECTS AT LAUNDRY AREA Retrofit Windows and SGD, no modification to structure Staging in the public right-of-way for tenant improvements. The deferred submittal for frontage improvements must be approved with printed plans given to the Public Works inspector prior to the start of any sidewalk work. The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications for details (attached). No traffic control setup, noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed and approved by the Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. A pre-construction meeting is required; call 805-781-7554 to coordinate. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Remove old comp and replace with new, replace some sheathing Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. Install 10.13kW roof mount photovoltaic system, Energy storage system (1), (1) EV charger Place POD storage container in public right-of-way. Anticipated dates are: 09/23/25-10/07/25, however, permit is to remain open until 10/14/25 in case of delays. POD must be maintained in a clean and safe manner. POD must be reflectorized. A copy of this permit must be placed on the POD. All work to be done to applicable City Standard Specifications & Engineering Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the POD is removed so the permit can be closed. Place U-Haul boxes in public right-of-way. Anticipated dates are: 07/03/25-07/05/25, however, permit is to remain open until 07/11/25 in case of delays. U-Haul boxes must be maintained in a clean and safe manner. U-Haul boxes must be reflectorized. A copy of this permit must be placed on the U-Haul boxes. All work to be done to applicable City Standard Specifications & Engineering Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the U-Haul boxes are removed so the permit can be closed. 6.5KW Rooftop Microinverter PV Solar System w/ ESS Trenching new 1" water service lateral from the main in the street to serve new 1" water meter. Trenching to install new sewer lateral from the main in the street to the property. This permit is for utility work only; a separate encroachment permit with separate fees is required for concrete work described on the approved plans. A separate building permit is required for any sewer lateral replacement on private property. All work to be done per BLDG-2838-2018 and to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. Addition of one 13.5 kWh (ESS) Energy Storage System and associated hardware to the main dwelling unit Remove existing floor furnace and installing a new forced air unit and heat pump condenser and all new ducting DECK REPAIR - UNIT F 4.555 kW DC Roof Mount Photovoltaic System, Sub Panel, EV Charger(1) Minor interior remodel of bathroom and replace existing pest damaged deck. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. Replace gas furnace with ducted Heat-pump; existing location MASTER PLOT PLAN (PERMIT#FIRE-0704-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 221; PLOT PLAN 2; TRACT 3089 INSTALL QTY 2 SETS OF HALO LIT LED CHANNEL LETTERS Change existing 100 amp panel to a new 200 amp panel in the same location HVAC Heat pump Mitsubishi install to replace existing furnace Replacement of Gas Furnace and duct work Like for like water heater replacement Install new 1" water service lateral to serve a new 1" water meter. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done per PLREV-0540-2025 and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. PV Roof mount 3.28KW, 8 Modules, 1 Inverter, 1 Tesla PW3 ESS, Main Breaker Upsize SEWER LATERAL REPLACEMENT Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. Install a 93.81kW roof mounted grid-tied solar photovoltaic (PV) Main water service line and whole house Repipe & Water Heater-From existing PVC near main, dig trench to side of home location, run pipe from pvc connection to riser location. Build main riser with ball valve, PRV, hose bib. Penetrate through exterior and up wall into attic area. From attic run control service line through attic and install drops for Master bathroom, kitchen, hallway bathroom, laundry room. Install angle stops, shower valves, reconnect existing fixtures. -Outside run water line from home and following the fence line and install hose bib on riser for both the pool side and the pump side for water access -Water heater will be brought up to code -Shut off water to existing unit and drain down -Remove existing water heater -Install 30 gallon natural gas Bradford white water heater -Install T&P, gas sediment drip leg, expansion tank, EQ straps -Turn on unit and purge air from system -Check for leaks and operation 2 commercial trucks in 10-hour meters Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. Replace existing hood suppression system Replace existing furnace with ducted heat-pump, like-for-like; existing location. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. REPLACE EXISTING OUTSIDE WATER SUPPLY LINE FROM WATER METER NEAR CURB TO FRONT PORCH HOSE BIB AT HOUSE W/1INCH; SCHEDULE 40 PVC W/BLUE TRACER WIRE AS DIAGRAMMED BELOW (~65 FOOT INSTALL). INSTALL COPPER RISER AT THE HOUSE W/NEW BALL VALVE & HOSE BIB. Install new 1" water service lateral from the main in the street via trenching to feed a new 1" water meter to serve new ADU. All work to be done per BLDG-0818-2024 and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. PROVIDE NEW DETICATED 200A 480V 3PHASE ELECTRICAL SERVICE TO FEED THREE EXISTING ELECTRIC FORKLIFT CHARGING STATIONS. Project address: 231 FOXTROT COURT, SAN LUIS OBISPO, CA, 93401. Avila Ranch Lot 218. Installation of a 5.4 kW-DC PV System, using (12) CANADIAN SOLAR MODULES + (12) ENPHASE Microinverters. Roof mounted solar 4.92 & 1 Energy storage system PV Roof Mount 3.69KW, 9 Modules,1 Inverter, 1 Tesla PW3 ESS Install EV Charger (1) Install 48A Tesla Wall Connector on exterior of garage on 60A circuit. Replace Existing Wood Retaining wall with poured concrete wall PV Roof Mount 6.48KW, 16 Modules, 1 Inverter, 1 ESS General tree maintenance. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Project address: 221 FOXTROT COURT, SAN LUIS OBISPO, CA, 93401. Avila Ranch Lot 215. Installation of a 4.95 kW-DC PV System, using (11) CANADIAN SOLAR MODULES + (11) ENPHASE Microinverters. Installing new electrical panel. We are keeping the panel in the same place it is at currently. NEW ROOF MOUNTED PV SYSTEM: 4.100 kW DC, 11.500 kW AC NEW ENERGY STORAGE SYSTEM: 13.500 kWh Place POD storage containers (2) in public right-of-way. Anticipated dates are: 08/22/25-08/25/25, however, permit is to remain open until 09/02/25 in case of delays. POD must be maintained in a clean and safe manner. POD must be reflectorized. A copy of this permit must be placed on the POD. All work to be done to applicable City Standard Specifications & Engineering Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the POD is removed so the permit can be closed. OFFICE TO SFR CONVERSION Staging for tree removal. A separate tree removal permit is required. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Install 48A Tesla Wall Connector with Load Management on exterior of garage on 60A circuit. Install 48A Tesla Wall Connector on interior of garage on 60A circuit. PV Roof Mount 7.38KW, 18 Modules, 1 inverter, 1 Tesla PW3 ESS, 1 Tesla PW3 Expansion pack Project address: 240 FOXTROT COURT, SAN LUIS OBISPO, CA, 93401. Avila Ranch Lot 223. Installation of a 4.95 kW-DC PV System, using (11) CANADIAN SOLAR MODULES + (11) ENPHASE Microinverters. Add a 2x4 skylight in master bath. Place Uhaul pod storage container in public right-of-way. Anticipated dates are: 08/08/25-08/12/25, however permit is to remain open until 08/20/25 in case of delays. Uhaul pod must be maintained in a clean and safe manner. Uhaul pod must be reflectorized. A copy of this permit must be placed on the Uhaul pod. All work to be done to applicable City Standard Specifications & Engineering Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the Uhaul pod is removed so the permit can be closed. CONVERT EXISTING ATTACHED 2-CAR GARAGE TO ADU (436 SQ. FT.) Interior remodel within an existing structure for business occupancy. New commercial NFPA 13 wet sprinkler system NEW GARAGE W/NEW SECOND STORY ADU ABOVE GARAGE addition to living room and kitchen The project scope consists of an interior remodel to an existing Whole Foods Market. The project includes the modification of an existing scullery and equipment. There will be no change in occupancy, use, exits, or travel distance. PG&E PM # 35582438. PG&E to install conduit, remove/install new UG cable, replace spliceboxes, and install meter. Work is in the sidewalk. Standard working hours are 7am-4pm. The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications for details (attached). No traffic control setup, noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed and approved by the Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35061860. PG&E to complete roadway asphalt restoration. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35652330. PG&E to install OH service and remove cable. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. AT&T job # A05A7WL. AT&T to access sub-box # 1055 and PFP. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35599732. PG&E to remove cable out of conduit. Standard working hours are 7am-4pm. A separate Caltrans permit must be obtained prior to the start of work. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35608255. PG&E to remove and install new cable and install meter. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sprouse Communication for Charter-Spectrum after-the-fact permit to replace bad cable. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Chorro CMP Replacement project, CIP Specification No. 2090742-11. All work to be done per City CIP Spec. No. 2090742-11 and City Standard Specifications & Engineering Standards. A traffic and pedestrian control plan must be submitted, reviewed, and approved prior to each phase of the work. Traffic and pedestrian controls must be per an approved plan and City Appendix G & MUTCD Standards. Contact City Public Works inspector Bobby Browning at 805-540-1031 to coordinate job inspections and information. Permittee is responsible for calling for final inspection so the permit can be closed. Grind removal of existing striping, install new striping, and remove existing signs at 3 locations, PO # 623253. All work to be done per PO # 623253 and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call Public Works inspector Chase Montoya at 805-540-8655 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E after-the-fact permit for emergency tree trimming. Work took place on 08/12/25. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 31739419. PG&E to replace rotten crossarm and replace damaged connectors. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Tree removal on Buena Vista. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call Nick Niles at 805-540-0895 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Install Charter/Spectrum conduit to service 3426 Empresa building. Work includes trenching in the dirt and boring a missile behind the back-of-sidewalk. Bore depth must be per City Engineering Standards, which is 7' below top-of-curb or 3' minimum below crossing utilities, whichever is deeper. All work to be done per the attached plans and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Foothill-Santa Rosa Sewerline Replacement Project, CIP Specification No. 2000096. All work to be done per City CIP Spec. No. 2000096 and City Standard Specifications & Engineering Standards. A traffic and pedestrian control plan must be submitted, reviewed, and approved prior to each phase of the work. Traffic and pedestrian controls must be per an approved plan and City Appendix G & MUTCD Standards. Contact City Public Works inspector Bobby Browning at 805-540-1031 to coordinate job inspections and information. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35638851. PG&E to install service cable and install transformer. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Tree removal. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call Nick Niles at 805-540-0895 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35659544. PG&E to replace pad-mounted transformer. Standard work hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35641868. PG&E to replace pole (same hole), install OH transformer, and install OH service cable. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 31623470. PG&E to replace damaged insulator and tie wire on existing OH electrical pole. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 46525317. PG&E to repair damaged enclosure. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. AT&T job # A059518. AT&T to access manhole # 3903 and aerial placement. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35638992. PG&E to install service cable, upgrade transformer, and install secondary breakers. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. SoCal Gas work order # 540000642494. SoCal Gas after-the-fact permit for gas leak repair. Final paving is required for the permit to be finaled. Work requires (1) 3'x2' concrete cut. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35654670. PG&E to replace pole and anchor and preform vegetation management. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. SoCal Gas # 2042081360. SoCal Gas to abandon and install gas lines. Work requires (1) 2'x3' asphalt cut to abandon the gas line, and (1) 3'x4' asphalt cut and (1) 2'x24' asphalt cut to install the gas line. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E after-the-fact permit for emergency tree trimming. Work was completed on 08/22/25. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. AT&T job # A05A6AM. AT&T to access sub-box # 1124. The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications for details (attached). No traffic control setup, noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed and approved by the Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. N Chorro Greenway Chorro St and Peach St Median Modification, CIP Specification No. 2000036-08. All work to be done per City CIP Spec. No. 2000036-08 and City Standard Specifications & Engineering Standards. A traffic and pedestrian control plan must be submitted, reviewed, and approved prior to each phase of the work. Traffic and pedestrian controls must be per an approved plan and City Appendix G & MUTCD Standards. Contact City Public Works inspector Bobby Browning at 805-540-1031 to coordinate job inspections and information. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35639631. PG&E to install OH transformer, install OH service cable, install secondary, and replace transformer. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35637689. PG&E to replace pole, install OH transformer, replace span guy, and install service cable. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. AT&T job # A059PRT. AT&T to access manholes # 7602 and 458 and sub-boxes # 444 and 410. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35645688. PG&E to replace pole (same hole set), install OH service cable, install secondary breakers, and install tx. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. AT&T job # A058ZCT. AT&T to access manhole # 7702 and sub-boxes # 7702E and # 7702F. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Set up traffic control to trim bottlebrush hedge on Madonna between Oceanaire and Los Osos Valley Road. Work is for the City and is coordinated with Billy Harvey. Traffic control must be per the attached plan and City Appendix G and MUTCD standards. Anticipated dates are: 7/7/2025-7/8/2025. All work to be done per the attached plans and City Standard Specifications & Engineering Standards. Contact the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35638613. PG&E to replace OH electrical pole. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. SoCal Gas NOT # 2043330809. SoCal Gas to perform service abandonment. Work requires (1) 2'x 4' asphalt cut. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35564930. PG&E to install fault indicator, remove and pull new UG cable. Standard working hours are 7am-4pm. Work must be complete before 08/13/2025. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. General tree work. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sprouse Communication for Charter-Spectrum to overlash fiber. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Inspect/clean PG&E subsurface equipment PM 46580415. Work requires access through City of San Luis Obispo right-of-way. All work to be done per the attached plans and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35411723. PG&E to install cable in conduit, remove UG conductor, deactivate conduit, install small OH equipment, and remove equipment. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sprouse Communication for Charter-Spectrum to pull cable through existing conduit. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Astound Broadband LLC to pull fiber through existing UG, wyecast and tie into existing conduit, and place new vault. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35557194. PG&E to install open point, replace pole, install OH cable, and install transformer. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35488216. PG&E to complete concrete restoration on sidewalk on pole anchor. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Off-site sidewalk repairs on Slack and Henderson related to ENCR-0470-2024. All work to be done per the attached plans and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. AT&T job # A0586LG. AT&T to remove aerial cable, remove pole, remove anchor/downguy, place anchor/downguy, and access sub-box. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 45611443. PG&E to install transformer, replace 2 poles, and install OH cables. Restricted work hours; see attached traffic control plan. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35642155. PG&E to replace (2) poles, upgrade transformer, install secondary, span guy and service cable. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sprouse Communication for Charter-Spectrum to overlash cable. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sprouse Communication for Charter-Spectrum to pull ug cable through existing conduit. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Avila Ranch Tract 3089 Phase 5 Public Improvements. All work to be done per the approved FMAP-0382-2022 plans and City Standard Specifications & Engineering Standards. A traffic and pedestrian control plan must be submitted, reviewed, and approved prior to each phase of the work. Traffic and pedestrian controls must be per an approved plan and City Appendix G & MUTCD Standards. Contact City Public Works inspector Trae Christensen at 805-458-1339 to coordinate job inspections and information. Permittee is responsible for calling for final inspection so the permit can be closed. AT&T job # A05AEGN. AT&T to transfer existing facilities from old poles to new poles and remove the old poles. Remove and restore panel(s) concrete sidewalk. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. AT&T job # A059622. AT&T to access pole # 00046 and sub-box # 1301. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sprouse Communication for Charter-Spectrum after-the-fact permit to replace broken pole. Any final paving (if any) is required to be completed for permit to be finaled. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Four 2-inch in diameter CPT soundings for the Prado Road Interchange project. Backfill to be per City Standards. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. After-the-fact permit for SoCal Gas for gas leak repair. Final paving is still required for this permit to be finaled. Work required (1) 3'x2' asphalt cut. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Bob Jones Trail Groundwater Well Drilling, Construction and Testing project, Specification No. 2091506. All work to be done per CIP Specification No. 2091506 and City Standard Specifications & Engineering Standards. A traffic and pedestrian control plan must be submitted, reviewed, and approved prior to each phase of the work. Traffic and pedestrian controls must be per an approved plan and City Appendix G & MUTCD Standards. Contact City Public Works inspector James Yanez at 805-503-8011 to coordinate job inspections and information. Permittee is responsible for calling for final inspection so the permit can be closed. AT&T job # A0591FB. AT&T to access manhole # 7210 and sub-boxes # 7210A, 7210 B, and 7210C. This work must be preformed at night. A separate night work permit from the Planning Division is required. Night work schedule must be coordinated ahead of time with the Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. A check for 40 hours of Public Works overtime inspection fees has been received. <On 07/10/2025, permit updated to include traffic control figure 6H-105(CA) to be used in conjunction with Figure M (see attached) to be used at locations # 5 and 6.> PG&E PM # 2010338. PG&E to complete tree trimming at 6 locations and after-the-fact emergency tree trimming for 14 locations. Final work hours and dates to be confirmed with construction inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. New Photovoltaic System 12.04kW ESS2 EV:1 MAIN HOUSE - VOID PG&E PM # 46558621. PG&E to replace anchor on pole. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. SoCal Gas NOT # 2043569812. SoCal Gas to abandon service. Work requires (1) 4'x2' asphalt cut. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35649663. PG&E to replace fuse. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Tree removal. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call Nick Niles at 805-540-0895 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. SoCal Gas work order # 520004134842. SoCal Gas to perform main leak repair. Work requires (1) 3' x 2' asphalt cut. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. AT&T job # A058EWX. AT&T to access manholes # 3805 and 3111. Night work is required for this work. A check for 25 hours of Public Works overtime inspection fees has been received. Must coordinate night work schedule with the Public Works inspector ahead of the work. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. SoCal Gas NOT # 33216894. SoCal Gas to perform meter curb box installation. Work requires (1) 4'x3' earth cut. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 2010338. PG&E to trim trees for routine maintenance. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 31744207. PG&E to replace damaged lighting arrestors and faded operating number signage. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35587150. PG&E to replace insulators/hardware on (3) towers on Margarita. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35622545. PG&E to conduct OH maintenance and repair/replace broken switch. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Turn Around Communication for Charter-Spectrum to overlash fiber cable on existing poles and strand, and pull fiber through existing conduit. No new poles or anchors are permitted with this work. Permittee must obtain permission from the utility pole owner(s)/PG&E to attach. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35639119. PG&E to replace subsurface transformer and clean out debris in enclosure. Work on El Mercado. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35532720. PG&E to remove overhead fuse. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35081651. PG&E to replace pole. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 31737285. PG&E to replace damaged connector, crossarm, and insulator. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. AT&T job # A058KYT. AT&T to access manholes # 7108, 1204, 7106 and sub-boxes # 577 and 579. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 46527555 and previously 46528366. After-the-fact PG&E permit for repaired cave in at side of enclosure that exposed primary cables. Any additional work (if any) will require final paving. Work was done 05/27/2025. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35592963. PG&E to perform work on private property. Work requires traffic control set up in City right-of-way. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 2010338. PG&E to trim trees at multiple locations. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 31743396. PG&E to replace crossarm/trim vegetation. Final scheduling must be confirmed with the Public Works inspector prior to the start of work. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Turn Around Communication for Charter-Spectrum to install fiber cable through existing utility vaults and existing conduit. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 31754141. PG&E to do OH work and make repairs to tie wire and install new crossarm. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Upgrade PG&E transformer - PM #35644833 and PM #35637338. All work to be done per the attached plans and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be the attached and approved plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 2010338. PG&E to perform routine tree maintenance. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Grand Avenue Sign & Striping Modifications, CIP Specification No.2000615-01. All work to be done per City CIP Spec. No. 2000615-01 and City Standard Specifications & Engineering Standards. A traffic and pedestrian control plan must be submitted, reviewed, and approved prior to each phase of the work. Traffic and pedestrian controls must be per an approved plan and City Appendix G & MUTCD Standards. Contact City Public Works inspector Bobby Browning at 805-540-1031 to coordinate job inspections and information. Permittee is responsible for calling for final inspection so the permit can be closed. Install Pacific Beach High School Improvements on Vicente Drive. Work includes installation of two driveway approaches, one driveway approach abandonment, sewer lateral installation, abandonment of two sewer laterals, installation of fire service lateral, and abandonment of one water service lateral. All work to be done per the approved FMAP-0005-2024 plans and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. SoCal Gas NOT # 2043562315. SoCal Gas to replace service. Work requires (1) 4'x3' asphalt cut. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 2010338. PG&E to trim trees. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Greenvale Tree Co to string loose and fallen strands of lights in trees. All business access must be retained during work. The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications for details (attached). No traffic control setup, noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed and approved by the Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the previously approved TCP and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Tree trimming along Higuera and Marsh. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call Eric Baker at 805-781-7014 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. SECURITY FENCING AROUND PROPERTY SoCal Gas NOT # 2043562314. SoCal Gas to perform service replacement. Work requires (1) 4'x3' asphalt cut. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. AT&T job # A05CATN. AT&T to access manhole # 3206 on Marsh. Due to the Downtown area's holiday moratorium, no work is allowed to occur between 11/27/25-01/01/26. The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications for details (attached). Proof of notice distribution must be provided to the Public Works inspector prior to the start of work. No traffic control setup, noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed and approved by the Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. SoCal Gas NOT # 2043562316. SoCal Gas service replacement. Work requires (1) 4'x3' asphalt cut. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. SoCal Gas work order # 520004102634. SoCal Gas to preform main leak repair. Work requires (1) 3'x2' asphalt cut. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Perform (3) geotechnical borings to depth of 10 ft for the City's Chorro St Waterline Upgrade project, Spec No. 2001040. All work to be done per Spec No. 2001040 and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Tenant Improvement of an existing office building. Work to include minor electrical work, minor mech/plumb. work and no structural work. No additional square footage space to be added. CITY PROJECT PG&E PM # 2010338. PG&E to trim trees. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 2010338. PG&E to trim tree. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35660466. PG&E to close road for work requiring crane. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Traffic control set-up in City's right-of-way. This work will also require an encroachment permit from Caltrans. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Tearoff and install of new composition and single ply roofing system of pool house & shed. PG&E PM # 2010338. PG&E to trim tree. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35633936. PG&E to replace pole, install OH transformer, replace anchor, and install conductor. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 2010338. PG&E to trim trees. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Turn Around Communication for Charter-Spectrum to replace an existing broken vault with a new vault. Work will occur in the Palmmill Alley. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35622653. PG&E to attempt to repair switch in existing subsurface enclosure; will replace if needed. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sprouse Communication for Charter-Spectrum to overlash fiber on existing poles. No new poles or anchors are permitted with this work. Permittee must obtain permission from the utility pole owner(s)/PG&E to attach. Traffic control is only approved for work on the Madonna frontage road; if any work extends onto Madonna (arterial), a site-specific tcp is required to be submitted and approved by the Traffic Division. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 2010338. PG&E to trim trees. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. SoCal Gas NOT # 2043680022. SoCal Gas to abandon service. Work requires (1) 4'x2' asphalt cut. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. AT&T job # A05AEHY. AT&T to transfer existing facilities from old pole to new pole and remove old pole. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35674451. PG&E to replace OH pole, install OH transformer, remove and install OH service cables. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E after-the-fact permit for emergency tree trimming on California in relation to PM # 2010338. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35664085. Traffic control to be in right-of-way for work on private property. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35694702. PG&E to replace pad mounted interrupter. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35218755. PG&E to replace fuse. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. <On 10/13/2025, permit updated to include updated traffic control to repair pit.> AT&T job # A05BC3M. AT&T to access manhole # 153. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. RE ROOF LIKE FOR LIKE - VOIDED REPLACING SHINGLES ONLY PG&E PM # 2010338. PG&E to trim trees. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Install and remove holiday lighting/decorations. Install to take place 11/10/2025-11/13/2025 and removal to take place 01/05/2026-01/06/2026. No noise is allowed to take place during the install or removal of holiday lighting/decorations that would disturb tenants or neighbors. Permittee must coordinate with Downtown SLO (Downtown Association). The permittee is required to notify affected tenants of construction/staging; refer to page 26 of City Standard Specifications for details (attached). All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved plans and City Appendix G & MUTCD Standards. TEST PG&E PM # 35615485. PG&E to flag to install new pole, transformer cable through conduit, and install OH secondary. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 2010338. PG&E to trim trees. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. SoCal Gas work order # 540000612841. SoCal Gas after-the-fact permit for emergency leak repair. Work requires (1) 5'x4' concrete cut. Final paving is required for the permit to be finaled. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. AT&T job # A05BRWG. AT&T to access sub-box # 1124 and manhole # 7107. Due to the Downtown area's holiday moratorium, no work is allowed to occur between 11/27/25-01/01/26. The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications for details (attached). Proof of notice distribution must be provided to the Public Works inspector prior to the start of work. No traffic control setup, noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed and approved by the Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35644055. PG&E to pull cable through conduit and install equipment. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sprouse Communication for Charter-Spectrum to overlash existing cable, riser down, and pull fiber through existing duct. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. AT&T job # A059T52. AT&T to remove sub-box # 4033 and replace it with BV # 4033. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 2010338. PG&E to perform tree maintenance at multiple locations. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 2010338. PG&E to perform routine maintenance on trees. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. SoCal Gas NOT # 2043663352. SoCal Gas to replace gas services at 688 and 672 Branch. Work requires (6) 4'x2' asphalt cuts. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 2010338. PG&E to trim tree on Johnson. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 2010338. PG&E to trim trees at multiple locations. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sprouse Communication for Charter-Spectrum to overlash new fiber aerial to new node location. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Remove (2) existing cabinets. Install new 20kw diesel generator VOID APPLICANT FOUND PREVIOUS PERMIT WITH COUNTY with a 54-gallon fuel tank in its place. Install new 400A disconnect and fire extinguisher Tree removal. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call Nick Niles at 805-540-0895 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. AT&T job # A059QAB. AT&T to access manhole # 7105, sub-boxes # 3605C and 3605d, and pole # 01234. The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications for details (attached). No traffic control setup, noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed and approved by the Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35562489. PG&E to replace damaged OH electrical pole, cross arms, and connectors. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. 2025 Paving Project, CIP Specification No.2000616. All work to be done per City CIP Spec. No. 2000616and City Standard Specifications & Engineering Standards. A traffic and pedestrian control plan must be submitted, reviewed, and approved prior to each phase of the work. Traffic and pedestrian controls must be per an approved plan and City Appendix G & MUTCD Standards. Contact City Public Works inspector Bobby Browning at 805-540-1031 to coordinate job inspections and information. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35509517. PG&E to install pad-mount transformer, pull UG cable, and install service cable, termination, and fuses. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Traffic control setup up in City right-of-way for a Caltrans project at multiple locations for construction area signs. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. AT&T job # A058Q4F. AT&T to excavate sidewalk panels to extract (3) poles (#46, #50, and #56) and restore sidewalk. Excavate and restore additional sidewalk to remove old anchor/down-guy on pole #56 and install new anchor/down guy on pole #30. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. upgrade from 100 amp to 200amp REPLACING ELECTRICAL PANEL, MOVING TO OUTSIDE New EV Chargepoint Charger added to existing parking lot. 5.94kW Photovoltaic System W/ 13.5kWh ENERGY STORAGE SYSTEM Roof Mounted, Grid-Tied Upsize existing water lateral in the street from 3/4" to 1 1/4". Also upsize existing 5/8" water meter to 1" water meter. All work to be done per BLDG-0406-2025 and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. A tenant Improvement to an existing fire sprinkler system in wood building type v-b construction Like for like replacement; existing location Like for like replacement of package unit; existing location Remove and replace driveway approach, bringing the new driveway approach to ADA standards. Place rolloff dumpster in public right-of-way. Dumpster must be removed by 01/02/26. Dumpster must be maintained in a clean and safe manner. Dumpster must be reflectorized. A copy of this permit must be placed on the dumpster. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Abandon existing sewer lateral at the main in the street. Install new sewer lateral .Sewer wye installations and abandonments shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. Install new 1" water service lateral to serve new 3/4" water meter for 2096 McCollum. All work to be done per PLREV-0671-2025 and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Trenching to install (3) new 2" water service laterals and (1) new 1" water service lateral. A utility work order must be obtained prior to water meter installations; currently there is only 1 utility work order and future work orders must be obtained at a later date. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. 4.8kW PV solar with battery Addition to an existing single family residence for kitchen remodel and office expansion AT&T job # A057XGZ. AT&T to transfer existing facilities from old pole PG8685 to newly placed pole 121432958. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. New retaining wall AT&T job # A05CQE9. AT&T to access FAP. No work is to occur until after 01/02/2026. The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications for details (attached). Proof of notice distribution must be provided to the Public Works inspector prior to the start of work. No traffic control setup, noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed and approved by the Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sprouse Communication for Charter-Spectrum to directional bore to set new vault. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. ADDITION OF MASTER BEDROOM Install mini split in garage NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2B; LOT 226; PLAN CLUSTER 2C Voluntary Seismic Retrofit In Accordance with Plan Set (A) NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2B; LOT 227; PLAN CLUSTER 1B Conduct soil sampling. Full panels of sidewalk must be removed and replaced per City Engineering Standards unless the alternate proposed restoration method is approved. The restoration method must be approved by the Public Works inspector in advance of the work; call the Public Works inspection hotline at 805-781-7554 to schedule a pre-construction meeting. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PARTIAL REMODEL OF EXISTING SFR (KITCHEN, BATHROOMS, AND CREATING AN ADDITIONAL BEDROOM WITHIN EXISTING SPACE) (287 SQ. FT. LOWER REMODEL & 546 SQ. FT. UPPER REMODEL) Like for like furnace replacement Remove and replace driveway approach. Abandon existing water service lateral at the main in the street. Install a new 1" water service lateral to serve a new 1" water meter. Abandon the existing sewer lateral at the main in the street. Install a new sewer lateral in a new location. Install sidewalk underdrain. All work to be done per the approved building plans, BLDG-2074-2023, and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations or abandonments will be performed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made for holidays as needed. Contractors must schedule wye installations or abandonments by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. AT&T job # A05CR8N. AT&T to access sub-box # 1011. A separate Caltrans permit is required prior to the start of work. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Cut concrete to create nine street tree wells. All work to be done per the attached plans and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Install a new fire alarm communicator . PV Roof Mount 11.07KW, 27 Modules, 1 Inverter, 1 Tesla PW3 ESS, 1 Tesla PW3 Expansion pack-Withdrawn 3.24 kW DC Roof Mount Photovoltaic with Energy Storage (1) PG&E PM # 46656190. PG&E to clean underground enclosure next to sidewalk. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. INSTALL 1 EST ILLUMINATED WALL SIGN, 1 NON-ILLUMINATED WALL SIGN, REFACE 2 FREESTANDING POST, REFACE 2 WALL PANELS Modify railroad lighting circuit along the railroad safety trail behind California Highway Patrol building. This work has been coordinated with Bryan Wheeler from the Transportation Division. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. REPLACE APPROX. 20' OF 4" MAINLINE USING ABS PIPE AND FITTINGS PV Roof Mount 4.455KW, 11 Modules, 1 Inverter, 1 Tesla PW3 PV Roof Mount 5.74KW, 14 Modules, 1 Inverter, 1 Tesla PW3 ESS, Trenching Required Roof Mount 25.92 kW Photovoltaic System REMODEL BLDG A UNIT TYPE A REMODEL BLDG B TYPE B REMODEL BLDG A UNIT TYPE A REMODEL BLDG A UNIT TYPE A REMODEL BLDG B UNIT TYPE A Like for like replacement of HVAC unit Interior remodel of existing kitchen / den spaces (~330 sqft); enlargement of (2) existing doors and (1) existing window; addition of (1) new exterior door at kitchen; new 264 sqft deck. Remove and replace a panel(s) of sidewalk to replace a section of sewer lateral. The sewer lateral is not being replaced all the way to the main in the street at this time. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Modify/Install fire sprinklers 131 sprinklers PV Roof Mount 12.96KW, 32 Modules, 3 Inverter, 3 Tesla PW3 ESS PV Roof Mount 3.28KW, 8 Modules, 1 Inverter, 1 Tesla PW3 ESS, DC Trenching required Addition of one 13.5 kWh (ESS) Energy Storage System and associated hardware to the main dwelling unit WINDOW REPLACEMENT & STUCCO REPAIR REPLACEMENT WIDNOW(1) ELECTRICAL PANEL REPLACEMENT. NO ADDED LOADS METER PANEL REPLACE LIKE FOR LIKE SAME LOCATION Installation of a ESS /PV system on a SFR. 8.1 KW of roof mounted solar (18 Panels) and 13.3 kWh of Battery storage. with a Sol-Ark 15 kw Battery/PV Inverter charger. NEW 4.5 KW DC PHOTOVOLTAIC SYSTEM WITH ESS STORAGE 13.5KWH Minor remodel of Deli area - removing and adding. 11.34 kW DC Roof Mount Photovoltaic System with Energy Storage (2),EV Charger (1) Service Relocation to New ADU 200amp Like-for-Like (N) SPA (INNER 6'X6') RAISED 2' ABOVED GROUND (N) EQUIPMENT PAD 3'X8' (N) EQUIPMENT REPAIR FRONT PORCH DECK AS NECESSARY PG&E PM # 46593128. PG&E to install bird protection on pole. Work should be scheduled when school is not in session. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. REPLACEMENT WINDOWS/SG DOOR Installation of a 5.4 Kw DC roof mount Pv system, Using (12) Pv modules of 450W + (12) ENPHASE IQ8PLUS-72-M-US microinverters. General tree maintenance. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. The proposed project includes a partial remodel and addition to an existing 1,005-sf single family residence. The proposed improvements include converting an existing partially enclosed 446 sq. ft. 2-car carport into a fully enclosed 2-car garage, and converting an existing non-conditioned 228 sq. ft. laundry room into a conditioned bathroom. The proposed improvements also include the addition of a 206 sf bedroom. CONVERSION OF AN ADDITION TO A SFR TO AN ADU Roof mounted solar 4.2 KW & 1 Energy Storage system CONVERSION OF GARAGE TO AN ADU (496 SQ. FT.); PM #46593135 - PG&E to install bird protection on pole located next to road. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Work must be scheduled to not conflict with school drop-off or pick-up times. PM #46592392 - PG&E to repair conductor on pole next to road. Pole located on Lizzie St side of property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. SoCal Gas NOT # 2043806738. SoCal Gas to abandon service. Work requires (1) 4'x2' asphalt cut. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. TENANT IMPROVEMENT ON THE 2ND FLOOR OF AN (E) COLD SHELL BUILDING TO INCLUDE A NEW OFFICE AND WARM SHELL IMPROVEMENTS IN THE REMAINDER OF THE 2ND FLOOR SPACE SoCal Gas NOT # 2043731271. SoCal Gas to replace service. Work requires (1) 2'x2' cut in concrete, (1) 4'x2' cut in asphalt, and (2) 2'x2' cuts in asphalt. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. REMODEL BLDG G TYPE A REMODEL BLDG G TYPE A REMODEL BLDG G TYPE A REMODEL BLDG G TYPE A REMODEL BLDG C UNIT TYPE A REMODEL BLDG C UNIT TYPE A REMODEL BLDG E UNIT TYPE A Installation of a 4.5 kW-DC PV System, using (10) Modules + (1) EP CUBE HYBRID INVERTER + BATTERIES 9.9KWh + New 100A Subpanel. REMODEL BLDG G TYPE A REMODEL BLDG F TYPE A REMODEL BLDG F TYPE A REMODEL BLDG D UNIT TYPE A REMODEL BLDG D UNIT TYPE A REMODEL BLDG E UNIT TYPE A REMODEL BLDG D UNIT TYPE A REMODEL BLDG D UNIT TYPE A New detached ADU Studio, 2-Story Residential Structure RESURFACING EXISITING STUCCO WITH NEW SMOOTH STUCCO ON ALL APARTMENT BUILDINGS REMODEL BLDG E UNIT TYPE A REMODEL BLDG E TYPE A REMODEL BLDG E TYPE A SoCal Gas NOT # 2043764075. SoCal Gas to abandon service. Work requires (1) 4'x2' earth cut. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. REMODEL BLDG G TYPE A SoCal Gas work order # 52-4255797. SoCal Gas to repair leak at the main and perform final paving. Work requires (1) 3'x2' asphalt cut. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. REMODEL BLDG C UNIT TYPE A REMODEL BLDG C UNIT TYPE A REMODEL BLDG B UNIT TYPE A REMODEL BLDG C UNIT TYPE A REMODEL BLDG C UNIT TYPE A REMODEL BLDG B UNIT TYPE A REMODEL BLDG B UNIT TYPE A SoCal Gas work order # 52-4360930. SoCal Gas to repair leak at the main and perform final paving. Work requires (1) 3'x2' asphalt cut. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. 2026 Blanket Encroachment Permit - This permit covers fees for maintenance work, which includes: new services, mainline repairs, pole relocations, sidewalk repairs/replacements, splice box repairs/replacements, and all general system activities. New mainline installations require a separate encroachment permit with separate fees. Traffic and pedestrian controls must be per MUTCD and City Standards. When applicable, traffic control plans and/or improvement plans must be submitted, reviewed, and approved prior to the start of work. Each job involving excavation, traffic control, or requiring any other inspection requires a separate encroachment permit and traffic control application. For each separate permit issued under the blanket, contact the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so each permit can be closed. New attached ADU garage conversion. garage adu conversion THIS PROJECT CONSISTS OF THE CONVERSION OF AN EXISTING DETACHED CAR PORT INTO A DETACHED 594 S.F. A.D.U. WITH 2-BEDROOMS AND 2-BATHROOMS. Voluntary Seismic Retrofit In Accordance with Plan Set (A) Install roof mounted 2.15kW PV System with (1) ESS Install roof mounted 5.16kW PV System with (1) ESS Hedge pruning. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. CHANGE OF USE FROM RETAIL TO BUSINESS OCCUPANCY (CIDER TASTING ROOM WITH LESS THAN 50 OCC.). TENANT IMPROVEMENT INCLUDING NEW SALES COUNTER & ASSOCIATED ACCESSIBILITY UPGRADES. MUP: USE-0136-2025 Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. 4.10 kW DC Roof Mount Photovoltaic System with Energy Storage (1) Project address: 210 FOXTROT COURT, SAN LUIS OBISPO, CA, 93401. Avila Ranch Lot 231. Installation of a 4.95 kW-DC PV System, using (11) CANADIAN SOLAR MODULES + (11) ENPHASE Microinverters. Installation of PV System of 4.95 kW-DC, 11 modules of 450W, 11 microinverters, Enphase EQ combiner, AC disconnect. INSTALL ENERGY STORAGE SYSTEM General tree maintenance. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. NEW DETACHED ADU REPLACE CELLULAR COMMUNICATOR ALL EXISTING DEVICES TO REMAIN. EXISTING FIRE ALARM SYSTEM NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2B; LOT 224; PLAN CLUSTER 2A Directional bore to install Charter-Spectrum conduit. Also, place fiber in existing conduit. Bore depth to be 7 ft below top of curb or 3 ft below the lowest utility, whichever is deeper. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sprouse Communication for Charter-Spectrum to overlash new coax on existing poles. No new poles or anchors are permitted with this work. Permittee must obtain permission from the utility pole owner(s)/PG&E to attach. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. New attached trellis, entry path, and site walls. Place and maintain tables and chairs in the sidewalk. Operations and maintenance shall comply with use permit USE-0678-2024 and Chapter 5.50 of the Municipal Code. Sidewalk rental fees will be billed annually to the permittee, based on 50 square feet of sidewalk space being used. Current insurance documentation must be maintained for this encroachment permit to remain valid. This encroachment permit may be extended with receipt of current insurance documentation. Please send updated insurance documents to encroachment@slocity.org to extend this permit. PG&E PM # 31756163. PG&E to replace crossarm and do maintenance work on pole. Work should be scheduled when school is not in session. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35691945. PG&E to install pole, install new OH transformer, and install OH service cable. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. MASTER PLOT PLAN (PERMIT#FIRE-0702-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 290; PLOT PLAN 5; TRACT 3089 Change Out Gas Furnace for Electric Mini-Split pv solar roof mount, 8 modules, 3.28kw, comp shingle, existing 100A MSP, 1 ESS, 1 BUI Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. PG&E PM # 46613633. PG&E to adjust tension on pole and straighten leaning pole. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 290; PLAN COTTAGE 5 Convert existing covered patio into living space with kitchen remodel Enlarging the master bedroom. Installation of roof mounted PV (5.46kW DC) with (12) CS 455's, (12) Enphase IQ8AC Microinverters, Enphase Combiner 5 new photovoltaic system 11.18kW ESS:2 Rooftop Mounted Solar Energy System PV+ST 15 HiN-T435NF(BK) solar modules 1 1707000-XX-Y {240V, 11.5kW} inverter 1 1707000-XX-Y {11.5kW} ESS + 1 1807000-XX-Y DC battery expansion Main Panel Upgrade: Yes System Size: 6.53 kW DC (11.51 kW AC) Add 20kWh ESS to (E) PV System Install (1) ESS Expansion pack New Window Install. (in new opening, not replacement) Installation of 5.1kW-DC roof mount solar system with 13.5kWh energy storage system Replace 100 amp Electric Service Panel with 200 amp Electric Service Panel ADD ON 1X ESS Installation of 13.5kWh Battery Energy Storage System. Existing, permitted/approved Solar PV already onsite. 4.86kw Roofmounted PV with micro inverters-no storage PV Roof Mount 8.1KW, 20 Modules, 1 Inverter, 1 Tesla PW3 ESS, 1 Tesla PW3 Expack, Existing solar installed ADDITION OF EV CHARGER AND 2X SOLAR PANELS TO EXISTING SYSTEM NEW DETACHED ADU - Modular building, 14'-10" x 44', placed on concrete perimeter foundation Like for like replacement of current HVAC unit. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. PG&E PM # 31754210. PG&E to do maintenance on pole. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35663764. PG&E to install transformer and OH minor equipment. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. PG&E PM # 35585344. PG&E to remove pole and OH transformers and replace with new pole and (2) OH transformers. Remove and install new OH conduit, and reframe pole. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Astound Broadband LLC to install conduit by open trench, intercept existing City conduit, wye cast and place new vault. Pull fiber through existing City conduit to existing vault. The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications for details (attached). Proof of notice distribution must be provided to the Public Works inspector prior to the start of work. No traffic control setup, noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed and approved by the Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. New 13D Fire Sprinkler System New 13D Sprinkler System PG&E PM # 35672971. PG&E to work in rear of property to transfer OH equipment from location 1 OH to Toro St. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. Garage conversion to 2bd/ 1ba ADU Painting wall which requires sidewalk closure. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35697601. PG&E to install OH span guy, upgrade transformer, and install OH service cable. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. divide space into 2 office spaces PG&E PM # 35675564. PG&E to replace OH transformer, install riser, remove and pull new UG cable, and install enclosure. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. Remodel home and add room / patio Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. Install new 1" water service lateral to serve a new 1" water meter. All work to be done per BLDG-2324-2022 and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. REMODEL 93 SF OF SINGLE BATHROOM INTO TWO BATHROOMS (ONE MASTER AND ONE HALL BATH) New Photovoltaic System 8.7kW ESS1 Subpanel:125A, Subpanel:200A Solar REMOVE AND REPLACE WALL HEATER AT SAME LOCATION (LIVING ROOM) NEW WET TYPE FIRE SPRINKLER SYSTEM ADDING CELL/RADIO UNIT INSTEAD OF 2 ANALOG PHONE LINES Install New Manufactured Duplex as ADUs MASTER PLOT PLAN (PERMIT#FIRE-0704-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 303; PLOT PLAN 2; TRACT 3089 MASTER PLOT PLAN (PERMIT#FIRE-0705-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 302; PLOT PLAN 3; TRACT 3089 Lettering on existing awning PG&E PM # 35655912. PG&E to remove equipment. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. 665 sq.ft. addition and 2 new wood decks SoCal Gas to place traffic control signage in the City's right-of-way for work in the County's jurisdiction. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. INTERIOR REMODEL OF PRIMARY SUITE, KITCHEN, DINING ROOM, HALLWAY. NEW EXTERIOR WINDOWS water heater change out Installation of PV System of 5.4 kW, 12 modules of 450W, 12 microinverters, Enphase EQ combiner. PM #35663336 - PG&E service connection. All work to be done per the attached plans and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Mechanical, electrical and plumbing work is limited to replacement of (3) existing rooftop Air Conditioning Units. Existing ductwork shall remain unchanged, other than to transition from rooftop unit duct connections to existing ductwork. PANEL UPGRADE Remove existing water heater and install new water heater. This will be the same type of water heater and will be going back into the same location. (Square ft shared is the square footage of the home.) PANEL UPGRADE 100A-200A NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2B; LOT 233; PLAN CLUSTER 4B SlO Cancer Center TI- Suite 120 This project consists of A group medical/ Office occupancy. 1. All fire sprinkler system control valves and waterflow switches shall be monitored by the fire alarm system. 2 Per CBC 907.2.2, group B exception: one manual fire alarm pull station has been installed in ) in the electrical room housing FACP & remote power supply. no additional manual pull stations are required or installed in this suite. 3. Building is 100% sprinklered per NFPA 13. Occupant notification shall activate automatically upon waterflow detection at the fire riser waterflow switch. 4. Fire Alarm occupant notification appliances (horns/ Strobes) shall be installed in public areas, staff work areas, nursing working areas, and exit corridors. 5. All notification appliances shall be connected to the fire alarm control panel and remote power supply located in the adjacent suite. see sheet FA2 for building map and panel locations. Install over head fire Sprinkler system for Tenant Improvement the system does not exceed the original OH II design in Suite 110- New 999 sf ADU attached to the rear of an existing SFR Demo existing tub, valve and tile surround. Install new acrylic shower pan, valve and acrylic wall surround. PG&E PM # 2010338. PG&E to trim trees. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. REPLACE SEVERAL ALARM DEVICES PG&E PM # 2010338. PG&E to trim tree. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Install Roof Mounted 14.62kW PV System with (2) ESS New install. Install a 2-ton mini Split w/Wind Free Tech (heatpump and wall mount) furnace change out Replacement of heat pump system P.V. ROOF TOP ARRAY Emergency repair - Replace leaky water service lateral. Work was requested by Utilities Department and coordinated with James Yanez, Construction Manager. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls are being coordinated with Justin Wong, Traffic Division. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. DETACHED STUDIO UNIT BEHIND EXISTING 2 BEDROOM RESIDENCE PG&E PM # 35596409. PG&E to replace fuse and pull cable through conduit. Work hour restrictions apply if school is in session. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. TO OBTAIN A BUILDING PERMIT FOR A NEW ACCESSORY DWELLING UNIT CONVERTED FROM A PREVIOUSLY PERMITTED SINGLE CAR GARAGE ON A SITE WITH AN EXISTING MAIN RESIDENCE, AND EXISTING ADU PER GOVERMENTAL CODE 66323 A, 1. like for like furnace change out PG&E PM # 35605976. PG&E to do pole maintenance on multiple poles and place a new pole. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Remove and relocate existing stairs, new sliding door, remodel Kitchen and Powder room. Remove and Replace all exterior windows. PG&E PM # 35641103. PG&E to install transformer. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35641866. PG&E to install pole and pull cable in conduit. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Install Lennox Heat Pump and air handler. Conversion of existing culinary school kitchen to commercial catering kitchen PG&E PM # 35547007. PG&E to install cable in conduits and install meters. Work hour restrictions apply; please see the attached traffic control plan comments. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Tree trimming along Marsh. The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications for details (attached). Proof of notice distribution (dates and times) must be provided to the Public Works inspector prior to the start of work. No traffic control setup, noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed and approved by the Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call Eric Baker at 805-781-7014 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. MASTER PLOT PLAN (PERMIT#FIRE-0699-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 292; PLOT PLAN 2; TRACT 3089 SoCal Gas NOT # 2042875000. SoCal Gas to move meter into vault. Work requires (1) 4'x4' earth cut. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Supply and Install (2) Retrofit Windows into EXISTING Openings. Ductless split system installation Conversion of an existing 226 S.F. into a microdistillery. Minor interior improvements, no expansion of building footprint. No changes to life safety or accessibility. Refer to BLDG-1226-2022 for Arcade work. 40g natural gas removal and replacement, like for like Staging in the right-of-way to paint third story window. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Battery Electric Bus Charging Infrastructure project, CIP Specification No.2000403. All work to be done per City CIP Spec. No. 2000403 and City Standard Specifications & Engineering Standards. A traffic and pedestrian control plan must be submitted, reviewed, and approved prior to each phase of the work. Traffic and pedestrian controls must be per an approved plan and City Appendix G & MUTCD Standards. Contact City Public Works inspector Brett Sinkovich at 805-440-7172 to coordinate job inspections and information. Permittee is responsible for calling for final inspection so the permit can be closed. remodel kitchen, remodel bathrooms and replace 7 windows AB-2533 - Legalization for existing unpermitted accessory dwelling unit built before January 1 2020 Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. 84.68kW Photovoltaic System Roof Mounted, Grid-Tied 2-Story Attached ADU MASTER PLOT PLAN (PERMIT#FIRE-0700-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 304; PLOT PLAN 3; TRACT 3089 MASTER PLOT PLAN (PERMIT#FIRE-0699-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 305; PLOT PLAN 2; TRACT 3089 Installation of carport PV systems at 972 Nipomo, 29 Prado, 900 Southwood, and 2160 Santa Barbara. All work to be done to City Standard Specifications & Engineering Standards. Where applicable, a traffic control plan must be submitted, reviewed, and approved prior to the start of work. Traffic and pedestrian controls must be per an approved plan and City Standard Specifications & Engineering Standards. Contact City Public Works inspector Brett Sinkovich at 805-440-7172 to coordinate job inspections and information. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 31768962. PG&E to replace lid on sidewalk. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. AT&T job # A05CY4S. AT&T to access manholes # 3060 and 3045A. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. MASTER PLOT PLAN (PERMIT#FIRE-0700-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 293; PLOT PLAN 3; TRACT 3089 re-pipe existing water lines with new PEX water lines D MASTER PLOT PLAN (PERMIT#FIRE-0699-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 291; PLOT PLAN 2; TRACT 3089 Replace sewer lateral to the main using trenchless technology. No staging in the public right-of-way is to occur during school drop-off and pick-up times. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. Installation of 4.5 kW-DC PV system, (10) 450W modules, (10) Enphase Microinverters + 125A Enphase IQ Combiner Panel + PV AC Disconnect ADD NEW CIRCUIT AND RACEWAY FROM THE PANEL TO THE SHED FOR POWER, SWITCH, AND LIGHTING Installation of 4.95 kW-DC PV system, (11) 450W modules, (11) Enphase Microinverters + 125A Enphase IQ Combiner Panel + PV AC Disconnect Remove existing meter. Install 200 amp exterior mount meter main panel. Repair Fire-Damaged Stair Landing at top of Exterior Stairs voluntary seismic Retrofit In Accordance with plan Set (A) Voluntary seismic Retrofit in Accordance with Plan Set (A) INSTALLATION OF SCULPTURE 4.5 kW-DC PHOTOVOLTAIC SYSTEM USING? 10 CANADIAN SOLAR CS6.1-54TM-450H 4.5 kW-DC PHOTOVOLTAIC SYSTEM USING?10 CANADIAN SOLAR CS6.1-54TM-450H 4.5 kW-DC PHOTOVOLTAIC SYSTEM USING: 10 CANADIAN SOLAR CS6.1-54TM-450H New roof mounted photovoltaic system 3.68kW Backfill spa with fill sand and pour 4" concrete to fill in. Backfill spa and pour top cap with concrete. Demo top copping, back fill with fill sand, pour 4" concrete cap. #3 rebar. Concrete pumping. labor to set and pour Like for like replacement of heat pump Roof mounted solar 4.2kw & 1 Energy Storage system removal of old water heater & installation of Noritz NRCR111 DV PRO Installation of a new circuit for a level 2 Electric vehicle Charger Abandon driveway approach with sidewalk, curb, and gutter. Install one new 1" water service lateral to serve one new 1" water meter that will serve 418 Jeffrey Drive Units A & B. Install a new 4" sewer lateral. All work to be done per the approved building plans, BLDG-3310-2023, and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations will be performed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made for holidays as needed. Contractors must schedule wye installations by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. Installation of PV System of 5.4 kW, 12 modules of 450W, 12 microinverters, Enphase EQ combiner. New Roof mounted photovoltaic system 3.48kW ESS:2 EV:48A Electrical Panel Upgrade-like for like same location no added load REMODEL 350 SQ. FT. OF EXISTING INTERIOR LIVING SPACE INTO (2)-BEDROOMS UTILIZING EXISTING SLIDING GLASS DOORS New Detached 1 bedroom, 1bathroom ADU Addition of living space to (e) SFR; partial interior remodel including new powder bath, replace windows and exterior doors, demo (e) raised deck, install (n) patio and attached pergola 5.40kW Photovoltaic System W/ 13.5kWh ENERGY STORAGE SYSTEM roof Mounted, Grid-Tied Install Tesla Powerwall 3 with Tesla Backup Switch on exterior of garage on 60A circuit. Install 48A Tesla Wall Connector on interior of garage on 60A circuit. Install 48A Tesla Wall Connector on interior of garage on 60A circuit. NEW SINGLE-FAMILY RESIDENCE W/ATTACHED ADU Temp pole for demolition of existing structure and construction of new structures 5.06kW Photovoltaic System W/ 13.5KWH ENERGY STORAGE SYSTEM (11) MODULES ROOF MOUNTED 1 Inverter, 1 Tesla PW3 ESS, Existing Solar system installed PV Roof Mount 5.72KW, 13 modules, 1 Inverter, 1 Tesla PW3 ESS PV Roof Mount 8.505KW, 21 Modules, 1 Inverter, 1 Tesla PW3 ESS, 1 Tesla PW3 Expansion pack 4.05 kW-DC PHOTOVOLTAIC SYSTEM USING: 09 CANADIAN SOLAR CS6.1-54TM-450H NEW ROOF MOUNTED 8.360KW SOLAR SYTEM - SOLAR ONLY 100 amp panel to 200 amp panel NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 291; PLAN COTTAGE 2 NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 293; PLAN COTTAGE 3 NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 292; PLAN COTTAGE 2 Relocate water softener and water heater from inside garage to outside house. Relocate electrical and plumbing to new location. Replace 21 windows with retrofit vinyl windows. Installation of 4.95 kW-DC PV system, (11) 450W modules, (11) Enphase Microinverters + 125A Enphase IQ Combiner Panel + PV AC Disconnect Replacement of 9 windows. No Construction. No Framing. Like for like. Reroof DEMO 63 SQ. FT. DILAPIDATED UTILITY ROOM ATTACHED TO SINGLE FAMILY RESIDENCE. ADDITION OF 546 SQ. FT. TO EXISTING SINGLE FAMILY RESIDENCE TO CREATE A DUPLEX. RELOCATE/REPLACE WASHER & DRYER INTO EXISTING UNIT AND INSTALL TANKLESS WATER HEATER OUTSIDE. Installation of 4.95 kW-DC PV system, (11) 450W modules, (11) Enphase Microinverters + 125A Enphase IQ Combiner Panel + PV AC Disconnect NEW SINGLE STORY DETACHED ADU & WORKSHOP ON PROPERTY WITH EXISTIN SFR NEW DUPLEX Phase 1 shoring design for Monterey Senior project at 1426 Monterey to allow for installation of transformer and PG&E infrastructure to service building. Phased shoring design is necessary as PG&E requires transformer to be installed in order to sign off on building's certificate of occupancy. Shoring in this phase is limited to that adjacent to PG&E infrastructure at project Driveway 2. REPAIR FIRE DAMAGE AT 2ND FLOOR SISTER EXISTING FLOOR JOIST FROM WALL TO WALL IN HALLWAY BOTH SIDES INSPECT EXIST ELEC. PANEL FOR RE-INSTALLING METER 40 gallon natural gas removal install Noritz EZTR50 PRO pv solar roof mount, 12 modules, 4.86kw, comp shingle, existing 125A MSP,, 1 ESS SoCal Gas WO # 52-2888137. SoCal Gas after-the-fact permit for emergency leak repair. Final paving is required for the permit to be finaled. Work requires (1) 3'x2' asphalt cut. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. 4.95 kW DC PV System using 11 modules. 5.4 kW-DC PHOTOVOLTAIC SYSTEM USING: 12 JA SOLAR JAM54D41 LB-450W OR 12 CANADIAN SOLAR CS6.1-54TM-450H OR 12 THORNOVA SOLAR TS-BGT54(450) 5.4 kW-DC PHOTOVOLTAIC SYSTEM USING: 12 JAM54D41 LB-450W OR 12 CANADIAN SOLAR CS6.1-54TM-450H OR 12 JKM 450N-54HL4R-B-F8-EN 4.5 kW DC PV System using 10 modules. 4.95 kW-DC PHOTOVOLTAIC SYSTEM USING: 11 JAM54D41 LB-450W OR 11 CANADIAN SOLAR CS6.1-54TM-450H OR 11 THORNOVA SOLAR TS-BGT54(450) PG&E PM # 35533791. PG&E to replace cover/lid on box, bring to grade, and install cable in conduit. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. 8.72kW Photovoltaic System W/ 27kWh ENERGY STORAGE SYSTEM Roof Mounted, Grid-Tied SoCal Gas WO # 54-487708. SoCal Gas after-the-fact permit for emergency leak repair. Final paving is required for the permit to be finaled. Work requires (1) 3'x6' concrete cut. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Replace existing fixed hexagonal skylight with similar skylight. Davey Tree Surgery for PG&E to restore PG&E utility pole using steel truss on Garfield. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Davey Tree Surgery for PG&E to restore PG&E utility pole using steel truss on Vachell. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. NEW ADU Interior remodel of existing single family residence. Two new bedrooms and one new bathroom. Replace all windows like for like. Replace roofing like for like. New HVAC system in existing attic. The proposed project is an interior tenant improvement to an existing office space. No exterior building walls nor site areas to be altered. THE CONSTRUCTION OF 2 (N) DETACHED 765 SQ. FT. ACCESSORY DWELLING UNITS IN THE REAR YARD OF AN (E) MULTI FAMILY RESIDENCE. Commercial TI to existing metal building; remodeled tenant spaces include beer tasting, food prep and storage areas Kitchen addition of the existing wood-framed structure DEMOLITION AND RESTORATION OF FRAMING AND EXTERIOR STUCCO ON CORNER OF FRONT PORCH. install 291 Linear feet of 16' feet tall racks and 46 linear feet of 7'-8' shelving units Kitchen, laundry/mudroom remodel that requires structural modifications with window and door replacement. Replace like-kind windows in the guest bedroom. Replacing existing 6 windows with retrofit windows ADU Garage Conversion New 2 Story Residence with a 2 car garage Expanding (E) 398 SF ADU into a 1,000 SF ADU. Number of bedrooms shall remain as 3. PV INSTALL 11.5 KW , 10 MODULES, 1 ESS New Photovoltaic System 3.44kW ESS:1 Roof mounted solar 6.56 KW & 1 Energy Storage system New photovoltaic system 5.59kW with new ESS, Panels:13 ESS:1 Install 60 amp subpanel to install potential maximum 50 amp dedicated circuit for an ampUP EV charger. Roof Mount PV system 8.1KW DC, (20) Panel, (1) Inverter with ESS Project address: 223 FOXTROT COURT, SAN LUIS OBISPO, CA, 93401. Avila Ranch Lot 214. Installation of a 5.4 kW-DC PV System, using (12) CANADIAN SOLAR MODULES + (12) ENPHASE Microinverters. Install 48A Tesla Universal Wall Connector on interior of garage on 60A circuit. 50 gallons natural gas removal and replacement Residential Roof Mounted Solar (PV) 2.1kwDC and (1) ESS Install (1) Level 2 EV Charger Install a 249.57kW roof mounted grid-tied solar photovoltaic (PV) system new 240V 30A 66G electric heat pump water heater replacing gas-fired water heater in same location (garage) INSTALLATION OF A 5.4 kW-DC PHOTOVOLTAIC SYSTEM USING: (12) CANADIAN SOLAR MODULES + (12) ENPHASE MICROINVERTERS + (01) CANADIAN EP CUBE BATTERY 9.9kWh Project address: 206 FOXTROT COURT, SAN LUIS OBISPO, CA, 93401. Avila Ranch Lot 230. Installation of a 4.95 kW-DC PV System, using (11) CANADIAN SOLAR MODULES + (11) ENPHASE Microinverters. Install 48A Tesla Universal Wall Connector on exterior wall on 60A circuit. PV Solar roof mounts, 3.69KW, 9panels, comp-shingle, Existing 100A MSP, 1 ESS, BUI, Subpanel 125A PV Roof Mount 3.69KW, 9 Modules, 1 Inverter, 1 ESS PV Solar roof mounts, 3.28KW, 8panels, comp-shingle, Existing 100A MSP 1-ESS, BUI, Subpanel 125A PV solar roof mount, 9 modules, 3.645 kw, rolled comp., existing main 100A, SolarEdge Battery with BUI + EV charger 24.8kW PHOTOVOLTAIC SYSTEM WITH 40.5 ENERGY STORAGE SYSTEM. ROOF MOUNTED GRID TIED 7.23kW Photovoltaic System W/ 13.5kWh ENERGY STORAGE SYSTEM & EV Charger Roof Mounted, Grid-Tied PV solar roof mount,22modules, 8.91kw, Comp shingles, existing Subpanel 100A, TESLA Powerwalls3 Add rooftop PV (68 modules, 36.72kw) and 1 ESS unit (Sol-Ark 30k-3r-208v) - Echelcon:Monterey Senior Apartments Installation of a 4.95 kW-DC PV System, using: (11) Modules + (1) EP CUBE HYBRID INVERTER + BATTERIES 9.9KWh NEW BACKUP SUB PANEL 100A+ (1) NEW EP CUBE SMART GATEWAY 120/240V. ADDED Emergency stop outside. pv solar roof mount, 8 modules, 3.24kw, comp shingle, existing 200A MSP, 1 ESS 100 ft replace sewer lateral with HDPE pipe using pipe bursting technology. Install G5 box with concrete ring Remove existing outdated 10.6 KW PV system and install a new 26.6 kWh ESS with a 12.6 KW PV system in its place. Design of a new Fire Sprinkler System for a new performing arts theater. MASTER PLOT PLAN (PERMIT#FIRE-0706-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 208; PLOT PLAN 4; TRACT 3089 MASTER PLOT PLAN (PERMIT#FIRE-0706-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 206; PLOT PLAN 4; TRACT 3089 MASTER PLOT PLAN (PERMIT#FIRE-0704-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 205; PLOT PLAN 2; TRACT 3089 MASTER PLOT PLAN (PERMIT#FIRE-0706-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 213; PLOT PLAN 4; TRACT 3089 MASTER PLOT PLAN (PERMIT#FIRE-0706-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 212; PLOT PLAN 4; TRACT 3089 MASTER PLOT PLAN (PERMIT#FIRE-0705-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 207; PLOT PLAN 3; TRACT 3089 Install Fire sprinkler for new multi family building; 4-plex Townhomes; Tract 3111. address: 1198 Tiburon way Type A, Fire sprinkler system is an NFPA 13D New SFR - Installing NFPA 13D fire sprinkler system Install Fire sprinkler for new multi family building; 4-plex Townhomes; Tract 3111. address: 1194 Tiburon way Type B, Fire sprinkler system is an NFPA 13D Install Fire sprinkler for new multi family building; 4-plex Townhomes; Tract 3111. address: 1196 Tiburon way Type B, Fire sprinkler system is an NFPA 13D MASTER PLOT PLAN (PERMIT#FIRE-0703-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 216; PLOT PLAN 1; TRACT 3089 Install Fire sprinkler for new multi family building; 4-plex Townhomes; Tract 3111. address: 1192 Tiburon way, Fire sprinkler system is an NFPA 13D Renovation of existing handball structure (2,862 SF) into a community center for apartment complex. MASTER PLOT PLAN (PERMIT#FIRE-0704-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 215; PLOT PLAN 2; TRACT 3089 MASTER PLOT PLAN (PERMIT#FIRE-0705-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 214; PLOT PLAN 3; TRACT 3089 New fire sprinkler system Grading and Utility Improvements associated with the Monterey Place Mixed Use project (Building plans to be submitted separately Surface improvements including but not limited to paved roadways, curb, gutter, sidewalks. Underground utility improvements including under walk drains and pedestrian button conduit. In addition per the DIR-0671-2022 two existing street trees will be removed and replaced with two new street trees and an outdoor dining pergola will be constructed. Sequentially remodel two existing bathrooms. Backyard pool AN ART PIECE "SHIFT" DESIGNED BY WARREN HAMRICK WILL BE INSTALLED IN THE ROUNDABOUT AT FROOM RANCH & HEIRLOOM. CITY PROJECT Install replacement windows Stage in the public right-of-way to install public art: "Shift". Also install plaque. Work is located at Froom Ranch Way and Heirloom Place roundabout. All work to be done per the attached and approved plans and City Standard Specifications & Engineering Standards. A separate building permit, BLDG-0588-2025, is required for structural inspections; structural inspections and the required building permit are not covered by this encroachment permit. Traffic and pedestrian controls must be per the attached and approved traffic control plan and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Installation of 4.5 kW-DC PV system, (10) 450W modules, (10) Enphase Microinverters + 125A Enphase IQ Combiner Panel + PV AC Disconnect Installation of 5.4 kW-DC PV system, (12) 450W modules, (12) Enphase Microinverters + 125A Enphase IQ Combiner Panel + PV AC Disconnect like for like furnace replacement Supply and Install (4) Retrofit Windows into EXISTING Openings. Supply and Install (19) Windows and (1) Sliding Glass Door into EXISTING Openings. TENANT IMPROVEMENT IN AN (E) 1,261 SF SHELL BUILDING TO BE A SUSHI RESTAURANT. IMPROVEMENTS INCLUDE A NEW SUSHI BAR, TYPE 1 HOOD, NEW FURNISHINGS, FINISHES, AND EQUIPMENT PER THE TENANTS PROGRAM REMOVE AND REPLACE EXISTING ASPHALT <On 01/27/26, permit extended to 04/24/26.> Install new water lateral from the main in the street to serve a new 1" water meter for 1321 and 1323 Garden. Install new sewer lateral from the main in the street to the property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance. 6.50 kW DC Roof Mount Photovoltaic with Energy Storage (1) NEW PHOTOVOLTAIC SYSTEM 4.40 kw Roof-mounted solar PV 3.52kW INSTALL LAUNDRY IN EXISTING CLOSET SPACE AND INFILL GARAGE DOOR TO WALL Tenant improvement of medical office space. The project consists of both OSHPD 3 and non-OSHPD areas. Remove and dispose of existing gas furnace and all accessible ductwork, seal openings. MXZ3C30NAU1 30,000 BTU heat pump. MSZ-GS12NA-U1 12,000 BTU wall mounted fan coil for living room. MSZ-GS09NAU1 wall mounted fan coil for master bedroom. MSZ-GS06NAU1 wall mounted fan coil for 2nd bedroom. Copper linesets run from each wall coil to outdoor unit. Power/Control wires run from each wall coil to outdoor unit. Power run from electrical panel to outdoor unit including breakers/disconnects. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. like for like furnace replacement Modification of Two occupant Notification Devices & One pull station in auditorium 7. Accessibility Ramps installed. Relocation of existing pull Station at Start of ramp. Existing wall mounted speaker strobes will be raised up the wall to correct height. Existing Ceiling mounted speaker strobe relocated to provide proper coverage of occupant notification CONVERT (E) 120 SF DETACHED ROOM TO (N) 175 SF ADU New detached ADU 4.5 kW DC PV System using 10 modules Install 48A Tesla Wall Connector on interior of garage on 60A circuit. Install Level 2 EV Charger NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2A; LOT 257; PLAN CLUSTER 2E NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2A; LOT 258; PLAN COTTAGE 3D We are seeking a permit to legalize and complete a remodel project located within the garage of our existing residence. A workshop had previously been constructed in the garage space which we want to expand to make it a more usable space to consume media and play games. Level 2 EV Charger (1) INSTALLATION OF FURNACE PV Roof Mount 5.74KW, 14 Modules,1 Inverter, 1 Tesla PW3 ESS, 1 Tesla PW3 expansion Pack. Supply and Install (2) windows into existing openings PV Roof Mount 9.02KW, 22 Modules, 1 Inverter, 1 Tesla PW3 ESS, 1 Tesla PW3 Expansion pack, Trenching Required NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2D; LOT 266; PLAN CLUSTER 3E NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2D; LOT 265; PLAN CLUSTER 3C INSTALLATION OF AN EV CHARGER OUTLET PV Roof Mount 6.56KW, 16 Modules, 1 Inverter, 1 Tesla PW3 ESS, 1 Tesla PW3 Expansion pack, Existing Solar system installed NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2D; LOT 267; PLAN CLUSTER 2B Proposed scope of work is to construct a (N) ADU, proposed area is 403 S.F. Living area + 135 S.F. loft. COMMERCIAL 7.98 kW DC ROOFTOP SOLAR NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 296; PLAN COTTAGE 5 PV INSTALL 7.04KW,(16)MODULES,(2)ESS-(1xTESLA POWERWALL 3 BASE & 1xEXPANSION PACK). NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 295; PLAN COTTAGE 2 NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 294; PLAN COTTAGE 3 Install new driveway approach. Abandon existing driveway approach with sidewalk, curb, and gutter. Install sidewalk underdrains. Replace damaged sections of sidewalk, curb, and gutter. All work to be done per PLBLDG-0012-2024 and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the attached and approved plan and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 297; PLAN COTTAGE 1 Addition to existing sprinkler system Updated: 2/2/2026 to be a conduit bore instead of intercepting existing conduit. Bore ~136' of Astound Broadband LLC fiber optic conduit. Install fiber optic cable into the newly-installed conduit. All work to be done per the attached plans and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PV solar roof mount, 8 modules, 3.28kw, existing main 100A, ESS PV roof mount 6.15kw dc 23kw ac modules 15 Ess 2 New Roof Mount Solar PV System 4.30 KW (10) Panels with ESS Battery Hazard reduction pruning of trees. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Install potential maximum 60 amp dedicated circuit for a FORD PRO EV charger. NEW AFFORDABLE MIXED- BUILDING 1 - USE CONSISTS OF 4,366 SF OF COMMERCIAL, 45 AFFORDABLE FAMILY RESIDENTIAL UNITS Retaining wall in the public right-of-way. See temporary encroachment agreement. SoCal Gas WO # 54-506131. SoCal Gas after-the-fact permit for anode installation at the main. Work requires (1) 3'x4' asphalt cut. Final paving is required for the permit to be finaled. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35587701. PG&E to install poles, upgrade transformer, install overhead span guy, and install OH cables. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35698666. PG&E to install cable in conduit. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35610256. PG&E to install meter, install service cable, and install riser. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sprouse Communication for Charter-Spectrum to place a ground rod at the base of poles. Work hour restrictions apply, see the attached traffic control plan. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 305; PLAN COTTAGE 2 PG&E PM # 35692587. PG&E to upgrade transformer and replace service cable. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. we are adding cell/radio unit instead of 2 analog phone lines Sprouse Communication for Charter-Spectrum to overlash coax and pull cable across the street to vault. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. THIS PROPOSED PROJECT CONSISTS OF THE CONSTRUCTION OF A 2-STORY 881 SQ.FT. New Modular Duplex ADU, 2 - 2bedroom units Sprouse Communication for Charter-Spectrum to pull fiber through existing conduit. The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications for details (attached). Proof of notice distribution (dates and times) must be provided to the Public Works inspector prior to the start of work. No traffic control setup, noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed and approved by the Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 2010338. PG&E to trim tree. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations will be performed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made for holidays as needed. Contractors must schedule wye installations by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. Sidewalk closure for water service lateral replacement from the meter to the building. No vehicle parking is permitted along the red curbs. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. REPLACEMENT WINDOWS (12) NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2A; LOT 255; PLAN CLUSTER 1E Remove and replace panels of sidewalk to install sidewalk underdrain. Core through the face of the curb and grout around the pipe at the face of the curb. All work to be done per the attached plans and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2A; LOT 254; PLAN CLUSTER 2C Solar Carport Structure Tenant improvement of Larson Audiology to accommodate building renovations. Righetti Ranch Parks - Community Park project, Specification No. 2000054. All work to be done per CIP Specification No. 2000054 and City Standard Specifications & Engineering Standards. A traffic and pedestrian control plan must be submitted, reviewed, and approved prior to each phase of the work. Traffic and pedestrian controls must be per approved plans and City Appendix G & MUTCD Standards. Contact City Public Works inspector Bryce Crespin at 805-540-0179 to coordinate job inspections and information. Permittee is responsible for calling for final inspection so the permit can be closed. 40g water heater changeout Reline Approximately 20' of 2" cast iron main underneath home using nuflow technologies PARKING GARAGE TRIPLEX Modify Existing Fire sprinkler system installed in shell building for Suite 130,230,240. TI consists of adding new office walls and ceiling. provide new pendent sprinkler coverage for all new rooms areas , no change to existing uprights and sprinkler system THE INTENT OF THIS SUBMITTAL IS TO INSTALL A NEW FIRE SPRINKLER MONITORING SYSTEM IN AN EXISTING B OCCUPANCY. Stage in the public right-of-way to install public art sculpture on Mission Plaza lawn. All work to be done per the building permit, BLDG-2946-2025, and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved plan and City Appendix G & MUTCD Standards. The permittee must notify affected tenants of construction; refer to City Standard Specifications for details (attached). Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. alterations to an existing single-family dwelling including addition by partial conversion of the existing attached garage Remove existing tile roof Install New Standing Seam Metal Roof General tree maintenance. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. 300 s.f. attached ADU to an existing single family residence. Remove existing roofing Install new TPO 60 mil Membrane roofing 60 s.f. addition to single family home. Structural/energy design was reviewed as part of the adjacent ADU (BLDG-1570-2025). Plans and documents included for reference. 4.05 kW-DC PHOTOVOLTAIC SYSTEM USING: 09 CANADIAN SOLAR CS6.1-54TM-450H 4.05 kW-DC PHOTOVOLTAIC SYSTEM USING: 09 CANADIAN SOLAR CS6.1-54TM-450H MASTER PLOT PLAN (PERMIT#FIRE-0699-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 295; PLOT PLAN 2; TRACT 3089 4.5 kW-DC PHOTOVOLTAIC SYSTEM USING: 10 CANADIAN SOLAR CS6.1-54TM-450H 4.5 kW-DC PHOTOVOLTAIC SYSTEM USING: 10 CANADIAN SOLAR CS6.1-54TM-450H Install 48A Tesla Universal Wall Connector on interior of garage on 60A circuit. Demolition of garage. New construction of ADU w/ attached garage. Remodel of front porch on primary residence. FULL TENANT IMPROVEMENT SERVICES FOR THE EXISTING SEVEN-SCREEN MOVIE THEATER INSEPARATE PHASES. PHASE 1 INCLUDES AUDITORIUM STADIUM SEATING 5.4 kW-DC PHOTOVOLTAIC SYSTEM USING: 12 JAM54D41 LB-450W OR 12 CANADIAN SOLAR CS6.1-54TM-450H OR 12 JKM 450N-54HL4R-B-F8-EN 4.95 kW-DC PHOTOVOLTAIC SYSTEM USING: 11 JAM54D41 LB-450W OR 11 CANADIAN SOLAR CS6.1-54TM-450H OR 11 JKM 450N-54HL4R-B-F8-EN 5.4 kW-DC PHOTOVOLTAIC SYSTEM USING:12 JAM54D41 LB-450W OR 12 CANADIAN SOLAR CS6.1-54TM-450H OR 12 JKM 450N-54HL4R-B-F8-EN Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. MASTER PLOT PLAN (PERMIT#FIRE-0702-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 296; PLOT PLAN 5; TRACT 3089 5.4 kW-DC PHOTOVOLTAIC SYSTEM USING: 12 JAM54D41 LB-450W OR 12 CANADIAN SOLAR CS6.1-54TM-450H OR 12 JKM 450N-54HL4R-B-F8-EN 4.95 kW-DC PHOTOVOLTAIC SYSTEM USING? 11 JAM54D41 LB-450W OR 11 CANADIAN SOLAR CS6.1-54TM-450H OR 11 JKM 450N-54HL4R-B-F8-EN Tree maintenance. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Project: Conserve Fuel, SLO- Install and monitor dedicated function fire alarm system building and Canopy 4.95 kW DC PV System using 11 modules. UPRGRADING ELECTRICAL PANEL Project Monterey senior apt Install new fire alarm system to provide occupant notification including low frequency audible devices provide monitoring of wet fire sprinkler system waterflow and valve tamper switches provide detection and relays for elevator recall functions REPLACE LIKE FOR LIKE 100 AMP METER MAIN Panel upgrade from 100AMP to 200AMP 2 meter panel. REMOVE SHINGLES AND INSTALL PLYWOOD Design & Install a Commercial Fire Sprinkler System per NFPA 13 for a TENANT IMPROVEMENT 7,880 sq ft commercial bldg per building plans dated 9/9/25 by Gensler for $21,035 Trench to install new separate sewer lateral, not replacing existing. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. Trench to install new 1" water service lateral to serve a new 1" water meter. Abandon existing driveway approach and replace with 25' of curb, gutter, and sidewalk. All work to be done per BLDG-1003-2023 and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Installing AC and gas furnace; existing location Minor T.I. including demo, three new full-height walls and new electrical outlets INSTALL LED CHANNEL LETTERS & PROJECTING LOGO CIRCLE PV Roof Mount 3.52KW, 8 Modules, 1 Inverter, 1 Tesla PW3 ESS furnace replacement, like for like in existing location located in garage Removal 40 gallon natural gas installation Noritz NRCR111DV replace furnace like for like in existing location(attic) REMOVE TOP FIXED WINDOW OVER GARAGE, FILL IN WITH STUDS 16" ON CENTER; LATH & PLASTER EXTERIOR, 5/8" DRYWALL INTERIOR NEW 13.5KWH TESLA ENERGY STORAGE SYSTEM Remove and dispose of existing water heater. Modify existing platform height to accommodate new, customer-supplied 60-gallon heat pump water heater. Install expansion tank (4.5 gal), new threaded ball valve shutoff, and ¾” condensate drain line. Reconnect temperature and pressure relief valve (T&P), install new 2” earthquake straps, and replace hot/cold supply lines. Cap existing ½” gas line. Remove flue pipe from second-story wall (wall to be repaired by homeowner); flue to remain in attic for potential future use. 5.53kW Photovoltaic System W/ 13.5kWh ENERGY STORAGE SYSTEM roof Mounted, Grid-Tied b. Different type and/or Different Location. Gas Water Heater to Electric Heat Pumps. Level 2 commercial grade electric vehicle charging station at driveway of a Vacation Rental. 3.52 kW DC Roof Mount Photovoltaic with Energy Storage (1) Installation of 4.95 kW-DC PV System, using: (11) CANADIAN SOLAR MODULES + (11) ENPHASE MICROINVERTERS. Installation of a commercial 18.88kW DC grid tied Photovoltaic system PG&E PM # 2010338. PG&E to perform routing tree trimming and removal. Phase 46 is not approved with this permit package and must be applied for separately. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. 42 sprinkler heads b. Different type and/or Different location. Replace the existing 2 gas-fired water heaters with 8 heat pump water heaters. pv solar roof mount, 8 modules, 3.24kw, comp shingle, existing 200A MSP, new subpanel, 1 ESS Renovation of existing handball structure (2,862 SF) into a community center for apartment complex. Tenant improvement of an existing retail food facility for a new retail food facility. No additional square footage to be added. RESOLVE CODE CASE FOR FENCE HEIGHT Building - New TI in existing, previously occupied (retail) street location, light, non-structural demolition, new interior partitions, ceiling fixtures, furniture and equipment. The storefront is existing to remain with cosmetic improvements only. Electrical panel replacement, same amperage and voltage. Panel will remain in the same location. New photovoltaic system 2.22 kw dc NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 303; PLAN CLUSTER 2 Install Level 2 EV Charger ADDITION OF ONE 13.5 KWH (ESS) ENERGY STORAGE SYSTEM AND ASSOCIATED HARDWARE TO THE MAIN DWELLING UNIT-VOIDED ADDRESS OUTSIDE CITY LIMITS Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. PG&E PM # 31757754. PG&E to reframe pole located next to road. Work hour restrictions apply; see the attached traffic control plan. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. Install one 1" water meter in existing water meter box for 2414 Johnson Unit A. Install a new 1" water meter, branching off of existing 2" water service/manifold, for 2414 Johnson Unit B. Install a new 2" water service to serve two new 1" water meters for 2422 Johnson, units A&B. Abandon one sewer lateral at the main in the street. Install two new sewer laterals, one for 2414 Johnson and one for 2422 Johnson. Install three sidewalk underdrains. All work to be done per BLDG-2743-2023, BLDG-0712-2023, and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations or abandonments will be performed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made for holidays as needed. Contractors must schedule wye installations or abandonments by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. New construction of a detached three bedroom, two bathroom, single story accessory dwelling unit. Remodel of an Existing Costco Warehouse Optical Office and Kiosk, and Membership and Returns Kiosks. MASTER PLOT PLAN (PERMIT#FIRE-0700-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 294; PLOT PLAN 3; TRACT 3089 8.18kW Photovoltaic System W/ Ev charger & 27kWh ENERGY STORAGE SYSTEM roof Mounted, Grid-Tied NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 301; PLAN CLUSTER 4 MASTER PLOT PLAN (PERMIT#FIRE-0698-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 297; PLOT PLAN 1; TRACT 3089 Supply and Install 1 Window into an Existing Opening Energy Storage (1) 8.1 kw rooftop pv w/o battery- VOIDED OUTSIDE CITY LIMITS NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 299; PLAN CLUSTER 3 NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 298; PLAN CLUSTER 4 NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 300; PLAN CLUSTER 1 FURNACE CHANGE OUT - LIKE FOR LIKE SAME LOCATION- DUCTWORK(5 SUPPLIES, 1 RETURN) Install Level 2 EV Charger Install 48A Tesla Wall Connector on interior of garage on 60A circuit. 200A like for like underground service replacement. NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 302; PLAN CLUSTER 3 PG&E PM # 35701253. PG&E to replace pole, install OH transformer, and replace OH service cable. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Mixed Use building with ground floor commercial, garages and covered parking; 2 - 2 bedroom apartments on second floor. All associated site work as shown on the submittal documents. CONSTRUCT 2-STORY ADU W/ ATTACHED GARAGE REMODEL BLDG A UNIT TYPE A Installation of roof mounted PV+ESS system with (27) Q.Cell 430's (11.61 kW DC), (1) Tesla Powerwall 3, (1) Tesla Expansion Unit, Tesla Backup Switch, Main Panel Upgrade ADU addition REPLACE DAMAGED SIDING OF LOWER LEVEL OF THE HOUSE. REPLACE 3 WINDOWS IN BASEMENT/STORAGE Remodel existing kitchen (110 s.f.) and 2 existing bathrooms (50 s.f. each) in an existing 1,485 s.f. house. The remodel will include framing, electrical, & plumbing modification. Proposed 274 sq second story ADU addition to existing single family dwelling over an existing (rebuilt) 1-car garage Opening of non-barring interior wall add door for passage to bathroom NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 304; PLAN COTTAGE 3 NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2A; LOT 253; PLAN CLUSTER 3E NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2A; LOT 256; PLAN CLUSTER 3D EXISTING 125 AMP ELECTRICAL SUB-PANEL TO BE REPLACED WITH NEW DEDICATED 125 AMP ELECTRICAL MAIN METER PANEL. PROVIDE NEW DEDICATED OVERHEAD SERVICE. Solar Ground Mount 16.56kW, 36 Modules. 2 Tesla ESS with 13.5kWh capacity each. NON-LIT SIGNS INSTALLED INTO BUILDING FACES Foundation repair with Ram Jack Steel Piers NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2D; LOT 263; PLAN CLUSTER 1B NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2D; LOT 268; PLAN CLUSTER 4E NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2D; LOT 269; PLAN COTTAGE 3B NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2D; LOT 270; PLAN CLUSTER 1D NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2D; LOT 271; PLAN COTTAGE 3E NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2D; LOT 272; PLAN CLUSTER 1B NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2D; LOT 273; PLAN CLUSTER 2E PG&E PM # 35698911. PG&E to replace pole, replace transformer, and install service cables. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. TEMPORARY POWER POLE LOT #272 Install 48A Tesla Wall Connector on interior of garage on 60A circuit. REPLACE EXISTING ELECTRICAL PANEL TEMPORARY POWER POLE LOT # TEMPORARY POWER POLE LOT # Trench to install a new 2" water service lateral to serve (2) new 3/4" water meters via manifolded. All work to be done per BLDG-1905-2025 and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. New 1,519 s.f., two-story, single-family residence w/ attached (2) car garage (664 s.f.) CODE CASE FOR LAUNDRY ROOM STUDIO B, DETACHED ADU UNIT BEHIND EXISTING 2 BEDROOM RESIDENCE commercial re-roof, like for like. Remove existing membrane; install 1/2" coverboard and install new membrane; no structural changes we are adding cell/radio unit sole path of communication instead of 2 analog phone lines 200A Electrical Service Upgrade & EV Charger Installation THE PROJECT CONSISTS OF IMPROVEMENTS AND ADDITIONS TO THE EXISTING 50,802 S.F. OFFICE BUILDING AT 3450 BROAD STREET TO BE USED FOR A PRIVATE, NON-SECTARIAN ELEMENTARY SCHOOL WITH INFANT CHILD CARE THROUGH 8TH GRADE (55,154 S.F. TOTAL). CAMPUS IMPROVEMENTS INCLUDE 7 PRESCHOOL / INFANT ROOMS, 19 CLASSROOM / EDUCATIONAL SPACES, A JUNIOR HIGH SIZED GYMNASIUM WITH ADJACENT KITCHEN, A SCHOOL LIBRARY, AND ADMINISTRATION OFFICES AND MEETING SPACES. SITE IMPROVEMENTS INCLUDE REPLACING THE NORTH PARKING LOT WITH OUTDOOR PLAYGROUND AND ACTIVITY SPACES AND ADDING 7 DROP-OFF / PICK-UP VEHICLE SPACES IN THE SOUTH PARKING LOT. CAMPUS ACCESS AND CIRCULATION IS SUMMARIZED IN THE PROJECT TRANSPORTATION ANALYSIS. CONVERSION OF EXISTING ATTACHED GARAGE TO ADU Traffic signal modifications on existing signal at Monterey & California. Work hour restrictions apply; see the attached traffic control plan. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. FULL TENANT IMPROVEMENT SERVICES FOR THE EXISTING SEVEN-SCREEN MOVIE THEATER IN SEPARATE PHASES. PHASE 2 INCLUDES RESTROOMS, AUDITORIUM 3 ENTRANCE AND EXISTS, AUDITORIUM 4, 5,& 6 VESTIBULES AND PORTION OF PROMENADE. INSTALL AUTO SERVICE LIFTS AND ABOVE GROUND STORAGE TANKS FOR MOTOR OIL ONLY New detached ADU on multifamily lot Replace 6 windows with retrofit vinyl windows. Upgrade dual meter electric panel NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2D; LOT 264; PLAN CLUSTER 2A Electrical Service Panel upgrade; 100amp to 100amp; same location NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2A; LOT 251; PLAN COTTAGE 3A Abandon existing water service lateral at the City main. Remove existing water meter and water meter box. Install new 1" water service lateral from the main in the street to serve a new 1" water meter. All work to be done per PLREV-0400-2025 and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35582039. PG&E to pull cable and install transformer. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Remove and replace driveway approach per PLREV-0351-2025 and City standards. Abandon existing water service at the main in the street per City standards. Install new 2" water service to manifold to existing 5/8" water meter and 2 new 3/4" water meters. All work to be done per PLREV-0351-2025 and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Addition to (e) attached garage and living space of (e) SFR for 2nd floor addition of (n) ADU Install one 4" water service lateral to serve one 2" residential water meter on the California Blvd. side of the project. Install one 2" water service lateral to serve one 1" commercial water meter on the California Blvd. side of the project. Install two sewer laterals on the California Blvd. side of the project. Install one sewer lateral on the Monterey Street side of the project. All work to be done per the approved building plans, BLDG-2341-2024 and City Standard Specifications & Engineering Standards. Separate encroachment permits are required for the additional work shown on BLDG-2341-2024 and the public improvement plans, FMAP-0375-2024, and any related building permit cases. Traffic and pedestrian controls must be per the attached and approved plans and City Appendix G & MUTCD Standards. Work must be coordinated to not conflict with the 1531 Monterey project. Call the Public Works inspection hotline at 805-781-7554 (voice message system) to coordinate a required pre-construction meeting. Also, call the Public Works inspection hotline two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations will be performed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made for holidays as needed. Contractors must schedule wye installations by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. Install overhead fire sprinkler system to expansion area 33 sprinklers Traffic signal modifications on the existing signal at 4029 S Higuera and 950 Orcutt. This project has been coordinated with William Ring in the Traffic Division. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Fire Alarm System Modification Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. General tree maintenance. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations will be performed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made for holidays as needed. Contractors must schedule wye installations by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. New 799 s.f. SFR and attached 799 s.f. ADU Sprouse Communication for Charter-Spectrum to pull fiber through existing conduit. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PG&E PM # 35641730. PG&E to stage in the right-of-way on San Carlos for work on private property using a crane. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. 3-Ton Furnace change out installation NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2A; LOT 250; PLAN CLUSTER 3C Supply and Install 5 Window into Existing Openings. Sprouse Communication for Charter-Spectrum to move storage on fiber strand. Certain work hour restrictions apply. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Tree trimming along Johnson. Work hour restrictions apply; see attached traffic control plan. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call Eric Baker at 805-781-7014 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. existing deck renovation NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2A; LOT 249; PLAN CLUSTER 1E Abandon water services for 3580 and 3584 Bullock at the City water main. Water meters and water meter boxes to be removed. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Turn Around Communication for Charter-Spectrum to install underground conduit from utility vault to building. The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications for details (attached). Proof of notice distribution (dates and times) must be provided to the Public Works inspector prior to the start of work. No traffic control setup, noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed and approved by the Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. Tree removal in basin. Schedule must be coordinated and confirmed with City inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Tenant improvements for Fusion Fitness, a personal fitness space and yoga studio at the ground floor of a mixed-use building. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. Trench to repair an approximately 4' section of sewer lateral. The sewer lateral is not being replaced all the way to the main. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. <On 12/17/2025, permit updated per attached.> A02EP0V - Install AT&T conduit via microtrenching per the attached microtrenching detail. If necessary, installation via bore or trench is also acceptable, per City Engineering Standards and per City Standard conduit depth, which is 7' below the top-of-curb or 3' below the deepest utility being crossed, whichever is deeper. All work to be done per the attached plans and to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Replace existing dual meter panel with new dual meter panel and replace 2 existing subpanels. Same location and no new load added. INSTALL 11.04KWDC/11.50KWAC COMP ROOF MOUNTED GRID INTERACTIVE PV SYSTEM W/ 40.50KWH ESS AT EXISTING RESIDENCE TYPE VB, OCCUPANCY R3 & U, NO FIRE SPRINKLER SYSTEM, 1-STORY. Upgrade electrical service from 100A to 200A NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 306; PLAN COTTAGE 2 PV Roof Mount 3.52KW, 8 Modules, 1 Inverter, 1 Tesla PW3 ESS, 1 Tesla PW3 Expansion Pack, Existing solar system installed 1 SET OF ACRYLIC LETTERS Upgrading 100 amp service to 200 amp PV Roof Mount 3.69KW, 9 Modules, 1 Inverter, 1 Tesla PW3 ESS, 1 Tesla PW3 Expansion pack, Existing solar system installed,, New 225A sub panel installed Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 311; PLAN COTTAGE 3 REMODEL OF SFR. REMODEL KITCHEN. CONSTRUCT NEW PRIMARY BATHROOM WITHIN EXISTING HABITABLE SPACE. REMOVE EXISTING INTERIOR NON-BEARING WALL. REPLACE ALL NON-ROMEX ELECTRICAL WIRING AND ALL RECEPTACLES. REPLACE ALL CAST IRON SEWER LINES IN CRAWL SPACE WITH PVC OR ABS. REPLACE ALL EXPOSED PLUMBING WITH PEX. REPLACE EXISTING SEWER LATERAL. <On 12/16/25, permit extended to 03/27/26.> Installing new PG&E and SoCal Gas utility services. A design exception has not been processed for this work, therefore, utility depth must be per City standards. Updated insurance documents must be submitted if the work will go past 10/01/25. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. SEWER LATERAL REPLACEMENT PV solar roof mount, 13 modules, 5.33kw, existing main 200A, ESS with Backup INSTALL FIRE SPINKLER SYSTEM Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. Battery-only installation (2 units) connected to existing permitted solar PV system. 4.95 kW DC PV System using 11 modules. 5.4 kW DC PV System using 12 modules. 4.05 kW-DC PHOTOVOLTAIC SYSTEM USING: 09 JAM54D41 LB-450W OR 09 CANADIAN SOLAR CS6.1-54TM-450H OR 09 JKM 450N-54HL4R-B-F8-EN 4.5 kW DC PV System using 10 modules Installation of 4.5 kW-DC PV system, (10) 450W modules, (10) Enphase Microinverters Installation of 5.4 kW-DC PV system, (12) 450W modules, (12) Enphase Microinverters New detached accessory dwelling unit and office. Install a new 5.4 kW-DC PV system , 12 modules , 12 micro inverters , 1 125 amp combiner panel. Install a new 5.4 kW-DC PV system , 12 modules , 12 micro inverters , 1 125 amp combiner panel. Installation of a new 4.95 kW-DC PV system with (11) modules, (11) microinverters, (1) 125A IQ combiner panel Installation of a new 4.95 kW-DC PV system, (11) modules, (11) microinverters, (1) 125A IQ combiner panel Installation of 5.4 kW- DC PV system, (11) modules, (11) microinverters and (1) 125A combiner panel Installation of 5.4 kW-DC PV system, (12) 450W modules, (12) Enphase Microinverters + 125A Enphase IQ Combiner Panel Installation of 4.95 kW-DC PV system, (11) 450W modules, (11) Enphase Microinverters + 125A Enphase IQ Combiner Panel Change out existing natural gas kitchen cooktop for induction cooktop. Run new 240V/40AMP circuit. Installation of 4.95 kW-DC PV system, (11) 450W modules, (11) Enphase Microinverters + 125A Enphase IQ Combiner Panel Installation of 4.5 kW-DC PV system, (10) 450W modules, (10) Enphase Microinverters + 125A Enphase IQ Combiner Panel Installation of 4.95 kW-DC PV system, (11) 450W modules, (11) Enphase Microinverters + 125A IQ Combiner Panel 4.05 kW-DC PHOTOVOLTAIC SYSTEM USING: 09 JAM54D41 LB-450W OR 09 CANADIAN SOLAR CS6.1-54TM-450H OR 09 JKM 450N-54HL4R-B-F8-EN Installation of 5.4 kW- DC PV system, (12) modules, (12) microinverters and (1) 125A combiner panel Installation of a 4.95 kW-DC PV system, (11) modules, (11) microinverters, (1) 125A combiner panel Installation of 4.95 kW- DC PV system, (11) modules, (11) microinverters and (1) 125A combiner panel Installation of 4.5 kW-DC PV system, (10) 450W modules, (10) Microinverters + 125A IQ Combiner Panel Installation of 4.95 kW-DC PV system, 11 modules, 11 microinvertes, (1) IQ 125A combiner panel Installation of a new 4.5 kW-DC PV System (10) Modules (10) Microinverters (1) 125 A IQ Combiner Installation of 4.95 kW-DC PV system, (11) 450W modules, (11) Enphase Microinverters + 125A Enphase IQ Combiner Panel Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations will be performed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made for holidays as needed. Contractors must schedule wye installations by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. LIT SIGNS INSTALLED INTO BUILDING FACES Installation of a new 5.4 kW-DC PV System (12) Modules (12) Microinverters (1) 125 A IQ Combiner Installation of a new 5.4 kW-DC PV system using (12) modules, (11) microinverters, (1)12A combiner panel Install a new 4.95 kW-DC PV system , 11 modules , 11 micro inverters , 1 125 amp combiner panel. Install a new 5.4 kW-DC PV system , 12 modules , 12 micro inverters , 1 125 amp combiner panel. Tenant improvement for a medical office building with 2 medical practices and an ambulatory surgery center. Medical office tenant improvement and ~1400sf addition for concrete vault for linear accelerator Install a new 4.95 kW-DC PV system , 11 modules , 11 micro inverters , 1 125 amp combiner panel. Installation of a new 4.95 kW-DC PV system with (11) modules, (11) microinverters, (1) 125A new IQ combiner panel Installation of a new 4.95 kW-DC PV system with (11) modules, (11) microinverters, (1) 125A IQ combiner panel INSTALL MANUFACTURED SHED FOR WASHER & DRYER BUILD REPLACEMENT RESIDENCE CONSTRUCT ADU TO REPLACE EXISTING SECONDARY DWELLING UNIT As-built permit for a 527 s.f. 2-story ADU conversion. Primary Unit A and unit B are to remain and are not in the scope of this permit. PV SRM 6.48KW, (16)Modules, (2)ESS Remove and replace asphalt surfacing within existing playground. All work to be done per the attached plans and applicable City Standard Specifications & Engineering Standards. Traffic and pedestrian controls will be per the attached plans and applicable City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 (voice message system) to schedule a required pre-construction meeting. Also, call the Public Works inspection hotline two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PHASE 3: FINE GRADING AND CONSTRUCTION OF BUILDING 3.3 Install customer provided EV charger PV solar roof mount 6.15KW, (15) Modules, (2) ESS PV SRM 5.74KW, (14)Modules, (2)ESS NEW 3,944 SQ.FT. SINGLE FAMILY RESIDENCE WITH ATTACHED 700 SQ.FT. 3-CAR GARAGE; LOT 34; TRACT 3063-3; 9 Ports DCFC 20 Ports Level 2 EV Charging Adding electrical outlets for new Gelato machine Demolition of 704 SF single family residential dwelling. House & Outbuilding demolition; Resubmitting expired Permit DEMO-1641-2022. House & Outbuilding demolition; Resubmission of expired permit DEMO-1697-2022. TENANT IMPROVEMENT OF LOBBY, BOH, AUDITORIUM 2 VESTIBULE AND MEZZANINE <On 02/12/26, permit extended to 07/10/2026.> Install new sewer lateral. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. Install 2 new 2" water service laterals; 1 to serve a new 1" residential water meter and new 1 to serve a 3/4" commercial water meter. Install new 6" fire water lateral. Tie into PG&E conduit in the sidewalk. Install PG&E sub-box in the sidewalk per the attached PG&E plans. Install new driveway approach and curb, gutter, and sidewalk. All frontage improvements must be mission style. Contractor must use Cal Portland “SLO Mission Style Concrete #0919”. Install street tree per the approved plans and City standards. All work to be done per the approved building plans, BLDG-1398-2024, and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. 1905 SF BOTTOM STORY INTERIOR TENANT IMPROVEMNT OF AN EXISTING TWO STORY RETAIL SPACE OF 2810 SF SECOND STORY TO REMAIN UNOCCUPIED AND UNIMPROVED ASSOCIATED MECHANICAL, ELECTRICAL, AND LIGHTING IMPROVEMENTS PV Roof Mount 5.72KW, 13 Modules, 1 Inverter, 1 Tesla PW3 ESS, (1)200A Backup Gateway installed, New 225A Backup panel to be Installed - DEMOLITION OF (E) WOODEN DECK AND STEPS, (E) WOODEN FENCES, AND REMOVAL OF (E) CONCRETE AND BRICK PAVERS - (N) 524 S.F. DECK WITH BUILT-IN BENCH, (N) FENCE, (N) TRELLIS, (N) OUTDOOR KITCHEN AND FIREPLACE AREA. FOR DECK AND TRELLIS, REFER TO STRUCTURAL DRAWINGS. - MODIFICATION TO ONE EXTERIOR WALL OF THE (E) MAIN RESIDENCE TO ALLOW FOR A (N) 8'-0"W DOOR. REFER TO STRUCTURAL DRAWINGS. - PROVIDE NEW EXTERIOR OUTLETS AND UTILITY HOOKUPS FOR OUTDOOR APPLIANCES. REFER TO PROPOSED ELECTRICAL PLAN. (E) BACKYARD SIZE TO REMAIN. NO CHANGES TO THE (E) BUILDING FOOTPRINT, (E) ROOF, OR (E) BUILDING HEIGHT ARE BEING PROPOSED. NO CHANGES TO GRADING, DRAINAGE, EROSION CONTROL, OR UTILITY SERVICES ARE BEING PROPOSED. TENANT IMPROVEMENT ON THE FIRST FLOOR (E) COLD SHELL BUILDING TO INCLUDE 1575 SF OF (N) CHIROPRACTOR OFFICE New detached ADU, single story Re-designate existing ADU into a SFR Exploratory demo of ceiling drywall and wall drywall. for the purpose of Ach & Engineer review for Major interior remodel. (on future permit) THE SCOPE OF WORK INCLUDES ADDING TEN (10) NEW ISLANDS EACH EQUIPPED WITH ONE DOUBLE-SIDED FUEL DISPENSER, MODIFY THREE (3) EXISTING ISLANDS, AND RELOCATE THREE (3) EXISTING FUEL DISPENSER. ALLOWING FOR TWENTY (20) NEW FUELING POSITIONS TO BE ADDED TO THE EXISTING TWELVE (12) FUELING POSITIONS. THE FUEL FACILITY WILL NOW TOTAL TO THIRTY-TWO (32) FUEL POSITIONS. THE TEN (10) NEW DISPENSERS AND THREE (3) RELOCATED DISPENSER WILL BE INTEGRATED INTO THE NEW COMPUTERIZED CONTROLLER, WHICH RUNS THE PAYMENT, PUMPING, AND MONITORING SYSTEMS - HOUSED BY A 17'-0" FOOT BY 7'-5" OWNER SUPPLIED STEEL UNIT, PREFABRICATED AND STATE APPROVED. FUEL WILL BE STORED IN THREE (3) EXISTING DOUBLE WALLED, FIBERGLASS UNDERGROUND STORAGE TANKS AND ONE (1) NEW FUEL ADDITIVE UST. THE NEW CONTROL / MONITORING SYSTEM INCLUDES AN ALARM TIED INTO THE OWNER'S CONTRACTED 24 HOUR MONITORING SERVICE COMPANY. THE CONTINUOUS LEAK DETECTION SYSTEM WILL AUTOMATICALLY CHECK FOR FLUID LEAKS AND AUTOMATICALLY WILL STOP THE FLOW OF FUEL IN THE EVENT OF AN ALARM CONDITION. Construction of new multi family building; 4-plex Townhomes; Tract 3111. installing hardwired EV charger. Emergency panel replacement. Tree has damaged existing 100A Zinsco panel. 7.7 KW Roof Mounted Solar System, Tesla Powerwall, 2 Car Chargers & Main Panel Upgrade The scope consists of the demolition of an existing garage and the construction of a 3 story residential duplex. The first floor consists of a garage and the upper levels consist of a two-bedroom dwelling unit on one side and a two-bedroom ADU on the other. NEW WAREHOUSE BUILDING - 1-STORY; BLDG B NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2D; LOT 262; PLAN CLUSTER 3E Proposed interior remodel consisting of the construction of two new bedrooms within the existing envelope of the S.F.R. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. SoCal Gas work order # 520004393100. SoCal Gas after-the-fact permit for gas leak repair and final paving. Work requires (1) 4'x2' asphalt cut. Final paving is required for this permit to be finaled. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 307; PLAN COTTAGE 1 NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2D; LOT 261; PLAN COTTAGE 3C INTERIOR REMODEL OF KITCHEN, LIVING, LAUNDRY, AND 2 BATHS NEW SELF-STORAGE BUILDING - 3 STORY; BLDG A Remove and replace old parking pay stations at multiple locations per CIP Specification No.2000574-01. The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications for details (attached). All work to be done per City CIP Spec. No. 2000574-01 and City Standard Specifications & Engineering Standards. A traffic and pedestrian control plan must be submitted, reviewed, and approved prior to each phase of the work. Traffic and pedestrian controls must be per an approved plan and City Appendix G & MUTCD Standards. Contact City Public Works inspector Chase Montoya at 805-540-8655 to coordinate job inspections and information. Permittee is responsible for calling for final inspection so the permit can be closed. NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 308; PLAN COTTAGE 1 NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 309; PLAN COTTAGE 5 (ADD) 238 SF PRIMARY BEDROOM & BATH, (N) BACKYARD DECK, INTERIOR REMODEL, ELECTRICAL PANEL UPGRADE, (N) ELECTRIC CAR CHARGING, (N) EXT. WINDOWS & DOORS, (N) 460 SF DECK South Street and King Crossing, CIP Specification No.2001059. All work to be done per City CIP Spec. No. 2001059 and City Standard Specifications & Engineering Standards. A traffic and pedestrian control plan must be submitted, reviewed, and approved prior to each phase of the work. Traffic and pedestrian controls must be per an approved plan and City Appendix G & MUTCD Standards. Contact City Public Works inspector Chase Montoya at 805-540-8655 to coordinate job inspections and information. Permittee is responsible for calling for final inspection so the permit can be closed. Traffic control for tree trimming on Johnson. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. THIS PROJECT CONSISTS OF THE CONVERSION OF AN EXISTING TWO-CAR GARAGE INTO AN ATTACHED 492 S.F. A.D.U. WITH 2-BEDROOMS AND 1-BATHROOM. MASTER PLOT PLAN (PERMIT#FIRE-0698-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 308; PLOT PLAN 1; TRACT 3089 MASTER PLOT PLAN (PERMIT#FIRE-0702-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 309; PLOT PLAN 5; TRACT 3089 MASTER PLOT PLAN (PERMIT#FIRE-0699-2022) INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 310; PLOT PLAN 2; TRACT 3089 1. ADDING A 3,100 SF PRE-ENGINEERED METAL SERVICE BUILDING. 2 ADDING A 450 SF METAL SERVICE CANOPY (COVERED OUTDOOR SPACE) AND TO RESTRIPE EXISTING PARKING TO ADD ELECTRICAL VEHICLE CHARGING SPACES TO MEET CITY REQUIREMENTS. New construction detached ADU; demolition of exg. detached garage; relocation of exg. shed onsite REMOVAL OF ALL CONTENTS, DRYWALL CEILING TILES, CARPETS ELECTRICAL PANEL UPGRADE THIS PROJECT CONSISTS OF THE CONSTRUCTION OF A 741 S.F., TWO-STORY ADDITION TO THE EXISTING S.F.R.. THIS ADDITION SHALL PROPOSE 4-BEDROOM AND 1-BATHROOM TO THE EXISTING 2-BEDROOM AND 1-BATHROOM RESIDENCE. UPGRADE ELECTRICAL PANEL upgrade from 100 amp to 200 overhead service PANEL UPGRADE 200 AMP NEW LOCATION (10 FT) Replacement of service riser/service mast and wiring. REMOVE AND REPLACE FRONT PORCH POST AND CONCRETE Replacement of 1 entry door Replacement of 1 Patio Door No Construction No Framing Like for like (5) Photovoltaic solar power arrays over existing parking structure deck. 158.4 kW DC. Associated with BLDG-2274-2022. 4.5 kW-DC PHOTOVOLTAIC SYSTEM USING: 10 JAM54D41 LB-450W OR 10 CANADIAN SOLAR CS6.1-54TM-450H OR 10 JKM 450N-54HL4R-B-F8-EN Asplundh Construction for PG&E to inspect pole and install c-truss if required. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. 16.72 kW DC Roof Mount Photovoltaic with Energy Storage (2) STUD MOUNTED NON-LIT ACRYLIC LETTERS REMOVE STUCCO AND INSTALL NEW STUCCO, REPLACE 16 WINDOWS/DOOR. CONSTRUCT 1-STORY DETACHED ADU CONSISTING OF A 4 BEDROOMS AND 2 BATHROOMS PER GOV. CODE 66323(a)(2) Upgrade existing 100 AMP meter main panel to a 200 AMP meter main panel in same location PG&E PM # 35610642. PG&E to trench to install conduit. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. PV solar roof mount, 40 modules, 16.2kw, comp. shingle, existing main 100A, Tesla Powerwall Place job trailer on Palm Street; reference attached plan. Job trailer must be as close to the project frontage as possible to minimize the impact to the neighboring property. This permit is valid until June 30, 2026. All work to be done per City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. New roof-mounted photovoltaic system 9.24 ESS:1 new Subpanel Add on ESS to existing PV, ESS:1 Residential EV charger install Tenant Improvement for Dental Office New agricultural open pavilion structure. No exterior walls, no electric, no conditioning. Addition to an existing SFR and an attached ADU THIS PROJECT PROPOSES THE CONSTRUCTION OF A (N) DETACHED 800 SQ. FT. A.D.U. AND A 260 S.F WORKSHOP AT THE REAR YARD OF AN EXISTING 1,766 SF SINGLE FAMILY RESIDENCE. NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2A; LOT 244; PLAN CLUSTER 2B new ADU converted from an [e] single-family residence attached garage NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2A; LOT 2359 PLAN CLUSTER 4B NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2A; LOT 260; PLAN COTTAGE 3D PV INSTALL 8.61KW DC, 21 PANELS, 1 ESS, 3 EXPANSION, (N) 225A SUB-PANEL NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2A; LOT 243; PLAN CLUSTER 2E Garage conversion to unheated laundry room and storage 230 SQ. FT INTERIOR REMODEL WHICH INCLUDES REMODELING FAMILY ROOM TO BEDROOM AND REMODELING 1/2 BATH & LAUNDRY TO FULL BATH WITH LAUNDRY CLOSET Scope of work is an interior remodel for a single family residence. We are just relocated plumbing fixtures and defining spaces with non structural walls. NEW 3,608 SQ.FT. SINGLE FAMILY RESIDENCE WITH 4 BEDROOMS, 4 BATHROOMS, AN ATTACHED 745 SQ.FT. 3 CAR GARAGE, 254 SQ.FT OF COVERED DECK, AND 0 SQ.FT. OF ROOF DECK ON THE SECOND FLOOR. THE PROPOSED IMPROVEMENTS INCLUDE 294 LINEAR FEET OF RETAINING WALL Remodel approximately 307 sf of existing the residence and create an ADU of approximately 550 sf within the footprint of the original residence. NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2A; LOT 252; PLAN CLUSTER 2C REMOVE & REPLACE (2) WALL SIGNS REMOVE AND REPLACEMENT EXTERIOR SIDING + REPLACE WINDOWS AND SLIDERS UL 300 Amerex Hood Suppression System THIS PROJECT CONSISTS OF THE CONVERSION OF AN EXISTING TWO-CAR GARAGE INTO AN ATTACHED 485 S.F. A.D.U. WITH 2-BEDROOMS AND 1-BATHROOM. Convert a portion of the existing home and garage into a 200 sf ADU. Remodel existing kitchen and master bath, vault living room ceiling. NO CHANGES TO EXITING FOOTPRINT. Place rolloff dumpster in public right-of-way. Anticipated dates are: 02/17/26-02/23/26, however, permit is to remain open until 02/27/26 in case of delays. Dumpster must be maintained in a clean and safe manner. Dumpster must be reflectorized. A copy of this permit must be placed on the dumpster. All work to be done to applicable City Standard Specifications & Engineering Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the dumpster is removed so the permit can be closed. REPLACE 40 GALLON WATER HEATER (SAME FOR SAME) BRING UP TO CODE PV Solar roof mounts, 3.69KW, 9panels, comp-shingle, Existing 200A MSP 1-Tesla Powerwall 3 Interior remodel of existing single family dwelling w partial roof replacement and no change to dwelling footprint of 1572 sf 2,034 SQ.FT. COMMERCIAL TENANT IMPROVEMENT INTERIOR REMODEL FOR CAYUCOS PHARMACY. Modify the existing overhead fire sprinkler system for the tenant improvement located at 1029 Chorro Street in San Luis Obispo, CA. Modifications of the existing fire sprinkler system shall be completed in accordance with NFPA 13, 2022 edition, 2022 California Fire Code, and the San Luis Obispo City Municipal Code. The sprinkler system for this building spans over multiple tenant spaces. The scope of work here is limited solely to this tenant space. Replace/repair main water line CONVERT PANTRY INTO SMALL FULL BATHROOM Replacing the old dialer with a new cellular communicator Tenant Improvement: Convert existing pizza restaurant to Mexican Food Restaurant. THIS PROJECT CONSISTS OF THE CONVERSION OF AN EXISTING TWO-CAR GARAGE INTO AN ATTACHED 402 S.F. A.D.U. WITH 2-BEDROOMS AND 1-BATHROOM. THE ADDITION OF A FOURTH BEDROOM WITHIN THE EXISTING S.F.R WALLS WILL ALSO BE INCLUDED. Replace existing recessed 100A Zinsco electrical panel on east wall with new 200A main service panel in same location. NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 310; PLAN COTTAGE 2 Remodel existing primary suite to add office and relocate existing toilet room door. Installation of 4.95 kW-DC PV system, (11) 450W modules, (11) Enphase Microinverters PV solar roof mount, 17Mods, 6.885kw, Comp shingle , Existing Main Service Panel 125A, TESLA Powerwall 3 Installation of a new 5.4 kW-DC PV System (12) Modules (12) Microinverters (1) 125 A IQ Combiner Installation of a 240V outlet for EV charging and new 125A sub panel. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. Interior remodel of kitchen and bathroom. Within existing footprint, add powder bathroom. Convert existing window to patio door. THIS PROJECT CONSISTS OF THE CONVERSION TO 270 S.F. PORTION OF AN EXISTING SINGLE FAMILY RESIDENCE AND THE CONSTRUCTION OF A 64 SF ADDITION TO SERVE AS THE 1-BATHROOM FOR THE PROPOSED A.D.U.. THEREFOR THE EXISTING RESIDENCE SHALL REMAIN AS A 2-BEDROOM AND 1-BATHROOM. Replace gas furnace with heat pump and wall mounts. 2-Story ADUs per Gov. Code 66232(a)(4) New fire sprinkler plans for a multi-residential home Replace gas furnace with electric Heat-pump; existing location THE PROJECT PRPOSES TO ADD AN ADDITIONAL 7'-8" HOOD AND PIZZA OVEN IN TO AN EXISTING FOOD SERVICE FACILITY. NO OTHER IMPROVEMENTS ARE PROPOSED AS A PART OF THIS PERMIT. THE PROJECT PROPOSES NO ALTERATIONS TO THE EXISTING ACCESSIBLE PATH OF EGRESS OR EGRESS COMPONENTS WITHIN THE BUILDING OR SITE . Remove old 100A recessed Zinsco main service panel and install new recessed 200A main service panel with new 2" rigid service mast and new Service Entrance Conductors Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. Permit Application Date 9/26/2025 11/13/2025 11/12/2025 10/17/2025 10/6/2025 9/5/2025 10/31/2025 10/8/2025 10/30/2025 10/13/2025 9/11/2025 9/16/2025 9/25/2025 9/23/2025 9/9/2025 9/24/2025 9/18/2025 7/15/2025 9/18/2025 9/10/2025 7/14/2025 9/9/2025 8/12/2025 8/28/2025 9/5/2025 6/3/2025 8/19/2025 9/5/2025 8/6/2025 5/16/2025 8/19/2025 7/24/2025 8/14/2025 6/25/2025 7/23/2025 8/15/2025 8/20/2025 8/21/2025 8/14/2025 8/14/2025 8/11/2025 7/9/2025 8/22/2025 8/11/2025 7/11/2025 7/14/2025 7/8/2025 7/8/2025 7/29/2025 9/4/2025 8/13/2025 8/1/2025 6/25/2025 8/27/2025 8/6/2025 6/30/2025 8/7/2025 7/21/2025 7/21/2025 6/13/2025 7/24/2025 8/15/2025 7/22/2025 7/2/2025 7/31/2025 7/23/2025 2/3/2025 6/25/2025 6/30/2025 8/5/2025 7/23/2025 7/1/2025 9/9/2025 6/30/2025 9/8/2025 6/23/2025 7/30/2025 8/21/2025 6/12/2025 8/4/2025 8/11/2025 8/27/2025 7/10/2025 6/30/2025 8/5/2025 8/14/2025 7/2/2025 8/5/2025 8/6/2025 7/29/2025 8/27/2025 6/23/2025 8/13/2025 8/29/2025 6/20/2025 8/21/2025 7/8/2025 7/16/2025 7/22/2025 7/29/2025 8/13/2025 6/23/2025 8/11/2025 7/22/2025 7/9/2025 5/30/2025 7/28/2025 9/4/2025 6/23/2025 8/19/2025 7/29/2025 6/16/2025 9/4/2025 6/30/2025 7/28/2025 7/2/2025 7/9/2025 9/9/2025 6/20/2025 8/19/2025 7/7/2025 5/29/2025 7/14/2025 5/15/2025 9/5/2025 8/4/2025 6/12/2025 8/28/2025 8/27/2025 7/9/2025 6/30/2025 8/11/2025 8/8/2025 8/13/2025 6/30/2025 6/30/2025 9/4/2025 11/20/2024 6/25/2025 9/4/2025 8/4/2025 7/14/2025 7/21/2025 8/28/2025 8/21/2025 7/16/2025 8/19/2025 7/9/2025 8/27/2025 7/29/2025 7/17/2025 9/10/2025 6/25/2025 8/26/2025 8/29/2025 8/11/2025 6/30/2025 6/25/2025 7/7/2025 6/20/2025 7/25/2025 7/22/2025 6/10/2025 7/10/2025 8/27/2025 8/27/2025 6/26/2025 6/27/2025 7/8/2025 8/14/2025 8/11/2025 6/17/2025 6/19/2025 7/9/2025 7/14/2025 7/9/2025 9/9/2025 7/21/2025 7/3/2025 8/11/2025 8/12/2025 6/27/2025 7/31/2025 9/3/2025 7/3/2025 8/21/2025 7/24/2025 8/13/2025 7/21/2025 7/2/2025 7/14/2025 8/13/2025 7/17/2025 8/20/2025 7/22/2025 8/21/2025 8/21/2025 7/16/2025 6/18/2025 7/24/2025 7/8/2025 8/19/2025 7/21/2025 8/12/2025 3/25/2025 8/27/2025 8/11/2025 7/2/2025 8/4/2025 8/26/2025 7/3/2025 8/19/2025 7/17/2025 8/1/2025 6/30/2025 8/21/2025 8/12/2025 8/20/2025 7/7/2025 7/8/2025 8/28/2025 7/1/2025 7/16/2025 7/11/2025 9/3/2025 6/20/2025 9/4/2025 8/14/2025 7/15/2025 6/25/2025 8/14/2025 9/8/2025 6/26/2025 8/6/2025 7/15/2025 6/26/2025 8/4/2025 6/22/2025 8/27/2025 6/23/2025 6/23/2025 7/21/2025 8/6/2025 7/7/2025 8/4/2025 7/1/2025 6/26/2025 1/16/2024 5/29/2025 7/9/2025 7/10/2025 8/6/2025 7/16/2025 9/2/2025 6/16/2025 8/5/2025 7/22/2025 8/5/2025 7/29/2025 7/16/2025 9/5/2025 8/15/2025 7/21/2025 6/30/2025 8/12/2025 8/15/2025 8/8/2025 6/24/2025 7/8/2025 6/3/2025 8/29/2025 8/28/2025 7/2/2025 8/15/2025 7/29/2025 6/9/2025 8/14/2025 8/19/2025 7/2/2025 8/12/2025 6/25/2025 8/7/2025 8/21/2025 8/4/2025 7/11/2025 9/8/2025 7/21/2025 6/30/2025 8/7/2025 7/22/2025 6/25/2025 9/8/2025 8/6/2025 7/2/2025 8/21/2025 7/21/2025 9/8/2025 6/23/2025 8/6/2025 7/9/2025 7/2/2025 9/2/2025 8/7/2025 7/15/2025 7/7/2025 6/6/2025 6/23/2025 8/4/2025 7/22/2025 7/22/2025 7/23/2025 8/7/2025 7/2/2025 7/3/2025 7/16/2025 6/2/2025 7/9/2025 3/25/2025 6/10/2025 9/2/2025 7/9/2025 7/31/2025 6/18/2025 7/30/2025 7/9/2025 9/10/2025 7/16/2025 7/23/2025 7/29/2025 6/18/2025 8/15/2025 7/7/2025 6/18/2025 6/25/2025 5/20/2024 12/14/2023 1/13/2023 10/10/2023 9/10/2024 3/4/2024 12/4/2023 10/11/2022 2/27/2024 10/11/2022 10/11/2022 6/3/2025 6/4/2025 6/12/2025 6/17/2025 6/4/2025 4/29/2025 6/18/2025 5/15/2025 6/4/2025 6/10/2025 6/13/2025 4/7/2025 6/13/2025 6/12/2025 6/17/2025 6/16/2025 6/2/2025 4/2/2025 5/29/2025 6/13/2025 6/11/2025 6/9/2025 6/17/2025 6/3/2025 5/19/2025 5/6/2025 6/5/2025 6/2/2025 6/16/2025 6/20/2025 6/11/2025 5/5/2025 6/2/2025 6/3/2025 6/4/2025 5/29/2025 6/8/2025 6/17/2025 4/29/2025 6/12/2025 6/9/2025 6/3/2025 5/21/2025 4/14/2025 5/29/2025 6/9/2025 6/9/2025 5/28/2025 6/10/2025 5/29/2025 6/13/2025 5/28/2025 6/18/2025 5/23/2025 6/12/2025 6/17/2025 2/25/2025 6/13/2025 5/1/2025 6/4/2025 6/9/2025 5/1/2025 6/17/2025 7/11/2024 5/12/2025 6/9/2025 6/2/2025 12/9/2025 6/9/2025 6/16/2025 5/30/2025 6/11/2025 6/11/2025 6/12/2025 3/18/2025 6/9/2025 3/21/2023 4/16/2025 6/6/2025 6/9/2025 5/16/2025 5/27/2025 5/27/2025 6/12/2025 6/10/2025 5/21/2025 6/17/2025 6/10/2025 6/9/2025 5/29/2025 4/25/2025 6/16/2025 4/21/2025 5/30/2025 3/27/2025 5/30/2025 6/10/2025 6/4/2025 6/17/2025 4/30/2025 5/20/2025 5/13/2025 6/4/2025 6/3/2025 4/21/2025 5/14/2025 6/13/2025 6/18/2025 6/9/2025 5/31/2025 3/17/2025 6/10/2025 6/6/2025 5/31/2025 6/11/2025 6/18/2025 6/4/2025 5/27/2025 6/17/2025 6/4/2025 6/16/2025 6/16/2025 6/4/2025 4/24/2025 5/6/2025 6/10/2025 5/29/2025 6/2/2025 6/12/2025 6/10/2025 6/19/2025 6/12/2025 6/12/2025 6/9/2025 6/4/2025 6/18/2025 6/11/2025 5/23/2025 5/4/2023 5/30/2025 6/11/2025 6/19/2025 5/13/2025 5/14/2025 6/12/2025 6/4/2025 5/13/2025 6/2/2025 5/6/2025 5/29/2025 6/9/2025 3/14/2025 5/14/2025 4/3/2025 8/18/2025 8/11/2025 8/26/2025 7/11/2025 7/31/2025 8/12/2025 12/9/2025 10/21/2025 11/4/2025 6/6/2025 11/5/2025 10/15/2025 11/14/2025 11/12/2025 11/19/2025 9/4/2025 10/16/2025 11/14/2025 10/22/2025 10/16/2025 11/4/2025 9/29/2025 9/29/2025 9/22/2025 9/2/2025 9/19/2025 11/21/2025 10/10/2025 11/24/2025 10/27/2025 9/29/2025 10/24/2025 10/16/2025 11/26/2025 12/1/2025 9/9/2025 9/22/2025 11/6/2025 11/13/2025 10/1/2025 10/6/2025 11/12/2025 10/27/2025 9/29/2025 8/29/2025 11/14/2025 8/25/2025 10/7/2025 10/6/2025 10/2/2025 6/6/2025 11/14/2025 10/1/2025 10/22/2025 11/17/2025 11/18/2025 9/19/2025 11/11/2025 10/7/2025 10/1/2025 11/25/2025 10/15/2025 11/17/2025 11/25/2025 10/16/2025 10/31/2025 10/16/2025 11/14/2025 11/19/2025 9/29/2025 10/6/2025 10/9/2025 10/6/2025 9/4/2025 10/16/2025 10/8/2025 12/4/2025 10/21/2025 9/22/2025 10/28/2025 9/22/2025 10/3/2025 10/27/2025 11/19/2025 11/14/2025 10/27/2025 12/1/2025 10/8/2025 11/5/2025 10/29/2025 9/19/2025 10/15/2025 10/2/2025 9/17/2025 10/9/2025 10/29/2025 9/24/2025 11/8/2025 12/2/2025 11/7/2025 11/19/2025 10/16/2025 8/12/2025 8/18/2025 11/6/2025 11/18/2025 10/2/2025 11/14/2025 10/31/2025 10/27/2025 11/12/2025 9/5/2025 8/25/2025 9/24/2025 10/23/2025 9/14/2025 9/25/2025 11/18/2025 11/13/2025 11/14/2025 10/31/2025 11/14/2025 12/2/2025 10/28/2025 10/8/2025 8/29/2025 9/25/2023 11/4/2025 10/17/2025 11/6/2025 10/17/2025 10/21/2025 9/25/2025 11/19/2025 9/24/2025 11/8/2025 12/4/2025 10/10/2025 10/2/2025 10/22/2025 11/18/2025 10/8/2025 10/9/2025 11/14/2025 10/15/2025 11/5/2025 10/17/2025 11/18/2025 10/2/2025 6/6/2025 9/22/2025 11/7/2025 11/11/2025 9/25/2025 9/26/2025 9/22/2025 10/31/2025 10/7/2025 11/8/2025 10/2/2025 10/2/2025 11/17/2025 11/24/2025 10/30/2025 9/29/2025 10/22/2025 6/6/2025 8/28/2025 10/16/2025 11/6/2025 11/14/2025 9/10/2025 11/8/2025 10/28/2025 10/23/2025 10/13/2025 12/5/2025 10/23/2025 10/23/2025 12/1/2025 11/19/2025 9/29/2025 11/26/2025 11/5/2025 9/18/2025 10/17/2025 10/22/2025 9/18/2025 10/9/2025 9/25/2025 9/18/2025 11/19/2025 9/22/2025 10/15/2025 10/9/2025 6/6/2025 11/5/2025 9/23/2025 10/29/2025 10/21/2025 9/23/2025 11/8/2025 8/28/2025 9/19/2025 10/29/2025 11/14/2025 11/14/2025 10/1/2025 12/2/2025 11/5/2025 9/18/2025 11/5/2025 9/23/2025 12/1/2025 10/22/2025 11/3/2025 10/27/2025 9/24/2025 10/31/2025 11/5/2025 8/27/2025 11/3/2025 12/1/2025 11/19/2025 10/28/2025 10/14/2025 11/18/2025 10/13/2025 10/10/2025 11/6/2025 10/15/2025 8/28/2025 12/3/2025 11/18/2025 11/18/2025 10/1/2025 9/30/2025 2/29/2024 10/30/2025 12/1/2025 10/10/2025 10/20/2025 10/15/2025 11/3/2025 11/3/2025 9/23/2025 10/20/2025 10/15/2025 12/3/2025 10/10/2025 10/17/2025 10/1/2025 11/18/2025 10/7/2025 11/12/2025 10/2/2025 10/10/2025 10/7/2025 10/27/2025 10/27/2025 11/6/2025 10/3/2025 11/4/2025 10/14/2025 11/25/2025 11/8/2025 10/6/2025 10/2/2025 9/24/2025 11/24/2025 10/17/2025 9/24/2025 11/7/2025 12/8/2025 10/22/2025 11/11/2025 10/31/2025 11/6/2025 12/8/2025 10/6/2025 11/18/2025 12/2/2025 11/12/2025 11/5/2025 10/28/2025 9/10/2025 10/13/2025 11/14/2025 10/1/2025 12/5/2025 9/25/2025 6/9/2025 12/8/2025 7/30/2025 10/7/2025 9/29/2025 12/2/2025 10/14/2025 10/20/2025 12/1/2025 10/15/2025 10/31/2025 9/29/2025 10/6/2025 10/24/2025 10/10/2025 9/23/2025 12/4/2025 10/28/2025 10/17/2025 10/7/2025 10/2/2025 11/10/2025 11/12/2025 10/23/2025 10/3/2025 7/25/2025 11/6/2025 11/24/2025 11/10/2025 9/23/2025 3/14/2025 12/8/2025 10/28/2025 9/11/2025 9/11/2025 9/15/2025 9/16/2025 9/17/2025 8/18/2025 9/12/2025 9/4/2025 9/11/2025 3/14/2025 9/11/2025 9/9/2025 7/14/2025 9/10/2025 9/15/2025 9/10/2025 9/10/2025 9/11/2025 9/18/2025 9/11/2025 9/11/2025 9/10/2025 9/18/2025 9/18/2025 9/17/2025 9/17/2025 9/18/2025 9/16/2025 7/1/2025 9/11/2025 9/16/2025 9/11/2025 9/11/2025 9/17/2025 9/16/2025 9/12/2025 8/12/2025 9/17/2025 9/18/2025 9/15/2025 8/18/2025 6/19/2025 6/25/2025 8/12/2025 8/28/2025 7/1/2025 8/18/2025 7/22/2025 9/4/2025 8/13/2025 7/14/2025 8/29/2025 8/11/2025 6/25/2025 6/17/2025 5/22/2025 8/14/2025 7/18/2025 8/4/2025 8/19/2025 8/14/2025 7/2/2025 8/4/2025 6/18/2025 7/9/2025 8/18/2025 7/9/2025 7/17/2025 6/27/2025 8/18/2025 6/18/2025 8/21/2025 8/27/2025 7/16/2025 8/29/2025 7/2/2025 7/1/2025 8/1/2025 8/26/2025 8/11/2025 8/5/2025 6/23/2025 7/7/2025 6/10/2025 6/27/2025 7/18/2025 6/23/2025 6/5/2025 8/15/2025 6/25/2025 9/9/2025 8/28/2025 8/5/2025 7/9/2025 6/25/2025 7/2/2025 6/24/2025 7/25/2025 8/27/2025 8/6/2025 8/29/2025 5/2/2025 7/17/2025 8/5/2025 8/7/2025 7/2/2025 8/6/2025 7/30/2025 6/25/2025 8/11/2025 2/8/2024 8/4/2025 9/10/2025 8/27/2025 7/28/2025 7/2/2025 7/21/2025 6/27/2025 8/5/2025 3/5/2025 3/3/2025 1/13/2025 2/3/2025 12/23/2024 3/12/2025 7/21/2025 7/29/2025 8/25/2025 8/4/2025 8/18/2025 7/23/2025 6/12/2025 7/1/2025 8/13/2025 8/14/2025 7/1/2025 6/19/2025 8/29/2025 7/1/2025 6/16/2025 6/19/2025 9/5/2025 8/26/2025 7/17/2025 6/17/2025 6/19/2025 8/26/2025 8/19/2025 8/25/2025 8/20/2025 8/25/2025 8/4/2025 6/26/2025 6/19/2025 8/8/2025 8/18/2025 8/26/2025 7/10/2025 6/30/2025 7/21/2025 6/12/2025 7/31/2025 6/5/2025 6/17/2025 9/2/2025 6/16/2025 7/11/2025 8/4/2025 6/18/2025 7/17/2025 9/4/2025 7/24/2025 8/26/2025 7/9/2025 7/15/2025 7/9/2025 7/15/2025 8/18/2025 6/23/2025 6/11/2025 6/30/2025 7/22/2025 8/5/2025 8/26/2025 7/9/2025 8/28/2025 7/24/2025 8/21/2025 7/29/2025 6/19/2025 6/13/2025 6/23/2025 6/10/2025 9/3/2025 8/26/2025 8/26/2025 6/2/2025 5/29/2025 6/9/2025 6/5/2025 6/10/2025 6/3/2025 6/3/2025 6/5/2025 6/10/2025 11/19/2025 11/24/2025 11/25/2025 11/18/2025 12/4/2025 11/25/2025 12/2/2025 11/13/2025 11/25/2025 12/2/2025 9/17/2025 12/1/2025 7/11/2024 9/3/2025 11/12/2025 11/4/2025 8/26/2025 9/26/2025 6/21/2024 10/31/2025 11/12/2025 10/13/2025 10/1/2025 10/13/2025 11/12/2025 7/9/2025 11/12/2025 10/1/2025 11/12/2025 11/4/2025 11/12/2025 10/8/2025 10/2/2025 11/6/2025 11/5/2025 10/28/2025 11/4/2025 10/1/2025 9/16/2025 11/13/2025 11/4/2025 11/10/2025 3/3/2025 11/6/2025 10/15/2025 10/30/2025 11/12/2025 10/30/2025 10/17/2025 7/29/2025 10/13/2025 10/30/2025 10/15/2025 11/6/2025 11/12/2025 6/18/2025 7/14/2025 6/19/2025 7/28/2025 8/4/2025 7/25/2025 6/24/2025 7/24/2025 6/10/2025 12/8/2025 10/21/2025 10/13/2025 9/29/2025 11/24/2025 6/24/2025 12/10/2025 12/9/2025 12/11/2025 12/11/2025 12/11/2025 12/11/2025 12/11/2025 9/12/2025 10/24/2024 12/12/2025 4/22/2025 12/12/2025 12/12/2025 2/21/2025 12/11/2025 1/23/2025 11/11/2025 1/23/2025 11/18/2025 3/26/2025 11/4/2025 12/8/2025 12/15/2025 11/14/2025 10/13/2025 9/11/2025 9/22/2025 12/15/2025 9/26/2025 12/16/2025 12/16/2025 12/3/2025 11/26/2025 8/19/2025 12/16/2025 12/16/2025 7/28/2025 10/10/2025 10/10/2025 10/10/2025 10/10/2025 10/10/2025 12/16/2025 9/30/2025 12/18/2025 10/15/2025 11/14/2025 11/18/2025 7/23/2025 12/17/2025 10/2/2025 10/2/2025 10/27/2025 6/24/2025 11/17/2025 12/19/2025 12/16/2025 8/4/2025 12/3/2025 12/18/2025 8/25/2025 11/17/2025 12/19/2025 9/2/2025 11/8/2025 12/16/2025 4/8/2025 5/7/2025 10/21/2025 3/26/2025 12/19/2025 12/19/2025 12/22/2025 3/12/2025 12/22/2025 12/22/2025 10/10/2025 10/10/2025 10/10/2025 10/10/2025 10/10/2025 10/10/2025 10/10/2025 9/25/2025 10/10/2025 10/10/2025 10/10/2025 10/10/2025 10/10/2025 10/10/2025 10/10/2025 10/10/2025 11/20/2024 12/10/2025 10/10/2025 10/10/2025 10/10/2025 12/16/2025 10/10/2025 12/16/2025 10/10/2025 10/10/2025 10/10/2025 10/10/2025 10/10/2025 10/10/2025 10/10/2025 12/16/2025 12/16/2025 10/22/2025 12/16/2025 8/5/2025 8/11/2025 10/18/2024 6/9/2025 11/3/2025 10/3/2025 12/9/2025 9/19/2025 12/16/2025 11/12/2025 7/2/2025 12/12/2025 10/24/2025 12/16/2025 4/1/2025 10/21/2025 11/17/2025 1/23/2025 7/1/2025 12/22/2025 6/5/2025 12/12/2025 12/22/2025 12/23/2025 10/8/2025 12/2/2025 8/8/2025 12/22/2025 12/23/2025 12/23/2025 3/27/2025 7/10/2025 2/27/2025 11/13/2025 9/12/2025 11/15/2025 11/16/2025 10/29/2025 9/23/2025 11/25/2025 11/13/2025 11/18/2025 12/2/2025 11/5/2025 11/24/2025 12/10/2025 7/3/2025 9/12/2025 9/9/2025 12/23/2025 11/12/2025 1/6/2026 11/14/2025 1/5/2026 10/1/2025 10/1/2025 10/1/2025 12/12/2025 1/6/2026 1/5/2026 4/30/2025 12/23/2025 12/16/2025 6/11/2025 1/5/2026 1/5/2026 12/23/2025 1/5/2026 7/17/2025 10/24/2025 1/5/2026 10/2/2025 9/30/2025 10/10/2025 12/30/2025 10/8/2025 9/11/2025 10/2/2024 1/7/2026 1/7/2026 1/7/2026 1/7/2026 12/5/2024 1/7/2026 4/18/2025 10/1/2025 12/5/2025 10/24/2025 9/5/2025 11/24/2025 12/22/2025 11/24/2025 1/23/2025 12/16/2025 12/3/2025 5/27/2025 12/19/2025 1/12/2026 1/28/2025 1/12/2026 9/15/2025 9/17/2025 11/21/2025 12/12/2025 1/5/2026 1/8/2026 3/29/2024 1/9/2026 4/15/2025 1/2/2026 1/9/2026 5/16/2025 1/9/2026 1/9/2026 11/11/2025 3/7/2025 1/6/2026 1/12/2026 1/7/2026 1/13/2026 1/8/2026 9/2/2025 9/2/2025 1/9/2026 1/13/2026 1/13/2026 12/9/2025 10/16/2025 1/13/2026 4/17/2025 1/14/2026 7/9/2025 1/8/2026 1/8/2026 1/14/2026 1/5/2026 12/12/2025 1/14/2026 10/2/2025 11/14/2025 10/8/2025 12/22/2025 1/6/2026 12/4/2025 1/6/2026 9/28/2025 1/15/2026 11/26/2025 12/25/2025 12/25/2025 12/18/2025 12/24/2025 12/24/2025 12/24/2025 1/2/2026 7/8/2025 10/7/2025 1/2/2026 1/13/2026 1/13/2026 1/16/2026 1/15/2026 12/2/2025 10/8/2025 1/15/2026 10/21/2025 6/16/2025 3/5/2025 11/5/2025 12/18/2025 12/22/2025 4/1/2025 12/29/2025 11/19/2025 10/30/2025 12/8/2025 12/11/2025 12/22/2025 12/30/2025 12/9/2025 3/27/2025 3/27/2025 3/27/2025 1/20/2026 1/15/2026 1/2/2026 1/19/2026 1/5/2026 7/13/2025 1/2/2026 6/24/2025 8/15/2025 10/21/2025 12/18/2025 1/16/2026 9/16/2025 1/21/2026 1/15/2026 1/14/2026 1/13/2026 1/15/2026 1/14/2026 5/29/2025 1/14/2026 1/21/2026 11/3/2025 1/21/2026 1/21/2026 1/13/2023 2/26/2025 5/2/2025 5/1/2025 5/16/2025 6/16/2025 7/29/2025 7/28/2025 7/29/2025 8/13/2025 10/10/2025 8/17/2022 12/18/2024 4/23/2025 6/16/2025 6/2/2025 5/22/2025 6/3/2025 7/15/2025 7/2/2025 7/15/2025 7/16/2025 7/1/2025 7/16/2025 6/24/2025 6/30/2025 7/28/2025 7/2/2025 8/13/2025 8/4/2025 8/4/2025 8/8/2025 8/11/2025 9/30/2025 8/14/2025 9/22/2025 9/4/2025 9/22/2025 9/22/2025 8/19/2025 11/5/2025 5/23/2025 7/16/2025 6/9/2025 6/9/2025 7/16/2025 7/16/2025 7/17/2025 7/28/2025 7/30/2025 7/28/2025 7/28/2025 7/30/2025 7/28/2025 8/1/2025 7/30/2025 7/30/2025 7/17/2025 3/4/2024 4/15/2024 12/17/2025 6/26/2025 1/26/2026 3/11/2025 10/30/2025 2/12/2024 1/6/2026 1/6/2026 11/11/2025 1/23/2026 1/23/2026 7/23/2025 1/22/2026 7/9/2025 1/12/2026 1/21/2026 1/19/2026 1/27/2026 1/14/2026 6/9/2025 3/28/2025 1/6/2026 12/22/2025 12/23/2025 10/7/2025 4/1/2024 1/15/2026 1/28/2026 1/28/2026 1/22/2026 12/1/2025 10/2/2024 10/2/2024 6/16/2025 1/6/2026 12/11/2025 1/28/2026 8/4/2025 12/19/2025 8/21/2025 8/21/2025 1/29/2026 12/17/2025 1/29/2026 8/21/2025 5/1/2025 12/15/2025 3/27/2025 1/15/2026 3/27/2025 3/27/2025 12/4/2025 3/27/2025 9/26/2025 10/7/2025 1/26/2026 6/26/2025 10/24/2025 1/29/2026 9/30/2025 1/29/2026 2/2/2026 1/20/2026 2/12/2024 1/29/2026 2/3/2026 2/3/2026 2/3/2026 2/3/2026 2/3/2026 3/27/2025 2/2/2026 12/17/2025 2/3/2026 4/7/2025 8/15/2025 1/21/2026 1/21/2026 1/6/2026 1/21/2026 1/7/2026 1/21/2026 10/2/2024 12/3/2025 10/2/2024 3/13/2025 1/9/2026 7/11/2025 1/22/2026 9/17/2025 10/20/2025 2/12/2024 2/12/2024 12/3/2025 12/11/2025 1/22/2026 10/9/2025 12/31/2025 1/12/2026 7/8/2025 12/31/2025 8/29/2025 12/24/2025 12/24/2025 10/17/2025 12/24/2025 12/24/2025 1/15/2026 12/10/2024 2/4/2025 1/5/2026 1/5/2026 1/7/2026 1/26/2026 10/27/2025 1/5/2026 1/5/2026 1/26/2026 1/26/2026 6/24/2025 1/15/2026 1/28/2026 1/28/2026 1/28/2026 1/28/2026 6/6/2025 1/28/2026 1/28/2026 1/14/2026 1/28/2026 9/17/2025 1/27/2026 12/1/2025 1/28/2026 1/26/2026 5/27/2025 7/2/2025 12/18/2025 1/29/2026 1/22/2026 1/19/2026 1/22/2026 12/15/2025 6/20/2025 7/1/2025 11/14/2025 11/19/2025 12/12/2025 1/30/2026 6/11/2025 1/30/2026 12/29/2025 2/3/2026 5/27/2025 11/21/2025 11/24/2025 2/5/2025 6/19/2025 11/25/2025 12/1/2025 1/30/2026 2/2/2026 1/22/2026 3/27/2025 1/21/2026 10/24/2025 1/8/2026 2/4/2026 1/16/2026 12/15/2025 3/7/2025 6/25/2025 10/17/2025 11/26/2025 3/27/2025 10/17/2025 12/11/2025 1/27/2026 12/9/2025 2/4/2026 3/27/2025 3/27/2025 3/27/2025 1/5/2026 1/21/2026 2/2/2026 11/7/2025 3/27/2025 2/4/2026 2/4/2026 6/11/2024 6/12/2025 10/10/2025 2/4/2026 1/2/2025 12/3/2025 8/27/2025 7/29/2025 1/12/2026 3/27/2025 10/2/2024 10/2/2024 2/3/2026 9/18/2025 7/16/2025 12/26/2025 8/21/2025 8/21/2025 8/21/2025 8/21/2025 8/21/2025 8/21/2025 8/21/2025 2/9/2026 2/2/2026 2/3/2026 2/3/2026 2/2/2026 2/2/2026 2/10/2026 1/2/2025 8/18/2025 3/29/2024 2/9/2026 6/18/2025 2/4/2026 2/11/2025 8/10/2023 2/6/2026 5/9/2025 6/18/2025 7/31/2025 12/17/2025 1/27/2026 8/21/2025 9/12/2025 10/2/2024 2/3/2026 2/11/2026 1/29/2026 9/29/2025 4/17/2025 10/23/2025 9/25/2025 2/4/2026 10/28/2025 1/28/2026 2/5/2026 1/30/2026 12/14/2023 2/6/2026 2/6/2026 11/13/2025 10/2/2024 10/14/2025 12/12/2025 2/6/2026 2/6/2026 9/23/2025 10/2/2024 2/3/2026 2/6/2026 1/7/2026 2/6/2026 6/30/2025 2/6/2026 2/9/2026 2/6/2026 10/27/2025 10/22/2025 11/21/2025 9/30/2025 3/27/2025 1/26/2026 9/9/2025 12/31/2025 1/21/2026 12/1/2025 3/27/2025 4/9/2025 5/28/2025 2/4/2026 12/22/2025 10/4/2024 2/6/2026 1/30/2026 1/15/2026 1/15/2026 1/13/2026 1/15/2026 1/27/2026 1/27/2026 5/22/2025 1/27/2026 1/27/2026 1/27/2026 1/27/2026 1/23/2026 1/28/2026 1/28/2026 2/7/2026 1/27/2026 1/27/2026 1/27/2026 1/13/2026 1/23/2026 1/23/2026 1/23/2026 1/16/2026 1/23/2026 1/28/2026 1/28/2026 1/20/2026 7/16/2025 1/28/2026 1/28/2026 1/28/2026 1/28/2026 3/25/2025 3/25/2025 1/28/2026 1/28/2026 1/28/2026 12/17/2025 1/19/2024 1/19/2024 4/3/2024 7/9/2025 2/11/2026 10/6/2021 1/13/2026 2/2/2026 2/2/2026 7/11/2025 7/9/2025 1/15/2025 10/2/2025 7/31/2025 6/30/2025 10/18/2024 10/18/2024 5/19/2025 10/1/2025 11/12/2025 1/14/2026 5/20/2025 3/12/2025 3/24/2025 5/2/2025 12/30/2025 11/22/2024 3/24/2023 11/6/2025 12/8/2025 11/13/2025 6/24/2024 4/11/2024 8/21/2025 5/6/2025 2/12/2026 2/12/2026 3/27/2025 8/21/2025 12/18/2023 4/11/2024 10/14/2025 3/27/2025 3/27/2025 6/26/2025 2/12/2026 2/12/2026 4/23/2025 2/4/2026 2/4/2026 2/4/2026 11/6/2024 2/13/2025 2/5/2026 2/5/2026 5/8/2025 2/12/2026 2/6/2026 2/11/2026 2/9/2026 2/10/2026 2/11/2026 2/5/2026 2/5/2026 11/6/2025 1/14/2026 2/13/2026 12/19/2025 2/12/2026 10/20/2025 10/21/2025 12/12/2025 2/13/2026 9/24/2025 2/13/2026 1/2/2026 10/15/2025 11/5/2025 2/13/2026 5/23/2025 1/16/2025 6/27/2024 6/26/2025 10/2/2024 9/12/2025 10/2/2024 10/2/2024 2/13/2026 10/2/2024 11/6/2025 11/5/2025 7/22/2024 4/25/2025 2/27/2025 10/2/2024 12/22/2025 11/17/2025 1/20/2026 2/13/2026 4/16/2025 2/11/2025 2/17/2026 2/11/2026 1/6/2026 1/20/2025 12/8/2025 2/17/2026 9/27/2025 2/17/2026 1/5/2026 6/9/2025 3/8/2025 9/30/2025 10/27/2025 3/27/2025 11/24/2025 2/9/2026 11/24/2025 1/28/2026 2/9/2026 2/17/2026 10/30/2025 9/22/2025 2/9/2026 7/16/2025 4/18/2025 9/17/2025 2/12/2026 7/9/2025 9/17/2025 2/17/2026 Permit Finaled Date 11/12/2025 9/16/2025 9/9/2025 9/30/2025 10/29/2025 11/20/2025 10/10/2025 8/13/2025 8/21/2025 10/8/2025 9/22/2025 10/28/2025 8/25/2025 9/9/2025 10/27/2025 9/16/2025 10/13/2025 8/6/2025 8/8/2025 10/6/2025 8/11/2025 7/8/2025 8/28/2025 8/11/2025 9/22/2025 8/21/2025 10/15/2025 9/15/2025 8/18/2025 9/9/2025 8/6/2025 8/27/2025 10/30/2025 11/21/2025 7/25/2025 9/25/2025 8/13/2025 10/31/2025 8/19/2025 12/5/2025 9/17/2025 10/3/2025 9/25/2025 11/12/2025 10/9/2025 8/1/2025 11/6/2025 7/14/2025 7/18/2025 11/6/2025 7/25/2025 11/5/2025 9/12/2025 10/3/2025 9/8/2025 10/9/2025 8/1/2025 11/19/2025 10/23/2025 10/21/2025 8/30/2025 10/22/2025 9/16/2025 10/8/2025 11/12/2025 8/6/2025 11/6/2025 8/26/2025 10/23/2025 9/2/2025 12/3/2025 8/11/2025 12/3/2025 10/17/2025 9/10/2025 11/12/2025 8/21/2025 10/6/2025 9/15/2025 9/15/2025 8/21/2025 9/25/2025 7/7/2025 8/29/2025 8/11/2025 10/3/2025 7/23/2025 9/18/2025 10/15/2025 8/13/2025 7/24/2025 7/31/2025 9/4/2025 9/29/2025 9/9/2025 9/8/2025 8/20/2025 10/8/2025 9/3/2025 9/16/2025 9/18/2025 8/21/2025 10/7/2025 10/15/2025 7/24/2025 9/15/2025 9/22/2025 8/4/2025 9/18/2025 9/24/2025 9/15/2025 10/28/2025 8/21/2025 10/17/2025 9/4/2025 8/18/2025 9/2/2025 8/26/2025 10/3/2025 8/19/2025 9/5/2025 9/9/2025 10/10/2025 8/5/2025 7/25/2025 10/17/2025 8/22/2025 10/8/2025 8/5/2025 11/10/2025 11/18/2025 9/4/2025 7/24/2025 7/18/2025 8/26/2025 9/22/2025 10/6/2025 7/14/2025 8/18/2025 7/16/2025 10/2/2025 11/5/2025 10/2/2025 9/24/2025 9/25/2025 9/17/2025 8/19/2025 8/25/2025 9/25/2025 11/12/2025 8/11/2025 8/19/2025 7/25/2025 9/25/2025 10/15/2025 9/25/2025 10/27/2025 9/22/2025 7/31/2025 8/8/2025 11/6/2025 9/9/2025 9/10/2025 8/8/2025 9/5/2025 10/27/2025 8/18/2025 8/15/2025 10/17/2025 9/24/2025 12/25/2025 11/10/2025 9/25/2025 8/11/2025 8/27/2025 7/25/2025 8/18/2025 7/29/2025 7/29/2025 7/29/2025 7/29/2025 7/10/2025 6/24/2025 6/25/2025 6/30/2025 12/10/2025 7/2/2025 8/1/2025 10/14/2025 10/14/2025 6/25/2025 8/26/2025 7/10/2025 8/12/2025 8/28/2025 7/2/2025 6/25/2025 8/1/2025 7/25/2025 7/3/2025 6/16/2025 6/16/2025 6/13/2025 6/25/2025 8/13/2025 6/16/2025 9/16/2025 6/13/2025 10/9/2025 9/10/2025 6/24/2025 7/3/2025 9/22/2025 9/18/2025 6/9/2025 7/2/2025 6/20/2025 8/21/2025 6/16/2025 6/26/2025 7/17/2025 6/13/2025 6/25/2025 6/13/2025 7/15/2025 7/23/2025 7/30/2025 8/15/2025 7/30/2025 6/26/2025 6/25/2025 6/24/2025 8/7/2025 7/1/2025 8/7/2025 9/17/2025 9/15/2025 7/7/2025 6/26/2025 6/17/2025 7/21/2025 7/3/2025 7/10/2025 7/1/2025 6/12/2025 8/19/2025 6/26/2025 9/19/2025 8/1/2025 7/3/2025 6/26/2025 7/2/2025 7/21/2025 7/24/2025 6/17/2025 9/25/2025 10/29/2025 6/12/2025 8/15/2025 7/30/2025 7/30/2025 7/8/2025 6/17/2025 6/25/2025 6/25/2025 8/11/2025 7/8/2025 12/8/2025 6/25/2025 10/29/2025 5/30/2025 9/2/2025 10/27/2025 11/7/2025 8/27/2025 11/10/2025 10/6/2025 8/7/2025 10/2/2025 12/1/2025 10/8/2025 10/29/2025 11/20/2025 10/14/2025 10/30/2025 11/21/2025 12/2/2025 10/8/2025 11/13/2025 10/9/2025 10/7/2025 12/10/2025 10/29/2025 10/24/2025 11/10/2025 11/6/2025 12/5/2025 10/6/2025 11/18/2025 11/21/2025 10/22/2025 12/8/2025 12/1/2025 11/13/2025 11/26/2025 11/17/2025 12/7/2025 10/3/2025 10/30/2025 11/18/2025 10/23/2025 10/8/2025 11/13/2025 10/17/2025 11/22/2025 12/9/2025 10/17/2025 11/10/2025 11/8/2025 11/21/2025 11/26/2025 11/13/2025 10/31/2025 11/17/2025 12/5/2025 11/26/2025 11/12/2025 11/18/2025 11/6/2025 11/26/2025 12/1/2025 11/21/2025 11/10/2025 11/10/2025 12/2/2025 12/3/2025 11/20/2025 11/10/2025 10/23/2025 12/9/2025 11/7/2025 11/14/2025 10/29/2025 11/12/2025 11/10/2025 11/5/2025 11/3/2025 12/1/2025 11/21/2025 12/7/2025 11/10/2025 10/23/2025 11/13/2025 10/17/2025 11/17/2025 10/2/2025 12/5/2025 10/17/2025 11/17/2025 11/21/2025 11/10/2025 11/6/2025 12/3/2025 11/20/2025 11/10/2025 10/17/2025 11/10/2025 11/10/2025 11/12/2025 12/8/2025 11/21/2025 11/10/2025 11/12/2025 11/10/2025 11/12/2025 12/8/2025 11/6/2025 12/8/2025 11/18/2025 10/8/2025 9/12/2025 10/10/2025 11/26/2025 11/26/2025 11/19/2025 11/19/2025 11/19/2025 9/26/2025 12/8/2025 11/19/2025 11/13/2025 11/26/2025 11/26/2025 10/8/2025 10/30/2025 9/29/2025 10/15/2025 9/23/2025 9/22/2025 8/14/2025 9/18/2025 7/31/2025 9/12/2025 8/29/2025 8/8/2025 10/27/2025 6/26/2025 9/4/2025 7/31/2025 8/20/2025 10/8/2025 9/3/2025 9/2/2025 9/16/2025 11/3/2025 9/24/2025 9/9/2025 11/6/2025 10/29/2025 7/29/2025 12/5/2025 8/8/2025 10/8/2025 9/2/2025 7/25/2025 12/1/2025 7/22/2025 9/9/2025 9/3/2025 10/8/2025 9/8/2025 9/22/2025 8/13/2025 10/27/2025 8/26/2025 9/9/2025 9/4/2025 8/19/2025 10/3/2025 9/15/2025 10/16/2025 11/24/2025 8/5/2025 9/12/2025 8/28/2025 11/25/2025 11/19/2025 8/21/2025 12/3/2025 11/21/2025 6/16/2025 9/2/2025 9/2/2025 7/25/2025 7/11/2025 8/11/2025 6/16/2025 7/1/2025 7/25/2025 7/25/2025 7/25/2025 7/25/2025 7/25/2025 7/11/2025 8/11/2025 7/1/2025 12/2/2025 11/10/2025 11/10/2025 10/17/2025 11/10/2025 11/10/2025 11/13/2025 1/7/2026 10/27/2025 11/10/2025 10/17/2025 7/1/2025 12/10/2025 12/9/2025 12/12/2025 12/12/2025 12/9/2025 12/5/2025 12/12/2025 12/11/2025 12/15/2025 12/12/2025 12/10/2025 12/15/2025 12/16/2025 12/9/2025 12/15/2025 12/15/2025 12/16/2025 12/16/2025 12/18/2025 12/19/2025 12/15/2025 12/18/2025 12/17/2025 12/18/2025 12/18/2025 12/17/2025 12/18/2025 12/19/2025 12/19/2025 12/17/2025 12/16/2025 12/19/2025 12/12/2025 12/16/2025 12/16/2025 12/17/2025 12/16/2025 12/16/2025 12/10/2025 12/17/2025 12/18/2025 12/8/2025 12/22/2025 12/23/2025 12/23/2025 12/22/2025 12/22/2025 12/23/2025 12/23/2025 12/12/2025 12/24/2025 12/24/2025 12/24/2025 12/24/2025 12/23/2025 12/23/2025 12/22/2025 12/23/2025 12/24/2025 12/24/2025 1/6/2026 12/11/2025 12/18/2025 1/5/2026 1/6/2026 1/6/2026 1/5/2026 1/5/2026 1/6/2026 12/19/2025 1/7/2026 1/7/2026 1/7/2026 1/7/2026 1/8/2026 1/8/2026 1/8/2026 1/15/2026 1/15/2026 1/13/2026 1/13/2026 1/14/2026 1/15/2026 1/15/2026 1/15/2026 1/16/2026 12/29/2025 12/29/2025 12/29/2025 12/31/2025 12/31/2025 12/31/2025 12/31/2025 12/31/2025 1/14/2026 1/14/2026 1/14/2026 1/20/2026 1/21/2026 11/24/2025 8/27/2025 7/23/2025 7/2/2025 7/31/2025 10/16/2025 10/16/2025 7/17/2025 12/1/2025 7/3/2025 10/16/2025 12/16/2025 8/15/2025 12/16/2025 10/15/2025 1/13/2026 9/25/2025 11/6/2025 11/21/2025 9/9/2025 12/17/2025 9/24/2025 9/18/2025 9/18/2025 10/16/2025 10/2/2025 9/17/2025 10/27/2025 10/16/2025 10/16/2025 1/26/2026 1/23/2026 1/22/2026 1/22/2026 1/23/2026 1/27/2026 1/27/2026 1/28/2026 1/28/2026 1/27/2026 1/27/2026 1/29/2026 1/27/2026 1/8/2026 1/12/2026 1/29/2026 1/26/2026 1/30/2026 1/23/2026 1/23/2026 1/28/2026 12/29/2025 2/2/2026 2/3/2026 1/21/2026 1/21/2026 1/21/2026 1/21/2026 1/23/2026 1/23/2026 1/23/2026 1/23/2026 1/23/2026 1/23/2026 1/23/2026 1/21/2026 1/8/2026 1/26/2026 8/25/2025 1/28/2026 1/28/2026 1/29/2026 1/28/2026 1/30/2026 12/29/2025 8/1/2025 2/3/2026 2/3/2026 2/3/2026 2/3/2026 2/4/2026 1/8/2026 1/21/2026 1/26/2026 1/27/2026 2/4/2026 2/4/2026 2/3/2026 2/4/2026 2/3/2026 1/9/2026 2/3/2026 1/30/2026 1/30/2026 2/5/2026 2/5/2026 2/5/2026 2/5/2026 2/10/2026 2/5/2026 2/6/2026 2/6/2026 2/6/2026 2/3/2026 2/5/2026 2/4/2026 2/4/2026 2/5/2026 2/5/2026 2/4/2026 12/8/2025 2/9/2026 2/9/2026 2/9/2026 2/10/2026 2/6/2026 2/9/2026 2/9/2026 2/10/2026 2/10/2026 2/10/2026 12/19/2025 1/8/2026 12/22/2025 1/26/2026 2/17/2026 2/17/2026