HomeMy WebLinkAboutCollins Monthly Permit Report.csvPermit Number
ENCR-2250-2025
ENCR-2652-2025
ENCR-2635-2025
ENCR-2451-2025
ENCR-2315-2025
ENCR-2098-2025
ENCR-2543-2025
ENCR-2345-2025
ENCR-2532-2025
ENCR-2368-2025
ENCR-2129-2025
ENCR-2162-2025
ENCR-2234-2025
TRAN-2216-2025
ENCR-2112-2025
ENCR-2232-2025
ENCR-2185-2025
ENCR-1642-2025
ENCR-2180-2025
ENCR-2118-2025
ENCR-1629-2025
ENCR-2111-2025
SAPP-1877-2025
EPM-2045-2025
SAPP-2093-2025
BLDG-1263-2025
EPM-1929-2025
SAPP-2095-2025
SAPP-1837-2025
FIRE-1154-2025
BLDG-1936-2025
EPM-1715-2025
TRAN-1902-2025
SAPP-1488-2025
EPM-1705-2025
ENCR-1912-2025
ENCR-1948-2025
SIGN-1985-2025
ENCR-1896-2025
ENCR-1891-2025
FIRE-1851-2025
EPM-1598-2025
ENCR-1998-2025
ENCR-1861-2025
EPM-1622-2025
EPM-1628-2025
BLDG-1569-2025
FIRE-1576-2025
ENCR-1746-2025
EPM-2078-2025
TRAN-1886-2025
FIRE-1778-2025
ENCR-1481-2025
EPM-2029-2025
TRAN-1830-2025
ENCR-1521-2025
EPM-1843-2025
ENCR-1681-2025
ENCR-1678-2025
TRAN-1369-2025
EPM-1719-2025
SAPP-1907-2025
EPM-1701-2025
EPM-1539-2025
SAPP-1775-2025
EPM-1707-2025
FIRE-0304-2025
EPM-1480-2025
SAPP-1505-2025
TRAN-1813-2025
EPM-1708-2025
BLDG-1522-2025
ENCR-2105-2025
ENCR-1520-2025
EPM-2100-2025
BLDG-1449-2025
EPM-1765-2025
EPM-1983-2025
EPM-1364-2025
TRAN-1800-2025
ENCR-1867-2025
EPM-2037-2025
EPM-1611-2025
TRAN-1507-2025
TRAN-1814-2025
TRAN-1900-2025
EPM-1550-2025
SAPP-1812-2025
TRAN-1833-2025
BLDG-1755-2025
FIRE-2023-2025
BLDG-1450-2025
EPM-1888-2025
TRAN-2060-2025
EPM-1436-2025
FIRE-1988-2025
EPM-1571-2025
SAPP-1658-2025
BLDG-1696-2025
EPM-1748-2025
SAPP-1884-2025
ENCR-1456-2025
TRAN-1863-2025
TRAN-1691-2025
BLDG-1591-2025
FIRE-1244-2025
BLDG-1743-2025
EPM-2084-2025
BLDG-1451-2025
SAPP-1935-2025
EPM-1757-2025
BLDG-1378-2025
EPM-2083-2025
EPM-1508-2025
EPM-1736-2025
EPM-1541-2025
SAPP-1595-2025
SAPP-2110-2025
EPM-1439-2025
EPM-1937-2025
ENCR-1564-2025
FIRE-1237-2025
SIGN-1625-2025
FIRE-1143-2025
EPM-2091-2025
EPM-1791-2025
FIRE-1352-2025
ENCR-2050-2025
FIRE-2024-2025
EPM-1584-2025
EPM-1506-2025
FIRE-1853-2025
SAPP-1845-2025
BLDG-1881-2025
BLDG-1514-2025
BLDG-1515-2025
ENCR-2081-2025
BLDG-2665-2024
ENCR-1485-2025
BLDG-2086-2025
EPM-1797-2025
ENCR-1632-2025
EPM-1680-2025
ENCR-2041-2025
ENCR-1987-2025
EPM-1648-2025
ENCR-1932-2025
BLDG-1589-2025
FIRE-2025-2025
ENCR-1750-2025
EPM-1668-2025
EPM-2125-2025
BLDG-1475-2025
ENCR-2018-2025
ENCR-2054-2025
ENCR-1850-2025
EPM-1509-2025
EPM-1473-2025
ENCR-1563-2025
ENCR-1438-2025
ENCR-1730-2025
TRAN-1692-2025
SAPP-1337-2025
EPM-1612-2025
EPM-2031-2025
BLDG-2027-2025
BLDG-1490-2025
SAPP-1501-2025
EPM-1573-2025
ENCR-1898-2025
EPM-1864-2025
SIGN-1399-2025
TRAN-1426-2025
BLDG-1594-2025
ENCR-1631-2025
BLDG-1590-2025
ENCR-2109-2025
ENCR-1676-2025
EPM-1554-2025
SAPP-1854-2025
EPM-1874-2025
BLDG-1500-2025
EPM-1771-2025
ENCR-2075-2025
EPM-1555-2025
BLDG-1981-2025
EPM-1720-2025
ENCR-1887-2025
EPM-1684-2025
EPM-1532-2025
BLDG-1633-2025
ENCR-1882-2025
TRAN-1663-2025
ENCR-1947-2025
ENCR-1693-2025
ENCR-1992-2025
TRAN-1991-2025
BLDG-1651-2025
EPM-1414-2025
EPM-1718-2025
FIRE-1574-2025
ENCR-1938-2025
EPM-1685-2025
EPM-1878-2025
BLDG-0716-2025
BLDG-2032-2025
ENCR-1862-2025
EPM-1552-2025
ENCR-1801-2025
ENCR-2021-2025
EPM-1557-2025
ENCR-1933-2025
TRAN-1662-2025
SAPP-1781-2025
EPM-1513-2025
ENCR-1980-2025
EPM-1870-2025
EPM-1944-2025
FIRE-1561-2025
EPM-1577-2025
EPM-2047-2025
BLDG-1524-2025
ENCR-1656-2025
SAPP-1616-2025
EPM-2077-2025
BLDG-1441-2025
EPM-2079-2025
BLDG-1897-2025
EPM-1636-2025
EPM-1476-2025
EPM-1893-2025
BLDG-2104-2025
ENCR-1606-2025
TRAN-1825-2025
ENCR-1641-2025
BLDG-1496-2025
EPM-1789-2025
FIRE-1443-2025
ENCR-2026-2025
FIRE-1455-2025
EPM-1459-2025
ENCR-1683-2025
TRAN-1828-2025
EPM-1562-2025
TRAN-1799-2025
ENCR-1453-2025
EPM-1491-2025
BLDG-0040-2024
BLDG-1239-2025
EPM-1600-2025
EPM-1613-2025
TRAN-1829-2025
BLDG-1653-2025
EPM-2066-2025
EPM-1387-2025
EPM-1804-2025
TRAN-1690-2025
EPM-1821-2025
ENCR-1754-2025
ENCR-1652-2025
ENCR-2097-2025
SAPP-1914-2025
ENCR-1682-2025
ENCR-1503-2025
EPM-1869-2025
EPM-1908-2025
EPM-1846-2025
EPM-1467-2025
FIRE-1575-2025
GRAD-1265-2025
SAPP-2061-2025
BLDG-2042-2025
EPM-1534-2025
SAPP-1906-2025
EPM-1749-2025
BLDG-1314-2025
EPM-1895-2025
EPM-1939-2025
BLDG-1542-2025
EPM-1873-2025
TRAN-1472-2025
BLDG-1844-2025
FIRE-1990-2025
EPM-1795-2025
EPM-1621-2025
TRAN-2103-2025
EPM-1687-2025
ENCR-1502-2025
SAPP-1842-2025
TRAN-1688-2025
BLDG-1487-2025
EPM-2102-2025
TRAN-1826-2025
EPM-1547-2025
ENCR-1982-2025
ENCR-1675-2025
BLDG-2101-2025
ENCR-1447-2025
EPM-1824-2025
BLDG-1586-2025
EPM-1543-2025
EPM-2072-2025
TRAN-1839-2025
SAPP-1637-2025
DEMO-1565-2025
BLDG-1296-2025
BLDG-1454-2025
EPM-1787-2025
SAPP-1697-2025
EPM-1695-2025
BLDG-1703-2025
BLDG-1841-2025
EPM-1546-2025
EPM-1558-2025
FIRE-1649-2025
ENCR-1604-2025
EPM-1583-2025
BLDG-0717-2025
EPM-1332-2025
ENCR-2065-2025
BLDG-1597-2025
BLDG-1773-2025
ENCR-1412-2025
SIGN-1764-2025
BLDG-1592-2025
SAPP-2119-2025
ENCR-1657-2025
EPM-1711-2025
BLDG-1751-2025
ENCR-1413-2025
EPM-1909-2025
ENCR-1567-2025
FIRE-1408-2025
EPM-1474-2025
FIRE-1218-2024
BLDG-3317-2023
BLDG-0095-2023
BLDG-2666-2023
BLDG-2096-2024
BLDG-0546-2024
BLDG-3185-2023
BLDG-2774-2022
BLDG-0459-2024
BLDG-2775-2022
BLDG-2740-2022
EPM-1260-2025
BLDG-1270-2025
BLDG-1359-2025
TRAN-1394-2025
ENCR-1274-2025
EPM-1015-2025
BLDG-1417-2025
BLDG-1146-2025
SAPP-1282-2025
EPM-1328-2025
SAPP-1373-2025
BLDG-0849-2025
SAPP-1374-2025
ENCR-1353-2025
ENCR-1396-2025
BLDG-1392-2025
TRAN-1250-2025
FIRE-0822-2025
EPM-1228-2025
SAPP-1377-2025
EPM-1347-2025
ENCR-1301-2025
ENCR-1395-2025
EPM-1261-2025
EPM-1160-2025
BLDG-1063-2025
EPM-1284-2025
TRAN-1249-2025
ENCR-1383-2025
BLDG-1440-2025
SAPP-1348-2025
ENCR-1061-2025
BLDG-1255-2025
ENCR-1264-2025
BLDG-1272-2025
ENCR-1232-2025
SAPP-1298-2025
ENCR-1398-2025
ENCR-1014-2025
SAPP-1368-2025
SAPP-1317-2025
EPM-1262-2025
EPM-1183-2025
BLDG-0899-2025
TRAN-1229-2025
SAPP-1321-2025
EPM-1309-2025
EPM-1222-2025
SAPP-1329-2025
EPM-1238-2025
BLDG-1370-2025
ENCR-1223-2025
BLDG-1421-2025
BLDG-1201-2025
ENCR-1357-2025
SAPP-1407-2025
FIRE-0461-2025
ENCR-1371-2025
EPM-1038-2025
EPM-1280-2025
SAPP-1320-2025
BLDG-1036-2025
EPM-1406-2025
BLDG-1639-2024
EPM-1107-2025
ENCR-1306-2025
ENCR-1248-2025
ENCR-2868-2025
SAPP-1319-2025
BLDG-1384-2025
EPM-1245-2025
ENCR-1344-2025
ENCR-1346-2025
SAPP-1367-2025
BLDG-0666-2025
SAPP-1322-2025
BLDG-0721-2023
FIRE-0937-2025
EPM-1293-2025
SAPP-1305-2025
BLDG-1156-2025
EPM-1218-2025
FIRE-1215-2025
SAPP-1358-2025
SAPP-1330-2025
FIRE-1185-2025
ENCR-1401-2025
SAPP-1339-2025
EPM-1304-2025
ENCR-1235-2025
EPM-0992-2025
BLDG-1386-2025
SIGN-0958-2025
EPM-1240-2025
BLDG-0785-2025
EPM-1243-2025
EPM-1340-2025
EPM-1277-2025
BLDG-1397-2025
BLDG-1026-2025
EPM-1177-2025
FIRE-1120-2025
BLDG-1273-2025
EPM-1259-2025
SIGN-0956-2025
FIRE-1130-2025
ENCR-1372-2025
ENCR-1415-2025
SAPP-1323-2025
BLDG-1246-2025
FIRE-0649-2025
ENCR-1325-2025
SAPP-1295-2025
BLDG-1247-2025
SAPP-1345-2025
BLDG-1420-2025
EPM-1278-2025
BLDG-1213-2025
EPM-1405-2025
SAPP-1281-2025
ENCR-1382-2025
BLDG-1390-2025
EPM-1279-2025
BLDG-0989-2025
BLDG-1071-2025
SAPP-1335-2025
EPM-1231-2025
TRAN-1251-2025
SAPP-1355-2025
SAPP-1327-2025
EPM-1425-2025
DEMO-1354-2025
SAPP-1361-2025
ENCR-1311-2025
EPM-1276-2025
BLDG-1419-2025
ENCR-1350-2025
EPM-1196-2025
BLDG-1179-2023
EPM-1241-2025
EPM-1341-2025
SAPP-1427-2025
BLDG-1124-2025
FIRE-1128-2025
TRAN-1360-2025
ENCR-1268-2025
BLDG-1119-2025
EPM-1252-2025
BLDG-1072-2025
BLDG-1233-2025
ENCR-1310-2025
FIRE-0642-2025
EPM-1126-2025
BLDG-0825-2025
EPM-1925-2025
ENCR-1858-2025
BLDG-2010-2025
FIRE-1617-2025
ENCR-1770-2025
EPM-1872-2025
ENCR-2862-2025
ENCR-2465-2025
BLDG-2565-2025
BLDG-1806-2025
TRAN-2577-2025
FIRE-2396-2025
TRAN-2680-2025
ENCR-2645-2025
TRAN-2727-2025
TRAN-2088-2025
EPM-2438-2025
BLDG-2674-2025
ENCR-2474-2025
TRAN-2404-2025
TRAN-2559-2025
EPM-2258-2025
EPM-2264-2025
ENCR-2198-2025
FIRE-2070-2025
ENCR-2192-2025
ENCR-2732-2025
BLDG-2360-2025
TRAN-2745-2025
SAPP-2502-2025
EPM-2260-2025
EPM-2499-2025
TRAN-2403-2025
TRAN-2768-2025
TRAN-2777-2025
ENCR-2113-2025
EPM-2194-2025
EPM-2598-2025
ENCR-2657-2025
EPM-2290-2025
SAPP-2323-2025
ENCR-2640-2025
BLDG-2510-2025
TRAN-2263-2025
FIRE-2055-2025
TRAN-2664-2025
BLDG-2004-2025
EPM-2331-2025
EPM-2324-2025
SAPP-2299-2025
BLDG-1805-2025
SAPP-2679-2025
EPM-2278-2025
ENCR-2477-2025
ENCR-2693-2025
EPM-2708-2025
BLDG-2189-2025
EPM-2625-2025
EPM-2333-2025
BLDG-2288-2025
ENCR-2765-2025
BLDG-2387-2025
TRAN-2694-2025
EPM-2759-2025
ENCR-2437-2025
BLDG-2540-2025
TRAN-2398-2025
EPM-2670-2025
SIGN-2728-2025
EPM-2262-2025
BLDG-2317-2025
EPM-2348-2025
SAPP-2319-2025
TRAN-2087-2025
TRAN-2397-2025
SAPP-2346-2025
BLDG-2826-2025
TRAN-2467-2025
EPM-2200-2025
TRAN-2516-2025
TRAN-2202-2025
EPM-2311-2025
EPM-2505-2025
SAPP-2719-2025
ENCR-2669-2025
EPM-2503-2025
TRAN-2786-2025
ENCR-2338-2025
TRAN-2576-2025
EPM-2525-2025
EPM-2188-2025
ENCR-2384-2025
FIRE-2293-2025
ENCR-2172-2025
TRAN-2352-2025
SAPP-2528-2025
SAPP-2231-2025
EPM-2618-2025
TRAN-2807-2025
SAPP-2609-2025
EPM-2726-2025
EPM-2400-2025
FIRE-1868-2025
EPM-1927-2025
ENCR-2594-2025
EPM-2710-2025
EPM-2297-2025
BLDG-2676-2025
TRAN-2539-2025
TRAN-2509-2025
ENCR-2642-2025
TRAN-2096-2025
EPM-2007-2025
SAPP-2230-2025
EPM-2484-2025
BLDG-2149-2025
SIGN-2237-2025
TRAN-2705-2025
EPM-2659-2025
BLDG-2677-2025
ENCR-2542-2025
TRAN-2681-2025
TRAN-2806-2025
TRAN-2517-2025
EPM-2341-2025
FIRE-2056-2025
BLDG-2524-2023
EPM-2563-2025
EPM-2439-2025
EPM-2597-2025
ENCR-2442-2025
BLDG-2464-2025
ENCR-2233-2025
ENCR-2723-2025
ENCR-2219-2025
EPM-2617-2025
SAPP-2824-2025
TRAN-2357-2025
ENCR-2307-2025
ENCR-2473-2025
ENCR-2717-2025
FIRE-2347-2025
TRAN-2354-2025
BLDG-2675-2025
EPM-2393-2025
ENCR-2570-2025
SAPP-2448-2025
FIRE-2707-2025
TRAN-2308-2025
BLDG-1807-2025
TRAN-2203-2025
ENCR-2608-2025
EPM-2629-2025
SAPP-2238-2025
EPM-2249-2025
BLDG-2201-2025
SAPP-2549-2025
TRAN-2328-2025
EPM-2619-2025
BLDG-2306-2025
BLDG-2292-2025
EPM-2700-2025
TRAN-2742-2025
EPM-2535-2025
EPM-2259-2025
SAPP-2479-2025
BLDG-1809-2025
DEMO-2039-2025
TRAN-2405-2025
EPM-2605-2025
FIRE-2673-2025
EPM-2120-2025
EPM-2614-2025
TRAN-2515-2025
ENCR-2487-2025
EPM-2374-2025
ENCR-2833-2025
TRAN-2486-2025
TRAN-2491-2025
ENCR-2795-2025
EPM-2725-2025
EPM-2265-2025
EPM-2772-2025
TRAN-2574-2025
EPM-2186-2025
ENCR-2443-2025
ENCR-2478-2025
TRAN-2184-2025
TRAN-2353-2025
SAPP-2236-2025
EPM-2183-2025
TRAN-2722-2025
EPM-2197-2025
ENCR-2390-2025
FIRE-2350-2025
BLDG-1808-2025
TRAN-2573-2025
TRAN-2213-2025
SAPP-2527-2025
TRAN-2468-2025
EPM-2215-2025
EPM-2613-2025
FIRE-2049-2025
SAPP-2193-2025
TRAN-2526-2025
BLDG-2672-2025
TRAN-2665-2025
ENCR-2276-2025
SIGN-2800-2025
TRAN-2575-2025
SAPP-2187-2025
TRAN-2578-2025
ENCR-2206-2025
ENCR-2794-2025
ENCR-2475-2025
TRAN-2554-2025
EPM-2507-2025
TRAN-2220-2025
ENCR-2545-2025
TRAN-2583-2025
EPM-2033-2025
ENCR-2551-2025
BLDG-2792-2025
EPM-2724-2025
EPM-2522-2025
SAPP-2381-2025
FIRE-2711-2025
ENCR-2371-2025
BLDG-2361-2025
ENCR-2599-2025
ENCR-2388-2025
FIRE-2044-2025
TRAN-2810-2025
TRAN-2714-2025
EPM-2713-2025
EPM-2280-2025
BLDG-2270-2025
DEMO-0501-2024
EPM-2531-2025
TRAN-2787-2025
BLDG-2365-2025
EPM-2459-2025
EPM-2394-2025
EPM-2555-2025
SAPP-2550-2025
TRAN-2212-2025
ENCR-2454-2025
EPM-2385-2025
ENCR-2813-2025
BLDG-2363-2025
ENCR-2449-2025
EPM-2287-2025
FIRE-2706-2025
FIRE-2332-2025
TRAN-2643-2025
ENCR-2304-2025
SAPP-2359-2025
EPM-2330-2025
SAPP-2511-2025
SAPP-2513-2025
ENCR-2595-2025
ENCR-2313-2025
SAPP-2567-2025
EPM-2382-2025
ENCR-2757-2025
EPM-2616-2025
ENCR-2318-2025
EPM-2301-2025
EPM-2222-2025
EPM-2744-2025
SAPP-2440-2025
ENCR-2221-2025
SAPP-2607-2025
TRAN-2843-2025
EPM-2480-2025
EPM-2630-2025
TRAN-2541-2025
ENCR-2601-2025
TRAN-2844-2025
ENCR-2322-2025
FIRE-2709-2025
TRAN-2808-2025
TRAN-2648-2025
EPM-2569-2025
SAPP-2519-2025
TRAN-2117-2025
ENCR-2376-2025
ENCR-2682-2025
ENCR-2283-2025
ENCR-2831-2025
ENCR-2244-2025
EPM-1312-2025
TRAN-2860-2025
BLDG-1761-2025
ENCR-2337-2025
ENCR-2266-2025
ENCR-2799-2025
TRAN-2380-2025
ENCR-2455-2025
ENCR-2791-2025
ENCR-2395-2025
ENCR-2546-2025
BLDG-2257-2025
SIGN-2321-2025
ENCR-2495-2025
BLDG-2362-2025
EPM-2209-2025
SAPP-2819-2025
EPM-2521-2025
TRAN-2441-2025
FIRE-2327-2025
FIRE-2295-2025
TRAN-2620-2025
ENCR-2639-2025
ENCR-2485-2025
EPM-2310-2025
EPM-1726-2025
EPM-2588-2025
TRAN-2749-2025
SIGN-2624-2025
EPM-2214-2025
FIRE-0641-2025
TRAN-2845-2025
ENCR-2518-2025
FIRE-2135-2025
EPM-2140-2025
ENCR-2150-2025
EPM-2160-2025
EPM-2167-2025
ENCR-1918-2025
EPM-2144-2025
EPM-2082-2025
FIRE-2133-2025
FIRE-0640-2025
FIRE-2136-2025
EPM-2115-2025
DEMO-1626-2025
FIRE-2122-2025
BLDG-2154-2025
FIRE-2121-2025
FIRE-2123-2025
EPM-2128-2025
TRAN-2179-2025
EPM-2139-2025
FIRE-2137-2025
FIRE-2124-2025
TRAN-2176-2025
TRAN-2177-2025
EPM-2164-2025
EPM-2166-2025
TRAN-2178-2025
SAPP-2159-2025
EPM-1527-2025
FIRE-2138-2025
BLDG-2157-2025
FIRE-2134-2025
ENCR-2132-2025
ENCR-2163-2025
BLDG-2156-2025
EPM-2147-2025
ENCR-1871-2025
EPM-2171-2025
BLDG-2181-2025
EPM-2151-2025
SAPP-1921-2025
BLDG-1428-2025
SAPP-1484-2025
EPM-1875-2025
BLDG-2052-2025
EPM-1519-2025
EPM-1920-2025
EPM-1689-2025
EPM-2085-2025
ENCR-1889-2025
EPM-1627-2025
TRAN-2059-2025
FIRE-1852-2025
EPM-1483-2025
BLDG-1404-2025
ENCR-1187-2025
BLDG-1901-2025
ENCR-1671-2025
EPM-1793-2025
ENCR-1931-2025
TRAN-1894-2025
ENCR-1551-2025
SAPP-1784-2025
ENCR-1416-2025
EPM-1582-2025
EPM-1915-2025
BLDG-1593-2025
EPM-1664-2025
BLDG-1499-2025
ENCR-1926-2025
EPM-1418-2025
FIRE-1989-2025
SIGN-2034-2025
EPM-1659-2025
TRAN-2058-2025
EPM-1535-2025
EPM-1523-2025
EPM-1777-2025
ENCR-2022-2025
ENCR-1860-2025
EPM-1819-2025
EPM-1457-2025
ENCR-1566-2025
EPM-1333-2025
EPM-1498-2025
ENCR-1673-2025
ENCR-1446-2025
FIRE-1287-2025
TRAN-1904-2025
EPM-1477-2025
ENCR-2106-2025
EPM-2043-2025
ENCR-1822-2025
ENCR-1581-2025
EPM-1478-2025
EPM-1545-2025
SAPP-1471-2025
SAPP-1724-2025
EPM-2030-2025
TRAN-1831-2025
EPM-2057-2025
BLDG-1047-2025
EPM-1661-2025
TRAN-1816-2025
ENCR-1838-2025
EPM-1548-2025
EPM-1832-2025
TRAN-1759-2025
SAPP-1479-2025
ENCR-1865-2025
BLDG-0283-2024
ENCR-1785-2025
EPM-2116-2025
EPM-2028-2025
SAPP-1732-2025
EPM-1540-2025
BLDG-1686-2025
TRAN-1497-2025
ENCR-1820-2025
BLDG-0553-2025
BLDG-0526-2025
FIRE-0077-2025
BLDG-0298-2025
BLDG-2889-2024
BLDG-0600-2025
ENCR-1677-2025
ENCR-1752-2025
ENCR-2006-2025
ENCR-1782-2025
ENCR-1917-2025
ENCR-1706-2025
ENCR-1363-2025
ENCR-1531-2025
ENCR-1890-2025
ENCR-1903-2025
ENCR-1530-2025
ENCR-1431-2025
ENCR-2053-2025
ENCR-1529-2025
ENCR-1385-2025
ENCR-1430-2025
ENCR-2099-2025
ENCR-2016-2025
ENCR-1667-2025
ENCR-1403-2025
ENCR-1434-2025
ENCR-2017-2025
ENCR-1930-2025
ENCR-2003-2025
ENCR-1949-2025
ENCR-2002-2025
ENCR-1788-2025
ENCR-1492-2025
ENCR-1433-2025
ENCR-1848-2025
ENCR-1916-2025
ENCR-2013-2025
ENCR-1610-2025
ENCR-1516-2025
ENCR-1679-2025
ENCR-1362-2025
ENCR-1774-2025
ENCR-1291-2025
ENCR-1402-2025
ENCR-2064-2025
ENCR-1391-2025
ENCR-1623-2025
ENCR-1786-2025
ENCR-1410-2025
ENCR-1666-2025
ENCR-2089-2025
ENCR-1717-2025
ENCR-2020-2025
ENCR-1602-2025
ENCR-1639-2025
ENCR-1603-2025
ENCR-1640-2025
ENCR-1922-2025
ENCR-1445-2025
ENCR-1342-2025
ENCR-1504-2025
ENCR-1698-2025
ENCR-1810-2025
ENCR-2011-2025
ENCR-1605-2025
EPM-2040-2025
ENCR-1714-2025
ENCR-1986-2025
ENCR-1745-2025
ENCR-1432-2025
ENCR-1376-2025
ENCR-1448-2025
ENCR-1331-2025
ENCR-2074-2025
ENCR-2015-2025
ENCR-2014-2025
ENCR-1256-2025
ENCR-1234-2025
ENCR-1302-2025
ENCR-1289-2025
ENCR-1326-2025
ENCR-1266-2025
ENCR-1257-2025
ENCR-1290-2025
ENCR-1324-2025
ENCR-2731-2025
ENCR-2752-2025
ENCR-2763-2025
ENCR-2712-2025
ENCR-2820-2025
ENCR-2766-2025
ENCR-2797-2025
ENCR-2658-2025
ENCR-2764-2025
ENCR-2805-2025
ENCR-2170-2025
ENCR-2788-2025
BLDG-1642-2024
ENCR-2073-2025
ENCR-2649-2025
ENCR-2562-2025
ENCR-2019-2025
ENCR-2247-2025
BLDG-1506-2024
ENCR-2544-2025
ENCR-2641-2025
ENCR-2370-2025
ENCR-2277-2025
BLDG-2375-2025
ENCR-2636-2025
ENCR-1609-2025
ENCR-2634-2025
ENCR-2285-2025
ENCR-2646-2025
ENCR-2557-2025
ENCR-2644-2025
ENCR-2342-2025
ENCR-2303-2025
ENCR-2603-2025
ENCR-2585-2025
ENCR-2514-2025
ENCR-2561-2025
ENCR-2291-2025
ENCR-2161-2025
BLDG-2651-2025
ENCR-2560-2025
ENCR-2623-2025
FIRE-0533-2025
ENCR-2600-2025
ENCR-2391-2025
ENCR-2538-2025
ENCR-2638-2025
ENCR-2536-2025
ENCR-2447-2025
ENCR-1753-2025
ENCR-2373-2025
ENCR-2534-2025
ENCR-2389-2025
ENCR-2602-2025
ENCR-2632-2025
ENCR-1411-2025
BLDG-1630-2025
ENCR-1429-2025
ENCR-1734-2025
ENCR-1783-2025
ENCR-1725-2025
ENCR-1462-2025
ENCR-1713-2025
ENCR-1338-2025
EPM-2842-2025
EPM-2462-2025
EPM-2372-2025
EPM-2256-2025
ENCR-2746-2025
FIRE-1470-2025
EPM-2876-2025
EPM-2872-2025
ENCR-2883-2025
ENCR-2889-2025
TRAN-2890-2025
ENCR-2884-2025
ENCR-2887-2025
EPM-2142-2025
BLDG-2486-2024
ENCR-2897-2025
BLDG-0967-2025
ENCR-2903-2025
ENCR-2899-2025
BLDG-0455-2025
EPM-2891-2025
BLDG-0209-2025
BLDG-2626-2025
BLDG-0210-2025
ENCR-2704-2025
BLDG-0736-2025
EPM-2564-2025
ENCR-2846-2025
ENCR-2913-2025
ENCR-2667-2025
FIRE-2369-2025
SAPP-2126-2025
SAPP-2199-2025
ENCR-2914-2025
SIGN-2246-2025
TRAN-2919-2025
ENCR-2920-2025
EPM-2815-2025
SAPP-2767-2025
SAPP-1928-2025
TRAN-2922-2025
TRAN-2923-2025
EPM-1738-2025
BLDG-2406-2025
BLDG-2358-2025
BLDG-2407-2025
BLDG-2408-2025
BLDG-2410-2025
EPM-2935-2025
BLDG-2275-2025
ENCR-2945-2025
FIRE-2386-2025
EPM-2661-2025
ENCR-2702-2025
SAPP-1704-2025
EPM-2937-2025
BLDG-2296-2025
BLDG-2298-2025
EPM-2512-2025
EPM-1464-2025
EPM-2695-2025
TRAN-2953-2025
SAPP-2927-2025
BLDG-1803-2025
EPM-2811-2025
EPM-2949-2025
BLDG-2005-2025
BLDG-2699-2025
ENCR-2957-2025
BLDG-2063-2025
EPM-2615-2025
ENCR-2918-2025
BLDG-0868-2025
BLDG-1085-2025
EPM-2461-2025
BLDG-0735-2025
ENCR-2962-2025
ENCR-2964-2025
ENCR-2980-2025
BLDG-0604-2025
TRAN-2987-2025
ENCR-2985-2025
BLDG-2433-2025
BLDG-2434-2025
BLDG-2435-2025
BLDG-2436-2025
BLDG-2418-2025
BLDG-2419-2025
BLDG-2425-2025
EPM-2235-2025
BLDG-2431-2025
BLDG-2429-2025
BLDG-2430-2025
BLDG-2421-2025
BLDG-2423-2025
BLDG-2424-2025
BLDG-2420-2025
BLDG-2422-2025
BLDG-2670-2024
BLDG-2879-2025
BLDG-2426-2025
BLDG-2427-2025
BLDG-2428-2025
ENCR-2928-2025
BLDG-2432-2025
ENCR-2925-2025
BLDG-2416-2025
BLDG-2417-2025
BLDG-2411-2025
BLDG-2415-2025
BLDG-2414-2025
BLDG-2412-2025
BLDG-2413-2025
ENCR-2926-2025
ENCR-2931-2025
ENCR-2476-2025
TRAN-2934-2025
BLDG-1815-2025
BLDG-1859-2025
BLDG-2448-2024
BLDG-1315-2025
EPM-2552-2025
EPM-2309-2025
ENCR-2863-2025
BLDG-2190-2025
ENCR-2930-2025
EPM-2647-2025
EPM-1536-2025
EPM-2894-2025
EPM-2494-2025
ENCR-2932-2025
BLDG-0809-2025
FIRE-2463-2025
ENCR-2692-2025
BLDG-0201-2025
ENCR-1269-2025
ENCR-2999-2025
BLDG-1285-2025
ENCR-2905-2025
ENCR-2992-2025
ENCR-3004-2025
FIRE-2339-2025
EPM-2801-2025
EPM-1849-2025
ENCR-2988-2025
TRAN-3007-2025
ENCR-3014-2025
BLDG-0748-2025
BLDG-1614-2025
BLDG-0485-2025
SAPP-2655-2025
SAPP-2145-2025
SAPP-2683-2025
SAPP-2684-2025
EPM-2524-2025
BLDG-2207-2025
EPM-2758-2025
EPM-2660-2025
EPM-2715-2025
EPM-2798-2025
EPM-2572-2025
SAPP-2741-2025
EPM-2877-2025
BLDG-1556-2025
EPM-2146-2025
ENCR-2107-2025
ENCR-3008-2025
ENCR-2637-2025
TRAN-0029-2026
ENCR-2663-2025
ENCR-0021-2026
ENCR-2284-2025
FIRE-2281-2025
FIRE-2282-2025
ENCR-2896-2025
ENCR-0026-2026
TRAN-0009-2026
BLDG-1021-2025
ENCR-3017-2025
ENCR-2924-2025
BLDG-1351-2025
ENCR-0007-2026
TRAN-0011-2026
ENCR-3011-2025
TRAN-0008-2026
BLDG-1665-2025
ENCR-2500-2025
ENCR-0015-2026
BLDG-2302-2025
EPM-2267-2025
SAPP-2364-2025
EPM-3045-2025
FIRE-2343-2025
FIRE-2127-2025
BLDG-2332-2024
FIRE-0044-2026
FIRE-0043-2026
SIGN-0042-2026
ENCR-0040-2026
BLDG-2753-2024
ENCR-0039-2026
BLDG-0952-2025
EPM-2279-2025
EPM-2830-2025
ENCR-2497-2025
EPM-2094-2025
EPM-2747-2025
EPM-2974-2025
EPM-2748-2025
BLDG-0216-2025
FIRE-2933-2025
FIRE-2812-2025
BLDG-1220-2025
BLDG-2952-2025
ENCR-0063-2026
FIRE-0262-2025
ENCR-0066-2026
EPM-2155-2025
EPM-2168-2025
EPM-2736-2025
EPM-2908-2025
EPM-0017-2026
ENCR-0051-2026
BLDG-0807-2024
ENCR-0054-2026
BLDG-0904-2025
EPM-0003-2026
ENCR-0053-2026
BLDG-1155-2025
ENCR-0055-2026
ENCR-0056-2026
EPM-2631-2025
BLDG-0575-2025
ENCR-0032-2026
ENCR-0059-2026
FIRE-0041-2026
ENCR-0071-2026
BLDG-0048-2026
EPM-2067-2025
BLDG-2069-2025
EPM-0052-2026
ENCR-0076-2026
ENCR-0079-2026
BLDG-2861-2025
BLDG-2402-2025
ENCR-0080-2026
EPM-0942-2025
TRAN-0081-2026
BLDG-1580-2025
FIRE-0049-2026
FIRE-0050-2026
ENCR-0089-2026
TRAN-0010-2026
ENCR-2898-2025
ENCR-0085-2026
FIRE-2294-2025
BLDG-2671-2025
FIRE-2340-2025
ENCR-2996-2025
EPM-0025-2026
EPM-2822-2025
EPM-0030-2026
EPM-2253-2025
TRAN-0094-2026
BLDG-2773-2025
BLDG-3025-2025
BLDG-3026-2025
BLDG-2946-2025
EPM-3018-2025
EPM-3020-2025
EPM-3019-2025
EPM-0002-2026
DEMO-1579-2025
EPM-2336-2025
SAPP-0004-2026
EPM-0077-2026
EPM-0070-2026
TRAN-0110-2026
ENCR-0104-2026
EPM-2804-2025
EPM-2344-2025
EPM-0106-2026
BLDG-2470-2025
BLDG-1379-2025
BLDG-0542-2025
SAPP-2579-2025
EPM-2951-2025
EPM-2972-2025
BLDG-0808-2025
EPM-3038-2025
EPM-2720-2025
EPM-2530-2025
SAPP-2841-2025
SAPP-2881-2025
EPM-2990-2025
SAPP-3044-2025
EPM-2865-2025
BLDG-0749-2025
BLDG-0751-2025
BLDG-0750-2025
EPM-0117-2026
BLDG-0105-2026
EPM-0005-2026
BLDG-0115-2026
BLDG-0019-2026
BLDG-1624-2025
EPM-0006-2026
BLDG-1465-2025
BLDG-1910-2025
GRAD-2466-2025
BLDG-2947-2025
EPM-0109-2026
EPM-2158-2025
ENCR-0127-2026
EPM-0099-2026
EPM-0086-2026
EPM-0078-2026
EPM-0096-2026
EPM-0087-2026
ENCR-1236-2025
EPM-0083-2026
ENCR-0126-2026
BLDG-2556-2025
ENCR-0128-2026
ENCR-0129-2026
BLDG-0094-2023
BLDG-0481-2025
BLDG-1048-2025
BLDG-1041-2025
BLDG-1157-2025
BLDG-1380-2025
BLDG-1744-2025
BLDG-1737-2025
BLDG-1756-2025
BLDG-1885-2025
BLDG-2366-2025
BLDG-2324-2022
BLDG-2851-2024
EPM-0979-2025
EPM-1381-2025
EPM-1253-2025
EPM-1186-2025
EPM-1267-2025
EPM-1638-2025
EPM-1549-2025
EPM-1635-2025
EPM-1650-2025
EPM-1526-2025
EPM-1643-2025
EPM-1469-2025
EPM-1518-2025
EPM-1733-2025
EPM-1537-2025
EPM-1883-2025
EPM-1798-2025
EPM-1792-2025
EPM-1847-2025
EPM-1856-2025
EPM-2271-2025
EPM-1899-2025
EPM-2204-2025
EPM-2080-2025
EPM-2195-2025
EPM-2196-2025
EPM-1940-2025
EPM-2582-2025
FIRE-1200-2025
FIRE-1645-2025
FIRE-1300-2025
FIRE-1299-2025
FIRE-1647-2025
FIRE-1646-2025
FIRE-1660-2025
FIRE-1740-2025
FIRE-1758-2025
FIRE-1741-2025
FIRE-1742-2025
FIRE-1763-2025
FIRE-1739-2025
FIRE-1779-2025
FIRE-1762-2025
FIRE-1760-2025
FIRE-1670-2025
GRAD-0521-2024
BLDG-0945-2024
BLDG-2941-2025
BLDG-1495-2025
TRAN-0168-2026
BLDG-0588-2025
BLDG-2537-2025
ENCR-0318-2024
EPM-0023-2026
EPM-0024-2026
EPM-2628-2025
BLDG-0151-2026
BLDG-0150-2026
BLDG-1710-2025
GRAD-0141-2026
ENCR-1588-2025
EPM-0068-2026
EPM-0124-2026
EPM-0114-2026
TRAN-0182-2026
BLDG-0090-2026
BLDG-1318-2025
EPM-0789-2025
ENCR-0028-2026
EPM-2991-2025
FIRE-3016-2025
BLDG-2316-2025
BLDG-0824-2024
EPM-0091-2026
TRAN-0210-2026
TRAN-0211-2026
EPM-0143-2026
EPM-2790-2025
BLDG-2136-2024
BLDG-2137-2024
BLDG-1393-2025
EPM-0034-2026
EPM-2888-2025
SAPP-0198-2026
BLDG-1790-2025
SAPP-2954-2025
BLDG-1956-2025
BLDG-1955-2025
EPM-0213-2026
SAPP-2939-2025
TRAN-0217-2026
BLDG-1957-2025
BLDG-1042-2025
EPM-2917-2025
BLDG-0754-2025
SAPP-0103-2026
BLDG-0753-2025
BLDG-0752-2025
ENCR-2827-2025
BLDG-0755-2025
FIRE-2251-2025
ENCR-2335-2025
EPM-0167-2026
SAPP-1489-2025
EPM-2498-2025
ENCR-0218-2026
EPM-2269-2025
TRAN-0222-2026
TRAN-0242-2026
TRAN-0118-2026
BLDG-0319-2024
ENCR-0214-2026
ENCR-0253-2026
ENCR-0256-2026
ENCR-0252-2026
ENCR-0254-2026
ENCR-0260-2026
BLDG-0763-2025
ENCR-0238-2026
FIRE-2936-2025
ENCR-0266-2026
BLDG-0852-2025
BLDG-1905-2025
ENCR-0125-2026
ENCR-0130-2026
ENCR-0027-2026
TRAN-0134-2026
ENCR-0045-2026
BLDG-0135-2026
BLDG-2134-2024
ENCR-2809-2025
BLDG-2133-2024
BLDG-0606-2025
TRAN-0057-2026
FIRE-1618-2025
ENCR-0148-2026
EPM-2165-2025
EPM-2456-2025
BLDG-2342-2024
BLDG-2343-2024
FIRE-2816-2025
FIRE-2892-2025
ENCR-0146-2026
BLDG-2356-2025
BLDG-3051-2025
ENCR-0060-2026
BLDG-1570-2025
BLDG-3050-2025
BLDG-2062-2025
EPM-3024-2025
EPM-3023-2025
FIRE-2445-2025
EPM-3021-2025
EPM-3022-2025
EPM-0092-2026
BLDG-2788-2024
BLDG-0312-2025
EPM-0014-2026
EPM-0013-2026
EPM-0038-2026
ENCR-0163-2026
FIRE-2501-2025
EPM-0012-2026
EPM-0020-2026
TRAN-0162-2026
ENCR-0165-2026
FIRE-1463-2025
EPM-0098-2026
TRAN-0195-2026
TRAN-0196-2026
TRAN-0194-2026
EPM-0197-2026
FIRE-1294-2025
TRAN-0202-2026
TRAN-0201-2026
TRAN-0082-2026
EPM-0200-2026
EPM-2174-2025
BLDG-0175-2026
FIRE-2776-2025
ENCR-0189-2026
EPM-0169-2026
BLDG-1217-2025
SIGN-1544-2025
SAPP-2944-2025
TRAN-0220-2026
EPM-0145-2026
EPM-0113-2026
EPM-0144-2026
BLDG-2916-2025
EPM-1437-2025
EPM-1525-2025
SAPP-2666-2025
EPM-2718-2025
EPM-2901-2025
SAPP-0224-2026
SAPP-1343-2025
TRAN-0227-2026
EPM-3031-2025
ENCR-0284-2026
FIRE-1219-2025
EPM-2739-2025
EPM-2751-2025
BLDG-0331-2025
BLDG-1435-2025
BLDG-2761-2025
BLDG-2793-2025
EPM-0225-2026
TRAN-0241-2026
EPM-0142-2026
BLDG-0761-2025
EPM-0138-2026
EPM-2496-2025
ENCR-0047-2026
ENCR-0302-2026
ENCR-0107-2026
ENCR-2915-2025
BLDG-0574-2025
BLDG-1486-2025
FIRE-2444-2025
EPM-2771-2025
BLDG-0759-2025
FIRE-2446-2025
BLDG-2893-2025
EPM-0171-2026
SAPP-2870-2025
TRAN-0290-2026
BLDG-0757-2025
BLDG-0756-2025
BLDG-0758-2025
EPM-0016-2026
EPM-0137-2026
EPM-0236-2026
EPM-2612-2025
BLDG-0760-2025
ENCR-0297-2026
TRAN-0298-2026
BLDG-1398-2024
BLDG-1356-2025
BLDG-2409-2025
SAPP-0295-2026
BLDG-0011-2025
BLDG-2814-2025
BLDG-2038-2025
BLDG-1747-2025
BLDG-0065-2026
BLDG-0762-2025
BLDG-2132-2024
BLDG-2135-2024
EPM-0272-2026
EPM-2182-2025
SIGN-1655-2025
BLDG-3029-2025
BLDG-1953-2025
BLDG-1958-2025
BLDG-1959-2025
BLDG-1960-2025
BLDG-1961-2025
BLDG-1962-2025
BLDG-1963-2025
ENCR-0335-2026
EPM-0233-2026
EPM-0281-2026
EPM-0257-2026
EPM-0235-2026
EPM-0234-2026
ENCR-0343-2026
BLDG-0009-2025
BLDG-1923-2025
BLDG-0808-2024
BLDG-0334-2026
FIRE-1409-2025
EPM-0294-2026
BLDG-0381-2025
BLDG-2070-2023
ENCR-0327-2026
BLDG-1099-2025
BLDG-1423-2025
BLDG-1772-2025
BLDG-2943-2025
EPM-0172-2026
BLDG-1954-2025
EPM-2148-2025
BLDG-2130-2024
ENCR-0258-2026
TRAN-0354-2026
ENCR-0221-2026
ENCR-2255-2025
BLDG-0939-2025
ENCR-2488-2025
FIRE-2243-2025
ENCR-0303-2026
FIRE-2520-2025
ENCR-0199-2026
ENCR-0310-2026
ENCR-0230-2026
BLDG-3310-2023
ENCR-0318-2026
ENCR-0319-2026
EPM-2653-2025
BLDG-2129-2024
BLDG-2379-2025
ENCR-2902-2025
ENCR-0315-2026
ENCR-0317-2026
BLDG-2210-2025
BLDG-2128-2024
ENCR-0251-2026
ENCR-0325-2026
ENCR-0036-2026
ENCR-0320-2026
BLDG-1510-2025
ENCR-0326-2026
TRAN-0330-2026
ENCR-0324-2026
ENCR-2504-2025
EPM-2481-2025
EPM-2737-2025
EPM-2273-2025
BLDG-0764-2025
SAPP-0161-2026
SIGN-2108-2025
EPM-3048-2025
SAPP-0136-2026
ENCR-2774-2025
BLDG-0769-2025
BLDG-0871-2025
ENCR-1224-2025
EPM-0299-2026
EPM-2983-2025
FIRE-2345-2024
ENCR-0316-2026
EPM-0226-2026
EPM-0097-2026
EPM-0100-2026
EPM-0073-2026
EPM-0093-2026
EPM-0174-2026
EPM-0173-2026
BLDG-1195-2025
EPM-0183-2026
EPM-0184-2026
EPM-0179-2026
EPM-0180-2026
EPM-0157-2026
EPM-0187-2026
EPM-0186-2026
EPM-0329-2026
EPM-0176-2026
EPM-0177-2026
EPM-0178-2026
EPM-0072-2026
EPM-0155-2026
EPM-0156-2026
EPM-0154-2026
EPM-0108-2026
EPM-0153-2026
EPM-0208-2026
EPM-0188-2026
ENCR-0121-2026
SIGN-1654-2025
EPM-0206-2026
EPM-0205-2026
EPM-0207-2026
EPM-0192-2026
BLDG-0719-2025
BLDG-0720-2025
EPM-0203-2026
EPM-0190-2026
EPM-0191-2026
BLDG-2940-2025
BLDG-0097-2024
BLDG-0098-2024
BLDG-0846-2024
SAPP-1587-2025
ENCR-0357-2026
BLDG-2373-2021
EPM-0069-2026
TRAN-0244-2026
TRAN-0245-2026
SAPP-1615-2025
SAPP-1608-2025
BLDG-0121-2025
EPM-2300-2025
BLDG-1767-2025
DEMO-1511-2025
DEMO-2451-2024
DEMO-2452-2024
BLDG-1162-2025
ENCR-2289-2025
BLDG-2650-2025
SAPP-0084-2026
BLDG-1168-2025
BLDG-0603-2025
BLDG-0705-2025
BLDG-1044-2025
DEMO-3041-2025
BLDG-2680-2024
BLDG-0754-2023
EPM-2606-2025
EPM-2835-2025
SAPP-2654-2025
BLDG-1514-2024
BLDG-0911-2024
BLDG-1952-2025
BLDG-1067-2025
ENCR-0364-2026
ENCR-0365-2026
BLDG-0765-2025
BLDG-1951-2025
BLDG-3338-2023
BLDG-0910-2024
ENCR-2377-2025
BLDG-0766-2025
BLDG-0767-2025
BLDG-1494-2025
ENCR-0373-2026
ENCR-0372-2026
BLDG-0982-2025
FIRE-0287-2026
FIRE-0288-2026
FIRE-0289-2026
BLDG-2579-2024
BLDG-0406-2025
DEMO-0311-2026
EPM-0312-2026
BLDG-1093-2025
EPM-0367-2026
EPM-0322-2026
EPM-0355-2026
EPM-0333-2026
TRAN-0344-2026
BLDG-0358-2026
BLDG-0309-2026
BLDG-0308-2026
EPM-2593-2025
EPM-0088-2026
ENCR-0378-2026
EPM-2955-2025
SIGN-0371-2026
BLDG-2457-2025
BLDG-2399-2025
EPM-2904-2025
ENCR-0380-2026
EPM-2217-2025
ENCR-0379-2026
SAPP-0001-2026
EPM-2392-2025
EPM-2586-2025
TRAN-0381-2026
BLDG-1204-2025
BLDG-0131-2025
BLDG-1546-2024
BLDG-1493-2025
BLDG-2123-2024
BLDG-2143-2025
BLDG-2138-2024
BLDG-2139-2024
SAPP-0383-2026
BLDG-2122-2024
BLDG-2604-2025
BLDG-2580-2025
BLDG-1705-2024
BLDG-0999-2025
BLDG-0484-2025
BLDG-2131-2024
SIGN-2989-2025
BLDG-2698-2025
FIRE-0123-2026
TRAN-0384-2026
BLDG-0925-2025
BLDG-0377-2025
ENCR-0390-2026
EPM-0359-2026
EPM-0031-2026
BLDG-0144-2025
BLDG-2840-2025
TRAN-0391-2026
FIRE-2252-2025
EPM-0392-2026
BLDG-0018-2026
FIRE-1303-2025
BLDG-0576-2025
BLDG-2268-2025
EPM-2506-2025
BLDG-0768-2025
BLDG-2756-2025
EPM-0331-2026
EPM-2755-2025
EPM-0204-2026
EPM-0337-2026
ENCR-0389-2026
BLDG-2533-2025
BLDG-1934-2025
EPM-0339-2026
BLDG-1644-2025
FIRE-0954-2025
EPM-2169-2025
BLDG-0368-2026
BLDG-1601-2025
EPM-2175-2025
ENCR-0396-2026
Permit Type
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Transportation
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Building
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Photovoltaic (SolarAPP)
Fire Construction
Building
Electrical, Plumbing, Mechanical (EPM)
Transportation
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Encroachment
Sign
Encroachment
Encroachment
Fire Construction
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Building
Fire Construction
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Transportation
Fire Construction
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Transportation
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Encroachment
Transportation
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Fire Construction
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Transportation
Electrical, Plumbing, Mechanical (EPM)
Building
Encroachment
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Transportation
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Transportation
Transportation
Transportation
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Transportation
Building
Fire Construction
Building
Electrical, Plumbing, Mechanical (EPM)
Transportation
Electrical, Plumbing, Mechanical (EPM)
Fire Construction
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Building
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Encroachment
Transportation
Transportation
Building
Fire Construction
Building
Electrical, Plumbing, Mechanical (EPM)
Building
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Fire Construction
Sign
Fire Construction
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Fire Construction
Encroachment
Fire Construction
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Fire Construction
Photovoltaic (SolarAPP)
Building
Building
Building
Encroachment
Building
Encroachment
Building
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Building
Fire Construction
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Building
Encroachment
Encroachment
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Encroachment
Encroachment
Transportation
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Building
Building
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Sign
Transportation
Building
Encroachment
Building
Encroachment
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Building
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Building
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Building
Encroachment
Transportation
Encroachment
Encroachment
Encroachment
Transportation
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Fire Construction
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Building
Building
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Transportation
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Fire Construction
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Building
Encroachment
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Building
Electrical, Plumbing, Mechanical (EPM)
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Building
Encroachment
Transportation
Encroachment
Building
Electrical, Plumbing, Mechanical (EPM)
Fire Construction
Encroachment
Fire Construction
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Transportation
Electrical, Plumbing, Mechanical (EPM)
Transportation
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Building
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Transportation
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Transportation
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Encroachment
Encroachment
Photovoltaic (SolarAPP)
Encroachment
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Fire Construction
Grading/Site Improvements
Photovoltaic (SolarAPP)
Building
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Building
Electrical, Plumbing, Mechanical (EPM)
Transportation
Building
Fire Construction
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Transportation
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Photovoltaic (SolarAPP)
Transportation
Building
Electrical, Plumbing, Mechanical (EPM)
Transportation
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Encroachment
Building
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Transportation
Photovoltaic (SolarAPP)
Demolition
Building
Building
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Building
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Fire Construction
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Building
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Building
Building
Encroachment
Sign
Building
Photovoltaic (SolarAPP)
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Building
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Fire Construction
Electrical, Plumbing, Mechanical (EPM)
Fire Construction
Building
Building
Building
Building
Building
Building
Building
Building
Building
Building
Electrical, Plumbing, Mechanical (EPM)
Building
Building
Transportation
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Building
Building
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Building
Photovoltaic (SolarAPP)
Encroachment
Encroachment
Building
Transportation
Fire Construction
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Building
Electrical, Plumbing, Mechanical (EPM)
Transportation
Encroachment
Building
Photovoltaic (SolarAPP)
Encroachment
Building
Encroachment
Building
Encroachment
Photovoltaic (SolarAPP)
Encroachment
Encroachment
Photovoltaic (SolarAPP)
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Building
Transportation
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Building
Encroachment
Building
Building
Encroachment
Photovoltaic (SolarAPP)
Fire Construction
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Building
Electrical, Plumbing, Mechanical (EPM)
Building
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Encroachment
Encroachment
Photovoltaic (SolarAPP)
Building
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Encroachment
Photovoltaic (SolarAPP)
Building
Photovoltaic (SolarAPP)
Building
Fire Construction
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Building
Electrical, Plumbing, Mechanical (EPM)
Fire Construction
Photovoltaic (SolarAPP)
Photovoltaic (SolarAPP)
Fire Construction
Encroachment
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Building
Sign
Electrical, Plumbing, Mechanical (EPM)
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Building
Building
Electrical, Plumbing, Mechanical (EPM)
Fire Construction
Building
Electrical, Plumbing, Mechanical (EPM)
Sign
Fire Construction
Encroachment
Encroachment
Photovoltaic (SolarAPP)
Building
Fire Construction
Encroachment
Photovoltaic (SolarAPP)
Building
Photovoltaic (SolarAPP)
Building
Electrical, Plumbing, Mechanical (EPM)
Building
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Encroachment
Building
Electrical, Plumbing, Mechanical (EPM)
Building
Building
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Transportation
Photovoltaic (SolarAPP)
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Demolition
Photovoltaic (SolarAPP)
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Building
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Building
Fire Construction
Transportation
Encroachment
Building
Electrical, Plumbing, Mechanical (EPM)
Building
Building
Encroachment
Fire Construction
Electrical, Plumbing, Mechanical (EPM)
Building
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Building
Fire Construction
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Encroachment
Building
Building
Transportation
Fire Construction
Transportation
Encroachment
Transportation
Transportation
Electrical, Plumbing, Mechanical (EPM)
Building
Encroachment
Transportation
Transportation
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Fire Construction
Encroachment
Encroachment
Building
Transportation
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Transportation
Transportation
Transportation
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Encroachment
Building
Transportation
Fire Construction
Transportation
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Building
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Building
Encroachment
Building
Transportation
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Building
Transportation
Electrical, Plumbing, Mechanical (EPM)
Sign
Electrical, Plumbing, Mechanical (EPM)
Building
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Transportation
Transportation
Photovoltaic (SolarAPP)
Building
Transportation
Electrical, Plumbing, Mechanical (EPM)
Transportation
Transportation
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Transportation
Encroachment
Transportation
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Fire Construction
Encroachment
Transportation
Photovoltaic (SolarAPP)
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Transportation
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Fire Construction
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Building
Transportation
Transportation
Encroachment
Transportation
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Building
Sign
Transportation
Electrical, Plumbing, Mechanical (EPM)
Building
Encroachment
Transportation
Transportation
Transportation
Electrical, Plumbing, Mechanical (EPM)
Fire Construction
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Building
Encroachment
Encroachment
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Transportation
Encroachment
Encroachment
Encroachment
Fire Construction
Transportation
Building
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Photovoltaic (SolarAPP)
Fire Construction
Transportation
Building
Transportation
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Building
Photovoltaic (SolarAPP)
Transportation
Electrical, Plumbing, Mechanical (EPM)
Building
Building
Electrical, Plumbing, Mechanical (EPM)
Transportation
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Building
Demolition
Transportation
Electrical, Plumbing, Mechanical (EPM)
Fire Construction
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Transportation
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Transportation
Transportation
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Transportation
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Encroachment
Transportation
Transportation
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Transportation
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Fire Construction
Building
Transportation
Transportation
Photovoltaic (SolarAPP)
Transportation
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Fire Construction
Photovoltaic (SolarAPP)
Transportation
Building
Transportation
Encroachment
Sign
Transportation
Photovoltaic (SolarAPP)
Transportation
Encroachment
Encroachment
Encroachment
Transportation
Electrical, Plumbing, Mechanical (EPM)
Transportation
Encroachment
Transportation
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Fire Construction
Encroachment
Building
Encroachment
Encroachment
Fire Construction
Transportation
Transportation
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Building
Demolition
Electrical, Plumbing, Mechanical (EPM)
Transportation
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Transportation
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Building
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Fire Construction
Fire Construction
Transportation
Encroachment
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Photovoltaic (SolarAPP)
Encroachment
Encroachment
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Encroachment
Photovoltaic (SolarAPP)
Transportation
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Transportation
Encroachment
Transportation
Encroachment
Fire Construction
Transportation
Transportation
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Transportation
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Transportation
Building
Encroachment
Encroachment
Encroachment
Transportation
Encroachment
Encroachment
Encroachment
Encroachment
Building
Sign
Encroachment
Building
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Transportation
Fire Construction
Fire Construction
Transportation
Encroachment
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Transportation
Sign
Electrical, Plumbing, Mechanical (EPM)
Fire Construction
Transportation
Encroachment
Fire Construction
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Fire Construction
Fire Construction
Fire Construction
Electrical, Plumbing, Mechanical (EPM)
Demolition
Fire Construction
Building
Fire Construction
Fire Construction
Electrical, Plumbing, Mechanical (EPM)
Transportation
Electrical, Plumbing, Mechanical (EPM)
Fire Construction
Fire Construction
Transportation
Transportation
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Transportation
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Fire Construction
Building
Fire Construction
Encroachment
Encroachment
Building
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Building
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Building
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Transportation
Fire Construction
Electrical, Plumbing, Mechanical (EPM)
Building
Encroachment
Building
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Transportation
Encroachment
Photovoltaic (SolarAPP)
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Building
Electrical, Plumbing, Mechanical (EPM)
Building
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Fire Construction
Sign
Electrical, Plumbing, Mechanical (EPM)
Transportation
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Encroachment
Fire Construction
Transportation
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Transportation
Electrical, Plumbing, Mechanical (EPM)
Building
Electrical, Plumbing, Mechanical (EPM)
Transportation
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Transportation
Photovoltaic (SolarAPP)
Encroachment
Building
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Building
Transportation
Encroachment
Building
Building
Fire Construction
Building
Building
Building
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Building
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Building
Encroachment
Encroachment
Encroachment
Encroachment
Building
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Building
Encroachment
Encroachment
Fire Construction
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Building
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Fire Construction
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Encroachment
Transportation
Encroachment
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Building
Encroachment
Building
Encroachment
Encroachment
Building
Electrical, Plumbing, Mechanical (EPM)
Building
Building
Building
Encroachment
Building
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Encroachment
Encroachment
Fire Construction
Photovoltaic (SolarAPP)
Photovoltaic (SolarAPP)
Encroachment
Sign
Transportation
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Photovoltaic (SolarAPP)
Transportation
Transportation
Electrical, Plumbing, Mechanical (EPM)
Building
Building
Building
Building
Building
Electrical, Plumbing, Mechanical (EPM)
Building
Encroachment
Fire Construction
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Building
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Transportation
Photovoltaic (SolarAPP)
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Building
Building
Encroachment
Building
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Building
Building
Electrical, Plumbing, Mechanical (EPM)
Building
Encroachment
Encroachment
Encroachment
Building
Transportation
Encroachment
Building
Building
Building
Building
Building
Building
Building
Electrical, Plumbing, Mechanical (EPM)
Building
Building
Building
Building
Building
Building
Building
Building
Building
Building
Building
Building
Building
Encroachment
Building
Encroachment
Building
Building
Building
Building
Building
Building
Building
Encroachment
Encroachment
Encroachment
Transportation
Building
Building
Building
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Building
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Building
Fire Construction
Encroachment
Building
Encroachment
Encroachment
Building
Encroachment
Encroachment
Encroachment
Fire Construction
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Transportation
Encroachment
Building
Building
Building
Photovoltaic (SolarAPP)
Photovoltaic (SolarAPP)
Photovoltaic (SolarAPP)
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Building
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Encroachment
Encroachment
Transportation
Encroachment
Encroachment
Encroachment
Fire Construction
Fire Construction
Encroachment
Encroachment
Transportation
Building
Encroachment
Encroachment
Building
Encroachment
Transportation
Encroachment
Transportation
Building
Encroachment
Encroachment
Building
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Fire Construction
Fire Construction
Building
Fire Construction
Fire Construction
Sign
Encroachment
Building
Encroachment
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Building
Fire Construction
Fire Construction
Building
Building
Encroachment
Fire Construction
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Building
Encroachment
Building
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Building
Encroachment
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Building
Encroachment
Encroachment
Fire Construction
Encroachment
Building
Electrical, Plumbing, Mechanical (EPM)
Building
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Encroachment
Building
Building
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Transportation
Building
Fire Construction
Fire Construction
Encroachment
Transportation
Encroachment
Encroachment
Fire Construction
Building
Fire Construction
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Transportation
Building
Building
Building
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Demolition
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Transportation
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Building
Building
Building
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Building
Building
Building
Electrical, Plumbing, Mechanical (EPM)
Building
Electrical, Plumbing, Mechanical (EPM)
Building
Building
Building
Electrical, Plumbing, Mechanical (EPM)
Building
Building
Grading/Site Improvements
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Building
Encroachment
Encroachment
Building
Building
Building
Building
Building
Building
Building
Building
Building
Building
Building
Building
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Fire Construction
Fire Construction
Fire Construction
Fire Construction
Fire Construction
Fire Construction
Fire Construction
Fire Construction
Fire Construction
Fire Construction
Fire Construction
Fire Construction
Fire Construction
Fire Construction
Fire Construction
Fire Construction
Fire Construction
Grading/Site Improvements
Building
Building
Building
Transportation
Building
Building
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Building
Building
Building
Grading/Site Improvements
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Transportation
Building
Building
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Fire Construction
Building
Building
Electrical, Plumbing, Mechanical (EPM)
Transportation
Transportation
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Building
Building
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Building
Photovoltaic (SolarAPP)
Building
Building
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Transportation
Building
Building
Electrical, Plumbing, Mechanical (EPM)
Building
Photovoltaic (SolarAPP)
Building
Building
Encroachment
Building
Fire Construction
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Transportation
Transportation
Transportation
Building
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Encroachment
Building
Encroachment
Fire Construction
Encroachment
Building
Building
Encroachment
Encroachment
Encroachment
Transportation
Encroachment
Building
Building
Encroachment
Building
Building
Transportation
Fire Construction
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Building
Building
Fire Construction
Fire Construction
Encroachment
Building
Building
Encroachment
Building
Building
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Fire Construction
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Building
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Fire Construction
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Transportation
Encroachment
Fire Construction
Electrical, Plumbing, Mechanical (EPM)
Transportation
Transportation
Transportation
Electrical, Plumbing, Mechanical (EPM)
Fire Construction
Transportation
Transportation
Transportation
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Building
Fire Construction
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Building
Sign
Photovoltaic (SolarAPP)
Transportation
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Photovoltaic (SolarAPP)
Transportation
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Fire Construction
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Building
Building
Building
Building
Electrical, Plumbing, Mechanical (EPM)
Transportation
Electrical, Plumbing, Mechanical (EPM)
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Encroachment
Encroachment
Encroachment
Building
Building
Fire Construction
Electrical, Plumbing, Mechanical (EPM)
Building
Fire Construction
Building
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Transportation
Building
Building
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Building
Encroachment
Transportation
Building
Building
Building
Photovoltaic (SolarAPP)
Building
Building
Building
Building
Building
Building
Building
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Sign
Building
Building
Building
Building
Building
Building
Building
Building
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Building
Building
Building
Building
Fire Construction
Electrical, Plumbing, Mechanical (EPM)
Building
Building
Encroachment
Building
Building
Building
Building
Electrical, Plumbing, Mechanical (EPM)
Building
Electrical, Plumbing, Mechanical (EPM)
Building
Encroachment
Transportation
Encroachment
Encroachment
Building
Encroachment
Fire Construction
Encroachment
Fire Construction
Encroachment
Encroachment
Encroachment
Building
Encroachment
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Building
Building
Encroachment
Encroachment
Encroachment
Building
Building
Encroachment
Encroachment
Encroachment
Encroachment
Building
Encroachment
Transportation
Encroachment
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Building
Photovoltaic (SolarAPP)
Sign
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Encroachment
Building
Building
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Fire Construction
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Sign
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Building
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Building
Building
Building
Building
Photovoltaic (SolarAPP)
Encroachment
Building
Electrical, Plumbing, Mechanical (EPM)
Transportation
Transportation
Photovoltaic (SolarAPP)
Photovoltaic (SolarAPP)
Building
Electrical, Plumbing, Mechanical (EPM)
Building
Demolition
Demolition
Demolition
Building
Encroachment
Building
Photovoltaic (SolarAPP)
Building
Building
Building
Building
Demolition
Building
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Photovoltaic (SolarAPP)
Building
Building
Building
Building
Encroachment
Encroachment
Building
Building
Building
Building
Encroachment
Building
Building
Building
Encroachment
Encroachment
Building
Fire Construction
Fire Construction
Fire Construction
Building
Building
Demolition
Electrical, Plumbing, Mechanical (EPM)
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Transportation
Building
Building
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Sign
Building
Building
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Photovoltaic (SolarAPP)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Transportation
Building
Building
Building
Building
Building
Building
Building
Building
Photovoltaic (SolarAPP)
Building
Building
Building
Building
Building
Building
Building
Sign
Building
Fire Construction
Transportation
Building
Building
Encroachment
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Building
Building
Transportation
Fire Construction
Electrical, Plumbing, Mechanical (EPM)
Building
Fire Construction
Building
Building
Electrical, Plumbing, Mechanical (EPM)
Building
Building
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Building
Building
Electrical, Plumbing, Mechanical (EPM)
Building
Fire Construction
Electrical, Plumbing, Mechanical (EPM)
Building
Building
Electrical, Plumbing, Mechanical (EPM)
Encroachment
Permit Issue Date
9/26/2025
11/13/2025
11/12/2025
10/17/2025
10/6/2025
9/5/2025
10/31/2025
10/8/2025
10/30/2025
10/13/2025
9/11/2025
9/16/2025
9/25/2025
9/23/2025
9/9/2025
9/24/2025
9/18/2025
7/15/2025
9/18/2025
9/10/2025
7/14/2025
9/9/2025
8/14/2025
9/2/2025
9/5/2025
7/22/2025
8/19/2025
9/8/2025
8/7/2025
8/26/2025
8/22/2025
7/28/2025
8/14/2025
6/26/2025
7/23/2025
8/15/2025
8/20/2025
8/21/2025
8/14/2025
8/14/2025
8/11/2025
8/12/2025
8/26/2025
8/11/2025
7/16/2025
7/31/2025
7/8/2025
7/10/2025
7/31/2025
9/4/2025
8/13/2025
11/7/2025
6/25/2025
8/27/2025
8/6/2025
7/1/2025
8/14/2025
8/25/2025
8/4/2025
6/13/2025
8/7/2025
8/15/2025
8/13/2025
8/7/2025
8/4/2025
7/30/2025
9/9/2025
6/26/2025
6/30/2025
8/5/2025
8/7/2025
7/15/2025
9/9/2025
7/1/2025
9/23/2025
6/24/2025
7/30/2025
10/7/2025
6/26/2025
8/4/2025
8/12/2025
8/27/2025
7/17/2025
6/30/2025
8/5/2025
8/19/2025
8/7/2025
8/5/2025
8/6/2025
7/30/2025
8/27/2025
6/24/2025
8/13/2025
9/3/2025
6/24/2025
8/27/2025
7/8/2025
7/16/2025
8/21/2025
7/29/2025
8/13/2025
6/23/2025
8/11/2025
7/22/2025
7/28/2025
6/25/2025
10/1/2025
9/4/2025
6/24/2025
8/20/2025
8/12/2025
8/27/2025
9/4/2025
7/1/2025
7/28/2025
8/12/2025
7/9/2025
9/11/2025
7/9/2025
8/27/2025
8/1/2025
7/2/2025
9/3/2025
7/14/2025
9/5/2025
8/4/2025
7/7/2025
8/28/2025
8/27/2025
7/9/2025
8/26/2025
8/11/2025
8/11/2025
8/29/2025
7/11/2025
8/13/2025
9/4/2025
10/8/2025
6/25/2025
12/4/2025
8/4/2025
7/14/2025
8/21/2025
9/3/2025
8/21/2025
7/22/2025
8/19/2025
7/28/2025
8/27/2025
7/29/2025
7/17/2025
9/10/2025
8/19/2025
8/26/2025
8/29/2025
8/11/2025
8/13/2025
7/8/2025
8/1/2025
7/15/2025
7/25/2025
7/22/2025
7/2/2025
7/15/2025
9/4/2025
8/29/2025
6/26/2025
6/27/2025
7/29/2025
8/14/2025
8/25/2025
6/27/2025
6/19/2025
7/28/2025
7/14/2025
7/28/2025
9/10/2025
7/21/2025
7/11/2025
8/21/2025
8/12/2025
8/12/2025
8/6/2025
9/5/2025
7/17/2025
8/28/2025
8/7/2025
8/13/2025
8/28/2025
7/28/2025
7/14/2025
8/13/2025
7/17/2025
8/20/2025
8/14/2025
8/21/2025
8/21/2025
8/7/2025
6/24/2025
8/7/2025
7/10/2025
8/20/2025
8/25/2025
9/9/2025
9/10/2025
8/28/2025
8/11/2025
8/29/2025
8/5/2025
8/26/2025
7/11/2025
8/19/2025
7/17/2025
8/4/2025
7/28/2025
8/21/2025
8/19/2025
8/20/2025
7/11/2025
8/12/2025
9/9/2025
7/2/2025
7/25/2025
7/11/2025
9/4/2025
7/17/2025
9/9/2025
8/15/2025
8/18/2025
6/26/2025
8/18/2025
9/10/2025
7/10/2025
8/6/2025
7/15/2025
6/27/2025
8/5/2025
7/22/2025
8/28/2025
7/22/2025
7/1/2025
7/22/2025
8/6/2025
7/7/2025
8/4/2025
7/14/2025
6/26/2025
8/18/2025
7/1/2025
7/14/2025
7/15/2025
8/6/2025
7/16/2025
9/3/2025
6/23/2025
8/14/2025
7/22/2025
8/20/2025
7/29/2025
8/4/2025
9/5/2025
8/18/2025
7/21/2025
6/30/2025
8/12/2025
8/15/2025
9/4/2025
6/24/2025
7/10/2025
8/11/2025
8/29/2025
8/28/2025
8/13/2025
8/15/2025
7/29/2025
12/1/2025
8/14/2025
8/20/2025
8/19/2025
8/15/2025
6/25/2025
12/8/2025
8/27/2025
8/4/2025
7/14/2025
9/8/2025
7/22/2025
7/1/2025
8/7/2025
7/22/2025
6/27/2025
9/8/2025
8/6/2025
8/12/2025
8/21/2025
7/21/2025
9/8/2025
6/23/2025
8/6/2025
7/28/2025
8/12/2025
9/3/2025
8/7/2025
7/15/2025
7/7/2025
12/1/2025
6/23/2025
8/18/2025
7/22/2025
7/23/2025
7/23/2025
8/7/2025
8/6/2025
7/15/2025
8/4/2025
7/10/2025
8/12/2025
9/22/2025
7/24/2025
9/2/2025
7/28/2025
11/6/2025
7/1/2025
8/11/2025
7/28/2025
9/10/2025
7/17/2025
7/23/2025
8/5/2025
11/21/2025
8/18/2025
7/8/2025
6/24/2025
7/1/2025
9/9/2025
6/30/2025
11/6/2025
8/18/2025
5/29/2025
7/23/2025
11/25/2025
6/30/2025
11/25/2025
6/30/2025
6/30/2025
6/5/2025
6/4/2025
11/17/2025
6/17/2025
6/5/2025
6/17/2025
6/18/2025
6/24/2025
6/4/2025
6/10/2025
6/13/2025
7/2/2025
6/13/2025
6/13/2025
6/17/2025
8/13/2025
6/2/2025
5/29/2025
5/29/2025
6/13/2025
6/12/2025
6/9/2025
6/17/2025
6/5/2025
6/12/2025
7/9/2025
6/30/2025
6/2/2025
6/17/2025
6/20/2025
6/11/2025
6/17/2025
6/2/2025
6/3/2025
6/4/2025
5/29/2025
6/8/2025
6/18/2025
6/17/2025
6/12/2025
6/9/2025
6/9/2025
5/29/2025
7/16/2025
5/29/2025
6/9/2025
6/9/2025
5/30/2025
6/10/2025
6/10/2025
6/13/2025
6/3/2025
8/4/2025
6/25/2025
6/12/2025
6/17/2025
6/24/2025
6/13/2025
7/2/2025
6/5/2025
6/9/2025
9/29/2025
6/18/2025
6/18/2025
6/5/2025
6/9/2025
6/2/2025
12/9/2025
6/9/2025
6/17/2025
6/2/2025
6/11/2025
6/11/2025
6/12/2025
9/9/2025
6/9/2025
6/11/2025
6/24/2025
6/17/2025
6/9/2025
6/17/2025
6/20/2025
6/6/2025
6/12/2025
6/10/2025
6/23/2025
6/17/2025
6/10/2025
6/16/2025
6/5/2025
7/15/2025
6/16/2025
10/14/2025
6/9/2025
8/13/2025
6/2/2025
6/13/2025
6/5/2025
6/17/2025
8/12/2025
6/9/2025
6/3/2025
6/4/2025
6/5/2025
6/26/2025
6/17/2025
6/13/2025
6/18/2025
6/9/2025
6/3/2025
6/4/2025
6/10/2025
6/6/2025
6/3/2025
6/11/2025
6/18/2025
6/5/2025
5/30/2025
6/18/2025
6/4/2025
6/16/2025
6/17/2025
6/5/2025
6/4/2025
8/19/2025
6/10/2025
6/19/2025
6/2/2025
6/12/2025
6/10/2025
6/19/2025
6/12/2025
6/12/2025
6/9/2025
6/5/2025
6/18/2025
6/12/2025
6/2/2025
6/16/2025
5/30/2025
7/1/2025
6/19/2025
6/2/2025
6/5/2025
6/12/2025
6/16/2025
6/10/2025
6/5/2025
8/19/2025
5/29/2025
6/9/2025
8/11/2025
7/2/2025
10/6/2025
8/18/2025
8/11/2025
8/29/2025
9/8/2025
7/31/2025
9/11/2025
12/9/2025
10/21/2025
11/19/2025
12/1/2025
11/5/2025
11/12/2025
11/14/2025
11/17/2025
11/19/2025
9/4/2025
12/2/2025
11/18/2025
11/25/2025
10/17/2025
11/4/2025
10/30/2025
10/6/2025
9/23/2025
11/3/2025
9/19/2025
12/1/2025
10/13/2025
11/24/2025
10/27/2025
12/8/2025
11/10/2025
10/16/2025
11/26/2025
12/1/2025
10/23/2025
9/22/2025
11/18/2025
11/13/2025
10/15/2025
10/6/2025
11/12/2025
10/27/2025
9/29/2025
9/24/2025
11/14/2025
9/25/2025
10/7/2025
10/6/2025
10/2/2025
12/1/2025
11/14/2025
10/1/2025
12/3/2025
11/17/2025
11/18/2025
10/3/2025
11/13/2025
10/9/2025
10/1/2025
12/4/2025
11/12/2025
11/17/2025
12/3/2025
10/17/2025
10/31/2025
10/16/2025
11/18/2025
11/19/2025
9/29/2025
10/7/2025
10/16/2025
10/6/2025
9/4/2025
10/20/2025
10/8/2025
12/4/2025
10/21/2025
9/22/2025
10/30/2025
9/22/2025
11/18/2025
10/30/2025
11/19/2025
11/14/2025
10/27/2025
12/1/2025
10/23/2025
11/5/2025
10/29/2025
9/26/2025
10/20/2025
10/8/2025
9/22/2025
10/9/2025
10/29/2025
9/25/2025
11/12/2025
12/2/2025
11/7/2025
11/20/2025
10/16/2025
9/22/2025
11/10/2025
11/6/2025
11/18/2025
10/2/2025
11/18/2025
10/31/2025
10/27/2025
11/12/2025
9/5/2025
11/4/2025
9/29/2025
10/24/2025
9/19/2025
9/25/2025
11/18/2025
11/18/2025
11/18/2025
11/3/2025
11/14/2025
12/2/2025
10/28/2025
10/8/2025
9/22/2025
10/6/2025
11/5/2025
10/17/2025
11/18/2025
10/17/2025
12/5/2025
9/25/2025
11/19/2025
9/24/2025
11/12/2025
12/4/2025
10/10/2025
10/3/2025
10/22/2025
11/19/2025
12/3/2025
10/9/2025
11/18/2025
10/16/2025
11/5/2025
10/17/2025
11/20/2025
10/2/2025
12/1/2025
9/22/2025
11/7/2025
11/13/2025
9/25/2025
10/30/2025
9/22/2025
10/31/2025
10/7/2025
11/12/2025
10/14/2025
10/14/2025
11/17/2025
11/24/2025
11/18/2025
9/29/2025
10/22/2025
12/1/2025
11/4/2025
10/17/2025
11/26/2025
11/21/2025
10/14/2025
11/25/2025
10/30/2025
10/27/2025
10/14/2025
12/9/2025
10/23/2025
10/23/2025
12/9/2025
11/19/2025
10/1/2025
12/1/2025
11/5/2025
10/8/2025
10/17/2025
10/23/2025
9/18/2025
10/9/2025
9/29/2025
10/8/2025
11/21/2025
9/26/2025
10/27/2025
10/24/2025
12/1/2025
11/5/2025
9/23/2025
10/30/2025
10/21/2025
9/24/2025
11/25/2025
11/5/2025
9/22/2025
10/30/2025
11/18/2025
11/14/2025
10/1/2025
12/8/2025
11/5/2025
9/22/2025
11/5/2025
9/23/2025
12/2/2025
12/8/2025
11/6/2025
10/30/2025
9/24/2025
11/10/2025
11/5/2025
9/26/2025
11/3/2025
12/2/2025
11/19/2025
11/17/2025
10/14/2025
11/20/2025
10/13/2025
10/15/2025
11/6/2025
10/17/2025
10/15/2025
12/3/2025
11/18/2025
11/18/2025
10/1/2025
9/30/2025
9/29/2025
11/7/2025
12/1/2025
10/20/2025
10/28/2025
10/16/2025
11/12/2025
11/3/2025
9/23/2025
10/20/2025
10/21/2025
12/3/2025
10/15/2025
10/27/2025
10/1/2025
11/20/2025
11/12/2025
11/12/2025
10/2/2025
10/10/2025
10/7/2025
10/27/2025
10/27/2025
11/6/2025
10/3/2025
11/4/2025
10/17/2025
12/1/2025
11/12/2025
10/6/2025
10/2/2025
10/2/2025
11/26/2025
10/17/2025
9/24/2025
11/7/2025
12/8/2025
10/29/2025
11/13/2025
10/31/2025
11/6/2025
12/8/2025
10/6/2025
11/20/2025
12/2/2025
11/12/2025
11/5/2025
10/28/2025
9/10/2025
10/14/2025
11/14/2025
10/1/2025
12/8/2025
11/5/2025
10/14/2025
12/9/2025
10/31/2025
10/8/2025
9/29/2025
12/8/2025
10/14/2025
10/20/2025
12/1/2025
10/16/2025
11/10/2025
10/7/2025
10/6/2025
10/24/2025
10/15/2025
10/7/2025
12/4/2025
10/30/2025
10/17/2025
12/5/2025
10/8/2025
11/12/2025
11/12/2025
10/23/2025
10/3/2025
9/26/2025
11/10/2025
11/24/2025
11/10/2025
9/24/2025
11/13/2025
12/8/2025
10/29/2025
9/17/2025
9/15/2025
9/15/2025
9/17/2025
9/17/2025
9/16/2025
9/12/2025
9/16/2025
9/17/2025
9/11/2025
9/17/2025
9/11/2025
10/28/2025
9/11/2025
9/15/2025
9/11/2025
9/11/2025
9/16/2025
9/18/2025
9/11/2025
9/17/2025
9/11/2025
9/18/2025
9/18/2025
9/17/2025
9/17/2025
9/18/2025
9/18/2025
9/12/2025
9/17/2025
9/16/2025
9/17/2025
9/11/2025
9/17/2025
9/16/2025
9/18/2025
11/18/2025
9/17/2025
9/19/2025
9/15/2025
8/18/2025
6/25/2025
6/25/2025
8/12/2025
9/2/2025
7/9/2025
8/19/2025
7/22/2025
9/4/2025
8/13/2025
7/31/2025
9/2/2025
8/11/2025
6/25/2025
6/24/2025
7/1/2025
8/15/2025
7/18/2025
8/11/2025
8/19/2025
8/14/2025
7/2/2025
8/21/2025
7/22/2025
7/10/2025
8/18/2025
7/28/2025
7/25/2025
8/7/2025
8/20/2025
6/24/2025
8/27/2025
8/27/2025
7/17/2025
9/2/2025
7/15/2025
7/9/2025
8/4/2025
8/26/2025
8/11/2025
8/27/2025
6/24/2025
7/8/2025
7/21/2025
6/30/2025
7/21/2025
6/24/2025
7/28/2025
8/15/2025
6/26/2025
9/9/2025
8/28/2025
8/5/2025
7/11/2025
9/2/2025
8/12/2025
6/24/2025
7/25/2025
8/27/2025
8/6/2025
8/29/2025
6/25/2025
9/3/2025
8/5/2025
8/7/2025
8/12/2025
8/6/2025
7/30/2025
6/25/2025
8/11/2025
7/1/2025
8/4/2025
9/10/2025
8/27/2025
7/28/2025
8/7/2025
8/21/2025
6/27/2025
8/5/2025
6/23/2025
6/18/2025
6/11/2025
11/13/2025
6/12/2025
7/24/2025
8/26/2025
7/29/2025
8/25/2025
8/4/2025
8/18/2025
7/23/2025
6/12/2025
7/1/2025
8/13/2025
8/14/2025
7/1/2025
6/19/2025
8/29/2025
7/1/2025
6/16/2025
6/19/2025
9/5/2025
8/26/2025
7/17/2025
6/17/2025
6/19/2025
8/26/2025
8/19/2025
8/25/2025
8/20/2025
8/25/2025
8/4/2025
6/26/2025
6/19/2025
8/8/2025
8/18/2025
8/26/2025
7/10/2025
6/30/2025
7/21/2025
6/12/2025
7/31/2025
6/5/2025
6/17/2025
9/2/2025
6/16/2025
7/11/2025
8/4/2025
6/18/2025
7/17/2025
9/4/2025
7/24/2025
8/26/2025
7/9/2025
7/15/2025
7/9/2025
7/17/2025
8/18/2025
6/23/2025
6/11/2025
6/30/2025
7/22/2025
8/5/2025
8/26/2025
7/9/2025
8/28/2025
7/24/2025
8/21/2025
7/29/2025
6/19/2025
6/13/2025
6/23/2025
6/10/2025
9/3/2025
8/26/2025
8/26/2025
6/2/2025
5/29/2025
6/9/2025
6/5/2025
6/10/2025
6/3/2025
6/3/2025
6/5/2025
6/10/2025
11/19/2025
11/24/2025
11/25/2025
11/18/2025
12/4/2025
11/25/2025
12/2/2025
11/13/2025
11/25/2025
12/2/2025
9/17/2025
12/1/2025
6/4/2025
9/3/2025
11/12/2025
11/4/2025
8/26/2025
9/26/2025
6/30/2025
10/31/2025
11/12/2025
10/13/2025
10/1/2025
10/20/2025
11/12/2025
7/9/2025
11/12/2025
10/1/2025
11/12/2025
11/4/2025
11/12/2025
10/8/2025
10/2/2025
11/6/2025
11/5/2025
10/28/2025
11/4/2025
10/1/2025
9/16/2025
11/13/2025
11/4/2025
11/10/2025
10/27/2025
11/6/2025
10/15/2025
10/30/2025
11/12/2025
10/30/2025
10/17/2025
7/29/2025
10/13/2025
10/30/2025
10/15/2025
11/6/2025
11/12/2025
6/18/2025
7/15/2025
6/19/2025
7/28/2025
8/4/2025
7/25/2025
6/24/2025
7/24/2025
6/10/2025
12/8/2025
10/30/2025
11/14/2025
10/27/2025
11/26/2025
10/6/2025
12/11/2025
12/10/2025
12/11/2025
12/11/2025
12/11/2025
12/11/2025
12/12/2025
12/9/2025
6/19/2025
12/12/2025
12/12/2025
12/12/2025
12/12/2025
6/11/2025
12/12/2025
6/17/2025
11/13/2025
6/17/2025
11/18/2025
7/2/2025
11/24/2025
12/9/2025
12/15/2025
11/14/2025
11/4/2025
9/16/2025
9/22/2025
12/15/2025
12/16/2025
12/16/2025
12/16/2025
12/10/2025
11/26/2025
8/19/2025
12/16/2025
12/16/2025
11/19/2025
12/16/2025
12/16/2025
12/16/2025
12/16/2025
12/16/2025
12/18/2025
12/1/2025
12/18/2025
12/18/2025
11/20/2025
11/18/2025
7/23/2025
12/19/2025
10/2/2025
10/2/2025
10/28/2025
6/24/2025
11/20/2025
12/19/2025
12/16/2025
10/24/2025
12/9/2025
12/19/2025
10/16/2025
11/17/2025
12/19/2025
9/2/2025
12/15/2025
12/19/2025
6/25/2025
6/26/2025
10/28/2025
7/2/2025
12/19/2025
12/19/2025
12/22/2025
9/18/2025
12/22/2025
12/22/2025
12/16/2025
12/16/2025
12/16/2025
12/16/2025
12/16/2025
12/16/2025
12/16/2025
10/2/2025
12/16/2025
12/16/2025
12/16/2025
12/16/2025
12/16/2025
12/16/2025
12/16/2025
12/16/2025
12/16/2025
12/16/2025
12/16/2025
12/16/2025
12/16/2025
12/16/2025
12/16/2025
12/16/2025
12/16/2025
12/16/2025
12/16/2025
12/16/2025
12/16/2025
12/16/2025
12/16/2025
12/16/2025
12/16/2025
12/16/2025
12/16/2025
11/26/2025
12/12/2025
6/25/2025
6/10/2025
11/19/2025
10/13/2025
12/12/2025
12/9/2025
12/17/2025
11/13/2025
8/12/2025
12/15/2025
10/27/2025
12/17/2025
12/17/2025
12/17/2025
11/17/2025
6/18/2025
6/5/2025
12/22/2025
8/25/2025
12/12/2025
12/22/2025
12/23/2025
10/9/2025
12/22/2025
9/4/2025
12/22/2025
12/23/2025
12/23/2025
6/24/2025
10/27/2025
6/5/2025
11/13/2025
9/12/2025
11/15/2025
11/16/2025
10/31/2025
12/2/2025
11/26/2025
11/17/2025
11/18/2025
12/3/2025
11/14/2025
11/24/2025
12/11/2025
12/22/2025
9/23/2025
9/9/2025
12/23/2025
11/12/2025
1/6/2026
11/14/2025
1/5/2026
1/5/2026
1/6/2026
1/6/2026
12/12/2025
1/6/2026
1/5/2026
6/24/2025
1/5/2026
12/16/2025
12/10/2025
1/5/2026
1/5/2026
1/5/2026
1/5/2026
12/1/2025
11/17/2025
1/5/2026
10/3/2025
10/17/2025
10/10/2025
1/6/2026
1/7/2026
12/5/2025
9/5/2025
1/8/2026
1/8/2026
1/7/2026
1/7/2026
7/28/2025
1/7/2026
7/14/2025
10/30/2025
1/6/2026
10/24/2025
9/25/2025
11/24/2025
12/22/2025
11/24/2025
6/19/2025
1/9/2026
1/9/2026
6/26/2025
1/12/2026
1/12/2026
7/23/2025
1/12/2026
11/4/2025
1/9/2026
12/26/2025
12/15/2025
1/5/2026
1/8/2026
7/23/2025
1/9/2026
7/7/2025
1/9/2026
1/9/2026
11/24/2025
1/9/2026
1/9/2026
11/18/2025
10/2/2025
1/6/2026
1/12/2026
1/8/2026
1/13/2026
1/13/2026
9/4/2025
11/19/2025
1/13/2026
1/13/2026
1/13/2026
1/5/2026
1/13/2026
1/13/2026
1/14/2026
1/14/2026
10/27/2025
1/13/2026
1/13/2026
1/14/2026
1/5/2026
12/12/2025
1/14/2026
10/8/2025
11/17/2025
10/9/2025
12/22/2025
1/15/2026
12/22/2025
1/15/2026
1/13/2026
1/18/2026
12/10/2025
1/15/2026
1/15/2026
1/15/2026
1/13/2026
1/13/2026
1/13/2026
1/15/2026
10/17/2025
10/15/2025
1/2/2026
1/16/2026
1/16/2026
1/21/2026
1/16/2026
12/3/2025
10/17/2025
1/16/2026
11/20/2025
10/9/2025
5/30/2025
11/5/2025
12/19/2025
12/22/2025
12/17/2025
12/30/2025
11/25/2025
11/10/2025
12/8/2025
12/11/2025
12/23/2025
12/30/2025
12/9/2025
6/17/2025
6/17/2025
6/17/2025
1/20/2026
1/20/2026
1/15/2026
1/20/2026
1/5/2026
10/30/2025
1/15/2026
10/1/2025
1/20/2026
1/20/2026
12/18/2025
1/20/2026
9/23/2025
1/21/2026
1/21/2026
1/21/2026
1/21/2026
1/21/2026
1/21/2026
5/29/2025
1/21/2026
1/21/2026
11/26/2025
1/21/2026
1/21/2026
11/6/2025
10/13/2025
8/29/2025
8/20/2025
8/29/2025
8/29/2025
8/13/2025
12/2/2025
9/15/2025
9/18/2025
12/22/2025
6/5/2025
12/12/2025
7/15/2025
6/19/2025
6/5/2025
6/3/2025
7/15/2025
9/9/2025
8/7/2025
7/15/2025
7/22/2025
7/15/2025
7/16/2025
8/11/2025
7/1/2025
8/21/2025
8/7/2025
8/13/2025
8/29/2025
9/9/2025
8/29/2025
8/18/2025
12/15/2025
8/21/2025
9/26/2025
9/22/2025
11/10/2025
9/29/2025
8/20/2025
11/20/2025
7/1/2025
7/16/2025
6/10/2025
6/10/2025
7/16/2025
7/16/2025
7/17/2025
9/9/2025
9/12/2025
9/9/2025
9/9/2025
7/31/2025
9/9/2025
11/7/2025
7/31/2025
7/31/2025
8/18/2025
8/19/2025
10/13/2025
1/23/2026
8/26/2025
1/26/2026
11/25/2025
11/5/2025
11/25/2025
1/15/2026
1/15/2026
11/18/2025
1/26/2026
1/26/2026
12/18/2025
1/22/2026
7/10/2025
1/26/2026
1/26/2026
1/26/2026
1/27/2026
1/14/2026
12/19/2025
1/27/2026
1/6/2026
1/9/2026
1/26/2026
1/26/2026
1/27/2026
1/28/2026
1/28/2026
1/28/2026
1/22/2026
12/2/2025
9/18/2025
9/18/2025
12/18/2025
1/21/2026
1/6/2026
1/28/2026
8/19/2025
12/19/2025
1/9/2026
1/9/2026
1/29/2026
12/17/2025
1/29/2026
1/9/2026
8/21/2025
1/8/2026
6/24/2025
1/16/2026
6/17/2025
6/17/2025
12/5/2025
6/24/2025
12/5/2025
10/8/2025
1/29/2026
6/26/2025
11/7/2025
1/29/2026
10/1/2025
2/2/2026
2/2/2026
1/20/2026
1/20/2026
2/3/2026
2/3/2026
2/3/2026
2/3/2026
2/3/2026
2/3/2026
7/30/2025
2/2/2026
2/3/2026
2/3/2026
9/23/2025
12/10/2025
1/21/2026
1/21/2026
1/6/2026
1/21/2026
1/7/2026
1/21/2026
9/18/2025
1/21/2026
9/18/2025
8/26/2025
1/12/2026
8/5/2025
1/22/2026
9/26/2025
10/20/2025
1/20/2026
1/20/2026
1/9/2026
1/22/2026
1/22/2026
1/22/2026
1/14/2026
1/12/2026
9/30/2025
1/14/2026
10/24/2025
1/13/2026
1/13/2026
10/22/2025
1/13/2026
1/13/2026
1/15/2026
6/30/2025
7/3/2025
1/22/2026
1/22/2026
1/15/2026
1/26/2026
10/27/2025
1/22/2026
1/22/2026
1/26/2026
1/26/2026
9/9/2025
1/21/2026
1/28/2026
1/28/2026
1/28/2026
1/28/2026
7/2/2025
1/28/2026
1/28/2026
1/14/2026
1/28/2026
10/21/2025
1/27/2026
1/28/2026
1/29/2026
1/29/2026
6/10/2025
7/2/2025
12/18/2025
1/29/2026
1/30/2026
1/30/2026
1/30/2026
12/15/2025
8/20/2025
7/9/2025
11/14/2025
12/19/2025
12/16/2025
1/30/2026
6/11/2025
1/30/2026
1/16/2026
2/3/2026
7/24/2025
12/22/2025
12/18/2025
9/18/2025
9/3/2025
11/25/2025
2/3/2026
2/3/2026
2/4/2026
2/3/2026
7/30/2025
1/26/2026
1/7/2026
1/14/2026
2/4/2026
1/16/2026
2/4/2026
8/18/2025
1/29/2026
10/22/2025
12/1/2025
7/30/2025
10/22/2025
12/15/2025
1/28/2026
12/9/2025
2/4/2026
7/30/2025
7/30/2025
7/30/2025
1/5/2026
1/26/2026
2/2/2026
11/13/2025
7/30/2025
2/4/2026
2/4/2026
8/28/2025
10/30/2025
12/16/2025
2/4/2026
6/3/2025
12/3/2025
11/12/2025
12/17/2025
1/12/2026
7/30/2025
9/18/2025
9/18/2025
2/4/2026
10/27/2025
7/16/2025
1/13/2026
1/9/2026
2/4/2026
2/4/2026
2/4/2026
2/4/2026
2/4/2026
2/4/2026
2/9/2026
2/3/2026
2/4/2026
2/3/2026
2/3/2026
2/3/2026
2/10/2026
6/9/2025
12/8/2025
7/23/2025
2/10/2026
7/3/2025
2/9/2026
7/17/2025
7/29/2025
2/10/2026
7/30/2025
8/14/2025
1/12/2026
1/6/2026
2/9/2026
1/9/2026
9/15/2025
9/18/2025
2/9/2026
2/11/2026
1/29/2026
9/29/2025
7/21/2025
10/23/2025
11/18/2025
2/4/2026
10/29/2025
1/28/2026
2/5/2026
1/30/2026
6/19/2025
2/6/2026
2/6/2026
12/10/2025
9/18/2025
10/16/2025
12/12/2025
2/6/2026
2/6/2026
12/3/2025
9/18/2025
2/3/2026
2/6/2026
1/7/2026
2/6/2026
8/22/2025
2/9/2026
2/9/2026
2/9/2026
11/12/2025
1/5/2026
12/16/2025
1/12/2026
7/30/2025
1/26/2026
9/9/2025
1/6/2026
1/21/2026
12/1/2025
7/30/2025
8/7/2025
8/20/2025
2/4/2026
1/6/2026
2/9/2026
2/9/2026
2/3/2026
2/9/2026
2/9/2026
2/9/2026
2/9/2026
2/9/2026
2/9/2026
9/8/2025
2/9/2026
2/9/2026
2/9/2026
2/9/2026
2/9/2026
2/9/2026
2/9/2026
2/9/2026
2/9/2026
2/9/2026
2/9/2026
2/9/2026
2/9/2026
2/9/2026
2/9/2026
2/9/2026
2/9/2026
2/9/2026
2/9/2026
1/26/2026
7/16/2025
2/9/2026
2/9/2026
2/9/2026
2/9/2026
9/30/2025
9/17/2025
2/9/2026
2/9/2026
2/9/2026
12/18/2025
10/21/2025
10/21/2025
10/30/2025
7/9/2025
2/11/2026
1/26/2026
2/11/2026
2/2/2026
2/2/2026
7/11/2025
7/9/2025
8/20/2025
12/8/2025
12/3/2025
12/5/2025
9/17/2025
9/17/2025
2/11/2026
10/3/2025
1/16/2026
1/14/2026
11/26/2025
12/15/2025
8/25/2025
10/28/2025
1/13/2026
7/24/2025
10/13/2025
12/4/2025
12/8/2025
11/13/2025
7/28/2025
10/22/2025
1/9/2026
11/21/2025
2/12/2026
2/12/2026
7/30/2025
1/9/2026
11/12/2025
10/22/2025
10/14/2025
7/30/2025
7/30/2025
12/15/2025
2/12/2026
2/12/2026
7/23/2025
2/5/2026
2/5/2026
2/5/2026
2/5/2026
5/29/2025
2/5/2026
2/5/2026
2/4/2026
2/12/2026
2/10/2026
2/11/2026
2/9/2026
2/12/2026
2/12/2026
2/9/2026
2/9/2026
1/5/2026
1/21/2026
2/13/2026
2/12/2026
2/12/2026
10/20/2025
2/13/2026
2/2/2026
2/13/2026
10/2/2025
2/13/2026
1/2/2026
10/16/2025
1/20/2026
2/13/2026
9/5/2025
8/12/2025
6/23/2025
12/1/2025
6/17/2025
10/28/2025
9/18/2025
9/18/2025
2/13/2026
6/17/2025
12/17/2025
1/7/2026
6/30/2025
10/6/2025
7/8/2025
9/18/2025
1/5/2026
11/17/2025
2/10/2026
2/13/2026
7/28/2025
6/20/2025
2/17/2026
2/12/2026
1/14/2026
7/23/2025
1/29/2026
2/17/2026
10/21/2025
2/17/2026
1/5/2026
11/4/2025
11/12/2025
2/12/2026
11/12/2025
7/30/2025
1/12/2026
2/17/2026
12/3/2025
2/9/2026
2/9/2026
2/17/2026
2/17/2026
1/26/2026
2/17/2026
10/30/2025
7/24/2025
9/22/2025
2/12/2026
10/6/2025
9/18/2025
2/17/2026
Contact Company Name
Sprouse Communications
Pacific Gas & Electric Company (PG&E)
Pacific Gas and Electric (PG&E)
Pacific Gas & Electric Company (PG&E)
Southern California Gas Company
Pacific Gas & Electric Company (PG&E)
Pacific Gas & Electric Company (PG&E)
West Coast Arborists, Inc.
SoCal Gas
Pacific Gas and Electric (PG&E)
AT&T
Pacific Gas & Electric Company (PG&E)
Pacific Gas & Electric Company (PG&E)
Downtown SLO
AT&T
Pacific Gas and Electric (PG&E)
Pacific Gas & Electric Company (PG&E)
COASTAL CONSTRUCTION & ENGINEERING INC
R. Burke Corporation
Lee Wilson Electric Company, Inc.
SoCalGas
Pacific Gas & Electric Company (PG&E)
SUNRUN
Solarponics, Inc
A.M.Sun Solar
Photon Brothers, Inc.
San Luis Electric
Superior Fire Sprinkler Systems, Inc
JT Construction
Mike Lowrie Transport
Action Rooter
L&D Maksoudian Inc., DBA: Mak Family Construction
SLO Promenade LLC
Borland Built & Managed LLC
LSE Fire Protection, Inc.
LIFESTYLE SOLAR INC
AT&T
SLO Trenchless
DW Auto Sales
AVILA RANCH DEVELOPERS INC A CA CORP
ECHEVARRIA ROOFING
LSE Fire Protection, Inc.
Chris Sunderland Engineering Co.
Charged Up EVs
Hartill Heavy Haul
A-Plus Fire Protection
Action Rooter
Charged Up EVs
Bragg Crane Service
L&D Maksoudian Inc., DBA: Mak Family Construction
Aztech Concrete Construction
SLO Trenchless
Hartill Heavy Haul
Staples Energy
SUNRUN
LIFESTYLE SOLAR INC
Axiom 360 LLC
A.M.Sun Solar
A-Plus Fire Protection
Pacific Heating and Sheet Metal
SUNRUN
Bragg Crane Service
Templeton Electric Inc
A-1 GLASS, LLC
SLO Trenchless
SLO Trenchless
Nexus Energy Systems
Kanyon Construction
TD ELECTRIC
Solarponics, Inc
Mike Lowrie Transport
Inland Engineering Services
Solarponics, Inc
Williams Scotsman
Bragg Crane Service
Anderson Trucking
LIFESTYLE SOLAR INC
SUNRUN
Bennett Motor Express
MURRAY STATION LP A CA LP
LSE FIRE PROTECTION, INC.
Kanyon Construction
TADA Services
Anderson Trucking
Water Fixers Plumbing & Filtration
LSE FIRE PROTECTION, INC.
SLO Trenchless
San Luis Electric
Nexus Energy Systems
COASTAL CONSTRUCTION & ENGINEERING INC.
B.E. McCarty & Sons
Superior Modular Transport
Mid-Coast Fire Protection, Inc
RSPaul Company
Charged Up EVs
Kanyon Construction
SUNRUN
Central Coast Renovations
SPAULDING FAMILY TRUST
PIPEDREAMS VENTURES HOLDINGS LLC - WIGHTON'S PLUMBING HEATING & AIR CONDITIONING
Charged Up EVs
LIFESTYLE SOLAR INC
SUNRUN
SUNRUN
KAWAMOTO ELIZABETH
Greg Peterson General Contractor
Alpha Fire Unlimited
GAVIOTA ENTERPRISES A CA LP
Cadwell & Co.
AVILA RANCH DEVELOPERS INC A CA CORP
RANDS BARRY
RLH Fire Protection
Patriot Plumbing and Drain Cleaning
LSE FIRE PROTECTION, INC.
INACTIVE
SUNRUN
LSE Fire Protection, Inc.
SUN SOLAR
Permit Services Inc.
CCWiley Construction
Hab Design Group
Ed Cuming Custom Homes
HIVE Engineering
Excel Construction Services, Inc.
Burcheri Construction
Patriot Plumbing and Drain Cleaning
Jason Poch dba Suncore Solar
Leo Tidwell Excavating Corp. (LTEC)
Foster Enterprises
PIPEDREAMS VENTURES HOLDINGS LLC - WIGHTON'S PLUMBING HEATING & AIR CONDITIONING
LSE FIRE PROTECTION, INC.
Coastal Tree Experts, Inc
Electricraft, Inc.
HAMAGUCHI STEVEN & CORAZON LIVING TRUST 2005
MATTUCCI PLUMBING INCORPORATED
COASTAL CONSTRUCTION & ENGINEERING INC
Action Rooter
L&D Maksoudian Inc., DBA: Mak Family Construction
SUNRUN
PIPEDREAMS VENTURES HOLDINGS LLC - WIGHTON'S PLUMBING HEATING & AIR CONDITIONING
Pacific Builders
Action Rooter
Superior Modular Transport
AVILA RANCH DEVELOPERS INC A CA CORP
Charged Up EVs
Doc Miller's Heating and Air
Permit Services Inc.
AMC Construction
Pacific Solar Homes
Bright Planet Solar
DONALD PLUMB SIGNS
Hartill Heavy Haul
Patriot Plumbing and Drain Cleaning
Greenvale Tree Co.
INACTIVE
Wicks Roofing and Solar LLC
Solarponics, Inc
SLO Trenchless
INACTIVE
RICHARD HEATH & ASSOCIATES
Greenvale Tree Company
SUNRUN
SUNRUN
Nieporte Roofing Inc
COASTAL CONSTRUCTION & ENGINEERING INC
Madrigal Transport
L&D Maksoudian Inc., DBA: Mak Family Construction
M.C. Etter Painting
Anderson Trucking
PACIFIC HEATING AND SHEET METAL
RICHARD HEATH & ASSOCIATES
LSE Fire Protection, Inc.
L&D Maksoudian Inc., DBA: Mak Family Construction
SUNRUN
SUNRUN
LAPIDUS DANIEL E
SPECIALTY CONSTRUCTION INC.
Patriot Plumbing and Drain Cleaning
INACTIVE
California Mobile Home Service
SLO Craft Builders
TESLA INC
L&D Maksoudian Inc., DBA: Mak Family Construction
Bright Planet Solar
Charged Up EVs
MONTEREY & MORRO, LLC
LIFESTYLE SOLAR INC
Bright Planet Solar
A-1 GLASS, LLC
B Walker Signs & Lighting, Inc.
SUNRUN
Charged Up EVs
Nativity of Our Lady Catholic Church
AAA Design and Construction, LLC
Solarponics, Inc
Pacific Heating and Sheet Metal
Sprouse Communications
Bragg Crane Service
Action Rooter
Permit Services Inc.
Johnson Fire Protection
B&T Construction, Inc.
COASTAL CONSTRUCTION & ENGINEERING INC
Bragg Crane Service
JOHNSON DALE M LIVING TRUST
EZE Trucking LLC DBA Rig Runner
Leo Tidwell Excavating Corp. (LTEC)
Triad Property Management
BE RIGHT THERE HEATING & AIR CONDITIONING INC
Fast Concepts
Bragg Crane Service
Wave Electric
Bright Planet Solar
Superior Modular Transport
Bright Planet Solar
KGM Construction
SLO Trenchless
Action Rooter
Axiom 360 LLC
SLO Trenchless
A.M.Sun Solar
Roto Rooter
Wicks Roofing and Solar LLC
Holland Realty
LSE Fire Protection, Inc.
SPECIALTY CONSTRUCTION INC.
SUNRUN
BOUDREAU PROPERTIES LLC A CA LLC
SUNRUN
SUNRUN
NIEL DILWORTH, ARCHITECT
L&D Maksoudian Inc., DBA: Mak Family Construction
Charged Up EVs
KEVIN BOHRER & PETER FALZON
Solarponics, Inc
Hartill Heavy Haul
Daniel J Kallal
LSE FIRE PROTECTION, INC.
Todd Bartolome
Anderson Trucking
Solarponics, Inc
L&D Maksoudian Inc., DBA: Mak Family Construction
SUNRUN
Superior Modular Transport
Coast Roofing Inc
Bragg Crane Service
LIFESTYLE SOLAR INC
M Johnson Construction, Inc.
Greenvale Tree Co.
Permit Services Inc.
Pacific Gas & Electric Company (PG&E)
LIFESTYLE SOLAR INC
Live Oak Electric Inc
McDonald Transport Inc.
SUNRUN
Robbins Build
NIEL DILWORTH, ARCHITECT
Jack In The Box Inc #3290
Bright Planet Solar
John J Schroder AIA
A.M.Sun Solar
Permit Services Inc.
TH AVILA RANCH LLC
Tekton Electric Inc
Smith's Alarms & Electronics Inc.
Browder Painting Company, Inc.
LIFESTYLE SOLAR INC
MAIN KEVIN R TRE ETAL
DS Marigold LP
SLOCA LLC A CA LLC
SLO Trenchless
Pacific Premier Bank
Solarponics, Inc
Tricamo Construction Inc
WURSTER ROBERT & KIM TRUST
A-1 GLASS, LLC
SLO Trenchless
Knecht's Plumbing & Heating, Inc.
L&D Maksoudian Inc., DBA: Mak Family Construction
Mid-Coast Fire Protection, Inc
TESLA INC
Alpha Fire Unlimited
ERNST MICHAEL J & KIMBERLY J
Michael J McGuire Architecture + Engineering
Cadwell & Co.
ROD CO.
ROD CO.
ROD CO.
KENDALL ROAD LLC
LIVESEY SHARON TRUST
Ryan Brockett Architect Inc.
Seamair Construction
L&D Maksoudian Inc., DBA: Mak Family Construction
PJ Designs
SunWork Renewable Energy Projects
LEWIS FAMILY TRUST
LIFESTYLE SOLAR INC
COASTAL CONSTRUCTION & ENGINEERING INC.
LIFESTYLE SOLAR INC
Astound Broadband LLC
B&T Construction, Inc.
BCCI Construction, LLC
Dalton Trucking
Perfection Fire Protection
Solarponics, Inc
LIFESTYLE SOLAR INC
Electricraft, Inc.
COASTAL CONSTRUCTION & ENGINEERING INC.
B&T Construction, Inc.
KENDALL ROAD LLC
BE RIGHT THERE HEATING & AIR CONDITIONING INC
PJ Designs
RIDER MARY S
McDonald Transport Inc.
B&T Construction, Inc.
Wage Builders
LIFESTYLE SOLAR INC
Leo Tidwell Excavating Corp. (LTEC)
SICANOFF FAMILY TRUST
Action Rooter
Action Rooter
SunWork Renewable Energy Projects
COASTAL CONSTRUCTION & ENGINEERING INC.
Souza Engineering Contracting - Souza Construction
LIFESTYLE SOLAR INC
SunWork Renewable Energy Projects
PIPEDREAMS VENTURES HOLDINGS LLC - WIGHTON'S PLUMBING HEATING & AIR CONDITIONING
PIPEDREAMS VENTURES HOLDINGS LLC - WIGHTON'S PLUMBING HEATING & AIR CONDITIONING
Always Measure Twice
Triple B Transportation, LLC
SunWork Renewable Energy Projects
High Tide Electric
PIPEDREAMS VENTURES HOLDINGS LLC - WIGHTON'S PLUMBING HEATING & AIR CONDITIONING
LIFESTYLE SOLAR INC
Central Coast Electric, Inc.
MCLEAN ROOFING INC
Semmes & Co Builders, Inc.
Circus Vargas
SunWork Renewable Energy Projects
La Cuesta Inn
Sprouse Communications
LIFESTYLE SOLAR INC
SunWork Renewable Energy Projects
SunWork Renewable Energy Projects
Self
Charged Up EVs
CWA Studios
Staples Energy
People's Self Help Housing Corp
Coastal Tree Experts, Inc
Southern California Gas Company
SunWork Renewable Energy Projects
SUNSTONE HOME CALIFORNIA LLC dba SUNSTONE
SPECTRUM LIGHTING SERVICES INCORPORATED dba SO CAL LIGHTING SERVICES
Action Rooter
LIFESTYLE SOLAR INC
GANNAGE DESIGN
SunWork Renewable Energy Projects
SLO Cider LLC
TESLA INC
SUNRUN
Bixler Builders
RICHARD HEATH & ASSOCIATES
Mid-Coast Fire Protection, Inc
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
Action Rooter
SunWork Renewable Energy Projects
SLO Circuit Electrical
SLO Trenchless
SUNRUN
WINTERMEYER GARY A
Eventide Ventures, LLC
TEN OVER STUDIO
PIPEDREAMS VENTURES HOLDINGS LLC - WIGHTON'S PLUMBING HEATING & AIR CONDITIONING
SunWork Renewable Energy Projects
SunWork Renewable Energy Projects
196 Architects Property Management
Jason Poch dba Suncore Solar
A-Plus Fire Protection
JM Construction
KENDALL ROAD LLC
CURRIE ROSS E & JOANNIE M FAMILY TRUST
Alpha Fire Unlimited
Leo Tidwell Excavating Corp. (LTEC)
Action Rooter
SunWork Renewable Energy Projects
Kanyon Construction
Alpha Fire Unlimited
SunWork Renewable Energy Projects
LIFESTYLE SOLAR INC
GIN FAMILY REVOCABLE TRUST
SunWork Renewable Energy Projects
Code 4 Roofing Specialist
LIGHTHOUSE ELECTRICAL SERVICES INC
SunWork Renewable Energy Projects
A CLASS CONSTRUCTION
PASO ROBLES GLASS
SunWork Renewable Energy Projects
Nwesto DBA Gettler-Ryan
D H CONSTRUCTION
SunWork Renewable Energy Projects
Dalton Trucking
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
Goldman Electric
LIFESTYLE SOLAR INC
Kain Building and Design Group, LLC
SunWork Renewable Energy Projects
Coastal Tree Experts, Inc
ELLIOTT LISA L LIVING TRUST % LINDA P ELLIOTT
Templeton Electric Inc
Alpha Fire Unlimited
Piazza Trucking
C3 Construction and Development Inc.
TESLA INC
Pacific Redwood Investments
AHEARN FAMILY REVOCABLE TRUST-SURVIVORS TRUST
COASTAL CONSTRUCTION & ENGINEERING INC.
Wayne Perry, Inc.
LIFESTYLE SOLAR INC
Charged Up EVs
SLO Trenchless
Tomasini Construction
PFC, Inc.
Cencal Enterprises, Inc.
Bright Planet Solar
AT&T
SLO Trenchless
AP SANDMAN, LLC
NIEL DILWORTH, ARCHITECT
Zac's Transport
Bixler Fire Protection
OST Truck and Crane
Foster Enterprises
Bennett Motor Express
Bragg Crane Service
RITTER CONSTRUCTION
Pacific Gas & Electric Company (PG&E)
Mike's Mobile Moving
Bennett Motor Express
PIPEDREAMS VENTURES HOLDINGS LLC dba
Bright Planet Solar
F&H Construction
Alpha Fire Unlimited
Andy's Concrete
Estero Bay Roofing Company
McDonald Transport Inc.
A.M.Sun Solar
Link Electrix
Trumark homes
Zac's Transport
Bennett Motor Express
McDonald Transport Inc.
Action Rooter
Solarponics, Inc
PIPEDREAMS VENTURES HOLDINGS LLC dba
Knecht's Plumbing & Heating, Inc.
A.M.Sun Solar
Photon Brothers, Inc.
Greenvale Tree Co.
Custom Machine Inc
California Mobile Home Service
Alpha Fire Unlimited
Landstar Ranger
Outriders West
Apple Farm
Charged Up EVs
Axiom 360 LLC
NIEL DILWORTH, ARCHITECT
SUNRUN
Goldman Electric
Charter Communications
Action Rooter
KRILL BRYAN M FAMILY TRUST
FOUNDATION SOLUTIONS
Jason Poch dba Suncore Solar
HOOVER LIVING TRUST
Greenvale Tree Co.
Jack In The Box Inc #3290
EZE Trucking LLC DBA Rig Runner
SMITH STEVEN G
Action Rooter
Bennett Motor Express
BENNETT TIMOTHY J TRE ETAL
KAMM KORINER PATRICIA TRUST
JT Construction
Wicks Roofing and Solar LLC
Photon Brothers, Inc.
Bragg Crane Service
McDonald Transport Inc.
Photon Brothers, Inc.
INACTIVE ZEEMER FAMILY TRUST
ATS Specialized
Solarponics, Inc
EZE Trucking LLC DBA Rig Runner
Reeve Trucking Company, Inc.
P2EG
Solarponics, Inc
SUNRUN
Roho Construction
Wave Electric
OST Truck and Crane
Action Rooter
AC Trucking
PIPEDREAMS VENTURES HOLDINGS LLC - WIGHTON'S PLUMBING HEATING & AIR CONDITIONING
Downtown SLO Association
LSE FIRE PROTECTION, INC.
EZE Trucking LLC DBA Rig Runner
A.M.Sun Solar
Axiom 360 LLC
LIFESTYLE SOLAR INC
Tenhet & Sons Mobile Home Transport
SUN SOLAR
NRG Clean Power
GORDON CONSTRUCTION
Smith's Alarms & Electronics Inc.
WIRE RUN ELECTRIC
Vellum Design Build
Alan Roinestad Construction
RITTER CONSTRUCTION
Bennett Motor Express
Reimer Transport
COASTAL CONSTRUCTION & ENGINEERING INC
David Crye General Engineering Contractor, Inc
4640 Broad St LLC
SUNRUN
LK Graphics, Inc. (dba The Sign Place)
Seamair Construction
HALL BUILDERS, INC
RITTER CONSTRUCTION
Meyers Constructors, Inc.
OST Truck and Crane
Tenhet & Sons Mobile Home Transport
Quality Home Transport LLC
R L H FIRE PROTECTION INC
Arris Studio Architects
Alco Building Solutions
Charged Up EVs
PIPEDREAMS VENTURES HOLDINGS LLC dba
COASTAL CONSTRUCTION & ENGINEERING INC
Coastal Tree Experts, Inc
L&D Maksoudian Inc., DBA: Mak Family Construction
WATHEN CASTANOS HYBRID HOMES II, INC.
discounted solar
Bennett Motor Express
J.R. Spencer Construction
Inland Engineering Services, Inc.
Alpha Fire Unlimited
Reeve Trucking Co
RITTER CONSTRUCTION
Charged Up EVs
Roto Rooter
TESLA INC
LSE FIRE PROTECTION, INC.
Reeve Trucking Co
NIEL DILWORTH, ARCHITECT
Reeve Trucking Company, Inc.
Roto Rooter
Photon Brothers, Inc.
Photon Brothers, Inc.
PIPEDREAMS VENTURES HOLDINGS LLC - WIGHTON'S PLUMBING HEATING & AIR CONDITIONING
SUN SOLAR
Seamair Construction
LIFESTYLE SOLAR INC
Steven Rogall Painting, Inc.
J.R. Spencer Construction
Bennett Motor Express
PIPEDREAMS VENTURES HOLDINGS LLC dba
BE RIGHT THERE HEATING & AIR CONDITIONING INC
Solarponics, Inc
NIEL DILWORTH, ARCHITECT
Golden State Modular
WATHEN CASTANOS HYBRID HOMES II, INC.
LIFESTYLE SOLAR INC
EZE Trucking LLC DBA Rig Runner
High Tide Electric
COASTAL CONSTRUCTION & ENGINEERING INC.
Bragg Crane Service
Landstar Ranger
Action Rooter
Specialized Transportation
Bright Planet Solar
RSH Construction, Inc.
AT&T
Dalton Trucking
Reeve Trucking Co
SUNRUN
Reeve Trucking Co
Wathen Castanos Home
HP Communications
Costco Wholesale #741
NIEL DILWORTH, ARCHITECT
Golden State Modular
Madrigal Transport
SLO Craft Builders
Hammer Trucking
Solarponics, Inc
LIFESTYLE SOLAR INC
San Luis Obispo County
Templeton Electric Inc
EZE Trucking LLC DBA Rig Runner
RITTER CONSTRUCTION
Bennett Motor Express
Joseph Construction and Consulting, Inc. DBA: Joseph Engineering
SLOLife Studio & Mercantile
AC Trucking
Solarponics, Inc
Mike's Mobile Moving
Inland Engineering Services, Inc.
Foster Enterprises
Pacific Gas & Electric (PG&E)
Bennett Motor Express
PIPEDREAMS VENTURES HOLDINGS LLC - WIGHTON'S PLUMBING HEATING & AIR CONDITIONING
Isco Machinery
Greenvale Tree Co.
B.E. McCarty & Sons
PIPEDREAMS VENTURES HOLDINGS LLC - WIGHTON'S PLUMBING HEATING & AIR CONDITIONING
B&T Construction, Inc.
Construction Inc.
Axiom 360 LLC
Photon Brothers, Inc.
LSE FIRE PROTECTION, INC.
Holland and Knapp Construction
Estero Bay Roofing Company
J.R. Spencer Construction
Whittle Fire Protection
OST Truck and Crane
City Motors Towing
CRITTENDEN GRACE REVOCABLE TRUST
Greg Moore Construction, Inc.
Kimbell & Brown Construction, Inc.
Staples Energy
OST Truck and Crane
TESLA INC
Charged Up EVs
Wicks Roofing and Solar LLC
SUNRUN
California Mobile Home Service
Pacific Builders
Water Fixers Plumbing & Filtration
Action Rooter
Estero Bay Roofing Company
Greenvale Tree Co.
LSE FIRE PROTECTION, INC.
J M G SECURITY SYSTEMS INC
City Motors Towing
Sprouse Communications
SUN SOLAR
Templeton Electric Inc
Solarponics, Inc
Action Rooter
Action Rooter
UDSEN NIELS TRE ETAL
Arbor First
WATHEN CASTANOS HYBRID HOMES II, INC.
SLO Trenchless
Rice Heating & Air Conditioning
Wathen Castanos Home
SUNRUN
SUNRUN
Ed Cuming Custom Homes
SUNRUN
McDonald Transport Inc.
Solarponics, Inc
Solarponics, Inc
Piazza Trucking
Patriot Plumbing and Drain Cleaning
EZE Trucking LLC DBA Rig Runner
SLO Trenchless
LSE FIRE PROTECTION, INC.
Tenhet & Sons Mobile Home Transport
Hatton's Crane & Rigging
Rexs Rooter plumbing Inc.
Axiom 360 LLC
Isco Machinery
COASTAL CONSTRUCTION & ENGINEERING INC
Lamassu Utility Services, Inc.
Rising Tide Companies, LLC
Pacific Gas & Electric Company (PG&E)
Staples Energy
Reeve Trucking Co
Cenco Enterprises, LLC
N Brent Knowles Construction
Action Rooter
Bennett Motor Express
Action Rooter
Goodwin Construction Group, Inc.
B&T Construction, Inc.
Greenvale Tree Co.
Permit Services Inc.
SLOCA, LLC
L&D Maksoudian Inc., DBA: Mak Family Construction
Estero Bay Roofing Company
Wicks Roofing and Solar LLC
SUNRUN
PIPEDREAMS VENTURES HOLDINGS LLC dba
McDonald Transport Inc.
Securitas Technology
LSE FIRE PROTECTION, INC.
EZE Trucking LLC DBA Rig Runner
N Brent Knowles Construction
Tricamo Construction
PIPEDREAMS VENTURES HOLDINGS LLC dba
WATHEN CASTANOS HYBRID HOMES II, INC.
California Mobile Home Service
MADDALENA ROLAND C EXEMPTION TRUST
Solarponics, Inc
Superior Fire Sprinkler Systems, Inc
McDonald Transport Inc.
Action Rooter
LSE FIRE PROTECTION, INC.
Bright Planet Solar
Coastal Tree Experts, Inc
FOWLER PEGGY (AKA 1)
RICHARD HEATH & ASSOCIATES
N Brent Knowles Construction
Charged Up EVs
SUNRUN
LSE FIRE PROTECTION, INC.
Superior Fire Sprinkler Systems, Inc
LSE FIRE PROTECTION, INC.
Central Coast Heating and Air INC
PJ Designs
LSE Fire Protection, Inc.
Pacific Builders
LSE Fire Protection, Inc.
LSE Fire Protection, Inc.
Solarponics, Inc
Reeve Trucking Company, Inc.
LSE FIRE PROTECTION, INC.
LSE Fire Protection, Inc.
Reeve Trucking Company, Inc.
Reeve Trucking Company, Inc.
ALPERT IRA R & MARSHA L REVOCABLE 1993 TRUST
Reeve Trucking Company, Inc.
SUNRUN
Photon Brothers, Inc.
LSE FIRE PROTECTION, INC.
LSE FIRE PROTECTION, INC.
L&D Maksoudian Inc., DBA: Mak Family Construction
Permit Services Inc.
Bright Planet Solar
Specialty Construction
Foster Enterprises
PRISTINE ROOFING
Erik, Dane & Michelle Lindgren
Wicks Roofing and Solar LLC
SUNRUN
Rooftop Co
Energy Masters
Charged Up EVs
Action Rooter
AVILA RANCH DEVELOPERS INC A CA CORP
Bragg Crane Service
LSE Fire Protection, Inc.
Kain Building and Design Group, LLC
PASO ROBLES GLASS
MAINO CONSTRUCTION COMPANY INCORPORATED
AAA Design and Construction, LLC
SLO Trenchless
Solarponics, Inc
Bennett Motor Express
SLO Craft Builders
Chris Sunderland Engineering Co.
H POOR AND COMPANY INC DBA ALLSTAR HEATING AND AIR CONDITIONING
Solarponics, Inc
HALL BUILDERS, INC
Action Rooter
LSE Fire Protection, Inc.
LK Graphics, Inc. (dba The Sign Place)
Hansen Construction
Bragg Crane Service
Adams Heating & Cooling
On Point Plumbing Heating & Air Conditioning Inc.
COASTAL CONSTRUCTION & ENGINEERING INC
SLO Trenchless
SUNRUN
COASTAL CONSTRUCTION & ENGINEERING INC.
Action Rooter
DS Marigold LP
PIPEDREAMS VENTURES HOLDINGS LLC - WIGHTON'S PLUMBING HEATING & AIR CONDITIONING
JW Design & Construction, Inc.
SLO Trenchless
LAGUNA VILLAGE SHOPPING CENTER LLC
EZA Trucking, LLC. DBA: Rig Runner
Pacific Heating and Sheet Metal
SLO Trenchless
Action Rooter
COASTAL CONSTRUCTION & ENGINEERING INC
Hayward Lumber Company
LIFESTYLE SOLAR INC
TESLA INC
SUNRUN
Solarponics, Inc
Bragg Crane Service
Charged Up EVs
SUNRUN
Bragg Crane Service
Greenvale Tree Co
LIFESTYLE SOLAR INC
Seamair Construction
Templeton Electric Inc
Attala Properties LLC
Paradise Tree Services
Charged Up EVs
Charged Up EVs
SUNRUN
LIFESTYLE SOLAR INC
City Motors Towing
MORRISON FAMILY TRUST 2000
EXCEL CONSTRUCTION SERVICES INC
MATHERLY FIRE PROTECTION
HALL BUILDERS, INC
RSVC COMPANY
Pacific Gas and Electric (PG&E)
Pacific Gas & Electric (PG&E)
Pacific Gas & Electric Company (PG&E)
AT&T
Pacific Gas & Electric Company (PG&E)
Pacific Gas and Electric (PG&E)
Sprouse Communications
R. Burke Corporation
Toste Construction Inc.
Pacific Gas & Electric Company (PG&E)
PG&E
West Coast Arborists, Inc.
Sprouse Communications
Souza Construction
Pacific Gas & Electric Company (PG&E)
West Coast Arborists, Inc.
Pacific Gas and Electric (PG&E)
Pacific Gas and Electric (PG&E)
PG&E
Pacific Gas and Electric (PG&E)
AT&T
Pacific Gas & Electric Company (PG&E)
SoCal Gas
Pacific Gas & Electric (PG&E)
SoCal Gas
Pacific Gas & Electric Company (PG&E)
AT&T
Souza Construction
Pacific Gas & Electric Company (PG&E)
Pacific Gas and Electric (PG&E)
AT&T
Pacific Gas & Electric Company (PG&E)
AT&T
Bunyon Bros. Tree Service
PG&E
Southern California Gas Company
Pacific Gas and Electric (PG&E)
Greenvale Tree Co.
Sprouse Communications
Pacific Gas and Electric (PG&E)
Pacific Gas & Electric Company (PG&E)
Sprouse Communications
Leo Tidwell Excavating Corp. (LTEC)
Pacific Gas & Electric Company (PG&E)
Pacific Gas & Electric (PG&E)
Coastal Community Builders Inc
AT&T
Pacific Gas & Electric Company (PG&E)
Pacific Gas and Electric (PG&E)
Sprouse Communications
Sprouse Communications
Trumark Homes
AT&T
AT&T
Sprouse Communications
Yeh and Associates
Southern California Gas Company
Pacific Coast Well Drilling, Inc
AT&T
Davey Tree Surgery Co.
Wicks Roofing and Solar LLC
Pacific Gas & Electric (PG&E)
Southern California Gas Company
Pacific Gas & Electric Company (PG&E)
West Coast Arborists, Inc.
Southern California Gas Company (SoCal Gas)
AT&T
Southern California Gas Company
Pacific Gas & Electric Company (PG&E)
PG&E
Pacific Gas & Electric Company (PG&E)
Pacific Gas and Electric (PG&E)
Turn Around Communications
PG&E
Pacific Gas & Electric Company (PG&E)
PG&E
PG&E
AT&T
PG&E
Pacific Gas & Electric Company (PG&E)
Pacific Gas & Electric Company (PG&E)
Pacific Gas & Electric, PG&E
Turn Around Communications
Pacific Gas & Electric (PG&E)
Pacific Gas & Electric Company (PG&E)
Pacific Gas & Electric Company (PG&E)
Toste Construction, Inc.
G F Garcia and Sons, Inc.
Southern California Gas Company
Pacific Gas & Electric Company (PG&E)
Greenvale Tree Co
West Coast Arborists, Inc.
City of San Luis Obispo
Southern California Gas Company
AT&T
Southern California Gas Company
Southern California Gas Company (SoCal Gas)
Earth Systems Pacific
Pacific Gas & Electric Company (PG&E)
Pacific Gas and Electric (PG&E)
Pacific Gas & Electric Company (PG&E)
Pacific Gas & Electric Company (PG&E)
Cencal Enterprises, Inc.
Pacific Gas and Electric (PG&E)
Pacific Gas and Electric (PG&E)
Pacific Gas and Electric (PG&E)
Turn Around Communications
PG&E
Sprouse Communications
Pacific Gas and Electric (PG&E)
Southern California Gas Company
AT&T
PG&E
Pacific Gas & Electric Company (PG&E)
Pacific Gas & Electric Company (PG&E)
Pacific Gas & Electric (PG&E)
Pacific Gas & Electric Company (PG&E)
AT&T
NEUKIRCH ULRICH W TRE ETAL
Pacific Gas & Electric Company (PG&E)
Adept Events
External Test
Pacific Gas & Electric Company (PG&E)
Pacific Gas & Electric Company (PG&E)
SoCal Gas
AT&T
Pacific Gas & Electric Company (PG&E)
Sprouse Communications
AT&T
Pacific Gas & Electric Company (PG&E)
Pacific Gas & Electric Company (PG&E)
Southern California Gas Company
Pacific Gas & Electric Company (PG&E)
Pacific Gas & Electric Company (PG&E)
Sprouse Communications
STIMSON SCOTT D & BARBARA M
West Coast Arborists, Inc.
AT&T
PG&E
Souza Construction
Pacific Gas and Electric (PG&E)
Souza Engineering Contracting - Souza Construction
AT&T
PoorBoy Electric & Lighting
Greenwave Solutions
Thoma Electric Inc.
A.M.Sun Solar
M.E. Avila Construction
Advanced Fire Protection
Pacific Heating and Sheet Metal
PACIFIC HEATING AND SHEET METAL
JNE Concrete
Seamair Construction, Inc. DBA: Seamair General Engineering
Seamair Construction
Action Rooter
Kirk Construction
RCM Building Systems
AT&T
3W CONSTRUCTION, INC.
AT&T
Sprouse Communications
Central Coast Renovations
PIPEDREAMS VENTURES HOLDINGS LLC - WIGHTON'S PLUMBING HEATING & AIR CONDITIONING
Trumark Homes
Kanyon Construction
TH AVILA RANCH LLC
Padre Associates
PJ Designs
Pacific Builders
AT&T
Coastal Demo, Inc.
Everon
SUNRUN
Solarponics, Inc
Pacific Gas & Electric (PG&E)
Independent Electric Supply Inc
EZE Trucking LLC DBA Rig Runner
Lee Wilson Electric Company, Inc.
Roto Rooter
SUNRUN
SUNRUN
City Motors Towing
City Motors Towing
Steele Drive 32, LLC
SKYLINE SERVICES LLC
HAB Design Group
SKYLINE SERVICES LLC
HAB Design Group
HAB Design Group
Pacific Heating and Sheet Metal
CWA Studios
Foster Enterprises
Whittle Fire Protection
SUNRUN
Knecht's Plumbing & Heating, Inc.
SUNRUN
John & Joan Rinell
MURRAY MANAGEMENT ENTERPRISES LLC %ELAINE F BAUER ETCON
DORADO ELECTRIC INC.
San Luis Electric
Travis Robson
Bennett Motor Express
Bison Energy Solutions
Sevan Multi-Site Solutions
Solarponics, Inc
Joe Rowles Construction
Pacific Gas & Electric (PG&E)
PERL KRISTIN & PATRICK FAMILY TRUST
LIFESTYLE SOLAR INC
Coastal Tree Experts, Inc
EsserStudios Architecture and Design
EsserStudios Architecture and Design
TESLA INC
PJ Designs
Pacific Gas & Electric (PG&E)
Pacific Gas & Electric (PG&E)
Southern California Gas Company
Exceed
Bennett Motor Express
Southern California Gas Company
HAB Design Group
HAB Design Group
HAB Design Group
HAB Design Group
HAB Design Group
HAB Design Group
HAB Design Group
HAB Design Group
HAB Design Group
HAB Design Group
HAB Design Group
HAB Design Group
HAB Design Group
HAB Design Group
HAB Design Group
HAB Design Group
HAB Design Group
HAB Design Group
HAB Design Group
Southern California Gas Company
HAB Design Group
SoCal Gas
HAB Design Group
HAB Design Group
HAB Design Group
HAB Design Group
HAB Design Group
HAB Design Group
HAB Design Group
SoCal Gas
Patriot Plumbing and Drain Cleaning
Southern California Gas Company (SoCal Gas)
EZE Trucking LLC DBA Rig Runner
SLOCA Properties LLC
Andrew Goodwin Design
Lepell, Joshua trust
Kanyon Construction
Photon Brothers, Inc.
Arbor First
SLO Cider LLC
COASTAL CONSTRUCTION & ENGINEERING INC
Solarponics, Inc
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
Solarponics, Inc
Greenvale Tree Co.
Aztec Fire and Security, Inc.
Action Rooter
TH AVILA RANCH LLC
Turn Around Communications
Sprouse Communications
MONTEREY & MORRO, LLC
Pacific Gas & Electric (PG&E)
Pacific Gas and Electric (PG&E)
LSE Fire Protection, Inc.
Cowen Consulting, Inc.
Bright Planet Solar
Action Rooter
Seamair Construction
PG&E
TH AVILA RANCH LLC
GANNAGE DESIGN
SUN SOLAR
Wicks Roofing and Solar LLC
SLO Craft Builders
SLO Craft Builders
Jessie Skidmore Art & Design
LEWIS FAMILY TRUST
Zurriola Studio
Axiom 360 LLC
RILEY TIM & MARY A FAMILY TRUST
SUNRUN
Axiom 360 LLC
Action Design-Build
Maddalena Realty
SLO Trenchless
Pacific Gas & Electric (PG&E)
Pacific Gas & Electric Company (PG&E)
Seamair Construction
SLO Trenchless
Pacific Gas and Electric (PG&E)
Leo Tidwell Excavating Corp. (LTEC)
Shaffer Fire Protection
Shaffer Fire Protection
Pacific Gas & Electric Company (PG&E)
M Johnson Construction, Inc.
Seamair Construction
Jessica Lehrbaum, Architect
Browder Painting Company, Inc.
Pacific Gas & Electric Company (PG&E)
Cebulla Associates
Pacific Gas and Electric (PG&E)
EZE Trucking LLC DBA Rig Runner
COASTAL CONSTRUCTION & ENGINEERING INC
Reeve Trucking Co
Dwellinart
MAIN LINE ENGINEERING CONSTRUCTION INC
COASTAL CONSTRUCTION & ENGINEERING INC
PJ Designs
OLSON T BRIAN
American Eco Services
Johnson Fire Protection
GOODWILL INDUSTRIES OF SNTA CRZ,SLO & MNTRY CNTYS
Steve Johnson
LSE FIRE PROTECTION, INC.
LSE FIRE PROTECTION, INC.
MASONIC HALL ASSN
Pacific Gas & Electric Company (PG&E)
Pacific Builders
Southern California Gas Company, SoCal Gas
Always Measure Twice
PIPEDREAMS VENTURES HOLDINGS LLC - WIGHTON'S PLUMBING HEATING & AIR CONDITIONING
LIFESTYLE SOLAR INC
Pacific Gas & Electric Company (PG&E)
1ST TEAM AIR CONDITIONING INC
J HERRERA CONSTRUCTION INC
TH AVILA RANCH LLC
Alpha Fire Unlimited
Alpha Fire Unlimited
Permit Services Inc.
Pacific Gas & Electric Company (PG&E)
JORGENSEN & SONS INC
Pacific Gas & Electric Company (PG&E)
PIPEDREAMS VENTURES HOLDINGS LLC - WIGHTON'S PLUMBING HEATING & AIR CONDITIONING
PIPEDREAMS VENTURES HOLDINGS LLC - WIGHTON'S PLUMBING HEATING & AIR CONDITIONING
PACIFIC HEATING AND SHEET METAL
John Olejczak
Souza Construction Inc.
Pacific Gas & Electric Company (PG&E)
PIPEDREAMS VENTURES HOLDINGS LLC dba
Pacific Gas & Electric (PG&E)
Pacific Gas & Electric Company (PG&E)
Pacific Gas & Electric Company (PG&E)
PIPEDREAMS VENTURES HOLDINGS LLC - WIGHTON'S PLUMBING HEATING & AIR CONDITIONING
ROB'S RESTORATION & RENOVATION
Pacific Gas & Electric Company (PG&E)
West Coast Arborists, Inc.
LSE FIRE PROTECTION, INC.
Southern California Gas Company
A-1 GLASS, LLC
West Coast Air Conditioning
BA Start
PIPEDREAMS VENTURES HOLDINGS LLC dba
Mike Mitchell Construction, Inc.
Newton Construction
KENT HARVEY
Action Rooter
Quaglino Properties LLC
B.E. McCarty & Sons
LSE FIRE PROTECTION, INC.
LSE FIRE PROTECTION, INC.
Greenskies Clean Energy
Williams Scotsman
Pacific Gas & Electric (PG&E)
AT&T
LSE FIRE PROTECTION, INC.
Central Plumbing Inc Service and Repair
LSE Fire Protection, Inc.
SLO Trenchless
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
805 Electric LLC
Landstar Inway, Inc.
Kanyon Construction
Kanyon Construction
Rarig Construction, Inc
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
Wicks Roofing and Solar LLC
Abington Concrete
PACIFIC HEATING AND SHEET METAL
TESLA INC
PIPEDREAMS VENTURES HOLDINGS LLC dba
SUNRUN
McDonald Transport Inc.
Twisselman and Fernandes Inc.
LIFESTYLE SOLAR INC
Wicks Roofing and Solar LLC
Classic Services
PJ Designs
Gordon construction
A.M.Sun Solar
Charged Up EVs
Charged Up EVs
San Luis Electric
A.M.Sun Solar
SUNRUN
SUNRUN
SUNRUN
LIFESTYLE SOLAR INC
Bison Energy Solutions
Central Coast Electric, Inc.
Trumark homes
Trumark Homes
TH AVILA RANCH LLC
Permit Services Inc.
LIFESTYLE SOLAR INC
Permit Services Inc.
H GALE KYLE INC DBA KYLE COMPANY ROOFING
PJ Designs
LIFESTYLE SOLAR INC
JW Design & Construction, Inc.
JW Design & Construction, Inc.
Farmer & Ready Law Corp.
PIPEDREAMS VENTURES HOLDINGS LLC dba
KORSGAARD RICHARD & CHARLENE LIVING TRUST
SoCal Gas
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
Pacific Gas & Electric Company (PG&E)
A.M.Sun Solar
SoCal Gas
MASONIC HALL ASSN
Davey Tree Surgery
Davey Tree Surgery
Michael J McGuire Architecture + Engineering
Foster Enterprises
SLOBISPO REMODELERS
Ryan Brockett Architect Inc.
TWO BROTHERS SAN LUIS ENTERPRISES LLC A CA LLC
bid joe California north inc
Hunter Smith Architecture
Andrew Goodwin Design
Smitty Built, Inc
SUNRUN
Wicks Roofing and Solar LLC
TESLA INC
Permit Services
Joe & Dorothy Boudreau
SUNRUN
LIFESTYLE SOLAR INC
Charged Up EVs
PIPEDREAMS VENTURES HOLDINGS LLC - WIGHTON'S PLUMBING HEATING & AIR CONDITIONING
Solarponics, Inc
SunWork Renewable Energy Projects
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
Charged Up EVs
Bright Planet Solar
SUNRUN
Bright Planet Solar
Bright Planet Solar
A.M.Sun Solar
A.M.Sun Solar
Bright Planet Solar
Citadel Roofing and Solar
LIFESTYLE SOLAR INC
Bright Planet Solar
COASTAL CONSTRUCTION & ENGINEERING INC.
Travis Robson
PFC, Inc.
LSE FIRE PROTECTION, INC.
LSE Fire Protection, Inc.
LSE Fire Protection, Inc.
LSE FIRE PROTECTION, INC.
LSE FIRE PROTECTION, INC.
LSE Fire Protection, Inc.
Alpha Fire Unlimited
CENTRAL COAST FIRE SUPPRESSION LLC
Alpha Fire Unlimited
Alpha Fire Unlimited
LSE Fire Protection, Inc.
Alpha Fire Unlimited
A-Plus Fire Protection
LSE Fire Protection, Inc.
LSE Fire Protection, Inc.
MATHERLY FIRE PROTECTION
Law Office Of Marshall E Ochylski
TEN OVER STUDIO
Carecraft Pools
Bennett Motor Express
SLO CITY CAPITAL IMPROVEMENT BOARD
Construction Inc.
San Luis Obispo Museum of Art (SLOMA)
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
PIPEDREAMS VENTURES HOLDINGS LLC - WIGHTON'S PLUMBING HEATING & AIR CONDITIONING
A-1 GLASS, LLC
A-1 GLASS, LLC
Exceed
Doug Ross Inc. DBA Central Valley Asphalt
Viola Construction, Inc
Solarponics, Inc
Wicks Roofing and Solar LLC
Wicks Roofing and Solar LLC
Bennett Motor Express
ALAN ROINESTAD CONSTRUCTION AND MANAGEMENT INC
SLOCO Heating and Cooling, Inc.
SLO Trenchless
PIPEDREAMS VENTURES HOLDINGS LLC dba
Alpha Fire Unlimited
Always Measure Twice
LIFESTYLE SOLAR INC
Bennett Truck Transport
Bennett Truck Transport
Charged Up EVs
Solarponics, Inc
TH AVILA RANCH LLC
TH AVILA RANCH LLC
Solarponics, Inc
APPLIANCE CLINIC HEATING & AIR CONDITIONING
SUNRUN
A-1 GLASS, LLC
SUNRUN
Trumark Homes
Trumark Homes
Solarponics, Inc
SUNRUN
Williams Scotsman, Inc.
Trumark Homes
Hunter Smith Architecture
Axiom 360 LLC
TH AVILA RANCH LLC
SUNRUN
TH AVILA RANCH LLC
Trumark Homes
N Brent Knowles Construction
TH AVILA RANCH LLC
Shaffer Fire Protection
HP Communications
Bright Planet Solar
SUNRUN
Greenvale Tree Company
Papich Construction Company Inc
McDonald Transport Inc.
Quality Home Transport LLC
JW Design & Construction, Inc.
FRANKLIN NANCY S FAMILY TRUST
SoCal Gas
Pacific Gas & Electric Company (PG&E)
Pacific Gas & Electric Company (PG&E)
Pacific Gas & Electric Company (PG&E)
Sprouse Communications
TH AVILA RANCH LLC
Pacific Gas & Electric Company (PG&E)
Securitas Technology
Sprouse Communications
Sprouse Communications
Pacific Gas & Electric Company (PG&E)
SLO Trenchless
Mike O'Brien Specialized Hauling Inc.
Total Plumbing Heating & Air
TH AVILA RANCH LLC
Central Coast Concrete
TH AVILA RANCH LLC
NewGen Energy
Cal Lowbed
A-Plus Fire Protection
Brough Construction Inc.
PIPEDREAMS VENTURES HOLDINGS LLC dba
Griffin Plumbing
JW Design & Construction, Inc.
JW Design & Construction, Inc.
ALAN ROINESTAD CONSTRUCTION AND MANAGEMENT INC
Rarig Construction, Inc
Wicks Roofing and Solar LLC
Greenvale Tree Co.
Studio Design Group Architects
Wicks Roofing and Solar LLC
Studio Design Group Architects
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
LSE Fire Protection, Inc.
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
Daniel J Kallal
Specialty Construction, Inc
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
Action Rooter
LSE Fire Protection, Inc.
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
EZE Trucking LLC DBA Rig Runner
Greenvale Tree Company
Alpha Fire Unlimited
LIFESTYLE SOLAR INC
Reeve Trucking Co
Reeve Trucking Co
Reeve Trucking Co
RUSSELL CRAIG H
Alpha Fire Unlimited
McDonald Transport Inc.
McDonald Transport Inc.
Cal Lowbed
AJM ELECTRICAL
TADA Services
A&B Carpet & Cleaning
Mid-Coast Fire Protection, Inc
Twisselman and Fernandes Inc.
PACIFIC HEATING & SHEET METAL
Pults & Associates
LK Graphics, Inc. (dba The Sign Place)
SUNRUN
Williams Scotsman
PIPEDREAMS VENTURES HOLDINGS LLC dba
PIPEDREAMS VENTURES HOLDINGS LLC dba
PIPEDREAMS VENTURES HOLDINGS LLC dba
BACKMAN VICKIE A FAMILY TRUST
Staples Energy
BACKMAN VICKIE A FAMILY TRUST
A.M.Sun Solar
ADX Consulting
Cynthia M White Trust
Solarponics, Inc
LIFESTYLE SOLAR INC
Bennett Motor Express
Solarponics, Inc
Pacific Gas & Electric Company (PG&E)
ADX Consulting
Bright Planet Solar
STUDIO 2G ARCHITECTS LLP
Central Pacific Construction
MUICK TAYLOR FAMILY TRUST
AVES ELECTRIC
Bennett Motor Express
Wicks Roofing and Solar LLC
TH AVILA RANCH LLC
Solarponics, Inc
RICHARD HEATH & ASSOCIATES
M Johnson Construction, Inc.
Pacific Gas & Electric (PG&E)
Action Rooter
RCH Construction
Transitions-Mental Health Association
W. L. Butler Construction, inc.
LSE Fire Protection, Inc.
A.M.Sun Solar
TH AVILA RANCH LLC
LSE Fire Protection, Inc.
A-1 GLASS, LLC
Solarponics, Inc
On Point Electric
EZE Trucking LLC DBA Rig Runner
TH AVILA RANCH LLC
TH AVILA RANCH LLC
TH AVILA RANCH LLC
BE RIGHT THERE HEATING & AIR CONDITIONING INC
Solarponics, Inc
Charged Up EVs
SIMS LIVING TRUST
TH AVILA RANCH LLC
Pacific Gas and Electric (PG&E)
Bennett Motor Express
RRM Design Group
PJ Designs
HAB Design Group
SUN SOLAR
DMA INVESTMENTS LTD PTP A NV LTD PTP
TH AVILA RANCH LLC
TH AVILA RANCH LLC
TH AVILA RANCH LLC
HALL BUILDERS, INC
LK Graphics, Inc. (dba The Sign Place)
FOUNDATION SOLUTIONS
Trumark Homes
TH AVILA RANCH LLC
TH AVILA RANCH LLC
TH AVILA RANCH LLC
TH AVILA RANCH LLC
TH AVILA RANCH LLC
TH AVILA RANCH LLC
Pacific Gas & Electric Company (PG&E)
Trumark Homes
Charged Up EVs
Trumark Homes
Trumark Homes
Scoggins Site Development and Engineering
OSR Holding Company
Securitas Technology
Cowen Consulting, Inc.
Kimbell & Brown Construction, Inc.
Judson Ventures, LLC
Bear Electrical Solutions LLC
Specialty Construction, Inc.
Permit Services Inc.
Trumark Homes
Drube Electric
TH AVILA RANCH LLC
Chris Sunderland Engineering Co.
EZE Trucking LLC DBA Rig Runner
Pacific Gas & Electric Company (PG&E)
Raminha Construction, Inc.
Scout 30882 Inc
Santa Cruz Underground & Paving, Inc.
Whittle Fire Protection
Bear Electrical Solutions LLC
Rincon Inspection Group Inc
Action Rooter
Coastal Tree Experts, Inc
SLO Trenchless
Sprouse Communications
Pacific Gas & Electric Company (PG&E)
TH AVILA RANCH LLC
A-1 GLASS, LLC
Sprouse Communications
West Coast Arborists, Inc.
SLO Trenchless
TH AVILA RANCH LLC
J. Terra Construction, Inc.
Turn Around Communications
L&D Maksoudian Inc., DBA: Mak Family Construction
Greenvale Tree Co.
J W DESIGN & CONSTRUCTION INC
SLO Trenchless
Landstar Ranger
N Brent Knowles Construction
AT&T
Vellum Inc.
Transitions Mental Health
TH AVILA RANCH LLC
SUNRUN
LK Graphics, Inc. (dba The Sign Place)
Generations Electric LLC
SUNRUN
TH AVILA RANCH LLC
BRIGNOLO RICHARD C
Veteran Pipeline Construction
Bright Planet Solar
COASTAL CONSTRUCTION & ENGINEERING INC
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
Trumark Construction Services, Inc.
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
L&D Maksoudian Inc., DBA: Mak Family Construction
LK Graphics, Inc. (dba The Sign Place)
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
ALAN ROINESTAD CONSTRUCTION AND MANAGEMENT INC
NKT Commercial
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
LIFESTYLE SOLAR INC
Expansive Investments LLC
WHITEFORD MICHAEL & ANDREA REVOCABLE TRUST
WHITEFORD MICHAEL & ANDREA REVOCABLE TRUST
Frantz Construction, Inc.
SUNRUN
Diversified Construction
RSPAUL COMPANY INC
Triple B Transportation
Triple B Transportation
SUNRUN
SUNRUN
Vellum, Inc
Electricraft, Inc.
Gemlato
Oasis Associates, Inc.
AbbottReed Inc
ABBOTT I REED INC.
Specialty Construction, Inc
KW Construction
SUNRUN
Wollenman
Exceed
Love Architecture
DW Construction, Inc. (Dream Werks Construction)
Costco Wholesale Corporation
Ambient Communities
Generations Electric LLC
Thoma Electric Inc.
Pacific Solar Homes
Specialty Construction, Inc
Trumark Homes
COASTAL CONSTRUCTION & ENGINEERING INC
Southern California Gas Company
TH AVILA RANCH LLC
TH AVILA RANCH LLC
Specialty Construction, Inc
KJH ELECTRIC
TH AVILA RANCH LLC
TH AVILA RANCH LLC
Always Measure Twice
JJ Fisher Construction, Inc.
Associated Traffic Safety
John Dittenhoefer
LSE FIRE PROTECTION, INC.
LSE FIRE PROTECTION, INC.
LSE FIRE PROTECTION, INC.
Studio IV, Inc.
RLH Construction
VENTERRA ENVIRONMENTAL INC
Teague Electric, Inc.
A Stireman's Labor Service
SLO LIFE Magazine
Thoma Electric Inc.
EZE Trucking LLC DBA Rig Runner
Permit Services Inc.
Permit Services Inc.
LIFESTYLE SOLAR INC
Asplundh Construction, LLC
Solarponics, Inc
LK Graphics, Inc. (dba The Sign Place)
David Zuvic Construction
Pacific Gas & Electric Company (PG&E)
CONNERS KATHLEEN A TRE ETAL
Echelcon Inc.
Wicks Roofing and Solar LLC
Wicks Roofing and Solar LLC
Paso Robles Tank
GOUIN CONSTRUCTION & DEVELOPMENT
Paul Rhodes Construction
Paul Rhodes Construction
TH AVILA RANCH LLC
D H CONSTRUCTION
TH AVILA RANCH LLC
TH AVILA RANCH LLC
SUNRUN
TH AVILA RANCH LLC
Jessica Lehrbaum, Architect
PJ Designs
Vellum Design Build
John J Schroder AIA
TH AVILA RANCH LLC
Signs Of Success, Inc
RP Framing
Apex Fire Control
EZE Trucking LLC DBA Rig Runner
Kristin Perl
Jessica Lehrbaum, Architect
Simple Homes Simple Living
Roto Rooter
Bright Planet Solar
ONE ARCH
Paul Rhodes Construction
EZE Trucking LLC DBA Rig Runner
Lenhart Fire Protection
ON SITE PLUMBING & SEPTIC
Adames Design Group
TH AVILA RANCH LLC
Quaglino Properties LLC
LIFESTYLE SOLAR INC
Bright Planet Solar
LIFESTYLE SOLAR INC
Solarponics, Inc
SLO Trenchless
Manzanita Construction
PJ Designs
A-Plus Fire Protection
Pacific Heating and Sheet Metal
Exceed
PSR WEST COAST BUILDERS INC
Lepell, Joshua trust
COASTAL CONSTRUCTION & ENGINEERING INC
Address
1697 Tanglewood Dr
San Luis Obispo, CA 93401
1559 Royal Wy
San Luis Obispo, CA 93405
2443 Broad St
San Luis Obispo, CA 93401
1304 Pacific St
San Luis Obispo, CA 93401
1804 Osos St
San Luis Obispo, CA 93401
607 Grand Ave
San Luis Obispo, CA 93401
12165 Los Osos Valley Rd
San Luis Obispo, CA 93405
796 Higuera St
San Luis Obispo, CA 93401
250 Bonetti Dr
San Luis Obispo, CA 93401
167 Foothill Blvd
San Luis Obispo, CA 93405
899 Pacific St
San Luis Obispo, CA 93401
411 Foothill Blvd
San Luis Obispo, CA 93405
841 Patricia Dr
San Luis Obispo, CA 93405
475 High St
San Luis Obispo, CA 93401
887 Nipomo St
San Luis Obispo, CA 93401
11 South Tassajara Dr
San Luis Obispo, CA 93405
1343 Bishop St
San Luis Obispo, CA 93401
1892 Oceanaire Dr
San Luis Obispo, CA 93405
50 Higuera St
San Luis Obispo, CA 93401
12398 Los Osos Valley Rd
San Luis Obispo, CA 93405
651 Foothill Blvd
San Luis Obispo, CA 93405
4568 Spanish Oaks Dr
San Luis Obispo, CA 93401
10 La Entrada Ave
San Luis Obispo, CA 93405
1792 Alrita St
San Luis Obispo, CA 93401
1321 Osos St
San Luis Obispo, CA 93401
959 Humbert Ave
San Luis Obispo, CA 93401
1004 Forest St
San Luis Obispo, CA 93405
203 Carpenter St
San Luis Obispo, CA 93401
260 Westmont Ave
San Luis Obispo, CA 93405
441 Pismo St
San Luis Obispo, CA 93401
1172 Atascadero St
San Luis Obispo, CA 93405
4362 Wavertree St
San Luis Obispo, CA 93401
182 Tango Wy
San Luis Obispo, CA 93401
248 Almond St
San Luis Obispo, CA 93405
482 Sandercock St
San Luis Obispo, CA 93401
445 Madonna Rd Unit: A
San Luis Obispo, CA 93405
731 Grove St
San Luis Obispo, CA 93401
1525 Slack St
San Luis Obispo, CA 93405
229 Foxtrot Ct
San Luis Obispo, CA 93401
213 Foxtrot Ct
San Luis Obispo, CA 93401
1810 Hope St
San Luis Obispo, CA 93405
210 Lincoln Ave
San Luis Obispo, CA 93405
3924 Carissa Ct
San Luis Obispo, CA 93401
202 Kitty Hawk Ct
San Luis Obispo, CA 93401
785 Lincoln Ave
San Luis Obispo, CA 93405
217 Foxtrot Ct
San Luis Obispo, CA 93401
233 Granada Dr
San Luis Obispo, CA 93401
1069 Legacy Ln
San Luis Obispo, CA 93405
11343 Los Osos Valley Rd Unit: A
San Luis Obispo, CA 93405
228 Mission Ln
San Luis Obispo, CA 93405
1452 Noveno Ave
San Luis Obispo, CA 93401
132 Crandall Wy
San Luis Obispo, CA 93405
290 Kentucky St
San Luis Obispo, CA 93405
875 Mission St
San Luis Obispo, CA 93405
1728 Santa Rosa St
San Luis Obispo, CA 93401
1591 Royal Wy
San Luis Obispo, CA 93405
319 Margarita Ave
San Luis Obispo, CA 93401
30 Chuparrosa Dr
San Luis Obispo, CA 93401
228 Foxtrot Ct
San Luis Obispo, CA 93401
321 Tolosa Wy
San Luis Obispo, CA 93405
2291 Exposition Dr
San Luis Obispo, CA 93401
523 Cuesta Dr
San Luis Obispo, CA 93405
1472 Ashmore St
San Luis Obispo, CA 93401
3193 Cherry Ln
San Luis Obispo, CA 93401
1347 Ironbark St
San Luis Obispo, CA 93401
1313 Broad St
San Luis Obispo, CA 93401
434 Islay St
San Luis Obispo, CA 93401
459 North Tassajara Dr
San Luis Obispo, CA 93405
1529 Tanglewood Dr
San Luis Obispo, CA 93401
431 Chorro St
San Luis Obispo, CA 93405
3767 Park Ridge Ln
San Luis Obispo, CA 93401
2583 Greta Pl
San Luis Obispo, CA 93401
868 Upham St
San Luis Obispo, CA 93401
3050 Broad St
San Luis Obispo, CA 93401
2432 Sunset Dr
San Luis Obispo, CA 93401
1010 San Carlos Dr
San Luis Obispo, CA 93401
219 Foxtrot Ct
San Luis Obispo, CA 93401
1350 Marsh St
San Luis Obispo, CA 93401
1262 Murray Ave
San Luis Obispo, CA 93405
212 Kitty Hawk Ct
San Luis Obispo, CA 93401
742 Center St
San Luis Obispo, CA 93405
1185 Foothill Blvd Unit: 17
San Luis Obispo, CA 93405
2250 King Street Unit: 4
San Luis Obispo, CA 93401
235 Foxtrot Ct
San Luis Obispo, CA 93401
153 Broad St
San Luis Obispo, CA 93405
321 Ramona Dr
San Luis Obispo, CA 93405
1792 Alrita St
San Luis Obispo, CA 93401
1243 Mill St
San Luis Obispo, CA 93401
1529 Tanglewood Dr
San Luis Obispo, CA 93401
1532 Gulf St
San Luis Obispo, CA 93405
437 Kentucky St Unit: D
San Luis Obispo, CA 93405
848 Monterey St
San Luis Obispo, CA 93401
187 Tank Farm Rd Unit: 110
San Luis Obispo, CA 93401
1282 Fernwood Dr
San Luis Obispo, CA 93401
2322 Flora St
San Luis Obispo, CA 93401
1414 Smith St
San Luis Obispo, CA 93401
2407 Boulevard Del Campo Blvd
San Luis Obispo, CA 93401
1116 Orcutt Rd
San Luis Obispo, CA 93401
785 Buchon St
San Luis Obispo, CA 93401
1490 Descanso St Unit: 2
San Luis Obispo, CA 93405
1115 Terra Wy
San Luis Obispo, CA 93405
236 Foxtrot Ct
San Luis Obispo, CA 93401
1389 Fairway Dr
San Luis Obispo, CA 93405
2035 Rachel St
San Luis Obispo, CA 93401
85 Encanto Ln
San Luis Obispo, CA 93401
362 Calle Lupita
San Luis Obispo, CA 93401
767 Chorro St Unit: A
San Luis Obispo, CA 93401
1321 Garden St
San Luis Obispo, CA 93401
3000 Broad St Unit: 209
San Luis Obispo, CA 93401
1132 Olive St
San Luis Obispo, CA 93405
195 Cessna Ct
San Luis Obispo, CA 93401
49 Mariposa Dr
San Luis Obispo, CA 93401
3850 Long St
San Luis Obispo, CA 93401
1145 Murray Ave
San Luis Obispo, CA 93405
216 Kitty Hawk Ct
San Luis Obispo, CA 93401
209 Tango Wy
San Luis Obispo, CA 93401
4200 La Posada
San Luis Obispo, CA 93401
237 Foxtrot Ct
San Luis Obispo, CA 93401
2018 Skylark Ln
San Luis Obispo, CA 93401
945 Bougainvillea St
San Luis Obispo, CA 93401
611 Mitchell Dr
San Luis Obispo, CA 93401
1186 Olive St
San Luis Obispo, CA 93405
1043 George St
San Luis Obispo, CA 93401
645 Tank Farm Rd
San Luis Obispo, CA 93401
1445 Calle Joaquin
San Luis Obispo, CA 93405
725 Serrano Dr
San Luis Obispo, CA 93405
1245 Ella St
San Luis Obispo, CA 93401
762 Lincoln Ave
San Luis Obispo, CA 93405
364 Montrose Dr
San Luis Obispo, CA 93405
1144 Chorro St
San Luis Obispo, CA 93401
308 San Miguel Ave
San Luis Obispo, CA 93405
1333 Madonna Rd
San Luis Obispo, CA 93405
1215 Peach St Unit: B
San Luis Obispo, CA 93401
437 Kentucky St Unit: B
San Luis Obispo, CA 93405
222 Kitty Hawk Ct
San Luis Obispo, CA 93401
591 Highland Dr
San Luis Obispo, CA 93405
1315 Woodside Dr
San Luis Obispo, CA 93401
966 Tarragon Ln
San Luis Obispo, CA 93401
3375 Sequoia Dr
San Luis Obispo, CA 93401
2041 Hays St
San Luis Obispo, CA 93405
188 Cuesta Dr
San Luis Obispo, CA 93405
1245 Ella St
San Luis Obispo, CA 93401
4755 Snapdragon Wy
San Luis Obispo, CA 93401
1088 Pauline Wy
San Luis Obispo, CA 93401
767 Chorro St Unit: A
San Luis Obispo, CA 93401
654 Mountain View St
San Luis Obispo, CA 93405
1176 Seaward St
San Luis Obispo, CA 93405
215 Foxtrot Ct
San Luis Obispo, CA 93401
1336 Fernwood Dr
San Luis Obispo, CA 93401
1190 Bedford Ct
San Luis Obispo, CA 93401
1695 Crestview Cir
San Luis Obispo, CA 93401
1339 Sawleaf Ct
San Luis Obispo, CA 93401
3029 Arezzo Dr
San Luis Obispo, CA 93401
624 Mission Ln
San Luis Obispo, CA 93405
850 Casitas Ct
San Luis Obispo, CA 93405
1286 Rich Ct
San Luis Obispo, CA 93401
1433 Calle Joaquin
San Luis Obispo, CA 93405
437 Kentucky St Unit: G
San Luis Obispo, CA 93405
2045 Hope St
San Luis Obispo, CA 93405
437 Kentucky St Unit: C
San Luis Obispo, CA 93405
777 Boysen Ave
San Luis Obispo, CA 93405
1446 Nipomo St
San Luis Obispo, CA 93401
1135 Islay St
San Luis Obispo, CA 93401
279 Lawrence Dr
San Luis Obispo, CA 93401
644 Patricia Dr
San Luis Obispo, CA 93405
130 Orange Dr
San Luis Obispo, CA 93405
2916 Johnson Ave
San Luis Obispo, CA 93401
1545 Oceanaire Dr
San Luis Obispo, CA 93405
197 Tango Wy
San Luis Obispo, CA 93401
1185 Foothill Blvd Unit: 25
San Luis Obispo, CA 93405
758 Grove St Unit: A
San Luis Obispo, CA 93401
886 Alyssum Ct
San Luis Obispo, CA 93401
1198 Seaward St
San Luis Obispo, CA 93405
4613 Snapdragon Wy
San Luis Obispo, CA 93401
804 Meinecke Ave
San Luis Obispo, CA 93405
2042 Hays St
San Luis Obispo, CA 93405
474 Sandercock St
San Luis Obispo, CA 93401
849 Higuera St
San Luis Obispo, CA 93401
1511 Morro St
San Luis Obispo, CA 93401
1511 Morro St
San Luis Obispo, CA 93401
1127 Iris St
San Luis Obispo, CA 93401
1943 Devaul Ranch Dr
San Luis Obispo, CA 93405
209 Foxtrot Ct
San Luis Obispo, CA 93401
28 South Tassajara Dr
San Luis Obispo, CA 93405
836 Vista Del Arroyo
San Luis Obispo, CA 93405
1011 Legacy Ln
San Luis Obispo, CA 93405
1023 Chorro St
San Luis Obispo, CA 93401
3933 Carissa Ct
San Luis Obispo, CA 93401
1463 Bishop St
San Luis Obispo, CA 93401
637 Oakridge Dr
San Luis Obispo, CA 93405
646 Caudill St
San Luis Obispo, CA 93401
522 Broad St
San Luis Obispo, CA 93405
1139 Islay St
San Luis Obispo, CA 93401
1861 Devaul Ranch Dr
San Luis Obispo, CA 93405
646 Caudill St
San Luis Obispo, CA 93401
1850 Alrita St
San Luis Obispo, CA 93401
402 Luneta Dr
San Luis Obispo, CA 93405
1518 Balboa St
San Luis Obispo, CA 93405
162 Earthwood Ln
San Luis Obispo, CA 93401
951 Monterey St
San Luis Obispo, CA 93401
217 Foxtrot Ct
San Luis Obispo, CA 93401
1939 Huasna Dr
San Luis Obispo, CA 93405
327 Highland Dr
San Luis Obispo, CA 93405
877 Palm St
San Luis Obispo, CA 93401
1435 Ironbark St
San Luis Obispo, CA 93401
1439 Hansen Ln
San Luis Obispo, CA 93401
221 Daly Ave
San Luis Obispo, CA 93405
1415 Hansen Ln
San Luis Obispo, CA 93401
1135 Islay St
San Luis Obispo, CA 93401
1588 Eto Cir
San Luis Obispo, CA 93405
403 High St
San Luis Obispo, CA 93401
150 Del Norte Wy
San Luis Obispo, CA 93405
1095 San Adriano St
San Luis Obispo, CA 93405
581 Higuera St
San Luis Obispo, CA 93401
1615 Lima Dr
San Luis Obispo, CA 93405
172 Twin Ridge Ct
San Luis Obispo, CA 93405
218 Patricia Ct
San Luis Obispo, CA 93405
990 Palm St
San Luis Obispo, CA 93401
1615 Phillips Ln
San Luis Obispo, CA 93401
1144 Chorro St
San Luis Obispo, CA 93401
132 Earthwood Ln
San Luis Obispo, CA 93401
1941 Chorro St
San Luis Obispo, CA 93401
249 Tank Farm
San Luis Obispo, CA 93401
555 Chorro St
San Luis Obispo, CA 93405
830 Boysen Ave
San Luis Obispo, CA 93405
382 Albert Dr Unit: A
San Luis Obispo, CA 93405
102 Santa Rosa St
San Luis Obispo, CA 93405
1909 Ruth St
San Luis Obispo, CA 93401
538 Mitchell Dr
San Luis Obispo, CA 93401
1134 Montalban St
San Luis Obispo, CA 93405
264 Daly Ave
San Luis Obispo, CA 93405
1256 Sydney St
San Luis Obispo, CA 93401
171 Cerro Romauldo Ave
San Luis Obispo, CA 93405
683 Patricia Dr
San Luis Obispo, CA 93405
248 Foothill Blvd
San Luis Obispo, CA 93405
2916 Johnson Ave
San Luis Obispo, CA 93401
2407 Boulevard Del Campo Blvd
San Luis Obispo, CA 93401
1159 Islay St
San Luis Obispo, CA 93401
1205 Ella St
San Luis Obispo, CA 93401
530 Serrano Dr
San Luis Obispo, CA 93405
602 Al Hil Dr
San Luis Obispo, CA 93405
1761 Monterey St
San Luis Obispo, CA 93401
1533 Hillcrest Pl
San Luis Obispo, CA 93401
1833 Vicente Dr
San Luis Obispo, CA 93405
215 Foxtrot Ct
San Luis Obispo, CA 93401
1463 Bishop St
San Luis Obispo, CA 93401
1159 Leff St
San Luis Obispo, CA 93401
274 Buchon St
San Luis Obispo, CA 93401
2279 Exposition Dr
San Luis Obispo, CA 93401
1376 Sonrisa Ct
San Luis Obispo, CA 93405
706 Foothill Blvd
San Luis Obispo, CA 93405
1239 Foothill Blvd Unit: 206
San Luis Obispo, CA 93405
1245 Ella St
San Luis Obispo, CA 93401
3727 Park Ridge Ln
San Luis Obispo, CA 93401
2333 Helena St
San Luis Obispo, CA 93401
1328 Royal Wy
San Luis Obispo, CA 93405
2063 Sierra Wy
San Luis Obispo, CA 93401
218 Kitty Hawk Ct
San Luis Obispo, CA 93401
1327 Tanglewood Dr
San Luis Obispo, CA 93401
3317 Rockview Ct
San Luis Obispo, CA 93401
2424 Cumbre Ct
San Luis Obispo, CA 93401
1529 Tanglewood Dr
San Luis Obispo, CA 93401
1376 Ironbark St
San Luis Obispo, CA 93401
822 Murray Ave
San Luis Obispo, CA 93405
299 Hermosa Wy
San Luis Obispo, CA 93405
227 Foxtrot Ct
San Luis Obispo, CA 93401
618 Grove St
San Luis Obispo, CA 93401
902 Peach St
San Luis Obispo, CA 93401
913 Rachel Ct
San Luis Obispo, CA 93401
1604 Monterey St
San Luis Obispo, CA 93401
140 Earthwood Ln
San Luis Obispo, CA 93401
437 Kentucky St Unit: A
San Luis Obispo, CA 93405
235 Foxtrot Ct
San Luis Obispo, CA 93401
232 Lincoln Ave
San Luis Obispo, CA 93405
1158 Forest St
San Luis Obispo, CA 93405
1427 Beach St
San Luis Obispo, CA 93401
1239 Foothill Blvd Unit: 205
San Luis Obispo, CA 93405
390 Santa Rosa St
San Luis Obispo, CA 93405
1722 Devaul Ranch Dr
San Luis Obispo, CA 93405
374 Corrida Dr
San Luis Obispo, CA 93401
155 Anacapa Cir
San Luis Obispo, CA 93405
672 Serrano Dr
San Luis Obispo, CA 93405
3094 Arezzo Dr
San Luis Obispo, CA 93401
229 Foxtrot Ct
San Luis Obispo, CA 93401
1850 Viewmont St
San Luis Obispo, CA 93401
1061 Murray Ave
San Luis Obispo, CA 93405
811 Palm St
San Luis Obispo, CA 93401
211 Foxtrot Ct
San Luis Obispo, CA 93401
726 Higuera St
San Luis Obispo, CA 93401
3940 Broad St
San Luis Obispo, CA 93401
865 Morro St
San Luis Obispo, CA 93401
437 Kentucky St Unit: H
San Luis Obispo, CA 93405
328 Leroy Ct Unit: A
San Luis Obispo, CA 93405
2684 Johnson Ave
San Luis Obispo, CA 93401
1144 Morro St
San Luis Obispo, CA 93401
437 Kentucky St Unit: E
San Luis Obispo, CA 93405
1751 Oceanaire Ct
San Luis Obispo, CA 93405
1029 Chorro St
San Luis Obispo, CA 93401
541 Couper Dr
San Luis Obispo, CA 93405
477 Sandercock St
San Luis Obispo, CA 93401
698 Higuera St
San Luis Obispo, CA 93401
778 Higuera St
San Luis Obispo, CA 93401
1528 Tanglewood Dr
San Luis Obispo, CA 93401
1127 Broad St
San Luis Obispo, CA 93401
1690 Royal Wy
San Luis Obispo, CA 93405
1800 Monterey St
San Luis Obispo, CA 93401
1236 Monte Vista Pl Unit: 19
San Luis Obispo, CA 93405
1625 Garden St
San Luis Obispo, CA 93401
380 Albert Dr
San Luis Obispo, CA 93405
1132 Olive St
San Luis Obispo, CA 93405
2023 San Luis Dr Unit: A
San Luis Obispo, CA 93401
474 Broad St
San Luis Obispo, CA 93401
1236 Monte Vista Pl Unit: 18
San Luis Obispo, CA 93405
472 Broad St
San Luis Obispo, CA 93405
1236 Monte Vista Pl Unit: 17
San Luis Obispo, CA 93405
1236 Monte Vista Pl Unit: 16
San Luis Obispo, CA 93405
1140 Kendall Rd Unit: C
San Luis Obispo, CA 93401
670 Buchon St
San Luis Obispo, CA 93401
20 Buena Vista Ave
San Luis Obispo, CA 93405
28 South Tassajara Dr
San Luis Obispo, CA 93405
1497 Slack St
San Luis Obispo, CA 93405
3271 Rockview Pl
San Luis Obispo, CA 93401
580 Serrano Dr
San Luis Obispo, CA 93405
262 Highland Dr
San Luis Obispo, CA 93405
1292 Sawleaf St
San Luis Obispo, CA 93401
174 Bravo St
San Luis Obispo, CA 93401
1326 Pacific St
San Luis Obispo, CA 93401
178 Bravo St
San Luis Obispo, CA 93401
811 Palm St
San Luis Obispo, CA 93401
319 Ramona Dr
San Luis Obispo, CA 93405
1194 Pacific St Unit: 100
San Luis Obispo, CA 93401
1823 Johnson Ave
San Luis Obispo, CA 93401
1831 Portola St
San Luis Obispo, CA 93405
170 Bravo St
San Luis Obispo, CA 93401
1459 Ella St
San Luis Obispo, CA 93401
294 Craig Wy
San Luis Obispo, CA 93405
201 Carpenter St
San Luis Obispo, CA 93401
1140 Kendall Rd Unit: D
San Luis Obispo, CA 93401
466 Woodbridge St
San Luis Obispo, CA 93401
2042 Hays St Unit: A
San Luis Obispo, CA 93405
495 Broad St
San Luis Obispo, CA 93405
1650 Palm St
San Luis Obispo, CA 93401
498 Stoneridge Dr
San Luis Obispo, CA 93401
193 Cessna Ct
San Luis Obispo, CA 93401
895 Monterey St
San Luis Obispo, CA 93401
1720 Johnson Ave
San Luis Obispo, CA 93401
529 Hathway St
San Luis Obispo, CA 93405
102 Santa Rosa St
San Luis Obispo, CA 93405
1313 Broad St
San Luis Obispo, CA 93401
830 Venable St
San Luis Obispo, CA 93405
1306 Chorro St
San Luis Obispo, CA 93401
845 Fiero Ln
San Luis Obispo, CA 93401
183 Cessna Ct
San Luis Obispo, CA 93401
1348 Fernwood Dr
San Luis Obispo, CA 93401
239 Rosita St
San Luis Obispo, CA 93405
82 La Loma Ct
San Luis Obispo, CA 93405
415 Dana St Unit: 1
San Luis Obispo, CA 93401
1769 San Luis Dr
San Luis Obispo, CA 93401
1845 Hays St
San Luis Obispo, CA 93405
554 Al Hil Dr
San Luis Obispo, CA 93405
186 Bravo St
San Luis Obispo, CA 93401
1470 Tanglewood Ct
San Luis Obispo, CA 93401
1217 Mill St
San Luis Obispo, CA 93401
2030 Rachel St
San Luis Obispo, CA 93401
418 Mitchell Dr
San Luis Obispo, CA 93401
100 Madonna Rd
San Luis Obispo, CA 93405
293 Albert Dr
San Luis Obispo, CA 93405
111 Chorro St
San Luis Obispo, CA 93405
2074 Monterey St
San Luis Obispo, CA 93401
847 Monterey St
San Luis Obispo, CA 93401
207 Foxtrot Ct
San Luis Obispo, CA 93401
30 Chorro St
San Luis Obispo, CA 93405
3242 Johnson Ave
San Luis Obispo, CA 93401
1961 Oceanaire Dr
San Luis Obispo, CA 93405
3661 Rock Garden Ln
San Luis Obispo, CA 93401
1617 Santa Rosa St
San Luis Obispo, CA 93401
1320 Phillips Ln
San Luis Obispo, CA 93401
3750 Bullock Ln
San Luis Obispo, CA 93401
1313 Broad St
San Luis Obispo, CA 93401
1647 Mccollum St
San Luis Obispo, CA 93405
2161 Sierra Wy
San Luis Obispo, CA 93401
4586 Spanish Oaks Dr
San Luis Obispo, CA 93401
253 Madonna Rd
San Luis Obispo, CA 93405
1336 Sweetbay Ln
San Luis Obispo, CA 93401
257 Patricia Ct
San Luis Obispo, CA 93405
182 Bravo St
San Luis Obispo, CA 93401
125 Longview Ln Unit: A
San Luis Obispo, CA 93405
1325 Pacific St
San Luis Obispo, CA 93401
3419 Roberto Ct Unit: C
San Luis Obispo, CA 93401
233 Granada Dr
San Luis Obispo, CA 93401
1322 Noveno Ave
San Luis Obispo, CA 93401
167 Cuesta Dr
San Luis Obispo, CA 93405
2449 Ladera Ct
San Luis Obispo, CA 93401
1735 Welsh Ct
San Luis Obispo, CA 93405
1127 Broad St
San Luis Obispo, CA 93401
185 Cessna Ct
San Luis Obispo, CA 93401
195 Cessna Ct
San Luis Obispo, CA 93401
1000 Olive St
San Luis Obispo, CA 93405
534 Highland Dr
San Luis Obispo, CA 93405
657 Cerro Romauldo Ave
San Luis Obispo, CA 93405
245 Bridge St
San Luis Obispo, CA 93401
755 Santa Rosa St
San Luis Obispo, CA 93401
66 Las Praderas Dr
San Luis Obispo, CA 93401
1639 Frambuesa Dr
San Luis Obispo, CA 93405
848 Higuera St
San Luis Obispo, CA 93401
586 Cuesta Dr
San Luis Obispo, CA 93405
1326 Higuera St
San Luis Obispo, CA 93401
833 Bougainvillea St
San Luis Obispo, CA 93401
1608 Karen Dr
San Luis Obispo, CA 93405
2063 Sierra Wy
San Luis Obispo, CA 93401
2045 Skylark Ln
San Luis Obispo, CA 93401
560 Higuera St Unit: H
San Luis Obispo, CA 93401
993 Bluebell Wy
San Luis Obispo, CA 93401
4111 Broad St
San Luis Obispo, CA 93401
781 Marsh St Unit: 270
San Luis Obispo, CA 93401
1140 Kendall Rd Unit: B
San Luis Obispo, CA 93401
1491 Monterey St
San Luis Obispo, CA 93401
899 Pacific St Unit: 100
San Luis Obispo, CA 93401
1250 Peach St
San Luis Obispo, CA 93401
392 Santa Maria Ave
San Luis Obispo, CA 93405
1640 El Cerrito Ct
San Luis Obispo, CA 93401
153 Broad St
San Luis Obispo, CA 93405
2600 Broad St
San Luis Obispo, CA 93401
2350 Meadow St
San Luis Obispo, CA 93401
879 Church St
San Luis Obispo, CA 93401
1129 George St
San Luis Obispo, CA 93401
191 Cessna Ct
San Luis Obispo, CA 93401
852 El Capitan Wy
San Luis Obispo, CA 93401
2161 Sierra Wy
San Luis Obispo, CA 93401
1347 Ironbark St
San Luis Obispo, CA 93401
1716 Oceanaire Dr
San Luis Obispo, CA 93405
1320 Vista Del Lago
San Luis Obispo, CA 93405
289 Ramona Dr
San Luis Obispo, CA 93405
1260 Ella St
San Luis Obispo, CA 93401
367 Hill St
San Luis Obispo, CA 93405
872 Morro St
San Luis Obispo, CA 93401
262 Foothill Blvd
San Luis Obispo, CA 93405
1270 Vista Del Lago
San Luis Obispo, CA 93405
1316 Diablo Dr
San Luis Obispo, CA 93405
187 Cessna Ct
San Luis Obispo, CA 93401
197 Cessna Ct
San Luis Obispo, CA 93401
1350 Marsh St
San Luis Obispo, CA 93401
1029 Chorro St
San Luis Obispo, CA 93401
194 Bravo St
San Luis Obispo, CA 93401
888 Monterey St
San Luis Obispo, CA 93401
2556 Gail Pl
San Luis Obispo, CA 93401
968 Walnut St
San Luis Obispo, CA 93401
777 Chorro St
San Luis Obispo, CA 93401
2864 Flora St
San Luis Obispo, CA 93401
3 La Entrada Ave Unit: A
San Luis Obispo, CA 93405
1245 Coral St
San Luis Obispo, CA 93405
1362 Aralia Ct
San Luis Obispo, CA 93401
1347 Ironbark St
San Luis Obispo, CA 93401
230 Broad St
San Luis Obispo, CA 93405
899 Pacific St Unit: 100
San Luis Obispo, CA 93401
315 Patricia Dr
San Luis Obispo, CA 93401
2432 Sunset Dr
San Luis Obispo, CA 93401
225 La Canada Dr
San Luis Obispo, CA 93405
262 Foothill Blvd Unit: A
San Luis Obispo, CA 93405
964 Johnson Ave
San Luis Obispo, CA 93401
767 Chorro St Unit: A
San Luis Obispo, CA 93401
1540 Froom Ranch Wy
San Luis Obispo, CA 93405
237 Foxtrot Ct
San Luis Obispo, CA 93401
1861 Devaul Ranch Dr Unit: A
San Luis Obispo, CA 93405
1206 Oceanaire Dr
San Luis Obispo, CA 93405
580 Serrano Dr
San Luis Obispo, CA 93405
11343 Los Osos Valley Rd
San Luis Obispo, CA 93405
1055 Monterey St
San Luis Obispo, CA 93401
1350 Osos St
San Luis Obispo, CA 93401
1357 Ironbark St
San Luis Obispo, CA 93401
1136 Walnut St
San Luis Obispo, CA 93401
562 Couper Dr
San Luis Obispo, CA 93405
855 Aerovista Pl
San Luis Obispo, CA 93401
1239 Foothill Blvd Unit: 202
San Luis Obispo, CA 93405
3450 Broad St
San Luis Obispo, CA 93401
231 Kentucky St
San Luis Obispo, CA 93405
1304 Sydney St
San Luis Obispo, CA 93401
107 Mustang Dr
San Luis Obispo, CA 93405
1219 Woodside Dr
San Luis Obispo, CA 93401
1219 Woodside Dr
San Luis Obispo, CA 93401
11050 Los Osos Valley Rd
San Luis Obispo, CA 93405
650 Sweeney Ln
San Luis Obispo, CA 93401
1440 Ella St
San Luis Obispo, CA 93401
795 Islay St
San Luis Obispo, CA 93401
1080 Grove St
San Luis Obispo, CA 93401
1601 Devaul Ranch Dr
San Luis Obispo, CA 93405
380 Christina Wy
San Luis Obispo, CA 93405
232 Foxtrot Ct
San Luis Obispo, CA 93401
777 Pismo St
San Luis Obispo, CA 93401
1831 Portola St
San Luis Obispo, CA 93405
1633 Crestview Cir
San Luis Obispo, CA 93401
887 Higuera St
San Luis Obispo, CA 93401
133 Del Sur Wy
San Luis Obispo, CA 93405
2023 Sierra Wy
San Luis Obispo, CA 93401
479 Broad St
San Luis Obispo, CA 93405
855 Via Esteban
San Luis Obispo, CA 93401
1194 Pacific St Unit: 100
San Luis Obispo, CA 93401
100 Madonna Rd
San Luis Obispo, CA 93405
2015 Monterey St
San Luis Obispo, CA 93401
2082 Fixlini St
San Luis Obispo, CA 93401
4320 Larkspur St
San Luis Obispo, CA 93401
1239 Foothill Blvd Unit: 204
San Luis Obispo, CA 93405
1731 Pico Ct
San Luis Obispo, CA 93405
1130 Atascadero St
San Luis Obispo, CA 93405
1320 Oceanaire Dr
San Luis Obispo, CA 93405
1901 Devaul Ranch Dr
San Luis Obispo, CA 93405
667 Hill St
San Luis Obispo, CA 93405
364 Montrose Dr
San Luis Obispo, CA 93405
305 Chaplin Ln
San Luis Obispo, CA 93405
3008 Arezzo Dr
San Luis Obispo, CA 93401
710 Foothill Blvd
San Luis Obispo, CA 93405
390 Santa Rosa St
San Luis Obispo, CA 93405
3406 Sycamore Dr
San Luis Obispo, CA 93401
2744 El Cerrito
San Luis Obispo, CA 93401
1230 Higuera St
San Luis Obispo, CA 93401
1930 Castillo Ct
San Luis Obispo, CA 93405
737 Higuera St
San Luis Obispo, CA 93401
1824 Castillo Ct
San Luis Obispo, CA 93405
750 Chorro St
San Luis Obispo, CA 93401
1150 Marsh St
San Luis Obispo, CA 93401
2019 Sierra Wy
San Luis Obispo, CA 93401
1257 Chaparral Cir
San Luis Obispo, CA 93401
713 Grand Ave
San Luis Obispo, CA 93401
1750 Conejo Ave
San Luis Obispo, CA 93401
1090 Court St
San Luis Obispo, CA 93401
405 Jaycee Dr
San Luis Obispo, CA 93405
1755 Diablo Dr
San Luis Obispo, CA 93405
1330 Buchon St
San Luis Obispo, CA 93401
595 Patricia Dr
San Luis Obispo, CA 93405
1432 Tanglewood Ct
San Luis Obispo, CA 93401
211 Chorro St
San Luis Obispo, CA 93405
777 Chorro St Unit: 2
San Luis Obispo, CA 93401
1135 Chorro St
San Luis Obispo, CA 93401
204 Foxtrot Ct
San Luis Obispo, CA 93401
2088 Price St
San Luis Obispo, CA 93401
1151 San Carlos Dr
San Luis Obispo, CA 93401
3060 Lucca Ln
San Luis Obispo, CA 93401
222 Kitty Hawk Ct
San Luis Obispo, CA 93401
1611 Colina Ct
San Luis Obispo, CA 93401
1115 Oceanaire Dr
San Luis Obispo, CA 93405
1190 Buchon St
San Luis Obispo, CA 93401
955 Monterey St
San Luis Obispo, CA 93401
1990 Hays St
San Luis Obispo, CA 93405
890 Marsh St
San Luis Obispo, CA 93401
4051 Broad St
San Luis Obispo, CA 93401
1215 Sponza Dr Unit: 2
San Luis Obispo, CA 93401
116 Mustang Dr
San Luis Obispo, CA 93405
2028 King Street
San Luis Obispo, CA 93401
4600 Broad St
San Luis Obispo, CA 93401
954 Lobelia Ln
San Luis Obispo, CA 93401
1907 Ruth St
San Luis Obispo, CA 93401
4337 Poinsettia St
San Luis Obispo, CA 93401
1531 Monterey St
San Luis Obispo, CA 93401
1330 Buchon St
San Luis Obispo, CA 93401
127 Mustang Dr
San Luis Obispo, CA 93405
2125 Story St
San Luis Obispo, CA 93401
2460 Augusta St
San Luis Obispo, CA 93401
343 Grand Ave
San Luis Obispo, CA 93405
2855 Mcmillan Ave
San Luis Obispo, CA 93401
1026 Palm St Unit: 101
San Luis Obispo, CA 93401
3894 Hayfield Loop
San Luis Obispo, CA 93401
24 Las Praderas Dr
San Luis Obispo, CA 93401
1531 Monterey St
San Luis Obispo, CA 93401
103 Stenner St
San Luis Obispo, CA 93405
2391 Lawton Ave
San Luis Obispo, CA 93401
3481 Sycamore Dr
San Luis Obispo, CA 93401
2011 Chorro St
San Luis Obispo, CA 93401
216 Kitty Hawk Ct
San Luis Obispo, CA 93401
1052 Vista Del Collados
San Luis Obispo, CA 93405
2475 Victoria Ave
San Luis Obispo, CA 93401
865 Morro St
San Luis Obispo, CA 93401
775 Capitolio Wy
San Luis Obispo, CA 93401
2800 Broad St Unit: 110
San Luis Obispo, CA 93401
110 Mustang Dr
San Luis Obispo, CA 93405
770 Haystack Pl
San Luis Obispo, CA 93405
868 Higuera St
San Luis Obispo, CA 93401
1639 Frambuesa Dr
San Luis Obispo, CA 93405
252 Memphis Belle Wy
San Luis Obispo, CA 93401
1239 Foothill Blvd Unit: 203
San Luis Obispo, CA 93405
868 Higuera St
San Luis Obispo, CA 93401
11295 Los Osos Valley Rd Unit: 27
San Luis Obispo, CA 93405
241 Westmont Ave
San Luis Obispo, CA 93405
672 Serrano Dr Unit: 4
San Luis Obispo, CA 93405
755 Chorro St
San Luis Obispo, CA 93401
1287 Descanso St
San Luis Obispo, CA 93405
218 Kitty Hawk Ct
San Luis Obispo, CA 93401
1750 Diablo Dr
San Luis Obispo, CA 93405
865 Morro St
San Luis Obispo, CA 93401
1236 Monte Vista Pl Unit: 1
San Luis Obispo, CA 93405
1221 Drake Cir
San Luis Obispo, CA 93405
4330 Sunflower Wy
San Luis Obispo, CA 93401
1283 San Carlos Dr
San Luis Obispo, CA 93401
1239 Foothill Blvd Unit: 207
San Luis Obispo, CA 93405
176 Chorro St
San Luis Obispo, CA 93405
218 Foxtrot Ct
San Luis Obispo, CA 93401
3442 Empresa Dr
San Luis Obispo, CA 93401
1422 Monterey St
San Luis Obispo, CA 93401
216 Foxtrot Ct
San Luis Obispo, CA 93401
311 Margarita Ave
San Luis Obispo, CA 93401
1105 Vista Del Lago
San Luis Obispo, CA 93405
995 Higuera St
San Luis Obispo, CA 93401
1936 McCollum St
San Luis Obispo, CA 93405
451 Mitchell Dr
San Luis Obispo, CA 93401
1200 Oceanaire Dr
San Luis Obispo, CA 93405
1420 Garcia Dr
San Luis Obispo, CA 93405
1334 Diablo Dr
San Luis Obispo, CA 93405
261 Cuesta Ave
San Luis Obispo, CA 93405
2122 Harris St
San Luis Obispo, CA 93401
2276 Broad St
San Luis Obispo, CA 93401
207 Foxtrot Ct
San Luis Obispo, CA 93401
11545 Los Osos Valley Rd
San Luis Obispo, CA 93405
1561 Froom Ranch Wy
San Luis Obispo, CA 93405
1239 Foothill Blvd Unit: 201
San Luis Obispo, CA 93405
4696 Snapdragon Wy
San Luis Obispo, CA 93401
1750 Conejo Ave
San Luis Obispo, CA 93401
222 Foxtrot Ct
San Luis Obispo, CA 93401
1055 Monterey St
San Luis Obispo, CA 93401
2383 Florence Ave
San Luis Obispo, CA 93401
76 Mustang Dr
San Luis Obispo, CA 93405
748 Marsh St
San Luis Obispo, CA 93401
12340 Los Osos Valley Rd
San Luis Obispo, CA 93405
1118 Buchon St
San Luis Obispo, CA 93401
3610 Sacramento Dr
San Luis Obispo, CA 93401
1430 Garden St
San Luis Obispo, CA 93401
254 Luneta Dr
San Luis Obispo, CA 93405
552 California Blvd
San Luis Obispo, CA 93405
600 Cuesta Dr
San Luis Obispo, CA 93405
210 Lincoln Ave
San Luis Obispo, CA 93405
670 Grove St
San Luis Obispo, CA 93401
1287 Cayucos Dr
San Luis Obispo, CA 93405
857 Casitas Ct
San Luis Obispo, CA 93405
431 San Vincenzo Dr
San Luis Obispo, CA 93401
242 Memphis Belle Wy
San Luis Obispo, CA 93401
767 Chorro St Unit: A
San Luis Obispo, CA 93401
1090 Grove St
San Luis Obispo, CA 93401
1528 Mill St
San Luis Obispo, CA 93401
865 Morro St
San Luis Obispo, CA 93401
1106 Walnut St Unit: 110
San Luis Obispo, CA 93401
1665 Tanglewood Dr
San Luis Obispo, CA 93401
1198 Oceanaire Dr
San Luis Obispo, CA 93405
1426 Broad St
San Luis Obispo, CA 93401
1841 Slack St
San Luis Obispo, CA 93405
1282 West Newport St
San Luis Obispo, CA 93405
1746 Chorro St
San Luis Obispo, CA 93401
2121 Harris St
San Luis Obispo, CA 93401
4127 Bernardo Dr
San Luis Obispo, CA 93401
1649 Mccollum St
San Luis Obispo, CA 93401
1309 Vega Wy
San Luis Obispo, CA 93405
336 Buchon St
San Luis Obispo, CA 93401
788 Azalea Ct
San Luis Obispo, CA 93401
1505 Balboa St
San Luis Obispo, CA 93405
1630 Higuera St
San Luis Obispo, CA 93401
1911 Johnson Ave
San Luis Obispo, CA 93401
2416 Sendero Ct
San Luis Obispo, CA 93401
246 Memphis Belle Wy
San Luis Obispo, CA 93401
202 Tank Farm Rd
San Luis Obispo, CA 93401
1490 Descanso St
San Luis Obispo, CA 93405
1844 San Luis Ranch Rd
San Luis Obispo, CA 93405
586 Buchon St
San Luis Obispo, CA 93401
2121 Harris St
San Luis Obispo, CA 93401
1760 San Luis Dr
San Luis Obispo, CA 93401
777 Pismo St
San Luis Obispo, CA 93401
1236 West Newport St
San Luis Obispo, CA 93405
1537 La Cita Ct
San Luis Obispo, CA 93401
1720 Morro St
San Luis Obispo, CA 93401
720 Leff St
San Luis Obispo, CA 93401
212 Kitty Hawk Ct
San Luis Obispo, CA 93401
769 Upham St
San Luis Obispo, CA 93401
2416 Santa Clara St Unit: A
San Luis Obispo, CA 93401
209 Foxtrot Ct
San Luis Obispo, CA 93401
56 Los Palos Dr
San Luis Obispo, CA 93401
3205 Calle Jazmin
San Luis Obispo, CA 93401
1043 George St
San Luis Obispo, CA 93401
1771 Cordova Dr
San Luis Obispo, CA 93405
1283 San Carlos Dr
San Luis Obispo, CA 93401
1741 Lima Dr
San Luis Obispo, CA 93405
1344 Balboa St
San Luis Obispo, CA 93405
1846 Conejo Ave
San Luis Obispo, CA 93401
244 Memphis Belle Wy
San Luis Obispo, CA 93401
1426 Marsh St
San Luis Obispo, CA 93401
857 Casitas Ct
San Luis Obispo, CA 93405
1218 Woodside Dr
San Luis Obispo, CA 93401
442 Buchon St
San Luis Obispo, CA 93401
1001 Foothill Blvd
San Luis Obispo, CA 93405
652 Lincoln Ave
San Luis Obispo, CA 93405
1750 Diablo Dr
San Luis Obispo, CA 93405
2176 Santa Ynez Ave
San Luis Obispo, CA 93405
390 North Chorro St Unit: 3
San Luis Obispo, CA 93405
530 Couper Dr
San Luis Obispo, CA 93405
382 Broad St
San Luis Obispo, CA 93405
401 Junipero Wy
San Luis Obispo, CA 93401
383 Buena Vista Ave
San Luis Obispo, CA 93405
2744 El Cerrito
San Luis Obispo, CA 93401
1220 Mill St
San Luis Obispo, CA 93401
11590 Los Osos Valley Rd
San Luis Obispo, CA 93405
361 Lincoln Ave
San Luis Obispo, CA 93405
723 Higuera St
San Luis Obispo, CA 93401
3428 Sycamore Dr
San Luis Obispo, CA 93401
1620 Higuera St
San Luis Obispo, CA 93401
244 Foothill Blvd
San Luis Obispo, CA 93405
1367 Diablo Dr
San Luis Obispo, CA 93405
661 Pasatiempo Dr
San Luis Obispo, CA 93405
102 Mustang Dr Unit: 101
San Luis Obispo, CA 93405
200 Foxtrot Ct
San Luis Obispo, CA 93401
1401 Cazadero St
San Luis Obispo, CA 93401
1033 Chorro St
San Luis Obispo, CA 93401
1342 Oceanaire Dr
San Luis Obispo, CA 93405
273 Almond St
San Luis Obispo, CA 93405
233 Foxtrot Ct
San Luis Obispo, CA 93401
3195 South Higuera St
San Luis Obispo, CA 93401
176 Chorro St
San Luis Obispo, CA 93405
1401 Cazadero St
San Luis Obispo, CA 93401
777 Pismo St
San Luis Obispo, CA 93401
210 Foxtrot Ct
San Luis Obispo, CA 93401
2348 Johnson Ave
San Luis Obispo, CA 93401
386 Broad St
San Luis Obispo, CA 93405
71 Las Praderas Dr
San Luis Obispo, CA 93401
1134 Forest St
San Luis Obispo, CA 93405
3160 Johnson Ave
San Luis Obispo, CA 93401
1069 Terra Wy
San Luis Obispo, CA 93405
940 Del Rio Ave
San Luis Obispo, CA 93405
218 Foxtrot Ct
San Luis Obispo, CA 93401
2744 El Cerrito
San Luis Obispo, CA 93401
222 Foxtrot Ct
San Luis Obispo, CA 93401
390 Santa Rosa St
San Luis Obispo, CA 93405
1220 Mill St
San Luis Obispo, CA 93401
232 Foxtrot Ct
San Luis Obispo, CA 93401
111 Twin Ridge Dr
San Luis Obispo, CA 93405
236 Foxtrot Ct
San Luis Obispo, CA 93401
240 Foxtrot Ct
San Luis Obispo, CA 93401
1037 Tiburon Wy
San Luis Obispo, CA 93401
978 Valecito Ct
San Luis Obispo, CA 93405
206 Foxtrot Ct
San Luis Obispo, CA 93401
228 Foxtrot Ct
San Luis Obispo, CA 93401
1701 Devaul Ranch Dr
San Luis Obispo, CA 93405
860 Skyline Dr
San Luis Obispo, CA 93405
3195 Lirio Ct
San Luis Obispo, CA 93401
2060 Parker St
San Luis Obispo, CA 93401
216 Foxtrot Ct
San Luis Obispo, CA 93401
1213 West Newport St
San Luis Obispo, CA 93405
214 Foxtrot Ct
San Luis Obispo, CA 93401
234 Broad St
San Luis Obispo, CA 93405
380 Christina Wy
San Luis Obispo, CA 93405
1415 Cazadero St
San Luis Obispo, CA 93401
1794 Partridge Dr
San Luis Obispo, CA 93405
4805 Morabito Pl
San Luis Obispo, CA 93401
11560 Los Osos Valley Rd Unit: 190
San Luis Obispo, CA 93405
3000 Mcmillan Ave
San Luis Obispo, CA 93401
377 Branch St
San Luis Obispo, CA 93401
632 Patricia Dr
San Luis Obispo, CA 93405
2432 Sunset Dr
San Luis Obispo, CA 93401
1684 Alrita St
San Luis Obispo, CA 93401
2220 Exposition Dr Unit: 55
San Luis Obispo, CA 93401
1546 Palm St
San Luis Obispo, CA 93401
1002 Parkview Pl
San Luis Obispo, CA 93405
1741 Lima Dr
San Luis Obispo, CA 93405
1427 Broad St
San Luis Obispo, CA 93401
3814 Hatchery Ln Unit: 1
San Luis Obispo, CA 93401
1027 Peach St
San Luis Obispo, CA 93401
234 Memphis Belle Wy
San Luis Obispo, CA 93401
231 Foxtrot Ct
San Luis Obispo, CA 93401
2015 Monterey St
San Luis Obispo, CA 93401
1015 Bluebell Wy
San Luis Obispo, CA 93401
1144 Chorro St
San Luis Obispo, CA 93401
1139 Islay St
San Luis Obispo, CA 93401
743 Buchon St
San Luis Obispo, CA 93401
270 Luneta Dr
San Luis Obispo, CA 93405
2145 Price St
San Luis Obispo, CA 93401
691 Lincoln Ave
San Luis Obispo, CA 93405
665 Grove St
San Luis Obispo, CA 93401
308 San Miguel Ave
San Luis Obispo, CA 93405
169 Earthwood Ln
San Luis Obispo, CA 93401
495 Broad St
San Luis Obispo, CA 93405
437 Kentucky St Unit: F
San Luis Obispo, CA 93405
1347 Avalon St
San Luis Obispo, CA 93405
130 Orange Dr
San Luis Obispo, CA 93405
2023 San Luis Dr
San Luis Obispo, CA 93401
3242 Johnson Ave
San Luis Obispo, CA 93401
233 Foxtrot Ct
San Luis Obispo, CA 93401
11560 Los Osos Valley Rd Unit: 190
San Luis Obispo, CA 93405
1529 Tanglewood Dr
San Luis Obispo, CA 93401
1185 Foothill Blvd Unit: 17
San Luis Obispo, CA 93405
2432 Sunset Dr
San Luis Obispo, CA 93401
3960 South Higuera St Unit: 13
San Luis Obispo, CA 93401
2432 Sunset Dr
San Luis Obispo, CA 93401
483 Sandercock St
San Luis Obispo, CA 93401
411 Foothill Blvd
San Luis Obispo, CA 93405
1532 Gulf St
San Luis Obispo, CA 93405
1612 Lima Dr
San Luis Obispo, CA 93405
3910 Broad St
San Luis Obispo, CA 93401
679 Funston Ave
San Luis Obispo, CA 93401
581 Higuera St
San Luis Obispo, CA 93401
1003 Buchon St
San Luis Obispo, CA 93401
11560 Los Osos Valley Rd Unit: 190
San Luis Obispo, CA 93405
188 Los Cerros Dr
San Luis Obispo, CA 93405
751 Buchon St
San Luis Obispo, CA 93401
167 Foothill Blvd
San Luis Obispo, CA 93405
595 Leff St
San Luis Obispo, CA 93401
105 Fel Mar Dr
San Luis Obispo, CA 93405
236 Higuera St
San Luis Obispo, CA 93401
231 Foxtrot Ct
San Luis Obispo, CA 93401
120 Serrano Heights
San Luis Obispo, CA 93405
537 Jeffrey Dr
San Luis Obispo, CA 93405
1645 Corona Ct
San Luis Obispo, CA 93401
1354 San Marcos Ct
San Luis Obispo, CA 93401
3158 Spring Ct
San Luis Obispo, CA 93401
798 Clearview Ln
San Luis Obispo, CA 93405
795 Lincoln Ave
San Luis Obispo, CA 93405
221 Foxtrot Ct
San Luis Obispo, CA 93401
233 Sandercock St
San Luis Obispo, CA 93401
1347 Ironbark St
San Luis Obispo, CA 93401
2220 Exposition Dr
San Luis Obispo, CA 93401
1502 Higuera St
San Luis Obispo, CA 93401
3061 Johnson Ave
San Luis Obispo, CA 93401
230 Marlene Dr
San Luis Obispo, CA 93405
4013 Bernardo Dr
San Luis Obispo, CA 93401
1545 Huckleberry Ln
San Luis Obispo, CA 93401
240 Foxtrot Ct
San Luis Obispo, CA 93401
1792 Alrita St
San Luis Obispo, CA 93401
161 Henderson Ave
San Luis Obispo, CA 93405
1525 Slack St Unit: A
San Luis Obispo, CA 93405
1445 Calle Joaquin
San Luis Obispo, CA 93405
3981 Steel Wy
San Luis Obispo, CA 93401
1330 Buchon St
San Luis Obispo, CA 93401
1529 Tanglewood Dr
San Luis Obispo, CA 93401
1531 Froom Ranch Wy
San Luis Obispo, CA 93405
1144 Chorro St
San Luis Obispo, CA 93401
2120 Santa Barbara Avenue
San Luis Obispo, CA 93401
305 Hathway Ave
San Luis Obispo, CA 93405
1055 California Blvd
San Luis Obispo, CA 93401
1042 Walnut St
San Luis Obispo, CA 93401
550 Foothill Blvd
San Luis Obispo, CA 93405
3442 Empresa Dr
San Luis Obispo, CA 93401
795 Lincoln Ave
San Luis Obispo, CA 93405
2138 Broad St
San Luis Obispo, CA 93401
717 Grand Ave
San Luis Obispo, CA 93401
335 San Miguel Ave
San Luis Obispo, CA 93405
2074 Monterey St
San Luis Obispo, CA 93401
3426 Empresa Dr
San Luis Obispo, CA 93401
5 Santa Rosa St
San Luis Obispo, CA 93405
1315 Aralia Ct
San Luis Obispo, CA 93401
1239 Osos St
San Luis Obispo, CA 93401
3071 South Higuera St
San Luis Obispo, CA 93401
313 Patricia Dr
San Luis Obispo, CA 93405
2071 Hope St
San Luis Obispo, CA 93405
1865 Monterey St
San Luis Obispo, CA 93401
1302 Osos St
San Luis Obispo, CA 93401
374 Ramona Dr
San Luis Obispo, CA 93405
675 Clarion Ct
San Luis Obispo, CA 93401
1695 Calle Joaquin
San Luis Obispo, CA 93405
333 Elks Ln
San Luis Obispo, CA 93401
3000 Augusta St
San Luis Obispo, CA 93401
1124 Nipomo St
San Luis Obispo, CA 93401
755 Chorro St
San Luis Obispo, CA 93401
1132 Olive St
San Luis Obispo, CA 93405
420 Cuesta Dr
San Luis Obispo, CA 93401
500 Marsh St
San Luis Obispo, CA 93401
3122 Flora St
San Luis Obispo, CA 93401
3701 South Higuera St
San Luis Obispo, CA 93401
1102 Madonna Rd
San Luis Obispo, CA 93405
1865 Monterey St
San Luis Obispo, CA 93401
1841 Slack St
San Luis Obispo, CA 93405
11050 Los Osos Valley Rd
San Luis Obispo, CA 93405
11050 Los Osos Valley Rd
San Luis Obispo, CA 93405
2156 Sierra Wy
San Luis Obispo, CA 93401
881 Francis Ave
San Luis Obispo, CA 93401
2730 Mcmillan Ave
San Luis Obispo, CA 93401
283 Madonna Rd
San Luis Obispo, CA 93405
445 Prado Rd
San Luis Obispo, CA 93401
2474 Augusta St
San Luis Obispo, CA 93401
1292 Foothill Blvd
San Luis Obispo, CA 93405
110 Grand Ave
San Luis Obispo, CA 93405
125 Grand Ave
San Luis Obispo, CA 93405
482 Sandercock St
San Luis Obispo, CA 93401
1526 Mill St
San Luis Obispo, CA 93401
1238 Foothill Blvd
San Luis Obispo, CA 93405
1490 Descanso St
San Luis Obispo, CA 93405
175 Venture Dr
San Luis Obispo, CA 93401
333 Buchon St
San Luis Obispo, CA 93401
1301 Calle Joaquin
San Luis Obispo, CA 93405
350 Elks Ln
San Luis Obispo, CA 93401
25 Prado Rd
San Luis Obispo, CA 93401
1626 Osos St
San Luis Obispo, CA 93401
3 Chuparrosa Dr
San Luis Obispo, CA 93401
290 Madonna Rd
San Luis Obispo, CA 93405
755 Chorro St
San Luis Obispo, CA 93401
667 Upham St
San Luis Obispo, CA 93401
2053 Hays St
San Luis Obispo, CA 93405
500 Westmont Ave
San Luis Obispo, CA 93405
184 Suburban Rd
San Luis Obispo, CA 93401
1035 Monterey St
San Luis Obispo, CA 93401
46 South Tassajara Dr
San Luis Obispo, CA 93405
265 South St
San Luis Obispo, CA 93401
1407 Cazadero St
San Luis Obispo, CA 93401
1402 Prefumo Canyon Rd
San Luis Obispo, CA 93405
140 South St
San Luis Obispo, CA 93401
3195 South Higuera St
San Luis Obispo, CA 93401
123 Casa St
San Luis Obispo, CA 93405
110 Tank Farm Rd
San Luis Obispo, CA 93401
309 Madonna Rd
San Luis Obispo, CA 93405
282 Chorro St
San Luis Obispo, CA 93405
2021 Skylark Ln
San Luis Obispo, CA 93401
145 Henderson Ave
San Luis Obispo, CA 93405
587 Marsh St
San Luis Obispo, CA 93401
100 Madonna Rd
San Luis Obispo, CA 93405
3741 Orcutt Rd
San Luis Obispo, CA 93401
2265 Broad St
San Luis Obispo, CA 93401
1780 Fixlini St
San Luis Obispo, CA 93401
583 Marsh St
San Luis Obispo, CA 93401
1783 Southwood Dr
San Luis Obispo, CA 93401
2462 Johnson Ave
San Luis Obispo, CA 93401
2052 Johnson Ave
San Luis Obispo, CA 93401
210 Grand Ave
San Luis Obispo, CA 93405
11950 Los Osos Valley Rd
San Luis Obispo, CA 93405
1901 Santa Barbara Avenue
San Luis Obispo, CA 93401
165 Grand Ave
San Luis Obispo, CA 93405
899 Higuera St
San Luis Obispo, CA 93401
560 Higuera St
San Luis Obispo, CA 93401
1106 Walnut St
San Luis Obispo, CA 93401
160 Brook St
San Luis Obispo, CA 93401
899 Higuera St
San Luis Obispo, CA 93401
667 Upham St
San Luis Obispo, CA 93401
2803 Johnson Ave
San Luis Obispo, CA 93401
591 Highland Dr
San Luis Obispo, CA 93405
1106 Walnut St
San Luis Obispo, CA 93401
1423 Descanso St
San Luis Obispo, CA 93405
1057 Buchon St
San Luis Obispo, CA 93401
446 Luneta Dr
San Luis Obispo, CA 93405
591 Highland Dr
San Luis Obispo, CA 93405
900 Southwood Dr
San Luis Obispo, CA 93401
267 Foothill Blvd
San Luis Obispo, CA 93405
1361 Stafford St
San Luis Obispo, CA 93405
1380 Broad St
San Luis Obispo, CA 93401
1023 Mill St
San Luis Obispo, CA 93401
428 Corrida Dr
San Luis Obispo, CA 93401
1557 Oceanaire Dr
San Luis Obispo, CA 93405
2141 Broad St
San Luis Obispo, CA 93401
1126 Buchon St
San Luis Obispo, CA 93401
2161 Broad St
San Luis Obispo, CA 93401
233 Sandercock St
San Luis Obispo, CA 93401
1443 Marsh St
San Luis Obispo, CA 93401
4370 Larkspur St
San Luis Obispo, CA 93401
333 Madonna Rd
San Luis Obispo, CA 93405
1367 Higuera St
San Luis Obispo, CA 93401
153 Cross St
San Luis Obispo, CA 93401
1308 Royal Wy
San Luis Obispo, CA 93405
859 California Blvd
San Luis Obispo, CA 93401
989 Chorro St
San Luis Obispo, CA 93401
990 Palm St
San Luis Obispo, CA 93401
2276 Augusta St
San Luis Obispo, CA 93401
11491 Los Osos Valley Rd
San Luis Obispo, CA 93405
1413 Monterey St
San Luis Obispo, CA 93401
1124 Nipomo St
San Luis Obispo, CA 93401
4600 Broad St
San Luis Obispo, CA 93401
1240 Southwood Dr
San Luis Obispo, CA 93401
4385 Orcutt Rd
San Luis Obispo, CA 93401
1490 Southwood Dr
San Luis Obispo, CA 93401
11860 Los Osos Valley Rd
San Luis Obispo, CA 93405
668 Branch St
San Luis Obispo, CA 93401
1630 Fairview St
San Luis Obispo, CA 93401
1951 Monterey St
San Luis Obispo, CA 93401
3316 Johnson Ave
San Luis Obispo, CA 93401
1239 Osos St
San Luis Obispo, CA 93401
698 Marsh St
San Luis Obispo, CA 93401
1333 Kentwood Dr
San Luis Obispo, CA 93401
711 Tank Farm Rd
San Luis Obispo, CA 93401
1025 Farmhouse Ln
San Luis Obispo, CA 93401
680 Broad St
San Luis Obispo, CA 93401
66 Higuera St
San Luis Obispo, CA 93401
1750 Diablo Dr
San Luis Obispo, CA 93405
2322 Flora St
San Luis Obispo, CA 93401
888 Morro St
San Luis Obispo, CA 93401
2435 Ladera Ct
San Luis Obispo, CA 93401
337 High St
San Luis Obispo, CA 93401
2800 Broad St
San Luis Obispo, CA 93401
1373 Fredericks St
San Luis Obispo, CA 93405
1772 Calle Joaquin
San Luis Obispo, CA 93405
228 Mission Ln
San Luis Obispo, CA 93405
2094 Mccollum St
San Luis Obispo, CA 93405
777 Pismo St
San Luis Obispo, CA 93401
277 Bridge St
San Luis Obispo, CA 93401
2027 Swazey St
San Luis Obispo, CA 93401
1487 Smith St
San Luis Obispo, CA 93401
920 Olive St
San Luis Obispo, CA 93405
650 Sweeney Ln
San Luis Obispo, CA 93401
899 Pacific St
San Luis Obispo, CA 93401
3271 South Higuera St
San Luis Obispo, CA 93401
2407 Boulevard Del Campo Blvd
San Luis Obispo, CA 93401
1414 Quarry Ct
San Luis Obispo, CA 93401
218 Foxtrot Ct
San Luis Obispo, CA 93401
1744 Southwood Dr
San Luis Obispo, CA 93401
222 Foxtrot Ct
San Luis Obispo, CA 93401
214 Higuera St
San Luis Obispo, CA 93401
319 Ramona Dr
San Luis Obispo, CA 93405
1108 Poppy Ln
San Luis Obispo, CA 93401
2474 Augusta St
San Luis Obispo, CA 93401
1021 Murray Ave
San Luis Obispo, CA 93405
651 Buchon St
San Luis Obispo, CA 93401
201 Madonna Rd
San Luis Obispo, CA 93405
121 Twin Ridge Dr
San Luis Obispo, CA 93405
1750 Conejo Ave
San Luis Obispo, CA 93401
3165 Broad St
San Luis Obispo, CA 93401
4540 Broad St
San Luis Obispo, CA 93401
675 California Blvd
San Luis Obispo, CA 93401
628 Grove St
San Luis Obispo, CA 93401
847 Mirada Dr
San Luis Obispo, CA 93405
832 Marigold Ct
San Luis Obispo, CA 93401
3981 Steel Wy
San Luis Obispo, CA 93401
60 Casa St Unit: A1
San Luis Obispo, CA 93405
60 Casa St Unit: B32
San Luis Obispo, CA 93405
60 Casa St Unit: A2
San Luis Obispo, CA 93405
60 Casa St Unit: A3
San Luis Obispo, CA 93405
60 Casa St Unit: B5
San Luis Obispo, CA 93405
660 Lawrence Dr
San Luis Obispo, CA 93401
661 Pasatiempo Dr
San Luis Obispo, CA 93405
1237 Archer St
San Luis Obispo, CA 93401
4051 Broad St
San Luis Obispo, CA 93401
121 Twin Ridge Dr
San Luis Obispo, CA 93405
887 Higuera St
San Luis Obispo, CA 93401
820 Marigold Ct
San Luis Obispo, CA 93401
1281 Oceanaire Dr
San Luis Obispo, CA 93405
1363 Marsh St
San Luis Obispo, CA 93401
1209 Murray Ave
San Luis Obispo, CA 93405
1518 Balboa St
San Luis Obispo, CA 93405
1363 Marsh St
San Luis Obispo, CA 93401
332 Patricia Dr
San Luis Obispo, CA 93405
1153 Terra Wy
San Luis Obispo, CA 93405
313 Madonna Rd
San Luis Obispo, CA 93405
2469 Gerda St
San Luis Obispo, CA 93401
710 Murray Ave
San Luis Obispo, CA 93401
1190 Buchon St
San Luis Obispo, CA 93401
1426 Marsh St
San Luis Obispo, CA 93401
1740 Fixlini St
San Luis Obispo, CA 93401
901 Lawrence Dr
San Luis Obispo, CA 93401
200 Foxtrot Ct
San Luis Obispo, CA 93401
1445 Prefumo Canyon Rd
San Luis Obispo, CA 93405
2943 Johnson Ave
San Luis Obispo, CA 93401
2943 Johnson Ave Unit: A
San Luis Obispo, CA 93401
1206 Twin Creek Rd
San Luis Obispo, CA 93401
319 Ramona Dr Unit: A
San Luis Obispo, CA 93405
1675 Calle Joaquin
San Luis Obispo, CA 93405
1828 Fixlini St
San Luis Obispo, CA 93401
241 Hathway St
San Luis Obispo, CA 93405
3850 Long St Unit: 200
San Luis Obispo, CA 93401
830 Capitolio Wy
San Luis Obispo, CA 93401
60 Casa St Unit: G19
San Luis Obispo, CA 93405
60 Casa St Unit: G20
San Luis Obispo, CA 93405
60 Casa St Unit: G21
San Luis Obispo, CA 93405
60 Casa St Unit: G22
San Luis Obispo, CA 93405
60 Casa St Unit: C13
San Luis Obispo, CA 93405
60 Casa St Unit: C14
San Luis Obispo, CA 93405
60 Casa St Unit: E24
San Luis Obispo, CA 93405
204 Foxtrot Ct
San Luis Obispo, CA 93401
60 Casa St Unit: G17
San Luis Obispo, CA 93405
60 Casa St Unit: F15
San Luis Obispo, CA 93405
60 Casa St Unit: F16
San Luis Obispo, CA 93405
60 Casa St Unit: D29
San Luis Obispo, CA 93405
60 Casa St Unit: D31
San Luis Obispo, CA 93405
60 Casa St Unit: E23
San Luis Obispo, CA 93405
60 Casa St Unit: D28
San Luis Obispo, CA 93405
60 Casa St Unit: D30
San Luis Obispo, CA 93405
1234 Archer St
San Luis Obispo, CA 93401
60 Casa St
San Luis Obispo, CA 93405
60 Casa St Unit: E25
San Luis Obispo, CA 93405
60 Casa St Unit: E26
San Luis Obispo, CA 93405
60 Casa St Unit: E27
San Luis Obispo, CA 93405
3355 Broad St
San Luis Obispo, CA 93401
60 Casa St Unit: G18
San Luis Obispo, CA 93405
652 Mitchell Dr
San Luis Obispo, CA 93401
60 Casa St Unit: C11
San Luis Obispo, CA 93405
60 Casa St Unit: C12
San Luis Obispo, CA 93405
60 Casa St Unit: B6
San Luis Obispo, CA 93405
60 Casa St Unit: C10
San Luis Obispo, CA 93405
60 Casa St Unit: C9
San Luis Obispo, CA 93405
60 Casa St Unit: B7
San Luis Obispo, CA 93405
60 Casa St Unit: B8
San Luis Obispo, CA 93405
1908 Ruth St
San Luis Obispo, CA 93401
561 Luneta Dr
San Luis Obispo, CA 93405
299 Albert Dr Unit: A
San Luis Obispo, CA
1223 Stafford St
San Luis Obispo, CA 93405
1547 Oceanaire Dr
San Luis Obispo, CA 93405
1124 Buchon St
San Luis Obispo, CA 93401
1257 Chaparral Cir
San Luis Obispo, CA 93401
1432 Tanglewood Ct
San Luis Obispo, CA 93401
265 Broad St
San Luis Obispo, CA 93405
755 Monterey St
San Luis Obispo, CA 93401
641 Caudill St
San Luis Obispo, CA 93401
2030 Rachel St
San Luis Obispo, CA 93401
210 Foxtrot Ct
San Luis Obispo, CA 93401
214 Foxtrot Ct
San Luis Obispo, CA 93401
212 Warren Wy
San Luis Obispo, CA 93405
375 Chorro St
San Luis Obispo, CA 93405
343 Grand Ave
San Luis Obispo, CA 93405
1531 Froom Ranch Wy
San Luis Obispo, CA 93405
777 Pismo St
San Luis Obispo, CA 93401
232 Foxtrot Ct
San Luis Obispo, CA 93401
895 Industrial Wy
San Luis Obispo, CA 93401
1815 Osos St
San Luis Obispo, CA 93401
1635 El Caserio Ct
San Luis Obispo, CA 93401
951 Monterey St
San Luis Obispo, CA 93401
1500 Lizzie St
San Luis Obispo, CA 93401
1545 Oceanaire Dr
San Luis Obispo, CA 93405
232 Memphis Belle Wy
San Luis Obispo, CA 93401
1250 Coral St
San Luis Obispo, CA 93405
378 Chorro St
San Luis Obispo, CA 93405
2125 Sierra Wy
San Luis Obispo, CA 93401
4115 Vachell Ln
San Luis Obispo, CA 93401
232 Memphis Belle Wy
San Luis Obispo, CA 93401
1335 Cavalier Ln
San Luis Obispo, CA 93405
927 Bougainvillea St
San Luis Obispo, CA 93401
1860 Homestead Pl
San Luis Obispo, CA 93405
667 Upham St
San Luis Obispo, CA 93401
2299 Flora St
San Luis Obispo, CA 93401
2250 Flora St
San Luis Obispo, CA 93401
3935 Kilbern Wy
San Luis Obispo, CA 93401
3783 Rock Garden Ln
San Luis Obispo, CA 93401
3641 Lawnwood Dr
San Luis Obispo, CA 93401
1318 Pacific St
San Luis Obispo, CA 93401
2574 Marian Wy
San Luis Obispo, CA 93401
1120 Vista Del Lago
San Luis Obispo, CA 93405
190 Loma Bonita Dr
San Luis Obispo, CA 93401
1234 San Carlos Dr
San Luis Obispo, CA 93401
199 Tango Wy
San Luis Obispo, CA 93401
2664 Flora St
San Luis Obispo, CA 93401
1329 Broad St
San Luis Obispo, CA 93401
1963 Partridge Dr
San Luis Obispo, CA 93405
2400 Loomis St
San Luis Obispo, CA 93405
1957 San Luis Dr
San Luis Obispo, CA 93401
1770 Viewmont St
San Luis Obispo, CA 93401
1480 Monterey St
San Luis Obispo, CA 93401
1144 Chorro St
San Luis Obispo, CA 93401
1649 Mccollum St
San Luis Obispo, CA 93401
1647 Mccollum St
San Luis Obispo, CA 93405
1220 Mill St
San Luis Obispo, CA 93401
333 Luneta Dr
San Luis Obispo, CA 93405
521 Princeton Pl Unit: A
San Luis Obispo, CA 93405
460 Marsh St
San Luis Obispo, CA 93401
1299 Fredericks St
San Luis Obispo, CA 93405
3591 Sacramento Dr Unit: 125
San Luis Obispo, CA 93401
308 San Miguel Ave
San Luis Obispo, CA 93405
1400 Madonna Rd
San Luis Obispo, CA 93405
1335 Tanglewood Dr
San Luis Obispo, CA 93401
374 Ramona Dr
San Luis Obispo, CA 93405
2183 San Luis Dr
San Luis Obispo, CA 93401
77 Chorro St
San Luis Obispo, CA 93405
2330 Santa Ynez Ave
San Luis Obispo, CA 93405
1528 Mill St
San Luis Obispo, CA 93401
171 North Tassajara Dr
San Luis Obispo, CA 93405
424 Higuera St
San Luis Obispo, CA 93401
880 Industrial Wy
San Luis Obispo, CA 93401
1232 Murray Ave Unit: A
San Luis Obispo, CA 93405
248 Memphis Belle Wy
San Luis Obispo, CA 93401
250 Memphis Belle Wy
San Luis Obispo, CA 93401
863 Marsh St
San Luis Obispo, CA 93401
600 Tank Farm Rd
San Luis Obispo, CA 93401
257 Patricia Ct
San Luis Obispo, CA 93405
12424 Los Osos Valley Rd
San Luis Obispo, CA 93405
232 Lincoln Ave
San Luis Obispo, CA 93405
14 Mariposa Dr
San Luis Obispo, CA 93401
215 Kitty Hawk Ct
San Luis Obispo, CA 93401
2094 Mccollum St
San Luis Obispo, CA 93405
1510 Froom Ranch Wy
San Luis Obispo, CA 93405
296 Warren Wy
San Luis Obispo, CA 93405
544 Stoneridge Dr
San Luis Obispo, CA 93401
619 Grove St
San Luis Obispo, CA 93401
200 Foxtrot Ct
San Luis Obispo, CA 93401
4051 Broad St Unit: 120
San Luis Obispo, CA 93401
3427 Roberto Ct Unit: 110
San Luis Obispo, CA 93401
132 Crandall Wy Unit: A
San Luis Obispo, CA 93405
324 Corrida Dr
San Luis Obispo, CA 93401
2501 Broad St
San Luis Obispo, CA 93401
313 Madonna Rd Unit: A
San Luis Obispo, CA 93405
1306 Johnson Ave
San Luis Obispo, CA 93401
2744 El Cerrito
San Luis Obispo, CA 93401
1701 Fixlini St
San Luis Obispo, CA 93401
901 Lawrence Dr
San Luis Obispo, CA 93401
648 Mitchell Dr
San Luis Obispo, CA 93401
2144 Price St
San Luis Obispo, CA 93401
2401 Broad St
San Luis Obispo, CA 93401
670 Branch St Unit: A
San Luis Obispo, CA 93401
261 Cuesta Ave
San Luis Obispo, CA 93405
623 Mitchell Dr
San Luis Obispo, CA 93401
1270 Vista Del Lago
San Luis Obispo, CA 93405
801 Grand Ave
San Luis Obispo, CA 93401
1672 Colina Ct
San Luis Obispo, CA 93401
1323 Garden St
San Luis Obispo, CA 93401
1463 Bishop St
San Luis Obispo, CA 93401
250 Highland Dr
San Luis Obispo, CA 93405
2078 Parker St Unit: 110
San Luis Obispo, CA 93401
1983 Slack St
San Luis Obispo, CA 93405
837 Marsh St
San Luis Obispo, CA 93401
228 Memphis Belle Wy
San Luis Obispo, CA 93401
4300 Broad St
San Luis Obispo, CA 93401
2916 Augusta St
San Luis Obispo, CA 93401
1304 Ella St
San Luis Obispo, CA 93401
647 Higuera St
San Luis Obispo, CA 93401
3596 Broad St Unit: 200
San Luis Obispo, CA 93401
1880 Santa Barbara Avenue
San Luis Obispo, CA 93401
29 Prado Rd
San Luis Obispo, CA 93401
2036 Skylark Ln
San Luis Obispo, CA 93401
980 Church St
San Luis Obispo, CA 93401
864 Mission St
San Luis Obispo, CA 93405
755 Fiero Ln
San Luis Obispo, CA 93401
1344 Mill St Unit: A
San Luis Obispo, CA 93401
254 Memphis Belle Wy
San Luis Obispo, CA 93401
256 Memphis Belle Wy
San Luis Obispo, CA 93401
972 Nipomo St
San Luis Obispo, CA 93401
208 Higuera St
San Luis Obispo, CA 93401
3729 Orcutt Rd
San Luis Obispo, CA 93401
226 Memphis Belle Wy
San Luis Obispo, CA 93401
1910 Chorro St
San Luis Obispo, CA 93401
230 Memphis Belle Wy
San Luis Obispo, CA 93401
1253 Cayucos Dr
San Luis Obispo, CA 93405
223 Kitty Hawk Ct
San Luis Obispo, CA 93401
1953 Oceanaire Dr
San Luis Obispo, CA 93405
217 Kitty Hawk Ct
San Luis Obispo, CA 93401
2023 San Luis Dr Unit: A
San Luis Obispo, CA 93401
956 Pismo St
San Luis Obispo, CA 93401
172 Broad St
San Luis Obispo, CA 93405
773 Johnson Ave
San Luis Obispo, CA 93401
1010 Broad St
San Luis Obispo, CA 93401
230 Memphis Belle Wy
San Luis Obispo, CA 93401
226 Memphis Belle Wy
San Luis Obispo, CA 93401
228 Memphis Belle Wy
San Luis Obispo, CA 93401
237 Catalina Dr
San Luis Obispo, CA 93405
1530 Calle Joaquin
San Luis Obispo, CA 93405
4696 Snapdragon Wy
San Luis Obispo, CA 93401
475 Corrida Dr
San Luis Obispo, CA 93401
1030 Trevor Wy
San Luis Obispo, CA 93401
53 Chorro St
San Luis Obispo, CA 93405
418 Jeffrey Dr
San Luis Obispo, CA 93405
209 Kitty Hawk Ct
San Luis Obispo, CA 93401
3985 Poinsettia St
San Luis Obispo, CA 93401
806 Rougeot Pl
San Luis Obispo, CA 93405
561 Luneta Dr
San Luis Obispo, CA 93405
276 Craig Wy
San Luis Obispo, CA 93405
1190 Buchon St
San Luis Obispo, CA 93401
1727 Chorro St
San Luis Obispo, CA 93401
908 Legacy Ln
San Luis Obispo, CA 93405
1111 Tiburon Wy
San Luis Obispo, CA 93401
345 Grand Ave
San Luis Obispo, CA 93405
241 Hathway St
San Luis Obispo, CA 93405
1950 San Luis Dr
San Luis Obispo, CA 93401
1742 Devaul Ranch Dr
San Luis Obispo, CA 93405
1644 Phillips Ln
San Luis Obispo, CA 93401
1755 Diablo Dr
San Luis Obispo, CA 93405
232 Memphis Belle Wy
San Luis Obispo, CA 93401
1040 Forest St
San Luis Obispo, CA 93405
290 Clover Dr
San Luis Obispo, CA 93405
230 Memphis Belle Wy
San Luis Obispo, CA 93401
226 Memphis Belle Wy
San Luis Obispo, CA 93401
228 Memphis Belle Wy
San Luis Obispo, CA 93401
33 Chorro St
San Luis Obispo, CA 93405
1320 Ironbark St
San Luis Obispo, CA 93401
207 Kitty Hawk Ct
San Luis Obispo, CA 93401
1253 Peach St
San Luis Obispo, CA 93401
1303 Higuera St
San Luis Obispo, CA 93401
1220 Mill St
San Luis Obispo, CA 93401
213 Kitty Hawk Ct
San Luis Obispo, CA 93401
178 Chorro St
San Luis Obispo, CA 93405
1413 Palm St
San Luis Obispo, CA 93406
1426 Monterey St
San Luis Obispo, CA 93401
870 Broad St
San Luis Obispo, CA 93401
166 Los Cerros Dr
San Luis Obispo, CA 93405
1345 Oakwood Ct
San Luis Obispo, CA 93401
561 Lawrence Dr
San Luis Obispo, CA 93401
201 Kitty Hawk Ct
San Luis Obispo, CA 93401
227 Kitty Hawk Ct
San Luis Obispo, CA 93401
244 Memphis Belle Wy
San Luis Obispo, CA 93401
262 Memphis Belle Wy
San Luis Obispo, CA 93401
211 Kitty Hawk Ct
San Luis Obispo, CA 93401
4600 Broad St
San Luis Obispo, CA 93401
1100 Grove St
San Luis Obispo, CA 93401
3419 Roberto Ct
San Luis Obispo, CA 93401
859 Marsh St
San Luis Obispo, CA 93401
700 Grand Ave
San Luis Obispo, CA 93401
120 Venture Dr
San Luis Obispo, CA 93401
1629 Garden St
San Luis Obispo, CA 93401
231 Kentucky St
San Luis Obispo, CA 93405
994 Mill St Unit: 250
San Luis Obispo, CA 93401
677 Lawrence Dr
San Luis Obispo, CA 93401
3427 Roberto Ct
San Luis Obispo, CA 93401
2450 Boulevard Del Campo Blvd
San Luis Obispo, CA 93401
1519 Nipomo St
San Luis Obispo, CA 93401
3981 Steel Wy
San Luis Obispo, CA 93401
1425 Sydney St
San Luis Obispo, CA 93401
233 Sandercock St
San Luis Obispo, CA 93401
344 Henderson Ave Unit: A
San Luis Obispo, CA
2183 San Luis Dr
San Luis Obispo, CA 93401
710 Murray Ave
San Luis Obispo, CA 93401
19 Mariposa Dr
San Luis Obispo, CA 93401
1533 Hillcrest Pl
San Luis Obispo, CA 93401
4165 Bernardo Dr
San Luis Obispo, CA 93401
2886 Rockview Pl
San Luis Obispo, CA 93401
1817 Garden St
San Luis Obispo, CA 93401
840 El Capitan Wy
San Luis Obispo, CA 93401
223 Foxtrot Ct
San Luis Obispo, CA 93401
905 Madonna Road Unit: 28
San Luis Obispo, CA 93405
1963 Devaul Ranch Dr
San Luis Obispo, CA 93405
182 Tango Wy
San Luis Obispo, CA 93401
1155 Oceanaire Dr
San Luis Obispo, CA 93405
3870 Broad St
San Luis Obispo, CA 93401
1588 Eto Cir
San Luis Obispo, CA 93405
225 Foxtrot Ct
San Luis Obispo, CA 93401
206 Foxtrot Ct
San Luis Obispo, CA 93401
669 Palm St
San Luis Obispo, CA 93401
1420 Palm St
San Luis Obispo, CA 93401
1681 Devaul Ranch Dr
San Luis Obispo, CA 93405
1681 Royal Wy
San Luis Obispo, CA 93405
1359 Cavalier Ln
San Luis Obispo, CA 93405
1450 Madonna Rd
San Luis Obispo, CA 93405
1064 Isabella Wy
San Luis Obispo, CA 93405
679 Funston Ave
San Luis Obispo, CA 93401
1422 Monterey St
San Luis Obispo, CA 93401
205 Foxtrot Ct
San Luis Obispo, CA 93401
1753 Tonini Dr
San Luis Obispo, CA 93405
1550 Madonna Rd
San Luis Obispo, CA 93405
1344 Nipomo St
San Luis Obispo, CA 93401
614 Monterey St
San Luis Obispo, CA 93401
211 Foxtrot Ct
San Luis Obispo, CA 93401
207 Foxtrot Ct
San Luis Obispo, CA 93401
205 Foxtrot Ct
San Luis Obispo, CA 93401
225 Foxtrot Ct
San Luis Obispo, CA 93401
219 Foxtrot Ct
San Luis Obispo, CA 93401
213 Foxtrot Ct
San Luis Obispo, CA 93401
1198 Tiburon Wy
San Luis Obispo, CA 93401
2030 Rachel St
San Luis Obispo, CA 93401
1194 Tiburon Wy
San Luis Obispo, CA 93401
1196 Tiburon Wy
San Luis Obispo, CA 93401
227 Foxtrot Ct
San Luis Obispo, CA 93401
1192 Tiburon Wy
San Luis Obispo, CA 93401
11343 Los Osos Valley Rd Unit: A
San Luis Obispo, CA 93405
221 Foxtrot Ct
San Luis Obispo, CA 93401
223 Foxtrot Ct
San Luis Obispo, CA 93401
3981 Steel Wy
San Luis Obispo, CA 93401
667 Monterey St
San Luis Obispo, CA 93401
790 Marsh St
San Luis Obispo, CA 93401
1194 Lexington Ct
San Luis Obispo, CA 93401
4050 Box Spring Rd
San Luis Obispo, CA 93401
990 Palm St
San Luis Obispo, CA 93401
391 Cerro Romauldo Ave
San Luis Obispo, CA 93405
1997 Heirloom Pl
San Luis Obispo, CA 93405
219 Kitty Hawk Ct
San Luis Obispo, CA 93401
221 Kitty Hawk Ct
San Luis Obispo, CA 93401
4535 Wavertree St
San Luis Obispo, CA 93401
1140 Wisteria Ln
San Luis Obispo, CA 93401
1304 Sydney St
San Luis Obispo, CA 93401
3885 South Higuera St
San Luis Obispo, CA 93401
212 Madonna Rd
San Luis Obispo, CA 93405
1321 Garden St
San Luis Obispo, CA 93401
20 Buena Vista Ave
San Luis Obispo, CA 93405
1669 Colina Ct
San Luis Obispo, CA 93401
808 Mission St
San Luis Obispo, CA 93405
33 Chorro St
San Luis Obispo, CA 93405
4051 Broad St
San Luis Obispo, CA 93401
865 Murray Ave
San Luis Obispo, CA 93405
421 Branch St
San Luis Obispo, CA 93401
2081 Sierra Wy
San Luis Obispo, CA 93401
888 Marsh St
San Luis Obispo, CA 93401
84 Benton Wy
San Luis Obispo, CA 93405
362 Islay St
San Luis Obispo, CA 93401
225 Kitty Hawk Ct
San Luis Obispo, CA 93401
1733 Spooner Dr
San Luis Obispo, CA 93405
1735 De Anza Ct
San Luis Obispo, CA 93405
217 Kitty Hawk Ct
San Luis Obispo, CA 93401
223 Kitty Hawk Ct
San Luis Obispo, CA 93401
199 Del Norte Wy
San Luis Obispo, CA 93405
547 Buchon St
San Luis Obispo, CA 93401
1445 Prefumo Canyon Rd Unit: 1
San Luis Obispo, CA 93405
3572 Cedar Ct
San Luis Obispo, CA 93401
123 Buena Vista Ave
San Luis Obispo, CA 93405
832 Marigold Ct
San Luis Obispo, CA 93401
233 Kitty Hawk Ct
San Luis Obispo, CA 93401
235 Kitty Hawk Ct
San Luis Obispo, CA 93401
2220 Exposition Dr Unit: 54
San Luis Obispo, CA 93401
1545 Huckleberry Ln
San Luis Obispo, CA 93401
241 Kitty Hawk Ct
San Luis Obispo, CA 93401
652 Lincoln Ave Unit: A
San Luis Obispo, CA 93405
3850 Long St
San Luis Obispo, CA 93401
238 Memphis Belle Wy
San Luis Obispo, CA 93401
1794 San Luis Dr
San Luis Obispo, CA 93401
236 Memphis Belle Wy
San Luis Obispo, CA 93401
234 Memphis Belle Wy
San Luis Obispo, CA 93401
3160 Johnson Ave
San Luis Obispo, CA 93401
240 Memphis Belle Wy
San Luis Obispo, CA 93401
506 High St
San Luis Obispo, CA 93401
153 Cross St
San Luis Obispo, CA 93401
175 High St
San Luis Obispo, CA 93401
3148 Johnson Ave
San Luis Obispo, CA 93401
629 Mission Ln
San Luis Obispo, CA 93405
1179 Toro St
San Luis Obispo, CA 93401
4363 Sky King Dr
San Luis Obispo, CA 93401
1422 Monterey St
San Luis Obispo, CA 93401
2125 Sierra Wy
San Luis Obispo, CA 93401
525 Marsh St
San Luis Obispo, CA 93401
353 Grand Ave
San Luis Obispo, CA 93405
1480 Monterey St
San Luis Obispo, CA 93401
3480 South Higuera St
San Luis Obispo, CA 93401
11555 Los Osos Valley Rd
San Luis Obispo, CA 93405
256 Memphis Belle Wy
San Luis Obispo, CA 93401
777 Pismo St
San Luis Obispo, CA 93401
3418 Sacramento Dr
San Luis Obispo, CA 93401
101 Bridge St
San Luis Obispo, CA 93401
1688 Mill St Unit: A
San Luis Obispo, CA 93401
424 South St Unit: A
San Luis Obispo, CA 93401
1023 Monterey St
San Luis Obispo, CA 93401
1490 Prefumo Canyon Rd
San Luis Obispo, CA 93405
460 Pacific St
San Luis Obispo, CA 93401
1000 Mill St
San Luis Obispo, CA 93401
234 North Tassajara Dr
San Luis Obispo, CA 93405
213 Kitty Hawk Ct
San Luis Obispo, CA 93401
1642 El Cerrito Ct
San Luis Obispo, CA 93401
207 Kitty Hawk Ct
San Luis Obispo, CA 93401
222 Elks Ln
San Luis Obispo, CA 93401
1545 Higuera St
San Luis Obispo, CA 93401
1037 Tiburon Wy
San Luis Obispo, CA 93401
3561 Johnson Ave
San Luis Obispo, CA 93401
1844 Vicente Dr
San Luis Obispo, CA 93405
1424 Monterey St
San Luis Obispo, CA 93401
1401 Palm St
San Luis Obispo, CA 93401
4051 Broad St Unit: 130
San Luis Obispo, CA 93401
760 Francis Ave
San Luis Obispo, CA 93401
1010 Broad St
San Luis Obispo, CA 93401
2454 Augusta St
San Luis Obispo, CA 93401
2449 Ladera Ct
San Luis Obispo, CA 93401
899 Pacific St
San Luis Obispo, CA 93401
188 Cuesta Dr Unit: A
San Luis Obispo, CA 93405
494 Bluerock Dr
San Luis Obispo, CA 93401
188 Cuesta Dr
San Luis Obispo, CA 93405
240 Memphis Belle Wy
San Luis Obispo, CA 93401
238 Memphis Belle Wy
San Luis Obispo, CA 93401
236 Memphis Belle Wy
San Luis Obispo, CA 93401
234 Memphis Belle Wy
San Luis Obispo, CA 93401
236 Memphis Belle Wy
San Luis Obispo, CA 93401
3105 Arezzo Dr
San Luis Obispo, CA 93401
597 Serrano Dr
San Luis Obispo, CA 93405
888 Marsh St
San Luis Obispo, CA 93401
252 Memphis Belle Wy
San Luis Obispo, CA 93401
242 Memphis Belle Wy
San Luis Obispo, CA 93401
250 Memphis Belle Wy
San Luis Obispo, CA 93401
2668 Flora St
San Luis Obispo, CA 93401
238 Memphis Belle Wy
San Luis Obispo, CA 93401
246 Memphis Belle Wy
San Luis Obispo, CA 93401
248 Memphis Belle Wy
San Luis Obispo, CA 93401
75 Higuera St Unit: 100
San Luis Obispo, CA 93401
4600 Broad St
San Luis Obispo, CA 93401
208 Kitty Hawk Ct
San Luis Obispo, CA 93401
652 Lincoln Ave
San Luis Obispo, CA 93405
1422 Monterey St
San Luis Obispo, CA 93401
525 Dana St
San Luis Obispo, CA 93401
1214 Ella St
San Luis Obispo, CA 93401
133 North Tassajara Dr
San Luis Obispo, CA 93405
3860 Broad St
San Luis Obispo, CA 93401
621 Grove St
San Luis Obispo, CA 93401
575 Stoneridge Dr
San Luis Obispo, CA 93401
3000 Broad St
San Luis Obispo, CA 93401
1029 Chorro St
San Luis Obispo, CA 93401
3961 Sunrose Ln
San Luis Obispo, CA 93401
1760 Royal Wy
San Luis Obispo, CA 93405
857 Casitas Ct
San Luis Obispo, CA 93405
1334 Marsh St
San Luis Obispo, CA 93401
1108 Poppy Ln
San Luis Obispo, CA 93401
370 Lemon St
San Luis Obispo, CA 93405
1108 Poppy Ln
San Luis Obispo, CA 93401
439 San Vincenzo Dr
San Luis Obispo, CA 93401
1530 Calle Joaquin
San Luis Obispo, CA 93405
648 Mitchell Dr
San Luis Obispo, CA 93401
72 Chorro St
San Luis Obispo, CA 93405
189 Cessna Ct
San Luis Obispo, CA 93401
4600 Broad St
San Luis Obispo, CA 93401
1418 Johnson Ave
San Luis Obispo, CA 93401
1957 San Luis Dr
San Luis Obispo, CA 93401
1585 Calle Joaquin
San Luis Obispo, CA 93405
3537 Sycamore Dr
San Luis Obispo, CA 93401
11343 Los Osos Valley Rd
San Luis Obispo, CA 93405
1029 Chorro St
San Luis Obispo, CA 93401
3731 Orcutt Rd
San Luis Obispo, CA 93401
949 Higuera St
San Luis Obispo, CA 93401
1840 Alrita St
San Luis Obispo, CA 93401
1332 Pismo St
San Luis Obispo, CA 93401
248 Memphis Belle Wy
San Luis Obispo, CA 93401
1002 Goldenrod Ln
San Luis Obispo, CA 93401
6055 Lewis Ln
San Luis Obispo, CA 93401
595 Serrano Dr
San Luis Obispo, CA 93405
1499 San Luis Dr
San Luis Obispo, CA 93401
856 Mission St
San Luis Obispo, CA 93405
2414 Johnson Ave
San Luis Obispo, CA 93401
291 Foothill Blvd
San Luis Obispo, CA 93405
1540 Froom Ranch Wy
San Luis Obispo, CA 93405
234 Memphis Belle Wy
San Luis Obispo, CA 93401
157 Del Norte Wy
San Luis Obispo, CA 93405
252 Memphis Belle Wy
San Luis Obispo, CA 93401
240 Memphis Belle Wy
San Luis Obispo, CA 93401
312 Sandercock St
San Luis Obispo, CA 93401
2038 Royal Wy
San Luis Obispo, CA 93405
140 Country Club Dr
San Luis Obispo, CA 93401
244 Memphis Belle Wy
San Luis Obispo, CA 93401
246 Memphis Belle Wy
San Luis Obispo, CA 93401
242 Memphis Belle Wy
San Luis Obispo, CA 93401
855 Mirada Dr
San Luis Obispo, CA 93405
1730 De Anza Ct
San Luis Obispo, CA 93405
174 Tango Wy
San Luis Obispo, CA 93401
1350 Cecelia Ct
San Luis Obispo, CA 93401
250 Memphis Belle Wy
San Luis Obispo, CA 93401
665 Grove St
San Luis Obispo, CA 93401
424 Higuera St
San Luis Obispo, CA 93401
415 Graves Ave
San Luis Obispo, CA 93405
60 Casa St Unit: A4
San Luis Obispo, CA 93405
408 Margarita Ave
San Luis Obispo, CA 93401
248 Almond St Unit: A
San Luis Obispo, CA 93405
1421 Garden St
San Luis Obispo, CA 93401
324 Cuesta Dr
San Luis Obispo, CA 93405
1126 Buchon Unit: A
San Luis Obispo, CA 93401
255 Rosita St
San Luis Obispo, CA 93405
254 Memphis Belle Wy
San Luis Obispo, CA 93401
209 Kitty Hawk Ct
San Luis Obispo, CA 93401
215 Kitty Hawk Ct
San Luis Obispo, CA 93401
2077 Hope St
San Luis Obispo, CA 93405
680 Hill St
San Luis Obispo, CA 93405
2640 Broad St
San Luis Obispo, CA 93401
2357 Banderola Ct
San Luis Obispo, CA 93401
229 Kitty Hawk Ct
San Luis Obispo, CA 93401
243 Kitty Hawk Ct
San Luis Obispo, CA 93401
245 Kitty Hawk Ct
San Luis Obispo, CA 93401
251 Kitty Hawk Ct
San Luis Obispo, CA 93401
247 Kitty Hawk Ct
San Luis Obispo, CA 93401
255 Kitty Hawk Ct
San Luis Obispo, CA 93401
259 Kitty Hawk Ct
San Luis Obispo, CA 93401
424 South St
San Luis Obispo, CA 93401
255 Kitty Hawk Ct
San Luis Obispo, CA 93401
3864 Righetti Ranch Rd
San Luis Obispo, CA 93401
2060 Skylark Ln
San Luis Obispo, CA 93401
278 Memphis Belle Wy
San Luis Obispo, CA 93401
241 Kitty Hawk Ct
San Luis Obispo, CA 93401
421 Branch St
San Luis Obispo, CA 93401
2030 Rachel St
San Luis Obispo, CA 93401
1877 Lima Dr
San Luis Obispo, CA 93405
670 Branch St Unit: B
San Luis Obispo, CA 93401
11990 Los Osos Valley Rd
San Luis Obispo, CA 93405
2945 Mcmillan Ave
San Luis Obispo, CA 93401
1148 Atascadero St
San Luis Obispo, CA 93405
3450 Broad St
San Luis Obispo, CA 93401
524 Dana St
San Luis Obispo, CA 93401
1422 Monterey St
San Luis Obispo, CA 93401
888 Marsh St
San Luis Obispo, CA 93401
12350 Los Osos Valley Rd
San Luis Obispo, CA 93405
561 Branch St
San Luis Obispo, CA 93401
315 Mira Sol Dr
San Luis Obispo, CA 93405
556 Foothill Blvd
San Luis Obispo, CA 93401
237 Kitty Hawk Ct
San Luis Obispo, CA 93401
1908 Chorro St
San Luis Obispo, CA 93401
205 Kitty Hawk Ct
San Luis Obispo, CA 93401
808 Mission St
San Luis Obispo, CA 93405
1 Higuera St
San Luis Obispo, CA 93401
670 Branch St Unit: A
San Luis Obispo, CA 93401
506 High St Unit: A
San Luis Obispo, CA 93401
1426 Monterey St
San Luis Obispo, CA 93401
12350 Los Osos Valley Rd
San Luis Obispo, CA 93405
4029 South Higuera St
San Luis Obispo, CA 93401
1540 Froom Ranch Wy
San Luis Obispo, CA 93405
1127 Fernwood Dr
San Luis Obispo, CA 93401
1703 Chorro St
San Luis Obispo, CA 93401
504 Cuesta Dr
San Luis Obispo, CA 93405
418 Jeffrey Dr Unit: A
San Luis Obispo, CA 93405
1290 Alder Ct
San Luis Obispo, CA 93401
1254 Joyce Ct
San Luis Obispo, CA 93401
2221 King Street Unit: 32
San Luis Obispo, CA 93401
203 Kitty Hawk Ct
San Luis Obispo, CA 93401
241 Westmont Ave
San Luis Obispo, CA 93405
1400 Madonna Rd
San Luis Obispo, CA 93405
1306 Johnson Ave
San Luis Obispo, CA 93401
841 Grove St
San Luis Obispo, CA 93401
1724 Southwood Dr
San Luis Obispo, CA 93401
201 Kitty Hawk Ct
San Luis Obispo, CA 93401
3580 Bullock Ln
San Luis Obispo, CA 93401
748 Marsh St
San Luis Obispo, CA 93401
335 San Miguel Ave
San Luis Obispo, CA 93405
1100 Tank Farm Rd
San Luis Obispo, CA 93401
2800 Broad St Unit: 110
San Luis Obispo, CA 93401
339 Patricia Dr
San Luis Obispo, CA 93405
1200 Monterey St
San Luis Obispo, CA 93401
101 Graves Ave
San Luis Obispo, CA 93405
1620 Chorro St
San Luis Obispo, CA 93401
1421 Hansen Ln
San Luis Obispo, CA 93401
1511 Osos St
San Luis Obispo, CA 93401
258 Memphis Belle Wy
San Luis Obispo, CA 93401
2336 Banderola Ct
San Luis Obispo, CA 93401
1025 Farmhouse Ln Unit: 2F
San Luis Obispo, CA 93401
1185 Pismo St
San Luis Obispo, CA 93401
478 Corrida Dr
San Luis Obispo, CA 93401
274 Craig Wy
San Luis Obispo, CA 93405
262 Memphis Belle Wy
San Luis Obispo, CA 93401
1846 Conejo Ave
San Luis Obispo, CA 93401
333 Elks Ln
San Luis Obispo, CA 93401
184 Twin Ridge Dr
San Luis Obispo, CA 93405
1686 La Vineda Ct
San Luis Obispo, CA 93401
296 Warren Wy
San Luis Obispo, CA 93405
176 Chorro St
San Luis Obispo, CA 93405
189 Cessna Ct
San Luis Obispo, CA 93401
202 Kitty Hawk Ct
San Luis Obispo, CA 93401
203 Kitty Hawk Ct
San Luis Obispo, CA 93401
266 Memphis Belle Wy
San Luis Obispo, CA 93401
254 Memphis Belle Wy
San Luis Obispo, CA 93401
245 Kitty Hawk Ct
San Luis Obispo, CA 93401
243 Kitty Hawk Ct
San Luis Obispo, CA 93401
1430 Tanglewood Ct
San Luis Obispo, CA 93401
255 Memphis Belle Wy
San Luis Obispo, CA 93401
257 Memphis Belle Wy
San Luis Obispo, CA 93401
261 Memphis Belle Wy
San Luis Obispo, CA 93401
253 Memphis Belle Wy
San Luis Obispo, CA 93401
241 Kitty Hawk Ct
San Luis Obispo, CA 93401
249 Memphis Belle Wy
San Luis Obispo, CA 93401
247 Memphis Belle Wy
San Luis Obispo, CA 93401
552 Perkins Ln
San Luis Obispo, CA 93401
251 Kitty Hawk Ct
San Luis Obispo, CA 93401
247 Kitty Hawk Ct
San Luis Obispo, CA 93401
255 Kitty Hawk Ct
San Luis Obispo, CA 93401
268 Memphis Belle Wy
San Luis Obispo, CA 93401
235 Kitty Hawk Ct
San Luis Obispo, CA 93401
233 Kitty Hawk Ct
San Luis Obispo, CA 93401
237 Kitty Hawk Ct
San Luis Obispo, CA 93401
205 Kitty Hawk Ct
San Luis Obispo, CA 93401
229 Kitty Hawk Ct
San Luis Obispo, CA 93401
277 Memphis Belle Wy
San Luis Obispo, CA 93401
251 Memphis Belle Wy
San Luis Obispo, CA 93401
973 Buchon St
San Luis Obispo, CA 93401
2600 Broad St
San Luis Obispo, CA 93401
265 Memphis Belle Wy
San Luis Obispo, CA 93401
273 Memphis Belle Wy
San Luis Obispo, CA 93401
269 Memphis Belle Wy
San Luis Obispo, CA 93401
285 Memphis Belle Wy
San Luis Obispo, CA 93401
4051 Broad St
San Luis Obispo, CA 93401
4051 Broad St Unit: 120
San Luis Obispo, CA 93401
281 Memphis Belle Wy
San Luis Obispo, CA 93401
289 Memphis Belle Wy
San Luis Obispo, CA 93401
293 Memphis Belle Wy
San Luis Obispo, CA 93401
1464 Gulf St Unit: A
San Luis Obispo, CA 93405
1841 Slack St
San Luis Obispo, CA 93405
1843 Slack St
San Luis Obispo, CA 93401
601 Sweeney Ln Unit: C
San Luis Obispo, CA 93401
3156 Johnson Ave
San Luis Obispo, CA 93401
864 Santa Rosa St
San Luis Obispo, CA 93401
3980 Steel Wy
San Luis Obispo, CA 93401
362 Woodbridge St
San Luis Obispo, CA 93401
3160 Johnson Ave
San Luis Obispo, CA 93401
3152 Johnson Ave
San Luis Obispo, CA 93401
1469 Hansen Ln
San Luis Obispo, CA 93401
253 Elks Ln
San Luis Obispo, CA 93401
1028 Chorro St
San Luis Obispo, CA 93401
3355 Broad St
San Luis Obispo, CA 93401
3584 Bullock Ln
San Luis Obispo, CA 93401
3580 Bullock Ln
San Luis Obispo, CA 93401
888 Marsh St
San Luis Obispo, CA 93401
424 Higuera St
San Luis Obispo, CA 93401
171 North Santa Rosa St Unit: A
San Luis Obispo, CA 93405
53 Chorro St
San Luis Obispo, CA 93405
505 Princeton Pl
San Luis Obispo, CA 93405
3850 Long St Unit: 100
San Luis Obispo, CA 93401
325 Cerro Romauldo Ave
San Luis Obispo, CA 93405
1407 Cazadero St
San Luis Obispo, CA 93401
2357 Banderola Ct
San Luis Obispo, CA 93401
1540 Froom Ranch Wy
San Luis Obispo, CA 93405
1192 Tiburon Wy
San Luis Obispo, CA 93401
3049 Arezzo Dr
San Luis Obispo, CA 93401
1292 San Mateo Dr
San Luis Obispo, CA 93401
1555 Cordova Dr
San Luis Obispo, CA 93405
1444 Higuera St Unit: A
San Luis Obispo, CA 93401
1109 Kendall Rd
San Luis Obispo, CA 93401
227 Kitty Hawk Ct
San Luis Obispo, CA 93401
1513 Eto Cir
San Luis Obispo, CA 93405
25 Buena Vista Ave
San Luis Obispo, CA 93405
2083 Cypress St
San Luis Obispo, CA 93401
260 Memphis Belle Wy
San Luis Obispo, CA 93401
225 Kitty Hawk Ct
San Luis Obispo, CA 93401
294 Lincoln Ave
San Luis Obispo, CA 93405
4805 Morabito Pl
San Luis Obispo, CA 93401
990 Palm St
San Luis Obispo, CA 93401
268 Memphis Belle Wy
San Luis Obispo, CA 93401
266 Memphis Belle Wy
San Luis Obispo, CA 93401
80 Benton Wy
San Luis Obispo, CA 93405
2250 King Street
San Luis Obispo, CA 93401
1630 Fairview St
San Luis Obispo, CA 93401
1236 West Newport St Unit: A
San Luis Obispo, CA 93405
268 Memphis Belle Wy
San Luis Obispo, CA 93401
266 Memphis Belle Wy
San Luis Obispo, CA 93401
264 Memphis Belle Wy
San Luis Obispo, CA 93401
12350 Los Osos Valley Rd
San Luis Obispo, CA 93405
337 High St
San Luis Obispo, CA 93401
3825 South Higuera St
San Luis Obispo, CA 93401
215 Meissner Ln
San Luis Obispo, CA 93401
1549 Mill St
San Luis Obispo, CA 93401
2060 Hope St
San Luis Obispo, CA 93405
1111 Fernwood Dr
San Luis Obispo, CA 93401
159 North Tassajara Dr
San Luis Obispo, CA 93405
2299 Santa Ynez Ave
San Luis Obispo, CA 93405
1945 Oceanaire Dr
San Luis Obispo, CA 93405
228 Daly Ave
San Luis Obispo, CA 93405
2126 Price St
San Luis Obispo, CA 93401
972 Nipomo St
San Luis Obispo, CA 93401
264 Memphis Belle Wy
San Luis Obispo, CA 93401
115 Mustang Dr
San Luis Obispo, CA 93405
1656 Monterey St
San Luis Obispo, CA 93401
848 Monterey St
San Luis Obispo, CA 93401
1210 Carmel St
San Luis Obispo, CA 93401
1280 Bond St
San Luis Obispo, CA 93405
522 Broad St
San Luis Obispo, CA 93405
900 Southwood Dr
San Luis Obispo, CA 93401
1895 Partridge Dr
San Luis Obispo, CA 93405
1422 Monterey St
San Luis Obispo, CA 93401
1815 Sydney St
San Luis Obispo, CA 93401
333 Tolosa Wy
San Luis Obispo, CA 93405
1209 Vista Del Lago
San Luis Obispo, CA 93405
1450 Madonna Rd Unit: A
San Luis Obispo, CA 93405
1221 Calle Joaquin
San Luis Obispo, CA 93405
352 Foothill Blvd Unit: A
San Luis Obispo, CA 93401
354 Foothill Blvd
San Luis Obispo, CA 93405
208 Kitty Hawk Ct
San Luis Obispo, CA 93401
380 Christina Wy Unit: A
San Luis Obispo, CA 93405
221 Kitty Hawk Ct
San Luis Obispo, CA 93401
219 Kitty Hawk Ct
San Luis Obispo, CA 93401
1637 Southwood Dr
San Luis Obispo, CA 93401
202 Kitty Hawk Ct
San Luis Obispo, CA 93401
236 Hermosa Wy
San Luis Obispo, CA 93405
89 Palomar Ave
San Luis Obispo, CA 93405
398 San Miguel Ave
San Luis Obispo, CA 93405
1429 Parsons Wy
San Luis Obispo, CA 93401
1213 West Newport St Unit: A
San Luis Obispo, CA 93405
211 Kitty Hawk Ct
San Luis Obispo, CA 93401
134 Tank Farm Rd
San Luis Obispo, CA 93401
1104 Iris St
San Luis Obispo, CA 93401
134 Tank Farm Rd
San Luis Obispo, CA 93401
1238 Coral St Unit: A
San Luis Obispo, CA 93405
260 Westmont Ave Unit: A
San Luis Obispo, CA 93405
344 Henderson Ave
San Luis Obispo, CA 93405
1552 Oceanaire Dr
San Luis Obispo, CA 93405
864 Mission St
San Luis Obispo, CA 93405
1105 Vista Del Lago
San Luis Obispo, CA 93405
3485 Sacramento Dr Unit: E
San Luis Obispo, CA 93401
1029 Chorro St
San Luis Obispo, CA 93401
1350 Marsh St
San Luis Obispo, CA 93401
1370 Broad St
San Luis Obispo, CA 93401
313 Madonna Rd
San Luis Obispo, CA 93405
12300 Los Osos Valley Rd
San Luis Obispo, CA 93405
312 Luneta Dr Unit: A
San Luis Obispo, CA 93405
1304 Sydney St
San Luis Obispo, CA 93401
264 Memphis Belle Wy
San Luis Obispo, CA 93401
1796 Corralitos Ave
San Luis Obispo, CA 93401
259 Kitty Hawk Ct
San Luis Obispo, CA 93401
2442 Boulevard Del Campo Blvd
San Luis Obispo, CA 93401
263 Memphis Belle Wy
San Luis Obispo, CA 93401
4698 Poinsettia St
San Luis Obispo, CA 93401
1940 San Luis Dr
San Luis Obispo, CA 93401
64 Broad St
San Luis Obispo, CA 93405
460 Pacific St Unit: A
San Luis Obispo, CA 93401
2220 Exposition Dr Unit: 97
San Luis Obispo, CA 93401
1222 Mill St Unit: 100
San Luis Obispo, CA 93401
777 Pismo St
San Luis Obispo, CA 93401
2830 Flora St
San Luis Obispo, CA 93401
134 Tank Farm Rd
San Luis Obispo, CA 93401
3977 South Higuera St
San Luis Obispo, CA 93401
1545 Oceanaire Dr
San Luis Obispo, CA 93405
1652 Encino Ct
San Luis Obispo, CA 93401
Permit Valuation
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
24906
4350
64000
29700
0
71000
13000
500
20000
0
0
18400
2500
0
0
14000
0
0
2600
20000
0
0
15000
0
12000
2600
0
2060
0
1200000
0
2600
0
0
18560
0
0
0
15000
27580
15000
11000
20000
21000
2000
18900
19011
0
500
22492.51
0
0
3000
0
500
17800
58645
0
0
10000
47534
0
0
0
12000
33764.5
0
35000
2300
5426.64
3000
0
14000
2700
10360
7000
34000
0
41000
0
0
0
5000
4944
20000
4800
6684.44
39059
4408
5000
820
3000
2100
11000
20300
17127
3000
12265
0
13500
2000
100000
10000
15000
19700
0
2000
15000
24698.5
2700
9803
7122
15000
25000
0
15000
0
85000
4500
0
3500
0
0
6000
0
5000
2000
0
11888
3800
750
0
0
0
13925.5
6000
0
0
0
0
11000
2500
26238
1683.17
8000
34000
36276
0
20200
1207.51
0
5000
0
5000
0
0
26794
2000
0
20000
35944
0
11000
500
15000
0
19464
37054
30165
0
0
0
0
0
0
50000
19071
15000
2300
0
22127
7000
1120
70000
2500000
76000
0
0
21141
0
0
37921
44000
0
35580
2700
5000
20000
23020
2897.19
0
13500
2800
0
15636
12000
4700
25000
2500
5000
0
0
0
14167
1200
10000
0
45000
24950
0
0
900000
0
0
15000
160000
20000
13387
2800
0
2500
2500
18560
12000
0
18480
0
0
0
25000
0
0
10000
10000
200
2000
2400
2500000
22843
10800
34269
15569
5500
35000
4000
2220
18700.78
49343
0
100000
2300
4500
16400
0
2900
0
14011
0
18000
1200
0
11000
0
0
2023
0
2700
5000
11000
3000
0
20232
1000
35000
1000
18480
20000
10000
77970
3500
12000
1200
5081.53
0
20000
1120
640000
0
5000
75000
0
12000
5000
16900
0
3000
7340.31
0
99100
0
1105.31
10950
11900
1500
350000
225000
100000
50000
220000
1500
150000
1500
1500
3800
18550
150000
0
0
3000
8000
40000
13250
0
20000
100000
20000
0
0
35000
0
7500
21495
20000
8899
0
0
3800
27717
50000
5000
0
0
27000
20000
0
2765
0
100000
0
3900
0
0
1100
6850
8600
12000
140000
0
4250
500
11208
11000
4500
20000
0
10000
20000
0
6650
5000
0
28960
6200
7450
75000
2700
16200
15000
0
0
0
3250
4620
1200
0
0
11000
35000
5900
10000
12000
24940
19464
80000
15000
23827
25000
20000
450
0
3600
3500
0
22069.12
2400
3000
7300
66900
16815.95
3550
6200
30000
330500
3500
2000
15000
3600
12000
19000
0
0
5750
7597.73
6500
0
6250
7129.29
20000
40
5550
10500
4000
10200
0
4850
6200
628855
10000
5150
4000
0
20000
20000
3500
25000
11000
0
6200
4500
0
13000
0
3000
6600
2000
0
2500
0
0
25000
44940
50000
2000
0
0
28960
160000
4210
0
30000
0
0
20200
0
0
500
35000
0
40000
0
100000
0
0
15000
7500
0
0
0
3500
21290
0
2500
0
0
4900
0
20000
2800
15000
0
0
0
8000
21495
15500
0
30000
28544.55
0
45000
0
8975
0
3000
20000
3910
58247
35000
31237.5
3500
0
0
27554
159100
3000
20000
2800
0
16000
0
20480
0
15650
0
13995
6240
4000
10000
2000
32722.57
0
0
30359
0
0
6000
0
0
120000
27505
24312
400000
3000
0
0
0
0
4100
0
2300
0
0
30000
30444
9000
0
32825
14000
0
2404.05
0
0
0
2565
7500
0
0
0
0
151138
19312
9543
19001.25
4900
0
6500
7500
0
0
0
0
3000
0
1200000
5000
4196
8200
19000
1000
0
0
0
9000
10000
0
0
0
0
4262.5
0
7500
2599
0
30000
2700
0
35000
0
0
37102
75968
5800
8000
26543
0
10000
5000
15000
0
0
6900
14936
39755
35000
5000
0
11000
3000000
1000
10000
0
0
500
0
0
0
300000
10000
23000
3000
0
20480
0
0
0
0
14011
35004.59
0
28960
0
119168
35000
0
0
64016
0
2650
11000
50000
1000
0
7500
0
0
3807.42
0
34138
0
0
0
0
0
7300
0
0
0
6700
0
0
0
2500
36152.64
2400
0
6000
0
0
2000
0
0
16000
10000
24150
15000
15000
0
47481
30000
3944
2000
17386.5
0
0
2621
0
6200
0
5000
2700
20689
0
0
22700
3000
1500
16981
0
0
36000
40295.28
0
10000
0
5000
10000
7000
12386.5
0
20464.5
0
1800
8345
0
0
0
0
2600
0
0
2000
33950
0
0
0
0
0
0
15000
0
2000
0
0
0
0
0
0
0
0
7444
15000
0
4900
2000
17386.5
32000
0
9500
2700
0
0
0
0
25000
11000
0
3000
2650
5000
0
0
2500
18560
0
15000
15000
0
2884
7000
2500
5000
2400
10000
1200
2500
20000
2500
2400
1250
0
28300
2400
2400
0
0
15000
2650
0
13925.5
67000
2300
13254
2500
0
0
11574
22100
1750000
9000
40850
7000
2000
20000
38846
2750
4000
15000
13941
3965
2800
0
0
0
2700
393
10150
0
4000
0
44864
0
0
0
45478
0
15000
16000
5000
18144
35000
0
17000
2500
18400
4125
0
14000
20000
3500
0
0
13232
0
0
120000
35000
0
0
7500
0
22800
0
0
0
0
30000
12000
44940
14011
2650
0
5500
10000
19312
0
0
11000
2000
0
1500
0
20000
0
3933
2650
21022
11000
1800
0
0
75000
200000
15000
400000
10000
20000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
10000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
800000
0
0
0
0
0
747705
0
0
0
0
26100
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
17000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
15000
0
0
0
0
0
0
0
3500
4500
14000
25000
0
9325
20000
42000
0
0
0
0
0
25000
84000
0
20000
0
0
75000
8800
190000
9972.18
181100
0
150000
8000
1150000
0
0
799
33033
37584
0
8970
0
0
10000
15464.5
19856
0
0
74986
100000
100000
100000
100000
100000
19000
57000
0
5000
45624
0
13232
15000
6500
1525
3200
1000
23500
0
1500
100000
60044
0
119398
5800
0
12265
12000
0
28000
50000
30000
70000
0
0
0
122420
0
0
100000
100000
100000
100000
100000
100000
100000
15000
100000
100000
100000
100000
100000
100000
100000
100000
200000
50000
100000
100000
100000
0
100000
0
100000
100000
100000
100000
100000
100000
100000
0
0
0
0
75000
75000
74000
5678.14
30359
30000.06
0
20000
0
30742
11000
12000
17495
0
0
5000
0
190000
0
0
20000
0
0
0
2000
7800
18560
0
0
0
81900
20000
90000
21277
2000
48943
28550
13150
300
20676
5000
16600
14724
14444
27390
7150
150000
17142
0
0
0
0
0
0
0
3500
6500
0
0
0
44000
0
0
5000
0
0
0
0
150000
0
0
30000
5000
15000
2000
30000
2900
225000
2500
2600
13000
0
140000
0
300000
4000
12000
0
30550
4000
2800
4000
227300
9975
9250
118000
10000
0
0
0
64234
9000
8300
7000
9000
0
150000
0
25000
6400
0
100000
0
0
26800
12000
0
0
2300
0
3683.06
17000
5000
4200
0
0
175000
100000
0
176594
0
125000
2300
2300
0
0
0
0
2300
5000
2300
0
12000
3738
13000
2500
0
2000
6401.24
5321.58
0
10000
10000
10000
2000
7530
18768
10000
8000
1499
0
500000
12000
5000
2000
7000
40000
120000
20000
21750
2200
500000
900
30000
7000
17868
28159.5
12000
1500
5000
160900
170800
160900
175
22348
13000
30089.46
24968
157500
13000
200000
0
0
10000
6900
23720
0
11000
12000
12000
10000
11000
0
30000
0
158123
0
0
250000
100000
44800
165000
700000
25000
1000
26379
30000
3765
75000
450000
250000
29138.18
23000
44940
36240
3000
22390
12000
2900
3800
30000
2650
268199
5300
28000
11000
5142
19380
14011
18560
19380
100000
27000
31820
34000
25770
20480
40000
61000
0
2700
2700
2500
2700
2700
2600
5500
3000
5500
5500
2400
5500
1200000
2500
2600
20000
150000
24000
50000
30000
0
10000
14381.44
10000
12000
13000
11300
6456.73
23812.1
34000
120000
0
45293
2000
2000
0
200
9500000
20802.96
0
15060
9975
100000
200000
10000
0
0
2929
2200
190000
170800
5000
2650
3000
22906
2669.25
29138
181100
206600
2000
24464
0
190000
300000
37455
81900
25376
160900
170800
0
116900
3000
0
20560
25685
25000
0
1200
0
0
0
775000
0
0
0
0
0
0
160900
0
2900
0
118000
320000
0
0
0
0
0
369810
181100
0
190000
428405.61
0
3000
0
4500
36467
3900000
600000
76250
3450
0
50000
37461
0
81000
22690
9000
9000
9000
2300
10000
10000
2918
475000
100000
12000
11000
12000
0
2000
12000
11000
0
0
5125
11000
0
0
0
0
40000
0
0
0
1800
3500
19500
21035
500000
15000
20000
5300
13688
0
8900
6900
7400
5000
15000
2000
23000
225000
2100
30439
20000
0
151137
0
6500
131400
20480
1200000
80000
500
250000
1500
0
2000
190000
2200
15000
0
0
0
0
500000
652735
2300
40000
227300
2100
2534.69
16996
11345
0
206600
227300
181100
12056
2650
2234
5695
206600
0
0
200000
300000
100000
69179
85000
2000
40000
150000
5000
170800
206600
206600
4000
71000
20000
32499
181100
227300
170800
181100
170800
181100
190000
0
0
2785
5500
0
0
320000
850000
16000
150000
293430
3900
5000
9500000
50000
0
100000
68000
400000
11645
2000
190000
4500
170800
0
0
0
0
110000
9000000
5000
0
20000
0
0
0
500000
0
0
1750
206600
13896.72
0
0
0
40000
181100
0
0
0
0
74000
0
0
0
0
3500
51939
5000
160900
18688
3465
4500
19011
0
170800
100000
0
13000
24660
3000
0
20000
11000
12000
9000
10000
13000
13000
112000
20000
20000
20000
20000
15000
13000
13000
2500
13000
13000
13000
9000
15000
15000
15000
13000
15000
20000
13000
0
20000
20000
20000
20000
20000
7000000
1000000
20000
20000
20000
0
635400
250000
5000
26500
0
805425
1500
0
0
26000
25000
525000
1005234
2500
8000
15000
15000
100000
200000
450000
17868
10000
63000
400000
0
10000
9209257
1200000
550
4000
48000
700000
2300000
206600
96000
0
0
116900
170800
100000
7000000
0
116900
81900
390000
0
0
50000
2100
2000
2300
500000
450000
357251
0
94000
0
5000
1000
1499
0
10000
11679
15648
0
10000
0
76051
1787
250000
200000
5000
0
46400
0
0
1000
900
0
250000
150000
268000
118000
190000
100000
227300
170800
38359
190000
5000
100000
150000
525000
185000
190000
3000
6000
3500
0
50000
80000
0
5300
21380
30000
38000
0
2000
7000
0
105000
50000
68000
2000
160900
90000
15000
37770
20000
3500
0
300000
100000
16000
225000
8000
17000
8900
500000
2500
0
Permit Description
Sprouse Communication for Charter-Spectrum to overlash fiber on existing poles. Standard working hours are 7am-4pm. No new poles or anchors are permitted with this work. Permittee must
obtain permission from the utility pole owner(s)/PG&E to attach. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be
per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35661544. PG&E to perform minor service install. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and
pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working
day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 2010338. PG&E to trim trees. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls
must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work
and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 2010338. PG&E to perform routine tree maintenance. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per
the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working
day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
SoCal Gas NOT # 2043562317. SoCal Gas to perform service replacement. Work requires (1) 4'x3' asphalt cut. All work to be done to City Standard Specifications & Engineering Standards.
Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and
one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 2010338. PG&E to perform routine tree maintenance at multiple locations. Working hours at some locations are restricted to what is listed on the attached traffic control plan.
All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD
Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is
responsible for calling for final inspection so the permit can be closed.
PG&E PM # 2010338. PG&E to trim trees. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached
plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Tree trimming at multiple locations along Higuera. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved
and attached plans and City Appendix G & MUTCD Standards. Call Eric Baker at 805-781-7014 two working days prior to the start of work and one working day prior to each subsequent inspection.
Permittee is responsible for calling for final inspection so the permit can be closed.
SoCal Gas work order # 520003557851. SoCal Gas after-the-fact permit for emergency leak repair. Work requires (1) 6'x6' concrete cut. Final paving is required for this permit to be finaled.
All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection
hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection
so the permit can be closed.
PG&E PM # 2010338. PG&E to trim tree near overhead lines. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and
pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior
to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
AT&T job # A05ATHE. AT&T to access manhole # 3208, pole # 01336, and FAP. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls
must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work
and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 2010338. PG&E to perform routine tree trimming and maintenance at multiple locations. All work to be done to City Standard Specifications & Engineering Standards. Traffic and
pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior
to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35643988. PG&E to install fault indicators. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix
G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee
is responsible for calling for final inspection so the permit can be closed.
AT&T job # A05AEJ6. AT&T to remove old pole tags to newly placed poles. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and
one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35655161. PG&E to remove and install anchors and down guys and reframe poles. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering
Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554
two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E after-the-fact permit for emergency tree trimming. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City
Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection.
Permittee is responsible for calling for final inspection so the permit can be closed.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Contact City Public Works inspector James Yanez at 805-503-8011 to coordinate job inspections and information. Permittee is responsible for
calling for final inspection so the permit can be closed. Also, please call James Yanez at 805-503-8011 to coordinate wye installation two working days in advance. A separate encroachment
permit will need to be pulled, with fees, if the work is not completed by August 8, 2025 to be in advance of CIP Spec. 2000539 project.
Silt Removal 2025 project, Specification No. 2000198-3. All work to be done per City CIP Specification No. 2000198-3 and City Standard Specifications & Engineering Standards. A traffic
and pedestrian control plan must be submitted, reviewed, and approved prior to each phase of the work. Traffic and pedestrian controls must be per an approved plan and City Appendix
G & MUTCD Standards. Contact City Public Works inspector Trae Christensen at 805-458-1339 to coordinate job inspections and information. Permittee is responsible for calling for final
inspection so the permit can be closed.
Madonna Rd and Caltrans driveway streetlight repair. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian
controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start
of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
SoCal Gas to drill two 1/2" holes for surveying. This work must be performed at night. A separate night work permit is required from the Planning Division. Public Works overtime inspection
fees must be paid in advance of the work. A check for 8 hours of Public Works overtime inspection fees has been received. Must schedule work ahead of time with the Public Works inspector.
All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD
Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is
responsible for calling for final inspection so the permit can be closed.
PG&E PM # 2010338. PG&E to perform routine maintenance for tree trimming. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls
must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work
and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PV Roof Mount 5.74KW, 14 Modules, 2 Inverter, 2 Tesla PW3 ESS
Install EV Charger level 2 (1), 125A Garage Sub Panel
18.36kW Photovoltaic System W/
40.5kWh ENERGY STORAGE SYSTEM
roof Mounted, Grid-Tied
Four pedestrian gates and one vehicle entry gate at 1321 Osos. 45 linear feet to match black wrought iron fencing next door at SLO Adventist Church at 1301 Osos. The walkway between
church and building will remain open.
INSTALL 3 UNDER CABINET LEDL IGHTS TO EXISTING CIRCUIT & SWITCH - WITHDRAWN PER APPLICANT
Roof Mounted 10.32 kW PV System with (2) ESS and (2) ESS Expansion Packs
Installation of 10 425watt modules with 5 DS3-S micro inverters
Add 2 Heads for Remodel of home
Replace rotted beam & framing, reinstall stucco & lath waterproofing
REMOVING 36' OF EXISTING SEWER LINE
Solar installation: System Size: 7.360KW (16) Modules (16) Microinverters (3) Batteries
EV Charger
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate
wye installation two working days in advance.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate
wye installation two working days in advance.
TWO SETS OF LED CHANNEL LETTERS ATTACHED TO FRONT AND BACK OF SUITE
Place U-haul storage containers in public right-of-way. Anticipated dates are: 08/16/25-08/21/25, however, permit is to remain open until 08/29/25 in case of delays. U-haul containers
must be maintained in a clean and safe manner. U-haul containers must be reflectorized. A copy of this permit must be placed on the U-haul containers. All work to be done to applicable
City Standard Specifications & Engineering Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline
after the U-haul containers are removed so the permit can be closed.
Replace sewer lateral to the main in back of the property via trenching. A separate building permit is required for any sewer lateral replacement on private property. All work to be
done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline
at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the
permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance.
MASTER PLOT PLAN (PERMIT#FIRE-0705-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 217; PLOT PLAN 3; TRACT 3089
Installation of a 5.4 kW-DC PHOTOVOLTAIC SYSTEM using: (12) CANADIAN SOLAR CS6.1-54TM-450H + (12) ENPHASE IQ8PLUS-72-2-US
<On 11/13/25, permit updated to include additional scope of work. TCP attached.> AT&T job # A02CZS5. AT&T to trench and place CPC from cabinet to existing pole. Accessing manholes #
1032 and 1018 and pole # 01805. Must pothole all utilities being crossed. Must install 7' below the top of curb or 3' below the deepest utility being crossed, whichever is deeper. No
new poles or anchors are permitted with this work. Permittee must obtain permission from the utility pole owner(s)/PG&E to attach. All work to be done to City Standard Specifications
& Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline
at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the
permit can be closed.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate
wye installation two working days in advance.
Addition of one 13.5 kWh (ESS) Energy Storage System and associated hardware to the main dwelling unit
TEMPORARY POWER POLE
REROOF REPLACE SHINGLES AND SHEATHING
MASTER PLOT PLAN (PERMIT#FIRE-0705-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 211; PLOT PLAN 3; TRACT 3089
Replace double check backflow preventer in planter on private property for 223 and 233 Granada. All work in on private property. Standard working hours are 7am-4pm. A pre-construction
meeting with the Public Works inspector is required. All work to be done per approved plans FIRE-0937-2025 and City Standard Specifications & Engineering Standards. Traffic and pedestrian
controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior
to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Install 32A Tesla Universal Wall Connector on interior of garage on 40A circuit.
Renovation of existing handball structure (2,862 SF) into a community center for apartment complex.
Replace sewer lateral to the main using trenchless technology on Broad. Trenchless lateral replacements require a video submittal to be emailed after replacement. A separate building
permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls
must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each
subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to
coordinate wye installation two working days in advance.
Install 48A Tesla Wall Connector on interior of garage on 60A circuit.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements require a video submittal to be emailed after replacement. A separate building permit is
required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be
per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate
wye installation two working days in advance.
PV solar roof mount, 8 modules, 3.28kw, comp. shingle, existing main 100A, SolarEdge Battery with BUI, 125A loads panel
Remove and replace driveway approach, and sidewalk at 859, 867, and 875 Mission. This work is in response to a Notice to Correct (NTC) for all addresses. All work to be done to City
Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554
two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and
one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection
hotline at 805-781-7554 to coordinate wye installation two working days in advance.
ADDITION OF ONE NEW 13.5KW (ESS) ENERGY STORAGE SYSTEM AND ASSOCIATED HARDWARE TO THE MAIN DWELLING UNIT
PV Roof Mount 8.2KW, 20 Modules, 1 Inverter, 1 Tesla PW3 ESS, 1 Tesla PW3 Expansion
INSTALLATION OF ONE 13.5 KWH (ESS) ENERGY STORAGE SYSTEM, AND ASSOCIATED HARDWARE TO THE MAIN DWELLING.
Project address: 228 FOXTROT COURT, SAN LUIS OBISPO, CA, 93401. Avila Ranch Lot 225. Installation of a 4.95 kW-DC PV System, using (11) CANADIAN SOLAR MODULES + (11) ENPHASE Microinverters.
Residential Roof Mounted Solar (PV) 4.8kwDC and (1) ESS
5.94kW Photovoltaic System W/
13.5kWh ENERGY STORAGE SYSTEM
roof Mounted, Grid-Tied
(1) ev charger
New SFR 13D Fire Sprinkler system for a n existing residence with a new addition.
Replace gas furnace with ducted heat-pump, like for like; existing location
PV Roof Mount 3.69KW, 9 Modules, 1 Tesla PW3 with integrated inverter, 1 Tesla PW3 Ex pack
Installation of Enphase IQ 50 EV Charger with J1772 Connector.
Supply and Install (3) Replacement Windows into EXISTING Openings. No opening modifications to be made.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection
Hotline at (805) 781-7554 at least 24 hours in advance.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements require a video submittal to be emailed after replacement. A separate building permit is
required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be
per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate
wye installation two working days in advance.
MPU New 200amp panel
Voluntary Seismic Retrofit In
Accordance With Plan Set (A)
ADD EXT RECEPTICAL PLUS REROUTE ONE BRANCH CIRCUIT
12 - 400W Solar Panels (4.8kW PV )
12 - Enphase Microinverters
1 - 15kWh battery
Install 13.53kW DC roof mount Photovoltaic System and Energy Storage System (2)
Bore and trench Level 3 Communications - Lumen conduit across Broad Street. Remove and replace full panels of sidewalk. Excavate approximately five 3'x5' potholes to repair sections
of conduit. Place new vault. Tie into Level 3 conduit and existing vault. Access Level 3 vaults and manholes. All work to be done per the approved plans and City Standard Specifications
& Engineering Standards. Traffic and pedestrian controls must be per the approved plan and City Appendix G & MUTCD Standards. 40 hours of Public Works overtime inspection fees have
been received for night-work. Must confirm night-work inspection coverage in advance; also, call the Public Works inspection hotline at 805-781-7554 two working days prior to the start
of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
REPLACE SEWER LATERAL TO CITY MAIN SEWER
Install 7.04kW DC roof mount Photovoltaic system, Energy Storage (1), Electric Vehicle Charger (1)
Project address: 219 FOXTROT COURT, SAN LUIS OBISPO, CA, 93401. Avila Ranch Lot 212. Installation of a 5.4 kW-DC PV System, using (12) CANADIAN SOLAR MODULES + (12) ENPHASE Microinverters.
PV Roof Mount 11.455KW, 29 modules, 1 Inverter, 1 Tesla PW3 ESS, 1 Tesla PW3 Expansion pack
LIKE FOR LIKE REPLACEMENT OF 8 COLUMNS (FIRST AND SECOND FLOOR), HANDRAIL REFRAMING
MASTER PLOT PLAN (PERMIT#FIRE-0700-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 245; PLOT PLAN 3; TRACT 3089
Voluntary Seismic Retrofit in
Accordance with Plan Set (A)
Electrical Panel upgrade from 100 amp to 200 amp
Replace 28' of sewer line from house to inside of garage using 3' ABS sewer pipe. Excavate ground from house to garage wall, cut and remove section of concrete floor inside garage. Reinstate
concrete floor once sewer line is replaced.
MASTER PLOT PLAN (PERMIT#FIRE-0706-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 220; PLOT PLAN 4; TRACT 3089
REPLACE SEWER LATERAL TO EXISTING PVC RISER
PROVIDED BY CITY OF SLO BEHIND NEW RETAINING WALL
2.55KW roof top photovoltaic
Re-Roof the existing roof on the main living structure.
UPDATE ELECTRICAL PANEL AND PLUMBING LEAK
Install 3.05kw solar system, 7 panels 7 Micro-Inverters, 2 Enphase batteries
Replace sewer lateral to the main using trenchless technology. Also, bore a new 1" water service lateral to serve a future water meter. A separate utility work-order with separate fees
must be obtained from the Building Division prior to placement of the water meter. Trenchless lateral replacements require a video submittal to be emailed after replacement. A separate
building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian
controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior
to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554
to coordinate wye installation two working days in advance.
DECK REPAIR - UNIT D
Modify existing Ansul system MFG date 2017
hood 8"x54" , duct 14"
Appliances:
Fryer 23"×14"
griddle 24"x20"
salmander above griddle 8"X24"
6B Range 36"x24" back self
pasta cooker
Connecting Gas Valve to Ansul System with Conduit & Cable
Add Link Detection Bracket & Link at End of Line
Add Link Detection Bracket & Link in middle of existing Link Brackets x2
Add Nozzle to existing Branch Line (or Plenum/ Duct) x3
Connect new Appliance Nozzle (or Plenum/ Duct) to Main Hood Supply above Hood x 3
manual pull station is not on the way of egress need to be relocated to other side of the hood.
customer is removing pasta cooker and put a stock pot instead need to add two more nozzle
Tenant Improvement to add chiropractic treatment rooms.
Install 48A Tesla Universal Wall
Connector on exterior of garage
on 60A circuit.
Voluntary Seismic Retrofit In
Accordance with Plan Set (A)
PV Roof Mount 8.61KW, 21 Modules, 2 Inverter, 2 Tesla PW3 ESS, 1 Expansion, MPR
Replace existing 100A main electrical panel with new 200A panel in same location.
Work includes new breakers, grounding, and reconnection of existing circuits.
No relocation of service equipment. Standard panel swap for residential use.
Repair Damage from Vehicle at area between front door and window in studio apartment at 1116 #B Orcutt Rd
WATER HEATER REPLACEMENT AND WATER SUPPLY LINES REPLACEMENT
LIKE FOR LIKE WATER HEATER REPLACEMENT. REPLACE 50 G NATURAL GAS WATER HEATER IN EXISTING LOCATION
Install 40A Tesla Wall Connector on interior of garage on 50A circuit.
Project address: 236 FOXTROT COURT, SAN LUIS OBISPO, CA, 93401. Avila Ranch Lot 222. Installation of a 4.95 kW-DC PV System, using (11) CANADIAN SOLAR MODULES + (11) ENPHASE Microinverters.
PV SRM 3.28KW, (8)Modules, (2)ESS
PV Roof Mount 5.33KW, 13 Modules, 1 Inverter, 1 Lunar ESS
Replace existing 50-gallon natural gas water heater in same location.
INSTALL LOPI NEXGEN-FYRE WOOD BURNING STOVE AND VENT PIPE. ADD AC TO EXISTING HVAC SYSTEM
Fire sprinkler for installed per NFPA 13 D
INSTALLATION OF 1 EXTERIOR BUILDING SIGN (BLACK ACRYLIC) AND 1 A-FRAME THAT WILL BE BROUGHT INSIDE EACH DAY. NO ELECTRICAL OR STRUCTURAL MODIFICATION TO THE BUILDING.
New Manufactured Unit to be installed at 1132 Olive in place of previous home that was burned in fire.
Installation of new MFH has been approved with the City of SLO under BLDG-2096-2024. Fire Sprinkler plans were a deferred submittal. Fire Sprinkler plans for the Manufactured Home
have already been reviewed and approved through PFS as indicated on the plans, Approval #PFS-25-003635
INSTALLATION OF (1) CANADIAN EP CUBE BATTERY OF 9.9KWH
Addition of one 13.5 kWh (ESS) Energy Storage System and associated hardware to the main dwelling unit
Bonetti Ranch T.I.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection
Hotline at (805) 781-7554 at least 24 hours in advance.
MASTER PLOT PLAN (PERMIT#FIRE-0702-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 246; PLOT PLAN 5; TRACT 3089
Addition of one 13.5 kWh (ESS) Energy Storage System and associated hardware to the main dwelling unit
PV Roof Mount 9.315KW, 23 Modules, 1 Lunar system
MASTER PLOT PLAN (PERMIT#FIRE-0706-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 219; PLOT PLAN 4; TRACT 3089
Installation of roof mounted PV system.
Hall Bath - Replace existing shower/tub with new walk-in shower - no change in footprint, drain will not be moved. Drywall patching (C-9) finish carpentry (C-6) Change a light switch
(C-10)
A GARAGE REMODEL FOR AN EXISTING SINGLE-FAMILY RESIDENCE.
THIS PROJECT WILL INCLUDE THE REMOVAL AND REPLACEMENT OF EXTERIOR SIDING ON AN EXISTING RESIDENCE BUILDING
Place rolloff dumpster in public right-of-way. Anticipated dates are: 09/04/25-09/18/25, however, permit is to remain open until 09/26/25 in case of delays. Dumpster must be maintained
in a clean and safe manner. Dumpster must be reflectorized. A copy of this permit must be placed on the dumpster. All work to be done to applicable City Standard Specifications & Engineering
Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the dumpster is removed so the permit
can be closed.
NEW FIRE WATER CONNECTION TO THE CITY SUPPLY
<On 07/10/25, permit extended to 07/18/25.> Place rolloff dumpster in public right-of-way. Anticipated dates are: 06/30/25-07/11/25. Dumpster must be maintained in a clean and safe manner.
Dumpster must be reflectorized. A copy of this permit must be placed on the dumpster. All work to be done to applicable City Standard Specifications & Engineering Standards. Call the
Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the dumpster is removed so the permit can be closed.
338 sq. ft. shop addition to existing detached 2-car garage
RELOCATE GAS METER
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate
wye installation two working days in advance.
Removal and reinstall existing PV system.
Complete conduit/vault repair for Astound Broadband LLC. Install conduit by open trenching and directional boring. Work includes intercepting existing conduit, wye cast, and place new
vault. Work must be completed at night. A separate night work permit from the Planning Division is required. Work must be scheduled ahead of time with the Public Works inspector, with
Public Works overtime inspection fees to be paid. All work to be done per the attached plans and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls
must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work
and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. 45 hours of Public Works overtime inspection
fees have been paid for.
Install San Miguel driveway approach and sidewalk underdrain. A separate encroachment permit with separate fees is required for the remaining concrete work required with BLDG-2838-2018.
All work to be done per the approved building plans, BLDG-2838-2018, and All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls
must be per the attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working
day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
removing a 40-gallon natural gas water heater and installing an EZTR50 natural gas tankless water heater
Place U-haul storage containers in public right-of-way. Anticipated dates are 08/28/25-09/08/25, however, permit is to remain open until 09/15/25 in case of delays. U-haul storage containers
must be maintained in a clean and safe manner. U-haul storage containers must be reflectorized. A copy of this permit must be placed on the U-haul storage containers. All work to be
done to applicable City Standard Specifications & Engineering Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the
inspection hotline after the U-haul storage containers are removed so the permit can be closed.
DECK REPAIR - UNIT B
MASTER PLOT PLAN (PERMIT#FIRE-0702-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 247; PLOT PLAN 5; TRACT 3089
General tree maintenance. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards.
Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible
for calling for final inspection so the permit can be closed.
Upgrade 100 amp panel to 200 amp. Add 50 amp circuit.
PLUMBING REPAIR-WATER MAIN REPLACEMENT
Replace gas meter, will be moved to meet current code
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate
wye installation two working days in advance.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations will be performed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made for holidays as needed. Contractors must schedule wye installations by calling the Public Works Inspection Hotline at (805) 781-7554
at least 24 hours in advance.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate
wye installation two working days in advance.
PV Roof Mount 3.645KW, 9 Modules, 1 Lunar System
Remove 40 gallon natural gas tank water heater install Noritz EZTR50DV tankless in existing location
See "parking meter bags" case - 2 commercially licensed trucks.
Install new driveway approach and sidewalk per BLDG-0841-2023. All work to be done per the approved building plans and City Standard Specifications & Engineering Standards. Traffic and
pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working
day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate
wye installation two working days in advance.
Installation of a 4.95 kW-DC PV System, using (11) CANADIAN SOLAR MODULES + (11) ENPHASE Microinverters.
Install 24A Tesla Wall Connector on interior of garage on 30A circuit.
5.95 KW-DC, 14 panel photo-voltaic electric system
Replacing 1 window with retrofit window
REPLACE EXISTING WINDOWS & SKYLIGHT
6KW Roof Mounted PV System W/ 1 Tesla Powerwall & EV Charger
6.075 kW DC Roof Mount Photovoltaic System with Energy Storage (1)
Place POD storage container in the street. Anticipated duration is about two weeks, starting on September 19, 2025. The permit is active until October 14, 2025, in case of delays. POD
must be maintained in a clean and safe manner. POD must be reflectorized. A copy of this permit must be placed on the POD. All work to be done to applicable City Standard Specifications
& Engineering Standards. Call the Public Works inspection hotline at 805-781-7554 (voice message system) to notify two working days prior to placement. Also, call the inspection hotline
after the POD is removed so the permit can be closed.
PV solar roof mount, 10 modules, 4.1kw, comp shingles, new 200A MPU, 5.0kw SolarEdge battery, BUI
Directory Sign
DECK REPAIR - UNIT G
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate
wye installation two working days in advance.
DECK REPAIR - UNIT C
Place U-haul pod storage container in public right-of-way. Anticipated dates are: 09/13/25-09/15/25, however permit is to remain open until 09/24/25 in case of delays. U-haul pod must
be maintained in a clean and safe manner. U-haul pod must be reflectorized. A copy of this permit must be placed on the U-haul pod. All work to be done to applicable City Standard Specifications
& Engineering Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the U-haul pod is removed
so the permit can be closed.
General tree maintenance. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards.
Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible
for calling for final inspection so the permit can be closed.
Roof Mount 3.240kW Photovoltaic System with (1) Enphase IQ Battery 5P
New Photovoltaic system ESS:1
UPGRADE ELECTRIC PANEL FROM 100AMPS TO 200AMPS
Minor interior remodel of bathroom and kitchen.
5.28 kW DC Roof Mount Photovoltaic System with Energy Storage (1)
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection
Hotline at (805) 781-7554 at least 24 hours in advance.
ADDING NEW - EP CUBE HYBRID INVERTER & ESS 7.6KW with ESS (9.9 KWH). 1 CANADIAN SOLAR EP CUBE SMART GATEWAY. 1 100A NEW BACK UP LOAD CENTER. AC DISCONECTED 240V. -TO EXISTING PV SOLAR
SYSTEM 12 CANADIAN SOLAR PV MODULES 12 ENPHASE MICROINVERTERS.
CONVERT STORAGE LOFT TO STUDY LOFT
ADDITION OF ONE 13.5KW (ESS) ENERGY STORAGE SYSTEM AND ASSOCIATED HARDWARE TO THE MAIN DWELLING UNIT
General tree maintenance on Tank Farm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached
plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PV INSTALL 6.56KW, 16 MODULES, 1 ESS, NEW GEN. PANEL
PV Install 6.075KW DC, 15 Modules, 1 Inverter, 1 Battery
Roof tear off and hauling away of debris.
Installation of new CertainTeed Landmark shingle roof.
Replace sewer lateral to the main using trenchless technology. Also directional bore new 1" water service lateral from the main in the street to feed a new 1" water meter. Trenchless
lateral replacements may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All
work to be done per Building plans and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the
Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling
for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate
wye installation two working days in advance.
Exterior painting and wood repair. Standard working hours are 7am-4pm, no setup in the right-of-way is permitted before 7am. The permittee must notify affected tenants of construction;
refer to page 26 of City Standard Specifications for details (attached). No traffic control setup, noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an
exception has been reviewed and approved by the Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls
must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work
and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
<On 09/29/2025, permit extended to 10/13/2025, however permit is to remain open until 10/17/2025 in case of delays. No further extensions will be allowed.> <Permit updated with new dates:
09/11/25-09/25/25, however permit is to remain open until 10/02/25 in case of delays.> Place rolloff dumpster in public right-of-way. Anticipated dates are: 09/02/25-09/16-25, however
permit is to remain open until 09/23/25 in case of delays. Dumpster must be maintained in a clean and safe manner. Dumpster must be reflectorized. A copy of this permit must be placed
on the dumpster. All work to be done to applicable City Standard Specifications & Engineering Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior
to placement. Also, call the inspection hotline after the dumpster is removed so the permit can be closed.
BATHROOM REMODEL INCLUDING RELOCATION OF TOILET, SINK, & PANTRY
Replace existing gas furnace with ducted heat-pump
ADDITION OF ONE 13.5KW (ESS) ENERGY STORAGE SYSTEM AND ASSOCIATED HARDWARE TO THE MAIN DWELLING UNIT
MASTER PLOT PLAN (PERMIT#FIRE-0700-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 209; PLOT PLAN 3; TRACT 3089
Remove and replace driveway approach, upgrading to current City standards. The property line is 6' behind face of curb. If the ADA path is not fully in the public right-of-way, a separate
easement must be recorded prior to this encroachment permit being finaled and prior to the building permit being finaled. All work to be done per BLDG-2560-2024 and City Standard Specifications
& Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior
to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PV INSTALL 5.33KW, 13 MODULES, 1 ESS, 1 EXPANSION
Addition of (1) 200A Backup gateway into an already existing Solar + Storage system.
PUT UP TENTS FOR RAIN - LUNA RED
REPLACEMENT WINDOWS (23) AND SIDING
<On 8/28/2025, updated to include gas service and landscape water service per the attached. A utility work-order and fees are required for water meters.> A separate utility work-order
must be obtained from the Building Division (building@slocity.org or 805-781-7180) prior to the installation of the 4" water meter; separate fees apply. All work is on the Bishop Street
side. Welcome Home Village utilities - Install new 6" sewer lateral, connecting to new sewer main. The new sewer main is a separate CIP. Install a 6" fire service lateral. Install a
4" water service lateral to serve a 4" water meter (separate utility work-order required prior to installation of water meter). All work to be done per GRAD-1265-2025 and City Standard
Specifications & Engineering Standards. A traffic control plan must be submitted, reviewed, and approved prior to the start of the work. Traffic and pedestrian controls must be per
an approved plan and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior
to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Installation of 13.65kW DC Solar with 40.5kWh of energy storage
Place Uhaul pod storage containers in public right-of-way. Anticipated dates are: 08/07/2025-08/08/2025, but permit is to remain open until 08/15/25 in case of delays. Uhaul pods must
be maintained in a clean and safe manner. Uhaul pods must be reflectorized. A copy of this permit must be placed on the Uhaul pods. All work to be done to applicable City Standard Specifications
& Engineering Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the Uhaul pods are removed
so the permit can be closed.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and
one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection
hotline at 805-781-7554 to coordinate wye installation two working days in advance.
Roof Mount 2.430kW Photovoltaic System with (1) Enphase IQ Battery 5P
Place rolloff dumpster in public right-of-way. Anticipated dates are: 09/04/25-09/18/25, however, permit is to remain open until 09/25/25 in case of delays. Dumpster must be maintained
in a clean and safe manner. Dumpster must be reflectorized. A copy of this permit must be placed on the dumpster. All work to be done to applicable City Standard Specifications & Engineering
Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the dumpster is removed so the permit
can be closed.
6.5KW Rooftop PV Solar System w/ ESS
Roof mounted solar 4.1 KW; 2 Energy Storage Systems; Trench- VOID OUTSIDE CITY LIMITS
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate
wye installation two working days in advance.
PV solar roof mount, 19 modules, 7.79kw, comp shingles, existing 100A MSP, (2) 5.0kw SolarEdge Battery, BUI
Install 48A Wallbox Pulsar Plus on interior of garage on 60A circuit.
Minor alteration to existing system
Installation of a 5.4 kW-DC PHOTOVOLTAIC SYSTEM using: 12 CANADIAN SOLAR CS6.1-54TM-450H + 12 ENPHASE IQ8PLUS-72-M-US
PV solar roof mount, 11 modules, 4.51kw, comp shingles, existing 100A MSP, tesla powerwall 3
Supply and Install 1 Replacement Window into an EXISTING Openings. No opening modifications to be made.
Servicing sign at Hotel San Luis Obispo. The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications for details (attached). No traffic
control setup, noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed and approved by the Public Works inspector. Any displaced
parking spaces will require separate fees. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and
attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior
to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PV Solar roof mount 3.24KW, (8)Modules, (1)ESS, (1) Inverter
Install 48A Tesla Universal Wall Connector on interior of garage on 60A circuit.
TEMPORARY TENT - NATIVITY JUBILEE - NATIVITY OF OUR LADY CATHOLIC CHURCH
ROOF MOUNT 5.74KW PHOTOVOLTAIC SYSTEM, GRID TIED, NO ESS.
remove old Composition roofing and replace with new comp roofing
Install Level 2 Electric Vehicle Charger and new sub panel
Replace existing furnace with heat pump.
Replace existing 100 AMP Service Panel TO 200 AMP service Panel
WE WANT TO REMOVE A WINDOW, RE FRAME THE R.O TO ACCOMODATE A SLIDING DOOR (SAME WIDTH AS THE EXISTING WINDOW, THEN THERE WILL BE MINIMAL STRUCTURAL CHANGES; WE'LL KEEP THE SAME HEADER
SIZE.)
Sprouse Communication for Charter-Spectrum to directional bore to pull cable. The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications
for details (attached). No traffic control setup, noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed and approved by the
Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and
City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate
wye installation two working days in advance.
Replacement of 2 windows with retrofit windows.
No Construction.
No Framing.
Like for Like.
upgrade exisitng 100 amp meter main to 200 amp meter main for future capacity
FIRE SPRINKLER TENANT IMPROVEMENT
Install new 1" water service lateral to serve a new 3/4" water meter. A separate utility work order for the water meter must be obtained from the Building Department prior to installation
of the water meter. Remove and replace 10' driveway approach and install 25' of sidewalk. All work to be done per BLDG-2644-2024 and City Standard Specifications & Engineering Standards.
Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and
one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Demo out existing lines and raise/re-locate fire sprinkler lines
1 ENERGY STORAGE SYSTEM & 1 TESLA WALL CONNECTOR
Install new 1" water service lateral from the main in the street to serve a new 1" water meter. All work to be done to City Standard Specifications & Engineering Standards. Traffic and
pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working
day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
CHANGE METER CAN
Astound Broadband LLC to install new fiber optic cable from existing vault to new vault via trenching and boring and wye cast existing conduit. A separate night work permit is required
from the Planning Division. Public Works overtime inspection fees must be paid in advance of the work. A check for 24 hours of Public Works overtime inspection fees has been received.
Must schedule work ahead of time with the Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be
per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one
working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
ELECTRICAL PANEL UPGRADE; LIKE FOR LIKE; 400A-400A
CONSTRUCTION OF NEW 2 STORY 940 SF ADU
REPLACE ROTTEN OUTSIDE DECKING, 228 SQ FT BUILDING FASCIA
replacing wall furnace with
ductless mini split in backyard with one head
Install 48A Wallbox Pulsar Plus on interior of garage on 60A circuit.
REPLACED DAMANGED DRY ROTTED 2X14S W/LVL'S
Main service panel upgrade from 100amp to 200 amp panel with no additional load
PV solar roof mount, 8 modules, 3.28kw, comp shingle, existing 200A MSP, 5.0kw solaredge battery, BUI, New 125A Sub panel
7.11 kw solar system
18 panels
pv solar roof mount, 8 modules, 3.24kw, comp shingle, existing 200A MSP, 1 ESS, 1 BUI
Remove and replace panel of sidewalk to upsize the water service lateral between the meter and property line from 3/4" to 1 1/4". Also, upsize water meter from 5/8" to 3/4". All work
to be done per BLDG-1781-2024 and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix
G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee
is responsible for calling for final inspection so the permit can be closed.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and
one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection
hotline at 805-781-7554 to coordinate wye installation two working days in advance.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection
Hotline at (805) 781-7554 at least 24 hours in advance.
Residential Roof Mounted Solar (PV) 8.5kw DC and (1) ESS
Place storage container in the street. Container will be in place for 3 days with the start date anticipated to be between 7/24/2025 and 7/28/2025. The permit is valid until 8/12/2025,
in case ofContainer must be maintained in a clean and safe manner. Container must be reflectorized. A copy of this permit must be placed on the container. All work to be done to applicable
City Standard Specifications & Engineering Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline
after the container is removed so the permit can be closed.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements require a video submittal to be emailed after replacement. A separate building permit is
required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be
per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate
wye installation two working days in advance.
13.5KW ENERGY STORAGE SYSTEM - GRID TIED
SEWER REPAIR 2-4FT OF PIPE 4"
Ev Charger: 40A
UPGRADE ELECTRICAL BOX
MASTER PLOT PLAN (PERMIT#FIRE-0703-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 210; PLOT PLAN 1; TRACT 3089
City utilities connections for a County Project
PV Roof Mount 6.97KW, 17 Modules, 1 Inverter, 1 Lunar ESS, Trenching required
WALL/ELECTRIC
PV INSTALL 3.645KW DC 9 MODULES 1 INVERTER 1 ESS
PV Roof Mount 4.51KW, 11 Modules, 1 Inverter, 1 Tesla PW3 ESS
ELECTRICAL PANEL UPGRADE (3 METERS) - UNITS A, B, & C
REPAIR WATER DAMAGE TO AN EXISTING EXTERIOR DECK
SEWER LATERAL REPLACEMENT
Install 48A Tesla Wall Connector on interior of garage on 60A circuit.
Supply and Install 3 Replacement Windows into Existing Openings. No opening modifications to be made.
6.9 kW DC roof mount Photovoltaic w/ Energy Storage(1),EV Charger,Sub Panel,Water Heater Replacement
KITCHEN REMODEL AND STRUCTURAL ROOF BEAM
MASTER PLOT PLAN (PERMIT#FIRE-0700-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 248; PLOT PLAN 3; TRACT 3089
upgrade existing electrical service to 200amps
(1) ENERGY STORAGE SYSTEM 13.5kWh
Install Level 2 EV Charger (1)
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements require a video submittal to be emailed after replacement. A separate building permit is
required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be
per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate
wye installation two working days in advance.
PV Roof Mount 3.69KW,9 Modules,1 Invereter,1 Tesla PW3 ESS
Full tear off reroof comp shingle
upgrade panel from 125 tro 200 amps for future.
Project address: 227 FOXTROT COURT, SAN LUIS OBISPO, CA, 93401. Avila Ranch Lot 216. Installation of a 4.95 kW-DC PV System, using (11) CANADIAN SOLAR MODULES + (11) ENPHASE Microinverters.
Abandon existing driveway approach, replacing with sidewalk, curb, and gutter. Install new driveway approach in new location. Install two sidewalk underdrains. All work to be done per
BLDG-1470-2023 and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection
hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection
so the permit can be closed.
General tree maintenance for 902, 930, and 940 Peach. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix
G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee
is responsible for calling for final inspection so the permit can be closed.
Replace 2 windows with retrofit vinyl windows.
PG&E PM # 35449268. PG&E to trench to install conduit duct, primary w/ conduit, and install minor equipment. For secondary power, conduit depth shall be 3’ minimum below crossing utilities
or 7’ below top of curb, whichever is deeper. Primary power must be 1' deeper than secondary power, reference Standard 6010. All work to be done to City Standard Specifications &
Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at
805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit
can be closed.
INSTALL 50A HOT TUB DISCONNECT, RECONFIGURE EV CHARGER TO 32A ON 40A CIRCUIT
DECK REPAIR - UNIT A
Project address: 235 FOXTROT COURT, SAN LUIS OBISPO, CA, 93401. Avila Ranch Lot 220. Installation of a 5.4 kW-DC PV System, using (12) CANADIAN SOLAR MODULES + (12) ENPHASE Microinverters.
Panel Upgrade 100 to 200 amps, same location
Roof Mount PV system 3.28KW DC, (8) Panel, (2) Inverter with integrated ESS
REMOVAL OF DRY WALL FOR EXPLORATORY.
Repair water damage to an exterior deck.
TEMP SHORING AT DAMAGED COLUMN - NORTHEAST ENTRY - 1 LOCATION
PV solar roof mount, 8 modules, 3.24kw, existing main 150A, new subpanel 125A, loads panel 125A, SolarEdge Battery with BUI
Install 20 PV modules to roof and two storage batteries to the garage wall.
13.5KW ENERGY STORAGE SYSTEM, GRID-TIED
Replacement of 14 windows and 2 patio doors. No construction. No Framing.
Like for Like.
INSTALLATION OF A MANFUFACTURED PERGOLA
Project address: 229 FOXTROT COURT, SAN LUIS OBISPO, CA, 93401. Avila Ranch Lot 217. Installation of a 5.4 kW-DC PV System, using (12) CANADIAN SOLAR MODULES + (12) ENPHASE Microinverters.
Install potential maximum 50 amp dedicated circuit to an AmpUp EV charger
Sprinkler Monitoring alarm
Painting sides of the building along Palm and Chorro. The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications for details (attached).
No traffic control setup, noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed and approved by the Public Works inspector.
All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD
Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is
responsible for calling for final inspection so the permit can be closed.
Installation of a 5.4 kW-DC PHOTOVOLTAIC SYSTEM using: (12) CANADIAN SOLAR CS6.1-54TM-450H + (12) ENPHASE IQ8PLUS-72-2-US
PUT UP TENTS FOR RAIN - NOVO
Install a 177.59kW roof mounted grid-tied solar photovoltaic (PV) system
Place storage container on Mill Street. Anticipated dates are 9/3/2025-9/4/2025 (Wednesday morning to Thursday afternoon, but the permit is active until 9/15/2025, in case of delays.
Container must be maintained in a clean and safe manner. Container must be reflectorized. A copy of this permit must be placed on the container. All work to be done to applicable City
Standard Specifications & Engineering Standards. Call the Public Works inspection hotline at 805-781-7554 prior to placement. Also, call the inspection hotline after the container is
removed so the permit can be closed.
DECK REPAIR - UNIT H
new attached ADU garage conversion
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements require a video submittal to be emailed after replacement. A separate building permit is
required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be
per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one
working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection
hotline at 805-781-7554 to coordinate wye installation two working days in advance.
REPLACEMENT OF SIGNAGE
DECK REPAIR - UNIT E
INSTALL 4.4KW DC ROOF MOUNT PHOTOVOLTAIC SYSTEM
Painting exterior of the building and stucco patching for 1029 and 1033 Chorro. The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications
for details (attached). No traffic control setup, noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed and approved by the
Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and
City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
UPGRADE PANEL FROM 100 AMP TO 200 AMP
Supply and Install (1) Skylight into an Existing Opening. No opening modifications to be made.
Replace sewer lateral to the main using trenchless technology on Broad. Trenchless lateral replacements require a video submittal to be emailed after replacement. A separate building
permit is required for any sewer lateral replacement on private property. The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications
for details (attached). No traffic control setup, noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed and approved by the
Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and
City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate
wye installation two working days in advance.
Replace (2) existing 20 ton roof mounted cooling only package AC units.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements require a video submittal to be emailed after replacement. A separate building permit is
required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be
per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate
wye installation two working days in advance.
Modifications to existing Ansul System:
Add (2) Nozzles over Lava Rock Char broiler
Remove Flex Conduit on Pull Station Line
reroute Pull Station to go around Wall if necessary
Remove & plug 5 Drops that are no longer required
1 ENERGY STORAGE SYSTEM
Provide and install dedicated function fire alarm for elevators A & B. No change to existing. This will provide recall and alternative recall. (12 devices)
CHANGE UNIT BALCONIES BACK TO ORIGINAL DESIGN
NEW SFR/DRIVEWAY/PARKING SPACES
NEW SINGLE FAMILY HOME AND ADU ON EXISTING SINGLE FAMILY LOT
Original Residence was burned in a fire. This is a new manufactured home to be installed in its place on a permanent foundation system.
CONVERSION OF ATTACHED GARAGE TO ADU
DEMO EXISTING NON CONFORMING GARAGE AND REPLACE WITH NEW ADU
CHANGE UNIT BALCONY BACK TO ORIGINAL DESIGN
remodel / addition to existing single family residence.
CONVERT ILLEGAL SUNROOM BACK TO CODE COMPLIANT BALCONY; REMOVE WINDOW & INSTALL SLIDING DOOR
CONVERT ILLEGAL SUNROOM BACK TO CODE COMPLIANT BALCONY; REMOVE WINDOW & INSTALL SLIDING DOOR
INSTALL 48A (11.5KW, AC) TESLA UNIVERSAL WALL CONNECTOR ON EXTERIOR OF BUILDING ON 60A CIRCUIT WITH LOAD MANAGEMENT.
Remove 2 layers of shingles, the first one is composition shingles, and the second one is wood shake shingles. We will be adding plywood on the entire roof and new CertainTeed Solaris
shingles.
Interior remodel of existing single-family residence; add bedroom, remodel 2 full baths, relocate laundry, add powder
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements require a video submittal to be emailed after replacement. A separate building permit is
required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be
per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate
wye installation two working days in advance.
Replace Pushmatic panel with new 100A panel.
REPLACE/REPLACE 2X4 WELLS W/WOOD TO 2X6 WALLS. FROM TERMITE DAMAGE & NEW ELECTRICAL PER CODE & SHEET ROCK/NEW SIDING
25 SF Addition to Living & 72 SF Bathroom Remodel
4.745 kW grid-tied rooftop solar PV system (13 solar PV panels w/ microinverters)
Install new dryer circuit (30AMP)
Installation of a 4.95 kW-DC PHOTOVOLTAIC SYSTEM using: (11) CANADIAN SOLAR CS6.1-54TM-450H + (11) ENPHASE IQ8PLUS-72-2-US
REPLACE ALL EXISTING CONTINUOUS CONCRETE FOOTINGS SUPPORTING THE RAISED FOUNDATION. EXISTING FLOOR FRAMING TO REMAIN. PROVIDE SMOKE & CARBON MONOXIDE ALARMS AND LOW FLOW PLUMBING FIXTURES.
Installation of a 4.95 kW-DC PHOTOVOLTAIC SYSTEM using: (11) CANADIAN SOLAR CS6.1-54TM-450H + (11) ENPHASE IQ8PLUS-72-2-US
<On 09/22/25, permit updated to be 10' of trenching to intercept City conduit, install a City box, and pull 725' of new cable per the attached plans.> The permittee must notify affected
tenants of construction; refer to page 26 of City Standard Specifications for details (attached). No traffic control setup, noise, or work is permitted in the downtown between 11:00
am and 1:00 pm unless an exception has been reviewed and approved by the Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic
and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days
prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Install new 2" water service to serve three 1" water meters. Work is for 319, 319A, and 321 Ramona. All work to be done to City Standard Specifications & Engineering Standards. Traffic
and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working
day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Installation of phone pods/booths inside an existing office space.
REMODEL AN INTERIOR REMODEL IN AN EXISTING NON-HOSPITAL MEDICAL OFFICE
BUILDING. THE SCOPE OF THE PROJECT INCLUDES NEW INTERIOR NON-LOAD BEARING
WALLS, EXAM / TREATMENT ROOMS, AND OTHER SUPPORT SPACES. SCOPE INCLUDES
COORDINATING MECHANICAL, PLUMBING, AND ELECTRICAL UPGRADES, AS WELL AS
STRUCTURAL SUPPORT FOR A PAIR OF SPECT IMAGING GANTRY / TABLES AND WATER
HEATERS. PROJECT IS AN OSHPD3 CLINIC.
ENERGY STORAGE (1) MAIN SERVICE PANEL UPGRADE-WITHDRAWN
Installation of a 5.4 kW-DC PHOTOVOLTAIC SYSTEM using: (12) CANADIAN SOLAR CS6.1-54TM-450H + (12) ENPHASE IQ8PLUS-72-M-US
2.52kw Rooftop PV with micro inverters
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements require a video submittal to be emailed after replacement. A separate building permit is
required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be
per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate
wye installation two working days in advance.
Install driveway approach. Install sidewalk underdrain. Replace sewer lateral to the main. Install new 2" water service to serve two 1" meters. Work is for 201 and 203 Carpenter. All
work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection
hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection
so the permit can be closed.
INSTALL 48A (11.5KW, AC) TESLA UNIVERSAL WALL CONNECTOR ON EXTERIOR OF BUILDING ON 60A CIRCUIT WITH LOAD MANAGEMENT.
Replacing heat pump like for like same location 4-ton heat pump in backyard 19 EER2SEER2 air handler in attic 8 HSPF2
Remodel Existing Garage to ADU
relocate and upgrade from 100 amp to 200amp main panel
Remove and replace panel(s) of sidewalk to install sidewalk underdrain. Remove and replace panel(s) of sidewalk to install new water meter box and replace the water service between the
meter and property line. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards.
Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible
for calling for final inspection so the permit can be closed.
Remove existing flat BUR roof and tile roof approximately 2700 square ft.
Apply new 3ply torch down rood 18 squares
Replace plywood sheathing approximately 85 sheets
Install new flat tile roof 10 squares
Interior drywall patching
Interior painting
Flooring repairs
Exterior paint
Installation of a 4.95 kW-DC PV System, using: (11) CANADIAN SOLAR MODULES + (11) ENPHASE MICROINVERTERS.
Astound Broadband LLC to install fiber optic cable and conduit via trenching and directional boring. All work to be done to City Standard Specifications & Engineering Standards. Traffic
and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days
prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
REPLACEMENT WINDOWS
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements require a video submittal to be emailed after replacement. A separate building permit is
required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be
per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate
wye installation two working days in advance.
FIX ROT DAMAGE ON ROOF
Installing a cleanout in the sidewalk. Remove and replace panel(s) of sidewalk. This permit is for sidewalk closure only; any work extending beyond the sidewalk will require a separate
traffic control plan to be submitted, reviewed, and approved. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per
City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
1.095 kW addition to existing grid-tied rooftop solar PV system (3 new solar PV panels w/ microinverters), total combined system size is 3.705 kW
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements require a video submittal to be emailed after replacement. A separate building permit is
required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be
per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one
working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection
hotline at 805-781-7554 to coordinate wye installation two working days in advance.
Potholing existing utilities in 7 locations along Broad and Fiero to verify project design. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian
controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start
of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Installation of a, 4.95 kW-DC PHOTOVOLTAIC SYSTEM using? (11) CANADIAN SOLAR CS6.1-54TM-450H + (11) ENPHASE IQ8PLUS-72-M-US
2.555 kW addition to existing grid-tied rooftop solar PV system (7 new solar PV panels w/ microinverters), total combined system size is 5.455 kW
Remove and dispose of existing furnace. Install 20' of new supply ducting in top level attic. Install new furnace in crawl space. Install new thermostat. Operate and monitor for proper.
Install condenser wall mounted in back yard. Install coil on furnace. Run electrical to condenser. Install line set. Install new thermostat. Operate and monitor for proper function.
INTERIOR RECONFIGURATION OF (E) 206 SF BEDROOM, (E) 150 SF BEDROOM ,
(E) 66 SF BATHROOM TO CREATE (N) 132 SF BEDROOM, (N) 140 SF BEDROOM,
(N) 72 SF BATHROOM, (N) 48 SF BATHROOM, & (N) 30 SF HALL AREA;
CONVERSION OF (E) 162 SF LOFT TO (N) 162 SF BEDROOM
1.460 kW addition to existing grid-tied rooftop solar PV system (4 new solar PV panels w/ microinverters), total combined system size is 8.500 kW
Replace Electric panel. Same location
Install Lennox furnace. Like for like change out.
Installation of a new home roof-mounted 4.95 kW-DC PV System, using (11) CANADIAN SOLAR MODULES + (11) ENPHASE Microinverters.
100 amp to 200 amp panel change
Remove existing 3 layers of roofing and install new OSB panels, install new comp. shingles
Install driveway approach and curb, gutter, and sidewalk along the frontage. Install dry utilities within the sidewalk area. Upsize water meter to 3/4". Install new water meter box and
upgrade water service lateral between the water meter and the property line. Also, stage equipment and materials within the public right-of-way, but not within any driving lanes. All
work to be done per BLDG-0009-2025 and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. A pre-construction
meeting is required prior to the start of work; call the Public Works inspection hotline at 805-781-7554 (voice message system) to schedule. Also, call the Public Works inspection hotline
at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the
permit can be closed.
Remove kitchenette and remodel bathroom from accessory dwelling unit (Rumpus room)
Erect a Circus Big Top with the intention of conducting Circus Vargas performances at the Meadows lot at The Madonna Inn
Encroachment for 3 parking spaces in the public right-of-way from 06/16/25-09/30/25, Monday-Fridays. Staging area to have No Parking signs posted in front of the property for the duration
of the project. Post No Parking signs with: address, start and end date, start and end time, company name, contact information, and reason for the posting. To create a legal tow-away
zone, call the police dept. at 805-781-7312 in advance to have them view and log the posting a full 24 hours prior to the start. All work to be done to City Standard Specifications
& Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior
to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
2.555 kW addition to existing grid-tied rooftop solar PV system (7 new solar PV panels w/ microinverters), total combined system size is 4.655 kW
Upsize existing fire sprinkler piping and replace existing fire sprinklers in basement area.
Sprouse Communication for Charter-Spectrum to directional bore, pull cable through existing duct, remove and restore concrete, and replace vault. Any displaced parking stalls will need
to be paid for separately. The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications for details (attached). No traffic control setup,
noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed and approved by the Public Works inspector. All work to be done to City
Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works
inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final
inspection so the permit can be closed.
Installation of a 5.4 kW-DC PV System, using (12) CANADIAN SOLAR MODULES + (1) CANADIANSOLAR EP CUBE HYBRID (9.9 kw) INVERTER & ESS + NEW BACKUP SUB PANEL 100A+ (1)NEW EP CUBE SMART
GATEWAY 120/240V
new 240V 30A 66G electric heat pump water heater replacing gas-fired water heater in same location (garage)
2.920 kW addition to existing grid-tied rooftop solar PV system (8 new solar PV panels w/ microinverters), total combined system size is 6.400 kW
minor interior remodel, remove and replace flatwork, replace wall heater with new heat pump fau, install garage door at carport.
Install 48A Tesla Universal Wall Connector on exterior of garage on 60A circuit.
Code Enforcement Remediation and Foundation Retrofit
NEW 13.5 KWH TESLA POWERWALL AND BACKUP GATEWAY
Remove and replace driveway approach to current City and ADA standards. Total driveway including the wings is approximately 26 ft wide. All work to be done to City Standard Specifications
& Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline
at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the
permit can be closed.
General tree maintenance. All displaced parking meters must be paid for separately. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian
controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior
to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
SoCal Gas NOT # 33744613. SoCal Gas to install piping. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix
G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee
is responsible for calling for final inspection so the permit can be closed.
1.095 kW addition to existing grid-tied rooftop solar PV system (3 new solar PV panels w/ microinverters), total combined system size is 4.865 kW
PARTIAL Re-Roof - 4sq (400sqft)
Tile Relay - Remove existing tiles & underlayment, install new synthetic underlayment, then reinstall the existing tiles.
Changing out electrical components within the electrical panel
Place rolloff dumpster in public right-of-way. Anticipated dates are: 06/12/25-06/30/25. Dumpster must be maintained in a clean and safe manner. Dumpster must be reflectorized. A copy
of this permit must be placed on the dumpster. All work to be done to applicable City Standard Specifications & Engineering Standards. Call the Public Works inspection hotline at 805-781-7554
two working days prior to placement. Also, call the inspection hotline after the dumpster is removed so the permit can be closed.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements require a video submittal to be emailed after replacement. A separate building permit is
required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be
per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate
wye installation two working days in advance.
Installation of a new home roof-mounted 4.95 kW-DC PV System, using (11) CANADIAN SOLAR MODULES + (11) ENPHASE Microinverters.
Convert existing workshop into accessory dwelling unit (1 bedroom & 1 bath)
2.190 kW addition to existing grid-tied rooftop solar PV system (6 new solar PV panels w/ microinverters), total combined system size is 6.990 kW
SLO CIDER - INSTALLATION OF (6) NEW FERMENTATION TANKS
Fire sprinkler system added to existing buildings.
roof mounted 4.92 KW & 2 Energy Storage systems
system size 6.56KW DC 9.6KW AC
MODUES (16)
ESS (1)
Window replacement and stucco repair.
NEW 13.5 KWH ENERGY STORAGE SYSTEM ON EXISTING SINGLE-FAMILY DWELLING
Design, engineer & install a pre-engineered (kitchen hood fire suppression) Amerex system per Manufacturers Recommendation for the following:
(20) Korean BBQ Tables
(3) Independent Exhaust Systems
Heat Sensors instead of Fusible Link mechanical detection.
Electric Gas Shut off already installed by others.
Installation of a 5.4 kW-DC PHOTOVOLTAIC SYSTEM, using: (12) CANADIAN SOLAR CS6.1-54TM-450H + (12) ENPHASE IQ8PLUS-72-M-US
Installation of a 4.5 kW-DC PV System, using: (10) CANADIAN SOLAR MODULES + (10) ENPHASE MICROINVERTERS.
Installing cell unit for alarm communication.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements require a video submittal to be emailed after replacement. A separate building permit is
required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be
per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one
working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection
hotline at 805-781-7554 to coordinate wye installation two working days in advance.
1.095 kW addition to existing grid-tied rooftop solar PV system (3 new solar PV panels w/ microinverters), total combined system size is 5.495 kW
Replace 200A main panel with new 200A main panel
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements require a video submittal to be emailed after replacement. A separate building permit is
required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be
per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one
working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection
hotline at 805-781-7554 to coordinate wye installation two working days in advance.
PV INSTALL 3.28 KWDC, 8 MODULES, 1 TESLA PW3 ESS AND 1 TESLA POWERWALL EXPANSION PACK
REROOF 100% WITH CLASS A COMP SHINGLE AND NEW FLASHING
INSTALL EXTERIOR SIGNAGE FOR BUSINESS
66k BTU furnace changeout like for like same location in attic 96 AFUE
Renovation of an existing detached garage to storage/laundry room
Install York Heat Pump & Air Handler on hanging straps. (Furnace located in the attic/Heat pump located in backyard.)
1.460 kW addition to existing grid-tied rooftop solar PV system (4 new solar PV panels connecting to existing inverter), total combined system size is 4.060 kW
new 240V 30A 80G electric heat pump water heater replacing gas-fired water heater in same location (garage)
remove tar and gravel
install new torch down on the back side
install metal roof in the front
33 squares
Tenant Improvements - 2 Suites
Removal and reinstall existing PV system to accommodate new roofing at existing location.
Addition of 4 new pendant fire sprinkler heads to accommodate new hallway.
REPLACE FIRE DAMAGED BATHROOM DRYWALL, FIXTURES AND FLOORING; LIKE FOR LIKE
INSTALL 48A (11.5 KW, AC) TESLA UNIVERSAL WALL CONNECTOR ON EXTERIOR OF BUILDING ON 60A CIRCUIT.
INSTALL ALUMINUM CABINET WITH NEON AND INSTALL NON-ILLUMINATED BLADE SIGN
Project: First American Title TI
Modify existing fire alarm system. All existing devices to replaced with new intelligent devices. fully detection and temporal 3 occupant Notification. Building is not sprinklered.
No tamper or waterflow to monitor.
Astound Broadband LLC to install aerial fiber optic cable to existing utility poles from splice point to customer building. Work to occur along Walnut and Toro to the rear easement of
1250 Peach. No new poles or anchors are permitted with this work. Permittee must obtain permission from the utility pole owner(s)/PG&E to attach. All work to be done to City Standard
Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection
hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection
so the permit can be closed.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements require a video submittal to be emailed after replacement. A separate building permit is
required for any sewer lateral replacement on private property. No road closures are allowed with this permit. A minimum 10' travel lane must be maintained with flagging at all times.
All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection
hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection
so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance.
2.190 kW addition to existing grid-tied rooftop solar PV system (6 new solar PV panels w/ microinverters), total combined system size is 6.285 kW
Voluntary Seismic Retrofit In
Accordance with Plan Set (A)
Install new automatic Fire sprinkler monitoring system Building 1 and building 2
Place moving truck/trailer in public right-of-way. Anticipated dates are: 06/17/25-06/19/25, however, permit is to remain open until 06/24/25 in case of delays. Moving truck/trailer
must be maintained in a clean and safe manner. Moving truck/trailer must be reflectorized. A copy of this permit must be placed on the moving truck/trailer. All work to be done to applicable
City Standard Specifications & Engineering Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline
after the moving truck/trailer is removed so the permit can be closed.
2.190 kW addition to existing grid-tied rooftop solar PV system (6 new solar PV panels w/ microinverters), total combined system size is 4.510 kW
Voluntary Seismic Retrofit In
Accordance With Plan Set (A)
Installation of a 5.4 kW-DC PV System, using: (12) CANADIAN SOLAR MODULES + 12 ENPHASE MICROINVERTERS.
FILLING IN OPENING IN HOUSE
new 120V plug-in 66G electric heat pump water heater replacing gas-fired water heater in same location (garage)
Remove existing tiles. Replace sheathing as needed. Install 30# felt. Install new tiles by Eagle, CAPISTRANO - SMC 8822 SAN BUENAVENTURA, CRRC #:0918-0067. SRI: 24.
100Amp panel upgrading to 200Amp panel
3.650 kW grid-tied rooftop solar PV system (10 solar PV panels w/ microinverters)
Remove and replace panels of sidewalk to install two sidewalk underdrains. Core through the face of the curb and grout around the pipe at the face of the curb. All work to be done per
the attached plans and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection
hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection
so the permit can be closed.
Unit 4
Retrofit Windows, no modification to structure
new 240V 30A 80G electric heat pump water heater replacing gas-fired water heater in same location (garage)
UST tank top and piping upgrade. Existing fuel pumps and TLS demolished. Disconnect power and preserve circuits. Provide power to new fueling pumps and TLS from existing circuits
Interior bedroom remodel of 211 sf to an existing single family residence.
1.825 kW addition to existing grid-tied rooftop solar PV system (5 new solar PV panels w/ microinverters), total combined system size is 5.665 kW
Remove and re-install 9 existing PV panels.
Installation of a 4.95 kW-DC PV System, using: (11) CANADIAN SOLAR MODULES + (11) ENPHASE MICROINVERTERS.
Installation of a 5.4 kW-DC PV System, using: (12) CANADIAN SOLAR MODULES + (12) ENPHASE MICROINVERTERS.
100-200A ELECTRICAL UPGRADE
Remove Tenant improvements and architectural finishes to restore space to cold shell condition.
Installation of a new home roof-mounted 4.95 kW-DC PV System, using (11) CANADIAN SOLAR MODULES + (11) ENPHASE Microinverters.
Remove and replace panel(s) of sidewalk to tie-in fire service lateral from the existing fire-service lateral stub-out in the sidewalk to the building. Any displaced parking spaces will
require separate fees. The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications for details (attached). No traffic control setup,
noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed and approved by the Public Works inspector. All work to be done to City
Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works
inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final
inspection so the permit can be closed.
new 240V 30A 66G electric heat pump water heater replacing gas-fired water heater in same location (garage)
STUCCO REPAIRS
General tree maintenance. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and
City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
ADD AIR CONDITIONING TO EXISTING GAS FURNACE SYSTEM.
ADU APPROVAL ATTACHED GARAGE CONVERSION
replace existing 100 amp panel with new 200 amp panel in same location
Gas heater replacement with electric heat pump indoor and outdoor. Reconnected to existing flexible, ductwork
New PV System: 4.1 kW DC, 11.500kW AC New Energy Storage System: 13.500kWh
Repair stucco on two walls of basement; repair/replace windows in those walls; replace unsafe exterior staircase from back patio to backyard
This project invoices a unique condition. The existing building is unsprinklered, but due the remodel , a new exterior step has been added at an egress path. To address this, the architect
received approval to install a single exterior sidewall sprinkler to cover, the designated assisted rescue area adjacent to the stair. This sprinkler will be supplied by 1" CPVC. tied
into the existing domestic water line. Refer to the plan for the tie-in location and routing of the CPVC pipe. Approved architecture plan used.
Remove and replace panel(s) of sidewalk to install a sidewalk underdrain per City Standards. Core through the face of the curb and grout around the pipe at the face of the curb. All
work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection
hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection
so the permit can be closed.
remove existing button board, upgrade electrical, add insulation to 2 bedrooms, bathroom, hallway, and living room
Roof mounted solar 4.1 KW & 1 Energy storage system
New 438 sf ADU converted from an existing single family residence attached garage.
CODE CASE - REPAIR RAILING TOP CAP WALKING SURFACE
Install (2) new 1" water service laterals to feed (2) new 1" water meters by directional boring. All work to be done to City Standard Specifications & Engineering Standards. Traffic
and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days
prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Costco fuel facility expansion project with 10 new dispensers, additive tank removal and replacement, all new piping, new vent stacks, and new additive injection system
Installation of a 5.4 kW-DC PV System, using (12) CANADIAN SOLAR MODULES + (1) CANADIANSOLAR EP CUBE HYBRID (9.9 kw) INVERTER & ESS.
THE CONSTRUCTION OF AN ATTACHED 1000 SF ACCESSORY DWELLING UNIT IN THE SIDE YARD OF A SINGLE FAMILY RESIDENCE. THE ADU WILL SHARE A SIDE WALL WITH THE EXISTING RESIDENCE AND INCLUDE
FOUR BEDROOMS, TWO FULL BATHROOMS, A FULL KITCHEN AND A LAUNDRY AREA. + SB 9 REMODEL OF AN EXISTING RESIDENCE TO ENCLOSE A LIVING AND DINING ROOM INTO TWO NEW BEDROOMS.
Install 48A Tesla Universal Wall Connector with Load Management on exterior of garage on 60A circuit.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate
wye installation two working days in advance.
Replace damaged materials like for like
EXISTING FIRE SPRINKLER SYSTEM TO BE MODIFIED USING EXISTING BULL HEADED TEES AND NEW MECHANICAL TEES (WHERE REQUIRED) AS PER TENANT IMPROVEMENTS.
EXISTING FIRE SPRINKLER SYSTEM IS DESIGNED TO ACCOMMODATE ORDINARY HAZARD IN KITCHENS AND LIGHT HAZARD IN ALL OTHER AREAS.
NEW TENANT IMPROVEMENT FIRE SPRINKLER SYSTEM CLASSIFICATIONS TO REMAIN THE SAME PRIOR TO REMODEL. SEE PLAN FOR NEW SPRINKLER LOCATIONS.
pv solar roof mount, 10 modules, 4.1kw, S-tile, existing 100A MSP, 1 ESS, 1 BUI
AT&T job # A05C6JY. AT&T to access manholes # 1004 and 1026, sub-box # 1136, and perform aerial placement. Some work hour restrictions apply. All work to be done to City Standard Specifications
& Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline
at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the
permit can be closed.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection
Hotline at (805) 781-7554 at least 24 hours in advance.
remove existing exit sign
Repair water damage to an exterior deck.
Tenant Improvement on existing fire sprinkler system
Install driveway approach and sidewalk, curb, and gutter. All work to be done per the approved building plans, BLDG-0481-2025, and City Standard Specifications & Engineering Standards.
Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and
one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Replace the (e) deteriorated sewer lateral serving the residence at 1304 Sydney Street, identified as being in very poor condition. Scope includes abandoning a portion of the existing
line, installing a new ABS/PVC lateral from the existing main tie-in to the cleanout (to accommodate a future additional dwelling unit), and providing a new sewer connection to the
public main for the existing residence.
Units 107, 108, and 109
Add a washer and dryer
2026 Blanket Encroachment Permit - This permit covers fees for maintenance work, which includes: new services, mainline repairs, pole relocations, sidewalk repairs/replacements, splice
box repairs/replacements, and all general system activities. New mainline installations require a separate encroachment permit with separate fees. Traffic and pedestrian controls must
be per MUTCD and City Standards. When applicable, traffic control plans and/or improvement plans must be submitted, reviewed, and approved prior to the start of work. Each job involving
excavation, traffic control, or requiring any other inspection requires a separate encroachment permit and traffic control application. For each separate permit issued under the blanket,
contact the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible
for calling for final inspection so each permit can be closed.
WATER HEATER REPLACEMENT 40G NAT GAS
PV solar roof mount,9modules, 3.645kw, Comp shingles, existing Subpanel 100A, TESLA Powerwalls3
Install a new fire service lateral - anticipated/approximate dates are between 9/25/2025 and 10/15/2025. Also, modify existing water service. Water service modifications to take place
during summer of 2026. All work to be done per the approved plans, FMAP-0775-2024, and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be
per the approved plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day
prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Design and install overhead fire sprinkler in office Spaces
Place rolloff dumpster in public right-of-way. Anticipated dates are: 09/22/25-09/26/25, however, permit is to remain open until 10/03/25 in case of delays. Dumpster must be maintained
in a clean and safe manner. Dumpster must be reflectorized. A copy of this permit must be placed on the dumpster. All work to be done to applicable City Standard Specifications & Engineering
Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the dumpster is removed so the permit
can be closed.
Remove and replace panels of sidewalk, about 75 ft. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian
controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior
to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Remove two layers of existing asphalt shingles, plus one layer of wood shingles. Install 7/16 OSB sheathing. Install GAF HDZ (limited life-time) asphalt shingles with GAF Pros-starter.
5.4kW Photovoltaic System W/
13.5kWh ENERGY STORAGE SYSTEM
Roof Mounted, Grid-Tied
Upgrade 100A panel to 200A
Installation of a 4.95 Kw DC Pv system, Using (11) Pv modules of 450W + EP Cube hybird inverter + batteries 9.9Kw.
Install new 2" fire service. Install new 2" water service to serve (2) new 1" water meters to be manifolded. Existing water service is to remain; the existing 1" commercial water meter
is to be changed to a residential water meter. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed
after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done per BLDG-2271-2023, FIRE-0954-2025, and City Standard
Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection
hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection
so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary
for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance.
ENERGY STORAGE SYSTEM
like for like furnace & AC changeout
Traffic control set up to replace AC units on the roof. Due to the Downtown area's holiday moratorium, no work is allowed to occur between 11/27/25-01/01/26. The permittee must notify
affected tenants of construction; refer to page 26 of City Standard Specifications for details (attached). Proof of notice distribution must be provided to the Public Works inspector
prior to the start of work. No traffic control setup, noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed and approved by
the Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans
and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
4.86kW Photovoltaic System W/
13.5kWh ENERGY STORAGE SYSTEM
ROOF Mounted, Grid-Tied
Install roof mounted 4.3kW PV System with (1) ESS
General tree maintenance. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards.
Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible
for calling for final inspection so the permit can be closed.
TEAR OFF EXISTING ROCK ROOF AND INSTALL NEW TPO ROOF SYSTEM
Project: Amazon Phone booth
Provide sprinkler coverage in new phone booth., Coverage is light hazard occupancy, this is a isolated compartment, and does not change the design classification of the existing system
Install temporary performance stage for Madonna Meadows Concert Series on September 24 - 25, 2025.
Stage used is a Stageline SL260 portable stage with a stage size of 32' x 24 (768 Square Feet)
UNDERGROUND SEWER PIPE REPAIR
Install 48A Tesla Universal Wall Connector on interior of garage on 60A circuit.
Residential Rooftop 11 kw DC Judkins
Repair water damage to an exterior deck.
PV Roof Mount 10.125KW, 25 Modules, 1 Inverter, 1 Tesla PW3 ESS, 1 Tesla PW3 Expansion pack, New 225 subpanel installed
100-200A overhead electrical service upgrade
120/240 3 wire single phase
No solar no added load and no barriers to access
2026 Blanket Encroachment Permit - This permit covers fees for maintenance work, which includes: new services, mainline repairs, pole relocations, sidewalk repairs/replacements, splice
box repairs/replacements, and all general system activities. New mainline installations require a separate encroachment permit with separate fees. Traffic and pedestrian controls must
be per MUTCD and City Standards. When applicable, traffic control plans and/or improvement plans must be submitted, reviewed, and approved prior to the start of work. Each job involving
excavation, traffic control, or requiring any other inspection requires a separate encroachment permit and traffic control application. For each separate permit issued under the blanket,
contact the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible
for calling for final inspection so each permit can be closed.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection
Hotline at (805) 781-7554 at least 24 hours in advance.
INSTALL TESLA POWERWALL 3 WITH EXPANSION PACK AND TESLA BACKUP SWITCH ON INTERIOR OF GARAGE ON 60A CIRCUIT.
Foundation repair with Ram Jack Steel Piers
Solar inverter replacement.
Replace approx. 40' of 4" Main Sewer Line from Cleanout to property line using Trenchless Technology using DR 17 Pipe.
INSTALLATION OF PREFABRICATED METAL PERGOLA OF 26 SQ FT
General tree work. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix
G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee
is responsible for calling for final inspection so the permit can be closed.
Repair damage column at exterior of building
PV solar roof mount, 3.24kw, 8 modules, comp shingles, existing 100A MSP, Tesla Powerwall3
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection
Hotline at (805) 781-7554 at least 24 hours in advance.
Remove and replace all shingles with Certainteed Landmark Solaris -
Replace all plywood
Energy Storage (1) Add Battery to Existing Energy Storage System
NEW SIGNAGE
INSTALL RPP BACLFLOW ASSEMBLY
Replace rotted siding and trim
ADD ON ESS TO EXISTING PV, ESS : 2
Install roof mounted 6.02kW PV System with (1) ESS
Install roof mounted 2.15kW PV System with (1) ESS
REPLACE GUARDRAIL
100A Service with 125A buss relocated directly around exterior corner from existing Service Panel location
REMOVE AND REPLACE
(3) INDOOR AHU'S LIKE
FOR LIKE
Energy Storage(1),EV Charger (1)
PV Roof Mount 6.48KW, 16 Modules, 1 Inverter, 1 Tesla PW3 ESS, 1 Tesla Expansion pack
Install a new sewer lateral and new 1" water service lateral to serve a new 3/4" water meter. Replace driveway approach and install sidewalk, curb, and gutter. Install sidewalk underdrain.
All work is on the Buchon side. All work to be done per BLDG-0298-2025 and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix
G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee
is responsible for calling for final inspection so the permit can be closed. Sewer wye installations will be performed by City staff during regular business hours on Tuesdays and Wednesdays
only, with exceptions made for holidays as needed. Contractors must schedule wye installations by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in
advance.
Panel upgrade from 100amp to 200amp service
Remove and replace panel(s) of sidewalk to install the storm water drain/sidewalk underdrain. Abandon existing water service at the main in the street and replace with a new 2" water
service lateral to manifold existing 5/8" water meter to serve 1418 Tanglewood and a new 1" water meter to serve 1432 Tanglewood. Core through the face of the curb to install storm
water drain/sidewalk underdrain. Grout around the pipe at the face of the curb. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require
a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard
Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working
days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer
wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule
all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance.
REPAIR SEWER LATERAL
40g water heater changeout
Permit to remain open and be extended with updated insurance and annual fees. Encroachment permit expiration date is tied to expiration date of insurance documents. Stage in the public
right-of-way for sidewalk sales events. Retail merchandise will be displayed on the sidewalk on a table display or on a clothing rack. All displays will protrude no more than 4 feet
from the front of a building and there will be 5 feet of ADA clearance maintained at all times. Setup shall be per DIR-0711-2025 and applicable City Standard Specifications & Engineering
Standards. Email encroachment@slocity.org to update insurance documents, pay annual fees, and extend this encroachment permit.
MASTER PLOT PLAN (PERMIT#FIRE-0700-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 232; PLOT PLAN 3; TRACT 3089
Place POD storage container in the street. Delivery date is 10/7/2025 with a duration of about 3 weeks, and an expiration date of 11/7/2025, in case of delays. POD must be maintained
in a clean and safe manner. POD must be reflectorized. A copy of this permit must be placed on the POD. All work to be done to applicable City Standard Specifications & Engineering
Standards. Call the Public Works inspection hotline at 805-781-7554 (voice message system) two working days prior to placement. Also, call the inspection hotline after the POD is removed
so the permit can be closed.
5.40kW Photovoltaic System W/
13.5kWh ENERGY STORAGE SYSTEM
roof Mounted, Grid-Tied
Residential Roof Mount Solar 5.72 kW DC + (1) ESS
Installation of a 4.05 Kw DC roof mount Pv system, Using (9) Pv modules of 450W + (9) ENPHASE IQ8PLUS-72-M-US microinverters.
Rooftop Mounted Solar Energy System
PV+ST
12 CS6.1-54TM-455H solar modules
1 1707000-XX-Y {240V, 11.5kW} inverter
1 1707000-XX-Y {11.5kW} ESS
New Busbar count - 1
System Size: 5.46 kW DC (11.51 kW AC)
Solar Roof Mount 5.52kW, 12 Modules. 1 Tesla Solar Inverter (7.6kW)
100 amp to 200 amp
adding sounders and hornstrobes to cafe of hotel
WORKSHOP AT 1990 HAYS HAS EXISTING ELECTRICAL (30+ YEARS OLD) THAT CITY DOES NOT HAVE IN RECORDS
OVERHEAD ELECTRICAL TO ON SITE JOB TRAILER
Install 48A Tesla Wall Connector on interior of garage on 60A circuit.
Units 116, 117, 118, 120, 121, 122, 123, 124, 125, 126
Add washer and dryer
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection
Hotline at (805) 781-7554 at least 24 hours in advance.
Installation of Level 3 DC Fast EV Charger
PV Roof Mount 6.48KW, 16 Modules, 1 Inverter, 1 Tesla PW3 ESS, (1) 200 A Tesla Powerwall backup gateway
8 HSPF2 / 14.3 SEER2 1 TON DUCTLESS HEAT PUMP MINISPLIT CHANGE OUT IN BEDROOM AND BACKYARD.
Replacing 11 windows and 3 patio doors with retrofit windows and doors.
HALO LIT CHANNEL LETTERS AND NON LIT HANGING SIGN
PV system on new ADU. ADU Permit #BLDG-0298-2025
Units 127, 128, 130, 131, 132
Add washer and dryer
Road closure for off loading and deliveries. Work hours are restricted per the attached traffic control plan. All work to be done to City Standard Specifications & Engineering Standards.
Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working
days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
UNDERGROUND ELECTRIC FEED
Install a new fire sprinkler system in a residence.
NEW 2-STORY AND WAREHOUSE, PARTIAL 2nd FLOOR OFFICE AND STORAGE UNDER MINOR USE PERMIT. PUBLIC ACCESS EASEMENT, SIDEWALK, CURB AND GUTTER, DRIVEWAY ENTRY
Upgrade electrical panel to allow for quicker EV charging.
Install 48A Tesla Wall Connector on interior of garage on 60A circuit.
like for like furnace change out
Install new 4" fire service lateral. Install new 1" water service lateral to serve a new 3/4" water meter. Abandon existing water service and meter box per City standards. All work to
be done per FIRE-0901-2025, BLDG-2233-2023, and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and
City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Installation of a guardrail at top of interior stairs. I received a notice to correct Code violation
General tree maintenance. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards.
Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible
for calling for final inspection so the permit can be closed.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection
Hotline at (805) 781-7554 at least 24 hours in advance.
Place rolloff dumpster in public right-of-way. Anticipated dates are: 09/24/25-09/29/25, however, permit is to remain open until 10/06/25 in case of delays. Dumpster must be maintained
in a clean and safe manner. Dumpster must be reflectorized. A copy of this permit must be placed on the dumpster. All work to be done to applicable City Standard Specifications & Engineering
Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the dumpster is removed so the permit
can be closed.
Installation of a 4.05 Kw DC roof mount Pv system, Using (9) Pv modules of 450W + (9) ENPHASE IQ8PLUS-72-M-US microinverters.
Rooftop Mounted Solar Energy System
PV+ST
19 CS1Y-400MS solar modules
19 IQ8PLUS-72-M-US {240V} microinverters
1 IQBATTERY-10C-1P-NA ESS
Existing System: Yes
New Busbar count - 1
System Size: 7.6 kW DC (5.51 kW AC)
Place POD storage container in public right-of-way. Anticipated dates are: 10/14/25-10/17/25, however, permit is to remain open until 10/24/25 in case of delays. POD must be maintained
in a clean and safe manner. POD must be reflectorized. A copy of this permit must be placed on the POD. All work to be done to applicable City Standard Specifications & Engineering
Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the POD is removed so the permit can
be closed.
Trench from existing vault in the sidewalk to the property line to install Level 3 Communications - Lumen Technologies conduit. Remove and replace full panel(s) of sidewalk. All work
to be done per the approved and attached plans and City Standard Specifications & Engineering Standards. This encroachment permit only covers work in the public right-of-way. Traffic
and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working
day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
BMX- TI- Install occupant notification throughout tenant improvement space that is fully sprinklered. Alpha fire Unlimited currently monitors existing fire alarm system
Units 110, 111, 112, 113, 114, 115
Add washer and dryer
Install 48A Tesla Wall Connector on interior of garage on 60A circuit with load sharing.
Roof mounted solar 6.15 KW & 1 Energy storage System
MASTER PLOT PLAN (PERMIT#FIRE-0706-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 301; PLOT PLAN 4; TRACT 3089
Repair water damage to an exterior deck.
Install roof mounted 6.02kW PV System with (1) ESS
Roof mounted 9.46kW PV System with (1) ESS and (1) ESS Exp Pack
water heater changeout, 40g nat gas
THE OLD SHINGLE ROOF WILL BE REMOVED AND NEW PLYWOOD AND NEW SHINGLES WILL BE INSTALLED.
Rooftop Mounted Solar Energy System
PV+ST
8 CS6.1-54TM-455H solar modules
1 1707000-XX-Y {240V, 11.5kW} inverter
1 1707000-XX-Y {11.5kW} ESS
System Size: 3.64 kW DC (11.51 kW AC)
Installation of a 4.5 Kw DC roof mount Pv system, Using (10) Pv modules of 450W + (10) ENPHASE IQ8PLUS-72-M-US microinverters.
Damaged shear wall will be replaced. No additional square footage or structural expansions will be made.
Foundation repair utilizing Chance helical piers on an existing apartment building.
Electrical Service panel upgrade Units 1-19, 100amp to 100amp each, underground
Replacement of ductwork only. No equipment is being replaced, relocated, or modified. All existing HVAC equipment remains in place and unchanged.
ADD NEW 16.2 SEER 2 3 TON HEAT PUMP LEDFT SIDE OF YEARD ADD NEW COIL GARAGE
6.48 kW DC Roof Mount Photovoltaic with Energy Storage(1)
Repair water damage to an exterior deck.
Demolition of detached single car garage wood-framed structure building
Installation of a 4.95 Kw DC roof mount Pv system, Using (11) Pv modules of 450W + (11) ENPHASE IQ8PLUS-72-M-US microinverters.
Fire Alarm / Sprinkler Supervisory System Replacement due to equipment failure.
200 AMP OVERHEAD TEMP POWER POLE
Installation of a 4.5 Kw DC roof mount Pv system, Using (10) Pv modules of 450W + (10) ENPHASE IQ8PLUS-72-M-US microinverters.
Place rolloff dumpster in public right-of-way. Anticipated date is: 10/29/2025, however, permit is to remain open until 11/05/2025 in case of delays. Dumpster must be maintained in a
clean and safe manner. Dumpster must be reflectorized. A copy of this permit must be placed on the dumpster. All work to be done to applicable City Standard Specifications & Engineering
Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the dumpster is removed so the permit
can be closed.
Replace electric panel. Same location
Remove and replace a panel(s) of sidewalk to replace sidewalk underdrain. An exception to the downtown holiday permit restrictions was approved for this emergency work, for maximum of
two working days in December. The portion of sidewalk removed for the repair must be temporarily backfilled with cold-mix asphalt at the end of each working day to maintain pedestrian
access. Final concrete restoration shall be completed January 5, 2026 or later, after the holiday restrictions. The permittee must notify affected tenants of construction; refer to
page 26 of City Standard Specifications for details. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the attached
and approved plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior
to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Install new 1" water service lateral to serve a new 1" water meter. All work to be done per PLREV-0965-2025 and City Standard Specifications & Engineering Standards. Traffic and pedestrian
controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior
to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
SPA INSTALL IN LANDSCAPE - ABOVE GROUND
1198 Oceanaire Dr: Replace (5) existing 125A Zinsco sub-panels, to be replaced in same location, to New 125A Square D subpanels. All breaker sizes and quantities to remain to the same
and existing branch wiring to be reconnected.
1200 Oceanaire Dr: Replace (5) existing 125A Zinsco sub-panels, to be replaced in same location, to New 125A Square D subpanels. All breaker sizes and quantities to remain to the same
and existing branch wiring to be reconnected.
Replace aged service panel (like for like)
PV solar roof mount, 8Mods, kw, Comp shingle, Existing main service panel 200A,TESLA Powerwall3
Remove and replace panels of sidewalk. Abandon mid-block curb ramp, replacing with sidewalk, curb, and gutter. Stage in the public right-of-way for onsite work. All work is on the Felton
frontage. All work to be done per the attached plans and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards.
Call the Public Works inspection hotline at 805-781-7554 (voice message system) to schedule a required pre-construction meeting. Also, call the Public Works inspection hotline two working
days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
2026 Blanket Encroachment Permit - This permit covers fees for maintenance work, which includes: new services, mainline repairs, pole relocations, sidewalk repairs/replacements, splice
box repairs/replacements, and all general system activities. New mainline installations require a separate encroachment permit with separate fees. Traffic and pedestrian controls must
be per MUTCD and City Standards. When applicable, traffic control plans and/or improvement plans must be submitted, reviewed, and approved prior to the start of work. Each job involving
excavation, traffic control, or requiring any other inspection requires a separate encroachment permit and traffic control application. For each separate permit issued under the blanket,
contact the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible
for calling for final inspection so each permit can be closed.
PV Roof Mount 3.69KW, 9 Modules, 1 Inverter, 1 Tesla PW3 ESS, 1 Tesla Backup Gateway
Replacing a 10 ton unit on the roof with a like for like model including same refrigerant type.
Installation of a 5.4 kW-DC PV System, using: (12) Modules + (1) EP CUBE HYBRID INVERTER + BATTERY 9.9KWh. (1) NEW BACKUP SUB PANEL 100A+ (1) NEW EP CUBE SMART GATEWAY 120/240V. ADDED
Emergency stop outside.
Hp Communications for Astound Broadband LLC to install fiber optic cable to (2) existing utility poles. No new poles or anchors are permitted with this work. Permittee must obtain permission
from the utility pole owner(s)/PG&E to attach. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved
and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior
to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Installation of new Fire Sprinkler System
Repair water damage to an exterior deck.
Rooftop Mounted Solar Energy System
PV+ST
26 HiS-T440NF(BK) solar modules
1 1707000-XX-Y {11.5kW} inverter
1 1707000-XX-Y {11.5kW} ESS + 2 1807000-XX-Y DC batteries expansion
System Size: 11.44 kW DC (11.5 kW AC)
Installation of Level 2 EV Charger
Installation of a 4.950 Kw DC roof mount Pv system, Using (11) Pv modules of 450W + (11) ENPHASE IQ8PLUS-72-M-US microinverters.
Install a new automatic alarm system where required per plans.
NEW ROOF MOUNTED PHOTOVOLTAIC SYSTEM 9.46KW DC 11.5KW AC WITH ENERGY STORAGE DEVICE 13.5 KWH
Add washer and dryer
Replace sewer lateral to the main and install cleanout. A separate building permit is required for any sewer lateral replacement on private property. The permittee must notify affected
tenants of construction; refer to page 26 of City Standard Specifications for details (attached). No traffic control setup, noise, or work is permitted in the downtown between 11:00
am and 1:00 pm unless an exception has been reviewed and approved by the Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic
and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working
day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff
during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling
the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance.
Illuminated Channel Logo Shape - white acrylic face with printed opaque graphics (1st surface)
INSTALL 4.86KW DC ROOF MOUNTED PHOTOVOLTAIC SYSTEM AND ENERGY STORAGE SYSTEM (1)
Level 3 Communication to tie into (1) existing manhole, remove and replace a panel of sidewalk, and install cable through existing underground conduit. All work to be done to City Standard
Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working
days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Remove and replace a panel of sidewalk to repair gas leak between the gas meter and the property line. All work to be done to City Standard Specifications & Engineering Standards. Traffic
and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working
day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
2026 Vegetation Management Blanket Encroachment Permit - this permit applies only to local streets, as defined in the Streets Classification Diagram. For local streets, as defined in
the Streets Classification Diagram, PG&E may work under the annual blanket vegetation management permit without submitting a custom traffic control application, as long as the work
does not affect school drop-offs or pick-ups and there are no full street closures. PG&E must notify the Public Works inspection hotline at 805-781-7554 and encroachment@slocity.org
of the locations and schedules at least two working days in advance. A custom traffic control plan and traffic control application must be submitted, reviewed, and approved and a separate
sub-permit must be issued for every job that involves a street closure, affects school drop-offs or pick-ups, or affects any street classification other than local as defined in the
Streets Classification Diagram.
replace water heater with Noritz EZTR50 PRO
General tree maintenance. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and
City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
like for like furnace swap
Install sidewalk in front of house. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards.
Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible
for calling for final inspection so the permit can be closed.
1 PICTURE WINDOW - 48 1/2 X 18 1/2; SILL HEIGHT 66"
RELOCATE 100 AMP SERVICE TO NEW LOCATION
EV Charger
Install roof mounted 4.73kW PV System with (1) ESS
MASTER PLOT PLAN (PERMIT#FIRE-0703-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 300; PLOT PLAN 1; TRACT 3089
Remove and replace driveway approach per City standards and PLREV-0215-2024. All work to be done per PLREV-0215-2024 and City Standard Specifications & Engineering Standards. Traffic
and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days
prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Remove two layers of existing asphalt shingles, plus one layer of wood shingles. Install 7/16 OSB sheathing. Install GAF HDZ (limited life-time) asphalt shingles with GAF Pros-starter.
Upsize existing 5/8" water meter with new 3/4" water meter. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal
to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done per BLDG-3409-2022 and City Standard
Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection
hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection
so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary
for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance.
Modify existing fire sprinkler system. (add 2 new sprinklers, relocate 4 sprinklers, & adjust sprinkler head heights 9 sprinklers)
INSTALL TESLA POWERWALL 3 WITH TESLA BACKUP SWITCH ON EXTERIOR OF HOUSE ON 60A CIRCUIT
Replace (5) unsafe subpanels with (5) new subpanels, like for like
TEAR OFF ALL EXISTING ROOFING RESHEET WITH 7/16 OSB INSTALL ASPHALT SHINGLES
DEMOLISH EXISTING SINGLE FAMILY RESIDENCE (1643 SF LIVING)
DEMOLISH EXISTING SECONDARY DWELLING UNIT (486 SF LIVING)
DEMOLISH EXISTING STRUCTURE (150 SF)
NEW 13.5 KWH ESS INSTALLED ON AN EXISTING SINGLE-FAMILY HOME. 1 NEW TESLA AC POWERWALL, 1 NEW TESLA BACKUP GATEWAY WITH ASSOCIATED HARDWARE
REMOVE AND REPLACE PIER FOUNDATIONS AND SUPPORT POSTS WHERE INDICATED ON THE REPAIR PLAN.
Roof mounted solar 4.51 KW & 1 Energy storage systems
Install 48A Tesla Universal Wall Connector on interior of garage on 60A circuit with load management.
New roof mounted photovoltaic system 5.66kW
PV Roof Mount 2.835KW, 7 Modules, 1 Tesla PW3 ESS, 1 Tesla PW3 Expansion pack, New 225A subpanel installed, Existing Solar system installed
Abandon existing water service lateral and install new 2" water service lateral to serve existing 5/8" water meter and (2) new 3/4" water meters. Install sidewalk underdrain. All work
to be done per PLREV-0219-2025 and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public
Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for
final inspection so the permit can be closed.
Replace 40 Gallon Wtr Htr in same existing location in garage
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations will be performed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made for holidays as needed. Contractors must schedule wye installations by calling the Public Works Inspection Hotline at (805) 781-7554
at least 24 hours in advance.
Remove two layers of existing asphalt shingles, plus one layer of wood shingles. Install 7/16 OSB sheathing. Install GAF HDZ (limited life-time) asphalt shingles with GAF Pros-starter.
General tree maintenance. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and
City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
UPGRADE TO ELECTRICAL PANEL FROM 100 AMP TO 200 AMP OR 320 A
MASTER PLOT PLAN (PERMIT#FIRE-0706-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 298; PLOT PLAN 4; TRACT 3089
Install a new non-required manual and automatic fire alarm system at this facility
Sprouse Communication for Charter-Spectrum to directional bore to place fiber and overlash fiber on existing poles. All work to be done to City Standard Specifications & Engineering
Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554
two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Installation of roof mounted (5.92kW) PV system with (13) CS 455's, (13) Enphase IQ8AC Microinverters.
ELECTRICAL PANEL UPGRADE
NEW PHOTOVOLTAIC SYSTEM 4.840KW DC 13.5KWH PHOTOVOLTAIC WITH 13.5KWH ESS STORAGE
4.10 kW DC Roof Mount Photovoltaic System
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations will be performed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made for holidays as needed. Contractors must schedule wye installations by calling the Public Works Inspection Hotline at (805) 781-7554
at least 24 hours in advance.
23 REC460AA Pure-RX solar modules
23 IQ8X-80-M-US {240V} microinverters
1 IQBATTERY-10C-1P-NA ESS
Install roof mounted 9.24kW PV System with (1) ESS
Staging in the right-of-way for tree removal. A separate tree removal permit is required from the Planning Division. All work to be done to City Standard Specifications & Engineering
Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start
of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Installation of a 4.5 Kw DC roof mount Pv system, Using (10) Pv modules of 450W + (10) ENPHASE IQ8PLUS-72-M-US microinverters.
Remove and replace panel(s) of sidewalk to install the sidewalk underdrain(s). Core through the face of the curb to install sidewalk underdrain(s). Grout around the pipe at the face
of the curb. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public
Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for
final inspection so the permit can be closed.
INSTALLATION OF A MINI-SPLIT HEATING AND AIR CONDITIONING UNIT
Installation of a 4.5 kW-DC PV System, using: (10) PV Modules of (450W) + (10) ENPHASE MICROINVERTERS + New 125A IQ combiner panel
Retrofit project with 1 Tesla PW3 ESS,
Existing solar system installed, New 225A
subpanel installed
PV Roof Mount 2.835KW, 7 Modules, 1 Inverter, 1 Tesla PW3 ESS, (1)Tesla Backup Gateway
Place rolloff dumpster in public right-of-way. Anticipated dates are: 09/26/25-10/03/2025, however, permit is to remain open until10/08/2025 in case of delays. Dumpster must be maintained
in a clean and safe manner. Dumpster must be reflectorized. A copy of this permit must be placed on the dumpster. All work to be done to applicable City Standard Specifications & Engineering
Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the dumpster is removed so the permit
can be closed.
PV Roof Mount 4.455KW, 11 Modules, 1 Inverter, 1 Tesla PW3 ESS, 1 Tesla PW3 Expansion pack
Level 2 EV Charger
Removal of gas water heater. Install electric hybrid water heater replacement.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and
one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed
by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these
days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance.
Sewer lateral replacement on private property in the utility easement in the back of the property. A separate building permit is required for any sewer lateral replacement on private
property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public
Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for
final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions
made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance.
MASTER PLOT PLAN (PERMIT#FIRE-0705-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 299; PLOT PLAN 3; TRACT 3089
REPLACE WATER HEATER
4.4 kW DC + 1xESS
Place rolloff dumpster in public right-of-way. Anticipated dates are: 10/15/2025-10/29/2025, however, permit is to remain open until 11/05/2025 in case of delays. Dumpster must be maintained
in a clean and safe manner. Dumpster must be reflectorized. A copy of this permit must be placed on the dumpster. All work to be done to applicable City Standard Specifications & Engineering
Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the dumpster is removed so the permit
can be closed.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection
Hotline at (805) 781-7554 at least 24 hours in advance.
Setup traffic control in City right-of-way related to a Caltrans project. Construction staging is in Caltrans right-of-way. Clean and CCTV pipes under Caltrans 05-1N3804 in Caltrans
right-of-way. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved plans and City Appendix G & MUTCD
Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is
responsible for calling for final inspection so the permit can be closed.
Abandon existing water service and meter. Install new 1" water service to serve a new 1" water meter. All work to be done per BLDG-1042-2025 and City Standard Specifications & Engineering
Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start
of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35663474. PG&E to trench to install conduit, install cable, abandon old conduit, and remove cable. Standard working hours are 7am-4pm. All work to be done to City Standard
Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working
days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
NEW 13.5 KWH TESLA POWERWALL
AND BACK UP SWITCH
Remove existing failed waterproof decking systems at Upstairs Unit-3 Backyard Upper Deck and Upstairs Unit-4 Backyard Upper Deck. Repair and replace any damaged or deteriorated framing
members in kind, per inspection report findings. Reinstall new waterproof deck systems over the existing wood framing to restore structural integrity and provide proper waterproofing
protection. All repairs will match existing structural configuration unless otherwise noted in the inspection report.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection
Hotline at (805) 781-7554 at least 24 hours in advance.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection
Hotline at (805) 781-7554 at least 24 hours in advance.
Place POD storage container in public right-of-way. Anticipated dates are: 12/11/25-12/23/25, however permit is to remain open until 12/29/25 in case of delays. POD must be maintained
in a clean and safe manner. POD must be reflectorized. A copy of this permit must be placed on the POD. All work to be done to applicable City Standard Specifications & Engineering
Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the POD is removed so the permit can
be closed.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection
Hotline at (805) 781-7554 at least 24 hours in advance.
Install driveway approach, sidewalk, curb, and gutter. Work may include utility service connections or replacements, all within the sidewalk area only. All work to be done per the building
plans, BLDG-2022-2024, fire plans, FIRE-0640-2025, and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards.
Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible
for calling for final inspection so the permit can be closed.
Abandon existing water service at the main in the street and abandon water meter box. Trench to install a new 2" water service lateral to serve four new 1" water meters; a utility work-order
must be obtained from the Building Division, building@slocity.org, prior to the installation of the water meters. Replace sidewalk panels related to water service lateral and sewer
lateral; contractor and Public Works inspector to coordinate on sections of required and possibly voluntary concrete frontage replacement. All work to be done to City Standard Specifications
& Engineering Standards. Traffic and pedestrian controls must be per the approved and attached traffic control plans and City Appendix G & MUTCD Standards. Call the Public Works inspection
hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection
so the permit can be closed.
General tree maintenance. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and
City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Replacement of 1 window. No Construction. No Framing. Like for like.
NEW NEON SIGN
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations will be performed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made for holidays as needed. Contractors must schedule wye installations by calling the Public Works Inspection Hotline at (805) 781-7554
at least 24 hours in advance.
Remove two layers of existing asphalt shingles, plus one layer of wood shingles. Install 7/16 OSB sheathing. Install GAF HDZ (limited life-time) asphalt shingles with GAF Pros-starter.
Add on ESS to existing PV system ESS:1
PV Roof Mount 2.835, 7 Modules, 1 Inverter, 1 Tesla PW3 ESS, 1 Tesla PW3 Expansion pack, Existing solar system installed
Remove existing system. Install new air handler with MERV11 filter in attic, new supply and return ducting, and outdoor condenser on roof with electrical and refrigerant connections.
Install 9K wall-mount head in master bedroom with new pad-mounted condenser. All lines sealed, wired, and tested for proper operation.
we are upgrading existing fire alarm system
MASTER PLOT PLAN (PERMIT#FIRE-0706-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 233; PLOT PLAN 4; TRACT 3089
Install new 1" water service lateral from the main in the street to serve a new 1" water meter. All work to be done per BLDG-0141-2025 and City Standard Specifications & Engineering
Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start
of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Place concrete pump hose across the sidewalk. Ramp over the hose to keep sidewalk open. Work shall be between 7:00 am and 11:00 am for one morning only. Work is not approved after 11:00
am. The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications for details (attached). All work to be done to City Standard Specifications
& Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior
to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
WATER HEATER
Install Lennox Dual Fuel System, Furnace and evaporator coil.
New install heat pump.
Furnace is a changeout.
Installation of a 4.95 Kw DC Pv system, Using (11) Pv modules of 450W + (11) Enphase MicroInverters. Plan 2B.
NON-ILLUMINATED MONUMENT SIGN
Installation of Level 2 EV Charger
NFPA 13D Fire Sprinklers
MASTER PLOT PLAN (PERMIT#FIRE-0704-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 231; PLOT PLAN 2; TRACT 3089
PV solar roof mount, 8 modules, 3.28kw, comps shingles, existing 200A MSP, 5.0kw SolarEdge battery, BUI
General tree maintenance. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards.
Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible
for calling for final inspection so the permit can be closed.
ADDITION OF ONE 13.5 KW (ESS) ENERGY STORAGE SYSTEM AND ASSOCIATED HARDWARE TO THE MAIN DWELLING UNIT
Addition of one 13.5 kWh (ESS) Energy Storage System and associated hardware to the main dwelling unit
A separate encroachment permit with separate fees is required for the concrete work from the approved Building plans. Trench for new gas line from the main in the street; SoCal Gas will
install. Remove and abandon existing water service, water meter, and water meter box. Install 2" water lateral in the street to serve four new 1" water meters. Replace sewer lateral
to the main using trenchless technology, upsizing from 4" to 6". Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per the approved plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working
day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff
during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling
the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance.
Install 48A Tesla Universal Wall Connector on interior of garage on 60A circuit.
RETROFIT PROJECT WITH 1 TESLA PW3 ESS
MASTER PLOT PLAN (PERMIT#FIRE-0704-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 226; PLOT PLAN 2; TRACT 3089
NFPA 13D Fire Sprinklers
MASTER PLOT PLAN (PERMIT#FIRE-0703-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 227; PLOT PLAN 1; TRACT 3089
Replace rooftop HVAC units
DEMO EXISTING RESIDENCE (580 SF)
DEMO EXISTING WORKSHOP (416 SF)
MASTER PLOT PLAN (PERMIT#FIRE-0704-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 224; PLOT PLAN 2; TRACT 3089
Kitchen Remodel - All items to remain AS-IS. Electrical to comply with 2022 Electrical Code.
MASTER PLOT PLAN (PERMIT#FIRE-0704-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 222; PLOT PLAN 2; TRACT 3089
MASTER PLOT PLAN (PERMIT#FIRE-0703-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 223; PLOT PLAN 1; TRACT 3089
Install Level 2 EV Charger
INSTALL TESLA POWERWALL 3 WITH TESLA BACKUP SWITCH AND SPAN SMART PANEL ON INTERIOR OF GARAGE
MASTER PLOT PLAN (PERMIT#FIRE-0703-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 230; PLOT PLAN 1; TRACT 3089
MASTER PLOT PLAN (PERMIT#FIRE-0703-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 225; PLOT PLAN 1; TRACT 3089
ADDITION OF ONE 13.5 KW (ESS) ENERGY STORAGE SYSTEM AND ASSOCIATED HARDWARE TO THE MAIN DWELLING UNIT
INSTALL LEVEL 2 ELECTRIC VEHICLE CHARGER
PV Roof Mount 3.645KW, 9 Modules, 1 Inverter, 1 Tesla PW3 ESS, (1) 200A Tesla PW3 Backup Gateway
Photovoltaic System (22.79kW) / 53 Modules.
MASTER PLOT PLAN (PERMIT#FIRE-0700-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 228; PLOT PLAN 3; TRACT 3089
Replacement of 2 patio doors.
No Construction.
No Framing.
Like for like.
MASTER PLOT PLAN (PERMIT#FIRE-0704-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 229; PLOT PLAN 2; TRACT 3089
Place rolloff dumpster in public right-of-way. Anticipated dates are: 09/12/25-09/19/25, however, permit is to remain open until 09/26/25 in case of delays. Dumpster must be maintained
in a clean and safe manner. Dumpster must be reflectorized. A copy of this permit must be placed on the dumpster. All work to be done to applicable City Standard Specifications & Engineering
Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the dumpster is removed so the permit
can be closed.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection
Hotline at (805) 781-7554 at least 24 hours in advance.
Replacement of 1 patio door
PV solar roof mount, 10Mods, 4.05kw, Comp shingles, Existing Subpanel 100A, TESLA Powerwall3
Remove and replace two driveway approaches. Install fire service lateral. Pothole utilities. All work to be done per the approved GRAD-0914-2024 plans and to City Standard Specifications
& Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior
to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
EMERGENCY GAS LINE REPAIRS - UNITS 110, 130, 150, 160, 190, 200, 220, 280, & 290
Remove the existing BUR roof and felt liner down to the wood decking. Inspect the wood decking and replace as needed. And any wood damage.
Replace Zinsco sub panels for insurance purposes. Panels will be replaced in the same location with no added load.
New Photovoltaic System 7.31kW ESS:1
Restucco and replacement of windows and exterior doors with like kind.
PV INSTALL 11.48KW DC 28 MODULES, 1 INVERTER 1 ESS
Install 32A Tesla Universal Wall Connector on interior of garage on 40A circuit.
Remove existing roof on back house, Install 15/32 osb sheathing and install new class A comp shingle roof
ADDITION OF 1 13.5 KWH (ESS) ENERGY STORAGE SYSTEM AND ASSOCIATED HARDWARE TO THE MAIN DWELLING UNIT
Installing 9BTU ductless mini split w/ (2) air handlers (9btu each)+ 220V electric circuit
Install 48A Tesla Universal Wall
Connector on exterior of house
on 60A circuit.
Install 48A Tesla Universal Wall
Connector on interior of garage
on 60A circuit.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate
wye installation two working days in advance.
TEMPORARY POWER POLE
MASTER PLOT PLAN (PERMIT#FIRE-0706-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 218; PLOT PLAN 4; TRACT 3089
INSTALL 2 DISCONNECTS AT LAUNDRY AREA
Retrofit Windows and SGD, no modification to structure
Staging in the public right-of-way for tenant improvements. The deferred submittal for frontage improvements must be approved with printed plans given to the Public Works inspector prior
to the start of any sidewalk work. The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications for details (attached). No traffic control
setup, noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed and approved by the Public Works inspector. All work to be done
to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. A pre-construction
meeting is required; call 805-781-7554 to coordinate. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior
to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Remove old comp and replace with new, replace some sheathing
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate
wye installation two working days in advance.
Install 10.13kW roof mount photovoltaic system, Energy storage system (1), (1) EV charger
Place POD storage container in public right-of-way. Anticipated dates are: 09/23/25-10/07/25, however, permit is to remain open until 10/14/25 in case of delays. POD must be maintained
in a clean and safe manner. POD must be reflectorized. A copy of this permit must be placed on the POD. All work to be done to applicable City Standard Specifications & Engineering
Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the POD is removed so the permit can
be closed.
Place U-Haul boxes in public right-of-way. Anticipated dates are: 07/03/25-07/05/25, however, permit is to remain open until 07/11/25 in case of delays. U-Haul boxes must be maintained
in a clean and safe manner. U-Haul boxes must be reflectorized. A copy of this permit must be placed on the U-Haul boxes. All work to be done to applicable City Standard Specifications
& Engineering Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the U-Haul boxes are removed
so the permit can be closed.
6.5KW Rooftop Microinverter PV Solar System w/ ESS
Trenching new 1" water service lateral from the main in the street to serve new 1" water meter. Trenching to install new sewer lateral from the main in the street to the property. This
permit is for utility work only; a separate encroachment permit with separate fees is required for concrete work described on the approved plans. A separate building permit is required
for any sewer lateral replacement on private property. All work to be done per BLDG-2838-2018 and to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls
must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work
and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection
hotline at 805-781-7554 to coordinate wye installation two working days in advance.
Addition of one 13.5 kWh (ESS) Energy Storage System and associated hardware to the main dwelling unit
Remove existing floor furnace and installing a new forced air unit and heat pump condenser and all new ducting
DECK REPAIR - UNIT F
4.555 kW DC Roof Mount Photovoltaic System, Sub Panel, EV Charger(1)
Minor interior remodel of bathroom and replace existing pest damaged deck.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate
wye installation two working days in advance.
Replace gas furnace with ducted Heat-pump; existing location
MASTER PLOT PLAN (PERMIT#FIRE-0704-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 221; PLOT PLAN 2; TRACT 3089
INSTALL QTY 2 SETS OF HALO LIT LED CHANNEL LETTERS
Change existing 100 amp panel to a new 200 amp panel in the same location
HVAC Heat pump Mitsubishi install to replace existing furnace
Replacement of Gas Furnace and duct work
Like for like water heater replacement
Install new 1" water service lateral to serve a new 1" water meter. Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video
submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done per PLREV-0540-2025 and
City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554
two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working days in advance.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate
wye installation two working days in advance.
PV Roof mount 3.28KW, 8 Modules, 1 Inverter, 1 Tesla PW3 ESS, Main Breaker Upsize
SEWER LATERAL REPLACEMENT
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements require a video submittal to be emailed after replacement. A separate building permit is
required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be
per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate
wye installation two working days in advance.
Install a 93.81kW roof mounted grid-tied solar photovoltaic (PV)
Main water service line and whole house Repipe & Water Heater-From existing PVC near main, dig trench to side of home location, run pipe from pvc connection to riser location. Build
main riser with ball valve, PRV, hose bib. Penetrate through exterior and up wall into attic area. From attic run control service line through attic and install drops for Master bathroom,
kitchen, hallway bathroom, laundry room. Install angle stops, shower valves, reconnect existing fixtures.
-Outside run water line from home and following the fence line and install hose bib on riser for both the pool side and the pump side for water access
-Water heater will be brought up to code
-Shut off water to existing unit and drain down
-Remove existing water heater
-Install 30 gallon natural gas Bradford white water heater
-Install T&P, gas sediment drip leg, expansion tank, EQ straps
-Turn on unit and purge air from system
-Check for leaks and operation
2 commercial trucks in 10-hour meters
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements require a video submittal to be emailed after replacement. A separate building permit is
required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be
per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one
working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection
hotline at 805-781-7554 to coordinate wye installation two working days in advance.
Replace existing hood suppression system
Replace existing furnace with ducted heat-pump, like-for-like; existing location.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection
Hotline at (805) 781-7554 at least 24 hours in advance.
REPLACE EXISTING OUTSIDE WATER SUPPLY LINE FROM WATER METER NEAR CURB TO FRONT PORCH HOSE BIB AT HOUSE W/1INCH; SCHEDULE 40 PVC W/BLUE TRACER WIRE AS DIAGRAMMED BELOW (~65 FOOT INSTALL).
INSTALL COPPER RISER AT THE HOUSE W/NEW BALL VALVE & HOSE BIB.
Install new 1" water service lateral from the main in the street via trenching to feed a new 1" water meter to serve new ADU. All work to be done per BLDG-0818-2024 and City Standard
Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working
days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate
wye installation two working days in advance.
PROVIDE NEW DETICATED 200A 480V 3PHASE ELECTRICAL SERVICE TO FEED THREE EXISTING ELECTRIC FORKLIFT CHARGING STATIONS.
Project address: 231 FOXTROT COURT, SAN LUIS OBISPO, CA, 93401. Avila Ranch Lot 218. Installation of a 5.4 kW-DC PV System, using (12) CANADIAN SOLAR MODULES + (12) ENPHASE Microinverters.
Roof mounted solar 4.92 & 1 Energy storage system
PV Roof Mount 3.69KW, 9 Modules,1 Inverter, 1 Tesla PW3 ESS
Install EV Charger (1)
Install 48A Tesla Wall Connector on exterior of garage on 60A circuit.
Replace Existing Wood Retaining wall with poured concrete wall
PV Roof Mount 6.48KW, 16 Modules, 1 Inverter, 1 ESS
General tree maintenance. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and
City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Project address: 221 FOXTROT COURT, SAN LUIS OBISPO, CA, 93401. Avila Ranch Lot 215. Installation of a 4.95 kW-DC PV System, using (11) CANADIAN SOLAR MODULES + (11) ENPHASE Microinverters.
Installing new electrical panel. We are keeping the panel in the same place it is at currently.
NEW ROOF MOUNTED PV SYSTEM: 4.100 kW DC, 11.500 kW AC NEW ENERGY STORAGE SYSTEM: 13.500 kWh
Place POD storage containers (2) in public right-of-way. Anticipated dates are: 08/22/25-08/25/25, however, permit is to remain open until 09/02/25 in case of delays. POD must be maintained
in a clean and safe manner. POD must be reflectorized. A copy of this permit must be placed on the POD. All work to be done to applicable City Standard Specifications & Engineering
Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the POD is removed so the permit can
be closed.
OFFICE TO SFR CONVERSION
Staging for tree removal. A separate tree removal permit is required. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and
one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Install 48A Tesla Wall Connector with Load Management on exterior of garage on 60A circuit.
Install 48A Tesla Wall Connector on interior of garage on 60A circuit.
PV Roof Mount 7.38KW, 18 Modules, 1 inverter, 1 Tesla PW3 ESS, 1 Tesla PW3 Expansion pack
Project address: 240 FOXTROT COURT, SAN LUIS OBISPO, CA, 93401. Avila Ranch Lot 223. Installation of a 4.95 kW-DC PV System, using (11) CANADIAN SOLAR MODULES + (11) ENPHASE Microinverters.
Add a 2x4 skylight in master bath.
Place Uhaul pod storage container in public right-of-way. Anticipated dates are: 08/08/25-08/12/25, however permit is to remain open until 08/20/25 in case of delays. Uhaul pod must
be maintained in a clean and safe manner. Uhaul pod must be reflectorized. A copy of this permit must be placed on the Uhaul pod. All work to be done to applicable City Standard Specifications
& Engineering Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the Uhaul pod is removed
so the permit can be closed.
CONVERT EXISTING ATTACHED 2-CAR GARAGE TO ADU (436 SQ. FT.)
Interior remodel within an existing structure for business occupancy.
New commercial NFPA 13 wet sprinkler system
NEW GARAGE W/NEW SECOND STORY ADU ABOVE GARAGE
addition to living room and kitchen
The project scope consists of an interior remodel to an existing Whole Foods Market. The project includes the modification of an existing scullery and equipment. There will be no change
in occupancy, use, exits, or travel distance.
PG&E PM # 35582438. PG&E to install conduit, remove/install new UG cable, replace spliceboxes, and install meter. Work is in the sidewalk. Standard working hours are 7am-4pm. The permittee
must notify affected tenants of construction; refer to page 26 of City Standard Specifications for details (attached). No traffic control setup, noise, or work is permitted in the downtown
between 11:00 am and 1:00 pm unless an exception has been reviewed and approved by the Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards.
Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working
days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35061860. PG&E to complete roadway asphalt restoration. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic
and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days
prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35652330. PG&E to install OH service and remove cable. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic
and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working
day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
AT&T job # A05A7WL. AT&T to access sub-box # 1055 and PFP. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the
approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working
day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35599732. PG&E to remove cable out of conduit. Standard working hours are 7am-4pm. A separate Caltrans permit must be obtained prior to the start of work. All work to be done
to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the
Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling
for final inspection so the permit can be closed.
PG&E PM # 35608255. PG&E to remove and install new cable and install meter. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards.
Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working
days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Sprouse Communication for Charter-Spectrum after-the-fact permit to replace bad cable. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian
controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior
to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Chorro CMP Replacement project, CIP Specification No. 2090742-11. All work to be done per City CIP Spec. No. 2090742-11 and City Standard Specifications & Engineering Standards. A traffic
and pedestrian control plan must be submitted, reviewed, and approved prior to each phase of the work. Traffic and pedestrian controls must be per an approved plan and City Appendix
G & MUTCD Standards. Contact City Public Works inspector Bobby Browning at 805-540-1031 to coordinate job inspections and information. Permittee is responsible for calling for final
inspection so the permit can be closed.
Grind removal of existing striping, install new striping, and remove existing signs at 3 locations, PO # 623253. All work to be done per PO # 623253 and City Standard Specifications
& Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call Public Works inspector Chase Montoya
at 805-540-8655 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the
permit can be closed.
PG&E after-the-fact permit for emergency tree trimming. Work took place on 08/12/25. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian
controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior
to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 31739419. PG&E to replace rotten crossarm and replace damaged connectors. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering
Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start
of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Tree removal on Buena Vista. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be
per the approved and attached plans and City Appendix G & MUTCD Standards. Call Nick Niles at 805-540-0895 two working days prior to the start of work and one working day prior to each
subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Install Charter/Spectrum conduit to service 3426 Empresa building. Work includes trenching in the dirt and boring a missile behind the back-of-sidewalk. Bore depth must be per City Engineering
Standards, which is 7' below top-of-curb or 3' minimum below crossing utilities, whichever is deeper. All work to be done per the attached plans and City Standard Specifications & Engineering
Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start
of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Foothill-Santa Rosa Sewerline Replacement Project, CIP Specification No. 2000096. All work to be done per City CIP Spec. No. 2000096 and City Standard Specifications & Engineering Standards.
A traffic and pedestrian control plan must be submitted, reviewed, and approved prior to each phase of the work. Traffic and pedestrian controls must be per an approved plan and City
Appendix G & MUTCD Standards. Contact City Public Works inspector Bobby Browning at 805-540-1031 to coordinate job inspections and information. Permittee is responsible for calling
for final inspection so the permit can be closed.
PG&E PM # 35638851. PG&E to install service cable and install transformer. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards.
Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and
one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Tree removal. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved
and attached plans and City Appendix G & MUTCD Standards. Call Nick Niles at 805-540-0895 two working days prior to the start of work and one working day prior to each subsequent inspection.
Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35659544. PG&E to replace pad-mounted transformer. Standard work hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and
pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior
to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35641868. PG&E to replace pole (same hole), install OH transformer, and install OH service cable. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications
& Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline
at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the
permit can be closed.
PG&E PM # 31623470. PG&E to replace damaged insulator and tie wire on existing OH electrical pole. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications
& Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior
to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 46525317. PG&E to repair damaged enclosure. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian
controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start
of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
AT&T job # A059518. AT&T to access manhole # 3903 and aerial placement. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and
one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35638992. PG&E to install service cable, upgrade transformer, and install secondary breakers. All work to be done to City Standard Specifications & Engineering Standards. Traffic
and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days
prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
SoCal Gas work order # 540000642494. SoCal Gas after-the-fact permit for gas leak repair. Final paving is required for the permit to be finaled. Work requires (1) 3'x2' concrete cut.
All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection
hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection
so the permit can be closed.
PG&E PM # 35654670. PG&E to replace pole and anchor and preform vegetation management. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering
Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start
of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
SoCal Gas # 2042081360. SoCal Gas to abandon and install gas lines. Work requires (1) 2'x3' asphalt cut to abandon the gas line, and (1) 3'x4' asphalt cut and (1) 2'x24' asphalt cut
to install the gas line. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards.
Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible
for calling for final inspection so the permit can be closed.
PG&E after-the-fact permit for emergency tree trimming. Work was completed on 08/22/25. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian
controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior
to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
AT&T job # A05A6AM. AT&T to access sub-box # 1124. The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications for details (attached).
No traffic control setup, noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed and approved by the Public Works inspector.
All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD
Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is
responsible for calling for final inspection so the permit can be closed.
N Chorro Greenway Chorro St and Peach St Median Modification, CIP Specification No. 2000036-08. All work to be done per City CIP Spec. No. 2000036-08 and City Standard Specifications
& Engineering Standards. A traffic and pedestrian control plan must be submitted, reviewed, and approved prior to each phase of the work. Traffic and pedestrian controls must be per
an approved plan and City Appendix G & MUTCD Standards. Contact City Public Works inspector Bobby Browning at 805-540-1031 to coordinate job inspections and information. Permittee is
responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35639631. PG&E to install OH transformer, install OH service cable, install secondary, and replace transformer. Standard working hours are 7am-4pm. All work to be done to City
Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works
inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final
inspection so the permit can be closed.
PG&E PM # 35637689. PG&E to replace pole, install OH transformer, replace span guy, and install service cable. Standard working hours are 7am-4pm. All work to be done to City Standard
Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection
hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection
so the permit can be closed.
AT&T job # A059PRT. AT&T to access manholes # 7602 and 458 and sub-boxes # 444 and 410. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian
controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start
of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35645688. PG&E to replace pole (same hole set), install OH service cable, install secondary breakers, and install tx. Standard working hours are 7am-4pm. All work to be done
to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554
two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
AT&T job # A058ZCT. AT&T to access manhole # 7702 and sub-boxes # 7702E and # 7702F. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian
controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start
of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Set up traffic control to trim bottlebrush hedge on Madonna between Oceanaire and Los Osos Valley Road. Work is for the City and is coordinated with Billy Harvey. Traffic control must
be per the attached plan and City Appendix G and MUTCD standards. Anticipated dates are: 7/7/2025-7/8/2025. All work to be done per the attached plans and City Standard Specifications
& Engineering Standards. Contact the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection.
Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35638613. PG&E to replace OH electrical pole. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian
controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start
of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
SoCal Gas NOT # 2043330809. SoCal Gas to perform service abandonment. Work requires (1) 2'x 4' asphalt cut. All work to be done to City Standard Specifications & Engineering Standards.
Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and
one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35564930. PG&E to install fault indicator, remove and pull new UG cable. Standard working hours are 7am-4pm. Work must be complete before 08/13/2025. All work to be done to
City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public
Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for
final inspection so the permit can be closed.
General tree work. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix
G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee
is responsible for calling for final inspection so the permit can be closed.
Sprouse Communication for Charter-Spectrum to overlash fiber. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per
the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working
day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Inspect/clean PG&E subsurface equipment PM 46580415. Work requires access through City of San Luis Obispo right-of-way. All work to be done per the attached plans and City Standard Specifications
& Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior
to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35411723. PG&E to install cable in conduit, remove UG conductor, deactivate conduit, install small OH equipment, and remove equipment. Standard working hours are 7am-4pm. All
work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection
hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection
so the permit can be closed.
Sprouse Communication for Charter-Spectrum to pull cable through existing conduit. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian
controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start
of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Astound Broadband LLC to pull fiber through existing UG, wyecast and tie into existing conduit, and place new vault. All work to be done to City Standard Specifications & Engineering
Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554
two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35557194. PG&E to install open point, replace pole, install OH cable, and install transformer. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications
& Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline
at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the
permit can be closed.
PG&E PM # 35488216. PG&E to complete concrete restoration on sidewalk on pole anchor. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering
Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start
of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Off-site sidewalk repairs on Slack and Henderson related to ENCR-0470-2024. All work to be done per the attached plans and City Standard Specifications & Engineering Standards. Traffic
and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days
prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
AT&T job # A0586LG. AT&T to remove aerial cable, remove pole, remove anchor/downguy, place anchor/downguy, and access sub-box. All work to be done to City Standard Specifications & Engineering
Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554
two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 45611443. PG&E to install transformer, replace 2 poles, and install OH cables. Restricted work hours; see attached traffic control plan. All work to be done to City Standard
Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection
hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection
so the permit can be closed.
PG&E PM # 35642155. PG&E to replace (2) poles, upgrade transformer, install secondary, span guy and service cable. Standard working hours are 7am-4pm. All work to be done to City Standard
Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection
hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection
so the permit can be closed.
Sprouse Communication for Charter-Spectrum to overlash cable. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per
the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working
day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Sprouse Communication for Charter-Spectrum to pull ug cable through existing conduit. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian
controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start
of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Avila Ranch Tract 3089 Phase 5 Public Improvements. All work to be done per the approved FMAP-0382-2022 plans and City Standard Specifications & Engineering Standards. A traffic and
pedestrian control plan must be submitted, reviewed, and approved prior to each phase of the work. Traffic and pedestrian controls must be per an approved plan and City Appendix G &
MUTCD Standards. Contact City Public Works inspector Trae Christensen at 805-458-1339 to coordinate job inspections and information. Permittee is responsible for calling for final inspection
so the permit can be closed.
AT&T job # A05AEGN. AT&T to transfer existing facilities from old poles to new poles and remove the old poles. Remove and restore panel(s) concrete sidewalk. All work to be done to City
Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554
two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
AT&T job # A059622. AT&T to access pole # 00046 and sub-box # 1301. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and
one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Sprouse Communication for Charter-Spectrum after-the-fact permit to replace broken pole. Any final paving (if any) is required to be completed for permit to be finaled. All work to be
done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline
at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the
permit can be closed.
Four 2-inch in diameter CPT soundings for the Prado Road Interchange project. Backfill to be per City Standards. Standard working hours are 7am-4pm. All work to be done to City Standard
Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection
hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection
so the permit can be closed.
After-the-fact permit for SoCal Gas for gas leak repair. Final paving is still required for this permit to be finaled. Work required (1) 3'x2' asphalt cut. All work to be done to City
Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works
inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final
inspection so the permit can be closed.
Bob Jones Trail Groundwater Well Drilling, Construction and Testing project, Specification No. 2091506. All work to be done per CIP Specification No. 2091506 and City Standard Specifications
& Engineering Standards. A traffic and pedestrian control plan must be submitted, reviewed, and approved prior to each phase of the work. Traffic and pedestrian controls must be per
an approved plan and City Appendix G & MUTCD Standards. Contact City Public Works inspector James Yanez at 805-503-8011 to coordinate job inspections and information. Permittee is responsible
for calling for final inspection so the permit can be closed.
AT&T job # A0591FB. AT&T to access manhole # 7210 and sub-boxes # 7210A, 7210 B, and 7210C. This work must be preformed at night. A separate night work permit from the Planning Division
is required. Night work schedule must be coordinated ahead of time with the Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic
and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days
prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. A check for
40 hours of Public Works overtime inspection fees has been received.
<On 07/10/2025, permit updated to include traffic control figure 6H-105(CA) to be used in conjunction with Figure M (see attached) to be used at locations # 5 and 6.> PG&E PM # 2010338.
PG&E to complete tree trimming at 6 locations and after-the-fact emergency tree trimming for 14 locations. Final work hours and dates to be confirmed with construction inspector. All
work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards.
Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible
for calling for final inspection so the permit can be closed.
New Photovoltaic System 12.04kW ESS2 EV:1
MAIN HOUSE - VOID
PG&E PM # 46558621. PG&E to replace anchor on pole. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian
controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start
of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
SoCal Gas NOT # 2043569812. SoCal Gas to abandon service. Work requires (1) 4'x2' asphalt cut. All work to be done to City Standard Specifications & Engineering Standards. Traffic and
pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working
day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35649663. PG&E to replace fuse. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls
must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each
subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Tree removal. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved
and attached plans and City Appendix G & MUTCD Standards. Call Nick Niles at 805-540-0895 two working days prior to the start of work and one working day prior to each subsequent inspection.
Permittee is responsible for calling for final inspection so the permit can be closed.
SoCal Gas work order # 520004134842. SoCal Gas to perform main leak repair. Work requires (1) 3' x 2' asphalt cut. All work to be done to City Standard Specifications & Engineering Standards.
Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and
one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
AT&T job # A058EWX. AT&T to access manholes # 3805 and 3111. Night work is required for this work. A check for 25 hours of Public Works overtime inspection fees has been received. Must
coordinate night work schedule with the Public Works inspector ahead of the work. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian
controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start
of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
SoCal Gas NOT # 33216894. SoCal Gas to perform meter curb box installation. Work requires (1) 4'x3' earth cut. All work to be done to City Standard Specifications & Engineering Standards.
Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and
one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 2010338. PG&E to trim trees for routine maintenance. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per
the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working
day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 31744207. PG&E to replace damaged lighting arrestors and faded operating number signage. All work to be done to City Standard Specifications & Engineering Standards. Traffic
and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days
prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35587150. PG&E to replace insulators/hardware on (3) towers on Margarita. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering
Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554
two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35622545. PG&E to conduct OH maintenance and repair/replace broken switch. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering
Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554
two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Turn Around Communication for Charter-Spectrum to overlash fiber cable on existing poles and strand, and pull fiber through existing conduit. No new poles or anchors are permitted with
this work. Permittee must obtain permission from the utility pole owner(s)/PG&E to attach. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications &
Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at
805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit
can be closed.
PG&E PM # 35639119. PG&E to replace subsurface transformer and clean out debris in enclosure. Work on El Mercado. Standard working hours are 7am-4pm. All work to be done to City Standard
Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working
days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35532720. PG&E to remove overhead fuse. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian
controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior
to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35081651. PG&E to replace pole. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls
must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each
subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 31737285. PG&E to replace damaged connector, crossarm, and insulator. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering
Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start
of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
AT&T job # A058KYT. AT&T to access manholes # 7108, 1204, 7106 and sub-boxes # 577 and 579. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications &
Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at
805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit
can be closed.
PG&E PM # 46527555 and previously 46528366. After-the-fact PG&E permit for repaired cave in at side of enclosure that exposed primary cables. Any additional work (if any) will require
final paving. Work was done 05/27/2025. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD
Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is
responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35592963. PG&E to perform work on private property. Work requires traffic control set up in City right-of-way. All work to be done to City Standard Specifications & Engineering
Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554
two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 2010338. PG&E to trim trees at multiple locations. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per
the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working
day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 31743396. PG&E to replace crossarm/trim vegetation. Final scheduling must be confirmed with the Public Works inspector prior to the start of work. Standard working hours are
7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public
Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for
final inspection so the permit can be closed.
Turn Around Communication for Charter-Spectrum to install fiber cable through existing utility vaults and existing conduit. Standard working hours are 7am-4pm. All work to be done to
City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public
Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for
final inspection so the permit can be closed.
PG&E PM # 31754141. PG&E to do OH work and make repairs to tie wire and install new crossarm. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications
& Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior
to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Upgrade PG&E transformer - PM #35644833 and PM #35637338. All work to be done per the attached plans and City Standard Specifications & Engineering Standards. Traffic and pedestrian
controls must be the attached and approved plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start
of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 2010338. PG&E to perform routine tree maintenance. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per
the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working
day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Grand Avenue Sign & Striping Modifications, CIP Specification No.2000615-01. All work to be done per City CIP Spec. No. 2000615-01 and City Standard Specifications & Engineering Standards.
A traffic and pedestrian control plan must be submitted, reviewed, and approved prior to each phase of the work. Traffic and pedestrian controls must be per an approved plan and City
Appendix G & MUTCD Standards. Contact City Public Works inspector Bobby Browning at 805-540-1031 to coordinate job inspections and information. Permittee is responsible for calling
for final inspection so the permit can be closed.
Install Pacific Beach High School Improvements on Vicente Drive. Work includes installation of two driveway approaches, one driveway approach abandonment, sewer lateral installation,
abandonment of two sewer laterals, installation of fire service lateral, and abandonment of one water service lateral. All work to be done per the approved FMAP-0005-2024 plans and
City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public
Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for
final inspection so the permit can be closed.
SoCal Gas NOT # 2043562315. SoCal Gas to replace service. Work requires (1) 4'x3' asphalt cut. All work to be done to City Standard Specifications & Engineering Standards. Traffic and
pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior
to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 2010338. PG&E to trim trees. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached
plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Greenvale Tree Co to string loose and fallen strands of lights in trees. All business access must be retained during work. The permittee must notify affected tenants of construction;
refer to page 26 of City Standard Specifications for details (attached). No traffic control setup, noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an
exception has been reviewed and approved by the Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls
must be per the previously approved TCP and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and
one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Tree trimming along Higuera and Marsh. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached
plans and City Appendix G & MUTCD Standards. Call Eric Baker at 805-781-7014 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee
is responsible for calling for final inspection so the permit can be closed.
SECURITY FENCING AROUND PROPERTY
SoCal Gas NOT # 2043562314. SoCal Gas to perform service replacement. Work requires (1) 4'x3' asphalt cut. All work to be done to City Standard Specifications & Engineering Standards.
Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and
one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
AT&T job # A05CATN. AT&T to access manhole # 3206 on Marsh. Due to the Downtown area's holiday moratorium, no work is allowed to occur between 11/27/25-01/01/26. The permittee must notify
affected tenants of construction; refer to page 26 of City Standard Specifications for details (attached). Proof of notice distribution must be provided to the Public Works inspector
prior to the start of work. No traffic control setup, noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed and approved by
the Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans
and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
SoCal Gas NOT # 2043562316. SoCal Gas service replacement. Work requires (1) 4'x3' asphalt cut. All work to be done to City Standard Specifications & Engineering Standards. Traffic and
pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working
day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
SoCal Gas work order # 520004102634. SoCal Gas to preform main leak repair. Work requires (1) 3'x2' asphalt cut. All work to be done to City Standard Specifications & Engineering Standards.
Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working
days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Perform (3) geotechnical borings to depth of 10 ft for the City's Chorro St Waterline Upgrade project, Spec No. 2001040. All work to be done per Spec No. 2001040 and City Standard Specifications
& Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline
at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the
permit can be closed.
Tenant Improvement of an existing office building. Work to include minor electrical work, minor mech/plumb. work and no structural work. No additional square footage space to be added.
CITY PROJECT
PG&E PM # 2010338. PG&E to trim trees. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached
plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 2010338. PG&E to trim tree. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls
must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work
and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35660466. PG&E to close road for work requiring crane. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be
per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one
working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Traffic control set-up in City's right-of-way. This work will also require an encroachment permit from Caltrans. All work to be done to City Standard Specifications & Engineering Standards.
Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working
days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Tearoff and install of new composition and single ply roofing system of pool house & shed.
PG&E PM # 2010338. PG&E to trim tree. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls
must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work
and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35633936. PG&E to replace pole, install OH transformer, replace anchor, and install conductor. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications
& Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline
at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the
permit can be closed.
PG&E PM # 2010338. PG&E to trim trees. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls
must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work
and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Turn Around Communication for Charter-Spectrum to replace an existing broken vault with a new vault. Work will occur in the Palmmill Alley. All work to be done to City Standard Specifications
& Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior
to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35622653. PG&E to attempt to repair switch in existing subsurface enclosure; will replace if needed. Standard working hours are 7am-4pm. All work to be done to City Standard
Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working
days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Sprouse Communication for Charter-Spectrum to overlash fiber on existing poles. No new poles or anchors are permitted with this work. Permittee must obtain permission from the utility
pole owner(s)/PG&E to attach. Traffic control is only approved for work on the Madonna frontage road; if any work extends onto Madonna (arterial), a site-specific tcp is required to
be submitted and approved by the Traffic Division. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix
G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee
is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 2010338. PG&E to trim trees. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls
must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work
and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
SoCal Gas NOT # 2043680022. SoCal Gas to abandon service. Work requires (1) 4'x2' asphalt cut. All work to be done to City Standard Specifications & Engineering Standards. Traffic and
pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working
day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
AT&T job # A05AEHY. AT&T to transfer existing facilities from old pole to new pole and remove old pole. All work to be done to City Standard Specifications & Engineering Standards. Traffic
and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days
prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35674451. PG&E to replace OH pole, install OH transformer, remove and install OH service cables. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications
& Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior
to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E after-the-fact permit for emergency tree trimming on California in relation to PM # 2010338. All work to be done to City Standard Specifications & Engineering Standards. Traffic
and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working
day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35664085. Traffic control to be in right-of-way for work on private property. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering
Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start
of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35694702. PG&E to replace pad mounted interrupter. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic
and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working
day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35218755. PG&E to replace fuse. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD
Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is
responsible for calling for final inspection so the permit can be closed.
<On 10/13/2025, permit updated to include updated traffic control to repair pit.> AT&T job # A05BC3M. AT&T to access manhole # 153. All work to be done to City Standard Specifications
& Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior
to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
RE ROOF LIKE FOR LIKE - VOIDED REPLACING SHINGLES ONLY
PG&E PM # 2010338. PG&E to trim trees. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached
plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Install and remove holiday lighting/decorations. Install to take place 11/10/2025-11/13/2025 and removal to take place 01/05/2026-01/06/2026. No noise is allowed to take place during
the install or removal of holiday lighting/decorations that would disturb tenants or neighbors. Permittee must coordinate with Downtown SLO (Downtown Association). The permittee is
required to notify affected tenants of construction/staging; refer to page 26 of City Standard Specifications for details (attached). All work to be done to City Standard Specifications
& Engineering Standards. Traffic and pedestrian controls must be per the approved plans and City Appendix G & MUTCD Standards.
TEST
PG&E PM # 35615485. PG&E to flag to install new pole, transformer cable through conduit, and install OH secondary. Standard working hours are 7am-4pm. All work to be done to City Standard
Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection
hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection
so the permit can be closed.
PG&E PM # 2010338. PG&E to trim trees. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached
plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
SoCal Gas work order # 540000612841. SoCal Gas after-the-fact permit for emergency leak repair. Work requires (1) 5'x4' concrete cut. Final paving is required for the permit to be finaled.
All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD
Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is
responsible for calling for final inspection so the permit can be closed.
AT&T job # A05BRWG. AT&T to access sub-box # 1124 and manhole # 7107. Due to the Downtown area's holiday moratorium, no work is allowed to occur between 11/27/25-01/01/26. The permittee
must notify affected tenants of construction; refer to page 26 of City Standard Specifications for details (attached). Proof of notice distribution must be provided to the Public Works
inspector prior to the start of work. No traffic control setup, noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed and approved
by the Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans
and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35644055. PG&E to pull cable through conduit and install equipment. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards.
Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working
days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Sprouse Communication for Charter-Spectrum to overlash existing cable, riser down, and pull fiber through existing duct. All work to be done to City Standard Specifications & Engineering
Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554
two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
AT&T job # A059T52. AT&T to remove sub-box # 4033 and replace it with BV # 4033. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls
must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work
and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 2010338. PG&E to perform tree maintenance at multiple locations. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls
must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work
and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 2010338. PG&E to perform routine maintenance on trees. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be
per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one
working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
SoCal Gas NOT # 2043663352. SoCal Gas to replace gas services at 688 and 672 Branch. Work requires (6) 4'x2' asphalt cuts. All work to be done to City Standard Specifications & Engineering
Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554
two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 2010338. PG&E to trim tree on Johnson. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved
and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior
to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 2010338. PG&E to trim trees at multiple locations. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per
the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working
day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Sprouse Communication for Charter-Spectrum to overlash new fiber aerial to new node location. All work to be done to City Standard Specifications & Engineering Standards. Traffic and
pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior
to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Remove (2) existing cabinets. Install new 20kw diesel generator VOID APPLICANT FOUND PREVIOUS PERMIT WITH COUNTY
with a 54-gallon fuel tank in its place.
Install new 400A disconnect and fire extinguisher
Tree removal. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved
and attached plans and City Appendix G & MUTCD Standards. Call Nick Niles at 805-540-0895 two working days prior to the start of work and one working day prior to each subsequent inspection.
Permittee is responsible for calling for final inspection so the permit can be closed.
AT&T job # A059QAB. AT&T to access manhole # 7105, sub-boxes # 3605C and 3605d, and pole # 01234. The permittee must notify affected tenants of construction; refer to page 26 of City
Standard Specifications for details (attached). No traffic control setup, noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed
and approved by the Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and
attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior
to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35562489. PG&E to replace damaged OH electrical pole, cross arms, and connectors. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications &
Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at
805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit
can be closed.
2025 Paving Project, CIP Specification No.2000616. All work to be done per City CIP Spec. No. 2000616and City Standard Specifications & Engineering Standards. A traffic and pedestrian
control plan must be submitted, reviewed, and approved prior to each phase of the work. Traffic and pedestrian controls must be per an approved plan and City Appendix G & MUTCD Standards.
Contact City Public Works inspector Bobby Browning at 805-540-1031 to coordinate job inspections and information. Permittee is responsible for calling for final inspection so the permit
can be closed.
PG&E PM # 35509517. PG&E to install pad-mount transformer, pull UG cable, and install service cable, termination, and fuses. Standard working hours are 7am-4pm. All work to be done to
City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554
two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Traffic control setup up in City right-of-way for a Caltrans project at multiple locations for construction area signs. All work to be done to City Standard Specifications & Engineering
Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554
two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
AT&T job # A058Q4F. AT&T to excavate sidewalk panels to extract (3) poles (#46, #50, and #56) and restore sidewalk. Excavate and restore additional sidewalk to remove old anchor/down-guy
on pole #56 and install new anchor/down guy on pole #30. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the
approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working
day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
upgrade from 100 amp to 200amp
REPLACING ELECTRICAL PANEL, MOVING TO OUTSIDE
New EV Chargepoint Charger added to existing parking lot.
5.94kW Photovoltaic System W/
13.5kWh ENERGY STORAGE SYSTEM
Roof Mounted, Grid-Tied
Upsize existing water lateral in the street from 3/4" to 1 1/4". Also upsize existing 5/8" water meter to 1" water meter. All work to be done per BLDG-0406-2025 and City Standard Specifications
& Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior
to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
A tenant Improvement to an existing fire sprinkler system in wood building type v-b construction
Like for like replacement; existing location
Like for like replacement of package unit; existing location
Remove and replace driveway approach, bringing the new driveway approach to ADA standards. Place rolloff dumpster in public right-of-way. Dumpster must be removed by 01/02/26. Dumpster
must be maintained in a clean and safe manner. Dumpster must be reflectorized. A copy of this permit must be placed on the dumpster. All work to be done to City Standard Specifications
& Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior
to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Abandon existing sewer lateral at the main in the street. Install new sewer lateral .Sewer wye installations and abandonments shall be completed by City staff during regular business
hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection
Hotline at (805) 781-7554 at least 24 hours in advance. Install new 1" water service lateral to serve new 3/4" water meter for 2096 McCollum. All work to be done per PLREV-0671-2025
and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the
Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling
for final inspection so the permit can be closed.
Trenching to install (3) new 2" water service laterals and (1) new 1" water service lateral. A utility work order must be obtained prior to water meter installations; currently there
is only 1 utility work order and future work orders must be obtained at a later date. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian
controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior
to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
4.8kW PV solar with battery
Addition to an existing single family residence for kitchen remodel and office expansion
AT&T job # A057XGZ. AT&T to transfer existing facilities from old pole PG8685 to newly placed pole 121432958. All work to be done to City Standard Specifications & Engineering Standards.
Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working
days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
New retaining wall
AT&T job # A05CQE9. AT&T to access FAP. No work is to occur until after 01/02/2026. The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications
for details (attached). Proof of notice distribution must be provided to the Public Works inspector prior to the start of work. No traffic control setup, noise, or work is permitted
in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed and approved by the Public Works inspector. All work to be done to City Standard Specifications &
Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at
805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit
can be closed.
Sprouse Communication for Charter-Spectrum to directional bore to set new vault. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls
must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work
and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
ADDITION OF MASTER BEDROOM
Install mini split in garage
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2B; LOT 226; PLAN CLUSTER 2C
Voluntary Seismic Retrofit In Accordance with Plan Set (A)
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2B; LOT 227; PLAN CLUSTER 1B
Conduct soil sampling. Full panels of sidewalk must be removed and replaced per City Engineering Standards unless the alternate proposed restoration method is approved. The restoration
method must be approved by the Public Works inspector in advance of the work; call the Public Works inspection hotline at 805-781-7554 to schedule a pre-construction meeting. All work
to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards.
Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible
for calling for final inspection so the permit can be closed.
PARTIAL REMODEL OF EXISTING SFR (KITCHEN, BATHROOMS, AND CREATING AN ADDITIONAL BEDROOM WITHIN EXISTING SPACE) (287 SQ. FT. LOWER REMODEL & 546 SQ. FT. UPPER REMODEL)
Like for like furnace replacement
Remove and replace driveway approach. Abandon existing water service lateral at the main in the street. Install a new 1" water service lateral to serve a new 1" water meter. Abandon
the existing sewer lateral at the main in the street. Install a new sewer lateral in a new location. Install sidewalk underdrain. All work to be done per the approved building plans,
BLDG-2074-2023, and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection
hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection
so the permit can be closed. Sewer wye installations or abandonments will be performed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made
for holidays as needed. Contractors must schedule wye installations or abandonments by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance.
AT&T job # A05CR8N. AT&T to access sub-box # 1011. A separate Caltrans permit is required prior to the start of work. All work to be done to City Standard Specifications & Engineering
Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554
two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Cut concrete to create nine street tree wells. All work to be done per the attached plans and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Install a new fire alarm communicator .
PV Roof Mount 11.07KW, 27 Modules, 1 Inverter, 1 Tesla PW3 ESS, 1 Tesla PW3 Expansion pack-Withdrawn
3.24 kW DC Roof Mount Photovoltaic with Energy Storage (1)
PG&E PM # 46656190. PG&E to clean underground enclosure next to sidewalk. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards.
Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working
days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
INSTALL 1 EST ILLUMINATED WALL SIGN, 1 NON-ILLUMINATED WALL SIGN, REFACE 2 FREESTANDING POST, REFACE 2 WALL PANELS
Modify railroad lighting circuit along the railroad safety trail behind California Highway Patrol building. This work has been coordinated with Bryan Wheeler from the Transportation
Division. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix
G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee
is responsible for calling for final inspection so the permit can be closed.
REPLACE APPROX. 20' OF 4" MAINLINE USING ABS PIPE AND FITTINGS
PV Roof Mount 4.455KW, 11 Modules, 1 Inverter, 1 Tesla PW3
PV Roof Mount 5.74KW, 14 Modules, 1 Inverter, 1 Tesla PW3 ESS, Trenching Required
Roof Mount 25.92 kW Photovoltaic System
REMODEL BLDG A UNIT TYPE A
REMODEL BLDG B TYPE B
REMODEL BLDG A UNIT TYPE A
REMODEL BLDG A UNIT TYPE A
REMODEL BLDG B UNIT TYPE A
Like for like replacement of HVAC unit
Interior remodel of existing kitchen / den spaces (~330 sqft); enlargement of (2) existing doors and (1) existing window; addition of (1) new exterior door at kitchen; new 264 sqft deck.
Remove and replace a panel(s) of sidewalk to replace a section of sewer lateral. The sewer lateral is not being replaced all the way to the main in the street at this time. A separate
building permit is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian
controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior
to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Modify/Install fire sprinklers 131 sprinklers
PV Roof Mount 12.96KW, 32 Modules, 3 Inverter, 3 Tesla PW3 ESS
PV Roof Mount 3.28KW, 8 Modules, 1 Inverter, 1 Tesla PW3 ESS, DC Trenching required
Addition of one 13.5 kWh (ESS) Energy Storage System and associated hardware to the main dwelling unit
WINDOW REPLACEMENT & STUCCO REPAIR
REPLACEMENT WIDNOW(1)
ELECTRICAL PANEL REPLACEMENT. NO ADDED LOADS
METER PANEL REPLACE LIKE FOR LIKE SAME LOCATION
Installation of a ESS /PV system on a SFR. 8.1 KW of roof mounted solar (18 Panels) and 13.3 kWh of Battery storage. with a Sol-Ark 15 kw Battery/PV Inverter charger.
NEW 4.5 KW DC PHOTOVOLTAIC SYSTEM WITH ESS STORAGE 13.5KWH
Minor remodel of Deli area - removing and adding.
11.34 kW DC Roof Mount Photovoltaic System with Energy Storage (2),EV Charger (1)
Service Relocation to New ADU 200amp Like-for-Like
(N) SPA (INNER 6'X6') RAISED 2'
ABOVED GROUND
(N) EQUIPMENT PAD 3'X8'
(N) EQUIPMENT
REPAIR FRONT PORCH DECK AS NECESSARY
PG&E PM # 46593128. PG&E to install bird protection on pole. Work should be scheduled when school is not in session. All work to be done to City Standard Specifications & Engineering
Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start
of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
REPLACEMENT WINDOWS/SG DOOR
Installation of a 5.4 Kw DC roof mount Pv system, Using (12) Pv modules of 450W + (12) ENPHASE IQ8PLUS-72-M-US microinverters.
General tree maintenance. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and
City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
The proposed project includes a partial remodel and addition to an existing 1,005-sf single family residence. The proposed improvements include converting an existing partially enclosed
446 sq. ft. 2-car carport into a fully enclosed 2-car garage, and converting an existing non-conditioned 228 sq. ft. laundry room into a conditioned bathroom. The proposed improvements
also include the addition of a 206 sf bedroom.
CONVERSION OF AN ADDITION TO A SFR TO AN ADU
Roof mounted solar 4.2 KW & 1 Energy Storage system
CONVERSION OF GARAGE TO AN ADU (496 SQ. FT.);
PM #46593135 - PG&E to install bird protection on pole located next to road. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls
must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each
subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Work must be scheduled to not conflict with school drop-off or pick-up times. PM #46592392 - PG&E to repair conductor on pole next to road. Pole located on Lizzie St side of property.
All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection
hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection
so the permit can be closed.
SoCal Gas NOT # 2043806738. SoCal Gas to abandon service. Work requires (1) 4'x2' asphalt cut. All work to be done to City Standard Specifications & Engineering Standards. Traffic and
pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working
day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
TENANT IMPROVEMENT ON THE 2ND FLOOR OF AN (E) COLD SHELL BUILDING TO INCLUDE A NEW OFFICE AND WARM SHELL IMPROVEMENTS IN THE REMAINDER OF THE 2ND FLOOR SPACE
SoCal Gas NOT # 2043731271. SoCal Gas to replace service. Work requires (1) 2'x2' cut in concrete, (1) 4'x2' cut in asphalt, and (2) 2'x2' cuts in asphalt. All work to be done to City
Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554
two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
REMODEL BLDG G TYPE A
REMODEL BLDG G TYPE A
REMODEL BLDG G TYPE A
REMODEL BLDG G TYPE A
REMODEL BLDG C UNIT TYPE A
REMODEL BLDG C UNIT TYPE A
REMODEL BLDG E UNIT TYPE A
Installation of a 4.5 kW-DC PV System, using (10) Modules + (1) EP CUBE HYBRID INVERTER + BATTERIES 9.9KWh + New 100A Subpanel.
REMODEL BLDG G TYPE A
REMODEL BLDG F TYPE A
REMODEL BLDG F TYPE A
REMODEL BLDG D UNIT TYPE A
REMODEL BLDG D UNIT TYPE A
REMODEL BLDG E UNIT TYPE A
REMODEL BLDG D UNIT TYPE A
REMODEL BLDG D UNIT TYPE A
New detached ADU Studio,
2-Story Residential Structure
RESURFACING EXISITING STUCCO WITH NEW SMOOTH STUCCO ON ALL APARTMENT BUILDINGS
REMODEL BLDG E UNIT TYPE A
REMODEL BLDG E TYPE A
REMODEL BLDG E TYPE A
SoCal Gas NOT # 2043764075. SoCal Gas to abandon service. Work requires (1) 4'x2' earth cut. All work to be done to City Standard Specifications & Engineering Standards. Traffic and
pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior
to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
REMODEL BLDG G TYPE A
SoCal Gas work order # 52-4255797. SoCal Gas to repair leak at the main and perform final paving. Work requires (1) 3'x2' asphalt cut. All work to be done to City Standard Specifications
& Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior
to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
REMODEL BLDG C UNIT TYPE A
REMODEL BLDG C UNIT TYPE A
REMODEL BLDG B UNIT TYPE A
REMODEL BLDG C UNIT TYPE A
REMODEL BLDG C UNIT TYPE A
REMODEL BLDG B UNIT TYPE A
REMODEL BLDG B UNIT TYPE A
SoCal Gas work order # 52-4360930. SoCal Gas to repair leak at the main and perform final paving. Work requires (1) 3'x2' asphalt cut. All work to be done to City Standard Specifications
& Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior
to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection
Hotline at (805) 781-7554 at least 24 hours in advance.
2026 Blanket Encroachment Permit - This permit covers fees for maintenance work, which includes: new services, mainline repairs, pole relocations, sidewalk repairs/replacements, splice
box repairs/replacements, and all general system activities. New mainline installations require a separate encroachment permit with separate fees. Traffic and pedestrian controls must
be per MUTCD and City Standards. When applicable, traffic control plans and/or improvement plans must be submitted, reviewed, and approved prior to the start of work. Each job involving
excavation, traffic control, or requiring any other inspection requires a separate encroachment permit and traffic control application. For each separate permit issued under the blanket,
contact the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible
for calling for final inspection so each permit can be closed.
New attached ADU garage conversion.
garage adu conversion
THIS PROJECT CONSISTS OF THE CONVERSION OF AN EXISTING DETACHED CAR PORT INTO A DETACHED 594 S.F. A.D.U. WITH 2-BEDROOMS AND 2-BATHROOMS.
Voluntary Seismic Retrofit In
Accordance with Plan Set (A)
Install roof mounted 2.15kW PV System with (1) ESS
Install roof mounted 5.16kW PV System with (1) ESS
Hedge pruning. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix
G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee
is responsible for calling for final inspection so the permit can be closed.
CHANGE OF USE FROM RETAIL TO BUSINESS OCCUPANCY (CIDER TASTING ROOM WITH LESS THAN 50 OCC.). TENANT IMPROVEMENT INCLUDING NEW SALES COUNTER & ASSOCIATED ACCESSIBILITY UPGRADES.
MUP: USE-0136-2025
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection
Hotline at (805) 781-7554 at least 24 hours in advance.
4.10 kW DC Roof Mount Photovoltaic System with Energy Storage (1)
Project address: 210 FOXTROT COURT, SAN LUIS OBISPO, CA, 93401. Avila Ranch Lot 231. Installation of a 4.95 kW-DC PV System, using (11) CANADIAN SOLAR MODULES + (11) ENPHASE Microinverters.
Installation of PV System of 4.95 kW-DC, 11 modules of 450W, 11 microinverters, Enphase EQ combiner, AC disconnect.
INSTALL ENERGY STORAGE SYSTEM
General tree maintenance. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and
City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
NEW DETACHED ADU
REPLACE CELLULAR COMMUNICATOR ALL EXISTING DEVICES TO REMAIN.
EXISTING FIRE ALARM SYSTEM
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2B; LOT 224; PLAN CLUSTER 2A
Directional bore to install Charter-Spectrum conduit. Also, place fiber in existing conduit. Bore depth to be 7 ft below top of curb or 3 ft below the lowest utility, whichever is deeper.
All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD
Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is
responsible for calling for final inspection so the permit can be closed.
Sprouse Communication for Charter-Spectrum to overlash new coax on existing poles. No new poles or anchors are permitted with this work. Permittee must obtain permission from the utility
pole owner(s)/PG&E to attach. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans
and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
New attached trellis, entry path, and site walls.
Place and maintain tables and chairs in the sidewalk. Operations and maintenance shall comply with use permit USE-0678-2024 and Chapter 5.50 of the Municipal Code. Sidewalk rental fees
will be billed annually to the permittee, based on 50 square feet of sidewalk space being used. Current insurance documentation must be maintained for this encroachment permit to remain
valid. This encroachment permit may be extended with receipt of current insurance documentation. Please send updated insurance documents to encroachment@slocity.org to extend this permit.
PG&E PM # 31756163. PG&E to replace crossarm and do maintenance work on pole. Work should be scheduled when school is not in session. All work to be done to City Standard Specifications
& Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior
to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35691945. PG&E to install pole, install new OH transformer, and install OH service cable. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications
& Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline
at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the
permit can be closed.
MASTER PLOT PLAN (PERMIT#FIRE-0702-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 290; PLOT PLAN 5; TRACT 3089
Change Out Gas Furnace for Electric Mini-Split
pv solar roof mount, 8 modules, 3.28kw, comp shingle, existing 100A MSP, 1 ESS, 1 BUI
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection
Hotline at (805) 781-7554 at least 24 hours in advance.
PG&E PM # 46613633. PG&E to adjust tension on pole and straighten leaning pole. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering
Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554
two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 290; PLAN COTTAGE 5
Convert existing covered patio into living space with kitchen remodel
Enlarging the master bedroom.
Installation of roof mounted PV (5.46kW DC) with (12) CS 455's, (12) Enphase IQ8AC Microinverters, Enphase Combiner 5
new photovoltaic system 11.18kW ESS:2
Rooftop Mounted Solar Energy System
PV+ST
15 HiN-T435NF(BK) solar modules
1 1707000-XX-Y {240V, 11.5kW} inverter
1 1707000-XX-Y {11.5kW} ESS + 1 1807000-XX-Y DC battery expansion
Main Panel Upgrade: Yes
System Size: 6.53 kW DC (11.51 kW AC)
Add 20kWh ESS to (E) PV System
Install (1) ESS Expansion pack
New Window Install. (in new opening, not replacement)
Installation of 5.1kW-DC roof mount solar system with 13.5kWh energy storage system
Replace 100 amp Electric Service Panel with 200 amp Electric Service Panel
ADD ON 1X ESS
Installation of 13.5kWh Battery Energy Storage System. Existing, permitted/approved Solar PV already onsite.
4.86kw Roofmounted PV with micro inverters-no storage
PV Roof Mount 8.1KW, 20 Modules, 1 Inverter, 1 Tesla PW3 ESS, 1 Tesla PW3 Expack, Existing solar installed
ADDITION OF EV CHARGER AND 2X SOLAR PANELS TO EXISTING SYSTEM
NEW DETACHED ADU - Modular building, 14'-10" x 44', placed on concrete perimeter foundation
Like for like replacement of current HVAC unit.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection
Hotline at (805) 781-7554 at least 24 hours in advance.
PG&E PM # 31754210. PG&E to do maintenance on pole. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix
G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee
is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35663764. PG&E to install transformer and OH minor equipment. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards.
Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working
days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection
Hotline at (805) 781-7554 at least 24 hours in advance.
PG&E PM # 35585344. PG&E to remove pole and OH transformers and replace with new pole and (2) OH transformers. Remove and install new OH conduit, and reframe pole. Standard working hours
are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix
G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee
is responsible for calling for final inspection so the permit can be closed.
Astound Broadband LLC to install conduit by open trench, intercept existing City conduit, wye cast and place new vault. Pull fiber through existing City conduit to existing vault. The
permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications for details (attached). Proof of notice distribution must be provided to the
Public Works inspector prior to the start of work. No traffic control setup, noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed
and approved by the Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and
attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior
to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
New 13D Fire Sprinkler System
New 13D Sprinkler System
PG&E PM # 35672971. PG&E to work in rear of property to transfer OH equipment from location 1 OH to Toro St. Standard working hours are 7am-4pm. All work to be done to City Standard
Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection
hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection
so the permit can be closed.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection
Hotline at (805) 781-7554 at least 24 hours in advance.
Garage conversion to 2bd/ 1ba ADU
Painting wall which requires sidewalk closure. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and
attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior
to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35697601. PG&E to install OH span guy, upgrade transformer, and install OH service cable. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications
& Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior
to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
divide space into 2 office spaces
PG&E PM # 35675564. PG&E to replace OH transformer, install riser, remove and pull new UG cable, and install enclosure. Standard working hours are 7am-4pm. All work to be done to City
Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554
two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection
Hotline at (805) 781-7554 at least 24 hours in advance.
Remodel home and add room / patio
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection
Hotline at (805) 781-7554 at least 24 hours in advance.
Install new 1" water service lateral to serve a new 1" water meter. All work to be done per BLDG-2324-2022 and City Standard Specifications & Engineering Standards. Traffic and pedestrian
controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior
to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
REMODEL 93 SF OF SINGLE BATHROOM INTO TWO BATHROOMS (ONE MASTER AND ONE HALL BATH)
New Photovoltaic System 8.7kW ESS1 Subpanel:125A, Subpanel:200A
Solar
REMOVE AND REPLACE WALL HEATER AT SAME LOCATION (LIVING ROOM)
NEW WET TYPE FIRE SPRINKLER SYSTEM
ADDING CELL/RADIO UNIT INSTEAD OF 2 ANALOG PHONE LINES
Install New Manufactured Duplex as ADUs
MASTER PLOT PLAN (PERMIT#FIRE-0704-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 303; PLOT PLAN 2; TRACT 3089
MASTER PLOT PLAN (PERMIT#FIRE-0705-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 302; PLOT PLAN 3; TRACT 3089
Lettering on existing awning
PG&E PM # 35655912. PG&E to remove equipment. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian
controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start
of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
665 sq.ft. addition and 2 new wood decks
SoCal Gas to place traffic control signage in the City's right-of-way for work in the County's jurisdiction. All work to be done to City Standard Specifications & Engineering Standards.
Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working
days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
INTERIOR REMODEL OF PRIMARY SUITE, KITCHEN, DINING ROOM, HALLWAY. NEW
EXTERIOR WINDOWS
water heater change out
Installation of PV System of 5.4 kW, 12 modules of 450W, 12 microinverters, Enphase EQ combiner.
PM #35663336 - PG&E service connection. All work to be done per the attached plans and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per
City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Mechanical, electrical and plumbing work is limited to replacement of (3) existing rooftop Air Conditioning Units. Existing ductwork shall remain unchanged, other than to transition
from rooftop unit duct connections to existing ductwork.
PANEL UPGRADE
Remove existing water heater and install new water heater.
This will be the same type of water heater and will be going back into the same location.
(Square ft shared is the square footage of the home.)
PANEL UPGRADE 100A-200A
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2B; LOT 233; PLAN CLUSTER 4B
SlO Cancer Center TI- Suite 120 This project consists of A group medical/ Office occupancy.
1. All fire sprinkler system control valves and waterflow switches shall be monitored by the fire alarm system.
2 Per CBC 907.2.2, group B exception: one manual fire alarm pull station has been installed in ) in the electrical room housing FACP & remote power supply. no additional manual pull
stations are required or installed in this suite.
3. Building is 100% sprinklered per NFPA 13. Occupant notification shall activate automatically upon waterflow detection at the fire riser waterflow switch.
4. Fire Alarm occupant notification appliances (horns/ Strobes) shall be installed in public areas, staff work areas, nursing working areas, and exit corridors.
5. All notification appliances shall be connected to the fire alarm control panel and remote power supply located in the adjacent suite. see sheet FA2 for building map and panel locations.
Install over head fire Sprinkler system for Tenant Improvement the system does not exceed the original OH II design in Suite 110-
New 999 sf ADU attached to the rear of an existing SFR
Demo existing tub, valve and tile surround. Install new acrylic shower pan, valve and acrylic wall surround.
PG&E PM # 2010338. PG&E to trim trees. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached
plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
REPLACE SEVERAL ALARM DEVICES
PG&E PM # 2010338. PG&E to trim tree. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached
plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Install Roof Mounted 14.62kW PV System with (2) ESS
New install.
Install a 2-ton mini Split w/Wind Free Tech (heatpump and wall mount)
furnace change out
Replacement of heat pump system
P.V. ROOF TOP ARRAY
Emergency repair - Replace leaky water service lateral. Work was requested by Utilities Department and coordinated with James Yanez, Construction Manager. All work to be done to City
Standard Specifications & Engineering Standards. Traffic and pedestrian controls are being coordinated with Justin Wong, Traffic Division. Traffic and pedestrian controls must be per
City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
DETACHED STUDIO UNIT BEHIND EXISTING 2 BEDROOM RESIDENCE
PG&E PM # 35596409. PG&E to replace fuse and pull cable through conduit. Work hour restrictions apply if school is in session. All work to be done to City Standard Specifications & Engineering
Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554
two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
TO OBTAIN A BUILDING PERMIT FOR A NEW ACCESSORY
DWELLING UNIT CONVERTED FROM A PREVIOUSLY
PERMITTED SINGLE CAR GARAGE ON A SITE WITH AN
EXISTING MAIN RESIDENCE, AND EXISTING ADU PER
GOVERMENTAL CODE 66323 A, 1.
like for like furnace change out
PG&E PM # 35605976. PG&E to do pole maintenance on multiple poles and place a new pole. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering
Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554
two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Remove and relocate existing stairs, new sliding door, remodel Kitchen and Powder room. Remove and Replace all exterior windows.
PG&E PM # 35641103. PG&E to install transformer. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian
controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start
of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35641866. PG&E to install pole and pull cable in conduit. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic
and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days
prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Install Lennox Heat Pump and air handler.
Conversion of existing culinary school kitchen to commercial catering kitchen
PG&E PM # 35547007. PG&E to install cable in conduits and install meters. Work hour restrictions apply; please see the attached traffic control plan comments. All work to be done to
City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public
Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for
final inspection so the permit can be closed.
Tree trimming along Marsh. The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications for details (attached). Proof of notice distribution
(dates and times) must be provided to the Public Works inspector prior to the start of work. No traffic control setup, noise, or work is permitted in the downtown between 11:00 am and
1:00 pm unless an exception has been reviewed and approved by the Public Works inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian
controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call Eric Baker at 805-781-7014 two working days prior to the start of work and one working
day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
MASTER PLOT PLAN (PERMIT#FIRE-0699-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 292; PLOT PLAN 2; TRACT 3089
SoCal Gas NOT # 2042875000. SoCal Gas to move meter into vault. Work requires (1) 4'x4' earth cut. All work to be done to City Standard Specifications & Engineering Standards. Traffic
and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days
prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Supply and Install (2) Retrofit Windows into EXISTING Openings.
Ductless split system installation
Conversion of an existing 226 S.F. into a microdistillery. Minor interior improvements, no expansion of building footprint. No changes to life safety or accessibility. Refer to BLDG-1226-2022
for Arcade work.
40g natural gas removal and replacement, like for like
Staging in the right-of-way to paint third story window. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and
pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior
to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Battery Electric Bus Charging Infrastructure project, CIP Specification No.2000403. All work to be done per City CIP Spec. No. 2000403 and City Standard Specifications & Engineering
Standards. A traffic and pedestrian control plan must be submitted, reviewed, and approved prior to each phase of the work. Traffic and pedestrian controls must be per an approved plan
and City Appendix G & MUTCD Standards. Contact City Public Works inspector Brett Sinkovich at 805-440-7172 to coordinate job inspections and information. Permittee is responsible for
calling for final inspection so the permit can be closed.
remodel kitchen, remodel bathrooms and replace 7 windows
AB-2533 - Legalization for existing unpermitted accessory dwelling unit built before January 1 2020
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection
Hotline at (805) 781-7554 at least 24 hours in advance.
84.68kW Photovoltaic System
Roof Mounted, Grid-Tied
2-Story Attached ADU
MASTER PLOT PLAN (PERMIT#FIRE-0700-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 304; PLOT PLAN 3;
TRACT 3089
MASTER PLOT PLAN (PERMIT#FIRE-0699-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 305; PLOT PLAN 2;
TRACT 3089
Installation of carport PV systems at 972 Nipomo, 29 Prado, 900 Southwood, and 2160 Santa Barbara. All work to be done to City Standard Specifications & Engineering Standards. Where
applicable, a traffic control plan must be submitted, reviewed, and approved prior to the start of work. Traffic and pedestrian controls must be per an approved plan and City Standard
Specifications & Engineering Standards. Contact City Public Works inspector Brett Sinkovich at 805-440-7172 to coordinate job inspections and information. Permittee is responsible for
calling for final inspection so the permit can be closed.
PG&E PM # 31768962. PG&E to replace lid on sidewalk. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved
and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior
to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
AT&T job # A05CY4S. AT&T to access manholes # 3060 and 3045A. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic
and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days
prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
MASTER PLOT PLAN (PERMIT#FIRE-0700-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 293; PLOT PLAN 3; TRACT 3089
re-pipe existing water lines with new PEX water lines
D MASTER PLOT PLAN (PERMIT#FIRE-0699-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 291; PLOT PLAN 2; TRACT 3089
Replace sewer lateral to the main using trenchless technology. No staging in the public right-of-way is to occur during school drop-off and pick-up times. Trenchless lateral replacements
may require a video submittal to be emailed after replacement. A separate building permit is required for any sewer lateral replacement on private property. All work to be done to City
Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554
two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must
schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance.
Installation of 4.5 kW-DC PV system, (10) 450W modules, (10) Enphase Microinverters + 125A Enphase IQ Combiner Panel + PV AC Disconnect
ADD NEW CIRCUIT AND RACEWAY FROM THE PANEL TO THE SHED FOR POWER, SWITCH, AND LIGHTING
Installation of 4.95 kW-DC PV system, (11) 450W modules, (11) Enphase Microinverters + 125A Enphase IQ Combiner Panel + PV AC Disconnect
Remove existing meter. Install 200 amp exterior mount meter main panel.
Repair Fire-Damaged Stair Landing at top of Exterior Stairs
voluntary seismic Retrofit
In Accordance with plan Set (A)
Voluntary seismic Retrofit in Accordance with Plan Set (A)
INSTALLATION OF SCULPTURE
4.5 kW-DC PHOTOVOLTAIC SYSTEM USING? 10 CANADIAN SOLAR CS6.1-54TM-450H
4.5 kW-DC PHOTOVOLTAIC SYSTEM USING?10 CANADIAN SOLAR CS6.1-54TM-450H
4.5 kW-DC PHOTOVOLTAIC SYSTEM USING: 10 CANADIAN SOLAR CS6.1-54TM-450H
New roof mounted photovoltaic system 3.68kW
Backfill spa with fill sand and pour 4" concrete to fill in. Backfill spa and pour top cap with concrete. Demo top copping, back fill with fill sand, pour 4" concrete cap. #3 rebar.
Concrete pumping. labor to set and pour
Like for like replacement of heat pump
Roof mounted solar 4.2kw & 1 Energy Storage system
removal of old water heater & installation of Noritz NRCR111 DV PRO
Installation of a new circuit for a level 2 Electric vehicle Charger
Abandon driveway approach with sidewalk, curb, and gutter. Install one new 1" water service lateral to serve one new 1" water meter that will serve 418 Jeffrey Drive Units A & B. Install
a new 4" sewer lateral. All work to be done per the approved building plans, BLDG-3310-2023, and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls
must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each
subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations will be performed by City staff during regular
business hours on Tuesdays and Wednesdays only, with exceptions made for holidays as needed. Contractors must schedule wye installations by calling the Public Works Inspection Hotline
at (805) 781-7554 at least 24 hours in advance.
Installation of PV System of 5.4 kW, 12 modules of 450W, 12 microinverters, Enphase EQ combiner.
New Roof mounted photovoltaic system 3.48kW ESS:2 EV:48A
Electrical Panel Upgrade-like for like same location no added load
REMODEL 350 SQ. FT. OF EXISTING INTERIOR LIVING SPACE INTO (2)-BEDROOMS UTILIZING EXISTING SLIDING GLASS DOORS
New Detached 1 bedroom, 1bathroom ADU
Addition of living space to (e) SFR; partial interior remodel including new powder bath, replace windows and exterior doors, demo (e) raised deck, install (n) patio and attached pergola
5.40kW Photovoltaic System W/
13.5kWh ENERGY STORAGE SYSTEM
roof Mounted, Grid-Tied
Install Tesla Powerwall 3 with
Tesla Backup Switch on exterior of
garage on 60A circuit. Install 48A
Tesla Wall Connector on interior
of garage on 60A circuit.
Install 48A Tesla Wall Connector on interior of garage on 60A circuit.
NEW SINGLE-FAMILY RESIDENCE W/ATTACHED ADU
Temp pole for demolition of existing structure and construction of new structures
5.06kW Photovoltaic System W/
13.5KWH ENERGY STORAGE SYSTEM
(11) MODULES ROOF MOUNTED
1 Inverter, 1 Tesla PW3 ESS, Existing Solar system installed
PV Roof Mount 5.72KW, 13 modules, 1 Inverter, 1 Tesla PW3 ESS
PV Roof Mount 8.505KW, 21 Modules, 1 Inverter, 1 Tesla PW3 ESS, 1 Tesla PW3 Expansion pack
4.05 kW-DC PHOTOVOLTAIC SYSTEM USING:
09 CANADIAN SOLAR CS6.1-54TM-450H
NEW ROOF MOUNTED 8.360KW SOLAR SYTEM - SOLAR ONLY
100 amp panel to 200 amp panel
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 291; PLAN COTTAGE 2
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 293; PLAN COTTAGE 3
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 292; PLAN COTTAGE 2
Relocate water softener and water heater from inside garage to outside house. Relocate electrical and plumbing to new location.
Replace 21 windows with retrofit vinyl windows.
Installation of 4.95 kW-DC PV system, (11) 450W modules, (11) Enphase Microinverters + 125A Enphase IQ Combiner Panel + PV AC Disconnect
Replacement of 9 windows. No Construction. No Framing. Like for like.
Reroof
DEMO 63 SQ. FT. DILAPIDATED UTILITY ROOM ATTACHED TO SINGLE FAMILY RESIDENCE. ADDITION OF 546 SQ. FT. TO EXISTING SINGLE FAMILY RESIDENCE TO CREATE A DUPLEX. RELOCATE/REPLACE WASHER
& DRYER INTO EXISTING UNIT AND INSTALL TANKLESS WATER HEATER OUTSIDE.
Installation of 4.95 kW-DC PV system, (11) 450W modules, (11) Enphase Microinverters + 125A Enphase IQ Combiner Panel + PV AC Disconnect
NEW SINGLE STORY DETACHED ADU & WORKSHOP ON PROPERTY WITH EXISTIN SFR
NEW DUPLEX
Phase 1 shoring design for Monterey Senior project at 1426 Monterey to allow for installation of transformer and PG&E infrastructure to service building. Phased shoring design is necessary
as PG&E requires transformer to be installed in order to sign off on building's certificate of occupancy. Shoring in this phase is limited to that adjacent to PG&E infrastructure at
project Driveway 2.
REPAIR FIRE DAMAGE AT 2ND FLOOR SISTER EXISTING FLOOR JOIST FROM WALL TO WALL
IN HALLWAY BOTH SIDES INSPECT EXIST ELEC. PANEL FOR RE-INSTALLING METER
40 gallon natural gas removal install Noritz EZTR50 PRO
pv solar roof mount, 12 modules, 4.86kw, comp shingle, existing 125A MSP,, 1 ESS
SoCal Gas WO # 52-2888137. SoCal Gas after-the-fact permit for emergency leak repair. Final paving is required for the permit to be finaled. Work requires (1) 3'x2' asphalt cut. All
work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection
hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection
so the permit can be closed.
4.95 kW DC PV System using 11 modules.
5.4 kW-DC PHOTOVOLTAIC SYSTEM USING: 12 JA SOLAR JAM54D41 LB-450W OR 12 CANADIAN SOLAR CS6.1-54TM-450H OR 12 THORNOVA SOLAR TS-BGT54(450)
5.4 kW-DC PHOTOVOLTAIC SYSTEM USING: 12 JAM54D41 LB-450W OR 12 CANADIAN SOLAR CS6.1-54TM-450H OR 12 JKM 450N-54HL4R-B-F8-EN
4.5 kW DC PV System using 10 modules.
4.95 kW-DC PHOTOVOLTAIC SYSTEM USING: 11 JAM54D41 LB-450W OR 11 CANADIAN SOLAR CS6.1-54TM-450H OR 11 THORNOVA SOLAR TS-BGT54(450)
PG&E PM # 35533791. PG&E to replace cover/lid on box, bring to grade, and install cable in conduit. All work to be done to City Standard Specifications & Engineering Standards. Traffic
and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days
prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
8.72kW Photovoltaic System W/
27kWh ENERGY STORAGE SYSTEM
Roof Mounted, Grid-Tied
SoCal Gas WO # 54-487708. SoCal Gas after-the-fact permit for emergency leak repair. Final paving is required for the permit to be finaled. Work requires (1) 3'x6' concrete cut. All
work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection
hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection
so the permit can be closed.
Replace existing fixed hexagonal skylight with similar skylight.
Davey Tree Surgery for PG&E to restore PG&E utility pole using steel truss on Garfield. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian
controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior
to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Davey Tree Surgery for PG&E to restore PG&E utility pole using steel truss on Vachell. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian
controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior
to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
NEW ADU
Interior remodel of existing single family residence. Two new bedrooms and one new bathroom. Replace all windows like for like. Replace roofing like for like. New HVAC system in existing
attic.
The proposed project is an interior tenant improvement to an existing office space. No exterior building walls nor site areas to be altered.
THE CONSTRUCTION OF 2 (N) DETACHED 765 SQ. FT. ACCESSORY DWELLING UNITS IN THE REAR YARD OF AN (E) MULTI FAMILY RESIDENCE.
Commercial TI to existing metal building; remodeled tenant spaces include beer tasting, food prep and storage areas
Kitchen addition of the existing wood-framed structure
DEMOLITION AND RESTORATION OF FRAMING AND EXTERIOR STUCCO ON CORNER OF FRONT PORCH.
install 291 Linear feet of 16' feet tall racks and 46 linear feet of 7'-8' shelving units
Kitchen, laundry/mudroom remodel that requires structural modifications with window and door replacement. Replace like-kind windows in the guest bedroom.
Replacing existing 6 windows with retrofit windows
ADU Garage Conversion
New 2 Story Residence with a 2 car garage
Expanding (E) 398 SF ADU into a 1,000 SF ADU. Number of bedrooms shall remain as 3.
PV INSTALL 11.5 KW , 10 MODULES, 1 ESS
New Photovoltaic System 3.44kW ESS:1
Roof mounted solar 6.56 KW & 1 Energy Storage system
New photovoltaic system 5.59kW with new ESS, Panels:13 ESS:1
Install 60 amp subpanel to install potential maximum 50 amp dedicated circuit for an ampUP EV charger.
Roof Mount PV system 8.1KW DC, (20) Panel, (1) Inverter with ESS
Project address: 223 FOXTROT COURT, SAN LUIS OBISPO, CA, 93401. Avila Ranch Lot 214. Installation of a 5.4 kW-DC PV System, using (12) CANADIAN SOLAR MODULES + (12) ENPHASE Microinverters.
Install 48A Tesla Universal Wall Connector on interior of garage on 60A circuit.
50 gallons natural gas removal and replacement
Residential Roof Mounted Solar (PV) 2.1kwDC and (1) ESS
Install (1) Level 2 EV Charger
Install a 249.57kW roof mounted grid-tied solar photovoltaic (PV) system
new 240V 30A 66G electric heat pump water heater replacing gas-fired water heater in same location (garage)
INSTALLATION OF A 5.4 kW-DC PHOTOVOLTAIC SYSTEM USING:
(12) CANADIAN SOLAR MODULES +
(12) ENPHASE MICROINVERTERS +
(01) CANADIAN EP CUBE BATTERY 9.9kWh
Project address: 206 FOXTROT COURT, SAN LUIS OBISPO, CA, 93401. Avila Ranch Lot 230. Installation of a 4.95 kW-DC PV System, using (11) CANADIAN SOLAR MODULES + (11) ENPHASE Microinverters.
Install 48A Tesla Universal Wall
Connector on exterior wall on
60A circuit.
PV Solar roof mounts, 3.69KW, 9panels, comp-shingle, Existing 100A MSP, 1 ESS, BUI, Subpanel 125A
PV Roof Mount 3.69KW, 9 Modules, 1 Inverter, 1 ESS
PV Solar roof mounts, 3.28KW, 8panels, comp-shingle, Existing 100A MSP
1-ESS, BUI, Subpanel 125A
PV solar roof mount, 9 modules, 3.645 kw, rolled comp., existing main 100A, SolarEdge Battery with BUI + EV charger
24.8kW PHOTOVOLTAIC SYSTEM WITH 40.5 ENERGY STORAGE SYSTEM. ROOF MOUNTED GRID TIED
7.23kW Photovoltaic System W/
13.5kWh ENERGY STORAGE SYSTEM &
EV Charger
Roof Mounted, Grid-Tied
PV solar roof mount,22modules, 8.91kw, Comp shingles, existing Subpanel 100A, TESLA Powerwalls3
Add rooftop PV (68 modules, 36.72kw) and 1 ESS unit (Sol-Ark 30k-3r-208v) - Echelcon:Monterey Senior Apartments
Installation of a 4.95 kW-DC PV System, using: (11) Modules + (1) EP CUBE HYBRID INVERTER + BATTERIES 9.9KWh NEW BACKUP SUB PANEL 100A+ (1) NEW EP CUBE SMART GATEWAY 120/240V. ADDED
Emergency stop outside.
pv solar roof mount, 8 modules, 3.24kw, comp shingle, existing 200A MSP, 1 ESS
100 ft replace sewer lateral with HDPE pipe using pipe bursting technology. Install G5 box with concrete ring
Remove existing outdated 10.6 KW PV system and install a new 26.6 kWh ESS with a 12.6 KW PV system in its place.
Design of a new Fire Sprinkler System for a new performing arts theater.
MASTER PLOT PLAN (PERMIT#FIRE-0706-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 208; PLOT PLAN 4; TRACT 3089
MASTER PLOT PLAN (PERMIT#FIRE-0706-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 206; PLOT PLAN 4; TRACT 3089
MASTER PLOT PLAN (PERMIT#FIRE-0704-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 205; PLOT PLAN 2; TRACT 3089
MASTER PLOT PLAN (PERMIT#FIRE-0706-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 213; PLOT PLAN 4; TRACT 3089
MASTER PLOT PLAN (PERMIT#FIRE-0706-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 212; PLOT PLAN 4; TRACT 3089
MASTER PLOT PLAN (PERMIT#FIRE-0705-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 207; PLOT PLAN 3; TRACT 3089
Install Fire sprinkler for new multi family building; 4-plex Townhomes; Tract 3111.
address: 1198 Tiburon way Type A, Fire sprinkler system is an NFPA 13D
New SFR - Installing NFPA 13D fire sprinkler system
Install Fire sprinkler for new multi family building; 4-plex Townhomes; Tract 3111.
address: 1194 Tiburon way Type B, Fire sprinkler system is an NFPA 13D
Install Fire sprinkler for new multi family building; 4-plex Townhomes; Tract 3111.
address: 1196 Tiburon way Type B, Fire sprinkler system is an NFPA 13D
MASTER PLOT PLAN (PERMIT#FIRE-0703-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 216; PLOT PLAN 1; TRACT 3089
Install Fire sprinkler for new multi family building; 4-plex Townhomes; Tract 3111.
address: 1192 Tiburon way, Fire sprinkler system is an NFPA 13D
Renovation of existing handball structure (2,862 SF) into a community center for apartment complex.
MASTER PLOT PLAN (PERMIT#FIRE-0704-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 215; PLOT PLAN 2; TRACT 3089
MASTER PLOT PLAN (PERMIT#FIRE-0705-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 214; PLOT PLAN 3; TRACT 3089
New fire sprinkler system
Grading and Utility Improvements associated with the Monterey Place Mixed Use project (Building plans to be submitted separately
Surface improvements including but not limited to paved roadways, curb, gutter, sidewalks. Underground utility improvements including under walk drains and pedestrian button conduit.
In addition per the DIR-0671-2022 two existing street trees will be removed and replaced with two new street trees and an outdoor dining pergola will be constructed.
Sequentially remodel two existing bathrooms.
Backyard pool
AN ART PIECE "SHIFT" DESIGNED BY WARREN HAMRICK WILL BE INSTALLED IN THE ROUNDABOUT AT FROOM RANCH & HEIRLOOM. CITY PROJECT
Install replacement windows
Stage in the public right-of-way to install public art: "Shift". Also install plaque. Work is located at Froom Ranch Way and Heirloom Place roundabout. All work to be done per the attached
and approved plans and City Standard Specifications & Engineering Standards. A separate building permit, BLDG-0588-2025, is required for structural inspections; structural inspections
and the required building permit are not covered by this encroachment permit. Traffic and pedestrian controls must be per the attached and approved traffic control plan and City Appendix
G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee
is responsible for calling for final inspection so the permit can be closed.
Installation of 4.5 kW-DC PV system, (10) 450W modules, (10) Enphase Microinverters + 125A Enphase IQ Combiner Panel + PV AC Disconnect
Installation of 5.4 kW-DC PV system, (12) 450W modules, (12) Enphase Microinverters + 125A Enphase IQ Combiner Panel + PV AC Disconnect
like for like furnace replacement
Supply and Install (4) Retrofit Windows into EXISTING Openings.
Supply and Install (19) Windows and (1) Sliding Glass Door into EXISTING Openings.
TENANT IMPROVEMENT IN AN (E) 1,261 SF SHELL BUILDING TO BE A SUSHI RESTAURANT. IMPROVEMENTS INCLUDE A NEW SUSHI BAR, TYPE 1 HOOD, NEW FURNISHINGS, FINISHES, AND EQUIPMENT PER THE TENANTS
PROGRAM
REMOVE AND REPLACE EXISTING ASPHALT
<On 01/27/26, permit extended to 04/24/26.> Install new water lateral from the main in the street to serve a new 1" water meter for 1321 and 1323 Garden. Install new sewer lateral from
the main in the street to the property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD
Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is
responsible for calling for final inspection so the permit can be closed. Also, please call the Public Works inspection hotline at 805-781-7554 to coordinate wye installation two working
days in advance.
6.50 kW DC Roof Mount Photovoltaic with Energy Storage (1)
NEW PHOTOVOLTAIC SYSTEM 4.40 kw
Roof-mounted solar PV 3.52kW
INSTALL LAUNDRY IN EXISTING CLOSET SPACE AND INFILL GARAGE DOOR TO WALL
Tenant improvement of medical office space. The project consists of both OSHPD 3 and non-OSHPD areas.
Remove and dispose of existing gas furnace and all accessible ductwork, seal openings.
MXZ3C30NAU1 30,000 BTU heat pump.
MSZ-GS12NA-U1 12,000 BTU wall mounted fan coil for living room.
MSZ-GS09NAU1 wall mounted fan coil for master bedroom.
MSZ-GS06NAU1 wall mounted fan coil for 2nd bedroom.
Copper linesets run from each wall coil to outdoor unit.
Power/Control wires run from each wall coil to outdoor unit.
Power run from electrical panel to outdoor unit including breakers/disconnects.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection
Hotline at (805) 781-7554 at least 24 hours in advance.
like for like furnace replacement
Modification of Two occupant Notification Devices & One pull station in auditorium 7. Accessibility Ramps installed. Relocation of existing pull Station at Start of ramp. Existing wall
mounted speaker strobes will be raised up the wall to correct height. Existing Ceiling mounted speaker strobe relocated to provide proper coverage of occupant notification
CONVERT (E) 120 SF DETACHED ROOM TO (N)
175 SF ADU
New detached ADU
4.5 kW DC PV System using 10 modules
Install 48A Tesla Wall Connector on interior of garage on 60A circuit.
Install Level 2 EV Charger
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2A; LOT 257; PLAN CLUSTER 2E
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2A; LOT 258; PLAN COTTAGE 3D
We are seeking a permit to legalize and complete a remodel project located within the garage of our existing residence. A workshop had previously been constructed in the garage space
which we want to expand to make it a more usable space to consume media and play games.
Level 2 EV Charger (1)
INSTALLATION OF FURNACE
PV Roof Mount 5.74KW, 14 Modules,1 Inverter, 1 Tesla PW3 ESS, 1 Tesla PW3 expansion Pack.
Supply and Install (2) windows into existing openings
PV Roof Mount 9.02KW, 22 Modules, 1 Inverter, 1 Tesla PW3 ESS, 1 Tesla PW3 Expansion pack, Trenching Required
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2D; LOT 266; PLAN CLUSTER 3E
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2D; LOT 265; PLAN CLUSTER 3C
INSTALLATION OF AN EV CHARGER OUTLET
PV Roof Mount 6.56KW, 16 Modules, 1 Inverter, 1 Tesla PW3 ESS, 1 Tesla PW3 Expansion pack, Existing Solar system installed
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2D; LOT 267; PLAN CLUSTER 2B
Proposed scope of work is to construct a (N) ADU, proposed area is 403 S.F. Living area + 135 S.F. loft.
COMMERCIAL 7.98 kW DC ROOFTOP SOLAR
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 296; PLAN COTTAGE 5
PV INSTALL 7.04KW,(16)MODULES,(2)ESS-(1xTESLA POWERWALL 3 BASE & 1xEXPANSION PACK).
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 295; PLAN COTTAGE 2
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 294; PLAN COTTAGE 3
Install new driveway approach. Abandon existing driveway approach with sidewalk, curb, and gutter. Install sidewalk underdrains. Replace damaged sections of sidewalk, curb, and gutter.
All work to be done per PLBLDG-0012-2024 and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the attached and approved plan and City
Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection.
Permittee is responsible for calling for final inspection so the permit can be closed.
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 297; PLAN COTTAGE 1
Addition to existing sprinkler system
Updated: 2/2/2026 to be a conduit bore instead of intercepting existing conduit. Bore ~136' of Astound Broadband LLC fiber optic conduit. Install fiber optic cable into the newly-installed
conduit. All work to be done per the attached plans and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards.
Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible
for calling for final inspection so the permit can be closed.
PV solar roof mount, 8 modules, 3.28kw, existing main 100A, ESS
PV roof mount 6.15kw dc 23kw ac
modules 15
Ess 2
New Roof Mount Solar PV System 4.30 KW (10) Panels with ESS Battery
Hazard reduction pruning of trees. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached
plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Install potential maximum 60 amp dedicated circuit for a FORD PRO EV charger.
NEW AFFORDABLE MIXED- BUILDING 1 - USE CONSISTS OF 4,366 SF OF COMMERCIAL, 45 AFFORDABLE FAMILY RESIDENTIAL UNITS
Retaining wall in the public right-of-way. See temporary encroachment agreement.
SoCal Gas WO # 54-506131. SoCal Gas after-the-fact permit for anode installation at the main. Work requires (1) 3'x4' asphalt cut. Final paving is required for the permit to be finaled.
Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached
plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35587701. PG&E to install poles, upgrade transformer, install overhead span guy, and install OH cables. Standard working hours are 7am-4pm. All work to be done to City Standard
Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection
hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection
so the permit can be closed.
PG&E PM # 35698666. PG&E to install cable in conduit. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian
controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start
of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35610256. PG&E to install meter, install service cable, and install riser. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering
Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554
two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Sprouse Communication for Charter-Spectrum to place a ground rod at the base of poles. Work hour restrictions apply, see the attached traffic control plan. All work to be done to City
Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works
inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final
inspection so the permit can be closed.
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 305; PLAN COTTAGE 2
PG&E PM # 35692587. PG&E to upgrade transformer and replace service cable. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards.
Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working
days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
we are adding cell/radio unit instead of 2 analog phone lines
Sprouse Communication for Charter-Spectrum to overlash coax and pull cable across the street to vault. All work to be done to City Standard Specifications & Engineering Standards. Traffic
and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days
prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
THIS PROPOSED PROJECT CONSISTS OF THE CONSTRUCTION OF A 2-STORY 881 SQ.FT.
New Modular Duplex ADU, 2 - 2bedroom units
Sprouse Communication for Charter-Spectrum to pull fiber through existing conduit. The permittee must notify affected tenants of construction; refer to page 26 of City Standard Specifications
for details (attached). Proof of notice distribution (dates and times) must be provided to the Public Works inspector prior to the start of work. No traffic control setup, noise, or
work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed and approved by the Public Works inspector. All work to be done to City Standard
Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection
hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection
so the permit can be closed.
PG&E PM # 2010338. PG&E to trim tree. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD
Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is
responsible for calling for final inspection so the permit can be closed.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations will be performed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made for holidays as needed. Contractors must schedule wye installations by calling the Public Works Inspection Hotline at (805) 781-7554
at least 24 hours in advance.
Sidewalk closure for water service lateral replacement from the meter to the building. No vehicle parking is permitted along the red curbs. All work to be done to City Standard Specifications
& Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior
to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
REPLACEMENT WINDOWS (12)
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2A; LOT 255; PLAN CLUSTER 1E
Remove and replace panels of sidewalk to install sidewalk underdrain. Core through the face of the curb and grout around the pipe at the face of the curb. All work to be done per the
attached plans and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection
hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection
so the permit can be closed.
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2A; LOT 254; PLAN CLUSTER 2C
Solar Carport Structure
Tenant improvement of Larson Audiology to accommodate building renovations.
Righetti Ranch Parks - Community Park project, Specification No. 2000054. All work to be done per CIP Specification No. 2000054 and City Standard Specifications & Engineering Standards.
A traffic and pedestrian control plan must be submitted, reviewed, and approved prior to each phase of the work. Traffic and pedestrian controls must be per approved plans and City
Appendix G & MUTCD Standards. Contact City Public Works inspector Bryce Crespin at 805-540-0179 to coordinate job inspections and information. Permittee is responsible for calling for
final inspection so the permit can be closed.
40g water heater changeout
Reline Approximately 20' of 2" cast iron main underneath home using nuflow technologies
PARKING GARAGE
TRIPLEX
Modify Existing Fire sprinkler system installed in shell building for Suite 130,230,240. TI consists of adding new office walls and ceiling. provide new pendent sprinkler coverage for
all new rooms areas , no change to existing uprights and sprinkler system
THE INTENT OF THIS SUBMITTAL IS TO INSTALL A NEW FIRE SPRINKLER MONITORING SYSTEM IN AN EXISTING B OCCUPANCY.
Stage in the public right-of-way to install public art sculpture on Mission Plaza lawn. All work to be done per the building permit, BLDG-2946-2025, and City Standard Specifications
& Engineering Standards. Traffic and pedestrian controls must be per the approved plan and City Appendix G & MUTCD Standards. The permittee must notify affected tenants of construction;
refer to City Standard Specifications for details (attached). Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day
prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
alterations to an existing single-family dwelling including addition by partial conversion of the existing attached garage
Remove existing tile roof
Install New Standing Seam Metal Roof
General tree maintenance. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and
City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
300 s.f. attached ADU to an existing single family residence.
Remove existing roofing
Install new TPO 60 mil Membrane roofing
60 s.f. addition to single family home. Structural/energy design was reviewed as part of the adjacent ADU (BLDG-1570-2025). Plans and documents included for reference.
4.05 kW-DC PHOTOVOLTAIC SYSTEM USING: 09 CANADIAN SOLAR CS6.1-54TM-450H
4.05 kW-DC PHOTOVOLTAIC SYSTEM USING: 09 CANADIAN SOLAR CS6.1-54TM-450H
MASTER PLOT PLAN (PERMIT#FIRE-0699-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 295; PLOT PLAN 2; TRACT 3089
4.5 kW-DC PHOTOVOLTAIC SYSTEM USING: 10 CANADIAN SOLAR CS6.1-54TM-450H
4.5 kW-DC PHOTOVOLTAIC SYSTEM USING: 10 CANADIAN SOLAR CS6.1-54TM-450H
Install 48A Tesla Universal Wall Connector on interior of garage on 60A circuit.
Demolition of garage. New construction of ADU w/ attached garage. Remodel of front porch on primary residence.
FULL TENANT IMPROVEMENT SERVICES FOR
THE EXISTING SEVEN-SCREEN
MOVIE THEATER INSEPARATE PHASES.
PHASE 1 INCLUDES AUDITORIUM STADIUM SEATING
5.4 kW-DC PHOTOVOLTAIC SYSTEM USING:
12 JAM54D41 LB-450W OR 12 CANADIAN SOLAR CS6.1-54TM-450H OR 12 JKM 450N-54HL4R-B-F8-EN
4.95 kW-DC PHOTOVOLTAIC SYSTEM USING: 11 JAM54D41 LB-450W OR 11 CANADIAN SOLAR CS6.1-54TM-450H OR 11 JKM 450N-54HL4R-B-F8-EN
5.4 kW-DC PHOTOVOLTAIC SYSTEM USING:12 JAM54D41 LB-450W OR 12 CANADIAN SOLAR CS6.1-54TM-450H OR 12 JKM 450N-54HL4R-B-F8-EN
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection
Hotline at (805) 781-7554 at least 24 hours in advance.
MASTER PLOT PLAN (PERMIT#FIRE-0702-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 296; PLOT PLAN 5; TRACT 3089
5.4 kW-DC PHOTOVOLTAIC SYSTEM USING: 12 JAM54D41 LB-450W OR 12 CANADIAN SOLAR CS6.1-54TM-450H OR 12 JKM 450N-54HL4R-B-F8-EN
4.95 kW-DC PHOTOVOLTAIC SYSTEM USING? 11 JAM54D41 LB-450W OR 11 CANADIAN SOLAR CS6.1-54TM-450H OR 11 JKM 450N-54HL4R-B-F8-EN
Tree maintenance. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix
G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee
is responsible for calling for final inspection so the permit can be closed.
Project: Conserve Fuel, SLO- Install and monitor dedicated function fire alarm system building and Canopy
4.95 kW DC PV System using 11 modules.
UPRGRADING ELECTRICAL PANEL
Project Monterey senior apt
Install new fire alarm system to provide occupant notification including low frequency audible devices provide monitoring of wet fire sprinkler system waterflow and valve tamper switches
provide detection and relays for elevator recall functions
REPLACE LIKE FOR LIKE 100 AMP METER MAIN
Panel upgrade from 100AMP to 200AMP 2 meter panel.
REMOVE SHINGLES AND INSTALL PLYWOOD
Design & Install a Commercial Fire Sprinkler System per NFPA 13 for a TENANT IMPROVEMENT 7,880 sq ft commercial bldg per building plans dated 9/9/25 by Gensler for $21,035
Trench to install new separate sewer lateral, not replacing existing. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays
only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554
at least 24 hours in advance. Trench to install new 1" water service lateral to serve a new 1" water meter. Abandon existing driveway approach and replace with 25' of curb, gutter,
and sidewalk. All work to be done per BLDG-1003-2023 and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards.
Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible
for calling for final inspection so the permit can be closed.
Installing AC and gas furnace; existing location
Minor T.I. including demo, three new full-height walls and new electrical outlets
INSTALL LED CHANNEL LETTERS & PROJECTING LOGO CIRCLE
PV Roof Mount 3.52KW, 8 Modules, 1 Inverter, 1 Tesla PW3 ESS
furnace replacement, like for like in existing location located in garage
Removal 40 gallon natural gas installation Noritz NRCR111DV
replace furnace like for like in existing location(attic)
REMOVE TOP FIXED WINDOW OVER GARAGE, FILL IN WITH STUDS 16" ON CENTER; LATH & PLASTER EXTERIOR, 5/8" DRYWALL INTERIOR
NEW 13.5KWH TESLA ENERGY STORAGE SYSTEM
Remove and dispose of existing water heater. Modify existing platform height to accommodate new, customer-supplied 60-gallon heat pump water heater. Install expansion tank (4.5 gal),
new threaded ball valve shutoff, and ¾†condensate drain line. Reconnect temperature and pressure relief valve (T&P), install new 2†earthquake straps, and replace hot/cold supply
lines. Cap existing ½†gas line. Remove flue pipe from second-story wall (wall to be repaired by homeowner); flue to remain in attic for potential future use.
5.53kW Photovoltaic System W/
13.5kWh ENERGY STORAGE SYSTEM
roof Mounted, Grid-Tied
b. Different type and/or Different Location.
Gas Water Heater to Electric Heat Pumps.
Level 2 commercial grade electric vehicle charging station at driveway of a Vacation Rental.
3.52 kW DC Roof Mount Photovoltaic with Energy Storage (1)
Installation of 4.95 kW-DC PV System, using: (11) CANADIAN SOLAR MODULES + (11) ENPHASE MICROINVERTERS.
Installation of a commercial 18.88kW DC grid tied Photovoltaic system
PG&E PM # 2010338. PG&E to perform routing tree trimming and removal. Phase 46 is not approved with this permit package and must be applied for separately. All work to be done to City
Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works
inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final
inspection so the permit can be closed.
42 sprinkler heads
b. Different type and/or Different location.
Replace the existing 2 gas-fired water heaters with 8 heat pump water heaters.
pv solar roof mount, 8 modules, 3.24kw, comp shingle, existing 200A MSP, new subpanel, 1 ESS
Renovation of existing handball structure (2,862 SF) into a community center for apartment complex.
Tenant improvement of an existing retail food facility for a new retail food facility. No additional square footage to be added.
RESOLVE CODE CASE FOR FENCE HEIGHT
Building - New TI in existing, previously occupied (retail) street location, light, non-structural demolition, new interior partitions, ceiling fixtures, furniture and equipment. The
storefront is existing to remain with cosmetic improvements only.
Electrical panel replacement, same amperage and voltage. Panel will remain in the same location.
New photovoltaic system 2.22 kw dc
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 303; PLAN CLUSTER 2
Install Level 2 EV Charger
ADDITION OF ONE 13.5 KWH (ESS) ENERGY STORAGE SYSTEM AND ASSOCIATED HARDWARE TO THE MAIN DWELLING UNIT-VOIDED ADDRESS OUTSIDE CITY LIMITS
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection
Hotline at (805) 781-7554 at least 24 hours in advance.
PG&E PM # 31757754. PG&E to reframe pole located next to road. Work hour restrictions apply; see the attached traffic control plan. All work to be done to City Standard Specifications
& Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline
at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the
permit can be closed.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection
Hotline at (805) 781-7554 at least 24 hours in advance.
Install one 1" water meter in existing water meter box for 2414 Johnson Unit A. Install a new 1" water meter, branching off of existing 2" water service/manifold, for 2414 Johnson Unit
B. Install a new 2" water service to serve two new 1" water meters for 2422 Johnson, units A&B. Abandon one sewer lateral at the main in the street. Install two new sewer laterals,
one for 2414 Johnson and one for 2422 Johnson. Install three sidewalk underdrains. All work to be done per BLDG-2743-2023, BLDG-0712-2023, and City Standard Specifications & Engineering
Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554
two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Sewer wye installations or abandonments will be performed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made for holidays as needed. Contractors
must schedule wye installations or abandonments by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance.
New construction of a detached three bedroom, two bathroom, single story accessory dwelling unit.
Remodel of an Existing Costco Warehouse Optical Office and Kiosk, and Membership and Returns Kiosks.
MASTER PLOT PLAN (PERMIT#FIRE-0700-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 294; PLOT PLAN 3; TRACT 3089
8.18kW Photovoltaic System W/
Ev charger & 27kWh ENERGY
STORAGE SYSTEM
roof Mounted, Grid-Tied
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 301; PLAN CLUSTER 4
MASTER PLOT PLAN (PERMIT#FIRE-0698-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 297; PLOT PLAN 1; TRACT 3089
Supply and Install 1 Window into an Existing Opening
Energy Storage (1)
8.1 kw rooftop pv w/o battery- VOIDED OUTSIDE CITY LIMITS
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 299; PLAN CLUSTER 3
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 298; PLAN CLUSTER 4
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 300; PLAN CLUSTER 1
FURNACE CHANGE OUT - LIKE FOR LIKE SAME LOCATION- DUCTWORK(5 SUPPLIES, 1 RETURN)
Install Level 2 EV Charger
Install 48A Tesla Wall Connector on interior of garage on 60A circuit.
200A like for like underground service replacement.
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 302; PLAN CLUSTER 3
PG&E PM # 35701253. PG&E to replace pole, install OH transformer, and replace OH service cable. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications
& Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior
to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Mixed Use building with ground floor commercial, garages and covered parking; 2 - 2 bedroom apartments on second floor. All associated site work as shown on the submittal documents.
CONSTRUCT 2-STORY ADU W/ ATTACHED GARAGE
REMODEL BLDG A UNIT TYPE A
Installation of roof mounted PV+ESS system with (27) Q.Cell 430's (11.61 kW DC), (1) Tesla Powerwall 3, (1) Tesla Expansion Unit, Tesla Backup Switch, Main Panel Upgrade
ADU addition
REPLACE DAMAGED SIDING OF LOWER LEVEL OF THE HOUSE. REPLACE 3 WINDOWS IN BASEMENT/STORAGE
Remodel existing kitchen (110 s.f.) and 2 existing bathrooms (50 s.f. each) in an existing 1,485 s.f. house. The remodel will include framing, electrical, & plumbing modification.
Proposed 274 sq second story ADU addition to existing single family dwelling over an existing (rebuilt) 1-car garage
Opening of non-barring interior wall add door for passage to bathroom
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 304; PLAN COTTAGE 3
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2A; LOT 253; PLAN CLUSTER 3E
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2A; LOT 256; PLAN CLUSTER 3D
EXISTING 125 AMP ELECTRICAL SUB-PANEL TO BE REPLACED WITH NEW DEDICATED 125 AMP ELECTRICAL MAIN METER PANEL. PROVIDE NEW DEDICATED OVERHEAD SERVICE.
Solar Ground Mount 16.56kW, 36 Modules. 2 Tesla ESS with 13.5kWh capacity each.
NON-LIT SIGNS INSTALLED INTO BUILDING FACES
Foundation repair with Ram Jack Steel Piers
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2D; LOT 263; PLAN CLUSTER 1B
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2D; LOT 268; PLAN CLUSTER 4E
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2D; LOT 269; PLAN COTTAGE 3B
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2D; LOT 270; PLAN CLUSTER 1D
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2D; LOT 271; PLAN COTTAGE 3E
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2D; LOT 272; PLAN CLUSTER 1B
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2D; LOT 273; PLAN CLUSTER 2E
PG&E PM # 35698911. PG&E to replace pole, replace transformer, and install service cables. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering
Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554
two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
TEMPORARY POWER POLE LOT #272
Install 48A Tesla Wall Connector on interior of garage on 60A circuit.
REPLACE EXISTING ELECTRICAL PANEL
TEMPORARY POWER POLE LOT #
TEMPORARY POWER POLE LOT #
Trench to install a new 2" water service lateral to serve (2) new 3/4" water meters via manifolded. All work to be done per BLDG-1905-2025 and City Standard Specifications & Engineering
Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start
of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
New 1,519 s.f., two-story, single-family residence w/ attached (2) car garage (664 s.f.)
CODE CASE FOR LAUNDRY ROOM
STUDIO B, DETACHED ADU UNIT BEHIND EXISTING 2 BEDROOM RESIDENCE
commercial re-roof, like for like. Remove existing membrane; install 1/2" coverboard and install new membrane; no structural changes
we are adding cell/radio unit sole path of communication instead of 2 analog phone lines
200A Electrical Service Upgrade & EV Charger Installation
THE PROJECT CONSISTS OF IMPROVEMENTS AND ADDITIONS TO THE EXISTING 50,802 S.F. OFFICE BUILDING AT 3450 BROAD STREET TO BE USED FOR A PRIVATE, NON-SECTARIAN ELEMENTARY SCHOOL WITH INFANT
CHILD CARE THROUGH 8TH GRADE (55,154 S.F. TOTAL).
CAMPUS IMPROVEMENTS INCLUDE 7 PRESCHOOL / INFANT ROOMS, 19 CLASSROOM / EDUCATIONAL SPACES, A JUNIOR HIGH SIZED GYMNASIUM WITH ADJACENT KITCHEN, A SCHOOL LIBRARY, AND ADMINISTRATION OFFICES
AND MEETING SPACES. SITE IMPROVEMENTS INCLUDE REPLACING THE NORTH PARKING LOT WITH OUTDOOR PLAYGROUND AND ACTIVITY SPACES AND ADDING 7 DROP-OFF / PICK-UP VEHICLE SPACES IN THE SOUTH
PARKING LOT. CAMPUS ACCESS AND CIRCULATION IS SUMMARIZED IN THE PROJECT TRANSPORTATION ANALYSIS.
CONVERSION OF EXISTING ATTACHED GARAGE TO ADU
Traffic signal modifications on existing signal at Monterey & California. Work hour restrictions apply; see the attached traffic control plan. All work to be done to City Standard Specifications
& Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline
at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the
permit can be closed.
FULL TENANT IMPROVEMENT SERVICES FOR THE EXISTING SEVEN-SCREEN MOVIE THEATER IN SEPARATE PHASES.
PHASE 2 INCLUDES RESTROOMS, AUDITORIUM 3 ENTRANCE AND EXISTS, AUDITORIUM 4, 5,& 6 VESTIBULES AND PORTION OF PROMENADE.
INSTALL AUTO SERVICE LIFTS AND ABOVE GROUND STORAGE TANKS FOR MOTOR OIL ONLY
New detached ADU on multifamily lot
Replace 6 windows with retrofit vinyl windows.
Upgrade dual meter electric panel
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2D; LOT 264; PLAN CLUSTER 2A
Electrical Service Panel upgrade; 100amp to 100amp; same location
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2A; LOT 251; PLAN COTTAGE 3A
Abandon existing water service lateral at the City main. Remove existing water meter and water meter box. Install new 1" water service lateral from the main in the street to serve a
new 1" water meter. All work to be done per PLREV-0400-2025 and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached
plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35582039. PG&E to pull cable and install transformer. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic
and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days
prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Remove and replace driveway approach per PLREV-0351-2025 and City standards. Abandon existing water service at the main in the street per City standards. Install new 2" water service
to manifold to existing 5/8" water meter and 2 new 3/4" water meters. All work to be done per PLREV-0351-2025 and City Standard Specifications & Engineering Standards. Traffic and pedestrian
controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior
to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Addition to (e) attached garage and living space of (e) SFR for 2nd floor addition of (n) ADU
Install one 4" water service lateral to serve one 2" residential water meter on the California Blvd. side of the project. Install one 2" water service lateral to serve one 1" commercial
water meter on the California Blvd. side of the project. Install two sewer laterals on the California Blvd. side of the project. Install one sewer lateral on the Monterey Street side
of the project. All work to be done per the approved building plans, BLDG-2341-2024 and City Standard Specifications & Engineering Standards. Separate encroachment permits are required
for the additional work shown on BLDG-2341-2024 and the public improvement plans, FMAP-0375-2024, and any related building permit cases. Traffic and pedestrian controls must be per
the attached and approved plans and City Appendix G & MUTCD Standards. Work must be coordinated to not conflict with the 1531 Monterey project. Call the Public Works inspection hotline
at 805-781-7554 (voice message system) to coordinate a required pre-construction meeting. Also, call the Public Works inspection hotline two working days prior to the start of work
and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations will be performed
by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made for holidays as needed. Contractors must schedule wye installations by calling the
Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance.
Install overhead fire sprinkler system to expansion area
33 sprinklers
Traffic signal modifications on the existing signal at 4029 S Higuera and 950 Orcutt. This project has been coordinated with William Ring in the Traffic Division. All work to be done
to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the
Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling
for final inspection so the permit can be closed.
Fire Alarm System Modification
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection
Hotline at (805) 781-7554 at least 24 hours in advance.
General tree maintenance. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards.
Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible
for calling for final inspection so the permit can be closed.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations will be performed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made for holidays as needed. Contractors must schedule wye installations by calling the Public Works Inspection Hotline at (805) 781-7554
at least 24 hours in advance.
New 799 s.f. SFR and attached 799 s.f. ADU
Sprouse Communication for Charter-Spectrum to pull fiber through existing conduit. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian
controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start
of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PG&E PM # 35641730. PG&E to stage in the right-of-way on San Carlos for work on private property using a crane. All work to be done to City Standard Specifications & Engineering Standards.
Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working
days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
3-Ton Furnace change out installation
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2A; LOT 250; PLAN CLUSTER 3C
Supply and Install 5 Window into Existing Openings.
Sprouse Communication for Charter-Spectrum to move storage on fiber strand. Certain work hour restrictions apply. All work to be done to City Standard Specifications & Engineering Standards.
Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working
days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Tree trimming along Johnson. Work hour restrictions apply; see attached traffic control plan. All work to be done to City Standard Specifications & Engineering Standards. Traffic and
pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call Eric Baker at 805-781-7014 two working days prior to the start of work and
one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection
Hotline at (805) 781-7554 at least 24 hours in advance.
existing deck renovation
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2A; LOT 249; PLAN CLUSTER 1E
Abandon water services for 3580 and 3584 Bullock at the City water main. Water meters and water meter boxes to be removed. All work to be done to City Standard Specifications & Engineering
Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start
of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Turn Around Communication for Charter-Spectrum to install underground conduit from utility vault to building. The permittee must notify affected tenants of construction; refer to page
26 of City Standard Specifications for details (attached). Proof of notice distribution (dates and times) must be provided to the Public Works inspector prior to the start of work.
No traffic control setup, noise, or work is permitted in the downtown between 11:00 am and 1:00 pm unless an exception has been reviewed and approved by the Public Works inspector.
All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD
Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is
responsible for calling for final inspection so the permit can be closed.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection
Hotline at (805) 781-7554 at least 24 hours in advance.
Tree removal in basin. Schedule must be coordinated and confirmed with City inspector. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian
controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start
of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Tenant improvements for Fusion Fitness, a personal fitness space and yoga studio at the ground floor of a mixed-use building.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and
one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed
by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these
days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance.
Trench to repair an approximately 4' section of sewer lateral. The sewer lateral is not being replaced all the way to the main. All work to be done to City Standard Specifications &
Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at
805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit
can be closed.
<On 12/17/2025, permit updated per attached.> A02EP0V - Install AT&T conduit via microtrenching per the attached microtrenching detail. If necessary, installation via bore or trench
is also acceptable, per City Engineering Standards and per City Standard conduit depth, which is 7' below the top-of-curb or 3' below the deepest utility being crossed, whichever is
deeper. All work to be done per the attached plans and to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached
plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
Replace existing dual meter panel with new dual meter panel and replace 2 existing subpanels. Same location and no new load added.
INSTALL 11.04KWDC/11.50KWAC COMP ROOF MOUNTED GRID
INTERACTIVE PV SYSTEM W/ 40.50KWH ESS AT EXISTING
RESIDENCE TYPE VB, OCCUPANCY R3 & U, NO FIRE SPRINKLER
SYSTEM, 1-STORY.
Upgrade electrical service from 100A to 200A
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 306; PLAN COTTAGE 2
PV Roof Mount 3.52KW, 8 Modules, 1 Inverter, 1 Tesla PW3 ESS, 1 Tesla PW3 Expansion Pack, Existing solar system installed
1 SET OF ACRYLIC LETTERS
Upgrading 100 amp service to 200 amp
PV Roof Mount 3.69KW, 9 Modules, 1 Inverter, 1 Tesla PW3 ESS, 1 Tesla PW3 Expansion pack, Existing solar system installed,, New 225A sub panel installed
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection
Hotline at (805) 781-7554 at least 24 hours in advance.
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 311; PLAN COTTAGE 3
REMODEL OF SFR. REMODEL KITCHEN. CONSTRUCT NEW PRIMARY BATHROOM WITHIN EXISTING HABITABLE SPACE. REMOVE EXISTING INTERIOR NON-BEARING WALL. REPLACE ALL NON-ROMEX ELECTRICAL WIRING AND
ALL RECEPTACLES. REPLACE ALL CAST IRON SEWER LINES IN CRAWL SPACE WITH PVC OR ABS. REPLACE ALL EXPOSED PLUMBING WITH PEX. REPLACE EXISTING SEWER LATERAL.
<On 12/16/25, permit extended to 03/27/26.> Installing new PG&E and SoCal Gas utility services. A design exception has not been processed for this work, therefore, utility depth must
be per City standards. Updated insurance documents must be submitted if the work will go past 10/01/25. All work to be done to City Standard Specifications & Engineering Standards.
Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and
one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
SEWER LATERAL REPLACEMENT
PV solar roof mount, 13 modules, 5.33kw, existing main 200A, ESS with Backup
INSTALL FIRE SPINKLER SYSTEM
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and
one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed
by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these
days by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance.
Battery-only installation (2 units) connected to existing permitted solar PV system.
4.95 kW DC PV System using 11 modules.
5.4 kW DC PV System using 12 modules.
4.05 kW-DC PHOTOVOLTAIC SYSTEM USING: 09 JAM54D41 LB-450W OR 09 CANADIAN SOLAR CS6.1-54TM-450H OR 09 JKM 450N-54HL4R-B-F8-EN
4.5 kW DC PV System using 10 modules
Installation of 4.5 kW-DC PV system, (10) 450W modules, (10) Enphase Microinverters
Installation of 5.4 kW-DC PV system, (12) 450W modules, (12) Enphase Microinverters
New detached accessory dwelling unit and office.
Install a new 5.4 kW-DC PV system , 12 modules , 12 micro inverters , 1 125 amp combiner panel.
Install a new 5.4 kW-DC PV system , 12 modules , 12 micro inverters , 1 125 amp combiner panel.
Installation of a new 4.95 kW-DC PV system with (11) modules, (11) microinverters, (1) 125A IQ combiner panel
Installation of a new 4.95 kW-DC PV system, (11) modules, (11) microinverters, (1) 125A IQ combiner panel
Installation of 5.4 kW- DC PV system, (11) modules, (11) microinverters and (1) 125A combiner panel
Installation of 5.4 kW-DC PV system, (12) 450W modules, (12) Enphase Microinverters + 125A Enphase IQ Combiner Panel
Installation of 4.95 kW-DC PV system, (11) 450W modules, (11) Enphase Microinverters + 125A Enphase IQ Combiner Panel
Change out existing natural gas kitchen cooktop for induction cooktop. Run new 240V/40AMP circuit.
Installation of 4.95 kW-DC PV system, (11) 450W modules, (11) Enphase Microinverters + 125A Enphase IQ Combiner Panel
Installation of 4.5 kW-DC PV system, (10) 450W modules, (10) Enphase Microinverters + 125A Enphase IQ Combiner Panel
Installation of 4.95 kW-DC PV system, (11) 450W modules, (11) Enphase Microinverters + 125A IQ Combiner Panel
4.05 kW-DC PHOTOVOLTAIC SYSTEM USING: 09 JAM54D41 LB-450W OR 09 CANADIAN SOLAR CS6.1-54TM-450H OR 09 JKM 450N-54HL4R-B-F8-EN
Installation of 5.4 kW- DC PV system, (12) modules, (12) microinverters and (1) 125A combiner panel
Installation of a 4.95 kW-DC PV system, (11) modules, (11) microinverters, (1) 125A combiner panel
Installation of 4.95 kW- DC PV system, (11) modules, (11) microinverters and (1) 125A combiner panel
Installation of 4.5 kW-DC PV system, (10) 450W modules, (10) Microinverters + 125A IQ Combiner Panel
Installation of 4.95 kW-DC PV system, 11 modules, 11 microinvertes, (1) IQ 125A combiner panel
Installation of a new 4.5 kW-DC PV System (10) Modules (10) Microinverters (1) 125 A IQ Combiner
Installation of 4.95 kW-DC PV system, (11) 450W modules, (11) Enphase Microinverters + 125A Enphase IQ Combiner Panel
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations will be performed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made for holidays as needed. Contractors must schedule wye installations by calling the Public Works Inspection Hotline at (805) 781-7554
at least 24 hours in advance.
LIT SIGNS INSTALLED INTO BUILDING FACES
Installation of a new 5.4 kW-DC PV System (12) Modules (12) Microinverters (1) 125 A IQ Combiner
Installation of a new 5.4 kW-DC PV system using (12) modules, (11) microinverters, (1)12A combiner panel
Install a new 4.95 kW-DC PV system , 11 modules , 11 micro inverters , 1 125 amp combiner panel.
Install a new 5.4 kW-DC PV system , 12 modules , 12 micro inverters , 1 125 amp combiner panel.
Tenant improvement for a medical office building with 2 medical practices and an ambulatory surgery center.
Medical office tenant improvement and ~1400sf addition for concrete vault for linear accelerator
Install a new 4.95 kW-DC PV system , 11 modules , 11 micro inverters , 1 125 amp combiner panel.
Installation of a new 4.95 kW-DC PV system with (11) modules, (11) microinverters, (1) 125A new IQ combiner panel
Installation of a new 4.95 kW-DC PV system with (11) modules, (11) microinverters, (1) 125A IQ combiner panel
INSTALL MANUFACTURED SHED FOR WASHER & DRYER
BUILD REPLACEMENT RESIDENCE
CONSTRUCT ADU TO REPLACE EXISTING SECONDARY DWELLING UNIT
As-built permit for a 527 s.f. 2-story ADU conversion. Primary Unit A and unit B are to remain and are not in the scope of this permit.
PV SRM 6.48KW, (16)Modules, (2)ESS
Remove and replace asphalt surfacing within existing playground. All work to be done per the attached plans and applicable City Standard Specifications & Engineering Standards. Traffic
and pedestrian controls will be per the attached plans and applicable City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 (voice message system)
to schedule a required pre-construction meeting. Also, call the Public Works inspection hotline two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PHASE 3: FINE GRADING AND CONSTRUCTION OF BUILDING 3.3
Install customer provided EV charger
PV solar roof mount 6.15KW, (15) Modules, (2) ESS
PV SRM 5.74KW, (14)Modules, (2)ESS
NEW 3,944 SQ.FT. SINGLE FAMILY RESIDENCE WITH ATTACHED 700 SQ.FT. 3-CAR GARAGE; LOT 34; TRACT 3063-3;
9 Ports DCFC
20 Ports Level 2 EV Charging
Adding electrical outlets for new Gelato machine
Demolition of 704 SF single family residential dwelling.
House & Outbuilding demolition; Resubmitting expired Permit DEMO-1641-2022.
House & Outbuilding demolition; Resubmission of expired permit DEMO-1697-2022.
TENANT IMPROVEMENT OF LOBBY, BOH, AUDITORIUM 2 VESTIBULE AND MEZZANINE
<On 02/12/26, permit extended to 07/10/2026.> Install new sewer lateral. Sewer wye installations shall be completed by City staff during regular business hours on Tuesdays and Wednesdays
only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection Hotline at (805) 781-7554
at least 24 hours in advance. Install 2 new 2" water service laterals; 1 to serve a new 1" residential water meter and new 1 to serve a 3/4" commercial water meter. Install new 6" fire
water lateral. Tie into PG&E conduit in the sidewalk. Install PG&E sub-box in the sidewalk per the attached PG&E plans. Install new driveway approach and curb, gutter, and sidewalk.
All frontage improvements must be mission style. Contractor must use Cal Portland “SLO Mission Style Concrete #0919â€. Install street tree per the approved plans and City standards.
All work to be done per the approved building plans, BLDG-1398-2024, and City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved
and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior
to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
1905 SF BOTTOM STORY INTERIOR TENANT IMPROVEMNT OF AN EXISTING TWO STORY RETAIL SPACE OF 2810 SF
SECOND STORY TO REMAIN UNOCCUPIED AND UNIMPROVED ASSOCIATED MECHANICAL, ELECTRICAL, AND LIGHTING IMPROVEMENTS
PV Roof Mount 5.72KW, 13 Modules, 1 Inverter, 1 Tesla PW3 ESS, (1)200A Backup Gateway installed, New 225A Backup panel to be Installed
- DEMOLITION OF (E) WOODEN DECK AND STEPS, (E) WOODEN FENCES, AND REMOVAL OF (E) CONCRETE AND BRICK PAVERS
- (N) 524 S.F. DECK WITH BUILT-IN BENCH, (N) FENCE, (N) TRELLIS, (N) OUTDOOR KITCHEN AND FIREPLACE AREA. FOR DECK AND TRELLIS, REFER TO STRUCTURAL DRAWINGS.
- MODIFICATION TO ONE EXTERIOR WALL OF THE (E) MAIN RESIDENCE TO ALLOW FOR A (N) 8'-0"W DOOR. REFER TO STRUCTURAL DRAWINGS.
- PROVIDE NEW EXTERIOR OUTLETS AND UTILITY HOOKUPS FOR OUTDOOR APPLIANCES. REFER TO PROPOSED ELECTRICAL PLAN.
(E) BACKYARD SIZE TO REMAIN.
NO CHANGES TO THE (E) BUILDING FOOTPRINT, (E) ROOF, OR (E) BUILDING HEIGHT ARE BEING PROPOSED.
NO CHANGES TO GRADING, DRAINAGE, EROSION CONTROL, OR UTILITY SERVICES ARE BEING PROPOSED.
TENANT IMPROVEMENT ON THE FIRST FLOOR (E) COLD SHELL BUILDING TO INCLUDE 1575 SF OF (N) CHIROPRACTOR OFFICE
New detached ADU, single story
Re-designate existing ADU into a SFR
Exploratory demo of ceiling drywall and wall drywall. for the purpose of Ach & Engineer review for Major interior remodel. (on future permit)
THE SCOPE OF WORK INCLUDES ADDING TEN (10) NEW ISLANDS EACH EQUIPPED WITH ONE DOUBLE-SIDED FUEL DISPENSER, MODIFY THREE (3) EXISTING ISLANDS, AND RELOCATE THREE (3) EXISTING FUEL DISPENSER.
ALLOWING FOR TWENTY (20) NEW FUELING POSITIONS TO BE ADDED TO THE EXISTING TWELVE (12) FUELING
POSITIONS. THE FUEL FACILITY WILL NOW TOTAL TO THIRTY-TWO (32) FUEL POSITIONS.
THE TEN (10) NEW DISPENSERS AND THREE (3) RELOCATED DISPENSER WILL BE INTEGRATED INTO THE NEW COMPUTERIZED CONTROLLER, WHICH RUNS THE PAYMENT, PUMPING, AND MONITORING SYSTEMS - HOUSED
BY A 17'-0" FOOT BY 7'-5" OWNER SUPPLIED STEEL UNIT, PREFABRICATED AND STATE APPROVED. FUEL WILL BE STORED IN THREE (3) EXISTING DOUBLE WALLED, FIBERGLASS UNDERGROUND STORAGE TANKS
AND ONE (1) NEW FUEL ADDITIVE UST.
THE NEW CONTROL / MONITORING SYSTEM INCLUDES AN ALARM TIED INTO THE OWNER'S CONTRACTED 24 HOUR MONITORING SERVICE COMPANY. THE CONTINUOUS LEAK DETECTION SYSTEM WILL
AUTOMATICALLY CHECK FOR FLUID LEAKS AND AUTOMATICALLY WILL STOP THE FLOW OF FUEL IN THE EVENT OF AN ALARM CONDITION.
Construction of new multi family building; 4-plex Townhomes; Tract 3111.
installing hardwired EV charger.
Emergency panel replacement. Tree has damaged existing 100A Zinsco panel.
7.7 KW Roof Mounted Solar System, Tesla Powerwall, 2 Car Chargers & Main Panel Upgrade
The scope consists of the demolition of an existing garage and the construction of a 3 story residential duplex. The first floor consists of a garage and the upper levels consist of
a two-bedroom dwelling unit on one side and a two-bedroom ADU on the other.
NEW WAREHOUSE BUILDING - 1-STORY; BLDG B
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2D; LOT 262; PLAN CLUSTER 3E
Proposed interior remodel consisting of the construction of two new bedrooms within the existing envelope of the S.F.R.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection
Hotline at (805) 781-7554 at least 24 hours in advance.
SoCal Gas work order # 520004393100. SoCal Gas after-the-fact permit for gas leak repair and final paving. Work requires (1) 4'x2' asphalt cut. Final paving is required for this permit
to be finaled. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public
Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for
final inspection so the permit can be closed.
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 307; PLAN COTTAGE 1
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2D; LOT 261; PLAN COTTAGE 3C
INTERIOR REMODEL OF KITCHEN, LIVING, LAUNDRY, AND 2 BATHS
NEW SELF-STORAGE BUILDING - 3 STORY; BLDG A
Remove and replace old parking pay stations at multiple locations per CIP Specification No.2000574-01. The permittee must notify affected tenants of construction; refer to page 26 of
City Standard Specifications for details (attached). All work to be done per City CIP Spec. No. 2000574-01 and City Standard Specifications & Engineering Standards. A traffic and pedestrian
control plan must be submitted, reviewed, and approved prior to each phase of the work. Traffic and pedestrian controls must be per an approved plan and City Appendix G & MUTCD Standards.
Contact City Public Works inspector Chase Montoya at 805-540-8655 to coordinate job inspections and information. Permittee is responsible for calling for final inspection so the permit
can be closed.
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 308; PLAN COTTAGE 1
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 309; PLAN COTTAGE 5
(ADD) 238 SF PRIMARY BEDROOM & BATH, (N) BACKYARD DECK, INTERIOR REMODEL, ELECTRICAL PANEL UPGRADE, (N) ELECTRIC CAR CHARGING, (N) EXT. WINDOWS & DOORS, (N) 460 SF DECK
South Street and King Crossing, CIP Specification No.2001059. All work to be done per City CIP Spec. No. 2001059 and City Standard Specifications & Engineering Standards. A traffic and
pedestrian control plan must be submitted, reviewed, and approved prior to each phase of the work. Traffic and pedestrian controls must be per an approved plan and City Appendix G &
MUTCD Standards. Contact City Public Works inspector Chase Montoya at 805-540-8655 to coordinate job inspections and information. Permittee is responsible for calling for final inspection
so the permit can be closed.
Traffic control for tree trimming on Johnson. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and
attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior
to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
THIS PROJECT CONSISTS OF THE CONVERSION OF AN EXISTING TWO-CAR GARAGE INTO AN ATTACHED 492 S.F. A.D.U. WITH 2-BEDROOMS AND 1-BATHROOM.
MASTER PLOT PLAN (PERMIT#FIRE-0698-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 308; PLOT PLAN 1;
TRACT 3089
MASTER PLOT PLAN (PERMIT#FIRE-0702-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 309; PLOT PLAN 5;
TRACT 3089
MASTER PLOT PLAN (PERMIT#FIRE-0699-2022)
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM; LOT 310; PLOT PLAN 2;
TRACT 3089
1. ADDING A 3,100 SF PRE-ENGINEERED METAL SERVICE BUILDING.
2 ADDING A 450 SF METAL SERVICE CANOPY (COVERED
OUTDOOR SPACE) AND TO RESTRIPE EXISTING PARKING TO ADD
ELECTRICAL VEHICLE CHARGING SPACES TO MEET CITY
REQUIREMENTS.
New construction detached ADU; demolition of exg. detached garage; relocation of exg. shed onsite
REMOVAL OF ALL CONTENTS, DRYWALL
CEILING TILES, CARPETS
ELECTRICAL PANEL UPGRADE
THIS PROJECT CONSISTS OF THE CONSTRUCTION OF A 741 S.F., TWO-STORY ADDITION TO THE EXISTING S.F.R.. THIS ADDITION SHALL PROPOSE 4-BEDROOM AND 1-BATHROOM TO THE EXISTING 2-BEDROOM AND
1-BATHROOM RESIDENCE.
UPGRADE ELECTRICAL PANEL
upgrade from 100 amp to 200 overhead service
PANEL UPGRADE 200 AMP NEW LOCATION (10 FT)
Replacement of service riser/service mast and wiring.
REMOVE AND REPLACE FRONT PORCH POST AND CONCRETE
Replacement of 1 entry door
Replacement of 1 Patio Door
No Construction
No Framing
Like for like
(5) Photovoltaic solar power arrays over existing parking structure deck. 158.4 kW DC. Associated with BLDG-2274-2022.
4.5 kW-DC PHOTOVOLTAIC SYSTEM USING: 10 JAM54D41 LB-450W OR 10 CANADIAN SOLAR CS6.1-54TM-450H OR 10 JKM 450N-54HL4R-B-F8-EN
Asplundh Construction for PG&E to inspect pole and install c-truss if required. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering
Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start
of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
16.72 kW DC Roof Mount Photovoltaic with Energy Storage (2)
STUD MOUNTED NON-LIT ACRYLIC LETTERS
REMOVE STUCCO AND INSTALL NEW STUCCO, REPLACE 16 WINDOWS/DOOR.
CONSTRUCT 1-STORY DETACHED ADU CONSISTING OF A 4 BEDROOMS AND 2 BATHROOMS PER GOV. CODE 66323(a)(2)
Upgrade existing 100 AMP meter main panel to a 200 AMP meter main panel in same location
PG&E PM # 35610642. PG&E to trench to install conduit. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian
controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start
of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed.
PV solar roof mount, 40 modules, 16.2kw, comp. shingle, existing main 100A, Tesla Powerwall
Place job trailer on Palm Street; reference attached plan. Job trailer must be as close to the project frontage as possible to minimize the impact to the neighboring property. This permit
is valid until June 30, 2026. All work to be done per City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards.
Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible
for calling for final inspection so the permit can be closed.
New roof-mounted photovoltaic system 9.24 ESS:1 new Subpanel
Add on ESS to existing PV, ESS:1
Residential EV charger install
Tenant Improvement for Dental Office
New agricultural open pavilion structure. No exterior walls, no electric, no conditioning.
Addition to an existing SFR and an attached ADU
THIS PROJECT PROPOSES THE CONSTRUCTION OF A (N) DETACHED 800 SQ. FT. A.D.U. AND A 260 S.F WORKSHOP AT THE REAR YARD OF AN EXISTING 1,766 SF SINGLE FAMILY RESIDENCE.
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2A; LOT 244; PLAN CLUSTER 2B
new ADU converted from an [e] single-family residence attached garage
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2A; LOT 2359 PLAN CLUSTER 4B
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2A; LOT 260; PLAN COTTAGE 3D
PV INSTALL 8.61KW DC, 21 PANELS, 1 ESS, 3 EXPANSION, (N) 225A SUB-PANEL
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2A; LOT 243; PLAN CLUSTER 2E
Garage conversion to unheated laundry room and storage
230 SQ. FT INTERIOR REMODEL WHICH INCLUDES REMODELING FAMILY ROOM TO BEDROOM AND REMODELING 1/2 BATH & LAUNDRY TO FULL BATH WITH LAUNDRY CLOSET
Scope of work is an interior remodel for a single family residence. We are just relocated plumbing fixtures and defining spaces with non structural walls.
NEW 3,608 SQ.FT. SINGLE FAMILY RESIDENCE WITH 4 BEDROOMS, 4 BATHROOMS, AN ATTACHED
745 SQ.FT. 3 CAR GARAGE, 254 SQ.FT OF COVERED DECK, AND 0 SQ.FT. OF ROOF DECK ON THE SECOND FLOOR. THE PROPOSED IMPROVEMENTS INCLUDE 294 LINEAR FEET OF RETAINING WALL
Remodel approximately 307 sf of existing the residence and create an ADU of approximately 550 sf within the footprint of the original residence.
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2A; LOT 252; PLAN CLUSTER 2C
REMOVE & REPLACE (2) WALL SIGNS
REMOVE AND REPLACEMENT EXTERIOR SIDING + REPLACE WINDOWS AND SLIDERS
UL 300 Amerex Hood Suppression System
THIS PROJECT CONSISTS OF THE CONVERSION OF AN EXISTING TWO-CAR GARAGE INTO AN ATTACHED 485 S.F. A.D.U. WITH 2-BEDROOMS AND 1-BATHROOM.
Convert a portion of the existing home and garage into a 200 sf ADU. Remodel existing kitchen and master bath, vault living room ceiling. NO CHANGES TO EXITING FOOTPRINT.
Place rolloff dumpster in public right-of-way. Anticipated dates are: 02/17/26-02/23/26, however, permit is to remain open until 02/27/26 in case of delays. Dumpster must be maintained
in a clean and safe manner. Dumpster must be reflectorized. A copy of this permit must be placed on the dumpster. All work to be done to applicable City Standard Specifications & Engineering
Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to placement. Also, call the inspection hotline after the dumpster is removed so the permit
can be closed.
REPLACE 40 GALLON WATER HEATER (SAME FOR SAME) BRING UP TO CODE
PV Solar roof mounts, 3.69KW, 9panels, comp-shingle, Existing 200A MSP
1-Tesla Powerwall 3
Interior remodel of existing single family dwelling w partial roof replacement and no change to dwelling footprint of 1572 sf
2,034 SQ.FT. COMMERCIAL TENANT IMPROVEMENT INTERIOR REMODEL FOR CAYUCOS PHARMACY.
Modify the existing overhead fire sprinkler system for the tenant improvement located at 1029
Chorro Street in San Luis Obispo, CA. Modifications of the existing fire sprinkler system shall
be completed in accordance with NFPA 13, 2022 edition, 2022 California Fire Code, and the San
Luis Obispo City Municipal Code.
The sprinkler system for this building spans over multiple tenant spaces. The scope of work
here is limited solely to this tenant space.
Replace/repair main water line
CONVERT PANTRY INTO SMALL FULL BATHROOM
Replacing the old dialer with a new cellular communicator
Tenant Improvement: Convert existing pizza restaurant to Mexican Food Restaurant.
THIS PROJECT CONSISTS OF THE CONVERSION OF AN EXISTING TWO-CAR GARAGE INTO AN ATTACHED 402 S.F. A.D.U. WITH 2-BEDROOMS AND 1-BATHROOM. THE ADDITION OF A FOURTH BEDROOM WITHIN THE EXISTING
S.F.R WALLS WILL ALSO BE INCLUDED.
Replace existing recessed 100A Zinsco electrical panel on east wall with new 200A main service panel in same location.
NEW SINGLE-FAMILY RESIDENCE - TRACT 3089; PHASE 2C; LOT 310; PLAN COTTAGE 2
Remodel existing primary suite to add office and relocate existing toilet room door.
Installation of 4.95 kW-DC PV system, (11) 450W modules, (11) Enphase Microinverters
PV solar roof mount, 17Mods, 6.885kw, Comp shingle , Existing Main Service Panel 125A, TESLA Powerwall 3
Installation of a new 5.4 kW-DC PV System (12) Modules (12) Microinverters (1) 125 A IQ Combiner
Installation of a 240V outlet for EV charging and new 125A sub panel.
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection
Hotline at (805) 781-7554 at least 24 hours in advance.
Interior remodel of kitchen and bathroom. Within existing footprint, add powder bathroom. Convert existing window to patio door.
THIS PROJECT CONSISTS OF THE CONVERSION TO 270 S.F. PORTION OF AN EXISTING SINGLE FAMILY RESIDENCE AND THE CONSTRUCTION OF A 64 SF ADDITION TO SERVE AS THE 1-BATHROOM FOR THE PROPOSED
A.D.U.. THEREFOR THE EXISTING RESIDENCE SHALL REMAIN AS A 2-BEDROOM AND 1-BATHROOM.
Replace gas furnace with heat pump and wall mounts.
2-Story ADUs per Gov. Code 66232(a)(4)
New fire sprinkler plans for a multi-residential home
Replace gas furnace with electric Heat-pump; existing location
THE PROJECT PRPOSES TO ADD AN ADDITIONAL 7'-8" HOOD AND PIZZA OVEN IN TO AN
EXISTING FOOD SERVICE FACILITY. NO OTHER IMPROVEMENTS ARE PROPOSED AS A PART OF
THIS PERMIT. THE PROJECT PROPOSES NO ALTERATIONS TO THE EXISTING ACCESSIBLE
PATH OF EGRESS OR EGRESS COMPONENTS WITHIN THE BUILDING OR SITE .
Remove old 100A recessed Zinsco main service panel and install new recessed 200A main service panel with new 2" rigid service mast and new Service Entrance Conductors
Replace sewer lateral to the main using trenchless technology. Trenchless lateral replacements may require a video submittal to be emailed after replacement. A separate building permit
is required for any sewer lateral replacement on private property. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must
be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent
inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations shall be completed by City staff during regular business hours
on Tuesdays and Wednesdays only, with exceptions made as necessary for holidays. Contractors must schedule all wye installations on these days by calling the Public Works Inspection
Hotline at (805) 781-7554 at least 24 hours in advance.
Permit Application Date
9/26/2025
11/13/2025
11/12/2025
10/17/2025
10/6/2025
9/5/2025
10/31/2025
10/8/2025
10/30/2025
10/13/2025
9/11/2025
9/16/2025
9/25/2025
9/23/2025
9/9/2025
9/24/2025
9/18/2025
7/15/2025
9/18/2025
9/10/2025
7/14/2025
9/9/2025
8/12/2025
8/28/2025
9/5/2025
6/3/2025
8/19/2025
9/5/2025
8/6/2025
5/16/2025
8/19/2025
7/24/2025
8/14/2025
6/25/2025
7/23/2025
8/15/2025
8/20/2025
8/21/2025
8/14/2025
8/14/2025
8/11/2025
7/9/2025
8/22/2025
8/11/2025
7/11/2025
7/14/2025
7/8/2025
7/8/2025
7/29/2025
9/4/2025
8/13/2025
8/1/2025
6/25/2025
8/27/2025
8/6/2025
6/30/2025
8/7/2025
7/21/2025
7/21/2025
6/13/2025
7/24/2025
8/15/2025
7/22/2025
7/2/2025
7/31/2025
7/23/2025
2/3/2025
6/25/2025
6/30/2025
8/5/2025
7/23/2025
7/1/2025
9/9/2025
6/30/2025
9/8/2025
6/23/2025
7/30/2025
8/21/2025
6/12/2025
8/4/2025
8/11/2025
8/27/2025
7/10/2025
6/30/2025
8/5/2025
8/14/2025
7/2/2025
8/5/2025
8/6/2025
7/29/2025
8/27/2025
6/23/2025
8/13/2025
8/29/2025
6/20/2025
8/21/2025
7/8/2025
7/16/2025
7/22/2025
7/29/2025
8/13/2025
6/23/2025
8/11/2025
7/22/2025
7/9/2025
5/30/2025
7/28/2025
9/4/2025
6/23/2025
8/19/2025
7/29/2025
6/16/2025
9/4/2025
6/30/2025
7/28/2025
7/2/2025
7/9/2025
9/9/2025
6/20/2025
8/19/2025
7/7/2025
5/29/2025
7/14/2025
5/15/2025
9/5/2025
8/4/2025
6/12/2025
8/28/2025
8/27/2025
7/9/2025
6/30/2025
8/11/2025
8/8/2025
8/13/2025
6/30/2025
6/30/2025
9/4/2025
11/20/2024
6/25/2025
9/4/2025
8/4/2025
7/14/2025
7/21/2025
8/28/2025
8/21/2025
7/16/2025
8/19/2025
7/9/2025
8/27/2025
7/29/2025
7/17/2025
9/10/2025
6/25/2025
8/26/2025
8/29/2025
8/11/2025
6/30/2025
6/25/2025
7/7/2025
6/20/2025
7/25/2025
7/22/2025
6/10/2025
7/10/2025
8/27/2025
8/27/2025
6/26/2025
6/27/2025
7/8/2025
8/14/2025
8/11/2025
6/17/2025
6/19/2025
7/9/2025
7/14/2025
7/9/2025
9/9/2025
7/21/2025
7/3/2025
8/11/2025
8/12/2025
6/27/2025
7/31/2025
9/3/2025
7/3/2025
8/21/2025
7/24/2025
8/13/2025
7/21/2025
7/2/2025
7/14/2025
8/13/2025
7/17/2025
8/20/2025
7/22/2025
8/21/2025
8/21/2025
7/16/2025
6/18/2025
7/24/2025
7/8/2025
8/19/2025
7/21/2025
8/12/2025
3/25/2025
8/27/2025
8/11/2025
7/2/2025
8/4/2025
8/26/2025
7/3/2025
8/19/2025
7/17/2025
8/1/2025
6/30/2025
8/21/2025
8/12/2025
8/20/2025
7/7/2025
7/8/2025
8/28/2025
7/1/2025
7/16/2025
7/11/2025
9/3/2025
6/20/2025
9/4/2025
8/14/2025
7/15/2025
6/25/2025
8/14/2025
9/8/2025
6/26/2025
8/6/2025
7/15/2025
6/26/2025
8/4/2025
6/22/2025
8/27/2025
6/23/2025
6/23/2025
7/21/2025
8/6/2025
7/7/2025
8/4/2025
7/1/2025
6/26/2025
1/16/2024
5/29/2025
7/9/2025
7/10/2025
8/6/2025
7/16/2025
9/2/2025
6/16/2025
8/5/2025
7/22/2025
8/5/2025
7/29/2025
7/16/2025
9/5/2025
8/15/2025
7/21/2025
6/30/2025
8/12/2025
8/15/2025
8/8/2025
6/24/2025
7/8/2025
6/3/2025
8/29/2025
8/28/2025
7/2/2025
8/15/2025
7/29/2025
6/9/2025
8/14/2025
8/19/2025
7/2/2025
8/12/2025
6/25/2025
8/7/2025
8/21/2025
8/4/2025
7/11/2025
9/8/2025
7/21/2025
6/30/2025
8/7/2025
7/22/2025
6/25/2025
9/8/2025
8/6/2025
7/2/2025
8/21/2025
7/21/2025
9/8/2025
6/23/2025
8/6/2025
7/9/2025
7/2/2025
9/2/2025
8/7/2025
7/15/2025
7/7/2025
6/6/2025
6/23/2025
8/4/2025
7/22/2025
7/22/2025
7/23/2025
8/7/2025
7/2/2025
7/3/2025
7/16/2025
6/2/2025
7/9/2025
3/25/2025
6/10/2025
9/2/2025
7/9/2025
7/31/2025
6/18/2025
7/30/2025
7/9/2025
9/10/2025
7/16/2025
7/23/2025
7/29/2025
6/18/2025
8/15/2025
7/7/2025
6/18/2025
6/25/2025
5/20/2024
12/14/2023
1/13/2023
10/10/2023
9/10/2024
3/4/2024
12/4/2023
10/11/2022
2/27/2024
10/11/2022
10/11/2022
6/3/2025
6/4/2025
6/12/2025
6/17/2025
6/4/2025
4/29/2025
6/18/2025
5/15/2025
6/4/2025
6/10/2025
6/13/2025
4/7/2025
6/13/2025
6/12/2025
6/17/2025
6/16/2025
6/2/2025
4/2/2025
5/29/2025
6/13/2025
6/11/2025
6/9/2025
6/17/2025
6/3/2025
5/19/2025
5/6/2025
6/5/2025
6/2/2025
6/16/2025
6/20/2025
6/11/2025
5/5/2025
6/2/2025
6/3/2025
6/4/2025
5/29/2025
6/8/2025
6/17/2025
4/29/2025
6/12/2025
6/9/2025
6/3/2025
5/21/2025
4/14/2025
5/29/2025
6/9/2025
6/9/2025
5/28/2025
6/10/2025
5/29/2025
6/13/2025
5/28/2025
6/18/2025
5/23/2025
6/12/2025
6/17/2025
2/25/2025
6/13/2025
5/1/2025
6/4/2025
6/9/2025
5/1/2025
6/17/2025
7/11/2024
5/12/2025
6/9/2025
6/2/2025
12/9/2025
6/9/2025
6/16/2025
5/30/2025
6/11/2025
6/11/2025
6/12/2025
3/18/2025
6/9/2025
3/21/2023
4/16/2025
6/6/2025
6/9/2025
5/16/2025
5/27/2025
5/27/2025
6/12/2025
6/10/2025
5/21/2025
6/17/2025
6/10/2025
6/9/2025
5/29/2025
4/25/2025
6/16/2025
4/21/2025
5/30/2025
3/27/2025
5/30/2025
6/10/2025
6/4/2025
6/17/2025
4/30/2025
5/20/2025
5/13/2025
6/4/2025
6/3/2025
4/21/2025
5/14/2025
6/13/2025
6/18/2025
6/9/2025
5/31/2025
3/17/2025
6/10/2025
6/6/2025
5/31/2025
6/11/2025
6/18/2025
6/4/2025
5/27/2025
6/17/2025
6/4/2025
6/16/2025
6/16/2025
6/4/2025
4/24/2025
5/6/2025
6/10/2025
5/29/2025
6/2/2025
6/12/2025
6/10/2025
6/19/2025
6/12/2025
6/12/2025
6/9/2025
6/4/2025
6/18/2025
6/11/2025
5/23/2025
5/4/2023
5/30/2025
6/11/2025
6/19/2025
5/13/2025
5/14/2025
6/12/2025
6/4/2025
5/13/2025
6/2/2025
5/6/2025
5/29/2025
6/9/2025
3/14/2025
5/14/2025
4/3/2025
8/18/2025
8/11/2025
8/26/2025
7/11/2025
7/31/2025
8/12/2025
12/9/2025
10/21/2025
11/4/2025
6/6/2025
11/5/2025
10/15/2025
11/14/2025
11/12/2025
11/19/2025
9/4/2025
10/16/2025
11/14/2025
10/22/2025
10/16/2025
11/4/2025
9/29/2025
9/29/2025
9/22/2025
9/2/2025
9/19/2025
11/21/2025
10/10/2025
11/24/2025
10/27/2025
9/29/2025
10/24/2025
10/16/2025
11/26/2025
12/1/2025
9/9/2025
9/22/2025
11/6/2025
11/13/2025
10/1/2025
10/6/2025
11/12/2025
10/27/2025
9/29/2025
8/29/2025
11/14/2025
8/25/2025
10/7/2025
10/6/2025
10/2/2025
6/6/2025
11/14/2025
10/1/2025
10/22/2025
11/17/2025
11/18/2025
9/19/2025
11/11/2025
10/7/2025
10/1/2025
11/25/2025
10/15/2025
11/17/2025
11/25/2025
10/16/2025
10/31/2025
10/16/2025
11/14/2025
11/19/2025
9/29/2025
10/6/2025
10/9/2025
10/6/2025
9/4/2025
10/16/2025
10/8/2025
12/4/2025
10/21/2025
9/22/2025
10/28/2025
9/22/2025
10/3/2025
10/27/2025
11/19/2025
11/14/2025
10/27/2025
12/1/2025
10/8/2025
11/5/2025
10/29/2025
9/19/2025
10/15/2025
10/2/2025
9/17/2025
10/9/2025
10/29/2025
9/24/2025
11/8/2025
12/2/2025
11/7/2025
11/19/2025
10/16/2025
8/12/2025
8/18/2025
11/6/2025
11/18/2025
10/2/2025
11/14/2025
10/31/2025
10/27/2025
11/12/2025
9/5/2025
8/25/2025
9/24/2025
10/23/2025
9/14/2025
9/25/2025
11/18/2025
11/13/2025
11/14/2025
10/31/2025
11/14/2025
12/2/2025
10/28/2025
10/8/2025
8/29/2025
9/25/2023
11/4/2025
10/17/2025
11/6/2025
10/17/2025
10/21/2025
9/25/2025
11/19/2025
9/24/2025
11/8/2025
12/4/2025
10/10/2025
10/2/2025
10/22/2025
11/18/2025
10/8/2025
10/9/2025
11/14/2025
10/15/2025
11/5/2025
10/17/2025
11/18/2025
10/2/2025
6/6/2025
9/22/2025
11/7/2025
11/11/2025
9/25/2025
9/26/2025
9/22/2025
10/31/2025
10/7/2025
11/8/2025
10/2/2025
10/2/2025
11/17/2025
11/24/2025
10/30/2025
9/29/2025
10/22/2025
6/6/2025
8/28/2025
10/16/2025
11/6/2025
11/14/2025
9/10/2025
11/8/2025
10/28/2025
10/23/2025
10/13/2025
12/5/2025
10/23/2025
10/23/2025
12/1/2025
11/19/2025
9/29/2025
11/26/2025
11/5/2025
9/18/2025
10/17/2025
10/22/2025
9/18/2025
10/9/2025
9/25/2025
9/18/2025
11/19/2025
9/22/2025
10/15/2025
10/9/2025
6/6/2025
11/5/2025
9/23/2025
10/29/2025
10/21/2025
9/23/2025
11/8/2025
8/28/2025
9/19/2025
10/29/2025
11/14/2025
11/14/2025
10/1/2025
12/2/2025
11/5/2025
9/18/2025
11/5/2025
9/23/2025
12/1/2025
10/22/2025
11/3/2025
10/27/2025
9/24/2025
10/31/2025
11/5/2025
8/27/2025
11/3/2025
12/1/2025
11/19/2025
10/28/2025
10/14/2025
11/18/2025
10/13/2025
10/10/2025
11/6/2025
10/15/2025
8/28/2025
12/3/2025
11/18/2025
11/18/2025
10/1/2025
9/30/2025
2/29/2024
10/30/2025
12/1/2025
10/10/2025
10/20/2025
10/15/2025
11/3/2025
11/3/2025
9/23/2025
10/20/2025
10/15/2025
12/3/2025
10/10/2025
10/17/2025
10/1/2025
11/18/2025
10/7/2025
11/12/2025
10/2/2025
10/10/2025
10/7/2025
10/27/2025
10/27/2025
11/6/2025
10/3/2025
11/4/2025
10/14/2025
11/25/2025
11/8/2025
10/6/2025
10/2/2025
9/24/2025
11/24/2025
10/17/2025
9/24/2025
11/7/2025
12/8/2025
10/22/2025
11/11/2025
10/31/2025
11/6/2025
12/8/2025
10/6/2025
11/18/2025
12/2/2025
11/12/2025
11/5/2025
10/28/2025
9/10/2025
10/13/2025
11/14/2025
10/1/2025
12/5/2025
9/25/2025
6/9/2025
12/8/2025
7/30/2025
10/7/2025
9/29/2025
12/2/2025
10/14/2025
10/20/2025
12/1/2025
10/15/2025
10/31/2025
9/29/2025
10/6/2025
10/24/2025
10/10/2025
9/23/2025
12/4/2025
10/28/2025
10/17/2025
10/7/2025
10/2/2025
11/10/2025
11/12/2025
10/23/2025
10/3/2025
7/25/2025
11/6/2025
11/24/2025
11/10/2025
9/23/2025
3/14/2025
12/8/2025
10/28/2025
9/11/2025
9/11/2025
9/15/2025
9/16/2025
9/17/2025
8/18/2025
9/12/2025
9/4/2025
9/11/2025
3/14/2025
9/11/2025
9/9/2025
7/14/2025
9/10/2025
9/15/2025
9/10/2025
9/10/2025
9/11/2025
9/18/2025
9/11/2025
9/11/2025
9/10/2025
9/18/2025
9/18/2025
9/17/2025
9/17/2025
9/18/2025
9/16/2025
7/1/2025
9/11/2025
9/16/2025
9/11/2025
9/11/2025
9/17/2025
9/16/2025
9/12/2025
8/12/2025
9/17/2025
9/18/2025
9/15/2025
8/18/2025
6/19/2025
6/25/2025
8/12/2025
8/28/2025
7/1/2025
8/18/2025
7/22/2025
9/4/2025
8/13/2025
7/14/2025
8/29/2025
8/11/2025
6/25/2025
6/17/2025
5/22/2025
8/14/2025
7/18/2025
8/4/2025
8/19/2025
8/14/2025
7/2/2025
8/4/2025
6/18/2025
7/9/2025
8/18/2025
7/9/2025
7/17/2025
6/27/2025
8/18/2025
6/18/2025
8/21/2025
8/27/2025
7/16/2025
8/29/2025
7/2/2025
7/1/2025
8/1/2025
8/26/2025
8/11/2025
8/5/2025
6/23/2025
7/7/2025
6/10/2025
6/27/2025
7/18/2025
6/23/2025
6/5/2025
8/15/2025
6/25/2025
9/9/2025
8/28/2025
8/5/2025
7/9/2025
6/25/2025
7/2/2025
6/24/2025
7/25/2025
8/27/2025
8/6/2025
8/29/2025
5/2/2025
7/17/2025
8/5/2025
8/7/2025
7/2/2025
8/6/2025
7/30/2025
6/25/2025
8/11/2025
2/8/2024
8/4/2025
9/10/2025
8/27/2025
7/28/2025
7/2/2025
7/21/2025
6/27/2025
8/5/2025
3/5/2025
3/3/2025
1/13/2025
2/3/2025
12/23/2024
3/12/2025
7/21/2025
7/29/2025
8/25/2025
8/4/2025
8/18/2025
7/23/2025
6/12/2025
7/1/2025
8/13/2025
8/14/2025
7/1/2025
6/19/2025
8/29/2025
7/1/2025
6/16/2025
6/19/2025
9/5/2025
8/26/2025
7/17/2025
6/17/2025
6/19/2025
8/26/2025
8/19/2025
8/25/2025
8/20/2025
8/25/2025
8/4/2025
6/26/2025
6/19/2025
8/8/2025
8/18/2025
8/26/2025
7/10/2025
6/30/2025
7/21/2025
6/12/2025
7/31/2025
6/5/2025
6/17/2025
9/2/2025
6/16/2025
7/11/2025
8/4/2025
6/18/2025
7/17/2025
9/4/2025
7/24/2025
8/26/2025
7/9/2025
7/15/2025
7/9/2025
7/15/2025
8/18/2025
6/23/2025
6/11/2025
6/30/2025
7/22/2025
8/5/2025
8/26/2025
7/9/2025
8/28/2025
7/24/2025
8/21/2025
7/29/2025
6/19/2025
6/13/2025
6/23/2025
6/10/2025
9/3/2025
8/26/2025
8/26/2025
6/2/2025
5/29/2025
6/9/2025
6/5/2025
6/10/2025
6/3/2025
6/3/2025
6/5/2025
6/10/2025
11/19/2025
11/24/2025
11/25/2025
11/18/2025
12/4/2025
11/25/2025
12/2/2025
11/13/2025
11/25/2025
12/2/2025
9/17/2025
12/1/2025
7/11/2024
9/3/2025
11/12/2025
11/4/2025
8/26/2025
9/26/2025
6/21/2024
10/31/2025
11/12/2025
10/13/2025
10/1/2025
10/13/2025
11/12/2025
7/9/2025
11/12/2025
10/1/2025
11/12/2025
11/4/2025
11/12/2025
10/8/2025
10/2/2025
11/6/2025
11/5/2025
10/28/2025
11/4/2025
10/1/2025
9/16/2025
11/13/2025
11/4/2025
11/10/2025
3/3/2025
11/6/2025
10/15/2025
10/30/2025
11/12/2025
10/30/2025
10/17/2025
7/29/2025
10/13/2025
10/30/2025
10/15/2025
11/6/2025
11/12/2025
6/18/2025
7/14/2025
6/19/2025
7/28/2025
8/4/2025
7/25/2025
6/24/2025
7/24/2025
6/10/2025
12/8/2025
10/21/2025
10/13/2025
9/29/2025
11/24/2025
6/24/2025
12/10/2025
12/9/2025
12/11/2025
12/11/2025
12/11/2025
12/11/2025
12/11/2025
9/12/2025
10/24/2024
12/12/2025
4/22/2025
12/12/2025
12/12/2025
2/21/2025
12/11/2025
1/23/2025
11/11/2025
1/23/2025
11/18/2025
3/26/2025
11/4/2025
12/8/2025
12/15/2025
11/14/2025
10/13/2025
9/11/2025
9/22/2025
12/15/2025
9/26/2025
12/16/2025
12/16/2025
12/3/2025
11/26/2025
8/19/2025
12/16/2025
12/16/2025
7/28/2025
10/10/2025
10/10/2025
10/10/2025
10/10/2025
10/10/2025
12/16/2025
9/30/2025
12/18/2025
10/15/2025
11/14/2025
11/18/2025
7/23/2025
12/17/2025
10/2/2025
10/2/2025
10/27/2025
6/24/2025
11/17/2025
12/19/2025
12/16/2025
8/4/2025
12/3/2025
12/18/2025
8/25/2025
11/17/2025
12/19/2025
9/2/2025
11/8/2025
12/16/2025
4/8/2025
5/7/2025
10/21/2025
3/26/2025
12/19/2025
12/19/2025
12/22/2025
3/12/2025
12/22/2025
12/22/2025
10/10/2025
10/10/2025
10/10/2025
10/10/2025
10/10/2025
10/10/2025
10/10/2025
9/25/2025
10/10/2025
10/10/2025
10/10/2025
10/10/2025
10/10/2025
10/10/2025
10/10/2025
10/10/2025
11/20/2024
12/10/2025
10/10/2025
10/10/2025
10/10/2025
12/16/2025
10/10/2025
12/16/2025
10/10/2025
10/10/2025
10/10/2025
10/10/2025
10/10/2025
10/10/2025
10/10/2025
12/16/2025
12/16/2025
10/22/2025
12/16/2025
8/5/2025
8/11/2025
10/18/2024
6/9/2025
11/3/2025
10/3/2025
12/9/2025
9/19/2025
12/16/2025
11/12/2025
7/2/2025
12/12/2025
10/24/2025
12/16/2025
4/1/2025
10/21/2025
11/17/2025
1/23/2025
7/1/2025
12/22/2025
6/5/2025
12/12/2025
12/22/2025
12/23/2025
10/8/2025
12/2/2025
8/8/2025
12/22/2025
12/23/2025
12/23/2025
3/27/2025
7/10/2025
2/27/2025
11/13/2025
9/12/2025
11/15/2025
11/16/2025
10/29/2025
9/23/2025
11/25/2025
11/13/2025
11/18/2025
12/2/2025
11/5/2025
11/24/2025
12/10/2025
7/3/2025
9/12/2025
9/9/2025
12/23/2025
11/12/2025
1/6/2026
11/14/2025
1/5/2026
10/1/2025
10/1/2025
10/1/2025
12/12/2025
1/6/2026
1/5/2026
4/30/2025
12/23/2025
12/16/2025
6/11/2025
1/5/2026
1/5/2026
12/23/2025
1/5/2026
7/17/2025
10/24/2025
1/5/2026
10/2/2025
9/30/2025
10/10/2025
12/30/2025
10/8/2025
9/11/2025
10/2/2024
1/7/2026
1/7/2026
1/7/2026
1/7/2026
12/5/2024
1/7/2026
4/18/2025
10/1/2025
12/5/2025
10/24/2025
9/5/2025
11/24/2025
12/22/2025
11/24/2025
1/23/2025
12/16/2025
12/3/2025
5/27/2025
12/19/2025
1/12/2026
1/28/2025
1/12/2026
9/15/2025
9/17/2025
11/21/2025
12/12/2025
1/5/2026
1/8/2026
3/29/2024
1/9/2026
4/15/2025
1/2/2026
1/9/2026
5/16/2025
1/9/2026
1/9/2026
11/11/2025
3/7/2025
1/6/2026
1/12/2026
1/7/2026
1/13/2026
1/8/2026
9/2/2025
9/2/2025
1/9/2026
1/13/2026
1/13/2026
12/9/2025
10/16/2025
1/13/2026
4/17/2025
1/14/2026
7/9/2025
1/8/2026
1/8/2026
1/14/2026
1/5/2026
12/12/2025
1/14/2026
10/2/2025
11/14/2025
10/8/2025
12/22/2025
1/6/2026
12/4/2025
1/6/2026
9/28/2025
1/15/2026
11/26/2025
12/25/2025
12/25/2025
12/18/2025
12/24/2025
12/24/2025
12/24/2025
1/2/2026
7/8/2025
10/7/2025
1/2/2026
1/13/2026
1/13/2026
1/16/2026
1/15/2026
12/2/2025
10/8/2025
1/15/2026
10/21/2025
6/16/2025
3/5/2025
11/5/2025
12/18/2025
12/22/2025
4/1/2025
12/29/2025
11/19/2025
10/30/2025
12/8/2025
12/11/2025
12/22/2025
12/30/2025
12/9/2025
3/27/2025
3/27/2025
3/27/2025
1/20/2026
1/15/2026
1/2/2026
1/19/2026
1/5/2026
7/13/2025
1/2/2026
6/24/2025
8/15/2025
10/21/2025
12/18/2025
1/16/2026
9/16/2025
1/21/2026
1/15/2026
1/14/2026
1/13/2026
1/15/2026
1/14/2026
5/29/2025
1/14/2026
1/21/2026
11/3/2025
1/21/2026
1/21/2026
1/13/2023
2/26/2025
5/2/2025
5/1/2025
5/16/2025
6/16/2025
7/29/2025
7/28/2025
7/29/2025
8/13/2025
10/10/2025
8/17/2022
12/18/2024
4/23/2025
6/16/2025
6/2/2025
5/22/2025
6/3/2025
7/15/2025
7/2/2025
7/15/2025
7/16/2025
7/1/2025
7/16/2025
6/24/2025
6/30/2025
7/28/2025
7/2/2025
8/13/2025
8/4/2025
8/4/2025
8/8/2025
8/11/2025
9/30/2025
8/14/2025
9/22/2025
9/4/2025
9/22/2025
9/22/2025
8/19/2025
11/5/2025
5/23/2025
7/16/2025
6/9/2025
6/9/2025
7/16/2025
7/16/2025
7/17/2025
7/28/2025
7/30/2025
7/28/2025
7/28/2025
7/30/2025
7/28/2025
8/1/2025
7/30/2025
7/30/2025
7/17/2025
3/4/2024
4/15/2024
12/17/2025
6/26/2025
1/26/2026
3/11/2025
10/30/2025
2/12/2024
1/6/2026
1/6/2026
11/11/2025
1/23/2026
1/23/2026
7/23/2025
1/22/2026
7/9/2025
1/12/2026
1/21/2026
1/19/2026
1/27/2026
1/14/2026
6/9/2025
3/28/2025
1/6/2026
12/22/2025
12/23/2025
10/7/2025
4/1/2024
1/15/2026
1/28/2026
1/28/2026
1/22/2026
12/1/2025
10/2/2024
10/2/2024
6/16/2025
1/6/2026
12/11/2025
1/28/2026
8/4/2025
12/19/2025
8/21/2025
8/21/2025
1/29/2026
12/17/2025
1/29/2026
8/21/2025
5/1/2025
12/15/2025
3/27/2025
1/15/2026
3/27/2025
3/27/2025
12/4/2025
3/27/2025
9/26/2025
10/7/2025
1/26/2026
6/26/2025
10/24/2025
1/29/2026
9/30/2025
1/29/2026
2/2/2026
1/20/2026
2/12/2024
1/29/2026
2/3/2026
2/3/2026
2/3/2026
2/3/2026
2/3/2026
3/27/2025
2/2/2026
12/17/2025
2/3/2026
4/7/2025
8/15/2025
1/21/2026
1/21/2026
1/6/2026
1/21/2026
1/7/2026
1/21/2026
10/2/2024
12/3/2025
10/2/2024
3/13/2025
1/9/2026
7/11/2025
1/22/2026
9/17/2025
10/20/2025
2/12/2024
2/12/2024
12/3/2025
12/11/2025
1/22/2026
10/9/2025
12/31/2025
1/12/2026
7/8/2025
12/31/2025
8/29/2025
12/24/2025
12/24/2025
10/17/2025
12/24/2025
12/24/2025
1/15/2026
12/10/2024
2/4/2025
1/5/2026
1/5/2026
1/7/2026
1/26/2026
10/27/2025
1/5/2026
1/5/2026
1/26/2026
1/26/2026
6/24/2025
1/15/2026
1/28/2026
1/28/2026
1/28/2026
1/28/2026
6/6/2025
1/28/2026
1/28/2026
1/14/2026
1/28/2026
9/17/2025
1/27/2026
12/1/2025
1/28/2026
1/26/2026
5/27/2025
7/2/2025
12/18/2025
1/29/2026
1/22/2026
1/19/2026
1/22/2026
12/15/2025
6/20/2025
7/1/2025
11/14/2025
11/19/2025
12/12/2025
1/30/2026
6/11/2025
1/30/2026
12/29/2025
2/3/2026
5/27/2025
11/21/2025
11/24/2025
2/5/2025
6/19/2025
11/25/2025
12/1/2025
1/30/2026
2/2/2026
1/22/2026
3/27/2025
1/21/2026
10/24/2025
1/8/2026
2/4/2026
1/16/2026
12/15/2025
3/7/2025
6/25/2025
10/17/2025
11/26/2025
3/27/2025
10/17/2025
12/11/2025
1/27/2026
12/9/2025
2/4/2026
3/27/2025
3/27/2025
3/27/2025
1/5/2026
1/21/2026
2/2/2026
11/7/2025
3/27/2025
2/4/2026
2/4/2026
6/11/2024
6/12/2025
10/10/2025
2/4/2026
1/2/2025
12/3/2025
8/27/2025
7/29/2025
1/12/2026
3/27/2025
10/2/2024
10/2/2024
2/3/2026
9/18/2025
7/16/2025
12/26/2025
8/21/2025
8/21/2025
8/21/2025
8/21/2025
8/21/2025
8/21/2025
8/21/2025
2/9/2026
2/2/2026
2/3/2026
2/3/2026
2/2/2026
2/2/2026
2/10/2026
1/2/2025
8/18/2025
3/29/2024
2/9/2026
6/18/2025
2/4/2026
2/11/2025
8/10/2023
2/6/2026
5/9/2025
6/18/2025
7/31/2025
12/17/2025
1/27/2026
8/21/2025
9/12/2025
10/2/2024
2/3/2026
2/11/2026
1/29/2026
9/29/2025
4/17/2025
10/23/2025
9/25/2025
2/4/2026
10/28/2025
1/28/2026
2/5/2026
1/30/2026
12/14/2023
2/6/2026
2/6/2026
11/13/2025
10/2/2024
10/14/2025
12/12/2025
2/6/2026
2/6/2026
9/23/2025
10/2/2024
2/3/2026
2/6/2026
1/7/2026
2/6/2026
6/30/2025
2/6/2026
2/9/2026
2/6/2026
10/27/2025
10/22/2025
11/21/2025
9/30/2025
3/27/2025
1/26/2026
9/9/2025
12/31/2025
1/21/2026
12/1/2025
3/27/2025
4/9/2025
5/28/2025
2/4/2026
12/22/2025
10/4/2024
2/6/2026
1/30/2026
1/15/2026
1/15/2026
1/13/2026
1/15/2026
1/27/2026
1/27/2026
5/22/2025
1/27/2026
1/27/2026
1/27/2026
1/27/2026
1/23/2026
1/28/2026
1/28/2026
2/7/2026
1/27/2026
1/27/2026
1/27/2026
1/13/2026
1/23/2026
1/23/2026
1/23/2026
1/16/2026
1/23/2026
1/28/2026
1/28/2026
1/20/2026
7/16/2025
1/28/2026
1/28/2026
1/28/2026
1/28/2026
3/25/2025
3/25/2025
1/28/2026
1/28/2026
1/28/2026
12/17/2025
1/19/2024
1/19/2024
4/3/2024
7/9/2025
2/11/2026
10/6/2021
1/13/2026
2/2/2026
2/2/2026
7/11/2025
7/9/2025
1/15/2025
10/2/2025
7/31/2025
6/30/2025
10/18/2024
10/18/2024
5/19/2025
10/1/2025
11/12/2025
1/14/2026
5/20/2025
3/12/2025
3/24/2025
5/2/2025
12/30/2025
11/22/2024
3/24/2023
11/6/2025
12/8/2025
11/13/2025
6/24/2024
4/11/2024
8/21/2025
5/6/2025
2/12/2026
2/12/2026
3/27/2025
8/21/2025
12/18/2023
4/11/2024
10/14/2025
3/27/2025
3/27/2025
6/26/2025
2/12/2026
2/12/2026
4/23/2025
2/4/2026
2/4/2026
2/4/2026
11/6/2024
2/13/2025
2/5/2026
2/5/2026
5/8/2025
2/12/2026
2/6/2026
2/11/2026
2/9/2026
2/10/2026
2/11/2026
2/5/2026
2/5/2026
11/6/2025
1/14/2026
2/13/2026
12/19/2025
2/12/2026
10/20/2025
10/21/2025
12/12/2025
2/13/2026
9/24/2025
2/13/2026
1/2/2026
10/15/2025
11/5/2025
2/13/2026
5/23/2025
1/16/2025
6/27/2024
6/26/2025
10/2/2024
9/12/2025
10/2/2024
10/2/2024
2/13/2026
10/2/2024
11/6/2025
11/5/2025
7/22/2024
4/25/2025
2/27/2025
10/2/2024
12/22/2025
11/17/2025
1/20/2026
2/13/2026
4/16/2025
2/11/2025
2/17/2026
2/11/2026
1/6/2026
1/20/2025
12/8/2025
2/17/2026
9/27/2025
2/17/2026
1/5/2026
6/9/2025
3/8/2025
9/30/2025
10/27/2025
3/27/2025
11/24/2025
2/9/2026
11/24/2025
1/28/2026
2/9/2026
2/17/2026
10/30/2025
9/22/2025
2/9/2026
7/16/2025
4/18/2025
9/17/2025
2/12/2026
7/9/2025
9/17/2025
2/17/2026
Permit Finaled Date
11/12/2025
9/16/2025
9/9/2025
9/30/2025
10/29/2025
11/20/2025
10/10/2025
8/13/2025
8/21/2025
10/8/2025
9/22/2025
10/28/2025
8/25/2025
9/9/2025
10/27/2025
9/16/2025
10/13/2025
8/6/2025
8/8/2025
10/6/2025
8/11/2025
7/8/2025
8/28/2025
8/11/2025
9/22/2025
8/21/2025
10/15/2025
9/15/2025
8/18/2025
9/9/2025
8/6/2025
8/27/2025
10/30/2025
11/21/2025
7/25/2025
9/25/2025
8/13/2025
10/31/2025
8/19/2025
12/5/2025
9/17/2025
10/3/2025
9/25/2025
11/12/2025
10/9/2025
8/1/2025
11/6/2025
7/14/2025
7/18/2025
11/6/2025
7/25/2025
11/5/2025
9/12/2025
10/3/2025
9/8/2025
10/9/2025
8/1/2025
11/19/2025
10/23/2025
10/21/2025
8/30/2025
10/22/2025
9/16/2025
10/8/2025
11/12/2025
8/6/2025
11/6/2025
8/26/2025
10/23/2025
9/2/2025
12/3/2025
8/11/2025
12/3/2025
10/17/2025
9/10/2025
11/12/2025
8/21/2025
10/6/2025
9/15/2025
9/15/2025
8/21/2025
9/25/2025
7/7/2025
8/29/2025
8/11/2025
10/3/2025
7/23/2025
9/18/2025
10/15/2025
8/13/2025
7/24/2025
7/31/2025
9/4/2025
9/29/2025
9/9/2025
9/8/2025
8/20/2025
10/8/2025
9/3/2025
9/16/2025
9/18/2025
8/21/2025
10/7/2025
10/15/2025
7/24/2025
9/15/2025
9/22/2025
8/4/2025
9/18/2025
9/24/2025
9/15/2025
10/28/2025
8/21/2025
10/17/2025
9/4/2025
8/18/2025
9/2/2025
8/26/2025
10/3/2025
8/19/2025
9/5/2025
9/9/2025
10/10/2025
8/5/2025
7/25/2025
10/17/2025
8/22/2025
10/8/2025
8/5/2025
11/10/2025
11/18/2025
9/4/2025
7/24/2025
7/18/2025
8/26/2025
9/22/2025
10/6/2025
7/14/2025
8/18/2025
7/16/2025
10/2/2025
11/5/2025
10/2/2025
9/24/2025
9/25/2025
9/17/2025
8/19/2025
8/25/2025
9/25/2025
11/12/2025
8/11/2025
8/19/2025
7/25/2025
9/25/2025
10/15/2025
9/25/2025
10/27/2025
9/22/2025
7/31/2025
8/8/2025
11/6/2025
9/9/2025
9/10/2025
8/8/2025
9/5/2025
10/27/2025
8/18/2025
8/15/2025
10/17/2025
9/24/2025
12/25/2025
11/10/2025
9/25/2025
8/11/2025
8/27/2025
7/25/2025
8/18/2025
7/29/2025
7/29/2025
7/29/2025
7/29/2025
7/10/2025
6/24/2025
6/25/2025
6/30/2025
12/10/2025
7/2/2025
8/1/2025
10/14/2025
10/14/2025
6/25/2025
8/26/2025
7/10/2025
8/12/2025
8/28/2025
7/2/2025
6/25/2025
8/1/2025
7/25/2025
7/3/2025
6/16/2025
6/16/2025
6/13/2025
6/25/2025
8/13/2025
6/16/2025
9/16/2025
6/13/2025
10/9/2025
9/10/2025
6/24/2025
7/3/2025
9/22/2025
9/18/2025
6/9/2025
7/2/2025
6/20/2025
8/21/2025
6/16/2025
6/26/2025
7/17/2025
6/13/2025
6/25/2025
6/13/2025
7/15/2025
7/23/2025
7/30/2025
8/15/2025
7/30/2025
6/26/2025
6/25/2025
6/24/2025
8/7/2025
7/1/2025
8/7/2025
9/17/2025
9/15/2025
7/7/2025
6/26/2025
6/17/2025
7/21/2025
7/3/2025
7/10/2025
7/1/2025
6/12/2025
8/19/2025
6/26/2025
9/19/2025
8/1/2025
7/3/2025
6/26/2025
7/2/2025
7/21/2025
7/24/2025
6/17/2025
9/25/2025
10/29/2025
6/12/2025
8/15/2025
7/30/2025
7/30/2025
7/8/2025
6/17/2025
6/25/2025
6/25/2025
8/11/2025
7/8/2025
12/8/2025
6/25/2025
10/29/2025
5/30/2025
9/2/2025
10/27/2025
11/7/2025
8/27/2025
11/10/2025
10/6/2025
8/7/2025
10/2/2025
12/1/2025
10/8/2025
10/29/2025
11/20/2025
10/14/2025
10/30/2025
11/21/2025
12/2/2025
10/8/2025
11/13/2025
10/9/2025
10/7/2025
12/10/2025
10/29/2025
10/24/2025
11/10/2025
11/6/2025
12/5/2025
10/6/2025
11/18/2025
11/21/2025
10/22/2025
12/8/2025
12/1/2025
11/13/2025
11/26/2025
11/17/2025
12/7/2025
10/3/2025
10/30/2025
11/18/2025
10/23/2025
10/8/2025
11/13/2025
10/17/2025
11/22/2025
12/9/2025
10/17/2025
11/10/2025
11/8/2025
11/21/2025
11/26/2025
11/13/2025
10/31/2025
11/17/2025
12/5/2025
11/26/2025
11/12/2025
11/18/2025
11/6/2025
11/26/2025
12/1/2025
11/21/2025
11/10/2025
11/10/2025
12/2/2025
12/3/2025
11/20/2025
11/10/2025
10/23/2025
12/9/2025
11/7/2025
11/14/2025
10/29/2025
11/12/2025
11/10/2025
11/5/2025
11/3/2025
12/1/2025
11/21/2025
12/7/2025
11/10/2025
10/23/2025
11/13/2025
10/17/2025
11/17/2025
10/2/2025
12/5/2025
10/17/2025
11/17/2025
11/21/2025
11/10/2025
11/6/2025
12/3/2025
11/20/2025
11/10/2025
10/17/2025
11/10/2025
11/10/2025
11/12/2025
12/8/2025
11/21/2025
11/10/2025
11/12/2025
11/10/2025
11/12/2025
12/8/2025
11/6/2025
12/8/2025
11/18/2025
10/8/2025
9/12/2025
10/10/2025
11/26/2025
11/26/2025
11/19/2025
11/19/2025
11/19/2025
9/26/2025
12/8/2025
11/19/2025
11/13/2025
11/26/2025
11/26/2025
10/8/2025
10/30/2025
9/29/2025
10/15/2025
9/23/2025
9/22/2025
8/14/2025
9/18/2025
7/31/2025
9/12/2025
8/29/2025
8/8/2025
10/27/2025
6/26/2025
9/4/2025
7/31/2025
8/20/2025
10/8/2025
9/3/2025
9/2/2025
9/16/2025
11/3/2025
9/24/2025
9/9/2025
11/6/2025
10/29/2025
7/29/2025
12/5/2025
8/8/2025
10/8/2025
9/2/2025
7/25/2025
12/1/2025
7/22/2025
9/9/2025
9/3/2025
10/8/2025
9/8/2025
9/22/2025
8/13/2025
10/27/2025
8/26/2025
9/9/2025
9/4/2025
8/19/2025
10/3/2025
9/15/2025
10/16/2025
11/24/2025
8/5/2025
9/12/2025
8/28/2025
11/25/2025
11/19/2025
8/21/2025
12/3/2025
11/21/2025
6/16/2025
9/2/2025
9/2/2025
7/25/2025
7/11/2025
8/11/2025
6/16/2025
7/1/2025
7/25/2025
7/25/2025
7/25/2025
7/25/2025
7/25/2025
7/11/2025
8/11/2025
7/1/2025
12/2/2025
11/10/2025
11/10/2025
10/17/2025
11/10/2025
11/10/2025
11/13/2025
1/7/2026
10/27/2025
11/10/2025
10/17/2025
7/1/2025
12/10/2025
12/9/2025
12/12/2025
12/12/2025
12/9/2025
12/5/2025
12/12/2025
12/11/2025
12/15/2025
12/12/2025
12/10/2025
12/15/2025
12/16/2025
12/9/2025
12/15/2025
12/15/2025
12/16/2025
12/16/2025
12/18/2025
12/19/2025
12/15/2025
12/18/2025
12/17/2025
12/18/2025
12/18/2025
12/17/2025
12/18/2025
12/19/2025
12/19/2025
12/17/2025
12/16/2025
12/19/2025
12/12/2025
12/16/2025
12/16/2025
12/17/2025
12/16/2025
12/16/2025
12/10/2025
12/17/2025
12/18/2025
12/8/2025
12/22/2025
12/23/2025
12/23/2025
12/22/2025
12/22/2025
12/23/2025
12/23/2025
12/12/2025
12/24/2025
12/24/2025
12/24/2025
12/24/2025
12/23/2025
12/23/2025
12/22/2025
12/23/2025
12/24/2025
12/24/2025
1/6/2026
12/11/2025
12/18/2025
1/5/2026
1/6/2026
1/6/2026
1/5/2026
1/5/2026
1/6/2026
12/19/2025
1/7/2026
1/7/2026
1/7/2026
1/7/2026
1/8/2026
1/8/2026
1/8/2026
1/15/2026
1/15/2026
1/13/2026
1/13/2026
1/14/2026
1/15/2026
1/15/2026
1/15/2026
1/16/2026
12/29/2025
12/29/2025
12/29/2025
12/31/2025
12/31/2025
12/31/2025
12/31/2025
12/31/2025
1/14/2026
1/14/2026
1/14/2026
1/20/2026
1/21/2026
11/24/2025
8/27/2025
7/23/2025
7/2/2025
7/31/2025
10/16/2025
10/16/2025
7/17/2025
12/1/2025
7/3/2025
10/16/2025
12/16/2025
8/15/2025
12/16/2025
10/15/2025
1/13/2026
9/25/2025
11/6/2025
11/21/2025
9/9/2025
12/17/2025
9/24/2025
9/18/2025
9/18/2025
10/16/2025
10/2/2025
9/17/2025
10/27/2025
10/16/2025
10/16/2025
1/26/2026
1/23/2026
1/22/2026
1/22/2026
1/23/2026
1/27/2026
1/27/2026
1/28/2026
1/28/2026
1/27/2026
1/27/2026
1/29/2026
1/27/2026
1/8/2026
1/12/2026
1/29/2026
1/26/2026
1/30/2026
1/23/2026
1/23/2026
1/28/2026
12/29/2025
2/2/2026
2/3/2026
1/21/2026
1/21/2026
1/21/2026
1/21/2026
1/23/2026
1/23/2026
1/23/2026
1/23/2026
1/23/2026
1/23/2026
1/23/2026
1/21/2026
1/8/2026
1/26/2026
8/25/2025
1/28/2026
1/28/2026
1/29/2026
1/28/2026
1/30/2026
12/29/2025
8/1/2025
2/3/2026
2/3/2026
2/3/2026
2/3/2026
2/4/2026
1/8/2026
1/21/2026
1/26/2026
1/27/2026
2/4/2026
2/4/2026
2/3/2026
2/4/2026
2/3/2026
1/9/2026
2/3/2026
1/30/2026
1/30/2026
2/5/2026
2/5/2026
2/5/2026
2/5/2026
2/10/2026
2/5/2026
2/6/2026
2/6/2026
2/6/2026
2/3/2026
2/5/2026
2/4/2026
2/4/2026
2/5/2026
2/5/2026
2/4/2026
12/8/2025
2/9/2026
2/9/2026
2/9/2026
2/10/2026
2/6/2026
2/9/2026
2/9/2026
2/10/2026
2/10/2026
2/10/2026
12/19/2025
1/8/2026
12/22/2025
1/26/2026
2/17/2026
2/17/2026