Loading...
HomeMy WebLinkAbout1480 Monterey Property HistoryPermit #Type Work Class Status Description Apply Issue Finalize Address Parcel BLDG-L00953-3-1957 Electrical, Plumbing, Mechanical (EPM) Miscellaneous Finaled Pre-Foxpro.1957-08-12 1957-08-12 1957-08-12 1480 MONTEREY 001-137-013 BLDG-L01479-1-1957 Building New Commercial Finaled Pre-Foxpro. SERVICE STATION BUILDING 1957-09-19 1957-09-19 1957-09-19 1480 MONTEREY 001-137-013 BLDG-L01006-3-1957 Electrical, Plumbing, Mechanical (EPM) Miscellaneous Finaled Pre-Foxpro.1957-09-23 1957-09-23 1957-09-23 1480 MONTEREY 001-137-013 BLDG-L00663-3-1957 Electrical, Plumbing, Mechanical (EPM) Miscellaneous Finaled Pre-Foxpro.1957-10-25 1957-10-25 1957-10-25 1480 MONTEREY 001-137-013 BLDG-L02216-2-1960 Electrical, Plumbing, Mechanical (EPM) Miscellaneous Finaled Pre-Foxpro.1960-05-02 1960-05-02 1960-05-02 1480 MONTEREY 001-137-013 BLDG-L00623-4-1964 Electrical, Plumbing, Mechanical (EPM) Miscellaneous Finaled Pre-Foxpro.1964-04-22 1964-04-22 1964-04-22 1480 MONTEREY 001-137-013 BLDG-L01460-8-1970 Sign All Types Finaled Pre-Foxpro. SIGN 1970-07-03 1970-07-03 1970-11-09 1480 MONTEREY 001-137-013 BLDG-L04321-1988 Building Import Finaled REWIRE OF FUEL PUMPS 1988-05-04 1989-03-06 1989-03-06 1480 MONTEREY 001-137-013 BLDG-L06932-1991 Building Import Finaled ADD ELECTRICAL CIRCUIT FOR VENDING AREA 1991-01-22 1991-01-25 1991-01-25 1480 MONTEREY 001-137-013 ENCR-L02807-1996 Encroachment Right of Way Finaled CORE SIDEWALK AND PERFORM SOIL SAMPLING. ANY BORING WITHIN TWO FEET OF THE GAS MAIN MUST BE EXPOSED PRIOR TO BORING. 1996-02-28 1996-02-28 1996-06-26 1480 MONTEREY 001-137-013 BLDG-L11697-1997 Grading/Site Improvements Soil Remediation Finaled REMOVE 10 YARDS OF CONTAMINATED SOIL 1997-06-23 1997-06-24 2001-03-12 1480 MONTEREY 001-137-013 Permits 2/6/2026 4:01:17 PMPage 1 of 28 Property History: 1480 Monterey Permit #Type Work Class Status Description Apply Issue Finalize Address Parcel BLDG-L18482-2002 Building New Commercial Expired OFFICE BUILDING - MONTEREY STREET 2002-09-19 2003-09-24 1480 MONTEREY 001-137-013 ENCR-0152-2014 Encroachment Right of Way Finaled Set up traffic control for radar penetration trailer. Radar is for design of City water main replacement project - fees waived. Traffic control is per the attached plan and City Appendix G and MUTCD Standards. Contact the Public Works inspection hotline at 805- 781-7554 two working days prior to the start of work. 2014-08-25 2014-08-25 2015-07-28 1480 Monterey 001-137-013 ENCR-0618-2014 Encroachment Capital Improvement Project Finaled Locations: Monterey at California, and Monterey at Johnson. Potholing for design of water main project, 91248. All work per the approved plan and City Standard Specifications & Engineering Standards. Traffic control per the attached plan, City Appendix G, and MUTCD Standards. Contact the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work. 2014-11-12 2014-11-12 2015-12-16 1480 Monterey 001-137-013 BLDG-2342-2024 Building New Commercial Issued PARKING GARAGE 2024-02-12 2026-01-20 1424 Monterey 001-137-017 BLDG-2343-2024 Building New Multi Family Issued TRIPLEX 2024-02-12 2026-01-20 1401 Palm 202 001-137-017 BLDG-2343-2024 Building New Multi Family Issued TRIPLEX 2024-02-12 2026-01-20 1401 Palm 101 001-137-017 BLDG-2343-2024 Building New Multi Family Issued TRIPLEX 2024-02-12 2026-01-20 1401 Palm 001-137-017 BLDG-2343-2024 Building New Multi Family Issued TRIPLEX 2024-02-12 2026-01-20 1401 Palm 201 001-137-017 BLDG-0319-2024 Building New Mixed Use Issued NEW AFFORDABLE MIXED- BUILDING 1 - USE CONSISTS OF 4,366 SF OF COMMERCIAL, 45 AFFORDABLE FAMILY RESIDENTIAL UNITS 2024-02-12 2026-01-20 1480 Monterey 001-137-013 2/6/2026 4:01:17 PMPage 2 of 28 Property History: 1480 Monterey Permit #Type Work Class Status Description Apply Issue Finalize Address Parcel BLDG-0319-2024 Building New Mixed Use Issued NEW AFFORDABLE MIXED- BUILDING 1 - USE CONSISTS OF 4,366 SF OF COMMERCIAL, 45 AFFORDABLE FAMILY RESIDENTIAL UNITS 2024-02-12 2026-01-20 1422 Monterey 001-137-013 BLDG-2024-2024 Building New Mixed Use On-Line Submission NEW AFFORDABLE MIXED-USE- BUILDING 2- CONSISTS OF 4,366 SF OF COMMERCIAL& 55 SENIOR RESIDENTIAL UNITS 2024-02-12 1422 Monterey 001-137-013 BLDG-2024-2024 Building New Mixed Use On-Line Submission NEW AFFORDABLE MIXED-USE- BUILDING 2- CONSISTS OF 4,366 SF OF COMMERCIAL& 55 SENIOR RESIDENTIAL UNITS 2024-02-12 1480 Monterey 001-137-013 DEMO-1594-2024 Demolition Building Issued PROPOSED REMOVAL OF ALL ONSITE EXISTING HARDSCAPE AND PARKING LOTS (SEE CIVIL SHEET C-001) AND DEMOLITION OF EXISTING BUILDINGS (AS NOTED ON DEMO PLAN) OF APROX 11,248 SF. SCOPE TO INCLUDE PREPERATION OF SITE FOR FUTURE CONSTRUCTION UNDER PERMIT BLDG-XXXX, INCLUDING CAPPING EXISTING UTILITIES AS NECESSARY AND SITE PERIMETER SAFETY FENCING. 2024-07-03 2024-10-17 1422 Monterey 001-137-013 2/6/2026 4:01:17 PMPage 3 of 28 Property History: 1480 Monterey Permit #Type Work Class Status Description Apply Issue Finalize Address Parcel DEMO-1594-2024 Demolition Building Issued PROPOSED REMOVAL OF ALL ONSITE EXISTING HARDSCAPE AND PARKING LOTS (SEE CIVIL SHEET C-001) AND DEMOLITION OF EXISTING BUILDINGS (AS NOTED ON DEMO PLAN) OF APROX 11,248 SF. SCOPE TO INCLUDE PREPERATION OF SITE FOR FUTURE CONSTRUCTION UNDER PERMIT BLDG-XXXX, INCLUDING CAPPING EXISTING UTILITIES AS NECESSARY AND SITE PERIMETER SAFETY FENCING. 2024-07-03 2024-10-17 1480 Monterey 001-137-013 ENCR-0019-2025 Encroachment Utility Company - Blanket Maint Work Issued PG&E PM # 35541410. PG&E to remove equipment, install 3 poles, install transformer, install cable in conduit, and install overhead conductor. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. 2025-01-03 2025-01-03 1480 Monterey 001-137-013 2/6/2026 4:01:17 PMPage 4 of 28 Property History: 1480 Monterey Permit #Type Work Class Status Description Apply Issue Finalize Address Parcel ENCR-0794-2025 Encroachment Right of Way Issued Trench to install conduits for joint utilities. All work is on the Palm Street side. Trench depth must be per City Engineering Standards, which is 7'0" below the top- of-curb or 3'0" below the deepest utility being crossed, whichever is deeper. Confirm with Public Works inspector if certain points of access or other sections can be at 4'0" minimum depth. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 (voice message system) to schedule a required pre- construction meeting. Also, call the hotline two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. 2025-03-28 2025-03-28 1422 Monterey 001-137-017 BLDG-1910-2025 Building New Multi Family Issued NEW DUPLEX 2025-08-15 2026-01-20 1413 Palm 100 001-137-017 BLDG-1910-2025 Building New Multi Family Issued NEW DUPLEX 2025-08-15 2026-01-20 1413 Palm 200 001-137-017 BLDG-1910-2025 Building New Multi Family Issued NEW DUPLEX 2025-08-15 2026-01-20 1413 Palm 001-137-017 2/6/2026 4:01:17 PMPage 5 of 28 Property History: 1480 Monterey GRAD-2466-2025 Grading/Site Improvements Site Improvements Issued Phase 1 shoring design for Monterey Senior project at 1426 Monterey to allow for installation of transformer and PG&E infrastructure to service building. Phased shoring design is necessary as PG&E requires transformer to be installed in order to sign off on building's certificate of occupancy. Shoring in this phase is limited to that adjacent to PG&E infrastructure at project Driveway 2. 2025-10-21 2026-01-20 1426 Monterey 001-137-019 ENCR-2488-2025 Encroachment Right of Way Issued Install one 4" water service lateral to serve one 2" residential water meter on the California Blvd. side of the project. Install one 2" water service lateral to serve one 1" commercial water meter on the California Blvd. side of the project. Install two sewer laterals on the California Blvd. side of the project. Install one sewer lateral on the Monterey Street side of the project. All work to be done per the approved building plans, BLDG-2341- 2024 and City Standard Specifications & Engineering Standards. Separate encroachment permits are required for the additional work shown on BLDG-2341-2024 and the public improvement plans, FMAP-0375-2024, and any related building permit cases. Traffic and pedestrian controls must be per the attached and approved plans and City Appendix G & MUTCD Standards. Work must be coordinated to not conflict 2025-10-23 2025-10-23 1426 Monterey 001-137-013 2/6/2026 4:01:17 PMPage 6 of 28 Property History: 1480 Monterey with the 1531 Monterey project. Call the Public Works inspection hotline at 805-781-7554 (voice message system) to coordinate a required pre- construction meeting. Also, call the Public Works inspection hotline two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations will be performed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made for holidays as needed. Contractors must schedule wye installations by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. ENCR-2488-2025 Encroachment Right of Way Issued Install one 4" water service lateral to serve one 2" residential water meter on the California Blvd. side of the project. Install one 2" water service lateral to serve one 1" commercial water meter on the California Blvd. side of the project. Install two sewer laterals on the California Blvd. side of the project. Install one sewer lateral on the Monterey Street side of the project. All work to be done per the approved building plans, BLDG-2341- 2024 and City Standard Specifications & Engineering Standards. Separate encroachment 2025-10-23 2025-10-23 1422 Monterey 001-137-013 2/6/2026 4:01:17 PMPage 7 of 28 Property History: 1480 Monterey permits are required for the additional work shown on BLDG-2341-2024 and the public improvement plans, FMAP-0375-2024, and any related building permit cases. Traffic and pedestrian controls must be per the attached and approved plans and City Appendix G & MUTCD Standards. Work must be coordinated to not conflict with the 1531 Monterey project. Call the Public Works inspection hotline at 805-781-7554 (voice message system) to coordinate a required pre- construction meeting. Also, call the Public Works inspection hotline two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations will be performed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made for holidays as needed. Contractors must schedule wye installations by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. ENCR-2488-2025 Encroachment Right of Way Issued Install one 4" water service lateral to serve one 2" residential water meter on the California Blvd. side of the project. Install one 2" water service lateral to serve one 1" commercial water meter on the 2025-10-23 2025-10-23 1426 Monterey 001-137-019 2/6/2026 4:01:17 PMPage 8 of 28 Property History: 1480 Monterey California Blvd. side of the project. Install two sewer laterals on the California Blvd. side of the project. Install one sewer lateral on the Monterey Street side of the project. All work to be done per the approved building plans, BLDG-2341- 2024 and City Standard Specifications & Engineering Standards. Separate encroachment permits are required for the additional work shown on BLDG-2341-2024 and the public improvement plans, FMAP-0375-2024, and any related building permit cases. Traffic and pedestrian controls must be per the attached and approved plans and City Appendix G & MUTCD Standards. Work must be coordinated to not conflict with the 1531 Monterey project. Call the Public Works inspection hotline at 805-781-7554 (voice message system) to coordinate a required pre- construction meeting. Also, call the Public Works inspection hotline two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations will be performed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made for holidays as needed. Contractors must schedule 2/6/2026 4:01:17 PMPage 9 of 28 Property History: 1480 Monterey wye installations by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. ENCR-2488-2025 Encroachment Right of Way Issued Install one 4" water service lateral to serve one 2" residential water meter on the California Blvd. side of the project. Install one 2" water service lateral to serve one 1" commercial water meter on the California Blvd. side of the project. Install two sewer laterals on the California Blvd. side of the project. Install one sewer lateral on the Monterey Street side of the project. All work to be done per the approved building plans, BLDG-2341- 2024 and City Standard Specifications & Engineering Standards. Separate encroachment permits are required for the additional work shown on BLDG-2341-2024 and the public improvement plans, FMAP-0375-2024, and any related building permit cases. Traffic and pedestrian controls must be per the attached and approved plans and City Appendix G & MUTCD Standards. Work must be coordinated to not conflict with the 1531 Monterey project. Call the Public Works inspection hotline at 805-781-7554 (voice message system) to coordinate a required pre- construction meeting. Also, call the Public Works inspection hotline two working days prior to the start of work and one 2025-10-23 2025-10-23 1422 Monterey 001-137-019 2/6/2026 4:01:17 PMPage 10 of 28 Property History: 1480 Monterey working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations will be performed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made for holidays as needed. Contractors must schedule wye installations by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. ENCR-2488-2025 Encroachment Right of Way Issued Install one 4" water service lateral to serve one 2" residential water meter on the California Blvd. side of the project. Install one 2" water service lateral to serve one 1" commercial water meter on the California Blvd. side of the project. Install two sewer laterals on the California Blvd. side of the project. Install one sewer lateral on the Monterey Street side of the project. All work to be done per the approved building plans, BLDG-2341- 2024 and City Standard Specifications & Engineering Standards. Separate encroachment permits are required for the additional work shown on BLDG-2341-2024 and the public improvement plans, FMAP-0375-2024, and any related building permit cases. Traffic and pedestrian controls must be per the attached and approved plans and City Appendix G & MUTCD 2025-10-23 2025-10-23 1426 Monterey 001-137-017 2/6/2026 4:01:17 PMPage 11 of 28 Property History: 1480 Monterey Standards. Work must be coordinated to not conflict with the 1531 Monterey project. Call the Public Works inspection hotline at 805-781-7554 (voice message system) to coordinate a required pre- construction meeting. Also, call the Public Works inspection hotline two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations will be performed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made for holidays as needed. Contractors must schedule wye installations by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. ENCR-2488-2025 Encroachment Right of Way Issued Install one 4" water service lateral to serve one 2" residential water meter on the California Blvd. side of the project. Install one 2" water service lateral to serve one 1" commercial water meter on the California Blvd. side of the project. Install two sewer laterals on the California Blvd. side of the project. Install one sewer lateral on the Monterey Street side of the project. All work to be done per the approved building plans, BLDG-2341- 2024 and City Standard Specifications & 2025-10-23 2025-10-23 1422 Monterey 001-137-017 2/6/2026 4:01:17 PMPage 12 of 28 Property History: 1480 Monterey Engineering Standards. Separate encroachment permits are required for the additional work shown on BLDG-2341-2024 and the public improvement plans, FMAP-0375-2024, and any related building permit cases. Traffic and pedestrian controls must be per the attached and approved plans and City Appendix G & MUTCD Standards. Work must be coordinated to not conflict with the 1531 Monterey project. Call the Public Works inspection hotline at 805-781-7554 (voice message system) to coordinate a required pre- construction meeting. Also, call the Public Works inspection hotline two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. Sewer wye installations will be performed by City staff during regular business hours on Tuesdays and Wednesdays only, with exceptions made for holidays as needed. Contractors must schedule wye installations by calling the Public Works Inspection Hotline at (805) 781-7554 at least 24 hours in advance. 2/6/2026 4:01:17 PMPage 13 of 28 Property History: 1480 Monterey Permit #Type Work Class Status Description Apply Issue Finalize Address Parcel ENCR-0021-2026 Encroachment Utility Company - Blanket Maint Work Issued PG&E PM # 35585344. PG&E to remove pole and OH transformers and replace with new pole and (2) OH transformers. Remove and install new OH conduit, and reframe pole. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. 2026-01-05 2026-01-05 1480 Monterey 001-137-013 2/6/2026 4:01:17 PMPage 14 of 28 Property History: 1480 Monterey Permit #Type Work Class Status Description Apply Issue Finalize Address Parcel ENCR-0021-2026 Encroachment Utility Company - Blanket Maint Work Issued PG&E PM # 35585344. PG&E to remove pole and OH transformers and replace with new pole and (2) OH transformers. Remove and install new OH conduit, and reframe pole. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. 2026-01-05 2026-01-05 1480 Monterey 001-137-017 2/6/2026 4:01:17 PMPage 15 of 28 Property History: 1480 Monterey Permit #Type Work Class Status Description Apply Issue Finalize Address Parcel ENCR-0021-2026 Encroachment Utility Company - Blanket Maint Work Issued PG&E PM # 35585344. PG&E to remove pole and OH transformers and replace with new pole and (2) OH transformers. Remove and install new OH conduit, and reframe pole. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. 2026-01-05 2026-01-05 1480 Monterey 001-137-019 2/6/2026 4:01:17 PMPage 16 of 28 Property History: 1480 Monterey Permit #Type Work Class Status Description Apply Issue Finalize Address Parcel ENCR-0252-2026 Encroachment Utility Company - Blanket Maint Work Issued PG&E PM # 35698666. PG&E to install cable in conduit. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. 2026-02-03 2026-02-03 1480 Monterey 001-137-017 ENCR-0252-2026 Encroachment Utility Company - Blanket Maint Work Issued PG&E PM # 35698666. PG&E to install cable in conduit. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. 2026-02-03 2026-02-03 1480 Monterey 001-137-019 2/6/2026 4:01:17 PMPage 17 of 28 Property History: 1480 Monterey Permit #Type Work Class Status Description Apply Issue Finalize Address Parcel ENCR-0252-2026 Encroachment Utility Company - Blanket Maint Work Issued PG&E PM # 35698666. PG&E to install cable in conduit. Standard working hours are 7am-4pm. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. 2026-02-03 2026-02-03 1480 Monterey 001-137-013 ENCR-0327-2026 Encroachment Right of Way Under Review Traffic signal modifications on existing signal at Monterey & California. Work hour restrictions apply; see the attached traffic control plan. All work to be done to City Standard Specifications & Engineering Standards. Traffic and pedestrian controls must be per the approved and attached plans and City Appendix G & MUTCD Standards. Call the Public Works inspection hotline at 805-781-7554 two working days prior to the start of work and one working day prior to each subsequent inspection. Permittee is responsible for calling for final inspection so the permit can be closed. 2026-02-06 1422 Monterey 001-137-017 2/6/2026 4:01:17 PMPage 18 of 28 Property History: 1480 Monterey Plans Plan #Type Work Class Status Description Apply Complete Address Parcel USE (A 1-90)Use Permit Administrative Use Permit Import Pre-Foxpro. Code: PADD Type: A Microfilm: N. Description: SIEGFRIED FLOWER STAND 1990-01-19 1480 MONTEREY 001-137-013 ARCH (ARC 126-93)Architectural Review Development Projects Import Demolition of service station including fuel tank removal 1993-08-23 1993-08-26 1480 MONTEREY 001-137-013 ER (ER 100-96)Environmental Impact Determination Environmental Impact Determination Import Environmental Analysis of proposed rezone amendment. 1996-07-16 1996-08-16 1480 MONTEREY 001-137-013 RTA (R 100-96)Rezoning Map Amendment (incl. Rezoning) Import Change in zoning on the subject property from Tourist Commercial (C-T) to Retail Commercial (C-R). 1996-07-16 1996-08-16 1480 MONTEREY 001-137-013 ARCH (ARC 34-01)Architectural Review Development Projects Import Design review of new office building. 2001-03-06 1480 MONTEREY 001-137-013 USE (A 34-01)Use Permit Administrative Use Permit Import Use permit for a new office building and review of a request to reduce parking by 15% for the project. 2001-03-06 1480 MONTEREY 001-137-013 VAR (V 34-01)Variance Variance Import Allow street yard to be reduced from 15' to 0' along California Boulevard. 2001-03-07 1480 MONTEREY 001-137-013 PLOCC-131038-2014 Occupancy Space Occupancy Approved 1480 Monterey 2014-07-30 1480 Monterey 001-137-013 PLOCC-106011-2014 Occupancy Structure Occupancy Approved 1480 Monterey 2014-07-30 1480 Monterey 001-137-013 PRE-0229-2021 Pre-Application Architectural Review Approved Pre-application meeting to discuss the proposed development of a mixed-use project consisting of 111 affordable units, and approximately 10,000 square feet of commercial space 2021-03-31 2021-05-18 1422 Monterey 001-137-013 2/6/2026 4:01:17 PMPage 19 of 28 Property History: 1480 Monterey Plan #Type Work Class Status Description Apply Complete Address Parcel ARCH-0020-2022 Architectural Review Development Projects - Major Under Review Development review of a five- story mixed-use project consisting of 4,366 square feet of commercial space, 106 residential units (dedicated for affordable housing), and a three-story parking garage. The project includes the following exceptions/waivers; a six-foot creek setback waiver (where 20 feet is normally required), 54-foot maximum height deviation (where 45 feet is normally required), a 4-foot side yard setback (where 8-feet is normally required), Edge Conditions waiver for a 3-foot setback (where 10 feet would normally be required), an alternative compliance request for the bicycle parking requirement for the senior housing units, and a 65% density bonus. The project is categorically exempt from environmental review (CEQA). 2022-01-10 2022-09-01 1422 Monterey 001-137-013 AFFH-0021-2022 Affordable Housing Incentive Request Under Review Development review of a five- story mixed-use project consisting of 4,366 square feet of commercial space and 106 residential units (dedicated for affordable housing). The project also includes a 3-story parking garage. The project includes the following exceptions/waivers; creek setback exception, maximum height exception, side yard setback exception, and 65% density bonus. 2022-01-11 1422 Monterey 001-137-013 2/6/2026 4:01:17 PMPage 20 of 28 Property History: 1480 Monterey Plan #Type Work Class Status Description Apply Complete Address Parcel SBDV-0279-2024 Subdivision Voluntary Merger Approved Notice of Merger for 1422, 1480 Monterey (associated with ARCH-0020-2022) 2024-05-17 2024-07-17 1422 Monterey 001-137-013 STORM-0656-2024 Stormwater General Stormwater Under Review NEW AFFORDABLE MIXED- BUILDING 1 - USE CONSISTS OF 4,366 SF OF COMMERCIAL, 45 AFFORDABLE FAMILY RESIDENTIAL UNITS 2024-10-16 1422 Monterey 001-137-013 PLREV-0748-2024 Permit Review - Revision Revision to Plans Approved Commercial Restaurant Room 117 re-purposed as a temporary community room for residents with addition of kitchen area. Adjacent Kitchen Room 119 re-purposed as temporary offices room 119A and 119B.Associated mechanical, plumbing, and electrical upgrades in this area. Passive radon mitigation design incorporated sheets A2- 020, -021, & -022. 2024-11-20 2025-01-17 1426 Monterey 001-137-013 PLREV-0749-2024 Permit Review - Revision Revision to Plans Approved Building 2 - Commercial Restaurant Room 117 and Kitchen Room 119 re-purposed as a temporary community room for residents with addition of kitchen area. Buildings 1&2 - Standpipe hose connection added at ground floor level at all stair enclosures. 2024-11-20 2024-12-18 1422 Monterey 001-137-013 PLREV-0060-2025 Permit Review - Revision Revision to Plans Under Review Revision to structural sub-slab section design to remove prior need for Soil Improvement deferred submittal. Structural sheets, Geotech letter, and Architectural Title Sheet updated to reflect that the project no longer requires Soil Improvement deferred submittal. 2025-01-24 2025-02-24 1426 Monterey 001-137-013 2/6/2026 4:01:17 PMPage 21 of 28 Property History: 1480 Monterey Plan #Type Work Class Status Description Apply Complete Address Parcel PLREV-0060-2025 Permit Review - Revision Revision to Plans Under Review Revision to structural sub-slab section design to remove prior need for Soil Improvement deferred submittal. Structural sheets, Geotech letter, and Architectural Title Sheet updated to reflect that the project no longer requires Soil Improvement deferred submittal. 2025-01-24 2025-02-24 1426 Monterey 001-137-017 PLREV-0299-2025 Permit Review - Revision Revision to Plans Approved Sheet C-018 showed a concrete slurry wall surrounding each of the proposed StormTech chamber systems. The only purpose of the wall was to promote infiltration straight down into the ground, instead of laterally toward the buildings. To save cost and time, we are proposing to utilize an impermeable pond-type liner instead of the slurry wall. The four impacted sheets have been included with the request for revision package (C-014, C- 015, C-017 and C-018). 2025-04-17 2025-06-06 1426 Monterey 001-137-019 2/6/2026 4:01:17 PMPage 22 of 28 Property History: 1480 Monterey Plan #Type Work Class Status Description Apply Complete Address Parcel PLREV-0299-2025 Permit Review - Revision Revision to Plans Approved Sheet C-018 showed a concrete slurry wall surrounding each of the proposed StormTech chamber systems. The only purpose of the wall was to promote infiltration straight down into the ground, instead of laterally toward the buildings. To save cost and time, we are proposing to utilize an impermeable pond-type liner instead of the slurry wall. The four impacted sheets have been included with the request for revision package (C-014, C- 015, C-017 and C-018). 2025-04-17 2025-06-06 1426 Monterey 001-137-013 PLREV-0299-2025 Permit Review - Revision Revision to Plans Approved Sheet C-018 showed a concrete slurry wall surrounding each of the proposed StormTech chamber systems. The only purpose of the wall was to promote infiltration straight down into the ground, instead of laterally toward the buildings. To save cost and time, we are proposing to utilize an impermeable pond-type liner instead of the slurry wall. The four impacted sheets have been included with the request for revision package (C-014, C- 015, C-017 and C-018). 2025-04-17 2025-06-06 1426 Monterey 001-137-017 2/6/2026 4:01:17 PMPage 23 of 28 Property History: 1480 Monterey PLREV-0329-2025 Permit Review - Revision Revision to Plans Approved Structural; revisions due to RFI #31 and #33 as described in the form and below: RFI #31- Pedestrian bridge structural connection detail revision due to state funding causing phasing of project. The Pedestrian Bridge needs to be built in Phase 2, as a result the columns and connections needed to be revised to accommodate the phasing. See revised Structural Sheets S2-101, S2-102, and S6.22. Architectural Details #63 and #65 on Sheet A-910 were revised to accommodate the finish changes due to the structural revisions. All refinements for this item have been clouded and tagged as RFI #31 RFI #33. Sheet S2-100 has been revised due to existing conditions for underground culvert location that differed from what was estimated during initial permitting. This impacted the grade beam design for adjacent columns. The issue has been coordinated via RFI #33 and heavily reviewed by project geotechnical engineer Nick Zoeteway - please see supporting documents for Geotechnical engineer response along with updated structural calculations to match the revised grade beam. All refinements for this item have been clouded and tagged as RFI #33 2025-05-01 2025-05-19 1426 Monterey 001-137-017 2/6/2026 4:01:17 PMPage 24 of 28 Property History: 1480 Monterey PLREV-0329-2025 Permit Review - Revision Revision to Plans Approved Structural; revisions due to RFI #31 and #33 as described in the form and below: RFI #31- Pedestrian bridge structural connection detail revision due to state funding causing phasing of project. The Pedestrian Bridge needs to be built in Phase 2, as a result the columns and connections needed to be revised to accommodate the phasing. See revised Structural Sheets S2-101, S2-102, and S6.22. Architectural Details #63 and #65 on Sheet A-910 were revised to accommodate the finish changes due to the structural revisions. All refinements for this item have been clouded and tagged as RFI #31 RFI #33. Sheet S2-100 has been revised due to existing conditions for underground culvert location that differed from what was estimated during initial permitting. This impacted the grade beam design for adjacent columns. The issue has been coordinated via RFI #33 and heavily reviewed by project geotechnical engineer Nick Zoeteway - please see supporting documents for Geotechnical engineer response along with updated structural calculations to match the revised grade beam. All refinements for this item have been clouded and tagged as RFI #33 2025-05-01 2025-05-19 1426 Monterey 001-137-019 2/6/2026 4:01:17 PMPage 25 of 28 Property History: 1480 Monterey PLREV-0329-2025 Permit Review - Revision Revision to Plans Approved Structural; revisions due to RFI #31 and #33 as described in the form and below: RFI #31- Pedestrian bridge structural connection detail revision due to state funding causing phasing of project. The Pedestrian Bridge needs to be built in Phase 2, as a result the columns and connections needed to be revised to accommodate the phasing. See revised Structural Sheets S2-101, S2-102, and S6.22. Architectural Details #63 and #65 on Sheet A-910 were revised to accommodate the finish changes due to the structural revisions. All refinements for this item have been clouded and tagged as RFI #31 RFI #33. Sheet S2-100 has been revised due to existing conditions for underground culvert location that differed from what was estimated during initial permitting. This impacted the grade beam design for adjacent columns. The issue has been coordinated via RFI #33 and heavily reviewed by project geotechnical engineer Nick Zoeteway - please see supporting documents for Geotechnical engineer response along with updated structural calculations to match the revised grade beam. All refinements for this item have been clouded and tagged as RFI #33 2025-05-01 2025-05-19 1426 Monterey 001-137-013 2/6/2026 4:01:17 PMPage 26 of 28 Property History: 1480 Monterey Plan #Type Work Class Status Description Apply Complete Address Parcel PLREV-0430-2025 Permit Review - Revision Revision to Plans Approved Wood to wood, diaphragm and shear wall fastener substitution, submittal 06 00 00 -3. 2025-06-05 2025-07-28 1480 Monterey 001-137-019 PLREV-0436-2025 Permit Review - Revision Revision to Plans Approved Clarifying RFI 46 for city review as requested by City Inspector. 2025-06-06 2025-07-10 1480 Monterey 001-137-019 PLREV-0543-2025 Permit Review - Revision Revision to Plans Approved City Field Inspector requested that a few RFI's that related to Structural refinements of column sizes and shear walls be submitted for record. 2025-07-10 2026-01-15 1480 Monterey 001-137-019 PLBLDG-0606-2025 Permit Review - Building New Multi Family Void BUILDING #1; BUILDING #2; PARKING GARAGE & DUPLEX 2025-08-04 1422 Monterey 001-137-017 PLREV-0629-2025 Permit Review - Revision Revision to Plans On-Line Submission Elevator and Connections deferred submittal. Submission includes engineering & architecturally approved elevator shop drawings & elevator guide rail structural steel packages. 2025-08-08 1480 Monterey 001-137-019 PLREV-0814-2025 Permit Review - Revision Revision to Plans Approved Roof Tieback Anchorage Specification deferred submittal. Submission includes engineering stamped drawings. 2025-10-08 2026-01-15 1480 Monterey 001-137-019 PLREV-0919-2025 Permit Review - Revision Revision to Plans Void DEFERRED SUBBMITTAL FOR DUPLEX-VOIDED ERROR 2025-11-18 1422 Monterey 001-137-013 PLREV-0961-2025 Permit Review - Revision Revision to Plans Approved Temporary Shoring Phase 2 deferred submittal for Permit #BLDG-0319-2024. 2025-12-08 2026-01-13 1422 Monterey 001-137-013 2/6/2026 4:01:17 PMPage 27 of 28 Property History: 1480 Monterey Plan #Type Work Class Status Description Apply Complete Address Parcel PLREV-0046-2026 Permit Review - Revision Revision to Plans On-Line Submission Building 1: Sprinkler head provided under the single combustible stair landing, and sprinkler head provided at top of trash chute. Please see clouds tagged with DELTA "B" Building 2: Non-combustible steel stairs were since revised with the city to wood stairs. However, the fire sprinkler plans were not properly updated to capture this change. Please see new sprinkler heads provided under the combustible stair mid landings, and sprinkler head provided at top of trash chute. Please see clouds tagged with DELTA "B" 2026-01-28 1422 Monterey 001-137-019 2/6/2026 4:01:17 PMPage 28 of 28 Property History: 1480 Monterey