HomeMy WebLinkAbout1480 Monterey Property HistoryPermit #Type Work Class Status Description Apply Issue Finalize Address Parcel
BLDG-L00953-3-1957 Electrical,
Plumbing,
Mechanical (EPM)
Miscellaneous Finaled Pre-Foxpro.1957-08-12 1957-08-12 1957-08-12 1480 MONTEREY 001-137-013
BLDG-L01479-1-1957 Building New Commercial Finaled Pre-Foxpro. SERVICE
STATION BUILDING
1957-09-19 1957-09-19 1957-09-19 1480 MONTEREY 001-137-013
BLDG-L01006-3-1957 Electrical,
Plumbing,
Mechanical (EPM)
Miscellaneous Finaled Pre-Foxpro.1957-09-23 1957-09-23 1957-09-23 1480 MONTEREY 001-137-013
BLDG-L00663-3-1957 Electrical,
Plumbing,
Mechanical (EPM)
Miscellaneous Finaled Pre-Foxpro.1957-10-25 1957-10-25 1957-10-25 1480 MONTEREY 001-137-013
BLDG-L02216-2-1960 Electrical,
Plumbing,
Mechanical (EPM)
Miscellaneous Finaled Pre-Foxpro.1960-05-02 1960-05-02 1960-05-02 1480 MONTEREY 001-137-013
BLDG-L00623-4-1964 Electrical,
Plumbing,
Mechanical (EPM)
Miscellaneous Finaled Pre-Foxpro.1964-04-22 1964-04-22 1964-04-22 1480 MONTEREY 001-137-013
BLDG-L01460-8-1970 Sign All Types Finaled Pre-Foxpro. SIGN 1970-07-03 1970-07-03 1970-11-09 1480 MONTEREY 001-137-013
BLDG-L04321-1988 Building Import Finaled REWIRE OF FUEL PUMPS 1988-05-04 1989-03-06 1989-03-06 1480 MONTEREY 001-137-013
BLDG-L06932-1991 Building Import Finaled ADD ELECTRICAL
CIRCUIT FOR VENDING
AREA
1991-01-22 1991-01-25 1991-01-25 1480 MONTEREY 001-137-013
ENCR-L02807-1996 Encroachment Right of Way Finaled CORE SIDEWALK AND
PERFORM SOIL
SAMPLING. ANY BORING
WITHIN TWO FEET OF
THE GAS MAIN MUST BE
EXPOSED PRIOR TO
BORING.
1996-02-28 1996-02-28 1996-06-26 1480 MONTEREY 001-137-013
BLDG-L11697-1997 Grading/Site
Improvements
Soil Remediation Finaled REMOVE 10 YARDS OF
CONTAMINATED SOIL
1997-06-23 1997-06-24 2001-03-12 1480 MONTEREY 001-137-013
Permits
2/6/2026 4:01:17 PMPage 1 of 28
Property History: 1480 Monterey
Permit #Type Work Class Status Description Apply Issue Finalize Address Parcel
BLDG-L18482-2002 Building New Commercial Expired OFFICE BUILDING -
MONTEREY STREET
2002-09-19 2003-09-24 1480 MONTEREY 001-137-013
ENCR-0152-2014 Encroachment Right of Way Finaled Set up traffic control for
radar penetration trailer.
Radar is for design of City
water main replacement
project - fees waived. Traffic
control is per the attached
plan and City Appendix G
and MUTCD Standards.
Contact the Public Works
inspection hotline at 805-
781-7554 two working days
prior to the start of work.
2014-08-25 2014-08-25 2015-07-28 1480 Monterey 001-137-013
ENCR-0618-2014 Encroachment Capital
Improvement
Project
Finaled Locations: Monterey at
California, and Monterey at
Johnson. Potholing for
design of water main
project, 91248. All work per
the approved plan and City
Standard Specifications &
Engineering Standards.
Traffic control per the
attached plan, City
Appendix G, and MUTCD
Standards. Contact the
Public Works inspection
hotline at 805-781-7554 two
working days prior to the
start of work.
2014-11-12 2014-11-12 2015-12-16 1480 Monterey 001-137-013
BLDG-2342-2024 Building New Commercial Issued PARKING GARAGE 2024-02-12 2026-01-20 1424 Monterey 001-137-017
BLDG-2343-2024 Building New Multi Family Issued TRIPLEX 2024-02-12 2026-01-20 1401 Palm 202 001-137-017
BLDG-2343-2024 Building New Multi Family Issued TRIPLEX 2024-02-12 2026-01-20 1401 Palm 101 001-137-017
BLDG-2343-2024 Building New Multi Family Issued TRIPLEX 2024-02-12 2026-01-20 1401 Palm 001-137-017
BLDG-2343-2024 Building New Multi Family Issued TRIPLEX 2024-02-12 2026-01-20 1401 Palm 201 001-137-017
BLDG-0319-2024 Building New Mixed Use Issued NEW AFFORDABLE
MIXED- BUILDING 1 - USE
CONSISTS OF 4,366 SF
OF COMMERCIAL, 45
AFFORDABLE FAMILY
RESIDENTIAL UNITS
2024-02-12 2026-01-20 1480 Monterey 001-137-013
2/6/2026 4:01:17 PMPage 2 of 28
Property History: 1480 Monterey
Permit #Type Work Class Status Description Apply Issue Finalize Address Parcel
BLDG-0319-2024 Building New Mixed Use Issued NEW AFFORDABLE
MIXED- BUILDING 1 - USE
CONSISTS OF 4,366 SF
OF COMMERCIAL, 45
AFFORDABLE FAMILY
RESIDENTIAL UNITS
2024-02-12 2026-01-20 1422 Monterey 001-137-013
BLDG-2024-2024 Building New Mixed Use On-Line
Submission
NEW AFFORDABLE
MIXED-USE- BUILDING 2-
CONSISTS OF 4,366 SF
OF COMMERCIAL& 55
SENIOR RESIDENTIAL
UNITS
2024-02-12 1422 Monterey 001-137-013
BLDG-2024-2024 Building New Mixed Use On-Line
Submission
NEW AFFORDABLE
MIXED-USE- BUILDING 2-
CONSISTS OF 4,366 SF
OF COMMERCIAL& 55
SENIOR RESIDENTIAL
UNITS
2024-02-12 1480 Monterey 001-137-013
DEMO-1594-2024 Demolition Building Issued PROPOSED REMOVAL OF
ALL ONSITE EXISTING
HARDSCAPE AND
PARKING LOTS (SEE
CIVIL SHEET C-001) AND
DEMOLITION OF
EXISTING BUILDINGS (AS
NOTED ON DEMO PLAN)
OF APROX 11,248 SF.
SCOPE TO INCLUDE
PREPERATION OF SITE
FOR FUTURE
CONSTRUCTION UNDER
PERMIT BLDG-XXXX,
INCLUDING CAPPING
EXISTING UTILITIES AS
NECESSARY AND SITE
PERIMETER SAFETY
FENCING.
2024-07-03 2024-10-17 1422 Monterey 001-137-013
2/6/2026 4:01:17 PMPage 3 of 28
Property History: 1480 Monterey
Permit #Type Work Class Status Description Apply Issue Finalize Address Parcel
DEMO-1594-2024 Demolition Building Issued PROPOSED REMOVAL OF
ALL ONSITE EXISTING
HARDSCAPE AND
PARKING LOTS (SEE
CIVIL SHEET C-001) AND
DEMOLITION OF
EXISTING BUILDINGS (AS
NOTED ON DEMO PLAN)
OF APROX 11,248 SF.
SCOPE TO INCLUDE
PREPERATION OF SITE
FOR FUTURE
CONSTRUCTION UNDER
PERMIT BLDG-XXXX,
INCLUDING CAPPING
EXISTING UTILITIES AS
NECESSARY AND SITE
PERIMETER SAFETY
FENCING.
2024-07-03 2024-10-17 1480 Monterey 001-137-013
ENCR-0019-2025 Encroachment Utility Company -
Blanket Maint
Work
Issued PG&E PM # 35541410.
PG&E to remove
equipment, install 3 poles,
install transformer, install
cable in conduit, and install
overhead conductor.
Standard working hours are
7am-4pm. All work to be
done to City Standard
Specifications &
Engineering Standards.
Traffic and pedestrian
controls must be per the
approved and attached
plans and City Appendix G
& MUTCD Standards. Call
the Public Works inspection
hotline at 805-781-7554 two
working days prior to the
start of work and one
working day prior to each
subsequent inspection.
Permittee is responsible for
calling for final inspection so
the permit can be closed.
2025-01-03 2025-01-03 1480 Monterey 001-137-013
2/6/2026 4:01:17 PMPage 4 of 28
Property History: 1480 Monterey
Permit #Type Work Class Status Description Apply Issue Finalize Address Parcel
ENCR-0794-2025 Encroachment Right of Way Issued Trench to install conduits for
joint utilities. All work is on
the Palm Street side.
Trench depth must be per
City Engineering Standards,
which is 7'0" below the top-
of-curb or 3'0" below the
deepest utility being
crossed, whichever is
deeper. Confirm with Public
Works inspector if certain
points of access or other
sections can be at 4'0"
minimum depth. All work to
be done to City Standard
Specifications &
Engineering Standards.
Traffic and pedestrian
controls must be per City
Appendix G & MUTCD
Standards. Call the Public
Works inspection hotline at
805-781-7554 (voice
message system) to
schedule a required pre-
construction meeting. Also,
call the hotline two working
days prior to the start of
work and one working day
prior to each subsequent
inspection. Permittee is
responsible for calling for
final inspection so the
permit can be closed.
2025-03-28 2025-03-28 1422 Monterey 001-137-017
BLDG-1910-2025 Building New Multi Family Issued NEW DUPLEX 2025-08-15 2026-01-20 1413 Palm 100 001-137-017
BLDG-1910-2025 Building New Multi Family Issued NEW DUPLEX 2025-08-15 2026-01-20 1413 Palm 200 001-137-017
BLDG-1910-2025 Building New Multi Family Issued NEW DUPLEX 2025-08-15 2026-01-20 1413 Palm 001-137-017
2/6/2026 4:01:17 PMPage 5 of 28
Property History: 1480 Monterey
GRAD-2466-2025 Grading/Site
Improvements
Site Improvements Issued Phase 1 shoring design for
Monterey Senior project at
1426 Monterey to allow for
installation of transformer
and PG&E infrastructure to
service building. Phased
shoring design is necessary
as PG&E requires
transformer to be installed in
order to sign off on
building's certificate of
occupancy. Shoring in this
phase is limited to that
adjacent to PG&E
infrastructure at project
Driveway 2.
2025-10-21 2026-01-20 1426 Monterey 001-137-019
ENCR-2488-2025 Encroachment Right of Way Issued Install one 4" water service
lateral to serve one 2"
residential water meter on
the California Blvd. side of
the project. Install one 2"
water service lateral to
serve one 1" commercial
water meter on the
California Blvd. side of the
project. Install two sewer
laterals on the California
Blvd. side of the project.
Install one sewer lateral on
the Monterey Street side of
the project. All work to be
done per the approved
building plans, BLDG-2341-
2024 and City Standard
Specifications &
Engineering Standards.
Separate encroachment
permits are required for the
additional work shown on
BLDG-2341-2024 and the
public improvement plans,
FMAP-0375-2024, and any
related building permit
cases. Traffic and
pedestrian controls must be
per the attached and
approved plans and City
Appendix G & MUTCD
Standards. Work must be
coordinated to not conflict
2025-10-23 2025-10-23 1426 Monterey 001-137-013
2/6/2026 4:01:17 PMPage 6 of 28
Property History: 1480 Monterey
with the 1531 Monterey
project. Call the Public
Works inspection hotline at
805-781-7554 (voice
message system) to
coordinate a required pre-
construction meeting. Also,
call the Public Works
inspection hotline two
working days prior to the
start of work and one
working day prior to each
subsequent inspection.
Permittee is responsible for
calling for final inspection so
the permit can be closed.
Sewer wye installations will
be performed by City staff
during regular business
hours on Tuesdays and
Wednesdays only, with
exceptions made for
holidays as needed.
Contractors must schedule
wye installations by calling
the Public Works Inspection
Hotline at (805) 781-7554 at
least 24 hours in advance.
ENCR-2488-2025 Encroachment Right of Way Issued Install one 4" water service
lateral to serve one 2"
residential water meter on
the California Blvd. side of
the project. Install one 2"
water service lateral to
serve one 1" commercial
water meter on the
California Blvd. side of the
project. Install two sewer
laterals on the California
Blvd. side of the project.
Install one sewer lateral on
the Monterey Street side of
the project. All work to be
done per the approved
building plans, BLDG-2341-
2024 and City Standard
Specifications &
Engineering Standards.
Separate encroachment
2025-10-23 2025-10-23 1422 Monterey 001-137-013
2/6/2026 4:01:17 PMPage 7 of 28
Property History: 1480 Monterey
permits are required for the
additional work shown on
BLDG-2341-2024 and the
public improvement plans,
FMAP-0375-2024, and any
related building permit
cases. Traffic and
pedestrian controls must be
per the attached and
approved plans and City
Appendix G & MUTCD
Standards. Work must be
coordinated to not conflict
with the 1531 Monterey
project. Call the Public
Works inspection hotline at
805-781-7554 (voice
message system) to
coordinate a required pre-
construction meeting. Also,
call the Public Works
inspection hotline two
working days prior to the
start of work and one
working day prior to each
subsequent inspection.
Permittee is responsible for
calling for final inspection so
the permit can be closed.
Sewer wye installations will
be performed by City staff
during regular business
hours on Tuesdays and
Wednesdays only, with
exceptions made for
holidays as needed.
Contractors must schedule
wye installations by calling
the Public Works Inspection
Hotline at (805) 781-7554 at
least 24 hours in advance.
ENCR-2488-2025 Encroachment Right of Way Issued Install one 4" water service
lateral to serve one 2"
residential water meter on
the California Blvd. side of
the project. Install one 2"
water service lateral to
serve one 1" commercial
water meter on the
2025-10-23 2025-10-23 1426 Monterey 001-137-019
2/6/2026 4:01:17 PMPage 8 of 28
Property History: 1480 Monterey
California Blvd. side of the
project. Install two sewer
laterals on the California
Blvd. side of the project.
Install one sewer lateral on
the Monterey Street side of
the project. All work to be
done per the approved
building plans, BLDG-2341-
2024 and City Standard
Specifications &
Engineering Standards.
Separate encroachment
permits are required for the
additional work shown on
BLDG-2341-2024 and the
public improvement plans,
FMAP-0375-2024, and any
related building permit
cases. Traffic and
pedestrian controls must be
per the attached and
approved plans and City
Appendix G & MUTCD
Standards. Work must be
coordinated to not conflict
with the 1531 Monterey
project. Call the Public
Works inspection hotline at
805-781-7554 (voice
message system) to
coordinate a required pre-
construction meeting. Also,
call the Public Works
inspection hotline two
working days prior to the
start of work and one
working day prior to each
subsequent inspection.
Permittee is responsible for
calling for final inspection so
the permit can be closed.
Sewer wye installations will
be performed by City staff
during regular business
hours on Tuesdays and
Wednesdays only, with
exceptions made for
holidays as needed.
Contractors must schedule
2/6/2026 4:01:17 PMPage 9 of 28
Property History: 1480 Monterey
wye installations by calling
the Public Works Inspection
Hotline at (805) 781-7554 at
least 24 hours in advance.
ENCR-2488-2025 Encroachment Right of Way Issued Install one 4" water service
lateral to serve one 2"
residential water meter on
the California Blvd. side of
the project. Install one 2"
water service lateral to
serve one 1" commercial
water meter on the
California Blvd. side of the
project. Install two sewer
laterals on the California
Blvd. side of the project.
Install one sewer lateral on
the Monterey Street side of
the project. All work to be
done per the approved
building plans, BLDG-2341-
2024 and City Standard
Specifications &
Engineering Standards.
Separate encroachment
permits are required for the
additional work shown on
BLDG-2341-2024 and the
public improvement plans,
FMAP-0375-2024, and any
related building permit
cases. Traffic and
pedestrian controls must be
per the attached and
approved plans and City
Appendix G & MUTCD
Standards. Work must be
coordinated to not conflict
with the 1531 Monterey
project. Call the Public
Works inspection hotline at
805-781-7554 (voice
message system) to
coordinate a required pre-
construction meeting. Also,
call the Public Works
inspection hotline two
working days prior to the
start of work and one
2025-10-23 2025-10-23 1422 Monterey 001-137-019
2/6/2026 4:01:17 PMPage 10 of 28
Property History: 1480 Monterey
working day prior to each
subsequent inspection.
Permittee is responsible for
calling for final inspection so
the permit can be closed.
Sewer wye installations will
be performed by City staff
during regular business
hours on Tuesdays and
Wednesdays only, with
exceptions made for
holidays as needed.
Contractors must schedule
wye installations by calling
the Public Works Inspection
Hotline at (805) 781-7554 at
least 24 hours in advance.
ENCR-2488-2025 Encroachment Right of Way Issued Install one 4" water service
lateral to serve one 2"
residential water meter on
the California Blvd. side of
the project. Install one 2"
water service lateral to
serve one 1" commercial
water meter on the
California Blvd. side of the
project. Install two sewer
laterals on the California
Blvd. side of the project.
Install one sewer lateral on
the Monterey Street side of
the project. All work to be
done per the approved
building plans, BLDG-2341-
2024 and City Standard
Specifications &
Engineering Standards.
Separate encroachment
permits are required for the
additional work shown on
BLDG-2341-2024 and the
public improvement plans,
FMAP-0375-2024, and any
related building permit
cases. Traffic and
pedestrian controls must be
per the attached and
approved plans and City
Appendix G & MUTCD
2025-10-23 2025-10-23 1426 Monterey 001-137-017
2/6/2026 4:01:17 PMPage 11 of 28
Property History: 1480 Monterey
Standards. Work must be
coordinated to not conflict
with the 1531 Monterey
project. Call the Public
Works inspection hotline at
805-781-7554 (voice
message system) to
coordinate a required pre-
construction meeting. Also,
call the Public Works
inspection hotline two
working days prior to the
start of work and one
working day prior to each
subsequent inspection.
Permittee is responsible for
calling for final inspection so
the permit can be closed.
Sewer wye installations will
be performed by City staff
during regular business
hours on Tuesdays and
Wednesdays only, with
exceptions made for
holidays as needed.
Contractors must schedule
wye installations by calling
the Public Works Inspection
Hotline at (805) 781-7554 at
least 24 hours in advance.
ENCR-2488-2025 Encroachment Right of Way Issued Install one 4" water service
lateral to serve one 2"
residential water meter on
the California Blvd. side of
the project. Install one 2"
water service lateral to
serve one 1" commercial
water meter on the
California Blvd. side of the
project. Install two sewer
laterals on the California
Blvd. side of the project.
Install one sewer lateral on
the Monterey Street side of
the project. All work to be
done per the approved
building plans, BLDG-2341-
2024 and City Standard
Specifications &
2025-10-23 2025-10-23 1422 Monterey 001-137-017
2/6/2026 4:01:17 PMPage 12 of 28
Property History: 1480 Monterey
Engineering Standards.
Separate encroachment
permits are required for the
additional work shown on
BLDG-2341-2024 and the
public improvement plans,
FMAP-0375-2024, and any
related building permit
cases. Traffic and
pedestrian controls must be
per the attached and
approved plans and City
Appendix G & MUTCD
Standards. Work must be
coordinated to not conflict
with the 1531 Monterey
project. Call the Public
Works inspection hotline at
805-781-7554 (voice
message system) to
coordinate a required pre-
construction meeting. Also,
call the Public Works
inspection hotline two
working days prior to the
start of work and one
working day prior to each
subsequent inspection.
Permittee is responsible for
calling for final inspection so
the permit can be closed.
Sewer wye installations will
be performed by City staff
during regular business
hours on Tuesdays and
Wednesdays only, with
exceptions made for
holidays as needed.
Contractors must schedule
wye installations by calling
the Public Works Inspection
Hotline at (805) 781-7554 at
least 24 hours in advance.
2/6/2026 4:01:17 PMPage 13 of 28
Property History: 1480 Monterey
Permit #Type Work Class Status Description Apply Issue Finalize Address Parcel
ENCR-0021-2026 Encroachment Utility Company -
Blanket Maint
Work
Issued PG&E PM # 35585344.
PG&E to remove pole and
OH transformers and
replace with new pole and
(2) OH transformers.
Remove and install new OH
conduit, and reframe pole.
Standard working hours are
7am-4pm. All work to be
done to City Standard
Specifications &
Engineering Standards.
Traffic and pedestrian
controls must be per the
approved and attached
plans and City Appendix G
& MUTCD Standards. Call
the Public Works inspection
hotline at 805-781-7554 two
working days prior to the
start of work and one
working day prior to each
subsequent inspection.
Permittee is responsible for
calling for final inspection so
the permit can be closed.
2026-01-05 2026-01-05 1480 Monterey 001-137-013
2/6/2026 4:01:17 PMPage 14 of 28
Property History: 1480 Monterey
Permit #Type Work Class Status Description Apply Issue Finalize Address Parcel
ENCR-0021-2026 Encroachment Utility Company -
Blanket Maint
Work
Issued PG&E PM # 35585344.
PG&E to remove pole and
OH transformers and
replace with new pole and
(2) OH transformers.
Remove and install new OH
conduit, and reframe pole.
Standard working hours are
7am-4pm. All work to be
done to City Standard
Specifications &
Engineering Standards.
Traffic and pedestrian
controls must be per the
approved and attached
plans and City Appendix G
& MUTCD Standards. Call
the Public Works inspection
hotline at 805-781-7554 two
working days prior to the
start of work and one
working day prior to each
subsequent inspection.
Permittee is responsible for
calling for final inspection so
the permit can be closed.
2026-01-05 2026-01-05 1480 Monterey 001-137-017
2/6/2026 4:01:17 PMPage 15 of 28
Property History: 1480 Monterey
Permit #Type Work Class Status Description Apply Issue Finalize Address Parcel
ENCR-0021-2026 Encroachment Utility Company -
Blanket Maint
Work
Issued PG&E PM # 35585344.
PG&E to remove pole and
OH transformers and
replace with new pole and
(2) OH transformers.
Remove and install new OH
conduit, and reframe pole.
Standard working hours are
7am-4pm. All work to be
done to City Standard
Specifications &
Engineering Standards.
Traffic and pedestrian
controls must be per the
approved and attached
plans and City Appendix G
& MUTCD Standards. Call
the Public Works inspection
hotline at 805-781-7554 two
working days prior to the
start of work and one
working day prior to each
subsequent inspection.
Permittee is responsible for
calling for final inspection so
the permit can be closed.
2026-01-05 2026-01-05 1480 Monterey 001-137-019
2/6/2026 4:01:17 PMPage 16 of 28
Property History: 1480 Monterey
Permit #Type Work Class Status Description Apply Issue Finalize Address Parcel
ENCR-0252-2026 Encroachment Utility Company -
Blanket Maint
Work
Issued PG&E PM # 35698666.
PG&E to install cable in
conduit. Standard working
hours are 7am-4pm. All
work to be done to City
Standard Specifications &
Engineering Standards.
Traffic and pedestrian
controls must be per the
approved and attached
plans and City Appendix G
& MUTCD Standards. Call
the Public Works inspection
hotline at 805-781-7554 two
working days prior to the
start of work and one
working day prior to each
subsequent inspection.
Permittee is responsible for
calling for final inspection so
the permit can be closed.
2026-02-03 2026-02-03 1480 Monterey 001-137-017
ENCR-0252-2026 Encroachment Utility Company -
Blanket Maint
Work
Issued PG&E PM # 35698666.
PG&E to install cable in
conduit. Standard working
hours are 7am-4pm. All
work to be done to City
Standard Specifications &
Engineering Standards.
Traffic and pedestrian
controls must be per the
approved and attached
plans and City Appendix G
& MUTCD Standards. Call
the Public Works inspection
hotline at 805-781-7554 two
working days prior to the
start of work and one
working day prior to each
subsequent inspection.
Permittee is responsible for
calling for final inspection so
the permit can be closed.
2026-02-03 2026-02-03 1480 Monterey 001-137-019
2/6/2026 4:01:17 PMPage 17 of 28
Property History: 1480 Monterey
Permit #Type Work Class Status Description Apply Issue Finalize Address Parcel
ENCR-0252-2026 Encroachment Utility Company -
Blanket Maint
Work
Issued PG&E PM # 35698666.
PG&E to install cable in
conduit. Standard working
hours are 7am-4pm. All
work to be done to City
Standard Specifications &
Engineering Standards.
Traffic and pedestrian
controls must be per the
approved and attached
plans and City Appendix G
& MUTCD Standards. Call
the Public Works inspection
hotline at 805-781-7554 two
working days prior to the
start of work and one
working day prior to each
subsequent inspection.
Permittee is responsible for
calling for final inspection so
the permit can be closed.
2026-02-03 2026-02-03 1480 Monterey 001-137-013
ENCR-0327-2026 Encroachment Right of Way Under
Review
Traffic signal modifications
on existing signal at
Monterey & California. Work
hour restrictions apply; see
the attached traffic control
plan. All work to be done to
City Standard Specifications
& Engineering Standards.
Traffic and pedestrian
controls must be per the
approved and attached
plans and City Appendix G
& MUTCD Standards. Call
the Public Works inspection
hotline at 805-781-7554 two
working days prior to the
start of work and one
working day prior to each
subsequent inspection.
Permittee is responsible for
calling for final inspection so
the permit can be closed.
2026-02-06 1422 Monterey 001-137-017
2/6/2026 4:01:17 PMPage 18 of 28
Property History: 1480 Monterey
Plans
Plan #Type Work Class Status Description Apply Complete Address Parcel
USE (A 1-90)Use Permit Administrative Use
Permit
Import Pre-Foxpro. Code: PADD
Type: A Microfilm: N.
Description: SIEGFRIED
FLOWER STAND
1990-01-19 1480 MONTEREY 001-137-013
ARCH (ARC 126-93)Architectural Review Development Projects Import Demolition of service station
including fuel tank removal
1993-08-23 1993-08-26 1480 MONTEREY 001-137-013
ER (ER 100-96)Environmental
Impact
Determination
Environmental Impact
Determination
Import Environmental Analysis of
proposed rezone amendment.
1996-07-16 1996-08-16 1480 MONTEREY 001-137-013
RTA (R 100-96)Rezoning Map Amendment (incl.
Rezoning)
Import Change in zoning on the
subject property from Tourist
Commercial (C-T) to Retail
Commercial (C-R).
1996-07-16 1996-08-16 1480 MONTEREY 001-137-013
ARCH (ARC 34-01)Architectural Review Development Projects Import Design review of new office
building.
2001-03-06 1480 MONTEREY 001-137-013
USE (A 34-01)Use Permit Administrative Use
Permit
Import Use permit for a new office
building and review of a
request to reduce parking by
15% for the project.
2001-03-06 1480 MONTEREY 001-137-013
VAR (V 34-01)Variance Variance Import Allow street yard to be reduced
from 15' to 0' along California
Boulevard.
2001-03-07 1480 MONTEREY 001-137-013
PLOCC-131038-2014 Occupancy Space Occupancy Approved 1480 Monterey 2014-07-30 1480 Monterey 001-137-013
PLOCC-106011-2014 Occupancy Structure Occupancy Approved 1480 Monterey 2014-07-30 1480 Monterey 001-137-013
PRE-0229-2021 Pre-Application Architectural Review Approved Pre-application meeting to
discuss the proposed
development of a mixed-use
project consisting of 111
affordable units, and
approximately 10,000 square
feet of commercial space
2021-03-31 2021-05-18 1422 Monterey 001-137-013
2/6/2026 4:01:17 PMPage 19 of 28
Property History: 1480 Monterey
Plan #Type Work Class Status Description Apply Complete Address Parcel
ARCH-0020-2022 Architectural Review Development Projects
- Major
Under
Review
Development review of a five-
story mixed-use project
consisting of 4,366 square feet
of commercial space, 106
residential units (dedicated for
affordable housing), and a
three-story parking garage.
The project includes the
following exceptions/waivers; a
six-foot creek setback waiver
(where 20 feet is normally
required), 54-foot maximum
height deviation (where 45 feet
is normally required), a 4-foot
side yard setback (where 8-feet
is normally required), Edge
Conditions waiver for a 3-foot
setback (where 10 feet would
normally be required), an
alternative compliance request
for the bicycle parking
requirement for the senior
housing units, and a 65%
density bonus. The project is
categorically exempt from
environmental review (CEQA).
2022-01-10 2022-09-01 1422 Monterey 001-137-013
AFFH-0021-2022 Affordable Housing Incentive Request Under
Review
Development review of a five-
story mixed-use project
consisting of 4,366 square feet
of commercial space and 106
residential units (dedicated for
affordable housing). The
project also includes a 3-story
parking garage. The project
includes the following
exceptions/waivers; creek
setback exception, maximum
height exception, side yard
setback exception, and 65%
density bonus.
2022-01-11 1422 Monterey 001-137-013
2/6/2026 4:01:17 PMPage 20 of 28
Property History: 1480 Monterey
Plan #Type Work Class Status Description Apply Complete Address Parcel
SBDV-0279-2024 Subdivision Voluntary Merger Approved Notice of Merger for 1422,
1480 Monterey (associated
with ARCH-0020-2022)
2024-05-17 2024-07-17 1422 Monterey 001-137-013
STORM-0656-2024 Stormwater General Stormwater Under
Review
NEW AFFORDABLE MIXED-
BUILDING 1 - USE CONSISTS
OF 4,366 SF OF
COMMERCIAL, 45
AFFORDABLE FAMILY
RESIDENTIAL UNITS
2024-10-16 1422 Monterey 001-137-013
PLREV-0748-2024 Permit Review -
Revision
Revision to Plans Approved Commercial Restaurant Room
117 re-purposed as a
temporary community room for
residents with addition of
kitchen area. Adjacent Kitchen
Room 119 re-purposed as
temporary offices room 119A
and 119B.Associated
mechanical, plumbing, and
electrical upgrades in this area.
Passive radon mitigation
design incorporated sheets A2-
020, -021, & -022.
2024-11-20 2025-01-17 1426 Monterey 001-137-013
PLREV-0749-2024 Permit Review -
Revision
Revision to Plans Approved Building 2 - Commercial
Restaurant Room 117 and
Kitchen Room 119 re-purposed
as a temporary community
room for residents with addition
of kitchen area. Buildings 1&2 -
Standpipe hose connection
added at ground floor level at
all stair enclosures.
2024-11-20 2024-12-18 1422 Monterey 001-137-013
PLREV-0060-2025 Permit Review -
Revision
Revision to Plans Under
Review
Revision to structural sub-slab
section design to remove prior
need for Soil Improvement
deferred submittal. Structural
sheets, Geotech letter, and
Architectural Title Sheet
updated to reflect that the
project no longer requires Soil
Improvement deferred
submittal.
2025-01-24 2025-02-24 1426 Monterey 001-137-013
2/6/2026 4:01:17 PMPage 21 of 28
Property History: 1480 Monterey
Plan #Type Work Class Status Description Apply Complete Address Parcel
PLREV-0060-2025 Permit Review -
Revision
Revision to Plans Under
Review
Revision to structural sub-slab
section design to remove prior
need for Soil Improvement
deferred submittal. Structural
sheets, Geotech letter, and
Architectural Title Sheet
updated to reflect that the
project no longer requires Soil
Improvement deferred
submittal.
2025-01-24 2025-02-24 1426 Monterey 001-137-017
PLREV-0299-2025 Permit Review -
Revision
Revision to Plans Approved Sheet C-018 showed a
concrete slurry wall
surrounding each of the
proposed StormTech chamber
systems. The only purpose of
the wall was to promote
infiltration straight down into
the ground, instead of laterally
toward the buildings. To save
cost and time, we are
proposing to utilize an
impermeable pond-type liner
instead of the slurry wall. The
four impacted sheets have
been included with the request
for revision package (C-014, C-
015, C-017 and C-018).
2025-04-17 2025-06-06 1426 Monterey 001-137-019
2/6/2026 4:01:17 PMPage 22 of 28
Property History: 1480 Monterey
Plan #Type Work Class Status Description Apply Complete Address Parcel
PLREV-0299-2025 Permit Review -
Revision
Revision to Plans Approved Sheet C-018 showed a
concrete slurry wall
surrounding each of the
proposed StormTech chamber
systems. The only purpose of
the wall was to promote
infiltration straight down into
the ground, instead of laterally
toward the buildings. To save
cost and time, we are
proposing to utilize an
impermeable pond-type liner
instead of the slurry wall. The
four impacted sheets have
been included with the request
for revision package (C-014, C-
015, C-017 and C-018).
2025-04-17 2025-06-06 1426 Monterey 001-137-013
PLREV-0299-2025 Permit Review -
Revision
Revision to Plans Approved Sheet C-018 showed a
concrete slurry wall
surrounding each of the
proposed StormTech chamber
systems. The only purpose of
the wall was to promote
infiltration straight down into
the ground, instead of laterally
toward the buildings. To save
cost and time, we are
proposing to utilize an
impermeable pond-type liner
instead of the slurry wall. The
four impacted sheets have
been included with the request
for revision package (C-014, C-
015, C-017 and C-018).
2025-04-17 2025-06-06 1426 Monterey 001-137-017
2/6/2026 4:01:17 PMPage 23 of 28
Property History: 1480 Monterey
PLREV-0329-2025 Permit Review -
Revision
Revision to Plans Approved Structural; revisions due to RFI
#31 and #33 as described in
the form and below:
RFI #31- Pedestrian bridge
structural connection detail
revision due to state funding
causing phasing of project. The
Pedestrian Bridge needs to be
built in Phase 2, as a result the
columns and connections
needed to be revised to
accommodate the phasing.
See revised Structural Sheets
S2-101, S2-102, and S6.22.
Architectural Details #63 and
#65 on Sheet A-910 were
revised to accommodate the
finish changes due to the
structural revisions. All
refinements for this item have
been clouded and tagged as
RFI #31
RFI #33. Sheet S2-100 has
been revised due to existing
conditions for underground
culvert location that differed
from what was estimated
during initial permitting. This
impacted the grade beam
design for adjacent columns.
The issue has been
coordinated via RFI #33 and
heavily reviewed by project
geotechnical engineer Nick
Zoeteway - please see
supporting documents for
Geotechnical engineer
response along with updated
structural calculations to match
the revised grade beam. All
refinements for this item have
been clouded and tagged as
RFI #33
2025-05-01 2025-05-19 1426 Monterey 001-137-017
2/6/2026 4:01:17 PMPage 24 of 28
Property History: 1480 Monterey
PLREV-0329-2025 Permit Review -
Revision
Revision to Plans Approved Structural; revisions due to RFI
#31 and #33 as described in
the form and below:
RFI #31- Pedestrian bridge
structural connection detail
revision due to state funding
causing phasing of project. The
Pedestrian Bridge needs to be
built in Phase 2, as a result the
columns and connections
needed to be revised to
accommodate the phasing.
See revised Structural Sheets
S2-101, S2-102, and S6.22.
Architectural Details #63 and
#65 on Sheet A-910 were
revised to accommodate the
finish changes due to the
structural revisions. All
refinements for this item have
been clouded and tagged as
RFI #31
RFI #33. Sheet S2-100 has
been revised due to existing
conditions for underground
culvert location that differed
from what was estimated
during initial permitting. This
impacted the grade beam
design for adjacent columns.
The issue has been
coordinated via RFI #33 and
heavily reviewed by project
geotechnical engineer Nick
Zoeteway - please see
supporting documents for
Geotechnical engineer
response along with updated
structural calculations to match
the revised grade beam. All
refinements for this item have
been clouded and tagged as
RFI #33
2025-05-01 2025-05-19 1426 Monterey 001-137-019
2/6/2026 4:01:17 PMPage 25 of 28
Property History: 1480 Monterey
PLREV-0329-2025 Permit Review -
Revision
Revision to Plans Approved Structural; revisions due to RFI
#31 and #33 as described in
the form and below:
RFI #31- Pedestrian bridge
structural connection detail
revision due to state funding
causing phasing of project. The
Pedestrian Bridge needs to be
built in Phase 2, as a result the
columns and connections
needed to be revised to
accommodate the phasing.
See revised Structural Sheets
S2-101, S2-102, and S6.22.
Architectural Details #63 and
#65 on Sheet A-910 were
revised to accommodate the
finish changes due to the
structural revisions. All
refinements for this item have
been clouded and tagged as
RFI #31
RFI #33. Sheet S2-100 has
been revised due to existing
conditions for underground
culvert location that differed
from what was estimated
during initial permitting. This
impacted the grade beam
design for adjacent columns.
The issue has been
coordinated via RFI #33 and
heavily reviewed by project
geotechnical engineer Nick
Zoeteway - please see
supporting documents for
Geotechnical engineer
response along with updated
structural calculations to match
the revised grade beam. All
refinements for this item have
been clouded and tagged as
RFI #33
2025-05-01 2025-05-19 1426 Monterey 001-137-013
2/6/2026 4:01:17 PMPage 26 of 28
Property History: 1480 Monterey
Plan #Type Work Class Status Description Apply Complete Address Parcel
PLREV-0430-2025 Permit Review -
Revision
Revision to Plans Approved Wood to wood, diaphragm and
shear wall fastener
substitution, submittal 06 00 00
-3.
2025-06-05 2025-07-28 1480 Monterey 001-137-019
PLREV-0436-2025 Permit Review -
Revision
Revision to Plans Approved Clarifying RFI 46 for city review
as requested by City Inspector.
2025-06-06 2025-07-10 1480 Monterey 001-137-019
PLREV-0543-2025 Permit Review -
Revision
Revision to Plans Approved City Field Inspector requested
that a few RFI's that related to
Structural refinements of
column sizes and shear walls
be submitted for record.
2025-07-10 2026-01-15 1480 Monterey 001-137-019
PLBLDG-0606-2025 Permit Review -
Building
New Multi Family Void BUILDING #1; BUILDING #2;
PARKING GARAGE &
DUPLEX
2025-08-04 1422 Monterey 001-137-017
PLREV-0629-2025 Permit Review -
Revision
Revision to Plans On-Line
Submission
Elevator and Connections
deferred submittal. Submission
includes engineering &
architecturally approved
elevator shop drawings &
elevator guide rail structural
steel packages.
2025-08-08 1480 Monterey 001-137-019
PLREV-0814-2025 Permit Review -
Revision
Revision to Plans Approved Roof Tieback Anchorage
Specification deferred
submittal. Submission includes
engineering stamped drawings.
2025-10-08 2026-01-15 1480 Monterey 001-137-019
PLREV-0919-2025 Permit Review -
Revision
Revision to Plans Void DEFERRED SUBBMITTAL
FOR DUPLEX-VOIDED
ERROR
2025-11-18 1422 Monterey 001-137-013
PLREV-0961-2025 Permit Review -
Revision
Revision to Plans Approved Temporary Shoring Phase 2
deferred submittal for Permit
#BLDG-0319-2024.
2025-12-08 2026-01-13 1422 Monterey 001-137-013
2/6/2026 4:01:17 PMPage 27 of 28
Property History: 1480 Monterey
Plan #Type Work Class Status Description Apply Complete Address Parcel
PLREV-0046-2026 Permit Review -
Revision
Revision to Plans On-Line
Submission
Building 1: Sprinkler head
provided under the single
combustible stair landing, and
sprinkler head provided at top
of trash chute. Please see
clouds tagged with DELTA "B"
Building 2: Non-combustible
steel stairs were since revised
with the city to wood stairs.
However, the fire sprinkler
plans were not properly
updated to capture this
change. Please see new
sprinkler heads provided under
the combustible stair mid
landings, and sprinkler head
provided at top of trash chute.
Please see clouds tagged with
DELTA "B"
2026-01-28 1422 Monterey 001-137-019
2/6/2026 4:01:17 PMPage 28 of 28
Property History: 1480 Monterey