HomeMy WebLinkAboutItem 4d. Consideration of the 2025 General Plan Annual Report PLANNING COMMISSION AGENDA REPORT SUBJECT: CONSIDERATION OF THE 2025 GENERAL PLAN ANNUAL REPORT BY: Ethan Estrada, Assistant Planner FROM: Tyler Corey, Deputy Director Phone Number: (805) 781-7576 Phone Number: (805) 781-7169 Email: ejestrad@slocity.org Email: tcorey@slocity.org RECOMMENDATION Receive and file the 2025 General Plan Annual Report for final review and acceptance by the City Council. 1.0 COMMISSION'S PURVIEW The Planning Commission provides input on long range planning efforts, such as specific plans, community plans, and all elements of the General Plan. The purpose of this agenda item is to provide an opportunity for the Planning Commission to review the 2025 General Plan Annual Report before forwarding to the City Council for acceptance. 2.0 SUMMARY California Government Code Section 65400 requires cities to submit a n annual report (Attachment A) on the status of their General Plan and progress in its implementation to their legislative body (City Council), the Governor’s Office of Land Use and Climate Innovation (previously known as the Governor’s Office of Planning and Research), and the California Department of Housing and Community Development. Prior to submi ssion to the State, the annual report must be presented to the City Council for review and acceptance. As a procedural matter, staff is presenting this annual report to the Planning Commission for receipt and acceptance prior to its presentation to the City Council, given the Commission’s role as an advisory body to the Council in planning matters, including implementation of the General Plan. Preparation of the General Plan Annual Report (GPAR) is also consistent with General Plan Land Use Element Policy 11.3, discussed below. The GPAR is strictly a reporting document and does not create or modify any City goals, policies, or programs found within the General Plan. 3.0 PREVIOUS REVIEW According to Land Use Element Policy 11.3, the City shall prepare an annual report on the status of the General Plan, which is to include the following items: A) A summary of private development activity and a brief analysis of how it helped achieved General Plan goals. Meeting Date: 3/11/2026 Item Number: 4d Time Estimate: 30 minutes Page 173 of 248 Item 4d GENP-0088-2026 Planning Commission Report – 3/11/2026 B) A summary of major public projects and a brief analysis of how they contributed to achieving General Plan goals. C) An overview of programs, and recommendations on any new approaches that may be necessary. D) A status report for each General Plan program scheduled to be worked on during that year, including discussion of whether that program’s realization is progressing on schedule, and recommendations for how it could better be kept on schedule if it is lagging. E) A status report on how the City is progressing with implementing its open space preservation policies and programs. F) Updated population or other information deemed important for the Plan. The GPAR has been prepared and presented to Council annually. Said reports have been prepared in accordance with the above topics per Land Use Element Policy 11.3. 4.0 PROJECT ANALYSIS The General Plan is a comprehensive statement of the City’s goals and guides the use and protection of various resources to achieve those goals. It consists of numerous policies covering a range of City activities, including the creation and/or maintenance of public programs, guidelines on land use and development standards, and other related actions. The GPAR is an opportunity for the City to evaluate how well the Plan continues to meet its goals. It also allows the City to assess how well programs identified in the Plan are being implemented and to determine whether they remain relevant to the City’s goals and policies. The 2025 GPAR is organized around the following key implementation areas:  Planning and Building Activity  Residential Growth  Non-Residential Growth  Housing Element Program Implementation  Regional Housing Needs Allocation (RHNA) Progress  Homelessness Solutions  Coordination with Other Agencies  Area Plan and Specific Plan Development  Municipal Code Updates  Climate Action Plan  Economic Development  Policy Initiatives  Water Supply  Transportation and Circulation  Safety Services  Neighborhood Wellness  Conservation and Open Space  Parks & Recreation Page 174 of 248 Item 4d GENP-0088-2026 Planning Commission Report – 3/11/2026 Below is a review of key highlights from the 2025 GPAR: Development Activity and Trends Residential Development The 2025 GPAR presents a variety of data collected by the City to provide insight into development activity and trends over several years. Based on CDD’s residential building permit data, the City permitted 83 single-family residences and 11 multifamily units in 2025, for a total of 94 new residential units. This represents a decrease compared to 353 units in 2024 and 284 units in 2023. A total of 104 accessory dwelling units were permitted in 2025, an increase compared to 96 in 2024 and 86 in 2023. LUE Policy 1.11.2, related to residential growth, states that the City’s housing supply shall grow no faster than an average of one percent per year, based on the established thresholds in Table 3 of the Land Use Element (LUE). Dwellings affordable to residents with extremely low, very low, low, or moderate incomes, as defined by the Housing Element; new dwellings in the Downtown Core; and legally established accessory dwelling units are exempt. The intent of this policy is to ensure that the rate of population growth does not exceed the City’s ability to accommodate new residents and provide municipal services consistent with the maximum growth rates established in the General Plan. Each year, the City calculates a rolling average of housing units produced since 2015 (the year the Land Use and Circulation Element was adopted). In 2024, for the first time since adopting this provision, the City had exceeded this threshold, producing an average annual growth rate of 1.03 percent. Staff attributed this to the completion of several specific plan areas, which significantly increased the number of residential units added to the total housing stock. However, staff also acknowledged that, with the completion of these planned areas, the number of residential units being permitted was expected to decrease. In 2025, staff calculated the current average annual growth rate to be 1.00 percent per year since 2015. As anticipated, the decrease in the number of residential units permitted in 2024 and again in 2025 resulted in the average annual residential growth rate falling back within the one percent threshold. Non-Residential Development Non-residential development increased in 2025, with a net annual growth rate of 1.47 percent, compared to 0.60 percent in 2024. Based on “finaled” permits for non-residential development, 176,673 square feet of floor area was added in 2025, yielding a five-year net non-residential growth rate of 3.15 percent. This substantial increase in non-residential development is attributed to the completion of the Marriot hotel project in the San Luis Ranch Specific Plan area, which accounted for more than 120,000 square feet of the non-residential floor area added to the City in 2025. LUE Policy 1.11.4 states that the City Council shall consider establishing limits on the rate of non-residential development if the increase in non-residential floor area exceeds five percent over any five-year period. The City remains below this threshold and is not required to consider a non-residential growth limit at this time. Page 175 of 248 Item 4d GENP-0088-2026 Planning Commission Report – 3/11/2026 Homelessness Solutions The City’s 6th Cycle Housing Element includes policies and programs to reduce homelessness under Goal 1, Safety, and Goal 8, Special Housing Needs. Homelessness Response was also identified as a Major City Goal as part of the 2025-27 Financial Plan. In 2025, the City responded to 104 encampment fires and 941 medical incidents , removed 47 tons of trash, and posted, conducted outreach, and cleaned up 247 illegal encampments. Homelessness response activities in 2025 included regional collaboration to pursue state funding opportunities for the development of interim and permanent supportive housing, as well as partnerships with community and faith-based organizations to implement a Community Safe Parking Pilot Program model. Other programs, including the Human Services Grant Program, Community Action Team, Mobile Crisis Unit, and collaborative efforts with Downtown SLO and CAPSLO , continued throughout 2025. Policy Initiatives – Historic Preservation In 2025, Phase 1 of an update to the City’s Historic Resources Inventory was completed as part of implementing the Cultural Vitality, Economic Resilience, and Fiscal Sustainability Major City Goal. Phase 1 included updates to the City’s Historic Preservation Ordinance and Historic Context Statement. Major updates to the Historic Preservation Ordinance included revisions to historic resource designations and evaluation criteria for historic significance to ensure greater consistency with guidance from the National Park Service and the California Office of Historic Preservation. The Historic Context Statement was updated to provide a more inclusive approach to the preservation of the City’s resources by expanding the discussion of themes related to minority and ethnic communities and integrating the contributions of San Luis Obispo’s Chinese, Japanese, African American, Filipino, and other communities into the relevant temporal and thematic contexts of the City. Safety Services Climate Adaptation and Safety Element (CASE) Policy OP -7.1 requires adequate planning, organization, and resources for emergency preparedness and emergency response. City staff made several accomplishments in 2025 to implement this policy. Fire Department The San Luis Obispo Fire Department (SLOFD) responded to 7,344 incidents from four strategically located fire stations throughout the City in 2025. SLOFD’s Urban Search and Rescue (USAR) Team continued to play a vital role in protecting the lives of both visitors and residents, responding to 13 technical rescues and medical emergencies in open space areas in and around the City. Page 176 of 248 Item 4d GENP-0088-2026 Planning Commission Report – 3/11/2026 SLOFD’s Mobile Crisis Unit (MCU) continued to respond to behavioral health incidents, handling 143 calls for service and conducting 2,234 field contacts, which resulted in 69 transports to alternate facilities. Working with stakeholders, the MCU Team also facilitated the reunification of 25 individuals with family members, friends, or other out-of-area support networks. An update to the City’s Hazard Mitigation Plan (HMP) was completed in 2025 as part of the Multi-Jurisdictional Hazard Mitigation Plan update led by San Luis Obispo County. The HMP provides guidance on reducing the community’s vulnerability to natural hazards. Maintaining an updated HMP, as required by law, allows the City to apply for state and federal funding for proactive mitigation projects and to seek reimbursement in the event of a disaster. The updated HMP will be presented to the City Council for adoption following review and approval by the Federal Emergency Management Agency (FEMA). In 2025, the State released updated Fire Hazard Severity Zone maps identifying area s of elevated wildfire risk within the City. These maps serve as the regulatory basis for future wildfire-related planning, development standards, and community risk -reduction efforts. The updated maps identified more than 2,800 parcels within the City as being in the Very High Fire Hazard Severity Zone, whereas fewer than 50 parcels were identified within that zone under the previous maps. In addition, the 2025 CA Wildland-Urban Interface (WUI) Code was issued at the state level for adoption by local jurisdictions. The City Council formally adopted the WUI code on December 2, 2025. Police Department In 2025, the San Luis Obispo Police Department (SLOPD) completed the second year of of its five-year strategic plan. Accomplishments included completion of a department-wide staffing study; implementation of data-driven policing tools to reduce crime; establishment of an online recruitment portal; improvements to the Department’s physical fitness facility; development of a centralized resource guide for employee wellness information; updates to body-worn and in-car camera systems; enhancement of community communication strategies; and improvements to the Department’s training program. SLOPD’s Community Action Team (CAT) continued to identify problems and crime trends negatively impacting residents, business owners, and visitors. In 2025, CAT engaged with 798 individuals and made 164 treatment referrals to mental health and substance abuse services. Additionally, CAT facilitated two family reunifications for individuals experiencing homelessness. SLOPD’s Community Service Officer (CSO) program continued to deliver personalized services to residents, business owners, and visitors. In 2025, CSOs issued 443 citations for offenses such as public alcohol consumption, littering, smoking, and unregistered vehicles, along with 189 cite-and-release arrests related to alcohol, drugs, theft, vehicle tows, and trespassing. Page 177 of 248 Item 4d GENP-0088-2026 Planning Commission Report – 3/11/2026 Conservation and Open Space The General Plan contains many goals, policies, and programs focused on open space protection. The policies apply to sensitive lands within the City’s urban reserve as well as land in the San Luis Obispo Greenbelt area protected for its biological, agricultural, aesthetic, and/or watershed protection value. These policies are further detailed in the Land Use and Circulation Element and the Conservation and Open Space Element of the General Plan. Some highlights for 2025 include:  In May 2025, the City hosted a ribbon-cutting ceremony for Righetti Hill Open Space, officially opening the 51-acre property to the public. The site features more than two miles of sustainably built trails.  City staff continued invasive vegetation control efforts along Froom, Prefumo, and San Luis Obispo Creeks, including the planting of native plants and trees.  City staff partnered with the California Conservation Corps through the Greenhouse Gas Reduction Fund program to implement the Wildland -Urban Interface and Integrated Vegetation Management Plan for the Open Space Land of San Luis Obispo. This work included activities in Bowden Ranch, as well as major fuel reduction and cleanup efforts along the WUI. 5.0 ENVIRONMENTAL REVIEW The California Environmental Quality Act (CEQA) does not apply because the GPAR does not constitute a “Project” under CEQA Guidelines Section 15378. 6.0 OTHER DEPARTMENT COMMENTS The 2025 General Plan Annual Report was a collaboration of many City departments and divisions, including Community Development, Public Works and Utilities, Parks & Recreation, Administration, Fire, and Police. 7.0 ALTERNATIVES Continue the item and direct staff to make revisions or include additional information.  Staff does not recommend continuation, as the GPAR is required to be approved by the City Council and submitted to the state in early April. 8.0 ATTACHMENTS A – 2025 General Plan Annual Report Page 178 of 248 cannshel growt ann City of San Luis Obispo 2025 General Plan Annual Report Page 179 of 248 General Plan Annual Report 2025 ii Community Development Department Our Mission Statement Our mission is to serve all persons in a positive and courteous manner while helping ensure that San Luis Obispo continues to be a healthy, safe, attractive, and enjoyable place to live, work, or visit. We help plan the City’s form and character, support community values, preserve the environment, promote wise use of resources, and protect public health and safety. Our Service Philosophy The City of San Luis Obispo Community Development Department (CDD) staff provides high quality service when you need it. We will: • Listen to understand your needs; • Give clear, accurate and prompt answers to your questions; • Explain how you can achieve your goals under the City’s rules; • Help resolve problems in an open, objective manner; • Maintain high ethical standards; and • Work to improve our service. Page 180 of 248 General Plan Annual Report 2025 iii Acknowledgements City Council Erica A. Stewart, Mayor Emily Francis, Vice Mayor Michael R. Boswell Jan Marx Michelle Shoresman Planning Commission David Houghton, Chair Eric Tolle, Vice Chair Justin Cooley Sheryl Flores Robert Jorgensen Steven Kahn Juan Munoz-Morris City Manager Whitney McDonald, City Manager Project Management Team Project Lead: Ethan Estrada, Assistant Planner Delaney Ginn, Intern IV The 2025 General Plan Annual Report was prepared by the Community Development Department for review by the Planning Commission and acceptance by City Council. The Community Development Department’s Planning Division often takes the lead on staff work related to the General Plan. However, all City departments and advisory bodies are involved in General Plan implementation and have contributed to the 2025 General Plan Annual Report. Page 181 of 248 General Plan Annual Report 2025 iv Staff Contributors Aaron Floyd, Public Works and Utilities Director Adam Fukushima, Active Transportation Manager Alexander Fuchs, Mobility Services Business Manager Brian Amoroso, Deputy Chief - Administration Bryan Wheeler, Transportation Planner/Engineer III Chris Read, Sustainability Manager Christine Wallace, Neighborhood Outreach Manager Daisy Wiberg, Homelessness Response Manager David Amini, Senior Planner Devin Hyfield, Recreation Manager Donna King, Parking Program Manager Doug Carscaden, Recreation Supervisor Freddy Otte, City Biologist Greg Avakian, Parks and Recreation Director Ivana Gomez, Cannabis Business Coordinator Jennifer Rice, Public Works Deputy Director of Mobility Services Joe Little, Emergency Manager John Mezzapesa, Code Enforcement Supervisor Joshua Daniel, Fire Marshal Luke Schwartz, Transportation Manager Lucia Baesemann, Sustainability and Natural Resources Analyst Matt Horn, Major City Projects Manager Matheson Bliss, Hazardous Materials Coordinator Meghan Tolley, Recreation Manager Laura Fiedler, Economic Development & Tourism Manager Nicole Vert, Business Analyst Rick Scott, Police Chief Robert Hill, Sustainability & Natural Resources Official Sammy Fox, Deputy Fire Chief Sarah Cooper, Administrative Specialist – Homelessness Response Shawna Scott, Assistant Director of Utilities Timmi Tway, Community Development Director Randy Harris, Interim Fire Chief Tyler Corey, Deputy Community Development Director Vanessa Nichols, Permit Services Supervisor Page 182 of 248 General Plan Annual Report 2025 v Table of Contents Introduction .................................................................................................................................... 1 Background ..................................................................................................................................... 2 Planning and Building Activity ........................................................................................................ 3 Residential Growth ......................................................................................................................... 5 Non-Residential Growth ................................................................................................................. 6 Housing Element Program Implementation ................................................................................... 7 Regional Housing Needs Allocation (RHNA) Progress .................................................................. 10 Homelessness Solutions ................................................................................................................ 12 Coordination with Other Agencies ............................................................................................... 15 Area Plan and Specific Plan Development .................................................................................... 16 Municipal Code Updates ............................................................................................................... 23 Climate Action Plan ....................................................................................................................... 24 Economic Development ................................................................................................................ 25 Policy Initiatives ............................................................................................................................ 26 Water Supply ................................................................................................................................. 27 Transportation and Circulation ..................................................................................................... 29 Safety Services .............................................................................................................................. 34 Neighborhood Wellness................................................................................................................ 46 Conservation and Open Space ...................................................................................................... 48 Parks & Recreation ........................................................................................................................ 51 Conclusion ..................................................................................................................................... 64 Page 183 of 248 General Plan Annual Report 2025 vi List of Figures Figure 1 - Total Planning Applications Received per Calendar Year, 2023-2025 ............................ 3 Figure 2 - Net Annual Growth Rates of Non-Residential Sectors, 2021-2025 ................................ 6 Figure 3 - Monthly Noise Party Calls for Service, 2025 ................................................................. 48 List of Tables Table 1 – Plan Check Applications Submitted, 2023-2025 ............................................................. 3 Table 2 – Building Permits Issued, 2023-2025 ................................................................................ 4 Table 3 – Valuation of Construction, 2023-2025 ............................................................................ 4 Table 4 – LUE Table 3, One Percent City Population Growth Projection ...................................... 5 Table 5 – Residential Growth Rates, 2015-2025............................................................................. 5 Table 6 – Highlights of Housing Element Program Implementation Progress, 2025 ..................... 7 Table 7 – Progress Towards 6th Cycle Quantified Objectives, 2019-2028 .................................... 10 Table 8 – Active BMR Housing Projects in the Pipeline ............................................................... 11 Table 9 – Margarita Area Development Status, 2025 .................................................................. 16 Table 10 – Orcutt Area Development Status, 2025 ...................................................................... 17 Table 11 – Airport Area Development Status, 2025 ..................................................................... 18 Table 12 – Avila Area Development Status, 2025 ......................................................................... 20 Table 13 – San Luis Ranch Area Development Status, 2025......................................................... 23 Table 14 – City Water Resource Availability, 2025 ....................................................................... 27 Table 15 – Code Enforcement Statistics, 2021-2025 .................................................................... 47 Page 184 of 248 General Plan Annual Report 2025 1 Introduction General Plan Annual Report The General Plan is a comprehensive statement of the City’s goals and guides the use and protection of various resources to achieve them. It consists of numerous policies covering a range of activities, including the creation and/or maintenance of public programs, guidelines for land use and development standards, and more. The General Plan is adopted and amended by the City Council after considering recommendations from citizens, appointed advisory bodies, other agencies, and City staff. As required by California Government Code Section 65400 and Land Use Element Policy 11.3 of the General Plan, the City publishes an annual report on the status of its General Plan and efforts to implement its policies. This report provides an opportunity to gauge the efficacy of both the actions taken to implement these policies and the policies themselves. Land Use Element Policy 11.3 stipulates that the annual report shall include the following: A) A summary of private development activity and a brief analysis of how it helped achieve General Plan goals; B) A summary of major public projects and a brief analysis of how they contributed to achieving General Plan goals; C) An overview of programs, and recommendations on any new approaches that may be necessary; D) A status report for each General Plan program scheduled to be worked on during that year, including discussion of whether that program's realization is progressing on schedule, and recommendations for how it could better be kept on schedule if it is lagging; E) A status report on how the City is progressing with implementing its open space preservation policies and programs; F) Updated population or other information deemed important for the plan. Housing Element Annual Report The City completes a separate Housing Element Annual Report that is submitted concurrently with the General Plan Annual Report as required under Government Code Section s 65400 and 65700. The Housing Element Annual Report contains detailed information on issued and/or completed residential building permits from the previous year. This information can be accessed on the California Department of Housing and Community Development (HCD) website. Page 185 of 248 General Plan Annual Report 2025 2 Background State law requires each city and county to adopt a general plan that addresses seven topics, typically referred to as “elements.” Additional topics, or general plan elements, may be included. The law also requires general plans to be comprehensive, internally consistent, and provide a long-term perspective. The California Governor’s Office of Planning and Research (OPR) publishes General Plan Guidelines, which include the following basics: • Geographic Comprehensiveness: The general plan must cover all territory in the jurisdiction’s boundaries. • Regional Context: The general plan must consider regional plans for transportation, air quality and water quality, and must spell out measures needed to meet federal or state standards for the region. • Issue Comprehensiveness: General plans must address the jurisdiction’s physical development over the long term, but because the general plan is the most comprehensive expression of the general welfare, it should also recognize social and economic concerns. • Internal Consistency: All general plan elements must be internally consistent. Each element’s data, analyses, goals, policies, and programs must be consistent and complement one another. This includes consistency with area and specific plans. • Long-Term Perspective: The general plan must address the welfare of current & future generations, although the timeframes may vary between elements. The Housing Element, for instance, must be updated every five to eight years. State law requires that a city’s general plan be kept current. The City of San Luis Obispo does so through this annual review process, comprehensive updates, and amendments. Updates to entire elements are done as needed and include an evaluation of underlying conditions and community preferences. Amendments are typically smaller in scope and involve changing one part in a way that fits within the overall framework. Consideration of amendments is triggered by private applications or by direction from the City Council. Changes to the City of San Luis Obispo General Plan require hearings by the Planning Commission and by the City Council. The type of notice provided for the hearings depends on the type of proposed change but always includes a descriptive item on the meeting agenda, which is published in the newspaper. The City’s website and public access television channel provide additional information. City of San Luis Obispo General Plan Elements Land Use Update Adopted 2014 Circulation Update Adopted 2014 Housing 6th Cycle Adopted 2020, certified 2021 Conservation and Open Space Revised 2014 Climate Adaptation and Safety Revised 2023 Parks and Recreation Adopted 2021 Water and Wastewater Revised 2025 Noise Adopted 1996 Page 186 of 248 General Plan Annual Report 2025 3 Planning and Building Activity Application totals are tracked in real-time via Community Development’s EnerGov permitting system. This data can serve as an indicator of development trends in the City, assist with budget forecasting, and provide insight into how this development has contributed to achieving General Plan goals. Yearly Planning Applications Received Figure 1 indicates all planning applications received in 2023, 2024, and 2025. This may include use permits, development reviews, subdivisions, zoning amendments, environmental reviews, and administrative actions. In 2025, the total number of planning applications received was 222, a decrease of approximately 16% from the previous year. Building Permits and Plan Reviews Building permits are issued for various projects, ranging from the relatively simple projects (e.g., water heaters, window change-outs, reroofing) to more complex projects (e.g., additions and new buildings). Plan reviews are typically required for the more complex projects, as it is necessary to examine submitted plans for code compliance. Table 1 shows the number of plan check applications conducted by the Building Division over the past three years. In 2025, plan check applications were roughly the same as in 2024, with no major increase or decrease. Table 1 - Plan Check Applications Submitted, 2023-2025 2023 2024 2025 Plan Check Applications Submitted 1,479 1,049 1,079 Source: Community Development Department, 2025 Figure 1 – Total Planning Applications Received per Calendar Year, 2023-2025 (Community Development, 2025) Page 187 of 248 General Plan Annual Report 2025 4 Table 2 shows the number of building permits issued for residential and commercial projects, as well as the number of expected residential units associated with these permits, over the past three years. In 2025, the City continued to see a gradual decline in the number of permits issued and a significant decrease in the total number of residential units. This decline is primarily due to a reduction in new multifamily and mixed-use permit issuances compared to the previous two years, while a steady decline in single-family permits continues as well. Table 2 - Building Permits Issued, 2023-2025 BUILDING PERMITS ISSUED 2023 2024 2025 Permits Units Permits Units Permits Units New Single-Family 136 136 119 119 83 83 New Accessory Dwelling Units (ADUs)1 73 86 88 96 99 104 New Multifamily & New Mixed-Use 7 148 13 234 6 11 Demolitions2 20 -3 25 -7 16 -6 New Commercial 6 - 5 - 6 - Residential Additions / Alterations 236 - 216 - 257 - Commercial Additions / Alterations 122 - 108 - 83 - TOTAL 600 367 574 442 525 192 Source: Community Development Department, 2025 1ADU unit totals come from ADU permits and new single-family permits, 2includes units lost from demolitions Valuation of Construction Construction valuation is a useful indicator of the level of private investment in building construction in the City. Table 3 shows the annual construction valuation over the past three years and indicates that total valuation has declined compared to last year. This decline is largely due to a reduction in permits issued. However, valuation for single-family and commercial addition/alterations increased, despite fewer permits issued, likely reflecting rising construction costs. Table 3 - Valuation of Construction, 2023-2025 VALUATION OF CONSTRUCTION 2023 2024 2025 Single-Family $31,956,590 $16,693,300 $22,705,700 Multi-Family $26,914,510 $57,011,615 $1,400,000 Commercial $41,871,000 $27,075,000 $12,140,000 Residential Additions / Alterations $11,494,439 $23,631,968 $12,531,181 Commercial Additions / Alterations $26,659,996 $30,689,344 $48,720,537 Total Valuation $138,896,535 $155,101,227 $97,497,418 Source: Community Development Department, 2025 Page 188 of 248 General Plan Annual Report 2025 5 Residential Growth The Land Use Element policy related to residential growth (LUE . . ) states that the City’s housing supply shall grow no faster than one percent per year, on average, based on the thresholds shown in Table 4 (Table 3 in the Land Use Element). Affordable dwellings restricted to residents with extremely low, very low, low, or moderate-incomes, new dwellings in the Downtown Core (including the C-D zone), and legally established accessory dwelling units are exempt from these regulations (M.C. 17.144.020.D). Table 4 – LUE Table 3, One Percent City Population Growth Projection Year Approximate Maximum Number of Dwellings* Anticipated Number of People 2013 20,697 45,541 2015 21,113 46,456 2020 22,190 48,826 2025 23,322 51,317 2030 24,512 53,934 2035 25,762 56,686 Estimated urban reserve capacity: 57,200 Source: Land Use Element, City of San Luis Obispo General Plan, Table 3, page 1-37. *2013 population based on CA Department of Finance data. Projected numbers are based on a one percent annual growth rate. As shown in Table 5, the City has maintained an average annual residential growth rate of 1.00 percent in dwellings since 2015. In 2024, the average annual residential growth rate exceeded the one-percent threshold by 0.03 percent. Staff attributed this to the near completion of several specific plan areas and anticipated that, once completed, the City would see a decline in the number of residential units produced, resulting in the average residential growth rate falling back below the one-percent threshold within the next few years. As shown in Table 2 (Building Permits Issued, 2023-2025), residential permits have continued to decline and are expected to continue this trend. Table 5 – Residential Growth Rates, 2015-2025 Calendar Year Period New Units Average Annual Growth Rate Total Units in the City in 2025 LUE Estimated Units in 2025 (1% Growth) 2025 174* 1.00% 23,292* 23,560 2015 - 2025 3,588 Source: 2025 Building Permits Finaled, Community Development Department *These totals exclude deed-restricted affordable units, accessory dwelling units (ADUs), and new dwellings in the Downtown Commercial (C-D) Zone. The all-encompassing unit total in 2025 was 24,399 units. Page 189 of 248 General Plan Annual Report 2025 6 From 2015 to 2025, the City granted occupancy to 3,588 newly constructed residential units, accounting for the 47 units demolished during that period. Of the 3,588 units constructed between 2015 and 2025, 2,522 were subject to growth management limitations. Of the units exempt from the Growth Management Ordinance, 589 units were deed-restricted affordable housing units, 497 were accessory dwelling units or junior accessory dwelling units, and 60 were located within the Downtown Commercial (C-D) zone. As of 2025, there are 23,292 residential units subject to the Growth Management Ordinance within the City (as shown in Table 5), compared to the 23,322 units projected for 2025 in the 2015 LUE. The City updated the General Plan Land Use and Circulation Elements in 2015; however, some of the housing construction occurring today within the Orcutt Area and the Margarita Area was planned for in the previous General Plan. Due to a variety of factors, some of the development originally planned in the 1994 General Plan is only now under construction. LUE Policy 1.11.2 (Residential Growth Rate) states that approved specific plan areas may develop in accordance with the phasing schedule adopted by each spe cific plan, provided that the thresholds established by LUE Table 3 are not exceeded. Of the 3,588 units granted occupancy from 2015 to 2025, 1,971 were located within Specific Plan areas. Non-Residential Growth Based on final building permits, 176,673 square feet of net new non-residential floor area were added to the City in 2025, resulting in an annual growth rate of 1.47 percent. Most of this increase is due to the completion of the Marriott hotel project in the San Luis Ranch Specific Plan area, which contains just over 120,000 square feet of non-residential floor area. Figure 2 illustrates the net annual non-residential growth rate from 2019 to 2025. Non-residential growth includes office, services and manufacturing, retail, hotel, and institutional uses. Figure 2 - Net Annual Growth Rates of Non-Residential Sectors, 2019-2025 Source: Building Permits Finaled, Community Development Department, 2025 Note: Demolition of nonresidential square footage included in calculations. 0.44% 0.29% 0.56% 0.71% 0.35% 0.60% 1.47% 0.00% 0.20% 0.40% 0.60% 0.80% 1.00% 1.20% 1.40% 2019 2020 2021 2022 2023 2024 2025 Gr o w t h R a t e Page 190 of 248 General Plan Annual Report 2025 7 Land Use Element Policy 1.11.4 states that each year the Council will evaluate the actual increase in non-residential floor area over the preceding five years. The Council shall consider establishing limits on the rate of non-residential development if the increase in non-residential floor area for any five-year period exceeds five percent. The five-year net non-residential growth rate from 2021 through 2025 was 3.15 percent. Each year, the City Council has considered implementing limits on new non-residential floor area and has decided against establishing such limits. If limits are established, they would apply only to certain types of new commercial floor area, such as new offices or new retail establishments outside the downtown core. Since the five-year growth rate is less than five percent (3.15 percent), establishing limits on new non-residential floor area is not necessary at this time. Housing Element Program Implementation Since adopting the Housing Element in November 2020, City staff has implemented numerous Housing Element Programs in alignment with the Housing and Homelessness Major City Goal s. Table 6 displays a list of programs that were implemented or started in 2025. Table 6 – Housing Element Program Implementation Progress, 2025 Safe Housing and Renter Protections Renter Protections Study Session: On October 28, 2025, City Council held a Study Session on Renter Protections. Staff presented Council with an overview of the various tenant protections in state law, as well as a variety of potential tools to improve conditions and protections for City renters, including a potential rental registry program. Healthy Housing and Innovation Cohort: In August 2024, the City was selected to join the National League of Cities Healthy Housing and Innovation Cohort to advance health outcomes and equity through improving healthy housing programs. The City’s team competed with other cities across the country, and won the second place prize of $20,000 in October of 2025 for the Green and Healthy Homes pilot program, which focused on creating a concierge service to provide energy upgrades to manufactured housing residents in the City. Program 1.6 Continue code enforcement to expedite the removal of illegal or unsafe dwellings, to eliminate hazardous site or property conditions, and resolve chronic building safety problems. Code Enforcement staff shall continue to provide property owners and tenants with information on how to rectify violations, who to contact in Code Enforcement for assistance, and other resources that may be pertinent to the citation. Policy 9.1 Residential developments should promote sustainability consistent with the Climate Action Plan (CAP) and California Building Energy Efficiency Standards (Title 24) in their design, placement, and functionality. Page 191 of 248 General Plan Annual Report 2025 8 Support Housing Solutions Maxine Lewis Apartments: In December 2025, the Maxine Lewis Grove Apartments opened, providing 40 new permanent supportive residential units. Tiburon Place: In July 2025, the Tiburon Place Apartments opened, providing 68 new permanent supportive housing units. Waterman Village: On December 11, 2024, the City Planning Commission approved the 20-unit below market rate tiny manufactured unit project on the site of the City-owned Rosa Butron historic adobe known as the Waterman Village. City Council upheld the Planning Commission’s approval of the project on March 5, 2025. The project is currently in the building permit submittal process. Housing Trust Fund Support: The City continues to provide $40,000 in operational support for the SLO County Housing Trust Fund’s efforts to provide below -market financing and technical assistance. Program 2.5 Continue to manage the Affordable Housing Fund so that the fund serves as a sustainable resource for supporting, at a minimum, 4 new affordable housing developments during the planning period. The fund shall serve as a source of both grant funding and belo w-market financing for affordable housing projects; and funds shall be used to support a wide variety of housing types at the following income levels: extremely low, very low, low, and moderate, but with a focus on production efficiency to maximize housing benefits for the City’s financial investment, and to support high-quality housing projects that would not be feasible without Affordable Housing Fund support Program 2.9 Assist with the issuance of tax-exempt bonds, tax credit financing, loan underwriting or other financial tools to help develop or preserve at least 20 affordable units annually through various programs. Program 2.11 In conjunction with the Housing Authority and other local housing agencies, continue to provide on-going technical assistance and education to tenants, property owners and the community at large on the need to preserve at-risk units as well as the available tools to help them do so. Program 2.14 Continue to support density bonuses for residential projects above the state density bonus allowance of 35% to promote the development of units for extremely low, very low, and low - income households. Policy 3.3 Encourage the construction, preservation, rehabilitation or expansion of residential hotels, group homes, integrated community apartments, and single-room occupancy dwellings. Policy 3.9 Work annually with non-profit organizations, faith-based organizations, or the Housing Authority of the City of San Luis Obispo to encourage rehabilitation of residential, commercial, or industrial buildings to expand extremely low, very-low, low-, or moderate income rental housing opportunities. Program 6.14 Continue to provide City resources, including $40,000 annually for operational support, to support the SLO County Housing Trust Fund’s efforts to provide below -market financing and technical assistance to affordable housing developers to construct or prese rve five affordable housing units per year in the City of San Luis Obispo. Page 192 of 248 General Plan Annual Report 2025 9 Homelessness Response Assisting the homeless and those at risk of becoming homeless : The City’s Homelessness Response Team continued to implement the 2024-2026 Homelessness Response Strategic Plan, which was adopted by the City Council on June 18, 2024. The Strategic Plan outlines objectives and key tasks to prevent and address homelessness in alignment with the Countywide Plan to Address Homelessness. More details are included in the following section. Community Safe Parking Pilot Program: On January 22, 2025, the Planning Commission approved Director’s Action applications for five sites as part of the Community Action Partnership of San Luis Obispo’s (CAPSLO) Community Safe Parking Pilot Program. CAPSLO implemented the pilot program in September 2025, utilizing three City-owned sites and three sites operated by faith-based organizations, including one faith-based site that is located outside of City limits. The program provides overnight safe parking for registered participants from 7 p.m. to 7 a.m. The long-term objective of the pilot program is to develop a safe parking model that can be replicated countywide to expand safe parking services throughout the County. Transitional and supportive tiny-unit housing: The City, as a California Encampment Resolution Grant subrecipient, continued to work closely with the County of San Luis Obispo on the Welcome Home Village project. The project will provide 14 interim and 40 permanent supportive manufactured housing units located within the City at the County Health Agency campus. On July 1, 2025, the City’s subrecipient agreement went into effect, and the City’s outreach teams began collaborating with the County and the project’s service provider, Good Samaritan Shelter, on encampment outreach and engagement efforts. The Welcome Home Village is projected to open in early May 2026. Permanent supportive housing motel conversion : The City and People’s Self-Help Housing (PSHH) continued to implement the Beacon Studios project, which will provide 75 permanent supportive housing units. The project is funded through the California Department of Housing and Community Development, which awarded the City and PSHH a $19.4 million Homekey Round 3 grant to convert the Motel 6 North into permanent supportive housing. The Beacon Studios project is projected to open in July 2027. Program 1.7 Continue to support local and regional solutions to homelessness by funding supportive program services and housing solutions. Policy 8.10 Assist the homeless and those at risk of becoming homeless by supporting 40 Prado Homeless Services Center and other local service providers, as well as advocating for additional safe parking, interim housing, and permanent supportive housing opportunities Countywide. Source: Community Development Department, 2025 Page 193 of 248 General Plan Annual Report 2025 10 Regional Housing Needs Allocation (RHNA) Progress Quantified Objectives California cities and counties must develop programs to meet their share of regional housing needs across all income groups. The California Department of Housing and Community Development (HCD) determines each region’s housing need, and councils of governments allocate those units among their member jurisdictions through the Regional Housing Needs Allocation (RHNA) process. RHNA ensures that each jurisdiction plans for housing consistent with its physical and financial capacity. State housing law clarifies that these allocations are planning goals, not production quotas. The allocations are incorporated into each jurisdiction’s Housing Element to guide policies and standards during the planning period. The City’s 6th Cycle RHNA allocation is 3,354 housing units, with 10 years to meet the requirement. The City counts building permits issued between January 1, 2019, and December 31, 2028, toward this allocation. Beginning in 2020, HCD also authorized the City to count half of all newly issued accessory dwelling unit (ADU) permits toward the low -income category, based on a market study conducted by the County of San Luis Obispo. Table 7 summarizes the City’s progress toward meeting its RHNA allocation. Table 7 - Progress Towards 6th Cycle Quantified Objectives, 2019-2028 Income Level (% of County Median Income) 6th Cycle RHNA Allocation Building Permitted Units Issued by Affordability Total Units by Income Level Total Units Remaining by Income Level Years 1 - 3 (2019-2021) Year 4 (2022) Year 5 (2023) Year 6 (2024) Year 7 of 10 (2025) Extremely Low Deed Restricted 825 14 36 0 123 0 173 500 Non-Deed Restricted 0 0 0 0 0 0 Very Low Deed Restricted 56 14 22 60 0 152 Non-Deed Restricted 0 0 0 0 0 0 Low Deed Restricted 520 42 21 5 15 0 83 211 Non-Deed Restricted 76 50 0 48 52 226 Moderate Deed Restricted 603 22 2 4 13 1 42 518 Non-Deed Restricted 0 0 43 0 0 43 Above Moderate - 1,406 1,411 439 293 190 145 2,478 0 Total Units 3,354 1,621 562 367 442 198 3,190 1,229 Source: Community Development Department, Building Permits Issued, 2025 Page 194 of 248 General Plan Annual Report 2025 11 The City has met its total allocation for above moderate housing units. This leaves 1,229 affordable units needed to meet the 6th Cycle RHNA allocation by the end of the 2028 calendar year. Of the remaining allocation, 39 percent of the units must be reserved for very low and extremely low incomes, 21 percent for low incomes, and 40 percent for moderate incomes. Below Market Rate (BMR) Housing (Commonly Known as Affordable Housing) In , the City followed the State’s lead in rebranding the often misunderstood term "affordable housing" as “Below Market Rate Housing.” Below Market Rate (BMR) means that the affordability level of a dwelling unit is below the cost of a comparable market-rate unit and includes a deed restriction to ensure the unit remains affordable to extremely low, very low, low, or moderate- income households. The City continues to implement its Inclusionary Housing Ordinance and promote opportunities to collaborate with non-profit partners to develop BMR housing projects. In 2025, two 100 percent BMR housing projects were completed (Maxine Lewis and Tiburon Place), resulting in 108 new units reserved for lower-income households. The City continues to assist in completing the three BMR projects currently under construction (Bridge Street, Beacon Studios, and Monterey Senior/Family), which will result in 275 units for lower-income households. Staff is also working on several new projects to ensure more BMR housing is provided in the City. These projects are listed in Table 8 below and show that, as of 2025, 357 new BMR units are planned for lower-income households. Table 8 – Active BMR Housing Projects in the Pipeline Projects Address Dwellings Status Bridge Street Mixed- Use 279 Bridge Street 94 Phase 1 – Under Construction Phase 2 and 3 – Seeking Financing Monterey Mixed- Use (Senior Phase and Family Phase) 1422 and 1424 Monterey Streets 106 Senior Phase – Under Construction Family Phase – Permitted, beginning construction March 2026 Avila Ranch – Sendero Apartments 165 Cessna Court 60 Planning Entitlements – Approved Building Permits – Awaiting Submittal Waterman Village 466 Dana Street 22 Planning Entitlements – Approved Building Permits – Under Review Beacon Studios 1433 Calle Joaquin 75 Planning Entitlements – Approved Building Permit – Issued, Under Construction Total 357 Source: Community Development Department, 2025 Page 195 of 248 General Plan Annual Report 2025 12 Third Party Below Market Rate Administrator The City of San Luis Obispo’s BMR housing programs are expanding, and oversight and enforcement are increasing to ensure that local affordable housing programs comply with State law. In 2021, the City contracted with HouseKeys to serve as the City’s BMR Housing Administrator and to manage its growing Affordable Homeownership and Rental Programs. This work ensures that units are marketed to the community in a fair and equitable manner and occupied by eligible households. HouseKeys also provides community members with the knowledge and support needed to successfully access homeownership and rental housing opportunities. Through HouseKeys, the City has conducted 58 Opportunity Drawings for inclusionary housing units across the City, including 24 drawings for homeownership opportunities and 34 drawings for rental opportunities. Funding and Grant Programs for Housing 1. Community Development Block Grant Program (CDBG): The CDBG program provides annual funding for eligible affordable housing projects and support for the 40 Prado Homeless Services Center. Over the past decade, the CDBG Program has allocated over $3,710,000 towards affordable housing and $1,160,000 towards homeless services. Projects funded for the upcoming 2025 Program Year include funding for CAPSLO and People’s Self-Help Housing for homeless services and homelessness prevention, funding toward the Monterey Family Housing project by the Housing Authority of San Luis Obispo, and funds to further implement the 6th Cycle Housing Element. 2. Prohousing Incentive Program Funding: In 2024, the City received designation as a Prohousing jurisdiction, which provides incentives to cities and counties in the form of additional points or other preferences in the scoring of competitive housing, community development, and infrastructure programs. Subsequently, the City applied for and was awarded $750,000 from the Prohousing Incentive Program. In 2025, the City successfully disbursed $400,000 of Prohousing Incentive Program funds to affordable housing projects, with additional disbursements anticipated in 2026. Homelessness Solutions The City’s 6th Cycle Housing Element includes policies and programs to reduce homelessness under Goal 1, Safety, and Goal 8, Special Housing Needs. Additionally, Homelessness Response remains a Major City Goal as part of the 2025-2027 Financial Plan. With the continued rise in homelessness across California, the City Council prioritized funding programs and resources to prevent and address homelessness in collaboration with the County of San Luis Obispo and local service providers. In local government, counties are primarily responsible for leading efforts to address homelessness; however, the impacts often are borne directly by cities. In 2025, the City responded to 104 encampment fires and 941 medical incidents involving people experiencing homelessness, removed 47 tons of trash, and posted, conducted outreach, and cleaned up 247 illegal encampments, with $49,879.20 in City funds spent on related cleanup and maintenance activities. The City also provided $412,005 to CAPSLO for programs and operations Page 196 of 248 General Plan Annual Report 2025 13 at the 40 Prado Homeless Services Center, including the 40 Prado Safe Parking Program, a hotel and motel program, the 40 Prado Warming Center, and the Community Safe Parking Pilot Program. Strategic Planning for Homelessness In June 2024, the City Council approved an updated version of the City’s Homelessness Response Strategic Plan for 2024-2026. The plan outlines objectives and key tasks to prevent and address homelessness in the City of San Luis Obispo . The Strategic Plan aligns with the San Luis Obispo Countywide Plan to Address Homelessness, which outlines key lines of effort to reduce homelessness by 50 percent between 2022 and 2027. Key components of the City’s plan include Regional Collaboration & Engagement, Communications, Data, Pilot Programs, and Funding Opportunities. Homelessness response activities in 2025 included regional collaboration on state funding opportunities to develop interim and permanent supportive housing; partnerships with community and faith-based organizations to implement a Community Safe Parking Pilot Program model; and distribution of the City’s Homeless Resources Pocket Guide, updated in English and Spanish, which contains critical information on how to access community resources for individuals experiencing homelessness. Staff also received and responded to 244 AskSLO requests from community members regarding transient activity on City property and general homelessness-related concerns. These requests were addressed through encampment cleanups, enforcement actions, and/or field outreach, and outcomes were communicated back to the reporting parties. Human Services Grant Program The City’s Human Services Grant (HSG) Program, overseen by the Human Relations Commission, provides financial support to non-profit organizations that promote the economic and social well- being of the community. The program’s funding criteria focus on homelessness prevention, including affordable and alternative housing, supportive services, and transitional housing. Other funding priority areas include hunger and malnutrition prevention ; supportive physical and mental health services; services for seniors, veterans and/or people with disabilities; supportive, developmental, and care services for children and youth; and services that encourage diversity, equity, and inclusion initiatives, including access to language services. The Human Services Grant Program is highly competitive and received total funding requests of $419,942, which was $269,942 more than funds available to the program. The Human Relations Commission reviewed 27 applications and recommended full or partial funding for 12 different organizations. The City has issued $150,000 in grants to those organizations since the approval of these funding recommendations. Page 197 of 248 General Plan Annual Report 2025 14 Community Action Team The San Luis Obispo Police Department’s Community Action Team (CAT) consists of one CAT officer, one Community Services Officer, one Licensed Psychiatric Technician from County Behavioral Health, and one Community Resources and Services Specialist. The team works to identify problems and crime trends that negatively impact the quality of life for residents, business owners, and visitors to the City of San Luis Obispo. In 2025, the CAT team engaged with 798 individuals, with 164 individuals electing to receive referrals to mental health and/or substance abuse services. Additionally, CAT facilitates family reunifications, and in 2025 reunited two individuals with family members across the United States. CAT works in collaboration with County Behavioral Health, social services agencies, local nonprofit organizations, and other City departments, utilizing a trauma-informed care approach to connect the City’s most vulnerable residents to resources and services. Partnerships with Downtown SLO and CAPSLO The City provides funding for the Downtown Clean & Safe Program, which is administered by Downtown SLO. The Downtown SLO Clean Team works to ensure that downtown is clean, safe, and welcoming to visitors — whether they’re living, working, shopping, or exploring downtown. The Clean Team provides cleaning services for sidewalks and alleys within the boundaries of the 24-block service area. This includes, but is not limited to, the removal of trash, graffiti, stickers, and human waste. In 2024, the Downtown SLO Board of Directors explored alternative options to further enhance the efficiency and effectiveness of the Downtown Ambassador and Clean & Safe Programs. Downtown SLO transitioned to a dedicated contractor cleaning service with CityWide Solutions to oversee cleaning duties. This shift allowed Downtown SLO to focus on maintaining a cleaner and more welcoming environment while ensuring consistent, high -quality service without the need to manage the day-to-day operations, hiring, and training of the Clean Team. By leveraging professional cleaning expertise, Downtown SLO can better meet the needs of the community and uphold the standards of cleanliness and safety essential to our shared spaces. In 2025, the Clean Team operated for a total of 1,672 hours and removed 7,741 pounds of trash; removed 693 graffiti tags; responded to and cleaned 1,394 cases of urine, vomit, and feces; cleaned public trash cans a total of 8,445 times; removed 2,744 pieces of gum; removed 18,696 cigarette butts; removed 1,658 stickers and flyers; and cleaned tree grates and wells a total of 2,277 times. Page 198 of 248 General Plan Annual Report 2025 15 The City also provides funding to CAPSLO for the 40 Prado Homeless Services Center, which provides overnight shelter and day services for unhoused community members, including housing navigation and case management. The Homeless Services Center also offers access to meals, showers, laundry facilities, healthcare, internet, and other supportive services. The City provides funding for the 40 Prado Safe Parking, Community Safe Parking, Warming Center, and Hotel & Motel Programs, which offer overflow capacity, services, and shelter for unhoused community members. Mobile Crisis Unit Embedded within the City’s Fire Department, the Mobile Crisis Unit (MCU) pairs a Community Resource and Services Specialist with a Licensed Psychiatric Technician (LPT) contracted through County Behavioral Health, as well as a part time Fire Department intern. The team responds to calls for service within the City and provides crisis support services to individuals experiencing non-emergency mental health challenges, drug and alcohol addiction, and chronic homelessness. In 2025, the MCU established 2,234 contacts with individuals experiencing homelessness; reunified 25 homeless individuals with agencies or family; provided 69 transports to services or alternate facilities; and responded to a total of 143 mental health crisis intervention calls for service. Inspection of Homeless Shelters (AB 362) Under AB 362, the City must follow up upon receiving a complaint from an occupant of a homeless shelter alleging that the shelter is substandard pursuant to California Health & Safety Code Section 17920.3. Code Enforcement received one complaint regarding the 40 Prado Homeless Services Center in June 2025. An inspection was conducted, and the complaint was determined to be unfounded. In June 2025, state legislature passed AB 130, which requires cities and counties to perform an annual inspection of every homeless shelter in their jurisdiction, even if no complaints have been filed by occupants. Code Enforcement conducted an inspection in December 2025 and found no violations. The Housing Team will file these inspection findings to HCD before the April 2026 reporting deadline. Coordination with Other Agencies City staff has continued to engage with other agencies and jurisdictions to foster collaboration aimed toward implementing General Plan policy: Regional Housing Action Team Representatives from San Luis Obispo County and its cities, including the City of San Luis Obispo, continue to implement the county’s first regional housing action team , as outlined in their respective Housing Elements. This collaboration has helped housing professionals in each jurisdiction navigate evolving housing issues and new state legislation aimed at removing housing barriers. Coordination through SLOCOG also facilitates the sharing of housing and transportation Page 199 of 248 General Plan Annual Report 2025 16 infrastructure data in preparation for the Regional Transportation Plan and future Regional Housing Needs Assessment allocations. Area Plan and Specific Plan Development The General Plan requires the approval of specific plans as a precursor to development of the City’s major expansion areas. Specific plans typically contain more detailed land-use and design standards than the General Plan and address the timing and financing of public facilities. Specific plans can supersede the Zoning Regulations or lead to amendments to the Municipal Code. The process of adopting a specific plan is similar to the process of adopting or amending a section of the General Plan. Margarita Area Specific Plan The Margarita Area Specific Plan (MASP) is located in southern San Luis Obispo, bounded by South Higuera Street, Broad Street, Tank Farm Road, and the South Hills ridge. Under Land Use Element (LUE) Policy 8.1.3, the MASP provides for residential units, a business park, a neighborhood park, sports fields, and open space. Over 40 percent of the land area is designated as open space, including 56 acres of parks. The policy also states that the City may consider the area appropriate for additional housing, but revisions to the MASP are required if development exceeds the plan’s current residential capacity The Airport Land Use Plan (ALUP) was amended in 2021. In response, City staff selected a consultant in 2024 to prepare amendments to the MASP to evaluate increased residential densities on already zoned land, encourage “Missing Middle” housing types, and allow mixed- use development on commercially zoned land. In 2025, staff continued working with the consultant on potential MASP amendments. Table 9 summarizes the status of current development projects within the MASP. Table 9 - Margarita Area Development Status, 2025 Projects Address Commercial Dwellings Status Prado Business Park 301 Prado 159,663 - Planning Entitlements – Approved Public Improvements - Under Review Building Permits – Expired 365 Prado Rd. Mixed-Use Project 365 Prado 100,000 222 GP and SP Amendments – In Process Planning Entitlements – In Process Total 259,663 222 Source: Community Development Department, 2025 Coversheet of Margarita Area Specific Plan Page 200 of 248 General Plan Annual Report 2025 17 Orcutt Area Specific Plan Nestled at the base of the Santa Lucia foothills, the Orcutt Area offers a variety of scenic resources for both residents of the area and travelers along Orcutt Road and Tank Farm Road, including views of Righetti Hill, Islay Hill, and the Santa Lucia foothills. Located along the southwestern edge of the city limits and bounded by Orcutt Road, the railroad, and Tank Farm Road, the area encompasses 230 acres at the base of Righetti Hill. The Orcutt Area Specific Plan calls for a residential neighborhood with up to 979 homes, a variety of housing types, parks, hiking trails, and recreational opportunities. These opportunities include bicycle and pedestrian paths, as well as protection of natural habitats and visual resources in nearby open space areas. Table 10 below shows the status of development in the Orcutt Area. Table 10 - Orcutt Area Development Status, 2025 Projects Address Dwellings Commercial Sq. Ft. Status Bullock Ranch 3580 Bullock 192 585 Planning Entitlements – Approved Public Improvements - Under Review Building Permits – Awaiting Submittal Pratt Property 3750 Bullock 35 3,400 Planning Entitlements - Approved Townhome Construction - Complete Live / Work units – Under Construction Building Permits for Commercial – Awaiting Submittal Enclave at Righetti 3805 Orcutt 34 Planning Entitlements - Approved Public Improvements – Substantially Complete Building Permits Issued – Under Construction Jones Mixed-Use 3806 Ranch House 15 7,600 Planning Entitlements – Approved Building Permits Issued – Under Construction; Three (3) affordable for-sale units construction complete Total 276 11,585 Source: Community Development Department, 2025 Linear Park Detail from Orcutt Area Specific Plan Page 201 of 248 General Plan Annual Report 2025 18 Airport Area Specific Plan Located approximately . miles south of Downtown San Luis Obispo, within the City’s Urban Reserve, the Airport Area Specific Plan (AASP) encompasses 1,500 acres adjacent to the San Luis Obispo County Regional Airport and is bordered by the Margarita Area, South Higuera Street, South Broad Street, and Buckley Road. The AASP envisions a mixture of open space, agriculture, business parks, and industrial development, as well as limited residential development. Plans for the Airport Area include the reuse and regeneration of the natural and built environment; enhancement of public, private, and environmental value; and smart, sustainable growth that benefit the community economically, aesthetically, and environmentally. Table 11 shows the status of development within the AASP in 2025. In 2025, the City Council adopted Ordinance No. 1747 (2025 Series), amending the AASP to allow mixed-use development in the Service Commercial (C-S) and Manufacturing (M) zones with a minor or conditional use permit where appropriate and consistent with the 2021 updated San Luis Obispo County Airport Land Use Plan (ALUP). The adoption of these amendments fulfilled Major City Goal of Housing and Homelessness work program 3.1.c. of the 2023-25 Financial Plan, which states: “Initiate an update to the Airport Area Specific Plan to allow mixed-use residential development, where appropriate and consistent with the County Airport Land Use Plan.” Table 11 – Airport Area Development Status, 2025 Projects Address Dwellings Commercial Sq. Ft. Status Tank Farm Commerce Park 179 Cross - 29,280 Planning Entitlements - Approved Under Construction 650 Tank Farm Mixed-Use 650 Tank Farm 239 18,600 Planning Entitlements – Approved Building Permits – Awaiting Submittal Public Improvements - Under Review 600 Tank Farm Mixed-Use 600 Tank Farm 280 12,500 Planning Entitlements – Approved, Modification in Process Public Improvements - Under Review SLO Airport Hotel 950 Aero 204 Rooms - Planning Entitlements – Approved Building Permits – Under Review Conserv Fuel Station 4600 Broad - 4,800 Planning Entitlements - Approved Under Construction U-Haul Personal Storage and Warehouse 1109 Kendall; 4805 Morabito - 114,368; 24,498 Planning Entitlements – Approved Under Construction Aerovista Medical Services and Offices 832 Aerovista - 41,007 Planning Entitlements – Approved Building Permits – Pending Submittal Earthwood Lane – Lots 16 and 17 4185 and 4195 Earthwood - 3,694; 3,764 Planning Entitlements – Under Review Total 519 252,511 Source: Community Development Department, 2025 Page 202 of 248 General Plan Annual Report 2025 19 Avila Ranch Development Plan In 2017, the City Council approved the Avila Ranch Development Plan to allow the development of 720 residential units and 15,000 square feet of neighborhood commercial uses on a 150-acre site located north of Buckley Road and within the boundaries of the Airport Area Specific Plan (AASP). Major Development review of the R- 2 portion of Phases 1-3 and the R-1 portion of Phase 5 were approved by the Planning Commission in 2021. The R-2 area includes up to 297 detached for-sale dwelling units. Building permits for this part of the project have been issued, and construction of the residential units and public improvements is underway. Approximately 200 residential units in Phases 1 and 2 have been completed and occupied to date. The R-1 portion includes 101 detached for-sale dwelling units, which have received entitlements but have not yet been constructed. An application for Major Development Review for the multifamily R-4 portion of Phase 3 was approved by the Planning Commission on February 14, 2024. The application included a density bonus request to add 20 affordable units to the site, bringing the total R-4 unit count to 85 market-rate rental units and 60 affordable rental units. Applications for Major Development Review and a Tentative Tract Map for condominium purposes for the multifamily R-3 portion of Phase 4 were approved by the Planning Commission on December 10, 2025. A total of 194 townhome-style residential units are included in Phase 4. With the approval of the R-4 density bonus, the total number of residential units entitled at Avila Ranch is currently 737. Phases 3 and 4 are fully entitled but have not yet begun construction. Conceptual Residential Street Scene from Avila Ranch Dev. Plan Phasing Map from the Avila Ranch Development Plan Page 203 of 248 General Plan Annual Report 2025 20 Mass grading for Phases 2-6 has been completed. Public improvements, including certain onsite improvements such as internal roads, utilities, and park and landscape areas, as well as certain offsite improvements, including the Buckley Road extension, have been substantially completed. Construction of the interim fire station at Avila Ranch is required to be completed by the developer prior to final occupancy of the 361st residential unit, which is currently anticipated in 2028. Table 12 shows the status on development in the Avila Ranch area. Table 12 - Avila Area Development Status, 2024 Projects Address Dwellings Commercial Sq. Ft. Status Avila Ranch SFR Phases 1, 2, & 3 (R-2) 175 Venture 297 - Planning Entitlements - Approved Public Improvements – Under Construction Building Permits Issued – Under Construction Avila Ranch Phase 3 (R-4) 175 Venture 145 - Planning Entitlements – Approved with 20- Unit Density Bonus Public Improvements – Pending Submittal Building Permits – Pending Submittal Avila Ranch Phases 4 (R-3) 175 Venture 194 - Planning Entitlements - Approved Public Improvements – Pending Submittal Building Permits - Pending Submittal Avila Ranch Phase 5 (R-1) 175 Venture 101 - Planning Entitlements - Approved Public Improvements – Under Construction Building Permits – Under Review Avila Ranch Phase 6 (Neighborhood Commercial) 175 Venture - 15,000 Future Phase Total 737 15,000 Source: Community Development Department, 2025 Page 204 of 248 General Plan Annual Report 2025 21 Froom Ranch Specific Plan A major component of the Froom Ranch Specific Plan is a Life Plan Community (LPC) known as Villaggio, which would provide 366 independent senior units, 38 assisted living units, 51 care facility beds, and a wellness center with ancillary services. In addition to the LPC, the Specific Plan includes approximately 174 multi-family units; 100,000 square feet of commercial retail uses; a 3.6-acre trailhead park that would incorporate onsite historic structures; and over 60 acres of land designated for conservation/open space. Consideration of the project included preparation of an Environmental Impact Report (EIR). The City Council certified the Final EIR and approved the Specific Plan, General Plan Amendment, pre-zoning of the property, and the Vesting Tentative Tract Map. The City Council authorized submittal of an annexation application to LAFCO in September 2020. An annexation application was filed in February 2021 and was approved by LAFCO in October 2021. The LAFCO conditions of annexation were completed, and the site was annexed into the City of San Luis Obispo in November 2023. Public improvement plans for on- and offsite roadway and utility improvements were submitted to the City for initial plan check in June 2023. The Froom Ranch project has been on hold for the past several years due to ownership changes and potential requests for modifications to the approved project entitlements. An application to initiate a Specific Plan amendment was recently submitted by the property owner, and City staff is currently evaluating the proposed changes. The City Council’s consideration of initiation of the proposed Specific Plan and General Plan amendments is expected to be scheduled for a public meeting late 2026 to determine whether the proposed legislative amendments should be accepted for processing. Froom Ranch Site Plan Page 205 of 248 General Plan Annual Report 2025 22 San Luis Ranch Specific Plan The San Luis Ranch Specific Plan project includes a mix of 654 residential units, 145,500 square feet of commercial, retail, and restaurant space; 100,000 square feet of office development; and a 200-room hotel. The public improvements have been completed, including utilities, landscaping, and the extension of Dalidio Drive and Froom Ranch Way. Building permits were issued in 2022 for the hotel, and construction was completed in 2025. The Agricultural Heritage and Learning Center (now known as SLO Ranch Farms and Marketplace) is open to the public and includes several new commercial buildings with restaurants, retail, and agricultural processing uses, along with the rehabilitation of historic structures. A total of 577 residential units have been completed and occupied within the San Luis Ranch Specific Plan area, including 296 multifamily units and 281 single-family units. Construction has not yet begun on the 64 to 77 affordable housing units required as part of the Specific Plan. In December 2024, the City Council authorized initiation of the processing of General Plan and Specific Plan amendments for San Luis Ranch to modify the uses planned for “Lot 7,” a vacant .44-acre commercial parcel. The developer has proposed replacing approximately 100,000 square feet of planned commercial uses with an additional 276 market-rate multifamily units. The project developer has not yet submitted applications for these amendments. Table 13 below displays the status of development in the San Luis Ranch Area. San Luis Ranch Site Plan Conceptual Rendering of the Agricultural Heritage and Learning Center (now known as SLO Ranch Farms and Marketplace) Page 206 of 248 General Plan Annual Report 2025 23 Table 13 – San Luis Ranch Area Development Status, 2025 Projects Address Dwellings Commercial Sq. Ft. Hotel Rooms Office Sq. Ft. Status Commercial Center 1035 Madonna 77 114,300 - - Planning Entitlements – Amendments in Process Public Improvements – Partially Complete SpringHill Suites Hotel - - 200 - Construction - Complete NG-10 Single-Unit Residences 198 - - - Construction - Complete NG-23 Single-Unit Residences 83 - - - Construction - Complete NG-30, The Orchard Multifamily Residential 296 - - - Construction - Complete Agricultural Heritage and Learning Center - 31,200 - - Construction - Complete Office - - - 100,000 Future phase, no building permits issued Total 654 145,500 200 100,000 Source: Community Development Department, 2025 Municipal Code Updates Energy Code & Reach Code Updates (Clean Energy Program for New Buildings) The City has a long history of local requirements for new construction that cost -effectively reduce greenhouse gas emissions through energy efficiency. On October 3, 2023, the City Council adopted an energy reach code for new buildings, which began enforcement on January 1, 2024, and is expected to result in lower building emissions. The reach code will remain in effect through December 31, 2025, when a new state energy code will be adopted. In 2024, the City Council adopted an energy reach code for major additions and alterations to single-family homes, which went into effect in early 2025 and also expired on December 31, 2025. Staff adopted an update to the additions and alterations reach code for enforcement in 2026 and will be working on updated new building reach codes throughout 2026. Page 207 of 248 General Plan Annual Report 2025 24 Amendments to Titles 16 & 17 Regarding ADUs and Urban Lot Splits On April 1, 2025, the City Council adopted a series of updates to the City’s accessory and junior accessory dwelling unit regulations, along with other miscellaneous items in the Zoning Regulations. These changes were made to maintain compliance with state law, provide clarifications, and identify and remove obvious barriers to housing development. This update also included revisions to the City’s Urban Lot Split regulations in Title 6 of the Municipal Code, implementing recent changes to state law. Climate Action Plan The General Plan includes climate action initiatives in the Land Use, Circulation, Conservation and Open Space, and Water and Wastewater Elements, including: • Land Use Policy 9.4 - Climate Action Plan: The City shall maintain and implement its Climate Action Plan to reduce community and municipal GHG emissions consistent with state laws and objectives. • Conservation and Open Space Policy 2.2.1 - Atmospheric Change: City actions shall seek to minimize undesirable climate changes and deterioration of the atmosphere’s protective functions that result from the release of carbon dioxide and other substances. • Conservation and Open Space Policy 2.2.5 - Model City: The City will be a model of pollution control efforts. It will manage its own operations to be as pollution free as possible. The City will work with other agencies and organizations to help educate citizens in ways to prevent air pollution. In 2020, the City Council adopted the Climate Action Plan for Community Recovery (CAP) and set the goal of achieving community carbon neutrality by 2035 (Resolution No. 11159,2020 Series). The City Council also adopted the Lead by Example Plan for Carbon Neutral City Operations in the summer of 2021 (Resolution No. 11263, 2021 Series), which established the goal of carbon- neutral municipal operations by 2030. As part of the 2023-25 Financial Plan, climate action was also identified as a Major City Goal (Climate Action, Open Space, and Sustainable Transportation), as well as in the new 2025-27 Financial Plan (Open Space, Climate Action, and Resilience). On December 13, 2022, the City Council adopted the Climate Action Plan 2023-27 Work Program (CAP Volume 3). In late 2025, staff initiated an update to the Climate Action Plan, which is expected to be completed in early 2027. Page 208 of 248 General Plan Annual Report 2025 25 Economic Development The City’s Economic Development Strategic Plan (EDSP) was adopted by the City Council in 2012, revised in 2015, and fully updated in 2023. The overarching goal of the plan is to advance the economic vitality of the City of San Luis Obispo and develop strategies that strengthen the City's economic development efforts while integrating the principles of sustainability, diversity, equity, and inclusion. Additionally, the EDSP emphasizes the retention of current businesses, the continued expansion of the arts and culture scene, and ongoing efforts to enhance the vibrancy of the Downtown area. The City has also recognized the need to expand the traditional scope of economic development to include practices that incorporate sustainability and social equity to maximize the community’s economic vitality. The EDSP establishes broad themes encompassing three key pillars and their associated action plans: Business & Entrepreneurship Vitality, Placemaking & Promotion, and Talent Development & Attraction. These pillars are intended to reflect the City’s priorities, as appropriate, while responding to its ever-evolving economic landscape. Careful consideration was given to ensure that the recommendations that follow fall within the scale and scope of the City’s economic development function. Many of the strategies in the EDSP are aligned with the policies in the Land Use Element. Progress on the implementation of the EDSP is published quarterly on the City’s website: Economic Development Strategic Plan | City of San Luis Obispo, CA. Tourism and Community Promotions The importance of the City’s Tourism and Community Promotions activities as an economic development function continued to be evident in Fiscal Year 2025 (FY25). As a result, the City collected a record-breaking $11.4 million in transient occupancy tax (TOT). This represents a 4.6 percent increase in revenue compared to Fiscal Year 2024 (FY24), which had previously been the best performing year in the City’s history. FY25 produced five $1 million revenue months – April, May, June, July, and August. This contribution of TOT revenue to the City’s General Fund is a direct benefit of tourism, as the full collection of TOT revenue is retained by the City. The FY25 occupancy level in the City was 2.9 percent higher than FY24, with an average occupancy rate of 70.05 percent for the year. During this same period, the Promotional Coordinating Committee (PCC) continued its commitment to enhancing the San Luis Obispo experience for residents and visitors. In October 2025, the PCC celebrated the third annual ARTober, a celebration of National Arts & Humanities Month. The events highlighted various arts, culture, and humanities experiences in San Luis Obispo. The PCC also continued the City’s Cultural Arts & Community Promotions (CACP) program, which provided $100,000 in vital promotional grants to local nonprofit organizations Visit San Luis Obispo Logo Page 209 of 248 General Plan Annual Report 2025 26 for programs that enrich the social, cultural, and diverse community events and activities available during this time. Also in FY25, the PCC directed the “Support Local” campaign through the Economic Development program, which included a multi-channel paid advertising plan, local public relations, a social media content strategy, and business support. In addition to implementing the sixth year of the Buy Local Bonus promotion, the City supported SLO Restaurant Month in January 2025. Policy Initiatives Cannabis Business Program Tax Revenue: The revenue generated from the City’s Cannabis Program helps support a variety of the City’s core services. This revenue is collected through taxes, licensing fees, and other financial mechanisms associated with the legal cannabis market. The City collected roughly $815,000 in tax revenue in Fiscal Year 2024-25 and is budgeting approximately $1 million in revenue for Fiscal Year 2025-26. Program Updates: Since the adoption of the Cannabis Program, staff has provided annual updates to the City Council, including policy recommendations to improve commercial cannabis administrative and operational processes. In 2025, staff presented the Annual Cannabis Business Program Update to the Council, including a review of operator permit changes, updates to cannabis tax and permit fee revenue forecasts, and recommended amendments to the cannabis zoning code to improve clarity in the Municipal Code and ensure consistency with state law. Historic Preservation An update to the Historic Resources Inventory was included as an implementation task under the City’s Major City Goal for Cultural Vitality, Economic Resilience, and Fiscal Sustainability in the 2023-25 Financial Plan. In 2025, Phase 1 of the project was completed. Phase 1 included updates to the City’s Historic Preservation Ordinance and Historic Context Statement. The City’s Historic Resources Inventory includes over 760 properties, the majority of which were added more than 30 years ago. The Historic Preservation Ordinance and Historic Context Statement provide the framework and regulatory guidance for determining which properties qualify as historically significant. Major updates to the Historic Preservation Ordinance included revisions to historic resource designations and evaluation criteria for historic significance to ensure greater consistency with guidance from the National Park Service and the State of California Office of Historic Preservation regarding the definition and evaluation of historic resources. Page 210 of 248 General Plan Annual Report 2025 27 The Historic Context Statement was revised to provide a more inclusive approach to preservation of the City’s resources and to align with updates to the Historic Preservation Ordinance. The updates expanded the discussion of themes related to minority and ethnic communities and integrated the contributions of San Luis Obispo’s Chinese, Japanese, African American, Filipino, and other communities into the relevant temporal and thematic contexts. Th ese changes recognize members of these groups as significant contributors to the City’s development whose social, economic, and cultural experiences are relevant to and reflective of broader themes. With the update of these documents, the City now has an updated framework and guidance for the next phase of the project (Phase 2), including review of the current Historic Resources Inventory, future surveys, and continued effective implementation of the City’s Historic Preservation Program . Staff will initiate Phase 2 of the project in mid-2026, and the project is expected to take 12-18 months to complete. The Historic Resource Inventory (HRI) Update project is consistent with various policies in the Cultural Heritage (Chapter 3) section of the Conservation and Open Space Element , including those related to the identification and preservation of historic resources. The project directly implements COSE Goal 3.2, which calls for the City to expand community understanding, appreciation, and support for historic and architectural resource preservation to ensure long- term protection of cultural resources. Water Supply In 2025, the City obtained water from four sources: the Salinas Reservoir (Santa Margarita Lake), the Whale Rock Reservoir, the Nacimiento Reservoir, and recycled water from the City’s Water Resource Recovery Facility (WRRF). Table 14 - City Water Resource Availability, 2025 Water Resource 2025 Annual Availability Salinas Reservoir (Santa Margarita Lake) and Whale Rock Reservoir 4,910 AF Safe Annual Yield1 Nacimiento Reservoir 5,482 AF Dependable Yield2 Recycled Water 354 AF 2024 Annual Usage3 Siltation to 2060 (500 AF) WWME Policy4 A4.2.24 TOTAL 10,246 AF Source: Public Works and Utilities Department, 2025 View of San Luis Obispo, Looking West Page 211 of 248 General Plan Annual Report 2025 28 1Safe Annual Yield is the quantity of water which can be withdrawn every year while operating both reservoirs in coordinated operations under critical drought conditions. The City’s Safe Annual Yield Model was updated in 8 to reflect drought conditions that ended in 7. 2Dependable Yield is the contractual amount of water the City has right to from Nacimiento Reservoir. During the 2025 calendar year, the Nacimiento Pipeline was offline for a portion of the year, during those periods the City did not receive source water from the Nacimiento Reservoir. City water supply was provided from the Whale Rock and Salinas Reservoirs, which provided sufficient supply for the City. 3The quantity of recycled water included is the actual prior year’s recycled water usage ( 243) per WWE A7.2.2. 4Reservoir siltation is a natural occurrence that reduces storage capacity over long periods, resulting in the reduction of safe annual yield. For 2025, availability from the City’s water sources totaled 10,246 acre-feet, as shown in Table 14. This supply meets the projected primary water supply need at General Plan buildout of 7,496 acre-feet, plus an additional 1,298.35 acre-feet for a reliability reserve and a secondary water supply of 1,452 acre-feet. The primary water supply was calculated using the City’s buildout population ( 7, people)1 and a water use rate of 117 gallons per capita, pursuant to Water and Wastewater Element Policy A 5.2.1 (Water Use Rate). The reliability reserve was calculated using the City’s estimated 2025 population (49,534) and 20 percent of the aforementioned water use rate. The secondary water supply includes the remaining water resources. Additional information is available in the City’s annual Water Supply and Demand Assessment. 1The City’s population projection of 7, persons, from the General Plan Land Use Element, is based on 1 percent growth annually between 2014 and 2035. By policy, certain housing types and areas are excluded from this growth rate and projection (affordable housing, etc.). The City’s estimated Primary Water Supply need is based on projected population but encompasses all water demand in the City (residential, non- residential, and irrigation). Whale Rock Reservoir Page 212 of 248 General Plan Annual Report 2025 29 Transportation & Circulation Sustainable Transportation was identified as a Major City Goal (Climate Action, Open Space, and Sustainable Transportation) as part of the Fiscal Year 202 2-23 Financial Plan and again in the 2023-25 Financial Plan. The following transportation planning and engineering projects and programs were implemented in 2025 as part of the City’s Sustainable Transportation Major City Goal, consistent with the Circulation Element of the General Plan. Vehicular Numerous traffic safety improvements were implemented as part of the City’s Traffic Safety Program to address collision trends and resident safety concerns. These improvements included striping modifications, sign replacements, and sight distance improvements at several intersections. Additionally, the City’s first Vision Zero Action Plan was released in draft form for public review in 2025. The Action Plan provides a comprehensive summary of current safety trends and a blueprint to guide priorities in engineering, enforcement, education, and post-crash care to improve traffic safety citywide. The final Action Plan is scheduled for City Council review in the spring of 2026. Additional vehicular projects and programs implemented in 2025 include: • Numerous traffic signal and intersection optimization improvements were completed as part of the City’s ongoing traffic signal management responsibilities. Traffic signal timings were adjusted at all City signals, and optimized signal coordination plans were implemented on the Johnson, Broad, Madonna, and Los Osos Valley Road corridors. • “Daylighting” improvements were implemented at intersections across the City. Daylighting prohibits vehicles from parking within 20 feet of marked and unmarked crosswalks, per State Assembly Bill 413. This improves safety at intersections by creating a clearer line of sight between drivers and pedestrians in crosswalks. • Traffic signal modifications were completed or are in progress at several intersections to address collision trends and improve pedestrian accessibility. These modifications include the addition of lead pedestrian crossing intervals and ADA- compliant audible pedestrian push buttons at multiple intersections. Striping and flex-post parking restriction to allow for pedestrian “Daylighting” Vision Zero Traffic Safety Program Page 213 of 248 General Plan Annual Report 2025 30 • Design for the roundabout at California and Taft Streets is complete, and acquisition of the remaining right-of-way is in progress, with construction expected to begin in 2026. • Prepared 38 Engineering and Traffic Studies to maintain enforceable speed limits and implemented speed limit reductions and/or speed limit visibility enhancements on 30 street segments, where permitted under California Vehicle Code requirements. • Issued 28 permits allowing residents to paint red curbs at their driveway entrances to improve sight distance. • Progress continues with preliminary engineering and environmental review for the Prado Road/US 101 Interchange Project, with a targeted construction start in 2029. • Final design, permitting, and right-of-way work continues for the Prado Road Bridge Replacement over San Luis Obispo Creek Project. Construction of the Prado Bridge Project is anticipated to begin in 2027 and is expected to be completed before the start of construction for the Prado Interchange Project. Bicycle/Pedestrian The 2024 Paving Project was completed in early 2025. The project included numerous traffic safety elements to improve mobility for all roadway users on Grand Avenue, Johnson Avenue, and various neighborhood streets, consistent with the Circulation Element, Active Transportation Plan, and Vision Zero Policy. It included the installation of a pilot road diet with new protected and buffered bike lanes and pedestrian/bicycle crossing enhancements on Grand Avenue; permanent improvements to retain a previous pilot road diet on Johnson Avenue; installation of an uphill bike lane on Highland Drive approaching Santa Rosa Street; Protected bicycle lanes and beacon crossings added to Grand Avenue Rendering of the Prado Road / Highway 101 Overpass Page 214 of 248 General Plan Annual Report 2025 31 and other minor complete street and safety improvements. Public outreach and design work continued through 2025 for the Higuera Complete Street Project. The project includes multimodal transportation and safety improvements along the Higuera Street corridor from Marsh Street south to the City limits. These improvements include several miles of protected bike lanes, more than 70 ADA curb ramp upgrades, enhanced pedestrian crosswalks at 40 locations, pavement repairs, traffic signal upgrades, and updated pavement surfaces and roadway markings. The project is supported by over $9 million in external grant funding. Environmental review and design are complete, and the project will be brought to the City Council for approval to advertise for construction in early 2026. Annual transportation safety educational activities continued in 2025, particularly with the development of the “Roll and Stroll” Bike and Pedestrian Resource Hub, which shares maps, information, tips, and how-to videos on biking and walking in San Luis Obispo. The Hub covers safety basics, understanding new facilities, and where to find additional education resources , including in-person classes. Activities in 2025 included Walk & Bike to School Days, Bike Month, Walktober, reflective Halloween bag distribution, Bike Light Education Pop-Up events, and other educational programs coordinated with Bike SLO County. Additionally, the City released a series of educational videos on bike and pedestrian safety topics, which will continue into 2026 and cover subjects such as safe riding and how to use new bikeway and pedestrian facilities. The City’s supply of short- and long-term bicycle parking continued to expand. Six new BikeLink lockers were installed at the parking lot at 1166 Higuera Street, providing secure and affordable long-term parking options in the downtown area. This brings the total to twelve such lockers in the downtown, in addition to the Marsh Street Parking Lot location. Bike valet parking service continued to be offered at the Farmer’s Market, Concerts in the Plaza, and other events, with a total of over 2,500 bikes parked in 2025. BikeLink Lockers at 1166 Higuera Rendering of the Planned Higuera Complete Streets Project Page 215 of 248 General Plan Annual Report 2025 32 SLO Transit SLO Transit operations in 2025 included the following: • In April 2025, the City Council adopted SLO Transit’s FY 6-30 Short-Range Transit Plan. The plan outlines service, program, and fare change recommendations aimed at meeting the City’s current and future public transit needs. Notable service change recommendations include the reinstatement of services suspended during the pandemic, more frequent service on Routes 2A/B, implementation of a new direct service to the Avila Ranch Specific Plan area, and a two-year microtransit pilot program. • In May 2025, the City took delivery of six new battery-electric buses to replace older diesel- powered buses. This purchase positions the City ahead of the state’s zero-emission mandates and advances its goal of achieving carbon neutrality by 2035. • Ridership continues to recover post-pandemic. SLO Transit reported over 660,000 passenger trips in Fiscal Year 2024-25, representing a seventeen percent increase compared to the previous fiscal year. • In August and September 2025, staff attended events at Laguna Middle School and Cal Poly to promote SLO Transit’s services, including the Laguna Tripper, which provides service to the middle school, and the 6 Express, which provides direct service between the campus and downtown on Farmers’ Market nights. • In November 2025, the City Council approved the release of a Request for Proposals (RFP) for transit operation and maintenance services. The RFP’s scope of services includes the service changes recommended by the Short-Range Transit Plan. Staff anticipate returning to the Council in April 2026 to award the contract, with service beginning July 1, 2026. • In December 2025, the City partnered with Rideshare’s Know How to Go campaign to offer free rides on the Holiday Trolley. During the 30-day holiday service period, more than 1,000 trips were provided at no cost to riders. New Battery-Electric Bus Page 216 of 248 General Plan Annual Report 2025 33 Parking Services Program Parking Services Program’s major focus areas in 2025 included: • Completion of the Technology Roadmap implementation, updating the parking technology used downtown to improve the customer experience. Improvements included digitizing garage permits, adopting a single mobile payment app for on-street parking, installing a consistent gated system in all public parking garages, adding new parking pay stations downtown, and enhancing security and customer service at all public parking garages. • In conjunction with the Technology Roadmap implementation, signage, equipment wraps, and public educational materials were standardized to improve communication and provide a consistent, easily recognizable downtown parking experience. • The final lighting, landscape, and striping improvements, as well as the demolition of the building and installation of six new BikeLink lockers, were completed at Lot 11, located at 1166 Higuera Street. This public parking lot provides long-term paid parking spaces on the eastern side of downtown. • The City continued construction of the Cultural Arts District Parking Structure, located at the corner of Palm and Nipomo Streets. This will be the City’s fourth parking garage and is expected to be completed in spring 2026. • Parking Services and the Mobility Services Communication Coordinator continue to collaborate with organizations such as Downtown SLO, the SLO Chamber, the Parking Steering Committee, and local business owners to keep them informed on all aspects of Page 217 of 248 General Plan Annual Report 2025 34 parking. This collaboration included the creation of informational flyers, business toolkits, and presentations. Staff have also provided ongoing public outreach through press releases, media campaigns, social media posts, flyers, updated signage, and in-person events. Safety Services Fire Department Climate Adaptation and Safety Element Policy OP-7.1 states that there should be adequate planning, organization, and resources for emergency preparedness and emergency response. Staff made several accomplishments in 2025 to meet this policy and has highlighted some of them below. Administration Public Information: In 2025, the San Luis Obispo Fire Department (SLOFD) continued to expand its Public Information services by increasing the Department’s communications capacity and public outreach efforts. This included an expanded social media presence , supported by a comprehensive social media calendar integrated into the City’s master communications calendar. The Department’s Administrative Specialist was responsible for social media content creation and external written communications, while the Emergency Manager conducted in- person television and radio interviews and served as the primary public-facing spokesperson. The Department also continued preparedness and safety interviews on KVEC and KNEWS radio. Since the Public Information Officer (PIO) role was formalized in late 2019, SLOFD has steadily improved its ability to deliver accurate, timely, and reliable information to the media and the public. Effective public information plays a critical role in reducing the severity of emergencies by educating the community in advance and enabling informed decision -making during incidents. Department social media analytics indicate that nearly percent of SLOFD’s followers are residents of the City of San Luis Obispo, demonstrating strong local reach and eng agement. Operations Emergency Response: In 2025, SLOFD responded to 7,344 incidents from four strategically placed fire stations throughout the City. This number is 4.85 percent higher than in 2024. Emergency response was accomplished with a daily minimum staffing of fourteen sworn personnel. To help maintain this daily minimum, the City continued its investment in two important programs: a functional movement program to reduce the occurrence and severity of physical injuries , and a Peer Support Team Program to maintain the mental health and well-being of department personnel. Page 218 of 248 General Plan Annual Report 2025 35 Open Space Rescue Operations: In 2025, the Fire Department’s Urban Search and Rescue (USAR) Team continued to play a vital role in protecting the lives of both visitors and residents. Members of the USAR Team receive specialized training in complex and technical rescue operations and participate in the San Luis Obispo County Regional USAR Team. The team consists of nine members, which increases the likelihood that multiple USAR specialists will be on duty on any given day, thereby increasing the Fire Department’s operational readiness. The Fire Department, along with its USAR Team members, responded to thirteen technical rescues and medical emergencies in open space areas in and around the City during 2025. Significant incidents included rescues on Cerro San Luis (Madonna Mountain), Bishop Peak, Irish Hills, Cal Poly, and Reservoir Canyon. The Fire Department’s open space rescue programs continue to evolve. Many of these rescues, particularly around Bishop Peak, require the use of a helicopter to locate, access, and transport victims. The Fire Department works closely with, and trains frequently alongside, the California Highway Patrol, which operates the rescue helicopter in the county. In addition to this collaboration with CHP for air resources, two key contributors to the continued success of the Fire Department’s open space rescue program have been the E-Bike Program and the Utility Terrain Vehicle (UTV) program. Both pieces of equipment have been invaluable in locating, transporting, and caring for people in open space in a timely manner. The UTV program is also utilized through Mutual Aid to assist neighboring fire departments. Mobile Crisis Unit: The Mobile Crisis Unit (MCU) responds to behavioral health incidents both proactively and reactively. Law Enforcement (LE) and Fire Service (FS) resources are often called to assist individuals in crisis, serving as a one-size- fits-all solution for issues ranging from homelessness to mental illness and addiction. As a result, many individuals are not connected to the most appropriate resources available. To provide more tailored support, the MCU pairs a Community Resources Services Specialist with a Fire Department intern and, as of October 2024, a Licensed Psychiatric Technician from County Behavioral Health. This model enhances service for those in need while reducing reliance on LE and FS resources, which have limited tools to address individuals in crisis. The MCU is staffed during peak activity hours, from 8 a.m. to 5 p.m., Monday through Friday, based on current SLOPD and SLOFD response data. Implementation of a 24/7 service may Open Space Rescue and Expanded Technical Rescue Team Mobile Crisis Unit Page 219 of 248 General Plan Annual Report 2025 36 eventually be warranted, depending on the program’s ability to meet community needs, reduce LE and FS resource impacts, and decrease hospitalization and arrest/jail time. In 2025, the MCU responded to a total of 143 calls for service and 2,234 field contacts. These field contacts enabled the MCU to provide transport to alternate facilities (other than local hospital emergency departments) a total of 69 times. Working with stakeholders, the MCU Team also facilitated the reunification of 25 individuals with their family, friends, or other out-of-area support networks. Training Climate Adaptation and Safety Element (CASE) Program OP-7.18 “Staff Training,” states that the City will train firefighters, police officers, building inspectors, and public works and utilities staff to levels appropriate for their tasks and responsibilities. As of 2025, the Fire Department employed 49 sworn positions and 12.5 non-sworn positions for a total of 57.5 full-time employees. Fire Department employees logged nearly 19,121 hours of training in 2025. Employees eligible to participate in the Joint Apprenticeship Committee (JAC) registered a total of 9,942 hours in 2025. The JAC provides reimbursable funds back to the department. JAC training resulted in over $47,000 in funds returned to the department in 2025, a $15,000 increase from 2024. These funds are held by the JAC program and can be used to support the department’s training program upon approval from the sub-JAC committee, which is comprised of department and labor group leadership. The department has also reached an Instructional Service Agreement (ISA) with Allan Hancock College, which allows it to receive compensation for the training of personnel who do not qualify for the JAC program. Non-sworn employees attended several key training courses in 2025 to maintain skill levels appropriate for their tasks and responsibilities. Some of this training included attendance at the biannual California Conference of Arson Investigators and State Fire Investigation training. Our Fire Mechanic staff attended training to maintain their certifications and to learn about new technologies in fire apparatus, including electric fire apparatus, which are becoming more common across the nation. Training Officer: The Training Captain oversees the Injury Prevention Program , which has continued to show success in reducing hours lost to work-related injuries. Prior to the start of the program in 2019, the Fire Department recorded 11,550 hours of work comp time lost. In 2025, comp time hours lost decreased to 3,487 hours, a 70 percent reduction. The new positions help provide consistent and reliable administration and coordination of all mandatory, recertification, and recommended in-service training and safety programs for emergency response, which is necessary as the increasing complexity and evolving service demands call for specialized instruction. In addition, the Fire Training and Safety Officer respond s to emergency incidents in the primary role of operational support and as the incident safety officer , identifying and addressing preventable accidents or potentially unsafe situations. The Training Captain oversaw a four-person recruit academy and continues to provide oversight of probationary firefighters during their rotations and testing at the six- and twelve-month marks of their probation. Page 220 of 248 General Plan Annual Report 2025 37 As part of the Injury Prevention Program, a new vendor, Pinnacle Fitness, provides more comprehensive physical examinations for all suppression members and fire prevention staff. The vendor offers in-house blood testing, physical exams, fitness assessments, cancer screening, hearing screening, and vision screening. The increased cancer screening aligns with NFPA recommendations for professional firefighters. The Deputy Chief manages the Fire Intern Program. In 2025, the Fire Department employed five interns, sponsoring two interns through a Firefighter 1 academy at Allan Hancock College. The program was expanded to include the fire prevention bureau, mechanic shop, MCU, and emergency management division. Fire interns were able to interview for areas in which they had particular interest or experience. Through the internship program, the Fire Department is a certified internship site for Cal Poly psychology students, currently providing a six-month internship for a psychology student. Interagency Training: The Training Division coordinated joint training with inter and intra- departmental entities, preparing our employees for all types of emergencies. Those included: • USAR H70 Helicopter Training - Irish Hills • Open Space Mapping - City GIS Department • County Structure Burn: Prepares members to extinguish and rescue victims from live structure fires. • Cal Poly Response: Training on Cal Poly Campus for various disciplines including open space rescue, technical rescue on campus, industrial accidents at the new dorm construction site, and large scale MCI response. Wellness and Fitness Initiative (WFI): The WFI program was created in 2018 to enhance the fitness, health, and wellness of Fire Department emergency response staff, strengthening the department’s ability to provide service to the community. In 2025, the wellness team helped provide funding for more comprehensive annual physical exams. California Incident Command Certification System (CICCS): The California Incident Command Certification System (CICCS) is a cooperative effort between the State Fire Marshal’s Office and the California Governor's Office of Emergency Services, Fire and Rescue Branch. CICCS is an all - hazard qualification and certification system that enhances the State of California’s ability to deploy firefighting resources to complex and catastrophic incidents with trained and qualified personnel. The system includes the development of personnel in key field positions of the ICS system, as well as minimum training standards, qualification s, and experience requirements when assigned to wildland/urban interface incidents. To achieve these standards and qualifications, personnel must meet the minimum requirements for each ICS position they choose to work in. Prospective candidates are required to complete Page 221 of 248 General Plan Annual Report 2025 38 multiple week-long classes, then submit an application that includes certifications from the required classes, documentation of experience, and a letter of support from their respective fire department. This application is reviewed by the CICCS committee for approval to become a trainee in the position. Trainees are then required to open a task book, which involves participating in all-hazard incidents under the supervision of a trainer. During this period, trainees are taught and evaluated on specific aspects of the position. Completing the task book often takes two or more years and multiple incident assignments. Once the task book is complete, all documentation is submitted to the CICCS committee for final review and approval to work in the position. These expanded roles provide personnel with greater depth of knowledge and qualification s, which further enhance departmental capabilities. By being qualified in multiple ICS positions, personnel can serve both within their department and in other jurisdictions in the event an incident, improving overall emergency response capacity. Emergency Management Climate Adaptation & Safety Element (CASE) Policy OP-7.1, Emergency Preparedness and Response, ensures that the City of San Luis Obispo and all relevant City departments maintain adequate planning, organization, and resources to effectively prepare for and respond to emergencies. In 2025, City staff made significant progress toward meeting this po licy through coordinated planning, training, public education, and emergency readiness initiatives, as summarized below. Coordinated Emergency Planning & Training: CASE Program OP-7.15 directs the City to operate within the Standardized Emergency Management System (SEMS), the National Incident Management System (NIMS), the National Response Framework (NRF), and to participate in periodic, multi-jurisdictional disaster response exercises. CASE Program OP-7.18 further requires the City to conduct Emergency Operations and Emergency Services response exercises for non - nuclear hazards, while also coordinating participation in requ ired nuclear disaster preparedness exercises. In , the City’s Emergency Manager ensured that the Fire Department maintained an effective and comprehensive emergency management program, including emergency planning, training, staff preparedness, community preparedness, and hazard mitigation project support. During the year, the Emergency Manager and San Luis Obispo Fire Department staff participated in multiple functional and full-scale emergency exercises, including a FEMA-evaluated Emergency Monitoring and Decontamination (EMAD) drill coordinated by the San Luis Obispo County Office of Emergency Services, a Cal Poly full-scale Emergency Operations Center (EOC) exercise, a City of San Luis Obispo EOC drill, and a First Responder Point of Distribution (FRPOD) drill focused on vaccine administration. These exercises strengthened interagency coordination, tested emergency communications and decision-making processes, and reinforced operational readiness across departments and partner agencies. The Fire Department continued close coordination with all City departments to ensure that employees, including City Council members, completed required SEMS and NIMS training. Completion of this training is a prerequisite for eligibility for Federal Emergency Management Page 222 of 248 General Plan Annual Report 2025 39 Agency (FEMA) disaster assistance. Staff also worked closely with Human Resources to integrate required disaster training into onboarding for new employees. This program will continue to expand with additional Disaster Service Worker (DSW) training citywide. The Emergency Operations Plan (EOP) describes the City of San Luis Obispo’s policies and concept of operations for responding to major emergencies or disasters that could affect the health, safety, and property of the public within the City and exceed the capabilities of day-to-day city operations. The EOP includes hazard-specific annexes, including Earthquake, Hazardous Materials, Multiple Casualty, Transportation, Fire, Civil Disturbance-Terrorism-Active Shooter, Diablo Canyon Nuclear Power Plant, Adverse Weather, Extended Utility Disruption, and Pandemic. This plan will be reviewed and exercised periodically and revised as necessary to satisfy changing conditions and needs. Preparedness Education: CASE Program MH-1.10 directs the City to work with community organizations to educate residents and households on strategies to increase preparedness for emergency events and climate-related impacts. In 2025, the Fire Department conducted a broad range of public education and outreach efforts to improve community disaster readiness. These efforts included wildfire preparedness events, community flood readiness outreach, the Fire Department’s annual Fire Prevention Week Open House, participation in a Parks & Recreation Monday Meet-Up event, and continued support of Firewise neighborhood education and engagement activities, including the countywide AlertSLO public notification program. In addition, the Emergency Manager conducted multiple preparedness-focused radio and television interviews to provide timely safety messaging and emergency preparedness information to the public. Staff also delivered preparedness presentations to the Downtown Business Association, church groups, and other community organizations, helping to extend preparedness messaging to residents, businesses, and vulnerable populations. Staff continued to disseminate preparedness flyers and videos developed through the Prepare SLO campaign to ensure the public had access to current and reliable information. These resources are available through the Fire Department’s website and social media platforms and support ongoing community awareness and resilience efforts. SLO Fire Dept. Preparedness Education Page 223 of 248 General Plan Annual Report 2025 40 Risk Reduction and Fire Prevention Hazard Mitigation: The most recent update of the City’s Hazard Mitigation Plan (HMP) was completed in 2025 as the Multi-Jurisdictional Hazard Mitigation Plan, which is pending adoption by the City Council after review and approval by the Federal Emergency Management Agency (FEMA) and the California Office of Emergency Services (CalOES). This HMP serves as the mandatory update to the City’s 2020 Local Hazard Mitigation Plan. The HMP is incorporated by reference into the CASE and should be consulted when addressing known hazards to ensure the general health and safety of people within the City of San Luis Obispo. It provides guidance on how to reduce the community’s vulnerability to natural hazards. The plan calls for annual stakeholder meetings at the County level to review progress and identify collaborative opportunities. The City is required to maintain a current HMP, which must be updated every five years, and in 2023 signed a letter of commitment to participate in the 2025 MJHMP update with the County of San Luis Obispo. Maintaining a current HMP allows the City to apply for State and Federal reimbursement in the event of a disaster. Program FI-5.12 of the CASE states that the City should continue to implement the City’s Community Wildfire Protection Plan (CWPP) to reduce wildfire risk in the City’s wildland-urban interface, including implementation of the CWPP Tactical Policy Measures that focus on four key policy areas: community education, fuels management, planning, and emergency response preparedness. As part of hazard mitigation, SLOFD finalized the City’s first CWPP in July 9. The CWPP is a collaborative plan designed to guide the City in addressing fire protection planning efforts to minimize wildfire risk to watershed lands, assets, firefighters, and the public. It presents the City’s physical and social characteristics, wildfire history, and evaluates landscape -scale fire hazard variables; utilizes priority landscape datasets to assess wildfire risk; identifies strategic measures for reducing structural ignitability; provides guidance for public education and outreach; and identifies fuel reduction goals and techniques for minimizing wildfire risk. The CWPP is intended to be a living document , managed and updated by the Fire Department with stakeholder input and involvement. Staff utilized the plan to act in 2025 to guide public education and fuel reduction efforts. City staff continued to provide wildfire preparedness tools to the community through news releases, webinars, social media, and a Wildfire Readiness Night held in June. The Fire Department also coordinated with the Office of Sustainability and Natural Resources and the Parks and Recreation Ranger Service to conduct fuel reduction efforts along San Luis Obispo Creek, the Irish Hills Open Space, San Luis Drive, and Cerro San Luis Open Space. Multi-Dwelling Property Inspection Program: Under the direction of the Fire Marshal, the Fire Prevention Bureau inspects all multi-dwelling properties (three or more units) in the City to ensure that they meet fire and life safety standards set by the California Fire Code. This state- Page 224 of 248 General Plan Annual Report 2025 41 mandated program helps safeguard residents and visitors who patronize local hotels and generates approximately $350,000 in annual revenue to offset implementation costs. The Fire Prevention Bureau conducted inspections of apartments, hotels, and fraternity and sorority houses in 2025, achieving 100 percent compliance. Fire and Life Safety Inspections: In 2025, 1,800 inspections were completed in the City of San Luis Obispo. These inspections included new and existing businesses, annual inspections, and fire and life safety systems. The Fire Prevention Bureau (FPB) maintained a 97 percent compliance rate for all fire and life safety systems in the City. Life safety systems include fire sprinklers, fire detection systems, and commercial kitchen hood systems. FPB staff also completed 428.66 hours of plan review. A portion of these inspections resulted in Fire Code operating permits, generating approximately $100,000 in annual revenue. Hazardous Materials Inspections: The Fire Prevention Bureau serves as a “Participating Agency” in the County’s Certified Unified Program Agency (CUPA). Businesses that use or store hazardous materials in appreciable quantities, generate hazardous waste, or operate underground or aboveground petroleum storage tanks are subject to inspection. The Hazardous Materials Coordinator conducted 325 facility inspections in 2025, an increase from 288 in 2024; of these, 109 were also Fire Department Operational Permitted Programs. The overall program generated approximately $214,000 in revenue in fiscal year 2024-2025. Vegetation Management: In July 2025, the Fire Prevention Bureau took a proactive role in weed abatement. The Bureau mailed 76 courtesy letters to property owners with a history of enforcement. Due to the early notification, only two dozen follow-up enforcement actions were required, resulting in compliance within 30 days. Vegetation management achieved 100 percent compliance across the City. The Fire Department continued to support the Natural Resources and Parks and Recreation Ranger Service in fuel- reduction projects within City-owned open space and creek corridors. In 2025, City staff conducted fuel reduction work along the Bob Jones Bike Trail and San Luis Obispo Creek between Prado Road, Los Osos Valley Road, and San Luis Drive. Staff removed dead and downed material and smaller vegetation from the creek, creating a shaded fuel break along the creek corridor behind the Water Resource Reco very Facility and other nearby critical facilities. Fuel reduction efforts also continued in the Bowden Ranch Open Space and Cerro San Luis Natural Reserve, with support from Ranger Service’s Open Space Technicians (supplemental staff positions) and assistance from California Conservation Corps crews. In the fall of 2024, staff received notification of a grant award from CalFIRE to purchase two large woodchippers to Bob Jones Trail Page 225 of 248 General Plan Annual Report 2025 42 support hazardous fuel reduction in high-fire-risk creek areas. The chippers were received in late 2025 and will be fully implemented in 2026. In 2025, the Fire Department worked closely with the County Fire Safe Council to support vegetation management projects through 2026, including planning and fuel-reduction efforts to reduce wildfire threats surrounding the City, with a strong focus on the Irish Hills, Miossi Ranch, and Reservoir Canyon areas. Grants secured through the Fire Safe Council funded hazardous tree removal throughout the City and grazing along San Luis Obispo and Prefumo creeks. Fire Hazard Severity Zones and WUI Code Implementation: In March 2025, the State of California released updated Fire Hazard Severity Zone (FHSZ) maps reflect ing the latest science on wildfire behavior, climate conditions, topography, and vegetation. These updated maps identify areas of elevated wildfire risk within the City of San Luis Obispo and serve as the regulatory basis for future wildfire-related planning, development standards, and community risk-reduction efforts. The maps identify more than 2,800 parcels within the City limits that fall within the Very High Fire Hazard Severity Zone (VHFHSZ). Following the release of the maps, the 2025 California Wildland-Urban Interface (WUI) Code was issued at the state level for adoption and implementation by cities beginning in January 2026. In October, City staff held a public study session with the City Council to explain the updated fire hazard maps and WUI code requirements and to clarify how state standards are applied and interpreted locally. This session was intended to support transparency, technical understanding, and informed policy decision-making. In November 2025, the City Council formally adopted the 2025 California WUI Code, along with the updated 2025 California Building and Fire Codes. Before and after adoption, the City leveraged publications, public messaging, and community outreach to inform residents, property owners, and development professionals about the changes and their future implications. To further support community preparedness and compliance, the Fire Department was awarded a FEMA Fire Prevention and Safety Grant in 2025. This funding enables the Department to begin offering voluntary Detailed Home Assessments to property owners, providing site-specific guidance on defensible space and home-hardening measures. These assessments are intended to help residents prepare for future wildfire resilience requirements, including anticipated legislation related to Zone 0 ember-resistant standards. 2025 Local Responsibility Area Fire Hazard Severity Zone Map Page 226 of 248 General Plan Annual Report 2025 43 Critical Facilities Locations and Reducing Structural Hazards: CASE Program OP-7.12 identifies City facilities that are essential to community function and emergency response and directs the City to avoid locating new critical facilities within designated flood hazard areas, wildfire hazard zones, earthquake fault zones, or other special hazard areas. Where critical facilities are already located within these zones, the program requires the City to identify and, where feasible, implement mitigation strategies to reduce associated hazard impacts. In 2022, City staff initiated a project in coordination with the California Joint Powers Insurance Authority (CJPIA) to install seismic sensors in select critical facilities to support rapid post- earthquake assessment of potential structural impacts. The sensors were installed, and the project was completed in 2024. In 2025, the devices were removed following the evaluation period, with lessons learned informing future approaches to post-earthquake structural assessment and critical facility resilience. Police Department CASE Program 9.4 states that the City will train police officers and other City employees to levels appropriate for their tasks and responsibilities. In 2025, the Police Department employed 63 sworn positions and 34 non- sworn positions, for a total of 97 full-time employees. As noted in the 2018 Capital Facilities Fee Program Nexus Study (i.e. AB 1600 Nexus Study), the service population totals a combined 72,800 workers and residents. With the current 63 sworn officers, the service level is a ratio of 0.87 sworn officers per 1,000 service population. At General Plan buildout, the service population is forecasted to grow by approximately 15,500 persons. If the same service level ratio is applied, the City would need 13 additional sworn officers by 2035. The Police Department had 59 sworn officers back in 2002 and has not experienced significant sustained growth in personnel over the past 20 years, while the City has continued to grow in area and population. In 2024, the Police Department completed a comprehensive staffing study that was presented to the City Council in January 2025. The study recommended 55 action items for the Department, including the addition of 14 full-time employees to enhance service delivery to the community, 11 of whom would be police officers. In 2025, the Police Department completed its second year of work effort on the five-year strategic plan. Year 1 and 2 action items included completion of a department-wide staffing study; use of data-driven policing tools to reduce crime; establishment of an online recruitment portal to enhance hiring efforts; improvements to the Department’s physical fitness facility; development of a central resource guide for employee wellness information; updates to body- SafeHub Seismic Sensor Page 227 of 248 General Plan Annual Report 2025 44 worn and in-car camera systems; exploration of options to enhance community communication; expansion of community presence; and enhancement of the Department’s training program. Staff Training: The California Commission on Peace Officer Standards and Training (POST), which mandates minimum content and hours for basic and in-service training, also regulates the training of police officers and communication technicians. In 2025, the Police Department maintained compliance with POST requirements for in-service training hours by sending employees to POST-certified courses on various topics - costs of which were reimbursed by POST - and by providing in-house training. Employees utilized a combination of online, in-person, and SLOPD-hosted training to ensure all staff maintained their required training hours. In 2025, the Department continued its commitment to having 100 percent of staff trained in Crisis Intervention Training (CIT). New employees are sent to CIT training as soon as possible to maintain a fully trained CIT staff. The primary goal of CIT is to reduce injuries to officers and mental health consumers during interactions, while appropriately redirecting consumers from the judicial system to services and support needed to stabilize them and reduce future police contact. CIT training ranges from 8 to 40 hours depending on the course, and the San Luis Obispo Police Department is committed to ensuring all staff receive the full 40-hour course as soon as possible. The San Luis Obispo Police Department (SLOPD) also conducts in-house training using employees who are certified instructors in a variety of police-related functions, including defensive tactics, mobile field force, active shooter response, and firearms use. In addition to standard police training, the Department continues to support training efforts related to the Peer Support Team, which was created to assist officers following tragic or traumatic events. The Peer Support Team is trained to address a wide variety of issues and can provide direct counseling or refer individuals to appropriate resources. The team also produces a monthly employee wellness newsletter to provide ongoing outreach and information to staff. Additionally, Peer Support has shared its expertise and experience with surrounding law enforcement agencies in response to critical incidents in those jurisdictions. Mutual and Automatic Aid – Police: Section 9.10 of the CASE indicates that the City will work with other jurisdictions to obtain and maintain adequate mutual-aid and automatic-aid agreements. The Police Department provides officers to assist surrounding law enforcement agencies with various special events, including parades, protests, and large-scale investigations. Typically, officers assist many local police departments, including Santa Maria, Pismo Beach, Paso Robles, Morro Bay, Atascadero, the California Highway Patrol, and the County Sheriff’s Department. In return, many of these agencies assist SLOPD with several of its large-scale events, including St. Patrick’s Day and the annual Holiday Parade. Page 228 of 248 General Plan Annual Report 2025 45 Since 2008, the City has participated in a regional Special Weapons and Tactics Team (Regional SWAT). The Regional SWAT team allows participating cities to leverage limited resources and maximize coordination and specialized expertise during critical incidents. The SWAT team responds to incidents throughout the county and conducts twice-monthly training exercises, along with scenario-based training days in conjunction with the City’s Crisis Negotiation Team. Community Action Team (CAT): The CAT Team continues to identify problems and crime trends that negatively impact the quality of life for residents, business owners, and visitors. The Team works collaboratively with patrol officers, investigators, the Neighborhood Outreach Manager, other City departments (Fire, Ranger Service, Public Works and Utilities, Community Development), social service providers, business groups, and other governmental agencies as appropriate to provide a trauma-informed care approach that connects the City’s most vulnerable residents to resources and services. The CAT Team has focused on individuals involved in adverse and repetitive criminal activities that negatively affect the community. In 2025, CAT engaged with 798 individuals and made 164 treatment referrals to mental health and substance abuse services. Additionally, CAT facilitated two family reunifications for individuals experiencing homelessness. The CAT Team includes one police officer, a Community Resources Officer, a Licensed Psychiatric Technician from County Behavioral Health, and a Community Resources and Services Specialist. Community Service Officers: The growth and rebranding of the Community Services Officer (CSO) program, formerly known as Field Service Technician (FST), was a strategic expansion aimed at tripling the program's capacity and enhancing the City’s commitment to the well-being of the Downtown Core and the broader community. Since then, the CSO program has played a pivotal role in delivering personalized services to the business community, residents, and visitors. The primary objective of CSOs is to address quality-of-life issues efficiently. These non-sworn officers promptly respond to both non-criminal and criminal infractions, including, but not limited to, drinking, smoking, noise disturbances, blocking the right-of-way, and minor disturbances of the peace. In 2025, the CSO program demonstrated significant impact and success in addressing crime and quality-of-life issues. CSOs have effectively responded to infractions and misdemeanors, contributing to a safer and more harmonious downtown environment. That year, CSOs issued 443 citations for offenses such as public alcohol consumption, littering, smoking, and unregistered vehicles, along with 189 cite-and-release arrests for alcohol, drugs, theft, tows, and trespassing. While many of these incidents reflect their dedicated efforts downtown, enforcement has been carried out citywide, and their presence has been felt through the rapid resolution of incidents. Community Service Officer Team, 2024 Page 229 of 248 General Plan Annual Report 2025 46 CSOs have actively engaged in building effective partnerships with various community stakeholders. This collaborative approach not only fosters a sense of community but also allows sworn police officers to concentrate on more serious calls for service. The CSO team maintains a visible presence in the community, utilizing a range of patrol tactics, including bikes, vehicles, and predominantly foot patrols. CSOs have proven to be a force multiplier for the Police Department, and the strategic allocation of these resources has improved overall service delivery, providing assistance more efficiently. The success of the expanded CSO program over the past few years represents a significant step toward creating a safer, more vibrant downtown community. This initiative has strengthened the bond between law enforcement and the community, fostering a collaborative and secure environment for all. Neighborhood Wellness Land Use Element Program 2.14 states that the City will help identify neighborhood problems and undertake a wide range of focused development review, capital improvement, and code enforcement efforts to help residents preserve and enhance their neighborhoods. Neighborhood Officer Program – Police Department In 2013, the Police Department launched a Neighborhood Officer Program that divides the City into distinct “neighborhoods,” each with dedicated patrol officers assigned to address neighborhood issues. The Neighborhood Officers act as liaisons between the Police Department, the community, and various City agencies. They have continued to serve as a consistent point of contact for residents needing assistance with a variety of quality-of-life concerns. Residents can contact their Neighborhood Officer directly through the City website. Code Enforcement – Community Development Department The City’s Code Enforcement Office reports directly to the Community Development Department’s Chief Building Official and is responsible for prioritizing, responding to, investigating, and enforcing the validity of all reported violations relating to several regulations. It is the goal of code enforcement to gain compliance utilizing the lowest level of enforcement mechanisms and techniques possible. Staff is responsible for ensuring compliance with state and local laws relating to: • Building and Zoning Requirements • Property Maintenance • Graffiti • Abandoned Shopping Carts • Conditional Approvals and Permits • Setbacks, Fence Height • Polystyrene/ Straws/Water bottle • Signs • Land Use • Health & Safety Concerns • Unpermitted Construction • Improper Occupancy • Substandard Buildings • Dangerous or Unsecured Buildings • Animal & Waste • Noise & Odor Page 230 of 248 General Plan Annual Report 2025 47 In 2025, Code Enforcement staff responded to 1,259 requests for investigation. This represents a 9.9% decrease compared to the previous calendar year; however, compared to the last five years, it represents a 121% overall increase from 2021-2025. In total, 163 Neighborhood Preservation cases and 183 additional Code Enforcement cases were opened during 2025. Additionally, 278 investigation requests resulted in confirmed violations and were resolved without escalated enforcement, resulting in a total of 624 cases addressing confirmed violations, as shown below in Table 15. Table 15 - Code Enforcement Statistics, 2021-2025 Source: Community Development Department, 2025 Neighborhood Outreach – Police Department Police Department SNAP employees (Student Neighborhood Assistance Program) continue to conduct parking enforcement and respond to noise complaints in neighborhoods during evening hours. In 2025, SNAP responded to 570 noise complaints and issued 300 Disturbance Advisement Cards (DACs). DACs are formal warnings that carry no financial penalty but place the property on the noise “no warning” list; future noise complaints are investigated by patrol. SNAP also continued parking enforcement in residential districts, issuing 3,626 citations in 2025 for violations such as no permit, fire lanes, blocking hydrants, and parking in disabled spaces without placard. In June 2025, Wilshire Community Services declared bankruptcy and closed. The SLO Solutions community mediation program, run by Creative Mediation was part of Wilshire, ceased operations with the closure. In December 2025, the Police Department, in collaboration with City Administration, Cal Poly, and Cuesta College, began discussions on revitalizing the community mediation program. Data for the first six months of 2025 for the SLO Solutions program was not available. Noise abatement in neighborhoods continues to be a priority for maintaing civility and community wellness. Figure 3 below provides a monthly overview of noise complaints throughout the year. Page 231 of 248 General Plan Annual Report 2025 48 Figure 3 - Monthly Noise Party Calls for Service, 2025 Voluntary party registration remains an effective tool for residents hosting social gatherings at their homes. Registration allows residents to notify SLOPD of their event so that, if a noise complaint is received, police dispatch can call the host and issue a 20-minute warning to reduce noise. In 2025, 4,453 party registration applications were received, 353 applications were approved, 50 warning calls were made, and six citations were issued to party hosts who did not heed their warning. Conservation & Open Space Conservation and Open Space Protection was identified as a Major City Goal (Climate Action, Open Space, and Sustainable Transportation) in the Fiscal Year 2023-2025 Financial Plan, as well as the new 2025-27 Financial Plan (Open Space, Climate Action, and Resilience). The General Plan includes numerous goals, policies, and programs focused on open space protection. These policies apply to sensitive lands within the City’s urban reserve , as well as to land in the San Luis Obispo Greenbelt that is protected for its biological, agricultural, aesthetic, and watershed protection value. Further details are provided in the Land Use and Circulation Element and the Conservation and Open Space Element. Highlights for 2025 include: Page 232 of 248 General Plan Annual Report 2025 49 • Righetti Hill: On May 13, 2025, the City hosted a ribbon-cutting ceremony for Righetti Hill Open Space and officially opened the 51- acre property to the public. The site, one of San Luis Obispo’s striking Morros, features over two miles of sustainably built trails. The City received a dedication of Righetti Hill within the Orcutt Area Specific Plan and Natural Resources, along with the Ranger Service staff to establish a new open space and trail system. The Righetti Hill Open Space Conservation Plan was adopted by the City Council in 2023. Phase 1 of the trail system and trailhead was completed in early 2024, with additional trails finished in 2025. • City Farm SLO: The City continued to support and partner with City Farm SLO to deliver sustainable agriculture education for students and the community, while producing healthy local food. In early 2022, a 40-year lease extension was granted to City Farm SLO reflecting the successful long-term partnership and City Farm SLO’s plans for significant capital improvements at the property. In 2024, City Council authorized a financial contribution by the City of San Luis Obispo to complete additional road maintenance on the driveway access from the end of Calle Joaquin to provide a 20-foot-wide all-weather access road on the City owned property. City Farm is currently constructing a 2,000 square foot agricultural pole barn structure onsite for storage and wash/pack operations for the farm. Architectural review was completed by the City in 2025 and 2026, as required by the lease agreement, and Building permits were issued for the new structure. The pole barn is being funded by a grant from the State of California Department of Food and Agriculture. The City will continue to further augment the efforts on the City Farm site with in-kind services and support as part of the Major City Goal work program. • Invasive Species and Restoration: The City continued invasive species vegetation control, focusing on French broom along Froom, Prefumo, and San Luis Obispo Creeks. Once the invasive plants were removed, native trees and vegetation were planted to restore habitat. Restoration efforts included the installation of butterfly gardens in City and neighborhood parks and medians to support the Mayor’s Monarch Pledge, a partnership with the National Wildlife Federation. With the installation of educational signage (in English and Spanish) and a demonstration nectar garden in Mission Plaza to educate visitors, staff plan to expand planting and educational efforts along the Mission Plaza Walkway with grant funding secured. Righetti Hill Open Space Ribbon-Cutting Ceremony Page 233 of 248 General Plan Annual Report 2025 50 • Cultural Fire: In December 2025, the City hosted a cultural burn at Johnson Ranch Open Space. The burn was conducted by the yak titʸu titʸu yak tiłhini Northern Chumash Tribe (ytt) with support from CalFIRE. It was the third Indigenous-led cultural fire hosted on City Open Space since the first burn in June 2024. In 2022, the City adopted the Climate Adaptation and Safety Element (CASE), which aims to incorporate traditional ecological knowledge - such as cultural burns - to help the community adapt to climate change. Good fire reduces fuel loads and decreases the likelihood of catastrophic wildfires that can cause safety risks, property damage, and poor air quality. Tinɨtyu ("Good Fire") can also enhance biodiversity, increase the abundance of foraged food, encourage the growth of high -quality plant material, reduce plant diseases and insect infestations, and improve hunting conditions. • Johnson Ranch Riparian Restoration: In 2025, the City continued implementing restoration work at Johnson Ranch. This project is funded by a $250,000 grant from the Wildlife Conservation Board and Point Blue Conservation Science. The approach relies heavily on City partners, such as ytt, who are leading perennial grassland restoration efforts on the banks of Dry Creek, while Nature’s Engineers installed and are maintaining 30 Beaver Dam Analogs (BDAs) in Dry Creek to retain water longer into the dry season, improve groundwater recharge, and improve steelhead habitat. ECOSLO is leading volunteer-driven native tree and shrub plantings in the creek corrridor. Together, these restoration activities sequester carbon while making Dry Creek and Johnson Ranch more resilient to climate change. Staff also continue to engage Cal Poly professors and students to provide hands-on education through the “Learn by Doing” approach in open space monitoring and restoration projects. • Staff continued to support the Public Works and Utilities Department in implementing the Stormwater Management Program as required by the Regional Water Quality Control Board (RWQCB). The program focuses on improving stormwater quality through Best Management Practices (BMPs), including construction site monitoring, municipal operations, development review, litter control, installation of projects addressing the Pathogen TMDL, and public participation to reduce pollution runoff. Johnson Ranch Open Space Cultural Burn at Johnson Ranch Open Space Page 234 of 248 General Plan Annual Report 2025 51 • Staff continued steelhead trout (Oncorhynchus mykiss) and Pacific lamprey (Entosphenus tridentatus) surveys along San Luis Obispo and Stenner Creeks with biologists from the California Department of Fish and Wildlife (CDFW) and the U.S. Fish and Wildlife Service (USFWS). Staff collaborated with CDFW to tag juvenile steelhead to better understand migratory patterns, timing, and population trends, and to expand future monitoring efforts. • Staff also began cataloging potential sites for new oak trees planting and initiated installation of oaks to expand the existing oak forest on several City open space properties, including Terrace Hill, Bowden Ranch, and Cerro San Luis. These projects were completed in collaboration with Rotary clubs, volunteers, and the California Conservation Corps and will support the City’s “ Tall” goal of planting , trees by . • City staff partnered with the California Conservation Corps (CCC) through the Greenhouse Gas Reduction Fund (GGRF) program to help implement the Wildland-Urban Interface (WUI) and Integrated Vegetation Management Plan for Open Space Lands of San Luis Obispo. Through this partnership, CCC members worked in Bowden Ranch to remove dead, downed, and burned material as well as ladder fuels following the October 2023 Lizzie Fire. Staff also collaborated with the FireSafe Council and PG&E on a major fuel reduction and cleanup effort in response to the fire and continue to additional projects to enhance community protection along the WUI. Parks & Recreation Throughout 2025, the Parks and Recreation Department offered programs and activities in senior programming, youth activities, and family-friendly community events, with an emphasis on community building to support objectives associated with the Parks and Recreation Blueprint for the Future (Element and General Plan), Major City Goals, and Local Revenue Measure G . The following sections highlight the divisions and programs that support the Major City Goals and the Parks & Recreation Blueprint for the Future. Community Programming Youth Sports: The City provides accessible recreational youth sports opportunities for children of all abilities and experience levels through instructional clinics and sports leagues that focus on building confidence, teamwork, integrity, and leadership skills. The City continues to work collaboratively with local youth sports groups, the San Luis Coastal Unified School District (SLCUSD), and the SLO County YMCA to meet community needs. Youth Sports Clinics, offered by Parks and Recreation staff, continued to provide a variety of sports and fitness activities in 2025. Throughout the year, eight separate clinics were offered twice a week, including pickleball, soccer, basketball, t-ball, and volleyball, serving over 125 youth athletes. Community Services staff provided two and a half weeks of full-day Summer Sports Camp during the summer, with 180 youth participants. This camp has quickly become a favorite summer option and is offered during the weeks when the Youth Services traditional summer camp is not in session, providing continuous childcare opportunities for the community. Page 235 of 248 General Plan Annual Report 2025 52 The Sports Division continued the long- standing San Francisco Junior Giants summer program (baseball and softball), serving 175 youth athletes and over 50 volunteer coaches. This free, non-competitive, eight-week program focused on skills and drills, training, gameplay, and weekly Junior Giants topics designed to build resiliency. Other annual youth leagues, offered in partnership with the Channel Islands YMCA (San Luis Obispo County), include the Basketball and Futsal leagues. The winter youth basketball league enrolled nearly 700 children, with 110 volunteer coaches. City staff served as weekly referees for Saturday games at five locations throughout the City. The spring Futsal program had over 370 youth participants and 55 volunteer coaches. The Division also provided focused, hands-on sports officials training before the start of the season and distributed communications to families and coaches outlining expected and appropriate conduct. Adult Sports: Adult recreational sports continue to provide the community with a variety of activities for both adult and senior populations. These activities include drop-in opportunities such as boomer softball, ultimate frisbee, table tennis, volleyball, dodgeball, and basketball. Scheduled community sports programs include adult soccer, offered in partnership with Central Coast Soccer, and affordable pickleball lessons through the SLO Pickleball Club. New in 2025, the Division launched an adult volleyball league, serving 80 players across 10 teams. The largest and most staff-intensive adult league is the year-round softball league, which consists of three seasons (Spring, Summer, and Fall) serving between 700 and 730 participants with 45- 50 teams per season. Games are held four nights per week, with Sports staff serving as umpires at all locations throughout the City. Softball League Champions Youth Futsal Game Page 236 of 248 General Plan Annual Report 2025 53 Community Building Programs: The Department continued to assess and expand accessible, low-cost activities that allow the community to connect and enjoy all that San Luis Obispo has to offer through enhanced year- round programming. Throughout 2025, staff coordinated popular community events, including the Leprechaun Lost event at the Farmer’s Market in March, the Spring Fling and Egg Hunt at Meadow Park, and the summer “Monday Meet-Up” nights at local parks, featuring music, food trucks, public art and activities. Highly attended fall events included the September Scramble, with over 600 participants, and the October Boo Bash, which featured a movie and haunted house and set a record attendance of over 600 community members of all ages. Contract Classes: The City’s external instructor partners offer a range of classes for youth and adults. Parks and Recreation staff coordinated over 750 class registrations for courses in art, dance, fitness, financial planning, and even surfing. Community Gardens: The five Community Gardens in the City continued to bloom with the support of staff through regular maintenance. Staff coordinated six volunteer workdays, as well as free composting days for gardeners through the City’s Hitachi Zosen Inova (HZI) program. With support from the garden intern, a quarterly gardening newsletter was produced, providing important reminders, seasonal tips and tricks, recipes, service opportunities, and highlighting a “favorite” garden plot. SLO Senior Center: The City continued to support senior programming and the Senior Center Board with a half-time Coordinator who continues to expand programs and services in partnership with the Senior Board. In 2025, City funded and coordinate programs included: • Family Trivia Nights: a multiage event held 19 times throughout the year. • Around-the-Town staff led tours; six different tours led throughout the year, including Dalidet Adobe Gardens and a downtown public art tour. • Family Barbecue events during the summer and winter. Leprechaun Lost Event at the Farmer’s Market Family Barbecue Event Page 237 of 248 General Plan Annual Report 2025 54 • Music and dancing events: six events including a partnership with the SLO Winds Orchestra. • Hiking and Walking Program: 12 SLO Hikers events and 10 SLO Walkers events, each led by City staff. • New Yoga for Seniors (and all ages) 11-month program. Jack House and Gardens: The Jack House Gardens event season was closed for most of 2025 due to a roofing project from March to August. During this time, the Volunteer Coordinator worked with the Jack House docents to inventory house items, prepare for upcoming tours, research other historical properties, and develop a framework for succession planning for a program that relies heavily on a volunteer docent coordinator. When the House reopened in the winter, it hosted the annual Holidays at the Jack House over a two-month period, with weekly attendance exceeding historical numbers, including over 120 visitors on any given Sunday. Youth Services School Year Childcare: During the 2024-2025 school year, childcare continued to be offered before and after school to children enrolled in grades TK through 6th grade at five San Luis Coastal Unified School District (SLCUSD) elementary school sites: Bishop Peak, CL Smith, Hawthorne, Pacheco, and Sinsheimer Elementary Schools (except for Teach Elementary, whose students are bussed to the nearby Pacheco Elementary site). To keep childcare costs low, increase access, and promote inclusion, staff continued to use a drop-in care registration system, allowing families to pay only for the time their child attends rather than registering by week or month. While this system requires more staff time and administrative effort, it benefits families by charging only for care used, rather than a flat “use it or lose it” rate, and allows more children to enroll despite fluctuating schedules. Programs continued to operate during traditional time frames: before school, midday for TK and Kindergarten students, and after school. Due to limited facility space at each campus, waitlists were managed throughout the school year. District construction projects at all of the school sites continued, resulting in shifting spaces to provide care. At two school sites, the licensed childcare program operated on the school stage, creating additional challenges, as the stage is a central location used for lunch, PE, or other programming while children were present. For the 2024-2025 school year, the District continued its partnership with the City to support younger students. Instead of the City providing family-paid childcare during traditional TK/Kinder program hours (8:30 a.m. to the start of the school day and from school dismissal until 2:50 p.m.), the District used Extended Learning Opportunity Program (ELOP) funds to cover childcare for all TK/Kindergarten students during this time. The District also extended the school day for Kindergarten students. This arrangement resulted in a Memorandum of Understanding (MOU), Page 238 of 248 General Plan Annual Report 2025 55 with the District paying directly for the costs associated with children attending during these program hours. During the 2024-2025 school year, 564 children were enrolled into the City’s licensed before- and after-school program (paid for by families or subsidized through CAPSLO or City scholarships), with 777 time slots of care provided. In addition, 438 TK/Kindergarten children received care during the District-paid hours (8:30 a.m.– 2:30 p.m.). Combined, the City provided daily care to more than 863 children - the highest number to date. Challenges in increasing attendance continued, as the school district is currently undergoing construction at all school sites using funds from a recent bond measure. As a result, some childcare programs have been confined to operating on a stage in a multipurpose room or sharing a classroom, with the understanding that opportunities for growth will follow once construction is complete. Summer and School Break Care: In summer of 2025, the City provided two camp models: the traditional summer camp program (Ultimate Day Camp, or UDC) and a summer school option offered in partnership with SLCUSD (Summer Fun Day Camp, or SFDC). UDC included seven weeks of full-day camp for approximately 105 children each week, featuring field trips, swim outings, and special on-site events. Staff coordinated field trips to locations throughout the City and County, including Mustang Waterslides, Avila Beach, the Santa Barbara Zoo, Boomers, and Mustang Lanes, as well as biweekly trips to the SLO Swim Center and Sinsheimer Park. Since the pandemic began, City transit and local buses have not been available for summer camp transportation. As a result, the program incurred additional costs to hire a charter bus, allowing children to participate in traditional field trips, including twice-weekly visits to the SLO Swim Center. Prior to the pandemic, the camp was held at Sinsheimer Elementary School, which allowed campers to walk to the SLO Swim Center. However, in summer 2025, Sinsheimer was unavailable due to construction, requiring the use of a charter bus for swim trips. For many campers, these outings provide their only opportunity to swim recreationally during the summer, as their families work and are unable to take them outside of camp hours. Ultimate Day Camp Attendees Page 239 of 248 General Plan Annual Report 2025 56 Enrollment in the package-price program decreased slightly in 2025, while participation in the District’s free summer school program increased. For SFDC, enrollment grew as the City partnered with the District to provide before- and after- summer-school care at two school sites. Although the program was free for participating children, the District paid the City directly for services using ELOP funds, with more than 400 children participating at the two sites before and after summer school. New this year, the District asked childcare staff to provide a two-week “extended day” program at SFDC. During this period, City staff delivered curriculum for summer school students as part of their educational experience, rather than solely providing before- and after-school care, Due to the District’s need for additional staffing support. For those two weeks, the City served nearly 200 registered children and an additional 400 non-registered students for the full day, while also continuing to operate the full-day UDC program. Other programs during the school year included Teacher Workday Camps and a week-long Spring Break Camp for school-aged youth, collectively serving 285 participants. In addition, the Division provides extended childcare hours during the District’s early release days, as well as numerous onsite special events. The Division also hosted its third annual “Family Fest” in December, where families made gingerbread houses and participated in a silent auction featuring items donated by local businesses, with all proceeds supporting Youth Scholarships. Subsidized Childcare: The City continues to partner with Community Action Partnership (CAPSLO) and Childcare Resource Connection to provide subsidized childcare. Children who qualify through CAPSLO may attend childcare at no cost, and the City applies to CAPSLO for reimbursement (unlike other participants, who are required to pay prior to attendance). In 2025, 62 children received subsidies through CAPSLO. The Youth Services Division also manages a registration scholarship program. In the 2023-2025 Financial Plan, the City Council approved $20,000 for youth scholarships. In 2024-2025, 38 families received $33,500 in scholarship support. Childcare Staff: All Youth Services programs are supported by up to 70 supplemental staff, ranging from entry-level Childcare Aides to Childcare Head Teachers and full-time Site Directors. Staff turnover since fall 2024 has resulted in the hiring of 200 part-time staff members during the year. Each time a supplemental staff member is onboarded, the Youth Services administrative Summer Camp 2025 Enrollment Advertisement Page 240 of 248 General Plan Annual Report 2025 57 team and Parks and Recreation administrative staff spend approximately 60 hours total per employee on onboarding and training. Staff receive ongoing instruction to ensure programs remain consistent with Department and State licensing standards. Training topics include Positive Guidance, Safety and Accountability, Mandated Child Abuse Reporting, and Pediatric CPR/First Aid. In addition to supplemental staff, each school site is supervised by a Site Director who is responsible for up to 150 children throughout the day, ensuring state licensing compliance and staff oversight. Due to current staff shortages, all Site Directors, along with full-time positions such as Program Assistant, Recreation Coordinator, and Recreation Supervisor, are providing direct care to children. Volunteers & Training The Citywide Volunteer Program continued to expand under the leadership of the Coordinator. Volunteers support the advancement of City projects and Major City Goals, working alongside staff on a regular basis, at single-day events, and through recurring opportunities. In 2025, an average of 150 volunteers served each month, contributing more than 8,600 volunteer hours. Fifteen different City teams engaged volunteers throughout the year. Volunteer opportunities included recurring administrative support across several departments, regular Trail Service Days with the Rangers, and service with the dedicated Jack House docents. Several groups continued to participate in the Adopt-A-Park program, and due to its success under the Volunteer Coordinator’s management, additional initiatives expanded to include Adopt-A-Trailway and Adopt-A-Storm Drain. Volunteers served throughout the City as visual arts volunteers, supported graffiti abatement efforts, assisted at Whale Rock Reservoir, promoted recycling education at downtown events, and provided coaching through sports leagues, among many other roles. Single Day of Service opportunities included Pumpkin Smash, September Scramble, Boo Bash, Leprechaun Lost, garden service days, public art maintenance, and more. Open Space Maintenance The Ranger Service accomplished significant goals in 2025, including creating new and upgraded trails, and continued to provide educational and recreational opportunities to the San Luis Obispo community. The City's 4,050 acres of designated open space and more than 68 miles of trails are designed to provide access for a variety of abilities and experiences, ranging from easy to rugged hiking trails, introductory to advanced mountain biking, and scenic pathways located within minutes of residences and businesses. City Volunteer Assisting with Administrative Duties Page 241 of 248 General Plan Annual Report 2025 58 The Ranger Service led monthly educational hikes throughout City open spaces, hosted more than 50 community and volunteer workdays, promoted educational “Wilderness Wednesdays” through social media to engage and educate the community, and conducted Junior Ranger Camps during the summer. In 2025, more than 1,000 hours were devoted to public education, focusing on conservation and the local history of flora and fauna specific to each open space property. Dedicated community volunteers worked alongside Ranger staff on trail maintenance projects at Johnson Ranch and Miossi Open Spaces, the Irish Hills Natural Reserve, and a new switchback trail in Bowden Ranch. Ranger staff also partnered with Natural Resources and the Fire Department to support a second collaborative cultural burn with the Chumash Tribes at Johnson Ranch Open Space in fall 2025. A major internal project - the creation of the first formal bike park at Laguna Lake Park - continued into 2025 with additional phases and upgrades. The project fulfills a key objective outlined in the Parks & Recreation Blueprint for the Future (Master Plan and General Plan Element), as bike park amenities ranked among the top five community requests. The bike park includes the Mountain Bike Loop, a Kids Pump Track, and two jump lines (Progressive and Advance). The next phase will add an intermediate (all- ages) pump track. In fall 2025, the Laguna Lake Bike Park received a Facility Design Award for Innovation from the California Parks and Recreation Society, District 8. The popular Winter Evening Access (WEA) Program at Cerro San Luis Natural Reserve allows for extended evening hours of passive recreational use along approximately 4.9 miles of City-managed trails during the winter months (November – March), when daylight savings time is not in effect. During this period, public use is extended to one hour before sunrise and until 8:30 p.m. During daylight saving time, public use hours return to one hour before sunrise through one hour after sunset. Nighttime use is by permit only and limited to 65 people per evening, based on prior conservation review. Free permits for biking and hiking are available up to one week in advance through the City website. Ranger staff are present at the trailhead to check permits and educate the public during the Winter Evening Access program. Mission Plaza Concessionaire Kiosk After bringing the RFP forward for approval in May 2025, the City received nine vendors, five of which were selected to move forward with in-person interviews. In late August 2025, a committee of City staff, SLO Chamber of Commerce representatives, and Downtown SLO staff selected Linnaea’s Café as the preferred vendor for the kiosk. The lease agreement was finalized in December 2025. Staff anticipate that tenant improvements to the kiosk will take 3-4 months, Laguna Lake Bike Park Page 242 of 248 General Plan Annual Report 2025 59 with a projected opening in Summer 2026. The concessionaire will collaborate with organizations hosting special events in the plaza to support plaza activation. Laguna Lake Dog Park The long-awaited new dog park project was approved for construction in fall 2024 and opened in May 2025. The three-acre park features full perimeter fencing with separate areas for small and large dogs. Each area includes ground improvements such as turf and mulch, as well as an improved drainage system for year-round use. New dog agility structures were assembled through a partnership with local organizations and schools to provide features for play and training. The project received a park design award from the California Parks and Recreation Society District 8 in November 2025. Orcutt Area Parks (Righetti Park System) In July 2021, the City Council approved the development of a multi-park system as part of the Orcutt Area Specific Plan, specifically within the Righetti Ranch Neighborhood. The design process continued with an in-person community workshop in April 2023, which provided updated construction designs. The proposed parks in this area include a comprehensive community park, a linear park, a pocket park, and a formal trail junction. An RFP for the project was issued in summer 2025, and the project was approved for construction, including funding authorization for the first three of five phases, in December 2025. Construction is set to begin in late spring 2026, with pickleball courts, a multi-age playground, restrooms, athletic turf fields, and bike park features planned for completion in fall 2027. The recreation amenities support the Parks and Recreation Blueprint for the Future (General Plan and Element), with future phases to include tennis courts, basketball courts, additional restrooms and parking, a dog park, and community gardens. Orcutt Area Park System A Good Dog Enjoying the New Agility Course Page 243 of 248 General Plan Annual Report 2025 60 SLO Swim Center In 2025, the popular SLO Swim Center continued to provide a wide range of community-focused aquatic opportunities, including lap swimming, recreational swimming, group and private swim lessons for all ages, aquatic fitness classes, SCUBA, and various programs for the warm- water pool. In summer 2025, the Swim Center partnered with three nonprofit organizations - GALA, Central Coast Autism Spectrum Center, and SLO County Friday Night Live - to offer unique recreational swim opportunities and modified swim lessons throughout the year, increasing lesson availability for the community. The Super Rec Saturdays featured an inflatable obstacle course and family-focused themed activities, with attendance averaging 500 to 800 participants per event. Staff also partnered with the SLO Seahawks to operate a snack bar during each event. The Aquatics Division continues to promote water safety through social media and the “Designated Water Watcher” program, which can be used at alternate water locations. This program provides tools to enhance water safety through proper swim instruction and educatio n. The SLO Swim Center currently serves as the lifeguard training hub for San Luis Obispo County, with the Aquatic Coordinator acting as the regional Red Cross Instructor Trainer. This prestigious certification allows the Swim Center to be a focal point for water safety within the region. Laguna Lake Golf Course The Laguna Lake Golf Course (LLGC) provides affordable programs and services seven days per week. During the past year, community use continued to grow, with just under 25,000 rounds played in 2025. Staff implemented a variety of community programming at the golf course, including upgraded mats at the driving range, seating and pitching area improvements, all-ages golf lessons, Laguna Middle School PE classes, the SLO High School golf program, Cal Poly kinesiology classes, free classes for the SLO County Special Olympics, free youth golf clinics through the First Tee program, and hosting special events such as the September Scramble and a county-wide cross-country youth competition. General maintenance and operations of the golf course continue to be impacted by aging irrigation systems, which require additional maintenance and increase operational Swim With Pride Rec Swim Event Upgraded Mats at the Driving Range Page 244 of 248 General Plan Annual Report 2025 61 costs, as well as rising water expenses. The Pro Shop facility remains closed due to major flooding from a significant winter storm in December 2021. Golf Operations are currently conducted from a temporary onsite office trailer, supporting golf reservations, rentals, and merchandise sales. Design of the new Pro Shop is scheduled to begin in mid-2026, with construction anticipated in 2026-2027. Winter 2023 storms created a significant safety hazard for the pedestrian wooden bridge, as creek embankments were compromised. The bridge connects holes one and two and provides access to holes three through five. Staff modified the course to provide alternate access and resume play for golfers. Bridge replacement is currently scheduled for summer 202 6. Public Art Program Outreach: The City Public Art Program plays a key role in the community and supports the Major City Goals of Diversity, Equity, and Inclusion (DEI) and Economic Development. City collaborations included internal partners - Public Works and Utilities, Community Development, Tourism, Communications, and DEI - as well as external partners and collaborators, including the SLO History Center, GALA, SLO Arts Council, The Bunker, SLO Senior Center, regional, state, and nationwide Public Art Administrators groups (all coordinated by the City’s Public Art Coordinator), numerous local artist groups, the San Luis Obispo Museum of Art, and many more. Public Art staff were invited to speak at both Laguna Middle School and SLO High School during tutorial periods to provide an overview of the Box Art program, ways to get involved, and opportunities for careers in the arts. Staff were also invited to present at other local and statewide events, including the California Parks and Recreation Society Fall Forum. Box Art Program: 2025 marked the 15th year of the Box Art program in San Luis Obispo, the oldest in California. This year also served as a revitalization of the program, beginning with the definition of “cultural districts” for box assignments. A call for artists in the winter/spring of 2025 resulted in over 80 submissions for 20 spots. Prior to the close of the call, City staff, along with local photographers, representatives from the vinyl wrap company, and tech experts, held workshops to support artists in submitting their work. A jury of 16 community members - including representatives from the Chumash Tribe, local Chinese-American community, GALA, the SLO History Center, downtown businesses, and others - spent a full day selecting pieces based on cultural representation, diversity of expression and medium, and overall aesthetics. 15th Anniversary of the SLO Box Art Program Page 245 of 248 General Plan Annual Report 2025 62 Once all boxes were installed, the City continued to celebrate the 15th anniversary with new swag, including playing cards and coloring books. Additionally, the first-ever “Meet the Artist” event was held downtown in October 2025, during National Arts and Humanities Month, and the annual Artist Appreciation event in December 2025 recognized both new and deaccessioned Box Art artists. Throughout the year, City staff hosted numerous walking tours of Box Art for the community, with over 20 attendees participating. Other City installations and projects: The North Chorro Street underpass project was completed, featuring the mural “In the Shadow of the Mountain” by local group Marmalade Mural Co. and bronze work by Thiessen Metal Works. This collaborative mixed media art installation celebrates one of the most locally treasured natural landmarks, Cerro San Luis Obispo Mountain. The mural depicts flora and fauna native to the surrounding open spaces, with each column of the overpass highlighting a vibrant plant or animal in a night scene on the north side of the street or a day scene on the south side. Public Art staff also spent part of 2025 preparing for the community mural to be installed at Newport Street, the first-ever community painting project. In addition, staff focused on developing the first-ever Poetry Walk, celebrating public art in a variety of mediums. Staff collaborated with SLO Rep staff as they began identifying a piece of art to fulfill private development requirements, and also guided the developers of San Luis Square through the installation of a privately funded public art piece, “The Alley Cats - All 9 Lives.” Community Programming: Continuing the trend of community building, an artist was commissioned to create an interactive community mural, which was transported to multiple programs and events throughout the summer, including the four Monday Meet-Up events. This provided opportunities for discussion and engagement. Artist Melisa Beveridge with her Box Art Mural A Portion of “In the Shadow of the Mountain” Page 246 of 248 General Plan Annual Report 2025 63 For the second year, the City partnered with the SLO Arts Council to offer a free summer artist lecture series, featuring four lectures throughout the season. New this year, the City hired a local artist to provide two weeks of daily art lessons for children attending Summer Fun Day Camp, in partnership with SLUCSD. The artist engaged over 200 budding artists, who created artwork inspired by the summer camp theme. In 2025, the City hosted four separate service days to engage the community with art. On MLK Day of Service, a group of individuals from the African Black Caucus participated in cleaning art. In the spring, nearly 20 Cal Poly volunteers worked with City staff and two local fabricators, learning how to clean and wax all the downtown bronze sculptures. Later in the fall, City staff led another volunteer group through the cleaning and waxing of the popular Mission Plaza Bears sculpture. Finally, volunteers spent a day with City staff cleaning downtown Box Art. Maintenance and Infrastructure: In 2024, an artist was hired to assess and provide recommendations for artwork with deferred maintenance. In 2025, City staff worked with local fabricators and repair professionals to determine the priority and costs of needed repairs, identifying two top projects based on safety concerns and deterioration: The Greys in Between and Puck. The Seven Sisters railing on the Santa Rosa bridge received a much-needed refresh. Ongoing graffiti abatement of murals continued throughout the year. As stated above, staff also worked with volunteers to complete overdue cleaning and waxing of downtown sculptures. SLOMA Partnership: In 2025, the City entered its third two-year community partnership agreement with the San Luis Obispo Museum of Art (SLOMA). In February 2025, the public art piece Along the Way was installed in Garden Street Alley as a temporary installation for one to two years. SLOMA staff also worked with City staff to prepare for the installation of Shift at San Luis Ranch, as well as the next temporary sculpture rotation at the Mission Plaza Lawn upon completion of the Mission renovation project. City Volunteers Assisting with Cleaning and Waxing Downtown Bronze Sculptures Page 247 of 248 General Plan Annual Report 2025 64 Conclusion The City’s General Plan guides the use and protection of the City’s various resources to meet community needs. The General Plan reflects consensus and compromise among a wide diversity of citizen preferences within a framework established by state law. The General Plan is published as separately adopted elements, each containing its own policies and programs. The 2025 General Plan Annual Report summarizes the progress made in 2025 on major programs specified in the elements of the General Plan. One purpose of the annual report is to evaluate whether actions taken during the year indicate a change in the community’s overall vision that would require a more comprehensive update of the General Plan. In review of the work reported on in this annual report, such a comprehensive update is unnecessary at this time. Substantial progress was made by the City in 2025 related to implementation of key General Plan elements. These efforts were undertaken in pursuit of the City Council’s Major City Goals for FY 2023-2025. With the end of the 2023-2025 Financial Plan, the City, with extensive community engagement, established the 2025-2027 Financial Plan with a new set of Major City Goals that, as per usual, are aligned with the City’s General Plan. With these new goals, City staff will continue to implement policies and programs related to Cultural Vitality, Economic Resilience, and Fiscal Sustainability; Diversity, Equity, and Inclusion; Homelessness Response; Housing and Neighborhood Livability – Healthy, Safe, and Affordable; Infrastructure and Sustainable Transportation; and Open Space, Climate Action, and Resilience. Progress on implementation of these goals and objectives will be further reported in the 2026 General Plan Annual Report. Page 248 of 248 2025 General Plan Annual Report March 11, 2026 Staff Recommendation 2 Receive and file the 2025 General Plan Annual Report for final review and acceptance by the City Council. General Plan Land Use (Updated 2014) Circulation (Updated 2014) Housing (Updated 2020) Noise (Adopted 1996) Water and Wastewater (Revised 2018) Conservation and Open Space (Revised 2014) Parks and Recreation (Updated 2021) Climate Adaptation & Safety (Updated 2023) Purpose Comply with Government Code Section 65400 and Land Use Element Policy 11.3 Review results/status of implementing General Plan Policies and Programs Planning and Building Activity Total Planning Applications Received per Calendar Year, 2023-2025 Source: Community Development Department, 2025 Planning and Building Activity Total Building Permits Issued per Calendar Year 2023-2025 600 574 525 354 442 192 0 100 200 300 400 500 600 700 2022 2023 2024 Permits Units Source: Community Development Department, 2025 Residential Growth Calendar Year Period New Units Average Annual Growth Rate Total Units in the City in 2024 LUE Estimated Units in 2025 (1% Growth) 2025 174 1.00%23,292 23,560 2015 - 2025 3,588 Table 5 – Residential Growth Rate, 2015-2025 Source: Community Development Department, 2025 Non-Residential Growth Net Annual Non-Residential Growth Rate, 2019-202 Source: Building Permits Finaled, Community Development Department, 2025 Regional Housing Needs Allocation (RHNA) 6th Cycle (2019-2028) Progress Table 7 – Progress Towards 6th Cycle Quantified Objectives, 2019-2028 Income Level (% of County Median Income) 6th Cycle RHNA Allocation Building Permitted Units Issued by Affordability Total Units by Income Level Total Units Remaining by Income LevelYears 1 - 3 (2019-2021) Year 4 (2022) Year 5 (2023)Year 6 (2024)Year 7 of 10 (2025) Extremely Low Deed Restricted 825 14 36 0 123 0 173 500 Non-Deed Restricted 0 0 0 0 0 0 Very Low Deed Restricted 56 14 22 60 0 152 Non-Deed Restricted 0 0 0 0 0 0 Low Deed Restricted 520 42 21 5 15 0 83 211Non-Deed Restricted 76 50 0 48 52 226 Moderate Deed Restricted 603 22 2 4 13 1 42 518Non-Deed Restricted 0 0 43 0 0 43 Above Moderate -1,406 1,411 439 293 190 145 2,478 0 Total Units 3,354 1,621 562 367 442 198 3,190 1,229 Active BMR Housing Projects Table 8 – Active BMR Housing Projects in the Pipeline Projects Address Dwellings Status Bridge Street Mixed- Use 279 Bridge Street 94 Phase 1 – Under Construction Phase 2 and 3 – Seeking Financing Monterey Mixed-Use (Senior Phase and Family Phase) 1422 and 1424 Monterey Streets 106 Senior Phase – Under Construction Family Phase – Permitted, beginning construction March 2026 Avila Ranch – Sendero Apartments 165 Cessna Court 60 Planning Entitlements – Approved Building Permits – Awaiting Submittal Waterman Village 466 Dana Street 22 Planning Entitlements – Approved Building Permits – Under Review Beacon Studios 1433 Calle Joaquin 75 Planning Entitlements – Approved Building Permit – Issued, Under Construction Total 357 Homelessness Solutions City response to encampments and related items Additional homelessness response activities: •Human Services Grant Program •Community Action Team, Mobile Crisis Unit, and collaborative efforts with Downtown SLO and CAPSLO Area Plan and Specific Plan Development Margarita Area Specific Plan (MASP) Projects Address Commercial Dwellings Status Prado Business Park 301 Prado 159,663 - Planning Entitlements – Approved Public Improvements - Under Review Building Permits – Expired 365 Prado Rd. Mixed-Use Project 365 Prado 100,000 222 GP and SP Amendments – In Process Planning Entitlements – In Process Total 259,663 222 Area Plan and Specific Plan Development Orcutt Area Specific Plan (OASP) Projects Address Dwellings Commercial Sq. Ft.Status Bullock Ranch 3580 Bullock 192 585 Planning Entitlements – Approved Public Improvements - Under Review Building Permits – Awaiting Submittal Pratt Property 3750 Bullock 35 3,400 Planning Entitlements - Approved Townhome Construction - Complete Live / Work units – Under Construction Building Permits for Commercial – Awaiting Submittal Enclave at Righetti 3805 Orcutt 34 Planning Entitlements - Approved Public Improvements – Substantially Complete Building Permits Issued – Under Construction Jones Mixed-Use 3806 Ranch House 15 7,600 Planning Entitlements – Approved Building Permits Issued – Under Construction; Three (3) affordable for-sale units construction complete Total 276 11,585 Area Plan and Specific Plan Development Airport Area Specific Plan (AASP) Projects Address Dwellings Commercial Sq. Ft.Status Tank Farm Commerce Park 179 Cross -29,280 Planning Entitlements - Approved Under Construction 650 Tank Farm Mixed- Use 650 Tank Farm 239 18,600 Planning Entitlements – Approved Building Permits – Awaiting Submittal Public Improvements - Under Review 600 Tank Farm Mixed- Use 600 Tank Farm 280 12,500 Planning Entitlements – Approved, Modification in Process Public Improvements - Under Review SLO Airport Hotel 950 Aero 204 Rooms -Planning Entitlements – Approved Building Permits – Under Review Conserv Fuel Station 4600 Broad -4,800 Planning Entitlements - Approved Under Construction U-Haul Personal Storage and Warehouse 1109 Kendall; 4805 Morabito -114,368; 24,498 Planning Entitlements – Approved Under Construction Aerovista Medical Services and Offices 832 Aerovista -41,007 Planning Entitlements – Approved Building Permits – Pending Submittal Earthwood Lane – Lots 16 and 17 4185 and 4195 Earthwood -3,694; 3,764 Planning Entitlements – Under Review Total 519 252,511 Area Plan and Specific Plan Development Avila Ranch Development Plan Projects Address Dwellings Commercial Sq. Ft.Status Avila Ranch SFR Phases 1, 2, & 3 (R-2)175 Venture 297 - Planning Entitlements - Approved Public Improvements – Under Construction Building Permits Issued – Under Construction Avila Ranch Phase 3 (R-4)175 Venture 145 - Planning Entitlements – Approved with 20- Unit Density Bonus Public Improvements – Pending Submittal Building Permits – Pending Submittal Avila Ranch Phases 4 (R-3)175 Venture 194 -Planning Entitlements - Approved Public Improvements – Pending Submittal Building Permits - Pending Submittal Avila Ranch Phase 5 (R-1)175 Venture 101 -Planning Entitlements - Approved Public Improvements – Under Construction Building Permits – Under Review Avila Ranch Phase 6 (Neighborhood Commercial) 175 Venture -15,000 Future Phase Total 737 15,000 Area Plan and Specific Plan Development Froom Ranch Specific Plan The project was on hold throughout 2025 due to ownership changes Application to initiate a Specific Plan Amendment submitted Area Plan and Specific Plan Development (Pgs. 18-24) San Luis Ranch Specific Plan Projects Address Dwellings Commercial Sq. Ft. Hotel Rooms Office Sq. Ft.Status Commercial Center 1035 Madonna 77 114,300 -- Planning Entitlements – Amendments in Process Public Improvements – Partially Complete Office ---100,000 Future phase, no building permits issued Total 654 145,500 200 100,000 Water Supply Table 14 – City Water Resource Availability, 2025 In 2025, the City obtained water from four sources: Salinas Reservoir (Santa Margarita Lake); Whale Rock Reservoir; Nacimiento Reservoir; and recycled water from the City’s Water Resource Recovery Facility Water Resource 2025 Annual Availability Salinas Reservoir (Santa Margarita Lake) and Whale Rock Reservoir 4,910 AF Safe Annual Yield1 Nacimiento Reservoir 5,482 AF Dependable Yield2 Recycled Water 354 AF 2024 Annual Usage3 Siltation to 2060 (500 AF)WWME Policy4 A4.2.24 TOTAL 10,246 AF Transportation & Circulation Vehicular and Bicycle/Pedestrian highlights from 2025 include: •Vision Zero Action Plan •2024 Paving Project •Transportation Safety Education Transportation & Circulation SLO Transit and highlights from 2025 include: •Received 6 electric buses •660,000 passenger trips – 17% increase •Short-Range Transit Plan Update Safety Services Fire Department: •Responded to 7,344 incidents •Urban Search and Rescue Team and the Mobile Crisis Unit •Fire Hazard Severity Zones and WUI Code Police Department: •Completed 2nd year of its 5-year strategic plan •Community Action Team and the Community Service Officer Program Conservation & Open Space Conservation & Open Space activities: •Opening of Righetti Hill Open Space •Froom, Prefumo, and San Luis Obispo Creeks invasive species control Parks & Recreation Community Programming •Youth and adult sports Laguna Lake Dog Park Additional highlights include: •Orcutt Area Parks Staff Recommendation 24 Receive and file the 2025 General Plan Annual Report for final review and acceptance by the City Council.