HomeMy WebLinkAbout01/05/1993, C-10 - AGREEMENTS WITH CAL POLY REGARDING WATER AND SEWER RATES4II11�1MI 1111I��II= ��1111 City Of s l � lis OB1SpO MEETING DATE: January 5, 1993 COUNCIL AGENDA REPORT ITEM NUMBER: /►_lO FROM: William Statler, Director of Finance ' John Moss, Acting Director of Utilities /y� Prepared by: Sue Baasch, Administrate eI, (Analyst . SUBJECT: AGREEMENTS WITH CAL POLY REGARDING WATER AND SEWER RATES CAO RECOMMENDATION 1. By motion, approve and authorize the Mayor to execute the following agreements with California Polytechnic State University: a. Agreement Regarding Water and Sewer Rates; b. Agreement Regarding Optional Equity Interest in the Water and Sewer. Systems. 2. By motion, approve and authorize the City Administrative Officer to execute the Memorandum of Understanding. DISCUSSION Background In the June 1992 review of the Water Fund, staff explained that negotiations were currently underway with California Polytechnic State University to increase the University's water and sewer rates. The University's water rate structure was last modified in 1964 and the sewer rate structure in 1986. Any change in the University's rate structure must be the result of mutual agreement between the City and the University. The University has historically had a unique rate structure because each time major upgrades have been made to the City's water and sewer systems, the University has elected to make equity contributions to the projects, purchasing a percentage of ownership in the system to reflect its use of each system. Also, the University is unique among the City's water customers because it is a co -owner of Whale Rock Reservoir, and thus has its own water supply and pays its prorata share of all costs of the Whale Rock operations. Discussions have resulted in the attached agreements. One establishes a water and sewer rate structure, one provides the option of continuing an equity position in the water and sewer systems, and the memorandum of understanding simply memorializes the first two. The basic rate agreement provides for either alternative, a rate structure without equity contribution and a rate structure with equity contribution. It assumes no equity contribution until such time as the University actually pays the equity contribution. If the University wishes to proceed with an equity contribution, and such funding is available to the University, the second agreement contains the understandings regarding the appropriate level of participation and the related portion of the total project colt. C—lQ _1 �������►�►►�►IlllflliP► ���d111 city O� Sall x4.46 OBISpo COUNCIL AGENDA REPORT University Water and Sewer Rates Page 2 Agreement Regarding Water and Sewer Rates Integral to the development of this agreement was the desire to develop a methodology that would tie the University to the City's approved rate structure and periodic rate reviews and adjustments, while reflecting the University's unique differences from other utility customers. As proposed, the rates are based on the rate for City commercial accounts as modified by a percentage (or ratio)'that accounts for o y that part of the rate structure that is applicable to the University. Water Rate - Developing a Percentage of City Commercial Rate Applicable to University Staff developed a percentage of the City's commercial rate applicable to the University, following the preparation of a five year projection of the revenue requirements for the City's water system. These revenue requirements were divided according to operational, capital and debt service requirements for the three components of the water system: source of supply, treatment and distribution. The appropriate percentage of total revenue requirements was assigned to each of the components. The University's rate structure was based on the revenue requirement for treatment and distribution only, as it has its own source of supply. In the proposed agreement, analysis showed that 4817c represented the five year average of the total revenue requirement attributable to treatment and distribution. Based on that, the University's percentage of the commercial water rate will be 48 % until 1996/97, at which time, a new analysis of the water fund revenue requirements will set the new percentage. Each new percentage will remain in place for a five year period. Due to the financial impact of implementing the new rate, the agreement sets forth a five year phasing schedule. By 1996/97, the University will be paying the full 48 %. In each of the years prior to that, beginning July 1, 1993, a portion of the total increase is implemented, in even increments. If the University makes an equity contribution, it will be relieved of a portion of the revenue requirement related to debt service. At this time, it is estimated that the applicable ratio would be reduced from 48% to approximately 39%. Sewer Rate - Developing a Percentage of City Commercial Rate Applicable to University The University's applicable percentage of the City's commercial sewer rate was analyzed in the same manner as the proposed water rate structure. The revenue requirements for the sewer system were divided according to the operational, capital and debt service requirements for three components: treatment, collection, and pre - treatment. The appropriate percentage of total cost was assigned to each of the components. Since all three components were applicable to the University, the appropriate percentage of the City commercial sewer rate for the University was 100 %. As with the water rate, this percentage will be fully realized by 1996/97 and implemented according to a five year phasing schedule. C -10- ������ ►�i►�illllplll���u����lU city of San _.pis OBISPO i WM1Q@ COUNCIL AGENDA REPORT University Water and Sewer Rates Page 3 If the University makes an equity contribution, it will be relieved of a portion of the,revenue requirement related to debt service. At this time, it is estimated that the applicable ratio would be reduced from 100% to approximately 70%. Agreement Regarding Optional Equity Interest in the Water and Sewer Systems The University may execute this agreement acknowledging its desire to continue its practice of equity ownership and agreeing that such contribution must be paid to the City by June 30, 1995; however, this does not bind the University to the equity contribution. The rate structure assumes no equity contribution until such time as it is made. The total contribution for continuing an equity position in both the water and sewer systems has been estimated at $4,004,000. In summary, making this contribution is solely at the discretion of the University, since the proposed rate structure fully recovers their share of costs assuming that this contribution is not made. The following is a brief overview of the improvements for which the University may chose to make an equity contribution: Water System Improvements The City is currently proposing to make significant improvements to its water treatment plant to meet drinking water quality regulations and to modemize the facility. Staff and the University agree that if the University desires to continue its past practice of an equity interest in the water system to equal its anticipated demand on the system, the University would require 1.44 million gallons per day (mgd) capacity in the plant. This translates into 8.93% of the total project cost. The estimated cost to the University will be $1,020,000. Sewer System Improvements The City currently is making modifications to its sewer system to assure continuing compliance with State of California effluent discharge requirements. These modifications are occurring in three phases, one phase building a relief sewer main and two phases upgrading the treatment plant. Staff and the University agree that if the University desires to continue its past practice of an equity interest in the sewer system equal to its anticipated demand on the system, the University would require .471 million gallons per day (mgd) capacity in the treatment plant. This level of capacity translates into 9.24% of the total cost of the treatment plant improvements. The estimated cost to the University would be $2,700,000. Continuing the University's equity interest in the collection system at the 1.2 mgd level would require the University to pay 7% of the total cost of the relief sewer main, estimated at $284,000. ./Q ��� +��»rN►IVIIIIIIIIIp►��'u�I�111 city of san L.41S OBlspo 1 COUNCIL AGENDA REPORT University Water and Sewer Rates Page 4 Memorandum of Understanding In recognition that the University desires to make an equity contribution to the water and sewer systems as previously described, but that this funding is dependent on approval of capital funding by the voters, the University has asked that the City sign the Memorandum of Understanding, Exhibit C to this report. CONCURRENCES The Utilities and Finance Department have mutually developed these agreements with the University and therefore concur with the recommendations in this report. It is important to note that under our existing agreements, the University must agree with any rate changes or increases. Given this constraint, we believe that the proposed agreement provides an excellent basis for implementing a rate structure that recognizes where the University is similar —and not similar —to other City customers. In addition to this basic equity issue, the proposed agreements provide for ongoing rate increases equal to those experienced by other customers without requiring case -by -case negotiations with the University. FISCAL IMPACT Approval of the recommended agreements will increase the University's monthly water and sewer rates as shown below: Sewer Assuming metered effluent flow of 138,000 ccf per year or 11,500 ccf per month: Existing rates - $ 6,015 per month 1996 -97 rates* - $26,500 per month * This assumes no equity contribution and approved rate adjustments. Water Assuming water demand of 180,000 ccf per year or 15,000 ccf per month: Existing rates - $ 2,625 per month 1996 -97 rates ** - $17,670 per month ** This assumes no equity contribution or rate adjustments. C -lo- �������►i��llll�lll� °� °�9�1111 CItY Of San _JIS OBISPO i MoZe COUNCIL AGENDA REPORT University Water and Sewer Rates Page 5 ATTACHMENTS Exhibit A - Agreement between the City of San Luis Obispo and California Polytechnic State University Regarding Water and Sewer Rates Exhibit B - Agreement between the City of San Luis Obispo and California Polytechnic State EXHIBIT A AGREEMENT BETWEEN THE CITY OF SAN LUIS OBISPO AND CALIFORNIA POLYTECHNIC STATE UNIVERSITY REGARDING WATER AND SEWER RATES THIS AGREEMENT, made this day of , 1992, by and between the CITY OF SAN LUIS OBISPO, CALIFORNIA (hereinafter refered to as "City "), and CALIFORNIA POLYTECHNIC STATE UNIVERSITY (hereinafter referred to as "University "). WITNESSETH: WHEREAS, the City and the University have a long- standing and unique relationship with regard to the co- development of water and sewer systems; and WHEREAS, it is the desire of both parties to continue that relationship; and WHEREAS, the City is upgrading both its Water Treatment Plant and Sewer Treatment /Collection Systems; and WHEREAS, other City utility customers have experienced periodic rate increases due to changing costs; and WHEREAS, the University's rate structure has not been modified since 1986 for sewer and 1964 for water; and WHEREAS, both the City and University have met and agreed to update the rate structure to reflect changing costs and the new capital projects; and WHEREAS, the City and University have agreed to a new rate structure methodology which ties the University to the City's approved rate structure and periodic rate reviews, while reflecting the University's unique differences from other utility customers. NOW, THEREFORE, in consideration bf their mutual covenants, the parties hereto agree as follows: RATE STRUCTURE METHODOLOGY The University's rate structure for both water and sewer shall be based on whatever the current rate is for City commercial accounts as modified by a percentage ( "ratio ") that accounts for that part of the rate structure that is applicable to the University. This ratio shall be established as outlined in paragraphs 2 and 3, and reviewed every five years. C -(0-(0 Rate Agreement Page 2 2. SETTING A WATER RATE RATIO The ratio to be applied to the commercial water rate structure shall be determined by the City. The City shall prepare a prospective five year projection of the revenue requirements for the City's water system. These revenue requirements shall be divided appropriately according to operational, capital and debt service requirements for three components: source of supply, treatment and distribution. The appropriate percentage of total revenue. requirements shall be assigned to each of the components. The University's rate structure will be based on the revenue requirements for these components less any equity interest in the system purchased by the University. The University's option to maintain an equity interest in the water system is defined in a separate agreement with the City, dated Exhibit A sets forth this analysis for the period July 1, 1992 through June 30, 1997, and shall serve as an example for determining any changes to the ratio in subsequent five year periods. 3. SETTING A SEWER RATE RATIO The ratio to be applied to the commercial sewer rate structure shall be determined by the City. The City shall prepare a prospective five year projection of the revenue requirements for the City's sewer system. These revenue requirements shall be divided appropriately according to operational, capital and debt service requirements for three components: treatment, collection and pre- treatment. The University's rate structure will be based on the revenue requirements for these components less any equity interest in the system purchased by the University. The University's option to maintain an equity interest in the sewer system is defined in a separate agreement with the City, dated Exhibit B sets forth this analysis for the period July 1, 1992 through June 30, 1997, and shall serve as an example for determining any changes to the ratio in subsequent five year periods. 4. EFFECTIVE DATE FOR THIS RATE STRUCTURE This rate structure shall be effective July 1, 1992. The City agrees that, due to the significant financial impact, the University may implement this change by phasing in the total increase over a five year period. It is the City's understanding that the University cannot change its budget for 92/93, so the total increase is divided evenly in the four following years. By 1996/97, the University shall be paying the full commercial rate times the applicable ratio for water and for sewer. Water charges will C -10-7 Rate Agreement Page 3 WATER RATIO FIVE YEAR PHASE IN July 1, 1992 Current rate structure Ratio applied against City standard rates for commercial accounts July 1, 1993 21% July 1, 1994 30% July 1, 1995 39% July 1, 1996 48% Table 1 SEWER RATIO FIVE YEAR PHASE IN Current rate structure Ratio applied against City standard rates for commercial accounts 40% 60% 80% 100% be assessed according to metered water flow. Sewer charges will be assessed according to metered effluent discharge flow. Table 1 sets forth the phase -in schedule of the ratios to be used per paragraphs two and three of this Agreement. 5. HOLD HARMLESS In recognition that the University's vested interest is limited to the upgrading of the facility, and that the University does not actively participate in the management of the services being provided by the facility, the City of San Luis Obispo will indemnify, defend and save harmless the Trustees of the California State University, its officers, agents, and employees from any and all claims and losses accruing or resulting to any person(s), firm(s), or corporation(s) who may be injured or damaged as a result of the service being provided by the City of San Luis Obispo through its facility described herein, except for any such injury or damage caused by any act, omission, or negligence of University 6. AMENDMENTS TO THE RATIO In the event the City and University cannot reach agreement on the proposed applicable ratio for the next five years, the ratio in existence at that time shall remain in effect until agreement is reached. The parties agree to cooperate and use their best efforts to reach agreement on the proposed ratio in an expeditious manner. 7. NOTICE The City shall provide the University with at least the same notice of proposed changes in water and sewer rates as other City customers. C -to -9 Rate Agreement Page 4 All notices related to this agreement shall be in writing and addressed as follows: University Norm Jacobson, Energy Coordinator Facilities Administration Cal Poly State University San Luis Obispo, CA 93407 Ray Macias, Director Support Services Cal Poly State University San Luis Obispo, CA 93407 Citv City Clerk City of San Luis Obispo P.O. Box 8100 San Luis Obispo, CA 93406 8. AGREEMENT CONTAINS ALL UNDERSTANDINGS This document (including all exhibits referred to above and attached hereto) represents the entire and integrated Agreement between the City and the University, and supersedes all prior negotiations, representations, or Agreements, either written or oral, except as described in a separate Memorandum of Understanding by and between the parties herein. This document may be amended only by written instrument, signed by both City and University. All provisions of this Agreement are expressly made conditions. This Agreement shall be governed by the laws of the State of California. IN WITNESS WHEREOF, CITY and UNIVERSITY have executed this Agreement the day and year first above written. UNIVERSITY CITY OF SAN LUIS OBISPO By By Director of Support Services Mayor Peg Pinard Ray Macias ATTEST: Diane Gladwell, City Clerk APPROVED AS TO FORM: Aieu7d�,4 00k\ ey . J ge en, City Attorfiey C-16 -q Rate Agreement Page 5 EXHIBIT A UNIVERSITY'S APPLICABLE PERCENTAGE (RATIO) OF APPROVED WATER RATE STRUCTURE As required in Paragraph 2, the City has developed a five year revenue projection for the water system. The components and applicable percentages of the total revenue requirement for FY 92/93 through FY 96/97 are shown on Schedules A -1 and A -2. 1. Applicable Components to the University The University shall not pay the percentage cost of those components related to Source of Supply, as the University has its own source of supply at Whale Rock. The University shall pay the percentage cost of treatment and distribution, less any cost for debt service related to the continuing equity investment in a portion of the water system. 2. Applicable Water Rate Ratio for the period beginning July 1, 1992 and ending June 30, 1997 The City is currently proposing to make significant improvements to its water treatment plant to meet drinking water quality regulations and to modernize the facility. It is expected that the City will debt - finance this project using lease revenue bonds over a period of 20 to 30 years. The University may choose to participate in the financing or pay its capital share of the revenue requirements directly. The appropriate ratio to be applied against the City's commercial rates will depend upon which of these options the University selects. A. Percentage of rate structure for 199211997, without capita/ contribution for equity interest in Water Treatment Plant Upgrades The University shall pay the average of the five year percentage cost of treatment and distribution, or 48 percent of the city -wide commercial rate, assuming it does not make a direct equity contribution to the proposed Water Treatment Plant improvements. The table below summarizes the detail on Schedule A -1: NO EQUITY CONTRIBUTION 92/93 51% 93/94 56% 94/95 48% 95/96 42% 96/97 43% 5 YR AVG 48% C -10-/0 Rate Agreement Page 6 B. Percentage of rate structure for 1992 11997, with capita/ contribution for equity interest in Water Treatment Piant�Upgrade The University may elect to make an equity contribution to the Water Treatment Plant upgrade. The City will adjust the percentage indicated in paragraph A above as necessary, if the University elects this option and when payment is received. The City anticipates the applicable percentage of city- wide commercial rate will be reduced to approximately 39 percent, but this percentage will be refined when project costs and applicable debt service is established. In the event that the University chooses this option, this Agreement will be amended to reflect the revised ratio. The table below summarizes the detail on Schedule A -2. EQUITY CONTRIBUTION 92/93 48% 93/94 43% 94/95 37% 95/96 33% 96/97 5 YR AVG 39% Rate Agreement Page 7 PPLICABLE RATIO - NON - EQUITY CONTRIBUTION SUMMARY OF WATER COST COMPONENTS FOR 1992 -93 SUMMARY OF WATER COST COMPONENTS FOR 1993 -94 Source of Supply ;Treatment Distribution,: Total Operations and Maintenance S2,727,837 5954,513 51,109 70i $4,792,051 Capital Outlay SO $0 .. 5600,OOD > $600,000 Debt Service $269,200 51.;89,400 > $222 SOD 1' S681,200 TOTAL $2,997,037 51,143 913':: St,932;3o $6,073,251 SUMMARY OF WATER COST COMPONENTS FOR 1993 -94 SUMMARY OF WATER COST COMPONENTS FOR 1994 -95 Source of Supply ;rations and Maintenance 53,664,789 Capital Outlay SO Debt Service $869,200 TOTAL S4,533,989 SUMMARY OF WATER COST COMPONENTS FOR 1995 -96 Total $6,163,676 $500,000 $2,044,700 $8,708,376 Source of Supply € Treatn.eni Distr�buUOR Total Operations and Maintenance $2,984,693 51,316,140 . $1,130,477;:: $5,431,310 Capital Outlay SO S0" 5500,000: $500,000 Debt Service $269,200 $952,900 5222,600 < $1,444,700 TOTAL $3,253,893 52,269,040 ;;.,,, 57,853;077 i, $7,376,010 SUMMARY OF WATER COST COMPONENTS FOR 1994 -95 Source of Supply ;rations and Maintenance 53,664,789 Capital Outlay SO Debt Service $869,200 TOTAL S4,533,989 SUMMARY OF WATER COST COMPONENTS FOR 1995 -96 Total $6,163,676 $500,000 $2,044,700 $8,708,376 SUMMARY OF WATER COST COMPONENTS FOR 1996 -97 Source of Supply Treatment Distnbutiort! Total Operations and Maintenance $4,822,812 51,357,002. Si,165 575 : $7,345,389 Capital Outlay $0 $0 ;; $500,000- 5500,000 Debt Service $869 200 ' ..... .:.::..:.:::....:..::.:S. ': >zi ;;,.22Z ":. :: .....,600::;; 2 $ ,044,700 TOTAL $5,692,012 52,309,902t.888.7.75,n: $1 ,949,551. $9.890.089 SUMMARY OF WATER COST COMPONENTS FOR 1996 -97 C -ro -ia Source of Supply Treatment Dstnbutron <:; Total Operations and Maintenance $4,989,771 $1,428,458 51,226 951 ? $7,645,180 Capital Outlay SO SD ' S500,00D $500,000 Debt Service $869,200 59.52,900: 5222,fi0ff $2,044,700 TOTAL $5,858,971 $2,3.81,358 $1 ,949,551. 510,189,880 C -ro -ia Rate Agreement Page 8 APPLICABLE RATIO - - EQUITY CONTRIBUTION SUMMARY OF WATER COST COMPONENTS FOR 1992 -93 SUMMARY OF WATER COST COMPONENTS FOR 1993 -94 Source of Supply , : Treatment Distnbuhon Total Operations and Maintenance $2,727,837 5954 5t3 51,109,701`; S4,792,051 Capital Outlay SO $0 i 5600,000 $600,000 Debt Service S269,200 $189,400 : <` ;:::;522.2;600;;:: $681,200 TOTAL $2,997,037 S1, 143, 913 <<€ <> < i^ $1 .9 932; ...... $6,073,251 SUMMARY OF WATER COST COMPONENTS FOR 1993 -94 Capital Outlay $0 SO $500,000.' $500,000 Debt Service $269,200 $952,900 222. 600 51,444,700 TOTAL $3,253,893 S2, 269, 040 OTl . $7,376,010 SUMMARY OF WATER COST COMPONENTS FOR 1994 -95 Source of Supply TreafRienY < " >; > > >' >:Distriputioriia « Total PP y i:i: Operations and Maintenance $3,664,789 51,344,258 57,1542629:: $6,163,676 Capital Outlay SO 50 $500,000 $500,000 Debt Service $869,200 5952,900 i ?<;rv!5222600:. S2,044,700 TOTAL 54,533.989 $2.297,158 > ? =i` >?i <!:S�877229 <<>. S8,708,376 SUMMARY OF WATER COST COMPONENTS FOR 1995 -96 Source of Supply ;;;;' <T;re'atmant >? ; >; i;.,�str..butro ..: >...._., otal Operations and Maintenance $4,822,812 57,357,002 57,765,5!5.; $7,345,389 Capital Outlay $O 50 $500,000:: $500,000 Debt Service 5869,200 $952,900 ; €;' `:;:;:;;;'5222;600:::: S2,044,700 TOTAL $5,692,012 $2,309,902 888775 $9,890,089 SUMMARY OF WATER COST COMPONENTS FOR 1996 -97 Source of upP Y ?' >:> regimen. Yi? ? € ?«;; €:a<::.IStn..uho.n..;: Total r .1' > $7,645,180 Oe in n Min n n 4 1 s ;:'22695... at o sad Maintenance a ce S 989 77 ''' a €428' 458' =�< <` > > <>':i...5. Capital Outlay SO $0 5500,000 . $500,000 Debt Service $869,200 S952,900 $222600 S2,044,700 TOTAL $5,858,971 52,381,358 $71 9494551 :i S10,189,880 C -lo-13 Source of Supply T Treatment D Distnbuaon T Total Operations and Maintenance $ $2,984,693 S q:: > 7 4.... is $ $5.431,310 SUMMARY OF WATER COST COMPONENTS FOR 1994 -95 Source of Supply TreafRienY < " >; > > >' >:Distriputioriia « Total PP y i:i: Operations and Maintenance $3,664,789 51,344,258 57,1542629:: $6,163,676 Capital Outlay SO 50 $500,000 $500,000 Debt Service $869,200 5952,900 i ?<;rv!5222600:. S2,044,700 TOTAL 54,533.989 $2.297,158 > ? =i` >?i <!:S�877229 <<>. S8,708,376 SUMMARY OF WATER COST COMPONENTS FOR 1995 -96 Source of Supply ;;;;' <T;re'atmant >? ; >; i;.,�str..butro ..: >...._., otal Operations and Maintenance $4,822,812 57,357,002 57,765,5!5.; $7,345,389 Capital Outlay $O 50 $500,000:: $500,000 Debt Service 5869,200 $952,900 ; €;' `:;:;:;;;'5222;600:::: S2,044,700 TOTAL $5,692,012 $2,309,902 888775 $9,890,089 SUMMARY OF WATER COST COMPONENTS FOR 1996 -97 Source of upP Y ?' >:> regimen. Yi? ? € ?«;; €:a<::.IStn..uho.n..;: Total r .1' > $7,645,180 Oe in n Min n n 4 1 s ;:'22695... at o sad Maintenance a ce S 989 77 ''' a €428' 458' =�< <` > > <>':i...5. Capital Outlay SO $0 5500,000 . $500,000 Debt Service $869,200 S952,900 $222600 S2,044,700 TOTAL $5,858,971 52,381,358 $71 9494551 :i S10,189,880 C -lo-13 SUMMARY OF WATER COST COMPONENTS FOR 1995 -96 Source of Supply ;;;;' <T;re'atmant >? ; >; i;.,�str..butro ..: >...._., otal Operations and Maintenance $4,822,812 57,357,002 57,765,5!5.; $7,345,389 Capital Outlay $O 50 $500,000:: $500,000 Debt Service 5869,200 $952,900 ; €;' `:;:;:;;;'5222;600:::: S2,044,700 TOTAL $5,692,012 $2,309,902 888775 $9,890,089 SUMMARY OF WATER COST COMPONENTS FOR 1996 -97 Source of upP Y ?' >:> regimen. Yi? ? € ?«;; €:a<::.IStn..uho.n..;: Total r .1' > $7,645,180 Oe in n Min n n 4 1 s ;:'22695... at o sad Maintenance a ce S 989 77 ''' a €428' 458' =�< <` > > <>':i...5. Capital Outlay SO $0 5500,000 . $500,000 Debt Service $869,200 S952,900 $222600 S2,044,700 TOTAL $5,858,971 52,381,358 $71 9494551 :i S10,189,880 C -lo-13 SUMMARY OF WATER COST COMPONENTS FOR 1996 -97 Source of upP Y ?' >:> regimen. Yi? ? € ?«;; €:a<::.IStn..uho.n..;: Total r .1' > $7,645,180 Oe in n Min n n 4 1 s ;:'22695... at o sad Maintenance a ce S 989 77 ''' a €428' 458' =�< <` > > <>':i...5. Capital Outlay SO $0 5500,000 . $500,000 Debt Service $869,200 S952,900 $222600 S2,044,700 TOTAL $5,858,971 52,381,358 $71 9494551 :i S10,189,880 C -lo-13 C -lo-13 Rate Agreement Page 9 EXHIBIT B UNIVERSITY'S APPLICABLE PERCENTAGE (RATIO) OF APPROVED SEWER RATE STRUCTURE As required in Paragraph 3, the City has developed a five year revenue projection for the sewer system. The components and related percentages of the total revenue requirement for FY 92/93 through FY 96/97 are shown on Schedules B -1 and B -2. 1. Applicable Components to the University The University shall pay the applicable percentage cost of treatment, collection and pretreatment, less any cost for debt service related to the continuing equity investment in a portion of the sewer system. 2. Applicable Sewer Ratio for the period beginning July 1, 1992 and ending June 30, 1997 The City is currently making modifications to its sewer system to assure continuing compliance with State of California effluent discharge requirements. These modifications are being performed in three phases, each of which has been approved for low interest loan funding through the State Revolving Loan Fund administered by the State Water Resources Control Board, Division of Clean Water Programs. The University may choose to participate in the financing or pay its capital share of the revenue requirements directly. The appropriate ratio to be applied against the City's commercial rates will depend upon which of these options the University selects. A. Percentage ofrate structure for 199211997, without capita/ contribution for equity interest in Sewer System Upgrade The University shall pay the average of the five year percentage cost of treatment and collection and pretreatment, or 100 percent of the city -wide commercial rate, if it does not continue its equity interest in the sewer system. The table below summarizes the detail on Schedule B -1: NO EQUITY CONTRIBUTION 92/93 100% 93/94 100% 94/95 100% 95/96 100% 96/97 100% 5 YR AVG 100% r C -1d -14 Rate Agreement Page 10 B. Percentage of rate structure for 199211997, with capital contribution for equity interest in Sewer System Upgrade The University may elect to make an equity contribution to the sewer system upgrade. The City will adjust the percentage indicated in paragraph A above as necessary, if the University elects this option and when payment is received. The City anticipates the applicable percentage of city -wide commercial rate will be reduced to approximately 70 percent, but this percentage will be refined when project costs and applicable debt service is established. In the event that the University chooses this option, this Agreement will be amended to reflect the revised ratio. The table below summarizes the detail on Schedule B -2. EQUITY CONTRIBUTION 92/93 93% 93/94 63% 94/95 64% 95/96 65% 96/97 66% 5 YR AVG 70% G'' -10-15 Rate Agreement Page 11 PPLICABLE RATIO - NON - EQUITY CONTRIBUTION SUMMARY OF SEWER COST COMPONENTS FOR 1992 -93 Operations and Maintenance Capital Outlay Debt Service TOTAL SUMMARY OF SEWER COST COMPONENTS FOR 1993 -94 Operations and Maintenance Capital Outlay Debt Service TOTAL SUMMARY OF SEWER COST COMPONENTS FOR 1994 -95 ;rations and Maintenance t,apital Outlay Debt Service TOTAL SUMMARY OF SEWER COST COMPONENTS FOR 1995 -96 Operations and Maintenance Capital Outlay Debt Service TOTAL SUMMARY OF SEWER COST COMPONENTS FOR 1996 -97 Operations and Maintenance Capital Outlay Debt Service TOTAL Rate Agreement Page 12 APPLICABLE RATIO - EQUITY CONTRIBUTION SUMMARY OF SEWER COST COMPONENTS FOR 1992 -93 Operations and Maintenance X567,770 $T64546 5r,lua,5tia sl,a4i,ypp Capital Outlay $0 $0 $535,SDD ; 5535.80D Debt Service $251,500 , $0 $0 <; - 5251,500 TOTAL $819,270: 1 :;,..51; ??s774. � ,._ 74 "384> $3,729,200 SUMMARY OF SEWER COST COMPONENTS FOR 1993 -94 Operations and Maintenance $596,]58 $172;;774 52,320,063`; 5..3,088,995; Capital Outlay SO .. $0 5452,032 '5452,032; Debt Service $ 251, 500 TOTAL S1,848,600 $2,100,100 TOTAL $847,658 1 :;,..51; ??s774. $4,620,695 $5,641,127 SUMMARY OF SEWER COST COMPONENTS FOR 1994 -95 Operations and Maintenance �:<,> rn ;:, : � 6:2.:: 5 .:. > °• 7 Capital Outlay...... $0 :;: ><:...::......:::,:::::_ 453> 313 ....... ..... .._: Debt Service $251,500 $0' $1,866,400 TOTAL $877,466 ? >';!;`S:i81412> >?;51.90486< 54,755,780 SUMMARY OF SEWER COST COMPONENTS FOR 1995 -96 Operations and Maintenance ° '° "° °° > > °• 2 7` 68 Capital Outlay $0 50 5454,646 Debt Service 5251,500 _'; ><. -!i $1,866,400 TOTAL S908,763 <`_` >?;51.90486< $4,878,914 SUMMARY OF SEWER COST COMPONENTS FOR 1996 -97 S2,117,900 $5,814,658 $2,117,900 $5,978.163 $2,117,900 $6,158,830 C -/0 -17 °..° pliection < Pretreatrnent Treatnn Operations and Maintenance '' .5689,427 5199';808 $2,695,663 Capital Outlay $0 $0 ' ...... 32 Debt Service $251,500 50 . $1,866,400 TOTAL $940, 927 r<r;S1.99:808: 55,018,095 S2,117,900 $5,814,658 $2,117,900 $5,978.163 $2,117,900 $6,158,830 C -/0 -17 EXHIBIT B AGREEMENT BETWEEN THE CITY OF SAN LUIS OBISPO AND CALIFORNIA POLYTECHNIC STATE UNIVERSITY REGARDING OPTIONAL EQUITY INTEREST IN THE WATER AND SEWER SYSTEMS THIS AGREEMENT, made this day of , 1992, by and between the CITY OF SAN LUIS OBISPO, CALIFORNIA (hereinafter referred to as "City "), and CALIFORNIA POLYTECHNIC STATE UNIVERSITY (hereinafter referred to as "University "). WITNESSETH: WHEREAS, the City and the University have a long- standing and unique relationship with regard to the co- development of water and sewer systems; and WHEREAS, it is the desire of both parties to continue that relationship; and WHEREAS, the City is upgrading both its water treatment plant and sewer treatment /collection systems; and WHEREAS, the University wishes to update prior agreements regarding its operational needs and related equity interest in the City's water and sewer system; and WHEREAS, maintaining an equity interest in the City's water and sewer systems is solely at the option of the University. NOW, THEREFORE, in consideration of their mutual covenants, the parties hereto agree as follows: 1. WATER SYSTEM - The anticipated modifications to the Water Treatment Plant will assure continuing compliance with drinking water quality regulations as well as modernize the facility. The University wishes to purchase an equity interest equivalent to 1000 acre feet /year or .9 mgd. The plant design allows a factor of 1.6 for peaking requirements. Multiplied by .9 mgd, the University would require 1.44 mgd capacity in the 16.0 mgd plant. 646gd Optional Equity Interest Agreement Page 2 If it chooses to maintain an equity interest in the plant at the required level, the University agrees to pay the percentage obtained by the division of 1.44 mgd (University's equity) by 16.0 mgd (plant capacity), or 8.93 %, of the total project cost. The estimated cost to the University is $ 1,020,000, which will be refined upward or downward by letter when the project construction is complete, subject to the total contribution ceiling noted in paragraph three of this agreement. 2. SEWER SYSTEM The current upgrade to the sewer system has three phases. One phase upgrades the collection system ( "relief sewer main "). The other two phases upgrade the Treatment plant. The upgrades to the Wastewater Treatment Plant relate to meeting discharge requirements. The capacity of the plant will remain at 5.1 mgd. The University wishes to purchase an equity interest in the Treatment Plant equivalent to .471 mgd. The current equity interest in the collection system is 1.2 mgd, required due to infiltration and inflow and wet weather peak flows. A. Treatment Plant If it chooses to maintain an equity interest in the plant at the required level, the University agrees to pay the percentage obtained by the division of .471 mgd (University's interest) by 5.1 mgd (plant capacity), or 9.24 %, of the total project cost. The estimated cost to the University is $2,700,000, which will be refined upward or downward by letter when project construction is complete, subject to the total contribution ceiling noted in paragraph three of this agreement. B. Collection System If it chooses to maintain an equity interest in the collection system at the 1.2 mgd level, the University agrees to pay 7% of the total cost for the relief sewer main. The estimated cost to the University is $284,000, which will be refined upward or downward by letter when project construction is complete, subject to the total contribution ceiling noted in paragraph three of this agreement. The availability of funds for this agreement is contingent upon the approval by the Legislature and Governor of necessary funding in the State budget for the fiscal years included in this agreement. C -l�-Iq Optional Equity Interest Agreement Page 3 3. RECEIPT OF FUNDS If the University chooses to exercise its option to maintain an equity interest in either the City's water or sewer systems, the University's contribution must be received by June 30, 1995. The estimated costs set forth in paragraphs one and two may be adjusted between categories based upon actual costs provided. The total University contribution for the water and sewer system upgrades will not exceed $4,004,000. Exercising this option will reduce the percentage ratio of commercial rate structure owed by the University as set forth in the Agreement between the City and the University regarding water and sewer rates, dated . The adjusted water ratio is described in paragraph 2B of Exhibit A of that Agreement; and the adjusted sewer ratio is described in paragraph 213 of Exhibit B of that Agreement. 4. NOTICE All notices related to this agreement shall be in writing and addressed as follows: University Norm Jacobson, Energy Coordinator Facilities Administration Cal Poly State University San Luis Obispo, CA 93407 Ray Macias, Director Support Services Cal Poly State University San Luis Obispo, CA 93407 Citv City Clerk City of San Luis Obispo P.O. Box 8100 San Luis Obispo, CA 93406 5. AGREEMENT CONTAINS ALL UNDERSTANDINGS This document represents the entire and integrated Agreement between the City and the University, and supersedes all prior negotiations, representations, or Agreements, either written or oral, except as described in a separate Memorandum of Understanding by and between the parties. This document may be amended only by written instrument, signed by both City and University. All provisions of this Agreement are expressly made conditions. This Agreement shall be governed by the laws of the State of California. 0 -10 -ao Optional Equity Interest Agreement Page 4 IN WITNESS WHEREOF, CITY and UNIVERSITY have executed this Agreement the day and year first above written. UNIVERSITY Directo of Support Services Ray Macias ATTEST: Diane Gladwell, City Clerk APPROVED AS TO FORM: s�•_ksen, City Attorne CITY OF SAN LUIS OBISPO By Mayor Peg Pinard EXHIBIT C MEMORANDUM To: John Dunn Date; City Administrative Officer City of San Luis OZo From: Frank Lebens ��' ZZ Interim Vice President for Business Affairs California Polytechnic State University Subject: MEMORANDUM OF UNDERSTANDING Water and Sewer Rates /Water and Sewer Systems WHEREAS, the City of San Luis Obispo and California Polytechnic State University have a longstanding and unique relationship with regard to the co- development of water and sewer systems; and WHEREAS, it is the desire of both parties to continue that relationship; and WHEREAS, the City of San Luis Obispo is upgrading both its Water Treatment Plant and Sewer Treatment /Collection Systems; and WHEREAS, other City of San Luis Obispo utility customers have experienced periodic rate increases due to changing costs; and WHEREAS, both the City of San Luis Obispo and California Polytechnic State University have met and agreed to update the rate structure to reflect changing costs and the new capital projects; and WHEREAS, Cal Poly State University wishes to update prior agreements regarding its operational needs and related equity interest in the City of San Luis Obispo's water and sewer system; and WHEREAS, maintaining an equity interest in the City of San Luis Obispo's water and sewer systems is solely at the option of the University: NOW, THEREFORE, agreements setting the conditions and terms for this relationship have been developed by both parties wherein a payment schedule has been agreed to by both parties which would be funded through California Polytechnic State University's Major Capital Outlay Program, such funding expected to be approved for fiscal year 1994 -95. C-16-01a TERMS AND CONDITIONS: The funding formula set forth in the referenced agreements by California Polytechnic State University assumes no equity contribution to the City of San Luis Obispo for the upgrading of its Water Treatment Plant and Sewer Treatment /Collection Systems. If the University chooses to maintain an equity interest and funding is available, the fees will be recalculated as stated in paragraph 2B of Exhibit A and paragraph 2B of Exhibit B of the Agreement Regarding Water and Sewer Rates. If this Memorandum of Understanding is acceptable, please sign, date, and return the attached copy to me. Thank you. ACCEPTED: City of San Luis Obispo by: Dunn Administrative Officer Date e-16-'a5