Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2000035 - Bid Results - SLO Creek Emergency Bank Stabilization Project near Johnson Avenue_PDF
Bid Item Item Description Unit of Measure Estimated Quantity Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost 1 Mobilization and Demobilization LS 1 $6,103.00 $6,103.00 $8,700.00 $8,700.00 $5,000.00 $5,000.00 $25,600.00 $25,600.00 2 Traffic Control System/Lane Closure Staging Area LS 1 $3,610.00 $3,610.00 $6,000.00 $6,000.00 $5,000.00 $5,000.00 $18,000.00 $18,000.00 3 Prepare Storm Water Pollution Prevention Plan LS 1 $2,910.00 $2,910.00 $1,000.00 $1,000.00 $1,500.00 $1,500.00 $3,500.00 $3,500.00 4 Construction Staking LS 1 $2,875.00 $2,875.00 $125.00 $125.00 $3,500.00 $3,500.00 $3,000.00 $3,000.00 5 Trim Existing Trees (for site access)EA 3 $287.00 $861.00 $557.00 $1,671.00 $1,335.00 $4,005.00 $2,700.00 $8,100.00 6 Cut Will Trees EA 4 $1,000.00 $4,000.00 $730.00 $2,920.00 $625.00 $2,500.00 $1,500.00 $6,000.00 7 Large Oak Tree Removal EA 5 $1,380.00 $6,900.00 $3,734.00 $18,670.00 $2,000.00 $10,000.00 $1,500.00 $7,500.00 8 Small Oak Tree Removal (4" Diameter or Less)EA 2 $575.00 $1,150.00 $2,980.00 $5,960.00 $2,000.00 $4,000.00 $250.00 $500.00 9 Install Temporary Check Dam EA 1 $6,170.00 $6,170.00 $10,300.00 $10,300.00 $10,000.00 $10,000.00 $8,500.00 $8,500.00 10 Install Temporary Sandbag Pipe Anchors EA 2 $670.00 $1,340.00 $557.00 $1,114.00 $1,500.00 $3,000.00 $2,000.00 $4,000.00 11 Install Temporary Bypass Drain Line, 24" HDPE LF 165 $65.00 $10,725.00 $59.00 $9,735.00 $95.00 $15,675.00 $62.00 $10,230.00 12 Install Temporary Sump, Sump Pump and 2" PVC Line (with Generator Located on Pismo Street)LS 1 $7,900.00 $7,900.00 $1,526.00 $1,526.00 $5,000.00 $5,000.00 $11,000.00 $11,000.00 13 Excavation for Riprap Key CY 60 $160.00 $9,600.00 $69.00 $4,140.00 $580.00 $34,800.00 $180.00 $10,800.00 14 Fill Erosion Hole with 12" - 36" Angular Riprap over RSP Non- woven Filter Fabric with Method A Placement CY 20 $250.00 $5,000.00 $304.00 $6,080.00 $500.00 $10,000.00 $250.00 $5,000.00 15 Place 12" - 36" Angular Riprap at Toe of Slope over RSP Non-woven Filter Fabric with Method A Placement CY 75 $224.00 $16,800.00 $205.00 $15,375.00 $160.00 $12,000.00 $200.00 $15,000.00 16 Remove and Reuse Broken Concrete Slabs in Erosion Hole LS 1 $4,125.00 $4,125.00 $744.00 $744.00 $4,500.00 $4,500.00 $3,500.00 $3,500.00 17 Remove Existing Concrete Lip (at toe of slope)LS 1 $3,660.00 $3,660.00 $1,950.00 $1,950.00 $2,500.00 $2,500.00 $3,000.00 $3,000.00 18 Install 8" Diameter Steel Casings in Riprap Fill Area EA 2 $612.00 $1,224.00 $454.00 $908.00 $1,000.00 $2,000.00 $500.00 $1,000.00 19 Remove and Replace Railing at back-of-sidewalk (if needed for access)LS 1 $1,400.00 $1,400.00 $600.00 $600.00 $1,000.00 $1,000.00 $3,000.00 $3,000.00 Kirk Construction $135,980.00 R Burke Corporation $147,230.00 San Luis Obispo Creek Emergency Bank Stabilization near Johnson, Specification No. 2000035 Total: Souza $96,353.00 David Crye Construction $97,518.00