Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
1000199 Bid Results - JOC for Street and Sidewalk Maintenance 2023_PDF
Item No. Item Description Unit of Measure Estimated Quantity Unit Price Total Unit Price Total 1 Edge Grind SQFT 500 10.00$ 5,000.00$ 5.00$ 2,500.00$ 2 1.75” Thin Maintenance Overlay SQFT 500 13.00$ 6,500.00$ 13.00$ 6,500.00$ 3 2” AC Grind & AC Overlay – ½” Aggregate SQFT 200 40.00$ 8,000.00$ 35.00$ 7,000.00$ 4 6” AC Pavement – Excavation & Restoration SQFT 8,000 9.00$ 72,000.00$ 17.00$ 136,000.00$ 5 10” AC Pavement – Excavation & Restoration SQFT 3,000 13.00$ 39,000.00$ 19.00$ 57,000.00$ 6 8” PCC with 3” max AC Cap – Excavation & Restoration SQFT 1,800 29.00$ 52,200.00$ 32.00$ 57,600.00$ 7 Class II Aggregate TON 50 85.00$ 4,250.00$ 62.00$ 3,100.00$ 8 Trench Backfill Sand TON 50 75.00$ 3,750.00$ 64.50$ 3,225.00$ 9 AC Dike – Caltrans A87B LF 220 23.00$ 5,060.00$ 30.00$ 6,600.00$ 10 Pavement Reinforcing Fabric - Glass Grid SQYD 10 70.00$ 700.00$ 43.00$ 430.00$ 11 Geo Textile grid SQYD 10 50.00$ 500.00$ 70.00$ 700.00$ 12 Fog Seal SQYD 20 25.00$ 500.00$ 43.00$ 860.00$ 13 Pavement Marking – Caltrans A24 SQFT 100 18.00$ 1,800.00$ 18.50$ 1,850.00$ 14 12-inch White Limit Line LF 50 20.00$ 1,000.00$ 18.50$ 925.00$ 15 Traffic Stripe – Caltrans A20A Detail 1 LF 50 20.00$ 1,000.00$ 18.50$ 925.00$ 16 Traffic Stripe – Caltrans A20A Detail 2 LF 50 20.00$ 1,000.00$ 18.50$ 925.00$ 17 Traffic Stripe – Caltrans A20A Detail 8 LF 50 20.00$ 1,000.00$ 18.50$ 925.00$ 18 Traffic Stripe – Caltrans A20A Detail 9 LF 50 20.00$ 1,000.00$ 18.50$ 925.00$ 19 Traffic Stripe – Caltrans A20A Detail 22 LF 50 23.00$ 1,150.00$ 18.50$ 925.00$ 20 Traffic Stripe – Caltrans A20B Detail 29 LF 50 23.00$ 1,150.00$ 18.50$ 925.00$ 21 Traffic Stripe – Caltrans A20D Detail 38 LF 50 23.00$ 1,150.00$ 18.50$ 925.00$ 22 Traffic Stripe – Caltrans A20D Detail 39 LF 50 23.00$ 1,150.00$ 18.50$ 925.00$ 23 Traffic Stripe – Caltrans A20D Detail 39A LF 50 23.00$ 1,150.00$ 18.50$ 925.00$ 24 Reflective Pavement Marker – All types EA 5 35.00$ 175.00$ 35.00$ 175.00$ 25 Hi-Vis Crosswalk – Std. 7350 LF 20 300.00$ 6,000.00$ 40.30$ 806.00$ 26 Bike Lane Buffer LF 50 30.00$ 1,500.00$ 23.00$ 1,150.00$ 27 Green Bike Lane Coating – Std. 7360 SQFT 1000 50.00$ 50,000.00$ 34.50$ 34,500.00$ 28 Remove Traffic Stripe LF 100 15.00$ 1,500.00$ 23.00$ 2,300.00$ 29 Remove Pavement Marking SQFT 100 15.00$ 1,500.00$ 23.00$ 2,300.00$ 30 Remove & Replace Sidewalk – Std. 4110 (Area – Under 60 SQFT)SQFT 60 70.00$ 4,200.00$ 110.00$ 6,600.00$ Souza Construction BASE BID ITEMS R. Burke Corporation 31 Remove & Replace Sidewalk – Std. 4110 (Area – 60 to 180 SQFT)SQFT 180 60.00$ 10,800.00$ 69.00$ 12,420.00$ 32 Remove & Replace Sidewalk – Std. 4110 (Area – Over 180 SQFT)SQFT 200 50.00$ 10,000.00$ 43.00$ 8,600.00$ 33 Remove & Replace Curb and Gutter – Std. 4030 LF 80 90.00$ 7,200.00$ 94.00$ 7,520.00$ 34 Remove & Replace Curb Ramp – Std. 4440 SQFT 1,500 24.00$ 36,000.00$ 19.00$ 28,500.00$ 35 Remove & Replace Cross Gutter – Std. 4310 SQFT 10 200.00$ 2,000.00$ 214.00$ 2,140.00$ 36 Remove & Replace Driveway Ramp – Std. 2110, 2111, 2115, 2116 SQFT 400 35.00$ 14,000.00$ 32.00$ 12,800.00$ 37 Mission Style PCC Coloring and Salt Finish SQFT 300 6.00$ 1,800.00$ 5.80$ 1,740.00$ 38 Mission Style Tile Installation - Std. 4220 LF 20 70.00$ 1,400.00$ 140.00$ 2,800.00$ 39 Single Mission Style Tile Installation – Std. 4220 EA 100 80.00$ 8,000.00$ 150.00$ 15,000.00$ 40 Replace Truncated Domes – Std. 4440 SQFT 50 70.00$ 3,500.00$ 190.00$ 9,500.00$ 41 Repaint Curb LF 100 6.00$ 600.00$ 5.80$ 580.00$ 42 Furnish & Install Metal Post – Std. 7210 EA 5 650.00$ 3,250.00$ 460.00$ 2,300.00$ 43 Furnish & Install Metal Post – Std. 7215 EA 5 700.00$ 3,500.00$ 460.00$ 2,300.00$ 44 Furnish & Install Sign EA 5 500.00$ 2,500.00$ 400.00$ 2,000.00$ 45 Reconstruct Guardrail – Caltrans A77A1 LF 10 500.00$ 5,000.00$ 410.00$ 4,100.00$ 46 Furnish & Install Tree Well – Std. 8130, 4’ x 4’EA 1 5,000.00$ 5,000.00$ 6,770.00$ 6,770.00$ 47 Furnish & Install Tree Well – Std. 8130, 5’ x 5’EA 1 5,800.00$ 5,800.00$ 8,110.00$ 8,110.00$ 48 Furnish & Install Tree Well – Std. 8130, 6’ x 6’EA 1 7,000.00$ 7,000.00$ 8,800.00$ 8,800.00$ 49 Enlarge Tree Grate Opening EA 20 250.00$ 5,000.00$ 400.00$ 8,000.00$ 50 Catch basin – Std. 3350 EA 1 15,000.00$ 15,000.00$ 22,200.00$ 22,200.00$ 51 Catch basin – Std. 3355 EA 1 18,000.00$ 18,000.00$ 25,000.00$ 25,000.00$ 52 Catch basin – Std. 3355A EA 1 12,000.00$ 12,000.00$ 21,000.00$ 21,000.00$ 53 Catch basin – Std. 3360 EA 1 18,000.00$ 18,000.00$ 24,000.00$ 24,000.00$ 54 Adjust Utility Cover – Std. 6040 EA 25 750.00$ 18,750.00$ 920.00$ 23,000.00$ 55 Manhole Frame & Cover Replacement – Std. 6040 EA 12 2,500.00$ 30,000.00$ 1,160.00$ 13,920.00$ 56 Manhole Replacement – Std. 3530 or 6610 EA 1 13,000.00$ 13,000.00$ 15,000.00$ 15,000.00$ 57 Manhole Coating EA 10 30,000.00$ 300,000.00$ 6,000.00$ 60,000.00$ 58 Construct Well / Cleanout – G5 – Std. 6710 EA 3 1,200.00$ 3,600.00$ 1,630.00$ 4,890.00$ 59 Potholing (Depth – 0’ to Under 4’)EA 20 650.00$ 13,000.00$ 625.00$ 12,500.00$ 60 Potholing (Depth – 4’ to Under 8’)EA 15 950.00$ 14,250.00$ 1,190.00$ 17,850.00$ 61 Potholing (Depth – 8’ and Over)EA 15 1,300.00$ 19,500.00$ 2,200.00$ 33,000.00$ 62 Pipe Excavation & Restoration (Depth - 0’ to Under 2.5’)LF 20 200.00$ 4,000.00$ 198.00$ 3,960.00$ 63 Pipe Excavation & Restoration (Depth - 2.5’ to Under 8.5’) Shoring Required LF 20 400.00$ 8,000.00$ 342.00$ 6,840.00$ 64 Pipe Excavation & Restoration (Depth – 8.5’ and Over) Shoring Required LF 20 650.00$ 13,000.00$ 524.00$ 10,480.00$ 65 Traffic Control – Eng. Std. Appendix G – Figure A HR 40 130.00$ 5,200.00$ 200.00$ 8,000.00$ 66 Traffic Control – Eng. Std. Appendix G – Figure B HR 70 250.00$ 17,500.00$ 200.00$ 14,000.00$ 67 Traffic Control – Eng. Std. Appendix G – Figure C HR 10 200.00$ 2,000.00$ 200.00$ 2,000.00$ 68 Traffic Control – Eng. Std. Appendix G – Figure D HR 30 250.00$ 7,500.00$ 200.00$ 6,000.00$ 69 Traffic Control – Eng. Std. Appendix G – Figure E HR 90 150.00$ 13,500.00$ 200.00$ 18,000.00$ 70 Traffic Control – Eng. Std. Appendix G – Figure F HR 10 200.00$ 2,000.00$ 200.00$ 2,000.00$ 71 Traffic Control – Eng. Std. Appendix G – Figure G HR 20 200.00$ 4,000.00$ 200.00$ 4,000.00$ 72 Traffic Control – Eng. Std. Appendix G – Figure H HR 40 150.00$ 6,000.00$ 200.00$ 8,000.00$ 73 Traffic Control – Eng. Std. Appendix G – Figure I HR 10 200.00$ 2,000.00$ 200.00$ 2,000.00$ 74 Traffic Control – Eng. Std. Appendix G – Figure J HR 10 200.00$ 2,000.00$ 200.00$ 2,000.00$ 75 Traffic Control – Eng. Std. Appendix G – Figure K HR 110 165.00$ 18,150.00$ 200.00$ 22,000.00$ 76 Traffic Control – Eng. Std. Appendix G – Figure L HR 20 350.00$ 7,000.00$ 300.00$ 6,000.00$ 77 Traffic Control – Eng. Std. Appendix G – Figure M HR 200 130.00$ 26,000.00$ 250.00$ 50,000.00$ 78 Traffic Control – Eng. Std. Appendix G – Figure N HR 30 250.00$ 7,500.00$ 300.00$ 9,000.00$ 79 Traffic Control – Eng. Std. Appendix G – Figure O HR 20 280.00$ 5,600.00$ 300.00$ 6,000.00$ 80 Traffic Control – Eng. Std. Appendix G – Figure P HR 100 100.00$ 10,000.00$ 116.00$ 11,600.00$ 81 Minor Traffic Control HR 1,000 75.00$ 75,000.00$ 280.00$ 280,000.00$ 82 Abandon and Grout (E) Sanitary Sewer with Flowable Fill CY 100 150.00$ 15,000.00$ 106.00$ 10,600.00$ 83 2" SCH 40 Conduit, 2- Sack Concrete Capped LF 300 60.00$ 18,000.00$ 55.00$ 16,500.00$ 84 4" SCH 40 Conduit, 2- Sack Concrete Capped LF 500 65.00$ 32,500.00$ 62.00$ 31,000.00$ 85 2" SCH 40 Conduit, 2- City Std. 6035- Trench Detail LF 300 65.00$ 19,500.00$ 42.00$ 12,600.00$ 86 4" SCH 40 Conduit, 2- City Std. 6035- Trench Detail LF 500 70.00$ 35,000.00$ 54.00$ 27,000.00$ 87 Electrical Pull Box, PG&E Type #2 (17"x30"x26)EA 10 1,000.00$ 10,000.00$ 540.00$ 5,400.00$ 88 Pexco City Post (EAC Mount), 36” height, white w/ 3 grey retroreflective strips (or approved equal)EA 30 250.00$ 7,500.00$ 329.00$ 9,870.00$ 89 Pexco City Post (EAC Mount), 18” height, white w/ 3 yellow retroreflective strips EA 20 225.00$ 4,500.00$ 300.00$ 6,000.00$ 1,347,636.00$ 1,260,285.00$ TOTAL PROJECT BID