Loading...
HomeMy WebLinkAboutBid Results Phase 1BBid Item Description Measurement Quantity 1 Phase 1B.1 Demolition of Residential Structures on Site LS 1 2 Phase 1B.2 Demolition of Parking Lot and Site Preparation LS 1 TOTAL $383,054.00 TOTAL $511,700.00 TOTAL $435,000.00 TOTAL $795,000.00 $665,000.00 $130,000.00 $121,951.00 $261,103.00 $367,000.00 $144,700.00 $190,000.00 $245,000.00 Edwards Construction Group, Inc John Madonna Construction Co Inc David Crye General Engineering Contractor, Inc. Bowen Engineering and Environmental Item Amount Item Amount Item Amount Item Amount